JP5181239B2 - Steel pipe pile and construction method of steel pipe pile - Google Patents

Steel pipe pile and construction method of steel pipe pile Download PDF

Info

Publication number
JP5181239B2
JP5181239B2 JP2008131102A JP2008131102A JP5181239B2 JP 5181239 B2 JP5181239 B2 JP 5181239B2 JP 2008131102 A JP2008131102 A JP 2008131102A JP 2008131102 A JP2008131102 A JP 2008131102A JP 5181239 B2 JP5181239 B2 JP 5181239B2
Authority
JP
Japan
Prior art keywords
steel pipe
pipe pile
injection nozzle
inward
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2008131102A
Other languages
Japanese (ja)
Other versions
JP2009280966A (en
Inventor
健二 西海
吉郎 石濱
久男 山下
隆太 田中
喜昭 菊池
勇吉 鈴木
博康 横山
健二 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INDEPENDENT ADMINISTRATIVE INSTITUTION PORT AND AIRPORT RESEARCH INSTITUTE
Nippon Steel Corp
Chowa Kogyo Co Ltd
Original Assignee
INDEPENDENT ADMINISTRATIVE INSTITUTION PORT AND AIRPORT RESEARCH INSTITUTE
Nippon Steel Corp
Chowa Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INDEPENDENT ADMINISTRATIVE INSTITUTION PORT AND AIRPORT RESEARCH INSTITUTE, Nippon Steel Corp, Chowa Kogyo Co Ltd filed Critical INDEPENDENT ADMINISTRATIVE INSTITUTION PORT AND AIRPORT RESEARCH INSTITUTE
Priority to JP2008131102A priority Critical patent/JP5181239B2/en
Publication of JP2009280966A publication Critical patent/JP2009280966A/en
Application granted granted Critical
Publication of JP5181239B2 publication Critical patent/JP5181239B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、噴射ノズルを用いて鋼管杭の先端に根固め部を築造するための鋼管杭およびその鋼管杭の施工方法に関する。   The present invention relates to a steel pipe pile for constructing a solidified portion at the tip of a steel pipe pile using an injection nozzle and a method for constructing the steel pipe pile.

鋼管杭の施工において、バイブロハンマを用いて、鋼管杭に振動力を与えて、地盤の抵抗を軽減しながら、地中に打設する工法が一般に用いられるが、地盤が固い場合にはウォータージェットを併用する方法がある。   In the construction of steel pipe piles, a construction method that uses a vibro hammer to apply vibration force to the steel pipe piles to reduce the resistance of the ground while reducing the ground resistance is generally used. There is a method to use together.

ウォータージェットを併用する鋼管杭の施工方法は、鋼管杭の先端部に複数の噴射ノズルを配置し、各々の噴射ノズルに配管ホースが接続され、噴射ノズルから高圧水を噴射することにより、地盤を掘削し、杭の打設抵抗を軽減する工法である。なお、一般的にウォータージェットは、鋼管杭の先端部から下方のみに向かって噴射される。   The construction method of steel pipe piles that use water jet together is that a plurality of injection nozzles are arranged at the tip of the steel pipe piles, pipe hoses are connected to each injection nozzle, and the ground is removed by injecting high-pressure water from the injection nozzle. It is a method of excavating and reducing the resistance to pile driving. In general, the water jet is jetted downward only from the tip of the steel pipe pile.

しかし、ウォータージェットを併用した施工方法においては、鋼管杭の下方の地盤内に空洞が発生したり、鋼管杭先端部の閉塞が不十分となるために、鋼管杭の施工後に、先端支持力を確保することができない。
そこで、噴射ノズルを用いて高圧水を噴射しながら、所定の支持層まで鋼管杭を施工後に、噴射ノズルから流動性固化材を噴射することにより、杭先端部に根固め部を築造する方法が知られている(例えば、特許文献1参照)。
However, in the construction method using water jet together, since the cavity is generated in the ground below the steel pipe pile and the clogging of the steel pipe pile tip is insufficient, the tip bearing capacity is increased after the construction of the steel pipe pile. It cannot be secured.
Therefore, there is a method for constructing a solidified portion at the tip of the pile by injecting the fluidized solidifying material from the injection nozzle after constructing the steel pipe pile to the predetermined support layer while injecting high-pressure water using the injection nozzle. It is known (see, for example, Patent Document 1).

また、噴射ノズルの高圧水の噴射方向を杭打設方向および打設方向と垂直外側方向に配置することにより、大きな根固め部を築造できることも知られている(例えば、特許文献1参照)。
特開2004−270157号公報
In addition, it is also known that a large solidified part can be built by arranging the injection direction of the high-pressure water of the injection nozzle in the pile driving direction and the direction perpendicular to the driving direction (see, for example, Patent Document 1).
JP 2004-270157 A

鋼管杭の先端支持力を確保するためには、前記のように、杭先端部に根固め部を築造することが必要である。その方法としては、噴射ノズルからセメントミルクなどの流動性固化材を高圧水と同じ圧力で噴射する方法がある。流動性固化材を高圧で噴射することにより鋼管杭先端部に大きな根固め部を築造することができる。
鋼管杭から地盤への荷重伝達方法としては、鋼管杭から鋼管杭のずれ止めを介して根固め部に荷重伝達され、さらに根固め部から先端地盤へ荷重伝達される。
しかし、鋼管杭を地盤に打設する場合に、鋼管杭にずれ止めを備えている形態では、ずれ止めの外面に土砂が付着する。
図9に示すように、鋼管杭20のずれ止め7に土砂10が付着した状態であれば、根固め部12に確実に荷重伝達を図ることができない。また、根固め部(ソイルセメント又はコンクリート)12内に土塊11などが介在した不均質なものであれば、根固め部12内に局部的に脆弱な部分が存在し、根固め部12での破壊が発生するために、先端地盤14へ確実に荷重伝達が図れないことになる。
In order to ensure the tip supporting force of the steel pipe pile, it is necessary to build a root-solidifying portion at the tip of the pile as described above. As the method, there is a method in which a fluidized solidified material such as cement milk is injected from an injection nozzle at the same pressure as high-pressure water. A large solidified part can be constructed at the tip of the steel pipe pile by injecting the fluidized solidifying material at a high pressure.
As a method for transmitting the load from the steel pipe pile to the ground, the load is transmitted from the steel pipe pile to the root consolidation part via the stopper of the steel pipe pile, and further, the load is transmitted from the root consolidation part to the tip ground.
However, when the steel pipe pile is placed on the ground, in the form in which the steel pipe pile is provided with a detent, soil and sand adhere to the outer surface of the detent.
As shown in FIG. 9, if the earth and sand 10 are attached to the stopper 7 of the steel pipe pile 20, it is not possible to reliably transmit the load to the root hardening portion 12. In addition, in the case of a non-homogeneous material in which a soil mass 11 or the like is interposed in the root consolidation part (soil cement or concrete) 12, a locally weak part exists in the root consolidation part 12, and the root consolidation part 12 Since the breakage occurs, the load cannot be reliably transmitted to the tip ground 14.

本発明者は、鋼管杭先端部から根固め部を介して先端地盤に荷重伝達させる場合について種々研究した結果、鋼管杭の外面に設けたずれ止め(図示省略)を介して先端地盤に荷重を伝達させる場合に比べて、鋼管杭の内面に設けたずれ止めを介して先端地盤に荷重を伝達させる場合の方が、数倍の荷重伝達が可能である知見を得た。また、特に、鋼管杭により横断面で閉鎖された鋼管杭内側に設けられるソイルセメントあるいはコンクリート等の根固め部は、拘束された状態であるため、鋼管杭外側の根固め部よりも支圧力を高めることができる知見を得た。   As a result of various studies on the case where the load is transmitted from the tip of the steel pipe pile to the tip ground through the solidified part, the inventor has applied a load to the tip ground via a detent (not shown) provided on the outer surface of the steel pipe pile. Compared with the case where it is transmitted, the knowledge that the load can be transmitted several times in the case where the load is transmitted to the tip ground via the stopper provided on the inner surface of the steel pipe pile was obtained. In particular, since the solidified part of soil cement or concrete, etc., provided inside the steel pipe pile closed in cross section by the steel pipe pile is in a restrained state, the bearing pressure is higher than that of the solidified part outside the steel pipe pile. Gained knowledge that can be enhanced.

したがって、鋼管杭の内面のずれ止めから根固め部へ確実に鉛直力を伝達可能にする上で、鋼管杭の内面に設けるずれ止めの外面全体と根固め部とが直接確実に接触して、初めて大きな鉛直力を鋼管杭から根固め部に伝達可能になる。しかも、均質な根固め部が形成されていることで、根固め部全体で鋼管杭を均等に支承し、そのような根固め部を介して地盤に均等に荷重を伝達することができる。   Therefore, in order to ensure that the vertical force can be transmitted from the detent on the inner surface of the steel pipe pile to the root consolidation part, the entire outer surface of the detent provided on the inner surface of the steel pipe pile and the root consolidation part are in direct contact, For the first time, a large vertical force can be transmitted from the steel pipe pile to the root consolidation part. In addition, since the uniform root consolidation part is formed, the steel pipe pile can be evenly supported by the entire root consolidation part, and the load can be evenly transmitted to the ground through such a root consolidation part.

鋼管杭と根固め部の荷重伝達を図るために、前記のように、鋼管杭先端部に土砂が固着している状況では、荷重伝達が不十分となることから、セメントミルク等の流動性固化材の噴射の前に、鋼管杭先端(鋼管の場合には鋼管内面)の土砂を洗浄する必要がある。   In order to transfer the load between the steel pipe pile and the root consolidation part, as described above, in the situation where the earth and sand are firmly attached to the tip of the steel pipe pile, the load transmission becomes insufficient. Before the injection of the material, it is necessary to clean the earth and sand at the tip of the steel pipe pile (in the case of a steel pipe, the inner surface of the steel pipe).

すなわち、噴射ノズルを用いた根固め部の築造においては、セメントミルク等の流動性固化材の噴射の前に、鋼管杭内空の土塊を破砕し、鋼管杭内面の土砂を洗浄することが重要である。さらにセメントミルク等の流動性固化材の噴射時には、鋼管杭内空の土砂と流動性固化材を均質に混練することが重要である。   In other words, in the construction of a root-solidifying part using an injection nozzle, it is important to crush the air mass in the steel pipe pile and wash the sediment on the inner surface of the steel pipe pile before injecting the fluidized solidifying material such as cement milk. It is. In addition, when jetting a fluidized solidifying material such as cement milk, it is important to uniformly knead the earth and sand in the steel pipe pile and the fluidized solidified material.

本発明は、噴射ノズルを備えた鋼管杭を、その噴射ノズルを用いて鋼管杭を打設後、鋼管杭内の土塊の破砕および洗浄を行い、かつ、均質な根固め部を築造することが可能な鋼管杭およびその鋼管杭の施工方法を提供することを目的とする。   In the present invention, a steel pipe pile provided with an injection nozzle is used to perform crushing and washing of a clot in the steel pipe pile after the steel pipe pile is placed using the injection nozzle, and to build a homogeneous root consolidation part. It is an object of the present invention to provide a possible steel pipe pile and a method for constructing the steel pipe pile.

前記の課題を有利に解決するために、第1発明の鋼管杭では、先端部の周方向に間隔をおいて複数の噴射ノズルを設置した鋼管杭において、前記複数の噴射ノズルの少なくとも一つの噴射ノズルが鋼管杭内面に向かって高圧水を噴射するように配置された内向き噴射ノズルであり、さらに、内向き噴射ノズルの内少なくとも1つの内向き噴射ノズルが、ノズル孔の中心軸線を鋼管杭の中心軸からずらして配置された内向き噴射ノズルであり、当該内向き噴射ノズルにより、前記高圧水を前記鋼管杭の中心から前記鋼管杭内の偏位した位置を通るように斜めに噴射させて、鋼管杭内における土砂混合水を流動させるとともに、全ての前記内向き噴射ノズルから噴射され高圧水により、前記鋼管杭内の土塊を破砕し、かつ鋼管杭内面に付着する土砂を洗浄することができることを特徴とする。
第2発明では、第一発明の鋼管杭において、前記内向き噴射ノズルのノズル孔が前期鋼管杭内にあることを特徴とする。
第3発明では、第1発明または第2発明の鋼管杭において、鋼管杭先端部内面にずれ止めが設けられていることを特徴とする。
第4発明の鋼管杭の施工方法においては、第1発明〜第3発明のいずれかに記載の鋼管杭を使用し、バイブロハンマを用い、鋼管杭貫入方向に高圧水を噴射する鋼管杭の施工方法であって、前記鋼管杭貫入方向に噴射する噴射ノズルおよび前記内向き噴射ノズルより高圧水を噴射して、鋼管杭を所定の深度に貫入させる際、前記内向き噴射ノズルの内少なくとも1つの内向き噴射ノズルが、ノズル孔の中心軸線を鋼管杭の中心軸からずらして配置された内向き噴射ノズルであり、これにより、前記高圧水を前記鋼管杭の中心から前記鋼管杭内の偏位した位置を通るように斜めに噴射させて、鋼管杭内における土砂混合水を流動させるとともに、全ての前記内向き噴射ノズルから噴射される高圧水により、前記鋼管杭内の土塊を破砕し、かつ鋼管杭内面に付着する土砂を洗浄した後、前記高圧水の噴射に代わって、前記各噴射ノズルから流動性固化材を噴射し、鋼管杭先端に流動性固化材を固化させた根固め部を築造することを特徴とする。
In order to solve the above-mentioned problem advantageously, in the steel pipe pile of the first invention, in the steel pipe pile in which a plurality of injection nozzles are installed at intervals in the circumferential direction of the tip , at least one of the plurality of injection nozzles The injection nozzle is an inward injection nozzle arranged to inject high-pressure water toward the inner surface of the steel pipe pile, and at least one inward injection nozzle of the inward injection nozzles has a central axis of the nozzle hole. An inward injection nozzle arranged offset from the central axis of the steel pipe pile, and with the inward injection nozzle, the high-pressure water is inclined from the center of the steel pipe pile so as to pass through a deviated position in the steel pipe pile. by injection, with flowing the sediment mixing water in the steel pipe pile, by all of the inward pressure water that will be injected from the injection nozzle, crushing clods of the steel pipe in the pile, and adhered to the steel pipe pile inner surface Characterized in that it is possible to clean that sediment.
According to a second invention, in the steel pipe pile of the first invention, the nozzle hole of the inward injection nozzle is in the previous steel pipe pile.
In the third invention, the steel pipe pile of the first invention or the second invention is characterized in that a stopper is provided on the inner surface of the tip of the steel pipe pile.
In the steel pipe pile construction method of the fourth invention, the steel pipe pile according to any one of the first invention to the third invention is used, and a vibro hammer is used to inject high-pressure water in the steel pipe pile penetration direction. a is, the steel pipe by injecting pile penetration direction to inject the injection nozzle and the inward pressure water from the ejection nozzle, when Ru is penetrating the steel pipe pile to a predetermined depth, at least one of said inward injection nozzle The inward spray nozzle is an inward spray nozzle arranged by shifting the center axis of the nozzle hole from the center axis of the steel pipe pile, and thereby the high pressure water is displaced in the steel pipe pile from the center of the steel pipe pile. The soil mixed water in the steel pipe pile is caused to flow obliquely so as to pass through the position, and the mass in the steel pipe pile is crushed by the high pressure water sprayed from all the inward injection nozzles, and steel After washing the sediment adhering to the pile interior surface, wherein in place of the injection of high pressure water, the injected flowable solidified material from the injection nozzle, roots consolidated portion obtained by solidifying a flowable solidifying material to the steel pipe pile tip It is characterized by building.

本発明によると、次のような効果が得られる。
先端部の周方向に間隔をおいて複数の噴射ノズルを設置した鋼管杭において、前記複数の噴射ノズルの内、少なくとも一つの噴射ノズルが鋼管杭内面に向かって噴射するように配置された内向き噴射ノズルとすることにより、鋼管杭内の土塊を容易に破砕し、かつ鋼管杭内面に付着する土砂を容易に洗浄することができる鋼管杭とすることができる。ここで、前記内向き噴射ノズルのノズル孔が前記鋼管杭内にあれば、洗浄がさらに容易になる。さらに、高圧水と破砕された土砂が混合した土砂混合水(アブレイシブウォータージェット)として鋼管杭内面に向かって噴射されることにより、鋼管杭内面の研磨効果が増加し、鋼管杭内面に付着する土砂の「はつり性」を向上することができる。
また、内向き噴射ノズルの内、少なくとも1つの内向き噴射ノズルのノズル孔の中心軸線を、鋼管杭の中心軸からずらして配置されている場合、このような内向き噴射ノズルから噴射される高圧水あるいは高圧の流動性固化材が、鋼管杭の中心から鋼管杭内の偏位した位置を通るように斜めに噴射されるため、鋼管杭内における土砂混合水を流動させ、鋼管杭内での高圧水による土砂に対する回転トルクを発生し、鋼管杭内に強制流動を生じる効果と、高圧水と鋼管杭内の土砂が混合されることにより鋼管杭内の研磨効果(アブレイシブウォータージェット効果)の相乗効果により、鋼管杭内面に付着する土砂の「はつり性」が向上することができる。さらに、土砂と流動性固化材との混合体を鋼管杭内において強制流動させて均一に混合させて均質な混合体とすることができる。
すなわち、内向き噴射ノズルの内、少なくとも1つの内向き噴射ノズルのノズル孔の中心軸線を、鋼管杭の中心軸からずらして配置されている場合には、少なくとも一つの内向き噴射ノズルにより鋼管杭内面方向に噴射することにより、鋼管杭内面の土塊の破砕および鋼管杭内面の土砂の洗浄を飛躍的に改善できる。
また、噴射ノズルから流動性固化材を噴射することにより、土砂とセメントミルク等の流動性固化材の混練を均一になるように改善することができ、均質な根固め部を築造することができる。
さらに、鋼管杭内面にずれ止めが設けられている場合は、鋼管杭から根固め部に確実に荷重伝達されることができる。
このように、本発明は、鋼管杭の先端支持力を飛躍的に改善することができる。
According to the present invention, the following effects can be obtained.
In a steel pipe pile in which a plurality of injection nozzles are installed at intervals in the circumferential direction of the tip, inwardly arranged such that at least one of the plurality of injection nozzles injects toward the inner surface of the steel pipe pile By setting it as an injection nozzle, it can be set as the steel pipe pile which can crush the clot in a steel pipe pile easily, and can wash the earth and sand adhering to a steel pipe pile inner surface easily. Here, if the nozzle hole of the inward injection nozzle is in the steel pipe pile, cleaning is further facilitated. In addition, sand and water mixed with high-pressure water and crushed earth and sand (abrasive water jet) is injected toward the inner surface of the steel pipe pile to increase the polishing effect of the inner surface of the steel pipe pile and adhere to the inner surface of the steel pipe pile. It can improve the “hanging property” of the soil.
Moreover, when the center axis line of the nozzle hole of at least one inward injection nozzle among the inward injection nozzles is shifted from the central axis of the steel pipe pile, the high pressure injected from such an inward injection nozzle Since water or high-pressure fluidized solidified material is injected obliquely from the center of the steel pipe pile so as to pass through the deviated position in the steel pipe pile, the soil-and-sand mixed water in the steel pipe pile flows and flows in the steel pipe pile. The effect of generating rotational torque on the sediment by high-pressure water and causing forced flow in the steel pipe pile, and the polishing effect in the steel pipe pile by mixing the high-pressure water and the soil in the steel pipe pile (Abrasive water jet effect) Due to this synergistic effect, the “suspension” of the earth and sand adhering to the inner surface of the steel pipe pile can be improved. Furthermore, the mixture of earth and sand and the fluidized solidifying material can be forced to flow in the steel pipe pile and uniformly mixed to obtain a homogeneous mixture.
That is, when the center axis line of the nozzle hole of at least one inward injection nozzle is shifted from the central axis of the steel pipe pile, the steel pipe pile is formed by at least one inward injection nozzle. By spraying in the inner surface direction, the crushing of the lump on the inner surface of the steel pipe pile and the washing of the earth and sand on the inner surface of the steel pipe pile can be dramatically improved.
In addition, by jetting the fluidized solidifying material from the spray nozzle, the kneading of the fluidized solidified material such as earth and cement milk can be improved to be uniform, and a uniform root-solidified portion can be built. .
Furthermore, when a slip stopper is provided on the inner surface of the steel pipe pile, the load can be reliably transmitted from the steel pipe pile to the root hardening portion.
Thus, the present invention can dramatically improve the tip support force of the steel pipe pile.

次に、本発明を図示の実施形態に基づいて詳細に説明する。   Next, the present invention will be described in detail based on the illustrated embodiment.

図1および図2には、本発明の第1実施形態の鋼管杭1が示され、図3には、図1および図2における鋼管杭1における内向き噴射ノズル2を有する鋼管杭1の横断平面図が示され、図4には、図1の一部が拡大して示されている。第1実施形態では内向き噴射ノズル2のノズル孔が鋼管杭内部にあるが、鋼管杭1の内面に向かって噴射できるのであれば、必ずしも鋼管杭内部でなくてもよい。   1 and 2 show a steel pipe pile 1 according to a first embodiment of the present invention, and FIG. 3 shows a crossing of a steel pipe pile 1 having an inward injection nozzle 2 in the steel pipe pile 1 shown in FIGS. 1 and 2. A plan view is shown, and FIG. 4 is an enlarged view of a part of FIG. In 1st Embodiment, although the nozzle hole of the inward injection nozzle 2 exists in the steel pipe pile, if it can inject toward the inner surface of the steel pipe pile 1, it does not necessarily need to be in the steel pipe pile.

図3に示すように、鋼管杭1における先端面から上部方向に離れた杭先端部外周面1aには、周方向に等角度間隔をおいて、高圧水または流動性固化材を噴射する内向き噴射ノズル2を有する噴射部3を備えている。   As shown in FIG. 3, inwardly injecting high-pressure water or a fluidized solidified material at an equiangular interval in the circumferential direction on the outer peripheral surface 1 a of the pile tip portion that is spaced upward from the tip surface of the steel pipe pile 1. An injection unit 3 having an injection nozzle 2 is provided.

さらに図1および図4を参照して説明すると、前記の噴射部3は、図示の形態では、杭貫入方向に噴射する貫入方向噴射ノズル6と、杭貫入方向に交差するように配置され、鋼管杭内面に向かって噴射し、鋼管杭内面を洗浄するための内向き噴射ノズル2とを備えた噴射部3である。図3に示した形態では、前記の内向き噴射ノズル2の中心軸線(噴射孔の中心軸線)C1は、杭貫入方向に対して直角な水平面内において、鋼管杭の中心軸からずらし、相対する直径P(噴射ノズル先端を通る半径に対し、垂直に交わる直径P)に対して斜めに交差するように配置されている。
なお、前記の内向き噴射ノズル2の中心軸線(噴射孔の中心軸線)C1は、杭貫入方向に対して直角な水平面に対して多少傾斜させて、上下方向の運動成分を付与するようにしてもよい。
1 and FIG. 4, in the form shown in the drawing, the injection unit 3 is disposed so as to intersect with the penetration direction injection nozzle 6 that injects in the pile penetration direction, and intersects with the pile penetration direction. It is the injection part 3 provided with the inward injection nozzle 2 for injecting toward a pile inner surface and wash | cleaning a steel pipe pile inner surface. In the form shown in FIG. 3, the center axis line (center axis line of the injection hole) C1 of the inward injection nozzle 2 is shifted from the center axis O of the steel pipe pile in a horizontal plane perpendicular to the pile penetration direction. It arrange | positions so that it may cross | intersect diagonally with respect to the diameter P (diameter P which cross | intersects perpendicularly | vertically with respect to the radius which passes along the injection nozzle front-end | tip).
The center axis C1 (injection hole center axis) of the inward injection nozzle 2 is slightly inclined with respect to a horizontal plane perpendicular to the pile penetration direction so as to impart a vertical motion component. Also good.

