JP4998921B2 - Steel plate concrete structure - Google Patents

Steel plate concrete structure Download PDF

Info

Publication number
JP4998921B2
JP4998921B2 JP2007186876A JP2007186876A JP4998921B2 JP 4998921 B2 JP4998921 B2 JP 4998921B2 JP 2007186876 A JP2007186876 A JP 2007186876A JP 2007186876 A JP2007186876 A JP 2007186876A JP 4998921 B2 JP4998921 B2 JP 4998921B2
Authority
JP
Japan
Prior art keywords
steel plate
concrete structure
stud bolt
concrete
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007186876A
Other languages
Japanese (ja)
Other versions
JP2009024359A (en
Inventor
芳寛 下戸
哲也 豊田
仁志 熊谷
宏 村上
功 小島
和司 島▲崎▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanagawa University
Shimizu Corp
Original Assignee
Kanagawa University
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kanagawa University, Shimizu Corp filed Critical Kanagawa University
Priority to JP2007186876A priority Critical patent/JP4998921B2/en
Publication of JP2009024359A publication Critical patent/JP2009024359A/en
Application granted granted Critical
Publication of JP4998921B2 publication Critical patent/JP4998921B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、例えば原子力発電所建屋の床に適用する鋼板コンクリート構造体に関するものである。   The present invention relates to a steel plate concrete structure applied to a floor of a nuclear power plant building, for example.

原子力発電所建屋の中には、例えばスタッドボルトを一方の表面に立設した複数の鋼板を用いて床を構築したものがある。すなわち、例えば図20に示すように、スタッドボルト1を一方の表面に立設した複数の鋼板2を、周縁が互いに隣接する態様で配置する。   In some nuclear power plant buildings, for example, a floor is constructed using a plurality of steel plates in which stud bolts are erected on one surface. That is, for example, as shown in FIG. 20, a plurality of steel plates 2 in which stud bolts 1 are erected on one surface are arranged in such a manner that their peripheral edges are adjacent to each other.

次いで、隣接する鋼板2のそれぞれにオーバーラップするよう継手材3を配置してから、連結した一方の鋼板2に継手材3の一方の側端部を隅肉溶接し、かつ連結した他方の鋼板2に、継手材3の他方の側端部を隅肉溶接することで、隣接する一方の鋼板2と他方の鋼板2とを連結する。   Next, after placing the joint material 3 so as to overlap each of the adjacent steel plates 2, one side end of the joint material 3 is fillet welded to the connected one steel plate 2, and the other steel plate is connected. 2, the adjacent one steel plate 2 and the other steel plate 2 are connected by fillet welding the other side end of the joint material 3.

このように継手材3を連結手段として隣接する鋼板2間を連結した後、図21に示すように、鋼板2の上層に鉄筋4を設け、かつその鉄筋4の上部に埋込金物5を取り付けた後、埋込金物5が表面に現れ、かつ鋼板2のスタッドボルト1、および鉄筋4を取り込む態様で、鋼板2の上層にコンクリート体を打設することで鋼板コンクリート構造体を構築する。   After connecting the adjacent steel plates 2 using the joint material 3 as a connecting means in this way, as shown in FIG. 21, a reinforcing bar 4 is provided on the upper layer of the steel plate 2, and an embedded metal fitting 5 is attached to the upper portion of the reinforcing bar 4. Then, the steel plate concrete structure is constructed by placing the concrete body on the upper layer of the steel plate 2 in such a manner that the embedded metal 5 appears on the surface and takes in the stud bolt 1 and the reinforcing bar 4 of the steel plate 2.

また、原子力発電所の建屋の中には、以下のようにして床を構築したものがある。すなわち、図22に示すように、先ず、スタッドボルト1を一方の表面に立設した複数の鋼板2を、周縁が互いに隣接する態様で配置する。より具体的には、例えばボルト孔を有するアングル11を一方の縁部に取り付けた一方の鋼板2と、ボルト孔を有するアングル11を他方の縁部に取り付けた他方の鋼板2とを、ボルト孔が相互に合致するよう隣接する態様で配置する。   Some nuclear power plant buildings have floors constructed as follows. That is, as shown in FIG. 22, first, a plurality of steel plates 2 with the stud bolts 1 standing on one surface are arranged in such a manner that their peripheral edges are adjacent to each other. More specifically, for example, one steel plate 2 having an angle 11 having a bolt hole attached to one edge portion and the other steel plate 2 having an angle 11 having a bolt hole attached to the other edge portion are connected to the bolt hole. Are arranged adjacent to each other so as to match each other.

次いで、上記ボルト孔に合致する貫通孔を有する座金12を、当該ボルト孔に合致するよう一方の鋼板2のアングル11に設ける。また、上記ボルト孔に合致する貫通孔を有する座金12を、当該ボルト孔に合致するよう他方の鋼板2のアングル11に設ける。   Next, a washer 12 having a through hole that matches the bolt hole is provided on the angle 11 of one steel plate 2 so as to match the bolt hole. In addition, a washer 12 having a through hole that matches the bolt hole is provided on the angle 11 of the other steel plate 2 so as to match the bolt hole.

次に、2つの座金12の貫通孔および2つのアングル11のボルト孔に高力ボルト13の先端を挿入してから、その高力ボルト13を一対のボルト孔に締結することによって隣接する一方の鋼板2と他方の鋼板2とを連結する。   Next, after inserting the tips of the high strength bolts 13 into the through holes of the two washers 12 and the bolt holes of the two angles 11, the high strength bolt 13 is fastened to the pair of bolt holes, so that The steel plate 2 and the other steel plate 2 are connected.

このように一対のアングル11、一対の座金12、および高力ボルト13を連結手段として隣接する鋼板2間を連結した後、図示省略するが、鋼板2の上層に鉄筋4を設け、かつその鉄筋4の上部に埋込金物5を取り付けた後、埋込金物5が表面に現れ、かつ鋼板2のスタッドボルト1および鉄筋4を取り込む態様で、鋼板2の上層にコンクリート体を打設することで鋼板コンクリート構造体を構築する。   Thus, after connecting between the adjacent steel plates 2 using the pair of angles 11, the pair of washers 12, and the high strength bolts 13 as connecting means, the reinforcing bars 4 are provided on the upper layer of the steel plates 2, and the reinforcing bars are omitted. After attaching the embedded metal 5 to the upper part of 4, the embedded metal 5 appears on the surface, and the concrete body is placed on the upper layer of the steel plate 2 in such a manner that the stud bolt 1 and the reinforcing bar 4 of the steel plate 2 are taken in. Build a steel plate concrete structure.

ところで、上述したように、一対のアングル11、一対の座金12、および高力ボルト13を連結手段として床を構築した場合には、アングル11のボルト孔が合致するように一方の鋼板2および他方の鋼板2を配置する作業、それらのボルト孔に高力ボルト13の先端を挿入する作業、およびアングル11のボルト孔に高力ボルト13を締結する作業が必要となり、構築作業に手間がかかる問題があった。   By the way, as described above, when the floor is constructed using the pair of angles 11, the pair of washers 12, and the high strength bolts 13 as the connecting means, one steel plate 2 and the other so that the bolt holes of the angle 11 are matched. The work which arranges the steel plate 2 of this, the operation | work which inserts the front-end | tip of the high strength bolt 13 in those bolt holes, and the operation | work which fastens the high strength bolt 13 to the bolt hole of the angle 11 are needed, and construction work takes time was there.

また、継手材3を隣接する鋼板2にそれぞれ溶接し、継手材3を連結手段として床を構築した場合には、溶接によって鋼板2の塗装が焦げ、補修が必要になるため、構築作業に手間がかかる問題があった。   In addition, when the joint material 3 is welded to each adjacent steel plate 2 and a floor is constructed using the joint material 3 as a connecting means, the steel plate 2 is burnt by welding and repair is necessary. There was a problem that took.

上述した問題は、原子力発電所の床のように、構築する床の面積が大きい場合には、上記作業量がその大きさに伴って増加することとなる。   The problem described above is that when the floor area to be constructed is large, such as the floor of a nuclear power plant, the amount of work increases with the size of the floor.

本発明は、上記に鑑みてなされたものであって、構築作業が容易な鋼板コンクリート構造体を提供することにある。   This invention is made | formed in view of the above, Comprising: It is providing the steel plate concrete structure with easy construction.

上述した課題を解決し、目的を達成するために、本発明は、隣接する態様で配置した複数の鋼板と、隣接する前記鋼板間を連結する連結手段と、前記連結手段によって連結した前記鋼板の上層に打設されたコンクリート体とを備える鋼板コンクリート構造体において、前記連結手段は、隣接する前記鋼板にそれぞれ立設する柱状体と、隣接する前記鋼板のそれぞれに立設した前記柱状体に挿通する挿通孔を有し、かつ前記コンクリート体を打設した後には前記挿通孔の内面と前記柱状体との間にコンクリートが充填される連結材とを備えることを特徴とする。   In order to solve the above-described problems and achieve the object, the present invention provides a plurality of steel plates arranged in an adjacent manner, connecting means for connecting the adjacent steel plates, and the steel plates connected by the connecting means. In the steel plate concrete structure comprising a concrete body placed in an upper layer, the connecting means is inserted into the columnar body standing on each of the adjacent steel plates and the columnar body standing on each of the adjacent steel plates. And a connecting material filled with concrete between the inner surface of the insertion hole and the columnar body after the concrete body is placed.

また、本発明の請求項2に係る鋼板コンクリート構造体は、上記請求項1において、前記連結材は、あらかじめ成形した金属板であることを特徴とする。   The steel plate concrete structure according to claim 2 of the present invention is characterized in that, in the above-mentioned claim 1, the connecting material is a pre-formed metal plate.

また、本発明の請求項3に係る鋼板コンクリート構造体は、上記請求項1において、前記連結材は、あらかじめ金属線材を巻回することで構成したスパイラル体であることを特徴とする。   The steel plate concrete structure according to claim 3 of the present invention is characterized in that, in the above-mentioned claim 1, the connecting material is a spiral body configured by winding a metal wire in advance.

本発明にかかる鋼板コンクリート構造体によれば、連結手段は、隣接する鋼板にそれぞれ立設する柱状体と、隣接する鋼板のそれぞれに立設した柱状体に挿通する挿通孔を有し、かつコンクリート体を打設した後には挿通孔の内面と柱状体との間にコンクリートが充填される連結材とを備えるため、連結材の挿通孔を柱状体に挿通する際、挿通孔の内面と柱状体との間に間隙を設けることができ、隣接する鋼板の連結作業効率を向上することができる。しかも、上記柱状体および連結材によって隣接する鋼板を連結することができるため、例えば継手材を隣接する一方の鋼板に溶接し、かつその継手材を隣接する他方の鋼板に溶接することで隣接する鋼板を連結する必要がない。よって、溶接する必要がないから、鋼板が焦げることもなく、当然に、焦げを補修する必要もない。加えて、上記連結手段によって隣接する鋼板を連結するため、アングル、座金、および高力ボルトで構成される連結手段を使用する必要がない。よって、アングルのボルト孔に高力ボルトの先端を挿入する作業、およびアングルのボルト孔に高力ボルトを締結する作業が不要である。従って、構築作業が容易な鋼板コンクリート構造体を提供することができる。   According to the steel plate concrete structure according to the present invention, the connecting means has a columnar body standing on each adjacent steel plate, an insertion hole inserted into each columnar body standing on each adjacent steel plate, and concrete. After inserting the body, since it includes a connecting material filled with concrete between the inner surface of the insertion hole and the columnar body, when inserting the insertion hole of the connecting material into the columnar body, the inner surface of the insertion hole and the columnar body A gap can be provided between the adjacent steel plates, and the connection work efficiency of adjacent steel plates can be improved. Moreover, since the adjacent steel plates can be connected by the columnar body and the connecting material, for example, the joint material is welded to one adjacent steel plate, and the joint material is welded to the other adjacent steel plate. There is no need to connect steel plates. Therefore, since there is no need to weld, the steel plate does not burn, and naturally, there is no need to repair the burn. In addition, since the adjacent steel plates are connected by the connecting means, there is no need to use a connecting means composed of an angle, a washer, and a high-strength bolt. Therefore, the operation | work which inserts the front-end | tip of a high strength bolt in an angle bolt hole, and the operation | work which fastens a high strength bolt in an angle bolt hole are unnecessary. Therefore, it is possible to provide a steel plate concrete structure that can be easily constructed.

以下に、本発明に係る鋼板コンクリート構造体の実施の形態を図面に基づいて詳細に説明する。   Hereinafter, embodiments of a steel plate concrete structure according to the present invention will be described in detail with reference to the drawings.

[実施の形態1]
図1は、本発明の実施の形態1に係る鋼板コンクリート構造体の要部を示す断面側面図である。この鋼板コンクリート構造体30は、例えば原子力発電所等の建築物の床に適用するものであって、複数の鋼板32と、第1連結手段34と、コンクリート体38とを備えている。なお、本発明に係る鋼板コンクリート構造体30も、上述した鉄筋4、および埋込金物5を有しているが、図1において省略してある。
[Embodiment 1]
FIG. 1 is a cross-sectional side view showing a main part of a steel plate concrete structure according to Embodiment 1 of the present invention. The steel plate concrete structure 30 is applied to a floor of a building such as a nuclear power plant, for example, and includes a plurality of steel plates 32, a first connecting means 34, and a concrete body 38. In addition, although the steel plate concrete structure 30 which concerns on this invention also has the reinforcing bar 4 and the embedded metal fitting 5 which were mentioned above, it has abbreviate | omitted in FIG.

鋼板32は、例えば矩形板状に形成してあり、構築する床の面積に応じた数だけ用意してある。鋼板32の一方の表面には、図2に示すように、スタッドボルト35が立設してある。   The steel plates 32 are formed in a rectangular plate shape, for example, and a number corresponding to the area of the floor to be constructed is prepared. A stud bolt 35 is erected on one surface of the steel plate 32 as shown in FIG.

スタッドボルト35は、上記コンクリート体38との接触面積を増加させることで、鋼板32とコンクリート体38とを一体化するものであって、鋼板32の一方の表面から上方に向かって突出する態様で設けてある。このスタッドボルト35は、あらかじめ設定した間隔となるよう鋼板32の上に縦横となる態様で立設してある。より具体的には、スタッドボルト35は、左右幅方向の間隔がdx1であり、奥行幅方向の間隔がdx2となるよう鋼板32の上に縦横となる態様で立設してある。本実施の形態1では、左右幅方向の間隔dx1と、奥行幅方向の間隔dx2とが同一のもので説明する。なお、上述した複数のスタッドボルト35のうち、隣接する鋼板32間を連結する際に使用するものが実施の形態1の発明における柱状体である。具体的には、隣接する2枚の鋼板32間において、図1中、隣接する縁に沿って立設した1列のスタッドボルト35が実施の形態1の発明における柱状体である。   The stud bolt 35 integrates the steel plate 32 and the concrete body 38 by increasing the contact area with the concrete body 38, and protrudes upward from one surface of the steel plate 32. It is provided. The stud bolts 35 are erected in a vertical and horizontal manner on the steel plate 32 so as to have a predetermined interval. More specifically, the stud bolts 35 are erected on the steel plate 32 so as to be vertically and horizontally so that the distance in the left-right width direction is dx1 and the distance in the depth width direction is dx2. In the first embodiment, the description will be made assuming that the distance dx1 in the left-right width direction and the distance dx2 in the depth width direction are the same. In addition, what is used when connecting between the adjacent steel plates 32 among the several stud bolts 35 mentioned above is the columnar body in invention of Embodiment 1. FIG. Specifically, a row of stud bolts 35 erected along adjacent edges in FIG. 1 between two adjacent steel plates 32 is the columnar body in the invention of the first embodiment.

スタッドボルト35は、図3に示すように、上下方向に延在するボルト軸35xに沿うよう形成してあり、軸部35aと、先端部35bとを有している。軸部35aは、上下方向に延在する円柱状に形成してある。先端部35bは、円柱状に形成してある。先端部35bの径の大きさda2は、軸部35aの径の大きさda1より大きく設定してある。また、軸部35aの上下方向の大きさdb1は、先端部35bの上下方向の大きさdb2よりも大きくなるよう設定してある。   As shown in FIG. 3, the stud bolt 35 is formed along a bolt shaft 35x extending in the vertical direction, and has a shaft portion 35a and a tip portion 35b. The shaft portion 35a is formed in a columnar shape extending in the vertical direction. The tip portion 35b is formed in a cylindrical shape. The diameter da2 of the tip portion 35b is set larger than the diameter da1 of the shaft portion 35a. Further, the vertical size db1 of the shaft portion 35a is set to be larger than the vertical size db2 of the tip portion 35b.

第1連結手段34は、図1に示すように、隣接する鋼板32間を相互に連結するものであって、上記スタッドボルト35と、第1連結材(連結材)36とで構成してある。   As shown in FIG. 1, the first connecting means 34 connects the adjacent steel plates 32 to each other, and includes the stud bolt 35 and a first connecting material (connecting material) 36. .

第1連結材36は、図4および図5に示すように、左右幅方向(図4における横方向)の長さに比して奥行幅方向(図4中における縦方向)の長さが長い矩形板状にあらかじめ成形した金属板である。この第1連結材36は、奥行幅方向の大きさが、例えば鋼板32の奥行幅方向の大きさと同一である。この第1連結材36の長手方向に沿った一方の側端部には、隣接する2枚の鋼板32において、一方の鋼板32にオーバーラップする第1オーバーラップ部36cを設定してある。さらに、第1連結材36の長手方向に沿った他方の側端部には、隣接する2枚の鋼板32において、他方の鋼板32にオーバーラップする第2オーバーラップ部36dを設定してある。   As shown in FIGS. 4 and 5, the first connecting member 36 is longer in the depth width direction (vertical direction in FIG. 4) than in the left-right width direction (lateral direction in FIG. 4). It is a metal plate previously formed into a rectangular plate shape. The first connecting member 36 has the same size in the depth width direction as that of the steel plate 32 in the depth width direction, for example. At one side end portion along the longitudinal direction of the first connecting member 36, a first overlap portion 36 c that overlaps one steel plate 32 is set in two adjacent steel plates 32. Furthermore, a second overlap portion 36 d that overlaps the other steel plate 32 is set at the other side end along the longitudinal direction of the first connecting member 36 in the two adjacent steel plates 32.

第1連結材36は、さらに、スタッドボルト35を挿通するための第1挿通孔(挿通孔)36hを複数有している。より具体的には、第1オーバーラップ部36cおよび第2オーバーラップ部36dに、上記スタッドボルト35の奥行幅方向の間隔dx2に対応する第1挿通孔36hを有している。より具体的には、第1挿通孔36hは、自身の中央の中心軸36xと、奥行幅方向において隣接する第1挿通孔36hの中心軸36xとの間隔dhx1が、上述したスタッドボルト35の奥行幅方向の間隔dx2と同一となるよう第1連結材36に形成してある。各第1挿通孔36hは、上下方向に沿って延在するよう円筒状にそれぞれ形成してある。この第1挿通孔36hの中心軸36xから円筒状の内壁(内面)までの距離ha1を2倍した孔径は、第1挿通孔36hにスタッドボルト35が入るように、スタッドボルト35の軸部35aの径の大きさda1、および先端部35bの径の大きさda2よりも十分大きくなるよう設定してある。さらに、左右幅方向において、相互に隣接する第1挿通孔36hの間隔dhx2は、隣接する2枚の鋼板32において、一方の鋼板32の縁に立設したスタッドボルト35と、他方の鋼板32の縁に立設したスタッドボルト35との間隔と同一である。   The first connecting member 36 further has a plurality of first insertion holes (insertion holes) 36 h for inserting the stud bolts 35. More specifically, the first overlap portion 36c and the second overlap portion 36d have first insertion holes 36h corresponding to the distance dx2 in the depth width direction of the stud bolt 35. More specifically, the first insertion hole 36h has a depth dhx1 between the center axis 36x of its own center and the center axis 36x of the first insertion hole 36h adjacent in the depth width direction. The first connecting member 36 is formed so as to have the same distance dx2 in the width direction. Each first insertion hole 36h is formed in a cylindrical shape so as to extend along the vertical direction. The hole diameter obtained by doubling the distance ha1 from the central axis 36x of the first insertion hole 36h to the cylindrical inner wall (inner surface) is such that the stud bolt 35 is inserted into the first insertion hole 36h. The diameter da1 and the diameter da2 of the tip 35b are set to be sufficiently larger. Furthermore, in the left-right width direction, the distance dhx2 between the first insertion holes 36h adjacent to each other is such that the stud bolt 35 erected on the edge of one steel plate 32 and the other steel plate 32 in the two adjacent steel plates 32. This is the same as the distance from the stud bolt 35 erected on the edge.

鉄筋4は、構築する鋼板コンクリート構造体30に応じ、第1連結手段34によって連結した鋼板32の上方に設けるものである。   The reinforcing bars 4 are provided above the steel plates 32 connected by the first connecting means 34 in accordance with the steel plate concrete structure 30 to be constructed.

埋込金物5は、必要に応じて鉄筋4の上部に取り付けるものである。   The embedded metal 5 is attached to the upper part of the reinforcing bar 4 as necessary.

コンクリート体38は、図1に示す第1連結手段34によって連結した鋼板32の上層にコンクリートを流し込み、その後、コンクリートを固化させることによって打設するものである。   The concrete body 38 is placed by pouring concrete into the upper layer of the steel plates 32 connected by the first connecting means 34 shown in FIG. 1 and then solidifying the concrete.

次に、本発明に係る鋼板コンクリート構造体30の構築方法を説明する。先ず、例えば工場において、図2に示す矩形状の鋼板32を複数形成し、かつそれら鋼板32の一方の表面に上記スタッドボルト35を溶接することで、各鋼板32にスタッドボルト35をそれぞれ立設する。また、例えば工場において、上記第1連結材36をあらかじめ成形しておく。   Next, the construction method of the steel plate concrete structure 30 according to the present invention will be described. First, for example, in a factory, a plurality of rectangular steel plates 32 shown in FIG. 2 are formed, and the stud bolts 35 are welded to one surface of the steel plates 32, so that the stud bolts 35 are erected on each steel plate 32, respectively. To do. For example, in the factory, the first connecting member 36 is formed in advance.

その後、複数の鋼板32および第1連結材36を、例えば原子力発電所の建設現場に輸送する。   Thereafter, the plurality of steel plates 32 and the first connecting member 36 are transported, for example, to a construction site of a nuclear power plant.

原子力発電所の床を構築する部位には、図1に示すように、上記複数の鋼板32を、周縁が互いに隣接する態様で配置する。このとき、隣接する鋼板32間には、例えば間隙Δx1を設けておく。   As shown in FIG. 1, the plurality of steel plates 32 are arranged in a manner in which the peripheral edges are adjacent to each other at the site where the floor of the nuclear power plant is constructed. At this time, for example, a gap Δx1 is provided between adjacent steel plates 32.

次いで、図6および図7に示すように、柱状体として使用するスタッドボルト35に、第1連結材36の第1挿通孔36hをそれぞれ挿通し、隣接する鋼板32間を第1連結手段34で連結する。スタッドボルト35に第1挿通孔36hを挿通した状態では、図7に示すように、第1挿通孔36hの内壁と、スタッドボルト35の周面との間には間隙Δx2が形成されることとなる。   Next, as shown in FIGS. 6 and 7, the first insertion holes 36 h of the first connection members 36 are respectively inserted into the stud bolts 35 used as the columnar bodies, and the first connection means 34 connects between the adjacent steel plates 32. Link. When the first insertion hole 36h is inserted through the stud bolt 35, a gap Δx2 is formed between the inner wall of the first insertion hole 36h and the peripheral surface of the stud bolt 35, as shown in FIG. Become.

次いで、第1連結手段34によって連結した各鋼板32の上層に鉄筋4をそれぞれ設け、かつその鉄筋4の上部に埋込金物5を取り付ける。   Next, the reinforcing bars 4 are provided on the upper layers of the steel plates 32 connected by the first connecting means 34, and the embedded metal 5 is attached to the upper part of the reinforcing bars 4.

最後に、埋込金物5が表面に現れ、かつ第1連結手段34によって連結した各鋼板32のスタッドボルト35、第1連結材36、および鉄筋4を取り込む態様で、各鋼板32の上層にコンクリートを流し、そのコンクリートを固化することで、第1連結手段34によって連結した鋼板32の上層にコンクリート体38を打設し、それにより図1に示す鋼板コンクリート構造体30を構築する。   Finally, the embedded metal 5 appears on the surface and the stud bolt 35, the first connecting member 36, and the reinforcing bar 4 of each steel plate 32 connected by the first connecting means 34 are taken in, and the concrete is formed on the upper layer of each steel plate 32. 1 and solidifying the concrete, the concrete body 38 is placed on the upper layer of the steel plate 32 connected by the first connecting means 34, thereby constructing the steel plate concrete structure 30 shown in FIG.

本発明の実施の形態1に係る鋼板コンクリート構造体30は、コンクリートを流す前、第1挿通孔36hの内壁と、スタッドボルト35の周面との間には間隙Δx2が形成されているため、この第1挿通孔36hの内壁と、スタッドボルト35の周面との間にコンクリートが流れ込み、その間隙Δx2にコンクリートが充填されることとなる。よって、コンクリート体38を打設した後には、図1に示すように、第1挿通孔36hの内壁と、スタッドボルト35の周面との間にコンクリート体38が打設されることとなる。   Since the steel plate concrete structure 30 according to Embodiment 1 of the present invention has a gap Δx2 formed between the inner wall of the first insertion hole 36h and the peripheral surface of the stud bolt 35 before flowing concrete, Concrete flows between the inner wall of the first insertion hole 36h and the peripheral surface of the stud bolt 35, and the gap Δx2 is filled with concrete. Therefore, after the concrete body 38 is placed, the concrete body 38 is placed between the inner wall of the first insertion hole 36h and the peripheral surface of the stud bolt 35, as shown in FIG.

上述した第1挿通孔36hの内壁と、スタッドボルト35の周面との間にコンクリート体38を打設した鋼板コンクリート構造体30において、図8に示すように、連結した鋼板32間に、それら鋼板32を左右幅方向に離隔する引張力F1が加えられた場合、その引張力F1は、スタッドボルト35を介して、第1挿通孔36hの内壁と、スタッドボルト35の周面との間に打設されたコンクリート体38に伝達されることとなる。   In the steel plate concrete structure 30 in which the concrete body 38 is placed between the inner wall of the first insertion hole 36h described above and the peripheral surface of the stud bolt 35, as shown in FIG. When a tensile force F1 that separates the steel plate 32 in the left-right width direction is applied, the tensile force F1 is interposed between the inner wall of the first insertion hole 36h and the peripheral surface of the stud bolt 35 via the stud bolt 35. It is transmitted to the concrete body 38 that has been placed.

上記引張力F1が伝達された場合、その引張力F1によって、第1挿通孔36hの内壁とスタッドボルト35の周面との間のコンクリート体38には、圧縮力F2が作用、換言すれば、連結した鋼板32を離隔する方向に移動しようとする力が作用することとなるが、上記コンクリート体38の移動は、第1連結材36により阻止されることとなる。   When the tensile force F1 is transmitted, the compressive force F2 acts on the concrete body 38 between the inner wall of the first insertion hole 36h and the peripheral surface of the stud bolt 35 by the tensile force F1, in other words, A force to move the connected steel plates 32 in the direction of separating acts, but the movement of the concrete body 38 is blocked by the first connecting material 36.

しかも、第1連結材36には、コンクリート体38の移動を阻止することにより、上記力の反作用として引張力F3が作用することとなる。   Moreover, the tensile force F3 acts on the first connecting member 36 as a reaction of the above-described force by preventing the concrete body 38 from moving.

本発明の実施の形態1にかかる鋼板コンクリート構造体30によれば、第1連結手段34は、隣接する鋼板32にそれぞれ立設するスタッドボルト35と、隣接する鋼板32のそれぞれに立設したスタッドボルト35に挿通する第1挿通孔36hを有し、かつコンクリート体38を打設した後には第1挿通孔36hの内面とスタッドボルト35との間にコンクリートが充填される第1連結材36とを備えるため、第1連結材36の第1挿通孔36hをスタッドボルト35に挿通する際、第1挿通孔36hの内面とスタッドボルト35との間に間隙Δx2を設けることができ、隣接する鋼板32の連結作業効率を向上することができる。しかも、上記スタッドボルト35および第1連結材36によって隣接する鋼板32を連結することができるため、例えば継手材を隣接する一方の鋼板32に溶接し、かつその継手材を隣接する他方の鋼板32に溶接する必要がない。よって、溶接する必要がないから、鋼板32が焦げることもなく、当然に、焦げを補修する必要もない。加えて、上記第1連結手段34によって隣接する鋼板32を連結するため、アングル、座金、および高力ボルトを使用する必要がない。よって、アングルのボルト孔に高力ボルトの先端を挿入する作業、およびアングルのボルト孔に高力ボルトを締結する作業が不要である。従って、構築作業が容易な鋼板コンクリート構造体30を提供することができる。   According to the steel plate concrete structure 30 according to the first exemplary embodiment of the present invention, the first connecting means 34 includes stud bolts 35 that stand on the adjacent steel plates 32 and studs that stand on each of the adjacent steel plates 32. A first connecting member 36 having a first insertion hole 36h inserted into the bolt 35 and filled with concrete between the inner surface of the first insertion hole 36h and the stud bolt 35 after the concrete body 38 is placed; Therefore, when the first insertion hole 36h of the first connecting member 36 is inserted into the stud bolt 35, a gap Δx2 can be provided between the inner surface of the first insertion hole 36h and the stud bolt 35, and adjacent steel plates The connection work efficiency of 32 can be improved. Moreover, since the adjacent steel plates 32 can be connected by the stud bolt 35 and the first connecting material 36, for example, the joint material is welded to one adjacent steel plate 32, and the joint material is connected to the other adjacent steel plate 32. There is no need to weld to. Therefore, since it is not necessary to weld, the steel plate 32 does not burn, and naturally it is not necessary to repair the burn. In addition, since the adjacent steel plates 32 are connected by the first connecting means 34, it is not necessary to use an angle, a washer, and a high-strength bolt. Therefore, the operation | work which inserts the front-end | tip of a high strength bolt in an angle bolt hole, and the operation | work which fastens a high strength bolt in an angle bolt hole are unnecessary. Therefore, the steel plate concrete structure 30 with easy construction work can be provided.

なお、上述した実施の形態1では、左右幅方向において各鋼板32に立設するスタッドボルト35の間隔dx1が同一であり、奥行幅方向において各鋼板32に立設するスタッドボルト35の間隔dx2が同一であり、かつ左右幅方向において第1連結材36に形成する第1挿通孔36hの間隔dhx2が同一であり、奥行幅方向において第1連結材36
に形成する第1挿通孔36hの間隔dhx1が同一であるもので説明した。しかし、この発明はそれに限られず、スタッドボルト35の間隔dx1,dx2を同一にする必要もなく、第1挿通孔36hの間隔dxh1,dxh2を同一にする必要もない。ただし、スタッドボルト35と、そのスタッドボルト35を挿通する第1挿通孔36hとは、対応するよう鋼板32にスタッドボルト35を立設し、第1連結材36に第1挿通孔36hを形成する必要がある。
In the first embodiment described above, the distance dx1 between the stud bolts 35 standing on each steel plate 32 in the left-right width direction is the same, and the distance dx2 between the stud bolts 35 standing on each steel plate 32 in the depth width direction. The interval dhx2 of the first insertion holes 36h formed in the first connecting member 36 in the left-right width direction is the same, and the first connecting member 36 is the same in the depth width direction.
As described above, the distance dhx1 between the first insertion holes 36h formed in the same is the same. However, the present invention is not limited to this, and it is not necessary to make the intervals dx1 and dx2 of the stud bolt 35 the same, and it is not necessary to make the intervals dxh1 and dxh2 of the first insertion hole 36h the same. However, the stud bolt 35 and the first insertion hole 36h through which the stud bolt 35 is inserted correspond to the stud bolt 35 erected on the steel plate 32, and the first connection hole 36 is formed with the first insertion hole 36h. There is a need.

また、上述した実施の形態1には、上下方向に延在するボルト軸35xに沿うよう形成し、軸部35aと、先端部35bとを有するスタッドボルト35を用いて説明した。しかし、この発明のスタッドボルトは、それに限られない。   Further, the first embodiment described above has been described using the stud bolt 35 that is formed along the bolt shaft 35x extending in the vertical direction and has the shaft portion 35a and the tip portion 35b. However, the stud bolt of the present invention is not limited thereto.

さらに、上述した実施の形態1には、隣接する2枚の鋼板32間において、図1中、隣接する縁に沿って立設した1列のスタッドボルト35を柱状体として使用するもので説明した。しかし、本発明はそれに限られず、柱状体として使用するスタッドボルト35は、適宜変更しても良い。   Further, in the first embodiment described above, a description has been given by using a row of stud bolts 35 erected along adjacent edges in FIG. 1 between two adjacent steel plates 32 as columnar bodies. . However, the present invention is not limited to this, and the stud bolt 35 used as the columnar body may be appropriately changed.

なお、上述した実施の形態1の鋼板コンクリート構造体30の変形例である鋼板コンクリート構造体30′を図9および図10に示す。図9および図10に示す変形例において、図1〜図5に示した鋼板コンクリート構造体30と同一のものには同一の符号を付して説明を省略する。また、説明の便宜上、図9および図10において、コンクリート体38を省略してある。   9 and 10 show a steel plate concrete structure 30 'which is a modification of the steel plate concrete structure 30 of the first embodiment described above. In the modification shown in FIGS. 9 and 10, the same components as those in the steel plate concrete structure 30 shown in FIGS. For convenience of explanation, the concrete body 38 is omitted in FIGS. 9 and 10.

図9および図10に示す鋼板コンクリート構造体30′は、隣接する2枚の鋼板32間において、隣接する縁に沿って立設した2列のスタッドボルト35を柱状体として使用するものである。また、柱状体として使用するスタッドボルト35を、鋼板32とコンクリート体38とを一体化するためのスタッドボルト35よりも大きく形成してある。   A steel plate concrete structure 30 ′ shown in FIGS. 9 and 10 uses two rows of stud bolts 35 erected along adjacent edges between two adjacent steel plates 32 as columnar bodies. Moreover, the stud bolt 35 used as a columnar body is formed larger than the stud bolt 35 for integrating the steel plate 32 and the concrete body 38.

また、この変形例で示す第1連結手段34′は、隣接する鋼板32間を相互に連結するものであって、上記スタッドボルト35と、第1連結材(連結材)36′とで構成してある。   The first connecting means 34 'shown in this modified example connects the adjacent steel plates 32 to each other, and is composed of the stud bolt 35 and the first connecting material (connecting material) 36'. It is.

第1連結材36′は、左右幅方向(図9における横方向)の長さに比して奥行幅方向(図9における縦方向)の長さが長い矩形状にあらかじめ成形した金属板である。この第1連結材36′は、奥行幅方向の大きさが、例えば鋼板32の奥行幅方向の大きさと同一である。この第1連結材36′の長手方向に沿った一方の側端部には、隣接する2枚の鋼板32において、一方の鋼板32にオーバーラップする第1オーバーラップ部36c′を設定してある。さらに、第1連結材36′の長手方向に沿った他方の側端部には、隣接する2枚の鋼板32において、他方の鋼板32にオーバーラップする第2オーバーラップ部36d′を設定してある。   The first connecting member 36 ′ is a metal plate previously formed into a rectangular shape whose length in the depth width direction (vertical direction in FIG. 9) is longer than the length in the left-right width direction (lateral direction in FIG. 9). . The first connecting member 36 ′ has the same size in the depth width direction as that of the steel plate 32, for example. At one side end portion along the longitudinal direction of the first connecting member 36 ′, a first overlap portion 36 c ′ overlapping with one steel plate 32 is set in the two adjacent steel plates 32. . Further, a second overlap portion 36d 'that overlaps the other steel plate 32 is set at the other side end along the longitudinal direction of the first connecting member 36'. is there.

第1連結材36′は、さらに、スタッドボルト35を挿通するための第1挿通孔(挿通孔)36hを複数有している。より具体的には、第1オーバーラップ部36c′および第2オーバーラップ部36d′に、上記スタッドボルト35の奥行幅方向の間隔dx2に対応する第1挿通孔36hを有している。   The first connecting member 36 ′ further includes a plurality of first insertion holes (insertion holes) 36 h for inserting the stud bolts 35. More specifically, the first overlap portion 36c ′ and the second overlap portion 36d ′ have first insertion holes 36h corresponding to the distance dx2 in the depth width direction of the stud bolt 35.

この鋼板コンクリート構造体30′には、第1連結材36′の第1挿通孔36hの内壁と、スタッドボルト35の周面との間のコンクリート体38を補強するための補強材40を設けてある。補強材40は、図11および図12に示すように、例えば金属材料を用いて上下方向に延在する中心軸40xに沿い、かつ柱状体であるスタッドボルト35を挿入するための第1挿入孔40hを有する態様で円筒状に形成してある。より具体的には、上記第1挿通孔36hに補強材40が入るよう、補強材40は、中心軸40xから外周面までの大きさ40haが、上記第1挿通孔36hにおける中心軸36xから円筒状の内壁(内面)までの距離ha1よりもわずかに小さくなるよう形成してある。このような補強材40は、例えば鋼管である。   The steel plate concrete structure 30 ′ is provided with a reinforcing member 40 for reinforcing the concrete body 38 between the inner wall of the first insertion hole 36 h of the first connecting member 36 ′ and the peripheral surface of the stud bolt 35. is there. As shown in FIGS. 11 and 12, the reinforcing member 40 is, for example, a first insertion hole for inserting a stud bolt 35 which is a columnar body along a central axis 40x extending in the vertical direction using a metal material. It is formed in a cylindrical shape in a mode having 40h. More specifically, the reinforcing member 40 has a size 40ha from the central axis 40x to the outer peripheral surface so that the reinforcing member 40 enters the first insertion hole 36h, and is cylindrical from the central axis 36x in the first insertion hole 36h. It is formed to be slightly smaller than the distance ha1 to the inner wall (inner surface). Such a reinforcing member 40 is, for example, a steel pipe.

また、補強材40の上下方向の大きさ40L1は、軸部35aの上下方向の大きさdb1よりも小さくなるよう設定してある。補強材40の中心軸40xから円筒の内面までの距離ha2は、上記スタッドボルト35の軸部35aの径の大きさda1、および先端部35bの径の大きさda2よりも十分大きくなるよう設定してある。なお、必ずしも補強材40の上下方向の大きさ40L1を、軸部35aの上下方向の大きさdb1よりも小さくする必要はなく、補強材40の上下方向の大きさ40L1を、軸部35aの上下方向の大きさdb1よりも大きくしても良い。   The vertical size 40L1 of the reinforcing member 40 is set to be smaller than the vertical size db1 of the shaft portion 35a. The distance ha2 from the central axis 40x of the reinforcing member 40 to the inner surface of the cylinder is set to be sufficiently larger than the diameter da1 of the shaft 35a of the stud bolt 35 and the diameter da2 of the tip 35b. It is. The vertical size 40L1 of the reinforcing member 40 does not necessarily need to be smaller than the vertical size db1 of the shaft portion 35a. The vertical size 40L1 of the reinforcing member 40 is not limited to the vertical size of the shaft portion 35a. It may be larger than the direction size db1.

このような鋼板コンクリート構造体30′を構築する場合は、複数の鋼板32を隣接する態様で配置する。一方、第1挿通36hを形成した部位に補強材40を配置し、第1連結材36′に補強材40を取り付ける。この後、鋼板32を連結するのに使用するスタッドボルト35を、補強材40の第1挿入孔40hおよび第1連結材36′の第1挿通孔36hにそれぞれ挿通して、隣接する鋼板32間を第1連結手段34′で連結する。この状態では、図10に示すように、第1挿通孔36hの内壁と、スタッドボルト35の周面との間には間隙Δx3が形成されることとなる。   When constructing such a steel plate concrete structure 30 ', a plurality of steel plates 32 are arranged in an adjacent manner. On the other hand, the reinforcing member 40 is disposed at the site where the first insertion 36h is formed, and the reinforcing member 40 is attached to the first connecting member 36 '. Thereafter, the stud bolts 35 used to connect the steel plates 32 are respectively inserted into the first insertion holes 40h of the reinforcing member 40 and the first insertion holes 36h of the first connecting member 36 ′, and between the adjacent steel plates 32. Are connected by the first connecting means 34 '. In this state, a gap Δx3 is formed between the inner wall of the first insertion hole 36h and the peripheral surface of the stud bolt 35, as shown in FIG.

次いで、第1連結手段34′によって連結した各鋼板32の上層に鉄筋4をそれぞれ設け、かつその鉄筋4の上部に埋込金物5を取り付ける。   Next, the reinforcing bar 4 is provided on the upper layer of each steel plate 32 connected by the first connecting means 34 ′, and the embedded metal 5 is attached to the upper part of the reinforcing bar 4.

最後に、埋込金物5が表面に現れ、かつ第1連結手段34′によって連結した各鋼板32のスタッドボルト35、第1連結材36′、および鉄筋4を取り込む態様で、各鋼板32の上層にコンクリートを流し、そのコンクリートを固化することで、第1連結手段34′によって連結した鋼板32の上層にコンクリート体38を打設することで鋼板コンクリート構造体30′を構築する。   Finally, the embedded metal 5 appears on the surface and takes up the stud bolt 35, the first connecting member 36 ', and the reinforcing bar 4 of each steel plate 32 connected by the first connecting means 34', and the upper layer of each steel plate 32. By pouring concrete into the concrete and solidifying the concrete, the concrete body 38 is placed on the upper layer of the steel plate 32 connected by the first connecting means 34 'to construct the steel plate concrete structure 30'.

このような鋼板コンクリート構造体30′は、上述した鋼板コンクリート構造体30′と同様の作用・効果を奏することができる。しかも、補強材40によって、第1連結材36′の第1挿通孔36hの内壁と、スタッドボルト35の周面との間のコンクリート体38を補強することができる。   Such a steel plate concrete structure 30 'can exhibit the same operations and effects as the steel plate concrete structure 30' described above. Moreover, the concrete body 38 between the inner wall of the first insertion hole 36 h of the first connecting member 36 ′ and the peripheral surface of the stud bolt 35 can be reinforced by the reinforcing member 40.

なお、上述した実施の形態1の変形例には、隣接する2枚の鋼板32間において、図10および図11中、隣接する鋼板32の縁に沿って立設した2列のスタッドボルト35を柱状体として使用するもので説明した。しかし、本発明はそれに限られず、柱状体として使用するスタッドボルト35は、適宜変更しても良い。   In the modification of the first embodiment described above, two rows of stud bolts 35 erected along the edges of the adjacent steel plates 32 in FIGS. 10 and 11 between the two adjacent steel plates 32 are provided. It explained with what is used as a columnar body. However, the present invention is not limited to this, and the stud bolt 35 used as the columnar body may be appropriately changed.

また、上述した実施の形態1の変形例には、柱状体として使用するスタッドボルト35を、鋼板32とコンクリート体38とを一体化するスタッドボルト35よりも大きく形成するもので説明した。しかし、この発明は、それに限られず、柱状体として使用するスタッドボルト35と、鋼板32とコンクリート体38とを一体化するスタッドボルト35とを同一の大きさに形成しても良いし、柱状体として使用するスタッドボルト35を、鋼板32とコンクリート体38とを一体化するスタッドボルト35よりも小さく形成しても良い。   Further, in the above-described modification of the first embodiment, the stud bolt 35 used as the columnar body is described as being formed larger than the stud bolt 35 that integrates the steel plate 32 and the concrete body 38. However, the present invention is not limited thereto, and the stud bolt 35 used as a columnar body and the stud bolt 35 that integrates the steel plate 32 and the concrete body 38 may be formed in the same size, or the columnar body. The stud bolt 35 to be used may be formed smaller than the stud bolt 35 that integrates the steel plate 32 and the concrete body 38.

また、上述した実施の形態1には、鋼板コンクリート構造体30、30′を原子力発電所等の建築物の床に適用するもので説明した。しかし、この発明はそれに限られず、建築物の壁にも適用することができる。   In the first embodiment, the steel plate concrete structures 30 and 30 'are applied to the floor of a building such as a nuclear power plant. However, the present invention is not limited to this, and can be applied to a wall of a building.

さらに、上述した実施の形態1には、鋼板コンクリート構造体30、30′の表面に立設したスタッドボルト35を柱状体として使用するもので説明した。しかし、この発明はそれに限られず、スタッドボルト35とは別に、鋼板32を連結するため、鋼板の表面から突出する柱状体を設けても良い。   Furthermore, in Embodiment 1 mentioned above, it demonstrated using the stud bolt 35 standingly arranged on the surface of the steel plate concrete structures 30 and 30 'as a columnar body. However, the present invention is not limited to this, and a columnar body protruding from the surface of the steel plate may be provided to connect the steel plate 32 separately from the stud bolt 35.

また、上述した実施の形態1には、鉄筋4および埋込金物5を備える鋼板コンクリート構造体30,30′を用いて説明した。しかし、この発明はそれに限られず、鉄筋4および埋込金物5を必ず備える必要はない。   Further, the first embodiment described above has been described using the steel plate concrete structures 30 and 30 ′ including the reinforcing bars 4 and the embedded hardware 5. However, the present invention is not limited to this, and it is not always necessary to provide the reinforcing bars 4 and the embedded hardware 5.

[実施の形態2]
図13および図14は、本発明の実施の形態2に係る鋼板コンクリート構造体50の要部を示す断面側面図である。なお、図13および図14に示す鋼板コンクリート構造体50において、図1〜図5に示した鋼板コンクリート構造体30と同一のものには同一の符号を付して説明を省略する。また、説明の便宜上、図13および図14において、コンクリート体38を省略してある。
[Embodiment 2]
13 and 14 are cross-sectional side views showing the main parts of a steel plate concrete structure 50 according to Embodiment 2 of the present invention. In addition, in the steel plate concrete structure 50 shown to FIG. 13 and FIG. 14, the same code | symbol is attached | subjected to the same thing as the steel plate concrete structure 30 shown in FIGS. 1-5, and description is abbreviate | omitted. For convenience of explanation, the concrete body 38 is omitted in FIGS. 13 and 14.

この鋼板コンクリート構造体50も、例えば原子力発電所の床に適用するものである。この鋼板コンクリート構造体50は、スタッドボルト35と、第2連結材55とで構成する第2連結手段53を備えている。   This steel plate concrete structure 50 is also applied to the floor of a nuclear power plant, for example. The steel plate concrete structure 50 includes a second connecting means 53 configured by a stud bolt 35 and a second connecting material 55.

この鋼板コンクリート構造体50は、隣接する2枚の鋼板32間において、隣接する縁に沿って立設した2列のスタッドボルト35を柱状体として使用するものである。また、柱状体として使用するスタッドボルト35を、鋼板32とコンクリート体38とを一体化するためのスタッドボルト35よりも大きく形成してある。   This steel plate concrete structure 50 uses two rows of stud bolts 35 erected along adjacent edges between two adjacent steel plates 32 as columnar bodies. Moreover, the stud bolt 35 used as a columnar body is formed larger than the stud bolt 35 for integrating the steel plate 32 and the concrete body 38.

第2連結材55は、あらかじめ金属線材を巻回することで構成したスパイラル体である。この第2連結材55は、第2挿通孔55hを有している。   The 2nd connection material 55 is a spiral body comprised by winding a metal wire beforehand. The second connecting member 55 has a second insertion hole 55h.

この第2連結材55の第2挿通孔55hにおいて、隣接する鋼板32を離隔する方向(左右幅方向)の内周面の大きさ55a1は、隣接する鋼板32間において、一方の鋼板32の2本のスタッドボルト35と、他方の鋼板32の2本のスタッドボルト35とに挿通することができるよう、上記スタッドボルト35の左右幅方向の間隔dx1の2倍と、隣接する鋼板32間の間隙Δx1とを合算した大きさよりもわずかに大きく設定してある。   In the second insertion hole 55h of the second connecting member 55, the size 55a1 of the inner peripheral surface in the direction separating the adjacent steel plates 32 (left and right width direction) is 2 between one of the steel plates 32. Two stud bolts 35 and the two stud bolts 35 of the other steel plate 32 so that the stud bolt 35 can be inserted through the gap dx1 in the left-right width direction and the gap between adjacent steel plates 32. It is set slightly larger than the sum of Δx1.

また、この第2連結材55の第2挿通孔55hにおいて、隣接する鋼板32間の縁に沿う方向(奥行幅方向)の内周面の大きさ55a2は、上記スタッドボルト35の軸部35aの径の大きさda1、および先端部35bの径の大きさda2の大きさよりも十分大きくなるよう設定してある。また、第2連結材55の上下方向の大きさ55a3は、軸部35aの上下方向の大きさdb1よりも小さくなるよう設定してある。   In addition, in the second insertion hole 55h of the second connecting member 55, the size 55a2 of the inner peripheral surface in the direction along the edge between the adjacent steel plates 32 (the depth width direction) is the height of the shaft portion 35a of the stud bolt 35. The diameter da1 and the diameter da2 of the tip 35b are set to be sufficiently larger than the diameter da2. Further, the vertical size 55a3 of the second connecting member 55 is set to be smaller than the vertical size db1 of the shaft portion 35a.

このような鋼板コンクリート構造体50を構築する場合は、図13および図14に示すように、複数の鋼板32を隣接する態様で配置した後、鋼板32を連結するのに使用するスタッドボルト35に、第2連結材55の第2挿通孔55hを挿通して、隣接する鋼板32間を第2連結手段53で連結する。この状態では、第2挿通孔55hの内面と、スタッドボルト35の周面との間には間隙Δx4が形成されることとなる。   When constructing such a steel plate concrete structure 50, as shown in FIGS. 13 and 14, after arranging a plurality of steel plates 32 in an adjacent manner, a stud bolt 35 used to connect the steel plates 32 is used. The second connecting member 55 is inserted through the second insertion hole 55 h and the adjacent steel plates 32 are connected by the second connecting means 53. In this state, a gap Δx4 is formed between the inner surface of the second insertion hole 55h and the peripheral surface of the stud bolt 35.

次いで、第2連結手段53によって連結した各鋼板32の上層に鉄筋4をそれぞれ設け、かつその鉄筋4の上部に埋込金物5を取り付ける。   Next, the reinforcing bars 4 are provided on the upper layers of the steel plates 32 connected by the second connecting means 53, and the embedded metal 5 is attached to the upper part of the reinforcing bars 4.

最後に、埋込金物5が表面に現れ、かつ第2連結手段53によって連結した各鋼板32のスタッドボルト35、第2連結材55、および鉄筋4を取り込む態様で、各鋼板32の上層にコンクリートを流し、そのコンクリートを固化することで、第2連結手段53によって連結した鋼板32の上層にコンクリート体38を打設することで鋼板コンクリート構造体50を構築する。   Finally, the embedded metal 5 appears on the surface and the stud bolt 35, the second connecting member 55, and the reinforcing bar 4 of each steel plate 32 connected by the second connecting means 53 are taken in, and the concrete is formed on the upper layer of each steel plate 32. The concrete structure 38 is constructed by placing the concrete body 38 on the upper layer of the steel plate 32 connected by the second connecting means 53 by solidifying the concrete.

ここで、本発明の実施の形態2に係る鋼板コンクリート構造体50は、コンクリートを流す前、第2挿通孔55hの内面と、スタッドボルト35の周面との間には間隙Δx4が形成されているため、この第2挿通孔55hの内面と、スタッドボルト35の周面との間にコンクリートが流れ込み、その間隙Δx4にコンクリートが充填されることとなる。よって、コンクリート体38を打設した後には、第2挿通孔55hの内面と、スタッドボルト35の周面との間にコンクリート体38が打設されることとなる。   Here, in the steel plate concrete structure 50 according to Embodiment 2 of the present invention, the gap Δx4 is formed between the inner surface of the second insertion hole 55h and the peripheral surface of the stud bolt 35 before flowing the concrete. Therefore, the concrete flows between the inner surface of the second insertion hole 55h and the peripheral surface of the stud bolt 35, and the gap Δx4 is filled with the concrete. Therefore, after the concrete body 38 is placed, the concrete body 38 is placed between the inner surface of the second insertion hole 55 h and the peripheral surface of the stud bolt 35.

本発明の実施の形態2にかかる鋼板コンクリート構造体50によれば、第2連結手段53は、隣接する鋼板32にそれぞれ立設するスタッドボルト35と、隣接する鋼板32のそれぞれに立設したスタッドボルト35に挿通する第2挿通孔55hを有し、かつコンクリート体38を打設した後には第2挿通孔55hの内面とスタッドボルト35との間にコンクリートが充填される第2連結材55とを備えるため、第2連結材55の第2挿通孔55hをスタッドボルト35に挿通する際、第2挿通孔55hの内面とスタッドボルト35との間に間隙Δx4を設けることができ、隣接する鋼板32の連結作業効率を向上することができる。しかも、上記スタッドボルト35および第2連結材55によって隣接する鋼板32を連結することができるため、例えば継手材を隣接する一方の鋼板32に溶接し、かつその継手材を隣接する他方の鋼板32に溶接する必要がない。よって、溶接する必要がないから、鋼板32が焦げることもなく、当然に、焦げを補修する必要もない。加えて、上記第2連結手段53によって隣接する鋼板32を連結するため、アングル、座金、および高力ボルトを使用する必要がない。よって、アングルのボルト孔に高力ボルトの先端を挿入する作業、およびアングルのボルト孔に高力ボルトを締結する作業が不要である。従って、構築作業が容易な鋼板コンクリート構造体50を提供することができる。   According to the steel plate concrete structure 50 according to the second embodiment of the present invention, the second connecting means 53 includes the stud bolts 35 that stand on the adjacent steel plates 32 and the studs that stand on each of the adjacent steel plates 32. A second connecting member 55 having a second insertion hole 55h inserted into the bolt 35 and filled with concrete between the inner surface of the second insertion hole 55h and the stud bolt 35 after the concrete body 38 is placed; Therefore, when the second insertion hole 55h of the second connecting member 55 is inserted into the stud bolt 35, a gap Δx4 can be provided between the inner surface of the second insertion hole 55h and the stud bolt 35, and adjacent steel plates The connection work efficiency of 32 can be improved. Moreover, since the adjacent steel plates 32 can be connected by the stud bolt 35 and the second connecting material 55, for example, the joint material is welded to one adjacent steel plate 32, and the joint material is connected to the other adjacent steel plate 32. There is no need to weld to. Therefore, since it is not necessary to weld, the steel plate 32 does not burn, and naturally it is not necessary to repair the burn. In addition, since the adjacent steel plates 32 are connected by the second connecting means 53, there is no need to use an angle, a washer, and a high strength bolt. Therefore, the operation | work which inserts the front-end | tip of a high strength bolt in an angle bolt hole, and the operation | work which fastens a high strength bolt in an angle bolt hole are unnecessary. Therefore, it is possible to provide a steel plate concrete structure 50 that can be easily constructed.

なお、上述した実施の形態2には、隣接する2枚の鋼板32間において、隣接する鋼板32の縁に沿って立設した2列のスタッドボルト35を柱状体として使用するもので説明した。しかし、本発明はそれに限られず、柱状体として使用するスタッドボルト35は、適宜変更しても良い。例えば、隣接する鋼板32の縁に沿って立設した1列のスタッドボルト35を柱状体として使用しても良いし、隣接する鋼板32の縁に沿って立設した3列以上のスタッドボルト35を柱状体として使用しても良い。   In the second embodiment, the two rows of stud bolts 35 erected along the edge of the adjacent steel plates 32 between the two adjacent steel plates 32 are used as columnar bodies. However, the present invention is not limited to this, and the stud bolt 35 used as the columnar body may be appropriately changed. For example, one row of stud bolts 35 erected along the edge of the adjacent steel plate 32 may be used as a columnar body, or three or more rows of stud bolts 35 erected along the edge of the adjacent steel plate 32. May be used as a columnar body.

また、上述した実施の形態2では、左右幅方向において各鋼板32に立設するスタッドボルト35の間隔dx1が同一であり、奥行幅方向において各鋼板32に立設するスタッドボルト35の間隔dx2が同一であるもので説明した。しかし、この発明はそれに限られず、スタッドボルト35の間隔dx1,dx2を同一にする必要はない。ただし、スタッドボルト35は、第2連結材55の第2挿通孔55hに挿通することができるよう立設する必要がある。   In the second embodiment described above, the distance dx1 between the stud bolts 35 standing on each steel plate 32 in the left-right width direction is the same, and the distance dx2 between the stud bolts 35 standing on each steel plate 32 in the depth width direction. The description is the same. However, the present invention is not limited to this, and the intervals dx1 and dx2 of the stud bolts 35 need not be the same. However, the stud bolt 35 needs to be erected so that it can be inserted into the second insertion hole 55 h of the second connecting member 55.

さらに、上述した実施の形態2には、柱状体として使用するスタッドボルト35を、鋼板32とコンクリート体38とを一体化するスタッドボルト35よりも大きく形成するもので説明した。しかし、この発明は、それに限られず、柱状体として使用するスタッドボルト35と、鋼板32とコンクリート体38とを一体化するスタッドボルト35とを同一の大きさに形成しても良いし、柱状体として使用するスタッドボルト35を、鋼板32とコンクリート体38とを一体化するスタッドボルト35よりも小さく形成しても良い。   Furthermore, in Embodiment 2 described above, the stud bolt 35 used as a columnar body is described as being formed larger than the stud bolt 35 that integrates the steel plate 32 and the concrete body 38. However, the present invention is not limited thereto, and the stud bolt 35 used as a columnar body and the stud bolt 35 that integrates the steel plate 32 and the concrete body 38 may be formed in the same size, or the columnar body. The stud bolt 35 to be used may be formed smaller than the stud bolt 35 that integrates the steel plate 32 and the concrete body 38.

なお、上述した実施の形態2の鋼板コンクリート構造体50の変形例を図17および図18に示す。図17および図18に示す変形例である鋼板コンクリート構造体50′において、図1〜図5に示した鋼板コンクリート構造体30、および図13および図14に示した鋼板コンクリート構造体50と同一のものには同一の符号を付して説明を省略する。   In addition, the modification of the steel plate concrete structure 50 of Embodiment 2 mentioned above is shown in FIG.17 and FIG.18. 17 and 18 is the same as the steel plate concrete structure 30 shown in Figs. 1 to 5 and the steel plate concrete structure 50 shown in Figs. 13 and 14. Components are denoted by the same reference numerals and description thereof is omitted.

この鋼板コンクリート構造体50′は、隣接する2枚の鋼板32間において、隣接する縁に沿って立設した2列のスタッドボルト35を柱状体として使用するものである。また、柱状体として使用するスタッドボルト35を、鋼板32とコンクリート体38とを一体化するためのスタッドボルト35よりも大きく形成してある。   This steel plate concrete structure 50 'uses two rows of stud bolts 35 standing up along adjacent edges between two adjacent steel plates 32 as columnar bodies. Moreover, the stud bolt 35 used as a columnar body is formed larger than the stud bolt 35 for integrating the steel plate 32 and the concrete body 38.

この鋼板コンクリート構造体50′には、第2連結材55の第2挿通孔55hの内周面と、スタッドボルト35の周面との間のコンクリート体38を補強するための補強材60を設けてある。   The steel plate concrete structure 50 ′ is provided with a reinforcing member 60 for reinforcing the concrete body 38 between the inner peripheral surface of the second insertion hole 55 h of the second connecting member 55 and the peripheral surface of the stud bolt 35. It is.

補強材60は、図19に示すように、例えば金属材料を用いて上下方向に延在する中心軸60xに沿い、かつ柱状体であるスタッドボルト35を挿入するための第2挿入孔60hを有する態様で円筒状に形成してある。より具体的には、上記第2挿通孔55hに補強材60が入るよう、補強材60は、中心軸60xから外周面までの大きさ60haを2倍したものが、上記第2挿通孔55hにおける奥行幅方向の内周面の大きさ55a2よりもわずかに小さくなるよう形成してある。   As shown in FIG. 19, the reinforcing member 60 has a second insertion hole 60h for inserting a stud bolt 35, which is a columnar body, along a central axis 60x extending in the vertical direction using, for example, a metal material. In an embodiment, it is formed in a cylindrical shape. More specifically, the reinforcing member 60 is obtained by doubling the size 60ha from the central axis 60x to the outer peripheral surface so that the reinforcing member 60 enters the second inserting hole 55h. It is formed so as to be slightly smaller than the size 55a2 of the inner peripheral surface in the depth width direction.

また、補強材60の上下方向の大きさ60L1は、軸部35aの上下方向の大きさdb1よりも小さくなるよう設定してある。なお、必ず、補強材60の上下方向の大きさ60L1を、軸部35aの上下方向の大きさdb1よりも小さくする必要はなく、補強材60の上下方向の大きさ60L1を、軸部35aの上下方向の大きさdb1よりも大きくしても良い。   The vertical size 60L1 of the reinforcing member 60 is set to be smaller than the vertical size db1 of the shaft portion 35a. Note that the vertical size 60L1 of the reinforcing member 60 is not necessarily smaller than the vertical size db1 of the shaft portion 35a, and the vertical size 60L1 of the reinforcing member 60 is not limited to that of the shaft portion 35a. The size may be larger than the vertical size db1.

補強材60の中心軸60xから円筒の内面までの距離60ha2は、上記スタッドボルト35の軸部35aの径の大きさda1、および先端部35bの径の大きさda2の径の大きさよりも十分大きくなるよう設定してある。このような補強材60は、例えば鋼管である。   The distance 60ha2 from the central axis 60x of the reinforcing member 60 to the inner surface of the cylinder is sufficiently larger than the diameter da1 of the shaft 35a of the stud bolt 35 and the diameter da2 of the tip 35b. It is set to become. Such a reinforcing material 60 is, for example, a steel pipe.

このような鋼板コンクリート構造体50′を構築する場合は、図17および図18に示すように、複数の鋼板32を隣接する態様で配置した後、鋼板32を連結するのに使用するスタッドボルト35に、補強材60の第2挿入孔60hを挿入する。   When constructing such a steel plate concrete structure 50 ', as shown in FIG. 17 and FIG. 18, after arranging a plurality of steel plates 32 in an adjacent manner, a stud bolt 35 used to connect the steel plates 32 is used. Then, the second insertion hole 60h of the reinforcing member 60 is inserted.

その後、柱状態として使用するスタッドボルト35に、第2連結材55の第2挿通孔55hをそれぞれ挿通して隣接する鋼板32間を第2連結手段53′で連結する。この状態では、第2挿通孔55hの内壁と、スタッドボルト35の周面との間には間隙Δx5が形成されることとなる。   Thereafter, the second insertion means 53 ′ connects the adjacent steel plates 32 by inserting the second insertion holes 55 h of the second connection material 55 into the stud bolts 35 used as the column state. In this state, a gap Δx5 is formed between the inner wall of the second insertion hole 55h and the peripheral surface of the stud bolt 35.

次いで、第2連結手段53′によって連結した各鋼板32の上層に鉄筋4をそれぞれ設け、かつその鉄筋4の上部に埋込金物5を取り付ける。   Next, the reinforcing bars 4 are provided on the upper layers of the steel plates 32 connected by the second connecting means 53 ′, and the embedded metal 5 is attached to the upper part of the reinforcing bars 4.

最後に、埋込金物5が表面に現れ、かつ第2連結手段53′によって連結した各鋼板32のスタッドボルト35、第2連結材55、および鉄筋4を取り込む態様で、各鋼板32の上層にコンクリートを流し、そのコンクリートを固化することで、第2連結手段53′によって連結した鋼板32の上層にコンクリート体38を打設することで鋼板コンクリート構造体50′を構築する。   Finally, the embedded metal 5 appears on the surface and the stud bolt 35, the second connecting member 55, and the reinforcing bar 4 of each steel plate 32 connected by the second connecting means 53 ′ are taken in the upper layer of each steel plate 32. By flowing concrete and solidifying the concrete, the concrete body 38 is placed on the upper layer of the steel plate 32 connected by the second connecting means 53 'to construct the steel plate concrete structure 50'.

このような鋼板コンクリート構造体50′は、上述した鋼板コンクリート構造体50と同様の作用・効果を奏することができる。しかも、補強材60によって、第2連結材55の第2挿通孔55hの内周面と、スタッドボルト35の周面との間のコンクリート体38を補強することができる。   Such a steel plate concrete structure 50 ′ can exhibit the same actions and effects as the steel plate concrete structure 50 described above. Moreover, the concrete body 38 between the inner peripheral surface of the second insertion hole 55 h of the second connecting member 55 and the peripheral surface of the stud bolt 35 can be reinforced by the reinforcing member 60.

なお、上述した実施の形態2の変形例には、隣接する2枚の鋼板32間において、図17および図18中、隣接する鋼板32の縁に沿って立設した2列のスタッドボルト35を柱状体として使用するもので説明した。しかし、本発明はそれに限られず、柱状体として使用するスタッドボルト35は、適宜変更しても良い。   In the modification of the second embodiment described above, two rows of stud bolts 35 erected along the edge of the adjacent steel plates 32 in FIGS. 17 and 18 between the two adjacent steel plates 32 are provided. It explained with what is used as a columnar body. However, the present invention is not limited to this, and the stud bolt 35 used as the columnar body may be appropriately changed.

また、上述した実施の形態2の変形例には、柱状体として使用するスタッドボルト35を、鋼板32とコンクリート体38とを一体化するスタッドボルト35よりも大きく形成するもので説明した。しかし、この発明は、それに限られず、柱状体として使用するスタッドボルト35と、鋼板32とコンクリート体38とを一体化するスタッドボルト35とを同一の大きさに形成しても良いし、柱状体として使用するスタッドボルト35を、鋼板32とコンクリート体38とを一体化するスタッドボルト35よりも小さく形成しても良い。   Further, in the above-described modification of the second embodiment, the stud bolt 35 used as the columnar body is described as being formed larger than the stud bolt 35 that integrates the steel plate 32 and the concrete body 38. However, the present invention is not limited thereto, and the stud bolt 35 used as a columnar body and the stud bolt 35 that integrates the steel plate 32 and the concrete body 38 may be formed in the same size, or the columnar body. The stud bolt 35 to be used may be formed smaller than the stud bolt 35 that integrates the steel plate 32 and the concrete body 38.

さらに、上述した実施の形態2には、鋼板コンクリート構造体50、50′を原子力発電所等の建築物の床に適用するもので説明した。しかし、この発明はそれに限られず、建築物の壁にも適用することができる。   Furthermore, in the second embodiment described above, the steel plate concrete structures 50 and 50 'are applied to the floor of a building such as a nuclear power plant. However, the present invention is not limited to this, and can be applied to a wall of a building.

さらに、上述した実施の形態2には、鋼板コンクリート構造体50、50′の表面に立設したスタッドボルト35を柱状体として使用するもので説明した。しかし、この発明はそれに限られず、スタッドボルト35とは別に、鋼板32を連結するため、鋼板の表面から突出する柱状体を設けても良い。   Furthermore, in the second embodiment described above, the stud bolt 35 provided upright on the surface of the steel plate concrete structure 50, 50 'is used as a columnar body. However, the present invention is not limited to this, and a columnar body protruding from the surface of the steel plate may be provided to connect the steel plate 32 separately from the stud bolt 35.

また、上述した実施の形態2には、鉄筋4および埋込金物5を備える鋼板コンクリート構造体50,50′を用いて説明した。しかし、この発明はそれに限られず、鉄筋4および埋込金物5を必ず備える必要はない。   Further, the second embodiment described above has been described using the steel plate concrete structures 50 and 50 ′ including the reinforcing bars 4 and the embedded hardware 5. However, the present invention is not limited to this, and it is not always necessary to provide the reinforcing bars 4 and the embedded hardware 5.

本発明の実施の形態1に係る鋼板コンクリート構造体の要部を示す部分断面図である。It is a fragmentary sectional view which shows the principal part of the steel plate concrete structure which concerns on Embodiment 1 of this invention. 図1に示した鋼板コンクリート構造体が備える鋼板を示す平面図である。It is a top view which shows the steel plate with which the steel plate concrete structure shown in FIG. 1 is provided. 図2に示した鋼板に立設したスタッドボルトを示す側面図である。It is a side view which shows the stud bolt erected in the steel plate shown in FIG. 図1に示した鋼板コンクリート構造体が備える第1連結材を示す平面図である。It is a top view which shows the 1st connection material with which the steel plate concrete structure shown in FIG. 1 is provided. 図4の矢視A−Aにおける断面図である。It is sectional drawing in the arrow AA of FIG. 図4に示した第1連結材によって、隣接する鋼板間を連結した状態を示す説明図である。It is explanatory drawing which shows the state which connected between the adjacent steel plates with the 1st connection material shown in FIG. 図6の矢視B−Bにおける断面図である。It is sectional drawing in the arrow BB of FIG. 隣接する鋼板を離隔する方向に引張力が作用した場合、作用する力を示す説明図である。It is explanatory drawing which shows the force which acts when tensile force acts in the direction which separates an adjacent steel plate. 図1に示した実施の形態1の鋼板コンクリート構造体の変形例を示す平面図である。It is a top view which shows the modification of the steel plate concrete structure of Embodiment 1 shown in FIG. 図9の矢視C−Cにおける断面図である。It is sectional drawing in the arrow CC of FIG. 図9に示す鋼板コンクリート構造体が備える補強材を示す斜視図である。It is a perspective view which shows the reinforcing material with which the steel plate concrete structure shown in FIG. 9 is provided. 図11に示した補強材の断面図である。It is sectional drawing of the reinforcing material shown in FIG. 本発明の実施の形態2に係る鋼板コンクリート構造体を示す平面図である。It is a top view which shows the steel plate concrete structure which concerns on Embodiment 2 of this invention. 図13の矢視D−Dにおける断面図である。It is sectional drawing in the arrow DD of FIG. 図13に示した鋼板コンクリート構造体が備える第2連結材を示す側面図である。It is a side view which shows the 2nd connection material with which the steel plate concrete structure shown in FIG. 13 is provided. 図15に示した第2連結材の平面図である。It is a top view of the 2nd connection material shown in FIG. 図13に示した実施の形態2の鋼板コンクリート構造体の変形例を示す平面図である。It is a top view which shows the modification of the steel plate concrete structure of Embodiment 2 shown in FIG. 図17の矢視E−Eにおける断面図である。It is sectional drawing in the arrow EE of FIG. 図17に示す鋼板コンクリート構造体が備える補強材を示す断面図である。It is sectional drawing which shows the reinforcing material with which the steel plate concrete structure shown in FIG. 従来の鋼板コンクリート構造体の要部を示す説明図である。It is explanatory drawing which shows the principal part of the conventional steel plate concrete structure. 鋼板コンクリート構造体が備える鉄筋、埋込金物を示す説明図である。It is explanatory drawing which shows the reinforcing bar with which a steel-plate concrete structure is equipped, and an embedded metal fitting. 従来の鋼板コンクリート構造体において、図20に示す鋼板コンクリート構造体とは別のものの要部を示す説明図である。In the conventional steel plate concrete structure, it is explanatory drawing which shows the principal part of a thing different from the steel plate concrete structure shown in FIG.

符号の説明Explanation of symbols

30 鋼板コンクリート構造体
32 鋼板
34 第1連結手段
35 スタッドボルト
35a 軸部
35b 先端部
35x ボルト軸
36 第1連結材
36a 第1連結材本体部
36b 補強部
36c 第1オーバーラップ部
36d 第2オーバーラップ部
36h 第1挿通孔
38 コンクリート体
40 補強材
40h 第1挿入孔
50 鋼板コンクリート構造体
53 第2連結手段
55 第2連結材
55h 第2挿通孔
60 補強材
30 Steel plate concrete structure 32 Steel plate 34 First connecting means 35 Stud bolt 35a Shaft portion 35b Tip portion 35x Bolt shaft 36 First connecting member 36a First connecting member body portion 36b Reinforcing portion 36c First overlap portion 36d Second overlap Part 36h First insertion hole 38 Concrete body 40 Reinforcement material 40h First insertion hole 50 Steel plate concrete structure 53 Second connection means 55 Second connection material 55h Second insertion hole 60 Reinforcement material

Claims (3)

隣接する態様で配置した複数の鋼板と、隣接する前記鋼板間を連結する連結手段と、前記連結手段によって連結した前記鋼板の上層に打設されたコンクリート体とを備える鋼板コンクリート構造体において、
前記連結手段は、
隣接する前記鋼板にそれぞれ立設する柱状体と、
隣接する前記鋼板のそれぞれに立設した前記柱状体に挿通する挿通孔を有し、かつ前記コンクリート体を打設した後には前記挿通孔の内面と前記柱状体との間にコンクリートが充填される連結材と
を備えることを特徴とする鋼板コンクリート構造体。
In a steel plate concrete structure comprising a plurality of steel plates arranged in an adjacent manner, a connecting means for connecting between the adjacent steel plates, and a concrete body placed in an upper layer of the steel plate connected by the connecting means,
The connecting means includes
A columnar body standing on each of the adjacent steel plates;
After inserting the concrete body, the concrete is filled between the inner surface of the insertion hole and the columnar body after insertion of the concrete body. A steel plate concrete structure comprising: a connecting material.
前記連結材は、あらかじめ成形した金属板であることを特徴とする請求項1に記載の鋼板コンクリート構造体。   The steel plate concrete structure according to claim 1, wherein the connecting material is a pre-formed metal plate. 前記連結材は、あらかじめ金属線材を巻回することで構成したスパイラル体であることを特徴とする請求項1に記載の鋼板コンクリート構造体。   The steel sheet concrete structure according to claim 1, wherein the connecting material is a spiral body configured by winding a metal wire in advance.
JP2007186876A 2007-07-18 2007-07-18 Steel plate concrete structure Active JP4998921B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007186876A JP4998921B2 (en) 2007-07-18 2007-07-18 Steel plate concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007186876A JP4998921B2 (en) 2007-07-18 2007-07-18 Steel plate concrete structure

Publications (2)

Publication Number Publication Date
JP2009024359A JP2009024359A (en) 2009-02-05
JP4998921B2 true JP4998921B2 (en) 2012-08-15

Family

ID=40396431

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007186876A Active JP4998921B2 (en) 2007-07-18 2007-07-18 Steel plate concrete structure

Country Status (1)

Country Link
JP (1) JP4998921B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101011070B1 (en) 2010-09-14 2011-01-25 한국수력원자력 주식회사 Connection method between steel plate concrete structure and different structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0190906U (en) * 1987-12-09 1989-06-15
JP2007032159A (en) * 2005-07-28 2007-02-08 Kansai Electric Power Co Inc:The Connecting structure of steel plate concrete structural body

Also Published As

Publication number Publication date
JP2009024359A (en) 2009-02-05

Similar Documents

Publication Publication Date Title
KR100618113B1 (en) H-shape Beam-Column Connection Detail and Method using Divided Split Tee in Weak Axis of H-shape Column
CN110409618B (en) Plastic region steel fiber reinforced section steel concrete frame beam column node
CN104895197A (en) Sectional steel concrete column-steel bar concrete beam joint connection method
CN108086531B (en) Horizontal joint connection method for double-steel-plate shear wall
JP4213753B2 (en) Foundation reinforcement
JP4998921B2 (en) Steel plate concrete structure
CN211172412U (en) Connecting joint of beam main rib and cross steel rib column
JP6030274B1 (en) Frame structure and its construction method
JP4996370B2 (en) Frame assembly method and building frame
CN105569190A (en) Connecting node of concrete filled steel tubular column and reinforced concrete beam and construction method of connecting node
CN106436925A (en) Node structures of structural beam and structural column through reverse building method
JP4198697B2 (en) Wooden building structure
JP4377808B2 (en) Seismic reinforcement panel and seismic reinforcement method using the same
JP6353647B2 (en) Seismic isolation device joint structure
JP3128312U (en) Steel building member connection bracket and steel building member connection structure using the same
KR101297110B1 (en) Concrete filled tube
KR102175363B1 (en) Connecting core for column-beam joint
JP4814019B2 (en) Joint structure and method of pile and superstructure
JPH05156654A (en) Top-down construction method
KR20050049797A (en) Shear reinforcement structure of slab - column connection
CN209742078U (en) Concrete frame steel shotcrete buries piece
JPH0788686B2 (en) Front cross beam method
JP4379732B2 (en) Seismic reinforcement method for buildings
JP6865009B2 (en) Building foundation construction method and building foundation structure
JP3906351B2 (en) Seismic reinforcement structure for existing buildings

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100716

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20100716

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120419

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120424

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120508

R150 Certificate of patent or registration of utility model

Ref document number: 4998921

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150525

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150525

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150525

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250