Prior art keywords
shear reinforcement
grout
insertion hole
grout material
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2008174960A
Other languages
Japanese (ja)
Other versions
JP2010013858A (en
Inventor
慎一 山野辺
耕輔 古市
哲也 河野
直樹 曽我部
紘明 松村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2008174960A priority Critical patent/JP5339498B2/en
Publication of JP2010013858A publication Critical patent/JP2010013858A/en
Application granted granted Critical
Publication of JP5339498B2 publication Critical patent/JP5339498B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、ボックスカルバートの壁、底版、頂版、フーチング等の壁状のコンクリート部材のせん断補強におけるせん断補強材の定着方法、特に既設のコンクリート構造体の一面側から有底のせん断補強材挿入孔を穿孔し、せん断補強材を挿入して、グラウト材で定着させるせん断補強材の定着方法に関するものである。   The present invention relates to a method of fixing a shear reinforcement in shear reinforcement of a wall-shaped concrete member such as a box culvert wall, bottom plate, top plate, or footing, and in particular, insertion of a bottomed shear reinforcement material from one side of an existing concrete structure The present invention relates to a fixing method for a shear reinforcing material in which holes are drilled, a shear reinforcing material is inserted, and the fixing is performed with a grout material.

ボックスカルバートの壁、底版、頂版、フーチング等の壁状のコンクリート部材の面外荷重に対するせん断補強あるいは耐震補強においては、コンクリート壁の片面または両面から削孔し、不足しているせん断補強鋼材に相当する後挿入のせん断補強材を、削孔内部に挿入し、空隙にセメント系材料などの充填材料を充填し、コンクリートと一体化している(特許文献1〜4、非特許文献1等参照)。   In shear reinforcement or seismic reinforcement against out-of-plane loads of wall-shaped concrete members such as box culvert walls, bottom slabs, top slabs, and footings, drill holes from one side or both sides of the concrete wall to make the missing shear reinforced steel. The corresponding post-insertion shear reinforcement is inserted into the drilling hole, and the gap is filled with a filling material such as a cement-based material and integrated with concrete (see Patent Documents 1 to 4, Non-Patent Document 1, etc.) .

ここで、後挿入のせん断補強材とは、寸切りの異形鉄筋、先端定着体または後端定着体を有するせん断補強鉄筋、鋼管、帯状鋼材、形鋼あるいはそれを組み合わせたもの、その他炭素繊維ロープ・ロッドなどである。   Here, the rear-insertion shear reinforcement is a cut-shaped deformed reinforcing bar, a shear-reinforced reinforcing bar having a front-end fixing body or a rear-end fixing body, a steel pipe, a strip steel material, a shape steel or a combination thereof, and other carbon fiber ropes.・ A rod.

例えば、古い基準で設計され、せん断補強鉄筋の少ないコンクリート部材に対し、後挿入するせん断補強材により、せん断耐力やじん性を向上させることにより、補強するのである。   For example, a concrete member that is designed based on the old standard and has few shear reinforcing bars is reinforced by improving the shear strength and toughness with a shear reinforcing material that is inserted later.

本発明は、こうした補強のうち、主として、壁状部材が鉛直の壁であり削孔が水平横向きになる場合や、ボックスカルバート等の頂版(天井)であり、カルバート内部から鉛直上向きに削孔する場合における、施工方法、特にセメント系グラウト材の充填方法に関するものである。   Of these reinforcements, the present invention mainly includes a case where the wall-shaped member is a vertical wall and the drilling hole is horizontally oriented, or a top plate (ceiling) such as a box culvert, which drills vertically upward from the inside of the culvert. The present invention relates to a construction method, particularly a cement-type grout material filling method.

上記の補強において、グラウト材は、後挿入されたせん断補強材と削孔した孔壁との間に隙間なく充填できる必要があり、その硬化体が密実でせん断補強材とコンクリート躯体との間で応カを確実に伝達でき、かつ補修する構造体コンクリートと同等以上の強度である必要がある。そのため、所定の強度や剛性だけでなく、硬化時に収縮を生じないような性質も併せ持つ必要がある。   In the above reinforcement, the grout material must be able to be filled without gap between the shear reinforcement material inserted later and the drilled hole wall, and the hardened body is solid and is between the shear reinforcement material and the concrete frame. Therefore, it is necessary to transmit the power reliably and to have a strength equal to or higher than that of the structural concrete to be repaired. Therefore, it is necessary to have not only predetermined strength and rigidity but also properties that do not cause shrinkage during curing.

セメント系グラウト材は、例えば、プレミックスされたセメント粉体と所定量の水を、ハンドミキサーなどで攪拌混合するだけで使用でき、価格も比較的安く、強度および剛性も十分であることから、アンカーの設置や各種コンクリート部材の補強において、最も一般的な材料として用いられている。   The cement-based grout material can be used, for example, by simply stirring and mixing a premixed cement powder and a predetermined amount of water with a hand mixer, etc., and the price is relatively low, and the strength and rigidity are sufficient. It is used as the most common material in anchor installation and reinforcement of various concrete members.

下向きに穿孔した孔にせん断補強材を挿入する場合は、まず穿孔した後、孔内をエアーブロー等で清掃し、充填する材料のドライアウトを防止するために必要に応じて吸湿防止剤を塗布したり、水で孔壁に吸水させた後、流動性のあるセメント系グラウト材を注ぎ込み、その中にせん断補強材を挿入するだけで、後は養生を行なえば施工を完了することができる。   When inserting a shear reinforcement into a hole drilled downward, first drill the hole, clean the hole with air blow, etc., and apply a moisture absorption inhibitor as necessary to prevent the material from filling out. Or, after the water is absorbed into the hole wall with water, a flowable cementitious grout material is poured, and a shear reinforcing material is inserted into the cemented grout material.

しかしながら、水平横向きの場合、および斜め上向きあるいは上向きの場合は、上述の下向きのように、流動性のあるセメント系グラウト材を充填しても流れ出してしまうため、施工が困難であった。そのため、水平横向きあるいは鉛直上向きの施工においては、以下のような方法が用いられている。   However, in the case of horizontal sideways, and in the case of diagonally upward or upward, as shown in the downward direction described above, even if filled with a fluid cement-based grout material, the construction is difficult. For this reason, the following methods are used in the horizontal or vertical construction.

方法A:
可塑性グラウト、すなわちスラリー状あるいは粘土状のセメント系充填材料を削孔先端に装填し、せん断補強材を挿入し、せん断補強材の後端部を押し込んだり、打撃を加えて強制的に所定の位置までせん断補強材を挿入し、その後残りの空隙部分に注入ホースおよび排気ホースを挿入し、注入ホースより流動上のセメント系充填材を注入し、硬化により一体化するものである(例えば、非特許文献1参照)。
Method A:
Load plastic grout, that is, slurry-like or clay-like cement-based filler, into the drilling tip, insert shear reinforcement, push the rear end of shear reinforcement, or apply impact to force it into place Insert the shear hose up to the bottom, then insert the injection hose and the exhaust hose into the remaining void, inject the cement filler on the flow from the injection hose, and integrate by curing (for example, non-patent Reference 1).

方法B:
注入ホースおよび排気ホースを配置し、注入ホースより流動状のセメント系充填材を注入し、硬化して一体化するものである(例えば、特許文献5、6参照)。
Method B:
An injection hose and an exhaust hose are arranged, a fluid cement filler is injected from the injection hose, and cured and integrated (for example, see Patent Documents 5 and 6).

特開2002−275927号公報JP 2002-275927 A 特開2003−113673号公報JP 2003-113673 A 特開2005−105808号公報JP 2005-105808 A 特開2004−293294号公報JP 2004-293294 A 特開平10−102600号公報JP-A-10-102600 特開2004−162295号公報JP 2004-162295 A 「事例3 沈埋トンネル(東京港第二航路海底トンネル)継ぎ手の改良などでせん断補強」、日経コンストラクション平成13年1月12日号、日経BP社、P72−73“Case 3: Shear reinforcement by improving the submerged tunnel (Tokyo Port 2nd seafloor tunnel) joint”, Nikkei Construction January 12, 2001, Nikkei BP, P72-73 “Post-Head-bar(後施工プレート定着型せん断補強鉄筋)工法”、[平成20年6月12日検索]、インターネット<http://www.phb-koho.jp/index.html>“Post-Head-bar (post-installed plate-fixing type shear reinforcing bar) method”, [Search June 12, 2008], Internet <http://www.phb-koho.jp/index.html>

せん断補強材が1本の異形鉄筋である場合は、注入ホースおよび排気ホースを配置することは、それほど困難ではないものの、その手間は施工上憂慮すべき程度のものとなる。また、こうしたホースは、ビニールホースなどであるが、こうしたホースがセメント系グラウトで満たすべき空隙に残置されることから、以下の問題があった。   When the shear reinforcement is a single deformed reinforcing bar, it is not so difficult to dispose the injection hose and the exhaust hose, but the time and effort is a concern for construction. Moreover, although such a hose is a vinyl hose etc., since such a hose was left in the space | gap which should be filled with cementitious grout, there existed the following problems.

すなわち、ホースの強度および剛性が硬化したグラウト材よりも小さいこと、一体化においてホースが構造上の弱点部となること。さらに、温度変化に対するホースの線膨張係数がグラウト材と大きく異なり、温度変化に対し両者の伸縮量が一致せず、長期的な水道などの弱点の原因となるという問題点があった。   That is, the strength and rigidity of the hose are smaller than the hardened grout material, and the hose becomes a structural weak point in integration. Furthermore, the linear expansion coefficient of the hose with respect to temperature change is significantly different from that of grout material, and the expansion and contraction amount of both does not match with respect to temperature change, which causes a weak point such as long-term water supply.

また、特にせん断補強材が、頭部定着体を有する異形鉄筋などである場合、頭部定着体と削孔空隙の遊間は狭く、そこに注入ホースあるいは排気ホースを配置することが困難であった。   In particular, when the shear reinforcement is a deformed reinforcing bar having a head fixing body, the clearance between the head fixing body and the drilling gap is narrow, and it is difficult to place an injection hose or an exhaust hose there. .

施工の品質の観点からは、排気ホースの先端を、削孔した奥に、しかも断面の最上部に確実に配置しないと、充填時に削孔内部に空気が残ることがあるが、これを確認することはほとんど不可能であった。   From the viewpoint of construction quality, if the tip of the exhaust hose is not placed in the back of the drilled hole and at the top of the cross section, air may remain inside the drilled hole. It was almost impossible.

また、排気ホースからグラウト材が排出されることを視認することにより充填完了を確認していたが、排気ホースは細径であるため、容易に閉塞することがある。この場合、充填完了が確認できないばかりでなく、排気ホース内に空気が残置されてしまうので、いわばコンクリート躯体内部に空洞があるようなものであり、構造上の弱点となってしまう。   Moreover, although the completion of filling was confirmed by visually confirming that the grout material was discharged from the exhaust hose, the exhaust hose has a small diameter and may be easily blocked. In this case, not only the completion of filling cannot be confirmed, but also air is left in the exhaust hose, so that there is a void inside the concrete housing, which is a structural weakness.

前述のAの方法において、せん断補強材を打撃して挿入する場合は、打撃の振動により可塑性グラウトが分離することもあった。そもそも可塑性グラウトは高性能減水剤や増粘剤などの混和剤を多量に配合したものであって、高価となる。また、各種の条件に最適な配合をその都度調整し練り混ぜることは、品質管理上、非常に煩雑である。   In the method A described above, when the shear reinforcement material is hit and inserted, the plastic grout may be separated by the vibration of the hit. In the first place, plastic grout is a combination of a large amount of admixtures such as a high-performance water reducing agent and a thickening agent, and is expensive. In addition, it is very troublesome in terms of quality control to adjust and knead the optimum composition for each condition.

本発明は、従来技術における上述のような課題の解決を図ったものであり、下向きの施工と同様の流動性のあるグラウト材を使用でき、かつ経済性、施工性に優れたせん断補強材の定着方法を提供することを目的としている。   The present invention aims to solve the above-mentioned problems in the prior art, and can use a grout material having fluidity similar to downward construction, and is a shear reinforcement material excellent in economic efficiency and workability. It aims to provide a fixing method.

本願の請求項1に係るせん断補強材の定着方法は、既設のコンクリート構造体の一面側から有底のせん断補強材挿入孔を穿孔し、前記せん断補強材挿入孔にせん断補強材を挿入して、グラウト材で定着させるせん断補強材の定着方法において、
前記せん断補強材挿入孔の穿孔位置外面に前記せん断補強材が納まる大きさのグラウト材貯留手段を設置し、該グラウト材貯留手段に形成した開口部を前記せん断補強材挿入孔の穿孔位置の外周に密着させて、せん断補強材挿入孔との間に密閉空間を形成させ、かつその内部空間が前記せん断補強材挿入孔と連通するようにし、
前記せん断補強材挿入孔に流動性を有する状態のグラウト材を充填し、その際に該せん断補強材挿入孔から流出するグラウト材を前記グラウト材貯留手段で受け、前記グラウト材貯留手段で受けたグラウト材の圧がグラウト材のせん断補強材挿入孔からの流出圧より大きくなるようにして、該せん断補強材挿入孔をグラウト材で実質的に充満させ、前記せん断補強材をグラウト材貯留手段内のグラウト材中に埋没させた状態から前記せん断補強材挿入孔に挿入し、該せん断補強材の挿入後、前記せん断補強材挿入孔と前記グラウト材貯留手段との連通部分を閉塞させ、該グラウト材の硬化により前記せん断補強材を定着させることを特徴とするものである。
The fixing method of the shear reinforcement material according to claim 1 of the present application is to drill a bottomed shear reinforcement material insertion hole from one side of an existing concrete structure and insert the shear reinforcement material into the shear reinforcement material insertion hole. In the fixing method of the shear reinforcement material fixed with the grout material,
A grout material storage means having a size to accommodate the shear reinforcement material is installed on the outer surface of the shear reinforcement material insertion hole, and an opening formed in the grout material storage means has an outer periphery of the drilling position of the shear reinforcement material insertion hole. To form a sealed space between the shear reinforcement material insertion hole, and to communicate the internal space with the shear reinforcement material insertion hole,
The shear reinforcing material insertion hole is filled with a fluid grout material, and the grout material flowing out from the shear reinforcing material insertion hole is received by the grout material storage means and received by the grout material storage means. The pressure of the grout material is larger than the outflow pressure of the grout material from the shear reinforcement material insertion hole, the shear reinforcement material insertion hole is substantially filled with the grout material, and the shear reinforcement material is stored in the grout material storage means. Inserted into the shear reinforcement member insertion hole from the state embedded in the grout material, and after the shear reinforcement member is inserted, the communication portion between the shear reinforcement member insertion hole and the grout material storage means is closed, and the grout material is closed. The shear reinforcement material is fixed by curing the material.

ここでいう既設のコンクリート構造体としては、主としてボックスカルバートの壁、底版、頂版、フーチング等の壁状または版状のコンクリート部材を想定しているが、必ずしもこれらに限定する必要はない。また、コンクリート構造体は、鉄筋コンクリートの場合が一般的であるが、本発明は、コンクリートを主体とし、せん断補強を必要とする構造体一般に適用することができる。   The existing concrete structure here is mainly assumed to be a wall-like or plate-like concrete member such as a box culvert wall, bottom plate, top plate, or footing, but is not necessarily limited to these. The concrete structure is generally reinforced concrete. However, the present invention can be applied to a structure that is mainly made of concrete and requires shear reinforcement.

なお、「コンクリート構造体の一面側から有底のせん断補強材挿入孔を穿孔し」における「一面側から」というのは、せん断補強材挿入孔についてみた場合の一面側からという意味であり、例えば空間を仕切る中壁の片側(一面側)からの穿孔と、その反対側(一面側)からの穿孔を行う場合も含むものである。   In addition, “from one side” in “perforate a bottomed shear reinforcement insert hole from one side of the concrete structure” means from one side when viewed from the shear reinforcement insert hole, for example, This includes the case of drilling from one side (one surface side) of the inner wall that partitions the space and drilling from the opposite side (one surface side).

せん断補強材も特に限定されず、従来使用されている、異形鉄筋、先端定着体または後端定着体を有するせん断補強鉄筋、鋼管、帯状鋼材、形鋼あるいはそれを組み合わせたもの、炭素繊維ロープ・ロッド等のせん断補強材について適用可能である。   There is no particular limitation on the shear reinforcement material, and conventionally used deformed reinforcing bars, shear reinforcing bars having a front anchoring body or a rear anchoring body, a steel pipe, a strip steel material, a shape steel or a combination thereof, a carbon fiber rope, It can be applied to shear reinforcements such as rods.

本発明で用いるグラウト材は、下向き施工で用いられているものと同様の流動性を有するグラウト材であり、安価なものとしてはセメント系グラウト材等を使用することができる。   The grout material used in the present invention is a grout material having fluidity similar to that used in downward construction, and a cement-type grout material or the like can be used as an inexpensive material.

せん断補強材挿入孔を穿孔した穿孔位置外面に設置されるグラウト材貯留手段は、せん断補強材挿入孔と連通させ、圧力差によりせん断補強材挿入孔からのグラウト材の流出を抑制し、せん断補強材挿入孔内をグラウト材で充満させるためのものである。   The grout material storage means installed on the outer surface of the drilling position where the shear reinforcement material insertion hole is drilled communicates with the shear reinforcement material insertion hole and suppresses the outflow of the grout material from the shear reinforcement material insertion hole due to the pressure difference. This is for filling the inside of the material insertion hole with the grout material.

なお、本発明においてせん断補強材は、通常はせん断補強材挿入孔内をグラウト材で充満させた後に挿入されるが、その場合はグラウト材貯留手段内のグラウト材中に没した状態からグラウト材貯留手段に挿入することができる。   In the present invention, the shear reinforcement material is usually inserted after the inside of the shear reinforcement material insertion hole is filled with the grout material. In that case, the grout material is submerged in the grout material in the grout material storage means. It can be inserted into the storage means.

本発明において、グラウト材は、充填時に流動性を有することが前提になっており、水平方向の充填や斜め上方向、鉛直方向の充填において、グラウト材がせん断補強材挿入孔から流れ出ることになるが、例えば水平方向の充填において、グラウト材貯留手段内に受けたグラウト材の上面がせん断補強材挿入孔のグラウト材の上面より高ければ、圧力差により、グラウト材の流出が抑えられる。   In the present invention, it is assumed that the grout material has fluidity at the time of filling, and the grout material flows out from the shear reinforcement insertion hole in horizontal filling, oblique upward direction, and vertical filling. However, in the horizontal filling, for example, if the upper surface of the grout material received in the grout material storage means is higher than the upper surface of the grout material in the shear reinforcing material insertion hole, the outflow of the grout material is suppressed due to the pressure difference.

また、グラウト材貯留手段に受けたグラウト材を密封状態で加圧することによっても、圧力差により、グラウト材の流出が抑えられる、特に、天井部分のコンクリート構造体等における斜め上向きや鉛直方向の充填で有効である。   In addition, by pressing the grout material received in the grout material storage means in a sealed state, the outflow of the grout material can be suppressed due to the pressure difference. Especially, the concrete structure in the ceiling portion is filled obliquely upward or vertically. It is effective in.

なお、せん断補強材挿入孔が水平方向またはそれより下向きであれば、せん断補強材挿入孔内に空気が残る恐れは少ないが、水平から斜め上向きの場合には孔内の上部に、また鉛直上向き方向の孔の場合には孔の上端(せん断補強材挿入方向先端)に空隙や空気泡が残る恐れがある。その場合、ホースを孔先端まで挿入しグラウト材の注入に関しある程度の注入速度があれば、グラウト材にも適度な粘性があるため、内部の空気は一緒に排出される.さらに、必要に応じてグラウト材を吸引すれば、削孔内奥に残った空気を排出することができる。   If the shear reinforcement insert hole is in the horizontal direction or downward, air is less likely to remain in the shear reinforcement insert hole. In the case of a directional hole, there is a risk that a void or air bubble may remain at the upper end of the hole (the tip in the direction of shear reinforcement insertion). In that case, if the hose is inserted to the tip of the hole and there is a certain injection speed for the injection of the grout material, the grout material also has an appropriate viscosity, so the internal air is discharged together. Furthermore, if the grout material is sucked as necessary, the air remaining in the back of the drilling hole can be discharged.

せん断補強材をグラウト材貯留手段内のグラウト材中に没した状態から、グラウト材が充満したせん断補強材挿入孔に挿入することで、グラウト材の充満状態を乱すことなく、せん断補強材を挿入することができ、そのまません断補強材挿入孔とグラウト材貯留手段との連通部分を閉塞させれば、グラウト材の硬化によりせん断補強材を定着させることができる。   By inserting the shear reinforcement material into the shear reinforcement material insertion hole filled with the grout material from the state where it is immersed in the grout material in the grout material storage means, the shear reinforcement material can be inserted without disturbing the full state of the grout material. If the communicating portion between the shear reinforcement insertion hole and the grout material storage means is closed as it is, the shear reinforcement can be fixed by hardening the grout material.

連通部分の閉塞は、グラウト材貯留手段が例えば後述するような硬質の箱状容器の場合には、開閉のための扉あるいは仕切板を利用することができ、またグラウト材貯留手段が例えば後述するようなビニールチューブなどの変形自在なチューブの場合には、チューブの一部を絞り込むなどして閉塞させることができる。その他、せん断補強材に後述するような後端部側定着体が取り付けられる場合、その定着体にゴムリング、あるいはゴムパッキンを取り付けたり、後端部側定着体に自碇式の板などを設けて閉塞するのでもよい。   When the grout material storage means is a hard box-shaped container as described later, for example, a door or a partition plate for opening and closing can be used, and the grout material storage means is described later as an example. In the case of a deformable tube such as a vinyl tube, the tube can be closed by narrowing a part of the tube. In addition, when a rear end side fixing body as described later is attached to the shear reinforcement, a rubber ring or a rubber packing is attached to the fixing body, or a self-supporting plate is provided on the rear end side fixing body. It may be occluded.

請求項は、請求項1に係るせん断補強材の定着方法において、前記せん断補強材の挿入後、前記せん断補強材挿入孔と前記グラウト材貯留手段との連通部分を閉塞させた後、グラウト材貯留手段側に残ったグラウト材を抜き取り、再利用することを特徴とするものである。 Claim 2 is the fixing method of shearing reinforcement according to claim 1, after insertion of the shear reinforcement, after closing the communicating portion between the shear reinforcement insertion hole and the grout reservoir means, grout The grout material remaining on the storage means side is extracted and reused.

本発明は、充填時には流動性のあるグラウト材を用い、せん断補強材挿入孔から流出するグラウト材をグラウト材貯留手段で受け、圧力差を利用して流出を抑えるものであるが、未硬化のグラウト材は流動性が維持されている状態では、順次、転用することでグラウト材の無駄を最小限に抑えることができる。   The present invention uses a fluid grout material at the time of filling, receives the grout material flowing out from the shear reinforcement insertion hole by the grout material storage means, and suppresses outflow using a pressure difference. In the state where the fluidity of the grout material is maintained, the waste of the grout material can be minimized by sequentially diverting the grout material.

再利用のためには、グラウト材貯留手段にグラウトの取出し口を設けたり、グラウト材貯留手段がチューブの場合には、閉塞後、チューブを切断してグラウト材を取り出すこともできる。   For reuse, the grout material storage means can be provided with a grout outlet, or when the grout material storage means is a tube, the tube can be cut off and the grout material taken out after closing.

請求項は、請求項またはに係るせん断補強材の定着方法において、前記グラウト材貯留手段内の流動状態のグラウト材の上面がせん断補強材挿入孔の高さ以上となるようにすることで、せん断補強材挿入孔側からのグラウト材の流出圧に抵抗させることを特徴とするものである。 According to a third aspect of the present invention, in the fixing method of the shear reinforcement material according to the first or second aspect , the upper surface of the fluid grout material in the grout material storage means is not less than the height of the shear reinforcement material insertion hole. Then, it is made to resist the outflow pressure of the grout material from the shear reinforcing material insertion hole side.

充填時におけるグラウト材は流動性を有するが、水位差あるいは液位差の考え方によりせん断補強材挿入孔側からのグラウト材の流出を抑制することができる。   Although the grout material at the time of filling has fluidity, the outflow of the grout material from the shear reinforcing material insertion hole side can be suppressed by the concept of the water level difference or the liquid level difference.

請求項は、請求項またはに係るせん断補強材の定着方法において、前記グラウト材貯留手段内のグラウト材に対し、該グラウト材貯留手段側より加圧することで、せん断補強材挿入孔側からのグラウト材の流出圧に抵抗させることを特徴とするものである。 According to a fourth aspect of the present invention, in the fixing method of the shear reinforcement material according to the first or second aspect , the grout material in the grout material storage means is pressurized from the grout material storage means side so that the side of the shear reinforcement material is inserted. It is made to resist the outflow pressure of the grout material from.

天井部分等、水位差の考え方が利用できない条件等では、グラウト材貯留手段内のグラウト材に対し、圧を加えることで、せん断補強材挿入孔側からのグラウト材の流出圧に抵抗させることができる。   Under conditions where the water level difference concept cannot be used, such as the ceiling, pressure can be applied to the grout material in the grout material storage means to resist the outflow pressure of the grout material from the shear reinforcement material insertion hole side. it can.

請求項は、請求項1〜に係るせん断補強材の定着方法において、前記グラウト材の充填に際し、グラウト材充填のためのホースを前記せん断補強材挿入孔先端まで挿入し、グラウト材充填の流速を高めることで、せん断補強材挿入孔内の空気をグラウト材とともに排出させることを特徴とするものである。 According to a fifth aspect of the present invention, in the fixing method of the shear reinforcement according to the first to fourth aspects, when filling the grout material, a hose for filling the grout material is inserted to the tip of the shear reinforcement material insertion hole, By increasing the flow velocity, the air in the shear reinforcement insertion hole is discharged together with the grout material.

これは、せん断補強材挿入孔内、特に先端部に残っている空気を完全に排出するための方法であり、必要に応じせん断補強材挿入孔先端部からのグラウト材および空気の吸引を併用することでより確実な空気の排出が可能となる。   This is a method for completely exhausting the air remaining in the shear reinforcement material insertion hole, particularly at the tip part. If necessary, the grout material and the air suction from the tip part of the shear reinforcement material insertion hole are used together. This makes it possible to discharge air more reliably.

請求項は、請求項1〜に係るせん断補強材の定着方法において、前記グラウト材貯留手段が、前記せん断補強材が納まる寸法を有し、一側に開閉可能な開口部を有する金属製またはプラスチック製の箱状容器からなることを特徴とするものである。 A sixth aspect of the present invention is the method of fixing a shear reinforcement according to any one of the first to fifth aspects, wherein the grout material storage means has a size in which the shear reinforcement can be accommodated and has an opening that can be opened and closed on one side. Or it consists of a plastic box-shaped container.

箱状容器の具体的な形態としては、例えば岡持ちのような形態の箱状容器の一端に、穿孔位置の外周に密着させた状態で、せん断補強材をせん断補強材挿入孔に挿入するための開口部を形成する。せん断補強材は、グラウト材貯留手段としての箱状容器内のグラウト材に没した状態から、グラウト材が充満しているせん断補強材挿入孔に挿入することができる。   As a specific form of the box-shaped container, for example, in order to insert the shear reinforcement material into the shear reinforcement material insertion hole in a state of being in close contact with the outer periphery of the piercing position on one end of the box-shaped container shaped like Okamochi The opening is formed. The shear reinforcement material can be inserted into the shear reinforcement material insertion hole filled with the grout material from a state where it is immersed in the grout material in the box-shaped container as the grout material storage means.

この開口部はせん断補強材をせん断補強材挿入孔に挿入した後、閉塞させることができるようにする。   This opening allows the shear reinforcement to be closed after it has been inserted into the shear reinforcement insertion hole.

箱状容器の材質は、金属、プラスチック、その他特に限定されないが付着したグラウト材を容易に除去できるものが好ましい。   The material of the box-shaped container is not particularly limited to metal, plastic, or the like, but is preferably one that can easily remove the attached grout material.

請求項は、請求項1〜に係るせん断補強材の定着方法において、前記グラウト材貯留手段が、前記せん断補強材が納まる大きさを有する変形自在なチューブからなることを特徴とするものである。 According to a seventh aspect of the present invention, in the fixing method for a shear reinforcement material according to any one of the first to fifth aspects, the grout material storage means is formed of a deformable tube having a size in which the shear reinforcement material can be accommodated. is there.

グラウト材貯留手段としてのチューブは、ビニールチューブなど容易に自由に形態を変えられるものでもよいし、ある程度形態を保持するもの、あるいはビニールと硬質の筒状物を組み合わせたものなどでもよい。   The tube as the grout material storage means may be a tube that can be easily changed in shape, such as a vinyl tube, a tube that retains its shape to some extent, or a combination of vinyl and a hard cylindrical material.

チューブの場合も、グラウト材を扱う上で不都合なものでなければ、材質は特に限定されない。   In the case of a tube, the material is not particularly limited as long as it is not inconvenient in handling the grout material.

本発明によれば、水平方向あるいは斜め上方や垂直方向の施工においても、下向きの施工と同じように、流動性のあるグラウト材が削孔内に充填された状態を作り出しことができるため、以下のような効果が得られる。   According to the present invention, even in the construction in the horizontal direction or obliquely upward or in the vertical direction, as in the construction in the downward direction, it is possible to create a state in which the grout material with fluidity is filled in the drilling hole. The following effects can be obtained.

(1) せん断補強材挿入孔に空気が残らず、確実な充填ができる。   (1) Air does not remain in the shear reinforcement material insertion hole, and reliable filling is possible.

(2) 注入ホースや排気ホースなどのホースがせん断補強材挿入孔内部に残置されないので、構造上の弱点となることがない。   (2) Since hoses such as injection hose and exhaust hose are not left inside the shear reinforcement insertion hole, there is no structural weakness.

(3) 注入ホースや排気ホースを取り付ける作業手間がない。   (3) There is no work to install the injection hose and exhaust hose.

(4) 高価で製造の煩雑な可塑性グラウトを用いず、安価で練混ぜの容易な流動状のセメントグラウト等を使用することができる。   (4) A fluid cement grout that is inexpensive and easy to knead can be used without using an expensive and complicated plastic grout.

以下、本発明の最良の形態として、具体的な実施形態について説明する。なお、本発明は、以下に説明する実施形態に限定されるものではない。   Hereinafter, specific embodiments will be described as the best mode of the present invention. Note that the present invention is not limited to the embodiments described below.

図1(a)〜(f)は、本発明の一実施形態(型枠タイプ)における施工手順を示したもので、それぞれ左側が側面図、右側((b)〜(e)のみ)が平面図である。   1 (a) to 1 (f) show a construction procedure in one embodiment (formwork type) of the present invention, in which the left side is a side view and the right side (only (b) to (e)) is a plane. FIG.

この場合の施工手順は以下のようになる。   The construction procedure in this case is as follows.

(1) 横向き削孔(図1(a)参照)
せん断補強の対象となるコンクリート構造体1の一面から横向きに削孔し、せん断補強材を挿入するための挿入孔2を形成させる。なお、この例では、挿入孔2の開口部にせん断補強材の定着体を設置するための拡径部3を設けている。
また、グラウト材の充填に先立ち、挿入孔2の内面に吸湿防止材を塗布する。
(1) Horizontal drilling (see Fig. 1 (a))
A hole is drilled laterally from one surface of the concrete structure 1 to be subjected to shear reinforcement, and an insertion hole 2 for inserting a shear reinforcement is formed. In this example, an enlarged diameter portion 3 for installing a fixing member of a shear reinforcement material is provided at the opening of the insertion hole 2.
Prior to filling the grout material, a moisture absorption preventing material is applied to the inner surface of the insertion hole 2.

(2) グラウト材貯留用箱状容器の設置(図1(b)参照)
グラウト材貯留手段としての、箱状容器4を挿入孔2の穿孔位置外面に設置する。なお、この例では、挿入孔2に充填されるグラウト材の型枠を取り付けるための外枠5を貼り付け、その外側に箱状容器4を取り付けている。
外枠5の中央と箱状容器4の設置面は開口しており、挿入孔2に連通する形となる。
(2) Installation of a container for storage of grout materials (see Fig. 1 (b))
A box-like container 4 serving as a grout material storage means is installed on the outer surface of the insertion hole 2 at the piercing position. In this example, an outer frame 5 for attaching a grout form to be filled in the insertion hole 2 is attached, and a box-like container 4 is attached to the outside thereof.
The center of the outer frame 5 and the installation surface of the box-like container 4 are open and communicate with the insertion hole 2.

(3) グラウト材の充填(図1(c)参照)
開口している箱状容器4の上面から注入ホース6を挿入孔2に差し込み、グラウト材7を充填する。
(3) Filling grout material (See Fig. 1 (c))
An injection hose 6 is inserted into the insertion hole 2 from the upper surface of the open box-like container 4 and filled with a grout material 7.

このとき、挿入孔2内に充填しているグラウト材7の流出とともに、内部の空気が挿入孔2の開口部から抜けて行き、箱状容器4に受けたグラウト材7の液面が挿入孔2の高さ以上になると、挿入孔2内がグラウト材7で充満し、注入ホース6を抜いても液圧により充満状態が維持される。   At this time, with the outflow of the grout material 7 filled in the insertion hole 2, the internal air escapes from the opening of the insertion hole 2, and the liquid level of the grout material 7 received in the box-shaped container 4 is the insertion hole. When the height is equal to or greater than 2, the inside of the insertion hole 2 is filled with the grout material 7, and even if the injection hose 6 is pulled out, the filled state is maintained by the hydraulic pressure.

(4) せん断補強鉄筋の挿入(図1(d)参照)
せん断補強材として、この例では異形鉄筋などのせん断補強鉄筋8を、グラウト材7が充満した挿入孔2に挿入する。また、この例で、せん断補強鉄筋8の後端にはセラミックス製の定着体9を取り付け、前述した拡径部3に納まるようにしている。
(4) Inserting a shear reinforcing bar (see Fig. 1 (d))
In this example, a shear reinforcing bar 8 such as a deformed bar is inserted into the insertion hole 2 filled with the grout material 7 as the shear reinforcing material. In this example, a ceramic fixing body 9 is attached to the rear end of the shear reinforcing bar 8 so as to be accommodated in the above-described enlarged diameter portion 3.

(5) 型枠の堰板挿入(図1(e)参照)
せん断補強鉄筋8を挿入した後、前述の外枠5の開口部に型枠の堰板5aをスライドさせる形で嵌めこみ、箱状容器4の設置面の開口部にも扉板4aを、スライドさせて嵌めこみ、挿入孔2と箱状容器4との連通部分を閉塞させる。
(5) Inserting the formwork dam (see Fig. 1 (e))
After the shear reinforcing bar 8 is inserted, the dam plate 5a of the mold is slid into the opening of the outer frame 5, and the door plate 4a is slid into the opening of the installation surface of the box-like container 4. It is made to fit and the communication part of the insertion hole 2 and the box-shaped container 4 is obstruct | occluded.

図2は型枠の形態例を示したもので、(a)は外枠5に対し四角形の堰板5aを挿入する場合、(b) はU字型の外枠5に対し同形状の堰板5aを挿入する場合の例である。   FIG. 2 shows an example of the form of a formwork. (A) shows a case where a rectangular dam plate 5 a is inserted into the outer frame 5, and (b) shows a dam having the same shape with respect to the U-shaped outer frame 5. It is an example in the case of inserting the board 5a.

(6) グラウト材貯留用箱状容器の撤去(図1(f)参照)
箱状容器4の下部に設けたグラウト回収口10から、グラウト材7を抜き取り、箱状容器4を撤去する。抜き取ったグラウト材7は流動性が保たれた状態で転用することができる。
養生後、挿入孔2内のグラウト材7が硬化したら、外枠5および堰板5aを撤去する。
(6) Removal of container for storage of grout material (See Fig. 1 (f))
The grout material 7 is extracted from the grout collection port 10 provided in the lower part of the box-shaped container 4, and the box-shaped container 4 is removed. The extracted grout material 7 can be diverted in a state where the fluidity is maintained.
After curing, when the grout material 7 in the insertion hole 2 is cured, the outer frame 5 and the weir plate 5a are removed.

図3は、図1の実施形態に対する変形例を示したもので、図1(f)の施工段階に対応する側面図である。   FIG. 3 shows a modification of the embodiment of FIG. 1, and is a side view corresponding to the construction stage of FIG. 1 (f).

この例では、グラウト材の型枠について、外枠5を用いず、コンクリート構造体1の表面側を事前にドリル削孔し、アンカー11として、ねじ棒(SUS全ネジ)などを埋めておき、コンクリート構造体1の表面にスポンジシール12あるいはパッキンを介して、堰板としての型枠13をナットなどで止めつけるようにしたものである。   In this example, for the grout formwork, the outer frame 5 is not used, the surface side of the concrete structure 1 is drilled beforehand, and a screw rod (SUS full screw) or the like is buried as the anchor 11, A mold 13 as a dam plate is fastened to the surface of the concrete structure 1 with a nut or the like via a sponge seal 12 or packing.

なお、アンカーの形式や定着手段は、従来知られている種々の形式のものを利用することができる。   Various types of anchors and fixing means known in the art can be used.

図4(a)、(b)は図3の実施形態における型枠の形態例として、正方形の場合と円形の場合を示したものである。挿入孔2を閉塞できるものであれば、特に限定されない。   4 (a) and 4 (b) show a case of a square and a case of a circle as an example of the form of the mold in the embodiment of FIG. There is no particular limitation as long as the insertion hole 2 can be closed.

図5は、図1の実施形態に対するさらに他の変形例を示したもので、図1(f)の施工段階に対応する側面図である。   FIG. 5 shows still another modified example of the embodiment of FIG. 1, and is a side view corresponding to the construction stage of FIG. 1 (f).

この例では、グラウト材が充満した挿入孔3に挿入されるせん断補強鉄筋8の軸部に、図6(a)、(b)に示すような抜出防止固定金具14を取り付けてせん断補強鉄筋8の抜け出しを防止し、せん断補強鉄筋8の後端にネジ方式などで取り付けたセラミックス製の定着体15にあらかじめアンカー16を埋め込んでおき、アンカー16により堰板としての型枠17をナットなどで止めつけるようにしたものである。   In this example, an anti-extraction fixing bracket 14 as shown in FIGS. 6 (a) and 6 (b) is attached to the shaft portion of the shear reinforcing bar 8 inserted into the insertion hole 3 filled with the grout material, thereby shear reinforcing bar. 8 is prevented and the anchor 16 is embedded in the ceramic fixing body 15 attached to the rear end of the shear reinforcing bar 8 by a screw method or the like. It is intended to stop.

図6(a)の抜出防止固定金具14は、鉄板の曲げ加工などによって成形され、図6(b)の抜出防止固定金具14は、ナットに羽状の突起を取り付けたものである。   The extraction preventing fixing metal fitting 14 shown in FIG. 6 (a) is formed by bending an iron plate or the like, and the extraction preventing fixing metal fitting 14 shown in FIG. 6 (b) is obtained by attaching a wing-like protrusion to a nut.

図7(a)〜(e)は本発明の他の実施形態(キャップタイプ)における施工手順を示したもので、それぞれ左側が側面図、右側((b)〜(d)のみ)が平面図である。   FIGS. 7 (a) to 7 (e) show the construction procedure in another embodiment (cap type) of the present invention, and the left side is a side view and the right side (only (b) to (d)) is a plan view. It is.

この場合の施工手順は以下のようになる。   The construction procedure in this case is as follows.

(1) 横向き削孔(図7(a)参照)
せん断補強の対象となるコンクリート構造体1の一面から横向きに削孔し、せん断補強材を挿入するための挿入孔2を形成させる。なお、この例では、挿入孔2の開口部にせん断補強材の定着体を設置するための拡径部3を設けている。
また、グラウト材の充填に先立ち、挿入孔2の内面に吸湿防止材を塗布する。
(1) Horizontal drilling (see Fig. 7 (a))
A hole is drilled laterally from one surface of the concrete structure 1 to be subjected to shear reinforcement, and an insertion hole 2 for inserting a shear reinforcement is formed. In this example, an enlarged diameter portion 3 for installing a fixing member of a shear reinforcement material is provided at the opening of the insertion hole 2.
Prior to filling the grout material, a moisture absorption preventing material is applied to the inner surface of the insertion hole 2.

(2) グラウト材貯留用箱状容器の設置および差込口キャップの取付け(図7(b)参照)
グラウト材貯留手段としての、箱状容器4を挿入孔2の穿孔位置外面に設置する。設置に際し、挿入孔2の開口部(拡径部3)に、図8に示すような中央に、挿入孔2の開口部に嵌り込む径の短筒状の開口部18aを有し、外周にコンクリート構造体1の表面に密着するフランジ部18bを有する差込口キャップ18を嵌め込み、その外側に箱状容器4を取り付けている。差込口キャップ18としては、弾性を有するゴムなどが適している。また、ブチルゴムなどのように、グラウト材中の水分を吸収して体積が増加する膨潤ゴムなども適している。
(2) Installation of a container for storage of grout material and installation of an insertion cap (see Fig. 7 (b))
A box-like container 4 serving as a grout material storage means is installed on the outer surface of the insertion hole 2 at the piercing position. At the time of installation, the opening (diameter expanded portion 3) of the insertion hole 2 has a short cylindrical opening 18a having a diameter fitted into the opening of the insertion hole 2 at the center as shown in FIG. An insertion cap 18 having a flange portion 18b that is in close contact with the surface of the concrete structure 1 is fitted, and the box-like container 4 is attached to the outside thereof. As the insertion cap 18, elastic rubber or the like is suitable. Also suitable is a swollen rubber that absorbs moisture in the grout material and increases its volume, such as butyl rubber.

箱状容器4の設置面は開口しており、差込口キャップ18の開口部18aを通じて挿入孔2に連通する形となる。また、箱状容器4の設置面のコンクリート構造体1の表面と接する外周部にはコーキング19を施し、密着させる。   The installation surface of the box-shaped container 4 is open and communicates with the insertion hole 2 through the opening 18 a of the insertion port cap 18. Moreover, the caulking 19 is given to the outer peripheral part which contact | connects the surface of the concrete structure 1 of the installation surface of the box-shaped container 4, and it adheres.

(3) グラウト材の充填(図7(c)参照)
開口している箱状容器4の上面から注入ホース6を挿入孔2に差し込み、グラウト材7を充填する。
(3) Filling grout material (see Fig. 7 (c))
An injection hose 6 is inserted into the insertion hole 2 from the upper surface of the open box-like container 4 and filled with a grout material 7.

このとき、挿入孔2内に充填しているグラウト材7の流出とともに、内部の空気が挿入孔2の開口部から抜けて行き、箱状容器4に受けたグラウト材7の液面が挿入孔2の高さ以上になると、挿入孔2内がグラウト材7で充満し、注入ホース6を抜いても液圧により充満状態が維持される。   At this time, with the outflow of the grout material 7 filled in the insertion hole 2, the internal air escapes from the opening of the insertion hole 2, and the liquid level of the grout material 7 received in the box-shaped container 4 is the insertion hole. When the height is equal to or greater than 2, the inside of the insertion hole 2 is filled with the grout material 7, and even if the injection hose 6 is pulled out, the filled state is maintained by the hydraulic pressure.

(4) せん断補強鉄筋の挿入(図7(d)参照)
せん断補強材として、この例では異形鉄筋などのせん断補強鉄筋8を、グラウト材7が充満した挿入孔2に挿入する。
(4) Inserting shear reinforcement bars (see Fig. 7 (d))
In this example, a shear reinforcing bar 8 such as a deformed bar is inserted into the insertion hole 2 filled with the grout material 7 as the shear reinforcing material.

また、この例で、せん断補強鉄筋8の後端にはセラミックス製の定着体9が取り付けられ、前述した拡径部3に納まる際、定着体9後端部が差込口キャップ18の開口部18aに嵌って固定されるようになっており、それにより挿入孔2と箱状容器4との連通部分を閉塞させる。   Further, in this example, a ceramic fixing body 9 is attached to the rear end of the shear reinforcing bar 8, and the rear end portion of the fixing body 9 is the opening portion of the insertion port cap 18 when the fixing body 9 is accommodated in the above-described enlarged diameter portion 3. It fits and is fixed to 18a, and, thereby, the communication part of the insertion hole 2 and the box-shaped container 4 is obstruct | occluded.

(5) グラウト材貯留用箱状容器の撤去(図7(e)参照)
箱状容器4の下部に設けたグラウト回収口10から、グラウト材7を抜き取り、箱状容器4を撤去する。抜き取ったグラウト材7は流動性が保たれた状態で転用することができる。
(5) Removal of container for storage of grout material (see Fig. 7 (e))
The grout material 7 is extracted from the grout collection port 10 provided in the lower part of the box-shaped container 4, and the box-shaped container 4 is removed. The extracted grout material 7 can be diverted in a state where the fluidity is maintained.

養生後、挿入孔2内のグラウト材7が硬化したら、差込口キャップ18を外し、必要に応じ、その部分をモルタルなどで埋める。   After curing, when the grout material 7 in the insertion hole 2 is cured, the insertion port cap 18 is removed, and the portion is filled with mortar or the like as necessary.

図9は、図7の実施形態に対する変形例を示したもので、図7(e)の施工段階に対応する側面図である。   FIG. 9 shows a modification to the embodiment of FIG. 7, and is a side view corresponding to the construction stage of FIG. 7 (e).

この例では、差込口キャップ18の代わりに裁頭円錐状のゴム栓20を用い、後端にセラミックス製の定着体9を取り付けたせん断補強鉄筋8を挿入孔3に挿入した後、挿入孔2の開口部をこのゴム栓20で塞ぐようにしたものである。なお、挿入孔2の開口部を塞ぐ手段としては、ゴム栓の他に、ポリーマーモルタル、急結セメントモルタル、水中硬化性のエポキシパテなど、未硬化のグラウトに没した状態で硬化する材料であってもよい。   In this example, a truncated cone-shaped rubber plug 20 is used in place of the insertion port cap 18, and a shear reinforcing bar 8 having a ceramic fixing body 9 attached to the rear end is inserted into the insertion hole 3, and then the insertion hole is inserted. The two openings are closed with the rubber plug 20. In addition to the rubber plug, the means for closing the opening of the insertion hole 2 is a material that hardens in an uncured grout, such as polymer mortar, quick-setting cement mortar, and water-curing epoxy putty. May be.

図10(a)、(b)は、図8の実施形態に対するさらに他の変形例における定着体部分を示したものである。   FIGS. 10A and 10B show a fixing member portion in still another modification example of the embodiment of FIG.

この例は、せん断補強鉄筋8の後端に取り付けられるセラミックス製の定着体21にグラウト材7の漏れを防止する機能を持たせたものである。   In this example, the fixing member 21 made of ceramics attached to the rear end of the shear reinforcing bar 8 has a function of preventing the grout material 7 from leaking.

すなわち、定着体21の後端部に溝22を形成し、この溝22部分に膨潤ゴムあるいは硬質ウレタンなどからなるOリング23を嵌め込み、定着体21を挿入することで、挿入孔2と箱状容器との連通部分を閉塞できるようにしたものである。   That is, a groove 22 is formed in the rear end portion of the fixing body 21, and an O-ring 23 made of swelling rubber or hard urethane is fitted into the groove 22 portion, and the fixing body 21 is inserted, whereby the insertion hole 2 and the box shape are formed. The communication part with the container can be closed.

図11(a)〜(e)は本発明の他の実施形態(ビニールチューブタイプ)一実施形態における施工手順を示す側面図である。   FIGS. 11A to 11E are side views showing a construction procedure in one embodiment of another embodiment (vinyl tube type) of the present invention.

この場合の施工手順は以下のようになる。   The construction procedure in this case is as follows.

(1) 横向き削孔(図11(a)参照)
せん断補強の対象となるコンクリート構造体1の一面から横向きに削孔し、せん断補強材を挿入するための挿入孔2を形成させる。なお、この例では、挿入孔2の開口部にせん断補強材の定着体を設置するための拡径部3を設けている。
また、グラウト材の充填に先立ち、挿入孔2の内面に吸湿防止材を塗布する。
(1) Horizontal drilling (see Fig. 11 (a))
A hole is drilled laterally from one surface of the concrete structure 1 to be subjected to shear reinforcement, and an insertion hole 2 for inserting a shear reinforcement is formed. In this example, an enlarged diameter portion 3 for installing a fixing member of a shear reinforcement material is provided at the opening of the insertion hole 2.
Prior to filling the grout material, a moisture absorption preventing material is applied to the inner surface of the insertion hole 2.

(2) ビニールチューブのセット(図11(b)参照)
グラウト材貯留手段としてのビニールチューブ24を挿入孔2の穿孔位置外面に粘着テープ25で密着状態に取り付ける。
(2) Vinyl tube set (See Fig. 11 (b))
A vinyl tube 24 as a grout material storage means is attached to the outer surface of the insertion hole 2 in a close contact state with an adhesive tape 25.

(3) グラウト材の充填(図11(c)参照)
開口しているビニールチューブ24の上部から注入ホース6を挿入孔2に差し込み、グラウト材7を充填する。
(3) Filling grout material (see Fig. 11 (c))
The injection hose 6 is inserted into the insertion hole 2 from the top of the opened vinyl tube 24 and filled with the grout material 7.

このとき、挿入孔2内に充填しているグラウト材7の流出とともに、内部の空気が挿入孔2の開口部から抜けて行き、ビニールチューブ24に受けたグラウト材7の液面が挿入孔2の高さ以上になると、挿入孔2内がグラウト材7で充満し、注入ホース6を抜いても液圧により充満状態が維持される。   At this time, with the outflow of the grout material 7 filled in the insertion hole 2, the internal air escapes from the opening of the insertion hole 2, and the liquid level of the grout material 7 received by the vinyl tube 24 becomes the insertion hole 2. When the height is equal to or higher than the height, the inside of the insertion hole 2 is filled with the grout material 7, and even when the injection hose 6 is pulled out, the full state is maintained by the hydraulic pressure.

(4) せん断補強鉄筋の挿入(図11(d)参照)
せん断補強材として、この例では異形鉄筋などのせん断補強鉄筋8を、グラウト材7が充満した挿入孔2に挿入する。また、この例で、せん断補強鉄筋8の後端にはセラミックス製の定着体9が取り付けられている。
(4) Inserting a shear reinforcing bar (see Fig. 11 (d))
In this example, a shear reinforcing bar 8 such as a deformed bar is inserted into the insertion hole 2 filled with the grout material 7 as the shear reinforcing material. In this example, a ceramic fixing body 9 is attached to the rear end of the shear reinforcing bar 8.

(5) ビニールチューブの切断(図11(e)参照)
ビニールチューブ24を挿入孔2の開口部近傍で縛りって閉塞させ、ビニールチューブ24を切断する。切断した側に残ったグラウトは回収し、流動性が保たれた状態で転用することができる。
(5) Cutting the vinyl tube (see Fig. 11 (e))
The vinyl tube 24 is tied and closed in the vicinity of the opening of the insertion hole 2 to cut the vinyl tube 24. The grout remaining on the cut side can be recovered and diverted with the fluidity maintained.

養生後、挿入孔2内のグラウト材7が硬化したら、粘着テープ25を剥がし、残ったビニールチューブ24および硬化したグラウト材7の余分な部分を除去する。   After curing, when the grout material 7 in the insertion hole 2 is cured, the adhesive tape 25 is peeled off, and the remaining vinyl tube 24 and the excess portion of the cured grout material 7 are removed.

図12は、図11の実施形態に対する変形例を示す側面図である。   FIG. 12 is a side view showing a modification of the embodiment of FIG.

この例では、短いビニールチューブ26を粘着テープ25で止め付け、反対側にせん断補強鉄筋8を収納できる寸法の筒状容器27をゴムバンド28等で取り付けている。   In this example, a short vinyl tube 26 is fastened with an adhesive tape 25, and a cylindrical container 27 having a size capable of accommodating the shear reinforcing bar 8 is attached to the opposite side with a rubber band 28 or the like.

短いビニールチューブ26と筒状容器27がグラウト材貯留手段として機能し、筒状容器27の上部に設けたコック30付きのグラウト投入口29からグラウト材7を充填し、筒状容器27の反対側にOリング31を装着して取り付けた挿入棒32で、せん断補強鉄筋8を挿入孔3に押し込むことができるようになっている。   The short vinyl tube 26 and the cylindrical container 27 function as a grout material storing means, and the grout material 7 is filled from a grout inlet 29 with a cock 30 provided at the upper part of the cylindrical container 27, and is opposite to the cylindrical container 27. The shear reinforcing bar 8 can be pushed into the insertion hole 3 with the insertion rod 32 attached with the O-ring 31 attached thereto.

図中、符号33は、せん断補強鉄筋8を仮支持する鉄筋支持用ゴム板である。   In the figure, reference numeral 33 denotes a reinforcing bar supporting rubber plate that temporarily supports the shear reinforcing reinforcing bar 8.

この場合、せん断補強鉄筋8を予め筒状容器27に挿入した状態でセットすることができ、装置全体としてもコンパクトであるため、天井に近い位置などでも作業が容易である。   In this case, the shear reinforcing bar 8 can be set in a state of being inserted in the cylindrical container 27 in advance, and since the entire apparatus is compact, the work is easy even at a position close to the ceiling.

図13は、図12の実施形態で用いた装置を天井部分等において鉛直方向に用いた場合の変形例を示す側面図である。装置自体の構成や操作方法は、図12のものと同じである。   FIG. 13 is a side view showing a modification when the apparatus used in the embodiment of FIG. 12 is used in the vertical direction in a ceiling portion or the like. The configuration and operation method of the apparatus itself are the same as those in FIG.

なお、鉛直方向の施工であるため、グラウト材7を挿入孔3に充満させるためには、グラウト投入口29からのグラウト材7の充填圧を高める必要がある。   Since the construction is in the vertical direction, it is necessary to increase the filling pressure of the grout material 7 from the grout inlet 29 in order to fill the insertion hole 3 with the grout material 7.

充填圧等との関係で、エア抜きを行わないと挿入孔3の上部に空気が残る恐れがある場合には、エア抜き用ホースを先端が挿入孔3の上端に達するように挿入し、空気を抜きながらグラウト材7の充填を行えばよい。   If there is a possibility that air may remain in the upper portion of the insertion hole 3 if the air is not vented due to the filling pressure, etc., the air vent hose is inserted so that the tip reaches the upper end of the insertion hole 3 The grout material 7 may be filled while removing.

その場合、空気抜きのホースを孔先端(上端)まで挿入し、ある程度の流速をもってグラウト材を吸引排出すれば、グラウト材が適度の粘性を有しているために、空気泡がグラウト材とともに排出される。あるいは、挿入孔3の上端(孔底)に傾斜をつけ、空気溜まりの断面を最小限とすることで、エア抜き作業が容易となる。傾斜の付け方は掘削時に孔底に傾斜がつくように掘削するか、後から孔底に樹脂などを斜めに詰めることによって可能である。   In that case, if you insert the air hose to the tip of the hole (upper end) and suck out the grouting material with a certain flow rate, the grouting material has an appropriate viscosity, so air bubbles are discharged together with the grouting material. The Alternatively, the upper end (hole bottom) of the insertion hole 3 is inclined to minimize the cross section of the air reservoir, thereby facilitating the air bleeding operation. Inclination can be done by excavating so that the hole bottom is inclined during excavation, or by filling the hole bottom with resin or the like afterwards.

(a)〜(f)は本発明の一実施形態(型枠タイプ)における施工手順を示したもので、それぞれ左側が側面図、右側((b)〜(e)のみ)が平面図である。(a)-(f) shows the construction procedure in one embodiment (formwork type) of the present invention, and the left side is a side view and the right side (only (b)-(e)) is a plan view. . (a)、(b)は図1の実施形態における型枠の形態例を示す正面図である。(a), (b) is a front view which shows the form example of the formwork in embodiment of FIG. 図1の実施形態に対する変形例を示す側面図である。It is a side view which shows the modification with respect to embodiment of FIG. (a)、(b)は図3の実施形態における型枠の形態例を示す正面図である。(a), (b) is a front view which shows the form example of the formwork in embodiment of FIG. 図1の実施形態に対するさらに他の変形例を示す側面図である。It is a side view which shows the further another modification with respect to embodiment of FIG. (a)、(b)は図5の実施形態における抜出防止固定治具の形態例を示す斜視図である。(a), (b) is a perspective view which shows the example of a form of the extraction prevention fixing jig in embodiment of FIG. (a)〜(e)は本発明の他の実施形態(キャップタイプ)における施工手順を示したもので、それぞれ左側が側面図、右側((b)〜(d)のみ)が平面図である。(a)-(e) has shown the construction procedure in other embodiment (cap type) of this invention, and the left side is a side view, respectively, and the right side (only (b)-(d)) is a top view. . 図7の実施形態におけるキャップの形態例を示す斜視図である。It is a perspective view which shows the example of a form of the cap in embodiment of FIG. 図8の実施形態に対する変形例を示す側面図である。It is a side view which shows the modification with respect to embodiment of FIG. (a)は、図8の実施形態に対するさらに他の変形例における定着体部分を示す側面図、(b)は定着体の斜視図である。(a) is a side view showing a fixing member portion in still another modification to the embodiment of FIG. 8, and (b) is a perspective view of the fixing member. (a)〜(e)は本発明の他の実施形態(チューブタイプ)一実施形態における施工手順を示す側面図である。(a)-(e) is a side view which shows the construction procedure in other embodiment (tube type) embodiment of this invention. 図11の実施形態に対する変形例を示す側面図である。It is a side view which shows the modification with respect to embodiment of FIG. 図12の実施形態で用いた装置を天井部分等において鉛直方向に用いた場合の変形例を示す側面図である。It is a side view which shows the modification at the time of using the apparatus used by embodiment of FIG.

符号の説明Explanation of symbols

1…コンクリート構造体、2…挿入孔、3…拡径部、4…箱状容器、4a…扉板、5…外枠、5a…堰板、6…注入ホース、7…グラウト材、8…せん断補強鉄筋、9…定着体、10…グラウト回収口、
11…アンカー、12…スポンジシール、13…型枠、
14…抜出防止固定金具、15…定着体、16…アンカー、17…型枠、18…差込口キャップ、18a…開口部、18b…フランジ部、19…コーキング、20…ゴム栓、21…定着体、22…溝、23…Oリング、
24…ビニールチューブ、25…粘着テープ、26…ビニールチューブ、27…筒状容器、28…ゴムバンド、29…グラウト投入口、30…コック、31…Oリング、32…挿入棒、33…鉄筋支持用ゴム板
DESCRIPTION OF SYMBOLS 1 ... Concrete structure, 2 ... Insertion hole, 3 ... Diameter expansion part, 4 ... Box-shaped container, 4a ... Door plate, 5 ... Outer frame, 5a ... Dam plate, 6 ... Injection hose, 7 ... Grout material, 8 ... Shear reinforcement bar, 9 ... Fixed body, 10 ... Grout recovery port,
11 ... Anchor, 12 ... Sponge seal, 13 ... Formwork,
DESCRIPTION OF SYMBOLS 14 ... Extraction prevention fixing metal, 15 ... Fixing body, 16 ... Anchor, 17 ... Formwork, 18 ... Insertion cap, 18a ... Opening part, 18b ... Flange part, 19 ... Caulking, 20 ... Rubber plug, 21 ... Fixing body, 22 ... groove, 23 ... O-ring,
24 ... vinyl tube, 25 ... adhesive tape, 26 ... vinyl tube, 27 ... cylindrical container, 28 ... rubber band, 29 ... grout inlet, 30 ... cock, 31 ... O-ring, 32 ... insertion rod, 33 ... reinforcing bar support Rubber plate for

Claims (7)

既設のコンクリート構造体の一面側から有底のせん断補強材挿入孔を穿孔し、前記せん断補強材挿入孔にせん断補強材を挿入して、グラウト材で定着させるせん断補強材の定着方法において、
前記せん断補強材挿入孔の穿孔位置外面に前記せん断補強材が納まる大きさのグラウト材貯留手段を設置し、該グラウト材貯留手段に形成した開口部を前記せん断補強材挿入孔の穿孔位置の外周に密着させて、せん断補強材挿入孔との間に密閉空間を形成させ、かつその内部空間が前記せん断補強材挿入孔と連通するようにし、
前記せん断補強材挿入孔に流動性を有する状態のグラウト材を充填し、その際に該せん断補強材挿入孔から流出するグラウト材を前記グラウト材貯留手段で受け、前記グラウト材貯留手段で受けたグラウト材の圧がグラウト材のせん断補強材挿入孔からの流出圧より大きくなるようにして、該せん断補強材挿入孔をグラウト材で実質的に充満させ、前記せん断補強材をグラウト材貯留手段内のグラウト材中に埋没させた状態から前記せん断補強材挿入孔に挿入し、該せん断補強材の挿入後、前記せん断補強材挿入孔と前記グラウト材貯留手段との連通部分を閉塞させ、該グラウト材の硬化により前記せん断補強材を定着させることを特徴とするせん断補強材の定着方法。
In the fixing method of the shear reinforcement material, drilling a bottomed shear reinforcement material insertion hole from one side of the existing concrete structure, inserting the shear reinforcement material into the shear reinforcement material insertion hole, and fixing with a grout material,
A grout material storage means having a size to accommodate the shear reinforcement material is installed on the outer surface of the shear reinforcement material insertion hole, and an opening formed in the grout material storage means has an outer periphery of the drilling position of the shear reinforcement material insertion hole. To form a sealed space between the shear reinforcement material insertion hole, and to communicate the internal space with the shear reinforcement material insertion hole,
The shear reinforcing material insertion hole is filled with a fluid grout material, and the grout material flowing out from the shear reinforcing material insertion hole is received by the grout material storage means and received by the grout material storage means. The pressure of the grout material is larger than the outflow pressure of the grout material from the shear reinforcement material insertion hole, the shear reinforcement material insertion hole is substantially filled with the grout material, and the shear reinforcement material is stored in the grout material storage means. Inserted into the shear reinforcement member insertion hole from the state embedded in the grout material, and after the shear reinforcement member is inserted, the communication portion between the shear reinforcement member insertion hole and the grout material storage means is closed, and the grout material is closed. A fixing method for a shear reinforcing material, comprising fixing the shear reinforcing material by curing the material.
前記せん断補強材の挿入後、前記せん断補強材挿入孔と前記グラウト材貯留手段との連通部分を閉塞させた後、グラウト材貯留手段側に残ったグラウト材を抜き取り、再利用することを特徴とする請求項1記載のせん断補強材の定着方法。 After the insertion of the shear reinforcement material, the communication portion between the shear reinforcement material insertion hole and the grout material storage means is closed, and then the grout material remaining on the grout material storage means side is extracted and reused. fixing method of shear reinforcement according to claim 1 Symbol mounting to. 前記グラウト材貯留手段内の流動状態のグラウト材の上面がせん断補強材挿入孔の高さ以上となるようにすることで、せん断補強材挿入孔側からのグラウト材の流出圧に抵抗させることを特徴とする請求項または記載のせん断補強材の定着方法。 By making the upper surface of the fluid grout material in the grout material storage means equal to or higher than the height of the shear reinforcement material insertion hole, it is possible to resist the outflow pressure of the grout material from the shear reinforcement material insertion hole side. The method for fixing a shear reinforcement according to claim 1 or 2, characterized in that: 前記グラウト材貯留手段内のグラウト材に対し、該グラウト材貯留手段側より加圧することで、せん断補強材挿入孔側からのグラウト材の流出圧に抵抗させることを特徴とする請求項または記載のせん断補強材の定着方法。 To grout in the grout storing means, by pressurizing from the grout reservoir means side, according to claim 1 or 2, characterized in that to resist the outflow pressure of the grout from the shear reinforcement insertion hole side The fixing method of the shear reinforcement as described. 前記グラウト材の充填に際し、グラウト材充填のためのホースを前記せん断補強材挿入孔先端まで挿入し、グラウト材充填の流速を高めることで、せん断補強材挿入孔内の空気をグラウト材とともに排出させることを特徴とする請求項1〜の何れかの請求項に記載のせん断補強材の定着方法。 When filling the grout material, a hose for filling the grout material is inserted to the tip of the shear reinforcement material insertion hole, and the flow rate of filling the grout material is increased so that the air in the shear reinforcement material insertion hole is discharged together with the grout material. The method for fixing a shear reinforcement according to any one of claims 1 to 4 , wherein the fixing method is used. 前記グラウト材貯留手段が、前記せん断補強材が納まる寸法を有し、一側に開閉可能な開口部を有する金属製またはプラスチック製の箱状容器からなることを特徴とする請求項1〜の何れかの請求項に記載のせん断補強材の定着方法。 The grout reservoir means has a dimension in which the shear reinforcement fits, according to claim 1 to 5, characterized in that it consists of metal or plastic box-like container having an openable and closable opening in one side The method for fixing a shear reinforcement according to any one of claims. 前記グラウト材貯留手段が、前記せん断補強材が納まる大きさを有する変形自在なチューブからなることを特徴とする請求項1〜の何れかの請求項に記載のせん断補強材の定着方法。 The fixing method for a shear reinforcement material according to any one of claims 1 to 5 , wherein the grout material storage means comprises a deformable tube having a size in which the shear reinforcement material can be accommodated.
JP2008174960A 2008-07-03 2008-07-03 Method of fixing shear reinforcement Active JP5339498B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008174960A JP5339498B2 (en) 2008-07-03 2008-07-03 Method of fixing shear reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008174960A JP5339498B2 (en) 2008-07-03 2008-07-03 Method of fixing shear reinforcement

Publications (2)

Publication Number Publication Date
JP2010013858A JP2010013858A (en) 2010-01-21
JP5339498B2 true JP5339498B2 (en) 2013-11-13

Family

ID=41700203

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008174960A Active JP5339498B2 (en) 2008-07-03 2008-07-03 Method of fixing shear reinforcement

Country Status (1)

Country Link
JP (1) JP5339498B2 (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5609295B2 (en) * 2010-06-16 2014-10-22 株式会社大林組 Manufacturing method of cement-based grout material, cement-based grout material manufactured by the method, and method and shear reinforcing structure of concrete member using this cement-based grout material
JP5609296B2 (en) * 2010-06-16 2014-10-22 株式会社大林組 Shear reinforcement method and shear reinforcement structure of concrete member
JP5584642B2 (en) * 2011-03-18 2014-09-03 鹿島建設株式会社 Method for fixing shear reinforcement member
JP5584641B2 (en) * 2011-03-18 2014-09-03 鹿島建設株式会社 Method for fixing shear reinforcement member
JP5603828B2 (en) * 2011-05-16 2014-10-08 鹿島建設株式会社 Method for fixing shear reinforcement member
JP6094033B2 (en) * 2012-01-20 2017-03-15 住友大阪セメント株式会社 Shear reinforcement method for concrete structure using cartridge-based cementitious composition
CN102587682B (en) * 2012-04-05 2014-08-20 郭猛 Strengthening method for lightening seismic response of frame structure
JP5832387B2 (en) * 2012-07-06 2015-12-16 東京地下鉄株式会社 Rebar fixing method
JP5903033B2 (en) * 2012-12-06 2016-04-13 鹿島建設株式会社 Method for fixing shear reinforcement member
JP6042779B2 (en) * 2013-07-30 2016-12-14 鹿島建設株式会社 Method for fixing shear reinforcement member
JP6068285B2 (en) * 2013-07-30 2017-01-25 鹿島建設株式会社 Post-installation anchor fixing method
CN106193324A (en) * 2016-07-29 2016-12-07 初明进 A kind of precast concrete method of attachment
CN106245787A (en) * 2016-07-29 2016-12-21 初明进 A kind of precast reinforced concrete structure method of attachment
CN106223476A (en) * 2016-08-31 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6259247U (en) * 1985-09-30 1987-04-13
JPH043068Y2 (en) * 1987-09-22 1992-01-31
JPH0343540A (en) * 1989-07-10 1991-02-25 Masataka Oka Method of construction for fixedly embedding bar steel using filling adhesive having expansibility of inorganic system water mold

Also Published As

Publication number Publication date
JP2010013858A (en) 2010-01-21

Similar Documents

Publication Publication Date Title
JP5339498B2 (en) Method of fixing shear reinforcement
US11214938B2 (en) Construction method for pouring concrete in karst cave
JP5284816B2 (en) Method of fixing shear reinforcement
KR200290351Y1 (en) A packer apparatus for pressure type soil nailing
RU2651681C2 (en) Rock anchor bolt
JP2009084919A (en) Ground excavating method
CN101550693B (en) Method for reinforcing base with bored pile in the underground structure of high groundwater level
KR101045625B1 (en) Construction method of retaining wall using cast-in-place pile
JP5038281B2 (en) Water-stop structure, construction method thereof, and method of water-stopping anchor penetration part of water-impervious member
JP2008208533A (en) Caisson and its construction method
JP4811176B2 (en) Construction method of ready-made piles
JP4609712B2 (en) Filling means for filling cavities and filling method
JP5308895B2 (en) Pile hole wall protection method
KR101309145B1 (en) Nailing apparatus of pressing type and, reinforcement methods for ground using the same
CN105887904A (en) Construction method for filling dissolving cavity in outer side of deep foundation pit in karst area
JPH0610344A (en) Confirmation and increase method for support force of cast-in-place pile
KR100944284B1 (en) Pile construction methode for minimizing remaining volume of slime
KR200337877Y1 (en) Pressure-type grouting apparatus for reinforcing the ground
JP2008223337A (en) Foundation pile construction method, and washing device of hollow pile inner peripheral wall used in construction method
KR20050030095A (en) Pressure-type grouting apparatus for reinforcing the ground and hybrid-type nailing method by pressurized using the apparatus
JP3775399B2 (en) Masonry structure reinforcement method
KR100610698B1 (en) Device for mending crevice of concrete structure and mending method thereof
KR102137200B1 (en) construction method of soil retaining wall using square steel pipe
JP2000345789A (en) Mouth caulking device used for filling type long-sized steel pipe tip receiving work, and filling type long-sized steel pipe tip receiving method using the device
JP2004270155A (en) Water stopping material injection method and levee body

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110223

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120720

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121127

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130117

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20130328

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130731

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130802

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5339498

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250