JP5525947B2 - Removal method of soil cement column - Google Patents

Removal method of soil cement column Download PDF

Info

Publication number
JP5525947B2
JP5525947B2 JP2010159562A JP2010159562A JP5525947B2 JP 5525947 B2 JP5525947 B2 JP 5525947B2 JP 2010159562 A JP2010159562 A JP 2010159562A JP 2010159562 A JP2010159562 A JP 2010159562A JP 5525947 B2 JP5525947 B2 JP 5525947B2
Authority
JP
Japan
Prior art keywords
cement column
soil cement
hollow
support
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010159562A
Other languages
Japanese (ja)
Other versions
JP2012021310A (en
Inventor
正人 真島
雅一 藤田
英 塚本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HOKOKU ENGINEERING CO., LTD.
Original Assignee
HOKOKU ENGINEERING CO., LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HOKOKU ENGINEERING CO., LTD. filed Critical HOKOKU ENGINEERING CO., LTD.
Priority to JP2010159562A priority Critical patent/JP5525947B2/en
Publication of JP2012021310A publication Critical patent/JP2012021310A/en
Application granted granted Critical
Publication of JP5525947B2 publication Critical patent/JP5525947B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、ソイルセメントコラムがその使命を終えた後に簡単で確実に解体することができるソイルセメントコラムの構築方法と撤去方法に関するものである。
The present invention relates to a method for constructing and removing a soil cement column that can be easily and reliably disassembled after the soil cement column has finished its mission.

構造物を支持するソイルセメントコラムは、土と固化材の混合体のみで円筒状に構築するタイプと、円筒状の混合体の内部に鋼管を埋設する合成コラムが知られている。
いずれのタイプであっても、コラムがその使命を終えた場合に解体、撤去する必要に迫られることがあるが、その場合には次のような工法が採用されている。
<1> 地中のコンクリート、岩石、その他の硬質な障害物を破砕できる特殊な切削ビットを先端に取り付けたオーガーを回転貫入することによって、障害物を強制的に破壊する方法。
<2> ソイルセメントコラムの外径より大きい内径を備えたケーシングを圧入して周辺地盤の崩壊を防ぎながらコラムをケーシング内で所定の大きさに解体して撤去し、撤去後にケーシング内に土砂を埋め戻し、最後のケーシングを引き抜く方法。
As the soil cement column for supporting the structure, a type in which the soil cement column is constructed in a cylindrical shape only with a mixture of soil and solidified material and a synthetic column in which a steel pipe is embedded in the cylindrical mixture are known.
In any type, when the column finishes its mission, it may be necessary to dismantle and remove it. In that case, the following method is adopted.
<1> A method of forcibly destroying obstacles by rotating through an auger with a special cutting bit attached to the tip that can crush underground concrete, rocks and other hard obstacles.
<2> A casing having an inner diameter larger than the outer diameter of the soil cement column is press-fitted to dismantle the column to a predetermined size in the casing while preventing the surrounding ground from collapsing. Refilling and pulling out the last casing.

特開2008−267034号公報JP 2008-267034 A 特開2009−2056号公報JP 2009-2056 A 特開2010−65405号公報JP 2010-65405 A

前記した従来のソイルセメントコラムの撤去方法では、既設のソイルセメントコラム自体は撤去を目的として構築したものではないから、大規模な装置を使用して強力に破壊してゆくという不経済な方法であった。
In the conventional soil cement column removal method described above, the existing soil cement column itself is not constructed for the purpose of removal, so it is an uneconomical method of using a large-scale device to destroy it strongly. there were.

上記のような課題を解決するために、本発明のソイルセメントコラムの撤去方法は、中空ロッドの周囲に攪拌翼を取り付けた攪拌ロッドを使用し、固化材を吐出しながら攪拌ロッドを地中に回転させて貫入し、中空ロッドの周囲に土砂と固化材を攪拌したソイルセメントコラムを形成し、その後に中空ロッドの内部に、支持兼ガイド管として端部を開放した鋼管を挿入し、内部に固化材を充填した支持兼ガイド管を地中に残して攪拌ロッドを回転しながら引き上げて構築したソイルセメントコラムにおいて、切削ビット付きの中空オーガーを使用し、前記の支持兼ガイド管をガイドとして、その外周に中空オーガーを嵌合して、ソイルセメントコラム内に回転させて貫入し、ソイルセメントコラムの先端まで粉砕したら、中空オーガーの内部から支持兼ガイド管を引き上げ、中空オーガーを通して埋め戻し土を充填しながら中空オーガーを引き上げて、ソイルセメントコラムを埋め戻し土に置き換えることを特徴としたものである。
In order to solve the problems as described above, the soil cement column removal method of the present invention uses a stirring rod having a stirring blade attached around a hollow rod, and the stirring rod is brought into the ground while discharging the solidified material. Rotating and penetrating, forming a soil cement column with the earth and sand and solidified material agitated around the hollow rod, and then inserting a steel pipe with an open end as a support and guide pipe inside the hollow rod, In a soil cement column constructed by pulling up while rotating the stirring rod while leaving the support and guide tube filled with the solidifying material in the ground, using a hollow auger with a cutting bit, the support and guide tube as a guide, Fit a hollow auger on the outer circumference, rotate it into the soil cement column, squeeze it to the tip of the soil cement column, Pull up al support and guide tube, raising the hollow auger while filling the backfill soil through the hollow auger is obtained by said replacing the return soil fill soil cement column.

本発明のソイルセメントコラムの撤去方法は以上説明したようになるから次のような効果を得ることができる。
<1> 地中に設置した支持兼ガイド管をガイドとして中空オーガーを貫入して撤去するから、中空オーガーが水平方向に逃げることがなく、正確に支持兼ガイド管の先端の深さまでソイルセメントコラムを切削して埋め戻し土と置き換えることができる。
<2> ソイルセメントコラムの中心に位置している支持兼ガイド管をガイド部材として切削ビット付き中空オーガーを回転貫入して撤去する方法であるために、ソイルセメントコラムを確実に破壊することができる。
<3> ソイルセメントコラムの撤去の際には、中空オーガーを引抜く際に、破砕したソイルセメントコラムの破砕片を地上に排出しながら埋め戻し土で充填するので、地盤を緩めることがない。
<4> ソイルセメントコラムは、中心に支持兼ガイド管が位置し、その内部にセメントスラリーなどの固化材が充填してあるから、硬化後の固化材に高い圧縮強度を期待できるので、鋼管である支持兼ガイド管と内部固化材との相乗効果によって高い支持補助部材として機能させることができる。
<5> 上記のように高い支持性能を期待できるから、支持兼ガイド管の肉厚を薄くすることができ、多数本を打設する場合にはきわめて経済的である。

Withdrawal removed by the method of soil cement column of the present invention can obtain the following effects because so described above.
<1> Since the hollow auger penetrates and is removed using the support and guide tube installed in the ground as a guide, the hollow auger does not escape in the horizontal direction, and the soil cement column accurately reaches the tip of the support and guide tube. Can be cut and replaced with backfill soil.
<2> Since the hollow auger with a cutting bit is rotationally penetrated and removed using the support and guide tube located at the center of the soil cement column as a guide member, the soil cement column can be reliably destroyed. .
<3> When the soil cement column is removed, when the hollow auger is pulled out, the crushed pieces of the soil cement column are filled with the backfill soil while being discharged to the ground, so that the ground is not loosened.
<4> The soil cement column has a support and guide tube located at the center and is filled with a solidifying material such as cement slurry. Therefore, the solidified material after hardening can be expected to have high compressive strength. It can be made to function as a high support auxiliary member by the synergistic effect of a certain support and guide tube and the internal solidifying material.
<5> Since a high support performance can be expected as described above, the thickness of the support / guide tube can be reduced, and it is extremely economical to place a large number of tubes.

