JP5005839B1 - Foundation form for solar panel mount and foundation construction method for solar panel mount - Google Patents

Foundation form for solar panel mount and foundation construction method for solar panel mount Download PDF

Info

Publication number
JP5005839B1
JP5005839B1 JP2012069279A JP2012069279A JP5005839B1 JP 5005839 B1 JP5005839 B1 JP 5005839B1 JP 2012069279 A JP2012069279 A JP 2012069279A JP 2012069279 A JP2012069279 A JP 2012069279A JP 5005839 B1 JP5005839 B1 JP 5005839B1
Authority
JP
Japan
Prior art keywords
formwork
concrete
solar panel
panels
plate form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2012069279A
Other languages
Japanese (ja)
Other versions
JP2013199795A (en
Inventor
勝義 長瀬
Original Assignee
グリーンリバー株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by グリーンリバー株式会社 filed Critical グリーンリバー株式会社
Priority to JP2012069279A priority Critical patent/JP5005839B1/en
Application granted granted Critical
Publication of JP5005839B1 publication Critical patent/JP5005839B1/en
Publication of JP2013199795A publication Critical patent/JP2013199795A/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

【課題】 生産性の向上により少人数での工期短縮が可能でスケジュール調整が容易であり、かつ労災リスクを低減できると共に、各ソーラーパネル架台用基礎のレベル精度を高めることができるソーラーパネル架台用基礎型枠及びソーラーパネル架台用基礎施工工法の提供。
【解決手段】 予め2枚の短板型枠パネル11と2枚の長板型枠パネルを12平面視で長方形に予め組み付けられた複数のコンクリート型枠1と、該複数のコンクリート型枠1を幅方向等間隔のもとに並べた状態で両短板型枠パネル11側においてそれぞれ互いに接続固定する2本の連結バー2と、該連結バー2と各コンクリート型枠1との間を接続固定する接続金具3と、で構成されている。
【選択図】 図1
PROBLEM TO BE SOLVED: To improve the level accuracy of the foundation for each solar panel mount as well as the work schedule can be shortened by a small number of people due to productivity improvement, the schedule adjustment is easy, and the risk of work accidents can be reduced. Providing foundation construction method for foundation formwork and solar panel mount.
SOLUTION: A plurality of concrete formwork 1 in which two short plate formwork panels 11 and two long plate formwork panels are assembled in advance in a rectangular shape in 12 plan view, and the plurality of concrete formwork 1 are provided. Two connecting bars 2 that are connected and fixed to each other on both short plate form panel 11 sides in a state of being arranged at equal intervals in the width direction, and connecting and fixing between the connecting bar 2 and each concrete form 1 And the connection fitting 3 to be configured.
[Selection] Figure 1

Description

本発明は、メガソーラー発電施設の設置において、広大な土地に多数のソーラーパネルを設置するためのソーラーパネル架台用基礎型枠及びソーラーパネル架台用基礎施工工法に関する。   The present invention relates to a basic form for a solar panel frame and a foundation construction method for a solar panel frame for installing a large number of solar panels on a vast land in the installation of a mega solar power generation facility.

従来、メガソーラー発電施設を設置する場合、先ず設置すべき広大な土地に、等間隔のもとに多数のコンクリート基礎(ソーラーパネル架台用基礎)を作り、各コンクリート基礎の上に太陽光パネルを設置していく(例えば、特許文献1参照)。
このコンクリート基礎の施工には、コンクリート型枠が用いられる。
Conventionally, when installing a mega solar power generation facility, a large number of concrete foundations (solar foundations for foundations) are made at equal intervals on the vast land to be installed, and solar panels are placed on each concrete foundation. Installation is performed (see, for example, Patent Document 1).
A concrete formwork is used for the construction of the concrete foundation.

特開2011−202479号公報JP 2011-202479 A

しかしながら、従来のコンクリート基礎の施工には、木製もしくは鋼製の型枠を制作し、これを現場で1つずつ組み立ていく、いわゆる現場組立コンクリート型枠が用いられていたため、コンクリート型枠の設置及び解体に多大の時間と労力を必要とし、膨大なコストがかかると共に、生産性が悪くスケジュール調整が困難になるという問題がある。
また、コンクリート型枠は現場において1つずつ個別に組み立てていくため、コンクリート型枠相互間におけるレベル調整が必要でソーラーパネル架台用基礎のレベル精度を出しにくいという問題がある。
また、現場作業に多くの作業人員が必要で、労災リスクが高くなる。
However, in the construction of conventional concrete foundations, so-called on-site assembly concrete formwork was used, in which a wooden or steel formwork was produced and assembled one by one at the site. Dismantling requires a lot of time and labor, and enormous costs are involved, and productivity is poor and schedule adjustment becomes difficult.
In addition, since the concrete molds are assembled individually one by one at the site, there is a problem that level adjustment between the concrete molds is necessary and it is difficult to achieve the level accuracy of the foundation for the solar panel mount.
In addition, a large number of workers are required for on-site work, increasing the risk of occupational accidents.

本発明の解決しようとする課題は、生産性の向上により少人数での工期短縮が可能でスケジュール調整が容易であり、かつ労災リスクを低減できると共に、各ソーラーパネル架台用基礎のレベル精度を高めることができるソーラーパネル架台用基礎型枠及びソーラーパネル架台用基礎施工工法を提供することにある。   The problem to be solved by the present invention is that the work period can be shortened by a small number of people by improving productivity, the schedule adjustment is easy, the risk of work accidents can be reduced, and the level accuracy of the foundation for each solar panel mount is increased. It is to provide a foundation form for a solar panel mount and a foundation construction method for a solar panel mount.

上記課題を解決するため請求項1記載のソーラーパネル架台用基礎型枠は、予め2枚の短板型枠パネルと2枚の長板型枠パネルを平面視で長方形に予め組み付けられた複数のコンクリート型枠と、該複数のコンクリート型枠を幅方向等間隔のもとに並べた状態で両短板型枠パネル側においてそれぞれ互いに接続固定する2本の連結バーと、該連結バーと前記各コンクリート型枠との間を接続固定する接続金具と、で構成されていることを特徴とする手段とした。   In order to solve the above-mentioned problem, a basic formwork for a solar panel frame according to claim 1 includes a plurality of short plate form panels and two long plate form panels previously assembled in a rectangular shape in plan view. A concrete formwork, two connecting bars for connecting and fixing each of the plurality of concrete formwork on both short plate formwork panels in a state of being arranged at equal intervals in the width direction, It is a means characterized in that it is composed of a connection fitting for connecting and fixing between the concrete formwork.

また、請求項2記載のソーラーパネル架台用基礎型枠は、請求項1記載のソーラーパネル架台用基礎型枠において、
前記連結バーには少なくとも2箇所に吊り下げ用フックを備えることと特徴とする手段とした。
Moreover, the basic formwork for solar panel mounts according to claim 2 is the basic formwork for solar panel mounts according to claim 1,
The connecting bar is provided with hanging hooks in at least two places.

また、請求項3記載のソーラーパネル架台用基礎型枠は、請求項1又は2に記載のソーラーパネル架台用基礎型枠において、
前記接続金具はコンクリート型枠側に予めボルトの基部が固定されており、前記連結バーに開設された穴に差し込んでナット締めすることにより複数のコンクリート型枠を幅方向等間隔のもとに並べた状態で両短板型枠パネル側において互いに接続固定するように構成されていることを特徴とする。
Moreover, the basic formwork for solar panel mounts according to claim 3 is the basic formwork for solar panel mounts according to claim 1 or 2,
The connection bracket has a bolt base fixed to the concrete formwork side in advance, and a plurality of concrete formwork are arranged at equal intervals in the width direction by inserting into a hole opened in the connecting bar and tightening with a nut. In this state, both short plate mold panels are connected and fixed to each other.

また、請求項4記載のソーラーパネル架台用基礎型枠は、請求項1〜3のいずれか1項に記載のソーラーパネル架台用基礎型枠において、
前記コンクリート型枠は上面開口部が下面開口部より狭くなるように前記2枚の短板型枠パネルと2枚の長板型枠パネルが内向き傾斜状に組み付けられていることを特徴とする手段とした。
Moreover, the basic formwork for solar panel mounts according to claim 4 is the basic formwork for solar panel mounts according to any one of claims 1 to 3,
The concrete formwork is characterized in that the two short plate form panels and the two long plate form panels are assembled in an inwardly inclined shape so that the upper opening is narrower than the lower opening. As a means.

また、請求項5記載のソーラーパネル架台用基礎型枠は、請求項1〜4のいずれか1項に記載のソーラーパネル架台用基礎型枠において、
前記2枚の長板型枠パネルの外周面に沿って上方から抜き差し自在に差し込んで両長板型枠パネルの間隔を維持する門型の間隔保持部材を備えることを特徴とする手段とした。
Moreover, the basic formwork for solar panel mounts according to claim 5 is the basic formwork for solar panel mounts according to any one of claims 1 to 4,
It is a means characterized by comprising a portal-type spacing holding member that is detachably inserted from above along the outer peripheral surface of the two long plate form panels and maintains the distance between both long plate form panels.

また、請求項6記載のソーラーパネル架台用基礎施工工法は、
工場において予め2枚の短板型枠パネルと2枚の長板型枠パネルを平面視で長方形のコンクリート型枠に予め組み付ける第1工程と、
現場において前記複数のコンクリート型枠を幅方向等間隔のもとに並べた状態で両短板型枠パネル側においてそれぞれ連結バーで互いに接続固定する第2工程と、
複数接続固定された各コンクリート型枠にコンクリートを打設する第3工程と、
打設したコンクリートが固まった時点で複数連結固定されたコンクリート型枠をクレーン等で持ち上げて型抜きし、次の施工場所に設置する第4工程と、
以後は上記第3工程と第4工程を繰り返すことにより多数のソーラーパネル架台用基礎を施工していくことを特徴とする手段とした。
In addition, the foundation construction method for solar panel mount according to claim 6 is:
A first step of pre-assembling two short plate form panels and two long plate form panels in a factory in a rectangular concrete form in plan view;
A second step of connecting and fixing each of the plurality of concrete molds to each other with a connecting bar on both short plate mold panel sides in a state where the plurality of concrete molds are arranged at equal intervals in the width direction;
A third step of placing concrete in each of the concrete forms fixed in a plurality of connections;
When the cast concrete is solidified, a plurality of concrete molds that are connected and fixed are lifted with a crane or the like and punched out, and installed at the next construction site;
After that, the third and fourth steps were repeated to construct a large number of solar panel mount foundations.

請求項1記載のソーラーパネル架台用基礎型枠では、上述のように、予め2枚の短板型枠パネルと2枚の長板型枠パネルを平面視で長方形に予め組み付けられた複数のコンクリート型枠と、該複数のコンクリート型枠を幅方向等間隔のもとに並べた状態で両短板型枠パネル側においてそれぞれ互いに接続固定する2本の連結バーと、該連結バーと前記各コンクリート型枠との間を接続固定する接続金具と、で構成されるため、現場で複数のコンクリート型枠を接続固定した後、該複数接続固定された各コンクリート型枠にコンクリートを打設し、打設したコンクリートが固まった時点で複数連結固定されたコンクリート型枠をクレーン等で持ち上げて型抜きをし、次の場所に設置するという工程を繰り返すことで、多数のコンクリート架台用基礎を少人数で能率よく短期間で施工することができる。
従って、生産性の向上により少人数での工期短縮が可能でスケジュール調整が容易であり、かつ労災リスクを低減できるという効果が得られる。
また、工場で精度良く制作された複数のコンクリート型枠が連結バーで精度良く連結された状態で用いられるため、各ソーラーパネル架台用基礎のレベル精度を高めることができるようになる。
In the basic form for a solar panel frame according to claim 1, as described above, a plurality of concrete pieces in which two short plate form panels and two long plate form panels are assembled in advance in a rectangular shape in plan view. Formwork, two connection bars for connecting and fixing each of the plurality of concrete formwork to each other on both short plate formwork panels in a state of being arranged at equal intervals in the width direction, the connection bar and each of the concrete Since it is made up of connecting metal fittings that connect and fix to the formwork, after connecting and fixing a plurality of concrete molds at the site, the concrete is placed in each concrete formwork that is connected and fixed, When the set concrete has hardened, the concrete form, which is connected and fixed multiple times, is lifted with a crane, etc., removed from the mold, and installed in the next place. Foundation may be applied in a short period of time better efficiency in a small number of people.
Therefore, it is possible to shorten the work period with a small number of people by improving productivity, to easily adjust the schedule, and to reduce the risk of industrial accidents.
In addition, since a plurality of concrete molds produced with high accuracy at the factory are used in a state of being accurately connected with a connecting bar, the level accuracy of the foundation for each solar panel mount can be increased.

請求項2記載のソーラーパネル架台用基礎型枠では、上述のように、連結バーには少なくとも2箇所に吊り下げ用フックを備えるため、複数連結された重量物であるコンクリート型枠の型抜き及び移動設置作業等をクレーン等を用いて安定良く吊り上げることができるようになる。   In the basic formwork for solar panel frame according to claim 2, as described above, the connecting bar is provided with hanging hooks in at least two places. It is possible to lift the moving installation work etc. stably using a crane or the like.

請求項3記載のソーラーパネル架台用基礎型枠では、上述のように、接続金具はコンクリート型枠側に予めボルトの基部が固定されており、連結バーに開設された穴に差し込んでナット締めすることにより複数のコンクリート型枠を幅方向等間隔のもとに並べた状態で両短板型枠パネル側において互いに接続固定するように構成されているため、現場における複数のコンクリート型枠の連結作業を能率的に行えるようになる。   In the basic form for solar panel mount according to claim 3, as described above, the base of the connecting metal fitting is fixed to the concrete form side in advance, and the nut is inserted into the hole formed in the connecting bar and tightened with the nut. As a result, it is configured to connect and fix a plurality of concrete molds to each other on both short plate mold panels in a state where they are arranged at equal intervals in the width direction. Can be done efficiently.

請求項4記載のソーラーパネル架台用基礎型枠では、上述のように、コンクリート型枠は上面開口部が下面開口部より狭くなるように2枚の短板型枠パネルと2枚の長板型枠パネルが内向き傾斜状に組み付けられているため、コンクリート硬化後の型抜き作業をスムーズに行えるようになる。   In the basic formwork for solar panel mount according to claim 4, as described above, the concrete formwork has two short plate form panels and two long plate types so that the upper surface opening is narrower than the lower surface opening. Since the frame panel is assembled in an inwardly inclined shape, it is possible to smoothly perform the die-cutting work after the concrete is hardened.

請求項5記載のソーラーパネル架台用基礎型枠では、上述のように、2枚の長板型枠パネルの外周面に沿って上方から抜き差し自在に差し込んで両長板型枠パネルの間隔を維持する門型の間隔保持部材を備えることで、コンクリート打設時の両長板型枠パネルの間隔を維持しつつ、コンクリート型枠の上方への型抜きが容易に行えるようになる。   In the basic formwork for the solar panel frame according to claim 5, as described above, the gap between the two long formwork panels is maintained by being detachably inserted from above along the outer peripheral surface of the two long formwork panels. By providing the gate-shaped interval holding member, it is possible to easily perform the die cutting upward of the concrete formwork while maintaining the distance between the two long plate formwork panels at the time of placing the concrete.

請求項6記載のソーラーパネル架台用基礎施工工法では、上述のように、工場において予め2枚の短板型枠パネルと2枚の長板型枠パネルを平面視で長方形のコンクリート型枠に予め組み付ける第1工程と、現場において前記複数のコンクリート型枠を幅方向等間隔のもとに並べた状態で両短板型枠パネル側においてそれぞれ連結バーで互いに接続固定する第2工程と、複数接続固定された各コンクリート型枠にコンクリートを打設する第3工程と、打設したコンクリートが固まった時点で複数連結固定されたコンクリート型枠をクレーン等で持ち上げて型抜きをし、次の施工場所に設置する第4工程と、以後は上記第3工程と第4工程を繰り返すことにより多数のソーラーパネル架台用基礎を施工していくようにしたことで、多数のコンクリート架台用基礎を少人数で能率よく短期間で施工することができる。
従って、生産性の向上により少人数での工期短縮が可能でスケジュール調整が容易であり、かつ労災リスクを低減できるという効果が得られる。
また、工場で精度良く制作された複数のコンクリート型枠が連結バーで精度良く連結された状態で用いられるため、各ソーラーパネル架台用基礎のレベル精度を高めることができるようになる。
In the basic construction method for a solar panel frame according to claim 6, as described above, two short plate form panels and two long plate form panels are preliminarily formed into a rectangular concrete form in plan view in the factory. A first step of assembling, a second step of connecting and fixing each of the plurality of concrete molds on the short plate mold panel side with a connecting bar in a state where the plurality of concrete molds are arranged at equal intervals in the width direction, and a plurality of connections The third step of placing concrete in each fixed concrete formwork, and when the placed concrete has hardened, lift the concrete formwork that is connected and fixed with a crane, etc. By constructing a large number of foundations for solar panel mounts by repeating the third process and the fourth process after the fourth process installed in the The basis for the over door frame may be applied efficiently in a short period of time with a small number of people.
Therefore, it is possible to shorten the work period with a small number of people by improving productivity, to easily adjust the schedule, and to reduce the risk of industrial accidents.
In addition, since a plurality of concrete molds produced with high accuracy at the factory are used in a state of being accurately connected with a connecting bar, the level accuracy of the foundation for each solar panel mount can be increased.

実施例1のソーラーパネル架台用基礎型枠を示す平面図である。It is a top view which shows the basic formwork for solar panel mounts of Example 1. FIG. 実施例1のソーラーパネル架台用基礎型枠を示す正面図である。It is a front view which shows the basic formwork for solar panel mounts of Example 1. FIG. 実施例1のソーラーパネル架台用基礎型枠を示す側面図である。It is a side view which shows the basic formwork for solar panel mounts of Example 1. FIG. 図2のA部を示す拡大図である。It is an enlarged view which shows the A section of FIG. 図3のB部を示す拡大断面図である。It is an expanded sectional view which shows the B section of FIG. 連結バーを示す部分斜視図である。It is a fragmentary perspective view which shows a connection bar. 吊金物を示す平面図である。It is a top view which shows a hanger. 吊金物を示す正面図である。It is a front view which shows a hanging material. 吊金物を示す側面図である。It is a side view which shows a hanger. 間隔保持部材の他の例を示す正面図である。It is a front view which shows the other example of a space | interval holding member.

以下にこの発明の実施例を図面に基づいて説明する。   Embodiments of the present invention will be described below with reference to the drawings.

まず、この実施例1のソーラーパネル架台用基礎型枠を図1〜6に基づいて説明する。
このソーラーパネル架台用基礎型枠は、予め2枚の短板型枠パネル11と2枚の長板型枠パネル12を平面視で長方形に予め組み付けられた複数のコンクリート型枠1と、該複数(この実施例1では5枠、即ちソーラーパネル2.5セット分)のコンクリート型枠1を幅方向等間隔(この実施例1では1m)のもとに並べた状態で両短板型枠パネル11側においてそれぞれ互いに接続固定する2本の連結バー2と、該連結バー2と前記各コンクリート型枠1との間を接続固定する接続金具3と、間隔保持部材4と、吊金物5と、を主な構成として備えている。
First, the basic formwork for solar panel mounts of this Example 1 is demonstrated based on FIGS.
The basic formwork for the solar panel frame includes a plurality of concrete formwork 1 in which two short plate form panels 11 and two long plate form panels 12 are assembled in advance in a rectangular shape in plan view, In this embodiment 1, the two short plate form panels are arranged in a state where the concrete formwork 1 (5 frames, that is, 2.5 sets of solar panels) is arranged at equal intervals in the width direction (1 m in this embodiment 1). Two connecting bars 2 that are connected and fixed to each other on the 11 side, a connection fitting 3 that connects and fixes the connecting bar 2 and each of the concrete molds 1, a spacing member 4, and a hanging object 5, As the main configuration.

さらに詳述すると、前記コンクリート型枠1は、軽量化のために2枚の木製の短板型枠パネル11と2枚の木製の長板型枠パネル12が用いられ、長板型枠パネル12の外面には、その上縁部と下縁部に沿って補強用角鋼管13が固定されている。
なお、この実施例1では、短板型枠パネル11の長さが1m、長板型枠パネル12の長さが3.5mに設定されている。
More specifically, the concrete formwork 1 includes two wooden short formwork panels 11 and two long wood formwork panels 12 for weight reduction. A reinforcing square steel pipe 13 is fixed to the outer surface of the steel plate along the upper and lower edges.
In the first embodiment, the length of the short plate form panel 11 is set to 1 m, and the length of the long plate form panel 12 is set to 3.5 m.

また、この補強用角鋼管13の両端部には、図5に示すように先端に雄ねじ部31を有する接続金具3が短板型枠パネル11より突出する状態で固定されている。
また、コンクリート型枠1は上面開口部が下面開口部より狭くなるように2枚の短板型枠パネル11と2枚の長板型枠パネル12が内向き傾斜状に組み付けられている。
Further, as shown in FIG. 5, a connecting fitting 3 having a male threaded portion 31 at the tip is fixed to both ends of the reinforcing square steel pipe 13 so as to protrude from the short plate form panel 11.
Moreover, the concrete formwork 1 is assembled with two short plate form panels 11 and two long plate form panels 12 in an inwardly inclined manner so that the upper opening is narrower than the lower opening.

前記連結バー2は、図2、6に示すように、上下2本の角材21の間をトラス22で繋いだ木製のトラスバー23を2本重ねた状態で連結固定され、軽量で強度性に優れた構造となっている。
また、図1に示すように、連結バー2の上面3箇所に吊り下げ用フック24を備えている。
As shown in FIGS. 2 and 6, the connecting bar 2 is connected and fixed in a state where two wooden truss bars 23 in which two upper and lower square members 21 are connected by a truss 22 are overlapped, and are lightweight and excellent in strength. It has a structure.
Further, as shown in FIG. 1, hanging hooks 24 are provided at three positions on the upper surface of the connecting bar 2.

前記間隔保持部材4は、図2、4に示すように、左右両長板型枠パネル12の外周面側である補強用角鋼管13の外面に沿って上方から抜き差し自在に差し込んで両長板型枠パネル12の間隔を維持する役目をなすもので、角鋼管で略門型に形成されている。なお、この実施例1では、図1、2に示すように、5個の間隔保持部材4が等間隔のもとに予め連結一体化されている。   As shown in FIGS. 2 and 4, the spacing member 4 is inserted into the outer side of the reinforcing square steel pipe 13, which is the outer peripheral surface side of the left and right long plate form panels 12, so as to be freely inserted and removed from above. It plays the role which maintains the space | interval of the formwork panel 12, and is formed in the substantially portal shape with the square steel pipe. In the first embodiment, as shown in FIGS. 1 and 2, five interval holding members 4 are connected and integrated in advance at equal intervals.

前記吊金物5は、この実施例1のソーラーパネル架台用基礎型枠をクレーン等で吊り上げて次の設置場所に移動設置するためのもので、図7〜8に示すように、H鋼51で長方形に形成され、その四隅とH鋼51の長手方向中央部からそれぞれ垂らしたワイヤー52の先端に、吊り下げ用フック24に係合するフック53を備えた構成となっている。また、H鋼51のコーナー上面4箇所にクレーン側のワイヤーを接続する接続金具54を備えている。   The hanging hardware 5 is for lifting and mounting the basic form for the solar panel frame of the first embodiment with a crane or the like and moving it to the next installation location. As shown in FIGS. It is formed in a rectangular shape, and has a configuration in which hooks 53 that engage with the hanging hooks 24 are provided at the four corners and the tips of the wires 52 that are hung from the longitudinal center of the H steel 51. Moreover, the connection metal fitting 54 which connects the wire on the crane side is provided at four corner upper surfaces of the H steel 51.

次に、上述のソーラーパネル架台用基礎型枠を用いたソーラーパネル架台基礎の施工工法について説明する。
<工場にて>
この実施例1のソーラーパネル架台用基礎型枠では、上述のように構成されるため、先ず、工場において予め2枚の短板型枠パネル11と2枚の長板型枠パネル12を平面視で長方形に組み付けられた5枠のコンクリート型枠1と、2本の連結バー2と、間隔保持部材4と、吊金物5を準備し、これらを設置現場まで運ぶ。
Next, the construction method of the solar panel frame foundation using the above-mentioned foundation formwork for the solar panel frame will be described.
<At the factory>
Since the basic form for the solar panel frame of the first embodiment is configured as described above, first, two short plate form panels 11 and two long plate form panels 12 are preliminarily viewed in a plan view at the factory. The five concrete molds 1 assembled in a rectangular shape, two connecting bars 2, a spacing member 4, and a hanging object 5 are prepared and carried to the installation site.

<現場にて>
現場では、先ず、2本の連結バー2を敷き並べ水平になるように設置する。
次に、2本の連結バー2相互間において、5枠のコンクリート型枠1を1m間隔のもとに水平かつ同一高さとなるようにレベル及び位置調整して設置する。
次に、コンクリート型枠1に固定された各接続金具3を連結バー2に予め、もしくは現場において開設されたボルト挿通穴25に挿通し、雄ねじ部31にナット32を螺合して締結することにより、両連結バー2−2相互間に5枠のコンクリート型枠1を接続固定し、これを1セットのシステム型枠Kとする。なお、図において、6は角鋼管を用いた火打ち、7は桟木である。
<On site>
At the site, first, the two connecting bars 2 are laid and placed horizontally.
Next, between the two connecting bars 2, the five concrete molds 1 are installed with the level and position adjusted so as to be horizontal and at the same height with an interval of 1 m.
Next, each connection fitting 3 fixed to the concrete formwork 1 is inserted into the coupling bar 2 in advance or through a bolt insertion hole 25 established in the field, and a nut 32 is screwed into the male screw portion 31 and fastened. Thus, the five concrete molds 1 are connected and fixed between the two connecting bars 2-2, and this is used as one set of system molds K. In addition, in the figure, 6 is a fire using a square steel pipe, and 7 is a crosspiece.

次に、システム型枠Kと路盤との間に砂等を詰めて隙間を塞ぐ。
また、各コンクリート型枠1における左右両長板型枠パネル12の外周面側である補強用角鋼管13の外面に沿って上方から間隔保持部材4を差し込んで、補強する。なお、5個のコンクリート型枠1を1m間隔のもとに配置して2本の連結バー2で接続する前に、この間隔保持部材4を用いることにより、コンクリート型枠1、1相互間の配置決めが容易に行えるとともに、コンクリート型枠1、1相互間の寸法精度を高めることができる。
次に、生コン車からシュートを使って各コンクリート型枠1内に直接コンクリートを打設し、木鏝にて天端を均す。
Next, sand or the like is packed between the system formwork K and the roadbed to close the gap.
Moreover, the space | interval holding member 4 is inserted from the upper direction along the outer surface of the square steel pipe 13 for reinforcement which is the outer peripheral surface side of the both left-and-right long plate form panel 12 in each concrete form 1, and it reinforces. In addition, before arrange | positioning five concrete formwork 1 under the space | interval of 1 m, and connecting with the two connection bars 2, by using this space | interval holding member 4, between concrete formwork 1, 1 mutual The layout can be easily determined and the dimensional accuracy between the concrete molds 1 and 1 can be increased.
Next, concrete is placed directly into each concrete formwork 1 using a chute from a ready-mixed car, and the top is leveled with a mallet.

次に、打設したコンクリートが固まった時点で、各間隔保持部材4を上方へ引き抜き、クレーン等にセットされた吊金物5の各フック53を連結バー2に設けられたフック24に係合してシステム型枠Kを上方に持ち上げることにより、型抜きを行う。   Next, when the placed concrete is hardened, each spacing member 4 is pulled upward, and each hook 53 of the hanging object 5 set on a crane or the like is engaged with the hook 24 provided on the connecting bar 2. The mold is removed by lifting the system mold K upward.

次に、クレーンで持ち上げられたシステム型枠Kを次の施工位置に移動して設置し、各コンクリート型枠1にコンクリートを打設する。
なお、前に施工したコンクリート基礎との間隔を1m開けて次のシステム型枠Kを設置することにより、ソーラーパネル3機分のソーラーパネル用架台基礎が施工できることになる。
Next, the system formwork K lifted by the crane is moved to the next construction position and installed, and concrete is placed in each concrete formwork 1.
In addition, by installing the next system formwork K with an interval of 1 m from the concrete foundation previously constructed, it is possible to construct the solar panel platform foundations for three solar panels.

以上の工程を繰り返すことにより、多数のソーラーパネル架台用基礎を施工していく。この場合、システム型枠Kを複数セット用いることで、作業効率を高めることができる。   By repeating the above steps, a large number of foundations for solar panel mounts will be constructed. In this case, work efficiency can be improved by using a plurality of sets of system formwork K.

次に、この実施例1の効果を説明する。   Next, the effect of the first embodiment will be described.

この実施例1のソーラーパネル架台用基礎型枠及びソーラーパネル架台用基礎施工工法では、上述のように、予め2枚の短板型枠パネル11と2枚の長板型枠パネル12を平面視で長方形に予め組み付けられた複数のコンクリート型枠1と、該複数のコンクリート型枠1を幅方向等間隔のもとに並べた状態で両短板型枠パネル11側においてそれぞれ互いに接続固定する2本の連結バー2と、該連結バー2と前記各コンクリート型枠1との間を接続固定する接続金具3と、で構成されるため、現場で複数のコンクリート型枠1を接続固定した後、該複数接続固定されたシステム型枠Kの各コンクリート型枠1にコンクリートを打設し、打設したコンクリートが固まった時点でシステム型枠Kをクレーン等で持ち上げて型抜きをし、次の場所に設置するという工程を繰り返すことで、多数のコンクリート架台用基礎を少人数で能率よく短期間で施工することができるようになる。
従って、生産性の向上により少人数での工期短縮が可能でスケジュール調整が容易であり、かつ労災リスクを低減できるという効果が得られる。
また、工場で精度良く制作された複数のコンクリート型枠1が連結バー2で精度良く連結された状態で用いられるため、各ソーラーパネル架台用基礎のレベル精度を高めることができるようになる。
In the basic form for the solar panel gantry and the basic construction method for the solar panel gantry of the first embodiment, as described above, the two short plate form panels 11 and the two long plate form panels 12 are viewed in plan view. And a plurality of concrete molds 1 assembled in advance in a rectangular shape, and the plurality of concrete molds 1 are connected and fixed to each other on the both sides of the short formwork panel 11 in a state where they are arranged at equal intervals in the width direction. Since the connecting bar 2 of the book, and the connection fitting 3 for connecting and fixing between the connecting bar 2 and each of the concrete molds 1, after connecting and fixing a plurality of concrete molds 1 on site, Place concrete on each concrete formwork 1 of the system formwork K that is connected and fixed, and when the placed concrete has hardened, lift the system formwork K with a crane or the like, and remove the mold. In By repeating the process that location, it is possible to construction in a short time be efficiently the basis for numerous concrete frame in small groups.
Therefore, it is possible to shorten the work period with a small number of people by improving productivity, to easily adjust the schedule, and to reduce the risk of industrial accidents.
Further, since the plurality of concrete molds 1 produced with high precision in the factory are used in a state of being accurately connected by the connecting bar 2, the level accuracy of each solar panel mount base can be increased.

また、連結バー2には少なくとも2箇所に吊り下げ用フック24を備えるため、複数連結された重量物であるシステム型枠Kの型抜き及び移動設置作業等がクレーン等を用いて安定よく吊り上げることができるようになる。   In addition, since the connecting bar 2 is provided with the hanging hooks 24 at least in two places, it is possible to stably lift the system form K, which is a multiple connected heavy object, using a crane or the like. Will be able to.

また、接続金具3はコンクリート型枠1側に予めボルトの基部が固定されており、連結バー2に開設されたボルト宗通穴25に差し込んでナット26で締結固定することにより複数のコンクリート型枠1を幅方向等間隔のもとに並べた状態で両短板型枠パネル11側において互いに接続固定するように構成されているため、現場における複数のコンクリート型枠1の連結作業を能率的に行えるようになる。   Further, the base 3 of the bolt is fixed in advance to the concrete formwork 1 side of the connection fitting 3, and a plurality of concrete formwork is inserted by being inserted into the bolt communication holes 25 formed in the connecting bar 2 and fastened and fixed with nuts 26. 1 is arranged to be connected and fixed to each other on the both sides of the short plate form panel 11 in a state in which they are arranged at equal intervals in the width direction, so that a plurality of concrete formwork 1 can be efficiently connected in the field. You can do it.

また、コンクリート型枠1は上面開口部が下面開口部より狭くなるように2枚の短板型枠パネル11と2枚の長板型枠パネル12が内向き傾斜状に組み付けられているため、コンクリート硬化後の型抜き作業をスムーズに行えるようになる。   Moreover, since the concrete formwork 1 is assembled with the two short plate form panels 11 and the two long plate form panels 12 so as to be inclined inward so that the top opening is narrower than the bottom opening, Die-cutting work after hardening concrete can be performed smoothly.

また、2枚の長板型枠パネル11の外周面に沿って上方から抜き差し自在に差し込んで両長板型枠パネル12の間隔を維持する門型の間隔保持部材4を備えることで、コンクリート打設時の両長板型枠パネル12の間隔を維持しつつ、各コンクリート型枠1の上方への型抜きが容易に行えるようになる。
また、システム型枠Kを構成するコンクリート型枠1の個数に合わせて、間隔保持部材4を予め等間隔(1m間隔)のもとに予め連結一体化しておくことにより、間隔保持部材4の着脱作業効率を高めることができると共に、コンクリート型枠1、1相互間の配置寸法精度を高めることができる。
Further, by providing a portal-type interval holding member 4 that can be inserted / removed from above along the outer peripheral surface of the two long plate form panels 11 to maintain the interval between the two long plate form panels 12, While maintaining the distance between the two long plate form panels 12 at the time of installation, it is possible to easily perform the die cutting upward of each concrete form 1.
Moreover, according to the number of the concrete formwork 1 which comprises the system formwork K, the space | interval holding member 4 is connected and integrated beforehand at equal intervals (1 m interval) beforehand, and attachment / detachment of the space holding member 4 is carried out. The working efficiency can be increased, and the arrangement dimensional accuracy between the concrete molds 1 and 1 can be increased.

以上本実施例を説明してきたが、本発明は上述の実施例に限られるものではなく、本発明の要旨を逸脱しない範囲の設計変更等があっても、本発明に含まれる。   Although the present embodiment has been described above, the present invention is not limited to the above-described embodiment, and design changes and the like within a scope not departing from the gist of the present invention are included in the present invention.

例えば、実施例1では、連結バー2と各コンクリート型枠1との間を接続固定する接続金具3として、先端に雄ねじ部31を有するボルトの基部をコンクリート型枠1側である補強用角鋼管13の両端部に予め固定したが、現場での後付けでも良く、また、それ以外の接続構造であってもよい。   For example, in the first embodiment, as a connection fitting 3 for connecting and fixing between the connecting bar 2 and each concrete mold 1, a reinforcing square steel pipe in which a base of a bolt having a male thread portion 31 at the tip is the concrete mold 1 side. Although it was fixed to the both ends of 13 in advance, it may be retrofitted on-site or may be other connection structures.

また、実施例1では、システム型枠を5枠のコンクリート型枠1で構成したが、コンクリート型枠の連結個数は任意である。   Moreover, in Example 1, although the system formwork was comprised with the five concrete formwork 1, the connection number of concrete formwork is arbitrary.

また、実施例1では、コンクリート型枠1の形状を長方形としたが、その形状や大きさは任意である。   Moreover, in Example 1, although the shape of the concrete formwork 1 was made into the rectangle, the shape and magnitude | size are arbitrary.

また、実施例1では、5個の間隔保持部材4が等間隔のもとに予め連結一体化された場合を示したが、図10に示すように、各コンクリート型枠1毎に個別に形成してもよい。また、間隔保持部材4の使用個数も任意である。   Moreover, in Example 1, although the case where the five space | interval holding members 4 were connected and integrated previously at equal intervals was shown, as shown in FIG. 10, it forms individually for each concrete formwork 1 May be. Further, the number of the spacing members 4 used is also arbitrary.

1 コンクリート型枠
11 短板型枠パネル
12 長板型枠パネル
13 補強用角鋼管
2 連結バー
21 角材
22 トラス
23 トラスバー
24 フック
25 ボルト挿通穴
26 ナット
3 接続金具
31 雄ねじ部
32 ナット
4 間隔保持部材
5 吊金物
51 H鋼
52 ワイヤー
53 フック
54 接続金具
6 火打ち
7 桟木
K システム型枠
DESCRIPTION OF SYMBOLS 1 Concrete formwork 11 Short plate form panel 12 Long plate form panel 13 Reinforcement square steel pipe 2 Connection bar 21 Square material 22 Truss 23 Truss bar 24 Hook 25 Bolt insertion hole 26 Nut 3 Connection metal fitting 31 Male thread part 32 Nut 4 Spacing member 5 Hang 51 H Steel 52 Wire 53 Hook 54 Connecting metal 6 Fire-fired 7 Crossing K System formwork

Claims (6)

予め2枚の短板型枠パネルと2枚の長板型枠パネルを平面視で長方形に予め組み付けられた複数のコンクリート型枠と、該複数のコンクリート型枠を幅方向等間隔のもとに並べた状態で両短板型枠パネル側においてそれぞれ互いに接続固定する2本の連結バーと、該連結バーと前記各コンクリート型枠との間を接続固定する接続金具と、で構成されていることを特徴とするソーラーパネル架台用基礎型枠。   A plurality of concrete molds preliminarily assembled in a rectangular shape in plan view with two short plate mold panels and two long plate mold panels in advance, and the plurality of concrete molds at equal intervals in the width direction It is composed of two connecting bars that are connected and fixed to each other on both short plate mold panels side by side, and a connection fitting that connects and fixes the connecting bar and each concrete formwork. A basic formwork for solar panel mounts. 請求項1に記載のソーラーパネル架台用基礎型枠において、
前記連結バーには少なくとも2箇所に吊り下げ用フックを備えることと特徴とするソーラーパネル架台用基礎型枠
In the basic formwork for solar panel mount according to claim 1,
A base formwork for a solar panel mount, wherein the connection bar has hanging hooks in at least two places.
請求項1または2に記載のソーラーパネル架台用基礎型枠において、
前記接続金具はコンクリート型枠側に予めボルトの基部が固定されており、前記連結バーに開設された穴に差し込んでナット締めすることにより複数のコンクリート型枠を幅方向等間隔のもとに並べた状態で両短板型枠パネル側において互いに接続固定するように構成されていることを特徴とするソーラーパネル架台用基礎型枠。
In the basic formwork for solar panel mount according to claim 1 or 2,
The connection bracket has a bolt base fixed to the concrete formwork side in advance, and a plurality of concrete formwork are arranged at equal intervals in the width direction by inserting into a hole opened in the connecting bar and tightening with a nut. A base formwork for a solar panel gantry, which is configured to be connected and fixed to each other on both short plate formwork panels in a state of being attached.
請求項1〜3のいずれか1項に記載のソーラーパネル架台用基礎型枠において、
前記コンクリート型枠は上面開口部が下面開口部より狭くなるように前記2枚の短板型枠パネルと2枚の長板型枠パネルが内向き傾斜状に組み付けられていることを特徴とするソーラーパネル架台用基礎型枠。
In the basic formwork for solar panel mounts according to any one of claims 1 to 3,
The concrete formwork is characterized in that the two short plate form panels and the two long plate form panels are assembled in an inwardly inclined shape so that the upper opening is narrower than the lower opening. Basic formwork for solar panel mount.
請求項1〜4のいずれか1項に記載のソーラーパネル架台用基礎型枠において、
前記2枚の長板型枠パネルの外周面に沿って上方から抜き差し自在に差し込んで両長板型枠パネルの間隔を維持する門型の間隔保持部材を備えることを特徴とするソーラーパネル架台用基礎型枠。
In the basic formwork for solar panel mounts according to any one of claims 1 to 4,
For a solar panel gantry comprising a portal-type spacing holding member that is detachably inserted from above along the outer peripheral surface of the two long plate form panels and maintains the distance between both long plate form panels Basic formwork.
工場において予め2枚の短板型枠パネルと2枚の長板型枠パネルを平面視で長方形のコンクリート型枠に予め組み付ける第1工程と、
現場において前記複数のコンクリート型枠を幅方向等間隔のもとに並べた状態で両短板型枠パネル側においてそれぞれ連結バーで互いに接続固定する第2工程と、
複数接続固定された各コンクリート型枠にコンクリートを打設する第3工程と、
打設したコンクリートが固まった時点で複数連結固定されたコンクリート型枠をクレーン等で持ち上げて型抜きし、次の施工場所に設置する第4工程と、
以後は上記第3工程と第4工程を繰り返すことにより多数のソーラーパネル架台用基礎を施工していくことを特徴とするソーラーパネル架台用基礎型枠施工工法。
A first step of pre-assembling two short plate form panels and two long plate form panels in a factory in a rectangular concrete form in plan view;
A second step of connecting and fixing each of the plurality of concrete molds to each other with a connecting bar on both short plate mold panel sides in a state where the plurality of concrete molds are arranged at equal intervals in the width direction;
A third step of placing concrete in each of the concrete forms fixed in a plurality of connections;
When the cast concrete is solidified, a plurality of concrete molds that are connected and fixed are lifted with a crane or the like and punched out, and installed at the next construction site;
After that, a plurality of foundations for solar panel mounts are constructed by repeating the third and fourth steps described above, and a foundation formwork construction method for solar panel mounts.
JP2012069279A 2012-03-26 2012-03-26 Foundation form for solar panel mount and foundation construction method for solar panel mount Expired - Fee Related JP5005839B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012069279A JP5005839B1 (en) 2012-03-26 2012-03-26 Foundation form for solar panel mount and foundation construction method for solar panel mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012069279A JP5005839B1 (en) 2012-03-26 2012-03-26 Foundation form for solar panel mount and foundation construction method for solar panel mount

Publications (2)

Publication Number Publication Date
JP5005839B1 true JP5005839B1 (en) 2012-08-22
JP2013199795A JP2013199795A (en) 2013-10-03

Family

ID=46844454

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012069279A Expired - Fee Related JP5005839B1 (en) 2012-03-26 2012-03-26 Foundation form for solar panel mount and foundation construction method for solar panel mount

Country Status (1)

Country Link
JP (1) JP5005839B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011006849A (en) * 2009-06-23 2011-01-13 Sekisui House Ltd Method for constructing foundation
JP2011202479A (en) * 2010-03-26 2011-10-13 Mitsubishi Electric Corp Support frame for solar cell array

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011006849A (en) * 2009-06-23 2011-01-13 Sekisui House Ltd Method for constructing foundation
JP2011202479A (en) * 2010-03-26 2011-10-13 Mitsubishi Electric Corp Support frame for solar cell array

Also Published As

Publication number Publication date
JP2013199795A (en) 2013-10-03

Similar Documents

Publication Publication Date Title
KR101983719B1 (en) Permanent form for pier and construction method using the same
JP5488895B2 (en) Module structure, plant, plant construction method using module structure
JP6860167B2 (en) How to build Box Culvert and Box Culvert
JP6046984B2 (en) Seismic isolation construction method and precast concrete footing
JP2014181439A (en) Form device for prismatic concrete structure and construction method using the same
KR101429137B1 (en) PC Beam Unit Connection Structure For Expensive Space And Construction Method Thereof
JP5005839B1 (en) Foundation form for solar panel mount and foundation construction method for solar panel mount
CN215660892U (en) Vertical die assembly
CN208309947U (en) A kind of hollow floor
CN202787300U (en) Control form for positions of foundation bolts of fixed tower crane
JP5618550B2 (en) Reinforcing bar placement in reinforced concrete forming
JP2010275743A (en) Structure for fixing wall panel
JP2015048655A (en) Photovoltaic power generation panel erection structure in photovoltaic power generation device, and method for constructing the same
JP3194686U (en) Column formwork device
CN203667842U (en) Freely-assembled hoisting device
JP6914822B2 (en) Formwork method and formwork unit for lifting
CN220807869U (en) Mould is used in prefabricated shear force wall production
KR20110006970U (en) Mould comprising wood plate and steel plate
CN109577650B (en) Assembled steel hanger for auxiliary prefabrication of large-scale steel reinforcement framework on construction site and construction method for auxiliary prefabrication of large-scale steel reinforcement framework
JP2019088172A (en) Concrete formwork assembly for frame of solar power generation panel and installation method of frame using the formwork assembly
CN203065955U (en) Detachable flyover planter installation structure
JP6922130B2 (en) Construction method of steel materials on the outer wall of a building
JP2005054427A (en) Method for reinforcing lost part of footing beam for underfloor communication
JP5185897B2 (en) Retaining wall construction method
CN202810750U (en) Precast process fixing foundation pier

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120523

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150601

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5005839

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees