JP5396323B2 - Curing method for tunnel lining concrete - Google Patents

Curing method for tunnel lining concrete Download PDF

Info

Publication number
JP5396323B2
JP5396323B2 JP2010076492A JP2010076492A JP5396323B2 JP 5396323 B2 JP5396323 B2 JP 5396323B2 JP 2010076492 A JP2010076492 A JP 2010076492A JP 2010076492 A JP2010076492 A JP 2010076492A JP 5396323 B2 JP5396323 B2 JP 5396323B2
Authority
JP
Japan
Prior art keywords
tunnel
lining concrete
curing
piping unit
piping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010076492A
Other languages
Japanese (ja)
Other versions
JP2011208407A (en
Inventor
啓二 近藤
全布 坂本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2010076492A priority Critical patent/JP5396323B2/en
Publication of JP2011208407A publication Critical patent/JP2011208407A/en
Application granted granted Critical
Publication of JP5396323B2 publication Critical patent/JP5396323B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、トンネル覆工コンクリートの養生方法に関するものである。   The present invention relates to a method for curing tunnel lining concrete.

従来、トンネル覆工コンクリートの養生方法として、(1)覆工コンクリートの脱型後に、ゴムや防水布等の養生バルーンを覆工コンクリートに密着するように設置する空気膜方式があった(例えば、特許文献1参照)。(1)の方法は、覆工コンクリート表面を空気膜で覆うことによる保温効果、空気の流れを遮断することにより覆工コンクリート表面からの水分の蒸発・乾燥を防止して湿潤状態を保つ効果があった。(1)の方法は、これらの効果により、覆工コンクリートの初期強度・長期強度を増大させて、コンクリートの品質の向上、ひび割れの低減を図るものであった。   Conventionally, as a curing method for tunnel lining concrete, (1) after the demolding of the lining concrete, there is an air film method in which a curing balloon such as rubber or waterproof cloth is installed in close contact with the lining concrete (for example, Patent Document 1). The method of (1) has the effect of keeping the moist state by preventing the evaporation and drying of moisture from the surface of the lining concrete by blocking the air flow by covering the surface of the lining concrete with an air film. there were. The method (1) is intended to increase the initial strength and long-term strength of the lining concrete by these effects, thereby improving the quality of the concrete and reducing cracks.

近年は、(2)覆工コンクリート表面に防水シートを利用して密閉した空間を形成し、その空間に噴霧ノズルを配置して水を噴霧する養生方法が多く実施されてきた(例えば、特許文献2参照)。(2)の方法は、密閉空間に湿潤状態を作り出すことにより、コンクリートの初期強度・長期強度を増大させて、コンクリートの品質の向上、ひび割れの低減を図るものであった。   In recent years, (2) many curing methods have been implemented in which a sealed space is formed on the lining concrete surface using a waterproof sheet, and water is sprayed by disposing a spray nozzle in the space (for example, patent documents). 2). In the method (2), by creating a wet state in the sealed space, the initial strength and long-term strength of the concrete are increased, thereby improving the quality of the concrete and reducing cracks.

さらに、トンネル坑内を機械式で移動して散水する方法や、養生剤を塗布・噴霧する方法、発泡スチロール材でコンクリート表面を保温する方法等があった。   Furthermore, there were a method of moving the inside of the tunnel mine mechanically and spraying water, a method of applying and spraying a curing agent, a method of keeping the concrete surface warm with a polystyrene foam material, and the like.

特開2005−299323号公報JP 2005-299323 A 特開2008−223372号公報JP 2008-223372 A

しかしながら、(1)の方法は、主として乾燥の防止を目的としており、積極的に湿度を加えて湿潤養生を行う機能は有していなかった。(1)の方法によれば、覆工コンクリート表面近傍の湿度はある程度保持されると思われるが、養生装置の移動毎に一時的に空気膜の密着を解くため、覆工コンクリート表面近傍の湿度がトンネル坑内と同等となり、覆工コンクリートの乾燥が促進されることがあった。   However, the method (1) is mainly for the purpose of preventing drying, and has no function of positively applying humidity to perform wet curing. According to the method (1), the humidity in the vicinity of the lining concrete surface seems to be maintained to some extent. However, the humidity in the vicinity of the lining concrete surface is temporarily removed every time the curing device is moved. Was equivalent to the inside of a tunnel mine, and drying of lining concrete was sometimes promoted.

(2)の方法は、積極的に湿度を加えて湿潤養生を行う機能を有していた。しかし、養生装置の移動毎に一時的に湿潤養生を解くため、十分な養生を行うことができなかった。例えば、養生装置が材齢7日後に移動すると、移動スパン分の覆工コンクリートの湿潤状態が急激に解除されるため、ひび割れの発生確率が大きくなる可能性があった。   The method (2) had a function of actively applying humidity to perform wet curing. However, since the wet curing is temporarily released every time the curing device is moved, sufficient curing cannot be performed. For example, when the curing device moves after 7 days of age, the wet state of the lining concrete for the moving span is abruptly released, which may increase the probability of occurrence of cracks.

また、(2)の方法は、防水シートと覆工コンクリートとの間の狭い密閉空間を加湿するため、湿度のコントロールが難しく、過剰に加湿しがちだった。そのため、湿度の飽和により発生した水垂れが、覆工コンクリート表面の仕上がりに、荒れや筋状の水の滴る跡等を生じさせていた。   Moreover, since the method (2) humidifies a narrow sealed space between the waterproof sheet and the lining concrete, it is difficult to control the humidity and tends to be excessively humidified. For this reason, dripping caused by saturation of humidity has caused rough or streaky traces of water on the finished concrete surface.

さらに、(1)、(2)の方法とも、覆工コンクリートの打設・脱型後に型枠装置が移動する毎に、養生装置自体を移動させて養生区間に再配置する必要があった。そのため、トンネル内に設置された工事用設備などが障害となったり、工事用車両等の走行スペースを侵したりする場合があり、作業性が悪かった。   Further, in both methods (1) and (2), every time the formwork device moves after placing / demolding the lining concrete, it is necessary to move the curing device itself and rearrange it in the curing section. For this reason, the construction equipment installed in the tunnel may become an obstacle, or the traveling space of the construction vehicle or the like may be violated, and workability is poor.

本発明は、前述した問題点に鑑みてなされたもので、その目的とするところは、養生区間のトンネル内全体を加湿の対象とし、湿度のコントロールが容易であること、覆工コンクリートの打設、型枠装置の脱型、移動などのトンネル工事の作業工程に左右されない安定した養生が可能であること、養生装置の移動時の作業性が良いこと、等の条件を実現できる覆工コンクリートの養生方法を提供することである。   The present invention has been made in view of the above-described problems, and the object of the present invention is to humidify the entire inside of the curing section tunnel and to easily control the humidity, and to place concrete lining Of lining concrete that can realize conditions such as stable curing that is not influenced by the work process of tunnel construction such as demolding and moving of formwork equipment, good workability when moving curing equipment, etc. It is to provide a curing method.

前述した目的を達成するために、本発明は、所定の区間の覆工コンクリートを打設する工程(a)と、前記覆工コンクリートの内側に、複数の配管からなる配管ユニットを設置する工程(b)と、脱型した前記覆工コンクリートが所定の材齢に達するまで、前記複数の配管に設けられた孔に設置したノズルから、所定の噴霧角度で水をトンネル内空間に噴霧する工程(c)と、前記覆工コンクリートの内側から、前記配管ユニットを取り外す工程(d)と、を具備し、前記工程(d)でトンネル掘削方向後方で取り外した前記配管ユニットを、前記工程(b)でトンネル掘削方向前方に設置して、前記工程(a)から前記工程(d)を繰り返し、少なくとも前記工程(c)において、換気装置により、前記トンネル内空間の風速が所定の範囲にコントロールされることを特徴とするトンネル覆工コンクリートの養生方法である。 In order to achieve the above-described object, the present invention includes a step (a) of placing lining concrete in a predetermined section, and a step of installing a piping unit composed of a plurality of pipes inside the lining concrete ( b) and a step of spraying water into the tunnel space at a predetermined spray angle from nozzles installed in holes provided in the plurality of pipes until the demolded lining concrete reaches a predetermined age ( c) and the step (d) of removing the piping unit from the inside of the lining concrete, and the piping unit removed at the rear of the tunnel excavation direction in the step (d) is the step (b). in be installed in the tunnel excavation direction forward, to repeat the process from the step (a) (d), at least said step (c), the ventilator, the wind speed of the tunnel space is in a predetermined range Is a regimen of a tunnel lining concrete, characterized in that it is controlled.

