Prior art keywords
pipe
water
valve
signal
sprinkler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010185809A
Other languages
Japanese (ja)
Other versions
JP2012040275A (en
Inventor
慶晃 久保
Original Assignee
アイエススプリンクラー株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by アイエススプリンクラー株式会社 filed Critical アイエススプリンクラー株式会社
Priority to JP2010185809A priority Critical patent/JP5183697B2/en
Publication of JP2012040275A publication Critical patent/JP2012040275A/en
Application granted granted Critical
Publication of JP5183697B2 publication Critical patent/JP5183697B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Description

本発明は、水源からスプリンクラーヘッドに至る管路中に設けられ、火災時に管路を開放し、スプリンクラーヘッドへの通水を行うと同時に、この通水に連動してスプリンクラーポンプや警報器に作動信号を送出するようにした自動警報弁に関する。   The present invention is provided in the pipeline from the water source to the sprinkler head, and in the event of a fire, the pipeline is opened and water is passed to the sprinkler head. At the same time, the sprinkler pump and alarm are operated in conjunction with this water flow. The present invention relates to an automatic alarm valve that transmits a signal.

一般に、ビルやマンションなどに設置されるスプリンクラーシステムは、図14の簡略図に示すように、一本の送水管11から分岐する複数系統のスプリンクラー管12,12が設けられ、火災時には、スプリンクラーヘッド13,13,…の作動により圧力の下がった系統のスプリンクラー管12にのみ、この送水管11から送水されるようになっている。   Generally, a sprinkler system installed in a building or a condominium is provided with a plurality of sprinkler pipes 12 and 12 branched from a single water supply pipe 11, as shown in the simplified diagram of FIG. Water is supplied from the water supply pipe 11 only to the sprinkler pipe 12 of the system whose pressure has been reduced by the operation of 13, 13,.

つまり、各スプリンクラー管12は、それぞれ独立して機能するように自動警報弁2を介して送水管11に連結されている。   That is, each sprinkler pipe 12 is connected to the water supply pipe 11 via the automatic alarm valve 2 so as to function independently.

この自動警報弁2は、スプリンクラー管12の末端側の圧力低下により、その管路を開放してスプリンクラーヘッド13への通水を行うと同時に、この通水に連動してスプリンクラーポンプ14や、通水がなされた系統の警報器15に作動信号を送出するものである。   The automatic alarm valve 2 opens the pipe line and allows water to flow to the sprinkler head 13 due to the pressure drop on the end side of the sprinkler pipe 12, and at the same time, the sprinkler pump 14 An operation signal is sent to the alarm device 15 of the system where water has been used.

図15は、下記の特許文献1に示す自動警報弁2の断面図である。この図15に示すように、自動警報弁2は、送水管11に連結されたスプリンクラー管12の途中に挿入されるように設けられている。そして、上記スプリンクラー管12内の加圧水は、1次側(図15にAで示す)と、2次側(図15にBで示す)とが、ほぼ同圧あるいは、2次側の方が1次側よりも高圧(A≦B)になっており、弁体20は、平常時に閉鎖状態が保持されるようになっている。なお、この1次側の圧力は、送水管11に連結された圧力水槽16で一定に維持されるようになっている。   FIG. 15 is a cross-sectional view of the automatic alarm valve 2 shown in Patent Document 1 below. As shown in FIG. 15, the automatic alarm valve 2 is provided so as to be inserted in the middle of the sprinkler pipe 12 connected to the water supply pipe 11. The pressurized water in the sprinkler tube 12 is approximately the same pressure on the primary side (indicated by A in FIG. 15) and the secondary side (indicated by B in FIG. 15), or 1 on the secondary side. The pressure is higher than the secondary side (A ≦ B), and the valve body 20 is maintained in a closed state in normal times. The primary pressure is kept constant in a pressure water tank 16 connected to the water pipe 11.

上記弁体20は、軸21回りに回動自在に枢着されており、弁体20が接する弁座部22には、信号水路24に連通した中間室23が設けられている。信号水路24は、信号停止弁25を介して三方管28に接続されており、この三方管28は、先端(図15では上端)に警報用圧力スイッチ30が取り付けられた圧力スイッチ取付管26と、排水管10が連結された排水部27とに接続されている。なお、この三方管28の排水部27側には、オリフィス29が設けられると共に、排水部27側からの逆流を防止するための逆止弁として働くボール弁32が設けられている。   The valve body 20 is pivotally mounted around a shaft 21, and an intermediate chamber 23 communicating with a signal water channel 24 is provided in a valve seat portion 22 with which the valve body 20 is in contact. The signal water channel 24 is connected to a three-way pipe 28 via a signal stop valve 25. The three-way pipe 28 is connected to a pressure switch mounting pipe 26 having a warning pressure switch 30 attached to the tip (upper end in FIG. 15). The drainage pipe 10 is connected to a drainage unit 27 connected thereto. An orifice 29 is provided on the drainage portion 27 side of the three-way pipe 28, and a ball valve 32 serving as a check valve for preventing a backflow from the drainage portion 27 side is provided.

また、上記中間室23は、常時、弁体20により封鎖されている。つまり、この中間室23と連通した信号水路24は、通常、排水部27を介して大気に開放された状態にある。   The intermediate chamber 23 is always sealed by the valve body 20. That is, the signal water channel 24 communicated with the intermediate chamber 23 is normally open to the atmosphere via the drainage part 27.

上記構成の自動警報弁2は、火災発生時、スプリンクラーヘッド13が火災を検知し、作動放水すると、1次側の水圧に比べて2次側の水圧が低下するので、弁体20が回動し、スプリンクラー管12の管路を開放する。このとき、流水の一部が中間室23を介して信号水路24内に流れ込み、その流れ込んだ水が、三方管28を経て圧力スイッチ取付管26に流れ込み、警報用圧力スイッチ30を作動させる。なお、このとき、余剰な水はオリフィス29を通って排水部27に排出されるが、このオリフィス29は、排水部27に排出される水の通路を絞ることにより、信号水路24内の水圧を保持させるように機能する。   In the automatic alarm valve 2 configured as described above, when the fire occurs, the sprinkler head 13 detects the fire and the water pressure on the secondary side is lower than the water pressure on the primary side when the water is discharged. Then, the pipe line of the sprinkler pipe 12 is opened. At this time, a part of the flowing water flows into the signal water channel 24 through the intermediate chamber 23, and the flowing water flows into the pressure switch mounting pipe 26 through the three-way pipe 28 and operates the alarm pressure switch 30. At this time, surplus water is discharged to the drainage portion 27 through the orifice 29. The orifice 29 reduces the water pressure in the signal water channel 24 by narrowing the passage of the water discharged to the drainage portion 27. Functions to hold.

そして、このようにして警報用圧力スイッチ30が作動すると、警報盤17へ火災検知信号が送られ、モーターサイレンなどの警報器15が鳴動すると共に、ポンプ制御盤18へスプリンクラーポンプ14の起動信号が送られ、スプリンクラーポンプ14が作動して水源45の水が、送水管11とスプリンクラー管12を介してスプリンクラーヘッド13へと送られ、消火用の散水が継続されるようになっている。   When the alarm pressure switch 30 is activated in this way, a fire detection signal is sent to the alarm panel 17, the alarm 15 such as a motor siren sounds, and the activation signal of the sprinkler pump 14 is sent to the pump control panel 18. Then, the sprinkler pump 14 is actuated, and the water from the water source 45 is sent to the sprinkler head 13 via the water supply pipe 11 and the sprinkler pipe 12 so that the watering for fire extinguishing is continued.

また、上記スプリンクラーシステムでは、スプリンクラーヘッド13よりも下流側となるスプリンクラー管12の下流端が、末端試験弁33を介して末端試験弁用排水管34に接続されている。このため、スプリンクラーシステムの機能維持を確保する上で、定期的に点検を行う必要がある。かかる点から、末端試験弁33を開放し、スプリンクラー管12内の水を末端試験弁用排水管34に排水して、スプリンクラーヘッド13からの散水がなされたのと同じ状況を作り、スプリンクラー管12内での1次側と2次側との差圧により弁体20を回動させてスプリンクラー管12の管路を開放することで、中間室23を介して信号水路24内から三方管28を経て圧力スイッチ取付管26に流れ込んだ流水によって、警報用圧力スイッチ30の作動を確認することが行われる。   Further, in the sprinkler system, the downstream end of the sprinkler pipe 12 on the downstream side of the sprinkler head 13 is connected to the terminal test valve drain pipe 34 via the terminal test valve 33. For this reason, in order to ensure the function maintenance of the sprinkler system, it is necessary to periodically inspect. From this point, the end test valve 33 is opened, and the water in the sprinkler pipe 12 is drained to the end test valve drain pipe 34 to create the same situation as the sprinkler head 13 is sprinkled. The valve body 20 is rotated by the pressure difference between the primary side and the secondary side in the inside to open the pipe line of the sprinkler pipe 12, so that the three-way pipe 28 is opened from the signal water path 24 through the intermediate chamber 23. The operation of the alarm pressure switch 30 is confirmed by the flowing water that has flowed into the pressure switch mounting pipe 26 after that.

そして、上記スプリンクラーシステムでは、スプリンクラーヘッド13の点検や交換などによりスプリンクラー管12内の水を抜く必要が生じた場合、作業を行う系統のスプリンクラー管12の1次側に設けられた制御弁35を閉め、1次側からの送水を遮断することにより、自動警報弁2の弁体20が回動しないようにし、この状態で、スプリンクラー管12の2次側に連通する連通管31に設けられた排水弁36を開放することにより、スプリンクラー管12内に溜まった水を連通管31を介して排水部27から排水管10に排水するようにしている。この場合、排水管10の下流端と末端試験弁用排水管34の下流端とは互いに合流し、その合流した水が長尺な合流管41(図14では便宜上、短尺に示す)を経て屋外の側溝42などに排出されるようにしている。   In the sprinkler system, when it is necessary to drain the water in the sprinkler pipe 12 due to inspection or replacement of the sprinkler head 13, the control valve 35 provided on the primary side of the sprinkler pipe 12 of the system that performs the work is provided. By closing and shutting off the water supply from the primary side, the valve body 20 of the automatic alarm valve 2 is prevented from rotating, and in this state, the communication pipe 31 communicating with the secondary side of the sprinkler pipe 12 is provided. By opening the drain valve 36, the water accumulated in the sprinkler pipe 12 is drained from the drain section 27 to the drain pipe 10 through the communication pipe 31. In this case, the downstream end of the drainage pipe 10 and the downstream end of the terminal test valve drainage pipe 34 merge with each other, and the joined water passes through a long junction pipe 41 (shown short for convenience in FIG. 14) to the outdoors. It is made to discharge | emit to the side groove 42 of this.

なお、図14において符号37は排水管10の先端に設けられた逆止弁、38は末端試験弁用排水管34に取り付けられた逆止弁、39は電気配線、40は電源をそれぞれ示している。   In FIG. 14, reference numeral 37 denotes a check valve provided at the tip of the drain pipe 10, 38 denotes a check valve attached to the terminal test valve drain pipe 34, 39 denotes electrical wiring, and 40 denotes a power source. Yes.

また、図16に示すように、排水管10が末端試験弁用排水管として共用されるようにしたスプリンクラーシステムもある。このものでは、スプリンクラー管12の2次側の下流端(各スプリンクラーヘッド13よりも下流側)が折り返されて排水管10側に延び、末端試験弁33を介して排水管10の排水部27の近辺に連結されている。また、排水管10の下流端は、屋外の側溝42などに開放している。   In addition, as shown in FIG. 16, there is also a sprinkler system in which the drain pipe 10 is shared as a terminal test valve drain pipe. In this configuration, the downstream end of the secondary side of the sprinkler tube 12 (downstream side of each sprinkler head 13) is folded back and extends to the drainage pipe 10 side, and the drainage portion 27 of the drainage pipe 10 is connected via the end test valve 33. It is connected in the vicinity. Further, the downstream end of the drain pipe 10 is open to the outdoor side groove 42 and the like.

特開2002−177412号公報Japanese Patent Laid-Open No. 2002-177412

ところで、上述したスプリンクラーシステムでは、スプリンクラーヘッド13の点検時や交換時などに排水部27から排水管10に排水される水や、機能維持を確保する上で定期的に行われる点検時にスプリンクラー管12から末端試験弁用排水管34や排水管10に排水される水が、初期工事の施工時に発生した切り粉等のゴミや異物を伴って末端試験弁用排水管34や排水管10を経て高所から低所まで流下し、この低所において合流管41で合流する。   By the way, in the above-described sprinkler system, the water that is drained from the drainage section 27 to the drain pipe 10 when the sprinkler head 13 is inspected or replaced, or the sprinkler pipe 12 that is regularly inspected to ensure function maintenance. The water drained into the terminal test valve drain pipe 34 and the drain pipe 10 from the terminal test valve drain pipe 34 and the drain pipe 10 is accompanied by dust and foreign matters such as chips generated during the initial construction. It flows down from the place to the low place, and merges at the low place at the junction pipe 41.

その場合、合流管41が、低所において横方向に配設されていたり、エルボなどの継手により迂回していると、水流の低下などによって合流管41の管路内でゴミや異物が局部的に堆積し、合流管41の管路内での水の流通が一時的に堰き止められるおそれがある。   In that case, if the junction pipe 41 is disposed in a lateral direction at a low place or is detoured by a joint such as an elbow, dust and foreign substances are localized in the pipeline of the junction pipe 41 due to a decrease in water flow or the like. There is a possibility that the water flow in the conduit of the junction pipe 41 is temporarily blocked.

また、排水管10が末端試験弁用排水管として共用される場合にも、排水管10を経て水を高所から低所まで流下させた排水管10が、低所において横方向に配設されていたり、エルボなどの継手により迂回していると、水流の低下などによって排水管10の管路内でもゴミや異物が局部的に堆積し、排水管10の管路内での水の流通が一時的に堰き止められるおそれがある。   In addition, even when the drain pipe 10 is shared as a terminal test valve drain pipe, the drain pipe 10 in which the water has flowed down from the high place to the low place through the drain pipe 10 is disposed in the lateral direction in the low place. If it is detoured by a joint such as an elbow, dirt and foreign matter accumulate locally in the pipe of the drain pipe 10 due to a decrease in the water flow, etc., and the flow of water in the pipe of the drain pipe 10 There is a risk of temporary damming.

このとき、合流管41又は排水管10の管路内で水の流通が一時的に堰き止められると、水が排水管10側に逆流してしまう。そのため、排水管10に逆流する水によって排水管10内の空気が圧縮され、この圧縮空気が他の系統の排水部27から信号水路24(三方管28及び圧力スイッチ取付管26)に逆流して圧力スイッチ30を誤作動させるおそれがある。これは、逆流した圧縮空気ではボール弁32を作動させることができないため、他の系統の排水部27から信号水路24に圧縮空気が逆流し、この圧縮空気によって圧力スイッチ30を誤作動させてしまうおそれがあるからである。   At this time, if the circulation of water is temporarily blocked in the pipe of the junction pipe 41 or the drain pipe 10, the water flows backward to the drain pipe 10 side. Therefore, the air in the drain pipe 10 is compressed by the water flowing back to the drain pipe 10, and this compressed air flows back from the drain section 27 of the other system to the signal water channel 24 (three-way pipe 28 and pressure switch mounting pipe 26). The pressure switch 30 may malfunction. This is because the ball valve 32 cannot be operated by the compressed air that has flowed back, and therefore, the compressed air flows backward from the drainage section 27 of the other system to the signal water channel 24, causing the pressure switch 30 to malfunction. Because there is a fear.

一方、スプリンクラーシステムにあっては、排水管10を縮径(例えば2インチから1.25インチ程度に縮径)して配管材料費および配管工事費を軽減したいという要求がある。このような要求を満たす上で、排水管10を縮径すると、スプリンクラーヘッド13の点検時や交換時などに排水部27から排水された水であっても排水管10をうまく流下せずに逆流するおそれがある。このため、当該排水管10内の空気が圧縮され、この圧縮された圧縮空気が他の系統の排水部27から信号水路24に逆流し、圧力スイッチ30を誤作動させてしまうこともある。   On the other hand, in the sprinkler system, there is a demand to reduce the piping material cost and the piping work cost by reducing the diameter of the drain pipe 10 (for example, reducing the diameter from about 2 inches to about 1.25 inches). If the diameter of the drain pipe 10 is reduced in order to satisfy such requirements, even if the water drained from the drain section 27 is inspected or replaced when the sprinkler head 13 is inspected, the drain pipe 10 does not flow down and flows backward. There is a risk. For this reason, the air in the drainage pipe 10 is compressed, and this compressed compressed air may flow backward from the drainage section 27 of the other system to the signal water channel 24 and cause the pressure switch 30 to malfunction.

本発明は、かかる点に鑑みてなされたものであり、その目的とするところは、排水管側に逆流する水又は排水管を縮径した際に逆流する水によって当該排水管内で圧縮された圧縮空気の逆流による他の系統での圧力スイッチの誤作動を確実に防止することができる自動警報弁を提供することにある。   The present invention has been made in view of such points, and the object of the present invention is to compress the water compressed in the drain pipe by the water flowing backward to the drain pipe side or the water flowing backward when the diameter of the drain pipe is reduced. An object of the present invention is to provide an automatic alarm valve that can reliably prevent malfunction of a pressure switch in another system due to air backflow.

上記目的を達成するため、本発明が講じた解決手段は、スプリンクラー管の管路中に設けられ、その管路を火災時に弁体により開放すると共に、この管路を流れる水の一部を圧力スイッチが設けられた信号水路へと導き、この圧力スイッチからスプリンクラーポンプおよび/または警報器に作動信号が送出されるようにした自動警報弁を前提とし、上記信号水路の上流端を、上記弁体が着座する弁座部に開口させ、その弁体の閉弁時に封鎖するとともに、上記信号水路の上記圧力スイッチよりも下流側をオリフィス及び逆止弁を介して排水部に連通させている。そして、上記逆止弁に、上端が上記排水部に連通すると共に下端が上記信号水路に連通する略鉛直な連通路内に設けられ、かつその連通路を上記スプリンクラー管の管路から信号水路に導かれた水の圧力により開放する一方その水の圧力が低下したときに自重により閉塞する開閉部材を備えていることを特徴とする。 In order to achieve the above object, the solution provided by the present invention is provided in a pipe line of a sprinkler pipe, and the pipe line is opened by a valve body in the event of a fire and a part of water flowing through the pipe line is pressurized Assuming an automatic alarm valve that leads to a signal water channel provided with a switch and an operation signal is sent from the pressure switch to a sprinkler pump and / or an alarm device, the upstream end of the signal water channel is connected to the valve body. Is opened when the valve element is closed, and the downstream side of the pressure switch of the signal water channel is communicated with the drainage portion via an orifice and a check valve. The check valve is provided in a substantially vertical communication path having an upper end communicating with the drainage portion and a lower end communicating with the signal water channel, and the communication channel is connected from the sprinkler pipe to the signal water channel. An opening / closing member that is opened by the pressure of the introduced water and that closes by its own weight when the pressure of the water drops is provided.

また、上記目的を達成するため、本発明が講じたその他の解決手段は、スプリンクラー管の管路中に設けられ、その管路を火災時に弁体により開放すると共に、この管路を流れる水の一部を圧力スイッチが設けられた信号水路へと導き、この圧力スイッチからスプリンクラーポンプおよび/または警報器に作動信号が送出されるようにした自動警報弁を前提とし、上記信号水路の上流端を、上記弁体が着座する弁座部に開口させ、その弁体の閉弁時に封鎖するとともに、上記信号水路の上記圧力スイッチよりも下流側をオリフィス及び逆止弁を介して排水部に連通させている。そして、上記逆止弁に、上端が上記排水部に連通すると共に下端が上記信号水路に連通する略鉛直な連通路内に設けられ、かつその連通路を上記スプリンクラー管の管路から信号水路に導かれた水の圧力により開放する一方その水の圧力が低下したときに付勢手段により閉塞する開閉部材を備えていることを特徴とする。 In order to achieve the above-mentioned object, another solution provided by the present invention is provided in a pipe line of a sprinkler pipe. The pipe line is opened by a valve body in the event of a fire, and water flowing through the pipe line is also provided. Assuming an automatic warning valve that leads partly to a signal waterway provided with a pressure switch and sends an activation signal from this pressure switch to a sprinkler pump and / or alarm device, the upstream end of the signal waterway is The valve body is opened when the valve body is seated, and the valve body is closed when the valve body is closed, and the downstream side of the pressure switch of the signal water channel is communicated with the drainage section through an orifice and a check valve. ing. The check valve is provided in a substantially vertical communication path having an upper end communicating with the drainage portion and a lower end communicating with the signal water channel, and the communication channel is connected from the sprinkler pipe to the signal water channel. An opening / closing member that is opened by the pressure of the introduced water and that is closed by the urging means when the pressure of the water drops is provided.

更に、上記目的を達成するため、本発明が講じたその他の解決手段は、スプリンクラー管の管路中に設けられ、その管路を火災時に弁体により開放すると共に、この管路を流れる水の一部を圧力スイッチが設けられた信号水路へと導き、この圧力スイッチからスプリンクラーポンプおよび/または警報器に作動信号が送出されるようにした自動警報弁を前提とし、上記信号水路の上流端を、上記弁体が着座する弁座部に開口させ、その弁体の閉弁時に封鎖するとともに、上記信号水路の上記圧力スイッチよりも下流側をオリフィス及び逆止弁を介して排水部に連通させている。そして、上記逆止弁に、上端が上記排水部に連通すると共に下端が上記信号水路に連通する略鉛直な連通路内に設けられ、かつその連通路を上記スプリンクラー管の管路から信号水路に導かれた水の圧力により開放する一方その水の圧力が低下したときに上記排水部側から作用する外圧により閉塞する開閉部材を備えていることを特徴とする。 In order to achieve the above object, another solution provided by the present invention is provided in a pipe line of a sprinkler pipe. The pipe line is opened by a valve body in the event of a fire, and water flowing through the pipe line is also provided. Assuming an automatic warning valve that leads partly to a signal waterway provided with a pressure switch and sends an activation signal from this pressure switch to a sprinkler pump and / or alarm device, the upstream end of the signal waterway is The valve body is opened when the valve body is seated, and the valve body is closed when the valve body is closed, and the downstream side of the pressure switch of the signal water channel is communicated with the drainage section through an orifice and a check valve. ing. The check valve is provided in a substantially vertical communication path having an upper end communicating with the drainage portion and a lower end communicating with the signal water channel, and the communication channel is connected from the sprinkler pipe to the signal water channel. An opening / closing member is provided which is opened by the pressure of the introduced water and is closed by an external pressure acting from the drainage portion side when the pressure of the water drops.

そして、上記連通路、上記開閉部材及び上記オリフィスを、上記信号水路と上記排水部との間に脱着自在に嵌装された脱着部材に一体的に設けることが好ましい。   The communication path, the opening / closing member, and the orifice are preferably provided integrally with a detachable member that is detachably fitted between the signal water channel and the drainage portion.

以上、要するに、圧力スイッチよりも下流側の信号水路に設けた逆止弁に、上端が排水部に連通しかつ下端が信号水路に連通する略鉛直な連通路を自重により閉塞する開閉部材を設けたり、逆止弁に、上端が排水部に連通しかつ下端が信号水路に連通する略鉛直な連通路を付勢手段により閉塞する開閉部材を設けたり、また、逆止弁に、上端が排水部に連通しかつ下端が信号水路に連通する略鉛直な連通路を排水部から作用する外圧により閉塞する開閉部材を設けたりすることで、排水管側に逆流する水によって排水管内で圧縮された圧縮空気が他の系統の排水部から信号水路に逆流しようとしても、信号水路に連通する略鉛直な連通路の下端が開閉部材の自重により閉塞されているために、信号水路への圧縮空気の逆流が阻止される。また、排水管を縮径した際に排水管をうまく流下しない水によって排水管内で圧縮された圧縮空気が他の系統の排水部から信号水路に逆流しようとしても、信号水路への圧縮空気の逆流が同様に阻止される。
これにより、排水管側に逆流する水はもちろんのこと排水管を縮径した際に逆流する水によって当該排水管内で圧縮された圧縮空気の逆流による他の系統での圧力スイッチの誤作動を確実に防止することができる。
しかも、排水管を縮径しても圧縮空気の逆流による他の系統での圧力スイッチの誤作動を確実に防止できることから、排水管の縮径化に伴う配管材料費および配管工事費の軽減化を図ることができ、実施する上で非常に有利なものとなる。
In short, the check valve provided in the signal water channel downstream of the pressure switch is provided with an opening / closing member that closes a substantially vertical communication path whose upper end communicates with the drainage portion and whose lower end communicates with the signal water channel by its own weight. The check valve is provided with an open / close member that closes a substantially vertical communication path whose upper end communicates with the drainage portion and whose lower end communicates with the signal water channel by the biasing means. Compressed in the drainage pipe by the water flowing back to the drainage pipe side by providing an open / close member that closes the substantially vertical communication path with the lower end communicating with the signal waterway by the external pressure acting from the drainage part. Even if the compressed air tries to flow backward from the drainage part of the other system to the signal channel, the lower end of the substantially vertical communication channel communicating with the signal channel is blocked by the weight of the opening / closing member. Backflow is prevented. In addition, when compressed air compressed in the drainage pipe by water that does not flow down the drainpipe when the drainage pipe is reduced in size tries to flow backward from the drainage part of other systems to the signal channel, the backflow of compressed air to the signal channel Is blocked as well.
This ensures the malfunction of pressure switches in other systems due to the backflow of compressed air compressed in the drainage pipe by the water flowing back when the diameter of the drainage pipe is reduced as well as the water flowing back to the drainage pipe side. Can be prevented.
Moreover, even if the drain pipe is reduced in diameter, it is possible to reliably prevent malfunction of the pressure switch in other systems due to the backflow of compressed air, thus reducing the piping material costs and piping construction costs associated with reducing the drain pipe diameter. This is very advantageous for implementation.

そして、信号水路と排水部との間に脱着自在に嵌装された脱着部材に、オリフィス、通路及び開閉部材を一体的に設けることで、オリフィス、連通路及び開閉部材の点検が信号水路と排水部との間から脱着部材を取り外して簡単に行え、オリフィス、連通路及び開閉部材の清掃を円滑に行うことができるとともに、オリフィス、連通路及び開閉部材の交換も脱着部材の交換により簡単に行え、点検時の作業効率を飛躍的に向上させることができる。   An orifice, a passage, and an opening / closing member are integrally provided in a detachable member that is detachably fitted between the signal water passage and the drainage portion, so that the inspection of the orifice, the communication passage, and the opening / closing member can be performed. The detachable member can be easily removed from the space, and the orifice, communication path, and opening / closing member can be smoothly cleaned, and the orifice, communication path, and opening / closing member can be easily replaced by replacing the detachable member. The work efficiency during inspection can be dramatically improved.

本発明の第1の実施の形態に係る自動警報弁の構成を示す断面図である。It is sectional drawing which shows the structure of the automatic alarm valve which concerns on the 1st Embodiment of this invention. 図1の自動警報弁の第2連結管の構成を示す断面図である。It is sectional drawing which shows the structure of the 2nd connecting pipe of the automatic alarm valve of FIG. 本発明の第1の実施の形態の変形例に係る自動警報弁の逆止弁の構成を示す断面図である。It is sectional drawing which shows the structure of the non-return valve of the automatic alarm valve which concerns on the modification of the 1st Embodiment of this invention. 本発明の第1の実施の形態のその他の変形例に係る自動警報弁の逆止弁の構成を示す断面図である。It is sectional drawing which shows the structure of the non-return valve of the automatic alarm valve which concerns on the other modification of the 1st Embodiment of this invention. 本発明の第1の実施の形態のその他の変形例に係る自動警報弁の逆止弁の構成を示す断面図である。It is sectional drawing which shows the structure of the non-return valve of the automatic alarm valve which concerns on the other modification of the 1st Embodiment of this invention. 本発明の第2の実施の形態に係る自動警報弁の逆止弁の構成を示す断面図である。It is sectional drawing which shows the structure of the non-return valve of the automatic alarm valve which concerns on the 2nd Embodiment of this invention. 本発明の第2の実施の形態の変形例に係る自動警報弁の逆止弁の構成を示す断面図である。It is sectional drawing which shows the structure of the non-return valve of the automatic alarm valve which concerns on the modification of the 2nd Embodiment of this invention. 同じく脱着部材を第3連通路側から見た背面図である。It is the rear view which similarly saw the detachable member from the 3rd communicating path side. 本発明の第2の実施の形態のその他の変形例に係る自動警報弁の逆止弁の構成を示す断面図である。It is sectional drawing which shows the structure of the non-return valve of the automatic alarm valve which concerns on the other modification of the 2nd Embodiment of this invention. 本発明の第3の実施の形態に係る自動警報弁の逆止弁の構成を示す断面図である。It is sectional drawing which shows the structure of the non-return valve of the automatic alarm valve which concerns on the 3rd Embodiment of this invention. 本発明の第4の実施の形態に係る自動警報弁の逆止弁の構成を示す断面図である。It is sectional drawing which shows the structure of the non-return valve of the automatic alarm valve which concerns on the 4th Embodiment of this invention. 本発明の第5の実施の形態に係る自動警報弁の構成を示す断面図である。It is sectional drawing which shows the structure of the automatic alarm valve which concerns on the 5th Embodiment of this invention. 図12の自動警報弁の逆止弁の構成を示す断面図である。It is sectional drawing which shows the structure of the non-return valve of the automatic alarm valve of FIG. スプリンクラーシステムを概略的に示す構成図である。It is a lineblock diagram showing a sprinkler system roughly. 従来例に係る自動警報弁の構成を示す断面図である。It is sectional drawing which shows the structure of the automatic alarm valve which concerns on a prior art example. その他のスプリンクラーシステムを概略的に示す構成図である。It is a block diagram which shows the other sprinkler system schematically.

以下、本発明を図示した実施の形態に基づき詳細に説明する。なお、図において、従来例で示したものと同一機能部品には、同一の符号を付している。   Hereinafter, the present invention will be described in detail based on illustrated embodiments. In the figure, the same functional parts as those shown in the conventional example are denoted by the same reference numerals.

図1は、本発明の第1の実施の形態に係る自動警報弁の構成を示す断面図である。この自動警報弁2は、従来のものと同様に、図14に示すようなスプリンクラーシステムに組み込まれ、使用されるものである。   FIG. 1 is a cross-sectional view showing a configuration of an automatic alarm valve according to a first embodiment of the present invention. This automatic alarm valve 2 is incorporated and used in a sprinkler system as shown in FIG.

ここで、本発明の自動警報弁2が使用されるスプリンクラーシステムについて簡単に説明すると、一般にスプリンクラーシステムは、図14の構成図に示すように、一本の送水管11を分岐するように、この送水管11に複数系統のスプリンクラー管12,12が連結されており、火災時には、スプリンクラーヘッド13,13,…の作動により圧力の下がった系統のスプリンクラー管12にのみ、通水されるようになっている。そのため、各スプリンクラー管12は、独立して機能するように、それぞれの送水管11側には、スプリンクラー管12の末端側の圧力低下により、その管路を開放してスプリンクラーヘッド13,13,…への通水を行うと同時に、この通水に連動してスプリンクラーポンプ14や、通水がなされた系統の警報器15に作動信号を送出する自動警報弁2が設けられている。   Here, the sprinkler system in which the automatic alarm valve 2 of the present invention is used will be briefly described. In general, the sprinkler system is configured so as to branch a single water pipe 11 as shown in the configuration diagram of FIG. A plurality of sprinkler pipes 12 and 12 are connected to the water supply pipe 11, and in the event of a fire, water is passed only to the sprinkler pipes 12 of the system whose pressure has been reduced by the operation of the sprinkler heads 13, 13,. ing. Therefore, the sprinkler heads 13, 13,... Are opened to the respective water supply pipes 11 by reducing the pressure on the end side of the sprinkler pipes 12 so that each sprinkler pipe 12 functions independently. At the same time that water is passed through, an automatic alarm valve 2 is provided that sends an operation signal to the sprinkler pump 14 and the alarm device 15 of the system through which water has passed in conjunction with this water flow.

この自動警報弁2は、送水管11に連結されたスプリンクラー管12の管路中に設けられ、このスプリンクラー管12内には、加圧水が充填されている。加圧水は、送水管11側の1次側(図1においてAで示す)と、スプリンクラーヘッド13側の2次側(図1においてBで示す)とが、ほぼ同圧あるいは、2次側の方が1次側よりも高圧(A≦B)になっている。したがって、軸21で回動自在に枢着された弁体20は、平常時、図1に実線で示す閉鎖状態を維持するようになっている。なお、この1次側の水の圧力は、送水管11に連結された圧力水槽16で一定に保たれるようになっている。   The automatic alarm valve 2 is provided in a pipe line of a sprinkler pipe 12 connected to a water supply pipe 11, and the sprinkler pipe 12 is filled with pressurized water. Pressurized water has approximately the same pressure on the primary side (indicated by A in FIG. 1) on the water pipe 11 side and the secondary side on the sprinkler head 13 side (indicated by B in FIG. 1) or on the secondary side. Is higher than the primary side (A ≦ B). Therefore, the valve body 20 pivotally attached to the shaft 21 is normally maintained in a closed state shown by a solid line in FIG. The primary water pressure is kept constant in a pressure water tank 16 connected to the water supply pipe 11.

また、上記弁体20が接する弁座部22には、信号水路24に連通した中間室23が設けられている。この信号水路24は、信号停止弁25を介して三方管28の内部に連通している。この三方管28には、一端(上流端)が信号停止弁25に連結された第1連結管281の他端(下流端)が連結されているとともに、一端(下流端)が排水部27を介して排水管10に連結された第2連結管282の他端(上流端)が連結されている。また、上記三方管28には、先端(下流端)に警報用圧力スイッチ30が取り付けられた圧力スイッチ取付管26の基端(上流端)が連結されている。そして、上記第2連結管282には、排水部27(排水管10)からの水の逆流を防止する逆止弁55が設けられている。また、上記第2連結管282は、その管本体50の下部を略水平方向へ延び、かつ上記三方管28に一端(図2では左端)が連通する第1連通路51と、上記管本体50の上部を略水平方向へ延び、上記排水部27に一端(図2では右端)が連通する第2連通路52と、上記管本体50の上面より下方に掘削されて略鉛直方向へ延び、上端が上記第2連通路52を介して排水部27に連通すると共に下端が上記第1連通路51を介して信号水路24に連通する連通路としての第3連通路53とを備えている。この第3連通路53は、その第2連通路52との連通部位よりも上端に螺着されたボルト状の閉塞部材54によって上端が閉塞されるようになっている。   Further, an intermediate chamber 23 communicating with the signal water channel 24 is provided in the valve seat portion 22 with which the valve body 20 contacts. The signal water channel 24 communicates with the inside of the three-way pipe 28 via a signal stop valve 25. The three-way pipe 28 is connected to the other end (downstream end) of the first connection pipe 281 whose one end (upstream end) is connected to the signal stop valve 25, and one end (downstream end) connects the drainage portion 27. The other end (upstream end) of the second connecting pipe 282 connected to the drain pipe 10 is connected. The three-way pipe 28 is connected to a base end (upstream end) of a pressure switch mounting pipe 26 to which an alarm pressure switch 30 is attached at a distal end (downstream end). The second connection pipe 282 is provided with a check valve 55 that prevents the backflow of water from the drainage section 27 (drainage pipe 10). The second connecting pipe 282 extends in a substantially horizontal direction at a lower portion of the pipe body 50 and has one end (left end in FIG. 2) communicating with the three-way pipe 28 and the pipe body 50. A second communication passage 52 that extends in a substantially horizontal direction and has one end (the right end in FIG. 2) communicated with the drainage portion 27, and is drilled downward from the upper surface of the pipe body 50 and extends in a substantially vertical direction. Is provided with a third communication path 53 as a communication path communicating with the drainage portion 27 via the second communication path 52 and having a lower end communicating with the signal water channel 24 via the first communication path 51. The upper end of the third communication passage 53 is closed by a bolt-shaped closing member 54 screwed to the upper end of the communication portion with the second communication passage 52.

そして、上記逆止弁55は、上記第3連通路53内に設けられた開閉部材56を備えている。この開閉部材56は、シリコンゴムなどの弾性体よりなり、球体状を呈している。また、上記第3連通路53は、上側に位置し、かつ開閉部材56の径よりも大径な上側連通部531と、下側に位置し、開閉部材56の径よりも小径な下側連通部532とを備えている。この上側連通部531の下端と下側連通部532の上端とは、その両者531,532間に介在させたテーパ部533によって、互いに異なる管径同士の連結を可能にしている。そして、上記開閉部材56は、弁体20の開放時にスプリンクラー管12の管路から中間室23を介して信号水路24に導かれた水の圧力により第3連通路53の上側連通部531内を浮遊し、上側連通部531の下端を開放する開放位置(図2に二点鎖線で示す位置)に移動する一方、弁体20の閉塞時つまり信号水路24に導かれた水の圧力が低下したときに自重により上側連通部531の下端を閉塞する閉塞位置(図2に実線で示す位置)に移動するようになっている。この場合、閉塞部材54のねじ部541の先端には、第2連結管282の他端に重なるように下方(上側連通部531側)に突出する突起542が設けられ、この突起542によって開閉部材56の開放位置よりも第2連結管282側への移動を規制している。   The check valve 55 includes an opening / closing member 56 provided in the third communication passage 53. The opening / closing member 56 is made of an elastic body such as silicon rubber and has a spherical shape. The third communication passage 53 is located on the upper side and has an upper communication portion 531 having a diameter larger than the diameter of the opening / closing member 56 and a lower communication located on the lower side and smaller in diameter than the diameter of the opening / closing member 56. Part 532. The lower end of the upper communication portion 531 and the upper end of the lower communication portion 532 enable connection of pipe diameters different from each other by a taper portion 533 interposed between the both. The opening / closing member 56 is formed in the upper communication portion 531 of the third communication passage 53 by the pressure of water introduced from the conduit of the sprinkler tube 12 to the signal water passage 24 through the intermediate chamber 23 when the valve body 20 is opened. While floating and moving to an open position (a position indicated by a two-dot chain line in FIG. 2) where the lower end of the upper communication portion 531 is opened, the pressure of the water guided to the signal water channel 24 when the valve body 20 is closed, that is, is decreased. Sometimes it moves to a closed position (position indicated by a solid line in FIG. 2) that closes the lower end of the upper communication portion 531 due to its own weight. In this case, a protrusion 542 that protrudes downward (on the upper communication part 531 side) is provided at the tip of the screw part 541 of the closing member 54 so as to overlap the other end of the second connection pipe 282, and the opening / closing member is provided by the protrusion 542. The movement to the 2nd connecting pipe 282 side is controlled rather than the open position of 56.

また、上記第1連通路51には、その管路を略半分程度に縮径させたオリフィス57が設けられている。なお、図2中における矢印は、弁体20によるスプリンクラー管12の管路の開放時に信号水路24から第2連結管282に導かれる水の流れ方向を示している。   The first communication passage 51 is provided with an orifice 57 whose diameter is reduced by about half. In addition, the arrow in FIG. 2 has shown the flow direction of the water guide | induced to the 2nd connecting pipe 282 from the signal water path 24 at the time of open | release of the pipe line of the sprinkler pipe | tube 12 by the valve body 20. FIG.

ここで、上記構成を有する本発明の自動警報弁2の機能について説明する。まず、火災発生時、スプリンクラーヘッド13,13,…が火災を検知し、作動放水すると、スプリンクラー管12の1次側(図1においてAで示す)の水圧に比べて2次側(図1においてBで示す)の水圧が低下(A>B)するので、弁体20が回動し、スプリンクラー管12の管路を開放する。この弁体20によるスプリンクラー管12の管路の開放時つまり弁体20の開放時に、流水の一部が中間室23を介して信号水路24内に流れ込み、流れ込んだ水は、三方管28の第1連結管281を経て、圧力スイッチ取付管26に流れ込んで警報用圧力スイッチ30を作動させる。このとき、一部の水は、第2連結管282のオリフィス57を通って排水部27に排出されるが、このオリフィス57の部分で水の通路が絞られることにより、信号水路24内の水圧が、警報用圧力スイッチ30の作動に必要な圧力となるものである。   Here, the function of the automatic alarm valve 2 of the present invention having the above configuration will be described. First, in the event of a fire, when the sprinkler heads 13, 13,... Detect a fire and discharge water, the secondary side (in FIG. 1) is compared with the water pressure on the primary side of the sprinkler pipe 12 (indicated by A in FIG. 1). Since the water pressure (shown by B) decreases (A> B), the valve body 20 rotates and the pipe line of the sprinkler pipe 12 is opened. When the pipe body of the sprinkler pipe 12 is opened by the valve body 20, that is, when the valve body 20 is opened, a part of the flowing water flows into the signal water path 24 through the intermediate chamber 23, and the water that has flowed in the three-way pipe 28. The alarm pressure switch 30 is actuated by flowing into the pressure switch mounting pipe 26 via the one connecting pipe 281. At this time, a part of the water is discharged to the drainage portion 27 through the orifice 57 of the second connecting pipe 282. By narrowing the water passage at the orifice 57, the water pressure in the signal water passage 24 is reduced. However, the pressure is necessary for the operation of the alarm pressure switch 30.

そして、このようにして警報用圧力スイッチ30が作動すると、警報盤17へ火災検知信号が送られ、モーターサイレンなどの警報器15が鳴動すると共に、ポンプ制御盤18へスプリンクラーポンプ14の起動信号が送られ、スプリンクラーポンプ14が作動して水源45の水が、送水管11とスプリンクラー管12を介してスプリンクラーヘッド13,13,…へと送られ、消火用の散水が継続されるものである。   When the alarm pressure switch 30 is activated in this way, a fire detection signal is sent to the alarm panel 17, the alarm 15 such as a motor siren sounds, and the activation signal of the sprinkler pump 14 is sent to the pump control panel 18. Then, the sprinkler pump 14 is operated and the water in the water source 45 is sent to the sprinkler heads 13, 13,... Via the water supply pipe 11 and the sprinkler pipe 12, and the watering for fire extinguishing is continued.

なお、このとき、スプリンクラーが作動していない他の系統の自動警報弁2は、2次側の水圧が高いため、弁体20が回動せず、この系統のスプリンクラー管12への送水はない。   At this time, the automatic warning valve 2 of the other system in which the sprinkler is not operating has a high water pressure on the secondary side, so that the valve body 20 does not rotate and water is not supplied to the sprinkler pipe 12 of this system. .

このように本発明の自動警報弁2は、火災時には、従来のものと何ら変わることなく、正確に機能する。   Thus, the automatic alarm valve 2 of the present invention functions accurately without any change from the conventional one in the event of a fire.

次に、本発明の自動警報弁2が要旨とする誤動作防止機能について説明する。   Next, the malfunction prevention function which the automatic alarm valve 2 of this invention makes a summary is demonstrated.

一般に、スプリンクラーシステムでは、機能維持を確保する上で定期的に点検を行う必要があるため、末端試験弁33を開放し、スプリンクラー管12内の水を末端試験弁用排水管34に排水して、スプリンクラーヘッド13からの散水がなされたのと同じ状況を作り、スプリンクラー管12内での1次側と2次側との差圧により弁体20を回動させてスプリンクラー管12の管路を開放することで、中間室23を介して信号水路24内から三方管28を経て圧力スイッチ取付管26に流れ込んだ流水によって、警報用圧力スイッチ30の作動を確認することが行われる。   In general, since it is necessary to periodically check the sprinkler system to maintain its function, the end test valve 33 is opened, and the water in the sprinkler pipe 12 is drained to the end test valve drain pipe 34. The sprinkler head 13 is sprinkled with water, and the valve body 20 is rotated by the pressure difference between the primary side and the secondary side in the sprinkler pipe 12 to thereby connect the pipe line of the sprinkler pipe 12. By opening, the operation of the alarm pressure switch 30 is confirmed by the flowing water flowing into the pressure switch mounting pipe 26 from the signal water passage 24 through the intermediate chamber 23 through the three-way pipe 28.

また、上記スプリンクラーシステムでは、スプリンクラーヘッド13の点検や交換などによりスプリンクラー管12内の水を抜く必要が生じた場合、その作業を行う系統のスプリンクラー管12の1次側に設けられた制御弁35を閉め、1次側からの送水を遮断することにより、自動警報弁2の弁体20が回動しないようにし、この状態で、スプリンクラー管12の2次側に連通する連通管31に設けられた排水弁36を開放することにより、スプリンクラー管12内に溜まった水を連通管31を介して排水部27から排水管10に排水するようにしている。この場合、排水管10の下流端と末端試験弁用排水管34の下流端とは互いに合流しており、その合流した水が、横方向に延びる長尺な合流管41を経て屋外の側溝42などに排出される。   In the sprinkler system, when it is necessary to drain the water in the sprinkler pipe 12 due to inspection or replacement of the sprinkler head 13, the control valve 35 provided on the primary side of the sprinkler pipe 12 of the system performing the work. Is closed, and the water supply from the primary side is shut off so that the valve body 20 of the automatic alarm valve 2 does not rotate. In this state, the communication pipe 31 communicated with the secondary side of the sprinkler pipe 12 is provided. By opening the drain valve 36, the water accumulated in the sprinkler pipe 12 is drained from the drain section 27 to the drain pipe 10 through the communication pipe 31. In this case, the downstream end of the drain pipe 10 and the downstream end of the terminal test valve drain pipe 34 merge with each other, and the merged water passes through a long junction pipe 41 extending in the lateral direction, and the outdoor side groove 42. Are discharged.

ところで、上述したスプリンクラーシステムにあっては、スプリンクラーヘッド13の点検時や交換時などに排水部27から排水管10に排水される水や、機能維持を確保する上で定期的に行われる点検時にスプリンクラー管12から末端試験弁用排水管34や排水管10に排水される水が、初期工事の施工時に発生した切り粉等のゴミや異物を伴って末端試験弁用排水管34や排水管10を経て高所から低所まで流下し、この低所において合流管41で合流する。その場合、合流管41が、低所において横方向に延びているため、水流の低下などによって合流管41の管路内でゴミや異物が局部的に堆積するおそれがある。このとき、合流管41の管路内でゴミや異物の局部的な堆積によって水の流通が一時的に堰き止められると、末端試験弁用排水管34からの水が排水管10側に逆流することがある。そのため、末端試験弁用排水管34から排水管10に逆流する水によって排水管10内の空気が圧縮され、この圧縮空気が他の系統の排水部27から信号水路24(三方管28及び圧力スイッチ取付管26)に逆流して圧力スイッチ30を誤作動させることがある。   By the way, in the above-described sprinkler system, when the sprinkler head 13 is inspected or replaced, the water drained from the drainage section 27 to the drain pipe 10 or the inspection periodically performed to ensure function maintenance. The water drained from the sprinkler pipe 12 to the terminal test valve drain pipe 34 and the drain pipe 10 is accompanied by dust and foreign matters such as chips generated during construction of the initial work, and the terminal test valve drain pipe 34 and the drain pipe 10. Then, it flows down from a high place to a low place, and merges at the low place at a junction pipe 41. In that case, since the junction pipe 41 extends in the lateral direction at a low place, there is a possibility that dust and foreign substances may locally accumulate in the pipeline of the junction pipe 41 due to a decrease in water flow. At this time, if the circulation of water is temporarily blocked by the local accumulation of dust and foreign matters in the pipe of the junction pipe 41, the water from the terminal test valve drain pipe 34 flows back to the drain pipe 10 side. Sometimes. Therefore, the air in the drain pipe 10 is compressed by the water flowing backward from the terminal test valve drain pipe 34 to the drain pipe 10, and this compressed air is sent from the drain section 27 of the other system to the signal water channel 24 (three-way pipe 28 and pressure switch). The pressure switch 30 may malfunction due to backflow in the mounting tube 26).

一方、スプリンクラーシステムにあっては、排水管10を縮径して配管材料費および配管工事費を軽減したいという要求がある。このような要求を満たす上で、排水管10を縮径すると、スプリンクラーヘッド13の点検時や交換時などに排水部27から排水された水であっても排水管10をうまく流下せずに逆流するおそれがある。このため、当該排水管10内の空気が圧縮され、この圧縮された圧縮空気が他の系統の排水部27から信号水路24に逆流し、圧力スイッチ30を誤作動させてしまうことがある。   On the other hand, in the sprinkler system, there is a demand for reducing the diameter of the drain pipe 10 to reduce the piping material cost and the piping work cost. If the diameter of the drain pipe 10 is reduced in order to satisfy such requirements, even if the water drained from the drain section 27 is inspected or replaced when the sprinkler head 13 is inspected, the drain pipe 10 does not flow down and flows backward. There is a risk. For this reason, the air in the said drain pipe 10 is compressed, and this compressed compressed air may flow backward from the drainage part 27 of another system to the signal water channel 24, and may cause the pressure switch 30 to malfunction.

