JP5458393B2 - Beam structure - Google Patents

Beam structure Download PDF

Info

Publication number
JP5458393B2
JP5458393B2 JP2010187427A JP2010187427A JP5458393B2 JP 5458393 B2 JP5458393 B2 JP 5458393B2 JP 2010187427 A JP2010187427 A JP 2010187427A JP 2010187427 A JP2010187427 A JP 2010187427A JP 5458393 B2 JP5458393 B2 JP 5458393B2
Authority
JP
Japan
Prior art keywords
steel plate
concrete
opening
rib
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010187427A
Other languages
Japanese (ja)
Other versions
JP2012046894A (en
Inventor
和也 太田
竜介 池田
亮太 高濱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2010187427A priority Critical patent/JP5458393B2/en
Publication of JP2012046894A publication Critical patent/JP2012046894A/en
Application granted granted Critical
Publication of JP5458393B2 publication Critical patent/JP5458393B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Rod-Shaped Construction Members (AREA)

Description

本発明は、梁構造に関し、特に、SC梁の構造に関する。   The present invention relates to a beam structure, and more particularly to the structure of an SC beam.

従来、SC構造(鋼板コンクリート構造)を採用する場合には、フルSC構造の梁と柱で構成するフレーム構造とすることが知られている(例えば、特許文献1参照)。このようなフレーム構造では、鋼板の枠内にコンクリートを打設して一体化させることが可能となるので、型枠が不要である。ところが、ハーフSC構造梁にあっては、打設したコンクリートの荷重全てを鋼板で負担する必要があるため、鋼板の座屈に対する補強が不可欠となっている。   Conventionally, when adopting an SC structure (steel plate concrete structure), it is known to have a frame structure composed of beams and columns of a full SC structure (see, for example, Patent Document 1). In such a frame structure, concrete can be cast and integrated in a steel plate frame, so that no formwork is required. However, in the half SC structure beam, since it is necessary to bear all the loads of the cast concrete with the steel plate, reinforcement against the buckling of the steel plate is indispensable.

そして、コンクリート打設荷重に対する鋼板の座屈防止方法としては、底面フランジ鋼板を支持する支保工を設置するか、対向するウェブ鋼板に対して、せん断座屈補強を目的とした中間スチフナを配置し、曲げおよび圧縮座屈補強を目的とした水平スチフナを配置して格子状にスチフナを構成することが行われる。
また、梁をハーフSCとして構成するフレーム構造において、ウェブ鋼板部分にH型鋼のような剛性の高い型鋼を採用してコンクリート打設荷重を負担する構造が提案されている(例えば、特許文献2参照)。
As a method for preventing buckling of the steel plate against the concrete loading load, a support for supporting the bottom flange steel plate is installed, or an intermediate stiffener for the purpose of reinforcing shear buckling is arranged on the opposing web steel plate. A stiffener is formed in a lattice shape by arranging horizontal stiffeners for the purpose of bending and compression buckling reinforcement.
In addition, in a frame structure in which the beam is formed as a half SC, a structure in which a cast steel having a high rigidity such as H-shaped steel is used for the web steel plate portion to bear the concrete placing load has been proposed (for example, see Patent Document 2). ).

特開平5−331807号公報JP-A-5-331807 特開2002−4474号公報JP 2002-4474 A

しかしながら、従来の梁構造では、以下のような問題があった。
すなわち、特許文献1で開示されるようなフルSC梁の場合、コンクリートを打設する際に、梁上面の鋼板に打設用の開口や空気抜きの開口等が必要となりそれらの断面欠損に対する補剛が必要となっていた。しかも、上側フランジ鋼板に打設口を設ける構造となるので、梁上面におけるコンクリートの充填性が確認できないことや、コンクリートの硬化に伴う収縮によって鋼板とコンクリートの境界部に空隙ができ、スタッドの所定の耐力が得られない等といった不具合から、予め空隙率を考慮したスタッドの設計が必要になっていた。なお、コンクリートの充填性を確保するために、高流動コンクリートを採用する改善策も想定されるが、材料費が高価になる欠点があった。
However, the conventional beam structure has the following problems.
That is, in the case of a full SC beam as disclosed in Patent Document 1, when placing concrete, a steel plate on the upper surface of the beam requires an opening for casting, an opening for air venting, etc., and stiffening against these cross-sectional defects. Was needed. In addition, since the upper flange steel plate has a structure in which a casting opening is provided, it is impossible to confirm the filling property of the concrete on the upper surface of the beam, and there is a gap at the boundary between the steel plate and the concrete due to the shrinkage caused by the hardening of the concrete, and the predetermined stud In view of such a problem that the yield strength cannot be obtained, it is necessary to design a stud in consideration of the porosity. In addition, in order to ensure the filling property of the concrete, an improvement measure that adopts the high fluidity concrete is also assumed, but there is a disadvantage that the material cost becomes expensive.

また、ハーフSC梁を採用する場合、必要鉄筋量が多くなり、配筋の施工手間が増えるだけでなく、鉄筋定着にあたって取り合うSC柱の鋼板に鉄筋貫通用の開口が必要になる等、施工手間が大幅に増えるという問題があった。
さらに、特許文献2では、H形鋼をウェブ鋼板の代わりに用いる構成であるが、重量が大きく、取り扱い難いことから施工手間がかかるという問題があった。
In addition, when half SC beams are used, the required amount of reinforcing bars increases, which increases the time and effort for bar arrangements, as well as the need for openings for penetration of the reinforcing bars in the steel plates of the SC columns that are involved in fixing the reinforcing bars. There was a problem that there was a significant increase.
Furthermore, in patent document 2, although it is the structure which uses a H-section steel instead of a web steel plate, there existed a problem that construction work will start from weight being large and difficult to handle.

本発明は、上述する問題点に鑑みてなされたもので、耐力を低下させることなく、コンクリート打設口を設けることができるうえ、コンクリートの充填状態の確認が行え、さらに施工の効率化が図れる梁構造を提供することを目的とする。   The present invention has been made in view of the above-described problems. A concrete placement port can be provided without lowering the proof stress, the concrete filling state can be confirmed, and the construction efficiency can be improved. The purpose is to provide a beam structure.