本発明は、覆工コンクリートの内側に、複数の配管からなる配管ユニットを設置し、養生区間のトンネル内全体を対象として加湿を行う。そのため、従来の養生方法と比較して、トンネル内の湿度を容易にコントロールでき、湿度の飽和による水垂れ等の発生が少なくなる。   This invention installs the piping unit which consists of several piping inside lining concrete, and performs humidification for the whole inside of the tunnel of a curing area. Therefore, compared with the conventional curing method, the humidity in the tunnel can be easily controlled, and the occurrence of dripping due to humidity saturation is reduced.

本発明では、所定の養生期間が終了した後、トンネル掘削方向後方の配管ユニットを取り外し、トンネル掘削方向前方に設置する。そのため、覆工コンクリートの打設、型枠装置の脱型、移動などのトンネル工事の作業工程に左右されず、養生期間および養生区間をそれぞれ単独で決定でき、従来の養生方法と比較して、安定した湿潤状態を十分に維持することができる。また、型枠装置が移動するごとに配管ユニットを移動させる必要がないため、従来の養生方法と比較して、配管ユニットの設置時や移動時に、トンネル内に設置された工事用設備等の影響が少なく、作業性が良い。   In the present invention, after the predetermined curing period ends, the piping unit at the rear of the tunnel excavation direction is removed and installed at the front of the tunnel excavation direction. Therefore, regardless of the tunnel construction work process such as placing concrete lining, demolding and moving the formwork device, the curing period and the curing section can be determined independently, compared with the conventional curing method, A stable wet state can be sufficiently maintained. In addition, since it is not necessary to move the piping unit every time the formwork device moves, the effects of construction equipment installed in the tunnel when the piping unit is installed or moved compared to conventional curing methods. There is little and workability is good.

配管ユニットは、例えば、トンネルの両側部にトンネル軸方向に配置された2本の配管で構成される。配管ユニットは、トンネルの両側部にトンネル軸方向に配置された2本の配管と、トンネル軸方向に所定の間隔をおいて配置され、両端部がトンネル軸方向に配置された2本の配管に連結された複数の配管とで構成してもよい。   A piping unit is comprised by two piping arrange | positioned at the tunnel axial direction on the both sides of a tunnel, for example. The piping unit consists of two pipes arranged in the tunnel axis direction on both sides of the tunnel, and two pipes arranged at predetermined intervals in the tunnel axis direction and both ends arranged in the tunnel axis direction. You may comprise by several connected piping.

配管ユニットを上述したような構成とすることにより、設置時や移動時の作業性が高まる。また、養生区間のトンネル内全体を効率的に加湿し、より安定した湿潤養生を行うことができる。   By configuring the piping unit as described above, the workability during installation and movement is enhanced. In addition, the entire inside of the tunnel of the curing section can be efficiently humidified, and more stable wet curing can be performed.

工程(b)では、養生する区間の長さに応じて、配管ユニットのトンネル軸方向の接続数を調整する。配管ユニットの接続数や長さを適切に調整することにより、設置時や移動時の作業性をより高めることができる。   In step (b), the number of pipe units connected in the tunnel axis direction is adjusted according to the length of the section to be cured. By appropriately adjusting the number and length of pipe unit connections, workability during installation and movement can be further improved.

工程(c)では、トンネル内空間の湿度に応じて、トンネル軸方向に区分した区間毎に水の噴霧量を調整する。区間毎の噴霧量を適切に調整することにより、トンネル内部の湿度を確実にコントロールし、より安定した湿潤養生を行うことができる。   In the step (c), the spray amount of water is adjusted for each section divided in the tunnel axis direction according to the humidity of the space in the tunnel. By appropriately adjusting the spray amount for each section, the humidity inside the tunnel can be reliably controlled and more stable wet curing can be performed.

工程(c)では、噴霧する水の平均粒径を35〜65μmとするのが望ましい。水の平均粒径が35μm以下であると、粒径が細かすぎ、覆工コンクリート表面の湿潤状態を適切に保つことができない。65μm以上であると、トンネル空間全体を加湿の対象とした場合でも、覆工コンクリート表面に結露を生じやすい。水の平均粒径を35〜65μmとすることにより、良好な状態で湿潤養生を行うことができる。   In the step (c), it is desirable that the average particle diameter of water to be sprayed is 35 to 65 μm. When the average particle size of water is 35 μm or less, the particle size is too fine, and the wet state of the lining concrete surface cannot be maintained appropriately. When the thickness is 65 μm or more, condensation tends to occur on the lining concrete surface even when the entire tunnel space is targeted for humidification. By setting the average particle size of water to 35 to 65 μm, wet curing can be performed in a good state.

本発明によれば、コンクリートの品質を向上させ、ひび割れの発生を防止できるトンネル覆工コンクリートの養生方法を提供できる。   ADVANTAGE OF THE INVENTION According to this invention, the curing method of the tunnel lining concrete which can improve the quality of concrete and can prevent generation | occurrence | production of a crack can be provided.

トンネル3の内側に配管ユニット13を設置する工程を示す図The figure which shows the process of installing the piping unit 13 inside the tunnel 3 配管ユニット13の概要を示す図The figure which shows the outline | summary of the piping unit 13 トンネル3の内側に配管ユニット13を設置した状態を示す図The figure which shows the state which installed the piping unit 13 inside the tunnel 3 配管ユニット13を用いて水を噴霧する工程を示す図The figure which shows the process of spraying water using the piping unit 13. トンネル3の坑内の湿度の経時変化を示す図The figure which shows the time-dependent change of the humidity in the tunnel 3 tunnel 配管ユニット41の概要を示す図The figure which shows the outline | summary of the piping unit 41 トンネル3の内側に配管ユニット41を設置する工程を示す図The figure which shows the process of installing the piping unit 41 inside the tunnel 3 配管ユニット41を用いて水を噴霧する工程を示す図The figure which shows the process of spraying water using the piping unit 41 トンネル3の貫通後の覆工コンクリート5の養生方法を示す図The figure which shows the curing method of the lining concrete 5 after penetrating the tunnel 3 トンネル3の坑内の換気方法を示す図The figure which shows the ventilation method inside the tunnel of tunnel 3

以下、図面に基づいて、本発明の第1の実施の形態について詳細に説明する。図1は、トンネル3の内側に配管ユニット13を設置する工程を示す図である。図1に示す工程では、まず、図示しない掘削機を用いて地山1を掘削し、移動式型枠7を用いてトンネル3の覆工コンクリート5を打設する。そして、養生区間11に配管ユニット13を設置する。   Hereinafter, a first embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is a diagram illustrating a process of installing the piping unit 13 inside the tunnel 3. In the process shown in FIG. 1, first, a natural ground 1 is excavated using an excavator (not shown), and lining concrete 5 of the tunnel 3 is placed using a movable formwork 7. Then, the piping unit 13 is installed in the curing section 11.

図2は、配管ユニット13の概要を示す図である。図2の(a)図は、配管ユニット13の斜視図である。図2の(a)図に示すように、配管ユニット13は、2本の直線状の配管13aを平行に配置して構成される。2本の配管13aの設置間隔は、配管ユニット13を設置するトンネル3の形状および大きさに応じて決定される。配管ユニット13の端部16は、他の配管ユニット13と軸方向に接続可能な構造とする。   FIG. 2 is a diagram showing an outline of the piping unit 13. FIG. 2A is a perspective view of the piping unit 13. As shown in FIG. 2A, the pipe unit 13 is configured by arranging two straight pipes 13a in parallel. The installation interval between the two pipes 13a is determined according to the shape and size of the tunnel 3 in which the pipe unit 13 is installed. The end 16 of the piping unit 13 is structured to be connectable to other piping units 13 in the axial direction.

図2の(b)図は、配管13aの軸方向の断面図である。図2の(b)図に示すように、配管13aには、所定の間隔で孔17が設けられる。孔17の設置間隔は、例えば30〜60cm程度とする。孔17には、ノズル35が設置される。配管13aの周方向における孔17の設置位置は、後述するノズル35の設置角度33(図4)に応じた位置とする。   FIG. 2B is an axial sectional view of the pipe 13a. As shown in FIG. 2B, holes 17 are provided in the pipe 13a at predetermined intervals. The interval between the holes 17 is, for example, about 30 to 60 cm. A nozzle 35 is installed in the hole 17. The installation position of the hole 17 in the circumferential direction of the pipe 13a is a position corresponding to an installation angle 33 (FIG. 4) of the nozzle 35 described later.

配管13aは、鋼管、アルミニューム管、塩ビ管、ビニールホース、ゴムホース等のいずれでもよい。但し、配管ユニット13を支えるための架台間隔を長くとるためには、鋼管が最適である。配管13aの径15は、例えば10mmとする。   The pipe 13a may be any of a steel pipe, an aluminum pipe, a polyvinyl chloride pipe, a vinyl hose, a rubber hose, and the like. However, a steel pipe is optimal for increasing the interval between the gantry for supporting the piping unit 13. The diameter 15 of the pipe 13a is, for example, 10 mm.

図1に示す工程では、トンネル3の覆工コンクリート5の内側に、養生区間11の全長にわたって、複数の配管ユニット13を軸方向に接続して設置する。軸方向に接続した複数の配管ユニット13の掘削方向後方の端部には、水タンク19およびポンプ21を接続する。水タンク19は、軽量で錆びないポリプロピレン容器等が好適である。ポンプ21は、高圧連続ポンプ等とする。   In the process shown in FIG. 1, a plurality of piping units 13 are installed in the axial direction over the entire length of the curing section 11 inside the lining concrete 5 of the tunnel 3. A water tank 19 and a pump 21 are connected to the ends of the plurality of piping units 13 connected in the axial direction on the rear side in the excavation direction. The water tank 19 is preferably a lightweight polypropylene container that does not rust. The pump 21 is a high-pressure continuous pump or the like.

なお、図1は、移動式型枠7が養生区間11の前方へ移動した後の状態を示す図であるが、移動式型枠7が養生区間11内に設置されている時点で、移動式型枠7の内側・底面に配管ユニット13を設置してもよい。   FIG. 1 is a diagram illustrating a state after the mobile formwork 7 has moved to the front of the curing section 11. However, when the mobile formwork 7 is installed in the curing section 11, the mobile formwork 7 is movable. You may install the piping unit 13 in the inner side and bottom face of the formwork 7. FIG.

複数の配管ユニット13を接続して設置する際には、養生区間11の長さに応じてトンネル軸方向の接続数を調整する。図1に示すように、配管ユニット13の軸方向の長さは、移動式型枠7を用いて覆工コンクリート5を打設・脱型する際の1スパンの施工長さAと略同等とする。養生区間11の長さが移動式型枠7による施工長さA×nの場合、n個の配管ユニット13をトンネル軸方向に接続して設置する。施工長さAは、例えば、10.5mである。   When connecting and installing a plurality of piping units 13, the number of connections in the tunnel axis direction is adjusted according to the length of the curing section 11. As shown in FIG. 1, the axial length of the piping unit 13 is substantially the same as the construction length A of one span when placing and removing the lining concrete 5 using the movable mold 7. To do. When the length of the curing section 11 is the construction length A × n by the movable mold 7, n piping units 13 are connected and installed in the tunnel axis direction. The construction length A is 10.5 m, for example.

図3は、トンネル3の内側に配管ユニット13を設置した状態を示す図である。図3の(a)図は、配管ユニット13が設置されたトンネル3の斜視図である。図3の(a)図に示すように、配管ユニット13を設置する際には、トンネル3の両側部に、2本の配管13aを1本ずつトンネル軸方向に配置する。上述した水タンク19およびポンプ21は、掘削方向最後部の配管ユニット13の2本の配管13aの端部に、各1台ずつ接続される。   FIG. 3 is a diagram showing a state in which the piping unit 13 is installed inside the tunnel 3. FIG. 3A is a perspective view of the tunnel 3 in which the piping unit 13 is installed. As shown in FIG. 3A, when installing the piping unit 13, two piping 13 a are arranged one by one in the tunnel axis direction on both sides of the tunnel 3. Each of the water tank 19 and the pump 21 described above is connected to one end of each of the two pipes 13a of the pipe unit 13 at the rearmost part in the excavation direction.

図3の(b)図は、配管ユニット13が設置されたトンネル3の周方向の断面図を示す。図3の(b)図に示すように、配管ユニット13の設置には、トンネル3の覆工コンクリート5の両側部の内周面25に固定したL型鋼材23を用いる。L型鋼材23は、トンネル3の工事用の電力供給用架台と併用してもよい。   FIG. 3B is a sectional view in the circumferential direction of the tunnel 3 in which the piping unit 13 is installed. As shown in FIG. 3B, the piping unit 13 is installed using an L-shaped steel material 23 fixed to the inner peripheral surfaces 25 on both sides of the lining concrete 5 of the tunnel 3. The L-shaped steel material 23 may be used in combination with a power supply mount for the construction of the tunnel 3.

2本の配管13aは、覆工コンクリート5の両側部のL型鋼材23上に、それぞれ配置される。配管13aとトンネル3の底面27との距離29は、例えば、20〜100cmとする。また、配管13aと覆工コンクリート5の内周面25との距離31は、例えば、5〜10cmとする。   The two pipes 13 a are respectively arranged on the L-shaped steel materials 23 on both sides of the lining concrete 5. The distance 29 between the pipe 13a and the bottom surface 27 of the tunnel 3 is, for example, 20 to 100 cm. The distance 31 between the pipe 13a and the inner peripheral surface 25 of the lining concrete 5 is, for example, 5 to 10 cm.

図4は、配管ユニット13を用いて水を噴霧する工程を示す図である。図4に示す部分は、図3の(b)図に示す範囲Bの拡大図である。図4に示す工程では、配管ユニット13を用いて水をトンネル3内の空間に噴霧し、養生区間11の覆工コンクリート5の養生を行う(図1)。   FIG. 4 is a diagram illustrating a process of spraying water using the piping unit 13. The portion shown in FIG. 4 is an enlarged view of a range B shown in FIG. In the process shown in FIG. 4, water is sprayed on the space in the tunnel 3 using the piping unit 13, and the lining concrete 5 in the curing section 11 is cured (FIG. 1).

上述したように、図1は、移動式型枠7が養生区間11の前方へ移動した後の状態を示す図であるが、移動式型枠7が養生区間11内に設置されている時点で、移動式型枠7の内側・底面に配管ユニット13を設置してもよい。この場合、移動式型枠7が養生区間11内に設置されている時点で、水の噴霧・養生を開始する。その後、移動式型枠7が移動して図1に示す状態となった後、移動式型枠7の内側・底面に設置した配管ユニット13をL型鋼材23上に盛り替え、水の噴霧・養生を継続する。配管ユニット13の盛り替えは、例えば、配管ユニット13間の接続をホースにすることにより、容易に行うことができる。   As described above, FIG. 1 is a diagram illustrating a state after the mobile formwork 7 has moved to the front of the curing section 11, but when the mobile formwork 7 is installed in the curing section 11. The piping unit 13 may be installed on the inner side / bottom surface of the movable mold 7. In this case, when the mobile formwork 7 is installed in the curing section 11, the spraying / curing of water is started. Thereafter, after the movable mold 7 is moved to the state shown in FIG. 1, the piping unit 13 installed on the inner side / bottom surface of the movable mold 7 is replaced on the L-type steel material 23, and water spray / Continue curing. The refilling of the piping unit 13 can be easily performed by using, for example, a hose connection between the piping units 13.

図4に示す工程では、養生区間11の覆工コンクリート5の養生を行うため、ポンプ21を用いて水タンク19から配管13aへ送水し、ノズル35からトンネル3の坑内中心に向けて微霧37を噴霧する。トンネル3の底面27に対するノズル35の設置角度33は、例えば45度とする。   In the process shown in FIG. 4, in order to cure the lining concrete 5 in the curing section 11, water is fed from the water tank 19 to the pipe 13 a using the pump 21, and a fine mist 37 is directed from the nozzle 35 toward the pit center of the tunnel 3. Spray. The installation angle 33 of the nozzle 35 with respect to the bottom surface 27 of the tunnel 3 is, for example, 45 degrees.

微霧37の平均粒径は、35〜65μmとするのが望ましい。平均粒径が35μm以下であると、粒径が細かすぎ、覆工コンクリート表面の湿潤状態を適切に保つことができない。65μm以上であると、トンネル空間全体を加湿の対象とした場合でも、覆工コンクリート表面に結露を生じやすい。平均粒径を35〜65μmとすることにより、良好な状態で湿潤養生を行うことができる。   The average particle diameter of the fine mist 37 is preferably 35 to 65 μm. When the average particle size is 35 μm or less, the particle size is too fine, and the wet state of the lining concrete surface cannot be maintained appropriately. When the thickness is 65 μm or more, condensation tends to occur on the lining concrete surface even when the entire tunnel space is targeted for humidification. By setting the average particle size to 35 to 65 μm, wet curing can be performed in a good state.

ノズル35から噴霧する微霧37の噴霧量は、例えば1〜2リットル/時間とする。噴霧期間は、例えば21日間とする。   The spray amount of the fine mist 37 sprayed from the nozzle 35 is, for example, 1 to 2 liters / hour. The spray period is, for example, 21 days.

図4に示す工程では、図1に示すように養生区間11をトンネル軸方向に複数の区間11−1、11−2、…、11−mに区分し、区間毎のトンネル内部の湿度に応じて水の噴霧量を調整してもよい。水の噴霧量は、例えば、配管13aの一部の孔17からノズル35を取り外して蓋(図示せず)を設置し、使用するノズル35の数量を変更することにより、調整可能である。   In the process shown in FIG. 4, the curing section 11 is divided into a plurality of sections 11-1, 11-2,..., 11-m in the tunnel axis direction as shown in FIG. The amount of water spray may be adjusted. The amount of water sprayed can be adjusted, for example, by removing the nozzle 35 from a part of the holes 17 of the pipe 13a, installing a lid (not shown), and changing the number of nozzles 35 to be used.

図10は、トンネル3の坑内の換気方法を示す図である。図10に示すように、施工中のトンネル3には、機械式の換気装置57が設置される。施工中のトンネル3では、換気装置57の風管59の端部63からトンネル3の内部に新鮮な空気を送り、一般に矢印Fに示す方向に0.3m/s以上の風速が得られるように換気を行う。施工中のトンネル3は、必要量の換気を行う以外は空気の変化が少なく、時系的に湿度および温度が比較的安定した密閉された空間である。トンネル3の内部は、通常、掘削方向前方の掘削面61付近では湿度が高く、掘削方向後方のトンネル3の開口部近傍では湿度が低い。そのため、養生区間11の前方では水の噴霧量を少なく、後方では噴霧量を多くすることが望ましい。   FIG. 10 is a diagram illustrating a ventilation method in the tunnel 3. As shown in FIG. 10, a mechanical ventilation device 57 is installed in the tunnel 3 under construction. In the tunnel 3 under construction, fresh air is sent from the end 63 of the wind pipe 59 of the ventilation device 57 into the tunnel 3 so that a wind speed of 0.3 m / s or more is generally obtained in the direction indicated by the arrow F. Provide ventilation. The tunnel 3 under construction is a sealed space in which the change in air is small except for the necessary amount of ventilation, and the humidity and temperature are relatively stable over time. The inside of the tunnel 3 is usually high in the vicinity of the excavation surface 61 in front of the excavation direction and low in the vicinity of the opening of the tunnel 3 in the rear of the excavation direction. Therefore, it is desirable to reduce the amount of water sprayed in front of the curing section 11 and increase the amount of sprayed behind.

図4に示す水タンク19の容量およびポンプ21の能力は、ノズル35の設置数や配管13aの長さ、微霧37の噴霧量や噴霧期間等に基づいて決定される。水タンク19の水は、所定の時間毎に供給してもよいし、トンネル3の坑内に常時設置されている水配管から自動で供給してもよい。   The capacity of the water tank 19 and the capacity of the pump 21 shown in FIG. 4 are determined based on the number of nozzles 35 installed, the length of the pipe 13a, the spray amount of the fine mist 37, the spray period, and the like. The water in the water tank 19 may be supplied every predetermined time or may be automatically supplied from a water pipe that is always installed in the tunnel 3.

図4に示す工程では、所定の養生期間が終了した後、養生区間11に設置した掘削方向最後部の配管ユニット13を覆工コンクリート5の内側から取り外し、掘削方向最前部に設置する。このとき、水タンク19およびポンプ21は一旦取り外し、新たに最後部となった配管ユニット13の端部に再接続する。または、取り外した配管ユニット13の区間を、送水配管と置き換えてもよい。   In the process shown in FIG. 4, after the predetermined curing period ends, the piping unit 13 at the rearmost part in the excavation direction installed in the curing section 11 is removed from the inside of the lining concrete 5 and installed at the frontmost part in the excavation direction. At this time, the water tank 19 and the pump 21 are once removed and reconnected to the end of the piping unit 13 which is newly the last part. Or you may replace the area of the removed piping unit 13 with water supply piping.

第1の実施の形態では、地山1の掘削と覆工コンクリート5の打設、養生区間11への配管ユニット13の設置、配管ユニット13による水の噴霧、配管ユニット13の取り外しを繰り返すことにより、トンネル3の覆工コンクリート5の構築を進める。養生区間11や噴霧期間の長さは、移動式型枠7の移動に関係なく、施工条件に応じて適切に設定される。   In the first embodiment, the excavation of the natural ground 1 and the placement of the lining concrete 5, the installation of the piping unit 13 in the curing section 11, the spraying of water by the piping unit 13, and the removal of the piping unit 13 are repeated. The construction of the lining concrete 5 of the tunnel 3 is advanced. The length of the curing section 11 and the spraying period are appropriately set according to the construction conditions regardless of the movement of the movable mold 7.

このように、第1の実施の形態では、複数の配管ユニット13をトンネル軸方向に接続しつつ覆工コンクリート5の内側に設置し、微霧37を噴霧して覆工コンクリート5の養生を行う。第1の実施の形態では、移動式型枠7の移動に関係なく、配管ユニット13を単独で設置・撤去・移動させることにより、養生区間11や噴霧期間の長さを自由に設定でき、安定した十分な養生を行うことができる。   As described above, in the first embodiment, the plurality of piping units 13 are installed inside the lining concrete 5 while being connected in the tunnel axial direction, and the lining concrete 5 is cured by spraying the fine mist 37. . In the first embodiment, the length of the curing section 11 and the spraying period can be set freely by installing, removing, and moving the piping unit 13 independently regardless of the movement of the movable formwork 7, and stable. Sufficient curing can be performed.

第1の実施の形態の養生方法では、配管ユニット13を用いて、トンネル3の養生区間11の内空全体を有効に利用して加湿する。また、上述したように、施工中のトンネル3では一般に0.3m/s以上の風速が得られるように換気が行われており、風速を0.3〜0.6m/s程度にコントロールすることにより、湿気を含んだ空気が充満しやすくなる。そのため、第1の実施の形態の養生方法では、湿度のコントロールが容易であり、トンネル3の養生区間11の内空全体を略均一に湿潤できる。   In the curing method according to the first embodiment, the piping unit 13 is used to humidify the entire interior space of the curing section 11 of the tunnel 3 effectively. Further, as described above, the tunnel 3 under construction is generally ventilated so as to obtain a wind speed of 0.3 m / s or higher, and the wind speed is controlled to about 0.3 to 0.6 m / s. Therefore, it becomes easy to fill the air containing moisture. Therefore, in the curing method of the first embodiment, it is easy to control the humidity, and the entire inner space of the curing section 11 of the tunnel 3 can be wetted substantially uniformly.

図5は、覆工コンクリートの表面湿度の経時変化を示す図である。図5は、トンネルの覆工コンクリートの脱型後、図5に示す期間Cに従来の空気膜方式による養生を行い、期間Dに第1の実施の形態で述べた方法による養生を行った場合の、覆工コンクリートの表面湿度の計測結果である。なお、コンクリートのセメント種類は高炉セメントB種、セメント量は320kg/mであり、打ち込み温度は20℃、トンネル坑内温度は17℃、トンネル坑内湿度は60%であった。 FIG. 5 is a diagram showing the change over time of the surface humidity of the lining concrete. FIG. 5 shows a case where, after demolding the lining concrete of the tunnel, curing is performed by the conventional air film method in period C shown in FIG. 5 and curing is performed by the method described in the first embodiment in period D. It is a measurement result of the surface humidity of lining concrete. The concrete cement type was blast furnace cement type B, the cement amount was 320 kg / m 3 , the driving temperature was 20 ° C., the tunnel mine temperature was 17 ° C., and the tunnel mine humidity was 60%.

図5に示すように、期間Dにおける覆工コンクリートの表面湿度は、80%程度に保持された。また、覆工コンクリートの1スパン(図1に示す施工長さA)当りのひび割れ平均長さは1.2mであった。空気膜方式のみにより養生した箇所の1スパン当りのひび割れ平均長さは8.2mであり、無養生の箇所の1スパン当りのひび割れ平均長さは11.6であったことから、第1の実施の形態で述べた方法で養生を行うことにより、ひび割れ発生を極めて減少できることが確認できた。   As shown in FIG. 5, the surface humidity of the lining concrete in the period D was kept at about 80%. Moreover, the average crack length per span of the lining concrete (construction length A shown in FIG. 1) was 1.2 m. The average length of cracks per span of the part cured by the air film method was 8.2 m, and the average length of cracks per span of the uncured part was 11.6. It was confirmed that the occurrence of cracks can be greatly reduced by curing using the method described in the embodiment.

第1の実施の形態によれば、図5に示すように、覆工コンクリートの表面湿度を、急激な変化なく一定に保つことができるため、覆工コンクリート5が緻密になり、初期・長期強度が増大し、従来工法と比較して構造上の安全性が向上する。また、乾燥収縮・温度応力によるひび割れが低減できるため、鉄筋の腐食等が抑制されてコンクリートの耐久性が向上し、剥離・剥落を防止できる。さらに、従来と比較してひび割れ補修の工期が短縮でき、工費削減が可能となる。   According to the first embodiment, as shown in FIG. 5, since the surface humidity of the lining concrete can be kept constant without abrupt change, the lining concrete 5 becomes dense and has an initial and long-term strength. And the structural safety is improved as compared with the conventional method. In addition, since cracks due to drying shrinkage and temperature stress can be reduced, corrosion of the reinforcing bars and the like are suppressed, the durability of the concrete is improved, and peeling / peeling can be prevented. Furthermore, the crack repair period can be shortened compared to the conventional case, and the construction cost can be reduced.