このとき、他の系統のスプリンクラー管12では、弁体20が閉塞しているため、上端が第2連通路52を介して排水部27に連通すると共に下端が第1連通路51を介して信号水路24に連通する第3連通路53の上側連通部531の下端を開閉部材56が自重によって閉塞している。このため、末端試験弁用排水管34から排水管10側に逆流する水によって排水管10内で圧縮された圧縮空気が他の系統の排水部27から信号水路24(三方管28及び圧力スイッチ取付管26)に逆流しようとしても、その逆流した圧縮空気によって開閉部材56が上方から押圧され、これによって圧縮空気の逆流が開閉部材56により確実に阻止される。また、排水管10を縮径した際に排水管10をうまく流下しない水によって排水管10内で圧縮された圧縮空気が他の系統の排水部27から信号水路24に逆流しようとしても、信号水路24への圧縮空気の逆流が開閉部材56により同様に阻止される。
これにより、排水管10側に逆流する水はもちろんのこと排水管10を縮径した際に逆流する水によって当該排水管10内で圧縮された圧縮空気の逆流による他の系統での圧力スイッチ30の誤作動を確実に防止することができる。
At this time, since the valve element 20 is closed in the sprinkler pipe 12 of the other system, the upper end communicates with the drainage portion 27 via the second communication path 52 and the lower end communicates with the signal via the first communication path 51. An opening / closing member 56 closes the lower end of the upper communication portion 531 of the third communication passage 53 communicating with the water channel 24 by its own weight. For this reason, the compressed air compressed in the drain pipe 10 by the water flowing backward from the end test valve drain pipe 34 to the drain pipe 10 side passes from the drain section 27 of the other system to the signal water channel 24 (three-way pipe 28 and pressure switch mounting). Even if it tries to flow backward to the pipe 26), the opening / closing member 56 is pressed from above by the compressed air that has flowed back, so that the backward flow of the compressed air is reliably prevented by the opening / closing member 56. In addition, even if compressed air compressed in the drain pipe 10 by water that does not flow down the drain pipe 10 when the drain pipe 10 is reduced in diameter is going to flow backward from the drainage section 27 of another system to the signal water path 24, the signal water path The backflow of the compressed air to 24 is similarly prevented by the opening / closing member 56.
As a result, the pressure switch 30 in the other system is caused by the backflow of the compressed air compressed in the drainage pipe 10 by the water flowing back when the diameter of the drainage pipe 10 is reduced as well as the water flowing back to the drainage pipe 10 side. Can be reliably prevented from malfunctioning.

しかも、排水管10を縮径しても圧縮空気の逆流による他の系統での圧力スイッチ30の誤作動を確実に防止できることから、排水管10の縮径化に伴う配管材料費および配管工事費の軽減化を図ることができ、実施する上で非常に有利なものとなる。   Moreover, since the malfunction of the pressure switch 30 in other systems due to the backflow of compressed air can be reliably prevented even if the drain pipe 10 is reduced in diameter, the piping material cost and the piping work cost associated with the reduction in the diameter of the drain pipe 10 can be prevented. Can be reduced, which is very advantageous in implementation.

なお、上記第1の実施の形態では、第1連結管281にオリフィス57を設けたが、図3に示すように、第1連通路51を均一な管径に形成し、第2連通路52の一側(図3では左側)に、その管路を略半分程度に縮径させたオリフィス57が設けられていてもよい。   In the first embodiment, the orifice 57 is provided in the first connection pipe 281. However, as shown in FIG. 3, the first communication path 51 is formed to have a uniform pipe diameter, and the second communication path 52 is formed. One side (left side in FIG. 3) may be provided with an orifice 57 whose diameter is reduced by about half.

また、図4に示すように、第1及び第2連通路51,52をそれぞれ均一な管径に形成し、第3連通路53の上側連通部531の下側に、管径を上側連通部531の管径の略五分の一程度に縮径させたオリフィス57が設けられていてもよい。   Further, as shown in FIG. 4, the first and second communication passages 51 and 52 are each formed to have a uniform pipe diameter, and the pipe diameter is set below the upper communication portion 531 of the third communication passage 53. An orifice 57 having a diameter reduced to approximately one fifth of the tube diameter of 531 may be provided.

また、上記第1の実施の形態では、開閉部材56をシリコンゴムなどの弾性体により球体状に成形したが、図5に示すように、第1及び第2連通路51,52をそれぞれ均一な管径に形成し、第3連通路53の上側連通部531の下側に、管径を上側連通部531の管径の略五分の一程度に縮径させたオリフィス57を設けるとともに、上側連通部531の下面にゴムパッキン61を敷設して、開閉部材62が鋼球により構成されるようにしてもよい。   In the first embodiment, the opening / closing member 56 is formed in a spherical shape by an elastic body such as silicon rubber. However, as shown in FIG. 5, the first and second communication passages 51 and 52 are each made uniform. An orifice 57 having a pipe diameter and having a pipe diameter reduced to about one fifth of the pipe diameter of the upper communication part 531 is provided below the upper communication part 531 of the third communication path 53. A rubber packing 61 may be laid on the lower surface of the communication portion 531 so that the opening / closing member 62 is formed of a steel ball.

次に、本発明の第2の実施の形態を図6に基づいて説明する。
この第2の実施の形態では、オリフィス、第3連通路及び開閉部材を一体的に設けている。なお、オリフィス、第3連通路及び開閉部材を除くその他の構成は、上記第1の実施の形態と同じであり、同一部分については、同じ符号を付して、その詳細な説明は省略する。
Next, a second embodiment of the present invention will be described with reference to FIG.
In the second embodiment, the orifice, the third communication path, and the opening / closing member are integrally provided. The other configurations except for the orifice, the third communication path, and the opening / closing member are the same as those in the first embodiment, and the same portions are denoted by the same reference numerals and detailed description thereof is omitted.

すなわち、本実施の形態では、図6に示すように、信号水路24に連通する第1連通路51と、排水部27に連通する第2連通路52との間には、第2連結管282の管本体50の上面に設けられた断面略円形状の凹部70に対し上方から脱着自在な脱着部材71が嵌装されている。この脱着部材71は、上端に鍔部711を有して略円筒形状に形成され、その内部にオリフィス72、第3連通路73及び開閉部材74を備えている。   That is, in the present embodiment, as shown in FIG. 6, the second connection pipe 282 is provided between the first communication path 51 communicating with the signal water channel 24 and the second communication path 52 communicating with the drainage portion 27. A detachable member 71 that is detachable from above is fitted into a recess 70 having a substantially circular cross section provided on the upper surface of the tube main body 50. The detachable member 71 has a flange portion 711 at the upper end and is formed in a substantially cylindrical shape, and includes an orifice 72, a third communication path 73, and an opening / closing member 74 inside the detachable member 71.

上記第3連通路73は、上記脱着部材71の上面より下方に掘削されて略鉛直方向へ延び、上端が上記第2連通路52を介して排水部27に連通すると共に下端が上記第1連通路51を介して信号水路24に連通している。この第3連通路73は、第2連通路52との連通部位よりも上端に螺着されたボルト状の閉塞部材54によって上端が閉塞されるようになっている。   The third communication path 73 is excavated downward from the upper surface of the detachable member 71 and extends in a substantially vertical direction. An upper end of the third communication path 73 communicates with the drainage portion 27 through the second communication path 52 and a lower end of the first communication path 73. The signal water channel 24 communicates with the channel 51. The upper end of the third communication passage 73 is closed by a bolt-shaped closing member 54 screwed to the upper end of the communication portion with the second communication passage 52.

上記開閉部材74は、上記第3連通路73内に設けられている。この開閉部材74は、シリコンゴムなどの弾性体よりなり、球体状を呈している。また、上記第3連通路73は、上側に位置し、かつ開閉部材56の径よりも大径な上側連通部731を備えている。   The opening / closing member 74 is provided in the third communication path 73. The opening / closing member 74 is made of an elastic body such as silicon rubber and has a spherical shape. The third communication path 73 includes an upper communication portion 731 that is positioned on the upper side and has a diameter larger than the diameter of the opening / closing member 56.

上記オリフィス72は、上記第3連通路73の下側に位置し、上側連通部731の管径の略四分の一程度に縮径されている。この上側連通部731の下端とオリフィス72の上端とは、その両者731,72間に介在させたテーパ部733によって、互いに異なる管径同士の連結を可能にしている。そして、上記開閉部材74は、弁体20の開放時にスプリンクラー管12の管路から中間室23を介して信号水路24に導かれた水の圧力により第3連通路73の上側連通部731内を浮遊し、上側連通部731の下端を開放する開放位置(図6に二点鎖線で示す位置)に移動する一方、弁体20の閉塞時(信号水路24に導かれた水の圧力が低下したとき)に自重により上側連通部731の下端を閉塞する閉塞位置(図6に実線で示す位置)に移動するようになっている。この場合、脱着部材71は、その軸線方向の長さが凹部70の軸線方向の長さよりも短く設定され、鍔部711を管本体50の上面に密接するまで螺着させた際に凹部70の底部に形成される空間701を介してオリフィス57が第1連通路51に連通している。   The orifice 72 is positioned below the third communication passage 73 and is reduced in diameter to about one quarter of the tube diameter of the upper communication portion 731. The lower end of the upper communication portion 731 and the upper end of the orifice 72 enable connection of pipe diameters different from each other by a taper portion 733 interposed between the both ends 731 and 72. The opening / closing member 74 is formed in the upper communication portion 731 of the third communication passage 73 by the pressure of water introduced from the conduit of the sprinkler tube 12 to the signal water passage 24 through the intermediate chamber 23 when the valve body 20 is opened. While floating and moving to an open position (a position indicated by a two-dot chain line in FIG. 6) that opens the lower end of the upper communication portion 731, the pressure of the water guided to the signal water passage 24 decreased when the valve body 20 was closed. ) To the closed position (position indicated by a solid line in FIG. 6) that closes the lower end of the upper communication portion 731 by its own weight. In this case, the detachable member 71 has a length in the axial direction shorter than the length in the axial direction of the recess 70, and when the flange portion 711 is screwed until it comes into close contact with the upper surface of the pipe body 50, The orifice 57 communicates with the first communication path 51 through a space 701 formed at the bottom.

また、上記脱着部材71の鍔部711よりも下方の外周面の略中央部には、管本体50の凹部70に対し螺着される雄ねじ部712が設けられている。この雄ねじ部712を挟んだ外周面の上下両端位置には、それぞれOリング75,75が設けられ、この各Oリング75によって、第2連結管282の凹部70に対する脱着部材71の上下両端での水密性が確保されている。この場合、第2連通路52は、脱着部材71を凹部70に螺着させた状態で穿設される。   Further, a male screw portion 712 that is screwed into the concave portion 70 of the tube main body 50 is provided at a substantially central portion of the outer peripheral surface below the flange portion 711 of the detachable member 71. O-rings 75 and 75 are respectively provided at both upper and lower end positions of the outer peripheral surface sandwiching the male screw portion 712, and the O-rings 75 are provided at both upper and lower ends of the detachable member 71 with respect to the concave portion 70 of the second connecting pipe 282. Water tightness is ensured. In this case, the second communication passage 52 is formed with the detachable member 71 screwed into the recess 70.

この実施の形態では、第2連結管282の管本体50の凹部70に脱着自在な脱着部材71が上方から嵌装され、この脱着部材71が、信号水路24に連通する第1連通路51と排水部27に連通する第2連通路52とに連通する第3連通路73と、この第3連通路73の上側連通部731に設けられた開閉部材74と、上記第3連通路73の下側に設けられたオリフィス72とを備えている。このため、オリフィス72、第3連通路73及び開閉部材74の点検が第1連通路51と第2連通路52との間つまり管本体50の凹部70から脱着部材71を取り外して簡単に行える。これにより、オリフィス72、第3連通路73及び開閉部材74の清掃を円滑に行うことができるとともに、オリフィス72、第3連通路73及び開閉部材74の交換も脱着部材71の交換により簡単に行え、点検時の作業効率を飛躍的に向上させることができる。   In this embodiment, a detachable member 71 detachably attached to the recess 70 of the pipe body 50 of the second connecting pipe 282 is fitted from above, and the detachable member 71 is connected to the first communication path 51 communicating with the signal water channel 24. A third communication path 73 that communicates with the second communication path 52 that communicates with the drainage section 27, an open / close member 74 provided in the upper communication section 731 of the third communication path 73, and a lower part of the third communication path 73. And an orifice 72 provided on the side. Therefore, the inspection of the orifice 72, the third communication path 73, and the opening / closing member 74 can be easily performed by removing the detachable member 71 between the first communication path 51 and the second communication path 52, that is, from the recess 70 of the pipe body 50. Accordingly, the orifice 72, the third communication path 73, and the opening / closing member 74 can be smoothly cleaned, and the orifice 72, the third communication path 73, and the opening / closing member 74 can be easily replaced by replacing the detachable member 71. The work efficiency during inspection can be dramatically improved.

なお、上記第2の実施の形態では、脱着部材71を管本体50の凹部70に上方から嵌装させたが、図7に示すように、排水部27に連通する第2連通路52と、信号水路24に連通する第1連通路51との間に、第2連結管282の管本体50の下面に設けられた断面略円形状の凹部70に対し下方から脱着自在な脱着部材71が嵌装されていてもよい。この場合、脱着部材71は、その軸線方向の長さが凹部70の軸線方向の長さよりも短く設定され、鍔部711を管本体50の下面に密接するまで螺着させた際に凹部70の底部との間に形成される空間701を介して第3連通路73の上側連通部731が第2連通路52に連通している。更に、図8にも示すように、第3連通路73の上端には、その第3連通路73の管路を二分するように管径方向に連結するストッパピン76が固設され、このストッパピン76によって開閉部材74の開放位置(図7に二点鎖線で示す位置)よりも第2連結管282側への移動を規制している。また、第1連通路51は、脱着部材71を凹部70に螺着させた状態でオリフィス72の下端と連通するように脱着部材71の中心付近まで穿設される。このものでは、第3連通路73の端部(上端)を閉塞するボルト状の閉塞部材が不要となり、部品点数の削減化とこれに伴う水密性の向上及び構造のシンプル化を図ることが可能となる。   In the second embodiment, the detachable member 71 is fitted into the concave portion 70 of the pipe body 50 from above. However, as shown in FIG. 7, the second communication passage 52 communicating with the drainage portion 27, A detachable member 71 that is detachable from below is fitted into a recess 70 having a substantially circular cross section provided on the lower surface of the pipe body 50 of the second connecting pipe 282 between the first communicating path 51 communicating with the signal water channel 24. You may be dressed. In this case, the detachable member 71 has a length in the axial direction shorter than the length in the axial direction of the recess 70, and when the flange portion 711 is screwed until it comes into close contact with the lower surface of the pipe body 50, The upper communication portion 731 of the third communication passage 73 communicates with the second communication passage 52 through a space 701 formed between the bottom portion and the bottom portion. Further, as shown in FIG. 8, a stopper pin 76 that is connected in the pipe radial direction so as to bisect the pipe line of the third communication path 73 is fixed to the upper end of the third communication path 73. The pin 76 restricts the movement of the opening / closing member 74 from the open position (the position indicated by the two-dot chain line in FIG. 7) toward the second connecting pipe 282. Further, the first communication passage 51 is drilled to the vicinity of the center of the detachable member 71 so as to communicate with the lower end of the orifice 72 in a state where the detachable member 71 is screwed into the recess 70. This eliminates the need for a bolt-shaped closing member that closes the end portion (upper end) of the third communication passage 73, and can reduce the number of parts, improve the water-tightness associated therewith, and simplify the structure. It becomes.

また、図9に示すように、排水部27に連通する第2連通路52と、信号水路24に連通する第1連通路51との間に、第2連結管282の管本体50の下面に設けられた断面略円形状の凹部70に対し下方から脱着自在な脱着部材71が嵌装されているものにおいて、第3連通路73を上側連通部731と下側連通部732とで構成し、この下側連通部732の下端と第1連通路51の一端(図9では右端)との間に、管径を第1連通路51の管径の略四分の一程度に縮径させたオリフィス72が設けられていてもよい。この場合、第1連通路51及びオリフィス72は、脱着部材71を凹部70に螺着させた状態で穿設されている。   Further, as shown in FIG. 9, between the second communication passage 52 communicating with the drainage portion 27 and the first communication passage 51 communicating with the signal water passage 24, the lower surface of the pipe body 50 of the second connection pipe 282 is provided. In what is provided with a detachable member 71 that is detachable from below with respect to the recess 70 having a substantially circular cross section provided, the third communication path 73 is composed of an upper communication part 731 and a lower communication part 732, Between the lower end of the lower communication portion 732 and one end (the right end in FIG. 9) of the first communication passage 51, the tube diameter is reduced to about one quarter of the tube diameter of the first communication passage 51. An orifice 72 may be provided. In this case, the first communication path 51 and the orifice 72 are formed in a state where the detachable member 71 is screwed into the recess 70.

次に、本発明の第3の実施の形態を図10に基づいて説明する。
この第3の実施の形態では、開閉部材の構成を変更している。なお、開閉部材を除くその他の構成は、上記第2の実施の形態と同じであり、同一部分については、同じ符号を付して、その詳細な説明は省略する。
Next, a third embodiment of the present invention will be described with reference to FIG.
In the third embodiment, the configuration of the opening / closing member is changed. The other configurations except for the opening / closing member are the same as those of the second embodiment, and the same portions are denoted by the same reference numerals and detailed description thereof is omitted.

すなわち、本実施の形態では、図10に示すように、脱着部材71の内部を略鉛直方向に延びる第3連通路73は、上側連通部731と、この上側連通部731の下側に位置し、上側連通部731の管径の略四分の一程度に縮径されたオリフィス72とを備えている。また、上記第3連通路73の上側連通部731の上側には略鉛直方向に延びるシリンダ室77が連設され、このシリンダ室77は、管本体50の上端に螺着されたボルト状の閉塞部材80によって上端が閉塞されている。   That is, in the present embodiment, as shown in FIG. 10, the third communication passage 73 extending in the substantially vertical direction inside the detachable member 71 is located on the upper communication portion 731 and on the lower side of the upper communication portion 731. And an orifice 72 having a diameter reduced to approximately one quarter of the tube diameter of the upper communication portion 731. Further, a cylinder chamber 77 extending in a substantially vertical direction is connected to the upper side of the upper communication portion 731 of the third communication path 73, and the cylinder chamber 77 is a bolt-shaped blockage screwed to the upper end of the pipe body 50. The upper end is closed by the member 80.

開閉部材78は、上記第3連通路73の上側連通部731とシリンダ室77との間に跨って当該両者731,77を区画するように設けられている。この開閉部材78は、シリンダ室77の周面に沿って上下方向に摺動するピストンよりなる。また、上記開閉部材78は、その上面より下方に凹設された凹部空間781を有し、その凹部空間781の底面と閉塞部材80のねじ部801の先端との間に縮装された付勢手段としての付勢スプリング79によって下方に付勢されている。更に、上記開閉部材78の下面には、シート状のゴムパッキン782が取り付けられている。   The opening / closing member 78 is provided so as to partition the upper communication portion 731 of the third communication passage 73 and the cylinder chamber 77 from each other. The opening / closing member 78 is composed of a piston that slides in the vertical direction along the circumferential surface of the cylinder chamber 77. The opening / closing member 78 has a recessed space 781 that is recessed below the upper surface thereof, and is biased between the bottom surface of the recessed space 781 and the tip of the screw portion 801 of the closing member 80. It is biased downward by a biasing spring 79 as a means. Further, a sheet-like rubber packing 782 is attached to the lower surface of the opening / closing member 78.

そして、上記開閉部材78は、弁体20の開放時にスプリンクラー管12の管路から中間室23を介して信号水路24に導かれた水の圧力により付勢スプリング79の付勢力に抗して上方へ摺動し、上側連通部731の下端を開放する開放位置に移動する一方、弁体20の閉塞時に付勢スプリング79の付勢力により上側連通部731の下端を閉塞する閉塞位置(図10に実線で示す位置)に移動するようになっている。この場合、付勢スプリング79のばね定数は、弁体20の開放時にスプリンクラー管12の管路から中間室23、信号水路24、第1連通路51及びオリフィス72を介して流入する水の圧力よりも小さな値に設定されている。   The opening / closing member 78 moves upward against the urging force of the urging spring 79 by the pressure of water guided from the pipe line of the sprinkler pipe 12 to the signal water path 24 through the intermediate chamber 23 when the valve body 20 is opened. To the open position where the lower end of the upper communication portion 731 is opened, while the lower end of the upper communication portion 731 is closed by the urging force of the urging spring 79 when the valve body 20 is closed (see FIG. 10). (Position indicated by a solid line). In this case, the spring constant of the urging spring 79 is determined by the pressure of water flowing from the sprinkler pipe 12 through the intermediate chamber 23, the signal water path 24, the first communication path 51 and the orifice 72 when the valve body 20 is opened. Is also set to a small value.

この実施の形態では、弁体20の閉塞時に付勢スプリング79の付勢力により上側連通部731の下端を閉塞する閉塞位置(図10に実線で示す位置)に開閉部材78が移動するので、末端試験弁用排水管34から排水管10に逆流する水によって排水管10内で圧縮された圧縮空気が他の系統の排水部27から信号水路24(三方管28及び圧力スイッチ取付管26)に逆流しようとしても、その圧縮空気の逆流が開閉部材78により確実に阻止される。また、排水管10を縮径した際に排水管10をうまく流下しない水によって排水管10内で圧縮された圧縮空気が他の系統の排水部27から信号水路24に逆流しようとしても、信号水路24への圧縮空気の逆流が開閉部材78により同様に阻止される。
これにより、排水管10側に逆流する水はもちろんのこと排水管10を縮径した際に逆流する水によって当該排水管10内で圧縮された圧縮空気の逆流による他の系統での圧力スイッチ30の誤作動を確実に防止することができる。
In this embodiment, when the valve body 20 is closed, the opening / closing member 78 moves to a closed position (position indicated by a solid line in FIG. 10) that closes the lower end of the upper communication portion 731 by the biasing force of the biasing spring 79. The compressed air compressed in the drain pipe 10 by the water flowing backward from the test valve drain pipe 34 to the drain pipe 10 flows back from the drainage section 27 of the other system to the signal water channel 24 (three-way pipe 28 and pressure switch mounting pipe 26). Even if an attempt is made, the backflow of the compressed air is reliably prevented by the opening / closing member 78. In addition, even if compressed air compressed in the drain pipe 10 by water that does not flow down the drain pipe 10 when the drain pipe 10 is reduced in diameter is going to flow backward from the drainage section 27 of another system to the signal water path 24, the signal water path The backflow of the compressed air to 24 is similarly prevented by the opening / closing member 78.
As a result, the pressure switch 30 in the other system is caused by the backflow of the compressed air compressed in the drainage pipe 10 by the water flowing back when the diameter of the drainage pipe 10 is reduced as well as the water flowing back to the drainage pipe 10 side. Can be reliably prevented from malfunctioning.

しかも、排水管10を縮径しても圧縮空気の逆流による他の系統での圧力スイッチ30の誤作動を確実に防止できることから、排水管10の縮径化に伴う配管材料費および配管工事費の軽減化を図ることができ、実施する上で非常に有利なものとなる。   Moreover, since the malfunction of the pressure switch 30 in other systems due to the backflow of compressed air can be reliably prevented even if the drain pipe 10 is reduced in diameter, the piping material cost and the piping work cost associated with the reduction in the diameter of the drain pipe 10 can be prevented. Can be reduced, which is very advantageous in implementation.

次に、本発明の第4の実施の形態を図11に基づいて説明する。
この第4の実施の形態では、開閉部材の構成を変更している。なお、開閉部材を除くその他の構成は、上記第3の実施の形態と同じであり、同一部分については、同じ符号を付して、その詳細な説明は省略する。
Next, a fourth embodiment of the present invention will be described with reference to FIG.
In the fourth embodiment, the configuration of the opening / closing member is changed. The rest of the configuration excluding the opening / closing member is the same as that of the third embodiment, and the same parts are denoted by the same reference numerals and detailed description thereof is omitted.

すなわち、本実施の形態では、図11に示すように、開閉部材81は、第3連通路73の上側連通部731とシリンダ室77との間に跨って当該両者731,77を区画するようにシリンダ室77の周面に沿って上下方向に摺動するピストンよりなる。この開閉部材81の内部には、第2連通路52とシリンダ室77との間を連通する第4連通路82が設けられている。   In other words, in the present embodiment, as shown in FIG. 11, the opening / closing member 81 extends between the upper communication portion 731 of the third communication passage 73 and the cylinder chamber 77 so as to partition the both 731, 77. It consists of a piston that slides in the vertical direction along the circumferential surface of the cylinder chamber 77. Inside the opening / closing member 81, a fourth communication path 82 that communicates between the second communication path 52 and the cylinder chamber 77 is provided.

そして、上記開閉部材81は、弁体20の開放時にスプリンクラー管12の管路から中間室23を介して信号水路24に導かれた水の圧力によりシリンダ室77を縮小させて上方へ摺動し、上側連通部731の下端を開放する開放位置に移動する。一方、上記開閉部材81は、排水部から作用する外圧つまり末端試験弁用排水管34から排水管10に逆流する水によって排水管10内で圧縮されて排水部27から逆流する圧縮空気を第4連通路82を介して第2連通路52からシリンダ室77に流入させることで、シリンダ室77を拡張させて下方に摺動し、上側連通部731の下端を閉塞する閉塞位置(図11に実線で示す位置)に移動する。この場合、弁体20の開放時にスプリンクラー管12の管路から中間室23を介して信号水路24に導かれた水の圧力は、末端試験弁用排水管34から排水管10に逆流する水によって排水管10内で圧縮されて排水部27から逆流する圧縮空気の圧力よりも大きいため、第1連通路51から水の圧力と排水部27からの圧縮空気の圧力とが共に作用しているときは、第1連通路51から水の圧力によりシリンダ室77の圧縮空気を押し出して開閉部材81を開放位置に位置付ける。   The opening / closing member 81 slides upward by reducing the cylinder chamber 77 by the pressure of water introduced from the pipe line of the sprinkler pipe 12 to the signal water path 24 through the intermediate chamber 23 when the valve body 20 is opened. Then, the upper communication part 731 moves to the open position where the lower end is opened. On the other hand, the open / close member 81 generates fourth compressed air that is compressed in the drainage pipe 10 by the external pressure acting from the drainage part, that is, the water flowing backward from the terminal test valve drainage pipe 34 to the drainage pipe 10 and flows backward from the drainage part 27. A closed position (the solid line in FIG. 11) that causes the cylinder chamber 77 to expand and slide downward by closing the lower end of the upper communication portion 731 by flowing into the cylinder chamber 77 from the second communication passage 52 via the communication passage 82. Move to the position indicated by. In this case, when the valve body 20 is opened, the pressure of the water led from the pipe line of the sprinkler pipe 12 to the signal water path 24 through the intermediate chamber 23 is caused by the water flowing backward from the terminal test valve drain pipe 34 to the drain pipe 10. When the pressure of the compressed air that is compressed in the drainage pipe 10 and flows backward from the drainage part 27 is larger than the pressure of the water from the first communication path 51 and the pressure of the compressed air from the drainage part 27 are acting together. Pushes the compressed air in the cylinder chamber 77 from the first communication path 51 by the pressure of water to position the open / close member 81 in the open position.

この実施の形態では、第1連通路51から水の圧力が作用せずに排水部27からの圧縮空気の圧力が作用していれば、この排水部27からの圧縮空気の圧力によりシリンダ室77を拡張させて開閉部材81が下方に摺動し、上側連通部731の下端が閉塞される。このため、末端試験弁用排水管34から排水管10に逆流する水によって排水管10内で圧縮された圧縮空気が他の系統の排水部27から信号水路24(三方管28及び圧力スイッチ取付管26)に逆流しようとしても、その圧縮空気の逆流が開閉部材81により確実に阻止される。また、排水管10を縮径した際に排水管10をうまく流下しない水によって排水管10内で圧縮された圧縮空気が他の系統の排水部27から信号水路24に逆流しようとしても、信号水路24への圧縮空気の逆流が開閉部材81により同様に阻止される。
これにより、排水管10側に逆流する水はもちろんのこと排水管10を縮径した際に逆流する水によって当該排水管10内で圧縮された圧縮空気の逆流による他の系統での圧力スイッチ30の誤作動を確実に防止することができる。
In this embodiment, if the pressure of the water from the first communication passage 51 does not act and the pressure of the compressed air from the drainage section 27 acts, the cylinder chamber 77 is compressed by the pressure of the compressed air from the drainage section 27. As the opening / closing member 81 slides downward, the lower end of the upper communication portion 731 is closed. Therefore, the compressed air compressed in the drain pipe 10 by the water flowing back from the end test valve drain pipe 34 to the drain pipe 10 is sent from the drainage section 27 of the other system to the signal water channel 24 (three-way pipe 28 and pressure switch mounting pipe). 26), the back and forth flow of the compressed air is reliably prevented by the opening / closing member 81. In addition, even if compressed air compressed in the drain pipe 10 by water that does not flow down the drain pipe 10 when the drain pipe 10 is reduced in diameter is going to flow backward from the drainage section 27 of another system to the signal water path 24, the signal water path The backflow of the compressed air to 24 is similarly prevented by the opening / closing member 81.
As a result, the pressure switch 30 in the other system is caused by the backflow of the compressed air compressed in the drainage pipe 10 by the water flowing back when the diameter of the drainage pipe 10 is reduced as well as the water flowing back to the drainage pipe 10 side. Can be reliably prevented from malfunctioning.

しかも、排水管10を縮径しても圧縮空気の逆流による他の系統での圧力スイッチ30の誤作動を確実に防止できることから、排水管10の縮径化に伴う配管材料費および配管工事費の軽減化を図ることができ、実施する上で非常に有利なものとなる。   Moreover, since the malfunction of the pressure switch 30 in other systems due to the backflow of compressed air can be reliably prevented even if the drain pipe 10 is reduced in diameter, the piping material cost and the piping work cost associated with the reduction in the diameter of the drain pipe 10 can be prevented. Can be reduced, which is very advantageous in implementation.

次に、本発明の第5の実施の形態を図12及び図13に基づいて説明する。
この第5の実施の形態では、脱着部材及び第2連通路の構成を変更している。なお、脱着部材及び第2連通路を除くその他の構成は、上記第2の実施の形態と同じであり、同一部分については、同じ符号を付して、その詳細な説明は省略する。
Next, a fifth embodiment of the present invention will be described with reference to FIGS.
In the fifth embodiment, the configuration of the detachable member and the second communication path is changed. The other configurations except for the detachable member and the second communication path are the same as those of the second embodiment, and the same parts are denoted by the same reference numerals and detailed description thereof is omitted.

すなわち、本実施の形態では、図12に示すように、脱着部材71の上端と排水部27の上端との間は、略J字状に配管された第2連通路84を介して連通している。この第2連通路84の一端側(図12では右端側)にはオリフィス72が設けられている。   That is, in the present embodiment, as shown in FIG. 12, the upper end of the detachable member 71 and the upper end of the drainage portion 27 communicate with each other via a second communication path 84 that is piped in a substantially J shape. Yes. An orifice 72 is provided on one end side (right end side in FIG. 12) of the second communication path 84.

また、図13に示すように、上記脱着部材71は、排水部27に連通する第2連通路84と、信号水路24に連通する第1連通路51との間に、第2連結管282の管本体50を上下方向に貫通する貫通孔85の下部に下方から脱着自在に嵌装されて取り付けられている。また、貫通孔85の上部には、下部に雄ねじ部862を有する略円筒形状の継手部材86が螺着されている。第2連通路84の他端は、継手部材86の内部に挿通され、その継手部材86の上部に設けられた雄ねじ部861にナット部材87を螺着させることで当該継手部材86の上部に取り付けられる。また、上記脱着部材71内の第3連通路73は、上側連通部731と、これよりも小径な下側連通部732とで構成され、この下側連通部732を介して第1連通路51に連通している。そして、第3連通路73の上側連通部731は、空間701から継手部材86の内部空間863を介して第2連通路84に連通している。この場合、第1連通路51は、脱着部材71を貫通孔85の下部に螺着させた状態で穿設される。   In addition, as shown in FIG. 13, the detachable member 71 includes a second connecting pipe 282 between a second communication path 84 communicating with the drainage portion 27 and a first communication path 51 communicating with the signal water path 24. The pipe body 50 is attached to the lower part of a through hole 85 penetrating in the vertical direction so as to be detachable from below. In addition, a substantially cylindrical joint member 86 having a male screw portion 862 at the lower portion is screwed to the upper portion of the through hole 85. The other end of the second communication passage 84 is inserted into the joint member 86, and is attached to the upper portion of the joint member 86 by screwing the nut member 87 to the male screw portion 861 provided on the upper portion of the joint member 86. It is done. The third communication path 73 in the detachable member 71 includes an upper communication part 731 and a lower communication part 732 having a smaller diameter than the upper communication part 731, and the first communication path 51 is provided via the lower communication part 732. Communicating with The upper communication portion 731 of the third communication path 73 communicates with the second communication path 84 from the space 701 through the internal space 863 of the joint member 86. In this case, the first communication passage 51 is formed in a state where the detachable member 71 is screwed to the lower portion of the through hole 85.

そして、開閉部材74は、弁体20の開放時にスプリンクラー管12の管路から中間室23を介して信号水路24に導かれた水の圧力により第3連通路73の上側連通部731内を浮遊し、上側連通部731の下端を開放する開放位置(図13に二点鎖線で示す位置)に移動する。一方、開閉部材74は、弁体20の閉塞時(信号水路24に導かれた水の圧力が低下したとき)に自重により上側連通部731の下端を閉塞する閉塞位置(図13に実線で示す位置)に移動するようになっている。また、第3連通路73の上端には、その第3連通路73の管路を二分するように管径方向に連結するストッパピン76が固設されている。   The opening / closing member 74 floats in the upper communication portion 731 of the third communication passage 73 by the pressure of water introduced from the conduit of the sprinkler tube 12 to the signal water passage 24 through the intermediate chamber 23 when the valve body 20 is opened. And it moves to the open position (position shown with a dashed-two dotted line in FIG. 13) which opens the lower end of the upper side communication part 731. On the other hand, the open / close member 74 closes the lower end of the upper communication portion 731 due to its own weight when the valve body 20 is closed (when the pressure of the water guided to the signal water passage 24 decreases) (shown by a solid line in FIG. 13). Position). A stopper pin 76 is fixed to the upper end of the third communication path 73 so as to be connected in the pipe diameter direction so as to bisect the pipe line of the third communication path 73.

この実施の形態では、他の系統のスプリンクラー管12で弁体20が閉塞しているので、上端が第2連通路84を介して排水部27に連通すると共に下端が第1連通路51を介して信号水路24に連通する第3連通路73の上側連通部731の下端を開閉部材74が自重によって閉塞している。このため、末端試験弁用排水管34から排水管10に逆流する水によって排水管10内で圧縮された圧縮空気が他の系統の排水部27から信号水路24(三方管28及び圧力スイッチ取付管26)に逆流しようとしても、その逆流した圧縮空気によって開閉部材74が上方から押圧され、これによって圧縮空気の逆流が開閉部材74により確実に阻止される。また、排水管10を縮径した際に排水管10をうまく流下しない水によって排水管10内で圧縮された圧縮空気が他の系統の排水部27から信号水路24に逆流しようとしても、信号水路24への圧縮空気の逆流が開閉部材74により同様に阻止される。
これにより、排水管10側に逆流する水はもちろんのこと排水管10を縮径した際に逆流する水によって当該排水管10内で圧縮された圧縮空気の逆流による他の系統での圧力スイッチ30の誤作動を確実に防止することができる。
In this embodiment, since the valve element 20 is closed by the sprinkler pipe 12 of another system, the upper end communicates with the drainage portion 27 via the second communication passage 84 and the lower end passes through the first communication passage 51. The opening / closing member 74 closes the lower end of the upper communication portion 731 of the third communication passage 73 communicating with the signal water passage 24 by its own weight. Therefore, the compressed air compressed in the drain pipe 10 by the water flowing back from the end test valve drain pipe 34 to the drain pipe 10 is sent from the drainage section 27 of the other system to the signal water channel 24 (three-way pipe 28 and pressure switch mounting pipe). 26), the open / close member 74 is pressed from above by the compressed air that has flowed back, so that the backflow of the compressed air is reliably prevented by the open / close member 74. In addition, even if compressed air compressed in the drain pipe 10 by water that does not flow down the drain pipe 10 when the drain pipe 10 is reduced in diameter is going to flow backward from the drainage section 27 of another system to the signal water path 24, the signal water path The backflow of the compressed air to 24 is similarly prevented by the opening / closing member 74.
As a result, the pressure switch 30 in the other system is caused by the backflow of the compressed air compressed in the drainage pipe 10 by the water flowing back when the diameter of the drainage pipe 10 is reduced as well as the water flowing back to the drainage pipe 10 side. Can be reliably prevented from malfunctioning.

しかも、排水管10を縮径しても圧縮空気の逆流による他の系統での圧力スイッチ30の誤作動を確実に防止できることから、排水管10の縮径化に伴う配管材料費および配管工事費の軽減化を図ることができ、実施する上で非常に有利なものとなる。   Moreover, since the malfunction of the pressure switch 30 in other systems due to the backflow of compressed air can be reliably prevented even if the drain pipe 10 is reduced in diameter, the piping material cost and the piping work cost associated with the reduction in the diameter of the drain pipe 10 can be prevented. Can be reduced, which is very advantageous in implementation.

また、上記第1、第2及び第5の実施の形態では、シリコンゴムなどの弾性体よりなる球体状の開閉部材56,74、又は鋼球よりなる開閉部材62を用いたが、鋼球を芯材とし、その表面にシリコンゴムなどの弾性体を被覆した球体状の開閉部材であってもよい。   In the first, second, and fifth embodiments, the spherical opening / closing members 56 and 74 made of an elastic body such as silicon rubber or the opening / closing member 62 made of a steel ball are used. It may be a spherical opening / closing member which is a core material and whose surface is covered with an elastic body such as silicon rubber.

また、上記第5の実施の形態では、第2連通路84の一端側にオリフィス72を設けたが、オリフィスが第2連通路84の他端側又は中央部などの途中位置に設けられていてもよい。   In the fifth embodiment, the orifice 72 is provided on one end side of the second communication passage 84. However, the orifice is provided at the other end side of the second communication passage 84 or in the middle of the central portion. Also good.

また、上記各実施の形態では、第2連結管282の管本体50を第2連通路52,84を介して排水部27に連結したが、第2連結管の管本体が排水部のハウジングに対し一体的に設けられていてもよいのはいうまでもない。その場合、第2連通路は、第2連結管の管本体および排水部のハウジングを貫通する貫通孔により構成される。   Moreover, in each said embodiment, although the pipe main body 50 of the 2nd connection pipe 282 was connected with the drainage part 27 via the 2nd communicating path 52,84, the pipe main body of a 2nd connection pipe is a housing | casing of a drainage part. Needless to say, they may be provided integrally. In this case, the second communication path is configured by a through hole that penetrates the pipe body of the second connection pipe and the housing of the drainage portion.

更に、上記各実施の形態では、オリフィス57,72の縮径度合いを上側連通部531,731、第1連通路51、又は第2連通路52の管径を基準にして述べたが、これらの縮径度合いはほんの一例であり、これに限定されるものでないことはいうまでもない。   Further, in each of the above embodiments, the degree of diameter reduction of the orifices 57 and 72 has been described with reference to the pipe diameters of the upper communication portions 531 and 731, the first communication passage 51, or the second communication passage 52. Needless to say, the degree of diameter reduction is only an example, and the present invention is not limited to this.

12 スプリンクラー管
30 圧力スイッチ
24 信号水路
14 スプリンクラーポンプ
15 警報器
2 自動警報弁
57,72 オリフィス
55 逆止弁
27 排水部
53,73 第3連通路(連通路)
56,62,74,78,81 開閉部材
79 付勢スプリング(付勢手段)
71 脱着部材
12 sprinkler pipe 30 pressure switch 24 signal water path 14 sprinkler pump 15 alarm device 2 automatic alarm valve 57, 72 orifice 55 check valve 27 drainage part 53, 73 third communication path (communication path)
56, 62, 74, 78, 81 Opening / closing member 79 Energizing spring (urging means)
71 Desorption member

Claims (4)

スプリンクラー管の管路中に設けられ、その管路を火災時に弁体により開放すると共に、この管路を流れる水の一部を圧力スイッチが設けられた信号水路へと導き、この圧力スイッチからスプリンクラーポンプおよび/または警報器に作動信号が送出されるようにした自動警報弁であって、
上記信号水路の上流端は、上記弁体が着座する弁座部に開口し、その弁体の閉弁時に封鎖されているとともに、上記信号水路の上記圧力スイッチよりも下流側がオリフィス及び逆止弁を介して排水部に連通しており、
上記逆止弁は、上端が上記排水部に連通すると共に下端が上記信号水路に連通する略鉛直な連通路内に設けられ、かつその連通路を上記スプリンクラー管の管路から信号水路に導かれた水の圧力により開放する一方その水の圧力が低下したときに自重により閉塞する開閉部材を備えていることを特徴とする自動警報弁。
A sprinkler pipe is provided in the pipe line, and the pipe line is opened by a valve body in the event of a fire, and a part of the water flowing through the pipe line is led to a signal water path provided with a pressure switch. An automatic alarm valve for sending an activation signal to a pump and / or an alarm device,
The upstream end of the signal water channel opens to a valve seat on which the valve body is seated, and is closed when the valve body is closed, and the downstream side of the pressure switch of the signal water channel is an orifice and a check valve. To the drainage section through
The check valve is provided in a substantially vertical communication path having an upper end communicating with the drainage portion and a lower end communicating with the signal water channel, and the communication channel is led from the sprinkler pipe to the signal water channel. An automatic alarm valve comprising an opening / closing member that is opened by the pressure of water but is closed by its own weight when the pressure of the water drops.
スプリンクラー管の管路中に設けられ、その管路を火災時に弁体により開放すると共に、この管路を流れる水の一部を圧力スイッチが設けられた信号水路へと導き、この圧力スイッチからスプリンクラーポンプおよび/または警報器に作動信号が送出されるようにした自動警報弁であって、
上記信号水路の上流端は、上記弁体が着座する弁座部に開口し、その弁体の閉弁時に封鎖されているとともに、上記信号水路の上記圧力スイッチよりも下流側がオリフィス及び逆止弁を介して排水部に連通しており、
上記逆止弁は、上端が上記排水部に連通すると共に下端が上記信号水路に連通する略鉛直な連通路内に設けられ、かつその連通路を上記スプリンクラー管の管路から信号水路に導かれた水の圧力により開放する一方その水の圧力が低下したときに付勢手段により閉塞する開閉部材を備えていることを特徴とする自動警報弁。
A sprinkler pipe is provided in the pipe line, and the pipe line is opened by a valve body in the event of a fire, and a part of the water flowing through the pipe line is led to a signal water path provided with a pressure switch. An automatic alarm valve for sending an activation signal to a pump and / or an alarm device,
The upstream end of the signal water channel opens to a valve seat on which the valve body is seated, and is closed when the valve body is closed, and the downstream side of the pressure switch of the signal water channel is an orifice and a check valve. To the drainage section through
The check valve is provided in a substantially vertical communication path having an upper end communicating with the drainage portion and a lower end communicating with the signal water channel, and the communication channel is led from the sprinkler pipe to the signal water channel. An automatic alarm valve comprising an opening / closing member that is opened by the pressure of water but is closed by an urging means when the water pressure drops.
スプリンクラー管の管路中に設けられ、その管路を火災時に弁体により開放すると共に、この管路を流れる水の一部を圧力スイッチが設けられた信号水路へと導き、この圧力スイッチからスプリンクラーポンプおよび/または警報器に作動信号が送出されるようにした自動警報弁であって、
上記信号水路の上流端は、上記弁体が着座する弁座部に開口し、その弁体の閉弁時に封鎖されているとともに、上記信号水路の上記圧力スイッチよりも下流側がオリフィス及び逆止弁を介して排水部に連通しており、
上記逆止弁は、上端が上記排水部に連通すると共に下端が上記信号水路に連通する略鉛直な連通路内に設けられ、かつその連通路を上記スプリンクラー管の管路から信号水路に導かれた水の圧力により開放する一方その水の圧力が低下したときに上記排水部から作用する外圧により閉塞する開閉部材を備えていることを特徴とする自動警報弁。
A sprinkler pipe is provided in the pipe line, and the pipe line is opened by a valve body in the event of a fire, and a part of the water flowing through the pipe line is led to a signal water path provided with a pressure switch. An automatic alarm valve for sending an activation signal to a pump and / or an alarm device,
The upstream end of the signal water channel opens to a valve seat on which the valve body is seated, and is closed when the valve body is closed, and the downstream side of the pressure switch of the signal water channel is an orifice and a check valve. To the drainage section through
The check valve is provided in a substantially vertical communication path having an upper end communicating with the drainage portion and a lower end communicating with the signal water channel, and the communication channel is led from the sprinkler pipe to the signal water channel. An automatic alarm valve comprising an opening / closing member that is opened by the pressure of water but is closed by an external pressure acting from the drainage portion when the pressure of the water drops.
上記オリフィス、上記通路及び上記開閉部材は、上記信号水路と上記排水部との間に脱着自在に嵌装された脱着部材に一体的に設けられている請求項1〜請求項3のいずれか1つに記載の自動警報弁。   The said orifice, the said channel | path, and the said opening-and-closing member are integrally provided in the attachment / detachment member detachably fitted between the said signal water channel and the said drainage part. Automatic alarm valve described in one.
JP2010185809A 2010-08-23 2010-08-23 Automatic alarm valve Expired - Fee Related JP5183697B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010185809A JP5183697B2 (en) 2010-08-23 2010-08-23 Automatic alarm valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010185809A JP5183697B2 (en) 2010-08-23 2010-08-23 Automatic alarm valve

Publications (2)

Publication Number Publication Date
JP2012040275A JP2012040275A (en) 2012-03-01
JP5183697B2 true JP5183697B2 (en) 2013-04-17

Family

ID=45897250

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010185809A Expired - Fee Related JP5183697B2 (en) 2010-08-23 2010-08-23 Automatic alarm valve

Country Status (1)

Country Link
JP (1) JP5183697B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6219649B2 (en) * 2013-09-20 2017-10-25 ホーチキ株式会社 Fire extinguishing equipment and emergency shut-off device
CN110465031A (en) * 2018-08-15 2019-11-19 成都慧云阵信息技术有限公司 A kind of alarm valve with data feedback and automatic inspection function

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0698202B2 (en) * 1989-08-31 1994-12-07 ホーチキ株式会社 Fire extinguisher with automatic inspection function
JP2002177412A (en) * 2000-12-14 2002-06-25 Yoshiaki Kubo Automatic warning valve
JP4068489B2 (en) * 2003-03-31 2008-03-26 能美防災株式会社 Sprinkler fire extinguishing equipment and check valve
JP4285610B2 (en) * 2005-10-25 2009-06-24 千住スプリンクラー株式会社 Pre-actuated sprinkler equipment

Also Published As

Publication number Publication date
JP2012040275A (en) 2012-03-01

Similar Documents

Publication Publication Date Title
US11788264B2 (en) Automatic draining back flow prevention device
US9265980B2 (en) Flow control assembly for a fire sprinkler system
US20150321036A1 (en) Thermal expansion assembly for water mist fire suppression system
JP5183697B2 (en) Automatic alarm valve
KR20080001532U (en) Test velve for operating test of alarm valve
JP6633132B2 (en) Flow control valve for negative pressure wet pre-actuated sprinkler equipment
KR100831714B1 (en) The same axis double check valve type reverse-flowing breaker
JP5707469B1 (en) Flowing water detection device
US20190388719A1 (en) Dry sprinkler system manifold adapter
KR200414294Y1 (en) Alarm valve drain connector with test orifice and transparent checkout
WO2024122268A1 (en) Siphon-cancelling backflow prevention water supplier and vertical reduced-pressure backflow prevention device
KR200465322Y1 (en) a valve for alarm valve system
KR102638115B1 (en) alarm valve is combined with test pipe for fire fighting
KR102490165B1 (en) valve for preventing over-pressure
JP6778961B1 (en) Flow detection device
KR102604391B1 (en) Alarm check valve that allows self-cleaning of foreign substances
JP2002177412A (en) Automatic warning valve
JP2004089412A (en) Water conveyance port apparatus for connected water conveyance pipe
JP2004243105A (en) Wet type flowing water detector with emergency shut-off mechanism
JP5317923B2 (en) Sprinkler fire extinguishing equipment
KR20100011295U (en) A Single Unit Alarm Check Valve
KR20080006407U (en) Test system for sprinkler equipment
WO2004020884A1 (en) Automatic emergency sprinkler shutoff valve
JP2008095829A (en) Check valve
JP2001340484A (en) Auto-drip of flowing water detector

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120621

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120703

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120830

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121225

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130115

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160125

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees