JP5217428B2 - Composite hollow structure of bridge column head or girder end - Google Patents

Composite hollow structure of bridge column head or girder end Download PDF

Info

Publication number
JP5217428B2
JP5217428B2 JP2007339199A JP2007339199A JP5217428B2 JP 5217428 B2 JP5217428 B2 JP 5217428B2 JP 2007339199 A JP2007339199 A JP 2007339199A JP 2007339199 A JP2007339199 A JP 2007339199A JP 5217428 B2 JP5217428 B2 JP 5217428B2
Authority
JP
Japan
Prior art keywords
girder
column head
hollow structure
reinforcing
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007339199A
Other languages
Japanese (ja)
Other versions
JP2009161907A (en
Inventor
広幸 南雲
勝 藤代
忠宏 佐藤
淳 高橋
慎一 山野辺
利通 一宮
誠 梶谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2007339199A priority Critical patent/JP5217428B2/en
Publication of JP2009161907A publication Critical patent/JP2009161907A/en
Application granted granted Critical
Publication of JP5217428B2 publication Critical patent/JP5217428B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、道路、鉄道、歩道、その他の橋梁でPC橋などの柱頭部または桁端部の複合中空構造に関するものである。   The present invention relates to a composite hollow structure of a head of a pillar such as a PC bridge or a girder end in a road, a railway, a sidewalk, and other bridges.

PC(プレストレストコンクリート)橋の施工方法として、移動作業車による張出架設工法が一般に知られている。この種の施工方法は、図5、図6に示すように、橋脚1の上に柱頭部2を築造し、この上に左右の移動作業車を設置し、この移動作業車を前方に順次送り出して主桁3を架設するものである。柱頭部2の横桁4から橋軸方向の左右に張り出す張出部分5は主桁の一部を構成し、この主桁の張出部分5から隣接する区分に張り出すように移動作業車を設置し、この移動作業車の先端部において、型枠の組立、鉄筋の組立、PC鋼材の配置、そしてコンクリート打設・養生を行って1ブロックずつ施工するものである。   As a construction method of a PC (prestressed concrete) bridge, an overhang construction method using a mobile work vehicle is generally known. As shown in FIGS. 5 and 6, this type of construction method is such that a pillar head 2 is built on a bridge pier 1, left and right mobile work vehicles are installed thereon, and the mobile work vehicles are sequentially sent forward. The main girder 3 is constructed. A projecting portion 5 projecting from the horizontal girder 4 of the column head 2 to the left and right in the direction of the bridge axis constitutes a part of the main girder, and the mobile work vehicle projects from the projecting portion 5 of the main girder to the adjacent section. At the front end of this mobile work vehicle, one block is constructed by assembling the formwork, assembling the reinforcing bars, placing the PC steel, and placing and curing the concrete.

図5は連続桁橋の柱頭部の例であり、橋脚1と充実断面の柱頭部2との間に支承6が設置されている。図6はラーメン橋の柱頭部の例であり、橋脚1と2枚壁形式の柱頭部2とが剛結されている。横桁4には橋軸方向に間隔をおいて一対の隔壁4aが設けられ、橋脚1から突出する定着鉄筋7が隔壁4a内に埋設される。   FIG. 5 shows an example of a column head of a continuous girder bridge, and a support 6 is installed between a pier 1 and a column head 2 having a solid section. FIG. 6 shows an example of a column head of a ramen bridge, in which a pier 1 and a two-wall column head 2 are rigidly connected. A pair of partition walls 4a are provided in the cross beam 4 at intervals in the bridge axis direction, and fixing reinforcing bars 7 protruding from the pier 1 are embedded in the partition walls 4a.

図5の連続桁型式の場合、柱頭部2は、主桁3と横桁4の補強鉄筋および支点反力による補強鋼材が高密度に配置されているため、施工が困難であり、工期も長期間を必要とする。図6のラーメン型式の場合、柱頭部2は、橋脚1と主桁3と横桁4の交差部であり、それぞれの補強鉄筋が高密度に配置されているため、施工が困難であり、工期も長期間を必要とする。   In the case of the continuous girder type in FIG. 5, the column head 2 is difficult to construct and the construction period is long because the reinforcing bars of the main girder 3 and the horizontal girder 4 and the reinforcing steel material by the fulcrum reaction force are arranged at high density. Need a period. In the case of the ramen type shown in FIG. 6, the column head 2 is an intersection of the pier 1, the main girder 3, and the cross girder 4, and the reinforcing bars are arranged at high density, so that the construction is difficult and the construction period Also requires a long time.

また、いずれの場合も、柱頭部2は充実断面または2枚壁形式が一般的であり、コンクリート数量が多いため、施工時の温度応力に対して補強筋を配置するなど検討を必要とする。さらに、上部工の重量が大きくなることで地震時の慣性力が大きくなり、柱頭部付近、主桁、橋脚に発生する応答値が大きくなるため、相応の補強を必要とする。   In either case, the column head 2 generally has a solid cross section or a two-wall form, and the amount of concrete is large. Therefore, it is necessary to consider such as arranging reinforcing bars against the temperature stress during construction. Furthermore, since the inertia force at the time of an earthquake becomes large by the weight of superstructure, the response value generated in the vicinity of the column head, the main girder, and the bridge pier becomes large.

上記のような課題に対して従来においては次のような技術で対応している。柱頭部の複雑な補強鉄筋に対しては、時間をかけて配筋を行っている。施工時の温度応力に対しては、リフト割を多くして1回のコンクリート打込み量を少なくし、硬化に伴う発熱量を抑えて発生応力を小さくするなど、作業工程を多くして施工を行っている。地震時の検討を行い、必要に応じた補強を行っている。   Conventionally, the following problems have been addressed with respect to the above problems. Reinforcement is performed over time for the complex reinforcing bars of the column head. For the temperature stress at the time of construction, increase the lift ratio to reduce the amount of concrete placed once, reduce the heat generated by hardening and reduce the generated stress, etc. ing. We examine the earthquake and reinforce it as necessary.

なお、橋梁の柱頭部に関する先行技術文献として、特許文献1〜3、非特許文献1がある。特許文献1の発明は、波形鋼板ウェブ橋の張出架設工法における柱頭部の施工方法であり、柱頭部の横桁部分と左右各1ブロック分の張出部分の波形鋼板ウェブ連結体を橋脚上に設置し、横桁部分のコンクリートと左右各1ブロック分の張出部分の下床版コンクリートを施工し、柱頭部の構築作業を簡易化するものである。   In addition, there exist patent documents 1-3 and a nonpatent literature 1 as a prior art document regarding the column head of a bridge. The invention of Patent Document 1 is a column head construction method in the overhanging construction method of a corrugated steel web bridge. The construction of the head of the column is simplified by installing the concrete of the cross beam part and the lower floor slab concrete of the overhanging part for each left and right block.

特許文献2の発明は、柱頭部の構築方法及び架設作業車であり、橋脚上に小面積の柱頭部(横桁部分)を構築し、この上に左右の張出架設作業車を入り組ませて設置し、この作業車を用いて柱頭部の左右の橋体(張出部分)を張り出し施工し、柱頭部の大きさを小さくし、橋脚側面に設けるブラケットを不要とするものである。   The invention of Patent Document 2 is a column head construction method and an erection work vehicle, in which a small area column head (horizontal girder part) is constructed on a bridge pier, and left and right overhanging construction vehicles are inserted on this. This work vehicle is used to project the left and right bridge bodies (projected parts) of the column head, reduce the size of the column head, and eliminate the need for a bracket provided on the side of the pier.