上記目的を達成するため、本発明に係る梁構造では、両側面を形成して対向するウェブ鋼板および底面を形成するフランジ鋼板の内面にそれぞれ複数のスタッドが突設され、前記対向するウェブ鋼板と前記フランジ鋼板によって形成される領域内にコンクリートが充填され、領域の上部には、開口を形成する上側鋼板が設けられ、上側鋼板の下面には、開孔を有する第1リブ鋼板が鉛直方向に配設されていることを特徴としている。   In order to achieve the above-mentioned object, in the beam structure according to the present invention, a plurality of studs protrude from the inner surfaces of the opposing web steel plate and the flange steel plate forming the bottom surface, which form both side surfaces, Concrete is filled in the region formed by the flange steel plate, and an upper steel plate that forms an opening is provided in the upper portion of the region, and a first rib steel plate having an opening is vertically formed on the lower surface of the upper steel plate. It is characterized by being arranged.

本発明では、側面のウェブ鋼板と底面のフランジ鋼板とがスタッドを介して打設したコンクリートとの一体化が図れるとともに、梁上面側において、第1リブ鋼板が梁上面から間隔をもった内空側に位置し、その開孔にはコンクリートが確実に充填されるので、第1リブ鋼板の面内方向のせん断抵抗性能が付加されて所定の耐力が得られ、SC構造のスタッドと同様の機能もたせることができる。したがって、コンクリートの硬化に伴う収縮によって上側鋼板とコンクリートとの境界部に空隙部ができても、第1リブ鋼板の開孔にコンクリートが充填されていることで所定の耐力を確保することができる。   In the present invention, the web steel plate on the side surface and the flange steel plate on the bottom surface can be integrated with the concrete cast through the stud, and the first rib steel plate on the beam upper surface side has an internal space spaced from the beam upper surface. Since the concrete is surely filled in the opening, the shear resistance performance in the in-plane direction of the first rib steel plate is added, and a predetermined proof stress is obtained. Can be given. Therefore, even if a gap is formed at the boundary between the upper steel plate and the concrete due to the shrinkage accompanying the hardening of the concrete, the predetermined strength can be ensured by filling the opening in the first rib steel plate with the concrete. .

また、上側鋼板によって形成される開口がコンクリート打設口やその際の空気抜き孔として機能するため、従来のように梁上面に設けられる上側フランジ鋼板に打設用、空気抜き用として現場で開口を設ける必要がなくなる。そして、上述したように、第1リブ鋼板の開孔をコンクリートで充填することで、上側鋼板とコンクリートとが一体化されるので、その分だけ開口の面積や数量を増やすことが可能となり、これによりコンクリート打設時のコンクリート充填状態の確認が行え、品質を確保できる。
さらに、従来のハーフSC梁のように鉄筋を現地で組み立てる必要がなく、上側鋼板を他のSC部材とともに工場などで組み立てることが可能となるので、現地での組み立て手間が低減し、工期の短縮を図ることができる。
In addition, since the opening formed by the upper steel plate functions as a concrete casting port and an air vent hole at that time, the upper flange steel plate provided on the beam upper surface is provided with an opening at the site for casting and air venting as in the past. There is no need. And as above-mentioned, since the upper steel plate and concrete are integrated by filling the opening of a 1st rib steel plate with concrete, it becomes possible to increase the area and quantity of opening by that much, and this This makes it possible to check the concrete filling state when placing concrete and to ensure quality.
In addition, it is not necessary to assemble the reinforcing bars locally as with conventional half SC beams, and it is possible to assemble the upper steel plate together with other SC members at the factory, etc., reducing the labor for assembling locally and shortening the construction period. Can be achieved.

また、本発明に係る梁構造では、両側面を形成して対向するウェブ鋼板および底面を形成するフランジ鋼板の内面にそれぞれ複数のスタッドが突設され、対向するウェブ鋼板とフランジ鋼板によって形成される領域内にコンクリートが充填され、領域の上部には、開口を有するとともに、梁上面から間隔をもった内空側の位置に上側鋼板が設けられていることを特徴としている。   Further, in the beam structure according to the present invention, a plurality of studs protrude from the inner surfaces of the web steel plate and the flange steel plate forming the bottom surface that form both side surfaces, and are formed by the web steel plate and the flange steel plate facing each other. The region is filled with concrete, and the upper part of the region has an opening, and an upper steel plate is provided at a position on the inner space side spaced from the beam upper surface.

本発明では、側面のウェブ鋼板と底面のフランジ鋼板とがスタッドを介して打設したコンクリートとの一体化が図れるとともに、梁上面から間隔をもった内空側の位置に配される上側鋼板の開口にはコンクリートが確実に充填されて鋼板ジベルとなるので、上側鋼板における開口の厚さ方向のせん断抵抗性能が付加されて所定の耐力が得られ、SC構造のスタッドと同様の機能もたせることができる。   In the present invention, the side web steel plate and the bottom flange steel plate can be integrated with the concrete cast through the stud, and the upper steel plate disposed at the position on the inner space side spaced from the beam upper surface. Since the concrete is reliably filled in the opening to form a steel plate diver, a shear resistance performance in the thickness direction of the opening in the upper steel plate is added to obtain a predetermined proof stress, and the same function as the SC structure stud can be provided. it can.

また、上側鋼板の開口がコンクリート打設口やその際の空気抜き孔として機能するため、従来のフルSC梁のように梁上面に設けられる上側フランジ鋼板に打設用、空気抜き用として現場で開口を設ける必要がなくなる。そして、上述したように、梁上面までコンクリートを打設すれば上側鋼板の開口を確実にコンクリートで充填させることができ、上側鋼板とコンクリートとが一体化されることになる。そのため、上側鋼板の開口の面積や数量を増やすことが可能となり、これによりコンクリート打設時のコンクリート充填状態の確認が行え、品質を確保できる。
さらに、従来のハーフSC梁のように鉄筋を現地で組み立てる必要がなく、上側鋼板を他のSC部材とともに工場などで組み立てることが可能となるので、現地での組み立て手間が低減し、工期の短縮を図ることができる。
In addition, since the opening of the upper steel plate functions as a concrete placement port and an air vent hole at that time, the upper flange steel plate provided on the upper surface of the beam like a conventional full SC beam has an opening at the site for casting and air venting. There is no need to provide it. Then, as described above, if concrete is placed up to the upper surface of the beam, the opening of the upper steel plate can be reliably filled with concrete, and the upper steel plate and the concrete are integrated. Therefore, it is possible to increase the opening area and quantity of the upper steel plate, thereby confirming the concrete filling state at the time of placing the concrete and ensuring the quality.
In addition, it is not necessary to assemble the reinforcing bars locally as with conventional half SC beams, and it is possible to assemble the upper steel plate together with other SC members at the factory, etc., reducing the labor for assembling locally and shortening the construction period. Can be achieved.