本発明のソイルセメントコラムの実施例の一部断面図。The partial cross section figure of the Example of the soil cement column of this invention. ソイルセメントコラムの構築順序の説明図。Explanatory drawing of the construction order of a soil cement column. ソイルセメントコラムの構築順序の説明図。Explanatory drawing of the construction order of a soil cement column. ソイルセメントコラムの構築順序の説明図。Explanatory drawing of the construction order of a soil cement column. ソイルセメントコラムの構築順序の説明図。Explanatory drawing of the construction order of a soil cement column. ソイルセメントコラムの構築順序の説明図。Explanatory drawing of the construction order of a soil cement column. ソイルセメントコラムの構築順序の説明図。Explanatory drawing of the construction order of a soil cement column. 完成したソイルセメントコラムの説明図。Illustration of the completed soil cement column. ソイルセメントコラムの撤去順序の説明図。Explanatory drawing of removal order of soil cement column. ソイルセメントコラムの撤去順序の説明図。Explanatory drawing of removal order of soil cement column. ソイルセメントコラムの撤去順序の説明図。Explanatory drawing of removal order of soil cement column. ソイルセメントコラムの撤去順序の説明図。Explanatory drawing of removal order of soil cement column. ソイルセメントコラムの撤去順序の説明図。Explanatory drawing of removal order of soil cement column. 撤去完了状態の説明図。Explanatory drawing of a removal completion state.

以下図面を参照にしながら本発明の好適な実施の形態を詳細に説明する。   DESCRIPTION OF EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

<1>ソイルセメントコラムの構築方法。
まず本発明のソイルセメントコラムを構築する方法について説明する。
<1> Construction method of soil cement column.
First, a method for constructing the soil cement column of the present invention will be described.

<2>攪拌ロッド。(図2)
本発明のソイルセメントコラム1の構築方法では、中空ロッド21の周囲に攪拌翼22を取り付けた攪拌ロッド2を使用する。
さらに詳細に説明すれば、筒状の中空ロッド21の先端には、中空ロッド21の中心軸と直交する方向に、一定長さの腕23を突設し、その腕23に複数のビット24を固定してある。
前記したように筒状の中空ロッド21の周囲には、中空ロッド21の中心軸と直交する方向に、一定長さの攪拌翼22を突設してあるから、攪拌翼22の先端の描く軌跡が、ソイルセメントコラム1の外径となる。
中空ロッド21の内部は貫通しており、上端からセメントスラリーのような固化材3を供給すれば、中空ロッド21の下端から吐出することができる。
中空ロッド21の内径は、後述する支持兼ガイド管4を内包できる寸法に構成する。
中空ロッド21の下端には、支持兼ガイド管4に押圧力を付与することで分離可能な先端ビット25を取り付け、この先端ビット25に吐出口を開口して、固化材3の吐出が可能であるように構成する。
中空ロッド21の周辺にも吐出口を開口することもできる。
<2> Stir rod. (Figure 2)
In the method for constructing the soil cement column 1 of the present invention, the stirring rod 2 in which the stirring blade 22 is attached around the hollow rod 21 is used.
More specifically, an arm 23 having a predetermined length is projected from the end of the cylindrical hollow rod 21 in a direction orthogonal to the central axis of the hollow rod 21, and a plurality of bits 24 are provided on the arm 23. It is fixed.
As described above, the stirring blade 22 having a fixed length is provided around the cylindrical hollow rod 21 in a direction orthogonal to the central axis of the hollow rod 21, and therefore the locus drawn by the tip of the stirring blade 22. Is the outer diameter of the soil cement column 1.
The inside of the hollow rod 21 penetrates, and if the solidifying material 3 such as cement slurry is supplied from the upper end, the hollow rod 21 can be discharged from the lower end.
The inner diameter of the hollow rod 21 is configured to have a dimension capable of containing a support / guide tube 4 described later.
A tip bit 25 that can be separated by applying a pressing force to the support and guide tube 4 is attached to the lower end of the hollow rod 21, and a discharge port is opened in the tip bit 25, so that the solidified material 3 can be discharged. Configure to be.
A discharge port can also be opened around the hollow rod 21.

<3>攪拌ロッドの貫入。(図3)
上記した攪拌ロッド2を地表面に鉛直に設置する。
そして攪拌ロッド2の上端から固化材3を注入しつつ、回転を与える。
こうして先端から固化材3を吐出しながら攪拌ロッド2を地中に回転させて攪拌翼22の先端の描く軌跡の範囲内に土砂と固化材3を攪拌した攪拌域11を形成しながら貫入して行く。
<3> Penetration of the stirring rod. (Figure 3)
The above-described stirring rod 2 is installed vertically on the ground surface.
And rotation is given, inject | pouring the solidification material 3 from the upper end of the stirring rod 2. FIG.
In this way, the agitation rod 2 is rotated into the ground while discharging the solidified material 3 from the tip, and penetrates while forming the agitation zone 11 where the earth and sand and the solidified material 3 are agitated within the range drawn by the tip of the agitating blade 22. go.

<4>攪拌域の形成。(図4)
攪拌ロッド2の回転によって攪拌翼22が中空ロッド21の周囲の土砂と、先端や周囲から吐出した固化材3を攪拌する。
このような攪拌によって、土砂と固化材3を攪拌できるから、中空ロッド21の周囲には、攪拌翼22の先端の軌跡を外径とした円柱状の攪拌域11を形成することができる。
<4> Formation of a stirring zone. (Fig. 4)
By the rotation of the stirring rod 2, the stirring blade 22 stirs the earth and sand around the hollow rod 21 and the solidified material 3 discharged from the tip or the surroundings.
Since the earth and sand and the solidified material 3 can be agitated by such agitation, a columnar agitation zone 11 having an outer diameter of the locus of the agitating blade 22 can be formed around the hollow rod 21.

<5>鋼管の挿入。(図5)
攪拌ロッド2の中心の中空ロッド21の内部にも固化材3が充填されている。
そこで攪拌ロッド2が計画深さまで到達したら回転を停止し、中空ロッド21の内部に鋼管4を挿入する。
この鋼管4が、支持兼ガイド管4としての機能を果たすものである。
中空ロッド21の内部の固化材3はまだ固化していないので、支持兼ガイド管4としての鋼管(支持兼ガイド管)4を容易に挿入することができる。
支持兼ガイド管4は、その端部を開口した管体なので、支持兼ガイド管4は挿入にしたがってその内部にも固化材3が充填される。
<5> Insert steel pipe. (Fig. 5)
The solidified material 3 is also filled inside the hollow rod 21 at the center of the stirring rod 2.
Therefore, when the stirring rod 2 reaches the planned depth, the rotation is stopped and the steel pipe 4 is inserted into the hollow rod 21.
The steel pipe 4 serves as a support / guide pipe 4.
Since the solidified material 3 inside the hollow rod 21 is not yet solidified, a steel pipe (support / guide pipe) 4 as the support / guide pipe 4 can be easily inserted.
Since the support / guide tube 4 is a tubular body having an open end, the support / guide tube 4 is filled with the solidified material 3 as it is inserted.

<6>攪拌ロッドの引き上げ。
支持兼ガイド管4の先端が中空ロッド21の先端の位置に達するまで、中空ロッド21の内部に挿入する。(図6)
挿入が完了したら、その支持兼ガイド管4を地中に残して攪拌ロッド2を引き上げる。(図7)
その際に中空ロッド21の先端の蓋は地中に残しておく。
攪拌ロッド2の引き上げに際しては、攪拌ロッド2を回転しながら引き上げて行くので周囲の土砂はさらに固化材3との攪拌が促進されて均一で良質な攪拌域11を構築することができる。
このように支持兼ガイド管4の周囲の土砂が攪拌されるので、支持兼ガイド管4の外周に付着していた固化材3の膜は破砕されて周囲のソイルセメントコラム1内に分散してゆく。
こうして、中心の鋼管(支持兼ガイド管)4の内部に高強度の固化材3が充填してあり、その周囲には円筒状の攪拌域11を備えたソイルセメントコラム1が完成する。(図1、8)
<6> Pull up the stirring rod.
The support / guide tube 4 is inserted into the hollow rod 21 until the tip of the support / guide tube 4 reaches the position of the tip of the hollow rod 21. (Fig. 6)
When the insertion is completed, the stirring rod 2 is pulled up with the support / guide tube 4 remaining in the ground. (Fig. 7)
At that time, the lid at the tip of the hollow rod 21 is left in the ground.
When the stirring rod 2 is pulled up, the stirring rod 2 is pulled up while rotating, so that the surrounding earth and sand are further promoted to be stirred with the solidifying material 3 and a uniform and high-quality stirring zone 11 can be constructed.
Since the earth and sand around the support / guide tube 4 is agitated in this way, the film of the solidified material 3 adhering to the outer periphery of the support / guide tube 4 is crushed and dispersed in the surrounding soil cement column 1. go.
Thus, a solid cement column 1 having a cylindrical stirring zone 11 is completed around the central steel pipe (support / guide pipe) 4 filled with the high-strength solidified material 3. (Figs. 1 and 8)

<7>ソイルセメントコラムの撤去方法。
次に上記の工程で構築したソイルセメントコラム1の撤去方法について説明する。
<7> How to remove the soil cement column.
Next, the removal method of the soil cement column 1 constructed | assembled by said process is demonstrated.