特許文献3の発明は、プレキャスト柱頭部及び橋脚柱頭部の施工方法であり、プレキャスト柱頭部(横桁部分と左右の張出部分)を下床版と上床版とウェブで構成し、その下部開口部に、橋脚の頭部から突出した橋脚用主鉄筋を貫通させ、コンクリートを打設して橋脚とプレキャスト柱頭部を一体化させ、工期の短縮を図るものである。   The invention of Patent Document 3 is a construction method of a precast column head and a pier column head, and the precast column head (the cross beam portion and the left and right overhang portions) is composed of a lower floor plate, an upper floor plate, and a web, and its lower opening The bridge pier main rebar protruding from the head of the pier is penetrated in the part, and concrete is cast to integrate the pier and the precast column head, thereby shortening the construction period.

非特許文献1には、柱頭部を重量軽減のため2セグメントで構成し、柱頭部鋼管ストラット構造を採用して施工性の向上を図る技術が記載されている。鋼管ストラットは左右一対で正面視ハ字状となるように配置し、鋼管ストラットの上下端をそれぞれ床版部の下面、底版部の上面に当接させ、ボルト等で接合している。鋼管ストラット構造は、通常の充実な横桁に比べ、応力の流れが明確で重量軽減の効果が大きい。   Non-Patent Document 1 describes a technique in which a column head is composed of two segments for weight reduction, and a column head steel pipe strut structure is employed to improve workability. The steel pipe struts are arranged in a pair of left and right so as to have a square shape in front view, and the upper and lower ends of the steel pipe struts are brought into contact with the lower surface of the floor slab part and the upper surface of the bottom slab part, respectively, and are joined by bolts or the like. The steel pipe strut structure has a clear stress flow and a large weight reduction effect compared to a normal solid beam.

また、本発明に関連する先行技術文献として特許文献4、5がある。特許文献4の発明は、多室型の箱桁橋の仕切り壁に代えて、梁部を介して柱体を垂直に立設し、部材厚さを可及的に薄くするものである。また、従来技術の図12には、箱桁橋の室内にストラットをハ字状に配置することが記載されている。   Patent Documents 4 and 5 are prior art documents related to the present invention. In the invention of Patent Document 4, instead of a partition wall of a multi-chamber box girder bridge, a column body is erected vertically through a beam portion to make the member thickness as thin as possible. Further, FIG. 12 of the prior art describes that struts are arranged in a C shape in a box girder bridge.

特許文献5の発明は、上床版と下床版と左右一対の波形鋼版ウェブからなる波形鋼板ウェブにおいて、橋軸直角方向に延びるプレキャストリブを橋軸方向に間隔をおいて配置すると共に各プレキャストリブ間にプレキャスト板を架け渡し、これらプレキャスト板の上にコンクリートを打設することにより、上床版を形成し、各プレキャストリブを含む橋軸直交面断面内に、上端部がプレキャストリブに連結され、下端部が下床版に連結された3本のストラットを設け、所要の強度を確保するものである。   In the invention of Patent Document 5, in a corrugated steel sheet web composed of an upper floor slab, a lower floor slab, and a pair of left and right corrugated steel webs, precast ribs extending in a direction perpendicular to the bridge axis are arranged at intervals in the bridge axis direction and each precast By placing precast plates between the ribs and placing concrete on these precast plates, an upper floor slab is formed, and the upper end is connected to the precast ribs in the cross section of the bridge axis orthogonal plane including each precast rib. The three struts whose lower ends are connected to the lower floor slab are provided to ensure the required strength.

特開2005−171521号公報JP 2005-171521 A 特開2004−218316号公報JP 2004-218316 A 特開2003−328320号公報JP 2003-328320 A 「橋梁&都市」、1999年5月号、p.40-49 TGV Avignon 高架橋の視察“Bridge & City”, May 1999, p.40-49 Visit to TGV Avignon viaduct 特許第2922749号公報Japanese Patent No. 2922749 特開2006−322182号公報JP 2006-322182 A

前述のような従来の柱頭部の構造の場合、次のような課題があった。   The conventional column head structure as described above has the following problems.

(1)構造成立性に関する課題
充実断面または2枚壁形式横桁に発生する引張力に対して、PC鋼材による柱頭部横締めの配置や鉄筋による補強の必要がある。また、柱頭部コンクリートの硬化に伴う温度応力に対しては、鉄筋による追加補強を実施している。
(1) Issues related to structural feasibility For the tensile force generated in a solid section or a double-walled cross beam, it is necessary to arrange column heads with PC steel and to reinforce them with reinforcing bars. In addition, for the temperature stress accompanying hardening of the column head concrete, additional reinforcement with reinforcing bars is implemented.

(2)施工性に関する課題
主桁や橋脚の補強鉄筋が柱頭部では錯綜するため、組立が複雑であり、1回当たりのコンクリート打込み数量も多く、施工に時間を要している。
(2) Issues related to workability Since the reinforcing bars of the main girder and pier are complicated at the column head, the assembly is complicated, and the amount of concrete placement per time is large, and construction takes time.

(3)耐震性に関する課題
柱頭部は横桁の重量が大きく、かつ、橋脚基礎からの位置が高いことから、地震時の慣性力が大きくなり、橋梁全体の耐震性に影響を与えている。
(3) Issues related to earthquake resistance Since the column head is heavy and the position from the foundation of the pier is high, the inertial force during the earthquake increases, affecting the earthquake resistance of the entire bridge.

本発明は、上記の従来技術の課題を解決すべくなされたもので、PC橋などの柱頭部または桁端部において、コンクリート数量や鉄筋数量の大幅な低減により工期の短縮を図ることができ、自重低減により耐震性能の向上および耐震補強の低減を図ることができる橋梁の柱頭部または桁端部の複合中空構造を提供することにある。   The present invention was made to solve the above-described problems of the prior art, and in the column head or girder end of a PC bridge or the like, the construction period can be shortened by drastically reducing the quantity of concrete and the number of reinforcing bars, An object of the present invention is to provide a composite hollow structure of a bridge column head or girder end that can improve seismic performance and reduce seismic reinforcement by reducing its own weight.

