JP5089125B2 - Liquefied gas transfer system and liquefied gas transfer method - Google Patents

Liquefied gas transfer system and liquefied gas transfer method Download PDF

Info

Publication number
JP5089125B2
JP5089125B2 JP2006279589A JP2006279589A JP5089125B2 JP 5089125 B2 JP5089125 B2 JP 5089125B2 JP 2006279589 A JP2006279589 A JP 2006279589A JP 2006279589 A JP2006279589 A JP 2006279589A JP 5089125 B2 JP5089125 B2 JP 5089125B2
Authority
JP
Japan
Prior art keywords
transfer
gas
tank
pressurizer
liquefied gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006279589A
Other languages
Japanese (ja)
Other versions
JP2008095872A (en
Inventor
浩 田淵
竹春 矢佐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006279589A priority Critical patent/JP5089125B2/en
Publication of JP2008095872A publication Critical patent/JP2008095872A/en
Application granted granted Critical
Publication of JP5089125B2 publication Critical patent/JP5089125B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

この発明は、タンクローリーの搬送タンクからサテライト基地の貯蔵タンクへの液化天然ガス(LNG)移送に適用可能な、液化ガス移送システム及び液化ガス移送方法に関する。詳しくは、検出手段により出力された移送終了信号に応じて、搬送タンクからの液化ガスの取り出しを停止し、搬送タンク及び貯蔵タンク外に残留する液化ガスが気化するのを待ち、気化したガスの搬送タンクへの返送を制御する残留ガス制御手段を備え、搬送タンク及び貯蔵タンク外に残留する液化ガスの外部への流出を防止して、極低温である液化ガスによる事故を防ぐとともに、大気中に放出されて消失する残留ガスを最小限に抑えられるようにしたものである。   The present invention relates to a liquefied gas transfer system and a liquefied gas transfer method applicable to liquefied natural gas (LNG) transfer from a transport tank of a tank truck to a storage tank of a satellite base. Specifically, in response to the transfer end signal output by the detection means, the extraction of the liquefied gas from the transfer tank is stopped, and the liquefied gas remaining outside the transfer tank and the storage tank is allowed to evaporate. Residual gas control means for controlling the return to the transport tank is provided to prevent the liquefied gas remaining outside the transport tank and the storage tank from flowing out to prevent accidents caused by liquefied gas at extremely low temperatures. Residual gas that is released and disappears is minimized.

現在、LNGを最初に受け入れる一次受け入れ基地と需要地が離れている場合、需要地の近くに二次受け入れ基地(サテライト基地)を配置し、サテライト基地から需要地へ天然ガスを供給する方法がとられている。このようなサテライト基地には、通常貯蔵タンクとともに気化器が配置されており、LNGは液体のまま貯蔵タンクに貯蔵され、気化器により気化されて天然ガス(NG)となり、需要地に供給される。これらのサテライト基地に必要なLNGは、例えばタンクローリーにより搬送され、適宜補充がなされる。   Currently, when the primary receiving base that first receives LNG is far from the demand area, a secondary receiving base (satellite base) is arranged near the demand area, and the natural gas is supplied from the satellite base to the demand area. It has been. In such a satellite base, a vaporizer is arranged together with a normal storage tank, and LNG is stored in a storage tank in a liquid state and is vaporized by the vaporizer to become natural gas (NG), which is supplied to a demand area. . The LNG necessary for these satellite bases is transported, for example, by a tank lorry and replenished as appropriate.

この補充作業は、LNGを搬送してきたタンクローリーの搬送タンクと、サテライト基地の貯蔵タンクとを、例えば移送ホースで連通し、移送ホースを介して搬送タンクから貯蔵タンクへLNG移送するようにして行われる。   This replenishment work is performed by connecting the transport tank of the tank truck that has transported LNG and the storage tank of the satellite base with, for example, a transfer hose and transferring the LNG from the transport tank to the storage tank via the transfer hose. .

この時、搬送タンクからLNGを流出させる方法の一例として、加圧器を用いる方法がある。この方法は、搬送タンクと貯蔵タンクとを連通する移送ホースとは別に、搬送タンクと加圧器とを2本のホースで連通し、一方のホースからLNGを一部取り出して加圧器に供給して気化させ、もう一方のホースから気化したNGを再度搬送タンクに戻すようになされる。こうして戻されたNGにより、搬送タンク内のガス圧が上昇し、LNGが移送ホースから貯蔵タンクへ押し出されるようになる。   At this time, as an example of a method for causing LNG to flow out of the transfer tank, there is a method using a pressurizer. In this method, apart from the transfer hose that connects the transfer tank and the storage tank, the transfer tank and the pressurizer are connected by two hoses, and a part of LNG is taken out from one hose and supplied to the pressurizer. NG vaporized and vaporized NG from the other hose is returned to the transport tank again. The NG thus returned increases the gas pressure in the transfer tank, and the LNG is pushed out from the transfer hose to the storage tank.

この際の搬送タンクと加圧器との連通は、蛇腹状の連結ホース(以下フレキシブルホースと呼ぶ)を用いて行われることが多い。フレキシブルホースは、可とう性、伸縮性に優れ、引き回しが自在である為、移動体であるタンクローリーと、様々な立地条件の元で設置されるサテライト基地の貯蔵タンクとを連通するのに適している。   In this case, the communication between the transport tank and the pressurizer is often performed using a bellows-like connecting hose (hereinafter referred to as a flexible hose). The flexible hose is excellent in flexibility and elasticity and can be routed freely, so it is suitable for communication between the tank lorry that is a moving body and the storage tank of the satellite base installed under various location conditions. Yes.

これに関連して、特許文献1には液化天然ガスの受入れ・払出し設備およびその受入れ・払出し方法が開示されている。この液化天然ガスの受入れ・払出し方法によれば、ローリータンク(搬送タンク)から液化天然ガスを受入れると共に、受入れた液化天然ガスを払い出すタンク2(貯蔵タンク)の上部から、タンク2に連通する受け入れライン3(フレキシブルホース等を用いた移送ホースを含む)を備え、この受け入れライン3を介してローリータンクからタンク2へ液化天然ガスを受入れるようになされる。   In this regard, Patent Document 1 discloses a facility for receiving and discharging liquefied natural gas and a method for receiving and discharging it. According to the method for receiving and discharging liquefied natural gas, the liquefied natural gas is received from the lorry tank (conveyance tank) and communicated with the tank 2 from the upper part of the tank 2 (storage tank) for discharging the received liquefied natural gas. A receiving line 3 (including a transfer hose using a flexible hose or the like) is provided, and liquefied natural gas is received from the lorry tank into the tank 2 through the receiving line 3.

特開2002−54796号公報(第4頁、図1)JP 2002-54796 A (page 4, FIG. 1)

しかし、従来のような、搬送タンクから貯蔵タンクへのLNG移送を行った場合、移送が終了した後で、搬送タンク及び貯蔵タンク外、例えば、加圧器内や、フレキシブルホース内の蛇腹状のくぼみにLNGが残留してしまう。この状態でフレキシブルホースの連結を外すと、液状のまま残留するLNGが流出及び飛散して、作業性が低下するとともに、気化したNGが大気中に放出されて無駄に消失するという問題がある。   However, when the LNG transfer from the transfer tank to the storage tank is performed as in the conventional case, after the transfer is completed, outside the transfer tank and the storage tank, for example, in the pressurizer or the bellows-like depression in the flexible hose. LNG remains on the surface. If the flexible hose is disconnected in this state, there is a problem that LNG remaining in a liquid state flows out and scatters, the workability is lowered, and the vaporized NG is discharged into the atmosphere and lost.

そこで本発明は、上述の問題に鑑み創作されたものであり、加圧器及びフレキシブルホース内等に残留する液化ガスの外部への流出を最小限に抑えることができるようにした液化ガス移送システム及び液化ガス移送方法を提供することを目的とする。   Accordingly, the present invention was created in view of the above-described problems, and a liquefied gas transfer system that can minimize the outflow of liquefied gas remaining in the pressurizer and the flexible hose to the outside, and It aims at providing the liquefied gas transfer method.

この発明に係る液化ガス移送システムは、搬送タンクと貯蔵タンクとを移送ホースで連通し、当該搬送タンクから液化ガスの一部を取り出して加圧器で気化し、気化したガスに基づいて当該搬送タンクから貯蔵タンクへ液化ガスを移送する液化ガス移送システムにおいて、搬送タンクから加圧器へのガス取出路を構築する第1のホースと、加圧器から搬送タンクへのガス送り込み路を構築する第2のホースと、搬送タンクから貯蔵タンクへの液化ガスの移送終了を検出する検出手段と、検出手段により出力された移送終了信号に応じて、搬送タンクからの液化ガスの取り出しを停止し、液化ガスの取り出しを停止した後、搬送タンク及び貯蔵タンク外の、少なくとも、第1、第2のホース及び加圧器による連通空間に残留する液化ガスが気化するのを待ち、第1、第2のホース及び加圧器で気化したガスの当該搬送タンクへの返送を制御する残留ガス制御手段と、第1、第2のホース及び加圧器による連通空間のガス圧を測定する圧力計とを備え、残留ガス制御手段は、液化ガスの取り出しを停止した後、第1、第2のホース及び加圧器による連通空間に残留する液化ガスを自然放置して気化し、第1、第2のホース及び加圧器による連通空間で自然放置されて気化したガスの圧力を監視し、第1、第2のホース及び加圧器による連通空間で気化したガスの移送終了後のガス圧と放置後のガス圧とを比較し、放置後のガス圧が移送終了後のガス圧より上昇している場合に、当該ガスの搬送タンクへの返送制御を実行することを特徴とするものである。
In the liquefied gas transfer system according to the present invention, a transfer tank and a storage tank are connected by a transfer hose, a part of the liquefied gas is taken out from the transfer tank, vaporized by a pressurizer, and the transfer tank is based on the vaporized gas. In a liquefied gas transfer system for transferring liquefied gas from a storage tank to a storage tank, a first hose for constructing a gas extraction path from the transfer tank to the pressurizer and a second gas supply path from the pressurizer to the transfer tank are constructed. In response to the transfer end signal output from the hose, the transfer tank from the transfer tank to the storage tank, and the detection means for detecting the transfer of the liquefied gas from the transfer tank, the extraction of the liquefied gas from the transfer tank is stopped. after stopping the extraction, the outer transport tanks and storage tanks, at least, the liquefied gas remaining in the communication space of the first, second hose and pressurizer vaporization Wait for that, first, a residual gas control means for controlling the return to the transport tank of gas is vaporized in the second hose and pressurizer, the first, the communication space of the second hose and pressurizer gas And a residual gas control means, after stopping the extraction of the liquefied gas, the liquefied gas remaining in the communication space by the first and second hoses and the pressurizer is naturally left to evaporate. The pressure of the gas that is naturally left in the communication space by the first and second hoses and the pressurizer is monitored, and the gas vaporized in the communication space by the first and second hoses and the pressurizer is transferred. The gas pressure is compared with the gas pressure after being left, and when the gas pressure after being left is higher than the gas pressure after completion of transfer, the return control of the gas to the transfer tank is executed. Is.

この発明に係る液化ガス移送システムによれば、残留ガス制御手段は、検出手段により出力された移送終了信号に応じて、搬送タンクからの液化ガスの取り出しを停止し、搬送タンク及び貯蔵タンク外に残留する液化ガスが気化するのを待ち、気化したガスの搬送タンクへの返送を制御するようになされる。   According to the liquefied gas transfer system according to the present invention, the residual gas control means stops taking out the liquefied gas from the transfer tank in response to the transfer end signal output by the detection means, and is placed outside the transfer tank and the storage tank. Waiting for the remaining liquefied gas to evaporate, the return of the vaporized gas to the transfer tank is controlled.

その制御によれば、液化ガスの取り出しを停止した後、搬送タンク及び貯蔵タンク外(加圧器、第1及び第2のホース内等)に残留する液化ガスを自然放置して気化し、第1、第2のホース及び加圧器による連通空間で、自然放置されて気化したガスの圧力を監視し、当該ガスの移送終了後のガス圧と放置後のガス圧とを比較し、放置後のガス圧が移送終了後のガス圧より上昇している場合に、搬送タンクへの返送制御を実行するようになる。
According to the control, after the extraction of the liquefied gas is stopped , the liquefied gas remaining outside the transfer tank and the storage tank (in the pressurizer , the first and second hoses, etc.) is naturally left to vaporize, and the first , Monitor the pressure of the gas that is naturally left and vaporized in the communication space of the second hose and the pressurizer , and compare the gas pressure after the gas transfer is completed with the gas pressure after the gas is left. When the pressure is higher than the gas pressure after the transfer is finished, the return control to the transfer tank is executed.

従って、加圧器及びホース内等に残留する液化ガス及び気化したガスを搬送タンクに返戻できるので、液化ガスが外部に流出することを防止できる。   Therefore, since the liquefied gas remaining in the pressurizer and the hose and the vaporized gas can be returned to the transfer tank, the liquefied gas can be prevented from flowing out.

この発明に係る液化ガス移送方法によれば、搬送タンクと貯蔵タンクとを移送ホースで連通すると共に、搬送タンクから加圧器へのガス取出路を構築する第1のホース及び当該加圧器から搬送タンクへのガス送り込み路を構築する第2のホースで連通し、当該搬送タンクから液化ガスの一部を取り出して加圧器で気化し、気化したガスに基づいて当該搬送タンクから貯蔵タンクへ液化ガスを移送する液化ガス移送方法において、搬送タンクから貯蔵タンクへの液化ガスの移送終了を検出する工程と、移送終了が検出された搬送タンクからの液化ガスの取り出しを停止する工程と、液化ガスの取り出し停止後、搬送タンク及び貯蔵タンク外の、少なくとも、第1、第2のホース及び加圧器による連通空間のガス圧を測定する工程と、第1、第2のホース及び加圧器による連通空間に残留する液化ガスを自然放置して気化する工程と、第1、第2のホース及び加圧器による連通空間で自然放置されて気化したガスの圧力を監視する工程と、第1、第2のホース及び加圧器による連通空間で気化したガスの移送終了後のガス圧と放置後のガス圧とを比較し、放置後のガス圧が移送終了後のガス圧より上昇している場合に、当該ガスを搬送タンクに返戻する工程とを有することを特徴とするものである。
According to the liquefied gas transfer method of the present invention, the transfer tank and the storage tank are communicated with each other by the transfer hose, and the first hose that constructs the gas extraction path from the transfer tank to the pressurizer and the transfer tank from the pressurizer. and communicating with a second hose to build gas infeed path to, they removed a portion of the liquefied gas from the transport tank vaporized in pressurizer, the liquefied gas into the storage tank from the transport tank based on vaporized gas In the method of transferring liquefied gas to be transferred, a step of detecting the end of the transfer of the liquefied gas from the transfer tank to the storage tank, a step of stopping the extraction of the liquefied gas from the transfer tank in which the end of transfer is detected, and a pickup of the liquefied gas after stopping, the outer transport tanks and storage tanks, at least, a step of measuring the gas pressure in the communication space of the first, second hose and pressurizer, first, second A step of monitoring a process of vaporizing the liquefied gas remaining in the communication space by hoses and pressurizer naturally left to the first, the pressure of the gas vaporized are allowed to stand in the communication space of the second hose and pressurizer The gas pressure after the transfer of the gas vaporized in the communication space by the first and second hoses and the pressurizer is compared with the gas pressure after being left, and the gas pressure after being left is higher than the gas pressure after the transfer is completed. And a step of returning the gas to the transfer tank.

この発明に係る液化ガス移送方法によれば、搬送タンク及び貯蔵タンク外に残留する液化ガスを搬送タンクに返戻できるので、液化ガスが外部に流出することを防止できる。   According to the liquefied gas transfer method according to the present invention, the liquefied gas remaining outside the transfer tank and the storage tank can be returned to the transfer tank, so that the liquefied gas can be prevented from flowing out.

この発明に係る液化ガス移送システム及び液化ガス移送方法によれば、検出手段により出力された移送終了信号に応じて、搬送タンクからの液化ガスの取り出しを停止し、搬送タンク及び貯蔵タンク外の、少なくとも、ガス取出路を構築する第1のホース、ガス送り込み路を構築する第2のホース及び加圧器による連通空間に残留する液化ガスが気化するのを待ち、液化ガス及び気化したガスの搬送タンクへの返送を制御する残留ガス制御手段を備え、残留ガス制御手段は、液化ガスの取り出しを停止した後、第1、第2のホース及び加圧器による連通空間に残留する液化ガスを自然放置して気化し、第1、第2のホース及び加圧器による連通空間で自然放置されて気化したガスの圧力を監視し、第1、第2のホース及び加圧器による連通空間で気化したガスの移送終了後のガス圧と放置後のガス圧とを比較し、放置後のガス圧が移送終了後のガス圧より上昇している場合に、当該ガスの搬送タンクへの返送制御を実行するものである。 According to the liquefied gas transfer system and the liquefied gas transfer method according to the present invention, in response to the transfer end signal output by the detection means, the extraction of the liquefied gas from the transfer tank is stopped, and the outside of the transfer tank and the storage tank , At least wait for the liquefied gas remaining in the communication space by the first hose that constructs the gas extraction path, the second hose that constructs the gas feed path, and the pressurizer to evaporate, and the transport tank for the liquefied gas and the vaporized gas Residual gas control means for controlling the return to the waste gas. The residual gas control means, after stopping the extraction of the liquefied gas, naturally leaves the liquefied gas remaining in the communication space by the first and second hoses and the pressurizer. vaporized Te, first, the pressure of the gas vaporized are allowed to stand in the communication space of the second hose and pressurizer monitor, first, communicating air according to a second hose and pressurizer In the transfer after the end of the gas pressure of the vaporized gas and compared with the gas pressure after standing, if the gas pressure after standing is higher than the gas pressure after completion of the transfer, return to the conveying tank of the gas Control is executed.

この構成により、搬送タンク及び貯蔵タンク外に残留する液化ガスの外部への流出及び飛散を防止できるので、作業性の低下を防ぐことができるとともに、大気中に放出されて消失する残留ガスを最小限に抑えることができる。   With this configuration, it is possible to prevent the liquefied gas remaining outside the transfer tank and the storage tank from flowing out and scattering to the outside, so that it is possible to prevent deterioration in workability and minimize the residual gas that is released into the atmosphere and disappears. To the limit.

続いて、この発明に係る実施の形態としての液化ガス移送システム及び液化ガス移送方法について、図面を参照しながら説明をする。   Next, a liquefied gas transfer system and a liquefied gas transfer method as embodiments according to the present invention will be described with reference to the drawings.

図1は、本発明に係る実施の形態としてのLNG移送システム100の構成例を示す図である。図1に示すLNG移送システム100は、液化ガス移送システムの一例を構成し、搬送タンクからLNGの一部を取り出して気化し、気化したNGに基づいて搬送タンクから貯蔵タンクへLNGを移送するようになされる。   FIG. 1 is a diagram showing a configuration example of an LNG transfer system 100 as an embodiment according to the present invention. The LNG transfer system 100 shown in FIG. 1 constitutes an example of a liquefied gas transfer system, takes out a part of LNG from the transfer tank, vaporizes it, and transfers LNG from the transfer tank to the storage tank based on the vaporized NG. To be made.

LNG移送システム100は、搬送タンク1、貯蔵タンク2、バルブ3、4、9、13、14及び19、LNG収量センサ5、制御装置6、圧力計7、加圧器8、フレキシブルホース10〜12を備え、例えばLNGのサテライト基地20において、LNG移送時に作業者により連結される等して構築されるものである。   The LNG transfer system 100 includes a transfer tank 1, a storage tank 2, valves 3, 4, 9, 13, 14 and 19, an LNG yield sensor 5, a control device 6, a pressure gauge 7, a pressurizer 8, and flexible hoses 10-12. For example, in the satellite base 20 of LNG, it is constructed by being connected by an operator at the time of LNG transfer.

LNGを搬送する搬送タンク1は、例えばタンクローリーのような移動体に搭載され、一次受け入れ基地において内部にLNGを収容した後、移送先であるサテライト基地20に向けて搬送されてくるものである。   The transport tank 1 for transporting LNG is mounted on a mobile body such as a tank lorry, for example, and is transported toward the satellite base 20 as a transfer destination after accommodating LNG in the primary receiving base.

搬送タンク1の例えば後部にはバルブ3が備えられ、搬送タンク1から一部取り出されるLNGの流出口を開閉する。バルブ3には、例えば、制御信号に応じて開閉の制御がなされる電磁バルブやエア駆動バルブ等が用いられ、搬送タンク1を加圧する為のLNGを取り出す。   A valve 3 is provided, for example, at the rear of the transfer tank 1, and opens and closes the outlet of the LNG taken out from the transfer tank 1. As the valve 3, for example, an electromagnetic valve or an air drive valve whose opening / closing is controlled according to a control signal is used, and LNG for pressurizing the transfer tank 1 is taken out.

バルブ3にはフレキシブルホース10が連結され、搬送タンク1から加圧器8へのLNG取出路を構築する。フレキシブルホース10は、一端をバルブ3に連結されるとともに、他端を加圧器8のバルブ13に連結され、搬送タンク1から一部取り出されたLNGを加圧器8に取り込ませる。   A flexible hose 10 is connected to the valve 3 to construct an LNG take-out path from the transfer tank 1 to the pressurizer 8. One end of the flexible hose 10 is connected to the valve 3 and the other end is connected to the valve 13 of the pressurizer 8 so that the LNG taken out from the transfer tank 1 is taken into the pressurizer 8.

加圧器8は、バルブ13及び14を備え、例えばサテライト基地20に設置される。加圧器8は、バルブ13を介して取り込んだLNGを気化し、バルブ14を介してNGを送り出すように動作する。   The pressurizer 8 includes valves 13 and 14 and is installed in, for example, a satellite base 20. The pressurizer 8 operates to vaporize LNG taken in via the valve 13 and send out NG via the valve 14.

この加圧器8の内部には圧力計7が備えられ、圧力情報を出力する。圧力計7は、加圧器8と連通する空間、例えばフレキシブルホース10及び11にかかるガス圧を測定する。   A pressure gauge 7 is provided inside the pressurizer 8 and outputs pressure information. The pressure gauge 7 measures a gas pressure applied to a space communicating with the pressurizer 8, for example, the flexible hoses 10 and 11.

また、加圧器8からNGを送り出すバルブ14には、フレキシブルホース11が連結され、加圧器8から搬送タンク1へのNGの送り込み路を構築する。フレキシブルホース11は、一端をバルブ14に連結されるとともに、他端を搬送タンク1のバルブ4に連結され、加圧器8から搬送タンク1へNGを送り込む。   Further, a flexible hose 11 is connected to the valve 14 that sends out NG from the pressurizer 8, and an NG feed path from the pressurizer 8 to the transport tank 1 is constructed. The flexible hose 11 has one end connected to the valve 14 and the other end connected to the valve 4 of the transfer tank 1, and sends NG from the pressurizer 8 to the transfer tank 1.

NGが送り込まれるバルブ4は、搬送タンク1の例えば後部に備えられ、NGの流入口を開閉するように制御される。バルブ4には、バルブ3と同様の制御可能な電磁バルブやエア駆動バルブ等が用いられ、搬送タンク1に加圧用のNGを送り込む。   The valve 4 into which NG is fed is provided, for example, at the rear of the transfer tank 1 and is controlled so as to open and close the NG inlet. As the valve 4, a controllable electromagnetic valve, an air drive valve or the like similar to the valve 3 is used, and NG for pressurization is fed into the transfer tank 1.

以上のように、搬送タンク1のバルブ3から一部取り出されたLNGは、加圧器8により気化されてNGとなり、バルブ4を介して再び搬送タンク1に送り込まれる。こうして送り込まれるNGにより搬送タンク1内が加圧され、移送用のLNGが搬送タンク1から押し出されて流出する。   As described above, LNG partially taken out from the valve 3 of the transport tank 1 is vaporized by the pressurizer 8 to become NG, and is sent to the transport tank 1 again through the valve 4. The inside of the transfer tank 1 is pressurized by the NG thus sent, and the transfer LNG is pushed out of the transfer tank 1 and flows out.

搬送タンク1にはLNG移送用にバルブ9が備えられ、搬送タンク1から押し出されるLNGの流出口を開閉する。バルブ9には、バルブ3及び4と同様の制御可能な電磁バルブやエア駆動バルブ等が用いられ、例えば搬送タンク1の後部に固定接続される。   The transfer tank 1 is provided with a valve 9 for LNG transfer, and opens and closes the outlet of the LNG pushed out from the transfer tank 1. As the valve 9, a controllable electromagnetic valve, an air drive valve, or the like similar to the valves 3 and 4 is used. For example, the valve 9 is fixedly connected to the rear portion of the transfer tank 1.

バルブ9にはフレキシブルホース12が連結され、搬送タンク1から貯蔵タンク2へのLNG移送路を構築する。フレキシブルホース12は、一端をバルブ9に連結されるとともに、他端を貯蔵タンク2の例えば下部に配置されるバルブ19に連結され、搬送タンク1から貯蔵タンク2へLNGを移送する。   A flexible hose 12 is connected to the valve 9 to construct an LNG transfer path from the transfer tank 1 to the storage tank 2. The flexible hose 12 has one end connected to the valve 9 and the other end connected to, for example, a valve 19 disposed at a lower portion of the storage tank 2 to transfer LNG from the transport tank 1 to the storage tank 2.

また、LNGが移送されることにより、収量が減少する搬送タンク1には、検出手段の一例を構成するLNG収量センサ5が備えられ、搬送タンク1から貯蔵タンク2へのLNGの移送終了を検出する。LNG収量センサ5は、例えば搬送タンク1内に残るLNGの量を感知して、移送前と移送後の差を求めることによりLNG移送量を算出し、予め設定されたLNG移送量に達した時点で移送終了信号を出力する。   Further, the transfer tank 1 whose yield is reduced by the transfer of LNG is provided with an LNG yield sensor 5 that constitutes an example of a detecting means, and detects the end of transfer of LNG from the transfer tank 1 to the storage tank 2. To do. The LNG yield sensor 5 senses the amount of LNG remaining in the transfer tank 1, for example, calculates the LNG transfer amount by obtaining the difference between before and after transfer, and reaches the preset LNG transfer amount To output a transfer end signal.

