Precast pillar and foundation connection method and temporary cradle. Download PDF

Info

Publication number
JP5065341B2
JP5065341B2 JP2009144178A JP2009144178A JP5065341B2 JP 5065341 B2 JP5065341 B2 JP 5065341B2 JP 2009144178 A JP2009144178 A JP 2009144178A JP 2009144178 A JP2009144178 A JP 2009144178A JP 5065341 B2 JP5065341 B2 JP 5065341B2
Authority
JP
Japan
Prior art keywords
foundation
precast
temporary
reinforcing bars
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009144178A
Other languages
Japanese (ja)
Other versions
JP2011001717A (en
Inventor
尚道 服部
俊之 黒岩
正 早川
克巳 荻原
宏 吉田
哲司 小西
清一 富田
秀樹 近藤
聡 清水
肇明 王
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP2009144178A priority Critical patent/JP5065341B2/en
Publication of JP2011001717A publication Critical patent/JP2011001717A/en
Application granted granted Critical
Publication of JP5065341B2 publication Critical patent/JP5065341B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Bridges Or Land Bridges (AREA)

Description

本発明は、プレキャスト柱と基礎の接続方法と、その方法に使用する仮受架台に関するものである。
The present invention relates to a method for connecting a precast pillar and a foundation, and a temporary support base used for the method.

鉄道、道路または建物などに接近して基礎上に柱を設置するには、周囲に空間的、平面的余裕がない場合が多く、型枠支保工、支保材を地盤と緊結する控え材や足場などのために十分な用地を確保することが一般には困難である場合が多い。
そのために、柱としてはプレキャスト柱を使用し、その端面からねじふし鉄筋を突設しておき、一方、基礎側にもそれと対向する位置にねじふし鉄筋を突設しておき、両側のねじふし鉄筋を現場で位置合わせしてカプラで接合する方法が考えられる。
In order to install pillars on the foundation close to railroads, roads, buildings, etc., there are often no spatial and planar margins around them, and formwork supporters, scaffolding materials and scaffolds that bind support materials to the ground In general, it is often difficult to secure sufficient land for such reasons.
For this purpose, a precast column is used as the column, and a threaded reinforcing bar is projected from the end face of the column. On the other hand, a threaded reinforcing bar is projected on the foundation side at a position opposite to it. A method of aligning the reinforcing bars at the site and joining them with a coupler is conceivable.

特開平11−247109号公報。Japanese Patent Laid-Open No. 11-247109.

前記した従来のプレキャスト柱と基礎の接続方法にあっては、次のような問題点が考えられる。
<1> 鉄道、道路または建物に接近した狭い空間の中でいかに効率のよい作業が確保できるか。
<2> プレキャスト柱と基礎とがコンクリートで一体化する前の、一番不安定な架設中に地震が発生した場合に、鉄道、道路または建物に絶対に被害を与えないという安全性は確保できるか。
<3> 柱の位置、高さおよび傾きが、それより上方の梁やスラブの出来形の精度に影響を与えるため、いかに高い精度でプレキャスト柱を設置できるか。
従来の技術では上記のような問題に明確に対応できなかった。
The above-described conventional precast pillar and foundation connecting method may have the following problems.
<1> How efficient work can be secured in a narrow space close to railways, roads or buildings.
<2> Safety can be ensured that will never damage railways, roads, or buildings in the event of an earthquake during the most unstable erection before the precast pillar and foundation are integrated with concrete. Or?
<3> Since the position, height, and inclination of the column affect the accuracy of the beam and slab that are above it, how accurately can the precast column be installed?
The conventional technique cannot clearly cope with the above problems.

上記のような従来の課題を解決した本発明のプレキャスト柱と基礎の接続方法は、対向する位置に鉄筋を突設してあるプレキャスト柱と基礎とを、鉄筋間を接合して接続する方法であって、プレキャスト柱の下端の外側に、仮受架台を取り付け、このプレキャスト柱を基礎の上から吊り下ろして、仮受架台に形成した脚を基礎上に搭載した後に、脚の調整ボルトでプレキャスト柱の高さを調整し、プレキャスト柱と基礎の対向する各鉄筋の間を接続し、同時に、仮受架台に取り付けたアンカーと、基礎から突設した固定ボルトを接続してプレストレスを与えて仮受架台を基礎に固定し、プレキャスト柱と基礎の鉄筋群を囲んで型枠を設置し、型枠内にコンクリートを打設して行うことを特徴としたものである。
また本発明のプレキャスト柱と基礎の接続に使用する仮受架台は、対向する位置に鉄筋を突設してあるプレキャスト柱と基礎とを、鉄筋間を接合して接続する場合に使用する仮受架台であって、仮受架台はプレキャスト柱の下端の外側にボルトを介して取り付けが可能であり、仮受架台に形成した脚には高さ調整ボルトを備え、仮受架台に取り付けたアンカーは、基礎から突設した固定ボルトとの接続が可能であるように構成したことを特徴としたものである。
The precast column and foundation connecting method of the present invention that has solved the conventional problems as described above is a method in which the reinforcing bars project from the precast column and the foundation, which are connected to each other by joining the reinforcing bars. Attach a temporary cradle to the outside of the lower end of the precast pillar, suspend the precast pillar from the top of the foundation, mount the leg formed on the temporary cradle on the foundation, and precast with the leg adjustment bolts. Adjust the height of the pillars, connect the precast pillars to the opposing reinforcing bars of the foundation, and simultaneously apply the prestress by connecting the anchors mounted on the temporary mount and the fixing bolts protruding from the foundation. It is characterized in that a temporary support base is fixed to the foundation, a formwork is set around the precast columns and the reinforcing bars of the foundation, and concrete is placed in the formwork.
Moreover, the temporary support stand used for the connection between the precast column and the foundation of the present invention is a temporary support used when the precast column and the foundation, in which reinforcing bars protrude from opposite positions, are joined and connected between the reinforcing bars. It is a pedestal, the temporary cradle can be attached to the outside of the lower end of the precast column via bolts, the legs formed on the temporary cradle are equipped with height adjustment bolts, and the anchor attached to the temporary cradle is It is characterized in that it can be connected to a fixing bolt projecting from the foundation.

本発明のプレキャスト柱と基礎の接続方法は以上説明したようになるから次のような効果を得ることができる。
<1> 基礎部分の上の最小限の空間だけを利用する方法であるから、鉄道、道路または建物などの施工スペースの狭い現場において作業を行うことができる。
<2> 地震時にプレキャスト柱に作用する水平力に対して、プレキャスト柱は仮受架台を介して基礎に押さえつけてあるから、プレキャスト柱が転倒する可能性はもちろん、片側が浮き上がることもない。
<3> 基礎に大きな振動を与える列車や車両の通行によっても、プレキャスト柱がずれる可能性もない。
<4> 軸方向鉄筋の接合手段としては、溶接継手、圧接継手または機械式継手などひろい範囲の接合手段を選択して採用できる。なお、鉄筋の継手に関しては、「コンクリートライブラリー128鉄筋定着・継手指針」[2008年版]発行所社団法人 土木学会に開示されている。
Since the precast pillar-to-foundation connecting method of the present invention is as described above, the following effects can be obtained.
<1> Since the method uses only the minimum space above the foundation portion, the work can be performed at a site having a narrow construction space such as a railway, a road, or a building.
<2> With respect to the horizontal force acting on the precast column during an earthquake, the precast column is pressed against the foundation via a temporary cradle, so there is no possibility that the precast column will fall and one side will not rise.
<3> There is no possibility that the precast pillars will shift due to the passage of trains and vehicles that give large vibrations to the foundation.
<4> As a means for joining axial rebars, a joining means in a wide range such as a welded joint, a pressure joint, or a mechanical joint can be selected and employed. Reinforcing bar joints are disclosed in the Japan Society of Civil Engineers, “Concrete Library 128 Rebar Fixing and Joint Guidelines” (2008 edition).

本発明のプレキャスト柱と基礎の接続方法の実施例の説明図。Explanatory drawing of the Example of the connection method of the precast pillar and foundation of this invention. 仮受架台の説明図。Explanatory drawing of a temporary support stand. プレキャスト柱を基礎の上に吊り降ろした状態の説明図。Explanatory drawing of the state which suspended the precast pillar on the foundation. プレキャスト柱と基礎をカプラで一体化した状態の説明図。Explanatory drawing of the state which integrated the precast pillar and the foundation with the coupler. プレキャスト柱を基礎に固定した高架橋の説明図。Explanatory drawing of viaduct fixed to precast pillar.

以下図面を参照しながら本発明のプレキャスト柱と基礎の接続方法の実施例を説明する。   Embodiments of a method for connecting a precast pillar and a foundation according to the present invention will be described below with reference to the drawings.

<1>全体の構成。
本発明は、工場で製作したプレキャスト柱1と、現場の基礎2とを接続する方法と、使用する仮受架台3とに関するものである。
プレキャスト柱1の端面と、基礎2とには、各々の対向する位置に、鉄筋11,21を突設してある。
プレキャスト柱1の下端側の側面にはナットを埋め込み、後述する仮受架台3をプレキャスト柱1の側面に取り付けること、取り外すことが可能であるように構成する。
基礎2は、場所打杭4の上端に、工場または現場で鉄筋を組み立てた鉄筋フレームを設置してコンクリートで一体化した構成を採用することができる。
<1> Overall configuration.
The present invention relates to a method of connecting a precast pillar 1 manufactured in a factory and a foundation 2 on site, and a temporary support base 3 to be used.
Reinforcing bars 11 and 21 project from the end face of the precast column 1 and the foundation 2 at positions facing each other.
A nut is embedded in the side surface on the lower end side of the precast column 1 so that a temporary support base 3 described later can be attached to and removed from the side surface of the precast column 1.
The foundation 2 can employ a configuration in which a reinforcing bar frame in which reinforcing bars are assembled at a factory or in the field is installed on the upper end of the cast-in-place pile 4 and integrated with concrete.

<2>ねじふし鉄筋。
図の実施例では、プレキャスト柱1の端から突設したねじふし鉄筋11と、基礎2から突設したねじふし鉄筋21とをカプラ12で接合する場合を説明している。
この場合に、両側のねじふし鉄筋11、21のねじ山は、当接した位置では連続しているとは限らない。
そのために、ねじ山間に余裕のないなカプラ12を使用すると両者を接合することは困難である。
しかし、ねじふし鉄筋のねじ山とカプラ12のねじ山のピッチは同一でも、山の頂点の幅に余裕を与えておけば、両者間で遊びが生じるから、カプラ12によって両ねじふし鉄筋11、21間を接合することができる。
その場合には、カプラ12の内部に接着剤を注入して固化させるものであり、このような接合方法は公知である。
なお図面の実施例では、「鉄筋」として「ねじふし鉄筋」を記載し、両ねじふし鉄筋11、21間をカプラ12で接合して接続する方法について説明する。
しかしねじの刻設していない、丸鋼あるいは異形鋼棒である通常の鉄筋と鉄筋の間を溶接継手、圧接継手、あるいはその他の機械式継手にしても、本発明の方法を利用することができるから、本発明はねじふし鉄筋をカプラ12の組み合わせに限定するものではない。
<2> Screw-reinforcing bar.
In the embodiment shown in the figure, a case is described in which a threaded reinforcing bar 11 protruding from the end of the precast column 1 and a threaded reinforcing bar 21 protruding from the foundation 2 are joined by a coupler 12.
In this case, the screw threads of the threaded reinforcing bars 11 and 21 on both sides are not always continuous at the contacted positions.
For this reason, it is difficult to join both the couplers 12 having no allowance between the screw threads.
However, even if the thread pitch of the threaded reinforcing bar and the thread pitch of the coupler 12 are the same, if there is a margin in the width of the peak of the thread, there will be play between the two. 21 can be joined.
In that case, an adhesive is injected into the coupler 12 and solidified, and such a joining method is known.
In the embodiment shown in the drawings, a “screw-reinforcing bar” is described as “reinforcing bar”, and a method of connecting and connecting both screw-reinforcing bars 11 and 21 with a coupler 12 will be described.
However, it is possible to use the method of the present invention even when a welded joint, a pressure welded joint, or other mechanical joint is provided between a normal reinforcing bar that is a round steel bar or a deformed steel bar that is not engraved with screws. Therefore, the present invention does not limit the threaded reinforcing bar to the combination of the couplers 12.

<3>仮受架台。
プレキャスト柱1の下端の外側に、仮受架台3を取り付ける。
この仮受架台3は、2箇所に脚31を形成してある、鋼製の門型の枠体である。
この仮受架台3はボルト穴を開口してあり、このボルト穴に挿入したボルトによって、プレキャスト柱1の外側に取り付けが可能である。
仮受架台3に形成した2箇所の脚31の下端には高さ調整ボルト32を備えている。
この調整ボルト32は、回転によってナットから出入りするボルトであるが、球面座金を基礎2と調整ボルト32の間に介在させて、基礎2の上面に不陸が存在する場合でも高さの調整を容易にする。
さらに仮受架台3には1本、あるいは複数本の鋼棒を鉛直方向に貫通させてアンカー33として利用する。
このアンカー鋼棒33の下端を基礎2側から突設した固定ボルト23に接続し、仮受架台3に反力を取ったセンターホールジャッキにより緊張すると、アンカー鋼棒33にプレスストレスが導入され、仮受架台3を基礎2に押さえつけることでプレキャスト柱1を固定することができる。
<3> Temporary cradle.
The temporary support base 3 is attached to the outside of the lower end of the precast pillar 1.
This temporary support stand 3 is a steel portal frame having legs 31 formed at two locations.
The temporary support base 3 has a bolt hole opened, and can be attached to the outside of the precast column 1 by a bolt inserted into the bolt hole.
Height adjustment bolts 32 are provided at the lower ends of the two legs 31 formed on the temporary mount 3.
The adjustment bolt 32 is a bolt that enters and exits from the nut by rotation, but a spherical washer is interposed between the foundation 2 and the adjustment bolt 32 to adjust the height even when unevenness exists on the upper surface of the foundation 2. make it easier.
Further, one or a plurality of steel bars are passed through the temporary support 3 in the vertical direction and used as the anchors 33.
When the lower end of the anchor steel bar 33 is connected to the fixing bolt 23 projecting from the foundation 2 side and is tensioned by the center hole jack that takes the reaction force on the temporary support 3, press stress is introduced into the anchor steel bar 33, The precast pillar 1 can be fixed by pressing the temporary support base 3 against the foundation 2.

次にプレキャスト柱1と基礎2との固定方法について説明する。   Next, a method for fixing the precast pillar 1 and the foundation 2 will be described.

<1>基礎側の準備。
まず基礎2側では、鉄筋フレームを、鋼材、またはコンクリートを用いて固定して基礎を形成する。
この鉄筋フレームは工場または現場で製作してあるから、すべてのねじふし鉄筋21の位置、寸法、鉛直性が正確に設置してある。
そのすべてのねじふし鉄筋21の上端から、カプラ12をねじ込んで、プレキャスト柱1のねじふし鉄筋11との間の接合の準備をしておく。
なお、ねじふし鉄筋11、21は一定の長さにせず、長短を千鳥に配置しておくと、作業空間を得やすくなる。
また基礎2の周囲、すなわちプレキャスト柱1を設置した場合の鉛直投影面外にはコンクリートを打設してあり、アンカー鋼棒33と接続する固定ボルト23を埋め込んである。
<1> Preparation on the foundation side.
First, on the foundation 2 side, the reinforcement frame is fixed using steel or concrete to form the foundation.
Since this reinforcing bar frame is manufactured at the factory or at the site, the positions, dimensions, and verticality of all screw thread reinforcing bars 21 are accurately installed.
The coupler 12 is screwed in from the upper ends of all the threaded reinforcing bars 21 to prepare for joining between the threaded reinforcing bars 11 of the precast column 1.
In addition, it will become easy to obtain a working space if the threaded reinforcing bars 11 and 21 are not fixed lengths and are arranged in a staggered manner.
In addition, concrete is placed around the foundation 2, that is, outside the vertical projection plane when the precast column 1 is installed, and a fixing bolt 23 connected to the anchor steel rod 33 is embedded.

<2>仮受架台の取り付け。
プレキャスト柱1の下端の側面には仮受架台3をボルトで取り付ける。
この取り付けは、前記した仮受架台3のボルト穴を介して、プレキャスト柱1のナットにボルトをねじ込む方法、あるいはプレキャスト柱1を貫通させたPC鋼棒に緊張力を導入して両者を一体化する方法、その他の公知の方法で行う。
この仮受架台3は、プレキャスト柱1の4面に取り付けることが好ましいが、建築限界などの関係から、図の実施例のように車両の進行方向と直交する2面に取り付けるだけでも、十分に安全を確保してプレキャスト柱1の固定作業を行うことができる。
また鉄道にあっては軌道側、道路にあっては走行車線側、建物あっては建物側を除く柱の3面に仮受架台を取付けても十分安全性を確保できる。
<2> Attaching a temporary support base.
The temporary support base 3 is attached to the side surface of the lower end of the precast pillar 1 with a bolt.
This attachment can be achieved by screwing the bolt into the nut of the precast column 1 through the bolt hole of the temporary support base 3 described above, or by introducing tension to the PC steel rod that has penetrated the precast column 1 to integrate the two. And other known methods.
Although it is preferable to attach this temporary support stand 3 to the four surfaces of the precast pillar 1, it is sufficient to attach it to the two surfaces orthogonal to the traveling direction of the vehicle as in the embodiment of the figure because of the construction limit. It is possible to secure the precast pillar 1 while ensuring safety.
In addition, sufficient safety can be ensured even if a temporary cradle is attached to the three surfaces of the rail except for the track side in the case of railways, the lane side in the case of roads, and the building side.

<3>プレキャスト柱の吊り降ろし。
そのような状態のプレキャスト柱1を、基礎2の上方からクレーンで吊り下ろす。
プレキャスト柱1を基礎2に吊り降ろすと、仮受架台3に形成した脚31が基礎2の上に搭載した状態となる。
同時に、プレキャスト柱1と基礎2の両側から突設したねじふし鉄筋11、21が同一軸線にそろい、かつ両者の先端がほぼ当接するように寸法と位置を正確に決定してある。
<3> Hanging precast pillars.
The precast column 1 in such a state is suspended from above the foundation 2 with a crane.
When the precast column 1 is suspended from the foundation 2, the legs 31 formed on the temporary support base 3 are mounted on the foundation 2.
At the same time, the size and position are accurately determined so that the threaded reinforcing bars 11 and 21 projecting from both sides of the precast column 1 and the foundation 2 are aligned on the same axis, and the tips of both are substantially in contact.

<4>高さ調整。
次に高さ方向の精密な測量を行い、仮受架台3の脚31下端の調整ボルト32を回転して仮受架台3の高さ、すなわち仮受架台3と一体となったプレキャスト柱1の高さを調整する。
脚31の下端の調整ボルト32に球面座金を組み込んでおけば、基礎2の周囲に打設したコンクリートの仕上げ面に多少の不正確さがあっても、容易に調整することができる。
<4> Height adjustment.
Next, a precise survey in the height direction is performed, and the adjustment bolt 32 at the lower end of the leg 31 of the temporary support base 3 is rotated to adjust the height of the temporary support base 3, that is, the precast column 1 integrated with the temporary support base 3. Adjust the height.
If a spherical washer is incorporated in the adjustment bolt 32 at the lower end of the leg 31, even if there is some inaccuracy in the finished surface of the concrete cast around the foundation 2, it can be easily adjusted.

<5>ねじふし鉄筋の一体化。
その後にプレキャスト柱1と基礎2の対向する各ねじふし鉄筋11、21の間を、カプラ12をねじ込んで接続する。
カプラ12は、事前に基礎2側のねじふし鉄筋21に取り付けてあるから、仮受架台3の空間から手を入れて回転を与えることによって、カプラ12の下半分は基礎2側のねじふし鉄筋21に、上半分はプレキャスト柱1側のねじふし鉄筋11にねじ込むことができる。
<5> Integration of threaded reinforcing bars.
After that, the coupler 12 is screwed and connected between the threaded reinforcing bars 11 and 21 of the precast column 1 and the foundation 2 facing each other.
Since the coupler 12 is attached in advance to the threaded reinforcing bar 21 on the base 2 side, the lower half of the coupler 12 is screwed on the foundation 2 side by applying a hand from the space of the temporary support base 3 and rotating it. 21, the upper half can be screwed into the threaded reinforcing bar 11 on the precast column 1 side.

<6>仮受架台の固定。
さらに、仮受架台3に取り付けたアンカー鋼棒33の鋼棒と、基礎2から突設した固定ボルト23を、やはりカプラ12を使用して接続する。
そしてアンカー鋼棒33をセンターホールジャッキで緊張してプレストレスを与えて仮受架台3を基礎2に押さえつけて固定する。
この場合のプレストレスとして、地震時の浮き上がり力を予測して導入すれば、架設中の地震によって転倒しないだけでなく、浮き上がりも阻止できる。
さらに列車や自動車の振動による、仮設中のずれの発生も阻止できる。
<6> Fixing the temporary cradle.
Further, the steel rod 33 of the anchor steel rod 33 attached to the temporary support 3 and the fixing bolt 23 projecting from the foundation 2 are also connected using the coupler 12.
Then, the anchor steel bar 33 is tensioned with a center hole jack and prestressed to press the temporary support 3 against the foundation 2 and fix it.
As a prestress in this case, if the lifting force at the time of an earthquake is predicted and introduced, not only will it not fall over due to an earthquake during erection, but it can also prevent lifting.
Furthermore, it is possible to prevent the occurrence of displacement during temporary construction due to vibrations of trains and cars.

<6>仮受架台の撤去。
ねじふし鉄筋間を接合したカプラ12内に有機、あるいは無機のグラウト材を固化材として注入する。
カプラ12内に充填した固化材が硬化すれば、プレキャスト柱1はねじふし鉄筋11、21群を介して基礎2を一体化していることになる。
そこで仮受架台3のアンカー鋼棒33の緊張力を解除し、仮受架台3とプレキャスト柱1とを固定したボルトを解体して、仮受架台3を撤去する。
この仮受架台3の撤去と前後してねじふし鉄筋11、21とカプラ12を囲む状態で、事前に配置しておいた複数本の帯鉄筋を、所定の間隔ごとに引き上げて固定する。
<6> Removal of temporary cradle.
An organic or inorganic grout material is injected as a solidifying material into the coupler 12 joined between the threaded reinforcing bars.
If the solidified material filled in the coupler 12 is hardened, the precast column 1 is integrated with the foundation 2 via the threaded reinforcing bars 11 and 21 group.
Therefore, the tension of the anchor steel bar 33 of the temporary support base 3 is released, the bolts fixing the temporary support base 3 and the precast column 1 are disassembled, and the temporary support base 3 is removed.
Before and after the removal of the temporary support 3, a plurality of pre-arranged strip reinforcing bars are pulled up and fixed at predetermined intervals in a state of surrounding the threaded reinforcing bars 11 and 21 and the coupler 12.

<7>コンクリートの打設。
プレキャスト柱1と基礎2のねじふし鉄筋11、21群を囲んで型枠を設置する。
そして型枠内にコンクリートを打設する。
プレキャスト柱1が中空のボックスである場合にはその上からコンクリートを打設できる。そうでない場合には、型枠の間からコンクリートを圧入して行う。
こうして鉄道高架橋、道路高架橋橋などの柱1と基礎2との固定が完成する。
<7> Placing concrete.
A formwork is installed around the pre-cast pillar 1 and the threaded reinforcing bars 11 and 21 of the foundation 2.
Then, concrete is placed in the formwork.
When the precast pillar 1 is a hollow box, concrete can be placed thereon. If this is not the case, press the concrete between the molds.
In this way, the fixing of the pillar 1 and the foundation 2 such as the railway viaduct and road viaduct bridge is completed.

1:プレキャスト柱
2:基礎
3:仮受架台
31:脚
4:場所打杭
1: Precast pillar
2: Basic
3: Temporary cradle
31: Leg
4: Place stake

Claims (3)

対向する位置に鉄筋を突設してあるプレキャスト柱と基礎とを、鉄筋間を接合して接続する方法であって、
プレキャスト柱の下端の外側に、仮受架台を取り付け、
このプレキャスト柱を基礎の上から吊り下ろして、
仮受架台に形成した脚を基礎上に搭載した後に、脚の調整ボルトでプレキャスト柱の高さを調整し、
プレキャスト柱と基礎の対向する各鉄筋の間を接続し、
同時に、仮受架台に取り付けたアンカーと、基礎から突設した固定ボルトを接続してプレストレスを与えて仮受架台を基礎に固定し、
プレキャスト柱と基礎の鉄筋群を囲んで型枠を設置し、
型枠内にコンクリートを打設して行う、
プレキャスト柱と基礎の接続方法。
It is a method of connecting and connecting the precast pillars and the foundations with reinforcing bars protruding from the opposing positions.
Attach a temporary cradle to the outside of the lower end of the precast pillar,
Hanging this precast pillar from the foundation,
After mounting the legs formed on the temporary mount on the foundation, adjust the height of the precast pillar with the adjustment bolts of the legs,
Connect between the pre-cast column and each rebar facing the foundation,
At the same time, the anchor attached to the temporary stand and the fixing bolt protruding from the foundation are connected to give pre-stress to fix the temporary stand to the foundation.
Set up a formwork around the precast columns and the reinforcing bars of the foundation,
Perform by placing concrete in the formwork,
How to connect precast pillars and foundations.
対向する位置に鉄筋を突設してあるプレキャスト柱と基礎とにおいて、
鉄筋としてねじふし鉄筋を使用し、
ねじふし鉄筋とねじふし鉄筋との接合にはカプラをねじ込んで行い、
カプラ内に接着剤を注入して固定する、
請求項1記載のプレキャスト柱と基礎の接続方法。
In the precast pillars and foundations with reinforcing bars protruding in opposite positions,
Use a threaded reinforcing bar as the reinforcing bar,
A screw is used to join the screw rebar to the screw rebar.
Inject and fix adhesive in the coupler,
The method for connecting a precast pillar and a foundation according to claim 1.
対向する位置に鉄筋を突設してあるプレキャスト柱と基礎とを、鉄筋間を接合して接続する場合に使用する仮受架台であって、
仮受架台はプレキャスト柱の下端の外側にボルトを介して取り付けが可能であり、
仮受架台に形成した脚には高さ調整ボルトを備え、
仮受架台に取り付けたアンカーは、基礎から突設した固定ボルトとの接続が可能であるように構成した、
プレキャスト柱と基礎の接続に使用する仮受架台。
It is a temporary support stand used when connecting a precast column and a foundation with reinforcing bars protruding from opposite positions by joining the reinforcing bars,
The temporary mount can be attached to the outside of the lower end of the precast pillar via bolts,
The legs formed on the temporary stand are equipped with height adjustment bolts,
The anchor attached to the temporary cradle was constructed so that it could be connected to the fixing bolt protruding from the foundation.
Temporary cradle used to connect precast pillar and foundation.
JP2009144178A 2009-06-17 2009-06-17 Precast pillar and foundation connection method and temporary cradle. Active JP5065341B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009144178A JP5065341B2 (en) 2009-06-17 2009-06-17 Precast pillar and foundation connection method and temporary cradle.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009144178A JP5065341B2 (en) 2009-06-17 2009-06-17 Precast pillar and foundation connection method and temporary cradle.

Publications (2)

Publication Number Publication Date
JP2011001717A JP2011001717A (en) 2011-01-06
JP5065341B2 true JP5065341B2 (en) 2012-10-31

Family

ID=43559897

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009144178A Active JP5065341B2 (en) 2009-06-17 2009-06-17 Precast pillar and foundation connection method and temporary cradle.

Country Status (1)

Country Link
JP (1) JP5065341B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7357462B2 (en) 2018-05-03 2023-10-06 ケースレー・インスツルメンツ・エルエルシー Ammeter and current measurement method

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108660910A (en) * 2017-03-31 2018-10-16 比亚迪股份有限公司 Precast pier, track support component and its manufacture installation method
CN108660912A (en) * 2017-03-31 2018-10-16 比亚迪股份有限公司 Precast pier, track support component and its manufacture installation method
CN114319087B (en) * 2022-02-23 2024-05-28 广东玄城建设工程有限公司 Reinforced concrete bridge pier taking chloride ion erosion and freeze thawing cycle coupling into consideration
CN114592423B (en) * 2022-04-01 2024-01-30 中国十九冶集团有限公司 Wet joint connection construction method for prefabricated pier column and bearing platform
CN115404899A (en) * 2022-10-14 2022-11-29 中国十七冶集团有限公司 Beam type raft structure and construction method thereof
JP7492073B1 (en) 2023-11-09 2024-05-28 鹿島建設株式会社 Equipment stand construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0960302A (en) * 1995-08-17 1997-03-04 Fudo Kenken Kk Erection method for precast concrete column and adjuster metal tool for adjustment of column level
JPH10204985A (en) * 1997-01-28 1998-08-04 Kumagai Gumi Co Ltd Constructing method for column and plumbing jig
JP3255634B2 (en) * 1997-04-25 2002-02-12 丸五基礎工業株式会社 Pile head structure of cast-in-place steel pipe concrete pile
JP4089761B2 (en) * 1998-03-05 2008-05-28 東急建設株式会社 Construction method of ramen railway viaduct
JP4026510B2 (en) * 2003-02-19 2007-12-26 株式会社大林組 Rapid construction method for PCa structures

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7357462B2 (en) 2018-05-03 2023-10-06 ケースレー・インスツルメンツ・エルエルシー Ammeter and current measurement method

Also Published As

Publication number Publication date
JP2011001717A (en) 2011-01-06

Similar Documents

Publication Publication Date Title
JP5065341B2 (en) Precast pillar and foundation connection method and temporary cradle.
JP5045214B2 (en) Column head construction method
KR101870309B1 (en) Aseismatic Reinforcement Steel Frame Structure and Aseismatic Reinforcement Method using thereof
JP4693299B2 (en) Column base connection structure
KR101274481B1 (en) Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof
JP2004092078A (en) Structure and construction method for bridge
JP2004285738A (en) Box girder bridge structure and method of constructing the same
JP2003090052A (en) Foundation constructing method, footing foundation, and foundation structure of elevated highway
KR20180137268A (en) Aseismatic Reinforcement Steel Frame with Friction Slip Brace and Aseismatic Reinforcement Method using thereof
KR101845717B1 (en) Aseismatic Reinforcement Steel Frame with Hinge Type Friction Slip Brace and Aseismatic Reinforcement Method using thereof
JP4472726B2 (en) Base-isolated building structure
JP4398876B2 (en) Structure pier structure
JP6283906B2 (en) Prop foundation
JPH05340031A (en) Prestressed concrete girder and its manufacture
JP2009114825A (en) Gap adjusting method for steel plate for steel plate-lining seismic strengthening
JP2004263507A (en) Building foundation construction method and building foundation structure
JP2002030672A (en) Structure of joining foundation pile to pier base and method of constructing the structure
KR102000082B1 (en) Aseismatic Reinforcement Device with Toggle Type Friction Slip Brace, and Aseismatic Reinforcement Method using thereof
KR20120078217A (en) Block out construction method for apparatus base
JP2006283317A (en) Prestressed concrete floor slab formed of precast concrete plates, and method of constructing the same
JP5265470B2 (en) Abutment and bridge girder reinforcement method
JP2007231694A (en) Joint method of concrete structure, and concrete beam
KR101189041B1 (en) Soundproofing walls using piles for constructing foundation and supporting posts and construction method the same
JPH08120638A (en) Connecting structure of pile and beam and execution method of structure using connecting structure
CN217298631U (en) Pier side assembly type construction platform

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20101206

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120228

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120717

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120809

R150 Certificate of patent or registration of utility model

Ref document number: 5065341

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150817

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250