本発明の請求項1は、下方に左右一対の支承が設置された橋梁の柱頭部または桁端部の構造であって、柱頭部横桁または桁端部横桁に、下面中央に定着凸部が設けられた床版部と隅角部にハンチが設けられた底版部と左右両側のウェブにより橋軸方向に貫通する中空部が形成され、前記中空部内に床版部下面と底版部上面とを連結する左右一対の作用力伝達補強部材が橋軸直角方向に平行な鉛直面内に、支点位置において橋軸方向から見た正面視でハ字状に、上端が床版部の橋軸方向に沿う中心軸に向け下端がそれぞれ支承に向けて配置され、前記左右一対の作用力伝達補強部材は、基部の外管と該外管内に収納可能な先端の内管からなる二重管の鋼管ストラットであり、それぞれの内管を上方に向けてスライド進出させることにより、それぞれの上端部が床版部の下面に定着され下端部が底版部に埋設され、前記左右一対の作用力伝達補強部材が中間部又は下端部において補強横材により連結されていることを特徴とする柱頭部または桁端部の複合中空構造である。 Claim 1 of the present invention is a structure of a pillar head or girder end of a bridge in which a pair of left and right supports are installed below, and is fixed to a pillar head girder or girder end cross girder and to a fixing protrusion at the center of the lower surface. A floor slab portion provided with a haunch at the corner and a hollow portion penetrating in the bridge axis direction by webs on both right and left sides, and a floor slab lower surface and a bottom slab upper surface are formed in the hollow portion. A pair of left and right acting force transmission reinforcing members that connect the two are in a vertical plane parallel to the direction perpendicular to the bridge axis, and in a front view when viewed from the bridge axis direction at the fulcrum position, the upper end is the bridge axis direction of the floor slab part A pair of left and right acting force transmission reinforcing members is a double-pipe steel pipe comprising a base outer pipe and a tip inner pipe that can be housed in the outer pipe. a strut, by sliding advance toward the respective inner tube upwards, it The upper end of the record is embedded lower end is fixed to the lower surface of the deck section is in the bottom plate portion, and wherein the pair of right and left acting force transmitting reinforcing member are connected by the reinforcing crosspieces at the intermediate portion or a lower end portion It is a composite hollow structure of a column head or a spar end.

本発明は、連続桁型式やラーメン型式の橋梁において、橋梁の柱頭部の場合、従来の充実断面または2枚壁形式に代えて、適用されるものである。橋梁の桁端部にも適用することができる。柱頭部横桁または桁端部横桁を橋軸方向に中空部が貫通する中空構造とし、中空部内における橋軸直角方向に平行な鉛直面内に、ストラット等の作用力伝達補強部材を橋軸直角方向の左右一対で配置し、それぞれの上部を床版部に定着し、それぞれの下部を底版部に所定長さで埋め込んで剛結とし、左右一対の作用力伝達補強部材を中間部や下端部において補強横材により連結する(図1参照)。この左右一対の作用力伝達補強部材と補強横材により中空の柱頭部横桁または桁端部横桁の剛性が高められ、十分な剛性を有する複合中空構造の柱頭部または桁端部が得られる。   The present invention is applied to a continuous girder type or rigid frame type bridge in the case of a column head of a bridge, instead of a conventional solid section or a two-wall type. It can also be applied to the end of a bridge girder. A hollow structure in which the hollow part penetrates the column head cross girder or girder end cross girder in the direction of the bridge axis, and the acting force transmission reinforcing member such as struts is placed on the bridge axis in the vertical plane parallel to the direction perpendicular to the bridge axis in the hollow part. Arranged in a pair of right and left in the right angle direction, each upper part is fixed to the floor slab part, each lower part is embedded in the bottom slab part with a predetermined length to be rigidly connected, and a pair of left and right acting force transmission reinforcing members are arranged in the middle part and lower end The parts are connected by a reinforcing cross member (see FIG. 1). The pair of left and right acting force transmission reinforcing members and the reinforcing cross member increase the rigidity of the hollow column head cross girder or girder end cross girder, and a composite hollow structure column head or girder end portion having sufficient rigidity is obtained. .

作用力伝達補強部材の上下端は、床版部、底版部に埋め込んで剛結合とし、コンクリートとの一体性を確保するため、プレートや定着鉄筋等の定着構造を持つものとするのが好ましい。作用力伝達補強部材の上端は、埋め込むことなくピン接合としてもよい。補強横材は鋼材や鉄筋等を用いることができ、作用力伝達補強部材に設けたガセットプレート等に剛結するのが好ましい。
本発明の請求項は、請求項1〜請求項のいずれかに記載の複合中空構造において、補強横材は作用力伝達補強部材に設けられたガゼットプレートに剛結されていることを特徴とする柱頭部または桁端部の複合中空構造である。
The upper and lower ends of the acting force transmission reinforcing member are preferably embedded in the floor slab part and the bottom slab part to be rigidly coupled, and preferably have a fixing structure such as a plate or a fixing reinforcing bar in order to ensure the integrity with the concrete. The upper end of the acting force transmission reinforcing member may be pin-joined without being embedded. The reinforcing cross member may be a steel material or a reinforcing bar, and is preferably rigidly connected to a gusset plate or the like provided on the acting force transmission reinforcing member.
According to a fourth aspect of the present invention, in the composite hollow structure according to any one of the first to third aspects, the reinforcing cross member is rigidly connected to a gusset plate provided on the acting force transmission reinforcing member. It is a composite hollow structure of a column head or a girder end.

本発明では、連続桁型式の橋梁における橋脚または橋台の支点位置において左右一対の作用力伝達補強部材が正面視でハ字状に配置されている。 In the present invention, a pair of right and left acting force transmitting reinforcing member in the support position of the pier or abutment of bridges successive digit model type that are located in V-shape in front view.

橋脚または橋台に支承により支持される連結桁型式に適用する場合である。連続桁型式の柱頭部または桁端部の場合、上部工の重量を支承に伝達し、断面を保持することが重要である。従って、作用力伝達補強部材は、設計荷重時において軸力および曲げの作用力を支承部へ伝達できるように橋軸方向から見た正面視でハ字状に配置する。軸力は底版部を押し広げる作用力となるが、補強横材が発生引張力に対する抵抗と断面形状を保持するように機能する(図1参照)。これにより、上部工の重量に対して主桁の断面が保持される。   This is a case where it is applied to a connecting girder type supported by a bridge pier or abutment. In the case of a continuous girder type column head or girder end, it is important to transmit the weight of the superstructure to the support and maintain the cross section. Therefore, the acting force transmission reinforcing member is arranged in a C shape in a front view as viewed from the bridge axis direction so that the axial force and the bending acting force can be transmitted to the support portion at the time of design load. The axial force acts as an action force that spreads the bottom plate portion, but the reinforcing cross member functions so as to maintain the resistance against the generated tensile force and the cross-sectional shape (see FIG. 1). Thereby, the cross section of the main girder is maintained with respect to the weight of the superstructure.

本発明の請求項3は、請求項1または請求項2のいずれかに記載の複合中空構造において、作用力伝達補強部材は、コンクリートストラット、鋼管ストラットまたはコンクリート充填鋼管ストラットであることを特徴とする柱頭部または桁端部の複合中空構造である。   According to a third aspect of the present invention, in the composite hollow structure according to the first or second aspect, the acting force transmission reinforcing member is a concrete strut, a steel pipe strut or a concrete-filled steel pipe strut. It is a composite hollow structure of a column head or a spar end.

二重管の鋼管ストラットは、外管および内管内にコンクリートが充填されたコンクリート充填鋼管ストラットが好ましい。 Steel struts of the double pipe, concrete filled steel tube struts concrete is filled in the outer tube and the inner tube is not preferred.

本発明の請求項は、請求項1に記載の複合中空構造において、補強横材は、前記左右一対の作用力伝達補強部材の下端部に剛結され、かつ、底版部に埋設されていることを特徴とする柱頭部または桁端部の複合中空構造である。 Claim 2 of the present invention, in the composite hollow structure according to claim 1, the reinforcing crosspieces are rigidly connected to the lower end portion of the pair of right and left acting force transmitting reinforcing member, and is buried in the bottom plate portion This is a composite hollow structure of a column head or a spar end.

補強横材は、左右一対の作用力伝達補強部材の中間部に配置することもできるが、左右一対の作用力伝達補強部材の下端部に剛結し、かつ、底版部内に埋設してコンクリートと一体化させることにより、剛性をより向上させるのが好ましい。   The reinforcing cross member can be disposed in the middle part of the pair of left and right acting force transmission reinforcing members, but is rigidly connected to the lower ends of the pair of left and right acting force transmission reinforcing members, and embedded in the bottom plate portion to form the concrete. It is preferable to improve the rigidity by integrating them.

以上のような正面視で略A型や略三角形の作用力伝達補強部材および補強横材は、橋軸方向に間隔をおいて複数設置することにより、従来の充実断面または2枚壁形式の柱頭部横桁または桁端部横桁の代わりとすることができる。連続桁型式の場合には、支点上に一箇所設置するだけでよい(図1(b)参照)。   By installing a plurality of substantially A-shaped or substantially triangular acting force transmission reinforcing members and reinforcing cross members in the bridge axis direction at the front view as described above, a conventional solid section or two-wall type capital It can be used in place of the cross beam or the end of the beam. In the case of the continuous girder type, it is only necessary to install one place on the fulcrum (see Fig. 1 (b)).

以上のような複合中空構造の柱頭部または桁端部は、プレキャストコンクリート、現場打設コンクリート、あるいはプレキャストコンクリートと現場打設コンクリートの組み合わせで製作することができる。プレキャストの場合には、作用力伝達補強部材や補強横材を製作時に取り付けておくことができる。また、作用力伝達補強部材はスライド方式(図2参照)、上部挿入方式(図3参照)、2リフト方式(図4参照)などで取り付けることができる。   The column head or girder end of the composite hollow structure as described above can be manufactured from precast concrete, on-site cast concrete, or a combination of precast concrete and on-site cast concrete. In the case of precast, an acting force transmission reinforcing member and a reinforcing cross member can be attached at the time of manufacture. The acting force transmission reinforcing member can be attached by a slide method (see FIG. 2), an upper insertion method (see FIG. 3), a two-lift method (see FIG. 4), or the like.

以上のような中空部内において床版部下面と底版部上面とを連結する作用力伝達補強部材を用いた複合中空構造の場合、柱頭部構造または桁端部構造を合理化することができ、柱頭部施工や桁端部施工に要する数量を低減し、工期を短縮することができる。具体的には、従来の横桁の充実部または2枚壁が無くなるため、鉄筋、型枠およびコンクリートの数量を低減でき、その作業工程が低減できる。また、コンクリートの温度応力対策として実施していた、施工リフト割の細分化の必要が無くなり、さらなる工程の短縮が可能となる。また、柱頭部重量や桁端部重量が大幅に低減されることにより、耐震性の向上および耐震補強の低減を図ることができる。   In the case of the composite hollow structure using the acting force transmission reinforcing member that connects the lower surface of the floor slab part and the upper surface of the bottom slab part in the hollow part as described above, the column head structure or the spar end structure can be rationalized. The quantity required for construction and girder end construction can be reduced and the construction period can be shortened. Specifically, since there are no conventional solid girder filling parts or two walls, the number of reinforcing bars, formwork and concrete can be reduced, and the work process can be reduced. In addition, it is not necessary to subdivide the construction lift percent, which has been implemented as a measure against temperature stress in concrete, and further shortening of the process becomes possible. In addition, since the column head weight and the girder end weight are significantly reduced, it is possible to improve the earthquake resistance and reduce the earthquake resistance reinforcement.

また、連続桁型式の柱頭部または桁端部においては、左右一対の作用力伝達補強部材と補強横材により、上部工の重量を支承に伝達し、断面を保持することができ、中空構造と補強部材による比較的簡易で低コストの構造により、上部工の重量に対して断面形状を保持できる柱頭部構造または桁端部構造を得ることができる。   In addition, in the continuous girder type column head or girder end, the pair of left and right acting force transmission reinforcing members and the reinforcing cross member can transmit the weight of the superstructure to the support, and the cross section can be maintained. A column head structure or a girder end structure capable of maintaining a cross-sectional shape with respect to the weight of the superstructure can be obtained by a relatively simple and low-cost structure using the reinforcing member.

本発明は、以上のような構成からなるので、次のような効果が得られる。   Since the present invention is configured as described above, the following effects can be obtained.

(1)PC橋などの柱頭部または桁端部を、中空部内に床版部下面と底版部上面とを連結する作用力伝達補強部材を配置した複合中空構造とすることにより、コンクリート数量や鉄筋数量の大幅な低減と、施工リフト割の低減により、工期の短縮を図ることができる。 (1) By making the column head or girder end of a PC bridge or the like a composite hollow structure in which an acting force transmission reinforcing member that connects the lower surface of the floor slab and the upper surface of the bottom slab is arranged in the hollow, The construction period can be shortened by drastically reducing the quantity and reducing the construction lift.

(2)自重低減により耐震性能の向上および耐震補強の低減を図ることができる。 (2) It is possible to improve seismic performance and reduce seismic reinforcement by reducing its own weight.

(3)連続桁型式の柱頭部や桁端部においては、左右一対の作用力伝達補強部材と補強横材により、上部工の重量を支承に伝達し、断面を保持することができ、中空構造と補強部材とによる比較的簡易で低コストの構造により、断面形状を保持できる柱頭部構造や桁端部構造が得られる。 (3) In the continuous girder type column head and girder end, a pair of left and right acting force transmission reinforcement members and reinforcing cross members can transmit the weight of the superstructure to the support and maintain the cross-section, which is a hollow structure A column head structure and a girder end structure capable of maintaining a cross-sectional shape can be obtained by a relatively simple and low-cost structure using a reinforcing member and a reinforcing member.

以下、本発明を図示する実施形態に基づいて説明する。この実施形態は、連続桁型式の橋梁における柱頭部に本発明を適用した例である。図1は、本発明の複合中空構造の一例を示す橋軸直角方向に平行な鉛直断面図と橋軸方向に平行な鉛直断面図である。   Hereinafter, the present invention will be described based on the illustrated embodiments. This embodiment is an example in which the present invention is applied to a column head in a continuous girder type bridge. FIG. 1 is a vertical sectional view parallel to the direction perpendicular to the bridge axis and a vertical sectional view parallel to the bridge axis direction showing an example of the composite hollow structure of the present invention.

図1の連続桁型式の実施形態においては、PC箱桁橋の橋脚1の上に柱頭部2が築造され、橋脚1と柱頭部2との間に支承6が設置される。柱頭部2は、橋脚直上の横桁4と、この橋軸方向の左右に張り出す張出部分5とから構成され、張出部分5は主桁3の一部を構成する。   In the continuous girder type embodiment of FIG. 1, a column head 2 is built on a pier 1 of a PC box girder bridge, and a support 6 is installed between the pier 1 and the column head 2. The column head 2 is composed of a horizontal girder 4 directly above the pier and a projecting portion 5 projecting left and right in the bridge axis direction, and the projecting portion 5 constitutes a part of the main girder 3.

このような連続桁型式の柱頭部2において、本発明では、横桁4を床版部10と底版部11と橋端直角方向の左右に一対のウェブ12から構成し、橋軸方向に貫通する中空部13を形成し、横桁4を中空構造とする。この中空部13の内部に床版部10の下面と底版部11の上面を連結する作用力伝達補強部材としてのストラット20を、橋軸直角方向の鉛直面内において橋軸直角方向に左右一対で配置し、このストラット20の上端部を床版部10の下面に定着し、下端部を底版部11に埋設して剛接合とし、左右一対のストラット20の下端部同士を補強横材としての補強鋼材21で連結し、左右一対のストラット20と水平の補強鋼材21により中空柱頭部2の剛性を高める。これにより、十分な剛性を有する複合中空構造の柱頭部2が得られる。   In such a continuous girder type column head 2, in the present invention, the cross girder 4 is composed of a floor slab portion 10, a bottom slab portion 11, and a pair of webs 12 on the right and left in the direction perpendicular to the bridge end, and penetrates in the bridge axis direction. A hollow portion 13 is formed, and the cross beam 4 has a hollow structure. The struts 20 as the acting force transmission reinforcing members for connecting the lower surface of the floor slab portion 10 and the upper surface of the bottom slab portion 11 inside the hollow portion 13 are paired on the right and left sides in the direction perpendicular to the bridge axis in the vertical plane perpendicular to the bridge axis. The upper end portion of the strut 20 is fixed to the lower surface of the floor slab portion 10, the lower end portion is embedded in the bottom slab portion 11 to be rigidly joined, and the lower end portions of the pair of left and right struts 20 are reinforced as reinforcing cross members. It connects with the steel material 21, and the rigidity of the hollow column head 2 is improved with the pair of left and right struts 20 and the horizontal reinforcing steel material 21. Thereby, the column head 2 having a composite hollow structure having sufficient rigidity is obtained.

ストラット20には、鋼管ストラット、コンクリート充填鋼管ストラット、あるいは鋼繊維等が混入された高靭性コンクリート複合材料などのコンクリートストラットを用いることができる。ストラット20および補強鋼材21の橋軸方向の配置に関しては、支点上の一箇所のみ配置するだけでよい。   The strut 20 may be a concrete strut such as a steel pipe strut, a concrete-filled steel pipe strut, or a high toughness concrete composite material mixed with steel fibers. Regarding the arrangement of the struts 20 and the reinforcing steel members 21 in the bridge axis direction, only one place on the fulcrum needs to be arranged.

また、ストラット20の上端部の定着には、埋設による剛接合あるいは凹部等によるピン接合を用いることができる。剛接合の場合には、ストラット20の上下端にプレートや定着鉄筋等による定着構造を用い、コンクリートとの一体性を確保する。   Further, for fixing the upper end portion of the strut 20, a rigid joint by burying or a pin joint by a concave portion can be used. In the case of rigid joining, fixing structures such as plates and fixing reinforcing bars are used at the upper and lower ends of the strut 20 to ensure the integrity with the concrete.

補強鋼材21には、鋼材や鉄筋等を用いることができる。この補強鋼材21は底版部11に埋設するのが好ましい。補強鋼材21の両端部をそれぞれ左右一対のストラット20の下端部に剛結し、かつ、底版部11内に埋設してコンクリートと一体化させることにより、剛性をより向上させることができる。なお、埋設することなくストラット20の中間部に配置してもよい。ストラット20には、ガセットプレート等を取り付けておき、補強鋼材21を剛接合する。   The reinforcing steel material 21 can be a steel material, a reinforcing bar, or the like. The reinforcing steel material 21 is preferably embedded in the bottom plate portion 11. The both ends of the reinforcing steel material 21 are rigidly connected to the lower ends of the pair of left and right struts 20, respectively, and embedded in the bottom slab 11 to be integrated with the concrete, whereby the rigidity can be further improved. In addition, you may arrange | position in the intermediate part of the strut 20 without embedding. A gusset plate or the like is attached to the strut 20, and the reinforcing steel material 21 is rigidly joined.

連続桁型式の場合、柱頭部2は、上部工の重量を支承6に伝達し、断面を保持することが重要であるため、ストラット20は支点位置において橋軸方向から見た正面視でハ字状に配置し、設計荷重時において軸力および曲げの作用力を左右一対のストラット20を介して支承6へ伝達する。軸力は底版部11を左右に押し広げる作用力となるが、左右一対のストラット20に連結された補強鋼材21が、発生引張力に対する抵抗と断面形状を保持するように機能する。左右一対のストラット20と補強鋼材21により、上部工の重量を支承6に伝達し、断面を保持することができる。   In the case of the continuous girder type, it is important for the column head 2 to transmit the weight of the superstructure to the support 6 and to maintain the cross section, so that the strut 20 has a letter C in front view as viewed from the bridge axis direction at the fulcrum position. The axial force and the bending action force are transmitted to the support 6 via the pair of left and right struts 20 at the time of design load. The axial force is an acting force that pushes the bottom plate portion 11 left and right, but the reinforcing steel material 21 connected to the pair of left and right struts 20 functions to maintain the resistance against the generated tensile force and the cross-sectional shape. The pair of left and right struts 20 and the reinforcing steel material 21 can transmit the weight of the superstructure to the support 6 and maintain the cross section.

ハ字状のストラット20の上端は、床版部10の橋軸方向に沿う中心軸に向け、下端をそれぞれ支承6に向けて配置する。床版部10の下面中央には定着凸部30を設け、ここにストラット20の上端を定着し、底版部11の左右両側の隅角部には、ハンチ31を設け、ここにストラット20の下端を埋設する。橋軸方向に関しては、支承6の位置に配置し、従来の充実断面柱頭部の代わりとする。   The upper end of the C-shaped strut 20 is arranged with the lower end directed toward the support 6 with the lower end directed toward the central axis along the bridge axis direction of the floor slab portion 10. A fixing convex portion 30 is provided at the center of the lower surface of the floor slab portion 10, and the upper end of the strut 20 is fixed here, and a haunch 31 is provided at the left and right corners of the bottom slab portion 11, and the lower end of the strut 20 is provided here. Buried. Regarding the bridge axis direction, it is arranged at the position of the support 6 to replace the conventional solid section column head.

以上のような複合中空構造の柱頭部2は、プレキャストコンクリート、現場打設コンクリート、あるいはプレキャストコンクリートと現場打設コンクリートの組み合わせで製作することができる。プレキャストの場合には、ストラット20や補強鋼材21を製作時に取り付けておくことができる。鋼管ストラット20は、例えば直径150mm〜400mm、板厚3〜5mmの市販の一般構造用鋼管を用いることができ、内部に圧縮強度40N程度のコンクリートを充填することで、コンクリート充填鋼管ストラットとすることができる。コンクリートは取り付け後に鋼管内に充填することができる。鋼管の表面には、腐食防止のため防錆処理を施しておく。   The column head 2 having a composite hollow structure as described above can be manufactured using precast concrete, on-site cast concrete, or a combination of precast concrete and on-site cast concrete. In the case of precast, the strut 20 and the reinforcing steel material 21 can be attached at the time of production. As the steel pipe strut 20, for example, a commercially available general structural steel pipe having a diameter of 150 mm to 400 mm and a plate thickness of 3 to 5 mm can be used, and a concrete filled steel pipe strut is formed by filling concrete with a compressive strength of about 40 N inside. Can do. Concrete can be filled into the steel pipe after installation. The surface of the steel pipe is treated with rust prevention to prevent corrosion.

図2〜図4は、ストラットの設置方法の例を示したものである。図2はストラット後設置方式の例であり、鋼管ストラット20を基部の外管20aと先端の内管20bからなるスライドストラットとし、外管20aの下部を底版部11に形成した鋼管による埋込み孔40に埋設して剛接合とし、内管20bの先端を床版部10の定着凸部30に形成した凹部41に挿入してピン接合とする。埋込み孔40の鋼管にはガセットプレート50を取付けておき、このガセットプレート50に補強横材21の端部を添接板または溶接で接合する。   2 to 4 show examples of strut installation methods. FIG. 2 shows an example of a post-strut installation method, in which the steel pipe strut 20 is a slide strut composed of a base outer tube 20a and a tip inner tube 20b, and a lower portion of the outer tube 20a is embedded in a steel pipe formed in the bottom plate portion 11. The tip of the inner tube 20b is inserted into the concave portion 41 formed on the fixing convex portion 30 of the floor slab portion 10 for pin joint. A gusset plate 50 is attached to the steel pipe of the embedding hole 40, and the end of the reinforcing cross member 21 is joined to the gusset plate 50 by an attachment plate or welding.

運搬時には、外管20a内に内管20bを収納した短尺の二重管を現場まで運搬し、プレキャストや現場打設の柱頭部2において、外管20aの下部を埋込み孔40に挿入した後、内管20bを上方に向けてスライド進出させ、上端を凹部41に挿入する。外管20aと内管20bの接続部分はボルトあるいは内管側に設けた輪留めによる締結等で仮止めし、隙間をシーリング材で塞ぐ。外管20aに設けた注入口と内管20bの上端に設けた排出口により、外管20aおよび内管20b内にモルタルやコンクリート42を充填する。埋込み孔40にもモルタル43を注入して外管20の下部を剛結する。なお、このスライドストラットの場合は、鋼管ストラット20の内部にコンクリートを充填することが必須であり、圧縮力は主にコンクリートが負担する。   At the time of transportation, after transporting the short double tube containing the inner tube 20b in the outer tube 20a to the site, and inserting the lower portion of the outer tube 20a into the embedding hole 40 in the column head 2 of precast or field placement, The inner tube 20b slides upward and the upper end is inserted into the recess 41. The connecting portion between the outer tube 20a and the inner tube 20b is temporarily fixed by fastening with a bolt or a ring clamp provided on the inner tube side, and the gap is closed with a sealing material. The outer pipe 20a and the inner pipe 20b are filled with mortar and concrete 42 by the inlet provided in the outer pipe 20a and the outlet provided at the upper end of the inner pipe 20b. The mortar 43 is also injected into the embedding hole 40 and the lower portion of the outer tube 20 is rigidly connected. In the case of this slide strut, it is essential to fill the steel pipe strut 20 with concrete, and the compressive force is mainly borne by the concrete.

図3はストラット後設置方式の別の例であり、ストラット20を床版部10の上部から後挿入する。プレキャストや現場打設の柱頭部2において、床版部10の中央部には、ストラット20の傾斜に対応した正面視でX字状の挿入孔44を形成しておき、この挿入孔44にストラット20を上方から挿入し、下部を埋込み孔40内に挿入する。ストラット20の上端部はシーリング材または型枠で塞ぎ、挿入孔44内にモルタルまたはコンクリート45を充填し、剛接合とする。この上部挿入ストラットにおいて鋼管ストラットを用いた場合、コンクリート充填は必須ではなく、コンクリートを充填してもしなくてもよい。   FIG. 3 shows another example of the post-strut installation method, in which the strut 20 is inserted back from the upper part of the floor slab portion 10. In the column head 2 for precast or on-site placement, an X-shaped insertion hole 44 is formed in the center of the floor slab portion 10 in front view corresponding to the inclination of the strut 20. 20 is inserted from above, and the lower part is inserted into the embedding hole 40. The upper end portion of the strut 20 is closed with a sealing material or a mold, and the insertion hole 44 is filled with mortar or concrete 45 to form a rigid joint. When steel pipe struts are used in the upper insertion struts, concrete filling is not essential and may or may not be filled with concrete.

図4はストラット設置方法のさらに別の例であり、箱桁の断面が通常2リフトで施工されることから、柱頭部横桁4の下部とストラット20に分離した場合である。プレキャストや現場打設の柱頭部2の1リフトにおいて、埋込み孔40を形成するソケットを設置し、これに補強横材21を接続し、コンクリートを打設する。2リフトにおいて、埋込み孔40のソケットにストラット20の下部を挿入してストラット20を設置した後、上部のコンクリートを打設してストラット20の上部を定着凸部30に埋設する。   FIG. 4 shows still another example of the strut installation method, in which the box girder section is usually constructed with two lifts, so that the lower part of the column head horizontal girder 4 and the strut 20 are separated. In one lift of the column head 2 for precast or on-site placement, a socket for forming the embedding hole 40 is installed, the reinforcing cross member 21 is connected to this, and concrete is cast. In 2 lifts, after the lower part of the strut 20 is inserted into the socket of the embedding hole 40 and the strut 20 is installed, the upper concrete is placed and the upper part of the strut 20 is embedded in the fixing convex part 30.

以上のようなストラット20と補強鋼材21を用いた複合中空構造の場合、柱頭部構造を合理化することができ、柱頭部施工に要する数量を低減し、工期を短縮することができる。具体的には、従来の横桁の充実部または2枚壁が無くなるため、鉄筋、型枠およびコンクリートの数量を低減でき、その作業工程が低減できる。また、柱頭部コンクリートの温度応力対策として実施していた、施工リフト割の細分化の必要が無くなり、さらなる工程の短縮が可能となる。また、柱頭部重量が大幅に低減されることにより、耐震性の向上および耐震補強の低減を図ることができる。   In the case of the composite hollow structure using the strut 20 and the reinforcing steel material 21 as described above, the column head structure can be rationalized, the quantity required for the column head construction can be reduced, and the construction period can be shortened. Specifically, since there are no conventional solid girder filling parts or two walls, the number of reinforcing bars, formwork and concrete can be reduced, and the work process can be reduced. In addition, it is no longer necessary to subdivide the construction lift percent, which has been implemented as a measure against temperature stress in the column head concrete, and the process can be further shortened. Further, since the weight of the column head is significantly reduced, it is possible to improve the earthquake resistance and reduce the earthquake resistance.

図示例の連続桁型式の場合、スパン85mの連続桁橋(柱頭部充実断面)での試算では、柱頭部コンクリート数量が55m減、鉄筋数量が2t減となり、施工リフト割りの変更により、1ヶ月程度の工程の短縮を図ることが可能である。また、柱頭部重量で約の130tの軽量化となることにより、耐震性能の向上または地震時補強の低減を図ることが可能である。 In the case of the continuous girder model shown in the figure, the trial calculation with a continuous girder bridge with a span of 85 m (column head solid section) reduces the column head concrete quantity by 55 m 3 and the reinforcing bar quantity by 2 t. It is possible to shorten the process for about a month. Further, by reducing the weight of the column head by about 130 tons, it is possible to improve the seismic performance or reduce the reinforcement at the time of earthquake.

本発明のストラットと補強鋼材を用いた複合中空構造はラーメン型式の柱頭部にも適用することができる。ラーメン型式の場合も、スパン120mのラーメン橋(柱頭部2枚壁形式)での試算では、柱頭部コンクリート数量が35m減、鉄筋数量が10t減となり、施工リフト割りの変更により、1ヶ月程度の工程の短縮を図ることが可能である。また、柱頭部重量で約の100tの軽量化となることにより、耐震性能の向上または地震時補強の低減を図ることが可能である。 The composite hollow structure using the strut and the reinforcing steel material of the present invention can also be applied to a ramen type column head. In the case of ramen type, in the estimation of ramen bridge span 120m (stigma part two wall format), the stigma part concrete quantity is 35m 3 down, rebar quantity becomes 10t declined, due to a change of construction lift split, about one month It is possible to shorten the process. In addition, by reducing the weight of the column head by about 100 tons, it is possible to improve the earthquake resistance or reduce the reinforcement during the earthquake.

また、連続桁型式の柱頭部2においては、左右一対のストラット20と補強横材21からなる正面視で略A型または略三角形の補強部材により、上部工の重量を支承に伝達し、断面を保持することができ、中空構造と補強部材による比較的簡易で低コストの構造により、上部工の重量に対して断面形状を保持できる柱頭部2を得ることができる。   Further, in the continuous girder type column head 2, the weight of the superstructure is transmitted to the support by a substantially A-shaped or substantially triangular reinforcing member in a front view composed of a pair of left and right struts 20 and a reinforcing cross member 21, and the cross section is The column head 2 that can be held and can hold the cross-sectional shape with respect to the weight of the superstructure can be obtained by a relatively simple and low-cost structure using the hollow structure and the reinforcing member.

なお、以上は連続桁形式、柱頭部横桁に適用した場合について説明したが、これに限らず、ラーメン型式、桁端部横桁にも本発明を適用することができる。   In addition, although the above demonstrated the case where it applied to a continuous girder form and a column head horizontal girder, it is not restricted to this, This invention is applicable also to a ramen type | mold and a girder edge cross girder.

本発明の連続桁橋における柱頭部の複合中空構造の一例であり、(a)は橋軸直角方向に平行な鉛直断面図、(b)は橋軸方向に平行な鉛直断面図である。It is an example of the composite hollow structure of the column head in the continuous girder bridge of this invention, (a) is a vertical sectional view parallel to the bridge axis perpendicular direction, (b) is a vertical sectional view parallel to the bridge axis direction. 本発明におけるストラットの設置方法の例であり、(a)は橋軸直角方向に平行な鉛直断面図、(b)はストラットの設置を工程順に示す鉛直断面図である。It is an example of the installation method of the strut in this invention, (a) is a vertical sectional view parallel to a bridge axis perpendicular direction, (b) is a vertical sectional view which shows installation of a strut in order of a process. 本発明におけるストラットの設置方法の別の例であり、ストラットの設置を工程順に示す橋軸直角方向に平行な鉛直断面図である。It is another example of the installation method of the strut in this invention, and is a vertical sectional view parallel to the direction perpendicular to the bridge axis showing the installation of the strut in the order of steps. 本発明におけるストラットの設置方法のさらに別の例であり、ストラットの設置を工程順に示す橋軸直角方向に平行な鉛直断面図である。It is another example of the installation method of the strut in this invention, and is a vertical sectional view parallel to the bridge axis perpendicular direction which shows installation of a strut in order of a process. 連続桁橋における従来の柱頭部の一例であり、(a)は橋軸直角方向に平行な鉛直断面図、(b)は橋軸方向に平行な鉛直断面図である。It is an example of the conventional pillar head in a continuous girder bridge, (a) is a vertical cross-sectional view parallel to the direction perpendicular to the bridge axis, and (b) is a vertical cross-sectional view parallel to the bridge axis direction. ラーメン橋における従来の柱頭部の一例であり、(a)は橋軸直角方向に平行な鉛直断面図、(b)は橋軸方向に平行な鉛直断面図である。It is an example of the conventional column head in a ramen bridge, (a) is a vertical sectional view parallel to the bridge axis perpendicular direction, and (b) is a vertical sectional view parallel to the bridge axis direction.

符号の説明Explanation of symbols

1……橋脚
2……柱頭部
3……主桁
4……横桁
5……張出部分
6……支承
7……定着鉄筋
10…床版部
11…底版部
12…ウェブ
13…中空部
20…ストラット(作用力伝達補強部材)
20a…外管
20b…内管
21…補強横材
30…定着凸部
31…ハンチ
40…埋込み孔
41…凹部
42…モルタルやコンクリート
43…モルタル
44…挿入孔
45…モルタルまたはコンクリート
50…ガセットプレート
DESCRIPTION OF SYMBOLS 1 …… Bridge pier 2 …… Column head 3 …… Main girder 4 …… Horizontal girder 5 …… Overhanging part 6 …… Supporting 7 …… Fixing reinforcement 10… Floor slab part 11… Bottom slab part 12… Web 13… Hollow part 20 ... Strut (acting force transmission reinforcing member)
20a ... Outer pipe 20b ... Inner pipe 21 ... Reinforcement cross member 30 ... Fixing convex part 31 ... Haunch 40 ... Embedding hole 41 ... Recessed part 42 ... Mortar and concrete 43 ... Mortar 44 ... Insertion hole 45 ... Mortar or concrete 50 ... Gusset plate

Claims (4)

下方に左右一対の支承が設置された橋梁の柱頭部または桁端部の構造であって、柱頭部横桁または桁端部横桁に、下面中央に定着凸部が設けられた床版部と隅角部にハンチが設けられた底版部と左右両側のウェブにより橋軸方向に貫通する中空部が形成され、前記中空部内に床版部下面と底版部上面とを連結する左右一対の作用力伝達補強部材が橋軸直角方向に平行な鉛直面内に、支点位置において橋軸方向から見た正面視でハ字状に、上端が床版部の橋軸方向に沿う中心軸に向け下端がそれぞれ支承に向けて配置され、前記左右一対の作用力伝達補強部材は、基部の外管と該外管内に収納可能な先端の内管からなる二重管の鋼管ストラットであり、それぞれの内管を上方に向けてスライド進出させることにより、それぞれの上端部が床版部の下面に定着され下端部が底版部に埋設され、前記左右一対の作用力伝達補強部材が中間部又は下端部において補強横材により連結されていることを特徴とする柱頭部または桁端部の複合中空構造。 A structure of a column head or girder end of a bridge in which a pair of left and right supports are installed below, and a floor slab part having a fixing convex part at the center of the bottom surface of the column head cross girder or girder end cross girder A pair of left and right acting forces connecting the bottom surface of the floor slab portion and the top surface of the bottom plate portion in the hollow portion is formed by a bottom plate portion having a haunch at the corner portion and webs on both left and right sides to penetrate the bridge axis direction. In the vertical plane parallel to the direction perpendicular to the bridge axis, the transmission reinforcing member is shaped like a letter C when viewed from the bridge axis direction at the fulcrum position, and the lower end is toward the central axis along the bridge axis direction of the floor slab. Each of the pair of left and right acting force transmission reinforcing members disposed toward the support is a double-pipe steel pipe strut comprising a base outer tube and a tip inner tube that can be housed in the outer tube. the upward by sliding advance, each upper end deck portion The lower end is fixed to the lower surface is embedded in the bottom plate portion, the composite of the stigma portion or Ketatan portion in which the pair of right and left acting force transmitting reinforcing member is characterized in that it is connected by the reinforcing crosspieces at the intermediate portion or a lower end portion Hollow structure. 請求項1に記載の複合中空構造において、補強横材は、前記左右一対の作用力伝達補強部材の下端部に剛結され、かつ、底版部に埋設されていることを特徴とする柱頭部または桁端部の複合中空構造。   The composite hollow structure according to claim 1, wherein the reinforcing cross member is rigidly coupled to the lower end portions of the pair of left and right acting force transmission reinforcing members and embedded in the bottom plate portion or Composite hollow structure at the end of the girder. 請求項1または請求項2のいずれかに記載の複合中空構造において、前記鋼管ストラットは、前記外管および前記内管内にコンクリートが充填されたコンクリート充填鋼管ストラットであることを特徴とする柱頭部または桁端部の複合中空構造。 3. The composite hollow structure according to claim 1, wherein the steel pipe struts are concrete-filled steel pipe struts in which concrete is filled in the outer pipe and the inner pipe. Composite hollow structure at the end of the girder. 請求項1〜請求項のいずれかに記載の複合中空構造において、補強横材は作用力伝達補強部材に設けられたガゼットプレートに剛結されていることを特徴とする柱頭部または桁端部の複合中空構造。 The composite hollow structure according to any one of claims 1 to 3 , wherein the reinforcing cross member is rigidly connected to a gusset plate provided on the acting force transmission reinforcing member. Composite hollow structure.
JP2007339199A 2007-12-28 2007-12-28 Composite hollow structure of bridge column head or girder end Active JP5217428B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007339199A JP5217428B2 (en) 2007-12-28 2007-12-28 Composite hollow structure of bridge column head or girder end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007339199A JP5217428B2 (en) 2007-12-28 2007-12-28 Composite hollow structure of bridge column head or girder end

Publications (2)

Publication Number Publication Date
JP2009161907A JP2009161907A (en) 2009-07-23
JP5217428B2 true JP5217428B2 (en) 2013-06-19

Family

ID=40964830

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007339199A Active JP5217428B2 (en) 2007-12-28 2007-12-28 Composite hollow structure of bridge column head or girder end

Country Status (1)

Country Link
JP (1) JP5217428B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5074260B2 (en) * 2008-03-28 2012-11-14 三井住友建設株式会社 Bridge erection method
CN101798794B (en) * 2010-03-29 2012-07-25 广东省公路勘察规划设计院股份有限公司 Composite box girder bridge erected in advance by using corrugated steel web steel girders and construction method thereof
CN103722297B (en) * 2013-12-16 2016-06-08 中铁宝桥集团有限公司 Steel box-girder open web type transverse wall group is welded standby and manufacture craft
CN109653106B (en) * 2019-01-03 2023-10-27 济南城建集团有限公司 Oblique crack disease treatment technology for end web plate of prestressed hollow slab of urban overhead road
CN113605208B (en) * 2021-08-11 2022-11-25 长安大学 Corrugated steel web PC box girder, internal support external pulling device and construction method of support before lining
CN113882236B (en) * 2021-10-15 2023-05-30 深圳市市政设计研究院有限公司 Corrugated steel web combined beam bridge

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3103025A (en) * 1958-12-03 1963-09-10 Kaiser Aluminium Chem Corp Structural unit
DE2911239A1 (en) * 1979-03-22 1980-10-02 Falkner Horst Cyclic process for forwarded bridge type concrete structure - uses prefabricated parts monolithically built onto cross=section core, with joints filled by casting
JP3883659B2 (en) * 1997-07-31 2007-02-21 横浜ゴム株式会社 Box girder support
JP3569134B2 (en) * 1998-08-21 2004-09-22 川田工業株式会社 Construction method of box girder bridge
FR2798407B1 (en) * 1999-09-15 2001-10-26 Entpr Razel Freres CONTINUOUS SOUL ASSEMBLY FOR MIXED FRAMEWORK ART WORK, AND MIXED FRAMEWORK ART WORK MADE WITH SUCH A SOUL ASSEMBLY
JP2003020615A (en) * 2001-07-06 2003-01-24 Hitachi Zosen Corp Bridge
JP2003166214A (en) * 2001-11-29 2003-06-13 Haltec:Kk Chord member for truss and truss using the same
JP3739045B2 (en) * 2002-08-01 2006-01-25 機動建設工業株式会社 Construction method of steel PC composite bridge
JP2006009449A (en) * 2004-06-28 2006-01-12 Kajima Corp Truss panel girder and precast truss panel
JP4040639B2 (en) * 2005-05-18 2008-01-30 三井住友建設株式会社 Corrugated steel web bridge

Also Published As

Publication number Publication date
JP2009161907A (en) 2009-07-23

Similar Documents

Publication Publication Date Title
KR101186062B1 (en) Connection of concrete filled steel tube column and H-shaped steel beam and constructing method of the same
KR100839439B1 (en) Moment connection structure combining a superstructure with substructure in the prefabricated rahmen bridge and method constructing rahmen bridge with the structure
JP5217428B2 (en) Composite hollow structure of bridge column head or girder end
KR102227674B1 (en) Reinforcement unit for support point of steel girder and construction method thereof
JP2007077630A (en) Continuous girder using precast main-girder segment, and its erection method
JP3844743B2 (en) Box girder bridge structure and its construction method
KR101011252B1 (en) Rigid-frame bridge frame for reinforcing negative moment part and rigid-frame bridge having it
KR20120140386A (en) Composite girder using inner molding member and bridge construction method therwith
KR20040006564A (en) Composite Deck having Frame and Concrete
KR102104382B1 (en) Steel beam, composite column, and joint structure of the same
JP4406879B2 (en) Bridge girder construction method
KR102568950B1 (en) Prefabricated Coping Structure using a Steel-Box and its Construction Method
JP2006316495A (en) Foundation structure of bridge pier and its construction method
CN210086022U (en) Assembled single-box multi-chamber corrugated steel web box girder
KR20140125754A (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
JP5157433B2 (en) Composite hollow structure of bridge column head or girder end
KR101426155B1 (en) The hybrid rahmen structure which can add prestress on steel girder of horizontal member by gap difference of connection face between vertical member and steel girder of horizontal member
KR101583401B1 (en) The continuous hybrid girder consist of concrete block and steel block which is can add prestress by gap difference between top and bottom of connection face of blocks
KR100462966B1 (en) Prestressed Concrete U-Girder of compositive girder bridge
KR101878762B1 (en) Coupling structure of double type for girder and column capable of reducing girder height
JP2002206209A (en) Bridge having upper-lower section integral structure and its execution method
CN212506737U (en) Assembled beam column node
JP4954226B2 (en) Prestressed concrete structure
KR101591808B1 (en) the deep composite precast beam, the connection structure between composite precast column and the deep composite precast beam
CN114457667A (en) Large-span through-type open-hole web beam-arch combined rigid frame bridge and construction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100729

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120315

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120321

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120509

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120522

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121120

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121213

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130218

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160315

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5217428

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250