第1の実施の形態で使用する配管13aやノズル35は、市販のものを用いるため、材料・工具の品質確認が容易である。配管ユニット13は軽量であるため、人手で容易に移動および組立が可能である。   Since the piping 13a and the nozzle 35 used in the first embodiment are commercially available, it is easy to check the quality of materials and tools. Since the piping unit 13 is lightweight, it can be easily moved and assembled manually.

トンネル3の内空には、換気設備、照明、給排水設備、電気ケーブルなどの工事用設備が設置されているが、配管ユニット13は設置時に大規模なフレーム等が不要であるため、設置時や移動時に工事用設備が障害物となることがなく、作業性が良い。また、配管ユニット13は、作業車両の通行の妨げにならない。   Construction equipment such as ventilation equipment, lighting, water supply / drainage equipment, and electric cables is installed in the interior of the tunnel 3. However, since the piping unit 13 does not require a large frame or the like during installation, Construction equipment does not become an obstacle when moving, and workability is good. Moreover, the piping unit 13 does not hinder the passage of the work vehicle.

なお、第1の実施の形態では、配管13aの径や孔17の設置間隔、配管13aとトンネル3の底面27との距離29、配管13aと覆工コンクリート5の内周面25との距離31、微霧37の噴霧量や噴霧期間等の数値を例示したが、これらの数値は上述したものに限らない。これらの数値は、事例ごとに適切に設定すればよい。   In the first embodiment, the diameter of the pipe 13 a and the installation interval of the holes 17, the distance 29 between the pipe 13 a and the bottom surface 27 of the tunnel 3, and the distance 31 between the pipe 13 a and the inner peripheral surface 25 of the lining concrete 5. Although numerical values such as the spray amount of the fine mist 37 and the spraying period are exemplified, these numerical values are not limited to those described above. These numerical values may be set appropriately for each case.

また、配管ユニット13を用いて水を噴霧する際に、配管13aに設置するノズル35の数量を調整することにより、養生区間11をトンネル軸方向に複数に区分した区間毎の水の噴霧量を調整したが、水の噴霧量の調整方法はこの限りでない。配管ユニット13に圧力バルブや流量弁を設け、トンネル軸方向において配管13aの圧力を変化させて噴霧量を調整してもよい。   Moreover, when spraying water using the piping unit 13, by adjusting the number of nozzles 35 installed in the piping 13a, the spraying amount of water for each section obtained by dividing the curing section 11 into a plurality of sections in the tunnel axis direction can be obtained. Although it adjusted, the adjustment method of the spray amount of water is not this limitation. The pipe unit 13 may be provided with a pressure valve or a flow valve, and the spray amount may be adjusted by changing the pressure of the pipe 13a in the tunnel axis direction.

さらに、第1の実施の形態では、覆工コンクリート5の脱型直後から配管ユニット13を用いた養生を行ったが、養生計画はこれに限らない。例えば、覆工コンクリート5を脱型し、従来の方法による養生を行った後、配管ユニット13を用いた養生を行ってもよい。   Furthermore, in 1st Embodiment, although the curing using the piping unit 13 was performed immediately after demolding of the lining concrete 5, a curing plan is not restricted to this. For example, after the lining concrete 5 is removed from the mold and cured by a conventional method, curing using the piping unit 13 may be performed.

配管13aの設置時には、図3に示すL型鋼材23のかわりにL型アルミニュームを用いてもよい。   When installing the pipe 13a, L-type aluminum may be used instead of the L-type steel material 23 shown in FIG.

次に、第2の実施の形態について説明する。第2の実施の形態では、第1の実施の形態の配管ユニット13のかわりに配管ユニット41を用いる。   Next, a second embodiment will be described. In the second embodiment, a piping unit 41 is used instead of the piping unit 13 of the first embodiment.

図6は、配管ユニット41の概要を示す図である。図6に示すように、配管ユニット41は、平行に配置された2本の直線状の配管41aと、配管41aの軸方向に所定の間隔をおいて配置され、両端部が2本の配管41aにそれぞれ連結された3本のアーチ状の配管41bとで構成される。2本の配管41aの設置間隔、3本の配管41bのアーチの形状は、配管ユニット41を設置するトンネル3の形状および大きさに応じて決定される。3本の配管41bの設置間隔は、例えば3〜5m程度とする。配管ユニット41の端部42は、他の配管ユニット41と軸方向に接続可能な構造とする。   FIG. 6 is a diagram showing an outline of the piping unit 41. As shown in FIG. 6, the piping unit 41 includes two linear pipes 41a arranged in parallel and a predetermined distance in the axial direction of the pipe 41a, and two pipes 41a at both ends. And three arched pipes 41b connected to each other. The installation interval of the two pipes 41a and the arch shape of the three pipes 41b are determined according to the shape and size of the tunnel 3 in which the pipe unit 41 is installed. The installation interval of the three pipes 41b is, for example, about 3 to 5 m. The end portion 42 of the piping unit 41 is structured to be connectable to another piping unit 41 in the axial direction.

図6に示すように、配管41bには、所定の間隔で孔39が設けられる。孔39の設置間隔49は、例えば30〜60cm程度とする。孔39には、ノズル53(図8)が設置される。配管41bの周方向における孔39の設置位置は、後述するノズル53(図8)の設置角度に応じた位置とする。   As shown in FIG. 6, holes 39 are provided in the piping 41b at predetermined intervals. The installation interval 49 of the holes 39 is, for example, about 30 to 60 cm. A nozzle 53 (FIG. 8) is installed in the hole 39. The installation position of the hole 39 in the circumferential direction of the pipe 41b is a position corresponding to the installation angle of a nozzle 53 (FIG. 8) described later.

配管41aおよび配管41bは、鋼管、アルミニューム管、塩ビ管、ビニールホース、ゴムホース等のいずれでもよい。但し、配管41aは、配管ユニット41を支えるための架台間隔を長くとるために、鋼管が最適である。配管41bは、覆工面に合わせるため、可撓性のあるゴムホースを使用することが適している。配管41aおよび配管41bの径は、例えば10mmとする。   The pipe 41a and the pipe 41b may be any of a steel pipe, an aluminum pipe, a vinyl chloride pipe, a vinyl hose, a rubber hose, and the like. However, the pipe 41a is optimally a steel pipe in order to increase the interval between the supports for supporting the pipe unit 41. In order to match the piping 41b with the lining surface, it is suitable to use a flexible rubber hose. The diameters of the pipe 41a and the pipe 41b are, for example, 10 mm.

第2の実施の形態における作業工程は、第1の実施の形態とほぼ同様である。図7は、トンネル3の内側に配管ユニット41を設置する工程を示す図である。図の(a)図は、配管ユニット41が設置されたトンネル3の斜視図である。図7の(b)図は、配管ユニット41が設置されたトンネル3の周方向の断面図である。   The work process in the second embodiment is substantially the same as that in the first embodiment. FIG. 7 is a diagram illustrating a process of installing the piping unit 41 inside the tunnel 3. The (a) figure of a figure is a perspective view of the tunnel 3 in which the piping unit 41 was installed. FIG. 7B is a sectional view in the circumferential direction of the tunnel 3 in which the piping unit 41 is installed.

図7に示す工程では、まず、図示しない掘削機を用いて地山を掘削し、移動式型枠を用いてトンネル3の覆工コンクリート5を打設する。そして、養生区間に配管ユニット41を設置する。   In the step shown in FIG. 7, first, a natural ground is excavated using an excavator (not shown), and the lining concrete 5 of the tunnel 3 is placed using a movable formwork. And the piping unit 41 is installed in a curing area.

図7に示す工程では、トンネル3の覆工コンクリート5の内側に、養生区間の全長にわたって、複数の配管ユニット41を軸方向に接続して設置する。軸方向に接続した複数の配管ユニット41の掘削方向後方の端部には、水タンク19およびポンプ21を接続する。水タンク19は、軽量で錆びないポリプロピレン容器等が好適である。ポンプ21は、高圧連続ポンプ等とする。なお、図7に示す工程では、移動式型枠が養生区間の前方に移動した後に、養生区間に配管ユニット41を設置する。   In the step shown in FIG. 7, a plurality of piping units 41 are installed in the axial direction over the entire length of the curing section inside the lining concrete 5 of the tunnel 3. The water tank 19 and the pump 21 are connected to the rear ends of the plurality of piping units 41 connected in the axial direction in the excavation direction. The water tank 19 is preferably a lightweight polypropylene container that does not rust. The pump 21 is a high-pressure continuous pump or the like. In addition, in the process shown in FIG. 7, after a movable formwork moves to the front of a curing area, the piping unit 41 is installed in a curing area.

複数の配管ユニット41を接続して設置する際には、第1の実施の形態における複数の配管ユニット13の配置時と同様に、養生区間の長さに応じてトンネル軸方向の接続数を調整する。配管ユニット41の軸方向の長さは、移動式型枠を用いて覆工コンクリート5を打設・脱型する際の1スパンの施工長さと略同等とする。   When connecting and installing a plurality of piping units 41, the number of connections in the tunnel axis direction is adjusted according to the length of the curing section, as in the case of arranging the plurality of piping units 13 in the first embodiment. To do. The length of the piping unit 41 in the axial direction is substantially equal to the construction length of one span when placing and removing the lining concrete 5 using a movable mold.

図7の(a)図に示すように、配管ユニット41を設置する際には、トンネル3の両側部に、2本の配管41aを1本ずつトンネル軸方向に配置する。このとき、3本の配管41bは、覆工コンクリート5の内側に、トンネル軸方向に所定の間隔をおいて配置される。上述した水タンク19およびポンプ21は、掘削方向最後部の配管ユニット41の2本の配管41aの端部に、各1台ずつ接続される。   As shown in FIG. 7A, when installing the piping unit 41, two piping 41 a are arranged one by one in the tunnel axis direction on both sides of the tunnel 3. At this time, the three pipes 41b are arranged inside the lining concrete 5 at a predetermined interval in the tunnel axis direction. Each of the water tank 19 and the pump 21 described above is connected to one end of each of the two pipes 41a of the pipe unit 41 at the rearmost part in the excavation direction.

図7の(b)図に示すように、配管ユニット41の設置には、トンネル3の覆工コンクリート5の両側部の内周面25に固定したL型鋼材23、覆工コンクリート5の内周面25に打ち込まれたコンクリートアンカ45を用いる。L型鋼材23は、トンネル3の工事用の電力供給用架台と併用してもよい。コンクリートアンカ45は、トンネル3の周方向に2m程度の間隔をおいて設置するのが望ましい。コンクリートアンカ45は、例えば、直径8mm、長さ60mm程度のものを用いる。鋼線47は、例えば、径3mm程度のものを用いる。   As shown in FIG. 7 (b), the piping unit 41 is installed with an L-shaped steel material 23 fixed to the inner peripheral surfaces 25 on both sides of the lining concrete 5 of the tunnel 3, and the inner periphery of the lining concrete 5. A concrete anchor 45 driven into the surface 25 is used. The L-shaped steel material 23 may be used in combination with a power supply mount for the construction of the tunnel 3. It is desirable to install the concrete anchors 45 at an interval of about 2 m in the circumferential direction of the tunnel 3. For example, a concrete anchor 45 having a diameter of about 8 mm and a length of about 60 mm is used. For example, a steel wire 47 having a diameter of about 3 mm is used.

2本の配管41aは、覆工コンクリート5の両側部のL型鋼材23上にそれぞれ配置される。配管41bは、コンクリートアンカ45に接続した鋼線47を用いて保持される。配管41bとトンネル3の上半部の覆工コンクリート5の内周面25との距離51は、例えば、30〜50cmとする。配管41bとトンネル3の両側部の覆工コンクリート5の内周面25との距離31は、例えば、5〜10cmとする。   The two pipes 41 a are respectively arranged on the L-shaped steel materials 23 on both sides of the lining concrete 5. The pipe 41 b is held using a steel wire 47 connected to the concrete anchor 45. A distance 51 between the pipe 41b and the inner peripheral surface 25 of the lining concrete 5 in the upper half of the tunnel 3 is, for example, 30 to 50 cm. The distance 31 between the pipe 41b and the inner peripheral surface 25 of the lining concrete 5 on both sides of the tunnel 3 is, for example, 5 to 10 cm.

図8は、配管ユニット41を用いて水を噴霧する工程を示す図である。図8に示す工程では、覆工コンクリート5を脱型して移動式型枠が掘削方向前方へ移動した後、配管ユニット41を用いて水をトンネル3内の空間に噴霧し、養生区間の覆工コンクリート5の養生を行う。   FIG. 8 is a diagram illustrating a process of spraying water using the piping unit 41. In the process shown in FIG. 8, after the lining concrete 5 is removed and the movable formwork moves forward in the excavation direction, water is sprayed onto the space in the tunnel 3 using the piping unit 41 to cover the curing section. Curing the concrete 5

図8に示す工程では、養生区間の覆工コンクリート5の養生を行うため、ポンプ21を用いて水タンク19から配管41aを介して配管41bへ送水し、配管41bの孔39に設置したノズル53から、トンネル軸方向に平行に微霧54を噴霧する。ノズル53の設置角度は、トンネル軸方向に対して0度および180度とする。微霧54は、トンネル軸方向前方および後方に向けて噴霧される。   In the process shown in FIG. 8, in order to cure the lining concrete 5 in the curing section, water is supplied from the water tank 19 to the pipe 41 b through the pipe 41 a using the pump 21, and the nozzle 53 installed in the hole 39 of the pipe 41 b. The fine mist 54 is sprayed in parallel to the tunnel axis direction. The installation angle of the nozzle 53 is 0 degrees and 180 degrees with respect to the tunnel axis direction. The fine mist 54 is sprayed forward and rearward in the tunnel axial direction.

微霧54の平均粒径は、第1の実施の形態と同様に、35〜65μmとするのが望ましい。平均粒径を35〜65μmとすることにより、良好な状態で湿潤養生を行うことができる。ノズル35から噴霧する微霧54の噴霧量は、例えば1〜2リットル/時間とする。噴霧期間は、例えば21日間とする。   The average particle diameter of the fine mist 54 is preferably 35 to 65 μm, as in the first embodiment. By setting the average particle size to 35 to 65 μm, wet curing can be performed in a good state. The spray amount of the fine mist 54 sprayed from the nozzle 35 is, for example, 1 to 2 liters / hour. The spray period is, for example, 21 days.

図8に示す工程では、第1の実施の形態と同様に、養生区間をトンネル軸方向に複数の区間に区分し、区間毎のトンネル内部の湿度に応じて水の噴霧量を調整してもよい。水の噴霧量は、例えば、配管41bの一部の孔39からノズル53を取り外して蓋(図示せず)を設置し、使用するノズル53の数量を変更することにより、調整可能である。   In the process shown in FIG. 8, as in the first embodiment, the curing section is divided into a plurality of sections in the tunnel axis direction, and the spray amount of water is adjusted according to the humidity inside the tunnel for each section. Good. The amount of water sprayed can be adjusted, for example, by removing the nozzle 53 from a part of the hole 39 of the pipe 41b, installing a lid (not shown), and changing the number of nozzles 53 to be used.

水タンク19の容量およびポンプ21の能力は、ノズル53の設置数や配管41aおよび配管41bの長さ、微霧54の噴霧量や噴霧期間等に基づいて決定される。水タンク19の水は、所定の時間毎に供給してもよいし、トンネル3の坑内に常時設置されている水配管から自動で供給してもよい。   The capacity of the water tank 19 and the capacity of the pump 21 are determined based on the number of nozzles 53 installed, the lengths of the pipes 41a and 41b, the spray amount of the fine mist 54, the spray period, and the like. The water in the water tank 19 may be supplied every predetermined time or may be automatically supplied from a water pipe that is always installed in the tunnel 3.

図8に示す工程では、所定の養生期間が終了した後、養生区間に設置した掘削方向最後部の配管ユニット41を覆工コンクリート5の内側から取り外し、掘削方向最前部に設置する。このとき、水タンク19およびポンプ21は一旦取り外し、新たに最後部となった配管ユニット41の端部に再接続する。または、取り外した配管ユニット41の区間を送水配管と置き換えてもよい。   In the process shown in FIG. 8, after the predetermined curing period ends, the piping unit 41 at the end of the excavation direction installed in the curing section is removed from the inside of the lining concrete 5 and installed at the forefront of the excavation direction. At this time, the water tank 19 and the pump 21 are once removed and reconnected to the end of the piping unit 41 which is newly the last part. Alternatively, the section of the removed piping unit 41 may be replaced with a water supply pipe.

第2の実施の形態では、地山1の掘削と覆工コンクリート5の打設、養生区間への配管ユニット41の設置、配管ユニット41による水の噴霧、配管ユニット41の取り外しを繰り返すことにより、トンネル3の覆工コンクリート5の構築を進める。養生区間や噴霧期間の長さは、移動式型枠の移動に関係なく、施工条件に応じて適切に設定される。   In the second embodiment, by excavating the natural ground 1 and placing the lining concrete 5, installing the piping unit 41 in the curing section, spraying water with the piping unit 41, and removing the piping unit 41, The construction of the lining concrete 5 of the tunnel 3 is advanced. The length of the curing section and the spraying period are appropriately set according to the construction conditions regardless of the movement of the movable formwork.