<8>中空オーガー(図9)。
杭の撤去に際しては、ソイルセメントコラム1を破砕して地上に押し出して排除する必要がある。
そのために中心の中空筒51の外周に螺旋翼52を取り付けた中空オーガー5を使用する。
この中空オーガー5の先端にはソイルセメントコラム1を切削するための切削ビット53を設けてある。
中空オーガー5の先端の切削ビット53は、中空筒51の中心軸と直交する方向に突出させた腕に掘削刃を固定したものである。
この腕の先端の回転軌跡が、構築したソイルセメントコラム1の外径にほぼ等しい。
<8> Hollow auger (FIG. 9).
When removing the pile, it is necessary to crush the soil cement column 1 and push it out to the ground.
For this purpose, a hollow auger 5 having a spiral blade 52 attached to the outer periphery of the central hollow cylinder 51 is used.
A cutting bit 53 for cutting the soil cement column 1 is provided at the tip of the hollow auger 5.
The cutting bit 53 at the tip of the hollow auger 5 is obtained by fixing an excavating blade to an arm that protrudes in a direction perpendicular to the central axis of the hollow cylinder 51.
The rotation trajectory of the tip of the arm is almost equal to the outer diameter of the constructed soil cement column 1.

<9>支持兼ガイド管の嵌合。(図9)
前記の工程で構築したソイルセメントコラム1の支持兼ガイド管4の真上の、中空オーガー5の中心の中空筒51を嵌合する。
中空オーガー5の中空筒51の内径は、支持兼ガイド管4の外径よりも多少大きい寸法に構成してあるので、中空筒51を支持兼ガイド管4の外周に嵌合することができる。
<9> Fitting of support and guide tube. (Fig. 9)
The hollow cylinder 51 at the center of the hollow auger 5 just above the support / guide pipe 4 of the soil cement column 1 constructed in the above-described process is fitted.
Since the inner diameter of the hollow cylinder 51 of the hollow auger 5 is configured to be slightly larger than the outer diameter of the support / guide tube 4, the hollow cylinder 51 can be fitted to the outer periphery of the support / guide tube 4.

<10>ソイルセメントコラムの粉砕(図10)。
支持兼ガイド管4の外周に中空オーガー5を嵌合して回転を与えると、中空オーガー5は中心の支持兼ガイド管4をガイドとして正確に地中に侵入することになる。
一般に中空オーガー5は切削中に、地盤の軟弱な方へ移動しやすく、正確に鉛直性を維持することが困難である。
しかし本願発明の工法では中心に支持兼ガイド管4が位置しており、その支持兼ガイド管4をガイドとして貫入して行くので正確な鉛直性を確保することが容易である。
こうして、中空オーガー5を、ソイルセメントコラム1内に回転させて貫入し、先端の切削ビット53でソイルセメントコラム1を粉砕してその先端まで破壊してゆく。(図11)
<10> Grinding of the soil cement column (FIG. 10).
When the hollow auger 5 is fitted to the outer periphery of the support / guide tube 4 and rotated, the hollow auger 5 accurately enters the ground using the central support / guide tube 4 as a guide.
In general, the hollow auger 5 is likely to move to a softer ground during cutting, and it is difficult to accurately maintain the verticality.
However, in the method of the present invention, the support / guide tube 4 is located at the center, and the support / guide tube 4 penetrates as a guide, so that it is easy to ensure accurate verticality.
Thus, the hollow auger 5 is rotated and penetrated into the soil cement column 1, and the soil cement column 1 is crushed by the cutting bit 53 at the tip and broken to the tip. (Fig. 11)

<11>支持兼ガイド管の引き上げ。(図12)
中空オーガー5がソイルセメントコラム1の先端まで切削したら、中空オーガー5の回転を停止する。
そして中空オーガー5の中心の中空筒51内に取り込んだ支持兼ガイド管4を地上に引き上げて抜き取る。
その結果、中空オーガー5の中空筒51の内部は空洞となる。
<11> Pull up the support and guide tube. (Fig. 12)
When the hollow auger 5 has been cut to the tip of the soil cement column 1, the rotation of the hollow auger 5 is stopped.
Then, the support / guide tube 4 taken into the hollow cylinder 51 at the center of the hollow auger 5 is pulled up to the ground and extracted.
As a result, the hollow cylinder 51 of the hollow auger 5 is hollow.

