JP5369728B2 - Gas control valve system - Google Patents

Gas control valve system Download PDF

Info

Publication number
JP5369728B2
JP5369728B2 JP2009022249A JP2009022249A JP5369728B2 JP 5369728 B2 JP5369728 B2 JP 5369728B2 JP 2009022249 A JP2009022249 A JP 2009022249A JP 2009022249 A JP2009022249 A JP 2009022249A JP 5369728 B2 JP5369728 B2 JP 5369728B2
Authority
JP
Japan
Prior art keywords
valve
interlocking
opening
closing
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009022249A
Other languages
Japanese (ja)
Other versions
JP2010180897A (en
Inventor
信隆 菊
幸一 柏木
昌宏 竹下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aisin Corp
Original Assignee
Aisin Seiki Co Ltd
Aisin Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aisin Seiki Co Ltd, Aisin Corp filed Critical Aisin Seiki Co Ltd
Priority to JP2009022249A priority Critical patent/JP5369728B2/en
Publication of JP2010180897A publication Critical patent/JP2010180897A/en
Application granted granted Critical
Publication of JP5369728B2 publication Critical patent/JP5369728B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells

Landscapes

  • Fuel Cell (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Fluid-Driven Valves (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a gas control type valve system capable of contributing to reduction in the number of parts and an installation space. <P>SOLUTION: This gas control type valve system includes a valve set 1 having interlocking valves 2, 3 that are interlockingly opened and closed based on controlling gas, a controlling passage 4 for supplying controlling gas to each of the interlocking valves 2, 3 and controlling opening operation and closing operation of the interlocking valves 2, 3, and a prioritizing and delaying element 5 for maintaining timewise prioritizing and delaying relation concerning interlocking of opening operation and/or interlocking of closing operation of the interlocking valves 2, 3. <P>COPYRIGHT: (C)2010,JPO&amp;INPIT

Description

本発明は空気圧等の気体圧に基づいてバルブを開閉させる気体制御式バルブシステムに関する。   The present invention relates to a gas-controlled valve system that opens and closes a valve based on a gas pressure such as air pressure.

一般的には、給電および断電により電磁バルブの開閉を制御する電動制御式のバルブシステムが提供されている。更に、空気の供給によりバルブの開閉を制御する気体制御式のバルブシステムが提供されている(特許文献1)。このものによれば、バルブの開閉を空気圧で行うため、電動制御式のバルブシステムよりも、消費電力を小さくできる利点、電気配線を減少させることができる利点、電気配線ではなく空気配管で済むため、高温雰囲気にも配管できる利点等といった利点が得られる。しかしながら上記した気体制御式バルブシステムでは、電気信号を送信する電気配線に相当する部分を空気配管で置き換え、更に、空気配管に空気を供給したり停止したりする切替制御を行う切替バルブを空気配管のそれぞれに接続させる必要があり、部品点数および設置スペースが増加する傾向があった。 Generally, an electrically controlled valve system that controls opening and closing of an electromagnetic valve by power supply and power interruption is provided. Furthermore, a gas control type valve system that controls opening and closing of the valve by supplying air is provided (Patent Document 1). According to this, since the valve is opened and closed by air pressure, the power consumption can be reduced compared to the electrically controlled valve system, the electrical wiring can be reduced, and air piping is used instead of electrical wiring. Advantages such as the advantage that piping is possible even in a high-temperature atmosphere are obtained. However, in the above-described gas control type valve system, the part corresponding to the electric wiring for transmitting the electric signal is replaced with the air pipe, and the switching valve for performing the switching control for supplying or stopping the air to the air pipe is provided with the air pipe. There was a tendency for the number of parts and installation space to increase.

特開2000−133294号公報JP 2000-133294 A

本発明は上記した実情に鑑みてなされたものであり、部品点数および設置スペースの低減に貢献できる気体制御式バルブシステムを提供することを課題とする。   This invention is made | formed in view of the above-mentioned actual condition, and makes it a subject to provide the gas control type valve system which can contribute to reduction of a number of parts and installation space.

本発明に係る気体制御式バルブシステムは、(i)機器に接続され、開放動作の連動および/または閉鎖動作の連動が行われる複数の連動バルブを備えるバルブ組と、(ii)バルブ組を構成する各連動バルブに制御用気体を供給して各連動バルブの開放動作の連動および/または閉鎖動作の連動を制御する制御用通路と、(iii)制御用通路および/または連動バルブに設けられ、バルブ組を構成する各連動バルブの開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係を維持させる優先遅延要素とを具備することを特徴とする。   A gas control type valve system according to the present invention comprises (i) a valve set including a plurality of interlocking valves connected to a device and interlocking for opening operation and / or interlocking for closing operation, and (ii) constitutes the valve set. A control passage for supplying control gas to each interlocking valve to control the interlocking of the opening operation and / or the closing operation of each interlocking valve, and (iii) the control passage and / or the interlocking valve, It is characterized by comprising a priority delay element that maintains a temporal priority delay relationship for the interlocking of the opening operation and / or the interlocking of the closing operation of each interlocking valve constituting the valve set.

機器は、バルブ組の開放動作により流体が供給されるものである。機器としては特に限定されず、燃料電池のスタック、コージェネ機器、ラジエータ機器、太陽電池機器、油圧機器等を例示できる。バルブ組は、開放動作および閉鎖動作が制御用気体により制御される複数の連動バルブを備えている。各連動バルブの開放動作または閉鎖動作により、機器の状態が調整される。   The device is supplied with fluid by opening the valve assembly. The device is not particularly limited, and examples thereof include a fuel cell stack, a cogeneration device, a radiator device, a solar cell device, and a hydraulic device. The valve set includes a plurality of interlocking valves whose opening operation and closing operation are controlled by a control gas. The state of the device is adjusted by opening or closing each interlocking valve.

制御用通路は、バルブ組を構成する各連動バルブに制御用気体を供給する。これにより各連動バルブの開放動作の連動および/または閉鎖動作の連動が制御される。優先遅延要素は、制御用通路および/または連動バルブに設けられている。優先遅延要素は、バルブ組を構成する連動バルブの開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係を維持させる機能を有する。従って、バルブ組が作動するときには、バルブ組を構成する各連動バルブにおいて、特定の連動バルブが他の連動バルブに対して優先的に開弁動作する。あるいは、特定の連動バルブが他の連動バルブに対して優先的に閉弁動作する。   The control passage supplies control gas to each interlocking valve constituting the valve set. Thereby, the interlocking of the opening operation and / or the closing operation of each interlocking valve is controlled. The priority delay element is provided in the control passage and / or the interlocking valve. The priority delay element has a function of maintaining a temporal priority delay relationship with respect to the interlocking of the opening operation and / or the interlocking of the closing operation of the interlocking valves constituting the valve set. Therefore, when the valve group is operated, a specific interlocking valve preferentially opens with respect to other interlocking valves in each interlocking valve constituting the valve group. Or a specific interlocking valve closes preferentially with respect to another interlocking valve.

本発明によれば、バルブ組が作動するとき、優先遅延要素は、バルブ組を構成する連動バルブの開放動作の連動および/または閉鎖動作の連動について時間的な優先遅延関係を自動的に維持させることができる。従って、バルブ組を構成する特定の連動バルブの開放動作を他の連動バルブの開放動作よりも優先させる形態、および/または、バルブ組を構成する特定の連動バルブの閉鎖動作を他の連動バルブの閉鎖動作よりも優先させる形態が得られる。   According to the present invention, when the valve set is operated, the priority delay element automatically maintains a temporal priority delay relationship for the interlocking of the opening operation and / or the interlocking of the closing operation of the interlocking valves constituting the valve set. be able to. Therefore, the opening operation of the specific interlocking valve constituting the valve group is given priority over the opening operation of the other interlocking valve, and / or the closing operation of the specific interlocking valve constituting the valve group is performed by the other interlocking valve. A configuration in which priority is given to the closing operation is obtained.

このような本発明によれば、優先遅延要素が設けられているため、気体を流す配管のそれぞれに切替バルブを設けずとも良く、部品点数および設置スペースの低減に貢献できる。   According to the present invention as described above, since the priority delay element is provided, it is not necessary to provide a switching valve in each of the pipes through which the gas flows, and it is possible to contribute to the reduction of the number of parts and the installation space.

実施例1に係り、気体制御式バルブシステムを模式的に示す配管図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a piping diagram schematically showing a gas control type valve system according to Example 1. 実施例2に係り、気体制御式バルブシステムを模式的に示す配管図である。FIG. 6 is a piping diagram schematically showing a gas control type valve system according to a second embodiment. 実施例3に係り、気体制御式バルブシステムを模式的に示す配管図である。FIG. 6 is a piping diagram schematically showing a gas control type valve system according to a third embodiment. 実施例4に係り、気体制御式バルブシステムを模式的に示す配管図である。FIG. 10 is a piping diagram schematically showing a gas control type valve system according to Example 4; 実施例5に係り、気体制御式バルブシステムを模式的に示す配管図である。FIG. 10 is a piping diagram schematically showing a gas control type valve system according to Example 5; 実施例6に係り、気体制御式バルブシステムを模式的に示す配管図である。FIG. 10 is a piping diagram schematically showing a gas control type valve system according to Example 6; 実施例7に係り、気体制御式バルブシステムを模式的に示す配管図である。FIG. 10 is a piping diagram schematically showing a gas control type valve system according to Example 7. 実施例8に係り、気体制御式バルブシステムで使用される連動バルブの一例を模式的に示す断面図である。FIG. 10 is a cross-sectional view schematically showing an example of an interlocking valve used in the gas control type valve system according to Example 8.

本発明の一視点によれば、優先遅延要素は、制御用気体が流れる単位時間あたりの流量を絞ることにより、バルブ組を構成する各連動バルブの開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係を設定することができる。制御用気体としては空気、窒素ガス、希ガス等が挙げられる。絞りの程度は、制御用通路を流れる制御用気体が単位時間に流れる流量に影響を与えるので、連動バルブの開放動作の連動および/または閉鎖動作の連動について時間的な優先遅延関係が設定できる。ここで、時間的な優先遅延関係とは、バルブ組を構成する特定の連動バルブの動作を他の連動バルブの動作よりも優先または遅延させることを意味する。   According to one aspect of the present invention, the priority delay element is configured to interlock the opening operation and / or the closing operation of each interlocking valve constituting the valve set by restricting the flow rate per unit time through which the control gas flows. , A temporal priority delay relationship can be set. Examples of the control gas include air, nitrogen gas, and rare gas. The degree of throttling affects the flow rate of the control gas flowing through the control passage per unit time, so that a temporal priority delay relationship can be set for the interlocking of the opening operation and / or the closing operation of the interlocking valve. Here, the temporal priority delay relationship means that the operation of a specific interlocking valve constituting the valve set is prioritized or delayed over the operation of other interlocking valves.

本発明の一視点によれば、優先遅延要素は、制御用通路の少なくとも一部の流路断面積を変化させることにより、バルブ組を構成する各連動バルブの開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係を設定することができる。流路断面積の変化は、制御用通路を流れる制御用気体が単位時間に流れる流量に影響を与えるので、連動バルブの開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係が設定できる。   According to one aspect of the present invention, the priority delay element changes the flow passage cross-sectional area of at least a part of the control passage, thereby interlocking the opening operation and / or closing operation of each interlocking valve constituting the valve group. A time priority delay relationship can be set for the interlocking. Since the change in the cross-sectional area of the flow channel affects the flow rate of the control gas flowing in the control passage per unit time, there is a temporal priority delay relationship for the interlocking of the opening operation and / or the closing operation of the interlocking valve. Can be set.

本発明の一視点によれば、優先遅延要素は、制御用通路の流路長を変化させることにより、バルブ組を構成する各連動バルブの開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係を設定することができる。流路長の変化は、制御用気体が連動バルブに到達する時間に影響を与えるので、連動バルブの開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係が設定できる。   According to one aspect of the present invention, the priority delay element changes the flow path length of the control passage to change the time for the interlocking of the opening operation and / or the closing operation of each interlocking valve constituting the valve group. It is possible to set a general priority delay relationship. Since the change in the channel length affects the time for the control gas to reach the interlocking valve, a temporal priority delay relationship can be set for interlocking of the opening operation and / or closing operation of the interlocking valve.

本発明の一視点によれば、優先遅延要素は、制御用通路および/または連動バルブに設けられたバッファ室で形成されていることができる。バッファ室の容積は、制御用通路を流れる制御用気体が連動バルブに到達するまでの時間に影響を与えるので、連動バルブの開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係が設定できる。   According to one aspect of the present invention, the priority delay element can be formed by a buffer chamber provided in the control passage and / or the interlocking valve. Since the volume of the buffer chamber affects the time until the control gas flowing through the control passage reaches the interlocking valve, the priority delay in time for interlocking of the opening operation and / or closing operation of the interlocking valve Relationships can be set.

本発明の一視点によれば、バルブ組は、開放動作により機器に流体を供給するための供給バルブと、開放動作により機器内の流体を機器外に排出させるための排出バルブとを備えている。この場合、供給バルブは、供給バルブの開放動作を実施するための開放用ポートと、供給バルブの閉鎖動作を実施するための閉鎖用ポートとを備えている。排出バルブは、排出バルブの開放動作を実施するための開放用ポートと、排出バルブの閉鎖動作を実施するための閉鎖用ポートとを備えている。   According to one aspect of the present invention, the valve set includes a supply valve for supplying fluid to the device by an opening operation and a discharge valve for discharging the fluid in the device to the outside by the opening operation. . In this case, the supply valve includes an opening port for performing the opening operation of the supply valve and a closing port for performing the closing operation of the supply valve. The discharge valve includes an opening port for performing the opening operation of the discharge valve and a closing port for performing the closing operation of the discharge valve.

本発明の一視点によれば、制御用通路は、供給バルブの開放用ポートおよび排出バルブの開放用ポートに連通する開放制御用通路と、供給バルブの閉鎖用ポートおよび排出バルブの閉鎖用ポートに連通する閉鎖制御用通路とを備えていることが好ましい。優先遅延要素は、供給バルブ、排出バルブ、開放制御用通路および閉鎖制御用通路のうちの少なくとも一つに設けられていることが好ましい。   According to one aspect of the present invention, the control passage includes an opening control passage communicating with the opening port of the supply valve and the opening port of the discharge valve, and a closing port of the supply valve and a closing port of the discharge valve. It is preferable to provide a closing control passage communicating therewith. The priority delay element is preferably provided in at least one of the supply valve, the discharge valve, the opening control passage, and the closing control passage.

本発明の一視点によれば、次の形態が例示される。
(a)開放動作について、排出バルブが開放した後に供給バルブが開放する形態(b)開放動作について、供給バルブが開放した後に排出バルブが開放する形態
(c)閉鎖動作について、排出バルブが開放した後に供給バルブが開放する形態(d)閉鎖動作について、供給バルブが開放した後に排出バルブが開放する形態
本発明の一視点によれば、バルブシステムは燃料電池のカソードにカソードガスを供給するためのものでもよいし、あるいは、アノードにアノードガスを供給するためのものでも良い。
According to one aspect of the present invention, the following form is exemplified.
(A) For the opening operation, the supply valve opens after the discharge valve opens (b) For the opening operation, the discharge valve opens for the opening operation after the supply valve opens (c) For the closing operation, the discharge valve opens (D) Form in which supply valve opens later (d) Form in which discharge valve opens after supply valve opens In accordance with one aspect of the present invention, the valve system is for supplying cathode gas to the cathode of a fuel cell. It may be a thing for supplying anode gas to an anode.

図1は実施例1を示す。本実施例に係る空気制御式(気体圧制御式)の連動バルブシステムは、開閉可能なバルブ組1と、制御用通路4と、優先遅延要素5とを有する。バルブ組1は、開放動作および閉鎖動作が制御用空気により制御される供給バルブ2と、開放動作および閉鎖動作が制御用空気(制御用気体)により制御される排出バルブ3とからなる。   FIG. 1 shows a first embodiment. The air control type (gas pressure control type) interlocking valve system according to this embodiment includes a valve set 1 that can be opened and closed, a control passage 4, and a priority delay element 5. The valve set 1 includes a supply valve 2 whose opening and closing operations are controlled by control air, and a discharge valve 3 whose opening and closing operations are controlled by control air (control gas).

具体的には、バルブ組1は、開放動作によりスタック6の内部にカソードガス(反応流体)を供給するための供給バルブ2(連動バルブ)と、開放動作によりスタック6内のカソードオフガス(反応流体)をスタック6の外部に排出させるための排出バルブ3(連動バルブ)とを備えている。ここで、供給バルブ2および排出バルブ3は、互いに連動して動作する。すなわち、スタック6が発電するとき、供給バルブ2および排出バルブ3は共に連動して開放動作する。また、スタック6が発電停止するとき、供給バルブ2および排出バルブ3は共に連動して閉鎖動作する。   Specifically, the valve set 1 includes a supply valve 2 (interlocking valve) for supplying cathode gas (reaction fluid) to the inside of the stack 6 by an opening operation, and a cathode off gas (reaction fluid) in the stack 6 by an opening operation. ) Are discharged to the outside of the stack 6. Here, the supply valve 2 and the discharge valve 3 operate in conjunction with each other. That is, when the stack 6 generates power, both the supply valve 2 and the discharge valve 3 are opened in conjunction with each other. When the stack 6 stops generating electricity, both the supply valve 2 and the discharge valve 3 are interlocked to perform a closing operation.

ここで、供給バルブ2の開放または閉鎖により、カソードガス(空気)を供給するためのカソードガス流路302が開閉される。カソードガス流路302には防塵用のフィルタ83が設けられている。排出バルブ3の開放または閉鎖により、カソードオフガスを排出させるためのカソードガス流路304が開閉される。この結果、機器であるスタック6のカソードにおけるカソードガスの状態が調整される。   Here, when the supply valve 2 is opened or closed, the cathode gas flow path 302 for supplying the cathode gas (air) is opened and closed. The cathode gas flow path 302 is provided with a dust-proof filter 83. By opening or closing the discharge valve 3, the cathode gas flow path 304 for discharging the cathode off gas is opened and closed. As a result, the state of the cathode gas at the cathode of the stack 6 that is a device is adjusted.

本実施例によれば、図1に示すように、供給バルブ2は、空気圧(気体圧)に基づいて作動するエアオペレイト連動バルブであり、供給バルブ2の開放動作を実施するための開放用ポート21と、開放用ポート21に連通する第1室22と、供給バルブ2の閉鎖動作を実施するための閉鎖用ポート23と、閉鎖用ポート23に連通する第2室24とを備えている。排出バルブ3は、空気圧に基づいて作動するエアオペレイト連動バルブであり、排出バルブ3の開放動作を実施するための開放用ポート31と、開放用ポート31に連通する第1室32と、排出バルブ3の閉鎖動作を実施するための閉鎖用ポート33と、閉鎖用ポート33に連通する第2室34とを備えている。 According to the present embodiment, as shown in FIG. 1, the supply valve 2 is an air operated interlocking valve that operates based on air pressure (gas pressure), and an opening port 21 for opening the supply valve 2. And a first chamber 22 communicating with the opening port 21, a closing port 23 for performing the closing operation of the supply valve 2, and a second chamber 24 communicating with the closing port 23. The discharge valve 3 is an air-operated valve that operates based on air pressure, and includes an opening port 31 for opening the discharge valve 3, a first chamber 32 that communicates with the opening port 31 , and the discharge valve 3. A closing port 33 for performing the closing operation of the first and second chambers 34 communicating with the closing port 33.

制御用通路4は、バルブ組1を構成する供給バルブ2および排出バルブ3にそれぞれ制御用空気を供給し、供給バルブ2および排出バルブ3の開放動作および閉鎖動作を制御する。具体的には、制御用通路4は、コンプレッサ82と切替連動バルブ7とを防塵フィルタ80を介して接続する元通路46と、供給バルブ2および排出バルブ3を連動させて開放動作させるための開放制御用通路40と、供給バルブ2および排出バルブ3を連動させて閉鎖動作させるための閉鎖制御用通路45とを備えている。図1に示すように、開放制御用通路40は、切替連動バルブ7の第1切替ポート71から導出された開放用主通路40mと、開放用主通路40mの分岐部40xから排出バルブ3の開放用ポート31に連通する第1開放用通路40fと、開放用主通路40mの分岐部40xから供給バルブ2の開放用ポート21に連通する第2開放用通路40sとを有する。   The control passage 4 supplies control air to the supply valve 2 and the discharge valve 3 constituting the valve set 1, respectively, and controls the opening and closing operations of the supply valve 2 and the discharge valve 3. Specifically, the control passage 4 is opened for operating the original passage 46 connecting the compressor 82 and the switching interlocking valve 7 via the dust filter 80, and opening the supply valve 2 and the discharge valve 3 in conjunction with each other. A control passage 40 and a closing control passage 45 for closing the supply valve 2 and the discharge valve 3 in conjunction with each other are provided. As shown in FIG. 1, the opening control passage 40 includes an opening main passage 40m led out from the first switching port 71 of the switching interlocking valve 7, and an opening of the discharge valve 3 from a branch portion 40x of the opening main passage 40m. A first opening passage 40f communicating with the opening port 31 and a second opening passage 40s communicating with the opening port 21 of the supply valve 2 from the branch portion 40x of the opening main passage 40m.

図1に示すように、閉鎖制御用通路45は、切替連動バルブ7の第2切替ポート72から導出された閉鎖用主通路45mと、閉鎖用主通路45mの分岐部45xから分岐され排出バルブ3の閉鎖用ポート33に連通する第1閉鎖用通路45fと、閉鎖用主通路45mの分岐部45xから供給バルブ2の閉鎖用ポート23に連通する第2閉鎖用通路45sとを有する。   As shown in FIG. 1, the closing control passage 45 is branched from the closing main passage 45m led out from the second switching port 72 of the switching interlocking valve 7 and the branching portion 45x of the closing main passage 45m, and the discharge valve 3 A first closing passage 45f communicating with the closing port 33, and a second closing passage 45s communicating with the closing port 23 of the supply valve 2 from the branch portion 45x of the closing main passage 45m.

図1に示すように、制御用通路4は切替連動バルブ7および防塵フィルタ80を介してコンプレッサ82(空気搬送源,気体搬送源,カソードガス搬送源)に接続されている。防塵フィルタ80は場合によっては廃止されていても良い。具体的には、切替連動バルブ7の第1切替ポート71は、開放制御用通路40に接続されている。切替連動バルブの第2切替ポート72は、閉鎖制御用通路45に接続されている。   As shown in FIG. 1, the control passage 4 is connected to a compressor 82 (air carrier source, gas carrier source, cathode gas carrier source) via a switching interlock valve 7 and a dust filter 80. The dust filter 80 may be eliminated depending on circumstances. Specifically, the first switching port 71 of the switching interlocking valve 7 is connected to the opening control passage 40. The second switching port 72 of the switching interlocking valve is connected to the closing control passage 45.

図1に示すように、開放制御用通路40は、開放制御用通路40の圧力を大気に開放できる第1逃圧連動バルブ91に接続されている。第1逃圧連動バルブ91は通常では閉鎖されているが、開放制御用通路40と第1逃圧ポート91pとが連通すると、開放制御用通路40の圧力が大気に開放される。また、閉鎖制御用通路45は、閉鎖制御用通路45の圧力を大気に開放できる第2逃圧連動バルブ92に接続されている。第2逃圧連動バルブ92は通常では閉鎖されているが、閉鎖制御用通路45と第2逃圧ポート92pとが連通すると、閉鎖制御用通路45の圧力が大気に開放される。   As shown in FIG. 1, the opening control passage 40 is connected to a first relief pressure interlocking valve 91 that can release the pressure of the opening control passage 40 to the atmosphere. The first relief pressure interlocking valve 91 is normally closed, but when the opening control passage 40 and the first relief pressure port 91p communicate with each other, the pressure in the opening control passage 40 is released to the atmosphere. The closing control passage 45 is connected to a second relief pressure interlocking valve 92 that can release the pressure of the closing control passage 45 to the atmosphere. The second relief pressure interlocking valve 92 is normally closed, but when the closure control passage 45 and the second relief pressure port 92p communicate with each other, the pressure in the closure control passage 45 is released to the atmosphere.

機器として機能するスタック6は、燃料電池のセルを複数個搭載しているものである。セルとしては、電解質膜を燃料極および酸化剤極で挟むシート状のセルでも良いし、あるいは、電解質膜を燃料極および酸化剤極で挟む筒形状のセルでも良い。電解質膜は炭化フッ素系または炭化水素系等の有機系膜でも良いし、あるいは、無機系膜でも良いし、あるいは、有機材料および無機材料が混在する膜でも良い。   The stack 6 functioning as a device is equipped with a plurality of fuel cell cells. The cell may be a sheet-like cell in which the electrolyte membrane is sandwiched between the fuel electrode and the oxidant electrode, or may be a cylindrical cell in which the electrolyte membrane is sandwiched between the fuel electrode and the oxidant electrode. The electrolyte membrane may be a fluorine-based or hydrocarbon-based organic film, an inorganic film, or a film in which an organic material and an inorganic material are mixed.

スタック6のカソードには、空気等のカソードガスが供給される。スタック6のアノードには、例えば水素ガス、水素含有ガス等のアノードガスが供給される。供給バルブ2および排出バルブ3は、カソードガスの供給および排出を実施するものである。従ってスタック6のカソードの入口には、カソードガスをスタック6に供給するための供給バルブ2が設けられている。スタック6のカソードの出口には、スタック6のカソードオフガス(発電反応を経たガス)を排出するための排出バルブ3が設けられている。   A cathode gas such as air is supplied to the cathode of the stack 6. An anode gas such as hydrogen gas or hydrogen-containing gas is supplied to the anode of the stack 6. The supply valve 2 and the discharge valve 3 perform supply and discharge of the cathode gas. Accordingly, a supply valve 2 for supplying cathode gas to the stack 6 is provided at the cathode inlet of the stack 6. At the outlet of the cathode of the stack 6, a discharge valve 3 for discharging the cathode off-gas (gas that has undergone a power generation reaction) of the stack 6 is provided.

図1に示すように、優先遅延要素5は、開放制御用通路40および閉鎖制御用通路45の双方に設けられている。優先遅延要素5は、供給バルブ2の開放動作を排出バルブ3の開放動作よりも時間的に遅延させる第1機能と、供給バルブ2の閉鎖動作を排出バルブ3の閉鎖動作よりも時間的に遅延させる第2機能とを併有する。   As shown in FIG. 1, the priority delay element 5 is provided in both the opening control passage 40 and the closing control passage 45. The priority delay element 5 has a first function for delaying the opening operation of the supply valve 2 with respect to time with respect to the opening operation of the discharge valve 3, and delaying the closing operation of the supply valve 2 with respect to the time with respect to the closing operation of the discharge valve 3. The second function is also included.

具体的には、優先遅延要素5は、供給バルブ2側の第2開放用通路40sに設けられた第1絞り孔をもつ第1絞り51と、供給バルブ2側の第2閉鎖用通路45sに設けられた第2絞り孔をもつ第2絞り52とを有する。絞りとは、単位時間あたりに流れる流量を絞る機能を有するものであり、オリフィスまたはノズル等と呼ばれる。絞りは、流量絞りにより時間遅延作用を発生させ得るものの、サイズ自体が小型で済むため、簡便な構造で済む。ここで、第1絞り51,第2絞り52は固定絞りでも良いし、可変絞りでも良い。可変絞りの場合には、スタック6の使用季節、スタック6の設置地域等に応じて絞り径を適宜設定できる。   Specifically, the priority delay element 5 is connected to the first throttle 51 having the first throttle hole provided in the second opening passage 40s on the supply valve 2 side and the second closing passage 45s on the supply valve 2 side. And a second diaphragm 52 having a second diaphragm hole. The restriction has a function of restricting the flow rate flowing per unit time and is called an orifice or a nozzle. Although the throttle can generate a time delay action by the flow restrictor, it can be a simple structure because the size itself is small. Here, the first diaphragm 51 and the second diaphragm 52 may be fixed diaphragms or variable diaphragms. In the case of a variable aperture, the aperture diameter can be appropriately set according to the use season of the stack 6, the installation area of the stack 6, and the like.

本実施例によれば、供給バルブ2の開放用ポート21側には第1絞り51が設けられている。このため供給バルブ2の開放用ポート21に単位時間あたり供給される空気の流量が絞られて小さくされている。故に、供給バルブ2の開放用ポート21に作用する空気圧の上昇は、第1絞り51が無い場合に比較して遅延する。これに対して、排出バルブ3の開放用ポート31側は絞りが設けられていないため、動作の遅延は発生しない。この結果、供給バルブ2の開放動作は、排出バルブ3の開放動作よりも時間的にΔto(o:open)ぶん遅延する。   According to the present embodiment, the first throttle 51 is provided on the opening port 21 side of the supply valve 2. Therefore, the flow rate of the air supplied per unit time to the opening port 21 of the supply valve 2 is reduced and reduced. Therefore, the increase in air pressure acting on the opening port 21 of the supply valve 2 is delayed as compared with the case where the first throttle 51 is not provided. On the other hand, since the throttle is not provided on the opening port 31 side of the discharge valve 3, no operation delay occurs. As a result, the opening operation of the supply valve 2 is delayed by Δto (o: open) in time from the opening operation of the discharge valve 3.

同様に、供給バルブ2の閉鎖用ポート23側には第2絞り52が設けられているため、供給バルブ2の閉鎖用ポート23に単位時間あたり流れる空気の流量が絞られて小さくなる。故に、供給バルブ2の閉鎖用ポート23に作用する空気圧の上昇は、第2絞り52が無い場合に比較して遅延する。これに対して、排出バルブ3の閉鎖用ポート33側は絞りが設けられていないので、遅延が発生しない。この結果、供給バルブ2の閉鎖動作は、排出バルブ3の閉鎖動作よりも時間的にΔts(s:shut)ぶん遅延する。   Similarly, since the second throttle 52 is provided on the closing port 23 side of the supply valve 2, the flow rate of air flowing into the closing port 23 of the supply valve 2 per unit time is reduced and reduced. Therefore, the increase in air pressure acting on the closing port 23 of the supply valve 2 is delayed as compared with the case where the second throttle 52 is not provided. On the other hand, since the throttle is not provided on the closing port 33 side of the discharge valve 3, no delay occurs. As a result, the closing operation of the supply valve 2 is delayed by Δts (s: shut) in time than the closing operation of the discharge valve 3.

換言すると、排出バルブ3の開放用ポート31側には絞りが設けられていないため、排出バルブ3の開放動作は、供給バルブ2の開放動作よりも時間的にΔtoぶん優先する。同様に、排出バルブ3の閉鎖用ポート33側には第2絞り52が設けられていないため、排出バルブ3の閉鎖動作は、供給バルブ2の閉鎖動作よりも時間的にΔtsぶん優先する。   In other words, since the throttle is not provided on the opening port 31 side of the discharge valve 3, the opening operation of the discharging valve 3 has a time priority over the opening operation of the supply valve 2 by Δto. Similarly, since the second throttle 52 is not provided on the closing port 33 side of the discharge valve 3, the closing operation of the discharging valve 3 has a time priority over Δts over the closing operation of the supply valve 2.

なおΔtoおよびΔtsはスタックの種類、スタックの運転状態等の要因に応じて適宜選択される。ここで、Δto=Δtsでも良いし、Δto≒Δtsでも良いし、Δto<Δtsでも良いし、Δto>Δtsでも良い。Δtoは例えば0.05〜20秒の範囲内あるいは0.2〜10秒の範囲内で設定できる。Δtsは例えば0.05〜20秒の範囲内あるいは0.2〜10秒の範囲内で設定できる。なお、第1絞り51の第1絞り孔の内径をα1とし、第2絞り52の第2絞り孔の内径をα2とすると、ΔtoおよびΔtsに応じて、α1=α2としても良いし、α1≒α2としても良いし、α1<α2としても良いし、α1>α2としても良い。  Δto and Δts are appropriately selected according to factors such as the type of stack and the operating state of the stack. Here, Δto = Δts, Δto≈Δts, Δto <Δts, or Δto> Δts may be used. Δto can be set, for example, within a range of 0.05 to 20 seconds or within a range of 0.2 to 10 seconds. Δts can be set, for example, within a range of 0.05 to 20 seconds or within a range of 0.2 to 10 seconds. If the inner diameter of the first diaphragm hole of the first diaphragm 51 is α1, and the inner diameter of the second diaphragm hole of the second diaphragm 52 is α2, α1 = α2 or α1≈ depending on Δto and Δts. α2 may be set, α1 <α2 may be set, or α1> α2 may be set.

本実施例によれば、使用時には、コンプレッサ82が駆動している。発電時にはスタック6のカソードにはカソードガスが供給され、アノードにはアノードガスが供給され、スタック6が発電反応により発電する。スタック6のカソードにカソードガスの供給を開始するにあたり、図略の制御装置により切替連動バルブ7が切り替えられ、図1に示すように、切替連動バルブ7の第1切替ポート71と開放制御用通路40とコンプレッサ82とが連通される。すると、排出バルブ3の開放用ポート31および供給バルブ2の開放用ポート21に制御用空気がそれぞれ供給される。このとき、供給バルブ2の開放用ポート21側には第1絞り51が設けられているため、供給バルブ2の開放用ポート21に供給される制御用空気の単位時間あたりの流量が絞られて制限される。この結果、供給バルブ2の開放動作は、排出バルブ3の開放動作よりも時間的にΔtoぶん遅延する。従って、排出バルブ3が開放動作したΔto後に、供給バルブ2が連動して開放動作する。 According to this embodiment, the compressor 82 is driven during use. During power generation, a cathode gas is supplied to the cathode of the stack 6, an anode gas is supplied to the anode, and the stack 6 generates power by a power generation reaction. When the supply of cathode gas to the cathode of the stack 6 is started, the switching interlock valve 7 is switched by a control device (not shown), and as shown in FIG. 1, the first switching port 71 of the switching interlock valve 7 and the opening control passage. 40 and the compressor 82 are communicated with each other. Then, control air is supplied to the opening port 31 of the discharge valve 3 and the opening port 21 of the supply valve 2, respectively. At this time, since the first throttle 51 is provided on the opening port 21 side of the supply valve 2, the flow rate per unit time of the control air supplied to the opening port 21 of the supply valve 2 is reduced. Limited. As a result, the opening operation of the supply valve 2 is delayed by Δto in time than the opening operation of the discharge valve 3. Accordingly, after Δto when the discharge valve 3 is opened, the supply valve 2 is opened in conjunction with it.

換言すると、排出バルブ3の開放動作が実施されて、スタック6に封入されているカソードガスが排出バルブ3から排出可能な状態にされた後、供給バルブ2の開放動作が実施されて供給バルブ2からカソードガスがスタック6の内部に供給される。このためスタックの内部にカソードガスを迅速に効果的に導入させるのに有利となる。なお、スタックの発電中においては、供給バルブ2および排出バルブ3の双方は開放されており、カソードガスがスタック6の内部に連続して供給される。   In other words, after the discharge valve 3 is opened and the cathode gas sealed in the stack 6 is made dischargeable from the discharge valve 3, the supply valve 2 is opened and the supply valve 2 is opened. To supply the cathode gas into the stack 6. This is advantageous for quickly and effectively introducing the cathode gas into the stack. During power generation of the stack, both the supply valve 2 and the discharge valve 3 are open, and the cathode gas is continuously supplied into the stack 6.

次に、スタック6での発電を停止させる場合について説明する。この場合には、図略の制御装置により切替連動バルブ7が切り替えられ、切替連動バルブ7の第2切替ポート72と閉鎖制御用通路45とコンプレッサ82とが連通される。すると、排出バルブ3の閉鎖用ポート33および供給バルブ2の閉鎖用ポート23に制御用空気がそれぞれ供給される。このとき、供給バルブ2の閉鎖用ポート23側には第2絞り52が設けられているため、供給バルブ2の閉鎖用ポート23に供給される制御用空気の単位時間あたりの流量が絞られて制限される。この結果、供給バルブ2の閉鎖動作は、排出バルブ3の閉鎖動作よりも時間的にΔtsぶん遅延する。従って、排出バルブ3が閉鎖動作したΔts後に、供給バルブ2が連動して閉鎖動作する。   Next, a case where power generation in the stack 6 is stopped will be described. In this case, the switching interlock valve 7 is switched by a control device (not shown), and the second switching port 72 of the switching interlock valve 7, the closing control passage 45, and the compressor 82 are communicated with each other. Then, control air is supplied to the closing port 33 of the discharge valve 3 and the closing port 23 of the supply valve 2, respectively. At this time, since the second throttle 52 is provided on the closing port 23 side of the supply valve 2, the flow rate per unit time of the control air supplied to the closing port 23 of the supply valve 2 is reduced. Limited. As a result, the closing operation of the supply valve 2 is delayed by Δts in time from the closing operation of the discharge valve 3. Therefore, after Δts when the discharge valve 3 is closed, the supply valve 2 is interlocked and closed.

換言すると、排出バルブ3の閉鎖動作が実施され、スタック6に供給されているカソードガスが排出バルブ3から排出できない状態にされた後、供給バルブ2の閉鎖動作が実施され、供給バルブ2からスタック6の内部へのカソードガスの供給が停止される。このためスタック6の内部に所定流量のカソードガスを封入させるのに有利となる。なおスタック6の発電が停止されているときにおいて、供給バルブ2および排出バルブ3の双方は閉鎖されており、カソードガスがスタック6の内部に封入された状態に維持されるとともに、外気の塵埃等がスタック6の内部に進入できないようにされる。   In other words, after the discharge valve 3 is closed and the cathode gas supplied to the stack 6 cannot be discharged from the discharge valve 3, the supply valve 2 is closed and the stack from the supply valve 2 is stacked. The supply of the cathode gas to the inside of 6 is stopped. This is advantageous for enclosing a predetermined flow rate of cathode gas inside the stack 6. When the power generation of the stack 6 is stopped, both the supply valve 2 and the discharge valve 3 are closed, and the cathode gas is maintained in a state of being enclosed in the stack 6 and the dust of the outside air, etc. Is prevented from entering the inside of the stack 6.

なお、上記した第1絞り51および第2絞り52は固定絞りでも良いし、可変絞りでも良い。可変絞りであれば、スタック6の発電状態に応じて遅延時間Δto,Δtsのうちの一方または双方を調整することができる。   The first diaphragm 51 and the second diaphragm 52 described above may be a fixed diaphragm or a variable diaphragm. If the aperture is variable, one or both of the delay times Δto and Δts can be adjusted according to the power generation state of the stack 6.

以上説明したように本実施例によれば、優先遅延要素5は、供給バルブ2の開放動作を排出バルブ3の開放動作よりも時間的に遅延させる第1機能と、供給バルブ2の閉鎖動作を排出バルブ3の閉鎖動作よりも時間的に遅延させる第2機能とを併有するが、これに限らず、場合によっては、第1機能および第2機能のうちの一方のみでも良い。   As described above, according to this embodiment, the priority delay element 5 performs the first function of delaying the opening operation of the supply valve 2 with respect to the opening operation of the discharge valve 3 and the closing operation of the supply valve 2. Although it has the 2nd function delayed in time rather than the closing operation of the discharge valve 3, it is not restricted to this, According to the case, only one of the 1st function and the 2nd function may be sufficient.

すなわち、優先遅延要素5は、供給バルブ2側の第2開放用通路40sに設けられた第1絞り51を採用する第1方策と、供給バルブ2側の第2閉鎖用通路45sに設けられた第2絞り52を採用する第2方策とを有する。しかしこれに限らず、場合によっては、第1方策および第2方策のうちのいずれか一方のみとしても良い。   That is, the priority delay element 5 is provided in the first measure that employs the first throttle 51 provided in the second opening passage 40s on the supply valve 2 side and the second closing passage 45s on the supply valve 2 side. And a second policy employing the second diaphragm 52. However, the present invention is not limited to this, and depending on the case, only one of the first policy and the second policy may be used.

また上記したコンプレッサ82はスタック6のカソードにカソードガスを供給する搬送源としても機能するが、これに限らず、コンプレッサ82はバルブシステムの開閉動作を実施するためだけに使用されるものでも良い。この場合には、スタック6のカソードに空気をカソードガスとして供給する搬送源を別途設けることが好ましい。なお、上記した供給バルブ2および排出バルブ3は、カソードガスの供給および排出を実施するものであるが、これに限らず、アノードガスの供給および排出を実施するものでも良い。   The above-described compressor 82 also functions as a transport source for supplying cathode gas to the cathode of the stack 6. However, the present invention is not limited to this, and the compressor 82 may be used only for performing the opening / closing operation of the valve system. In this case, it is preferable to separately provide a transport source for supplying air as a cathode gas to the cathode of the stack 6. The supply valve 2 and the discharge valve 3 described above perform supply and discharge of the cathode gas. However, the supply valve 2 and the discharge valve 3 are not limited to this and may supply and discharge the anode gas.

図2は実施例2を示す。本実施例は実施例1と基本的には同様の構成および作用効果を有する。具体的には、優先遅延要素5Bは、開放制御用通路40の第2開放用通路40sに設けられた第1抵抗体51bと、閉鎖制御用通路45の第2閉鎖用通路45sに設けられた第2抵抗体52bとを有する。   FIG. 2 shows a second embodiment. The present embodiment basically has the same configuration and operational effects as the first embodiment. Specifically, the priority delay element 5B is provided in the first resistor 51b provided in the second opening passage 40s of the opening control passage 40 and in the second closing passage 45s of the closing control passage 45. And a second resistor 52b.

第1抵抗体51bおよび第2抵抗体52bは、空気が流れる方向に開放された多数の連続孔を有する透過フィルタ、多孔質体、網を積層させた網積層体、球体等の複数の物体を積層させた積層体のうちの少なくとも一つで形成されており、単位時間あたり流れる空気の流量を絞って制限することができる。ここで、第1抵抗体51bの空気透過率をβ1とし、第2抵抗体52bの空気透過率をβ2とすると、β1=β2としても良いし、β1≒β2としても良いし、β1<β2としても良いし、β1>β2としても良い。なお空気透過率が高い方が、単位時間あたりに通過させる空気の流量が大きい。   The first resistor 51b and the second resistor 52b are formed of a plurality of objects such as a permeation filter having a large number of continuous holes opened in a direction in which air flows, a porous body, a net laminate in which nets are laminated, and a sphere. It is formed of at least one of the laminated bodies that are laminated, and can restrict the flow rate of air flowing per unit time. Here, when the air permeability of the first resistor 51b is β1, and the air permeability of the second resistor 52b is β2, β1 = β2 may be satisfied, β1≈β2, or β1 <β2. Alternatively, β1> β2 may be satisfied. In addition, the one where the air permeability is higher has a larger flow rate of air that passes through per unit time.

本実施例によれば、供給バルブ2の開放用ポート21側には第1抵抗体51bが設けられている。このため実施例1と同様に、供給バルブ2の開放動作は、排出バルブ3の開放動作よりも時間的にΔtoぶん遅延する。同様に、供給バルブ2の閉鎖用ポート23側には第2抵抗体52bが設けられている。このため、供給バルブ2の閉鎖動作は、排出バルブ3の閉鎖動作よりも時間的にΔtsぶん遅延する。   According to the present embodiment, the first resistor 51 b is provided on the opening port 21 side of the supply valve 2. Therefore, as in the first embodiment, the opening operation of the supply valve 2 is delayed by Δto in terms of time from the opening operation of the discharge valve 3. Similarly, a second resistor 52 b is provided on the closing port 23 side of the supply valve 2. For this reason, the closing operation of the supply valve 2 is delayed by Δts in time from the closing operation of the discharge valve 3.

このような本実施例によれば、カソードガスの供給開始時には、供給バルブ2の開放動作は、排出バルブ3の開放動作よりも時間的にΔtoぶん遅延する。従ってカソードガス(反応ガス,反応流体)の供給開始時には、排出バルブ3が開放したΔto後に、供給バルブ2が連動して開放する。この場合、スタック6の内部への気体供給性が確保される。   According to this embodiment, when the cathode gas is started to be supplied, the opening operation of the supply valve 2 is delayed by Δto in time with respect to the opening operation of the discharge valve 3. Therefore, when the supply of the cathode gas (reaction gas, reaction fluid) is started, the supply valve 2 is opened in conjunction with Δto after the discharge valve 3 is opened. In this case, the gas supply property to the inside of the stack 6 is ensured.

同様に、発電停止時には、供給バルブ2の閉鎖動作は、排出バルブ3の閉鎖動作よりも時間的にΔtsぶん遅延する。従って発電停止時には、排出バルブ3が閉鎖したΔts後に、供給バルブ2が連動して閉鎖する。この場合、スタック6の内部におけるカソードガスの封入性が確保される。   Similarly, when power generation is stopped, the closing operation of the supply valve 2 is delayed by Δts in time from the closing operation of the discharge valve 3. Accordingly, when power generation is stopped, the supply valve 2 is interlocked and closed after Δts when the discharge valve 3 is closed. In this case, the sealing property of the cathode gas inside the stack 6 is ensured.

本実施例によれば、優先遅延要素5Bは、開放制御用通路40の第2開放用通路40sに設けられた第1抵抗体51bを採用する第1方策と、閉鎖制御用通路45の第2閉鎖用通路45sに設けられた第2抵抗体52bを採用する第2方策とを有する。しかしこれに限らず、場合によっては、第1方策および第2方策のうちのいずれか一方のみとしても良い。   According to the present embodiment, the priority delay element 5 </ b> B includes a first measure that employs the first resistor 51 b provided in the second opening passage 40 s of the opening control passage 40, and the second control passage 45. And a second policy employing the second resistor 52b provided in the closing passage 45s. However, the present invention is not limited to this, and depending on the case, only one of the first policy and the second policy may be used.

図3は実施例3を示す。本実施例は実施例1と基本的には同様の構成および作用効果を有する。具体的には、開放制御用通路40の第2開放用通路40sの流路長をLO2とし、開放制御用通路40の第1開放用通路40fの流路長をLO1とする。閉鎖制御用通路45の第2閉鎖用通路45sの流路長をLS2とし、閉鎖制御用通路45の第1閉鎖用通路45fの流路長をLS1とする。ここで、第2開放用通路40sには、流路長を長くするためのスパイラル通路48が形成されている。第2閉鎖用通路45sには、流路長を長くするためのスパイラル通路49が形成されている。   FIG. 3 shows a third embodiment. The present embodiment basically has the same configuration and operational effects as the first embodiment. Specifically, the flow length of the second opening passage 40s of the opening control passage 40 is LO2, and the flow length of the first opening passage 40f of the opening control passage 40 is LO1. The channel length of the second closing passage 45s of the closing control passage 45 is LS2, and the channel length of the first closing passage 45f of the closing control passage 45 is LS1. Here, a spiral passage 48 for increasing the flow path length is formed in the second opening passage 40s. In the second closing passage 45s, a spiral passage 49 for increasing the flow path length is formed.

ここで、優先遅延要素5Cは、スパイラル通路48により流路長LO2を流路長LO1よりも長くすることにより形成されているとともに、スパイラル通路49により流路長LS2を流路長LS1よりも長くすることにより形成されている。制御用空気が流れる流路長の距離が長いと、時間遅延を発生させる。   Here, the priority delay element 5C is formed by making the flow path length LO2 longer than the flow path length LO1 by the spiral passage 48, and makes the flow path length LS2 longer than the flow path length LS1 by the spiral passage 49. It is formed by doing. If the distance of the flow path length through which the control air flows is long, a time delay is generated.

このような本実施例によれば、供給バルブ2の開放動作は、排出バルブ3の開放動作よりも時間的にΔtoぶん遅延する。従ってカソードガスの供給開始時には、排出バルブ3が開放動作したΔto後に、供給バルブ2が連動して開放動作する。   According to this embodiment, the opening operation of the supply valve 2 is delayed by Δto in terms of time compared to the opening operation of the discharge valve 3. Therefore, at the start of the supply of the cathode gas, the supply valve 2 is opened in conjunction with Δto after the discharge valve 3 is opened.

同様に、供給バルブ2の閉鎖動作は、排出バルブ3の閉鎖動作よりも時間的にΔtsぶん遅延する。従って発電停止時、つまりカソードガスの供給停止時には、排出バルブ3が閉鎖したΔts後に、供給バルブ2が連動して閉鎖動作する。   Similarly, the closing operation of the supply valve 2 is delayed by Δts in time from the closing operation of the discharge valve 3. Therefore, when the power generation is stopped, that is, when the supply of the cathode gas is stopped, the supply valve 2 closes in conjunction with Δts after the discharge valve 3 is closed.

なお、Δtoぶんの遅延が得られるように、第1開放用通路40fの流路断面積は、第2閉鎖用通路45sの流路断面積と同一または類似にできる。またΔtsぶんの遅延が得られるように、第1閉鎖用通路45fの流路断面積は、第2閉鎖用通路45sの流路断面積と同一または類似にできる。   Note that the flow passage cross-sectional area of the first opening passage 40f can be the same as or similar to the flow passage cross-sectional area of the second closing passage 45s so that a delay of Δto can be obtained. Further, the flow passage cross-sectional area of the first closing passage 45f can be the same as or similar to the flow passage cross-sectional area of the second closing passage 45s so that a delay of Δts can be obtained.

上記した本実施例によれば、優先遅延要素5Cは、流路長LO2を流路長LO1よりも長くすることにより形成されている第1方策とともに、流路長LS2を流路長LS1よりも長くする第2方策とを備えている。しかしこれに限らず、場合によっては、第1方策および第2方策のうちのいずれか一方のみとしても良い。スパイラル通路48,49により流路長を調整しているが、これに限らず、場合によっては、スパイラルに限らず、場合によっては、S字状、N字状、M字状の通路を形成して流路長を調整しても良い。   According to the above-described embodiment, the priority delay element 5C has the flow path length LS2 longer than the flow path length LS1 together with the first measure formed by making the flow path length LO2 longer than the flow path length LO1. And a second policy to make it longer. However, the present invention is not limited to this, and depending on the case, only one of the first policy and the second policy may be used. The flow path length is adjusted by the spiral passages 48 and 49. However, the present invention is not limited to this. In some cases, the passage length is not limited to the spiral, and depending on the case, an S-shaped, N-shaped or M-shaped passage may be formed. The flow path length may be adjusted.

図4は実施例4を示す。本実施例は実施例1と基本的には同様の構成および作用効果を有する。具体的には、開放制御用通路40の第2開放用通路40sの流路断面積をDO2とし、開放制御用通路40の第1開放用通路40fの流路断面積をDO1とする。閉鎖制御用通路45の第2閉鎖用通路45sの流路断面積をDS2とし、閉鎖制御用通路45の第1閉鎖用通路45fの流路断面積をDS1とする。ここで、優先遅延要素5Dは、流路断面積DO2を流路断面積DO1よりも小さくすることにより形成されているとともに、流路断面積DS2を流路断面積DS1よりも小さくすることにより形成されている。DO1/DO2の値は適宜設定できる。同様に、DS1/DS2の値は適宜設定できる。   FIG. 4 shows a fourth embodiment. The present embodiment basically has the same configuration and operational effects as the first embodiment. Specifically, the flow passage sectional area of the second opening passage 40s of the opening control passage 40 is DO2, and the passage sectional area of the first opening passage 40f of the opening control passage 40 is DO1. The flow path cross-sectional area of the second closing passage 45s of the closing control path 45 is DS2, and the flow path cross-sectional area of the first closing path 45f of the closing control path 45 is DS1. Here, the priority delay element 5D is formed by making the channel cross-sectional area DO2 smaller than the channel cross-sectional area DO1, and by making the channel cross-sectional area DS2 smaller than the channel cross-sectional area DS1. Has been. The value of DO1 / DO2 can be set as appropriate. Similarly, the value of DS1 / DS2 can be set as appropriate.

このような本実施例によれば、供給バルブ2の開放動作は、排出バルブ3の開放動作よりも時間的にΔtoぶん遅延する。従ってカソードガス供給時には、排出バルブ3が開放したΔto後に、供給バルブ2が連動して開放する。同様に、供給バルブ2の閉鎖動作は、排出バルブ3の閉鎖動作よりも時間的にΔtsぶん遅延する。従って発電停止時には、排出バルブ3が閉鎖したΔts後に、供給バルブ2が連動して閉鎖する。   According to this embodiment, the opening operation of the supply valve 2 is delayed by Δto in terms of time compared to the opening operation of the discharge valve 3. Therefore, when supplying the cathode gas, the supply valve 2 is opened in conjunction with Δto after the discharge valve 3 is opened. Similarly, the closing operation of the supply valve 2 is delayed by Δts in time from the closing operation of the discharge valve 3. Accordingly, when power generation is stopped, the supply valve 2 is interlocked and closed after Δts when the discharge valve 3 is closed.

なお本実施例によれば、LS2,LS1,LO2,LO1を実施例3通りに定義すれば、LS2=LS1,LS2≒LS1とすることができ、あるいは、LS2>LS1とすることができる。またLO2=LO1,LO2≒LO1とすることができる。あるいは、LO2>LO1とすることができる。   According to the present embodiment, if LS2, LS1, LO2, and LO1 are defined as in the third embodiment, LS2 = LS1, LS2≈LS1 can be established, or LS2> LS1 can be established. LO2 = LO1, LO2≈LO1. Alternatively, LO2> LO1.

上記した本実施例によれば、優先遅延要素5Dは、流路断面積DO2を流路断面積DO1よりも小さくすることにより形成されている第1方策とともに、流路断面積DS2を流路断面積DS1よりも小さくする第2方策とで形成されている。しかしこれに限らず、場合によっては、第1方策および第2方策のうちのいずれか一方のみとしても良い。   According to the above-described embodiment, the priority delay element 5D includes the first measure formed by making the channel cross-sectional area DO2 smaller than the channel cross-sectional area DO1, and the channel cross-sectional area DS2 is disconnected. It is formed by a second measure that is smaller than the area DS1. However, the present invention is not limited to this, and depending on the case, only one of the first policy and the second policy may be used.

図5は実施例5を示す。本実施例は実施例1と基本的には同様の構成および作用効果を有する。具体的には、優先遅延要素5Eは、開放制御用通路40の第2開放用通路40sに設けられた第1バッファ室51eと、第2開放用通路40sにおいて第1バッファ室51eの上流に設けられた第1絞り51と、閉鎖制御用通路45の第2閉鎖用通路45sに設けられた第2バッファ室52eと、閉鎖制御用通路45において第2バッファ室52eの上流に設けられた第2絞り52とを有する。第1バッファ室51eは第2開放用通路40sよりも、流路断面積が大きくされている。第2バッファ室52eは第2閉鎖用通路45sよりも、流路断面積が大きくされている。   FIG. 5 shows a fifth embodiment. The present embodiment basically has the same configuration and operational effects as the first embodiment. Specifically, the priority delay element 5E is provided upstream of the first buffer chamber 51e in the first buffer chamber 51e provided in the second opening passage 40s of the opening control passage 40 and in the second opening passage 40s. The first throttle 51, the second buffer chamber 52e provided in the second closing passage 45s of the closing control passage 45, and the second buffer chamber 52e provided upstream of the second buffer chamber 52e in the closing control passage 45. And a diaphragm 52. The first buffer chamber 51e has a channel cross-sectional area larger than that of the second opening passage 40s. The second buffer chamber 52e has a channel cross-sectional area larger than that of the second closing passage 45s.

すなわち、供給バルブ2の開放用ポート21側には第1バッファ室51eおよび第1絞り51の双方が設けられているため、遅延時間を長くできる。従って、供給バルブ2の開放動作は、排出バルブ3の開放動作よりも時間的にΔtoeぶん遅延する。同様に、供給バルブ2の閉鎖用ポート23側には第2バッファ室52eおよび第2絞り52の双方が設けられているため、遅延時間を長くできる。従って、供給バルブ2の閉鎖動作は、排出バルブ3の閉鎖動作よりも時間的にΔtseぶん遅延する。   That is, since both the first buffer chamber 51e and the first throttle 51 are provided on the opening port 21 side of the supply valve 2, the delay time can be increased. Therefore, the opening operation of the supply valve 2 is delayed by Δtoe in time than the opening operation of the discharge valve 3. Similarly, since both the second buffer chamber 52e and the second throttle 52 are provided on the closing port 23 side of the supply valve 2, the delay time can be increased. Accordingly, the closing operation of the supply valve 2 is delayed by Δtse in time from the closing operation of the discharge valve 3.

なお、第1バッファ室51eの容積をη1とし、第2バッファ室52eの容積をη2とすると、η1=η2としても良いし、η1≒η2としても良いし、η1<η2としても良いし、η1>η2としても良い。   When the volume of the first buffer chamber 51e is η1 and the volume of the second buffer chamber 52e is η2, η1 = η2 may be satisfied, η1≈η2 may be satisfied, η1 <η2 may be satisfied, or η1 It may be> η2.

上記した本実施例によれば、優先遅延要素5Eは、開放制御用通路40の第2開放用通路40sに設けられた第1バッファ室51eおよび第1絞り51を形成する第1方策と、閉鎖制御用通路45の第2閉鎖用通路45sに設けられた第2バッファ室52eおよび第2絞り52を形成する第2方策とを有する。しかしこれにに限らず、場合によっては、第1方策および第2方策のうちのいずれか一方のみとしても良い。更には、第1方策においても、第1バッファ室51eおよび第1絞り51のうちのいずれか一方のみとしても良い。第2方策においても、第2バッファ室52eおよび第2絞り52のうちのいずれか一方のみとしても良い。   According to the above-described embodiment, the priority delay element 5E includes the first strategy for forming the first buffer chamber 51e and the first throttle 51 provided in the second opening passage 40s of the opening control passage 40, and the closing. A second buffer chamber 52e provided in the second closing passage 45s of the control passage 45 and a second measure for forming the second throttle 52. However, the present invention is not limited to this, and depending on circumstances, only one of the first policy and the second policy may be used. Furthermore, also in the first measure, only one of the first buffer chamber 51e and the first throttle 51 may be used. Also in the second strategy, only one of the second buffer chamber 52e and the second diaphragm 52 may be used.

図6は実施例6を示す。本実施例は実施例1と基本的には同様の構成および作用効果を有する。具体的には、優先遅延要素5Fは、供給バルブ2の開放用ポート21に設けられた第1絞り51と、排出バルブ3の閉鎖用ポート33側に設けられた第2絞り52とを有する。この場合、供給バルブ2の開放用ポート21側には第1絞り51が設けられているため、供給バルブ2の開放用ポート21に単位時間あたり流れる空気の流量が絞られて小さくなり、供給バルブ2の開放動作は、排出バルブ3の開放動作よりも時間的にΔtoぶん遅延する。従って排出バルブ3が開放動作したΔto後に、供給バルブ2が開放動作する。   FIG. 6 shows a sixth embodiment. The present embodiment basically has the same configuration and operational effects as the first embodiment. Specifically, the priority delay element 5 </ b> F has a first throttle 51 provided in the opening port 21 of the supply valve 2 and a second throttle 52 provided on the closing port 33 side of the discharge valve 3. In this case, since the first throttle 51 is provided on the opening port 21 side of the supply valve 2, the flow rate of air flowing into the opening port 21 of the supply valve 2 per unit time is reduced and reduced. The opening operation of 2 is delayed by Δto in time than the opening operation of the discharge valve 3. Accordingly, the supply valve 2 opens after Δto when the discharge valve 3 opens.

同様に、排出バルブ3の閉鎖用ポート33側には第2絞り52が設けられているため、排出バルブ3の閉鎖用ポート33に単位時間あたり流れる空気の流量が絞られて小さくなる。よって、排出バルブ3の閉鎖動作は、供給バルブ2の閉鎖動作よりも時間的にΔtsaぶん遅延する。   Similarly, since the second throttle 52 is provided on the closing port 33 side of the discharge valve 3, the flow rate of air flowing into the closing port 33 of the discharge valve 3 per unit time is reduced and reduced. Therefore, the closing operation of the discharge valve 3 is delayed by Δtsa in time from the closing operation of the supply valve 2.

すなわち、排出バルブ3の閉鎖用ポート33側には第2絞り52が設けられているため、排出バルブ3の閉鎖動作は、供給バルブ2の閉鎖動作よりも時間的にΔtsaぶん遅延し、供給バルブ2が閉鎖した後に排出バルブ3が閉鎖する。この場合、供給バルブ2が閉鎖されたにも拘わらず、排出バルブ3が開放されている時間が存在するため、スタック6の内部に残留するカソードガスを排出バルブ3からスタック6の外部に排出させるのに有利となる。   That is, since the second throttle 52 is provided on the closing port 33 side of the discharge valve 3, the closing operation of the discharging valve 3 is delayed by Δtsa in time from the closing operation of the supply valve 2, and the supply valve After 2 is closed, the discharge valve 3 is closed. In this case, since the discharge valve 3 is open even though the supply valve 2 is closed, the cathode gas remaining inside the stack 6 is discharged from the discharge valve 3 to the outside of the stack 6. This is advantageous.

上記した本実施例によれば、優先遅延要素5Fは、供給バルブ2の開放用ポート21に設けられた第1絞り51を備える第1方策と、排出バルブ3の閉鎖用ポート33側に設けられた第2絞り52を備える第2方策とを有する。しかしこれに限らず、場合によっては、第1方策および第2方策のうちのいずれか一方のみとしても良い。   According to the above-described embodiment, the priority delay element 5F is provided on the first measure including the first throttle 51 provided on the opening port 21 of the supply valve 2 and on the closing port 33 side of the discharge valve 3. And a second measure including the second diaphragm 52. However, the present invention is not limited to this, and depending on the case, only one of the first policy and the second policy may be used.

図7は実施例7を示す。本実施例は実施例1と基本的には同様の構成および作用効果を有する。具体的には、優先遅延要素5Gは、供給バルブ2の開放用ポート21に設けられた第1絞り521と、供給バルブ2の閉鎖用ポート23側に設けられた第2絞り522と、排出バルブ3の開放用ポート31に設けられた第1絞り531と、排出バルブ3の閉鎖用ポート33側に設けられた第2絞り532とを有する。絞り521.522,531,532は流量絞り作用を有するため、時間遅延作用を発揮する。   FIG. 7 shows a seventh embodiment. The present embodiment basically has the same configuration and operational effects as the first embodiment. Specifically, the priority delay element 5G includes a first throttle 521 provided on the opening port 21 of the supply valve 2, a second throttle 522 provided on the closing port 23 side of the supply valve 2, and a discharge valve. 3 has a first throttle 531 provided in the opening port 31 and a second throttle 532 provided on the closing port 33 side of the discharge valve 3. Since the throttles 521.522, 531, and 532 have a flow rate throttle action, they exhibit a time delay action.

ここで、第1絞り521の絞り度は、第1絞り531の絞り度よりも大きい。従って単位時間あたり、第1絞り521を流れる空気の流量は、第1絞り531を流れる空気の流量よりも少ない。また、第1絞り522の絞り度は、第1絞り532の絞り度よりも大きい。従って、単位時間あたり、第1絞り522を流れる空気の流量は、第1絞り532を流れる空気の流量よりも少ない。   Here, the aperture of the first aperture 521 is larger than the aperture of the first aperture 531. Therefore, the flow rate of air flowing through the first throttle 521 per unit time is smaller than the flow rate of air flowing through the first throttle 531. The aperture of the first aperture 522 is greater than the aperture of the first aperture 532. Therefore, the flow rate of air flowing through the first throttle 522 per unit time is smaller than the flow rate of air flowing through the first throttle 532.

このような本実施例によれば、供給バルブ2および排出バルブ3の開放については、切替連動バルブ7の第1切替ポート71がコンプレッサ82に連通するように切替連動バルブ7が切り替えられたとき(図7参照)、切替時から第1所定時間経過した後に排出バルブ3が開放動作し、その後、第2所定時間経過した後、供給バルブ2が開放動作する。   According to this embodiment, the supply valve 2 and the discharge valve 3 are opened when the switching interlock valve 7 is switched so that the first switching port 71 of the switching interlock valve 7 communicates with the compressor 82 ( 7), the discharge valve 3 is opened after a first predetermined time has elapsed from the time of switching, and then the supply valve 2 is opened after a second predetermined time has elapsed.

これに対して供給バルブ2および排出バルブ3の閉鎖については、切替連動バルブ7の第2切替ポート72がコンプレッサ82に連通するように切替連動バルブ7が切り替えられたとき、切替時から第4所定時間経過した後に排出バルブ3が閉鎖動作し、その後、第5所定時間経過した後、供給バルブ2が閉鎖動作する。   On the other hand, regarding the closing of the supply valve 2 and the discharge valve 3, when the switching interlock valve 7 is switched so that the second switching port 72 of the switching interlock valve 7 communicates with the compressor 82, the fourth predetermined time from the switching is set. After a lapse of time, the discharge valve 3 performs a closing operation, and thereafter, after a fifth predetermined time has elapsed, the supply valve 2 performs a closing operation.

図8は、供給バルブ2Wおよび排出バルブ3Wの内部構造の一例を示す。供給バルブ2Wは、ハウジング90と、バルブ室91と、バルブ室91に連通する入口92と、バルブ室91に連通する出口93と、バルブ室91に移動可能に設けられたバルブ体94と、バルブ体94の受圧面95に空気圧を作用させる制御ポート96と、入口92および出口93の連通性を遮断させる方向にバルブ体94を付勢する付勢部材としての付勢バネ97とを有する。空気圧が制御ポート96に作用していないとき、付勢バネ97の矢印Y1方向(閉弁方向)の付勢力で、バルブ体94のバルブ面98が着座面99に着座し、入口92および出口93の連通性は遮断されている。開放制御用通路40から制御ポート96に制御用空気が供給されると、空気圧がバルブ体94の受圧面95に作用する。すると、付勢バネ97のバネ力に抗しつつ、バルブ体94が矢印Y2方向(開弁方向)に開放動作し、入口92および出口93が連通され、カソードガスが供給バルブ2Wの入口92、バルブ室91、出口93、スタック6の入口6iの順に流れる。   FIG. 8 shows an example of the internal structure of the supply valve 2W and the discharge valve 3W. The supply valve 2W includes a housing 90, a valve chamber 91, an inlet 92 communicating with the valve chamber 91, an outlet 93 communicating with the valve chamber 91, a valve body 94 movably provided in the valve chamber 91, a valve A control port 96 that applies air pressure to the pressure receiving surface 95 of the body 94, and a biasing spring 97 as a biasing member that biases the valve body 94 in a direction that blocks the communication between the inlet 92 and the outlet 93 are provided. When the air pressure is not acting on the control port 96, the valve surface 98 of the valve body 94 is seated on the seating surface 99 by the biasing force of the biasing spring 97 in the direction of the arrow Y1 (valve closing direction). Connectivity is blocked. When control air is supplied from the opening control passage 40 to the control port 96, air pressure acts on the pressure receiving surface 95 of the valve body 94. Then, while resisting the spring force of the urging spring 97, the valve body 94 is opened in the direction of the arrow Y2 (the valve opening direction), the inlet 92 and the outlet 93 are communicated, and the cathode gas is connected to the inlet 92 of the supply valve 2W, It flows in the order of the valve chamber 91, the outlet 93, and the inlet 6i of the stack 6.

排出バルブ3Wは、供給バルブ2Wと同様に、ハウジング90と、バルブ室91と、バルブ室91に連通する入口92と、バルブ室91に連通する出口93と、バルブ室91に移動可能に設けられたバルブ体94と、バルブ体94の受圧面95に空気圧を作用させる制御ポート96と、入口92および出口93の連通性を遮断させる方向にバルブ体94を付勢する付勢部材としての付勢バネ97とを有する。   Similarly to the supply valve 2W, the discharge valve 3W is movably provided in the housing 90, the valve chamber 91, an inlet 92 communicating with the valve chamber 91, an outlet 93 communicating with the valve chamber 91, and the valve chamber 91. The valve body 94, a control port 96 for applying air pressure to the pressure receiving surface 95 of the valve body 94, and an urging member as an urging member for urging the valve body 94 in a direction to block the communication between the inlet 92 and the outlet 93 And a spring 97.

排出バルブ3Wにおいて、空気圧が制御ポート96に作用していないとき、付勢バネ97の矢印Y1方向(閉弁方向)の付勢力で、バルブ体94のバルブ面98が着座面99に着座しており、入口92および出口93の連通性は遮断されている。開放制御用通路40から排出バルブ3Wの制御ポート96に空気圧が作用すると、付勢バネ97のバネ力に抗しつつ、バルブ体94が矢印Y2方向(開弁方向)に開放動作し、スタック6内のカソードオフガス等のガスがスタック6の出口6p、排出バルブ3Wの入口92、バルブ室91、出口93の順に流れて排出される。   In the discharge valve 3W, when the air pressure is not acting on the control port 96, the urging force of the urging spring 97 in the arrow Y1 direction (valve closing direction) causes the valve surface 98 of the valve body 94 to be seated on the seating surface 99. Therefore, the communication between the inlet 92 and the outlet 93 is cut off. When air pressure acts on the control port 96 of the discharge valve 3W from the opening control passage 40, the valve body 94 opens in the direction of the arrow Y2 (valve opening direction) against the spring force of the biasing spring 97, and the stack 6 A gas such as the cathode off-gas in the flow flows in the order of the outlet 6p of the stack 6, the inlet 92 of the discharge valve 3W, the valve chamber 91, and the outlet 93 in this order.

図8に示すように、開放制御用通路40のうち供給バルブ2W(開放動作および閉鎖動作を遅延させるバルブ)に連通する第2開放用通路40sには、優先遅延要素として機能する逆止弁100が設けられている。逆止弁100は、ポート101と、ポート101を開閉する弁体102と、弁体102を閉弁方向に付勢するバネ103とを有する。第2開放用通路40sの空気圧が逆止弁100のバネ103のバネ力に打ち勝つまで、ポート101は閉鎖されている。第2開放用通路40sの空気圧がバネ103のバネ力に打ち勝つと、ポート101は開放される。このため、第2開放用通路40sの供給バルブ2Wには、逆止弁100に開弁応答に基づく時間遅れが積極的に発生する。しかし、開放制御用通路40のうち排出バルブ3に連通する第1開放用通路40fには逆止弁が設けられていないため、排出バルブ3における時間遅れは抑えられている。   As shown in FIG. 8, a check valve 100 functioning as a priority delay element is provided in the second opening passage 40s communicating with the supply valve 2W (a valve for delaying the opening operation and the closing operation) in the opening control passage 40. Is provided. The check valve 100 includes a port 101, a valve body 102 that opens and closes the port 101, and a spring 103 that biases the valve body 102 in the valve closing direction. The port 101 is closed until the air pressure in the second opening passage 40 s overcomes the spring force of the spring 103 of the check valve 100. When the air pressure in the second opening passage 40s overcomes the spring force of the spring 103, the port 101 is opened. Therefore, a time delay based on the valve opening response is positively generated in the check valve 100 in the supply valve 2W of the second opening passage 40s. However, since the check valve is not provided in the first opening passage 40f communicating with the discharge valve 3 in the opening control passage 40, the time delay in the discharge valve 3 is suppressed.

本発明は上記した各実施例のみに限定されるものではなく、要旨を逸脱しない範囲内で適宜変更して実施できる。例えば、優先遅延要素は、上記した各実施例のうちの少なくとも二つの特徴を併合させても良い。具体的には、必要な遅延時間を確保すべく、絞り、抵抗体、流路長、流路断面積、バッファ室、逆止弁のうちの少なくとも二種を併合させる構造としても良い。実施例1は燃料電池の入口および出口を開閉する連動バルブシステムに適用されているが、これに限らず、場合によっては、燃料電池に付設される加湿器の入口および出口を開閉する連動バルブシステムに適用されていても良いし、あるいは、ガスエンジンヒートポンプに使用される連動バルブシステム、他のコージェネシステムに使用される連動バルブシステムに適用されていても良い。実施例1に係る供給バルブ2は、開放用ポート21、第1室22、閉鎖用ポート23、第2室24を備えているが、これに限定されない。排出バルブ3についても同様である。   The present invention is not limited only to the above-described embodiments, and can be implemented with appropriate modifications within a range not departing from the gist. For example, the priority delay element may combine at least two features of the above-described embodiments. Specifically, in order to secure a necessary delay time, a structure in which at least two of a throttle, a resistor, a channel length, a channel cross-sectional area, a buffer chamber, and a check valve are combined may be used. The first embodiment is applied to an interlocking valve system that opens and closes an inlet and an outlet of a fuel cell. However, the present invention is not limited to this, and in some cases, an interlocking valve system that opens and closes an inlet and an outlet of a humidifier attached to the fuel cell. Or may be applied to an interlocking valve system used in a gas engine heat pump or an interlocking valve system used in another cogeneration system. The supply valve 2 according to the first embodiment includes the opening port 21, the first chamber 22, the closing port 23, and the second chamber 24, but is not limited thereto. The same applies to the discharge valve 3.

本発明は例えば燃料電池システム(定置用、車載用等)、加湿システム、コージェネシステム等に利用することができる。   The present invention can be used for, for example, a fuel cell system (stationary, in-vehicle, etc.), a humidification system, a cogeneration system, and the like.

1はバルブ組、2は供給バルブ、21は開放用ポート、23は閉鎖用ポート、3は排出バルブ、31は開放用ポート、33は閉鎖用ポート、4は制御用通路、40は開放制御用通路、40fは第1開放用通路、40sは第2開放用通路、45は閉鎖制御用通路、45fは第1閉鎖用通路、45sは第2閉鎖用通路、5は優先遅延要素、51は第1絞り、52は第2絞り、51bは第1抵抗体、52bは第2抵抗体、51eは第1バッファ室、52eは第2バッファ室、6はスタック(機器)、82はコンプレッサを示す。   1 is a valve assembly, 2 is a supply valve, 21 is an opening port, 23 is a closing port, 3 is a discharge valve, 31 is an opening port, 33 is a closing port, 4 is a control passage, and 40 is for opening control 40f is the first opening passage, 40s is the second opening passage, 45 is the closing control passage, 45f is the first closing passage, 45s is the second closing passage, 5 is the priority delay element, and 51 is the first 1 stop, 52 is a 2nd stop, 51b is a 1st resistor, 52b is a 2nd resistor, 51e is a 1st buffer chamber, 52e is a 2nd buffer chamber, 6 is a stack (apparatus), 82 shows a compressor.

Claims (5)

機器に接続され、開放動作の連動および/または閉鎖動作の連動が行われる複数の連動バルブを備えるバルブ組と、
前記バルブ組を構成する各前記連動バルブに制御用気体を供給して各前記連動バルブの開放動作の連動および/または閉鎖動作の連動を制御する制御用通路と、
前記制御用通路および/または前記連動バルブに設けられ、前記バルブ組を構成する各前記連動バルブの前記開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係を維持させる優先遅延要素とを具備し、
前記優先遅延要素は、前記制御用通路の少なくとも一部の流路断面積を変化させることにより、前記バルブ組を構成する各前記連動バルブの前記開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係を設定することを特徴とする気体制御式バルブシステム。
A valve set comprising a plurality of interlocking valves connected to the device and interlocking for opening operation and / or interlocking for closing operation;
A control passage for supplying a control gas to each interlocking valve constituting the valve set to control the interlocking of the opening operation and / or the closing operation of each interlocking valve;
A priority delay that is provided in the control passage and / or the interlocking valve and maintains a temporal priority delay relation for the interlocking of the opening operation and / or the interlocking of the closing operation of each interlocking valve constituting the valve group. Comprising elements,
The priority delay element changes the flow passage cross-sectional area of at least a part of the control passage, thereby interlocking the opening operation and / or closing operation of each interlocking valve constituting the valve set. A gas control type valve system characterized by setting a temporal priority delay relationship .
請求項1において、さらに前記優先遅延要素は、前記制御用気体が流れる単位時間あたりの流量を絞ることにより、前記バルブ組を構成する各前記連動バルブの前記開放動作の連動および/または閉鎖動作の連動について、時間的な優先遅延関係を設定することを特徴とする気体制御式バルブシステム。 2. The priority delay element according to claim 1, wherein the priority delay element further restricts a flow rate per unit time through which the control gas flows, thereby interlocking the opening operation and / or closing operation of each interlocking valve constituting the valve group. A gas control type valve system characterized by setting a temporal priority delay relationship for interlocking. 請求項1または2において、さらに前記優先遅延要素は、前記制御用通路の流路長を変化させることにより、前記バルブ組を構成する各前記連動バルブに対して時間的な優先遅延関係を設定することを特徴とする気体制御式バルブシステム。 According to claim 1 or 2, further wherein the priority delay element, by changing the flow path length of the control passage, setting the temporal priority delay relationship to each of said interlocking valve constituting the valve assembly A gas-controlled valve system characterized by that. 請求項1〜3のうちの一項において、さらに前記優先遅延要素は、前記制御用通路および/または前記連動バルブに設けられたバッファ室で形成されていることを特徴とする気体制御式バルブシステム。 In one of claims 1 to 3, further wherein the priority delay element, the gas control valve system characterized in that it is formed by a buffer chamber provided in the control passage and / or the interlocking valve . 請求項1〜4のうちの一項において、前記バルブ組は、開放動作により前記機器に流体を供給するための供給バルブと、開放動作により前記機器内の流体を機器外に排出させるための排出バルブとを備えており、
前記供給バルブは、前記供給バルブの開放動作を実施するための開放用ポートと、前記供給バルブの閉鎖動作を実施するための閉鎖用ポートとを備えており、
前記排出バルブは、前記排出バルブの開放動作を実施するための開放用ポートと、前記排出バルブの閉鎖動作を実施するための閉鎖用ポートとを備えており、
前記制御用通路は、前記供給バルブの前記開放用ポートおよび前記排出バルブの前記開放用ポートに連通する開放制御用通路と、前記供給バルブの前記閉鎖用ポートおよび前記排出バルブの前記閉鎖用ポートに連通する閉鎖制御用通路とを備えており、
前記優先遅延要素は、前記供給バルブ、前記排出バルブ、前記開放制御用通路および前記閉鎖制御用通路のうちの少なくとも一つに設けられていることを特徴とする気体制御式バルブシステム。
5. The valve set according to claim 1 , wherein the valve set includes a supply valve for supplying fluid to the device by an opening operation, and a discharge for discharging the fluid in the device to the outside by the opening operation. With a valve,
The supply valve includes an opening port for performing an opening operation of the supply valve and a closing port for performing a closing operation of the supply valve;
The discharge valve includes an opening port for performing an opening operation of the discharge valve and a closing port for performing a closing operation of the discharge valve,
The control passage includes an opening control passage communicating with the opening port of the supply valve and the opening port of the discharge valve, and the closing port of the supply valve and the closing port of the discharge valve. And a closed control passage that communicates,
The gas control type valve system, wherein the priority delay element is provided in at least one of the supply valve, the discharge valve, the opening control passage, and the closing control passage.
JP2009022249A 2009-02-03 2009-02-03 Gas control valve system Expired - Fee Related JP5369728B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009022249A JP5369728B2 (en) 2009-02-03 2009-02-03 Gas control valve system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009022249A JP5369728B2 (en) 2009-02-03 2009-02-03 Gas control valve system

Publications (2)

Publication Number Publication Date
JP2010180897A JP2010180897A (en) 2010-08-19
JP5369728B2 true JP5369728B2 (en) 2013-12-18

Family

ID=42762597

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009022249A Expired - Fee Related JP5369728B2 (en) 2009-02-03 2009-02-03 Gas control valve system

Country Status (1)

Country Link
JP (1) JP5369728B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6114202U (en) * 1984-06-30 1986-01-27 隆巳 青野 delay valve device
JP2000133294A (en) * 1998-10-21 2000-05-12 Aisin Seiki Co Ltd Fuel cell system
JP4621007B2 (en) * 2004-11-24 2011-01-26 本田技研工業株式会社 Fuel cell system

Also Published As

Publication number Publication date
JP2010180897A (en) 2010-08-19

Similar Documents

Publication Publication Date Title
EP1885013B1 (en) Fuel cell system
US8642194B2 (en) Fuel cell system
US8492046B2 (en) Method of mitigating fuel cell degradation due to startup and shutdown via hydrogen/nitrogen storage
JP5364916B2 (en) Humidifier for fuel cell
CA2527286C (en) Passive electrode blanketing in a fuel cell
JP2003151588A (en) Fuel circulation fuel cell system
JP2008041265A (en) Fuel cell system
JP2008275075A (en) Gas supply system
CA2634157A1 (en) Passive electrode blanketing in a fuel cell
JP2004152529A (en) Fuel cell system
US20070082243A1 (en) Compact anode flow shift design for small fuel cell vehicles
JP5040411B2 (en) Fuel cell system
JP5369728B2 (en) Gas control valve system
JP2010053983A (en) On-off valve
WO2005096427A1 (en) Fuel cell
KR102474369B1 (en) Valve device
US20060078768A1 (en) Anode inlet unit for a fuel cell system
JP5949898B2 (en) Fuel cell system
JP2005339847A (en) Fuel cell system
KR102654843B1 (en) Air shut off valve apparatus for fuel cell system
JP2010049878A (en) Fuel cell system
US10406934B2 (en) Fuel cell system for vehicle
JP2005166404A (en) Fuel cell system
JP5746062B2 (en) Fuel cell system
JP2010177166A (en) Fuel cell system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110913

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121109

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121115

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130111

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20130111

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20130111

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130820

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130902

R151 Written notification of patent or utility model registration

Ref document number: 5369728

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

LAPS Cancellation because of no payment of annual fees