このように、第2の実施の形態では、複数の配管ユニット41をトンネル軸方向に接続しつつ覆工コンクリート5の内側に設置し、微霧43を噴霧して覆工コンクリート5の養生を行う。第2の実施の形態では、移動式型枠の移動に関係なく、配管ユニット41を単独で設置・撤去・移動させることにより、養生区間や噴霧期間の長さを自由に設定でき、安定した十分な養生を行うことができる。   As described above, in the second embodiment, the plurality of piping units 41 are installed inside the lining concrete 5 while being connected in the tunnel axis direction, and the lining concrete 5 is cured by spraying the fine mist 43. . In the second embodiment, regardless of the movement of the movable formwork, the length of the curing section and the spraying period can be set freely by installing, removing, and moving the piping unit 41 alone, and stable and sufficient Can be cured.

第2の実施の形態の養生方法では、配管ユニット41を用いて、トンネル3の養生区間の内空全体を有効に利用して加湿する。また、上述したように、施工中のトンネル3では一般に0.3m/s以上の風速が得られるように換気が行われており、風速を0.3〜0.6m/s程度にコントロールすることにより、湿気を含んだ空気が充満しやすくなる。そのため、第2の実施の形態の養生方法では、湿度のコントロールが容易であり、トンネル3の養生区間の内空全体を略均一に湿潤できる。   In the curing method of the second embodiment, the piping unit 41 is used to humidify the entire inside space of the curing section of the tunnel 3 effectively. Further, as described above, the tunnel 3 under construction is generally ventilated so as to obtain a wind speed of 0.3 m / s or higher, and the wind speed is controlled to about 0.3 to 0.6 m / s. Therefore, it becomes easy to fill the air containing moisture. Therefore, in the curing method of the second embodiment, the humidity can be easily controlled, and the entire inner space of the curing section of the tunnel 3 can be moistened substantially uniformly.

第2の実施の形態によれば、覆工コンクリート5の表面湿度を、急激な変化なく一定に保つことができるため、覆工コンクリート5が緻密になり、初期・長期強度が増大し、従来工法と比較して構造上の安全性が向上する。また、乾燥収縮・温度応力によるひび割れが低減できるため、鉄筋の腐食等が抑制されてコンクリートの耐久性が向上し、剥離・剥落を防止できる。さらに、従来と比較してひび割れ補修の工期が短縮でき、工費削減が可能となる。   According to the second embodiment, since the surface humidity of the lining concrete 5 can be kept constant without abrupt change, the lining concrete 5 becomes dense, the initial and long-term strength increases, and the conventional construction method As a result, structural safety is improved. In addition, since cracks due to drying shrinkage and temperature stress can be reduced, corrosion of the reinforcing bars and the like are suppressed, the durability of the concrete is improved, and peeling / peeling can be prevented. Furthermore, the crack repair period can be shortened compared to the conventional case, and the construction cost can be reduced.

第2の実施の形態で使用する配管41a、配管41bやノズル53は、市販のものを用いるため、材料・工具の品質確認が容易である。配管ユニット41は軽量であるため、人手で容易に移動および組立が可能である。   Since piping 41a, piping 41b, and nozzle 53 used in the second embodiment are commercially available, it is easy to check the quality of materials and tools. Since the piping unit 41 is lightweight, it can be easily moved and assembled manually.

トンネル3の内空には、換気設備、照明、給排水設備、電気ケーブルなどの工事用設備が設置されているが、配管ユニット41は設置時に大規模なフレーム等が不要であるため、設置時や移動時に工事用設備が障害物となることがなく、作業性が良い。また、配管ユニット41は、作業車両の通行の妨げにならない。   Construction equipment such as ventilation equipment, lighting, water supply / drainage equipment, and electric cables is installed in the interior of the tunnel 3, but the piping unit 41 does not require a large frame or the like when installed. Construction equipment does not become an obstacle when moving, and workability is good. Moreover, the piping unit 41 does not obstruct the passage of the work vehicle.

なお、第2の実施の形態の配管ユニット41では、3本の配管41bを配管41aの軸方向に3〜5mおきに配置したが、配管41bの設置本数や設置間隔は、これに限らない。また、配管41bをアーチ状としたが、配管41bの形状はアーチ状に限らず、養生する覆工コンクリート5の内周面25の形状に対応したものとする。   In the pipe unit 41 of the second embodiment, the three pipes 41b are arranged every 3 to 5 m in the axial direction of the pipe 41a. However, the number of pipes 41b and the installation interval are not limited thereto. Moreover, although the piping 41b was made into an arch shape, the shape of the piping 41b is not limited to the arch shape, and corresponds to the shape of the inner peripheral surface 25 of the lining concrete 5 to be cured.

第2の実施の形態では、配管41aおよび配管41bの径や孔39の設置間隔、配管41bと覆工コンクリート5の内周面25との距離、微霧54の噴霧量や噴霧期間等の数値を例示したが、これらの数値は上述したものに限らない。これらの数値は、事例ごとに適切に設定すればよい。   In the second embodiment, numerical values such as the diameter of the pipe 41a and the pipe 41b, the interval between the holes 39, the distance between the pipe 41b and the inner peripheral surface 25 of the lining concrete 5, the spray amount of the fine mist 54, the spray period, and the like. However, these numerical values are not limited to those described above. These numerical values may be set appropriately for each case.

また、配管ユニット41を用いて水を噴霧する際に、配管41bに設置するノズル53の数量を調整することにより、養生区間をトンネル軸方向に複数に区分した区間毎の水の噴霧量を調整したが、水の噴霧量の調整方法はこの限りでない。配管ユニット41に圧力バルブや流量弁を設けて噴霧量を調整してもよい。   Moreover, when spraying water using the piping unit 41, the amount of water sprayed in each section obtained by dividing the curing section into a plurality of sections in the tunnel axis direction is adjusted by adjusting the number of nozzles 53 installed in the piping 41b. However, the method for adjusting the amount of water spray is not limited to this. The spray amount may be adjusted by providing the piping unit 41 with a pressure valve or a flow valve.

さらに、第2の実施の形態では、覆工コンクリート5の脱型直後から配管ユニット41を用いた養生を行ったが、養生計画はこれに限らない。例えば、覆工コンクリート5を脱型し、従来の方法による養生を行った後、配管ユニット41を用いた養生を行ってもよい。   Furthermore, in 2nd Embodiment, although the curing using the piping unit 41 was performed immediately after demolding of the lining concrete 5, a curing plan is not restricted to this. For example, the lining concrete 5 may be removed from the mold and cured using a conventional method, and then cured using the piping unit 41.

配管41aの設置時には、図7に示すL型鋼材23のかわりにL型アルミニュームを用いてもよい。   When installing the pipe 41a, an L-type aluminum may be used instead of the L-type steel material 23 shown in FIG.

図9は、トンネル3の貫通後の覆工コンクリート5の養生方法を示す図である。第1および第2の実施の形態では、図10に示す換気装置57により坑内の風速が所定の範囲にコントロールされた下でトンネル3を掘削しつつ覆工コンクリート5の養生を行うことにより、微霧により湿気を含んだ空気が充満しやすくなり、さらに覆工コンクリート5の養生が促進できることを述べた。以下に、図9に示すように、覆工コンクリート5に先行して実施する地山1の掘削によりトンネル3が貫通した場合の坑内風速をコントロールする方法について説明する。   FIG. 9 is a diagram illustrating a curing method for the lining concrete 5 after passing through the tunnel 3. In the first and second embodiments, the lining concrete 5 is cured while excavating the tunnel 3 while the wind speed in the mine is controlled within a predetermined range by the ventilation device 57 shown in FIG. It was stated that the air containing moisture was easily filled by the mist, and the curing of the lining concrete 5 could be further promoted. Below, as shown in FIG. 9, the method to control the mine wind speed when the tunnel 3 penetrates by excavation of the natural ground 1 implemented prior to the lining concrete 5 will be described.

図9に示すようにトンネル3が貫通した後は、トンネル3内の移動式型枠7の前方に隔壁55を設置する。そして、トンネル3の貫通後にも、トンネル貫通前と同様に、換気装置57の風管59の端部63からトンネル3の内部に新鮮な空気を送り、矢印Gに示す方向に所定の範囲の風速が得られるように換気を行う。また、第1および第2の実施の形態と同様の方法で、配管ユニット13等を用いて覆工コンクリート5の養生を行う。   After the tunnel 3 penetrates as shown in FIG. 9, a partition wall 55 is installed in front of the movable mold 7 in the tunnel 3. After passing through the tunnel 3, fresh air is sent from the end 63 of the wind pipe 59 of the ventilation device 57 into the tunnel 3 after passing through the tunnel 3, and a wind speed within a predetermined range in the direction indicated by arrow G Ventilate so that can be obtained. Further, the lining concrete 5 is cured using the piping unit 13 and the like by the same method as in the first and second embodiments.

図9に示す養生方法では、隔壁55を設置することにより、トンネル3の貫通後にも、トンネル3の貫通前と同様に、トンネル坑内の風向きや風速を所定の範囲に保つことができる。よって、容易に湿度をコントロールすることができ、トンネル3の養生区間の内空全体を略均一に湿潤できる。   In the curing method shown in FIG. 9, by installing the partition wall 55, the wind direction and the wind speed in the tunnel mine can be maintained within a predetermined range even after the tunnel 3 is penetrated, as in the case before the tunnel 3 is penetrated. Therefore, the humidity can be easily controlled, and the entire inner space of the curing section of the tunnel 3 can be wetted substantially uniformly.

以上、添付図を参照しながら、本発明の実施の形態を説明したが、本発明の技術的範囲は、前述した実施の形態に左右されない。当業者であれば、特許請求の範囲に記載された技術的思想の範疇内において各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   As mentioned above, although embodiment of this invention was described referring an accompanying drawing, the technical scope of this invention is not influenced by embodiment mentioned above. It is obvious for those skilled in the art that various modifications or modifications can be conceived within the scope of the technical idea described in the claims, and these are naturally within the technical scope of the present invention. It is understood that it belongs.

3………トンネル
5………覆工コンクリート
11………養生区間
13、41………配管ユニット
13a、41a、41b………配管
17、39………孔
23………L型鋼材
35、53……ノズル
37、54………微霧
45………コンクリートアンカ
47………鋼線
55………隔壁
3 ......... Tunnel 5 ......... Concrete concrete 11 ......... Curing section 13, 41 ......... Piping units 13a, 41a, 41b ......... Piping 17, 39 ......... Hole 23 ......... L-shaped steel 35 , 53 …… Nozzle 37, 54 ……… Fog 45 ……… Concrete anchor 47 ……… Steel wire 55 ……… Bulk

Claims (6)

所定の区間の覆工コンクリートを打設する工程(a)と、
前記覆工コンクリートの内側に、複数の配管からなる配管ユニットを設置する工程(b)と、
脱型した前記覆工コンクリートが所定の材齢に達するまで、前記複数の配管に設けられた孔に設置したノズルから、所定の噴霧角度で水をトンネル内空間に噴霧する工程(c)と、
前記覆工コンクリートの内側から、前記配管ユニットを取り外す工程(d)と、
を具備し、
前記工程(d)でトンネル掘削方向後方で取り外した前記配管ユニットを、前記工程(b)でトンネル掘削方向前方に設置して、前記工程(a)から前記工程(d)を繰り返し、
少なくとも前記工程(c)において、換気装置により、前記トンネル内空間の風速が所定の範囲にコントロールされることを特徴とするトンネル覆工コンクリートの養生方法。
A step (a) of placing lining concrete in a predetermined section;
A step (b) of installing a piping unit comprising a plurality of piping inside the lining concrete;
(C) spraying water into the tunnel space at a predetermined spray angle from nozzles installed in the holes provided in the plurality of pipes until the demolded lining concrete reaches a predetermined age;
Removing the piping unit from the inside of the lining concrete (d),
Comprising
The pipe unit in the step (d) was removed by tunneling rearward, the step (b) installed in the tunnel excavation direction forward, the to repeat step (d) from the step (a), the
At least in the step (c), the wind speed of the tunnel inner space is controlled within a predetermined range by a ventilation device, and the curing method for tunnel lining concrete is characterized.
前記配管ユニットは、トンネルの両側部にトンネル軸方向に配置された2本の配管からなることを特徴とする請求項1記載のトンネル覆工コンクリートの養生方法。   2. The tunnel lining concrete curing method according to claim 1, wherein the pipe unit is composed of two pipes arranged in both sides of the tunnel in the tunnel axial direction. 前記配管ユニットは、トンネル軸方向に所定の間隔をおいて配置され、両端部が前記2本の配管に連結された複数の配管をさらに有することを特徴とする請求項2に記載のトンネル覆工コンクリートの養生方法。   The tunnel lining according to claim 2, wherein the pipe unit further includes a plurality of pipes arranged at predetermined intervals in the tunnel axis direction and having both ends connected to the two pipes. Concrete curing method. 前記工程(b)で、養生する区間の長さに応じて、前記配管ユニットのトンネル軸方向の接続数を調整することを特徴とする請求項1から請求項3のいずれかに記載のトンネル覆工コンクリートの養生方法。   The tunnel covering according to any one of claims 1 to 3, wherein, in the step (b), the number of connections in the tunnel axis direction of the piping unit is adjusted according to the length of a section to be cured. Curing method for engineering concrete. 前記工程(c)で、前記トンネル内空間の湿度に応じて、トンネル軸方向に区分した区間毎に水の噴霧量を調整することを特徴とする請求項1から請求項4のいずれかに記載のトンネル覆工コンクリートの養生方法。   5. The spray amount of water is adjusted in each section divided in the tunnel axis direction according to the humidity of the space in the tunnel in the step (c). Tunnel lining concrete curing method. 前記工程(c)で、噴霧する水の平均粒径が35〜65μmであることを特徴とする請求項1から請求項5のいずれかに記載のトンネル覆工コンクリートの養生方法。   The method for curing tunnel lining concrete according to any one of claims 1 to 5, wherein in the step (c), an average particle diameter of water to be sprayed is 35 to 65 µm.
JP2010076492A 2010-03-30 2010-03-30 Curing method for tunnel lining concrete Active JP5396323B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010076492A JP5396323B2 (en) 2010-03-30 2010-03-30 Curing method for tunnel lining concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010076492A JP5396323B2 (en) 2010-03-30 2010-03-30 Curing method for tunnel lining concrete

Publications (2)

Publication Number Publication Date
JP2011208407A JP2011208407A (en) 2011-10-20
JP5396323B2 true JP5396323B2 (en) 2014-01-22

Family

ID=44939733

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010076492A Active JP5396323B2 (en) 2010-03-30 2010-03-30 Curing method for tunnel lining concrete

Country Status (1)

Country Link
JP (1) JP5396323B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611120B (en) * 2018-12-12 2024-05-07 中建隧道建设有限公司 Tunnel lining intelligent maintenance trolley and control method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006089995A (en) * 2004-09-22 2006-04-06 Fukuda Corp Curing device of tunnel lining concrete
JP2008223372A (en) * 2007-03-14 2008-09-25 Konoike Constr Ltd Concrete curing method
JP2009270318A (en) * 2008-05-07 2009-11-19 Atsuta Kazuhiko Concrete wall surface curing method in tunnel work

Also Published As

Publication number Publication date
JP2011208407A (en) 2011-10-20

Similar Documents

Publication Publication Date Title
US3277219A (en) Method of molding a building structure by spraying a foamed plastic on the inside of an inflatable form
JP5275115B2 (en) Curing device and curing method for concrete continuum
JP5711896B2 (en) Wet curing method for concrete structures
JP4552142B2 (en) Lining concrete curing equipment
CN103748321A (en) A method for constructing a tunnel course, and structural element for use by the method
JP2008223372A (en) Concrete curing method
JP6357960B2 (en) Repair and reinforcement methods for existing tunnels
JP4750166B2 (en) Curing device and curing method for concrete continuum
CN105908887A (en) Airbag core mold component cast hollow floor construction method
CN109519193B (en) Tunnel lining structure of existing railway line and construction method thereof
JP4386798B2 (en) Curing method and curing device for tunnel lining concrete
JP5091167B2 (en) Concrete curing equipment and curing method
JP5396323B2 (en) Curing method for tunnel lining concrete
JP5207319B2 (en) Curing method for concrete cast in tunnel structures
JP5439813B2 (en) Curing equipment for lining concrete and curing method
JP2008202274A (en) Wet curing equipment for lining concrete
CN210858069U (en) Concrete curing device for ultrahigh independent structure column
JP5486908B2 (en) Curing equipment for widening tunnel lining concrete
JP2004162375A (en) Concrete curing apparatus
CN110056011B (en) Basement ground waterproof structure construction process
CN106089261B (en) Forward in steep dip thin layer country rock tunnel abutment wall supporting construction and method for protecting support
JP4078610B2 (en) Curing method of lining concrete by lining centle
JP4866939B2 (en) Concrete curing method and curing equipment
JP2001173894A (en) Method and device for constructing heat insulating layer for wall surface of low-temperature tank
JP7045004B2 (en) Construction method of tunnel lining body and formwork for tunnel lining concrete

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121012

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130730

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130731

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130917

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131008

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131021

R150 Certificate of patent or registration of utility model

Ref document number: 5396323

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250