また、本発明に係る梁構造では、上側鋼板は、梁の材軸方向に沿って延びる平鋼であることが好ましい。
この場合、平鋼の両側に材軸方向に連続する開口が形成されることとなり、この開口を使用してコンクリートの打設と空気抜きとを行うことができる。そして、梁上面に平鋼からなる上側鋼板を配置するだけの簡単な構成であり、鋼板に開口を開ける加工も不要となることから、施工のさらなる簡略化を図ることができる。
In the beam structure according to the present invention, the upper steel plate is preferably a flat steel extending along the beam axis direction of the beam.
In this case, openings that are continuous in the axial direction are formed on both sides of the flat steel, and it is possible to perform concrete placement and air venting using these openings. And since it is a simple structure which only arrange | positions the upper side steel plate which consists of a flat steel on a beam upper surface, and the process which opens an opening in a steel plate becomes unnecessary, the further simplification of construction can be aimed at.

また、本発明に係る梁構造では、上側鋼板は複数配列され、それぞれが連結鋼板によって接続されていることがより好ましい。
この場合、連結鋼板によって複数列の上側鋼板の位置が保持されて上側鋼板同士の間隔も一定に維持されるので、打設したコンクリートの圧力によって上側鋼板同士の間隔がずれて、開口の大きさが変化するのを防ぐことができ、せん断補強効果も期待することができる。
Further, in the beam structure according to the present invention, it is more preferable that a plurality of upper steel plates are arranged and connected by connecting steel plates.
In this case, the positions of the upper steel plates in a plurality of rows are maintained by the connecting steel plates, and the distance between the upper steel plates is also kept constant. Therefore, the distance between the upper steel plates is shifted by the pressure of the placed concrete, and the size of the opening Can be prevented and a shear reinforcement effect can also be expected.

また、本発明に係る梁構造では、第1リブ鋼板は、梁の材軸方向に延び、対向するウェブ鋼板間には、第1リブ鋼板同士を繋ぐタイバーが架設されていてもよい。
本発明では、第1リブ鋼板がタイバーを介してウェブ鋼板に接続されているので、第1リブ鋼板とコンクリートとの一体化において靭性を増大させることができる。
In the beam structure according to the present invention, the first rib steel plate may extend in the beam axis direction of the beam, and a tie bar connecting the first rib steel plates may be provided between the opposing web steel plates.
In this invention, since the 1st rib steel plate is connected to the web steel plate via the tie bar, toughness can be increased in the integration of the first rib steel plate and concrete.

また、本発明に係る梁構造では、上側鋼板には、開孔を有する第2リブ鋼板が鉛直方向に配設されていることが好ましい。
この場合、上側鋼板の開口に充填されるコンクリートによる耐力向上に加え、第2リブ鋼板の開孔にもコンクリートが確実に充填されるので、第2リブ鋼板の面内方向のせん断抵抗性能が付加されて所定の耐力が得られ、SC構造のスタッドと同様の機能もたせることができ、さらなる補強効果が得られる。
In the beam structure according to the present invention, it is preferable that the upper steel plate is provided with a second rib steel plate having an opening in the vertical direction.
In this case, in addition to improving the proof stress by the concrete filled in the opening of the upper steel plate, the concrete is also reliably filled in the opening of the second rib steel plate, so that the shear resistance performance in the in-plane direction of the second rib steel plate is added. Thus, a predetermined yield strength can be obtained, and a function similar to that of the stud having the SC structure can be provided, and a further reinforcing effect can be obtained.

本発明の梁構造によれば、上側鋼板に設けられる開口、又はリブ鋼板の開孔にコンクリートが充填されることでコンクリートとの一体化が図れ、所定の強度が確保できるので、SC梁としての耐力を低下させることなくコンクリート打設口や空気抜き孔、或いはコンクリート充填確認窓として機能する開口を鋼板に設けることができる。
また、鉄筋組立やH形鋼を用いる構造ではないことから、現地での施工の効率化が図れる利点がある。
According to the beam structure of the present invention, the concrete provided in the opening provided in the upper steel plate or the opening of the rib steel plate can be integrated with the concrete, and a predetermined strength can be secured. The steel plate can be provided with an opening that functions as a concrete placement port, an air vent hole, or a concrete filling confirmation window without reducing the proof stress.
Moreover, since it is not the structure which uses a rebar assembly or H-section steel, there exists an advantage which can aim at the efficiency of construction in a field.

本発明の第1の実施の形態による梁構造(SC梁)の概略構成を示す側断面図である。It is a sectional side view which shows schematic structure of the beam structure (SC beam) by the 1st Embodiment of this invention. SC梁の断面図であって、図1に示すA−A線断面図である。It is sectional drawing of SC beam, Comprising: It is the sectional view on the AA line shown in FIG. 図2に示すSC梁の部分拡大図である。It is the elements on larger scale of SC beam shown in FIG. SC梁の上面図であって、図1に示すB−B線矢視図である。It is a top view of SC beam, and is a BB line arrow view shown in FIG. 第2の実施の形態によるSC梁の断面図である。It is sectional drawing of SC beam by 2nd Embodiment. 図5に示すSC梁の部分拡大図である。It is the elements on larger scale of SC beam shown in FIG. SC梁の部分上面図である。It is a partial top view of SC beam.

以下、本発明の実施の形態による梁構造について、図面に基づいて説明する。   Hereinafter, a beam structure according to an embodiment of the present invention will be described with reference to the drawings.

(第1の実施の形態)
図1に示すように、本第1の実施の形態による梁構造は、SC造(鋼板コンクリート造)の柱(以下、「SC柱2」という)に接合するSC造の梁(以下、「SC梁1」という)を対象としている。ここで、SC梁1の材軸を符号Gで示す。
(First embodiment)
As shown in FIG. 1, the beam structure according to the first embodiment has an SC beam (hereinafter referred to as “SC column 2”) joined to an SC (steel plate concrete) column (hereinafter referred to as “SC column 2”). "Beam 1"). Here, the material axis of the SC beam 1 is indicated by G.

SC柱2は、断面視で外周面に鋼板21が巻かれており、その鋼板21の内面21aに垂直に立設された複数のスタッド22、22、…が設けられ、内部にはコンクリート23が充填された構造となっている。SC柱2には、SC梁1との接合部Tにおいて、SC梁1の上下の高さと同じ位置に水平ダイアフラム24(24A、24B)が設けられている。これら一対の水平ダイアフラム24A、24Bには、それぞれ作業用の開口部24a(図4参照)が設けられている。
そして、SC柱2のSC梁1が接続する端面の位置には、鉛直ダイアフラム25が設けられ、この鉛直ダイアフラム25には作業用の開口部25aが設けられている。
The SC column 2 has a steel plate 21 wound around its outer peripheral surface in a cross-sectional view, and is provided with a plurality of studs 22, 22,... It has a filled structure. The SC column 2 is provided with horizontal diaphragms 24 (24A, 24B) at the same position as the vertical height of the SC beam 1 at the joint T with the SC beam 1. Each of the pair of horizontal diaphragms 24A and 24B is provided with a working opening 24a (see FIG. 4).
And the vertical diaphragm 25 is provided in the position of the end surface to which the SC beam 1 of the SC pillar 2 connects, and the opening 25a for work is provided in this vertical diaphragm 25. FIG.

上側の水平ダイアフラム24Aの下面には、複数(ここでは4本)の平鋼からなるリブ鋼板26が長手方向をSC梁1の材軸G方向に平行に向けて互いに一定の離間間隔をおいて溶接されている(図1でリブ鋼板26は1枚のみが見えている)。これらリブ鋼板26は、後述するT型形状の孔開き鋼板15のリブ鋼板152に対して材軸G方向で同一線上に接続可能な位置に配置されている。   On the lower surface of the upper horizontal diaphragm 24A, a plurality of (here, four) rib steel plates 26 made of flat steel are spaced apart from each other with their longitudinal directions parallel to the material axis G direction of the SC beam 1. It is welded (only one rib steel plate 26 is visible in FIG. 1). The rib steel plates 26 are arranged at positions that can be connected on the same line in the direction of the material axis G with respect to the rib steel plates 152 of the T-shaped perforated steel plates 15 described later.

図2に示すように、SC梁1は、両側面を形成して対向するウェブ鋼板11、11と、底面を形成するフランジ鋼板12との内面にそれぞれ複数のスタッド13、13、…が溶着により突設され、ウェブ鋼板11、11とフランジ鋼板12によって形成される領域内にコンクリート14が充填された構成となっている。
これらスタッド13は、コンクリート14との付着強度を増大させるものであり、ボルト状の頭部を梁の内空側に位置させた状態で配置されている。
As shown in FIG. 2, the SC beam 1 has a plurality of studs 13, 13,... Welded to the inner surfaces of the web steel plates 11, 11 facing each other and forming the bottom surface, and the flange steel plate 12 forming the bottom surface. It has a configuration in which concrete 14 is filled in a region that is formed by projecting web steel plates 11 and 11 and flange steel plate 12.
These studs 13 increase the adhesion strength with the concrete 14, and are arranged in a state where the bolt-shaped head is positioned on the inner side of the beam.

図2乃至図4に示すように、SC梁1の上部(すなわち、ウェブ鋼板11、11とフランジ鋼板12によって形成される領域の上部)には、材軸G方向に延びる複数本(ここでは4本)の孔開き鋼板15、15、…が梁幅方向に所定の離間間隔をおいて配列されている。   As shown in FIGS. 2 to 4, a plurality (in this case, 4) extending in the direction of the material axis G is formed on the upper portion of the SC beam 1 (that is, the upper portion of the region formed by the web steel plates 11 and 11 and the flange steel plate 12). The perforated steel plates 15, 15,... Are arranged in the beam width direction with a predetermined spacing.

これら孔開き鋼板15は、それぞれ平鋼からなる主鋼板151(上側鋼板)とリブ鋼板152(第1リブ鋼板)とから断面視でT型形状に形成されている。主鋼板151は、面方向を水平方向に配置させ、その上面151a(図3)がSC梁1の梁上面1aの位置となっている。そして、隣り合う主鋼板151、151同士の間、および主鋼板151とウェブ鋼板11との間には、材軸G方向に平行する帯状の開口Sが形成されている。
なお、開口Sの大きさは、主鋼板151とコンクリート14の一体化の確保と、施工を行う上でのバイブ径、通気孔径や機器配置(アンカー径など)により決定される。
Each of the perforated steel plates 15 is formed in a T shape in a sectional view from a main steel plate 151 (upper steel plate) and a rib steel plate 152 (first rib steel plate) each made of flat steel. The main steel plate 151 is arranged with its surface direction in the horizontal direction, and its upper surface 151a (FIG. 3) is the position of the beam upper surface 1a of the SC beam 1. And between the adjacent main steel plates 151 and 151, and between the main steel plate 151 and the web steel plate 11, the strip | belt-shaped opening S parallel to the material-axis G direction is formed.
The size of the opening S is determined by ensuring the integration of the main steel plate 151 and the concrete 14, and the vibrator diameter, vent hole diameter, and equipment arrangement (anchor diameter, etc.) for construction.

一方、リブ鋼板152は、主鋼板151の下面に対して鉛直方向に配設されるとともに、材軸G方向に沿って所定の間隔をあけて複数の開孔15a、15a、…が設けられている。
これら複数の開孔15aは、配列される複数の孔開き鋼板15、15、…において互いに同軸線上となるように配置され、それら同軸線上に位置する開孔15aにはタイバー16が貫通され、そのタイバー16の両端部16aがそれぞれウェブ鋼板11の内面に溶接により接続している。つまり、タイバー16は、対向するウェブ鋼板11、11間において、リブ鋼板152、152同士を繋ぐために架設されており、せん断補強筋を兼ねている。開孔15a孔径寸法は、任意に設定することが可能であるが、タイバー16の外径寸法よりも大きく、タイバー16を挿通させた状態で充填されるコンクリート14が孔内に充填できる大きさである。
なお、タイバー16は、ウェブ鋼板11に対して溶接する接合に限らず、ボルト接合、或いはタイバー16の端部を曲げ加工をしてウェブ鋼板11とオーバーラップさせて定着させることも可能である。
On the other hand, the rib steel plate 152 is arranged in the vertical direction with respect to the lower surface of the main steel plate 151, and is provided with a plurality of apertures 15a, 15a,... At predetermined intervals along the material axis G direction. Yes.
The plurality of apertures 15a are arranged so as to be coaxial with each other in the plurality of apertured steel plates 15, 15,..., And the tie bars 16 are passed through the apertures 15a located on the coaxial lines. Both end portions 16a of the tie bar 16 are connected to the inner surface of the web steel plate 11 by welding. That is, the tie bar 16 is installed between the opposing web steel plates 11 and 11 to connect the rib steel plates 152 and 152 to each other, and also serves as a shear reinforcement. The diameter of the opening 15a can be arbitrarily set, but is larger than the outer diameter of the tie bar 16, and is large enough to fill the hole with the concrete 14 filled with the tie bar 16 inserted. is there.
In addition, the tie bar 16 is not limited to the joint to be welded to the web steel plate 11, but can be fixed by bolt joining or bending the end portion of the tie bar 16 to overlap the web steel plate 11.

また、4本の孔開き鋼板15同士は、平鋼からなる連結鋼板17によって互いに連結されている。この連結鋼板17は、孔開き鋼板15、15同士を一定の間隔に保持するとともに、振れ止めの機能を有している。具体的には、図1および図4に示すように、主鋼板151には、SC梁1の幅方向で材軸G方向に直交する凹溝15bが形成されており、この凹溝15bに連結鋼板17を嵌合させつつ、その嵌合部を溶接した構成となっている。   The four perforated steel plates 15 are connected to each other by a connecting steel plate 17 made of flat steel. The connecting steel plate 17 holds the perforated steel plates 15 and 15 at a constant interval and also has a function of steadying. Specifically, as shown in FIGS. 1 and 4, the main steel plate 151 is formed with a groove 15b perpendicular to the material axis G direction in the width direction of the SC beam 1, and is connected to the groove 15b. The fitting portion is welded while the steel plate 17 is fitted.

また、図1に示すように、穴開き鋼板15は、SC柱2との接合部Tにおいて、主鋼板151が上側の水平ダイアフラム24Aに対して溶接により固定されるとともに、同じくリブ鋼板152がSC柱2のリブ鋼板26に対して溶接により固定されている。   As shown in FIG. 1, the perforated steel plate 15 has the main steel plate 151 fixed to the upper horizontal diaphragm 24 </ b> A by welding at the joint T with the SC column 2, and the rib steel plate 152 is similarly SC. It is fixed to the rib steel plate 26 of the column 2 by welding.

次に、上述したSC梁1の作用について、図面に基づいて詳細に説明する。
図2に示すように、SC梁1は、側面のウェブ鋼板11、11と底面のフランジ鋼板12とが複数のスタッド13、13、…を介して打設したコンクリート14との一体化が図れるとともに、梁上面側において、孔開き鋼板15のリブ鋼板152が梁上面1aから間隔をもった内空側に位置し、その開孔15aにはコンクリート14が確実に充填されるので、リブ鋼板152の面内方向のせん断抵抗性能が付加されて所定の耐力が得られ、SC構造のスタッドと同様の機能もたせることができる。
したがって、コンクリート14の硬化に伴う収縮によって主鋼板151とコンクリート14との境界部に空隙部ができても、リブ鋼板152の開孔15aにコンクリート14が充填されていることで所定の耐力を確保することができる。
Next, the effect | action of the SC beam 1 mentioned above is demonstrated in detail based on drawing.
As shown in FIG. 2, the SC beam 1 can be integrated with the concrete 14 in which the side web steel plates 11, 11 and the bottom flange steel plate 12 are placed through a plurality of studs 13, 13,. On the beam upper surface side, the rib steel plate 152 of the perforated steel plate 15 is positioned on the inner space side spaced from the beam upper surface 1a, and the concrete is filled in the aperture 15a. A predetermined proof stress is obtained by adding shear resistance performance in the in-plane direction, and the same function as the SC structure stud can be provided.
Therefore, even if a gap is formed at the boundary between the main steel plate 151 and the concrete 14 due to the shrinkage caused by the hardening of the concrete 14, the concrete 14 is filled in the opening 15a of the rib steel plate 152 to ensure a predetermined proof stress. can do.

また、図3に示すように、主鋼板151によって形成される開口Sがコンクリート打設口やその際の空気抜き孔として機能するため、従来のように梁上面に設けられる上側フランジ鋼板に打設用、空気抜き用として現場で開口を設ける必要がなくなる。そして、上述したように、リブ鋼板152の開孔15aをコンクリート14で充填することで、主鋼板151とコンクリート14とが一体化されるので、その分だけ開口の面積や数量を増やすことが可能となり、これによりコンクリート打設時のコンクリート14の充填状態の確認が行え、品質を確保できる。
さらに、従来のハーフSC梁のように鉄筋を現地で組み立てる必要がなく、主鋼板151を他のSC部材とともに工場などで組み立てることが可能となるので、現地での組み立て手間が低減し、工期の短縮を図ることができる。
Moreover, as shown in FIG. 3, since the opening S formed by the main steel plate 151 functions as a concrete placement port and an air vent hole at that time, it is used for placing on the upper flange steel plate provided on the beam upper surface as in the prior art. It is no longer necessary to provide an opening on site for venting air. And as above-mentioned, since the main steel plate 151 and the concrete 14 are integrated by filling the opening 15a of the rib steel plate 152 with the concrete 14, it is possible to increase the area and quantity of opening by that much. Thus, the filling state of the concrete 14 at the time of placing the concrete can be confirmed, and the quality can be ensured.
In addition, it is not necessary to assemble the rebar locally, unlike the conventional half SC beam, and the main steel plate 151 can be assembled together with other SC members at the factory. Shortening can be achieved.

さらにまた、図1に示すように、それぞれの孔開き鋼板15は、その端部でSC柱2の上側の水平ダイアフラム24Aとリブ鋼板26に溶接されて応力伝達を図ることによって、従来のハーフSC梁と同等の機能をもたせることができる。   Furthermore, as shown in FIG. 1, each of the perforated steel plates 15 is welded to the horizontal diaphragm 24A on the upper side of the SC pillar 2 and the rib steel plate 26 at the end thereof, thereby transmitting the stress, whereby the conventional half SC. It can have the same function as a beam.

また、孔開き鋼板15の開孔15aの孔径寸法を調整することで、スタッド13以上にせん断伝達に必要な耐力を得ることができることから、スタッド13で数本分の耐力を一箇所の開孔15aにもたせることが可能であり、梁上面境界の材軸G方向の曲げ応力の伝達はフルSC梁に近い構造形式となる。   Further, since the proof stress necessary for shear transmission can be obtained more than the stud 13 by adjusting the hole size of the aperture 15a of the perforated steel sheet 15, several proof stresses are provided at one location by the stud 13. The bending stress in the direction of the material axis G at the upper surface boundary of the beam can be transmitted in a structural form close to that of a full SC beam.

また、孔開き鋼板15の主鋼板151が梁の材軸G方向に沿って延びる平鋼であるので、平鋼の両側に材軸G方向に連続する開口Sが形成されることとなり、この開口Sを使用してコンクリート14の打設と空気抜きを行うことができる。そして、梁上面1aに平鋼からなる主鋼板151を配置するだけの簡単な構成であり、鋼板に開口を開ける加工も不要となることから、施工のさらなる簡略化を図ることができる。   Moreover, since the main steel plate 151 of the perforated steel plate 15 is a flat steel extending along the beam material axis G direction, openings S that are continuous in the material axis G direction are formed on both sides of the steel plate. Using S, the concrete 14 can be placed and vented. And since it is a simple structure which only arrange | positions the main steel plate 151 which consists of a flat steel in the beam upper surface 1a, and the process which opens an opening in a steel plate becomes unnecessary, the further simplification of construction can be aimed at.

さらに、孔開き鋼板15の主鋼板151が複数配列され、それぞれが連結鋼板17によって接続されているので、この連結鋼板17によって複数列の主鋼板151の位置が保持されて主鋼板151、151同士の間隔も一定に維持されるので、打設したコンクリート14の圧力によって主鋼板151、151同士の間隔がずれて、開口Sの大きさが変化するのを防ぐことができ、せん断補強効果も期待することができる。   Furthermore, since a plurality of main steel plates 151 of the perforated steel plate 15 are arranged and connected to each other by the connecting steel plates 17, the positions of the plurality of rows of main steel plates 151 are held by the connecting steel plates 17, and the main steel plates 151 and 151 are connected to each other. Since the distance between the main steel plates 151 and 151 is shifted due to the pressure of the cast concrete 14, the size of the opening S can be prevented from changing, and a shear reinforcement effect is also expected. can do.

さらにまた、孔開き鋼板15のリブ鋼板152がタイバー16を介して対抗するウェブ鋼板11、11に接続されているので、複数のリブ鋼板152、152、…とコンクリート14との一体化において靭性を増大させることができる。   Furthermore, since the rib steel plate 152 of the perforated steel plate 15 is connected to the opposing web steel plates 11, 11 via the tie bars 16, the toughness is improved in the integration of the plurality of rib steel plates 152, 152,. Can be increased.

上述のように本第1の実施の形態による梁構造では、孔開き鋼板15のリブ鋼板152の開孔15aにコンクリート14が充填されることでコンクリート14との一体化が図れ、所定の強度が確保できるので、SC梁1としての耐力を低下させることなくコンクリート打設口や空気抜き孔、或いはコンクリート充填確認窓として機能する開口を鋼板に設けることができる。
また、鉄筋組立やH形鋼を用いる構造ではないことから、現地での施工の効率化が図れる利点がある。
As described above, in the beam structure according to the first embodiment, the concrete 14 is filled with the concrete 14 in the opening 15a of the rib steel plate 152 of the perforated steel plate 15, so that the concrete 14 can be integrated and the predetermined strength is obtained. Since it can be ensured, the steel plate can be provided with an opening that functions as a concrete placement port, an air vent hole, or a concrete filling confirmation window without reducing the yield strength of the SC beam 1.
Moreover, since it is not the structure which uses a rebar assembly or H-section steel, there exists an advantage which can aim at the efficiency of construction in a field.

次に、本発明の梁構造による他の実施の形態について、添付図面に基づいて説明するが、上述の第1の実施の形態と同一又は同様な部材、部分には同一の符号を用いて説明を省略し、第1の実施の形態と異なる構成について説明する。   Next, another embodiment of the beam structure of the present invention will be described with reference to the accompanying drawings. The same reference numerals are used for the same or similar members and parts as those in the first embodiment described above. A configuration different from that of the first embodiment will be described.

(第2の実施の形態)
図5乃至図7に示すように、第2の実施の形態によるSC梁1A(梁構造)は、上側フランジ鋼板として機能する孔開き鋼板30を一体的に設けたものである。
SC梁1Aは、対向するウェブ鋼板11、11とフランジ鋼板12によって形成される領域の上部には、複数の開口33、33、…を有するとともに、梁上面1aから間隔(図6に示す符号D)をもった内空側の位置に主鋼板31(上側鋼板)を備えた孔開き鋼板30が設けられている。この主鋼板31は、前記領域の上部全体を覆う範囲に配置されている。
なお、開口33の孔径や孔ピッチは、主鋼板31とコンクリート14の一体化の確保と、施工を行う上でのバイブ径、通気孔径や機器配置(アンカー径など)により決定される。
(Second Embodiment)
As shown in FIGS. 5 to 7, the SC beam 1A (beam structure) according to the second embodiment is integrally provided with a perforated steel plate 30 that functions as an upper flange steel plate.
The SC beam 1A has a plurality of openings 33, 33,... At the upper part of the region formed by the opposing web steel plates 11, 11 and the flange steel plate 12, and is spaced from the beam upper surface 1a (reference symbol D shown in FIG. 6). A perforated steel plate 30 provided with a main steel plate 31 (upper steel plate) is provided at a position on the inner space side with a). The main steel plate 31 is disposed in a range covering the entire upper portion of the region.
In addition, the hole diameter and hole pitch of the opening 33 are determined by ensuring the integration of the main steel plate 31 and the concrete 14, and the vibrator diameter, vent hole diameter, and equipment arrangement (anchor diameter, etc.) for construction.

そして、主鋼板31には、材軸G方向に延びるとともに、開孔32aを有するリブ鋼板32(第2リブ鋼板)が鉛直方向に配設されている。このリブ鋼板32は、平鋼からなり、主鋼板31の上面に対して鉛直方向に配設されるとともに、材軸G方向に沿って所定の間隔をあけて複数の開孔32a、32a、…が設けられている。
なお、スタッド13については、上述した第1の実施の形態と同様であるので、詳しい説明は省略する。
The main steel plate 31 is provided with a rib steel plate 32 (second rib steel plate) extending in the material axis G direction and having an opening 32a in the vertical direction. The rib steel plate 32 is made of flat steel, and is arranged in a vertical direction with respect to the upper surface of the main steel plate 31, and has a plurality of apertures 32a, 32a,... At predetermined intervals along the material axis G direction. Is provided.
Since the stud 13 is the same as that of the first embodiment described above, detailed description thereof is omitted.

本第2の実施の形態によるSC梁1Aでは、側面のウェブ鋼板11、11と底面のフランジ鋼板12とがスタッド13を介して打設したコンクリート14との一体化が図れるとともに、梁上面1aから間隔Dをもった内空側の位置に配される主鋼板31の開口33にはコンクリート14が確実に充填されて鋼板ジベルとなるので、主鋼板31における開口33の厚さ方向のせん断抵抗性能が付加されて所定の耐力が得られ、SC構造のスタッドと同様の機能もたせることができる。   In the SC beam 1A according to the second embodiment, the side web steel plates 11 and 11 and the bottom flange steel plate 12 can be integrated with the concrete 14 placed via the studs 13, and from the beam upper surface 1a. Since the opening 14 of the main steel plate 31 arranged at the inner space side with the interval D is surely filled with the concrete 14 to form a steel plate gibber, the shear resistance performance in the thickness direction of the opening 33 in the main steel plate 31. Is added to obtain a predetermined proof stress, and the same function as the SC structure stud can be provided.

また、主鋼板31の開口33がコンクリート打設口やその際の空気抜き孔として機能するため、従来のように梁上面に設けられる上側フランジ鋼板に打設用、空気抜き用として現場で開口を設ける必要がなくなる。そして、上述したように、梁上面1aまでコンクリート14を打設すれば主鋼板31の開口33を確実にコンクリート14で充填させることができ、主鋼板31とコンクリート14とが一体化されることになる。そのため、主鋼板31の開口の面積や数量を増やすことが可能となり、これによりコンクリート打設時のコンクリート14の充填状態の確認が行え、品質を確保できる。
さらに、従来のハーフSC梁のように鉄筋を現地で組み立てる必要がなく、主鋼板31を他のSC部材とともに工場などで組み立てることが可能となるので、現地での組み立て手間が低減し、工期の短縮を図ることができる。
In addition, since the opening 33 of the main steel plate 31 functions as a concrete placement opening and an air vent hole at that time, it is necessary to provide an opening at the site for casting and air venting on the upper flange steel plate provided on the upper surface of the beam as in the prior art. Disappears. As described above, if the concrete 14 is placed up to the beam upper surface 1a, the opening 33 of the main steel plate 31 can be reliably filled with the concrete 14, and the main steel plate 31 and the concrete 14 are integrated. Become. Therefore, it becomes possible to increase the area and quantity of the opening of the main steel plate 31, thereby confirming the filling state of the concrete 14 at the time of placing the concrete and ensuring the quality.
In addition, it is not necessary to assemble the reinforcing bars locally as in the case of conventional half SC beams, and the main steel plate 31 can be assembled together with other SC members at the factory. Shortening can be achieved.

また、主鋼板31に開孔32aを有するリブ鋼板が鉛直方向に配設されているので、主鋼板31の開口33に充填されるコンクリート14による耐力向上に加え、リブ鋼板32の開孔32aにもコンクリート14が確実に充填されるので、リブ鋼板32の面内方向のせん断抵抗性能が付加されて所定の耐力が得られ、SC構造のスタッドと同様の機能もたせることができ、さらなる補強効果を得ることができる。   Moreover, since the rib steel plate having the opening 32a in the main steel plate 31 is arranged in the vertical direction, in addition to the improvement in the proof stress by the concrete 14 filled in the opening 33 of the main steel plate 31, the opening 32a of the rib steel plate 32 is provided. Since the concrete 14 is reliably filled, a shear resistance performance in the in-plane direction of the rib steel plate 32 is added to obtain a predetermined proof stress, and a function similar to that of the stud of the SC structure can be provided. Can be obtained.

以上、本発明による梁構造の実施の形態について説明したが、本発明は上記の実施の形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。
例えば、本第1の実施の形態ではタイバー16や連結鋼板17を設けているが、これらを省略する構成とすることも可能である。
また、本第1の実施の形態では4本の孔開き鋼板15をSC梁1の材軸G方向に平行に配列させているが、数量、配列間隔、加工Sの寸法などの構成は任意に設定することが可能である。そして、リブ鋼板152の形状やその開孔15aの数量、孔径についても適宜設定することができる。
The embodiment of the beam structure according to the present invention has been described above. However, the present invention is not limited to the above embodiment, and can be appropriately changed without departing from the scope of the present invention.
For example, although the tie bar 16 and the connecting steel plate 17 are provided in the first embodiment, a configuration in which these are omitted is also possible.
In the first embodiment, the four perforated steel plates 15 are arranged in parallel to the material axis G direction of the SC beam 1, but the configuration such as the quantity, the arrangement interval, and the dimension of the processing S is arbitrarily set. It is possible to set. The shape of the rib steel plate 152, the number of the apertures 15a, and the hole diameter can be set as appropriate.

また、第2の実施の形態において、リブ鋼板32を省略することも可能である。そして、主鋼板31の位置、すなわち梁上面1aから間隔(図6で符号D)をもった内空側の位置は、とくに限定されることはなく、主鋼板31に形成される開口33にコンクリート14が確実に充填され得る深さ(梁上面1aからの距離)が確保されれば良い。   Further, in the second embodiment, the rib steel plate 32 can be omitted. The position of the main steel plate 31, that is, the position on the inner air side having a distance (reference numeral D in FIG. 6) from the beam upper surface 1 a is not particularly limited, and the concrete is formed in the opening 33 formed in the main steel plate 31. It is only necessary to secure a depth (a distance from the beam upper surface 1a) that can be surely filled with 14.

1、1A SC梁(梁構造)
2 SC柱
11 ウェブ鋼板
12 フランジ鋼板
13 スタッド
14 コンクリート
15 孔開き鋼板
15a 開孔
15b 凹溝
151 主鋼板(上側鋼板)
152 リブ鋼板(第1リブ鋼板)
16 タイバー
17 連結鋼板
24、24A、24B 水平ダイアフラム
26 SC柱のリブ鋼板
30 孔開き鋼板
31 主鋼板(上側鋼板)
32 リブ鋼板(第2リブ鋼板)
32a 開孔
33 開口
G 材軸
S 開口
1, 1A SC beam (beam structure)
2 SC pillar 11 Web steel plate 12 Flange steel plate 13 Stud 14 Concrete 15 Perforated steel plate 15a Open hole 15b Concave groove 151 Main steel plate (upper steel plate)
152 Rib steel plate (first rib steel plate)
16 Tie Bar 17 Connecting Steel Plate 24, 24A, 24B Horizontal Diaphragm 26 SC Column Rib Steel Plate 30 Perforated Steel Plate 31 Main Steel Plate (Upper Steel Plate)
32 Rib steel plate (2nd rib steel plate)
32a Opening 33 Opening G Material shaft S Opening

Claims (6)

両側面を形成して対向するウェブ鋼板および底面を形成するフランジ鋼板の内面にそれぞれ複数のスタッドが突設され、
前記対向するウェブ鋼板と前記フランジ鋼板によって形成される領域内にコンクリートが充填され、
前記領域の上部には、開口を形成する上側鋼板が設けられ、
該上側鋼板の下面には、開孔を有する第1リブ鋼板が鉛直方向に配設されていることを特徴とする梁構造。
A plurality of studs project from the inner surfaces of the opposing web steel plate and the flange steel plate forming the bottom surface, forming both side surfaces,
Concrete is filled in the region formed by the opposing web steel plate and the flange steel plate,
On the upper part of the region, an upper steel plate that forms an opening is provided,
A beam structure, wherein a first rib steel plate having an opening is disposed in a vertical direction on a lower surface of the upper steel plate.
前記上側鋼板は、梁の材軸方向に沿って延びる平鋼であることを特徴とする請求項1に記載の梁構造。   The beam structure according to claim 1, wherein the upper steel plate is a flat steel extending along the material axis direction of the beam. 前記上側鋼板は複数配列され、それぞれが連結鋼板によって接続されていることを特徴とする請求項2に記載の梁構造。   The beam structure according to claim 2, wherein a plurality of the upper steel plates are arranged, and each is connected by a connecting steel plate. 前記第1リブ鋼板は、梁の材軸方向に延び、
前記対向するウェブ鋼板間には、前記第1リブ鋼板同士を繋ぐタイバーが架設されていることを特徴とする請求項3に記載の梁構造。
The first rib steel plate extends in the beam axial direction of the beam,
The beam structure according to claim 3, wherein a tie bar that connects the first rib steel plates is installed between the opposing web steel plates.
両側面を形成して対向するウェブ鋼板および底面を形成するフランジ鋼板の内面にそれぞれ複数のスタッドが突設され、
前記対向するウェブ鋼板と前記フランジ鋼板によって形成される領域内にコンクリートが充填され、
前記領域の上部には、開口を有するとともに、梁上面から間隔をもった内空側の位置に上側鋼板が設けられていることを特徴とする梁構造。
A plurality of studs project from the inner surfaces of the opposing web steel plate and the flange steel plate forming the bottom surface, forming both side surfaces,
Concrete is filled in the region formed by the opposing web steel plate and the flange steel plate,
A beam structure characterized in that an upper steel plate is provided at a position on the inner space side having an opening at an upper portion of the region and spaced from the beam upper surface.
前記上側鋼板には、開孔を有する第2リブ鋼板が鉛直方向に配設されていることを特徴とする請求項5に記載の梁構造。
The beam structure according to claim 5, wherein a second rib steel plate having an opening is disposed in the upper steel plate in a vertical direction.
JP2010187427A 2010-08-24 2010-08-24 Beam structure Active JP5458393B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010187427A JP5458393B2 (en) 2010-08-24 2010-08-24 Beam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010187427A JP5458393B2 (en) 2010-08-24 2010-08-24 Beam structure

Publications (2)

Publication Number Publication Date
JP2012046894A JP2012046894A (en) 2012-03-08
JP5458393B2 true JP5458393B2 (en) 2014-04-02

Family

ID=45902052

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010187427A Active JP5458393B2 (en) 2010-08-24 2010-08-24 Beam structure

Country Status (1)

Country Link
JP (1) JP5458393B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6350850B2 (en) * 2014-02-03 2018-07-04 清水建設株式会社 SC floor structure
CN113107108A (en) * 2021-03-20 2021-07-13 北京工业大学 Double-steel-plate concrete composite wall with T-shaped stiffening ribs and U-shaped pull rods

Also Published As

Publication number Publication date
JP2012046894A (en) 2012-03-08

Similar Documents

Publication Publication Date Title
KR101781603B1 (en) Prefabricated beam structure with concrete form
KR101186062B1 (en) Connection of concrete filled steel tube column and H-shaped steel beam and constructing method of the same
KR101368218B1 (en) a concrete filled steel tube with the inner reinforcing structure
KR20200067408A (en) Double-wall having a variable thickness and construction method therewith
KR102001041B1 (en) Joint structure between the cft square column and the steel girder
JP6484209B2 (en) Connecting member, beam structure and construction method thereof
KR102104382B1 (en) Steel beam, composite column, and joint structure of the same
JP2018131770A (en) Junction structure of column and beam and construction method of junction structure of column and beam
JP5458393B2 (en) Beam structure
KR101954614B1 (en) Strcutrue of connecting traverse beam with main beam in bridge upper structure and method of constructing the same
KR101320571B1 (en) Steel composite girder module and method of constructing the same
KR100949828B1 (en) Steel beam and hybrid beam of steel concrete for slim floor
KR101402384B1 (en) Steel frame girder having pressure plate and, construction method for the same
JP7158231B2 (en) Composite column, bridge pier using same, construction method
JP6574336B2 (en) Steel-framed reinforced concrete columns and buildings using the same
JP7070890B2 (en) Joint structure
KR101182680B1 (en) I section composite girder, girder bridge and manufacturing and constructing method thereof
JP5157433B2 (en) Composite hollow structure of bridge column head or girder end
JP5344702B2 (en) Column and slab joint structure
JP6647142B2 (en) Segment joint structure
JP2014114549A (en) Bridge fall prevention device
JP6324765B2 (en) Load-bearing wall-type installation structure in steel-framed buildings
JP6350850B2 (en) SC floor structure
KR102540266B1 (en) Joint structure between improved CFT column and prefabricated beam with concrete form
EP3938593B1 (en) Method for constructing a closed steel sheet structure and closed steel sheet structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130131

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131127

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131225

R150 Certificate of patent or registration of utility model

Ref document number: 5458393

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150