<12>埋め戻し土の充填。(図13)
空洞になった中空筒51の内部に、地上から埋め戻し土6を投入する。
そして中空オーガー5に引抜き方向の回転とは逆の回転を与えつつ引き上げてゆく。
この中空オーガー5の引き上げによって螺旋翼52の周囲にある、破壊されたソイルセメントコラム1の粒子は地上に押し出されて回収できる。
同時に中空筒51を通して供給した埋め戻し土6は、その先端からソイルセメントコラム1と置き換わって充填が行われる。
このように、地上に排出するソイルセメントコラム1の量に応じて、埋め戻し土6を供給して置き換えるから、周囲の地盤が緩むことがない。
こうしてソイルセメントコラム1の撤去が完了する。(図14)
<12> Filling with backfilling soil. (Fig. 13)
The backfill soil 6 is thrown into the hollow cylinder 51 that has become a hollow space from the ground.
Then, the hollow auger 5 is pulled up while giving a rotation opposite to the rotation in the pulling direction.
By pulling up the hollow auger 5, the broken particles of the soil cement column 1 around the spiral blade 52 are pushed out to the ground and can be recovered.
At the same time, the backfilling soil 6 supplied through the hollow cylinder 51 is replaced with the soil cement column 1 from the tip thereof and is filled.
Thus, since the backfill soil 6 is supplied and replaced according to the amount of the soil cement column 1 discharged to the ground, the surrounding ground does not loosen.
Thus, the removal of the soil cement column 1 is completed. (Fig. 14)

1:ソイルセメントコラム
11:攪拌域
2:攪拌ロッド
3:固化材
4:鋼管(支持兼ガイド管)
5:中空オーガー
6:埋め戻し土
1: Soil cement column 11: Stir zone 2: Stir rod 3: Solidified material 4: Steel pipe (support and guide pipe)
5: Hollow auger 6: Backfill soil

Claims (1)

中空ロッドの周囲に攪拌翼を取り付けた攪拌ロッドを使用し、
固化材を吐出しながら攪拌ロッドを地中に回転させて貫入し、
中空ロッドの周囲に土砂と固化材を攪拌したソイルセメントコラムを形成し、
その後に中空ロッドの内部に、支持兼ガイド管として端部を開放した鋼管を挿入し、
内部に固化材を充填した支持兼ガイド管を地中に残して攪拌ロッドを回転しながら引き上げて構築したソイルセメントコラムにおいて、
切削ビット付きの中空オーガーを使用し、
前記の支持兼ガイド管をガイドとして、
その外周に中空オーガーを嵌合して、ソイルセメントコラム内に回転させて貫入し、
ソイルセメントコラムの先端まで粉砕したら、中空オーガーの内部から支持兼ガイド管を引き上げ、
中空オーガーを通して埋め戻し土を充填しながら中空オーガーを引き上げて、ソイルセメントコラムを埋め戻し土に置き換えることを特徴とする、
ソイルセメントコラムの撤去方法
Use a stirring rod with a stirring blade around the hollow rod,
While discharging the solidified material, rotate the stirring rod into the ground and penetrate,
A soil cement column in which earth and sand and solidifying material are stirred around the hollow rod is formed.
After that, inside the hollow rod, insert a steel pipe with an open end as a support and guide pipe,
In the soil cement column constructed by pulling up while rotating the stirring rod leaving the support and guide tube filled with solidification material in the ground ,
Use a hollow auger with a cutting bit,
Using the support and guide tube as a guide,
A hollow auger is fitted to the outer periphery, and it is inserted into the soil cement column by rotating it.
After grinding to the tip of the soil cement column, pull up the support and guide tube from the inside of the hollow auger,
While filling the backfilling soil through the hollow auger, the hollow auger is pulled up to replace the soil cement column with backfilling soil,
How to remove the soil cement column .
JP2010159562A 2010-07-14 2010-07-14 Removal method of soil cement column Active JP5525947B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010159562A JP5525947B2 (en) 2010-07-14 2010-07-14 Removal method of soil cement column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010159562A JP5525947B2 (en) 2010-07-14 2010-07-14 Removal method of soil cement column

Publications (2)

Publication Number Publication Date
JP2012021310A JP2012021310A (en) 2012-02-02
JP5525947B2 true JP5525947B2 (en) 2014-06-18

Family

ID=45775783

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010159562A Active JP5525947B2 (en) 2010-07-14 2010-07-14 Removal method of soil cement column

Country Status (1)

Country Link
JP (1) JP5525947B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389309A (en) * 2014-11-21 2015-03-04 淮海工学院 Sand pile construction method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5730826B2 (en) * 2012-08-02 2015-06-10 株式会社設計室ソイル Construction method of soil cement column easy to remove
JP2014218817A (en) * 2013-05-08 2014-11-20 日本ベース株式会社 Earth auger and method for removing underground obstacle
JP6334761B2 (en) * 2017-02-27 2018-05-30 株式会社新生工務 Pile reinforcement structure construction method and apparatus
JP6328814B2 (en) * 2017-02-27 2018-05-23 株式会社新生工務 Pile reinforcement structure construction method and apparatus
CN113668511B (en) * 2021-08-23 2022-08-02 中国港湾工程有限责任公司 Building pile foundation and construction method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2630709B2 (en) * 1992-05-15 1997-07-16 財団法人鉄道総合技術研究所 Tensile reinforcement construction equipment
JPH09268554A (en) * 1996-03-27 1997-10-14 Nippon Sogo Bosui Kk Construction method of basic pile and device thereof
JP4672209B2 (en) * 2001-08-10 2011-04-20 株式会社テノックス Soil-cement pillars having a small-diameter steel pipe as a core material and construction method
JP3987989B2 (en) * 2002-05-30 2007-10-10 株式会社テノックス Construction method of soil cement pile with core material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389309A (en) * 2014-11-21 2015-03-04 淮海工学院 Sand pile construction method

Also Published As

Publication number Publication date
JP2012021310A (en) 2012-02-02

Similar Documents

Publication Publication Date Title
JP5525947B2 (en) Removal method of soil cement column
JP6343445B2 (en) Construction method of earth retaining wall
JP2008075266A (en) Method of constructing pile
KR101900343B1 (en) Boring and mixing machine with streamline structure for soil-cement body and the construction method therefor
JP5852038B2 (en) Construction method of on-site cast-in-place concrete piles and steel pipes with excavation blades
KR20140089680A (en) Piles for self-enlargement and construction method thereof
JP6836284B2 (en) How to drive foundation piles and foundation piles
JP5730826B2 (en) Construction method of soil cement column easy to remove
JP2006342560A (en) Construction method of foundation pile
JP5140136B2 (en) Ground improvement body, ground improvement method
JP2005282063A (en) Composite field preparation pile, its construction method and device for preparing composite field preparation pile
JP6320951B2 (en) Construction method of freely expanding reinforcement body using partial cylinder and seismic reinforcement method for existing soil structure using the reinforcement body
JPH04185813A (en) Formation of soil-cement composite pile
JP2014134000A (en) On-site drive type tapered concrete-based knotted pile, construction method thereof and steel pipe for construction
JP3748024B2 (en) Method for reducing soil discharge of synthetic steel pipe piles
JP5499335B2 (en) Steel pipe pile and support structure and construction method using the steel pipe pile
JP2012067561A (en) Ground excavation method
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
JP4853132B2 (en) Construction method of foundation pile
JP6320359B2 (en) Remaining pile crushing method
JP5132701B2 (en) Construction method of columnar ground improvement body
JP4200237B2 (en) Construction method of foundation pile
JP5777424B2 (en) Ground excavation method
JP2013133630A (en) Excavation rod and construction method
JP2009150157A (en) Construction device and method for soil cement column

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130416

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140128

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140214

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140401

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140414

R150 Certificate of patent or registration of utility model

Ref document number: 5525947

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250