JP5289068B2 - Steam turbine power plant - Google Patents

Steam turbine power plant Download PDF

Info

Publication number
JP5289068B2
JP5289068B2 JP2009002675A JP2009002675A JP5289068B2 JP 5289068 B2 JP5289068 B2 JP 5289068B2 JP 2009002675 A JP2009002675 A JP 2009002675A JP 2009002675 A JP2009002675 A JP 2009002675A JP 5289068 B2 JP5289068 B2 JP 5289068B2
Authority
JP
Japan
Prior art keywords
pressure turbine
steam
pressure
intermediate pressure
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009002675A
Other languages
Japanese (ja)
Other versions
JP2010159702A (en
Inventor
内 優 宮
屋 亮 夫 土
藤 蔵 進
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2009002675A priority Critical patent/JP5289068B2/en
Publication of JP2010159702A publication Critical patent/JP2010159702A/en
Application granted granted Critical
Publication of JP5289068B2 publication Critical patent/JP5289068B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Turbines (AREA)

Description

本発明は、ボイラにおいて生成された蒸気が供給される高圧タービン、中圧タービン、および低圧タービンと、これら高圧タービン、中圧タービン、および低圧タービンに連結された発電機とを備えた蒸気タービン発電プラントに係り、とりわけ、負荷遮断が行われた場合にタービン回転数が上昇することを抑制して信頼性を向上させることができる蒸気タービン発電プラントに関する。   The present invention relates to a steam turbine power generation including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine to which steam generated in a boiler is supplied, and a generator connected to the high-pressure turbine, the intermediate-pressure turbine, and the low-pressure turbine. The present invention relates to a plant, and more particularly to a steam turbine power plant capable of improving reliability by suppressing an increase in turbine rotation speed when load interruption is performed.

近年、環境保全を背景として、火力発電設備の高効率化が積極的に進められており、具体的には、600℃級程度の高温蒸気を利用した蒸気タービン発電プラントの運転が行われている。このような蒸気タービン発電プラントにおいては各部の温度が従来よりも高くなるため、一般的なフェライト系耐熱鋼を用いる場合、この温度上昇に対して各部の機械的強度を確保することが困難になる。このことに対処するために、高温特性に優れた耐熱合金または耐熱合金鋼が使用されることがある。   In recent years, with the background of environmental preservation, thermal power generation facilities have been actively improved in efficiency, and specifically, steam turbine power plants using high-temperature steam of about 600 ° C. are being operated. . In such a steam turbine power plant, the temperature of each part becomes higher than before, so when using a general ferritic heat resistant steel, it becomes difficult to ensure the mechanical strength of each part against this temperature rise. . In order to cope with this, a heat-resistant alloy or a heat-resistant alloy steel having excellent high temperature characteristics may be used.

特に、ボイラにおいて生成される再熱蒸気の温度を650℃以上とする場合、中圧タービンのロータおよびケーシングに、オーステナイト系耐熱合金または耐熱合金鋼が使用されることがある。このオーステナイト系耐熱合金または耐熱合金鋼は、優れた高温特性を有しているが、フェライト系耐熱鋼に比べて材料の製造性が劣る。このため、オーステナイト系耐熱合金または耐熱合金鋼を用いて任意の形状を形成すること、および形成後に本来の特性を発揮させることが困難となる場合がある。さらにこのオーステナイト系耐熱合金または耐熱合金鋼は高価であるという問題もある。   In particular, when the temperature of the reheat steam generated in the boiler is set to 650 ° C. or higher, an austenitic heat resistant alloy or heat resistant alloy steel may be used for the rotor and casing of the intermediate pressure turbine. This austenitic heat-resistant alloy or heat-resistant alloy steel has excellent high-temperature characteristics, but the material productivity is inferior to that of ferritic heat-resistant steel. For this reason, it may be difficult to form an arbitrary shape using an austenitic heat-resistant alloy or a heat-resistant alloy steel and to exhibit original characteristics after the formation. Further, the austenitic heat-resistant alloy or heat-resistant alloy steel has a problem that it is expensive.

また、このオーステナイト系材料はフェライト系材料に比べて熱伝導率が低い。ここで、プラント起動時またはプラント停止時などのように負荷が変化する際、一般的にタービンのロータに熱応力が過大に負荷されることがある。このことにより、オーステナイト系材料を用いる場合には、その熱伝導率が低いために、プラント起動時またはプラント停止時の負荷変化率を低く抑えて熱応力が過大に負荷されることを抑制する必要がある。このため、オーステナイト系材料を用いる場合には、一般的な蒸気タービン発電プラントに比べて運転効率が低下するという問題がある。   Further, this austenitic material has a lower thermal conductivity than a ferrite material. Here, when the load changes, such as when the plant is started or when the plant is stopped, generally, thermal stress may be excessively applied to the rotor of the turbine. Because of this, when using austenitic materials, the thermal conductivity is low, so it is necessary to suppress the load change rate at the time of plant start-up or plant stop low and to prevent excessive thermal stress from being applied. There is. For this reason, when using an austenitic material, there exists a problem that operation efficiency falls compared with a general steam turbine power plant.

このような問題を解決するために、優れた高温特性を有する高価な材料の使用量を低減して蒸気タービン発電プラントの設備コストが上昇することを抑制するとともに、ロータ数が増加することを抑制して振動に対する安定性を確保した蒸気タービン発電プラントが知られている(例えば、特許文献1参照)。この蒸気タービン発電プラントにおいては、中圧タービンが、オーステナイト系耐熱鋼により形成された高温高圧側の第1中圧タービン部とフェライト系耐熱鋼により形成された低温低圧側の第2中圧タービン部とに分離され、この第1中圧タービン部と第2中圧タービン部との間に、第1中圧タービン部から排気された蒸気を第2中圧タービン部に供給する中圧部連絡管が連結されている。   In order to solve these problems, the amount of expensive materials having excellent high-temperature characteristics is reduced to suppress the increase in the equipment cost of the steam turbine power plant, and the increase in the number of rotors is suppressed. Thus, there is known a steam turbine power plant that ensures stability against vibration (see, for example, Patent Document 1). In this steam turbine power plant, the medium pressure turbine is composed of a first medium pressure turbine section on the high temperature and high pressure side formed of austenitic heat resistant steel and a second medium pressure turbine section on the low temperature and low pressure side formed of ferritic heat resistant steel. And an intermediate pressure section connecting pipe for supplying steam exhausted from the first intermediate pressure turbine section to the second intermediate pressure turbine section between the first intermediate pressure turbine section and the second intermediate pressure turbine section. Are connected.

この特許文献1に示す蒸気タービン発電プラントにおいて発電機の負荷遮断が行われた場合、まず、所定の整定速度調停率に基づいて、蒸気加減弁とインターセプト弁が急速に全閉する。このことにより、主蒸気の通流および再熱蒸気の通流が遮断されて蒸気タービンのタービン回転数が上昇することが抑制される。なお、このとき、残留していた主蒸気および再熱蒸気によりタービン回転数は一旦上昇するが、各蒸気の通流が遮断されたことによりその後下降する。次に、整定速度調停率に基づいて蒸気加減弁およびインターセプト弁が開弁し、タービン回転数が無負荷状態における整定回転数に達する。
特許第4074208号公報
In the steam turbine power plant shown in Patent Document 1, when the generator load is cut off, first, the steam control valve and the intercept valve are rapidly fully closed based on a predetermined settling speed arbitration rate. As a result, the flow of the main steam and the flow of the reheat steam are blocked, and the turbine rotational speed of the steam turbine is prevented from increasing. At this time, the turbine rotation speed temporarily increases due to the remaining main steam and reheated steam, but then decreases due to the interruption of the flow of each steam. Next, the steam control valve and the intercept valve are opened based on the settling speed arbitration rate, and the turbine speed reaches the set speed in the no-load state.
Japanese Patent No. 4074208

しかしながら、上述したようにインターセプト弁が全閉した場合であっても、第1中圧タービン部と第2中圧タービン部との間に連結された中圧部連絡管内に再熱蒸気が残留しており、この残留蒸気が第2中圧タービン部および低圧タービンに流入し、第2中圧タービン部および低圧タービンにて膨張仕事を行う。このことにより、負荷遮断直後のタービン回転数は上昇し、場合によっては非常調速機が作動することもある。   However, even when the intercept valve is fully closed as described above, reheat steam remains in the intermediate pressure section connecting pipe connected between the first intermediate pressure turbine section and the second intermediate pressure turbine section. The residual steam flows into the second intermediate pressure turbine section and the low pressure turbine, and performs expansion work in the second intermediate pressure turbine section and the low pressure turbine. As a result, the turbine speed immediately after the load is interrupted increases, and in some cases, the emergency governor may be activated.

ここで、このようにタービン回転数を増大させる要因としては以下が挙げられる。
(a)蒸気加減弁とインターセプト弁の始動遅れによるもの
(b)蒸気加減弁とインターセプト弁の閉鎖時間によるもの
(c)負荷遮断時の各タービン内および各管内の残留蒸気によるもの
Here, the following factors can be cited as factors for increasing the turbine rotational speed.
(A) Due to the delay in starting the steam control valve and intercept valve (b) Due to the closing time of the steam control valve and intercept valve (c) Due to residual steam in each turbine and pipe when the load is shut off

このうち(a)と(b)については、蒸気加減弁とインターセプト弁の全閉動作を改善することによりタービン回転数の上昇を抑制することができる。一方特許文献1に示す蒸気タービン発電プラントにおいては、上述の(c)の要因による影響が大きい。すなわち、第1中圧タービン部と第2中圧タービン部との間に連結された中圧部連絡管内に残留している残留蒸気が第2中圧タービン部に流入して膨張仕事を行い、その結果タービン回転数が上昇していると考えられる。   Among these, about (a) and (b), the raise of turbine rotation speed can be suppressed by improving the fully closing operation | movement of a steam control valve and an intercept valve. On the other hand, in the steam turbine power plant shown in patent document 1, the influence by the above-mentioned factor (c) is large. That is, residual steam remaining in the intermediate pressure section connecting pipe connected between the first intermediate pressure turbine section and the second intermediate pressure turbine section flows into the second intermediate pressure turbine section and performs expansion work, As a result, it is considered that the turbine rotational speed has increased.

本発明は、このような点を考慮してなされたものであり、負荷遮断が行われた場合にタービン回転数が上昇することを抑制して信頼性を向上させることができる蒸気タービン発電プラントを提供することを目的とする。   The present invention has been made in consideration of such points, and a steam turbine power plant that can improve reliability by suppressing an increase in the turbine rotational speed when load interruption is performed. The purpose is to provide.

本発明は、主蒸気を発生させる過熱器および再熱蒸気を発生させる再熱器を備えたボイラと、前記主蒸気が供給される高圧タービンと、前記再熱蒸気が供給される第1中圧タービン部と、前記第1中圧タービン部に中圧部連絡管を介して連結され、当該第1中圧タービン部から排気された前記再熱蒸気が供給される第2中圧タービン部とを有する中圧タービンと、前記第2中圧タービン部から排気された前記再熱蒸気が供給される低圧タービンと、前記高圧タービン、前記第1中圧タービン部、前記第2中圧タービン部、および前記低圧タービンに連結された発電機と、前記中圧部連絡管内における前記再熱蒸気の通流を遮断可能な過速度防止弁と、を備えたことを特徴とする蒸気タービン発電プラントである。   The present invention includes a superheater that generates main steam and a reheater that generates reheat steam, a high-pressure turbine to which the main steam is supplied, and a first intermediate pressure to which the reheat steam is supplied. A turbine section, and a second intermediate pressure turbine section connected to the first intermediate pressure turbine section via an intermediate pressure section communication pipe and supplied with the reheated steam exhausted from the first intermediate pressure turbine section. An intermediate pressure turbine, a low pressure turbine to which the reheat steam exhausted from the second intermediate pressure turbine portion is supplied, the high pressure turbine, the first intermediate pressure turbine portion, the second intermediate pressure turbine portion, and A steam turbine power plant comprising: a generator connected to the low-pressure turbine; and an overspeed prevention valve capable of blocking the flow of the reheated steam in the intermediate-pressure section connecting pipe.

本発明は、主蒸気を発生させる過熱器および再熱蒸気を発生させる再熱器を備えたボイラと、前記主蒸気が供給される第1高圧タービン部と、前記第1高圧タービン部に高圧部連絡管を介して連結され、当該第1高圧タービン部から排気された前記主蒸気が供給される第2高圧タービン部とを有する高圧タービンと、前記再熱蒸気が供給される中圧タービンと、前記中圧タービンから排気された前記再熱蒸気が供給される低圧タービンと、前記第1高圧タービン部、前記第2高圧タービン部、前記中圧タービン、および前記低圧タービンに連結された発電機と、前記高圧部連絡管内における前記主蒸気の通流を遮断する過速度防止弁と、を備えたことを特徴とする蒸気タービン発電プラントである。   The present invention includes a superheater that generates main steam and a reheater that generates reheat steam, a first high-pressure turbine section to which the main steam is supplied, and a high-pressure section to the first high-pressure turbine section. A high-pressure turbine connected via a connecting pipe and having a second high-pressure turbine section to which the main steam exhausted from the first high-pressure turbine section is supplied; and an intermediate-pressure turbine to which the reheat steam is supplied; A low-pressure turbine to which the reheat steam exhausted from the intermediate-pressure turbine is supplied, a first high-pressure turbine section, the second high-pressure turbine section, the intermediate-pressure turbine, and a generator connected to the low-pressure turbine; An overspeed prevention valve for blocking the flow of the main steam in the high-pressure section communication pipe.

本発明によれば、中圧タービンの第1中圧タービン部から排気された再熱蒸気が中圧部連絡管内において通流することを遮断可能な過速度防止弁が設けられている。このことにより、定格負荷運転を行っている間に発電機の負荷遮断が行われた場合、この過速度防止弁により中圧部連絡管内における再熱蒸気の通流を遮断することができる。このため、第2中圧タービン部および低圧タービンに流入される残留蒸気の量を低減してタービン回転数が上昇することを抑制し、信頼性を向上させることができる。   According to the present invention, the overspeed prevention valve capable of blocking the reheat steam exhausted from the first intermediate pressure turbine section of the intermediate pressure turbine from flowing in the intermediate pressure section communication pipe is provided. As a result, when the load of the generator is cut off during the rated load operation, the overheat prevention valve can cut off the flow of reheat steam in the intermediate pressure section communication pipe. For this reason, it is possible to reduce the amount of residual steam that flows into the second intermediate-pressure turbine section and the low-pressure turbine, thereby suppressing an increase in the turbine rotation speed and improving the reliability.

本発明によれば、高圧タービンの第1高圧タービン部から排気された主蒸気が高圧部連絡管内において通流することを遮断可能な過速度防止弁が設けられている。このことにより、定格負荷運転を行っている間に発電機の負荷遮断が行われた場合、この過速度防止弁により高圧部連絡管内における主蒸気の通流を遮断することができる。このため、第2高圧タービン部に流入される残留蒸気の量を低減してタービン回転数が上昇することを抑制し、信頼性を向上させることができる。   According to the present invention, the overspeed prevention valve is provided that can block main steam exhausted from the first high-pressure turbine section of the high-pressure turbine from flowing in the high-pressure section communication pipe. As a result, when the load of the generator is cut off during the rated load operation, the flow of main steam in the high-pressure section connecting pipe can be cut off by this overspeed prevention valve. For this reason, it is possible to reduce the amount of residual steam that flows into the second high-pressure turbine section, thereby suppressing an increase in the turbine rotational speed, and to improve the reliability.

第1の実施の形態
以下、図面を参照して、本発明の実施の形態について説明する。ここで、図1は、本発明の第1の実施の形態における蒸気タービン発電プラントを示す図である。
DESCRIPTION OF EXEMPLARY EMBODIMENTS First Embodiment Hereinafter, an embodiment of the invention will be described with reference to the drawings. Here, FIG. 1 is a diagram showing a steam turbine power plant in the first embodiment of the present invention.

図1に示す蒸気タービン発電プラント1は、主蒸気2および再熱蒸気3を発生させるボイラ4と、高圧ロータ7aを有し、主蒸気2が供給される高圧タービン7と、再熱蒸気3が供給される中圧タービン8とを備えている。このうち中圧タービン8は、第1中圧ロータ9aを含み、再熱蒸気3が供給される第1中圧タービン部9と、第2中圧ロータ10aを含み、第1中圧タービン部9に中圧部連絡管11を介して連結され、第1中圧タービン部9から排気された再熱蒸気3が供給される第2中圧タービン部10とを有している。ボイラ4は、後述するボイラ給水ポンプ26から供給される給水を過熱して主蒸気2を発生させる過熱器5と、高圧タービン7から排気された主蒸気2を再過熱して再熱蒸気3を発生させる再熱器6とを有している。   A steam turbine power plant 1 shown in FIG. 1 includes a boiler 4 that generates main steam 2 and reheat steam 3, a high pressure rotor 7a, and a high pressure turbine 7 to which the main steam 2 is supplied. And an intermediate pressure turbine 8 to be supplied. Among these, the intermediate pressure turbine 8 includes a first intermediate pressure turbine section 9 including a first intermediate pressure turbine section 9 including a first intermediate pressure turbine section 9 to which the reheat steam 3 is supplied, and a second intermediate pressure rotor 10 a. And a second intermediate pressure turbine section 10 to which the reheated steam 3 exhausted from the first intermediate pressure turbine section 9 is supplied. The boiler 4 reheats the main steam 2 exhausted from the high-pressure turbine 7 by reheating the superheater 5 which superheats the feed water supplied from the boiler feed water pump 26 mentioned later and generates the main steam 2, and reheats the steam 3. And a reheater 6 to be generated.

ボイラ4の過熱器5と高圧タービン7との間に、過熱器5から高圧タービン7に主蒸気2を供給する主蒸気管12が連結されている。この主蒸気管12には主蒸気止め弁13が設けられ、この主蒸気止め弁13の下流側(高圧タービン7側)には蒸気加減弁14が設けられている。この蒸気加減弁14は、蒸気タービンの出力を調整するために主蒸気管12を通流する主蒸気2の流量を調整可能に構成されている。高圧タービン7と再熱器6との間に、高圧タービン7から排気された主蒸気2を再熱器6に供給する低温再熱管15が連結されている。   A main steam pipe 12 that supplies the main steam 2 from the superheater 5 to the high-pressure turbine 7 is connected between the superheater 5 of the boiler 4 and the high-pressure turbine 7. The main steam pipe 12 is provided with a main steam stop valve 13, and a steam control valve 14 is provided downstream of the main steam stop valve 13 (on the high-pressure turbine 7 side). The steam control valve 14 is configured to be able to adjust the flow rate of the main steam 2 flowing through the main steam pipe 12 in order to adjust the output of the steam turbine. A low-temperature reheat pipe 15 that supplies the main steam 2 exhausted from the high-pressure turbine 7 to the reheater 6 is connected between the high-pressure turbine 7 and the reheater 6.

ボイラ4の再熱器6と第1中圧タービン部9との間に、再熱器6から第1中圧タービン部9に再熱蒸気3を供給する高温再熱管16が連結されている。この高温再熱管16には再熱蒸気止め弁17が設けられ、この再熱蒸気止め弁17の下流側(第1中圧タービン部9側)にはインターセプト弁(中圧部蒸気弁)18が設けられている。このインターセプト弁18は再熱器6から第1中圧タービン部9に供給される再熱蒸気3の通流を遮断可能に構成されている。   A high-temperature reheat pipe 16 that supplies the reheated steam 3 from the reheater 6 to the first intermediate pressure turbine unit 9 is connected between the reheater 6 of the boiler 4 and the first intermediate pressure turbine unit 9. The high temperature reheat pipe 16 is provided with a reheat steam stop valve 17, and an intercept valve (intermediate pressure steam valve) 18 is provided downstream of the reheat steam stop valve 17 (on the first intermediate pressure turbine section 9 side). Is provided. The intercept valve 18 is configured to be able to block the flow of the reheat steam 3 supplied from the reheater 6 to the first intermediate pressure turbine section 9.

図1に示す中圧部連絡管11に、内部における再熱蒸気3の通流を遮断可能な過速度防止弁19が設けられている。ここで、この過速度防止弁19は、定格負荷運転が行われている場合、常時全開となっている。このため、この過速度防止弁19としては、中圧部連絡管11内を通流する再熱蒸気3の圧力損失が増大することを抑制可能な弁を用いることが好ましく、とりわけバタフライ型の弁を用いることが好適である。また、過速度防止弁19は、中圧部連絡管11のうち第2中圧タービン部10に近接した位置に配置することが好ましい。このことにより、過速度防止弁19を全閉した場合に、過速度防止弁19と第2中圧タービン部10との間に残留している残留蒸気の量をより一層低減させることができる。   An overspeed prevention valve 19 capable of blocking the flow of the reheat steam 3 inside is provided in the intermediate pressure part communication pipe 11 shown in FIG. Here, the overspeed prevention valve 19 is always fully open when the rated load operation is performed. For this reason, as this overspeed prevention valve 19, it is preferable to use a valve capable of suppressing an increase in the pressure loss of the reheated steam 3 flowing through the intermediate pressure portion communication pipe 11, and in particular, a butterfly type valve. Is preferably used. Further, it is preferable that the overspeed prevention valve 19 is disposed at a position in the intermediate pressure portion communication pipe 11 close to the second intermediate pressure turbine portion 10. As a result, when the overspeed prevention valve 19 is fully closed, the amount of residual steam remaining between the overspeed prevention valve 19 and the second intermediate pressure turbine section 10 can be further reduced.

この過速度防止弁19に、過速度防止弁19を所望の整定速度調定率に基づいてインターセプト弁18と同期して開閉動作させる制御装置20が接続されている。この制御装置20は、蒸気加減弁14、インターセプト弁18にも接続され、発電機23の負荷遮断が行われた場合にタービン回転数信号に基づいてタービン回転数が上昇したか否かを判断し、上昇したと判断すると蒸気加減弁14、インターセプト弁18、および過速度防止弁19を全閉動作するように構成されている。さらにこの制御装置20は、蒸気加減弁14、インターセプト弁18、および過速度防止弁19を全閉動作させた後、タービン回転数が一旦上昇して最大回転数を経て下降を開始したと判断した場合に過速度防止弁19を全開させる。ここで、過速度防止弁19を全開させる際、急速に全開させる必要はなく、比較的低速(ランプ状動作)で全開させることが好ましい。あるいは、インターセプト弁18によるブローダウン動作に影響を与えることがない程度の速度で全開させることが好ましい。このことにより、タービン回転数が上述の最大回転数まで再び上昇することを防止することができる。なお、制御装置20が過速度防止弁19を全開させる条件としては、タービン回転数が一旦上昇して最大回転数を経て下降を開始したと判断した場合に限られることはなく、例えばタイマー(図示せず)を用いて所定の時間が経過したことを条件としてもよい。   Connected to the overspeed prevention valve 19 is a control device 20 that opens and closes the overspeed prevention valve 19 in synchronization with the intercept valve 18 based on a desired settling speed adjustment rate. The control device 20 is also connected to the steam control valve 14 and the intercept valve 18, and determines whether or not the turbine speed has increased based on the turbine speed signal when the load on the generator 23 is cut off. When it is determined that the valve has risen, the steam control valve 14, the intercept valve 18 and the overspeed prevention valve 19 are fully closed. Further, the control device 20 determines that the turbine rotation speed has once increased and has started to decrease after reaching the maximum rotation speed after the steam control valve 14, the intercept valve 18 and the overspeed prevention valve 19 are fully closed. In this case, the overspeed prevention valve 19 is fully opened. Here, when fully opening the overspeed prevention valve 19, it is not necessary to fully open it rapidly, and it is preferable to fully open it at a relatively low speed (ramp-like operation). Alternatively, it is preferable to fully open at a speed that does not affect the blow-down operation by the intercept valve 18. This can prevent the turbine rotational speed from rising again to the maximum rotational speed described above. The condition for the controller 20 to fully open the overspeed prevention valve 19 is not limited to the case where it is determined that the turbine rotational speed has once increased and then started to decrease after reaching the maximum rotational speed. It is good also as a condition that predetermined time passed using (not shown).

図1に示すように、第2中圧タービン部10にクロスオーバー管21を介して低圧タービン22が連結されており、この低圧タービン22は低圧ロータ22aを有し、第2中圧タービン部10から排気された再熱蒸気3が低圧タービン22に供給されるように構成されている。   As shown in FIG. 1, a low pressure turbine 22 is connected to the second intermediate pressure turbine section 10 via a crossover pipe 21. The low pressure turbine 22 includes a low pressure rotor 22 a, and the second intermediate pressure turbine section 10. The reheat steam 3 exhausted from is supplied to the low-pressure turbine 22.

また、高圧タービン7、第1中圧タービン部9、第2中圧タービン部10、および低圧タービン22に、回転軸23aを有する発電機23が連結されている。すなわち、図1に示すように、高圧タービン7の高圧ロータ7aと第2中圧タービン部10の第2中圧ロータ10aとが一体化されて高圧・第2中圧一体ロータ24を構成し、第1中圧タービン部9の第1中圧ロータ9a、高圧・第2中圧一体ロータ24、低圧タービン22の低圧ロータ22a、および発電機23の回転軸23aが連結部29を介して同一軸線上で順次連結されている。   A generator 23 having a rotating shaft 23 a is connected to the high-pressure turbine 7, the first intermediate-pressure turbine unit 9, the second intermediate-pressure turbine unit 10, and the low-pressure turbine 22. That is, as shown in FIG. 1, the high-pressure rotor 7a of the high-pressure turbine 7 and the second intermediate-pressure rotor 10a of the second intermediate-pressure turbine unit 10 are integrated to form a high-pressure / second intermediate-pressure integrated rotor 24. The first intermediate pressure rotor 9 a of the first intermediate pressure turbine section 9, the high-pressure / second intermediate-pressure integrated rotor 24, the low-pressure rotor 22 a of the low-pressure turbine 22, and the rotating shaft 23 a of the generator 23 are connected to the same axis via the connecting section 29. They are connected sequentially on the line.

ここで、第1中圧タービン部9の第1中圧ロータ9aに用いる材料としては、耐熱性の優れたオーステナイト系耐熱鋼を用いることが好ましい。このことにより、第1中圧タービン部9に供給される再熱蒸気3の温度が高温化された場合(例えば再熱蒸気3の温度が700℃級の場合)においても、高温時における機械的強度の信頼性を確保することができる。また、高圧タービン7の高圧ロータ7a、第2中圧タービン部10の第2中圧ロータ10a、低圧タービン22の低圧ロータ22aに用いる材料としては、フェライト系耐熱鋼を用いることが好ましい。このことにより、比較的高価なオーステナイト系耐熱鋼を用いる量を低減させることができ、設備コストが増大することを抑制することができる。   Here, as a material used for the first intermediate pressure rotor 9a of the first intermediate pressure turbine section 9, it is preferable to use austenitic heat resistant steel having excellent heat resistance. As a result, even when the temperature of the reheat steam 3 supplied to the first intermediate pressure turbine section 9 is increased (for example, when the temperature of the reheat steam 3 is 700 ° C.), the mechanical performance at the high temperature is high. Strength reliability can be ensured. Moreover, as a material used for the high pressure rotor 7a of the high pressure turbine 7, the second intermediate pressure rotor 10a of the second intermediate pressure turbine section 10, and the low pressure rotor 22a of the low pressure turbine 22, it is preferable to use ferritic heat resistant steel. As a result, the amount of relatively expensive austenitic heat-resistant steel used can be reduced, and an increase in equipment cost can be suppressed.

さらに、低圧タービン22に、この低圧タービン22から排気される再熱蒸気3を冷却し凝縮させて復水とする復水器25が連結され、この復水器25に復水を昇圧してボイラ4の過熱器5に還流するボイラ給水ポンプ26が連結されている。   Further, a condenser 25 is connected to the low-pressure turbine 22 to cool and condense the reheat steam 3 exhausted from the low-pressure turbine 22 to condense, and the condenser 25 is pressurized to boost the boiler. A boiler feed water pump 26 is connected to the 4 superheaters 5.

次に、このような構成からなる本実施の形態の作用について説明する。   Next, the operation of the present embodiment having such a configuration will be described.

図1に示すように、まず、ボイラ給水ポンプ26から還流された給水がボイラ4の過熱器5において過熱されて主蒸気2が生成される。次に、この主蒸気2が主蒸気管12へ導かれ、主蒸気止め弁13および蒸気加減弁14を通って高圧タービン7に供給される。このとき、主蒸気止め弁13は全開しているが、蒸気加減弁14は主蒸気2の流量を調整してタービンの出力を調整するために所望の開度に設定されている。高圧タービン7に供給された主蒸気2は膨張仕事を行い、その後高圧タービン7から排気されて低温再熱管15を通ってボイラ4の再熱器6に供給される。   As shown in FIG. 1, first, the feed water recirculated from the boiler feed pump 26 is superheated in the superheater 5 of the boiler 4 to generate the main steam 2. Next, the main steam 2 is guided to the main steam pipe 12 and supplied to the high-pressure turbine 7 through the main steam stop valve 13 and the steam control valve 14. At this time, the main steam stop valve 13 is fully opened, but the steam control valve 14 is set to a desired opening in order to adjust the flow rate of the main steam 2 and adjust the output of the turbine. The main steam 2 supplied to the high-pressure turbine 7 performs expansion work, and is then exhausted from the high-pressure turbine 7 and supplied to the reheater 6 of the boiler 4 through the low-temperature reheat pipe 15.

再熱器6に供給された主蒸気2は再過熱され、再熱蒸気3が生成されて高温再熱管16に導かれ、再熱蒸気止め弁17およびインターセプト弁18を通って中圧タービン8の第1中圧タービン部9に供給される。このとき、再熱蒸気止め弁17およびインターセプト弁18は全開になっている。第1中圧タービン部9に供給された再熱蒸気3は膨張仕事を行い、その後第1中圧タービン部9から排気されて中圧部連絡管11に導かれ、過速度防止弁19を通って第2中圧タービン部10に供給される。このとき、過速度防止弁19は全開になっている。第2中圧タービン部10に供給された再熱蒸気3は膨張仕事を行い、その後第2中圧タービン部10から排気されてクロスオーバー管21を通って低圧タービン22に供給される。   The main steam 2 supplied to the reheater 6 is re-superheated, reheated steam 3 is generated and guided to the high temperature reheat pipe 16, passes through the reheat steam stop valve 17 and the intercept valve 18, and reaches the intermediate pressure turbine 8. It is supplied to the first intermediate pressure turbine section 9. At this time, the reheat steam stop valve 17 and the intercept valve 18 are fully opened. The reheated steam 3 supplied to the first intermediate pressure turbine section 9 performs expansion work, and then is exhausted from the first intermediate pressure turbine section 9 and led to the intermediate pressure section communication pipe 11, passing through the overspeed prevention valve 19. To the second intermediate pressure turbine section 10. At this time, the overspeed prevention valve 19 is fully opened. The reheat steam 3 supplied to the second intermediate pressure turbine section 10 performs expansion work, and then is exhausted from the second intermediate pressure turbine section 10 and supplied to the low pressure turbine 22 through the crossover pipe 21.

低圧タービン22に供給された再熱蒸気3は膨張仕事を行い、その後低圧タービン22から排気されて復水器25に供給され復水となる。この復水は、ボイラ給水ポンプ26に送られて昇圧され、ボイラ4の過熱器5に還流される。その後、過熱器5において過熱されて主蒸気2が生成される。このようにして蒸気が循環する。   The reheat steam 3 supplied to the low-pressure turbine 22 performs expansion work, and then is exhausted from the low-pressure turbine 22 and supplied to the condenser 25 to become condensate. The condensate is sent to the boiler feed pump 26 to increase the pressure, and is returned to the superheater 5 of the boiler 4. Thereafter, the main steam 2 is generated by being heated in the superheater 5. In this way, the steam circulates.

この間、高圧タービン7において主蒸気2が膨張仕事を行うとともに、第2中圧タービン部10において再熱蒸気3が膨張仕事を行っているため、高圧タービン7の高圧ロータ7aと第2中圧タービン部10の第2中圧ロータ10aとにより構成される高圧・第2中圧一体ロータ24が回転駆動されている。また、第1中圧タービン部9および低圧タービン22において、再熱蒸気3がそれぞれ膨張仕事を行っているため、第1中圧タービン部9の第1中圧ロータ9a、および低圧タービン22の低圧ロータ22aが回転駆動されている。このことにより、第1中圧ロータ9a、高圧・第2中圧一体ロータ24、低圧ロータ22aに連結された発電機23の回転軸23aが回転し、発電機23が発電している。   During this time, the main steam 2 performs expansion work in the high-pressure turbine 7 and the reheat steam 3 performs expansion work in the second intermediate-pressure turbine section 10, so that the high-pressure rotor 7 a of the high-pressure turbine 7 and the second intermediate-pressure turbine The high-pressure / second intermediate-pressure integrated rotor 24 constituted by the second intermediate-pressure rotor 10a of the section 10 is rotationally driven. Moreover, in the 1st intermediate pressure turbine part 9 and the low pressure turbine 22, since the reheat steam 3 is each performing expansion work, the 1st intermediate pressure rotor 9a of the 1st intermediate pressure turbine part 9, and the low pressure of the low pressure turbine 22 The rotor 22a is rotationally driven. As a result, the rotating shaft 23a of the generator 23 connected to the first intermediate pressure rotor 9a, the high pressure / second intermediate pressure integrated rotor 24, and the low pressure rotor 22a rotates, and the generator 23 generates power.

ここで、蒸気タービン発電プラント1が定格負荷運転を行っている間に発電機23の負荷遮断が行われた場合、まず、中圧部連絡管11に設けられた過速度防止弁19が所望の整定速度調定率に基づいてインターセプト弁18と同期して急速に全閉する。この場合制御装置20は、まず、タービン回転数信号に基づいてタービン回転数が上昇したと判断し、その後過速度防止弁19を全閉動作させる。このことにより中圧部連絡管11内における再熱蒸気3の通流を迅速に遮断して、第2中圧タービン部10および低圧タービン22に流入される残留蒸気の量を低減させることができる。   Here, when the load interruption of the generator 23 is performed while the steam turbine power plant 1 is performing the rated load operation, first, the overspeed prevention valve 19 provided in the intermediate pressure unit communication pipe 11 is desired. Based on the settling rate settling rate, the valve is fully fully closed in synchronization with the intercept valve 18. In this case, the control device 20 first determines that the turbine rotational speed has increased based on the turbine rotational speed signal, and then causes the overspeed prevention valve 19 to be fully closed. As a result, the flow of the reheated steam 3 in the intermediate pressure section communication pipe 11 can be quickly cut off, and the amount of residual steam flowing into the second intermediate pressure turbine section 10 and the low pressure turbine 22 can be reduced. .

このとき、制御装置20からの指令を受けて蒸気加減弁14も同様にして急速に全閉し、主蒸気管12内における主蒸気2の通流を迅速に遮断して高圧タービン7に流入される残留蒸気の量を低減させるとともに、インターセプト弁18も急速に全閉し、高温再熱管16内における再熱蒸気3の通流を迅速に遮断して第1中圧タービン部9に流入される残留蒸気の量を低減させている。このことによりタービン回転数が上昇することを抑制することができる。   At this time, in response to a command from the control device 20, the steam control valve 14 is also fully closed in a similar manner, and the flow of the main steam 2 in the main steam pipe 12 is quickly cut off and flows into the high-pressure turbine 7. In addition to reducing the amount of residual steam, the intercept valve 18 is also fully closed rapidly, and the flow of the reheat steam 3 in the high temperature reheat pipe 16 is quickly cut off and flows into the first intermediate pressure turbine section 9. The amount of residual steam is reduced. This can suppress an increase in the turbine rotational speed.

なお、蒸気加減弁14、インターセプト弁18、および過速度防止弁19が全閉した後、残留していた蒸気によりタービン回転数は一旦上昇して最大回転数に達するが、その後各蒸気の通流が遮断されたことによりタービン回転数は下降する。   After the steam control valve 14, the intercept valve 18 and the overspeed prevention valve 19 are fully closed, the turbine speed is temporarily increased by the remaining steam and reaches the maximum speed. As the engine is cut off, the turbine speed decreases.

次に、制御装置20は、タービン回転数信号に基づいてタービン回転数が下降を開始したと判断し、蒸気加減弁14、インターセプト弁18、および過速度防止弁19を全開させる。この場合、蒸気加減弁14、インターセプト弁18、および過速度防止弁19の開度が上述の整定速度調定率に基づいて全開し、タービン回転数が無負荷状態における整定回転数に達する。この間、過速度防止弁19は比較的低速(ランプ状動作)で、あるいは、インターセプト弁18によるブローダウン動作に影響を与えることがない程度の速度で全開する。このことにより、タービン回転数が最大回転数まで再び上昇することを防止することができる。   Next, the control device 20 determines that the turbine rotational speed has started to decrease based on the turbine rotational speed signal, and fully opens the steam control valve 14, the intercept valve 18, and the overspeed prevention valve 19. In this case, the opening degree of the steam control valve 14, the intercept valve 18 and the overspeed prevention valve 19 is fully opened based on the settling speed adjustment rate described above, and the turbine speed reaches the settling speed in the no-load state. During this time, the overspeed prevention valve 19 is fully opened at a relatively low speed (ramp-like operation) or at a speed that does not affect the blowdown operation by the intercept valve 18. This can prevent the turbine speed from rising again to the maximum speed.

このように本実施の形態によれば、中圧タービン8の第1中圧タービン部9と第2中圧タービン部10との間に連結された中圧部連絡管11に、内部における再熱蒸気3の通流を遮断可能な過速度防止弁19が設けられ、この過速度防止弁19に所望の整定速度調定率に基づいて過速度防止弁19をインターセプト弁18と同期して開閉動作させる制御装置20が接続されている。このことにより、蒸気タービン発電プラント1が定格負荷運転を行っている間に発電機23の負荷遮断が行われた場合、インターセプト弁18と同期して過速度防止弁19を急速に全閉させて、中圧部連絡管11内における再熱蒸気3の通流を迅速に遮断することができる。このため、第2中圧タービン部10および低圧タービン22に流入される残留蒸気の量を低減してタービン回転数が上昇することを抑制し、信頼性を向上させることができる。   As described above, according to the present embodiment, the intermediate pressure connecting pipe 11 connected between the first intermediate pressure turbine section 9 and the second intermediate pressure turbine section 10 of the intermediate pressure turbine 8 is reheated inside. An overspeed prevention valve 19 capable of interrupting the flow of the steam 3 is provided, and the overspeed prevention valve 19 is opened and closed in synchronization with the intercept valve 18 based on a desired settling speed adjustment rate. A control device 20 is connected. As a result, when the load interruption of the generator 23 is performed while the steam turbine power plant 1 is performing the rated load operation, the overspeed prevention valve 19 is rapidly fully closed in synchronization with the intercept valve 18. The flow of the reheat steam 3 in the intermediate pressure part communication pipe 11 can be quickly shut off. For this reason, it is possible to reduce the amount of residual steam that flows into the second intermediate-pressure turbine unit 10 and the low-pressure turbine 22 to suppress an increase in the turbine rotational speed, and to improve the reliability.

また本実施の形態によれば、中圧タービン8が、オーステナイト系耐熱鋼により形成された第1中圧ロータ9aを含む第1中圧タービン部9とフェライト系耐熱鋼により形成された第2中圧ロータ10aを含む第2中圧タービン部10とを有している。このことにより、ボイラ4の再熱器6から第1中圧タービン部9に供給される再熱蒸気3の温度が高温化された場合においても、第1中圧タービン部9の高温時における機械的強度の信頼性を確保することができるとともに、比較的高価なオーステナイト系耐熱鋼を用いる量を低減させて設備コストが増大することを抑制することができる。   Further, according to the present embodiment, the intermediate pressure turbine 8 includes the first intermediate pressure turbine portion 9 including the first intermediate pressure rotor 9a formed of austenitic heat resistant steel and the second medium formed of ferritic heat resistant steel. And a second intermediate-pressure turbine section 10 including a pressure rotor 10a. As a result, even when the temperature of the reheat steam 3 supplied from the reheater 6 of the boiler 4 to the first intermediate pressure turbine section 9 is increased, the machine at a high temperature of the first intermediate pressure turbine section 9 is used. The reliability of the mechanical strength can be ensured, and the amount of the relatively expensive austenitic heat-resisting steel used can be reduced to prevent the equipment cost from increasing.

また本実施の形態によれば、高圧タービン7の高圧ロータ7aと第2中圧タービン部10の第2中圧ロータ10aとが一体化されて高圧・第2中圧一体ロータ24が構成されている。このことにより、ロータ数が増加することを抑制して、振動に対する安定性を確保することができる。   According to the present embodiment, the high-pressure rotor 7a of the high-pressure turbine 7 and the second intermediate-pressure rotor 10a of the second intermediate-pressure turbine unit 10 are integrated to form the high-pressure / second intermediate-pressure integrated rotor 24. Yes. As a result, an increase in the number of rotors can be suppressed, and stability against vibration can be ensured.

なお、本実施の形態においては、中圧部連絡管11に過速度防止弁19が設けられている例について述べたが、このことに限られることはなく、第2中圧タービン部10の内部、とりわけ中圧部連絡管11に近接した位置に設けても良い。このことにより、過速度防止弁19を全閉した場合に中圧部連絡管11内に残留している残留蒸気が第2中圧タービン部10に流入することを確実に防止して、タービン回転数が上昇することを確実に抑制することができる。   In the present embodiment, the example in which the intermediate speed communication pipe 11 is provided with the overspeed prevention valve 19 has been described. However, the present invention is not limited to this, and the inside of the second intermediate pressure turbine section 10 is described. In particular, it may be provided at a position close to the intermediate pressure part communication tube 11. As a result, when the overspeed prevention valve 19 is fully closed, the residual steam remaining in the intermediate pressure communication pipe 11 is reliably prevented from flowing into the second intermediate pressure turbine section 10, and the turbine rotation It can suppress reliably that a number rises.

本発明の変形例
次に、本発明による蒸気タービン発電プラントの変形例について説明する。本変形例は、制御装置が発電機の負荷遮断が行われた後に過速度防止弁をインターセプト弁に先行して開閉動作させるものであり、他の構成は図1に示す第1の実施の形態と略同一である。
Next, a modification of the steam turbine power plant according to the present invention will be described. In this modification, the control device opens and closes the overspeed prevention valve prior to the intercept valve after the generator load is cut off, and the other configuration is the first embodiment shown in FIG. Is almost the same.

本変形例においては、制御装置20は、発電機23の負荷遮断が行われた後に過速度防止弁19をインターセプト弁18に先行して開閉動作させる。すなわち、この制御装置20は、発電機23の電流信号と高圧タービン7における主蒸気2の圧力信号とに基づいて、発電機23の出力と高圧タービン7にかかる負荷との間の関係が、定格運転時における関係と異なっているか否かを判断し、異なっていると判断した場合に負荷遮断が行われたことを電気的に認識して、過速度防止弁19を全閉動作するように構成されている。   In this modification, the control device 20 opens and closes the overspeed prevention valve 19 prior to the intercept valve 18 after the load interruption of the generator 23 is performed. That is, the control device 20 determines that the relationship between the output of the generator 23 and the load applied to the high-pressure turbine 7 is rated based on the current signal of the generator 23 and the pressure signal of the main steam 2 in the high-pressure turbine 7. It is determined whether or not the relationship is different from the relationship at the time of operation, and when it is determined that the relationship is different, the overspeed prevention valve 19 is fully closed by electrically recognizing that the load is cut off. Has been.

このように本変形例によれば、蒸気タービン発電プラント1が定格負荷運転を行っている間に発電機23の負荷遮断が行われた場合、インターセプト弁18に先行して過速度防止弁19を急速に全閉させる。この場合制御装置20は、まず、発電機23の電流信号と高圧タービン7にける主蒸気2の圧力信号とに基づいて、発電機23の電流と高圧タービン7にかかる負荷との間の関係が定格運転時における関係と異なっていると判断し、その後、過速度防止弁19を全閉動作させる。このことにより、中圧部連絡管11内における再熱蒸気3の通流をより一層迅速に遮断することができる。このため、過速度防止弁19をより一層急速に全閉させ、第2中圧タービン部10および低圧タービン22に流入される残留蒸気の量を低減することができ、タービン回転数が上昇することを抑制して信頼性をより一層向上させることができる。   Thus, according to this modification, when the load interruption of the generator 23 is performed while the steam turbine power plant 1 is performing the rated load operation, the overspeed prevention valve 19 is set in advance of the intercept valve 18. It is fully closed rapidly. In this case, the control device 20 first determines that the relationship between the current of the generator 23 and the load applied to the high pressure turbine 7 is based on the current signal of the generator 23 and the pressure signal of the main steam 2 in the high pressure turbine 7. It is determined that the relationship is different from that during rated operation, and then the overspeed prevention valve 19 is fully closed. As a result, the flow of the reheated steam 3 in the intermediate pressure portion communication pipe 11 can be more quickly interrupted. For this reason, the overspeed prevention valve 19 can be fully closed more rapidly, the amount of residual steam flowing into the second intermediate-pressure turbine unit 10 and the low-pressure turbine 22 can be reduced, and the turbine speed increases. And the reliability can be further improved.

第2の実施の形態
次に、図2により、本発明の第2の実施の形態における蒸気タービン発電プラントについて説明する。ここで図2は、本発明の第2の実施の形態における蒸気タービン発電プラントを示す図である。
Second Embodiment Next, referring to FIG. 2, a steam turbine power plant according to a second embodiment of the present invention will be described. Here, FIG. 2 is a diagram showing a steam turbine power plant in the second embodiment of the present invention.

図2に示す第2の実施の形態において、蒸気タービン発電プラントは、高圧タービンの高圧ロータと第1中圧タービン部の第1中圧ロータとが一体化されて高圧・第1中圧一体ロータを構成し、高圧タービンと第1中圧タービン部との間に、高圧タービンから第1中圧タービン部に主蒸気を供給するクーリング蒸気管が連結されている点が異なり、他の構成は、図1に示す第1の実施の形態と略同一である。なお、図2において、図1に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   In the second embodiment shown in FIG. 2, the steam turbine power plant is a high-pressure / first intermediate-pressure integrated rotor in which a high-pressure rotor of a high-pressure turbine and a first intermediate-pressure rotor of a first intermediate-pressure turbine section are integrated. The cooling steam pipe for supplying the main steam from the high pressure turbine to the first intermediate pressure turbine part is connected between the high pressure turbine and the first intermediate pressure turbine part. This is substantially the same as the first embodiment shown in FIG. In FIG. 2, the same parts as those of the first embodiment shown in FIG.

図2に示すように、高圧タービン7の高圧ロータ7aと第1中圧タービン部9の第1中圧ロータ9aとが一体化されて高圧・第1中圧一体ロータ27を構成し、高圧・第1中圧一体ロータ27、第2中圧タービン部10の第2中圧ロータ10a、低圧タービン22の低圧ロータ22a、および発電機23の回転軸23aが連結部29を介して同一軸線上で順次連結されている。   As shown in FIG. 2, the high pressure rotor 7a of the high pressure turbine 7 and the first intermediate pressure rotor 9a of the first intermediate pressure turbine section 9 are integrated to form a high pressure / first intermediate pressure integrated rotor 27. The first intermediate pressure integrated rotor 27, the second intermediate pressure rotor 10 a of the second intermediate pressure turbine section 10, the low pressure rotor 22 a of the low pressure turbine 22, and the rotating shaft 23 a of the generator 23 are on the same axis via the connecting section 29. It is sequentially connected.

高圧タービン7と第1中圧タービン部9との間に、この高圧タービン7から抽気された主蒸気2の一部を第1中圧タービン部9に供給するクーリング蒸気管28が連結されている。なお、本実施の形態においては、このように高圧タービン7から抽気された主蒸気2の一部が第1中圧タービン部9に供給されるように構成されているが、このことに限られることはなく、例えば高圧タービン7から排気される主蒸気2の一部が第1中圧タービン部9に供給されるように構成されていてもよい。   A cooling steam pipe 28 is connected between the high pressure turbine 7 and the first intermediate pressure turbine section 9 to supply a part of the main steam 2 extracted from the high pressure turbine 7 to the first intermediate pressure turbine section 9. . In the present embodiment, a part of the main steam 2 extracted from the high-pressure turbine 7 is supplied to the first intermediate-pressure turbine unit 9 in this way, but is limited to this. For example, part of the main steam 2 exhausted from the high-pressure turbine 7 may be supplied to the first intermediate-pressure turbine unit 9.

図2に示す本実施の形態においては、高圧タービン7において主蒸気2が膨張仕事を行うとともに、第1中圧タービン部9において再熱蒸気3が膨張仕事を行っているため、高圧タービン7の高圧ロータ7aと第1中圧タービン部9の第1中圧ロータ9aとにより構成される高圧・第1中圧一体ロータ27が回転駆動されている。また、第2中圧タービン部10および低圧タービン22において再熱蒸気3がそれぞれ膨張仕事を行っているため、第2中圧タービン部10の第2中圧ロータ10aおよび低圧タービン22の低圧ロータ22aがそれぞれ回転駆動されている。このことにより、高圧・第1中圧一体ロータ27、第2中圧ロータ10a、低圧ロータ22aに連結された発電機23の回転軸23aが回転し、発電機23が発電している。   In the present embodiment shown in FIG. 2, the main steam 2 performs expansion work in the high-pressure turbine 7, and the reheat steam 3 performs expansion work in the first intermediate-pressure turbine section 9. A high-pressure / first intermediate pressure integrated rotor 27 constituted by the high-pressure rotor 7 a and the first intermediate-pressure rotor 9 a of the first intermediate-pressure turbine section 9 is driven to rotate. Further, since the reheat steam 3 performs expansion work in the second intermediate pressure turbine section 10 and the low pressure turbine 22, respectively, the second intermediate pressure rotor 10 a of the second intermediate pressure turbine section 10 and the low pressure rotor 22 a of the low pressure turbine 22. Are driven to rotate. As a result, the rotating shaft 23a of the generator 23 connected to the high-pressure / first intermediate-pressure integrated rotor 27, the second intermediate-pressure rotor 10a, and the low-pressure rotor 22a rotates, and the generator 23 generates power.

また、高圧タービン7から抽気された主蒸気2の一部がクーリング蒸気管28に導かれて第1中圧タービン部9にクーリング蒸気として供給される。このことにより、第1中圧タービン部9の第1中圧ロータ9aおよびケーシング(図示せず)を冷却することができる。このため、第1中圧タービン部9の第1中圧ロータ9aに用いる材料として耐熱性の優れたオーステナイト系耐熱鋼を用いることなく、フェライト系耐熱鋼を用いることができ、設備コストが増大することを抑制することができる。   A part of the main steam 2 extracted from the high-pressure turbine 7 is guided to the cooling steam pipe 28 and supplied to the first intermediate-pressure turbine unit 9 as cooling steam. Thereby, the 1st intermediate pressure rotor 9a and the casing (not shown) of the 1st intermediate pressure turbine part 9 can be cooled. For this reason, a ferritic heat resistant steel can be used without using an austenitic heat resistant steel having excellent heat resistance as a material used for the first intermediate pressure rotor 9a of the first intermediate pressure turbine section 9, and the equipment cost increases. This can be suppressed.

このように本実施の形態によれば、中圧タービン8の第1中圧タービン部9と第2中圧タービン部10との間に連結された中圧部連絡管11に、内部における再熱蒸気3の通流を遮断可能な過速度防止弁19が設けられている。このことにより、蒸気タービン発電プラント1が定格負荷運転を行っている間に発電機23の負荷遮断が行われた場合、中圧部連絡管11内における再熱蒸気3の通流を迅速に遮断することができる。この場合、過速度防止弁19により、中圧部連絡管11内に残留している再熱蒸気3だけではなく、高圧タービン7から抽気されてクーリング蒸気管28内に残留している主蒸気2が第2中圧タービン部10および低圧タービン22に流入されることを防止することができる。このため、第2中圧タービン部10および低圧タービン22に流入される残留蒸気の量を低減してタービン回転数が上昇することを抑制し、信頼性を向上させることができる。   As described above, according to the present embodiment, the intermediate pressure connecting pipe 11 connected between the first intermediate pressure turbine section 9 and the second intermediate pressure turbine section 10 of the intermediate pressure turbine 8 is reheated inside. An overspeed prevention valve 19 capable of blocking the flow of the steam 3 is provided. As a result, when the load of the generator 23 is cut off while the steam turbine power plant 1 is operating at the rated load, the flow of the reheat steam 3 in the intermediate pressure communication pipe 11 is quickly cut off. can do. In this case, not only the reheat steam 3 remaining in the intermediate pressure portion communication pipe 11 but also the main steam 2 extracted from the high pressure turbine 7 and remaining in the cooling steam pipe 28 by the overspeed prevention valve 19. Can be prevented from flowing into the second intermediate-pressure turbine section 10 and the low-pressure turbine 22. For this reason, it is possible to reduce the amount of residual steam that flows into the second intermediate-pressure turbine unit 10 and the low-pressure turbine 22 to suppress an increase in the turbine rotational speed, and to improve the reliability.

また本実施の形態によれば、高圧タービン7の高圧ロータ7aと第1中圧タービン部9の第1中圧ロータ9aとが一体化されて高圧・第1中圧一体ロータ27が構成されている。このことにより、ロータ数が増加することを抑制して、振動に対する安定性を確保することができる。   According to the present embodiment, the high pressure rotor 7a of the high pressure turbine 7 and the first intermediate pressure rotor 9a of the first intermediate pressure turbine section 9 are integrated to form the high pressure / first intermediate pressure integrated rotor 27. Yes. As a result, an increase in the number of rotors can be suppressed, and stability against vibration can be ensured.

第3の実施の形態
次に、図3により、本発明の第3の実施の形態における蒸気タービン発電プラントについて説明する。ここで図3は、本発明の第3の実施の形態における蒸気タービン発電プラントを示す図である。
Third Embodiment Next, a steam turbine power plant according to a third embodiment of the present invention will be described with reference to FIG. FIG. 3 is a diagram showing a steam turbine power plant in the third embodiment of the present invention.

図3に示す第3の実施の形態において、中圧タービンは、ボイラの第1再熱器から第1再熱蒸気が供給される第3中圧タービン部を更に有し、この第3中圧タービン部から排気された第1再熱蒸気がボイラの第2再熱器において再熱されて第2再熱蒸気として第1中圧タービン部に供給されている点が異なり、他の構成は、図1に示す第1の実施の形態と略同一である。なお、図3において、図1に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   In the third embodiment shown in FIG. 3, the intermediate pressure turbine further includes a third intermediate pressure turbine section to which the first reheat steam is supplied from the first reheater of the boiler. The difference is that the first reheat steam exhausted from the turbine section is reheated in the second reheater of the boiler and supplied to the first intermediate pressure turbine section as the second reheat steam. This is substantially the same as the first embodiment shown in FIG. In FIG. 3, the same parts as those of the first embodiment shown in FIG.

図3に示すように、中圧タービン8は、第3中圧ロータ30aを含み、ボイラ4から再熱蒸気3が供給される第3中圧タービン部30を更に有している。ボイラ4は、ボイラ給水ポンプ26から供給される給水を過熱して主蒸気2を発生させる過熱器5と、高圧タービン7から排気された主蒸気2を再熱して再熱蒸気3を発生させる再熱器とを有している。このうち再熱器は、主蒸気2を再熱して第1再熱蒸気3aを発生させる第1再熱器31と、第3中圧タービン部30から排気された第1再熱蒸気3aを再熱して第2再熱蒸気3bを発生させる第2再熱器32とを有しており、再熱蒸気3として第1再熱蒸気3aと第2再熱蒸気3bとをそれぞれ発生させるように構成されている。   As shown in FIG. 3, the intermediate pressure turbine 8 includes a third intermediate pressure rotor 30 a and further includes a third intermediate pressure turbine unit 30 to which the reheat steam 3 is supplied from the boiler 4. The boiler 4 superheats the feed water supplied from the boiler feed pump 26 to generate the main steam 2, and reheats the main steam 2 exhausted from the high-pressure turbine 7 to generate the reheated steam 3. And a heater. Among these, the reheater recycles the first reheat steam 31 a that reheats the main steam 2 to generate the first reheat steam 3 a and the first reheat steam 3 a that is exhausted from the third intermediate pressure turbine section 30. And a second reheater 32 for generating the second reheat steam 3b by heating, and configured to generate the first reheat steam 3a and the second reheat steam 3b as the reheat steam 3, respectively. Has been.

高圧タービン7と第1再熱器31との間に、高圧タービン7から排気された主蒸気2を第1再熱器31に供給する第1低温再熱管33が連結されている。   A first low-temperature reheat pipe 33 that supplies the main steam 2 exhausted from the high-pressure turbine 7 to the first reheater 31 is connected between the high-pressure turbine 7 and the first reheater 31.

また、第1再熱器31と第3中圧タービン部30との間に、第1再熱器31から第3中圧タービン部30に第1再熱蒸気3aを供給する第1高温再熱管34が連結されている。この第1高温再熱管34には第1再熱蒸気止め弁35が設けられ、この第1再熱蒸気止め弁35の下流側(第3中圧タービン部30側)には第1インターセプト弁36が設けられている。この第1インターセプト弁36は第1再熱器31から第3中圧タービン部30に供給される第1再熱蒸気3aの通流を遮断可能に構成されている。第3中圧タービン部30と第2再熱器32との間に、第3中圧タービン部30から排気された第1再熱蒸気3aを第2再熱器32に供給する第2低温再熱管37が連結されている。   In addition, a first high-temperature reheat pipe that supplies the first reheat steam 3 a from the first reheater 31 to the third intermediate pressure turbine unit 30 between the first reheater 31 and the third intermediate pressure turbine unit 30. 34 are connected. The first high-temperature reheat pipe 34 is provided with a first reheat steam stop valve 35, and a first intercept valve 36 is provided downstream of the first reheat steam stop valve 35 (on the third intermediate pressure turbine section 30 side). Is provided. The first intercept valve 36 is configured to be able to block the flow of the first reheat steam 3 a supplied from the first reheater 31 to the third intermediate pressure turbine unit 30. Between the third intermediate pressure turbine section 30 and the second reheater 32, a second low temperature re-supply for supplying the first reheat steam 3 a exhausted from the third intermediate pressure turbine section 30 to the second reheater 32. A heat pipe 37 is connected.

さらに、第2再熱器32と第1中圧タービン部9との間に、第2再熱器32から第1中圧タービン部9に第2再熱蒸気3bを供給する第2高温再熱管38が連結されている。この第2高温再熱管38には第2再熱蒸気止め弁39が設けられ、この第2再熱蒸気止め弁39の下流側(第1中圧タービン部9側)には第2インターセプト弁(中圧部蒸気弁)40が設けられている。この第2インターセプト弁40は第2再熱器32から第1中圧タービン部9に供給される第2再熱蒸気3bの通流を遮断可能に構成されている。   Furthermore, a second high-temperature reheat pipe that supplies the second reheat steam 3b from the second reheater 32 to the first intermediate pressure turbine unit 9 between the second reheater 32 and the first intermediate pressure turbine unit 9. 38 are connected. The second high-temperature reheat pipe 38 is provided with a second reheat steam stop valve 39, and a second intercept valve (on the first intermediate pressure turbine section 9 side) downstream of the second reheat steam stop valve 39 (on the first intermediate pressure turbine section 9 side). An intermediate pressure section steam valve) 40 is provided. The second intercept valve 40 is configured to be able to block the flow of the second reheat steam 3b supplied from the second reheater 32 to the first intermediate pressure turbine section 9.

このようにして、第3中圧タービン部30から排気された第1再熱蒸気3aがボイラ4の第2再熱器32において再熱されて第2再熱蒸気3bとして第1中圧タービン部9に供給されるように構成されている。   In this way, the first reheat steam 3a exhausted from the third intermediate pressure turbine section 30 is reheated in the second reheater 32 of the boiler 4 and becomes the second reheat steam 3b. 9 is configured to be supplied.

また、高圧タービン7の高圧ロータ7aと第2中圧タービン部10の第2中圧ロータ10aとが一体化されて高圧・第2中圧一体ロータ41が構成されるとともに、第3中圧タービン部30の第3中圧ロータ30aと第1中圧タービン部9の第1中圧ロータ9aとが一体化されて第1中圧・第3中圧一体ロータ42が構成され、図3に示すように、第1中圧・第3中圧一体ロータ42、高圧・第2中圧一体ロータ41、低圧タービン22の低圧ロータ22aおよび発電機23の回転軸23aが連結部29を介して同一軸線上で順次連結されている。   The high pressure rotor 7a of the high pressure turbine 7 and the second intermediate pressure rotor 10a of the second intermediate pressure turbine section 10 are integrated to form a high pressure / second intermediate pressure integrated rotor 41, and a third intermediate pressure turbine. The third intermediate pressure rotor 30a of the section 30 and the first intermediate pressure rotor 9a of the first intermediate pressure turbine section 9 are integrated to form a first intermediate pressure / third intermediate pressure integrated rotor 42, which is shown in FIG. Thus, the first intermediate pressure / third intermediate pressure integrated rotor 42, the high pressure / second intermediate pressure integrated rotor 41, the low pressure rotor 22 a of the low pressure turbine 22, and the rotating shaft 23 a of the generator 23 are connected to the same shaft via the connecting portion 29. They are connected sequentially on the line.

図3に示すように、過速度防止弁19に、過速度防止弁19を所望の整定速度調定率に基づいて第2インターセプト弁40と同期して開閉動作させる制御装置20が接続されている。この制御装置20は、蒸気加減弁14、第1インターセプト弁36、および第2インターセプト弁40にも接続され、発電機23の負荷遮断が行われた場合にタービン回転数信号に基づいてタービン回転数が上昇したか否かを判断し、上昇したと判断すると蒸気加減弁14、第1インターセプト弁36、第2インターセプト弁40、および過速度防止弁19を全閉動作するように構成されている。さらにこの制御装置20は、蒸気加減弁14、第1インターセプト弁36、第2インターセプト弁40、および過速度防止弁19を全閉動作させた後、タービン回転数が一旦上昇して最大回転数を経て下降を開始したと判断した場合に過速度防止弁19を全開させる。   As shown in FIG. 3, the overspeed prevention valve 19 is connected to a control device 20 that opens and closes the overspeed prevention valve 19 in synchronization with the second intercept valve 40 based on a desired settling speed adjustment rate. The control device 20 is also connected to the steam control valve 14, the first intercept valve 36, and the second intercept valve 40, and the turbine rotational speed based on the turbine rotational speed signal when the load of the generator 23 is cut off. It is determined whether or not the steam rises, and when it is judged that the steam rises, the steam control valve 14, the first intercept valve 36, the second intercept valve 40, and the overspeed prevention valve 19 are fully closed. Further, the control device 20 fully closes the steam control valve 14, the first intercept valve 36, the second intercept valve 40, and the overspeed prevention valve 19, and then the turbine rotational speed temporarily increases to increase the maximum rotational speed. After that, when it is determined that the descent has started, the overspeed prevention valve 19 is fully opened.

図3に示す本実施の形態において、高圧タービン7において膨張仕事を行った主蒸気2は、その後高圧タービン7から排気されて第1低温再熱管33を通ってボイラ4の第1再熱器31に供給される。   In the present embodiment shown in FIG. 3, the main steam 2 that has performed expansion work in the high-pressure turbine 7 is then exhausted from the high-pressure turbine 7, passes through the first low-temperature reheat pipe 33, and the first reheater 31 of the boiler 4. To be supplied.

第1再熱器31に供給された主蒸気2は再過熱され、第1再熱蒸気3aが生成される。この第1再熱蒸気3aは第1高温再熱管34に導かれ、第1再熱蒸気止め弁35および第1インターセプト弁36を通って中圧タービン8の第3中圧タービン部30に供給される。このとき、第1再熱蒸気止め弁35および第1インターセプト弁36は全開になっている。第3中圧タービン部30に供給された第1再熱蒸気3aは膨張仕事を行い、その後第3中圧タービン部30から排気されて第2低温再熱管37を通ってボイラ4の第2再熱器32に供給される。   The main steam 2 supplied to the first reheater 31 is resuperheated to generate the first reheat steam 3a. The first reheat steam 3a is guided to the first high temperature reheat pipe 34 and supplied to the third intermediate pressure turbine section 30 of the intermediate pressure turbine 8 through the first reheat steam stop valve 35 and the first intercept valve 36. The At this time, the first reheat steam stop valve 35 and the first intercept valve 36 are fully opened. The first reheat steam 3a supplied to the third intermediate pressure turbine section 30 performs expansion work, and then is exhausted from the third intermediate pressure turbine section 30 and passed through the second low-temperature reheat pipe 37 to perform the second reheat of the boiler 4. It is supplied to the heater 32.

第2再熱器32に供給された第1再熱蒸気3aは再熱され、第2再熱蒸気3bが生成される。この第2再熱蒸気3bは第2高温再熱管38に導かれ、第2再熱蒸気止め弁39および第2インターセプト弁40を通って第1中圧タービン部9に供給される。このとき、第2再熱蒸気止め弁39および第2インターセプト弁40は全開になっている。第1中圧タービン部9に供給された第2再熱蒸気3bは膨張仕事を行い、その後第1中圧タービン部9から排気されて中圧部連絡管11に導かれ、過速度防止弁19を通って第2中圧タービン部10に供給される。このとき、過速度防止弁19は全開になっている。   The first reheat steam 3a supplied to the second reheater 32 is reheated to generate a second reheat steam 3b. The second reheat steam 3 b is guided to the second high temperature reheat pipe 38 and supplied to the first intermediate pressure turbine section 9 through the second reheat steam stop valve 39 and the second intercept valve 40. At this time, the second reheat steam stop valve 39 and the second intercept valve 40 are fully opened. The second reheat steam 3b supplied to the first intermediate pressure turbine section 9 performs expansion work, and then is exhausted from the first intermediate pressure turbine section 9 and led to the intermediate pressure section communication pipe 11, and the overspeed prevention valve 19 And is supplied to the second intermediate pressure turbine section 10. At this time, the overspeed prevention valve 19 is fully opened.

第2中圧タービン部10に供給された第2再熱蒸気3bは膨張仕事を行い、その後第2中圧タービン部10から排気されてクロスオーバー管21を通って低圧タービン22に供給される。この第2再熱蒸気3bは低圧タービン22において膨張仕事を行い、その後低圧タービン22から排気されて復水器25に供給されて復水となる。この復水は、ボイラ給水ポンプ26に送られて昇圧され、ボイラ4の過熱器5に還流される。その後、過熱器5において過熱されて主蒸気2が生成される。このようにして蒸気が循環する。   The second reheat steam 3 b supplied to the second intermediate pressure turbine section 10 performs expansion work, and is then exhausted from the second intermediate pressure turbine section 10 and supplied to the low pressure turbine 22 through the crossover pipe 21. The second reheat steam 3b performs expansion work in the low-pressure turbine 22, and is then exhausted from the low-pressure turbine 22 and supplied to the condenser 25 to become condensate. The condensate is sent to the boiler feed pump 26 to increase the pressure, and is returned to the superheater 5 of the boiler 4. Thereafter, the main steam 2 is generated by being heated in the superheater 5. In this way, the steam circulates.

この間、高圧タービン7において主蒸気2が膨張仕事を行うとともに、第2中圧タービン部10において第2再熱蒸気3bが膨張仕事を行っているため、高圧タービン7の高圧ロータ7aと第2中圧タービン部10の第2中圧ロータ10aとにより構成される高圧・第2中圧一体ロータ41が回転駆動されている。同様に、第3中圧タービン部30において第1再熱蒸気3aが膨張仕事を行うとともに、第1中圧タービン部9において第2再熱蒸気3bが膨張仕事を行っているため、第3中圧タービン部30の第3中圧ロータ30aと第1中圧タービン部9の第1中圧ロータ9aとにより構成される第1中圧・第3中圧一体ロータ42が回転駆動されている。さらに、低圧タービン22において第2再熱蒸気3bが膨張仕事を行っているため、低圧タービン22の低圧ロータ22aが回転駆動されている。このことにより、第1中圧・第3中圧一体ロータ42、高圧・第2中圧一体ロータ41、低圧ロータ22aに連結された発電機23の回転軸23aが回転し、発電機23が発電している。   During this time, the main steam 2 performs expansion work in the high-pressure turbine 7 and the second reheated steam 3b performs expansion work in the second intermediate-pressure turbine section 10, so that the high-pressure rotor 7 and the second medium A high-pressure / second intermediate-pressure integrated rotor 41 configured by the second intermediate-pressure rotor 10a of the pressure turbine unit 10 is rotationally driven. Similarly, the first reheat steam 3a performs expansion work in the third intermediate pressure turbine section 30, and the second reheat steam 3b performs expansion work in the first intermediate pressure turbine section 9. The first intermediate pressure / third intermediate pressure integrated rotor 42 constituted by the third intermediate pressure rotor 30a of the pressure turbine section 30 and the first intermediate pressure rotor 9a of the first intermediate pressure turbine section 9 is rotationally driven. Furthermore, since the second reheat steam 3b performs expansion work in the low pressure turbine 22, the low pressure rotor 22a of the low pressure turbine 22 is rotationally driven. As a result, the rotary shaft 23a of the generator 23 connected to the first intermediate pressure / third intermediate pressure integrated rotor 42, the high pressure / second intermediate pressure integrated rotor 41, and the low pressure rotor 22a rotates, and the generator 23 generates power. doing.

ここで、蒸気タービン発電プラント1が定格負荷運転を行っている間に発電機23の負荷遮断が行われた場合、まず、中圧部連絡管11に設けられた過速度防止弁19が所望の整定速度調定率に基づいて第2インターセプト弁40と同期して急速に全閉する。   Here, when the load interruption of the generator 23 is performed while the steam turbine power plant 1 is performing the rated load operation, first, the overspeed prevention valve 19 provided in the intermediate pressure unit communication pipe 11 is desired. Based on the settling speed settling rate, it is fully closed in synchronism with the second intercept valve 40.

このとき、制御装置20からの指令を受けて蒸気加減弁14も同様にして急速に全閉し、主蒸気管12内における主蒸気2の通流を迅速に遮断して高圧タービン7に流入される残留蒸気の量を低減させる。同時に、第1インターセプト弁36および第2インターセプト弁40も急速に全閉し、第1高温再熱管34内および第2高温再熱管38内における再熱蒸気3(第1再熱蒸気3a、第2再熱蒸気3b)の通流を迅速に遮断して第3中圧タービン部30および第1中圧タービン部9に流入される残留蒸気の量をそれぞれ低減させている。このことによりタービン回転数が上昇することを抑制することができる。   At this time, in response to a command from the control device 20, the steam control valve 14 is also fully closed in a similar manner, and the flow of the main steam 2 in the main steam pipe 12 is quickly cut off and flows into the high-pressure turbine 7. Reduce the amount of residual steam. At the same time, the first intercept valve 36 and the second intercept valve 40 are also fully closed rapidly, and the reheat steam 3 (the first reheat steam 3a, the second reheat steam 3a, the second reheat steam 3 in the first high temperature reheat pipe 34 and the second high temperature reheat pipe 38). The flow of the reheat steam 3b) is quickly cut off to reduce the amount of residual steam flowing into the third intermediate pressure turbine section 30 and the first intermediate pressure turbine section 9, respectively. This can suppress an increase in the turbine rotational speed.

なお、蒸気加減弁14、第1インターセプト弁36、第2インターセプト弁40、および過速度防止弁19が全閉した後、残留していた蒸気によりタービン回転数は一旦上昇して最大回転数に達するが、その後各蒸気の通流が遮断されたことによりタービン回転数は下降する。   Note that after the steam control valve 14, the first intercept valve 36, the second intercept valve 40, and the overspeed prevention valve 19 are fully closed, the turbine speed is temporarily increased by the remaining steam and reaches the maximum speed. However, the turbine rotational speed falls because the flow of each steam is interrupted thereafter.

次に、制御装置20は、タービン回転数信号に基づいてタービン回転数が下降を開始したと判断し、蒸気加減弁14、第1インターセプト弁36、第2インターセプト弁40、および過速度防止弁19を全開させる。この場合、蒸気加減弁14、第1インターセプト弁36、第2インターセプト弁40、および過速度防止弁19の開度が上述の整定速度調定率に基づいて全開し、タービン回転数が無負荷状態における整定回転数に達する。   Next, the control device 20 determines that the turbine rotational speed has started to decrease based on the turbine rotational speed signal, and the steam control valve 14, the first intercept valve 36, the second intercept valve 40, and the overspeed prevention valve 19. Fully open. In this case, the openings of the steam control valve 14, the first intercept valve 36, the second intercept valve 40, and the overspeed prevention valve 19 are fully opened based on the settling speed adjustment rate described above, and the turbine rotational speed is in a no-load state. Reach settling speed.

このように本実施の形態によれば、図3に示す2段再熱型の蒸気タービン発電プラント1においても、中圧タービン8の第1中圧タービン部9と第2中圧タービン部10との間に連結された中圧部連絡管11に、内部における第2再熱蒸気3bの通流を遮断可能な過速度防止弁19が設けられ、この過速度防止弁19に所望の整定速度調定率に基づいて過速度防止弁19を第2インターセプト弁40と同期して開閉動作させる制御装置20が接続されている。このことにより、蒸気タービン発電プラント1が定格負荷運転を行っている間に発電機23の負荷遮断が行われた場合、第2インターセプト弁40と同期して過速度防止弁19を急速に全閉させて、中圧部連絡管11内における第2再熱蒸気3bの通流を迅速に遮断することができる。このため、第2中圧タービン部10および低圧タービン22に流入される残留蒸気の量を低減してタービン回転数が上昇することを抑制し、信頼性を向上させることができる。   Thus, according to the present embodiment, in the two-stage reheat steam turbine power plant 1 shown in FIG. 3, the first intermediate pressure turbine section 9 and the second intermediate pressure turbine section 10 of the intermediate pressure turbine 8 Is provided with an overspeed prevention valve 19 capable of interrupting the flow of the second reheat steam 3b inside, and the overspeed prevention valve 19 has a desired settling speed control. A control device 20 that opens and closes the overspeed prevention valve 19 in synchronization with the second intercept valve 40 based on a constant rate is connected. As a result, when the load interruption of the generator 23 is performed while the steam turbine power plant 1 is performing the rated load operation, the overspeed prevention valve 19 is rapidly fully closed in synchronization with the second intercept valve 40. Thus, the flow of the second reheat steam 3b in the intermediate pressure part communication pipe 11 can be quickly shut off. For this reason, it is possible to reduce the amount of residual steam that flows into the second intermediate-pressure turbine unit 10 and the low-pressure turbine 22 to suppress an increase in the turbine rotational speed, and to improve the reliability.

また本実施の形態によれば、高圧タービン7の高圧ロータ7aと第2中圧タービン部10の第2中圧ロータ10aとが一体化されて高圧・第2中圧一体ロータ41が構成されるとともに、第3中圧タービン部30の第3中圧ロータ30aと第1中圧タービン部9の第1中圧ロータ9aとが一体化されて第1中圧・第3中圧一体ロータ42が構成されている。このことにより、ロータ数が増加することを抑制して、振動に対する安定性を確保することができる。   Further, according to the present embodiment, the high-pressure rotor 7a of the high-pressure turbine 7 and the second intermediate-pressure rotor 10a of the second intermediate-pressure turbine unit 10 are integrated to form the high-pressure / second intermediate-pressure integrated rotor 41. At the same time, the third intermediate pressure rotor 30a of the third intermediate pressure turbine section 30 and the first intermediate pressure rotor 9a of the first intermediate pressure turbine section 9 are integrated to form a first intermediate pressure / third intermediate pressure integrated rotor 42. It is configured. As a result, an increase in the number of rotors can be suppressed, and stability against vibration can be ensured.

第4の実施の形態
次に、図4により、本発明の第4の実施の形態における蒸気タービン発電プラントについて説明する。ここで図4は、本発明の第4の実施の形態における蒸気タービン発電プラントを示す図である。
Fourth Embodiment Next, a steam turbine power plant according to a fourth embodiment of the present invention will be described with reference to FIG. FIG. 4 is a diagram showing a steam turbine power plant in the fourth embodiment of the present invention.

図4に示す第4の実施の形態において、高圧タービンは、主蒸気が供給される第1高圧タービン部と、第1高圧タービン部に高圧部連絡管を介して連結され、第1高圧タービン部から排気された主蒸気が供給される第2高圧タービン部とを有している点が異なり、他の構成は、図1に示す第1の実施の形態と略同一である。なお、図4において、図1に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   In the fourth embodiment shown in FIG. 4, the high-pressure turbine is connected to the first high-pressure turbine section to which the main steam is supplied, and the first high-pressure turbine section via the high-pressure section connecting pipe, and the first high-pressure turbine section 1 and the second high-pressure turbine section to which main steam exhausted from the engine is supplied. The other configuration is substantially the same as that of the first embodiment shown in FIG. In FIG. 4, the same parts as those of the first embodiment shown in FIG.

図4に示す蒸気タービン発電プラント1は、主蒸気2および再熱蒸気3を発生させるボイラ4と、主蒸気2が供給される高圧タービン7と、中圧ロータ8aを有し、再熱蒸気3が供給される中圧タービン8とを備えている。このうち高圧タービン7は、第1高圧ロータ50aを含み、主蒸気2が供給される第1高圧タービン部50と、第2高圧ロータ51aを含み、第1高圧タービン部50に高圧部連絡管52を介して連結され、第1高圧タービン部50から排気された主蒸気2が供給される第2高圧タービン部51とを有している。   A steam turbine power plant 1 shown in FIG. 4 includes a boiler 4 that generates main steam 2 and reheat steam 3, a high pressure turbine 7 to which main steam 2 is supplied, and an intermediate pressure rotor 8a. The intermediate pressure turbine 8 is supplied. Among these, the high-pressure turbine 7 includes a first high-pressure rotor 50 a and includes a first high-pressure turbine section 50 to which the main steam 2 is supplied and a second high-pressure rotor 51 a, and the first high-pressure turbine section 50 is connected to the high-pressure section communication pipe 52. And a second high pressure turbine section 51 to which main steam 2 exhausted from the first high pressure turbine section 50 is supplied.

ボイラ4の過熱器5と第1高圧タービン部50との間に、過熱器5から第1高圧タービン部50に主蒸気2を供給する主蒸気管12が連結されている。この主蒸気管12には主蒸気止め弁13が設けられ、この主蒸気止め弁13の下流側(第1高圧タービン部50側)には蒸気加減弁(高圧部蒸気弁)14が設けられている。この蒸気加減弁14は、蒸気タービンの出力を調整するために主蒸気管12を通流する主蒸気2の流量を調整可能に構成されている。   A main steam pipe 12 that supplies main steam 2 from the superheater 5 to the first high-pressure turbine unit 50 is connected between the superheater 5 of the boiler 4 and the first high-pressure turbine unit 50. The main steam pipe 12 is provided with a main steam stop valve 13, and a steam control valve (high pressure section steam valve) 14 is provided downstream of the main steam stop valve 13 (on the first high pressure turbine section 50 side). Yes. The steam control valve 14 is configured to be able to adjust the flow rate of the main steam 2 flowing through the main steam pipe 12 in order to adjust the output of the steam turbine.

図1に示す高圧部連絡管52に、内部における主蒸気2の通流を遮断可能な過速度防止弁19が設けられている。ここで、この過速度防止弁19は、定格負荷運転が行われている場合、常時全開となっている。このため、この過速度防止弁19としては、高圧部連絡管52内を通流する主蒸気2の圧力損失が増大することを抑制可能な弁を用いることが好ましく、とりわけバタフライ型の弁を用いることが好適である。また、過速度防止弁19は、高圧部連絡管52のうち第2高圧タービン部51に近接した位置に配置することが好ましい。このことにより、過速度防止弁19を全閉した場合に、過速度防止弁19と第2高圧タービン部51との間に残留している残留蒸気の量をより一層低減させることができる。   1 is provided with an overspeed prevention valve 19 capable of blocking the flow of the main steam 2 inside. Here, the overspeed prevention valve 19 is always fully open when the rated load operation is performed. For this reason, as this overspeed prevention valve 19, it is preferable to use a valve capable of suppressing an increase in the pressure loss of the main steam 2 flowing in the high-pressure section communication pipe 52, and in particular, a butterfly type valve is used. Is preferred. Further, the overspeed prevention valve 19 is preferably arranged at a position in the high pressure section communication pipe 52 that is close to the second high pressure turbine section 51. As a result, when the overspeed prevention valve 19 is fully closed, the amount of residual steam remaining between the overspeed prevention valve 19 and the second high pressure turbine section 51 can be further reduced.

また、第1高圧タービン部50、第2高圧タービン部51、中圧タービン8、および低圧タービン22に、回転軸23aを有する発電機23が連結されている。すなわち、図4に示すように、第2高圧タービン部51の第2高圧ロータ51aと中圧タービン8の中圧ロータ8aとが一体化されて第2高圧・中圧一体ロータ53を構成し、第1高圧タービン部50の第1高圧ロータ50a、第2高圧・中圧一体ロータ53、低圧タービン22の低圧ロータ22a、および発電機23の回転軸23aが連結部29を介して同一軸線上で順次連結されている。   A generator 23 having a rotating shaft 23 a is connected to the first high-pressure turbine unit 50, the second high-pressure turbine unit 51, the intermediate-pressure turbine 8, and the low-pressure turbine 22. That is, as shown in FIG. 4, the second high-pressure and intermediate-pressure integrated rotor 53 is configured by integrating the second high-pressure rotor 51a of the second high-pressure turbine section 51 and the intermediate-pressure rotor 8a of the intermediate-pressure turbine 8; The first high-pressure rotor 50 a of the first high-pressure turbine unit 50, the second high-pressure / medium-pressure integrated rotor 53, the low-pressure rotor 22 a of the low-pressure turbine 22, and the rotating shaft 23 a of the generator 23 are on the same axis via the connecting portion 29. It is sequentially connected.

図4に示す蒸気タービン発電プラント1においては、ボイラ4の過熱器5において発生した主蒸気2が主蒸気管12を通って第1高圧タービン部50に供給される。第1高圧タービン部50に供給された主蒸気2は膨張仕事を行い、その後第1高圧タービン部50から排気されて高圧部連絡管に導かれ、過速度防止弁19を通って第2高圧タービン部51に供給される。このとき、過速度防止弁19は全開になっている。第2高圧タービン部51に供給された主蒸気2は膨張仕事を行い、その後第2高圧タービン部51から排気されて低温再熱管15を通ってボイラ4の再熱器6に供給される。   In the steam turbine power plant 1 shown in FIG. 4, the main steam 2 generated in the superheater 5 of the boiler 4 is supplied to the first high-pressure turbine section 50 through the main steam pipe 12. The main steam 2 supplied to the first high-pressure turbine section 50 performs expansion work, and then is exhausted from the first high-pressure turbine section 50 and led to the high-pressure section connecting pipe, and passes through the overspeed prevention valve 19 to the second high-pressure turbine. Supplied to the unit 51. At this time, the overspeed prevention valve 19 is fully opened. The main steam 2 supplied to the second high-pressure turbine section 51 performs expansion work, and is then exhausted from the second high-pressure turbine section 51 and supplied to the reheater 6 of the boiler 4 through the low-temperature reheat pipe 15.

再熱器6に供給された主蒸気2は再過熱され、再熱蒸気3が生成される。この再熱蒸気3は高温再熱管16に導かれ、再熱蒸気止め弁17およびインターセプト弁18を通って中圧タービン8に供給される。このとき、再熱蒸気止め弁17およびインターセプト弁18は全開になっている。中圧タービン8に供給された再熱蒸気3は膨張仕事を行い、その後中圧タービン8から排気されてクロスオーバー管21を通って低圧タービン22に供給される。   The main steam 2 supplied to the reheater 6 is re-superheated to generate reheat steam 3. The reheat steam 3 is guided to the high temperature reheat pipe 16 and supplied to the intermediate pressure turbine 8 through the reheat steam stop valve 17 and the intercept valve 18. At this time, the reheat steam stop valve 17 and the intercept valve 18 are fully opened. The reheated steam 3 supplied to the intermediate pressure turbine 8 performs expansion work, and is then exhausted from the intermediate pressure turbine 8 and supplied to the low pressure turbine 22 through the crossover pipe 21.

この間、第2高圧タービン部51において主蒸気2が膨張仕事を行うとともに、中圧タービン8において再熱蒸気3が膨張仕事を行っているため、第2高圧タービン部51の第2高圧ロータ51aと中圧タービン8の中圧ロータ8aとにより構成される第2高圧・中圧一体ロータ53が回転駆動されている。また、第1高圧タービン部50および低圧タービン22において、主蒸気2および再熱蒸気3がそれぞれ膨張仕事を行っているため、第1高圧タービン部50の第1高圧ロータ50a、および低圧タービン22の低圧ロータ22aが回転駆動されている。このことにより、第1高圧ロータ50a、第2高圧・中圧一体ロータ53、低圧ロータ22aに連結された発電機23の回転軸23aが回転し、発電機23が発電している。   During this time, the main steam 2 performs expansion work in the second high-pressure turbine section 51 and the reheat steam 3 performs expansion work in the intermediate-pressure turbine 8, so that the second high-pressure rotor 51 a of the second high-pressure turbine section 51 The second high-pressure / medium-pressure integrated rotor 53 constituted by the medium-pressure rotor 8a of the medium-pressure turbine 8 is rotationally driven. Further, in the first high-pressure turbine section 50 and the low-pressure turbine 22, the main steam 2 and the reheat steam 3 are performing expansion work, respectively. Therefore, the first high-pressure rotor 50 a of the first high-pressure turbine section 50 and the low-pressure turbine 22 The low-pressure rotor 22a is rotationally driven. As a result, the rotating shaft 23a of the generator 23 connected to the first high-pressure rotor 50a, the second high-pressure / medium-pressure integrated rotor 53, and the low-pressure rotor 22a rotates, and the generator 23 generates power.

ここで、蒸気タービン発電プラント1が定格負荷運転を行っている間に発電機23の負荷遮断が行われた場合、高圧部連絡管52に設けられた過速度防止弁19が急速に全閉する。このことにより高圧部連絡管52内における主蒸気2の通流を迅速に遮断して第2高圧タービン部51に流入される残留蒸気の量を低減させることができる。   Here, when the load interruption of the generator 23 is performed while the steam turbine power plant 1 is performing the rated load operation, the overspeed prevention valve 19 provided in the high-pressure part communication pipe 52 is rapidly fully closed. . As a result, the flow of the main steam 2 in the high pressure section communication pipe 52 can be quickly cut off, and the amount of residual steam flowing into the second high pressure turbine section 51 can be reduced.

このように本実施の形態によれば、高圧タービンの第1高圧タービン部50と第2高圧タービン部51との間に連結された高圧部連絡管52に、内部における主蒸気2の通流を遮断可能な過速度防止弁19が設けられている。このことにより、蒸気タービン発電プラント1が定格負荷運転を行っている間に発電機23の負荷遮断が行われた場合、過速度防止弁19を急速に全閉させて、高圧部連絡管52内における主蒸気2の通流を迅速に遮断することができる。このため、第2高圧タービン部51に流入される残留蒸気の量を低減してタービン回転数が上昇することを抑制し、信頼性を向上させることができる。   Thus, according to the present embodiment, the main steam 2 flows through the high-pressure section connecting pipe 52 connected between the first high-pressure turbine section 50 and the second high-pressure turbine section 51 of the high-pressure turbine. An overspeed prevention valve 19 that can be shut off is provided. As a result, when the load interruption of the generator 23 is performed while the steam turbine power plant 1 is performing the rated load operation, the overspeed prevention valve 19 is rapidly fully closed, and the inside of the high-pressure unit communication pipe 52 is It is possible to quickly shut off the flow of the main steam 2 at. For this reason, it is possible to reduce the amount of residual steam that flows into the second high-pressure turbine section 51 and suppress an increase in the turbine rotational speed, thereby improving the reliability.

また本実施の形態によれば、第2高圧タービン部51の第2高圧ロータ51aと中圧タービン8の中圧ロータ8aとが一体化されて第2高圧・中圧一体ロータ53が構成されている。このことにより、ロータ数が増加することを抑制して、振動に対する安定性を確保することができる。   Further, according to the present embodiment, the second high-pressure and intermediate-pressure integrated rotor 53 is configured by integrating the second high-pressure rotor 51 a of the second high-pressure turbine section 51 and the intermediate-pressure rotor 8 a of the intermediate-pressure turbine 8. Yes. As a result, an increase in the number of rotors can be suppressed, and stability against vibration can be ensured.

図1は、本発明の第1の実施の形態における蒸気タービン発電プラントを示す図。FIG. 1 is a diagram showing a steam turbine power plant according to a first embodiment of the present invention. 図2は、本発明の第2の実施の形態における蒸気タービン発電プラントを示す図。FIG. 2 is a diagram showing a steam turbine power plant according to a second embodiment of the present invention. 図3は、本発明の第3の実施の形態における蒸気タービン発電プラントを示す図。FIG. 3 is a diagram showing a steam turbine power plant according to a third embodiment of the present invention. 図4は、本発明の第4の実施の形態における蒸気タービン発電プラントを示す図。FIG. 4 is a diagram showing a steam turbine power plant according to a fourth embodiment of the present invention.

1 蒸気タービン発電プラント
2 主蒸気
3 再熱蒸気
3a 第1再熱蒸気
3b 第2再熱蒸気
4 ボイラ
5 過熱器
6 再熱器
7 高圧タービン
7a 高圧ロータ
8 中圧タービン
8a 中圧ロータ
9 第1中圧タービン部
9a 第1中圧ロータ
10 第2中圧タービン部
10a 第2中圧ロータ
11 中圧部連絡管
12 主蒸気管
13 主蒸気止め弁
14 蒸気加減弁
15 低温再熱管
16 高温再熱管
17 再熱蒸気止め弁
18 インターセプト弁
19 過速度防止弁
20 制御装置
21 クロスオーバー管
22 低圧タービン
22a 低圧ロータ
23 発電機
23a 回転軸
24 高圧・第2中圧一体ロータ
25 復水器
26 ボイラ給水ポンプ
27 高圧・第1中圧一体ロータ
28 クーリング蒸気管
29 連結部
30 第3中圧タービン部
30a 第3中圧ロータ
31 第1再熱器
32 第2再熱器
33 第1低温再熱管
34 第1高温再熱管
35 第1再熱蒸気止め弁
36 第1インターセプト弁
37 第2低温再熱管
38 第2高温再熱管
39 第2再熱蒸気止め弁
40 第2インターセプト弁
41 高圧・第2中圧一体ロータ
42 第1中圧・第3中圧一体ロータ
50 第1高圧タービン部
50a 第1高圧ロータ
51 第2高圧タービン部
51a 第2高圧ロータ
52 高圧部連絡管
53 第2高圧・中圧一体ロータ
DESCRIPTION OF SYMBOLS 1 Steam turbine power plant 2 Main steam 3 Reheat steam 3a 1st reheat steam 3b 2nd reheat steam 4 Boiler 5 Superheater 6 Reheater 7 High pressure turbine 7a High pressure rotor 8 Medium pressure turbine 8a Medium pressure rotor 9 1st Intermediate pressure turbine section 9a First intermediate pressure rotor 10 Second intermediate pressure turbine section 10a Second intermediate pressure rotor 11 Intermediate pressure section communication pipe 12 Main steam pipe 13 Main steam stop valve 14 Steam control valve 15 Low temperature reheat pipe 16 High temperature reheat pipe 17 Reheat steam stop valve 18 Intercept valve 19 Overspeed prevention valve 20 Control device 21 Crossover pipe 22 Low pressure turbine 22a Low pressure rotor 23 Generator 23a Rotating shaft 24 High pressure / second intermediate pressure integrated rotor 25 Condenser 26 Boiler feed pump 27 High-pressure / first intermediate pressure integrated rotor 28 Cooling steam pipe 29 Connecting portion 30 Third intermediate pressure turbine portion 30a Third intermediate pressure rotor 31 First reheater 32 2 Reheater 33 1st low temperature reheat pipe 34 1st high temperature reheat pipe 35 1st reheat steam stop valve 36 1st intercept valve 37 2nd low temperature reheat pipe 38 2nd high temperature reheat pipe 39 2nd reheat steam stop valve 40 Second intercept valve 41 High pressure / second intermediate pressure integrated rotor 42 First intermediate pressure / third intermediate pressure integrated rotor 50 First high pressure turbine section 50a First high pressure rotor 51 Second high pressure turbine section 51a Second high pressure rotor 52 High pressure section Connecting pipe 53 Second high pressure / medium pressure integrated rotor

Claims (9)

主蒸気を発生させる過熱器および再熱蒸気を発生させる再熱器を備えたボイラと、
前記主蒸気が供給される高圧タービンと、
前記再熱蒸気が供給される第1中圧タービン部と、前記第1中圧タービン部に中圧部連絡管を介して連結され、当該第1中圧タービン部から排気された前記再熱蒸気が供給される第2中圧タービン部とを有する中圧タービンと、
前記第2中圧タービン部から排気された前記再熱蒸気が供給される低圧タービンと、
前記高圧タービン、前記第1中圧タービン部、前記第2中圧タービン部、および前記低圧タービンに連結された発電機と、
前記中圧部連絡管内における前記再熱蒸気の通流を遮断可能な過速度防止弁と、
前記ボイラの前記再熱器と前記第1中圧タービン部との間に設けられ、当該再熱器から当該第1中圧タービン部に供給される前記再熱蒸気の通流を遮断可能な中圧部蒸気弁と、
前記過速度防止弁に接続され、所望の整定速度調定率に基づいて当該過速度防止弁を前記中圧部蒸気弁と同期して開閉動作させる制御装置と、を備えたことを特徴とする蒸気タービン発電プラント。
A boiler with a superheater that generates main steam and a reheater that generates reheat steam;
A high-pressure turbine to which the main steam is supplied;
A first intermediate pressure turbine section to which the reheat steam is supplied, and the reheat steam connected to the first intermediate pressure turbine section via an intermediate pressure section connecting pipe and exhausted from the first intermediate pressure turbine section. An intermediate pressure turbine having a second intermediate pressure turbine section supplied with
A low pressure turbine to which the reheat steam exhausted from the second intermediate pressure turbine section is supplied;
A generator coupled to the high pressure turbine, the first intermediate pressure turbine section, the second intermediate pressure turbine section, and the low pressure turbine;
An overspeed prevention valve capable of shutting off the flow of the reheat steam in the intermediate pressure section communication pipe;
It is provided between the reheater of the boiler and the first intermediate pressure turbine section, and can block the flow of the reheat steam supplied from the reheater to the first intermediate pressure turbine section. Pressure section steam valve,
A steam device connected to the overspeed prevention valve and configured to open and close the overspeed prevention valve in synchronization with the intermediate pressure steam valve based on a desired settling speed adjustment rate. Turbine power plant.
主蒸気を発生させる過熱器および再熱蒸気を発生させる再熱器を備えたボイラと、
前記主蒸気が供給される高圧タービンと、
前記再熱蒸気が供給される第1中圧タービン部と、前記第1中圧タービン部に中圧部連絡管を介して連結され、当該第1中圧タービン部から排気された前記再熱蒸気が供給される第2中圧タービン部とを有する中圧タービンと、
前記第2中圧タービン部から排気された前記再熱蒸気が供給される低圧タービンと、
前記高圧タービン、前記第1中圧タービン部、前記第2中圧タービン部、および前記低圧タービンに連結された発電機と、
前記中圧部連絡管内における前記再熱蒸気の通流を遮断可能な過速度防止弁と、
前記ボイラの前記再熱器と前記第1中圧タービン部との間に設けられ、当該再熱器から当該第1中圧タービン部に供給される前記再熱蒸気の通流を遮断可能な中圧部蒸気弁と、
前記過速度防止弁に接続され、前記発電機の負荷遮断が行われた後に、当該過速度防止弁を前記中圧部蒸気弁に先行して開閉動作させる制御装置と、を備えたことを特徴とする蒸気タービン発電プラント。
A boiler with a superheater that generates main steam and a reheater that generates reheat steam;
A high-pressure turbine to which the main steam is supplied;
A first intermediate pressure turbine section to which the reheat steam is supplied, and the reheat steam connected to the first intermediate pressure turbine section via an intermediate pressure section connecting pipe and exhausted from the first intermediate pressure turbine section. An intermediate pressure turbine having a second intermediate pressure turbine section supplied with
A low pressure turbine to which the reheat steam exhausted from the second intermediate pressure turbine section is supplied;
A generator coupled to the high pressure turbine, the first intermediate pressure turbine section, the second intermediate pressure turbine section, and the low pressure turbine;
An overspeed prevention valve capable of shutting off the flow of the reheat steam in the intermediate pressure section communication pipe;
It is provided between the reheater of the boiler and the first intermediate pressure turbine section, and can block the flow of the reheat steam supplied from the reheater to the first intermediate pressure turbine section. Pressure section steam valve,
A controller that is connected to the overspeed prevention valve and that opens and closes the overspeed prevention valve before the intermediate pressure steam valve after the load of the generator is shut off. And steam turbine power plant.
前記高圧タービンが高圧ロータを有し、
前記第2中圧タービン部が第2中圧ロータを有し、
前記高圧ロータと前記第2中圧ロータとが一体化されて高圧・第2中圧一体ロータを構成していることを特徴とする請求項1または2に記載の蒸気タービン発電プラント。
The high-pressure turbine has a high-pressure rotor;
The second intermediate pressure turbine section has a second intermediate pressure rotor;
The steam turbine power plant according to claim 1 or 2, wherein the high-pressure rotor and the second medium-pressure rotor are integrated to form a high-pressure / second medium-pressure integrated rotor.
前記高圧タービンが高圧ロータを有し、
前記第1中圧タービン部が第1中圧ロータを有し、
前記高圧ロータと前記第1中圧ロータとが一体化されて高圧・第1中圧一体ロータを構成し、
前記高圧タービンと前記第1中圧タービン部との間に、当該高圧タービンから当該第1中圧タービン部に前記主蒸気を供給するクーリング蒸気管が連結されていることを特徴とする請求項1または2に記載の蒸気タービン発電プラント。
The high-pressure turbine has a high-pressure rotor;
The first intermediate pressure turbine section has a first intermediate pressure rotor;
The high-pressure rotor and the first medium-pressure rotor are integrated to form a high-pressure / first medium-pressure integrated rotor,
The cooling steam pipe for supplying the main steam from the high pressure turbine to the first intermediate pressure turbine section is connected between the high pressure turbine and the first intermediate pressure turbine section. Or a steam turbine power plant according to 2;
前記再熱器は第1再熱器および第2再熱器を備え、前記再熱蒸気として第1再熱蒸気と第2再熱蒸気をそれぞれ発生させるとともに、
前記中圧タービンは、前記第1再熱器から前記第1再熱蒸気が供給される第3中圧タービン部を更に有し、
前記第3中圧タービン部から排気された前記第1再熱蒸気が前記第2再熱器において再熱され前記第2再熱蒸気として前記第1中圧タービン部に供給されることを特徴とする請求項1または2に記載の蒸気タービン発電プラント。
The reheater includes a first reheater and a second reheater, and generates a first reheat steam and a second reheat steam as the reheat steam,
The intermediate pressure turbine further includes a third intermediate pressure turbine section to which the first reheat steam is supplied from the first reheater,
The first reheat steam exhausted from the third intermediate pressure turbine section is reheated in the second reheater and supplied to the first intermediate pressure turbine section as the second reheat steam. The steam turbine power plant according to claim 1 or 2.
前記高圧タービンが高圧ロータを有し、
前記第1中圧タービン部が第1中圧ロータを有し、
前記第2中圧タービン部が第2中圧ロータを有し、
前記第3中圧タービン部が第3中圧ロータを有し、
前記高圧ロータと前記第2中圧ロータとが一体化されて高圧・第2中圧一体ロータを構成するとともに、前記第3中圧ロータと前記第1中圧ロータとが一体化されて第1中圧・第3中圧一体ロータを構成することを特徴とする請求項5に記載の蒸気タービン発電プラント。
The high-pressure turbine has a high-pressure rotor;
The first intermediate pressure turbine section has a first intermediate pressure rotor;
The second intermediate pressure turbine section has a second intermediate pressure rotor;
The third intermediate pressure turbine section has a third intermediate pressure rotor;
The high pressure rotor and the second intermediate pressure rotor are integrated to form a high pressure / second intermediate pressure integrated rotor, and the third intermediate pressure rotor and the first intermediate pressure rotor are integrated to form a first. 6. The steam turbine power plant according to claim 5, comprising an intermediate pressure / third intermediate pressure integrated rotor.
主蒸気を発生させる過熱器および再熱蒸気を発生させる再熱器を備えたボイラと、
前記主蒸気が供給される第1高圧タービン部と、前記第1高圧タービン部に高圧部連絡管を介して連結され、当該第1高圧タービン部から排気された前記主蒸気が供給される第2高圧タービン部とを有する高圧タービンと、
前記再熱蒸気が供給される中圧タービンと、
前記中圧タービンから排気された前記再熱蒸気が供給される低圧タービンと、
前記第1高圧タービン部、前記第2高圧タービン部、前記中圧タービン、および前記低圧タービンに連結された発電機と、
前記高圧部連絡管内における前記主蒸気の通流を遮断する過速度防止弁と、
前記ボイラの前記過熱器と前記第1高圧タービン部との間に設けられ、当該過熱器から当該第1高圧タービン部に供給される前記主蒸気の通流を遮断可能な高圧部蒸気弁と、
前記過速度防止弁に接続され、所望の整定速度調定率に基づいて当該過速度防止弁を前記高圧部蒸気弁と同期して開閉動作させる制御装置と、を備えたことを特徴とする蒸気タービン発電プラント。
A boiler with a superheater that generates main steam and a reheater that generates reheat steam;
A first high-pressure turbine section to which the main steam is supplied, and a second high-pressure turbine section connected to the first high-pressure turbine section via a high-pressure section connecting pipe and supplied with the main steam exhausted from the first high-pressure turbine section. A high pressure turbine having a high pressure turbine section;
An intermediate pressure turbine to which the reheat steam is supplied;
A low pressure turbine to which the reheat steam exhausted from the intermediate pressure turbine is supplied;
A generator coupled to the first high pressure turbine section, the second high pressure turbine section, the intermediate pressure turbine, and the low pressure turbine;
An overspeed prevention valve for blocking the flow of the main steam in the high-pressure section communication pipe;
A high-pressure section steam valve provided between the superheater of the boiler and the first high-pressure turbine section, and capable of interrupting the flow of the main steam supplied from the superheater to the first high-pressure turbine section;
A steam turbine , comprising: a control device connected to the overspeed prevention valve and configured to open and close the overspeed prevention valve in synchronization with the high pressure steam valve based on a desired settling speed adjustment rate. Power plant.
主蒸気を発生させる過熱器および再熱蒸気を発生させる再熱器を備えたボイラと、A boiler with a superheater that generates main steam and a reheater that generates reheat steam;
前記主蒸気が供給される第1高圧タービン部と、前記第1高圧タービン部に高圧部連絡管を介して連結され、当該第1高圧タービン部から排気された前記主蒸気が供給される第2高圧タービン部とを有する高圧タービンと、A first high-pressure turbine section to which the main steam is supplied, and a second high-pressure turbine section connected to the first high-pressure turbine section via a high-pressure section connecting pipe and supplied with the main steam exhausted from the first high-pressure turbine section. A high pressure turbine having a high pressure turbine section;
前記再熱蒸気が供給される中圧タービンと、An intermediate pressure turbine to which the reheat steam is supplied;
前記中圧タービンから排気された前記再熱蒸気が供給される低圧タービンと、A low pressure turbine to which the reheat steam exhausted from the intermediate pressure turbine is supplied;
前記第1高圧タービン部、前記第2高圧タービン部、前記中圧タービン、および前記低圧タービンに連結された発電機と、A generator coupled to the first high pressure turbine section, the second high pressure turbine section, the intermediate pressure turbine, and the low pressure turbine;
前記高圧部連絡管内における前記主蒸気の通流を遮断する過速度防止弁と、An overspeed prevention valve for blocking the flow of the main steam in the high-pressure section communication pipe;
前記ボイラの前記過熱器と前記第1高圧タービン部との間に設けられ、当該過熱器から当該第1高圧タービン部に供給される前記主蒸気の通流を遮断可能な高圧部蒸気弁と、A high-pressure section steam valve provided between the superheater of the boiler and the first high-pressure turbine section, and capable of interrupting the flow of the main steam supplied from the superheater to the first high-pressure turbine section;
前記過速度防止弁に接続され、前記発電機の負荷遮断が行われた後に、当該過速度防止弁を前記高圧部蒸気弁に先行して開閉動作させる制御装置と、を備えたことを特徴とする蒸気タービン発電プラント。A control device that is connected to the overspeed prevention valve and that opens and closes the overspeed prevention valve before the high-pressure section steam valve after the load of the generator is shut off. Steam turbine power plant.
前記第2高圧タービンが第2高圧ロータを有し、
前記中圧タービンが中圧ロータを有し、
前記第2高圧ロータと前記中圧ロータとが一体化されて第2高圧・中圧一体ロータを構成していることを特徴とする請求項7または8に記載の蒸気タービン発電プラント。
The second high pressure turbine has a second high pressure rotor;
The intermediate pressure turbine has an intermediate pressure rotor;
The steam turbine power plant according to claim 7 or 8 , wherein the second high-pressure rotor and the medium-pressure rotor are integrated to form a second high-pressure / medium-pressure integrated rotor.
JP2009002675A 2009-01-08 2009-01-08 Steam turbine power plant Active JP5289068B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009002675A JP5289068B2 (en) 2009-01-08 2009-01-08 Steam turbine power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009002675A JP5289068B2 (en) 2009-01-08 2009-01-08 Steam turbine power plant

Publications (2)

Publication Number Publication Date
JP2010159702A JP2010159702A (en) 2010-07-22
JP5289068B2 true JP5289068B2 (en) 2013-09-11

Family

ID=42577049

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009002675A Active JP5289068B2 (en) 2009-01-08 2009-01-08 Steam turbine power plant

Country Status (1)

Country Link
JP (1) JP5289068B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042879B (en) * 2018-10-12 2024-04-12 上海明华电力科技有限公司 High-load high-efficiency turbine unit with high and medium pressure cylinders cut off by separate cylinders

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4368520A (en) * 1980-09-29 1983-01-11 Westinghouse Electric Corp. Steam turbine generator control system
JPS5862304A (en) * 1981-10-08 1983-04-13 Toshiba Corp Turbine overspeed preventing device
JPS5982505A (en) * 1982-11-02 1984-05-12 Hitachi Ltd Preventing method of overspeed in steam turbine
JPS6189911A (en) * 1984-10-09 1986-05-08 Hitachi Ltd Preventive measure against excessive speed of steam turbine
JPH081124B2 (en) * 1987-02-27 1996-01-10 株式会社日立製作所 Turbine advance emergency control method
JPH01111107U (en) * 1988-01-18 1989-07-26
JPH07116922B2 (en) * 1988-02-25 1995-12-18 株式会社日立製作所 Turbine controller
JP3582848B2 (en) * 1994-03-14 2004-10-27 株式会社東芝 Steam turbine power plant
JP3609450B2 (en) * 1994-05-02 2005-01-12 株式会社東芝 Intermediate steam valve control device
JP4004680B2 (en) * 1999-03-31 2007-11-07 株式会社東芝 Steam turbine equipment
JP4074208B2 (en) * 2003-03-17 2008-04-09 株式会社東芝 Steam turbine power plant

Also Published As

Publication number Publication date
JP2010159702A (en) 2010-07-22

Similar Documents

Publication Publication Date Title
JP5221443B2 (en) Method for starting single-shaft combined cycle power plant and single-shaft combined cycle power plant
US7765807B2 (en) Method for warming-up a steam turbine
US8276382B2 (en) Systems and methods for pre-warming a heat recovery steam generator and associated steam lines
JP5734792B2 (en) Steam turbine plant and operation method thereof
JP6264128B2 (en) Combined cycle plant, control method thereof, and control device thereof
US20100229523A1 (en) Continuous combined cycle operation power plant and method
JP5860597B2 (en) System and method for preheating exhaust heat recovery boiler piping
JP6550659B2 (en) Water supply method, water supply system for carrying out this method, steam generating equipment provided with water supply system
JP2010163892A (en) Steam turbine facility, and method of operating feed water pump drive turbine
JP4503995B2 (en) Reheat steam turbine plant and operation method thereof
JP5591377B2 (en) Steam rankin plant
JP5289068B2 (en) Steam turbine power plant
EP3071803A2 (en) Selective pressure kettle boiler for rotor air cooling applications
KR101520238B1 (en) Gas turbine cooling system, and gas turbine cooling method
JP2004245184A (en) Reheat steam turbine plant and starting method for the plant
JP5959454B2 (en) Steam turbine system
JP2020193612A (en) Steam regulating valve system, power generation plant, and method for operating steam regulating valve
JP5812873B2 (en) Combined cycle power plant
JP2010249050A (en) Steam turbine and steam turbine installation
JP5475315B2 (en) Combined cycle power generation system
JP2020084948A (en) Steam turbine equipment and combined cycle plant comprising the same, and modification method of steam turbine equipment
JP2021001551A (en) Power generation plant
JP2006242522A (en) Steam supply device and method
JP2010236367A (en) Steam turbine generator set
JP6625848B2 (en) Steam control valve control device, power plant and steam control valve control method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110215

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120217

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120322

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120911

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121026

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130514

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130604

R151 Written notification of patent or utility model registration

Ref document number: 5289068

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151