前記の噴射部3は、鋼管杭外面に溶接等の固定手段により固定される。前記の内向き噴射ノズル2は、鋼管杭1先端部に、鋼管杭周方向に等角度間隔をおいて設けられた貫通孔4に挿入配置された状態で、噴射部3が鋼管杭1の外面に溶接により固定(または図示を省略するが着脱可能に固定)されることにより、所定の位置に設置される。   The said injection part 3 is fixed to the steel pipe pile outer surface by fixing means, such as welding. The inward injection nozzle 2 is inserted into a through-hole 4 provided at an equiangular interval in the circumferential direction of the steel pipe pile at the tip of the steel pipe pile 1, and the injection part 3 is an outer surface of the steel pipe pile 1. It is installed at a predetermined position by being fixed by welding (or detachably fixed although not shown).

図4に示した形態では、噴射部3における基端側の高圧水供給孔5から横方向に分岐されて、貫入方向噴射孔6aと、内向き噴射孔2aとを備え、鋼管杭の先端部から鋼管杭貫入方向に噴射する貫入方向噴射ノズル6と、水平方向等の横方向に噴射する内向き噴射ノズル2とを備えている。 In the form shown in FIG. 4, it is branched laterally from the high-pressure water supply hole 5 on the proximal end side in the injection portion 3, and includes a penetration direction injection hole 6 a and an inward injection hole 2 a, and a tip portion of the steel pipe pile The penetration direction injection nozzle 6 which injects in a steel pipe pile penetration direction, and the inward injection nozzle 2 which injects in horizontal directions, such as a horizontal direction, are provided.

前記の噴射部3は、貫入方向噴射ノズル6を備えた噴射部と、内向き噴射ノズル2を備えた噴射部とがそれぞれ独立別個に設置され、それぞれ独立した別個の高圧水・流動性固化材供給パイプ等を設ける形態でもよい。   The injection unit 3 includes an injection unit having a penetrating injection nozzle 6 and an injection unit having an inward injection nozzle 2, which are installed separately and independently. It is also possible to provide a supply pipe or the like.

図1に示すように、鋼管杭1の本体を形成している鋼管の内面には、周方向内面に沿って丸鋼が溶接により固定されてなるずれ止め7が設けられている。前記のずれ止め7は上下方向に間隔をおいて複数段設けられている。他の形態のずれ止め7としては、例えば、図7に示すように、縞鋼板における凹凸部8を利用するようにしてもよい。このような場合には、凹凸部8を鋼管内面側となるように配置して構成した内面突起付き鋼管9を鋼管杭1として用いればよい。 As shown in FIG. 1, the inner surface of the steel pipe which forms the main body of the steel pipe pile 1 is provided with a stopper 7 in which round steel is fixed by welding along the circumferential inner surface. The shift stopper 7 is provided in a plurality of stages at intervals in the vertical direction. As another form of the shift stopper 7, for example, as shown in FIG. 7, an uneven portion 8 in a striped steel plate may be used. In such a case, the steel pipe 9 with an inner surface protrusion formed by arranging the uneven portion 8 so as to be on the inner surface side of the steel pipe may be used as the steel pipe pile 1.

本発明においては、先端部の周方向に間隔をおいて複数の噴射ノズルを設置した鋼管杭において、前記複数の噴射ノズルの内、少なくとも一つの噴射ノズルが鋼管杭内面に向かって噴射するように配置された内向き噴射ノズル2である必要がある。
内向き噴射ノズル2は、設置個数が多いほど、これらから噴射される高圧水により鋼管杭1内を掘削すると共に、鋼管杭1の内面を洗浄して、鋼管杭内面に付着している土砂を確実に洗浄して落とすことができる。また、鋼管杭1内の土砂と高圧水とが混合した土砂混合水として鋼管杭内面に噴射されることにより、鋼管杭内面の研磨効果(アブレイシブウォータージェット効果)が増加し、鋼管杭1の内面側に付着する土砂洗浄性が高まる。
In the present invention, in the steel pipe pile in which a plurality of injection nozzles are installed at intervals in the circumferential direction of the tip, at least one of the plurality of injection nozzles is injected toward the inner surface of the steel pipe pile. It is necessary to be the inward injection nozzle 2 arranged.
As the number of inward injection nozzles 2 increases, the inside of the steel pipe pile 1 is excavated by the high-pressure water jetted from them, and the inner surface of the steel pipe pile 1 is washed to remove the soil adhering to the inner surface of the steel pipe pile. Can be washed and dropped reliably. In addition, the sand and sand mixed water in which the earth and sand in the steel pipe pile 1 are mixed and sprayed on the inner surface of the steel pipe pile increases the polishing effect on the inner surface of the steel pipe pile (the abrasive water jet effect). increasing cleaning of sediment adhering to the inner surface of.

図3に示すように、前記の内向き噴射ノズル2の内の少なくとも1つの内向き噴射ノズル2のノズル孔2aの中心軸線C1は、相対する鋼管杭1の直径Pに対して斜めにして、鋼管杭1の中心軸Oをはずして鋼管杭内の偏位した位置を通るように配置されている。 As shown in FIG. 3, the central axis C1 of the nozzle hole 2a of at least one inward injection nozzle 2 of the inward injection nozzles 2 is inclined with respect to the diameter P of the opposing steel pipe pile 1, It arrange | positions so that the center axis | shaft O of the steel pipe pile 1 may be removed and it may pass through the position shifted in the steel pipe pile.

このように内向き噴射ノズル2のノズル孔の中心軸線C1を鋼管杭の中心軸Oからずらし、相対する直径Pに対して斜めに交差するように配置することにより、前記内向き噴射ノズル2から高圧水を噴射させ、鋼管杭内の土砂または鋼管杭内面に付着している土砂10(図9参照)を掘削する。
この場合には、前記のように高圧水と破砕された土砂が混合した土砂混合水(アブレイシブウォータージェット)として鋼管杭内面に向かって噴射されることにより、鋼管杭内面の研磨効果(アブレイシブウォータージェット効果)が増加することに加えて、鋼管杭内では土砂混合水に強制流動(例えば、図3のAに示すような方向の強制流動)を積極的に起こし、この強制流動により鋼管杭内の土砂または鋼管杭内面に付着している土砂10の洗浄性を飛躍的に向上することができる。
また、前記内向き噴射ノズル2から流動性固化材を噴射する場合には、鋼管杭1内(および鋼管杭1の下方)での土砂10あるいは土塊11を含む鋼管杭内部の掘削土を含む流動性固化材16の強制流動を積極的に起す。そして塊状の土砂10(図9参照)あるいは土塊11を積極的に破砕して細粒化し、均一に混合可能にする。
In this way, the center axis C1 of the nozzle hole of the inward injection nozzle 2 is shifted from the center axis O of the steel pipe pile and arranged so as to cross obliquely with respect to the opposite diameter P. High-pressure water is injected to excavate the earth and sand 10 in the steel pipe pile or the earth and sand 10 attached to the inner surface of the steel pipe pile (see FIG. 9).
In this case, the high-pressure water and the crushed earth and sand mixed as described above are sprayed toward the inner surface of the steel pipe pile as an abrasive water jet (abrasive water jet). in addition to the abrasive water jet effect) increases, forced flow in the sediment mixing water in steel pipe pile (e.g., forced flow direction as indicated by a in FIG. 3) actively raised by the forced flow The detergency of the earth and sand in the steel pipe pile or the earth and sand 10 adhering to the inner surface of the steel pipe pile can be greatly improved.
Moreover, when injecting a fluid solidification material from the inward injection nozzle 2, a flow including excavated soil inside the steel pipe pile including the earth and sand 10 or the lump 11 in the steel pipe pile 1 (and below the steel pipe pile 1). The forced flow of the property solidifying material 16 is actively caused. Then, the massive earth and sand 10 (see FIG. 9) or the earth lump 11 is actively crushed and finely divided so that they can be mixed uniformly.

鋼管杭内において鋼管杭内部掘削土混合水を流動させる場合に、図5に示すように鋼管杭中心Oを通るように噴射すると、鋼管杭中心を境にして、左右2分した流れになる。それでもよいが、好ましくは、図3に矢印Aで示すように、鋼管杭内において一方向に流れる流れが生じるようにするのがい。すなわち、相対する直径Pに対して斜めに配置した内向き噴射ノズル2を複数個設置する場合には、斜めにする配置方向を同じ方向にすることが好ましい。ただし、斜めにする角度を一致させる必要はない。 When flowing the steel pipe pile internal excavated soil mixed water in a steel pipe pile, when injected so as to pass through the steel pipe pile center O as shown in FIG. 5, and the steel pipe pile center as a boundary, that Do right and left 2 minutes the flow . So also may, but preferably, as shown by an arrow A in FIG. 3, have good is to so flow flowing in one direction in the steel pipe pile occurs. That is, in the case where a plurality of inward injection nozzles 2 arranged obliquely with respect to the opposite diameter P are installed, it is preferable that the oblique arrangement directions are the same direction. However, it is not necessary to match the oblique angles.

相対する直径Pに対して傾斜するように配置されている複数の内向き噴射ノズル2より噴射した場合、各内向き噴射ノズル2の噴射孔中心軸線C1が同レベルに対向するように配置されていると、対向配置されている噴射ノズル2から噴射されている各高圧水が干渉し、高圧水の運動エネルギーが減少することが懸念される場合には、鋼管杭1の内側において、各内向き噴射ノズル2の上下方向あるいは横方向(例えば、横水平方向)の噴射角度に差を設けて、干渉しないようにしてもよい。 When injection is performed from a plurality of inward injection nozzles 2 arranged to be inclined with respect to the opposing diameter P, the injection hole central axis C1 of each inward injection nozzle 2 is arranged so as to face the same level. If there is a concern that the high-pressure water jetted from the jet nozzles 2 that are arranged to interfere with each other and the kinetic energy of the high-pressure water is reduced, A difference may be provided in the injection angle of the injection nozzle 2 in the vertical direction or the horizontal direction (for example, the horizontal direction) so as not to interfere.

このように内向き噴射ノズル2が配置されていることにより、鋼管杭内面における流れを強制的に促進し、流動現象による鋼管杭内の洗浄効果が飛躍的に改善される。 Thus, by arrange | positioning the inward injection nozzle 2, the flow in a steel pipe pile inner surface is forcedly accelerated | stimulated, and the washing | cleaning effect in the steel pipe pile by a flow phenomenon is improved dramatically.

鋼管杭内の流れを促進する上では、内向き噴射ノズル2の中心軸線C1を相対する直径Pに対して斜めに交差させ交差角度は、例えば、噴射ノズルからの噴射のひろがり角度は約10度であるために、対向する噴射ノズルは相対する直径Pに対して垂直から約5度以上にすれば良い。 In promoting the flow of the steel pipe pile, the intersection angle of the central axis C1 of the inward injection nozzle 2 Ru crossed obliquely to opposed diameter P is, for example, the spread angle of the injection from the injection nozzle is approximately 10 Therefore, it is only necessary that the opposing spray nozzle be set to about 5 degrees or more from the perpendicular to the opposing diameter P.

内向き噴射ノズル2の相対する直径Pに対して垂直から斜めにする角度を大きくするほど、鋼管杭内の流れは良好になるが、土塊の破砕力が弱まるために、45度以下にすることが望ましい。 The larger the angle from the perpendicular to the opposing diameter P of the inward injection nozzle 2 is, the better the flow in the steel pipe pile will be, but the crushing force of the clot will weaken, so it should be 45 degrees or less Is desirable.

前記の内向き噴射ノズル2は複数配置されていてもよく、例えば、鋼管杭周方向に等角度間隔をおいて、2つ、3つ、4つ、8つ等複数配置されていてもよい。例えば、内向き噴射ノズル2を4つ配置する場合、図3に示した形態のように、90度の等角度間隔をおいて設置されていてもよい。 A plurality of the inward injection nozzles 2 may be arranged. For example, two, three, four, eight, etc. may be arranged at equal angular intervals in the circumferential direction of the steel pipe pile. For example, when four inward injection nozzles 2 are arranged, they may be installed at an equal angular interval of 90 degrees as in the form shown in FIG.

さらに、例えば、複数の内向き噴射ノズル2を配置する場合、鋼管杭1の外径にもよるが、鋼管杭1の外径が600mm〜2000mmの場合、2個〜8個の内向き噴射ノズル2を等角度間隔をおいて鋼管杭1の周方向に設けるようにする。   Furthermore, for example, when arranging a plurality of inward injection nozzles 2, depending on the outer diameter of the steel pipe pile 1, when the outer diameter of the steel pipe pile 1 is 600 mm to 2000 mm, two to eight inward injection nozzles 2 is provided in the circumferential direction of the steel pipe pile 1 at equal angular intervals.

貫入方向噴射ノズル6は、例えば、前記のような外径の鋼管杭1の場合に、鋼管杭1の周方向に等角度間隔をおいて、4個〜8個設けるようにすればよい。   For example, in the case of the steel pipe pile 1 having an outer diameter as described above, four to eight penetration direction injection nozzles 6 may be provided at equal angular intervals in the circumferential direction of the steel pipe pile 1.

前記の各貫入方向噴射ノズル6および内向き噴射ノズル2は、杭打込み時には、バイブロハンマと併用して、例えば圧力3〜15MPaの高圧水(例えば清水)を噴射し、バイブロハンマの振動力による土の流動性および鋭敏性を活用したウォータージェットカッタとして機能する。また、杭先端の根固め部12と杭周面の地盤強度の増大のために利用する流動性固化材注入工法においては、バイブロハンマを駆動しつつかつ貫入方向噴射ノズル6および内向き噴射ノズル2から例えば圧力15MPa程度以下(高圧水と同程度の圧力)で流動性固化材16を噴射する。
なお、後述する本発明の施工方法においては、バイブロハンマの駆動を停止して流動性固化材を噴射する工程も含まれている。
配管(またはホース)18は、切り替えバルブ(図示を省略)を介して、グラウト(流動性固化材)ポンプ(図示省略)とウォータージェットカッタ装置(図示省略)に接続される。
Each of the penetrating injection nozzles 6 and the inward injection nozzles 2 is used in combination with a vibro hammer when injecting piles, for example, jets high-pressure water (for example, fresh water) at a pressure of 3 to 15 MPa, and the flow of soil due to the vibration force of the vibro hammer It functions as a water jet cutter that takes advantage of sexuality and sensitivity. Moreover, in the fluidized solidifying material injection method used for increasing the ground strength of the root consolidation portion 12 at the tip of the pile and the peripheral surface of the pile, while driving the vibro hammer, the penetration direction injection nozzle 6 and the inward injection nozzle 2 For example, the fluidized solid material 16 is sprayed at a pressure of about 15 MPa or less (a pressure similar to that of high-pressure water).
In addition, in the construction method of this invention mentioned later, the process of stopping the drive of a vibro hammer and injecting a fluid solidification material is also included.
The pipe (or hose) 18 is connected to a grout (fluid solidifying material) pump (not shown) and a water jet cutter device (not shown) via a switching valve (not shown).

噴射ノズルの構造としては、1本の配管に対して、貫通孔を鋼管杭貫入方向(軸方向)下方と、これに直角な水平方向あるいは横方向等の直角方向に配置することにより、2方向に噴射することができる。   As for the structure of the injection nozzle, the two through-holes are arranged in the pipe pipe penetration direction (axial direction) downward with respect to one pipe and in a right angle direction such as a horizontal direction or a horizontal direction perpendicular thereto. Can be injected.

1本の配管で2方向に噴射した場合に、流量が確保できない場合には、鋼管杭軸方向と直角方向に独立した噴射ノズルを配置してもよい。   When the flow rate cannot be ensured when spraying in two directions with one pipe, an independent spray nozzle may be arranged in the direction perpendicular to the steel pipe pile axis direction.

噴射部3には、地上等に設置される高圧水供給ポンプ(図示を省略した)に接続された高圧水(例えば清水)兼流動性固化材供給管(またはホース)18が接続されている。   A high-pressure water (for example, fresh water) and fluidized solidification material supply pipe (or hose) 18 connected to a high-pressure water supply pump (not shown) installed on the ground or the like is connected to the injection unit 3.

鋼管杭1の先端部外面側に噴射部3を固定し、鋼管杭1の外側から噴射する形態について説明してきたが、前記の噴射部3は、鋼管杭内面に固定してもよく、鋼管杭内面に固定された噴射部3における貫入方向噴射ノズル6および内向き噴射ノズル2から、それぞれ水(または流動性固化材に切り替える場合は、流動性固化材)を噴射するようにしてもよい。 Although the injection part 3 was fixed to the front-end | tip part outer surface side of the steel pipe pile 1, and the form injected from the outer side of the steel pipe pile 1 has been demonstrated , the said injection part 3 may be fixed to the steel pipe pile inner surface, You may make it inject water (or a fluidized solidification material when switching to a fluidized solidification material) from the penetration direction injection nozzle 6 and the inward injection nozzle 2 in the injection part 3 fixed to the inner surface, respectively.

次に、本発明の鋼管杭を用いた鋼管杭の施工方法について説明する。   Next, the construction method of the steel pipe pile using the steel pipe pile of this invention is demonstrated.

図8は、本発明の鋼管杭1を用いた鋼管杭の施工方法の一例の各工程を説明するための工程図である。なお、打込深度が非常に深い場合には、順次鋼管を継ぎ足し溶接しながら打ち込みを行う。 Drawing 8 is a flowchart for explaining each process of an example of a construction method of a steel pipe pile using steel pipe pile 1 of the present invention. When the driving depth is very deep, the steel pipes are successively added and driven while welding.

図8に示す工程について簡単に説明すると、(a)に示す第1工程は、鋼管杭1の打込工程である。高圧水を貫入方向噴射ノズル6および内向き噴射ノズル2から噴射し、鋼管杭1とバイブロハンマ(図示省略)の質量で、例えば5D〜10D(Dは鋼管杭の外径)程度を自重自沈させ、その後バイブロハンマを運転し、振動と水の力で連続的に地盤13に打設する。
連続打設速度は、例えば100cm/分で、支持層17内への打込速度は、例えば60cm/分程度以下とする。支持層17の確認は、事前に行われた地質調査結果や地層断面図で行うほか、予め推定した支持層17に杭先端が近づいたら、バイブロハンマの全荷重を鋼管杭1に預け、打込速度と打込抵抗の変化(例えば電動式バイブロハンマの場合は負荷電流)を読み取ることで行う。
If the process shown in FIG. 8 is demonstrated easily, the 1st process shown to (a) is a driving process of the steel pipe pile 1. FIG. High-pressure water is injected from the intrusion direction injection nozzle 6 and the inward injection nozzle 2, and the weight of the steel pipe pile 1 and the vibro hammer (not shown) is reduced by, for example, about 5D to 10D (D is the outer diameter of the steel pipe pile). Thereafter, the vibratory hammer is operated and continuously placed on the ground 13 by vibration and water.
The continuous casting speed is, for example, 100 cm / min, and the driving speed into the support layer 17 is, for example, about 60 cm / min or less. The confirmation of the support layer 17 is performed based on the geological survey results and the cross-sectional view of the geological survey conducted in advance, and when the pile tip approaches the previously estimated support layer 17, the full load of the vibrator hammer is deposited in the steel pipe pile 1 and the driving speed And a change in driving resistance (for example, a load current in the case of an electric vibrator hammer).

鋼管杭1の先端が、中間層と支持層17の界面(支持層深度)を通過した後、打込掘削深度で打ち止める(図8(b)参照)。ここで、ウォータージェットを停止する。図示省略のバイブロハンマは、一旦停止してもよいが、引き続く第2工程のために運転したままとしてもよい。   After the tip of the steel pipe pile 1 passes through the interface between the intermediate layer and the support layer 17 (support layer depth), it is stopped at the driving excavation depth (see FIG. 8B). Here, the water jet is stopped. The vibratory hammer (not shown) may be temporarily stopped, but may be kept operating for the subsequent second step.

第2工程は、流動性固化材振動撹拌工程である。図示省略の高圧水と流動性固化材のそれぞれのタンクへの配管の切替バルブを操作して、流動性固化材流路に切り替える。セメントサイロからセメントを供給し、その他の注入材を配合してW/C(水/セメント比)が50%〜150%の流動性固化材(セメントミルク等)を調製しておく。このような流動性固化材16を噴射圧力最大15MPa程度以下で噴射を開始し、バイブロハンマを運転して鋼管杭1を、引上深度まで引き上げる(図示省略)。例えば、鋼管杭1を支持層深度より1.0D程度浅い位置まで引き上げている。   The second step is a fluidized solid material vibration stirring step. The switching valve of the piping to each tank of high-pressure water and fluid solidifying material (not shown) is operated to switch to the fluid solidifying material flow path. Cement is supplied from a cement silo, and other injecting materials are blended to prepare a fluidized solidified material (cement milk or the like) having a W / C (water / cement ratio) of 50% to 150%. The injection of such a fluidized solid material 16 is started at a maximum injection pressure of about 15 MPa or less, and the vibro hammer is operated to raise the steel pipe pile 1 to the pulling depth (not shown). For example, the steel pipe pile 1 is pulled up to a position shallower by about 1.0D than the support layer depth.

さらに図8(c)に示す第3工程において、流動性固化材を噴射しつつ引上深度から定着深度まで鋼管杭1を打ち込む。例えば、定着深度は、支持層深度より1.0D程度深く、第1工程の打込掘削深度よりも浅い。その際の鋼管杭1の移動速度は、50〜200cm/分程度である。   Further, in the third step shown in FIG. 8C, the steel pipe pile 1 is driven from the pulling depth to the fixing depth while jetting the fluidized solidified material. For example, the fixing depth is about 1.0D deeper than the support layer depth and shallower than the driving excavation depth in the first step. The moving speed of the steel pipe pile 1 in that case is about 50-200 cm / min.

上記の連続する第2及び第3工程は、1回のみ行ってもよく、地盤13の硬軟度等の状況に応じて複数回繰り返してもよい。硬い地盤13の場合は、地盤13の攪拌のため適宜繰り返すことが好ましい。この第2及び第3工程の繰り返し工程においては、流動性固化材16又は高圧水のいずれを噴射してもよい。これにより、鋼管杭1先端において固化体の拡大された根固め部12を確実に形成することができ、先端支持力を増大させることができる。   Said 2nd and 3rd continuous process may be performed only once, and may be repeated several times according to conditions, such as the hardness of the ground 13. In the case of the hard ground 13, it is preferable to repeat appropriately for the stirring of the ground 13. In the repetition process of the second and third processes, either the fluidized solidifying material 16 or high-pressure water may be injected. Thereby, the root consolidation part 12 with which the solidified body was expanded can be formed reliably in the steel pipe pile 1 front-end | tip, and a tip support force can be increased.

そして、図8(d)に示す第3工程のように、鋼管杭1を定着深度にて打ち止めた後、バイブロハンマを停止する。その後、鋼管杭1を定着深度に停止したまま、根固め工程として所定時間、流動性固化材16を噴射し、均質な根固め部(根固め球根)12を構築する。   Then, as in the third step shown in FIG. 8D, after stopping the steel pipe pile 1 at the fixing depth, the vibro hammer is stopped. After that, while the steel pipe pile 1 is stopped at the fixing depth, the fluidized solidification material 16 is sprayed for a predetermined time as a root consolidation step, and a uniform root consolidation portion (root consolidation bulb) 12 is constructed.

なお、貫入方向噴射ノズル6および内向き噴射ノズル2を備えた噴射部3および高圧水兼流動性固化材供給管18は残置させた状態としてもよく、噴射部3が鋼管杭1から分離可能な形態では、流動性固化材16を噴射しながら引き抜くようにしてもよい。このようにして、鋼管杭1の外側に流動性固化材16の固化体を形成し、これにより周面摩擦力を増大させる。   In addition, the injection part 3 provided with the penetration direction injection nozzle 6 and the inward injection nozzle 2 and the high-pressure water / fluidized solidification material supply pipe 18 may be left, and the injection part 3 can be separated from the steel pipe pile 1. In the form, the fluidized solid material 16 may be pulled out while being jetted. In this way, a solidified body of the fluidized solidified material 16 is formed outside the steel pipe pile 1, thereby increasing the peripheral frictional force.

図6または図7は、本発明の鋼管杭1による鋼管杭の施工方法によって形成される杭基礎(合成杭)の断面図である。前記のような本発明の実施形態の施工方法によれば、杭先端部には、鋼管杭1に比して拡径された略柱状のソイルセメント固化体15が形成される。ソイルセメント固化体15下端の深度は、打込深度又はそれ以上まで達している。   FIG. 6 or FIG. 7 is a cross-sectional view of a pile foundation (synthetic pile) formed by a steel pipe pile construction method using the steel pipe pile 1 of the present invention. According to the construction method of the embodiment of the present invention as described above, the substantially columnar soil cement solidified body 15 whose diameter is larger than that of the steel pipe pile 1 is formed at the tip of the pile. The depth of the lower end of the soil cement solidified body 15 reaches the driving depth or more.

なお、本発明における鋼管杭には、鋼管杭、コンクリート部を備えた鋼管杭や、横断面が矩形あるいは横断面多角形の角鋼管からなる鋼矢板(鋼管矢板)は当然含まれる。
また、図6のずれ止め7は、鋼管杭内面のみに配置されているが、鋼管杭外面に別途ずれ止めやリブを設けても良い(図示せず)。
In addition, the steel pipe pile in this invention includes the steel pipe pile, the steel pipe pile provided with the concrete part, and the steel sheet pile (steel pipe sheet pile) which consists of a square steel pipe whose cross section is a rectangle or a cross section polygon.
Moreover, although the slip stopper 7 of FIG. 6 is arrange | positioned only at the steel pipe pile inner surface, you may provide a slip stopper and a rib separately on the steel pipe pile outer surface (not shown).

前記のように、本発明の鋼管杭1を使用した本発明の施工方法により地盤13に築造された鋼管杭1では、鋼管杭1のずれ止め7の近傍に土砂10が付着していないので、根固め部12に確実に荷重伝達される。また、根固め部(ソイルセメント又はコンクリート)12内に土塊11などが介在した不均質なものでなく、均質な根固め部12となるため、根固め部12内に局部的に脆弱な部分が存在しないようになる。
そのため、根固め部12での破壊が発生しないため、先端地盤14へ確実に荷重伝達を図ることができる。
そして、鋼管杭1から先端地盤14への荷重伝達方法としては、鋼管杭1のずれ止め7から、根固め部12に荷重伝達され、根固め部12から先端地盤14へ荷重伝達される。
As described above, in the steel pipe pile 1 built on the ground 13 by the construction method of the present invention using the steel pipe pile 1 of the present invention, since the earth and sand 10 are not attached in the vicinity of the detent 7 of the steel pipe pile 1, The load is reliably transmitted to the root hardening portion 12. Further, since the soil solidified portion 12 is not a heterogeneous thing in which the soil mass 11 or the like is intervened in the root solidified portion (soil cement or concrete) 12 but becomes a homogeneous root solidified portion 12, there is a locally weak portion in the root solidified portion 12. No longer exists.
For this reason, no destruction occurs at the root hardening portion 12, so that the load can be reliably transmitted to the tip ground 14.
And as a load transmission method from the steel pipe pile 1 to the tip ground 14, the load is transmitted from the stopper 7 of the steel pipe pile 1 to the root consolidation part 12, and the load is transmitted from the root consolidation part 12 to the tip ground 14.

本発明の一実施形態の鋼管杭の先端部付近を示す縦断正面図である。It is a vertical front view which shows the front-end | tip part vicinity of the steel pipe pile of one Embodiment of this invention. 本発明の鋼管杭を示す概略正面図である。It is a schematic front view which shows the steel pipe pile of this invention. 本発明の鋼管杭の内向き噴射ノズル付近を示す横断平面図である。It is a cross-sectional top view which shows the inward injection nozzle vicinity of the steel pipe pile of this invention. 貫入方向噴射ノズルおよび内向き噴射ノズルを備えた噴射部の一例を示し、噴射部付近を示す拡大縦断正面図である。It is an enlarged vertical front view which shows an example of the injection part provided with the penetration direction injection nozzle and the inward injection nozzle, and shows the injection part vicinity. 本発明の鋼管杭の内向き噴射ノズルの配置形態の他の例を示す横断平面図である。It is a cross-sectional top view which shows the other example of the arrangement | positioning form of the inward injection nozzle of the steel pipe pile of this invention. 本発明の鋼管杭により形成される根固め部付近を拡大して示す拡大縦断正面図である。It is an expanded vertical front view which expands and shows the root vicinity vicinity formed with the steel pipe pile of this invention. 本発明の他の形態の鋼管杭に根固め部を形成した状態を示す拡大縦断正面図である。It is an enlarged vertical front view which shows the state which formed the root hardening part in the steel pipe pile of the other form of this invention. 本発明の鋼管杭の施工方法を示す工程図を示す概略縦断正面図である。It is a schematic longitudinal front view which shows the process figure which shows the construction method of the steel pipe pile of this invention. 鋼管杭内のずれ止めに土砂が付着した状態で根固め部が形成された状態を示す縦断正面図である。It is a vertical front view which shows the state in which the solidified part was formed in the state to which earth and sand adhered to the slip stopper in a steel pipe pile.

符号の説明Explanation of symbols

1 鋼管杭
1a 杭先端部外周面
2 内向き噴射ノズル
3 噴射部
4 貫通孔
5 高圧水供給孔
6 貫入方向噴射ノズル
7 ずれ止め
8 凹凸部
9 内面突起付き鋼管
10 土砂
11 土塊
12 根固め部
13 地盤
14 先端地盤
15 ソイルセメント固化体
16 流動性固化材
17 支持層
18 高圧水兼流動性固化材供給管(またはホース)
19 管内閉塞土
20 鋼管杭
P 内向き噴射ノズルの噴射孔に相対する直径
C1 内向き噴射ノズルの中心軸線(噴射孔の中心軸線)
O 鋼管杭の中心
DESCRIPTION OF SYMBOLS 1 Steel pipe pile 1a Pile front-end | tip outer peripheral surface 2 Inward injection nozzle 3 Injection part 4 Through-hole 5 High-pressure water supply hole 6 Intrusion direction injection nozzle 7 Detachment 8 Uneven part 9 Steel pipe 10 with an internal protrusion 10 Sediment 11 Clot 12 Root consolidation part 13 Ground 14 Tip Ground 15 Soil Cement Solidified Body 16 Fluidized Solidified Material 17 Support Layer 18 High Pressure Water / Flowable Solidified Material Supply Pipe (or Hose)
19 Closed soil in pipe 20 Steel pipe pile P Diameter C1 opposite to the injection hole of the inward injection nozzle Center axis of the inward injection nozzle (center axis of the injection hole)
O Center of steel pipe pile

Claims (4)

先端部の周方向に間隔をおいて複数の噴射ノズルを設置した鋼管杭において、
前記複数の噴射ノズルの少なくとも一つの噴射ノズルが鋼管杭内面に向かって高圧水を噴射するように配置された内向き噴射ノズルであり、
さらに、内向き噴射ノズルの内少なくとも1つの内向き噴射ノズルが、ノズル孔の中心軸線を鋼管杭の中心軸からずらして配置された内向き噴射ノズルであり、
当該内向き噴射ノズルにより、前記高圧水を前記鋼管杭の中心から前記鋼管杭内の偏位した位置を通るように斜めに噴射させて、鋼管杭内における土砂混合水を流動させるとともに、
全ての前記内向き噴射ノズルから噴射され高圧水により、前記鋼管杭内の土塊を破砕し、かつ鋼管杭内面に付着する土砂を洗浄することができることを特徴とする鋼管杭。
In steel pipe piles installed with multiple injection nozzles at intervals in the circumferential direction of the tip,
At least one injection nozzle among the plurality of injection nozzles, a inward injection nozzle disposed to inject high pressure water toward the steel pipe pile inner surface,
Further, at least one inward injection nozzle of the inward injection nozzles is an inward injection nozzle arranged by shifting the central axis of the nozzle hole from the central axis of the steel pipe pile,
With the inward injection nozzle, the high-pressure water is injected obliquely from the center of the steel pipe pile so as to pass through the displaced position in the steel pipe pile, and the soil-sand mixed water in the steel pipe pile flows.
By all of the inward pressure water that will be injected from the injection nozzle, crushing clods of the steel pipe in the pile, and is characterized in that it is possible to wash the sediment adhering to the steel pipe pile inner surface, the steel pipe pile.
前記内向き噴射ノズルのノズル孔が前記鋼管杭内にあることを特徴とする請求項1に記載の鋼管杭。 Nozzle hole of the inward injection nozzle, characterized in that in said steel pipe in a pile, steel pipe pile according to claim 1. 鋼管杭先端部内面にずれ止めが設けられていることを特徴とする請求項1または2に記載の鋼管杭。 Wherein the stop deviation in the steel pipe pile tip inner surface is provided, steel pipe pile according to claim 1 or 2. 請求項1〜のいずれかに記載の鋼管杭を使用し、バイブロハンマを用い、鋼管杭貫入方向に高圧水を噴射する鋼管杭の施工方法であって、
前記鋼管杭貫入方向に噴射する噴射ノズルおよび前記内向き噴射ノズルより高圧水を噴射して、鋼管杭を所定の深度に貫入させる際、前記内向き噴射ノズルの内少なくとも1つの内向き噴射ノズルが、ノズル孔の中心軸線を鋼管杭の中心軸からずらして配置された内向き噴射ノズルであり、これにより、前記高圧水を前記鋼管杭の中心から前記鋼管杭内の偏位した位置を通るように斜めに噴射させて、鋼管杭内における土砂混合水を流動させるとともに、全ての前記内向き噴射ノズルから噴射される高圧水により、前記鋼管杭内の土塊を破砕し、かつ鋼管杭内面に付着する土砂を洗浄した後、
前記高圧水の噴射に代わって、前記各噴射ノズルから流動性固化材を噴射し、鋼管杭先端に流動性固化材を固化させた根固め部を築造することを特徴とする鋼管杭の施工方法。
A construction method of a steel pipe pile using the steel pipe pile according to any one of claims 1 to 3 , using a vibro hammer and injecting high-pressure water in a steel pipe pile penetration direction,
By injecting high pressure water from the injection nozzle and the inward injection nozzle for injecting the steel pipe pile penetration direction, when Ru is penetrating the steel pipe pile to a predetermined depth, at least one inwardly injection nozzle of said inwardly injection nozzle Is an inward injection nozzle arranged by shifting the center axis of the nozzle hole from the center axis of the steel pipe pile, thereby passing the high-pressure water from the center of the steel pipe pile through a position displaced in the steel pipe pile. The sludge mixed water in the steel pipe pile is made to flow in such a way as to flow, and the high-pressure water injected from all the inward injection nozzles crushes the lump in the steel pipe pile, and on the inner surface of the steel pipe pile. After washing the adhering earth and sand ,
In place of the injection of the high-pressure water, a fluidized solidifying material is injected from each of the injection nozzles, and a rooted portion in which the fluidized solidifying material is solidified is built at the tip of the steel pipe pile. Method.
JP2008131102A 2008-05-19 2008-05-19 Steel pipe pile and construction method of steel pipe pile Active JP5181239B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008131102A JP5181239B2 (en) 2008-05-19 2008-05-19 Steel pipe pile and construction method of steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008131102A JP5181239B2 (en) 2008-05-19 2008-05-19 Steel pipe pile and construction method of steel pipe pile

Publications (2)

Publication Number Publication Date
JP2009280966A JP2009280966A (en) 2009-12-03
JP5181239B2 true JP5181239B2 (en) 2013-04-10

Family

ID=41451699

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008131102A Active JP5181239B2 (en) 2008-05-19 2008-05-19 Steel pipe pile and construction method of steel pipe pile

Country Status (1)

Country Link
JP (1) JP5181239B2 (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6093923B2 (en) * 2013-06-19 2017-03-15 新日鐵住金株式会社 Steel pipe pile and steel pipe pile construction method
JP6260931B2 (en) * 2013-12-04 2018-01-17 株式会社大林組 Steel pipe pile and its embedding method
JP6311459B2 (en) * 2014-06-04 2018-04-18 新日鐵住金株式会社 Tip-worked steel sheet pile and its placing method
JP6529226B2 (en) * 2014-07-28 2019-06-12 大成建設株式会社 Pile driving method and the pile
JP6630560B2 (en) * 2015-12-14 2020-01-15 東亜建設工業株式会社 Piling method for bedrock
CN105625418A (en) * 2016-02-05 2016-06-01 云南建工基础工程有限责任公司 Cast-in-place pile structure provided with cored expanded head jet grouting piles and construction method of cast-in-place pile structure
CN105714770A (en) * 2016-02-05 2016-06-29 云南建工基础工程有限责任公司 Reinforced type cast-in-situ bored pile structure and construction method thereof
JP6792239B2 (en) * 2016-11-07 2020-11-25 日本製鉄株式会社 Scuttling prevention device for steel pipe piles and scuttling prevention method
JP6792240B2 (en) * 2016-11-07 2020-11-25 日本製鉄株式会社 Scuttling prevention device for steel pipe piles, scuttling prevention structure and scuttling prevention method
JP6807285B2 (en) * 2017-05-15 2021-01-06 鹿島建設株式会社 Construction method of ground improvement body and casing pipe
CN109778857A (en) * 2018-11-30 2019-05-21 北京荣创岩土工程股份有限公司 A kind of prefabricated pile is from pilot hole device and prefabricated pile from pilot hole pile making method
KR102492406B1 (en) * 2021-01-28 2023-01-27 주식회사 송현이엔씨 Steel pipe piling method using vibro hammer
CN113186903A (en) * 2021-06-10 2021-07-30 河南中城建设集团股份有限公司 Combined pile structure and construction method for treating insufficient bearing capacity of deep foundation pit construction pile by adopting combined pile structure
CN113338281B (en) * 2021-06-29 2022-05-27 中京建设工程(广州)股份有限公司 Piling device with piling floating dust floating prevention structure for civil construction and piling method
EP4296432A1 (en) * 2022-06-24 2023-12-27 Ørsted Wind Power A/S Foundation for a structure and method of installing the same

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5217646B2 (en) * 1972-07-28 1977-05-17
JPS5310510A (en) * 1976-07-15 1978-01-31 Kahee Shimomura Method of sinking small diameter well
JP4413490B2 (en) * 2002-11-26 2010-02-10 間瀬建設株式会社 Steel pipe pile press-in method and steel pipe pile
JP3850802B2 (en) * 2003-03-05 2006-11-29 新日本製鐵株式会社 Steel pile and its construction method
JP4608327B2 (en) * 2005-01-31 2011-01-12 新日本製鐵株式会社 The tip structure of a steel pipe pile used in the medium digging method.

Also Published As

Publication number Publication date
JP2009280966A (en) 2009-12-03

Similar Documents

Publication Publication Date Title
JP5181239B2 (en) Steel pipe pile and construction method of steel pipe pile
JP3850802B2 (en) Steel pile and its construction method
JP6943273B2 (en) Construction method of steel pipe pile
TWI460337B (en) Steel pile inserting method including degassing process
JP2011122408A (en) Jetting apparatus for supplying liquid or fluid solidifying material, steel pile using the same, construction method of steel pile, and foundation pile
JP6663053B2 (en) Ground liquefaction countermeasures
JP4674186B2 (en) Ground improvement method and ground improvement machine
JP6566233B1 (en) Pile construction method, assembly device and assembly device design method
JP3220925U (en) Auger device for liquefaction prevention ground improvement construction
JP2014109097A (en) Foot protection method for rotary penetration pile
JP6555849B2 (en) Ground improvement device
JP2005324283A (en) Spray nozzle and injection device using the same
JP2007255064A (en) Jet mixing construction method
JP3731181B2 (en) Construction method of winged pile
JP2008081942A (en) Construction method for water passage portion of underground wall
CN102900072A (en) Heavy-caliber high-pressure spraying stirring drill and drilling spraying integrated construction method
EP1520936A2 (en) Boring method and apparatus
CN203034461U (en) Spraying nozzle sleeve and vibratory high-pressure spraying and grouting spraying nozzle
JP6307049B2 (en) Ground hardening layer construction method and its equipment
JP6408948B2 (en) Construction method of impermeable wall
JP7498493B2 (en) A method of filling the joints of steel pipe sheet piles with grout material after discharging soil from the joints.
JP2017172279A (en) High pressure jet agitation device for ground improvement and ground improvement method
JP3289745B2 (en) Ground improvement method for soft ground
JP6943272B2 (en) Construction method of steel pipe pile, steel pipe pile
JP4929378B2 (en) Composite pile and composite pile construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100816

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101022

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101022

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120118

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120406

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120703

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20120828

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120903

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20120905

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121225

R150 Certificate of patent or registration of utility model

Ref document number: 5181239

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160125

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250