一方、搬送タンク1の搭載側、例えばタンクローリーには、残留ガス制御手段の一例を構成する制御装置6が備えられ、LNG収量センサ5により出力された移送終了信号に応じて、搬送タンク1からのLNGの取り出しを停止し、搬送タンク1及び貯蔵タンク2外に残留する残留LNGが気化するのを待ち、気化したNGの搬送タンク1への返送を制御する。例えば、LNGの取り出しを停止した後、搬送タンク1及び貯蔵タンク2以外に残留するLNGを所定時間自然放置して気化し、自然放置されて気化したガスの圧力を監視し、当該ガスの圧力が所定のレベルに到達した場合に、搬送タンク1への返送制御を実行する。   On the other hand, the mounting side of the transfer tank 1, for example, a tank lorry, is provided with a control device 6 that constitutes an example of the residual gas control means, and from the transfer tank 1 according to the transfer end signal output from the LNG yield sensor 5. The removal of the LNG is stopped, the remaining LNG remaining outside the transfer tank 1 and the storage tank 2 is vaporized, and the return of the vaporized NG to the transfer tank 1 is controlled. For example, after the removal of LNG is stopped, the LNG remaining outside the transport tank 1 and the storage tank 2 is naturally left for a predetermined time to evaporate, and the pressure of the gas that is naturally left and vaporized is monitored. When a predetermined level is reached, return control to the transfer tank 1 is executed.

制御装置6は、LNGの移送終了後、内部に備える記憶手段に記憶されたプログラムを実行して、主に搬送タンク1側のバルブ3、4及び9の開閉を制御することにより、例えばフレキシブルホース10に残留するLNGやNGを搬送タンク1に返戻させる。このようにして、LNG移送システム100が構成される。   After the transfer of LNG is completed, the control device 6 executes a program stored in a storage means provided inside, and mainly controls opening and closing of the valves 3, 4 and 9 on the side of the transfer tank 1, for example, a flexible hose The LNG and NG remaining in 10 are returned to the transfer tank 1. In this way, the LNG transfer system 100 is configured.

なお、LNG移送システム100が構築されるサテライト基地20には、貯蔵タンク2の他に、ポンプ21、気化器22等が備えられ、移送されたLNGを気化して需要地へ供給する。貯蔵タンク2には配管を介してポンプ21が接続され、LNGを引き出して後段に供給する。ポンプ21の後段には気化器22が配置され、ポンプ21から供給されたLNGを気化する。こうしてサテライト基地20内にて気化された天然ガスは、需要地へ向けて供給されるようになる。   In addition, the satellite base 20 in which the LNG transfer system 100 is constructed is provided with a pump 21, a vaporizer 22, and the like in addition to the storage tank 2, and the transferred LNG is vaporized and supplied to a demand area. A pump 21 is connected to the storage tank 2 via a pipe, and LNG is drawn out and supplied to the subsequent stage. A carburetor 22 is disposed at the subsequent stage of the pump 21 to vaporize LNG supplied from the pump 21. The natural gas thus vaporized in the satellite base 20 is supplied toward the demand area.

図2は、LNG移送終了後のフレキシブルホース10の構成例を示す断面図である。図2に示すフレキシブルホース10は、搬送タンク1から貯蔵タンク2へのLNG移送が終了した後の状態を示すものでる。   FIG. 2 is a cross-sectional view illustrating a configuration example of the flexible hose 10 after completion of the LNG transfer. The flexible hose 10 shown in FIG. 2 shows a state after the LNG transfer from the transfer tank 1 to the storage tank 2 is completed.

LNG移送終了後、バルブ3、4及び9が閉められ、搬送タンク1からのLNGの一部取り出しが停止される。この時、フレキシブルホース10の蛇腹状のくぼみには、加圧器8へ供給できなかった残留LNG30が残る。この残留LNG30は通常、フレキシブルホース10の取り外し時等にホースの外部に放出されて消失してしまう。本発明では、LNGの移送終了後に後処理を行い、この残留LNG30をガス化させ、搬送タンク1に返戻するようになされる。   After completion of the LNG transfer, the valves 3, 4 and 9 are closed, and a part of the LNG taken out from the transfer tank 1 is stopped. At this time, residual LNG 30 that could not be supplied to the pressurizer 8 remains in the bellows-shaped recess of the flexible hose 10. This residual LNG 30 is usually released to the outside of the hose when the flexible hose 10 is removed and disappears. In the present invention, after the LNG transfer is completed, post-processing is performed, and the residual LNG 30 is gasified and returned to the transport tank 1.

続いて、LNG移送システム100による、LNG移送方法について説明をする。図3は、LNG移送終了後の後処理例を示すフローチャートである。   Then, the LNG transfer method by the LNG transfer system 100 is demonstrated. FIG. 3 is a flowchart showing an example of post-processing after completion of the LNG transfer.

この例のLNG移送方法によれば、搬送タンク1からLNGの一部を取り出して加圧器8において気化し、気化したNGに基づいて、搬送タンク1から貯蔵タンク2へLNGを移送するようになされる。その為、加圧器8へのLNGの取出路を構築するフレキシブルホース10や、その他の配管等の経路には、LNG移送終了後にLNGが残留する。残留したこのLNGは、後述の後処理を実行することにより、搬送タンク1へ返戻される。   According to the LNG transfer method of this example, a part of the LNG is taken out from the transfer tank 1 and vaporized in the pressurizer 8, and the LNG is transferred from the transfer tank 1 to the storage tank 2 based on the vaporized NG. The Therefore, LNG remains in the flexible hose 10 that constructs the LNG take-out path to the pressurizer 8 and other pipes after the LNG transfer is completed. The remaining LNG is returned to the transport tank 1 by performing post-processing described later.

これらを後処理条件にして、図3に示すフローチャートのステップA1で制御装置6は、搬送タンク1から貯蔵タンク2へのLNGの移送が終了したかの判定を行う(判定1)。制御装置6は、LNG収量センサ5により移送終了が検出されたか否かを監視する。LNG収量センサ5は、例えばLNGの移送時にLow信号を出力しており、LNGの移送が終了した時点からHigh信号を出力するように動作する。判定1の結果、制御装置6により、移送終了信号が検出された場合はステップA2に進み、検出されない場合はステップA1に戻る。   Under these post-processing conditions, the control device 6 determines whether or not the transfer of the LNG from the transfer tank 1 to the storage tank 2 has been completed in Step A1 of the flowchart shown in FIG. 3 (Decision 1). The control device 6 monitors whether or not the transfer end is detected by the LNG yield sensor 5. The LNG yield sensor 5 outputs a Low signal, for example, at the time of LNG transfer, and operates so as to output a High signal from the time when the LNG transfer is completed. If the transfer end signal is detected by the control device 6 as a result of determination 1, the process proceeds to step A2, and if not detected, the process returns to step A1.

ステップA2に進んだ場合、制御装置6は、バルブ3、4及び9を閉める。これにより、搬送タンク1からのLNGの一部取り出し及び搬送タンク1へのNGの返戻が停止される。また、搬送タンク1と搬送タンク1以外(フレキシブルホース10、11及び加圧器8等)の空間とが遮断される。   When the process proceeds to Step A2, the control device 6 closes the valves 3, 4 and 9. As a result, partial removal of LNG from the transfer tank 1 and return of NG to the transfer tank 1 are stopped. Moreover, the space other than the transport tank 1 and the transport tank 1 (flexible hoses 10, 11 and the pressurizer 8) is blocked.

ステップA3で制御装置6は、圧力計7の値を読み込む。この測定値は、フレキシブルホース10、11及び加圧器8による連通空間のガス圧を示しており、この圧力情報は制御装置6の内部に有する記憶手段に記憶され、以後の判定の基準値として用いられる。   In step A3, the control device 6 reads the value of the pressure gauge 7. This measured value indicates the gas pressure in the communication space by the flexible hoses 10 and 11 and the pressurizer 8, and this pressure information is stored in the storage means included in the control device 6 and used as a reference value for subsequent determination. It is done.

ステップA4で制御装置6は、内部に備える計時手段により、例えば10分間カウントを行い、搬送タンク1及び貯蔵タンク2以外に残留するLNGが大気温や加圧器によって自然に気化するまで放置する。   In step A4, the control device 6 counts, for example, for 10 minutes by the timekeeping means provided inside, and is left until the LNG remaining other than the transfer tank 1 and the storage tank 2 is naturally vaporized by the atmospheric temperature or the pressurizer.

ステップA5で制御装置6は、カウントした後の圧力計7の値を読み込む。   In step A5, the control device 6 reads the value of the pressure gauge 7 after counting.

ステップA6で制御装置6は、自然に気化したNGによる、フレキシブルホース10、11及び加圧器8による連通空間のガス圧の上昇を監視して、ガス圧の上昇が所定のレベルに達したかの判定を行う(判定2)。この例で制御装置6は、ステップA3で読み込んだ移送終了後のガス圧と、ステップA5で読み込んだ放置後のガス圧とを比較し、ガス圧が所定の比率もしくは差よりも上昇したかを判定する。判定2の結果、放置後のガス圧が上昇していると判断された場合はステップA7に進む。   In step A6, the control device 6 monitors the increase in the gas pressure in the communication space by the flexible hoses 10 and 11 and the pressurizer 8 due to the naturally vaporized NG, and determines whether the increase in the gas pressure has reached a predetermined level. Perform (determination 2). In this example, the control device 6 compares the gas pressure after the transfer read in step A3 with the gas pressure after the reading read in step A5, and determines whether the gas pressure has risen above a predetermined ratio or difference. judge. As a result of determination 2, if it is determined that the gas pressure after being left is increasing, the process proceeds to step A7.

ステップA7で制御装置6は、バルブ3を開けて、フレキシブルホース10、11及び加圧器8による連通空間おいて昇圧された残留ガスの圧力を利用して、残留ガス及び残留LNGを搬送タンク1に返戻させる。   In step A7, the control device 6 opens the valve 3, and uses the pressure of the residual gas boosted in the communication space by the flexible hoses 10 and 11 and the pressurizer 8 to transfer the residual gas and residual LNG to the transfer tank 1. Let me return.

ステップA8で制御装置6は、再度バルブ3を閉めて搬送タンク1と搬送タンク1以外の空間とを遮断し、再度ステップA3に戻り、残留ガス及び残留LNGを返戻したことで下降したガス圧の値を読み込む。   In step A8, the control device 6 closes the valve 3 again to shut off the transfer tank 1 and the space other than the transfer tank 1, and returns to step A3 again to return the residual gas and the residual LNG. Read the value.

制御装置6は、ステップA6の判定2において、ガス圧が上昇しないと判定されるまで、上述のステップA3〜A8の処理を繰り返す。   The control device 6 repeats the processing of steps A3 to A8 described above until it is determined in step A6 of determination 2 that the gas pressure does not increase.

残留するLNGが無くなり、判定2において、もはやガス圧が上昇しないと判定された場合には、制御装置6は後処理を終了する。この時、例えばアラーム音などにより作業者に終了を告知するようにするとよい。   If there is no remaining LNG and it is determined in determination 2 that the gas pressure will no longer increase, the control device 6 ends the post-processing. At this time, for example, the operator may be notified of the end by an alarm sound or the like.

こうして後処理がなされたフレキシブルホース10及び11は、作業者により比較的安全に取り外すことができるようになる。   The flexible hoses 10 and 11 thus post-treated can be removed relatively safely by the operator.

このように、本発明に係る実施の形態としてのLNG移送方法によれば、制御装置6は、LNG収量センサ5により出力された移送終了信号に応じて、搬送タンク1からのLNGの取り出しを停止し、この例では、搬送タンク1及び貯蔵タンク2外に残留するLNGが自然に気化するのを待ち、気化したNGを搬送タンク1に返戻する。   As described above, according to the LNG transfer method as the embodiment of the present invention, the control device 6 stops taking out the LNG from the transfer tank 1 in accordance with the transfer end signal output from the LNG yield sensor 5. In this example, the LNG remaining outside the transport tank 1 and the storage tank 2 is waited for to naturally vaporize, and the vaporized NG is returned to the transport tank 1.

従って、例えばフレキシブルホース10に残留するLNGが外部に流出及び飛散することを防止できるので、作業性の低下を防ぐことができるとともに、大気中に放出されて消失する残留NGを最小限に抑えることができる。   Therefore, for example, since LNG remaining in the flexible hose 10 can be prevented from flowing out and scattering to the outside, it is possible to prevent deterioration in workability and to minimize residual NG that is released into the atmosphere and disappears. Can do.

なお、この例では、動力を最小限に抑える為、残留LNGを自然放置して気化させるようにしたが、LNG移送終了後の一定時間、残留LNGを加熱する等して、人為的に気化させるようにしてもよい。こうすることにより、気化させる為の時間を短縮することができる。   In this example, in order to minimize the power, the residual LNG is allowed to stand for vaporization, but it is artificially vaporized by heating the residual LNG for a certain time after the LNG transfer is completed. You may do it. By doing so, the time for vaporization can be shortened.

また、ステップA2で制御装置6は、同時にバルブ3、4及び9を閉めるようにしたが、まずバルブ3、次にバルブ4という様に、所定の時間をおいて各バルブを閉めるようにしてもよい。こうすることにより、フレキシブルホース10内等の残留LNGの量を最小限に抑えることができる。   In step A2, the control device 6 simultaneously closes the valves 3, 4 and 9. However, the valve 3 is closed first after a predetermined time, such as the valve 3 and then the valve 4. Good. By doing so, the amount of residual LNG in the flexible hose 10 or the like can be minimized.

またこの例では、LNG収量センサ5により、LNG移送の終了を検出するようにしたが、それに限られることはなく、貯蔵タンク2側が備える検出手段により検出を行ってもよい。また、バルブ9を通過するLNGの量を積算することにより検出を行ってもよい。   In this example, the end of the LNG transfer is detected by the LNG yield sensor 5, but the present invention is not limited to this, and the detection may be performed by a detection means provided on the storage tank 2 side. Alternatively, detection may be performed by integrating the amount of LNG passing through the valve 9.

また、バルブ3、4及び9を自動制御するようにしたが、LNG収量センサ5、圧力計7等による検出/測定結果に応じて、作業者がバルブ3、4及び9を手動操作するようにしてもよい。   Although the valves 3, 4 and 9 are automatically controlled, the operator manually operates the valves 3, 4 and 9 according to the detection / measurement results by the LNG yield sensor 5, the pressure gauge 7, etc. May be.

この発明は、タンクローリーからLNGサテライト基地へのLNG補充に適用して極めて好適である。   The present invention is very suitable when applied to LNG replenishment from a tank truck to an LNG satellite station.

実施の形態としてのLNG移送システム100の構成例を示す図である。It is a figure which shows the structural example of the LNG transfer system 100 as embodiment. LNG移送終了後のフレキシブルホース10の構成例を示す断面図である。It is sectional drawing which shows the structural example of the flexible hose 10 after completion | finish of LNG transfer. LNG移送システム100によるLNG移送終了後の後処理例を示すフローチャートである。5 is a flowchart showing an example of post-processing after LNG transfer is completed by the LNG transfer system 100.

符号の説明Explanation of symbols

1・・・搬送タンク、2・・・貯蔵タンク、3、4、9、13、14、19・・・バルブ、5・・・LNG収量センサ、6・・・制御装置、7・・・圧力計、8・・・加圧器、10〜12・・・フレキシブルホース、20・・・サテライト基地、21・・・ポンプ、22・・・気化器、30・・・残留LNG、100・・・LNG移送システム DESCRIPTION OF SYMBOLS 1 ... Transfer tank, 2 ... Storage tank, 3, 4, 9, 13, 14, 19 ... Valve, 5 ... LNG yield sensor, 6 ... Control apparatus, 7 ... Pressure 8 ... pressurizer, 10-12 ... flexible hose, 20 ... satellite base, 21 ... pump, 22 ... vaporizer, 30 ... residual LNG, 100 ... LNG Transport system

Claims (2)

搬送タンクから貯蔵タンクへ液化ガスを移送する液化ガス移送システムにおいて、
前記搬送タンクから液化ガスの一部を取り出して気化する加圧器と、
前記搬送タンクから前記加圧器へのガス取出路を構築する第1のホースと、
前記加圧器から前記搬送タンクへのガス送り込み路を構築する第2のホースと、
前記搬送タンクと貯蔵タンクとを連通すると共に前記加圧器によって気化された液化ガスに基づいて当該搬送タンクから貯蔵タンクへ液化ガスを移送する移送ホースと、
前記移送ホースによって前記搬送タンクから前記貯蔵タンクへ移送される液化ガスの移送終了を検出する検出手段と、
前記検出手段により出力された移送終了信号に応じて、前記搬送タンクからの液化ガスの取り出しを停止し、
液化ガスの取り出しを停止した後、前記搬送タンク及び貯蔵タンク外の、少なくとも、前記第1、第2のホース及び前記加圧器による連通空間に残留する液化ガスが気化するのを待ち、
前記搬送タンク及び貯蔵タンク外で気化したガスの当該搬送タンクへの返送を制御する残留ガス制御手段と
前記第1、第2のホース及び前記加圧器による連通空間のガス圧を測定する圧力計とを備え
前記残留ガス制御手段は、
液化ガスの取り出しを停止した後、前記第1、第2のホース及び前記加圧器による連通空間に残留する液化ガスを自然放置して気化し、
前記第1、第2のホース及び前記加圧器による連通空間で自然放置されて気化したガスの圧力を監視し、
前記第1、第2のホース及び前記加圧器による連通空間で気化したガスの移送終了後のガス圧と放置後のガス圧とを比較し、放置後のガス圧が移送終了後のガス圧より上昇している場合に、当該ガスの前記搬送タンクへの返送制御を実行することを特徴とする液化ガス移送システム。
In a liquefied gas transfer system for transferring liquefied gas from a transfer tank to a storage tank,
A pressurizer that takes out a part of the liquefied gas from the transfer tank and vaporizes the liquefied gas;
A first hose that constructs a gas extraction path from the transfer tank to the pressurizer;
A second hose for constructing a gas feed path from the pressurizer to the transfer tank;
A transfer hose communicating the transfer tank and the storage tank and transferring the liquefied gas from the transfer tank to the storage tank based on the liquefied gas vaporized by the pressurizer;
Detecting means for detecting the end of the transfer of the liquefied gas transferred from the transfer tank to the storage tank by the transfer hose;
In response to the transfer end signal output by the detection means, the extraction of the liquefied gas from the transfer tank is stopped,
After stopping the extraction of the liquefied gas, wait for the liquefied gas remaining in the communication space by at least the first and second hoses and the pressurizer outside the transfer tank and the storage tank to vaporize,
Residual gas control means for controlling the return of gas vaporized outside the transfer tank and storage tank to the transfer tank ;
A pressure gauge that measures the gas pressure in the communication space by the first and second hoses and the pressurizer ;
The residual gas control means includes
After stopping the extraction of the liquefied gas, the liquefied gas remaining in the communication space by the first and second hoses and the pressurizer is naturally left to vaporize,
Monitoring the pressure of the gas that is naturally left in the communication space by the first and second hoses and the pressurizer and vaporized;
The gas pressure after the transfer of the gas vaporized in the communication space by the first and second hoses and the pressurizer is compared with the gas pressure after being left, and the gas pressure after being left is determined by the gas pressure after the end of transfer. A liquefied gas transfer system that performs return control of the gas to the transfer tank when rising.
搬送タンクと貯蔵タンクとを移送ホースで連通すると共に、前記搬送タンクから加圧器へのガス取出路を構築する第1のホース及び当該加圧器から前記搬送タンクへのガス送り込み路を構築する第2のホースで連通し、当該搬送タンクから液化ガスの一部を取り出して加圧器で気化し、気化したガスに基づいて当該搬送タンクから貯蔵タンクへ液化ガスを移送する液化ガス移送方法において、
前記搬送タンクから前記貯蔵タンクへの液化ガスの移送終了を検出する工程と、
移送終了が検出された前記搬送タンクからの液化ガスの取り出しを停止する工程と、
液化ガスの取り出し停止後、
前記搬送タンク及び貯蔵タンク外の、少なくとも、前記第1、第2のホース及び前記加圧器による連通空間のガス圧を測定する工程と、
前記第1、第2のホース及び前記加圧器による連通空間に残留する液化ガスを自然放置して気化する工程と、
前記第1、第2のホース及び前記加圧器による連通空間で自然放置されて気化したガスの圧力を監視する工程と、
前記第1、第2のホース及び前記加圧器による連通空間で気化したガスの移送終了後のガス圧と放置後のガス圧とを比較し、放置後のガス圧が移送終了後のガス圧より上昇している場合に、当該ガスを前記搬送タンクに返戻する工程とを有することを特徴とする液化ガス移送方法。
The transfer tank and the storage tank are communicated by a transfer hose, and a first hose for constructing a gas extraction path from the carry tank to the pressurizer and a second gas feed path from the pressurizer to the carry tank are constructed. In the liquefied gas transfer method of transferring a liquefied gas from the transfer tank to the storage tank based on the vaporized gas, a part of the liquefied gas is taken out from the transfer tank and vaporized with a pressurizer.
Detecting the end of transfer of liquefied gas from the transfer tank to the storage tank;
A step of stopping the extraction of the liquefied gas from the transfer tank in which the end of the transfer is detected;
After stopping taking out liquefied gas,
Measuring a gas pressure in a communication space by at least the first and second hoses and the pressurizer outside the transfer tank and the storage tank ;
A step of allowing the liquefied gas remaining in the communication space by the first and second hoses and the pressurizer to stand for vaporization;
Monitoring the pressure of the gas that is naturally left in the communication space formed by the first and second hoses and the pressurizer and vaporized;
The gas pressure after the transfer of the gas vaporized in the communication space by the first and second hoses and the pressurizer is compared with the gas pressure after being left, and the gas pressure after being left is determined by the gas pressure after the end of transfer. And a step of returning the gas to the transfer tank when the gas is rising.
JP2006279589A 2006-10-13 2006-10-13 Liquefied gas transfer system and liquefied gas transfer method Active JP5089125B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006279589A JP5089125B2 (en) 2006-10-13 2006-10-13 Liquefied gas transfer system and liquefied gas transfer method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006279589A JP5089125B2 (en) 2006-10-13 2006-10-13 Liquefied gas transfer system and liquefied gas transfer method

Publications (2)

Publication Number Publication Date
JP2008095872A JP2008095872A (en) 2008-04-24
JP5089125B2 true JP5089125B2 (en) 2012-12-05

Family

ID=39378930

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006279589A Active JP5089125B2 (en) 2006-10-13 2006-10-13 Liquefied gas transfer system and liquefied gas transfer method

Country Status (1)

Country Link
JP (1) JP5089125B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102200220B (en) * 2011-04-22 2012-10-10 张家港富瑞特种装备股份有限公司 Liquefied natural gas (LNG) filling station
CN102506299B (en) * 2011-10-20 2014-04-02 秦皇岛首秦金属材料有限公司 Method for reducing running pressure of common compressed air pipe network

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS604695A (en) * 1983-06-22 1985-01-11 Kawasaki Heavy Ind Ltd Unloading device of liquefied gas transport tank lorry
JPH1047595A (en) * 1996-08-02 1998-02-20 Nippon Gas Kaihatsu Kk Method and device for conveying liquefied gas from bulk lorry
US6595048B1 (en) * 2000-08-04 2003-07-22 Chart Inc. Accurate cryogenic liquid dispenser
JP2002054796A (en) * 2000-08-10 2002-02-20 Kobe Steel Ltd Reception/paying out equipment for liquefied natural gas and its receiving/paying out method
JP3947423B2 (en) * 2002-04-26 2007-07-18 株式会社コーアガス日本 Fast filling bulk lorry
JP2004069029A (en) * 2002-08-09 2004-03-04 Gas Techno Serve:Kk Filling system of liquefied petroleum gas

Also Published As

Publication number Publication date
JP2008095872A (en) 2008-04-24

Similar Documents

Publication Publication Date Title
EP2214962B1 (en) Apparatus and method for testing an aircraft tank system
JP2007024152A (en) Gas supply device
JP5252089B2 (en) Fuel leak detection device and detection method
JP4877434B2 (en) Gas filling device and gas filling method
US10935186B2 (en) Device equipped with tank
JP2011149533A (en) Fuel gas station, fuel gas filling system, and fuel gas supply method
JP4950754B2 (en) Liquefied gas filling apparatus and liquefied gas filling method
JP2012518143A5 (en)
JP2011122657A (en) Fuel gas station, fuel gas filling system, and fuel gas filling method
JP5063383B2 (en) Liquefied natural gas satellite equipment
JP3920895B2 (en) How to ship LNG
JP2012097815A (en) Tank
JP5387846B2 (en) Gas station and gas filling system
JP5089125B2 (en) Liquefied gas transfer system and liquefied gas transfer method
JP6001745B2 (en) Reduction of pressure rise when supplying hydrogen
JP2009074586A (en) Gas feeder
JP5063945B2 (en) Gas supply device
JP2009115180A (en) System and method for receiving liquefied natural gas
JP5077881B2 (en) Facility for receiving liquefied natural gas
JP2007120605A (en) Gas supply device
JP2010174912A (en) Method and device for measuring residual pressure in gas container
JP2016205439A (en) Gas supply device
JP2010174951A (en) Gas filling device
JP6512991B2 (en) Tank truck for low temperature liquefied gas and unloading method for low temperature liquefied gas using the same
JP2008144878A (en) Reception system for liquefied gas and operation method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090420

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100805

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110929

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20111004

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120605

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120720

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120904

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120911

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150921

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5089125

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150921

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250