JP5026936B2 - Derrick for steel tower assembly / disassembly and removal method - Google Patents

Derrick for steel tower assembly / disassembly and removal method Download PDF

Info

Publication number
JP5026936B2
JP5026936B2 JP2007310766A JP2007310766A JP5026936B2 JP 5026936 B2 JP5026936 B2 JP 5026936B2 JP 2007310766 A JP2007310766 A JP 2007310766A JP 2007310766 A JP2007310766 A JP 2007310766A JP 5026936 B2 JP5026936 B2 JP 5026936B2
Authority
JP
Japan
Prior art keywords
mast
boom
steel tower
end portion
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007310766A
Other languages
Japanese (ja)
Other versions
JP2009133139A (en
Inventor
哲世 浅見
修三 清水
吉田  敬
信男 岡村
勝 野々原
伯晃 川崎
達也 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanwa Tekki Corp
Original Assignee
Sanwa Tekki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanwa Tekki Corp filed Critical Sanwa Tekki Corp
Priority to JP2007310766A priority Critical patent/JP5026936B2/en
Publication of JP2009133139A publication Critical patent/JP2009133139A/en
Application granted granted Critical
Publication of JP5026936B2 publication Critical patent/JP5026936B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

この発明は、鉄塔の組立(解体)に用いるための鉄塔組立・解体用デリック及びその撤去方法に関するものである。   The present invention relates to a steel tower assembly / disassembly derrick for use in steel tower assembly (disassembly) and a method for removing the same.

鉄塔の組立・解体装置及び方法が特許文献1に開示されている。この装置は、台棒を鉄塔に取り付け、組立後に取り外し、順次台棒を鉄塔の上方に移動させていくものである。しかし、特許文献1の装置では、台棒の鉄塔に対する取り付けと取り外しが面倒であり、作業を迅速に行うことが困難である。   An apparatus and method for assembling / disassembling a steel tower is disclosed in Patent Document 1. This apparatus attaches a pedestal to a steel tower, removes it after assembly, and sequentially moves the pedestal above the steel tower. However, in the apparatus of Patent Document 1, it is troublesome to attach and remove the pedestal to the steel tower, and it is difficult to perform the operation quickly.

特開2005−68864号公報JP 2005-68864 A

この発明は、上記従来技術を考慮したものであって、鉄塔の組立作業において、迅速な組立ができ、迅速な撤去を行うことができる鉄塔組立・解体用デリック及びその撤去方法の提供を目的とするものである。   The present invention takes the above-mentioned prior art into consideration, and an object thereof is to provide a steel tower assembly / disassembly derrick that can be quickly assembled and quickly removed in a steel tower assembly operation, and a method for removing the same. To do.

前記目的を達成するため、請求項1の発明では、円筒状のマストと、一方の端部が前記マストに対して周方向に回転可能に取り付けられた棒状のブームと、前記マストの外側を挿通可能なリング状のマストガイドと、前記マストの下端に備わり、前記マストの外周側に連続して突出するマスト基台とを有し、前記ブームは前記マストに対して旋回部材を介して取り付けられ、前記マストは前記旋回部材の位置で切断され、上側のマストは、前記旋回部材とともに回転可能であり、前記ブームの先端には吊上げワイヤーロープを介してフックが備わり、当該吊上げワイヤーロープは、前記旋回部材の上側に備わるガイドローラを通って前記マスト内に通され、前記マストの下側から前記吊上げワイヤーロープを操作することにより、前記フックが上下移動可能であり、前記ブーム先端近傍には起伏ワイヤの一方の端部が取り付けられ、当該起伏ワイヤは前記マスト上端に備わる起伏ワイヤ用滑車を通り、前記起伏ワイヤの他方の端部は前記マストに対して周方向に回転可能に固定され、前記ブームは、前記起伏ワイヤの長さ調節をすることにより、前記ブームの前記マストに対する固定端部を支点にして回動可能であり、前記マストガイド及び前記マスト基台には、鉄塔の主材に固定するための固定ロープが連結され、前記マスト基台には、前記鉄塔の主材に固定され、巻き上げ可能な揚重工具が連結され、前記マストガイドは2個備わることを特徴とする鉄塔組立・解体用デリックを提供する。   In order to achieve the above object, according to the first aspect of the present invention, a cylindrical mast, a rod-like boom having one end rotatably attached to the mast in the circumferential direction, and the outside of the mast are inserted. A ring-shaped mast guide that is possible, and a mast base that is provided at the lower end of the mast and continuously protrudes from the outer peripheral side of the mast, and the boom is attached to the mast via a turning member. The mast is cut at the position of the swivel member, the upper mast is rotatable together with the swivel member, and the boom tip is provided with a hook via a lifting wire rope, and the lifting wire rope is The hook is passed through the guide roller provided on the upper side of the swivel member and is passed into the mast, and the lifting wire rope is operated from the lower side of the mast. It is movable up and down, and one end portion of the undulation wire is attached in the vicinity of the boom tip. The undulation wire passes through the undulation wire pulley provided at the upper end of the mast, and the other end portion of the undulation wire is the mast wire. The boom can be rotated about a fixed end portion of the boom with respect to the mast by adjusting the length of the hoisting wire, and the mast guide can be rotated. The mast base is connected to a fixing rope for fixing to the main material of the tower, and the mast base is connected to a lifting tool fixed to the main material of the tower and capable of being rolled up, A derrick for steel tower assembly and dismantling is provided, characterized by two mast guides.

また、請求項2の発明では、前記ブームは、段差部を有する2枚の板材を対称にして重ねて形成され、前記ブームの幅広側の端部である基端部で前記旋回部材を挟持して固定され、前記段差部と前記基端部との間は、前記ブームの固定位置と前記マストの上端との間の長さと略同一であることを特徴としている。   According to a second aspect of the present invention, the boom is formed by symmetrically stacking two plate members having stepped portions, and the pivot member is sandwiched by a base end portion that is an end portion on the wide side of the boom. The length between the step portion and the base end portion is substantially the same as the length between the boom fixing position and the upper end of the mast.

さらに、請求項3の発明では、鉄塔の頂部略中央に撤去用滑車を設置し、前記ブームを最大限上側に回動させ、当該撤去用滑車に前記吊上げワイヤーロープを通し、前記固定ロープ及び前記揚重工具が前記主材から取り外された状態で、前記吊上げワイヤーロープを前記マストの下側から繰り出し、前記マストを前記鉄塔の下方に降下させることを特徴とする請求項1又は2に記載の鉄塔組立・解体用デリックを用いた鉄塔組立・解体用デリックの撤去方法を提供する。   Furthermore, in the invention of claim 3, a removal pulley is installed at the approximate center of the top of the steel tower, the boom is rotated to the maximum upper side, the lifting wire rope is passed through the removal pulley, the fixed rope and the The lifting tool is unwound from the main material, and the lifting wire rope is unwound from the lower side of the mast to lower the mast below the tower. A method for removing a derrick for steel tower assembly / disassembly using the derrick for steel tower assembly / disassembly is provided.

請求項1の発明によれば、固定ロープでマストガイド及びマスト基台を鉄塔の主材に固定できるので、マストを鉄塔内の空中でその軸がぶれることなく確実にこれを保持することができる。したがって、マスト上側のブームを操作して鉄塔を組み立てる際に、安全に作業することができる。ある程度鉄塔を組み立てた後、マストガイド又はマスト基台のうち、いずれかひとつの固定ロープを外してこれを上方に移動させ、これを順次行う過程において、マスト基台を上昇させたときに、マスト全体が上方に移動する。このとき、マストガイドが2個備わるため、マストは必ずマストガイドにより鉄塔に固定保持されるため、マストを安定して保持した状態で、マストを鉄塔上方に移動させることができる。また、マストガイドを上昇させるときも、マストは他方のマストガイド及びマスト基台で安定して鉄塔に保持される。   According to the invention of claim 1, since the mast guide and the mast base can be fixed to the main material of the steel tower with the fixed rope, the mast can be securely held in the air in the steel tower without the shaft being shaken. . Therefore, it is possible to work safely when assembling the steel tower by operating the boom on the upper side of the mast. After assembling the steel tower to some extent, remove one of the mast guide or mast base and move it upward. The whole moves upward. At this time, since the two mast guides are provided, the mast is always fixed and held on the steel tower by the mast guide. Therefore, the mast can be moved upward while the mast is stably held. Also, when raising the mast guide, the mast is stably held on the steel tower by the other mast guide and mast base.

また、ブームのマストに対する固定端が、旋回部材を介してマストの周方向に対して回転可能に取り付けられる。また、マストは旋回部材の位置で切断され、上側のマストが旋回部材とともに回転する。さらに、吊上げワイヤーロープがガイドローラを通ってマスト内を通る。このガイドローラは、旋回部材よりも上側に備わるため、上側マストに設けられる。このため、ブームをマストの周方向に回転させても、吊上げワイヤーロープがねじれて引っかかることがなく、スムーズな回転動作をすることができる。また、吊上げワイヤーロープをマスト内に挿通するため、マストの下側から吊上げワイヤーロープを出し入れすることにより、ブーム先端のフックの昇降操作を行うことができる。したがって、吊上げワイヤーロープをマスト下側のウインチ等に接続してこれを行うことができ、作業が容易になり作業性が向上する。   Moreover, the fixed end with respect to the mast of a boom is attached rotatably with respect to the circumferential direction of a mast via a turning member. The mast is cut at the position of the turning member, and the upper mast rotates together with the turning member. Further, the lifting wire rope passes through the guide roller and the mast. The guide roller is provided on the upper mast because it is provided above the revolving member. For this reason, even if the boom is rotated in the circumferential direction of the mast, the lifting wire rope is not twisted and caught, and a smooth rotating operation can be performed. Moreover, since the lifting wire rope is inserted into the mast, the lifting operation of the hook at the tip of the boom can be performed by inserting and removing the lifting wire rope from the lower side of the mast. Therefore, this can be done by connecting the lifting wire rope to the winch or the like on the lower side of the mast, which facilitates the work and improves the workability.

また、起伏ワイヤの一方の端部がブームの先端近傍に取り付けられ、他方の端部がマストに回転可能に取り付けられる。このため、鉄塔組立の際に、ブームを回転させても、これに追従して起伏ワイヤの他方の端部が回転する。これにより、起伏ワイヤがマストに巻きつくことを防止し、効率よく迅速に鉄塔組立作業をすることができる。   Also, one end of the undulation wire is attached near the tip of the boom, and the other end is attached to the mast so as to be rotatable. For this reason, even when the boom is rotated during the steel tower assembly, the other end of the undulation wire rotates following this. Thereby, it is possible to prevent the undulating wire from being wound around the mast, and to efficiently and quickly perform the steel tower assembly work.

請求項2の発明によれば、段差部と基端部との間が、マストに対するブームの固定位置とマストの上端との間の長さと略同一であるため、起伏ワイヤを操作してブームを起こしたときに、板材の間の幅広の空間内にマストを収めることができる。したがって、最大までブームを起伏させたときにブームとマストを略一直線上に形成することができ、デリック全体としての重心の位置を揃えることができる。したがって、この状態でデリック全体を吊ったときの安定性が向上し、取扱い性が向上する。   According to the second aspect of the present invention, the distance between the stepped portion and the base end portion is substantially the same as the length between the boom fixing position with respect to the mast and the upper end of the mast. When woken up, the mast can be stored in a wide space between the plates. Therefore, when the boom is raised and lowered to the maximum, the boom and the mast can be formed in a substantially straight line, and the position of the center of gravity as the whole derrick can be aligned. Therefore, stability when the whole derrick is suspended in this state is improved, and handling is improved.

請求項3によれば、ブームを最大限上側に回動、すなわち最大起伏させた状態で、マストの鉄塔に対する固定を解除して、撤去用滑車に通された吊上げワイヤーロープをマストの下側から繰り出すことにより、マストが鉄塔内で下降する。したがって、鉄塔の下側からの操作が可能となり、簡易迅速な作業が実現できる。また、下降には吊り下げ用ワイヤを利用するため、撤去用のワイヤを別に用意することが不要となり、撤去のための部品点数が減少し、取扱い性が向上する。   According to claim 3, in a state where the boom is pivoted up to the maximum, that is, in the maximum undulation state, the fixing of the mast to the steel tower is released, and the lifting wire rope passed through the removal pulley is moved from the lower side of the mast. By feeding out, the mast descends in the steel tower. Therefore, an operation from the lower side of the steel tower is possible, and simple and quick work can be realized. In addition, since a hanging wire is used for lowering, it is not necessary to prepare a separate wire for removal, the number of parts for removal is reduced, and handling is improved.

この発明は、鉄塔の組立作業において、迅速な組立ができ、迅速な撤去を行うことができる鉄塔組立・解体用デリック及びその撤去方法である。   The present invention is a steel tower assembly / disassembly derrick that can be quickly assembled in a steel tower assembly operation, and a method for removing the same.

図1はこの発明に係る鉄塔組立・解体用デリックの概略図である。   FIG. 1 is a schematic view of a derrick for steel tower assembly / disassembly according to the present invention.

図示したように、この発明に係る鉄塔組立・解体用デリック1は、マスト2と、ブーム3と、マストガイド4,5と、マスト基台6で構成される。マスト2は、円筒形状であり、上端と下端は連通している。ブーム3は、棒状であり、一方の端部である基端部3aにおいて、マスト2に取り付けられる。マストガイド4,5はリング状であり、マストを挿通して設けられる。マスト基台6は、マスト2の下端に備わり、マスト2の外周側に連続して突出して形成される。マスト基台6の外形は、マストガイド4,5と略同様の形状である。   As illustrated, a derrick 1 for assembling and dismantling a steel tower according to the present invention includes a mast 2, a boom 3, mast guides 4 and 5, and a mast base 6. The mast 2 has a cylindrical shape, and the upper end and the lower end communicate with each other. The boom 3 has a rod shape and is attached to the mast 2 at a base end portion 3a which is one end portion. The mast guides 4 and 5 are ring-shaped and are provided through the mast. The mast base 6 is provided at the lower end of the mast 2 and is formed so as to continuously protrude from the outer peripheral side of the mast 2. The outer shape of the mast base 6 is substantially the same as the mast guides 4 and 5.

ブーム3は、その基端部3aにおいて、マスト2に対して旋回部材14を介して周方向に回転可能に取り付けられる。マスト2は、この旋回部材14の位置で上側マスト2a及び下側マスト2bに切断される。上側マスト2aは、旋回部材14に固定される。ブーム3を回転させるときは、ブーム3の先端から垂れ下がった操作ロープ10を操作することにより行われる。ブーム3の回転とともに、旋回部材14及び上側マスト2aが回転する。   The boom 3 is attached to the mast 2 so as to be rotatable in the circumferential direction with respect to the mast 2 at the base end portion 3a. The mast 2 is cut into an upper mast 2a and a lower mast 2b at the position of the turning member 14. The upper mast 2 a is fixed to the turning member 14. When the boom 3 is rotated, the operation rope 10 hanging from the tip of the boom 3 is operated. As the boom 3 rotates, the turning member 14 and the upper mast 2a rotate.

ブーム3の先端には、フック7が備わり、このフック7は、吊上げワイヤーロープ8でブーム3の先端から吊られている。吊上げワイヤーロープ8は、旋回部材14の上側、すなわち上側マスト2aに備わるガイドローラ9を通ってマスト2の内部に通される。マスト2に通された吊上げワイヤーロープ8は、マスト2の下端から露出する。この下端から露出した吊上げワイヤーロープ8を地上のウインチ等(図示省略)に接続することにより、吊上げワイヤーロープ8の巻き取りや繰り出しが可能である。吊上げワイヤーロープ8を巻き取れば、フック7が上昇し、吊上げワイヤーロープ8を繰り出せば、フック7が下降する。   A hook 7 is provided at the tip of the boom 3, and this hook 7 is suspended from the tip of the boom 3 by a lifting wire rope 8. The lifting wire rope 8 is passed through the mast 2 through the guide roller 9 provided on the upper side of the revolving member 14, that is, the upper mast 2a. The lifting wire rope 8 passed through the mast 2 is exposed from the lower end of the mast 2. By connecting the lifting wire rope 8 exposed from the lower end to a winch or the like (not shown) on the ground, the lifting wire rope 8 can be wound or fed. If the lifting wire rope 8 is wound up, the hook 7 is raised, and if the lifting wire rope 8 is fed out, the hook 7 is lowered.

以上により、ブーム3を操作ロープ10によりマスト2の周方向に回転させた場合、旋回部材14とともに上側マスト2a、さらにこれに設けられたガイドローラ9が回転するため、吊上げワイヤーロープ8がねじれて引っかかることがなく、ブーム3のスムーズな回転動作をすることができる。   As described above, when the boom 3 is rotated in the circumferential direction of the mast 2 by the operation rope 10, the upper mast 2 a and the guide roller 9 provided on the upper member 2 a rotate together with the turning member 14, so that the lifting wire rope 8 is twisted. The boom 3 can be smoothly rotated without being caught.

ブーム3の先端近傍には、起伏ワイヤ11の一方の端部が取り付けられる。この起伏ワイヤ11は、マスト2の上端に備わる起伏ワイヤ用滑車12を通る。起伏ワイヤ11の他方の端部は、起伏ワイヤ支持クランプ13に接続される。この起伏ワイヤ支持クランプ13は、下側マスト2bの外周に設けられ、マスト2の周方向に回転可能に固定される。したがって、ブーム3の回転とともに、起伏ワイヤ11もこれに追従してマストの周りを回転可能であり、起伏ワイヤ11がマスト2に巻きつくことを防止し、効率よく迅速に鉄塔組立作業をすることができる。   One end of the undulation wire 11 is attached near the tip of the boom 3. The undulation wire 11 passes through the undulation wire pulley 12 provided at the upper end of the mast 2. The other end of the undulation wire 11 is connected to the undulation wire support clamp 13. The undulating wire support clamp 13 is provided on the outer periphery of the lower mast 2 b and is fixed so as to be rotatable in the circumferential direction of the mast 2. Therefore, as the boom 3 rotates, the undulation wire 11 can follow the mast and rotate around the mast, preventing the undulation wire 11 from winding around the mast 2 and efficiently and quickly performing the tower assembly work. Can do.

起伏ワイヤ11の前記他方の端部付近にはレバーブロック(手動式のワイヤーロープ巻取り装置)15が取り付けられる。このレバーブロック15を操作することにより、起伏ワイヤ11の長さ調節が可能である。起伏ワイヤ11を短くすると、ブーム3は基端部3aを支点にして上側に回動する。起伏ワイヤ11を長くすると、ブーム3は基端部3aを支点にして下側に回動する。   A lever block (manual wire rope winding device) 15 is attached near the other end of the undulating wire 11. By operating this lever block 15, the length of the undulating wire 11 can be adjusted. When the hoisting wire 11 is shortened, the boom 3 rotates upward with the base end 3a as a fulcrum. When the hoisting wire 11 is lengthened, the boom 3 rotates downward with the base end 3a as a fulcrum.

マストガイド4,5及びマスト基台6は、それぞれ固定ロープ16,17,18を介して鉄塔20の主材19に固定される。このように、マスト2の下端のマスト基台6を鉄塔に固定し、マスト2の中間部分をマストガイド4,5で支持しながら鉄塔に固定するので、マスト2は鉄塔20内の空中でその軸がぶれることなく確実に保持される。したがって、ブーム3を操作して鉄塔20を組み立てる際に、安全に作業することができる。21はマスト基台6を上方に移動させるための揚重工具である。この揚重工具21は、ウインチを備えている。   The mast guides 4 and 5 and the mast base 6 are fixed to the main material 19 of the steel tower 20 via fixed ropes 16, 17 and 18, respectively. In this way, the mast base 6 at the lower end of the mast 2 is fixed to the steel tower, and the middle portion of the mast 2 is fixed to the steel tower while being supported by the mast guides 4, 5. The shaft is securely held without shaking. Therefore, when assembling the steel tower 20 by operating the boom 3, it is possible to work safely. 21 is a lifting tool for moving the mast base 6 upward. The lifting tool 21 includes a winch.

図2はブームの概略図である。   FIG. 2 is a schematic view of the boom.

図示したように、ブーム3は、段差部22を有する2枚の板材23,23を対称にして重ねて形成される。したがって、ブームの一方の端部は幅広に形成される。この幅広側の端部が基端部3aとなる。ブーム3は、この基端部3aで、マスト2を挟持して固定される。なお、図では旋回部材14(図1参照)は省略している。前述した吊上げワイヤーロープ8は、このブーム3に沿って、ブーム3の先端のローラ24を通り、フック7に接続される(図1参照)。ブーム3の先端近傍には、台座25が備わり、ここに前述した起伏ワイヤ11の一方の端部が接続される(図1参照)。   As illustrated, the boom 3 is formed by overlapping two plate members 23 and 23 having a stepped portion 22 symmetrically. Therefore, one end of the boom is formed wide. The end on the wide side is the base end 3a. The boom 3 is fixed by sandwiching the mast 2 at the base end portion 3a. In the figure, the turning member 14 (see FIG. 1) is omitted. The lifting wire rope 8 is connected to the hook 7 along the boom 3 through the roller 24 at the tip of the boom 3 (see FIG. 1). A pedestal 25 is provided in the vicinity of the tip of the boom 3, and one end of the above-described undulation wire 11 is connected thereto (see FIG. 1).

基端部3aと段差部22までの距離Lは、マスト2におけるブーム3の固定位置とマスト2の上端との距離と略同一である。これについては後述する。   The distance L between the base end portion 3 a and the stepped portion 22 is substantially the same as the distance between the fixed position of the boom 3 on the mast 2 and the upper end of the mast 2. This will be described later.

図3は図1のA−A端面図である。   FIG. 3 is an AA end view of FIG.

(A)に示すように、マストガイド4は、鉄塔を構成する4本の主材19のそれぞれに対し、固定ロープ16で固定される。固定ロープ16の端部には、連結片26を介して断面鉤型の弾性部材27が取り付けられる。連結片26には、固定ピン29が挿通される。固定ピン29は、主材19の外面側に沿って取り付けられた固定部材32の左右から突出した突出片28に挿通されて固定される。固定部材32は、この突出片28と上下のフランジ33を備える。   As shown to (A), the mast guide 4 is fixed with the fixed rope 16 with respect to each of the four main materials 19 which comprise a steel tower. An elastic member 27 having a bowl-shaped cross section is attached to the end of the fixed rope 16 via a connecting piece 26. A fixing pin 29 is inserted through the connecting piece 26. The fixing pin 29 is inserted and fixed to the protruding pieces 28 protruding from the left and right of the fixing member 32 attached along the outer surface side of the main material 19. The fixing member 32 includes the protruding piece 28 and upper and lower flanges 33.

(B)に示すように、連結片26は固定ピン29を軸心にして回動可能である。連結片26には、固定ロープ16を取り付けるための取付孔34が備わる。この取付孔34は、固定ピン29の軸心を含む水平面と、固定ロープ16の軸心を含む水平面が同一平面とならない位置に形成される。すなわち、取付孔34は、固定ピン29の軸心を含む水平面とは別の位置に形成される(図では固定ピン29より下側に形成されている)。これにより、固定ロープ16を矢印P方向に引っ張って緊張させると、連結片26が矢印Q方向に回動する。したがって、弾性部材27が主材19の角部に確実に押圧され固定される。後述するように、マストガイド4を上昇(下降)させる場合は、固定ロープ16の緊張を解き、連結片26を回動させて弾性部材27を主材19から離す。この後、固定部材32を主材19に沿って上昇(下降)させる。この上下移動の際、マストガイド4に備わるガイドローラ31(図では4個のガイドローラ31)はマスト2に沿って回転する。なお、マストガイド4の主材19に対する固定は、単に固定ロープ16を主材19に備わる昇降用のステップボルトにプレート等の部材を介して固定してもよい。マストガイド5、マスト基台6も同様の構成で主材19に固定される。なお、図では、連結片26の固定ピン29を挿通する孔に、鞘管26aが設けられ、これにより固定ピン29を連結片26に通しやすくしている。   As shown in (B), the connecting piece 26 can be rotated about the fixing pin 29 as an axis. The connection piece 26 is provided with an attachment hole 34 for attaching the fixed rope 16. The mounting hole 34 is formed at a position where the horizontal plane including the axis of the fixing pin 29 and the horizontal plane including the axis of the fixing rope 16 are not the same plane. That is, the mounting hole 34 is formed at a position different from the horizontal plane including the axis of the fixing pin 29 (in the drawing, it is formed below the fixing pin 29). Accordingly, when the fixed rope 16 is pulled and tensioned in the direction of the arrow P, the connecting piece 26 rotates in the direction of the arrow Q. Accordingly, the elastic member 27 is reliably pressed and fixed to the corner portion of the main material 19. As will be described later, when the mast guide 4 is raised (lowered), the tension of the fixed rope 16 is released, the connecting piece 26 is rotated, and the elastic member 27 is separated from the main material 19. Thereafter, the fixing member 32 is raised (lowered) along the main material 19. During this vertical movement, the guide rollers 31 (four guide rollers 31 in the figure) provided in the mast guide 4 rotate along the mast 2. Note that the mast guide 4 may be fixed to the main member 19 simply by fixing the fixing rope 16 to the lifting step bolt provided on the main member 19 via a member such as a plate. The mast guide 5 and the mast base 6 are also fixed to the main material 19 with the same configuration. In the figure, a sheath tube 26 a is provided in a hole through which the fixing pin 29 of the connecting piece 26 is inserted, thereby making it easy to pass the fixing pin 29 through the connecting piece 26.

(C)は固定部材32に連結片26を取り付ける(取り外す)ときの説明図であり、図示したように、片方の突出片28に固定ピン29を挿通させ、同時に連結片26にも挿通させる。この状態で、他方の突出片28に固定ピン29を挿通する。   (C) is an explanatory view when attaching (removing) the connecting piece 26 to the fixing member 32. As shown in the drawing, the fixing pin 29 is inserted into one protruding piece 28 and simultaneously inserted into the connecting piece 26. In this state, the fixing pin 29 is inserted into the other protruding piece 28.

図4及び図5はマストの上昇動作を順番に示した概略図である。   4 and 5 are schematic views sequentially showing the mast raising operation.

図1の状態から、鉄塔20を組み立てていき、図4に示す高さまで、鉄塔20が組み立てられたとする。このとき、まず、マストガイド4の主材19に対する固定を解除し、上昇させる。この上昇時、マスト2はマストガイド5とマスト基台6で主材19に安定して固定されている。この後、揚重工具21の主材19に対する固定位置を上昇させる(図4の状態)。このとき、4本の主材19にそれぞれ固定されている揚重工具21の、2個をまず上昇させ、その次に他の2個を上昇させる。   Assume that the steel tower 20 is assembled from the state shown in FIG. 1 to the height shown in FIG. 4. At this time, first, the fixing of the mast guide 4 to the main material 19 is released and raised. At this time, the mast 2 is stably fixed to the main material 19 by the mast guide 5 and the mast base 6. Thereafter, the fixing position of the lifting tool 21 with respect to the main material 19 is raised (state of FIG. 4). At this time, two of the lifting tools 21 fixed to the four main members 19 are first raised, and then the other two are raised.

次に、マスト基台6の主材19に対する固定を解除し、揚重工具21により、マスト基台6を引き上げる。これと同時に、マスト2全体が上昇する(図5の状態)。この上昇時、マスト2はマストガイド4及び5で主材19に安定して固定されている。以上により、マスト2は上昇し、さらに上方で鉄塔の組立が可能となる。マストガイド5を上昇させれば、図1と同様の状態となり、これを繰り返すことにより、さらにマスト2の上昇(せり上げ)が可能となる。なお、鉄塔の解体時は上記と逆の手順によりますと2を下降させながら行う。   Next, the fixing of the mast base 6 to the main material 19 is released, and the mast base 6 is pulled up by the lifting tool 21. At the same time, the entire mast 2 rises (state shown in FIG. 5). At this time, the mast 2 is stably fixed to the main material 19 by the mast guides 4 and 5. As described above, the mast 2 is raised, and the steel tower can be assembled further upward. If the mast guide 5 is raised, the same state as in FIG. 1 is obtained. By repeating this, the mast 2 can be further raised (raised). When dismantling the tower, follow the procedure reverse to the above while lowering 2.

図示したように、マストガイドは2個備わる(マストガイド4及び5)。したがって、マストガイド4又は5、又はマスト基台6の上昇時に、マスト2は必ずマストガイド4又は5、又はマスト基台6のうち、いずれか二つで主材19(鉄塔20)に固定保持される。このため、マスト2を安定して保持した状態で、マスト2の上昇動作を行うことができる。   As shown, two mast guides are provided (mast guides 4 and 5). Accordingly, when the mast guide 4 or 5 or the mast base 6 is raised, the mast 2 is always fixedly held on the main material 19 (steel tower 20) by either the mast guide 4 or 5 or the mast base 6. Is done. For this reason, the raising operation of the mast 2 can be performed in a state where the mast 2 is stably held.

図6〜図8は、この発明に係る鉄塔組立・解体用デリックの撤去方法を順番に示す概略図である。また、図9は図7の鉄塔頂部周辺の拡大概略図である。   6-8 is the schematic which shows in order the removal method of the derrick for steel tower assembly and demolition concerning this invention. FIG. 9 is an enlarged schematic view around the tower top of FIG.

図6に示すように、鉄塔20を組み立て終えたら、起伏ワイヤ11にてブーム3を引き上げ、最大まで起伏させる。このとき、図2で示したように、基端部3aと段差部22までの距離Lは、マスト2におけるブーム3の固定位置とマスト2の上端との距離と略同一であるため、ブーム3を引き上げたときに、この基端部3aと段差部22までの間の空間にマスト2が収まる。したがって、最大までブーム3を起伏させたときにブーム3とマスト2を略一直線上に形成することができ、デリック全体としての重心の位置を揃えることができる。これにより、後述するように、この状態でデリック全体を吊ったときの安定性が向上し、取扱い性が向上する。フック7は、起伏ワイヤ支持クランプ13に固定した状態とする(図9参照)。   As shown in FIG. 6, after assembling the steel tower 20, the boom 3 is pulled up by the hoisting wire 11 and raised up to the maximum. At this time, as shown in FIG. 2, the distance L between the base end portion 3 a and the stepped portion 22 is substantially the same as the distance between the fixing position of the boom 3 in the mast 2 and the upper end of the mast 2. When the mast 2 is pulled up, the mast 2 is accommodated in the space between the base end portion 3a and the stepped portion 22. Therefore, when the boom 3 is raised and lowered to the maximum, the boom 3 and the mast 2 can be formed on a substantially straight line, and the position of the center of gravity as the whole derrick can be made uniform. Thereby, as will be described later, the stability when the entire derrick is suspended in this state is improved, and the handleability is improved. The hook 7 is fixed to the undulating wire support clamp 13 (see FIG. 9).

次に、図7に示すように、起伏させたブーム3の先端が鉄塔20の頂部より若干下側の位置までマスト2を下降させる。この下降は、マスト基台6の鉄塔20に対する固定を解除し、揚重工具21により引き下げることにより行う。次に、鉄塔20の頂部に撤去用の吊り下げ用滑車30を設置する。この吊り下げ用滑車30に、吊上げワイヤーロープ8を通す。   Next, as shown in FIG. 7, the mast 2 is lowered to a position where the tip of the boom 3 that has been raised and lowered is slightly below the top of the steel tower 20. This lowering is performed by releasing the fixation of the mast base 6 to the steel tower 20 and pulling it down by the lifting tool 21. Next, a suspension pulley 30 for removal is installed at the top of the steel tower 20. The lifting wire rope 8 is passed through the suspension pulley 30.

次に、図8に示すように、マストガイド4,5及びマスト基台6の固定ロープ16,17,18をそれぞれ鉄塔20から取り外し、連結片26(図3参照)とともにマスト2に固定する。揚重工具21も、鉄塔20から取り外し、マスト2に固定する。これにより、マスト2はせり下げ用滑車30のみで鉄塔20の頂部から吊り下げられた状態となる。なお、マストガイド4,5をマスト2に沿って下降させ、マスト基台6に重ねた状態としてもよい。この後、マスト2を鉄塔20内で下降させる。この下降は、地面から吊り下げ用ワイヤ8を繰り出すことにより行われる。このように、鉄塔20の下側からのマスト2の下降操作が可能となるため、簡易迅速な作業が実現できる。また、マスト2の下降には吊上げワイヤーロープ8を利用するため、撤去用のワイヤを別に用意することが不要となり、撤去のための部品点数が減少し、取扱い性が向上する。マスト2を地面まで下降させたら、吊り下げ用滑車30を鉄塔20から取り外し、この発明に係る鉄塔組立・解体用デリックの撤去が完了する。   Next, as shown in FIG. 8, the mast guides 4, 5 and the fixing ropes 16, 17, 18 of the mast base 6 are each removed from the steel tower 20 and fixed to the mast 2 together with the connecting piece 26 (see FIG. 3). The lifting tool 21 is also removed from the tower 20 and fixed to the mast 2. As a result, the mast 2 is suspended from the top of the steel tower 20 only by the pulley 30 for hanging down. The mast guides 4 and 5 may be lowered along the mast 2 and overlapped with the mast base 6. Thereafter, the mast 2 is lowered in the steel tower 20. This lowering is performed by feeding the hanging wire 8 from the ground. As described above, since the lowering operation of the mast 2 from the lower side of the steel tower 20 is possible, a simple and quick operation can be realized. Further, since the lifting wire rope 8 is used for lowering the mast 2, it is not necessary to prepare a separate wire for removal, the number of parts for removal is reduced, and handling is improved. When the mast 2 is lowered to the ground, the suspension pulley 30 is removed from the steel tower 20, and the removal of the steel tower assembly / disassembly derrick according to the present invention is completed.

以上説明したように、この発明に係る鉄塔組立・解体用デリックで鉄塔を組立、さらに上記方法で撤去すれば、作業に関する部材が全て鉄塔内に収まった状態で作業することができる。したがって、狭隘地においての鉄塔の組立てあるいは解体を行うに際し、効率よく適用することが可能である。   As described above, when a steel tower is assembled with the steel tower assembly / disassembly derrick according to the present invention and further removed by the above method, the work can be performed in a state where all the members related to the work are contained in the steel tower. Therefore, it can be efficiently applied when assembling or dismantling a steel tower in a confined area.

この発明に係る鉄塔組立・解体用デリックの概略図である。It is the schematic of the derrick for steel tower assembly and demolition concerning this invention. ブームの概略図である。It is the schematic of a boom. 図1のA−A端面図である。It is an AA end view of FIG. マストの上昇動作を順番に示した概略図である。It is the schematic which showed the raising operation | movement of the mast in order. マストの上昇動作を順番に示した概略図である。It is the schematic which showed the raising operation | movement of the mast in order. この発明に係る鉄塔組立・解体用デリックの撤去方法を順番に示す概略図である。It is the schematic which shows the removal method of the derrick for steel tower assembly and demolition concerning this invention in order. この発明に係る鉄塔組立・解体用デリックの撤去方法を順番に示す概略図である。It is the schematic which shows the removal method of the derrick for steel tower assembly and demolition concerning this invention in order. この発明に係る鉄塔組立・解体用デリックの撤去方法を順番に示す概略図である。It is the schematic which shows the removal method of the derrick for steel tower assembly and demolition concerning this invention in order. 図7の鉄塔頂部周辺の拡大概略図である。FIG. 8 is an enlarged schematic view around the top of the steel tower in FIG. 7.

符号の説明Explanation of symbols

1:鉄塔組立・解体用デリック、2:マスト、2a:上側マスト、2b:下側マスト、3:ブーム、3a:基端部、4:マストガイド、5:マストガイド、6:マスト基台、7:フック、8:吊上げワイヤーロープ、9:ガイドローラ、10:操作ロープ、11:起伏ワイヤ、12:起伏ワイヤ用滑車、13:起伏ワイヤ支持クランプ、14:旋回部材、15:レバーブロック、16:固定ロープ、17:固定ロープ、18:固定ロープ、19:主材、20:鉄塔、21:揚重工具、22:段差部、23:板材、24:ローラ、25:台座、26:連結片、26a:鞘管、27:弾性部材、28:突出片、29:固定ピン、30:吊り下げ用滑車、31:ガイドローラ、32:固定部材、33:フランジ、34:取付孔 1: Derrick for assembling and dismantling the steel tower, 2: mast, 2a: upper mast, 2b: lower mast, 3: boom, 3a: base end, 4: mast guide, 5: mast guide, 6: mast base, 7: hook, 8: lifting wire rope, 9: guide roller, 10: operation rope, 11: undulation wire, 12: undulation wire pulley, 13: undulation wire support clamp, 14: swivel member, 15: lever block, 16 : Fixed rope, 17: Fixed rope, 18: Fixed rope, 19: Main material, 20: Steel tower, 21: Lifting tool, 22: Stepped part, 23: Plate material, 24: Roller, 25: Base, 26: Connection piece 26a: sheath tube, 27: elastic member, 28: protruding piece, 29: fixing pin, 30: pulley for suspension, 31: guide roller, 32: fixing member, 33: flange, 34: mounting hole

Claims (3)

円筒状のマストと、
一方の端部が前記マストに対して周方向に回転可能に取り付けられた棒状のブームと、
前記マストの外側を挿通可能なリング状のマストガイドと、
前記マストの下端に備わり、前記マストの外周側に連続して突出するマスト基台とを有し、
前記ブームは前記マストに対して旋回部材を介して取り付けられ、
前記マストは前記旋回部材の位置で切断され、上側のマストは、前記旋回部材とともに回転可能であり、
前記ブームの先端には吊上げワイヤーロープを介してフックが備わり、
当該吊上げワイヤーロープは、前記旋回部材の上側に備わるガイドローラを通って前記マスト内に通され、
前記マストの下側から前記吊上げワイヤーロープを操作することにより、前記フックが上下移動可能であり、
前記ブーム先端近傍には起伏ワイヤの一方の端部が取り付けられ、当該起伏ワイヤは前記マスト上端に備わる起伏ワイヤ用滑車を通り、前記起伏ワイヤの他方の端部は前記マストに対して周方向に回転可能に固定され、
前記ブームは、前記起伏ワイヤの長さ調節をすることにより、前記ブームの前記マストに対する固定端部を支点にして回動可能であり、
前記マストガイド及び前記マスト基台には、鉄塔の主材に固定するための固定ロープが連結され、
前記マスト基台には、前記鉄塔の主材に固定され、巻き上げ可能な揚重工具が連結され、
前記マストガイドは2個備わることを特徴とする鉄塔組立・解体用デリック。
A cylindrical mast,
A rod-like boom having one end rotatably attached to the mast in the circumferential direction;
A ring-shaped mast guide that can be inserted through the outside of the mast;
A mast base provided at the lower end of the mast and continuously protruding from the outer peripheral side of the mast;
The boom is attached to the mast via a turning member,
The mast is cut at the position of the pivot member, and the upper mast is rotatable with the pivot member;
The tip of the boom is equipped with a hook via a lifting wire rope,
The lifting wire rope is passed through the mast through a guide roller provided on the upper side of the swivel member,
By operating the lifting wire rope from below the mast, the hook can be moved up and down,
One end portion of the undulation wire is attached in the vicinity of the tip of the boom, the undulation wire passes through a undulation wire pulley provided at the upper end of the mast, and the other end portion of the undulation wire extends in the circumferential direction with respect to the mast. Fixed rotatably,
The boom can be rotated about a fixed end portion of the boom with respect to the mast by adjusting the length of the hoisting wire,
The mast guide and the mast base are connected to a fixing rope for fixing to the main material of the steel tower,
The mast base is connected to a lifting tool fixed to the main material of the tower and capable of being rolled up,
Derrick for steel tower assembly and dismantling, characterized in that it has two mast guides.
前記ブームは、段差部を有する2枚の板材を対称にして重ねて形成され、前記ブームの幅広側の端部である基端部で前記旋回部材を挟持して固定され、前記段差部と前記基端部との間は、前記ブームの固定位置と前記マストの上端との間の長さと略同一であることを特徴とする請求項1に記載の鉄塔組立・解体用デリック。   The boom is formed by symmetrically stacking two plate members having a step portion, and is fixed by sandwiching the turning member at a base end portion which is an end portion on the wide side of the boom, and the step portion and the step The derrick for steel tower assembly / disassembly according to claim 1, wherein a distance between the base end portion and the base end portion is substantially the same as a length between a fixing position of the boom and an upper end of the mast. 鉄塔の頂部略中央に撤去用滑車を設置し、前記ブームを最大限上側に回動させ、当該撤去用滑車に前記吊上げワイヤーロープを通し、前記固定ロープ及び前記揚重工具が前記主材から取り外された状態で、前記吊上げワイヤーロープを前記マストの下側から繰り出し、前記マストを前記鉄塔の下方に降下させることを特徴とする請求項1又は2に記載の鉄塔組立・解体用デリックを用いた鉄塔組立・解体用デリックの撤去方法。   A removal pulley is installed at the approximate center of the top of the steel tower, the boom is rotated to the maximum upward, the lifting wire rope is passed through the removal pulley, and the fixed rope and the lifting tool are removed from the main material. 3. The steel tower assembly / disassembly derrick according to claim 1, wherein the lifting wire rope is fed out from below the mast and the mast is lowered below the steel tower. How to remove derricks for assembling and dismantling steel towers.
JP2007310766A 2007-11-30 2007-11-30 Derrick for steel tower assembly / disassembly and removal method Active JP5026936B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007310766A JP5026936B2 (en) 2007-11-30 2007-11-30 Derrick for steel tower assembly / disassembly and removal method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007310766A JP5026936B2 (en) 2007-11-30 2007-11-30 Derrick for steel tower assembly / disassembly and removal method

Publications (2)

Publication Number Publication Date
JP2009133139A JP2009133139A (en) 2009-06-18
JP5026936B2 true JP5026936B2 (en) 2012-09-19

Family

ID=40865266

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007310766A Active JP5026936B2 (en) 2007-11-30 2007-11-30 Derrick for steel tower assembly / disassembly and removal method

Country Status (1)

Country Link
JP (1) JP5026936B2 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101865593B (en) * 2010-06-30 2012-05-02 中国一冶集团有限公司 Method for installing device with air separating tower structure
CN102910532B (en) * 2012-05-23 2014-08-13 中煤第三建设(集团)有限责任公司 Method for butting and hoisting large box type derricks in air
CN102849622B (en) * 2012-08-17 2014-09-03 中国十七冶集团有限公司 Mast-based section-by-section vertical lifting assembling method of tower
CN103101847B (en) * 2013-01-31 2014-12-10 杭州国电大力机电工程有限公司 Tower type truss installing structure and method without cooperation with altitude hoisting equipment
CN105217414B (en) * 2015-11-09 2017-09-22 湖南省第一工程有限公司 Head sheave of hoister loads and unloads handling method
CN105540435B (en) * 2015-12-28 2017-11-24 上海市机械施工集团有限公司 Stretch system and tower crane method for dismounting in one kind top
JP6910110B2 (en) * 2016-05-13 2021-07-28 日本リーテック株式会社 How to assemble a tower using a tower assembly jig and a mast for raising the tower assembly jig
JP7245098B2 (en) * 2019-03-28 2023-03-23 株式会社シーテック Relocation method of mast guide device for tower assembly work
JP7281936B2 (en) * 2019-03-28 2023-05-26 株式会社シーテック Elevating method of derrick device for assembly work of steel tower
CN110644808A (en) * 2019-09-27 2020-01-03 上海东鼎钢结构有限公司 Dismantling tool and method for indoor MARK3 installation platform
CN115324416A (en) * 2022-03-14 2022-11-11 中铁一局集团电务工程有限公司 Integral hoisting construction process for iron tower
CN115354882B (en) * 2022-07-15 2023-08-22 安徽送变电工程有限公司 Method for dismantling ultra-large spanning old electric tower

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4426267Y1 (en) * 1966-07-16 1969-11-05
JPS55161779A (en) * 1979-05-29 1980-12-16 Hitachi Construction Machinery Crane for building steel tower or like

Also Published As

Publication number Publication date
JP2009133139A (en) 2009-06-18

Similar Documents

Publication Publication Date Title
JP5026936B2 (en) Derrick for steel tower assembly / disassembly and removal method
JP2008533334A (en) Working scaffold
JP2007302352A (en) Crane, and crane boom derricking device
JP3158320U (en) crane
JP4688771B2 (en) Gondola suspension mechanism for maintenance of cylindrical steel tower used in horizontal axis wind power generation system, and gondola suspension method for maintenance of cylindrical steel tower
JP6639928B2 (en) Pump lifting device and pump lifting method
JP5065814B2 (en) Electric wire replacement method
JP2010242429A (en) Demolition method for steel tower
JP5010354B2 (en) Structure assembly method and lifting scaffold device
JP6628310B2 (en) Derrick for steel tower assembly and dismantling
JP5331539B2 (en) Derrick for steel tower assembly and dismantling
JP2855014B2 (en) Disassembled jib crane
JPH11199157A (en) Existing main rope take-up device for elevator
JPH0761773A (en) Jib crane
JP3960392B2 (en) Exterior wall material lifting device and exterior wall material lifting method
JP7281936B2 (en) Elevating method of derrick device for assembly work of steel tower
JP7245098B2 (en) Relocation method of mast guide device for tower assembly work
JP2004076256A6 (en) Chimney demolition scaffold device and chimney demolition method using the device
JP4054800B2 (en) Climbing scaffold
JP7416034B2 (en) How to assemble the crane
JP2004204506A (en) Base rod apparatus for hoisting concrete pole, and method of cutting and recovering concrete pole using the same
WO2022264497A1 (en) Backstop
JP6579172B2 (en) Crane and crane strut raising method
JP2001226082A (en) Wire rope winding device
JP6236605B2 (en) How to change auxiliary rope

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20101129

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120516

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120522

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120621

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150629

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5026936

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250