JP5054449B2 - Rehabilitation method of pile foundation structure - Google Patents

Rehabilitation method of pile foundation structure Download PDF

Info

Publication number
JP5054449B2
JP5054449B2 JP2007178913A JP2007178913A JP5054449B2 JP 5054449 B2 JP5054449 B2 JP 5054449B2 JP 2007178913 A JP2007178913 A JP 2007178913A JP 2007178913 A JP2007178913 A JP 2007178913A JP 5054449 B2 JP5054449 B2 JP 5054449B2
Authority
JP
Japan
Prior art keywords
pile
foundation structure
joint
foundation
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007178913A
Other languages
Japanese (ja)
Other versions
JP2009013720A (en
Inventor
俊二 藤井
俊昌 長尾
英樹 船原
良浩 堀井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2007178913A priority Critical patent/JP5054449B2/en
Publication of JP2009013720A publication Critical patent/JP2009013720A/en
Application granted granted Critical
Publication of JP5054449B2 publication Critical patent/JP5054449B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、既存の構造物の耐震性を向上させることを目的とした、杭基礎構造の改修方法に関する。   The present invention relates to a method for repairing a pile foundation structure for the purpose of improving the earthquake resistance of an existing structure.

従来の杭基礎構造は、パイルキャップに剛接合された状態で基礎梁に接続されており、地震時に大きな横方向の外力が作用した際には、杭頭部および基礎梁端部に大きな曲げモーメントが発生する。ところが、既存の構造物の中には、基礎構造に対する耐震設計がなされておらず、曲げ耐力やせん断耐力が不十分なものがある。このように基礎の耐震性が不十分な既存の構造物は、地震時に杭頭や基礎梁に損傷が生じる場合がある。   The conventional pile foundation structure is connected to the foundation beam in a rigid connection with the pile cap. When a large lateral force is applied during an earthquake, a large bending moment is applied to the pile head and the end of the foundation beam. Will occur. However, some existing structures have not been seismically designed for the foundation structure and have insufficient bending strength and shear strength. Thus, existing structures with insufficient foundation earthquake resistance may cause damage to the pile heads or foundation beams during an earthquake.

そのため、従来、耐震性が不十分な既存の基礎構造に対して、耐力の増強を図る補強方法が多数開発されている。
例えば、特許文献1には、既存のコンクリート杭の頭部周面に、配筋を行った後、モルタルまたはコンクリートを吹き付けることにより、既存のコンクリート杭の断面を大きくして耐力を増強する補強方法が開示されている。
For this reason, a number of reinforcing methods have been developed in the past to increase the proof strength of existing foundation structures with insufficient earthquake resistance.
For example, Patent Literature 1 discloses a reinforcement method for increasing the proof stress by enlarging the cross section of an existing concrete pile by spraying mortar or concrete after performing bar arrangement on the head peripheral surface of the existing concrete pile. Is disclosed.

また、特許文献2には、既存の基礎の脇に竪孔を削孔した後、この竪孔を利用して、既存の基礎の直下であって、既存の支持杭の杭頭部周辺の地盤改良を行う補強方法が開示されている。これにより、既存の基礎に対する支持力が増強されるとともに、地盤改良体により杭に作用する応力が低減される。   Further, in Patent Document 2, after drilling a hole in the side of an existing foundation, using this hole, the ground just below the existing foundation and around the pile head of the existing support pile A reinforcing method for making improvements is disclosed. Thereby, the supporting force with respect to the existing foundation is enhanced, and the stress acting on the pile by the ground improvement body is reduced.

特開平10−317373号公報JP 10-317373 A 特開平08−296240号公報Japanese Patent Laid-Open No. 08-296240

ところが、従来の補強方法は、外力に対して耐力を増強する補強を基本原理としているため、施工が大掛かりになるとともに、不経済であった。
例えば、前述の杭の断面を大きくする補強方法は、基礎直下の掘削、配筋、モルタルまたはコンクリート吹付け等の作業に手間を要し、多種多様の施工設備が必要となる。そのため、施工が大掛かりとなり、工期も長くなる。
また、後述の基礎直下の地盤改良を行う補強方法は、広範囲に地盤改良を行う必要があるために作業の手間や材料費が嵩むことや、大掛かりな重機が必要となることなどにより費用が嵩むこと等の問題点を有していた。
However, since the conventional reinforcement method is based on the reinforcement principle that enhances the yield strength against the external force, the construction becomes large and uneconomical.
For example, the above-described reinforcing method for enlarging the cross section of a pile requires time and labor for excavation, reinforcement, mortar, or concrete spraying directly under the foundation, and requires a wide variety of construction facilities. Therefore, the construction becomes large and the construction period becomes long.
In addition, the reinforcement method for improving the ground directly below the foundation described later requires a large amount of work and material costs due to the need for ground improvement over a wide area, and the cost increases due to the need for large heavy machinery. There was a problem such as that.

本発明は、前記の問題点を解決するためになされたものであり、施工性に優れ、かつ、経済的に既存の基礎構造の耐震性を向上させることを可能とした、杭基礎構造の改修方法を提案することを課題とする。   The present invention has been made to solve the above-mentioned problems, and is excellent in workability and economically improving the earthquake resistance of an existing foundation structure. The problem is to propose a method.

前記課題を解決するために、請求項1に記載の発明は、既存の構造物が建っている状態で杭基礎構造を構成する杭と基礎部材との接合部を露出させる工程と、露出させた前記接合部の近傍のコンクリートを取り除く工程と、を備える杭基礎構造の改修方法であって、前記杭頭部の周縁のコンクリートを前記杭の上端に行くに従い当該杭の直径が狭まるように取り除くことで、前記接合部の断面積を縮小させて、前記接合部に隙間を形成し、前記基礎部材と剛接合されていた杭頭部を半剛接合化させることを特徴としている。 In order to solve the above-mentioned problem, the invention according to claim 1 exposes the step of exposing the joint between the pile and the foundation member constituting the pile foundation structure in a state where the existing structure is erected. Removing the concrete in the vicinity of the joint, and rehabilitating the pile foundation structure including removing the concrete at the periphery of the pile head so that the diameter of the pile becomes narrower as it goes to the upper end of the pile. Thus, the cross-sectional area of the joint is reduced, a gap is formed in the joint, and the pile head that is rigidly joined to the foundation member is semi-rigidly joined.

かかる杭基礎構造の改修方法によれば、前記接合部の近傍のコンクリートであって、基礎部材の接合部に対応する箇所または杭頭部の周縁のコンクリートを取り除くことで、簡易かつ経済的に杭基礎構造の耐震性の向上を図ることが可能となる。すなわち、杭頭部とパイルキャップ等の基礎部材との接合部の断面積が縮小されたことにより、地震時等において、接合部の回転変形が許容され、その結果、杭頭部に作用する曲げモーメントを低減させることが可能となる。   According to such a method for repairing a pile foundation structure, it is possible to easily and economically pile the concrete near the joint portion by removing the concrete corresponding to the joint portion of the foundation member or the periphery of the pile head. It becomes possible to improve the earthquake resistance of the foundation structure. In other words, by reducing the cross-sectional area of the joint between the pile head and the foundation member such as a pile cap, rotational deformation of the joint is permitted during an earthquake or the like, and as a result, the bending acting on the pile head The moment can be reduced.

ここで、「半剛接合化」とは、杭頭部の固定度を落とし、回転剛性を小さくすることで、杭と基礎部材との接合状態を、剛接合とピン接合との間の状態にすることをいう。これによって、地震時に杭頭部に作用する曲げモーメントが低減される。
また、本明細書における「基礎部材」とは、杭基礎構造において杭が接続される部材であって、例えば、基礎スラブ、パイルキャップ、フーチング、基礎梁等を表すものとする。
Here, “semi-rigid joint” means that the joint state between the pile and the foundation member is changed between the rigid joint and the pin joint by reducing the degree of fixation of the pile head and reducing the rotational rigidity. To do. This reduces the bending moment acting on the pile head during an earthquake.
Further, the “foundation member” in the present specification is a member to which a pile is connected in a pile foundation structure, and represents, for example, a foundation slab, a pile cap, a footing, a foundation beam, and the like.

また、前記杭頭部の周縁のコンクリートを取り除くことで、前記接合部の断面積を縮小させて、前記基礎部材と剛接合されていた該杭頭部を半剛接合化させるため、作業が容易であるとともに、廃棄物量を縮小することができる。 The front by removing a peripheral concrete Kikui head, by reducing the cross-sectional area of the joint, in order to semirigid bonding of the base member and the rigid該杭head has been joined, is working It is easy and the amount of waste can be reduced.

また、請求項に記載の発明は、請求項1に記載の杭基礎構造の改修方法であって、前記接合部の周縁において前記杭と前記基礎部材との間に跨って配設された鉄筋を切断することを特徴としている。
かかる杭基礎構造の改修方法によれば、杭頭部の回転変形により作用する引張応力を小さくすることが可能となるため、杭基礎構造の耐震性がさらに向上する。
Further, the invention according to claim 2 is the method for repairing a pile foundation structure according to claim 1 , wherein the reinforcing bars disposed between the pile and the foundation member at the periphery of the joint. It is characterized by cutting.
According to such a method for rehabilitating a pile foundation structure, it is possible to reduce the tensile stress acting due to the rotational deformation of the pile head, so that the earthquake resistance of the pile foundation structure is further improved.

また、請求項に記載の発明は、請求項1または請求項2に記載の杭基礎構造の改修方法であって、断面積が縮小された前記接合部の直下の杭の周囲を補強部材で覆う工程を含むことを特徴としている。
かかる杭基礎構造の改修方法によれば、断面が縮小された接合部のコンクリート強度と靭性を向上させることが可能となる。
The invention according to claim 3 is the method for repairing a pile foundation structure according to claim 1 or 2 , wherein a reinforcing member is provided around the pile immediately below the joint with a reduced cross-sectional area. It is characterized by including the process of covering.
According to the method for repairing such a pile foundation structure, it is possible to improve the concrete strength and toughness of the joint with a reduced cross section.

本発明の杭基礎構造の改修方法によれば、施工性に優れ、かつ、経済的に既存の基礎構造の耐震性を向上させることが可能となる。   According to the method for repairing a pile foundation structure of the present invention, it is possible to improve the seismic resistance of an existing foundation structure with excellent workability and economically.

以下、本発明の好適な実施の形態について、図面を参照して説明する。なお、説明において、同一要素には同一の符号を用い、重複する説明は省略する。   DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described with reference to the drawings. In the description, the same reference numerals are used for the same elements, and duplicate descriptions are omitted.

<第1の実施形態(参考実施形態)
第1の実施の形態に係る杭基礎構造の改修方法は、図1に示すように、杭基礎構造2により支持された既存の建物(構造物)1について、耐震性の向上を図ることを目的として行うものである。
ここで、図1は、本発明の好適な実施の形態に係る改修後の構造物の概要を示す立面図である。また、図2は、第1の実施の形態に係る杭基礎構造の改修方法を示す図であって、(a)は改修前の杭基礎構造を示す縦断面図、(b)は改修前の杭を上方から望む平面図、(c)は改修後の杭基礎構造を示す縦断面図、(d)は改修後の杭を上方から望む平面図である。さらに、図3の(a)〜(d)は、第1の実施の形態に係る杭基礎構造の改修方法の各工程を示す模式図である。
<First Embodiment (Reference Embodiment) >
The method of repairing a pile foundation structure according to the first embodiment aims to improve seismic resistance of an existing building (structure) 1 supported by a pile foundation structure 2 as shown in FIG. Is what you do.
Here, FIG. 1 is an elevational view showing an outline of a structure after repair according to a preferred embodiment of the present invention. Moreover, FIG. 2 is a figure which shows the repair method of the pile foundation structure which concerns on 1st Embodiment, Comprising: (a) is a longitudinal cross-sectional view which shows the pile foundation structure before repair, (b) is before repair. A plan view of the pile viewed from above, (c) is a longitudinal sectional view showing the pile foundation structure after repair, and (d) is a plan view of the pile after repair viewed from above. Furthermore, (a)-(d) of FIG. 3 is a schematic diagram which shows each process of the repair method of the pile foundation structure which concerns on 1st Embodiment.

かかる杭基礎構造2の改修方法は、図2(a)および(c)に示すように、杭21とパイルキャップ22の既存の接合部20の断面積を、杭頭部の周縁の除去部20aを取り除くことで、杭21の断面積よりも縮小させることにより、剛接合されている杭頭部を半剛接合化させるものである。   As shown in FIGS. 2 (a) and 2 (c), the repair method of the pile foundation structure 2 is obtained by changing the cross-sectional area of the existing joint 20 between the pile 21 and the pile cap 22 to the removal portion 20a at the periphery of the pile head. The pile heads that are rigidly joined are made semi-rigidly joined by reducing the cross-sectional area of the pile 21 by removing.

杭基礎構造2は、図1に示すように、複数本の杭21,21,…とこれらの杭21,21,…を連結する基礎梁23とを備えて構成されている。各杭21と基礎梁23とは、パイルキャップ22を介して連結されている。
かかる杭基礎構造2は、建物荷重等を基礎梁23と杭21を介して支持地盤層G2へと伝達するものである。
As shown in FIG. 1, the pile foundation structure 2 includes a plurality of piles 21, 21,... And foundation beams 23 that connect these piles 21, 21,. Each pile 21 and the foundation beam 23 are connected via a pile cap 22.
This pile foundation structure 2 transmits building load etc. to the support ground layer G2 via the foundation beam 23 and the pile 21.

杭21は、軟弱地盤層G1を貫通し、所定の強度を有した支持地盤層G2に下端部が所定長挿入された支持杭である。第1の実施の形態では、現場打ち杭の場合について説明するが、杭21が既製杭であってもよいことはいうまでもない。
杭21は、図2(a)および(b)に示すように、断面円形であって、主筋R1と帯筋R2とが所定のコンクリート被りを有して配筋されている。杭21は、上端面をパイルキャップ22に突き合わせた状態で、上端から突出した主筋R1がパイルキャップ22に定着されていることで、パイルキャップ22に剛接合されている。
The pile 21 is a support pile that penetrates the soft ground layer G1 and has a lower end inserted into the support ground layer G2 having a predetermined strength for a predetermined length. Although 1st Embodiment demonstrates the case of an in-situ pile, it cannot be overemphasized that the pile 21 may be a ready-made pile.
As shown in FIGS. 2 (a) and 2 (b), the pile 21 has a circular cross section, and the main reinforcing bar R1 and the reinforcing bar R2 are arranged with a predetermined concrete cover. The pile 21 is rigidly joined to the pile cap 22 by fixing the main reinforcement R1 protruding from the upper end to the pile cap 22 in a state where the upper end surface is abutted against the pile cap 22.

パイルキャップ22は、杭21と基礎梁23とを接合するために配置されたコンクリート部材である。
パイルキャップ22には、下面から杭21が接合されているとともに、側面には基礎梁23が接合されている。さらに、パイルキャップ22の上面には、建物1の柱24が接合されている。
The pile cap 22 is a concrete member arranged to join the pile 21 and the foundation beam 23.
A pile 21 is joined to the pile cap 22 from the lower surface, and a foundation beam 23 is joined to the side surface. Further, the pillar 24 of the building 1 is joined to the upper surface of the pile cap 22.

第1の実施の形態では、図2(c)および(d)に示すように、パイルキャップ22に剛接合された杭頭部(接合部20)の周縁の除去部20aを削り取るとともに、主筋R1を切断することにより、杭基礎構造2の耐震性の向上を図る。これにより、杭21とパイルキャップ22との接合が、半剛接合状態となり、接合部20における杭頭部の回転変形が許容されるようになるため、杭頭部および基礎梁端部に作用する曲げモーメントを低減させることが可能となる。   In the first embodiment, as shown in FIGS. 2 (c) and 2 (d), the removal portion 20 a at the periphery of the pile head (joint portion 20) rigidly joined to the pile cap 22 is scraped off and the main reinforcement R 1 The seismic resistance of the pile foundation structure 2 is improved by cutting. Thereby, joining of the pile 21 and the pile cap 22 will be in a semi-rigid joining state, and since the rotational deformation of the pile head in the junction part 20 will be accept | permitted, it acts on a pile head and a foundation beam edge part. It becomes possible to reduce a bending moment.

次に、第1の実施の形態に係る杭基礎構造の改修方法について、図面を参照して説明する。
かかる杭基礎構造の改修方法は、(1)掘削工程と、(2)縮径工程と、(3)補強工程と、(4)埋め戻し工程とを備えている。
Next, the repair method of the pile foundation structure which concerns on 1st Embodiment is demonstrated with reference to drawings.
Such a method for repairing a pile foundation structure includes (1) an excavation process, (2) a diameter reduction process, (3) a reinforcement process, and (4) a backfilling process.

(1)掘削工程
掘削工程は、図3(a)および(b)に示すように、杭基礎構造2の周囲の地盤Gを掘削することにより、杭21とパイルキャップ22との接合部20を露出させる工程である。
接合部20の周囲の掘削は、バックホウ等の掘削機械Mを利用して行い、必要に応じて、土留め工も行う。なお、第1の実施の形態では、掘削機械Mを利用して掘削を行うものとしたが、人力により掘削を行ってもよい。
(1) Excavation process As shown in FIGS. 3 (a) and 3 (b), the excavation process involves excavating the ground G around the pile foundation structure 2 so that the joint 20 between the pile 21 and the pile cap 22 is formed. It is a step of exposing.
Excavation around the joint 20 is performed using an excavating machine M such as a backhoe, and earth retaining work is also performed as necessary. In the first embodiment, excavation is performed using the excavating machine M, but excavation may be performed manually.

(2)縮径工程
縮径工程は、図3(b)に示すように、掘削工程により露出された接合部20について、コンクリートカッタCを利用してその周縁を削り取る工程である。
第1の実施の形態では、杭頭部の周縁を削り取ることにより接合部20の縮径を行う。
(2) Diameter reduction process The diameter reduction process is a process of scraping the periphery of the joint 20 exposed by the excavation process using a concrete cutter C as shown in FIG.
In 1st Embodiment, the diameter of the junction part 20 is reduced by scraping off the periphery of a pile head.

縮径工程では、まず、接合部(杭頭部)20の直下に、支持部材Cを設置する。次に、この支持部材Cに支持されたコンクリートカッタCを杭頭部の周縁に沿って移動させつつ、杭頭部の除去部20aを削り取ることにより、杭21とパイルキャップ22との接合部(杭頭部)20の断面積を、改修前の杭21の断面積よりも小さくする。第1の実施の形態では、杭頭部(接合部20)の縮径を、主筋R1の内側まで行うことで、コンクリートとともに、主筋R1も切断して、除去する(図2参照)。 In the diameter reduction process, first, the support member C <b> 1 is installed directly below the joint (pile head) 20. Then, while the concrete cutter C which is supported by the support member C 1 is moved along the periphery of the pile head, by scraping the removal portion 20a of the pile head, the junction of the pile 21 and the pile cap 22 (Pile head) The cross-sectional area of 20 is made smaller than the cross-sectional area of the pile 21 before repair. In 1st Embodiment, the main reinforcement R1 is also cut | disconnected and removed with concrete by performing the diameter reduction of a pile head (joining part 20) to the inside of the main reinforcement R1 (refer FIG. 2).

支持部材Cは、コンクリートカッタCを支持し、かつ安定した移動を可能とするための部材であって、複数に分割された鋼管を組み合わせることにより形成されている。なお、支持部材Cは鋼管に限定されないことはいうまでもない。 The support member C 1 is a concrete cutter C is supported, and a member for enabling the stable movement, are formed by combining a plurality of divided steel tube. The support member C 1 is of course not limited to the steel pipe.

本実施形態では、支持部材Cを、その上端面が、杭頭部の縮径の対象となる部分の下端面と一致するように配置することで、支持部材Cを杭頭部の縮径時の定規としての機能も発揮させる。つまり、コンクリートカッタCのカッタ刃を、支持部材Cの上端面沿って移動させることにより、縮径部分の下端の位置が決定する。
また、支持部材Cの外径は、杭頭部の縮径幅とコンクリートカッタCの刃の直径(長さ)に応じて決定されている。これにより、コンクリートカッタCを支持部材Cの外面に沿って移動させることで、所望の幅による縮径が可能となる。
In this embodiment, the support member C 1, its upper end face, by arranging to match the lower end face of the portion to be reduced in diameter of the pile head, the support member C 1 of pile head condensation It also functions as a ruler for diameter. That is, the cutter blade of the concrete cutter C, by moving along the upper end surface of the support member C 1, the position of the lower end of the reduced diameter portion is determined.
The outer diameter of the support member C 1 is determined in accordance with the diameter of the blade of the reduced diameter width and concrete cutter C of the pile head (length). Thus, by moving the concrete cutter C along the outer surface of the support member C 1, it is possible to shrink due to the desired width.

(3)補強工程
補強工程は、図2(d)および図3(c)に示すように、縮径工程において杭頭部の周縁の削り取られた部分の周囲を補強部材25で覆う工程である。
(3) Reinforcing step The reinforcing step is a step of covering the periphery of the portion of the periphery of the pile head with a reinforcing member 25 in the diameter reducing step, as shown in FIGS. 2 (d) and 3 (c). .

第1の実施の形態では、まず、杭頭部(接合部20)の縮径された部分の周囲を覆うように外殻25aを配置する。次に、外殻25aと杭21との間に形成された隙間に、地上から送液管Pを介して圧送されたモルタルやコンクリート等の充填材25bを充填することにより行う。外殻25aは、例えば、複数に分割された鋼管からなり、杭頭部の縮径された部分の周囲において、環状に組み合わせることにより形成されている。外殻25aは、組み合わされた状態で、縮径された杭頭部の外径よりも大きな内径を有しているとともに、縮径される前の杭頭部(杭)の外径よりも小さな外径を有している。
なお、第1の実施の形態では、外殻25aと充填材25bとにより補強部材25を構成するものとしたが、補強部材25はこれに限定されるものではなく、例えば、繊維補強シートや鋼板等の他の補強部材を使用することが可能である。また、外殻25aは鋼管に限定されるものではない。また、充填材25bとして使用する材料も限定されるものではない。さらに、第1の実施の形態では杭頭部の縮径された部分のみを補強部材25により覆うものとしたが、杭頭部の縮径された部分を含めた形で杭21の周縁を覆うものとしてもよい。
In the first embodiment, first, the outer shell 25a is arranged so as to cover the periphery of the reduced diameter portion of the pile head (joint portion 20). Next, the gap formed between the outer shell 25a and the pile 21 is filled with a filler 25b such as mortar or concrete fed from the ground via the liquid feeding pipe P. The outer shell 25a is made of, for example, a steel pipe divided into a plurality of parts, and is formed by combining in an annular shape around the reduced diameter portion of the pile head. The outer shell 25a, in a combined state, has an inner diameter larger than the outer diameter of the reduced pile head and is smaller than the outer diameter of the pile head (pile) before being reduced in diameter. It has an outer diameter.
In the first embodiment, the reinforcing member 25 is constituted by the outer shell 25a and the filler 25b. However, the reinforcing member 25 is not limited to this, and for example, a fiber reinforced sheet or a steel plate. Other reinforcing members such as can be used. Further, the outer shell 25a is not limited to a steel pipe. Moreover, the material used as the filler 25b is not limited. Furthermore, in the first embodiment, only the reduced diameter portion of the pile head is covered with the reinforcing member 25, but the periphery of the pile 21 is covered in a form including the reduced diameter portion of the pile head. It may be a thing.

(4)埋め戻し工程
埋め戻し工程は、図3(d)に示すように、補強工程において、杭頭部(接合部20)の補強が完了した箇所を埋め戻す工程である。埋め戻し工程が完了することで、杭基礎構造の改修方法が完了する。
(4) Backfilling step The backfilling step is a step of backfilling the place where the reinforcement of the pile head (joining portion 20) is completed in the reinforcing step, as shown in FIG. 3 (d). When the backfilling process is completed, the repair method of the pile foundation structure is completed.

以上、第1の実施の形態に係る杭基礎構造の改修方法によれば、剛接合されていた杭頭部を容易かつ安価に半剛接合化することが可能である。そして、杭頭部の半剛接合化により、杭21や基礎梁23に発生する断面力を、許容値を下回るように抑制することが可能となり、杭基礎構造2の耐震性の向上が実現される。
つまり、杭頭部(接合部20)の断面積を縮径することで、杭21とパイルキャップ22との接合部20に隙間を形成し、杭頭部の回転を許容する。これにより杭頭部および基礎梁端部に発生する曲げモーメントを小さくすることが可能となる。
As mentioned above, according to the repair method of the pile foundation structure which concerns on 1st Embodiment, it is possible to semi-rigidly join the pile head which was rigidly joined easily and cheaply. And by making semi-rigid joining of the pile head, it becomes possible to suppress the cross-sectional force generated in the pile 21 and the foundation beam 23 so as to be below the allowable value, and the improvement of the earthquake resistance of the pile foundation structure 2 is realized. The
That is, by reducing the cross-sectional area of the pile head (joint portion 20), a gap is formed in the joint portion 20 between the pile 21 and the pile cap 22, and the pile head is allowed to rotate. As a result, the bending moment generated at the pile head and the end of the foundation beam can be reduced.

また、大掛かりな重機や特殊な施工設備を必要とせず、工期の短縮が可能なため、経済的である。
また、施工に伴う廃棄物は、杭頭部の縮径により発生する少量のコンクリートガラと鉄筋のみなため、環境負荷が小さい。
In addition, it does not require large heavy machinery or special construction equipment, and the construction period can be shortened, which is economical.
Moreover, since the waste accompanying construction is only a small amount of concrete and reinforcing bars generated by the reduced diameter of the pile head, the environmental load is small.

また、改修工事中も、杭基礎構造2としての機能は維持されているため、建物1を継続利用することができる。
また、建て替えによらず、既存の建物1の耐震性を向上させることが可能なため、用途変更や増改築等の自由度が高まる。
Moreover, since the function as the pile foundation structure 2 is maintained also during repair work, the building 1 can be used continuously.
Moreover, since it is possible to improve the earthquake resistance of the existing building 1 regardless of rebuilding, the degree of freedom of application change, extension or reconstruction is increased.

縮径された杭頭部は、補強部材25(外殻25aおよび充填材25b)により補強されているため、回転変形等に伴い作用する杭頭部への圧縮力や地震時のせん断力等に対して保護がなされている。   Since the pile head reduced in diameter is reinforced by the reinforcing member 25 (outer shell 25a and filler 25b), the pile head acting as a result of rotational deformation or the like, the shearing force during an earthquake, etc. Protected against it.

<第2の実施形態>
第2の実施の形態に係る杭基礎構造の改修方法は、第1の実施の形態と同様に、図1に示す杭基礎構造2により支持された既存の建物(構造物)1について、耐震性の向上を図ることを目的として行うものである。
ここで、図4は、第2の実施の形態に係る杭基礎構造の改修方法を示す図であって、(a)は改修前の杭基礎構造を示す縦断面図、(b)は改修前の杭を上方から望む平面図、(c)は改修後の杭基礎構造を示す縦断面図、(d)は改修後の杭を上方から望む平面図である。また、図5の(a)〜(d)は、第2の実施の形態に係る杭基礎構造の改修方法の各工程を示す模式図である。
<Second Embodiment>
As with the first embodiment, the method for repairing a pile foundation structure according to the second embodiment is earthquake resistant with respect to an existing building (structure) 1 supported by the pile foundation structure 2 shown in FIG. The purpose is to improve the above.
Here, FIG. 4 is a figure which shows the repair method of the pile foundation structure which concerns on 2nd Embodiment, (a) is a longitudinal cross-sectional view which shows the pile foundation structure before repair, (b) is before repair. The top view which desires the pile of (2) from above, (c) is a longitudinal cross-sectional view which shows the pile foundation structure after repair, (d) is a top view which desires the pile after repair from the top. Moreover, (a)-(d) of FIG. 5 is a schematic diagram which shows each process of the repair method of the pile foundation structure which concerns on 2nd Embodiment.

第2の実施の形態に係る杭基礎構造の改修方法は、図4(a)および(c)に示すように、杭21とパイルキャップ22の既存の接合部20の断面積を、杭21の断面積よりも縮小させることにより、剛接合されている杭頭部を半剛接合化させるものである。
ここで、第2の実施の形態では、接合部20をテーパ状に形成することにより接合部20の縮径を行い、さらに接合部20直下の杭の周囲に補強部材27を配した点で、接合部(縮径部分)の直径が一定に縮径される第1の実施の形態に係る杭基礎構造の改修方法と異なっている。
As shown in FIGS. 4A and 4C, the pile foundation structure repair method according to the second embodiment uses the cross-sectional area of the existing joint 20 of the pile 21 and the pile cap 22 as shown in FIG. By reducing the cross-sectional area, the pile heads that are rigidly joined are made semi-rigidly joined.
Here, in the second embodiment, the diameter of the joint portion 20 is reduced by forming the joint portion 20 in a tapered shape, and the reinforcing member 27 is arranged around the pile just below the joint portion 20, This is different from the method for repairing the pile foundation structure according to the first embodiment in which the diameter of the joint portion (reduced diameter portion) is uniformly reduced.

なお、杭基礎構造2の各構成は、第1の実施の形態で示した内容と同様のため、詳細な説明は省略する。   In addition, since each structure of the pile foundation structure 2 is the same as the content shown in 1st Embodiment, detailed description is abbreviate | omitted.

第2の実施の形態では、図4(c)および(d)に示すように、パイルキャップ22に剛接合された杭頭部(接合部20)の周縁を削り取ることにより、接合部20にテーパ26を形成する。また、主筋R1を切断することにより、杭基礎構造2の耐震性の向上を図る。これにより、杭21とパイルキャップ22との接合が、半剛接合状態となり、杭頭部20における回転変形が許容されることで、杭頭部および基礎梁端部に作用する曲げモーメントを低減させることが可能となる。   In the second embodiment, as shown in FIGS. 4C and 4D, the joint 20 is tapered by scraping the periphery of the pile head (joint 20) rigidly joined to the pile cap 22. 26 is formed. Further, the main reinforcement R1 is cut to improve the earthquake resistance of the pile foundation structure 2. Thereby, joining with the pile 21 and the pile cap 22 will be in a semi-rigid joining state, and the bending deformation which acts on a pile head and a foundation beam edge part is reduced by the rotational deformation | transformation in the pile head 20 being permitted. It becomes possible.

次に、第2の実施の形態に係る杭基礎構造の改修方法について、図面を参照して説明する。
かかる杭基礎構造の改修方法は、(1)掘削工程と、(2)縮径工程と、(3)補強工程と、(4)埋め戻し工程とを備えている。
Next, the repair method of the pile foundation structure which concerns on 2nd Embodiment is demonstrated with reference to drawings.
Such a method for repairing a pile foundation structure includes (1) an excavation process, (2) a diameter reduction process, (3) a reinforcement process, and (4) a backfilling process.

(1)掘削工程
掘削工程は、図5(a)および(b)に示すように、杭基礎構造2の周囲の地盤Gを掘削することにより、杭21とパイルキャップ22との接合部20を露出させる工程である。
接合部20の周囲の掘削は、バックホウ等の掘削機械Mを利用して行い、必要に応じて、土留め工も行う。なお、第2の実施の形態では、掘削機械Mを利用して掘削を行うものとしたが、人力により掘削を行ってもよい。
(1) Excavation process As shown in FIGS. 5 (a) and 5 (b), the excavation process involves excavating the ground G around the pile foundation structure 2 so that the joint 20 between the pile 21 and the pile cap 22 is formed. It is a step of exposing.
Excavation around the joint 20 is performed using an excavating machine M such as a backhoe, and earth retaining work is also performed as necessary. In the second embodiment, excavation machine M is used for excavation, but excavation may be performed by human power.

(2)縮径工程
縮径工程は、図5(b)に示すように、掘削工程により露出された接合部20について、コンクリートカッタCを利用して接合部20を縮径する工程である。
第2の実施の形態では、杭頭部の周縁を削り取ることにより接合部20の縮径を行う。
(2) Diameter reduction process The diameter reduction process is a process of reducing the diameter of the joint 20 using the concrete cutter C with respect to the joint 20 exposed in the excavation process, as shown in FIG.
In 2nd Embodiment, the diameter of the junction part 20 is reduced by scraping off the periphery of a pile head.

縮径工程では、まず、接合部(杭頭部)20の直下に、支持部材Cを設置する。次に、この支持部材Cに支持されたコンクリートカッタCを杭頭部の周縁に沿って移動させつつ、杭頭部を削ることにより、杭21とパイルキャップ22との接合部(杭頭部)20の断面積を、改修前の杭21の断面積よりも小さくする。
第2の実施の形態では、図4(c)に示すように、杭21の杭頭部を、杭21の上端に行くに従い、杭21の直径が狭まるように取り除いてテーパ26を形成する。また、本実施形態では、杭21の上端面の外周縁が、円を成すように配置された主筋R1の内側に位置するように、杭頭部の縮径を行い、あわせて、主筋R1も切断する。
In the diameter reduction process, first, the support member C <b> 1 is installed directly below the joint (pile head) 20. Then, while the concrete cutter C which is supported by the support member C 1 is moved along the periphery of the pile head, joint by cutting the pile head, the pile 21 and the pile cap 22 (pile head ) Make the cross-sectional area of 20 smaller than the cross-sectional area of the pile 21 before repair.
In 2nd Embodiment, as shown in FIG.4 (c), the taper 26 is formed by removing the pile head of the pile 21 so that the diameter of the pile 21 may become narrow as it goes to the upper end of the pile 21. FIG. Moreover, in this embodiment, the diameter of the pile head is reduced so that the outer peripheral edge of the upper end surface of the pile 21 is positioned inside the main reinforcement R1 arranged to form a circle. Disconnect.

支持部材Cは、コンクリートカッタCを支持し、かつ安定した移動を可能とするための部材であって、複数に分割された鋼管を組み合わせることにより形成されている。本実施形態では、支持部材Cを、その上端面が、杭頭部の縮径の対象となる部分の下端面と一致するように配置することで、支持部材Cを杭頭部の縮径時の定規としての機能も発揮させる。
なお、支持部材Cは鋼管に限定されないことはいうまでもない。
The support member C 1 is a concrete cutter C is supported, and a member for enabling the stable movement, are formed by combining a plurality of divided steel tube. In this embodiment, the support member C 1, its upper end face, by arranging to match the lower end face of the portion to be reduced in diameter of the pile head, the support member C 1 of pile head condensation It also functions as a ruler for diameter.
The support member C 1 is of course not limited to the steel pipe.

(3)補強工程
補強工程は、図4(c)、(d)および図5(c)に示すように、縮径工程において周縁が削り取られることにより形成されたテーパ26の直下の杭21の周囲を補強部材27で覆う工程である。
(3) Reinforcing process As shown in FIGS. 4 (c), 4 (d) and 5 (c), the reinforcing process is performed with the pile 21 directly below the taper 26 formed by scraping the periphery in the diameter reducing process. This is a step of covering the periphery with the reinforcing member 27.

第2の実施の形態では、まず、接合部20(テーパ26)の直下の杭(杭頭部)21の周囲を覆うように外殻27aを配置する。次に、外殻27aと杭頭部との間に形成された隙間に、地上から送液管Pを介して圧送されたモルタルやコンクリート等の充填材27bを充填する。本実施形態では、外殻27aとして、複数に分割された鋼管を使用するものとし、この鋼管を杭頭部21の周囲において円環状に組み合わせることにより構成する。
なお、第2の実施の形態では、外殻27aと充填材27bとにより補強部材27を構成するものとしたが、補強部材27はこれに限定されるものではなく、例えば、繊維補強シートや鋼板等の他の補強部材を使用することが可能である。また、外殻27aは鋼管に限定されない。また、テーパ部26についても補強部材27により補強する構成としてもよい。さらに、補強部材27で支持部材Cを代替させ、支持部材Cを省略することも可能である。
In the second embodiment, first, the outer shell 27a is arranged so as to cover the periphery of the pile (pile head) 21 immediately below the joint portion 20 (taper 26). Next, the gap formed between the outer shell 27a and the pile head is filled with a filler 27b such as mortar or concrete that is pumped from the ground via the liquid feeding pipe P. In the present embodiment, a steel pipe divided into a plurality of parts is used as the outer shell 27 a, and the steel pipe is configured in an annular shape around the pile head 21.
In the second embodiment, the reinforcing member 27 is constituted by the outer shell 27a and the filler 27b. However, the reinforcing member 27 is not limited to this, and for example, a fiber reinforced sheet or a steel plate. Other reinforcing members such as can be used. The outer shell 27a is not limited to a steel pipe. Further, the taper portion 26 may be reinforced by the reinforcing member 27. Further, it is possible to replace the support member C 1 with the reinforcing member 27 and omit the support member C 1 .

(4)埋め戻し工程
埋め戻し工程は、図5(d)に示すように、補強工程において、接合部20の補強が完了した箇所を埋め戻す工程である。埋め戻し工程が完了することで、杭基礎構造の改修方法が完了する。
(4) Backfilling step The backfilling step is a step of backfilling the portion where the reinforcement of the joint portion 20 has been completed in the reinforcing step, as shown in FIG. When the backfilling process is completed, the repair method of the pile foundation structure is completed.

以上、第2の実施の形態に係る杭基礎構造の改修方法によれば、杭頭部にテーパ26が形成されていることで、杭21とパイルキャップ22との接合部20に隙間を形成し、杭頭部の回転を許容する。これにより杭頭部および基礎梁端部に発生する曲げモーメントを小さくすることが可能となる。したがって、剛接合されていた杭頭部を容易かつ安価に半剛接合化することができる。   As mentioned above, according to the repair method of the pile foundation structure which concerns on 2nd Embodiment, the clearance gap is formed in the junction part 20 of the pile 21 and the pile cap 22 by the taper 26 being formed in the pile head. , Allow the pile head to rotate. As a result, the bending moment generated at the pile head and the end of the foundation beam can be reduced. Therefore, the pile heads that have been rigidly joined can be made semi-rigidly easily and inexpensively.

また、杭21には、接合部20の直下に対して補強部材27により補強しているため、回転変形等に伴い杭21に圧縮力やせん断力が作用した場合でも、杭21における破損が防止される。   Further, since the pile 21 is reinforced by the reinforcing member 27 directly below the joint portion 20, even when a compressive force or a shearing force is applied to the pile 21 due to rotational deformation or the like, damage to the pile 21 is prevented. Is done.

この他の第2の実施の形態に係る杭基礎構造の改修方法による作用効果は、第1の実施の形態で示した内容と同様なため、詳細な説明は省略する。   Since the effect by the repair method of the pile foundation structure which concerns on this other 2nd Embodiment is the same as the content shown in 1st Embodiment, detailed description is abbreviate | omitted.

次に、本発明の杭基礎構造の改修方法による作用効果を検証した結果を示す。
ここで、図6は、構造物に横方向の荷重が作用した際の応力状態を示す模式図であって、(a)は従来の杭基礎構造を備える構造物、(b)は本発明の杭基礎構造の改修方法により改修された杭基礎構造を備える構造物を示している。また、図7は、図6に示す構造物の杭基礎構造を示す図であって、(a)は従来の杭基礎構造の接合部の拡大図、(b)は本発明の杭基礎構造の改修方法により改修された杭基礎構造の接合部の拡大図、(c)は(a)および(b)に示す接合部の曲げモーメントと回転変形との関係を示すグラフである。
Next, the result of having verified the effect by the repair method of the pile foundation structure of this invention is shown.
Here, FIG. 6 is a schematic diagram showing a stress state when a lateral load is applied to the structure, where (a) is a structure having a conventional pile foundation structure, and (b) is the present invention. The structure provided with the pile foundation structure repaired by the pile foundation structure repair method is shown. Moreover, FIG. 7 is a figure which shows the pile foundation structure of the structure shown in FIG. 6, Comprising: (a) is an enlarged view of the junction part of the conventional pile foundation structure, (b) is the pile foundation structure of this invention. The enlarged view of the junction part of the pile foundation structure renovated by the repair method, (c) is a graph which shows the relationship between the bending moment and rotational deformation of the junction part shown to (a) and (b).

図6(a)および(b)に示すように、建物(構造物)1に地震等による大きな横方向の荷重Yが作用すると、接合部20’と杭21に応力が作用する。   As shown in FIGS. 6A and 6B, when a large lateral load Y due to an earthquake or the like acts on the building (structure) 1, stress acts on the joint 20 ′ and the pile 21.

図6(a)に示すように、杭21がパイルキャップ22に剛接合された杭基礎構造2’において杭21に作用する応力Mは、杭21の上端の接合部20’で最大となっている。また、接合部20’では、大きな基礎梁端部の曲げモーメントM3が作用している。   As shown in FIG. 6 (a), the stress M acting on the pile 21 in the pile foundation structure 2 ′ in which the pile 21 is rigidly joined to the pile cap 22 becomes maximum at the joint 20 ′ at the upper end of the pile 21. Yes. In addition, a large bending moment M3 at the end of the foundation beam acts on the joint 20 '.

一方、半剛接合による基礎構造2を備える建物1は、図6(b)に示すように、杭21の上端に作用する応力M1が、改修前の杭基礎構造(図6(a)参照)と比較して、7割程度に低減されていることで、杭21の中間部に作用する応力M2と同程度である。また、接合部20に作用する基礎梁端部の曲げモーメントM3も、剛接合された杭基礎構造(図6(a)参照)と比較して7割程度に小さくなっている。   On the other hand, in the building 1 including the foundation structure 2 by semi-rigid joining, as shown in FIG. 6 (b), the stress M1 acting on the upper end of the pile 21 is the pile foundation structure before repair (see FIG. 6 (a)). In comparison with the stress M2 acting on the intermediate portion of the pile 21 by being reduced to about 70%. Further, the bending moment M3 of the end portion of the foundation beam acting on the joint portion 20 is also reduced to about 70% compared to the rigidly joined pile foundation structure (see FIG. 6A).

図7(a)および(c)に示すように、杭21とパイルキャップ22が剛接合された杭基礎構造2’の接合部20’は、曲げモーメントMaによる回転変形θの抵抗が大きい。そのため、図7(c)に示すように、曲げモーメントMaが急激に上昇した後、杭頭部に破損が生じてしまう。   As shown in FIGS. 7A and 7C, the joint 20 ′ of the pile foundation structure 2 ′ in which the pile 21 and the pile cap 22 are rigidly joined has a large resistance to rotational deformation θ due to the bending moment Ma. Therefore, as shown in FIG.7 (c), after the bending moment Ma raises rapidly, a pile head will be damaged.

一方、半剛接合による杭基礎構造2は、図7(b)および(c)に示すように、回転変形θが許容されているため、接合部20における曲げモーメントMbを抑制することが可能となり、極端に曲げモーメントMbが上昇することがない。そのため、接合部20の破損を防止することが可能となり、杭基礎構造2の耐震性の向上が図れる。   On the other hand, as shown in FIGS. 7B and 7C, the pile foundation structure 2 by semi-rigid bonding is allowed to be rotationally deformed θ, so that the bending moment Mb at the joint 20 can be suppressed. The bending moment Mb does not increase extremely. Therefore, it becomes possible to prevent the joint 20 from being damaged, and the earthquake resistance of the pile foundation structure 2 can be improved.

以上、本発明について、好適な実施形態について説明したが、本発明は前記の実施形態に限られず、本発明の趣旨を逸脱しない範囲で適宜設計変更が可能である。
例えば、前記各実施形態では、支持杭により構成された杭基礎構造について、改修工事を行う場合について説明したが、杭の形式は限定されるものではなく、例えば摩擦杭であってもよい。
As mentioned above, although preferred embodiment was described about this invention, this invention is not limited to the said embodiment, A design change is possible suitably in the range which does not deviate from the meaning of this invention.
For example, in each said embodiment, although the case where repair work was performed about the pile foundation structure comprised by the support pile was demonstrated, the form of a pile is not limited, For example, a friction pile may be sufficient.

また、前記各実施形態では、杭頭部を縮径する場合について説明したが、パイルキャップ(基礎部材)を削ることにより、杭とパイルキャップとの接合部を縮径してもよい。   Moreover, although the said each embodiment demonstrated the case where a pile head diameter was reduced, you may reduce the diameter of the junction part of a pile and a pile cap by shaving a pile cap (foundation member).

また、前記各実施形態では、接合部を縮径するものとしたが、杭頭(接合部)を取り除くことで、杭と基礎部材とを分離し、分離された杭と基礎部材との間に杭の断面積よりも小さい面積を有する接合部材を配置することで、剛接合されている杭頭部を半剛接合化させてもよい。
かかる杭基礎構造の改修方法は、既存の構造物の杭基礎構造を構成する杭と基礎部材との接合部を露出させる掘削工程と、前記基礎部材を仮支承する仮支承工程と、露出された接合部を取り除くことで杭と基礎部材とを分離する分離工程と、分離された杭と基礎部材との間に該杭の断面積よりも小さい面積を有する接合部材を配置する接合工程とを備えている。
Moreover, in each said embodiment, although the joint part shall be reduced in diameter, a pile and a foundation member are isolate | separated by removing a pile head (joint part), and between the separated pile and a foundation member. By placing a joining member having an area smaller than the cross-sectional area of the pile, the pile heads that are rigidly joined may be semi-rigidly joined.
Such a method for rehabilitating a pile foundation structure includes an excavation process for exposing a joint portion between a pile and a foundation member constituting a pile foundation structure of an existing structure, a temporary support process for temporarily supporting the foundation member, A separation step of separating the pile and the foundation member by removing the joint portion, and a joining step of arranging a joining member having an area smaller than the cross-sectional area of the pile between the separated pile and the foundation member. ing.

また、前記各実施形態では、杭がパイルキャップに接合されている場合について説明したが、例えば、杭が基礎スラブ、フーチング、基礎梁などに接合されていてもよく、杭と接合される基礎部材はパイルキャップに限定されるものではない。
また、建物の基礎形式は、前記各実施形態に示したものに限定されるものではなく、例えば、パイルドラフト形式などであってもよい。
Moreover, in each said embodiment, although the case where the pile was joined to the pile cap was demonstrated, for example, the pile may be joined to a foundation slab, a footing, a foundation beam, etc., and the foundation member joined to a pile Is not limited to pile caps.
Moreover, the basic form of a building is not limited to what was shown to each said embodiment, For example, a piled raft form etc. may be sufficient.

前記各実施形態では、補強部材を設置するものとしたが、杭頭部の強度が十分に確保されていれば、補強部材は省略してもよい。
また、杭頭部の回転変形が可能であれば、主筋は切断しなくてもよい。
In each said embodiment, although the reinforcement member shall be installed, if the intensity | strength of a pile head is fully ensured, you may abbreviate | omit a reinforcement member.
Moreover, if the pile head can be rotationally deformed, the main bars need not be cut.

また、前記第1の実施の形態では、杭径よりも小さい外径を有する補強部材により、縮径された接合部の周囲を覆うことでコンクリートが取り除かれた部分を補強する構成としたが、コンクリートが取り除かれた部分にモルタルやコンクリート等を充填することで補強してもよい。
つまり、既存の建物が建っている状態で、杭と基礎部材との接合部を露出させた後、接合部の近傍のコンクリートを取り除くとともに杭と基礎部材との間に跨って配設された鉄筋を切断し、このコンクリートが取り除かれた部分に、モルタルやコンクリート等の充填材を充填することで、基礎部材と剛接合されていた杭頭部を半剛接合化させてもよい。
In the first embodiment, the reinforcing member having an outer diameter smaller than the pile diameter is used to reinforce the portion from which the concrete has been removed by covering the periphery of the reduced diameter joint portion. You may reinforce by filling the part from which concrete was removed with mortar, concrete, etc.
In other words, after the joint between the pile and the foundation member is exposed in the state where the existing building is built, the concrete in the vicinity of the joint is removed and the reinforcing bars arranged between the pile and the foundation member The pile head that has been rigidly joined to the foundation member may be made semi-rigidly joined by filling the portion from which the concrete has been removed with a filler such as mortar or concrete.

かかる杭基礎構造の改修方法によれば、接合部に配筋された鉄筋が切断されることで、杭頭部の固定度が低下し、回転剛性を小さくなるため、杭と基礎部材との接合状態を、剛接合とピン接合との間の状態にすることが可能となる。また、接合部のコンクリートが除去された部分には、充填材が充填されるため、軸力に対しては、既存の杭基礎構造と同等の耐力を発現する。
さらに、充填材が充填された接合部の外周囲を外殻で覆うことで、さらなる補強を行ってもよい。
According to such a method for rehabilitating a pile foundation, since the reinforcing bars arranged at the joint are cut, the fixing degree of the pile head is lowered and the rotational rigidity is reduced. It becomes possible to change the state between a rigid joint and a pin joint. Moreover, since the part from which the concrete of the joint part was removed is filled with the filler, the same proof stress as that of the existing pile foundation structure is expressed with respect to the axial force.
Furthermore, you may perform the further reinforcement | strengthening by covering the outer periphery of the junction part with which the filler was filled with the outer shell.

また、前記各実施形態では、接合部を縮径するものとしたが、杭頭(接合部)を取り除くことで、杭と基礎部材とを分離し、取り除かれた部分にモルタルやコンクリート等の充填材を充填することで、接合部の断面積を維持したまま、杭と基礎部材との間に跨って配設された鉄筋を切断し、杭基礎構造に剛接合されている杭頭部を半剛接合化させてもよい。
かかる杭基礎構造の改修方法は、既存の構造物の杭基礎構造を構成する杭と基礎部材との接合部を露出させる掘削工程と、前記基礎部材を仮支承する仮支承工程と、露出された接合部を取り除くことで杭と基礎部材とを分離する分離工程と、分離された杭と基礎部材との間に充填材を充填する充填工程とを備えている。
さらに、充填材が充填された接合部の外周囲を補強部材で覆う工程を含んでいてもよい。
In each of the above embodiments, the diameter of the joint is reduced. However, by removing the pile head (joint), the pile and the base member are separated, and the removed portion is filled with mortar, concrete, or the like. By filling the material, the reinforcing bars arranged between the pile and the foundation member are cut while maintaining the cross-sectional area of the joint, and the pile head rigidly joined to the pile foundation structure is cut in half. It may be rigidly joined.
Such a method for rehabilitating a pile foundation structure includes an excavation process for exposing a joint portion between a pile and a foundation member constituting a pile foundation structure of an existing structure, a temporary support process for temporarily supporting the foundation member, A separation step of separating the pile and the foundation member by removing the joint portion and a filling step of filling a filler between the separated pile and the foundation member are provided.
Furthermore, the process of covering the outer periphery of the junction part with which the filler was filled with a reinforcement member may be included.

本発明の好適な実施の形態に係る構造物の概要を示す立面図である。It is an elevation view which shows the outline | summary of the structure based on suitable embodiment of this invention. 第1の実施の形態に係る杭基礎構造の改修方法を示す図であって、(a)は改修前の杭基礎構造を示す縦断面図、(b)は改修前の杭を上方から望む平面図、(c)は改修後の杭基礎構造を示す縦断面図、(d)は改修後の杭を上方から望む平面図である。It is a figure which shows the repair method of the pile foundation structure which concerns on 1st Embodiment, Comprising: (a) is a longitudinal cross-sectional view which shows the pile foundation structure before repair, (b) is a plane which wants the pile before repair from upper direction (C) is a longitudinal sectional view showing a pile foundation structure after repair, and (d) is a plan view of the pile after repair viewed from above. (a)〜(d)は、第1の実施の形態に係る杭基礎構造の改修方法の各工程を示す模式図である。(A)-(d) is a schematic diagram which shows each process of the repair method of the pile foundation structure which concerns on 1st Embodiment. 第2の実施の形態に係る杭基礎構造の改修方法を示す図であって、(a)は改修前の杭基礎構造を示す縦断面図、(b)は改修前の杭を上方から望む平面図、(c)は改修後の杭基礎構造を示す縦断面図、(d)は改修後の杭を上方から望む平面図である。It is a figure which shows the repair method of the pile foundation structure which concerns on 2nd Embodiment, Comprising: (a) is a longitudinal cross-sectional view which shows the pile foundation structure before repair, (b) is a plane which wants the pile before repair from upper direction (C) is a longitudinal sectional view showing a pile foundation structure after repair, and (d) is a plan view of the pile after repair viewed from above. (a)〜(d)は、第2の実施の形態に係る杭基礎構造の改修方法の各工程を示す模式図である。(A)-(d) is a schematic diagram which shows each process of the repair method of the pile foundation structure which concerns on 2nd Embodiment. 構造物に横方向の荷重が作用した際の応力状態を示す模式図であって、(a)は従来の杭基礎構造を備える構造物、(b)は本発明の杭基礎構造の改修方法により改修された杭基礎構造を備える構造物を示している。It is a schematic diagram which shows the stress state at the time of the load of a horizontal direction acting on a structure, (a) is a structure provided with the conventional pile foundation structure, (b) is the repair method of the pile foundation structure of this invention. A structure with a modified pile foundation structure is shown. 図6に示す構造物の杭基礎構造を示す図であって、(a)は従来の杭基礎構造の接合部の拡大図、(b)は本発明の杭基礎構造の改修方法により改修された杭基礎構造の接合部の拡大図、(c)は(a)および(b)に示す接合部の曲げモーメントと回転変形との関係を示すグラフである。It is a figure which shows the pile foundation structure of the structure shown in FIG. 6, Comprising: (a) is an enlarged view of the junction part of the conventional pile foundation structure, (b) was renovated by the repair method of the pile foundation structure of this invention. The enlarged view of the junction part of a pile foundation structure, (c) is a graph which shows the relationship between the bending moment and rotational deformation of the junction part shown to (a) and (b).

符号の説明Explanation of symbols

1 建物(構造物)
2 杭基礎構造
20 接合部
21 杭
22 パイルキャップ(基礎部材)
23 基礎梁
25 補強部材
1 Building (structure)
2 Pile foundation structure 20 Joint 21 Pile 22 Pile cap (foundation member)
23 Foundation beam 25 Reinforcement member

Claims (3)

既存の構造物が建っている状態で杭基礎構造を構成する杭と基礎部材との接合部を露出させる工程と、
露出させた前記接合部の近傍のコンクリートを取り除く工程と、を備える杭基礎構造の改修方法であって、
記杭頭部の周縁のコンクリートを前記杭の上端に行くに従い当該杭の直径が狭まるように取り除くことで、前記接合部の断面積を縮小させて、前記接合部に隙間を形成し、前記基礎部材と剛接合されていた該杭頭部を半剛接合化させることを特徴とする、杭基礎構造の改修方法。
A step of exposing a joint between a pile and a foundation member constituting the pile foundation structure in a state where an existing structure is built; and
Removing the concrete in the vicinity of the exposed joint, and a method for repairing a pile foundation structure comprising:
Before by removing as the diameter of the pile is narrowed as it goes to the peripheral edge of the concrete Kikui head to the upper end of the pile, by reducing the cross-sectional area of the joint, a gap is formed the joint, the A method for repairing a pile foundation structure , characterized in that the pile head that has been rigidly joined to the foundation member is semi-rigidly joined.
前記接合部の周縁において前記杭と前記基礎部材との間に跨って配設された鉄筋を切断することを特徴とする、請求項1に記載の杭基礎構造の改修方法。 The method of repairing a pile foundation structure according to claim 1, wherein a reinforcing bar disposed between the pile and the foundation member is cut at a peripheral edge of the joint portion. 断面積が縮小された前記接合部の直下の杭の周囲を補強部材で覆う工程を含むことを特徴とする、請求項1または請求項2に記載の杭基礎構造の改修方法。 The method for repairing a pile foundation structure according to claim 1 or 2 , further comprising a step of covering the periphery of the pile immediately below the joint with a reduced cross-sectional area with a reinforcing member.
JP2007178913A 2007-07-06 2007-07-06 Rehabilitation method of pile foundation structure Expired - Fee Related JP5054449B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007178913A JP5054449B2 (en) 2007-07-06 2007-07-06 Rehabilitation method of pile foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007178913A JP5054449B2 (en) 2007-07-06 2007-07-06 Rehabilitation method of pile foundation structure

Publications (2)

Publication Number Publication Date
JP2009013720A JP2009013720A (en) 2009-01-22
JP5054449B2 true JP5054449B2 (en) 2012-10-24

Family

ID=40354943

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007178913A Expired - Fee Related JP5054449B2 (en) 2007-07-06 2007-07-06 Rehabilitation method of pile foundation structure

Country Status (1)

Country Link
JP (1) JP5054449B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7013800B2 (en) * 2017-11-08 2022-02-01 株式会社大林組 Dismantling method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09170338A (en) * 1995-12-21 1997-06-30 Taisei Corp Base isolation method for existing building
JP3290887B2 (en) * 1996-05-17 2002-06-10 飛島建設株式会社 Seismic isolation method for existing building with pile foundation
JP3222114B2 (en) * 1999-04-02 2001-10-22 東海興業株式会社 Plastic hinge method for pile head
JP3661997B2 (en) * 2001-02-22 2005-06-22 大成建設株式会社 Support structure for structure foundation
JP3741426B2 (en) * 2002-02-28 2006-02-01 株式会社ダイナミックデザイン Pile head and structure joining apparatus and installation method thereof
JP2005344388A (en) * 2004-06-03 2005-12-15 Shimizu Corp Pile head connection structure
JP4468102B2 (en) * 2004-08-03 2010-05-26 大成建設株式会社 Pile head support structure
JP2007315136A (en) * 2006-05-29 2007-12-06 Taisei Corp Foundation structure using existing pile and new pile

Also Published As

Publication number Publication date
JP2009013720A (en) 2009-01-22

Similar Documents

Publication Publication Date Title
JP5308116B2 (en) How to build a tunnel
JP4912030B2 (en) Junction structure between pier and pile
JP5054449B2 (en) Rehabilitation method of pile foundation structure
JP4882492B2 (en) Steel pipe pile structure and its construction method
JP5457276B2 (en) Underground pillar construction
CN106812359A (en) A kind of assembled underground garage and its method of construction
KR102076969B1 (en) Top-down construction method for concrete building structure using steel pile underground wall and shear support plate
JP2004197373A (en) Earthquake resistant reinforcement method of existing concrete container structure and earthquake resistant reinforcement structure
JP4830589B2 (en) Core material, soil cement wall, soil cement wall pile, method of building soil cement wall
JP4649283B2 (en) Columnar structure, pier or foundation pile using shape steel, and manufacturing method thereof
JP4675226B2 (en) Method for joining concrete piles
JP4466418B2 (en) Soil cement wall pile, soil cement structure
JP2011063957A (en) Method for removing upper portion of pile
JP3899307B2 (en) Cast-in-place concrete filled steel pipe pile and method for constructing cast-in-place concrete filled steel pipe pile
JP2007051500A (en) Joint structure of column and pile
JP4209314B2 (en) Pile head joint structure and pile body construction method
KR101762207B1 (en) The speed up construction method using hemispherical joint
JP4286737B2 (en) Construction method of pier
JP4647396B2 (en) Bending strength strengthening method for upper end of foundation pile or upper and lower ends of pillar of existing structure
JP2020111905A (en) Pile head joining structure and construction method therefor
JP6865009B2 (en) Building foundation construction method and building foundation structure
JP4500221B2 (en) Construction method of underground structure
JP2001254355A (en) Head-reamed pile hole for cast-in-place pile and its construction method
JP4343078B2 (en) Underground structure and method for constructing underground structure
JP4319231B2 (en) Approach caisson and method for constructing tunnel approach section composed of caisson

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20111024

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120313

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120509

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120717

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120727

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20180803

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees