JP5224245B2 - Pile main bar lifting device and bar arrangement method - Google Patents

Pile main bar lifting device and bar arrangement method Download PDF

Info

Publication number
JP5224245B2
JP5224245B2 JP2008322898A JP2008322898A JP5224245B2 JP 5224245 B2 JP5224245 B2 JP 5224245B2 JP 2008322898 A JP2008322898 A JP 2008322898A JP 2008322898 A JP2008322898 A JP 2008322898A JP 5224245 B2 JP5224245 B2 JP 5224245B2
Authority
JP
Japan
Prior art keywords
pile
pile main
bar
pair
bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008322898A
Other languages
Japanese (ja)
Other versions
JP2010144430A (en
Inventor
崇宜 岡野
佳史 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Neturen Co Ltd
Original Assignee
Neturen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Neturen Co Ltd filed Critical Neturen Co Ltd
Priority to JP2008322898A priority Critical patent/JP5224245B2/en
Publication of JP2010144430A publication Critical patent/JP2010144430A/en
Application granted granted Critical
Publication of JP5224245B2 publication Critical patent/JP5224245B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、仮組みされた杭主筋に対し補強筋を配筋し易くするための杭主筋リフト装置及び杭主筋への配筋方法に関する。   The present invention relates to a pile main bar lift device and a bar arrangement method for a pile main bar for facilitating the placement of reinforcing bars to a temporarily assembled pile main bar.

従来、鉄筋コンクリート杭体で用いられる鉄筋篭を組立製造する場合、複数の鉄筋を円周方向に並べて杭主筋として仮組みし、杭主筋の外周にスパイラル筋を連続して巻き付け、杭主筋をスパイラル筋で外側から拘束し、杭主筋とスパイラル筋との交点を結線したり溶接したりしている(例えば、特許文献1)。   Conventionally, when rebar rods used in reinforced concrete piles are assembled and manufactured, multiple reinforcing bars are arranged in the circumferential direction and temporarily assembled as pile main bars, spiral bars are continuously wound around the outer periphery of the pile main bars, and the main bars of the pile are spiral bars In this case, the intersection of the pile main bar and the spiral bar is connected or welded (for example, Patent Document 1).

鉄筋篭が大型である場合、鉄筋を現場の地上で先行地組みして杭主筋を製造し、その後地組みした杭主筋を吊り上げ、直立した状態で所定位置に設置し、杭主筋にスパイラル筋を巻き付けている(例えば、特許文献2)。   If the rebar rod is large, the pile main bar is manufactured by assembling the reinforcing bar on the ground in the field, and then the pile main bar is lifted and installed at a predetermined position in the upright position. It is wound (for example, Patent Document 2).

地上に枕木などを互いにずらして配置しておき、これらの枕木上を円筒状に仮組みした杭主筋を転動させ、一方の枕木等から外すことにより、杭主筋の下側に形成された空隙を通して、杭主筋にスパイラル筋を外嵌する、所謂ころがし法も知られている。   A gap formed on the lower side of the pile main bar by laying out the sleepers on the ground and moving the pile main bar temporarily assembled in a cylindrical shape on the sleeper and removing it from one of the sleepers. A so-called rolling method in which a spiral bar is externally fitted to the main pile bar is also known.

特許文献3に開示されている鉄筋篭の編成方法では、組立用架台の鉄筋受金具上に杭主筋の一部を載せ、縮めた状態のスパライル鉄筋を杭主筋に嵌め、そのスパイラル鉄筋を杭主筋に沿って引き伸ばし、次いで他の杭主筋をスパイラル鉄筋内に懸垂状に挿通し、かつ各杭主筋とスパイラル鉄筋を係止している。   In the knitting method of the reinforcing bar rod disclosed in Patent Document 3, a part of the pile main reinforcing bar is placed on the reinforcing bar receiving bracket of the assembly base, the contracted spail rebar is fitted to the pile main reinforcing bar, and the spiral reinforcing bar is connected to the main reinforcing bar. Then, the other pile main bars are inserted into the spiral reinforcing bars in a suspended manner, and the pile main bars and the spiral reinforcing bars are locked.

ここで、鉄筋籠とは、杭基礎即ちビルなどの建物を支える基礎のアンカーの役目を果たすコンクリート杭の骨となるものであり、杭主筋にスパイラル筋やフープ筋などの補強筋が外巻きされて構成される。杭主筋は、主筋が軸方向に平行に並んで設けられ、かつその端部同士が円周状を成すよう仮止めされたものである。建築現場の所定箇所に鉄筋籠を鉛直方向に立てて設置し、型枠を取り付けた後、コンクリートを打設してコンクリート杭が完成する。   Reinforcing rods are the foundations of concrete piles that serve as anchors for foundations that support buildings such as pile foundations. Building reinforcements such as spiral bars and hoop bars are wound around the pile main bars. Configured. The pile main bars are provided with the main bars arranged in parallel in the axial direction, and the ends thereof are temporarily fixed so as to form a circumferential shape. Reinforcing rods are installed in a vertical position at a predetermined location on the building site, and after a formwork is attached, concrete is placed to complete a concrete pile.

特開2001−150078号公報Japanese Patent Laid-Open No. 2001-150078 特公平06−100028号公報Japanese Patent Publication No. 06-100028 特開昭52−065170号公報JP 52-065170 A

しかしながら、特許文献1に開示されているような、杭主筋へスパイラル筋を連続的に巻き付ける手法では、大型の鉄筋籠を製造することは、作業効率が悪くまた難しい。   However, in the technique of continuously winding spiral bars around pile main bars as disclosed in Patent Document 1, it is difficult and difficult to produce large-sized reinforcing bar rods.

杭主筋を地上で先行地組みしてスパイラル筋を巻き付ける場合、複数本の間隔をあけて複数の枕木を配置し、枕木上に仮組みの杭主筋を横置し、杭主筋をクレーンなどの重機で吊り下げ、仮組みの杭主筋と枕木との間に隙間を開け、枕木を越えてスパイラル筋を跨ぐ必要がある。よって杭主筋をたびたびクレーンなどの重機で吊り上げることが必要となるばかりか、鉄筋籠が大型になると、クレーンも大きくなり、作業スペースの確保、作業の安全性にも配慮しなければならない。特に専用重機を用いる場合、専用重機の稼働率が悪く、鉄筋籠の製造コストの増加を招く。一方、専用でない他の作業にも用いる重機で杭主筋の吊り上げ作業を行う場合、重機の取り合いとなり、重機の待ち時間が発生し、作業効率が低下してしまう。   When wrapping spiral main bars on the ground and winding spiral bars on the ground, multiple sleepers are arranged at intervals of several, temporary pile main bars are placed on the sleepers, and pile main bars are heavy machinery such as cranes. It is necessary to hang it up and make a gap between the temporary pile main bar and the sleeper, and cross the sleeper and straddle the spiral bar. Therefore, it is necessary to frequently lift the pile main bar with heavy machinery such as a crane. In addition, the larger the rebar rod, the larger the crane, and the work space and work safety must be taken into consideration. In particular, when a dedicated heavy machine is used, the operation rate of the dedicated heavy machine is poor, and the manufacturing cost of the reinforcing bar is increased. On the other hand, when the lifting work of the pile main bars is performed using heavy equipment that is also used for other work that is not dedicated, heavy equipment is engaged, waiting time for the heavy equipment is generated, and work efficiency is reduced.

また、大型の鉄筋籠を製造する場合、鉄筋籠は例えば1〜10トンの重さを有し、寸法も例えば直径約0.5〜3mで長さ3m〜10mとなるため、ころがし法を用いて複数人の作業者により杭主筋を転がすこともできない。   Moreover, when manufacturing a large rebar rod, the rebar rod has a weight of, for example, 1 to 10 tons, and the dimensions are, for example, about 0.5 to 3 m in diameter and 3 to 10 m in length. The pile main bars cannot be rolled by multiple workers.

特許文献3による鉄筋篭の編成方法では、一本の杭主筋を空中に保持し、この杭主筋に対して束ねたスパイラル筋を等間隔に配筋した後、他の杭主筋を配筋することにより、鉄筋篭を製造しているが、大型の鉄筋篭を同様の工程で製造することは難しい。   In the knitting method of the reinforcing bar rod according to Patent Document 3, one pile main bar is held in the air, and after arranging the spiral bars bundled to this pile main bar at equal intervals, the other pile main bars are arranged. However, it is difficult to manufacture a large-sized rebar rod in the same process.

本発明は、以上の点に鑑み、簡単な構成、手法により、横置きの杭主筋に対し配筋作業を行える杭主筋リフト装置及び杭主筋への配筋方法を提供することを目的とする。   In view of the above points, an object of the present invention is to provide a pile main bar lifting device and a bar arrangement method for a pile main bar that can perform a bar arrangement work on a horizontal pile main bar by a simple configuration and method.

上記目的を達成するために、本発明の第1の構成は、仮組みされた杭主筋の長手方向に配置される杭主筋リフト装置であって、杭主筋の長手方向に所定間隔を開けて配置され杭主筋を支持する一対の杭受台と、その一対の杭受台をそれぞれ上下動する駆動手段と、を備えることを特徴とする。
特に、一対の杭受台は、それぞれ、杭主筋を鉛直下方から支持する受け本体部と、その受け本体部から杭主筋の軸方向と交わる方向に向けてそれぞれ張り出し、斜め上方に傾斜した一対の受け補助部と、を有していれば好ましい。この場合、一対の受け補助部のうち少なくとも一方が揺動可能に受け本体部に取り付けられているとよい。
駆動手段は、一対の杭受台をそれぞれ上下動する油圧シリンダと、各一対の杭受台の上下動をガイドするガイド部と、を有すると好ましい。
In order to achieve the above object, a first configuration of the present invention is a pile main bar lifting device arranged in the longitudinal direction of a temporarily assembled pile main bar, and is arranged at a predetermined interval in the longitudinal direction of the pile main bar. And a pair of pile pedestals that support the pile main reinforcement, and driving means for moving the pair of pile pedestals up and down.
In particular, each of the pair of pile cradles includes a receiving body part that supports the pile main bar from the vertically lower side, and a pair of slanted upwards extending from the receiving body part in a direction crossing the axial direction of the pile main bar. It is preferable to have a receiving auxiliary part. In this case, it is preferable that at least one of the pair of receiving auxiliary portions is swingably attached to the receiving main body portion.
Preferably, the driving means includes a hydraulic cylinder that moves up and down each of the pair of pile supports and a guide portion that guides up and down movement of each pair of pile supports.

上記目的を達成するために、本発明の第2の構成は、仮組みされた杭主筋に補強筋を配設する方法であって、一対の杭受台のそれぞれが上下動する杭主筋リフト装置を配置し、一対の杭受台に杭主筋を横置きするステップAと、外巻きすべき補強筋を杭主筋の一端部に引っ掛けるステップBと、一対の杭受台のうち挿出側の杭受台を上昇して挿入側の杭受台と杭主筋との間に第1の隙間を形成するステップCと、第1の隙間を経由して補強筋を一対の杭受台の間に移動し、挿出側の杭受台を下降して第1の隙間をなくすステップDと、一対の杭受台のうち挿入側の杭受台を上昇して挿出側の杭受台と杭主筋との間に第2の隙間を形成するステップEと、第2の隙間を経由して補強筋を上記一対の杭受台の間から引き出し、挿入側の杭受台を下降して第2の隙間をなくすステップFと、を含むことを特徴としている。
特に、ステップC〜ステップFを、一列に複数台並べた杭主筋リフト装置の順に繰り返すとよい。
In order to achieve the above object, a second configuration of the present invention is a method of disposing reinforcing bars on a temporarily assembled pile main reinforcement, and a pile main reinforcement lifting device in which each of a pair of pile supports moves up and down. Step A for placing the pile main bars horizontally on the pair of pile supports, Step B for hooking the reinforcing bars to be externally wound on one end of the pile main bars, and the pile receiver on the insertion side of the pair of pile supports The step C is raised to form a first gap between the pile cradle on the insertion side and the main pile bar, and the reinforcing bar is moved between the pair of pile cradles via the first gap. Step D which lowers the pile holder on the insertion side and eliminates the first gap, and raises the pile holder on the insertion side of the pair of pile holders, Step E to form a second gap between the two, and pull out the reinforcing bar from between the pair of pile holders via the second gap, and lower the pile holder on the insertion side And step F for eliminating the second gap.
In particular, step C to step F may be repeated in the order of pile main bar lifting devices arranged in a row.

上記目的を達成するために、本発明の第3の構成は、仮組みされた杭主筋に補強筋を配設する方法であって、一対の杭受台のそれぞれが上下動する杭主筋リフト装置を配置し、該一対の杭受台に上記杭主筋を横置きするステップAと、外巻きすべき補強筋を杭主筋の一端部に引っ掛けるステップBと、一対の杭受台のうち挿入側の杭受台を下降して挿入側の杭受台と上記杭主筋との間に第1の隙間を形成するステップCと、第1の隙間を経由して補強筋を上記一対の杭受台の間に移動し、挿入側の杭受台を上昇して第1の隙間をなくすステップDと、一対の杭受台のうち挿出側の杭受台を下降して挿出側の杭受台と杭主筋との間に第2の隙間を形成するステップEと、第2の隙間を経由して補強筋を一対の杭受台の間から引き出し、挿出側の杭受台を上昇して第2の隙間をなくすステップFと、を含むことを特徴とする。
特に、ステップC〜ステップFを、一列に複数台並べた杭主筋リフト装置の順に繰り返すとよい。
In order to achieve the above object, a third configuration of the present invention is a method of disposing reinforcing bars on a temporarily assembled pile main reinforcement, and a pile main reinforcement lifting device in which each of a pair of pile supports moves up and down. Step A for horizontally placing the pile main bars on the pair of pile supports, Step B for hooking a reinforcing bar to be wound around one end of the pile main bars, and a pile on the insertion side of the pair of pile supports Step C for lowering the cradle and forming a first gap between the pile cradle on the insertion side and the main pile bar, and the reinforcing bar between the pair of pile cradles via the first gap Step D, where the insertion side pile cradle is lifted to eliminate the first gap, and the insertion side pile cradle is lowered among the pair of pile cradles. Step E for forming the second gap between the pile main bars and the reinforcement bar is pulled out from between the pair of pile supports via the second gap, A step F to eliminate the second gap by raising the pedestal, characterized in that it comprises a.
In particular, step C to step F may be repeated in the order of pile main bar lifting devices arranged in a row.

上記第2及び第3の観点において、特に、補強筋はスパイラル状に巻かれたスパイラル筋であるか、又は、円周状のフープ筋である。   In the second and third aspects, in particular, the reinforcing bar is a spiral line wound in a spiral shape or a circumferential hoop line.

本発明によれば、一対の杭受台上に杭主筋を横置きした状態で、一対の杭受台を交互に上昇又は下降することにより、一対の杭受台の何れか一方と杭主筋との間に隙間を設けることができ、杭主筋に外巻きすべき補強筋を一対の杭受台の挿入側から挿出側に移動することができる。従って、仮に大型の鉄筋篭を製造する場合でも、専用重機を使用して杭主筋を動かすことなく、容易に且つ迅速に補強筋を仮組みの杭主筋に外巻きすることができる。この手法は、現場打ち杭の鉄筋籠を製造する場合や工場などで製造する場合の何れにも適用することができる。   According to the present invention, in a state where the pile main bars are horizontally placed on the pair of pile supports, by raising or lowering the pair of pile supports alternately, either one of the pair of pile supports, the pile main bars, A gap can be provided between the reinforcing bars to be wound around the main pile bars, and the reinforcing bars can be moved from the insertion side to the insertion side of the pair of pile receiving bases. Therefore, even when a large reinforcing bar is manufactured, the reinforcing bars can be easily wound around the temporarily built pile main bars without using a dedicated heavy machine to move the pile main bars. This method can be applied to either the case where the steel bar made of on-site piles is manufactured or the case where it is manufactured in a factory.

以下、図面を参照しながら本発明の実施形態について詳細に説明するが、本発明は特許請求の範囲に記載した発明の範囲で適宜変更して実施し得るこというまでもない。   DESCRIPTION OF EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. However, it goes without saying that the present invention can be implemented with appropriate modifications within the scope of the invention described in the claims.

〔杭主筋リフト装置〕
図1は、本発明の実施形態に係る杭主筋リフト装置の平面図であり、図2は図1に示す杭主筋リフト装置の左側面図、図3は図1に示す杭主筋リフト装置の正面図である。杭主筋リフト装置10は、杭主筋の長手方向に隣接して配置される一対の杭受台11,11と、一対の杭受台11,11をそれぞれ上下動する駆動手段12,12と、を有する。
[Pile main bar lift device]
1 is a plan view of a pile main bar lifting device according to an embodiment of the present invention, FIG. 2 is a left side view of the pile main bar lifting device shown in FIG. 1, and FIG. 3 is a front view of the pile main bar lifting device shown in FIG. FIG. The pile main bar lift device 10 includes a pair of pile receivers 11 and 11 arranged adjacent to each other in the longitudinal direction of the pile main bar, and driving means 12 and 12 that move the pair of pile receivers 11 and 11 up and down, respectively. Have.

最初に、杭主筋リフト装置10の一対の杭受台11,11について説明する。
一対の杭受台11,11は、ベース部13上に設置される。ベース部13では、台座となるフレーム13aが間隔を開けて配置され、フレーム13a上に鋼板などの板材13bが配置されている。一対の杭受台11のそれぞれは、同じベース部13上に所定の間隔を開けて互いに隣接して配置される。ここで、所定の間隔とは、一回の作業で外巻きすべき補強筋の軸方向の長さより大きい間隔であって、例えば1000mmである。
First, the pair of pile receiving bases 11 and 11 of the pile main bar lifting device 10 will be described.
The pair of pile holders 11 and 11 are installed on the base portion 13. In the base portion 13, frames 13 a serving as pedestals are arranged at intervals, and a plate material 13 b such as a steel plate is arranged on the frame 13 a. Each of the pair of pile receiving bases 11 is arranged adjacent to each other with a predetermined interval on the same base portion 13. Here, the predetermined interval is an interval larger than the length in the axial direction of the reinforcing bars to be externally wound in one operation, and is, for example, 1000 mm.

各杭受台11は、図3に示すように、杭主筋を鉛直下方から支持する受け本体部11aと、受け本体部11aから杭主筋の軸方向と交わる方向、例えば直交する方向に向けてそれぞれ張り出し、斜め上方に傾斜した一対の受け補助部11b,11cと、を有する。一対の受け補助部11b,11cは、外側に向うに従い上方に傾斜しているため、杭受台11上に杭主筋が載置されている場合、一対の受け補助部11b,11cが杭主筋を両側から支え、杭主筋が転動しない。なお、図示した例では、一対の杭受台11,11のそれぞれは一対の受け補助部11b,11cを有しているが、例えば、一対の杭受台11のうち、一方の杭受台11には一方の受け補助部11bを備え、他方の杭受台11には他方の受け補助部11cを有する場合であってもよい。   As shown in FIG. 3, each pile cradle 11 has a receiving main body portion 11 a that supports the pile main bars from vertically below, and a direction intersecting with the axial direction of the pile main bars from the receiving main body section 11 a, for example, in a direction orthogonal to each other. It has a pair of receiving auxiliary portions 11b and 11c that protrude and are inclined obliquely upward. Since the pair of receiving auxiliary portions 11b and 11c are inclined upward toward the outside, when the pile main reinforcement is placed on the pile receiving base 11, the pair of receiving auxiliary portions 11b and 11c Support from both sides, pile main bar does not roll. In the illustrated example, each of the pair of pile receivers 11 and 11 has a pair of receiving auxiliary portions 11b and 11c. For example, one of the pair of pile receivers 11 is one of the pile receivers 11. May be provided with one receiving auxiliary portion 11b, and the other pile receiving base 11 may have the other receiving auxiliary portion 11c.

駆動手段12について説明する。駆動手段12は、一対の杭受台11、11をそれぞれ独立に上下動する油圧シリンダ14と、各一対の杭受台11,11の上下動をガイドするガイド部15と、油圧シリンダ14の上下動をガイド部15の上下動と連動する連結部16と、を有する。   The drive unit 12 will be described. The drive means 12 includes a hydraulic cylinder 14 that moves the pair of pile supports 11, 11 up and down independently, a guide portion 15 that guides the vertical movement of each pair of pile supports 11, 11, and the vertical movement of the hydraulic cylinder 14. And a connecting part 16 that interlocks with the vertical movement of the guide part 15.

油圧シリンダ14は、例えば、ベース部13に固定して配置された固定部14aと、固定部14aに対して油圧により上下方向に移動する可動部14bと、を有する。油圧ユニット17がベース部13上に配置されている。油圧シリンダ14は、油圧ユニット17により駆動制御され、可動部14bを上下駆動する。   The hydraulic cylinder 14 includes, for example, a fixed portion 14a that is fixedly disposed on the base portion 13 and a movable portion 14b that moves in the vertical direction by hydraulic pressure with respect to the fixed portion 14a. A hydraulic unit 17 is disposed on the base portion 13. The hydraulic cylinder 14 is driven and controlled by the hydraulic unit 17 and drives the movable portion 14b up and down.

ガイド部15は、杭受台11、特に受け本体部11aに接続されている油圧シリンダ14の回りに隣接して配置される。図2及び図3に示す例では、各ガイド部15,15は、一対の杭受台11,11のそれぞれに対応して配置される油圧シリンダ14,14間に、それぞれ配置されている。ガイド部15は、ベース部13に固定して配置され、ガイド穴を有する固定部15aと、ガイド穴に挿入して上下動するロッド状の可動部15bと、を有する。ガイド部15における可動部15bの上端部と、油圧シリンダ14における可動部14bの上端部とには、板状の連結部16が接続されている。この連結部16上に前述の受け本体部11aが取り付けられている。   The guide portion 15 is disposed adjacent to the periphery of the hydraulic cylinder 14 connected to the pile receiving base 11, in particular, the receiving body portion 11 a. In the example shown in FIG.2 and FIG.3, each guide part 15 and 15 is each arrange | positioned between the hydraulic cylinders 14 and 14 arrange | positioned corresponding to each of a pair of pile holders 11 and 11, respectively. The guide portion 15 is fixed to the base portion 13 and includes a fixed portion 15a having a guide hole and a rod-like movable portion 15b that is inserted into the guide hole and moves up and down. A plate-like connecting portion 16 is connected to the upper end portion of the movable portion 15 b in the guide portion 15 and the upper end portion of the movable portion 14 b in the hydraulic cylinder 14. The receiving body 11a is attached on the connecting portion 16.

油圧ユニット17が油圧制御により油圧シリンダ14の可動部14bを上下動する。その際、連結部16も上下動し、それに伴い、ガイド部15の可動部15bも上下動する。よって、ガイド部15は、上下動の際、杭受台11を上下方向に案内し、補助的に支持する。   The hydraulic unit 17 moves the movable part 14b of the hydraulic cylinder 14 up and down by hydraulic control. At that time, the connecting portion 16 also moves up and down, and accordingly, the movable portion 15b of the guide portion 15 also moves up and down. Therefore, the guide part 15 guides the pile stand 11 in the up-down direction and moves in the up-down direction, and supports it in an auxiliary manner.

杭主筋リフト装置10には、図示するように、ベース部13に油圧ユニット制御用の操作部18が取り付けられている。操作部18は図示した例では、油圧シリンダ14毎に、即ち杭受台11毎に操作レバー18a,18bを備える。よって、各操作レバー18a,18bを操作すると、油圧ユニット17が油圧シリンダ14,14をそれぞれ駆動制御し、それぞれ対応する杭受台11,11を駆動手段12でもって上下動する。例えば、図3に実線で示す位置から点線で示す位置まで移動する。   In the pile main bar lifting device 10, an operating unit 18 for controlling a hydraulic unit is attached to a base unit 13 as illustrated. In the illustrated example, the operation unit 18 includes operation levers 18 a and 18 b for each hydraulic cylinder 14, that is, for each pile holder 11. Therefore, when the operation levers 18a and 18b are operated, the hydraulic unit 17 controls the hydraulic cylinders 14 and 14 to move the corresponding pile receivers 11 and 11 up and down by the driving means 12, respectively. For example, it moves from the position indicated by the solid line in FIG. 3 to the position indicated by the dotted line.

なお、操作レバー18a,18bを多段階に設定できるようにしておくことで、油圧シリンダ14,14の上下位置を複数設定でき、これにより、杭受台11,11の位置を多段階に設定することもできる。また、操作レバー18a,18bを一つのレバーとして、このレバーをニュートラル位置から一方側に操作すると、一対の杭受台11,11の一方を上昇又は下降し、レバーをニュートラル位置に戻すと、一対の杭受台11,11のうち一方を元の位置に戻すと共に、このレバーをニュートラル位置から他方側に操作すると、一対の杭受台11,11の他方を上昇又は下降し、レバーをニュートラル位置に戻すと、一対の杭受台11,11のうち他方を元の位置に戻すこともできる。   The operation levers 18a and 18b can be set in multiple stages, whereby a plurality of vertical positions of the hydraulic cylinders 14 and 14 can be set, thereby setting the positions of the pile supports 11 and 11 in multiple stages. You can also. Further, when the operation levers 18a and 18b are used as one lever and the lever is operated from the neutral position to one side, when one of the pair of pile receivers 11 and 11 is raised or lowered and the lever is returned to the neutral position, When one of the pile supports 11 and 11 is returned to the original position and the lever is operated from the neutral position to the other side, the other of the pair of pile supports 11 and 11 is raised or lowered, and the lever is moved to the neutral position. If it returns to, the other of a pair of pile receptacles 11 and 11 can also be returned to an original position.

図4は、本発明の実施形態に係る杭主筋リフト装置20の変形例を示す図である。
図4に示す変形例は、一対の受け補助部11b,11cのうち少なくとも一方、好ましくは双方が揺動軸部11dで揺動可能に受け本体部11aに取り付けられている点と、各受け補助部11b,11cの下側にそれぞれ傾斜調整手段22が設けられている点と、で異なっている。即ち、一対の受け補助部11b,11cが、受け本体部11aのうち杭主筋の軸方向に垂直な方向の端部に揺動軸部11dで接続されている。各受け補助部11b,11cの下側には、同じベース部13上に載置された傾斜調整手段22が設けられる。傾斜調整手段22は受け補助部11b,11cの下面に当接して上下動可能なものであればよく、例えば油圧シリンダ24を採用することができる。油圧シリンダ24は、ベース部13に固定して配置される固定部24aと、ロッド状を成す可動部24bとで構成され、可動部24が固定部14aに対し油圧により上下方向に移動する。ここで、受け本体部11aの下面に設けられる駆動手段12とは異なり、可動部24bの先端と受け補助部11b,11cとは固定されていない。よって、傾斜調整手段22により、一対の受け補助部11b,11cは、それぞれ、図の矢印Aで示すように、受け本体部11aに対して揺動する。なお、傾斜調整手段22においても図4には示さないが、図2に示すようなガイド部15を杭主筋の軸方向に垂直で外側に設けてもよい。作業者が傾斜調整手段22を操作するために、図3に示したような操作部18を設けることは説明するまでもないし、傾斜調整手段22は油圧制御のみならず、機械的駆動手段、例えば操作ハンドルを回転することで上下方向に移動する機械的な駆動手段であってもよい。
FIG. 4 is a view showing a modification of the pile main bar lifting device 20 according to the embodiment of the present invention.
In the modification shown in FIG. 4, at least one of the pair of receiving auxiliary portions 11b and 11c, preferably both are attached to the receiving main body portion 11a so as to be swingable by the swinging shaft portion 11d, and each receiving auxiliary portion is supported. The difference is that the inclination adjusting means 22 is provided below the portions 11b and 11c, respectively. That is, the pair of receiving auxiliary portions 11b and 11c are connected to the end of the receiving main body portion 11a in the direction perpendicular to the axial direction of the pile main reinforcing bar by the swing shaft portion 11d. An inclination adjusting means 22 placed on the same base portion 13 is provided below the receiving auxiliary portions 11b and 11c. The inclination adjusting means 22 may be anything that can move up and down by contacting the lower surfaces of the receiving auxiliary portions 11b and 11c. For example, a hydraulic cylinder 24 can be used. The hydraulic cylinder 24 includes a fixed portion 24a that is fixedly disposed on the base portion 13 and a movable portion 24b having a rod shape, and the movable portion 24 moves up and down with respect to the fixed portion 14a by hydraulic pressure. Here, unlike the driving means 12 provided on the lower surface of the receiving main body 11a, the tip of the movable portion 24b and the receiving auxiliary portions 11b and 11c are not fixed. Therefore, the pair of receiving auxiliary portions 11b and 11c are swung relative to the receiving main body portion 11a by the inclination adjusting means 22, as indicated by an arrow A in the figure. Although not shown in FIG. 4 in the inclination adjusting means 22, a guide portion 15 as shown in FIG. 2 may be provided on the outer side perpendicular to the axial direction of the pile main bar. Needless to say, an operator 18 is provided with an operating section 18 as shown in FIG. 3 to operate the tilt adjusting means 22, and the tilt adjusting means 22 is not only hydraulically controlled but also mechanical drive means such as It may be a mechanical drive means that moves up and down by rotating the operation handle.

図4に示す変形例では、水平な受け本体部11aに対し受け補助部11b,11cが斜め上方に延びる傾斜角を段階的に変え、杭主筋1の直径寸法に対応して所定の傾斜角に設定できる。よって、直径寸法が異なる大小の杭主筋1についても同一の杭主筋リフト装置20で対処することができる。また、受け補助部11b,11cが受け本体部11aに揺動可能に取り付けられていることで、受け補助部11b,11cを受け本体部11aに対し水平にしておき(図4において点線で示す状態)、受け補助部11b,11c及び受け本体部11aの上面が同一平面内に存在することになる。よって、仮組みの杭主筋1を転がし易くなり、仮組みの杭主筋1の杭受台11への横置き載置作業を容易に行える。同様に、杭主筋1に補強筋が外巻きされて製造された鉄筋籠も転がしやすく、取り出し作業も容易に行える。もちろん、載置作業、取り出し作業の何れの場合も、受け本体部11aに対し受け補助部11b,11cの先端が下方になるよう受け本体部11aに対して傾斜してもよい。   In the modification shown in FIG. 4, the inclination angle at which the auxiliary receiving portions 11 b and 11 c extend obliquely upward with respect to the horizontal receiving main body portion 11 a is changed stepwise, and the predetermined inclination angle corresponding to the diameter dimension of the pile main reinforcement 1 is obtained. Can be set. Therefore, the same pile main bar lifting device 20 can deal with large and small pile main bars 1 having different diameter dimensions. Further, since the receiving auxiliary portions 11b and 11c are attached to the receiving main body portion 11a so as to be swingable, the receiving auxiliary portions 11b and 11c are kept horizontal with respect to the main body portion 11a (a state indicated by a dotted line in FIG. 4). ), The upper surfaces of the receiving auxiliary portions 11b and 11c and the receiving main body portion 11a exist in the same plane. Therefore, it becomes easy to roll the temporarily assembled pile main reinforcing bar 1, and the horizontal placement work on the pile receiving base 11 of the temporarily assembled pile main reinforcing bar 1 can be easily performed. Similarly, a reinforcing bar made by winding reinforcing bars around the pile main reinforcement 1 is also easy to roll and can be taken out easily. Of course, in any of the placement work and the take-out work, the receiving auxiliary portions 11b and 11c may be inclined with respect to the receiving main body portion 11a so that the tips of the receiving auxiliary portions 11b and 11c are downward.

〔杭主筋への配筋方法その1〕
本発明の実施形態に係る杭主筋への配筋方法を説明する。以下説明する杭主筋への配筋方法では、補強筋としてらせん状で軸方向に圧縮されたスパイラル筋を杭主筋に配設する場合を例に説明するが、補強筋として円周状のフープ筋を複数同時に杭主筋の軸方向に移動し、杭主筋の外周に装着して配設する場合も同様である。
[Method of bar arrangement to pile main bar 1]
The bar arrangement method to the pile main reinforcement which concerns on embodiment of this invention is demonstrated. In the method of bar arrangement to the pile main bar described below, a spiral hoop that is compressed in the axial direction as a reinforcing bar will be described as an example, but a circular hoop bar is used as the reinforcing bar. The same applies to the case where a plurality of slabs are simultaneously moved in the axial direction of the pile main reinforcement and are mounted on the outer periphery of the pile main reinforcement.

図5はスパイラル筋の外装方法の工程を模式的に示す図である。
前提として、杭主筋リフト装置10を一列に、即ち仮組みされている杭主筋1の軸方向に平行に配置した後、各杭主筋リフト装置10の一対の杭受台11に仮組みの杭主筋を横置きしているものとする。なお、杭主筋リフト装置10は、油圧シリンダ14の可動部14bが下降した位置(以下、「下降位置」と呼ぶ。)と、油圧シリンダ14の可動部14bが上昇した位置(以下、「上昇位置」と呼ぶ)との二段階に設定されている場合を想定するが、三段以上に設定できる場合も同様である。図5では杭主筋リフト装置10は二台設置されており、各杭主筋リフト装置10は一対の杭受台11,11を有するので、杭受台11は合計4台配備されていることになる。説明の便宜上、図示の左側から順に杭受台11A,11B,11C,11Dとし、区別することにする。
FIG. 5 is a diagram schematically showing the steps of the spiral line exterior method.
As a premise, after the pile main bar lifting device 10 is arranged in a line, that is, in parallel to the axial direction of the pile main bar 1 that is temporarily assembled, the pile main bar temporarily assembled on the pair of pile receiving bases 11 of each pile main bar lifting device 10 Shall be placed horizontally. The pile main bar lifting device 10 includes a position where the movable portion 14b of the hydraulic cylinder 14 is lowered (hereinafter referred to as a “lowering position”) and a position where the movable portion 14b of the hydraulic cylinder 14 is raised (hereinafter referred to as an “ascending position”). ”), But the same applies to the case where it can be set to three or more stages. In FIG. 5, two pile main bar lifting devices 10 are installed, and each pile main bar lifting device 10 has a pair of pile receiving bases 11, 11, so that a total of four pile receiving bases 11 are arranged. . For convenience of explanation, the pile holders 11A, 11B, 11C, and 11D are sequentially distinguished from the left side in the drawing.

第1ステップとして、仮組みの杭主筋1の一端部(これを上流側ということもある。)にスパイラル筋2を引っ掛けて挿通する。図5(A)に示す例では、左側の杭主筋リフト装置10における挿入側の杭受台11Aの外側で、杭主筋1の一端部にスパイラル筋2が引っ掛けられて外嵌されている。   As a first step, the spiral reinforcement 2 is hooked and inserted into one end of the temporary pile main reinforcement 1 (this may be referred to as the upstream side). In the example shown in FIG. 5 (A), the spiral reinforcement 2 is hooked on one end of the pile reinforcement 1 and externally fitted outside the pile receiving base 11A on the insertion side in the left pile reinforcement reinforcement device 10.

第2ステップとして、左側の杭主筋リフト装置10における挿出側の杭受台11Bを上昇位置まで上昇する。すると、杭主筋1の左側即ち上流側が持ち上げられ、左側の杭主筋リフト装置10における挿入側の杭受台11Aと杭主筋1との間には隙間が形成される。即ち、左側の杭主筋リフト装置10における挿出側の杭受台11Bと右側の杭主筋リフト装置10における外側の杭受台11Dとで杭主筋1が支持され、杭主筋1の左側が上方となるよう傾斜する。   As a second step, the pile support 11B on the insertion side in the left pile main bar lifting device 10 is raised to the raised position. Then, the left side, that is, the upstream side of the pile main reinforcement 1 is lifted, and a gap is formed between the pile receiving base 11 </ b> A on the insertion side and the pile main reinforcement 1 in the left pile main reinforcement lifting device 10. That is, the pile main reinforcement 1 is supported by the pile receiving base 11B on the insertion side in the left pile main reinforcement device 10 and the outer pile support 11D in the right pile main reinforcement device 10, and the left side of the pile main reinforcement 1 is the upper side. Tilt to be.

第3ステップとして、この傾斜した状態において、杭主筋1の一端部に引っ掛けられているスパイラル筋2を、図5(B)に示すように、左側の杭主筋リフト装置10における一対の杭受台11A,11Bの間までスライドして下流側へ移動する。このスパイラル筋2の移動は作業者により行われる。   As a third step, in this inclined state, as shown in FIG. 5 (B), the spiral reinforcement 2 hooked on one end of the pile reinforcement 1 is a pair of pile supports in the left pile reinforcement reinforcement device 10. Slide between 11A and 11B and move downstream. The movement of the spiral muscle 2 is performed by an operator.

第4ステップとして、図5(C)に示すように、左側の杭主筋リフト装置10における挿出側の杭受台11Bを下降位置まで下降する。すると、左側の杭主筋リフト装置10における一対の杭受台11A,11Bと右側の杭主筋リフト装置10における一対の杭受台11C,11Dとが杭主筋1を支持する。   As a fourth step, as shown in FIG. 5C, the insertion-side pile support 11B in the left pile main bar lifting device 10 is lowered to the lowered position. Then, the pair of pile supports 11 </ b> A and 11 </ b> B in the left pile main bar lift device 10 and the pair of pile supports 11 </ b> C and 11 </ b> D in the right pile main bar lift device 10 support the pile main bar 1.

第5ステップとして、左側の杭主筋リフト装置10における挿入側の杭受台11Aを上昇位置まで上昇する。すると、杭主筋1の左側が持ち上げられ、左側の杭主筋リフト装置10における挿出側の杭受台11Bと杭主筋1との間には隙間が形成される。即ち、左側の杭主筋リフト装置10における挿入側の杭受台11Aと右側の杭主筋リフト装置10における外側の杭受台11Dとで杭主筋1が支持され、杭主筋1の左側が上方となるよう傾斜する。   As a fifth step, the pile support 11 </ b> A on the insertion side in the left pile main bar lifting device 10 is raised to the raised position. Then, the left side of the pile main reinforcement 1 is lifted, and a gap is formed between the pile support 11 B on the insertion side and the pile main reinforcement 1 in the left pile main reinforcement lifting device 10. That is, the pile main reinforcement 1 is supported by the pile support 11 </ b> A on the insertion side in the left pile main reinforcement device 10 and the outer pile support 11 </ b> D in the right pile main reinforcement device 10, and the left side of the pile main reinforcement 1 is upward. Inclined like so.

第6ステップとして、この傾斜した状態において、左側の杭主筋リフト装置10における一対の杭受台11A,11B間に配置されているスパイラル筋2を、左側の杭主筋リフト装置10における挿出側の杭受台11Bと杭主筋1との間の隙間を経由し、即ち、杭主筋1の挿出側の杭受台11Bを越え、図5(D)に示すように、左右の杭主筋リフト装置10との間の任意の位置までスライドして下流側へ移動する。このスパイラル筋2の移動は作業者により行われる。   As a sixth step, in this inclined state, the spiral reinforcement 2 arranged between the pair of pile receiving bases 11A and 11B in the left pile main reinforcement lift device 10 is inserted into the insertion side of the left pile main reinforcement lift 10. As shown in FIG. 5 (D), the left and right pile main bar lift devices pass through the gap between the pile support 11B and the main bar bar 1, that is, over the pile base 11B on the insertion side of the main bar bar 1. Slide to any position between 10 and move downstream. The movement of the spiral muscle 2 is performed by an operator.

第7ステップとして、図5(E)に示すように、左側の杭主筋リフト装置10における挿入側の杭受台11Aを下降位置まで下降する。すると、左側の杭主筋リフト装置10における一対の杭受台11A,11Bが杭主筋1を支持する。   As a seventh step, as shown in FIG. 5 (E), the pile receiving base 11A on the insertion side in the left pile main bar lifting device 10 is lowered to the lowered position. Then, a pair of pile receiving bases 11 </ b> A and 11 </ b> B in the left pile main bar lifting device 10 support the pile main bar 1.

この第2ステップから第7ステップまでを経ることにより、一つのスパイラル筋2が一つの杭主筋リフト装置10を越えて内側に移動すると共に、複数の杭主筋リフト装置10が、杭主筋1をほぼ横置きの状態で支持する。   By passing through the second step to the seventh step, one spiral bar 2 moves inwardly beyond one pile main bar lifting device 10, and a plurality of pile main bar lifting devices 10 substantially extend the pile main bar 1. Support in a horizontal state.

図5では図示を省略しているが、左右の杭主筋リフト装置10,10の間に他の杭主筋リフト装置が配備され、この他の杭主筋リフト装置と右側の杭主筋リフト装置10との間まで、スパイラル筋2を移動する場合には、その他の杭主筋リフト装置について、第2ステップ〜第7ステップを行うことで、右側の杭主筋リフト装置10側の近くまで、スパイラル筋2をスライドして移動することができる。   Although not shown in FIG. 5, another pile main bar lifting device is arranged between the left and right pile main bar lifting devices 10, 10, and the other pile main bar lifting device and the right pile main bar lifting device 10 When moving the spiral reinforcement 2 to the middle, slide the spiral reinforcement 2 near the right pile reinforcement reinforcement device 10 side by performing the second to seventh steps for the other pile reinforcement reinforcement devices. And can move.

また、スパイラル筋2の軸方向の長さは、一つの杭主筋リフト装置10における杭受台11,11同士の間隔以下であるので、仮組みの杭主筋1の軸方向長さには到底達しない。そこで、別のスパイラル筋2について第1ステップから順に行う。これにより、仮組みの杭主筋1の長手全体に亙って、スパイラル筋2を外装することができる。即ち、外装すべき他のスパイラル筋2がある場合には、上述した第1ステップから順に繰り返し行い、杭主筋1に所定数のスパイラル筋2をスライドして、外装する。   Further, since the axial length of the spiral reinforcement 2 is equal to or less than the interval between the pile supports 11 in the one pile reinforcement reinforcement device 10, the axial length of the temporarily assembled pile reinforcement 1 is almost reached. do not do. Therefore, another spiral muscle 2 is sequentially performed from the first step. Thereby, the spiral reinforcement 2 can be sheathed over the entire length of the temporary pile main reinforcement 1. That is, when there is another spiral bar 2 to be armed, the process is repeated in order from the first step described above, and a predetermined number of spiral bars 2 are slid on the pile main bar 1 to be armed.

所定数のスパイラル筋2を仮組みの杭主筋1に外装したら、スパイラル筋2を巻き返し杭主筋1とスパイラル筋2の交点を結束したり、溶接したりする。
以上のプロセスを経て鉄筋籠が完成する。
When a predetermined number of spiral bars 2 are externally mounted on the temporarily assembled pile main bars 1, the spiral bars 2 are rewound and the intersections of the pile main bars 1 and the spiral bars 2 are bound or welded.
The steel bar is completed through the above process.

鉄筋籠を搬出する場合には、各杭主筋リフト装置10,10において搬出側の受け補助部(例えば図4に示す場合では受け補助部11b)の傾斜を緩めて受け本体部11aと同一面とするか、又は搬出側の受け補助部11bの先端が下降するよう受け補助部の傾斜角を調整し、鉄筋篭を搬出する。もちろん、杭主筋リフト装置10の受け本体部11aからの鉄筋籠を搬出する際にはクレーンなどを用いて吊り下げても、受け本体部11aから鉄筋籠を受け補助部11bの上を跨ぐ程度僅かに持ち上げればよい。杭主筋リフト装置10を用いることで、杭主筋1にスパイラル筋2を外巻きする作業が効率良く行えるのみならず、仮組みの杭主筋1の搬入、鉄筋籠の搬出の何れの作業効率も向上する。   When unloading the reinforcing bar rod, in each pile main bar lifting device 10, 10, the unloading side receiving auxiliary portion (for example, the receiving auxiliary portion 11b in the case shown in FIG. 4) is slanted to be flush with the receiving main body portion 11a. Or the inclination angle of the receiving auxiliary part is adjusted so that the tip of the receiving auxiliary part 11b on the carry-out side is lowered, and the reinforcing bar rod is carried out. Of course, when carrying out the reinforcing bar rod from the receiving main body portion 11a of the pile main bar lifting device 10, even if it is suspended using a crane or the like, the reinforcing bar rod is received from the receiving main body portion 11a and is slightly over the auxiliary portion 11b. Just lift it up. By using the pile main bar lifting device 10, not only can the work of externally winding the spiral bar 2 around the pile main bar 1 be performed efficiently, but also the work efficiency of carrying in the temporary pile main bar 1 and carrying out the reinforcing bar rod is improved. To do.

〔杭主筋への配筋方法その2〕
図6は図5に示すスパイラル筋の外装方法とは異なる方法に関する工程を模式的に示す図である。なお、前提条件は、各杭主筋リフト装置10における駆動手段12が予め上昇位置まで上げられている点で異なり、その他は同一である。
[Method of bar arrangement to pile main bars 2]
FIG. 6 is a diagram schematically showing steps relating to a method different from the spiral muscle exterior method shown in FIG. The precondition is different in that the driving means 12 in each pile main bar lifting device 10 is raised to the raised position in advance, and the other conditions are the same.

第1ステップとして、仮組みの杭主筋1の一端部にスパイラル筋2を引っ掛けて挿通する。図6(A)に示す例では、左側の杭主筋リフト装置10における挿入側の杭受台11Aの外側で、杭主筋1の一端部にスパイラル筋2が引っ掛けられて外嵌されている。   As a first step, the spiral reinforcement 2 is hooked and inserted through one end of the temporarily assembled pile main reinforcement 1. In the example shown in FIG. 6 (A), the spiral reinforcement 2 is hooked on one end of the pile main reinforcement 1 and externally fitted outside the pile receiving base 11A on the insertion side in the left pile reinforcement reinforcement device 10.

第2ステップとして、左側の杭主筋リフト装置10における挿入側の杭受台11Aを下降位置まで下降する。すると、左側の杭主筋リフト装置10における挿入側の杭受台11Aと杭主筋1との間には隙間が形成される。即ち、左側の杭主筋リフト装置10における挿出側の杭受台11Bと右側の杭主筋リフト装置10における外側の杭受台11Dとで、杭主筋1を支持する。   As a second step, the pile support 11 </ b> A on the insertion side in the left pile main bar lifting device 10 is lowered to the lowered position. Then, a gap is formed between the pile receiving bar 11 </ b> A on the insertion side in the left pile main bar lifting device 10 and the pile main bar 1. That is, the pile main reinforcement 1 is supported by the pile support 11 </ b> B on the insertion side in the left pile main reinforcement device 10 and the outer pile support 11 </ b> D in the right pile main reinforcement device 10.

第3ステップとして、杭主筋1の一端部に引っ掛けられているスパイラル筋2を、図6(B)に示すように、左側の杭主筋リフト装置10における一対の杭受台11A,11Bの間までスライドして下流側へ移動する。このスパイラル筋2の移動は作業者により行われる。   As a third step, as shown in FIG. 6B, the spiral reinforcement 2 hooked on one end of the pile main reinforcement 1 is between the pair of pile supports 11A and 11B in the left pile main reinforcement lift device 10. Slide to move downstream. The movement of the spiral muscle 2 is performed by an operator.

第4ステップとして、図6(C)に示すように、左側の杭主筋リフト装置10における挿入側の杭受台11Bを上昇位置まで上昇する。すると、左側の杭主筋リフト装置10では一対の杭受台11A,11Bの何れも杭主筋1を支持する。   As a fourth step, as shown in FIG. 6C, the pile receiving base 11B on the insertion side in the left pile main bar lifting device 10 is raised to the raised position. Then, in the left pile main bar lifting device 10, both of the pair of pile receiving bases 11 </ b> A and 11 </ b> B support the pile main bar 1.

第5ステップとして、左側の杭主筋リフト装置10における挿出側の杭受台11Bを下降位置まで下降する。すると、左側の杭主筋リフト装置10における挿出側の杭受台11Bと杭主筋1との間には隙間が形成される。即ち、左側の杭主筋リフト装置10における挿入側の杭受台11Aと右側の杭主筋リフト装置10の一対の杭受台11C,11Dとで杭主筋1を支持する。   As a fifth step, the pile receiving base 11B on the insertion side in the left pile main bar lifting device 10 is lowered to the lowered position. Then, a gap is formed between the pile receiving base 11 </ b> B on the insertion side in the left pile main bar lifting device 10 and the pile main bar 1. That is, the pile main reinforcement 1 is supported by the pile support 11 </ b> A on the insertion side in the left pile main reinforcement device 10 and the pair of pile supports 11 </ b> C and 11 </ b> D of the right pile main reinforcement device 10.

第6ステップとして、左側の杭主筋リフト装置10における一対の杭受台11A,11B間に配置されているスパイラル筋2を、左側の杭主筋リフト装置10における挿出側の杭受台11Bと杭主筋1との間の隙間を経由し、即ち、挿出側の杭受台11Bを越え、図6(D)に示すように、左右の杭主筋リフト装置10との間の任意の位置までスライドして下流側へ移動する。このスパイラル筋2の移動は作業者により行われる。   As a sixth step, the spiral reinforcement 2 arranged between the pair of pile support bases 11A and 11B in the left pile main reinforcement device 10 is replaced with the pile support 11B on the insertion side and the pile in the left pile main reinforcement equipment 10. Slides to an arbitrary position between the left and right pile main bar lifting devices 10 through the gap between the main bars 1, that is, beyond the pile receiving base 11B on the insertion side, as shown in FIG. And move downstream. The movement of the spiral muscle 2 is performed by an operator.

第7ステップとして、図6(E)に示すように、左側の杭主筋リフト装置10における挿出側の杭受台11Bを上昇位置まで上昇する。すると、左側の杭主筋リフト装置10では一対の杭受台11A,11Bが杭主筋1を支持する。   As a seventh step, as shown in FIG. 6 (E), the pile-side cradle 11B on the insertion side in the left-side pile main bar lifting device 10 is raised to the raised position. Then, in the left pile main bar lifting device 10, the pair of pile receiving bases 11 </ b> A and 11 </ b> B supports the pile main bar 1.

この第2ステップから第7ステップまでを経ることにより、一つのスパイラル筋2が一つの杭主筋リフト装置10を越えて内側に移動すると共に、複数の杭主筋リフト装置10が、杭主筋1をほぼ横置きの状態で支持する。   By passing through the second step to the seventh step, one spiral bar 2 moves inwardly beyond one pile main bar lifting device 10, and a plurality of pile main bar lifting devices 10 substantially extend the pile main bar 1. Support in a horizontal state.

図6では図示を省略しているが、左右の杭主筋リフト装置10,10の間に他の杭主筋リフト装置が配備され、この他の杭主筋リフト装置と右側の杭主筋リフト装置10との間まで、スパイラル筋2を移動する場合には、その他の杭主筋リフト装置について、第2ステップ〜第7ステップを行うことで、右側の杭主筋リフト装置10側まで、スパイラル筋2をスライドして移動することができる。   Although not shown in FIG. 6, another pile main bar lifting device is provided between the left and right pile main bar lifting devices 10, 10, and the other pile main bar lifting device and the right pile main bar lifting device 10 are connected to each other. When moving the spiral reinforcement 2 between the two, the spiral reinforcement 2 is slid to the right pile reinforcement reinforcement device 10 side by performing the second to seventh steps for the other pile reinforcement reinforcement devices. Can move.

また、スパイラル筋2の軸方向の長さは、一つの杭主筋リフト装置10における杭受台11,11同士の間隔以下であるので、仮組みの杭主筋1の軸方向長さには到底達しない。そこで、別のスパイラル筋2について第1ステップから順に行う。これにより、仮組みの杭主筋1の長手全体に亙って、スパイラル筋2を外装することができる。即ち、外装すべき他のスパイラル筋2がある場合には、上述した第1ステップから順に繰り返し行い、杭主筋1に所定数のスパイラル筋2をスライドして、外巻きする。   Further, since the axial length of the spiral reinforcement 2 is equal to or less than the interval between the pile supports 11 in the one pile reinforcement reinforcement device 10, the axial length of the temporarily assembled pile reinforcement 1 is almost reached. do not do. Therefore, another spiral muscle 2 is sequentially performed from the first step. Thereby, the spiral reinforcement 2 can be sheathed over the entire length of the temporary pile main reinforcement 1. That is, when there is another spiral bar 2 to be armored, the process is repeated in order from the first step described above, and a predetermined number of spiral bars 2 are slid on the pile main bar 1 and wound externally.

所定数のスパイラル筋2を仮組みの杭主筋1に外巻きしたら、図5に示す方法の場合と同様にして、杭主筋1とスパイラル筋2の交点を結束したり、溶接したりして鉄筋籠が完成する。完成した鉄筋籠の搬出は、図5に示す方法と同様に行える。   When a predetermined number of spiral bars 2 are wound around a temporarily assembled pile main bar 1, the intersection of the main bar 1 and the spiral bar 2 is bound or welded in the same manner as in the method shown in FIG. The kite is completed. The completed reinforcing bar rod can be carried out in the same manner as shown in FIG.

本発明はその趣旨を逸脱しない範囲において各種変更して実施することができる。例えば、上述した実施形態においては、杭受台11の上下移動は駆動手段12として油圧シリンダを用いて行っているが、その他の機械的駆動手段、例えば操作ハンドルを回転することで上下動方向に移動する機械的な駆動手段であってもよい。また、前述では、仮組みされた杭主筋の軸方向に間隔を開けて杭主筋リフト装置を配置する場合を説明したが、杭主筋1の両サイドの一方は必ずしも杭主筋リフト装置10である必要はなく、杭主筋1の端部を支持する支持台に代えてもよい。   The present invention can be implemented with various modifications without departing from the spirit of the present invention. For example, in the above-described embodiment, the vertical movement of the pile cradle 11 is performed using a hydraulic cylinder as the driving means 12, but in the vertical movement direction by rotating other mechanical driving means, for example, an operation handle. It may be a mechanical drive means that moves. In the above description, the case where the pile main bar lift device is arranged with an interval in the axial direction of the temporarily assembled pile main bar has been described. However, one of both sides of the pile main bar 1 is necessarily the pile main bar lift device 10. Instead, it may be replaced with a support base that supports the end of the pile main reinforcement 1.

本発明の実施形態に係る杭主筋リフト装置の平面図である。It is a top view of a pile main bar lift device concerning an embodiment of the present invention. 図1に示す杭主筋リフト装置の左側面図である。It is a left view of the pile main reinforcement lifting apparatus shown in FIG. 図1に示す杭主筋リフト装置の正面図である。It is a front view of the pile main bar lifting apparatus shown in FIG. 図1に示す杭主筋リフト装置の変形例を示す左側面図である。It is a left view which shows the modification of the pile main reinforcement apparatus shown in FIG. 本発明の実施形態に係る杭主筋への配筋方法を模式的に示す工程図である。It is process drawing which shows typically the bar arrangement method to the pile main reinforcement which concerns on embodiment of this invention. 図5とは異なる、本発明の実施形態に係る杭主筋への配筋方法を模式的に示す工程図である。It is process drawing which shows typically the bar arrangement method to the pile main reinforcement which concerns on embodiment of this invention different from FIG.

符号の説明Explanation of symbols

1:杭主筋
2:スパイラル筋
10,20:杭主筋リフト装置
11,11A,11B,11C,11D:杭受台
11a:受け本体部
11b,11c:受け補助部
11d:揺動軸部
12:駆動手段
13:ベース部
13a:フレーム
13b:板材
14,24:油圧シリンダ
14a,24a:固定部
14b,24b:可動部
15:ガイド部
15a:固定部
15b:可動部
16:連結部
17:油圧ユニット
18:操作部
18a,18b:操作レバー
22:傾斜調整手段
1: Pile main bars 2: Spiral bars 10, 20: Pile main bar lift devices 11, 11A, 11B, 11C, 11D: Pile cradle 11a: Receiving body 11b, 11c: Receiving auxiliary 11d: Oscillating shaft 12: Drive Means 13: Base part 13a: Frame 13b: Plate member 14, 24: Hydraulic cylinders 14a, 24a: Fixed part 14b, 24b: Movable part 15: Guide part 15a: Fixed part 15b: Movable part 16: Connection part 17: Hydraulic unit 18 : Operation units 18a, 18b: operation lever 22: inclination adjusting means

Claims (10)

仮組みされた杭主筋の長手方向に配置される杭主筋リフト装置であって、
杭主筋の長手方向に所定間隔を開けて配置され杭主筋を支持する一対の杭受台と、
上記一対の杭受台をそれぞれ上下動する駆動手段と、
を備える、杭主筋リフト装置。
A pile main bar lifting device arranged in the longitudinal direction of the temporarily assembled pile main bar,
A pair of pile cradles arranged at predetermined intervals in the longitudinal direction of the pile main bars and supporting the pile main bars;
Driving means for vertically moving the pair of pile holders;
A pile main bar lifting device.
前記一対の杭受台は、それぞれ、杭主筋を鉛直下方から支持する受け本体部と、該受け本体部から杭主筋の軸方向と交わる方向に向けてそれぞれ張り出し、斜め上方に傾斜した一対の受け補助部と、を有する、請求項1に記載の杭主筋リフト装置。   The pair of pile cradles respectively includes a receiving body part that supports the pile main bars from vertically below, and a pair of receiving bodies that project from the receiving body part in a direction crossing the axial direction of the pile main bars and are inclined obliquely upward. The pile main bar lifting device according to claim 1, comprising an auxiliary part. 前記一対の受け補助部のうち少なくとも一方が揺動可能に前記受け本体部に取り付けられている、請求項2に記載の杭主筋リフト装置。   The pile main bar lifting device according to claim 2, wherein at least one of the pair of receiving auxiliary portions is swingably attached to the receiving main body portion. 前記駆動手段は、前記一対の杭受台をそれぞれ上下動する油圧シリンダと、各一対の杭受台の上下動をガイドするガイド部と、を有する、請求項1乃至3の何れかに記載の杭主筋リフト装置。   The said drive means has a hydraulic cylinder which moves up and down each of a pair of said pile support, and a guide part which guides the up-and-down movement of each pair of pile supports. Pile main bar lift device. 仮組みされた杭主筋に補強筋を配設する方法であって、
一対の杭受台のそれぞれが上下動する杭主筋リフト装置を配置し、該一対の杭受台に上記杭主筋を横置きするステップAと、
外巻きすべき補強筋を杭主筋の一端部に引っ掛けるステップBと、
上記一対の杭受台のうち挿出側の杭受台を上昇して該挿入側の杭受台と上記杭主筋との間に第1の隙間を形成するステップCと、
第1の隙間を経由して上記補強筋を上記一対の杭受台の間に移動し、上記挿出側の杭受台を下降して第1の隙間をなくすステップDと、
上記一対の杭受台のうち挿入側の杭受台を上昇して該挿出側の杭受台と上記杭主筋との間に第2の隙間を形成するステップEと、
第2の隙間を経由して上記補強筋を上記一対の杭受台の間から引き出し、上記挿入側の杭受台を下降して第2の隙間をなくすステップFと、
を含む、杭主筋への補強筋取付方法。
It is a method of arranging reinforcing bars on the temporarily assembled pile main bars,
A step A in which a pile main bar lift device in which each of the pair of pile supports moves up and down, and the pile main bars horizontally placed on the pair of pile supports,
Step B for hooking the reinforcing bars to be wound around one end of the pile main bars,
Step C which raises the pile side on the insertion side among the pair of pile stands and forms a first gap between the pile side on the insertion side and the pile main reinforcement,
Moving the reinforcing bar between the pair of pile cradles via the first gap, and lowering the pile cradle on the insertion side to eliminate the first gap;
Step E of raising the pile-side cradle on the insertion side of the pair of pile cradles to form a second gap between the pile-side cradle on the insertion side and the pile main reinforcement,
Step F for pulling out the reinforcing bar from between the pair of pile holders via the second gap, and descending the pile holder on the insertion side to eliminate the second gap;
Reinforcing bar attachment method to pile main bars including
前記ステップC〜前記ステップFを一列に並べた前記杭主筋リフト装置の順に繰り返す、請求項5に記載の杭主筋への配筋方法。   The bar arrangement method to the pile main reinforcement according to claim 5, wherein the steps C to F are repeated in the order of the pile main reinforcement lifting devices arranged in a line. 仮組みされた杭主筋に補強筋を配設する方法であって、
一対の杭受台のそれぞれが上下動する杭主筋リフト装置を配置し、該一対の杭受台に上記杭主筋を横置きするステップAと、
外巻きすべき補強筋を杭主筋の一端部に引っ掛けるステップBと、
上記一対の杭受台のうち挿入側の杭受台を下降して該挿入側の杭受台と上記杭主筋との間に第1の隙間を形成するステップCと、
第1の隙間を経由して上記補強筋を上記一対の杭受台の間に移動し、上記挿入側の杭受台を上昇して第1の隙間をなくすステップDと、
上記一対の杭受台のうち挿出側の杭受台を下降して該挿出側の杭受台と上記杭主筋との間に第2の隙間を形成するステップEと、
第2の隙間を経由して上記補強筋を上記一対の杭受台の間から引き出し、上記挿出側の杭受台を上昇して第2の隙間をなくすステップFと、
を含む、杭主筋への配筋方法。
It is a method of arranging reinforcing bars on the temporarily assembled pile main bars,
A step A in which a pile main bar lift device in which each of the pair of pile supports moves up and down, and the pile main bars horizontally placed on the pair of pile supports,
Step B for hooking the reinforcing bars to be wound around one end of the pile main bars,
Step C of lowering the pile side on the insertion side of the pair of pile stands and forming a first gap between the pile side on the insertion side and the pile main reinforcement,
Moving the reinforcing bar between the pair of pile cradles via the first gap, raising the pile cradle on the insertion side and eliminating the first gap;
Step E of lowering the pile support on the insertion side of the pair of pile supports to form a second gap between the pile support on the insertion side and the pile main reinforcement,
Step F for pulling out the reinforcing bar from between the pair of pile holders via the second gap, and lifting the pile holder on the insertion side to eliminate the second gap;
Reinforcement method for pile main bars including
前記ステップC〜前記ステップFを一列に並べた前記杭主筋リフト装置の順に繰り返す、請求項7に記載の杭主筋への配筋方法。   The bar arrangement method to the pile main reinforcement according to claim 7, wherein the steps C to F are repeated in the order of the pile main reinforcement lifting devices arranged in a line. 前記補強筋はスパイラル状に巻かれたスパイラル筋である、請求項5乃至8の何れかに記載の杭主筋への配筋方法。   9. The bar arrangement method for a pile main bar according to claim 5, wherein the reinforcing bar is a spiral bar wound in a spiral shape. 前記補強筋は円周状のフープ筋である、請求項5乃至8の何れかに記載の杭主筋への配筋方法。   9. The bar arrangement method for a pile main bar according to claim 5, wherein the reinforcing bar is a circumferential hoop bar.
JP2008322898A 2008-12-18 2008-12-18 Pile main bar lifting device and bar arrangement method Expired - Fee Related JP5224245B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008322898A JP5224245B2 (en) 2008-12-18 2008-12-18 Pile main bar lifting device and bar arrangement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008322898A JP5224245B2 (en) 2008-12-18 2008-12-18 Pile main bar lifting device and bar arrangement method

Publications (2)

Publication Number Publication Date
JP2010144430A JP2010144430A (en) 2010-07-01
JP5224245B2 true JP5224245B2 (en) 2013-07-03

Family

ID=42565134

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008322898A Expired - Fee Related JP5224245B2 (en) 2008-12-18 2008-12-18 Pile main bar lifting device and bar arrangement method

Country Status (1)

Country Link
JP (1) JP5224245B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5865119B2 (en) * 2012-02-27 2016-02-17 サプロン建材工業株式会社 Split unit knitting device for reinforcing bar
JP2015038269A (en) * 2012-11-27 2015-02-26 株式会社恵信工業 Reinforcement cage assembling jig pedestal and reinforcement cage horizontal set assembling method
KR102239104B1 (en) * 2019-07-18 2021-04-13 영풍파일(주) Apparatus for manufacturing ICP pile reinforced lateral stiffness
CN216893142U (en) * 2021-11-02 2022-07-05 中铁四局集团第二工程有限公司 Steel reinforcement cage

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5265170A (en) * 1975-11-25 1977-05-30 Sumitomo Metal Ind Method of building reinforcement cage
JPH05192731A (en) * 1991-04-18 1993-08-03 Toshio Haino Manufacturing device of reinforcing bar cage for field placing concrete pile
JPH0551921A (en) * 1991-08-23 1993-03-02 Hiroshi Suwa Assembling method for reinforcing bar for in-situ concrete pile
JPH06210386A (en) * 1992-10-08 1994-08-02 Takenaka Komuten Co Ltd Auxiliary assembling device for site pile driving reinforced steel cage

Also Published As

Publication number Publication date
JP2010144430A (en) 2010-07-01

Similar Documents

Publication Publication Date Title
JP4012974B2 (en) Wind turbine tower assembly apparatus and assembly method
KR101614253B1 (en) Cantilever construction method of temporary bridge
JP5224245B2 (en) Pile main bar lifting device and bar arrangement method
JP2012036667A (en) Device and method for assembling reinforcement cage
KR101922324B1 (en) Ceiling lift up construction method
KR100915944B1 (en) discharge system for metal bar cutting apparatus
JP4253105B2 (en) Pile driver and pile driving method
JP2018154995A (en) Concrete casting method on inclined surface and movable form device
JP2894226B2 (en) Bridge construction method
JP6684572B2 (en) Reinforcing bar support device and reinforcing bar assembling method
JP5453172B2 (en) Floor reinforcement arrangement method
JP2006063718A (en) Method of constructing overhung bridge using corrugated steel plate web
JP6508958B2 (en) Demolition system and demolition method
JP6508959B2 (en) Demolition system and demolition method
JP2563762B2 (en) Bridge girder uplifting method, uplifting machine and vent member
JP2010255374A (en) Demolition method for skyscraper building
JP5435569B2 (en) Dismantling equipment and method for dismantling steel tower support
CN211664594U (en) Movable hoisting equipment
JP6449637B2 (en) Building construction method
JP2019015151A (en) Demolition system of existing structure
KR101044443B1 (en) Slab hanging up and down apparatus for top-down method of underground construction
JP3341195B2 (en) Bottom formwork mounting device
JP2003119806A (en) Device and method for constructing sidewall of underground tank
CN220953393U (en) Steel sheet pile sinking device suitable for limited construction space
JPH1030331A (en) Form installation scaffold device for caisson constructing

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111031

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130219

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130304

R150 Certificate of patent or registration of utility model

Ref document number: 5224245

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160322

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees