JP4983085B2 - Image display control device, image display control program, and image display control method - Google Patents

Image display control device, image display control program, and image display control method Download PDF

Info

Publication number
JP4983085B2
JP4983085B2 JP2006123035A JP2006123035A JP4983085B2 JP 4983085 B2 JP4983085 B2 JP 4983085B2 JP 2006123035 A JP2006123035 A JP 2006123035A JP 2006123035 A JP2006123035 A JP 2006123035A JP 4983085 B2 JP4983085 B2 JP 4983085B2
Authority
JP
Japan
Prior art keywords
display
time
page
shift
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006123035A
Other languages
Japanese (ja)
Other versions
JP2007293742A5 (en
JP2007293742A (en
Inventor
芳春 鈴木
正 杵淵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seiko Epson Corp
Original Assignee
Seiko Epson Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiko Epson Corp filed Critical Seiko Epson Corp
Priority to JP2006123035A priority Critical patent/JP4983085B2/en
Publication of JP2007293742A publication Critical patent/JP2007293742A/en
Publication of JP2007293742A5 publication Critical patent/JP2007293742A5/ja
Application granted granted Critical
Publication of JP4983085B2 publication Critical patent/JP4983085B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、イベントの開催案内等を表示する画面の表示時間や画面中の時刻表示を一括
変換する技術に関する。
The present invention relates to a technique for collectively converting display time of a screen for displaying event information and the like and time display on the screen.

例えば、博覧会や見本市等では、来場者に多数のブースの展示物やイベントの開催スケ
ジュールを案内する。そのために、多数の表示装置と情報端末とネットワークを利用して
、案内情報の表示を実現する運営システムが開発されている(特許文献1参照)。
特開2002−188494号公報
For example, at exhibitions and trade fairs, visitors are informed of the booth exhibits and event schedules. For this reason, an operation system that realizes display of guidance information using a large number of display devices, information terminals, and networks has been developed (see Patent Document 1).
JP 2002-188494 A

ここで、従来の技術には、次のような解決すべき課題があった。各種イベントが特定の会場で開催される場合には、その開催予定時刻が表示される。この開催予定時刻は、しばしば、主催者側の都合で変更される。例えば、開催時間が繰り下がったり、一部のイベントが中止されたり、順番が入れ替わることもある。このとき、主催者側では、会場の表示装置に表示される画面中の予定時刻を、ネットワークに接続された情報端末を使用して訂正する。イベント開始案内を表示するための画面の表示タイミングも訂正が必要になることがある。これらの作業は迅速性が要求されるが、煩雑であり誤記等の間違いが生じ易い。本発明は以上の課題を解決するためになされたもので、イベントの開催案内等を表示する画面の表示時間や画面中の時刻表示を、自動的に一括変換できる仕組みを提供することを目的とする。 Here, the conventional technique has the following problems to be solved. When various events are held at a specific venue, the scheduled time is displayed. The scheduled time is often changed for the convenience of the organizer. For example, the holding time may be delayed, some events may be canceled, or the order may be changed. At this time, the organizer corrects the scheduled time on the screen displayed on the display device at the venue using an information terminal connected to the network. The display timing of the screen for displaying the event start guide may also need to be corrected. These operations are required to be quick, but are complicated and easy to make mistakes such as errors. The present invention has been made to solve the above problems, and an object of the present invention is to provide a mechanism capable of automatically converting the display time of a screen for displaying event guidance and the time display on the screen automatically. To do.

本発明は、表示制御の対象となる複数のページと、当該ページの表示開始時刻と表示終了時刻とを含むスケジュールデータとを記憶する記憶装置と、前記記憶装置に記憶されている複数のページをそれぞれ、当該記憶装置に記憶されているスケジュールデータに含まれる当該ページの表示開始時刻から表示終了時刻まで表示装置に表示するよう制御する表示制御手段と、シフト時間データの入力を受け付ける入力受付手段と、前記記憶装置に記憶されているスケジュールデータに含まれる前記表示開始時刻と前記表示終了時刻とを一括して、前記入力受付手段により入力が受け付けられたシフト時間データに従ってシフトさせるシフト処理手段を備えたことを特徴とする画像表示制御装置を提供する。The present invention provides a storage device for storing a plurality of pages to be subjected to display control, schedule data including display start time and display end time of the page, and a plurality of pages stored in the storage device. Display control means for controlling display on the display device from the display start time to the display end time of the page included in the schedule data stored in the storage device, and an input receiving means for receiving input of shift time data, respectively And shift processing means for collectively shifting the display start time and the display end time included in the schedule data stored in the storage device in accordance with the shift time data received by the input receiving means. An image display control device characterized by the above is provided.
本発明に係る画像表示制御装置において、前記シフト処理手段は、指定された時間範囲に含まれる前記表示開始時刻と前記表示終了時刻とを、前記シフト時間データに従ってシフトさせてもよい。In the image display control device according to the present invention, the shift processing means may shift the display start time and the display end time included in a designated time range according to the shift time data.
本発明に係る画像表示制御装置において、前記シフト処理手段は、相互に関係付けられた複数の前記ページの表示開始時刻と表示終了時刻とを、前記シフト時間データに従ってシフトさせてもよい。In the image display control apparatus according to the present invention, the shift processing means may shift the display start time and display end time of the plurality of pages related to each other according to the shift time data.
本発明に係る画像表示制御装置において、前記ページは、画像表示用データもしくは機器の動作タイミングを制御する制御データを含んでもよい。In the image display control apparatus according to the present invention, the page may include image display data or control data for controlling operation timing of the device.
本発明に係る画像表示制御装置において、前記ページは、予め設定された時刻を含み、前記シフト処理手段は、前記ページの表示開始時刻と表示終了時刻とともに、当該ページに含まれる前記時刻をシフトさせてもよい。In the image display control apparatus according to the present invention, the page includes a preset time, and the shift processing means shifts the time included in the page together with the display start time and display end time of the page. May be.
また、本発明は、予め設定された時刻を含むページを記憶する記憶装置と、シフト時間データの入力を受け付ける入力受付手段と、前記ページに含まれる前記時刻を、前記入力受付手段によって入力が受け付けられたシフト時間データに従ってシフトさせるシフト処理手段と、前記シフト処理手段により前記時刻がシフトされた前記ページを表示するためのデータを生成するページ処理手段と、前記ページ処理手段によって生成された前記ページを表示装置に転送して表示制御をする表示制御手段とを備えたことを特徴とする画像表示制御装置を提供する。Further, the present invention provides a storage device that stores a page including a preset time, an input receiving unit that receives an input of shift time data, and an input that receives the time included in the page by the input receiving unit. Shift processing means for shifting according to the received shift time data, page processing means for generating data for displaying the page shifted in time by the shift processing means, and the page generated by the page processing means There is provided an image display control device comprising display control means for controlling the display by transferring the image to the display device.
本発明に係る画像表示制御装置においては、前記ページに含まれる前記時刻が複数のグループに区分され、前記シフト処理手段は、指定されたグループの前記時刻を前記シフト時間データに従ってシフトさせてもよい。In the image display control apparatus according to the present invention, the time included in the page may be divided into a plurality of groups, and the shift processing unit may shift the time of the designated group according to the shift time data. .
本発明に係る画像表示制御装置において、前記シフト処理手段は、前記ページ全体の前記時刻を前記シフト時間データに従って一括してシフトさせてもよい。In the image display control apparatus according to the present invention, the shift processing means may shift the time of the entire page at once according to the shift time data.
さらに、本発明は、コンピュータを、表示制御の対象となる複数のページと、当該ページの表示開始時刻と表示終了時刻とを含むスケジュールデータとを記憶する記憶装置に記憶されている複数のページをそれぞれ、当該記憶装置に記憶されているスケジュールデータに含まれる当該ページの表示開始時刻から表示終了時刻まで表示装置に表示するよう制御する表示制御手段と、前記記憶装置に記憶されているスケジュールデータに含まれる前記表示開始時刻と前記表示終了時刻とを一括して、シフト時間データの入力を受け付ける入力受付手段により入力が受け付けられたシフト時間データに従ってシフトさせるシフト処理手段、として機能させる画像表示制御プログラムを提供する。Further, according to the present invention, the computer stores a plurality of pages stored in a storage device that stores a plurality of pages to be subjected to display control and schedule data including a display start time and a display end time of the page. Display control means for controlling display from the display start time to the display end time of the page included in the schedule data stored in the storage device, and schedule data stored in the storage device; An image display control program that functions as a shift processing unit that shifts the display start time and the display end time included in accordance with shift time data received by an input receiving unit that receives input of shift time data. I will provide a.
また、本発明は、表示制御手段が、表示制御の対象となる複数のページと、当該ページの表示開始時刻と表示終了時刻とを含むスケジュールデータとを記憶する記憶装置に記憶されている複数のページをそれぞれ、当該記憶装置に記憶されているスケジュールデータに含まれる当該ページの表示開始時刻から表示終了時刻まで表示装置に表示するよう制御するステップと、シフト処理手段が、前記記憶装置に記憶されているスケジュールデータに含まれる前記表示開始時刻と前記表示終了時刻とを一括して、シフト時間データの入力を受け付ける入力受付手段により入力が受け付けられたシフト時間データに従ってシフトさせるステップ、とを含む画像表示制御方法を提供する。Further, according to the present invention, the display control unit stores a plurality of pages stored in a storage device that stores a plurality of pages to be subjected to display control and schedule data including the display start time and the display end time of the pages. Each of the pages is controlled to be displayed on the display device from the display start time to the display end time of the page included in the schedule data stored in the storage device, and shift processing means is stored in the storage device. A step of collectively shifting the display start time and the display end time included in the schedule data according to the shift time data received by the input receiving means for receiving the input of the shift time data. A display control method is provided.

それぞれ次のような構成により上記の課題が解決される。
〈構成1〉 表示制御の対象となる任意の構成の複数のページと当該ページの表示開始時刻と表示終了時刻とを設定したスケジュールデータを記憶する記憶装置と、上記スケジュールデータを参照して、上記複数のページを、それぞれ上記表示開始時刻から上記表示終了時刻まで表示装置に表示するよう制御する表示制御手段と、シフト時間データの入力を受け付ける入力受付手段と、上記スケジュールデータに含まれた上記ページの表示開始時刻と表示終了時刻の全部または一部を一括して、上記シフト時間データに従ってシフトさせるシフト処理手段を備えたことを特徴とする画像表示制御システム。
ケジュールデータにより、複数のページの表示開始時刻と表示終了時刻とを設定し制御する。この表示開始時刻と表示終了時刻の全部または一部を一括シフトすることができるので、スケジュール全体を正確に簡便に変更でき、管理を容易にする。
The above-described problems can be solved by the following configurations.
<Configuration 1> With reference to the schedule data, a storage device that stores a plurality of pages of an arbitrary configuration to be subjected to display control, schedule data in which the display start time and display end time of the page are set, and the schedule data Display control means for controlling a plurality of pages to be displayed on the display device from the display start time to the display end time, input acceptance means for accepting input of shift time data, and the page included in the schedule data An image display control system comprising shift processing means for shifting all or part of the display start time and display end time in accordance with the shift time data.
The schedule data, to set a display start time and display end time of the plurality of pages control. Since all or part of the display start time and display end time can be shifted at once, the entire schedule can be changed accurately and easily, and management is facilitated.

〈構成2〉 構成1に記載の画像表示制御システムにおいて、指定された時間範囲に含
まれた上記ページの表示開始時刻と表示終了時刻を、上記シフト時間データに従ってシフ
トさせるシフト処理手段を備えたことを特徴とする画像表示制御システム。
<Configuration 2> The image display control system according to Configuration 1, further comprising shift processing means for shifting the display start time and display end time of the page included in the specified time range according to the shift time data. An image display control system characterized by the above.

複数のページを指定して、その表示開始時刻や表示終了時刻を一括シフトするだけでな
く、時間範囲を指定して、該当する表示開始時刻や表示終了時刻を一括シフトできる。
Not only can a plurality of pages be specified and the display start time and display end time are collectively shifted, but the corresponding display start time and display end time can be collectively shifted by specifying a time range.

〈構成3〉 構成1に記載の画像表示制御システムにおいて、相互に関係付けられた複
数のページの表示開始時刻と表示終了時刻を、上記シフト時間データに従ってシフトさせ
るシフト処理手段を備えたことを特徴とする画像表示制御システム。
<Configuration 3> The image display control system according to Configuration 1, further comprising shift processing means for shifting the display start time and the display end time of a plurality of mutually related pages according to the shift time data. An image display control system.

予め相互に関係付けられた複数のページについて、その表示開始時刻や表示終了時刻を
一括シフトできる。
The display start time and display end time of a plurality of pages related to each other in advance can be collectively shifted.

〈構成4〉 構成1に記載の画像表示制御システムにおいて、上記ページは、任意の画
像表示用データもしくは任意の機器の動作タイミングを制御する制御データを含むことを
特徴とする画像表示制御システム。
<Configuration 4> The image display control system according to Configuration 1, wherein the page includes arbitrary image display data or control data for controlling operation timing of an arbitrary device.

表示制御の対象となるページは、任意の画像表示用データを含んでよい。また、任意の
機器の動作タイミングを制御する制御データを含んでいれば、表示開始とともに、当該機
器の動作を制御できる。
The page that is subject to display control may include arbitrary image display data. If the control data for controlling the operation timing of an arbitrary device is included, the operation of the device can be controlled at the start of display.

〈構成5〉 構成1に記載の画像表示制御システムにおいて、上記ページは、時刻表示
を含み、上記シフト処理手段は、上記ページの表示開始時刻と表示終了時刻の全部または
一部とともに、上記時刻表示をシフトさせることを特徴とする画像表示制御システム。
<Configuration 5> In the image display control system according to Configuration 1, the page includes a time display, and the shift processing unit includes the time display together with all or part of the display start time and the display end time of the page. An image display control system characterized by shifting the image.

ページの表示開始時刻や表示終了時刻とともに、ページ中に含まれた時刻表示も一括シ
フトの対象にすることができる。
Along with the display start time and display end time of the page, the time display included in the page can also be a target of batch shift.

〈構成6〉 時刻表示を含むページと、上記時刻表示をシフトさせるためのシフト時間
データとを記憶する記憶装置と、上記シフト時間データの入力を受け付ける入力受付手段
と、上記時刻表示を上記シフト時間データに従ってシフトさせるシフト処理手段と、上記
シフト処理後の時刻表示を含むページを表示するためのデータを生成するページ処理手段
と、上記ページを表示装置に転送して表示制御をする表示制御手段とを備えたことを特徴
とする画像表示制御システム。
<Configuration 6> A storage device that stores a page including a time display, shift time data for shifting the time display, input receiving means for receiving input of the shift time data, and the time display with the shift time. Shift processing means for shifting in accordance with data, page processing means for generating data for displaying a page including a time display after the shift processing, and display control means for controlling display by transferring the page to a display device An image display control system comprising:

ページ中の時刻表示を、シフト時間データの入力によって、前後に自由に一括シフトで
きる。
The time display on the page can be freely shifted forward and backward by inputting shift time data.

〈構成7〉 構成6に記載の画像表示制御システムにおいて、上記時刻表示は複数のグ
ループに区分され、上記シフト時間データが上記グループ毎に設けられることを特徴とす
る画像表示制御システム。
<Configuration 7> The image display control system according to Configuration 6, wherein the time display is divided into a plurality of groups, and the shift time data is provided for each group.

ページ中の複数の時刻表示のうち、例えば、前半はそのままで、後半だけ予定変更にな
ったような場合に、前半と後半とを別々のグループに区分して、後半だけ、シフト時間デ
ータにより一括シフト処理することができる。
Of the multiple time displays on the page, for example, if the first half is left as it is and the schedule is changed only in the second half, the first half and the second half are divided into separate groups, and only the second half is batched by shift time data. Shift processing can be performed.

〈構成8〉 構成7に記載の画像表示制御システムにおいて、上記シフト時間データは
、上記ページ毎に設けられることを特徴とする画像表示制御システム。
<Configuration 8> The image display control system according to Configuration 7, wherein the shift time data is provided for each page.

特定のページに含まれる時刻表示だけを一括シフトの対象にしたり、ページ毎にそれぞ
れ別々のシフト時間データを適用することができる。
Only the time display included in a specific page can be subjected to batch shift, or different shift time data can be applied to each page.

〈構成9〉 コンピュータを、表示制御の対象となる任意の構成の複数のページと当該
ページの表示開始時刻と表示終了時刻とを設定したスケジュールデータを記憶する記憶装
置と、上記スケジュールデータを参照して、上記複数のページを、それぞれ上記表示開始
時刻から上記表示終了時刻まで表示装置に表示するよう制御する表示制御手段と、シフト
時間データの入力を受け付ける入力受付手段と、上記スケジュールデータに含まれた上記
ページの表示開始時刻と表示終了時刻の全部または一部を一括して、上記シフト時間デー
タに従ってシフトさせるシフト処理手段、として機能させる画像表示制御プログラム。
<Configuration 9> The computer refers to a storage device that stores schedule data in which a plurality of pages having an arbitrary configuration to be subjected to display control, a display start time and a display end time of the page are set, and the schedule data. The display control means for controlling the plurality of pages to be displayed on the display device from the display start time to the display end time, the input receiving means for receiving input of shift time data, and the schedule data. An image display control program that functions as a shift processing unit that shifts all or part of the display start time and display end time of the page in accordance with the shift time data.

〈構成10〉 コンピュータを、表示制御の対象となる任意の構成の複数のページと当
該ページの表示開始時刻と表示終了時刻とを設定したスケジュールデータを記憶する記憶
装置と、上記スケジュールデータを参照して、上記複数のページを、それぞれ上記表示開
始時刻から上記表示終了時刻まで表示装置に表示するよう制御する表示制御手段と、シフ
ト時間データの入力を受け付ける入力受付手段と、上記スケジュールデータに含まれた上
記ページの表示開始時刻と表示終了時刻の全部または一部を一括して、上記シフト時間デ
ータに従ってシフトさせるシフト処理手段、として機能させる画像表示制御プログラムを
記録したコンピュータで読み取り可能な記録媒体。
<Configuration 10> The computer refers to the storage device that stores schedule data in which a plurality of pages having an arbitrary configuration to be subjected to display control, the display start time and the display end time of the page are set, and the schedule data. The display control means for controlling the plurality of pages to be displayed on the display device from the display start time to the display end time, the input receiving means for receiving input of shift time data, and the schedule data. A computer-readable recording medium having recorded thereon an image display control program that functions as shift processing means for shifting all or part of the display start time and display end time of the page in accordance with the shift time data.

〈構成11〉 記憶装置が、表示制御の対象となる任意の構成の複数のページと当該ペ
ージの表示開始時刻と表示終了時刻とを設定したスケジュールデータを記憶するステップ
と、表示制御手段が、上記スケジュールデータを参照して、上記複数のページを、それぞ
れ上記表示開始時刻から上記表示終了時刻まで表示装置に表示するよう制御するステップ
と、入力受付手段が、シフト時間データの入力を受け付けるステップと、シフト処理手段
が、上記スケジュールデータに含まれた上記ページの表示開始時刻と表示終了時刻の全部
または一部を一括して、上記シフト時間データに従ってシフトさせるステップ、とを含む
画像表示制御方法。
<Configuration 11> A step of storing a schedule data in which a storage device sets a plurality of pages of an arbitrary configuration to be subjected to display control and a display start time and a display end time of the page, and the display control means includes the above Referring to the schedule data, the step of controlling the plurality of pages to be displayed on the display device from the display start time to the display end time, and the step of receiving the shift time data; An image display control method comprising: a step of shifting all or part of the display start time and the display end time of the page included in the schedule data according to the shift time data.

本発明によれば、画面の表示開始時刻や表示終了時刻の全部または一部を一括シフトで
きる。あるいは、画面に表示された時刻表示を一括して前後にシフトできる。また、ある
いは、画面の表示タイミングをシフトし、同時に画面に表示された時刻表示を連動させて
一括シフトする制御もできる。以下、本発明の実施の形態を実施例毎に詳細に説明する。
According to the present invention, all or part of the display start time and display end time of the screen can be shifted at once. Alternatively, the time display displayed on the screen can be collectively shifted forward and backward. Alternatively, it is possible to shift the display timing of the screen and simultaneously shift the time display displayed on the screen in conjunction with each other. Hereinafter, embodiments of the present invention will be described in detail for each example.

図1は実施例1の画像表示制御システムブロック図である。
このシステムはコンピュータ10により制御される。コンピュータ10は、液晶プロジ
ェクタ等の表示装置40を制御して、スクリーン41に様々な画像を所定のタイミングで
表示する。なお、この実施例では液晶プロジェクタとコンピュータとを組み合わせてシス
テムを実現するが、液晶プロジェクタの中にコンピュータの全ての機能が含まれていても
よい。また、プラズマディスプレイやその他の様々な表示装置も同様に採用できる。さら
に、DVD(ディジタルビデオデータ再生装置)43やVTR44(ビデオテープレコー
ダ)も表示制御の対象にすることができる。
FIG. 1 is a block diagram of an image display control system according to the first embodiment.
This system is controlled by a computer 10. The computer 10 controls the display device 40 such as a liquid crystal projector to display various images on the screen 41 at a predetermined timing. In this embodiment, a system is realized by combining a liquid crystal projector and a computer. However, all functions of the computer may be included in the liquid crystal projector. Further, a plasma display and various other display devices can be similarly employed. Furthermore, a DVD (digital video data reproducing device) 43 and a VTR 44 (video tape recorder) can be subjected to display control.

コンピュータ10には演算処理装置20と記憶装置30が設けられている。コンピュー
タ10は一般によく知られた構成のもので、ディスプレイ2と本体制御部3とキーボード
4とマウス5とを備える。本体制御部3の中に、演算処理装置20と記憶装置30が組み
込まれている。演算処理装置20は、入力受付手段21、シフト処理手段22、スケジュ
ール処理手段23、ページ処理手段24、及び表示制御手段25を備える。これらの手段
はコンピュータ10に所定の処理を実行させるコンピュータプログラムである。また、演
算処理装置20には、入出力インタフェース45を介して表示装置40が接続されている
The computer 10 is provided with an arithmetic processing unit 20 and a storage device 30. The computer 10 has a generally well-known configuration, and includes a display 2, a main body control unit 3, a keyboard 4, and a mouse 5. An arithmetic processing device 20 and a storage device 30 are incorporated in the main body control unit 3. The arithmetic processing unit 20 includes an input receiving unit 21, a shift processing unit 22, a schedule processing unit 23, a page processing unit 24, and a display control unit 25. These means are computer programs that cause the computer 10 to execute predetermined processing. Further, a display device 40 is connected to the arithmetic processing device 20 via an input / output interface 45.

記憶装置30には、ページ31、スケジュールデータ35、シフト時間データ26、ス
ケジュール設定画面27、スケジュール変更画面28、絶対時刻データ29などが記憶さ
れている。ページ31は様々な画像要素32を含む。画像要素32は任意の図形や文字デ
ータである。ページ31には時刻表示34を含めることができる。時刻表示34は、例え
ば、文字や図形により、例えば、あるイベントの開催時刻を表示するためのものである。
The storage device 30 stores a page 31, schedule data 35, shift time data 26, a schedule setting screen 27, a schedule change screen 28, absolute time data 29, and the like. The page 31 includes various image elements 32. The image element 32 is an arbitrary graphic or character data. The page 31 can include a time display 34. The time display 34 is for displaying, for example, the opening time of a certain event, for example, with characters and graphics.

スケジュールデータ35は、表示制御の対象となるページ31と、ページの表示開始時
刻36と表示終了時刻37を設定するための制御用データである。ページ31は、ページ
のタイトル38で指定する。シフト時間データ26は、スケジュールデータ35に含まれ
るページの表示開始時刻36や表示終了時刻37を一括シフトするためのデータである。
また、あるいは、シフト時間データ26は、ページ31に含まれる時刻表示34を一括シ
フトするためのデータである。
The schedule data 35 is control data for setting a page 31 to be subjected to display control, a page display start time 36, and a display end time 37. The page 31 is designated by the page title 38. The shift time data 26 is data for collectively shifting the display start time 36 and the display end time 37 of pages included in the schedule data 35.
Alternatively, the shift time data 26 is data for collectively shifting the time display 34 included in the page 31.

スケジュール設定画面27は、スケジュールデータ35を作成するときに操作する画面
である。スケジュール変更画面28は、スケジュールデータ35を変更するときに操作す
る画面である。いずれの画面もディスプレイ2に表示して使用される。絶対時刻データは
、時間の経過とともに順次書き換えられる。例えば、1秒毎に書き換えられる。このデー
タは、絶対時刻を画像要素32に含めて表示する場合等に利用される。この絶対時刻デー
タはシフト処理などによって変更されない。
The schedule setting screen 27 is a screen operated when creating the schedule data 35. The schedule change screen 28 is a screen operated when changing the schedule data 35. Both screens are displayed on the display 2 and used. The absolute time data is sequentially rewritten as time passes. For example, it is rewritten every second. This data is used when the absolute time is included in the image element 32 and displayed. This absolute time data is not changed by a shift process or the like.

演算処理装置20に設けられた入力受付手段21は、管理者の操作によってシフト時間
データ26が入力されたとき、その入力を受け付ける機能を持つ。シフト処理手段22は
、スケジュールデータ35に含まれたページの表示開始時刻36と表示終了時刻37の全
部または一部を一括して、シフト時間データ26に従ってシフトさせる機能を持つ。例え
ば、シフト時間データ26がプラス10であればページの表示開始時刻36を10分遅ら
せる。マイナス10であればページの表示開始時刻36を10分早める。対象となる表示
開始時刻36が複数あれば、全てについて同様の処理を行う。
The input receiving means 21 provided in the arithmetic processing unit 20 has a function of receiving the input when the shift time data 26 is input by the operation of the administrator. The shift processing means 22 has a function of shifting all or part of the display start time 36 and the display end time 37 of the page included in the schedule data 35 in accordance with the shift time data 26. For example, if the shift time data 26 is plus 10, the page display start time 36 is delayed by 10 minutes. If it is minus 10, the page display start time 36 is advanced by 10 minutes. If there are a plurality of target display start times 36, the same processing is performed for all of them.

なお、シフト処理手段22は、スケジュール変更画面28で指定された時間範囲に含ま
れた、ページの表示開始時刻36と表示終了時刻37のみを、一括シフトすることもでき
る。また、相互に関係付けられた複数のページの表示開始時刻36と表示終了時刻37の
みを、一括シフトすることもできる。また、表示開始時刻36と表示終了時刻37の全部
または一部とともに、ページ31中の時刻表示34を一括シフトさせることもできる。ま
た、シフト処理手段22は、ページ31中の時刻表示34のみを、シフト時間データ26
に従ってシフトさせることができる。時刻表示34は、複数のグループに区分され、シフ
ト時間データ26を、グループ毎にそれぞれ独立に設けることができる。シフト時間デー
タ26は、ページ毎にそれぞれ独立に設けることもできる。また、ページ31は、任意の
画像表示用データもしくは任意の機器の動作タイミングを制御する制御データを含むこと
ができる。これらの具体例は後述する。
The shift processing means 22 can also collectively shift only the page display start time 36 and the display end time 37 included in the time range specified on the schedule change screen 28. In addition, only the display start time 36 and the display end time 37 of a plurality of pages related to each other can be collectively shifted. In addition, the time display 34 in the page 31 can be collectively shifted together with all or part of the display start time 36 and the display end time 37. Further, the shift processing means 22 displays only the time display 34 in the page 31 with the shift time data 26.
Can be shifted according to The time display 34 is divided into a plurality of groups, and the shift time data 26 can be provided independently for each group. The shift time data 26 can also be provided independently for each page. Further, the page 31 can include arbitrary image display data or control data for controlling the operation timing of an arbitrary device. Specific examples of these will be described later.

スケジュール処理手段23は、スケジュール設定画面27やスケジュール変更画面28
を使用して、スケジュールデータ35の内容を設定したり変更する処理を制御する機能を
持つ。表示制御手段25は、シフト処理後の時刻表示34を含むページ31を表示するた
めのデータを生成する機能を持つ。表示制御手段25は、スケジュールデータ35を参照
して、複数のページ31を、それぞれ表示開始時刻36から表示終了時刻37まで表示装
置40に表示するよう制御する機能を持つ。表示装置40には、入出力インタフェース4
5を通じてページ31が転送されて表示される。また、ページ31の表示開始時刻にDV
D43が起動して、DVD43の出力が表示装置40に転送されて表示される。
The schedule processing means 23 includes a schedule setting screen 27 and a schedule change screen 28.
Is used to control the process of setting or changing the contents of the schedule data 35. The display control means 25 has a function of generating data for displaying the page 31 including the time display 34 after the shift process. The display control means 25 has a function of referring to the schedule data 35 and controlling the plurality of pages 31 to be displayed on the display device 40 from the display start time 36 to the display end time 37, respectively. The display device 40 includes an input / output interface 4.
5, the page 31 is transferred and displayed. In addition, DV at the display start time of page 31
D43 is activated and the output of the DVD 43 is transferred to the display device 40 and displayed.

図2は、使用されるデータの具体例説明図である。
スケジュールデータ35は、例えば、図のような「09:00:00」といった数値で
表示された表示開始時刻36を含む。表示終了時刻37も同様に数値で表示される。タイ
トル38は「本日のご案内」といった文字で表示される。この文字のプロパティ(後述す
る)で、ページ31(図1)のデータファイルを特定する。入力受付手段21によれば、
例えば、図のように、スケジュールを遅らせる場合の時間の入力操作ができる。この詳細
も後述するが、このスケジュール変更画面28の操作により、シフト時間データ26が取
得される。シフト処理手段22は、スケジュールデータ35に含まれた該当する表示開始
時刻36や表示終了時刻37をシフトさせる。この例では、一括して5分間時刻を遅らせ
る。また、シフト処理手段22は、ページ処理手段24に対して、ページ31に含まれた
時刻表示34を一括して5分間シフトするように要求する。表示制御手段25は、こうし
て時刻が一括シフトされたページ31を、スケジュールデータ35に従って表示する。
FIG. 2 is an explanatory diagram of a specific example of data to be used.
The schedule data 35 includes a display start time 36 displayed as a numerical value such as “09:00:00” as shown in the figure. The display end time 37 is similarly displayed as a numerical value. The title 38 is displayed in characters such as “Today's guidance”. The data file of page 31 (FIG. 1) is specified by this character property (described later). According to the input receiving means 21,
For example, as shown in the figure, a time input operation can be performed when the schedule is delayed. Although details will be described later, the shift time data 26 is acquired by operating the schedule change screen 28. The shift processing means 22 shifts the corresponding display start time 36 and display end time 37 included in the schedule data 35. In this example, the time is delayed by 5 minutes in a lump. The shift processing unit 22 requests the page processing unit 24 to shift the time display 34 included in the page 31 in a batch for 5 minutes. The display control means 25 displays the page 31 whose time has been shifted in this way in accordance with the schedule data 35.

例えば、イベントの紹介のためにそのイベント開始1時間前にページを表示する予定で
あったが、イベントの開始時刻が30分間延期されたような場合がある。このとき、管理
者は、シフト時間データ26を入力して、ページの表示時刻やページに含まれたイベント
開始時刻の表示を、30分間一括シフトする。毎日同じスケジュールでイベントが開催さ
れる場合に、その日の状況に応じて、イベントの開始時刻等を適宜シフトすることができ
る。スケジュールデータ自体の基本構成に変更を加えること無く、シフト時間データの入
力により、自由に、時刻の一括シフトができる。シフト時間データをゼロにすれば、スケ
ジュールデータを簡単に最初の状態に戻すことができる。スケジュールデータに新たなデ
ータを追加したり削除したりするデータ編集作業を必要としないから、元に戻すための複
雑な作業も必要としない。なお、スケジュールデータ35に含まれた表示開始時刻36や
表示終了時刻37の一括シフト処理の具体例は、最後の実施例4で説明をする。次の実施
例2で、ページ中の時刻表示を独立に制御する説明をし、実施例3で、制御プログラムの
動作フローチャートを説明する。
For example, there is a case where the page is scheduled to be displayed one hour before the start of the event for the introduction of the event, but the start time of the event is postponed for 30 minutes. At this time, the administrator inputs the shift time data 26 and shifts the display of the page display time and the event start time included in the page for 30 minutes at a time. When an event is held every day according to the same schedule, the start time of the event can be appropriately shifted according to the situation of the day. Without changing the basic configuration of the schedule data itself, the time can be collectively shifted freely by inputting the shift time data. If the shift time data is set to zero, the schedule data can be easily returned to the initial state. Data editing work for adding or deleting new data to the schedule data is not required, and therefore no complicated work for restoring the data is required. A specific example of the batch shift process of the display start time 36 and the display end time 37 included in the schedule data 35 will be described in the last embodiment 4. In the second embodiment, the time display in the page is controlled independently, and in the third embodiment, an operation flowchart of the control program is described.

図3は、ページと時刻表示の説明図である。
ページ31中の時刻表示34は、スケジュールデータ35の表示開始時刻36等の一括
シフトと連動するように制御できる。その説明は後述することにして、ここでは、時刻表
示34をグループ化してその時刻を強制的に一括シフトする例を説明する。例えば、図の
下方に示すようなページの表示制御をする。この画面55には、本日開催されるイベント
名67とその開催時刻表示66と、時計の画像68とが含まれている。「本日のご案内」
という文字やイベント名67や背景の模様等は、画像要素32である。開催時刻表示66
には、時刻表示グループ34−1と34−2が含まれる。時計の画像68は絶対時刻デー
タ29を使用して生成された画像である。シフト時間データ35−1は時刻表示グループ
34−1を一括シフトさせるためのデータである。シフト時間データ35−2は時刻表示
グループ34−2を一括シフトさせるためのデータである。
FIG. 3 is an explanatory diagram of page and time display.
The time display 34 in the page 31 can be controlled so as to be linked with a batch shift such as the display start time 36 of the schedule data 35. The description thereof will be described later. Here, an example will be described in which the time display 34 is grouped and the time is forcibly shifted collectively. For example, page display control as shown in the lower part of the figure is performed. This screen 55 includes an event name 67 to be held today, its holding time display 66, and a clock image 68. "Today's information"
The characters, event name 67, background pattern, and the like are image elements 32. Time display 66
Includes time display groups 34-1 and 34-2. The clock image 68 is an image generated using the absolute time data 29. The shift time data 35-1 is data for collectively shifting the time display group 34-1. The shift time data 35-2 is data for collectively shifting the time display group 34-2.

この画像45は、例えばイベントの開催中、継続的に表示し続けられているものとする
。ここで、イベントAとイベントBは予定通り開催されるが、イベントCとイベントDは
予定よりも10分間開始を遅らせるものとする。このとき、図に示すように、イベントA
とイベントBの時刻表示グループ34−1はそのままにしておく。シフト時間データ35
−1はシフト時間0とされている。一方、イベントCとイベントDの時刻表示グループ3
4−2については、当初それぞれ15時と17時に設定されていた。これに対して、シフ
ト時間データは10分に設定されている。従って、時刻表示グループ34−2は、いずれ
も10分だけシフトされた内容になる。
It is assumed that the image 45 is continuously displayed during the event, for example. Here, event A and event B are held as scheduled, but event C and event D are delayed for 10 minutes from the schedule. At this time, as shown in FIG.
And the time display group 34-1 of event B is left as it is. Shift time data 35
-1 is a shift time of zero. On the other hand, time display group 3 of event C and event D
4-2 was initially set at 15:00 and 17:00, respectively. On the other hand, the shift time data is set to 10 minutes. Therefore, the time display group 34-2 has a content shifted by 10 minutes.

このような制御を行うために、例えば、図1に示したコンピュータ10のディスプレイ
2に、スケジュール変更画面28を表示する。これは、ここには修正対象のイベントを選
択するドロップダウンリスト61が設けられている。ここでイベントCを選択する。さら
に、シフト時間データ35−2を設定するためにドロップダウンリスト62を使用する。
ここで予定を10分遅らせるとする。また、単にイベントCの時刻表示を10分遅らせる
のか、あるいは進ませるのか、あるいはイベントC以降の全てのイベントについて時刻表
示を10分遅らせるのかという選択ができる。この選択のために、オプションボタン63
が用意されている。
In order to perform such control, for example, the schedule change screen 28 is displayed on the display 2 of the computer 10 shown in FIG. This is provided with a drop-down list 61 for selecting an event to be corrected. Here, event C is selected. Further, the drop-down list 62 is used to set the shift time data 35-2.
Suppose here that the schedule is delayed by 10 minutes. In addition, it is possible to select whether the time display of the event C is simply delayed by 10 minutes, advanced, or whether the time display is delayed by 10 minutes for all events after the event C. Option button 63 for this selection
Is prepared.

この例では、イベントC以降の全てのイベントを10分遅らせるというように処理を選
択している。最後にセットボタン64をクリックすると、シフト時間データ26−2に1
0分という値がセットされる。そして、そのシフト対象がイベントCとイベントD用の時
刻表示グループ34−2になる。キャンセルボタン65をクリックすれば、修正対象のイ
ベントの選択がデフォルトの状態に戻る。こうして画面28を使用して、特定のイベント
の開始時刻や終了時刻などを指定して、シフト時間の設定ができる。また、複数の時刻表
示を一括して任意の時間シフトさせることができる。従って、複雑なイベント開催予定で
あっても、その時刻データを全て間違いなく一括変更することが可能になる。
In this example, processing is selected so that all events after event C are delayed by 10 minutes. Finally, when the set button 64 is clicked, 1 is added to the shift time data 26-2.
A value of 0 minutes is set. The shift target is the time display group 34-2 for event C and event D. If the cancel button 65 is clicked, the selection of the event to be corrected returns to the default state. In this way, the shift time can be set by specifying the start time and end time of a specific event using the screen 28. In addition, a plurality of time displays can be shifted at any time in a lump. Therefore, even if a complicated event is scheduled, it is possible to change all the time data without fail.

図4は、上記のシステムのハードウエアブロック図である。
本体制御部3の内部バス110には、CPU(中央処理装置)111と、ROM(リー
ドオンリメモリ)112と、RAM(ランダムアクセスメモリ)113と、HDD(ハー
ドディスク)114と、入出力インタフェース115とが接続されている。入出力インタ
フェース115には、ディスプレイ2とキーボード4とマウス5と液晶プロジェクタから
なる表示装置40やDVD43やVTR44が接続されている。本体制御部3のハードウ
エアは一般的によく知られたパーソナルコンピュータに備えられている。
FIG. 4 is a hardware block diagram of the above system.
An internal bus 110 of the main body control unit 3 includes a CPU (Central Processing Unit) 111, a ROM (Read Only Memory) 112, a RAM (Random Access Memory) 113, an HDD (Hard Disk) 114, and an input / output interface 115. Is connected. The input / output interface 115 is connected to a display device 40 including a display 2, a keyboard 4, a mouse 5, and a liquid crystal projector, a DVD 43, and a VTR 44. The hardware of the main body control unit 3 is provided in a generally well-known personal computer.

図1に示した記憶装置30は、ROM112やRAM113やHDD114により構成
される。図1に示した演算処理装置20は、CPU111、ROM112、RAM113
等により構成される。主なデータは、HDD114に記憶される。また、CPU111が
実行するコンピュータプログラムは、ROM112に記憶され、あるいはRAM113に
適時ロードされる。シフト時間データは、キーボード103やマウス105により入力さ
れる。キーボード103やマウス105から入力されたデータは、入出力インタフェース
115を通じてRAM113に一時記憶され、所定のタイミングで中央処理装置に読み出
されて使用される。
The storage device 30 illustrated in FIG. 1 includes a ROM 112, a RAM 113, and an HDD 114. The arithmetic processing unit 20 shown in FIG. 1 includes a CPU 111, a ROM 112, and a RAM 113.
Etc. Main data is stored in the HDD 114. The computer program executed by the CPU 111 is stored in the ROM 112 or loaded into the RAM 113 as appropriate. The shift time data is input by the keyboard 103 or the mouse 105. Data input from the keyboard 103 or the mouse 105 is temporarily stored in the RAM 113 through the input / output interface 115, and is read out and used by the central processing unit at a predetermined timing.

図5は、スケジュールデータの設定処理動作フローチャートである。
以下、上記のシステムを動作させるコンピュータプログラムの実施例を説明する。ここ
では、図2で説明したスケジュールデータ35を生成する。まず、ステップS11で、入
力受付手段21を起動して、図2に示したようなスケジュールデータ35の入力画面をデ
ィスプレイ2に表示する。次に、ステップS12で、スケジュール処理手段23を起動す
る。その結果、ステップS13で、項目毎のスケジュール設定画面の表示をする。この画
面の具体例は図24等で後述する。ステップS14では、表示開始時刻36の入力をする
。ステップS15では、表示終了時刻37の入力をする。ステップS16では、タイトル
38の入力をする。ステップS17では、タイトル38のプロパティの入力をする。この
画面の実施例も図33等で後述する。これで、ページのデータファイルを特定する。以上
の処理で、図2で例示したスケジュールデータ35が作成できる。
FIG. 5 is a flowchart of the schedule data setting process.
Hereinafter, an embodiment of a computer program for operating the above system will be described. Here, the schedule data 35 described with reference to FIG. 2 is generated. First, in step S11, the input receiving means 21 is activated, and an input screen for the schedule data 35 as shown in FIG. Next, in step S12, the schedule processing means 23 is activated. As a result, the schedule setting screen for each item is displayed in step S13. A specific example of this screen will be described later with reference to FIG. In step S14, the display start time 36 is input. In step S15, the display end time 37 is input. In step S16, the title 38 is input. In step S17, the property of the title 38 is input. An example of this screen will be described later with reference to FIG. This identifies the page data file. With the above processing, the schedule data 35 illustrated in FIG. 2 can be created.

図6は、スケジュールデータの変更処理動作フローチャートである。
この処理により、スケジュールデータ35の表示開始時刻36や表示終了時刻37の一
括シフトを要求する。ステップS21では、入力受付手段21を起動する。ステップS2
2では、スケジュール処理手段23の起動をする。ここまでは、図5の処理と同様である
。ステップS23では、スケジュール変更画面28の表示をする。その具体例は図12等
で後述する。ステップS24では、変更処理の種類により分岐をする。スケジュール変更
画面28を使用して、全体的にスケジュールを変更するのか、指定時間帯のスケジュール
を変更するのか、スケジュールを直接変更するのかをここで指定する。その後の処理は図
7で説明する。
FIG. 6 is a flowchart of the schedule data change processing operation.
Through this process, a batch shift of the display start time 36 and the display end time 37 of the schedule data 35 is requested. In step S21, the input receiving means 21 is activated. Step S2
2, the schedule processing means 23 is activated. Up to this point, the process is the same as that in FIG. In step S23, the schedule change screen 28 is displayed. Specific examples thereof will be described later with reference to FIG. In step S24, the process branches depending on the type of change process. Using the schedule change screen 28, it is specified here whether to change the schedule as a whole, to change the schedule in the specified time zone, or to change the schedule directly. The subsequent processing will be described with reference to FIG.

図7は、変更処理の種類により分岐した動作フローチャートである。
ステップS31では、全体のスケジュールの変更処理かどうかという判断をする。この
判断の結果がイエスのときはステップS32の処理に移行し、ノーのときはステップS3
3の処理に移行する。ステップS32では、スケジュールデータ35に含まれた表示開始
時刻36と表示終了時刻37全体を処理対象に指定する。ステップS33では、部分変更
処理かどうかという判断をする。この判断の結果がイエスのときはステップS34の処理
に移行し、ノーのときはステップS36の処理に移行する。ステップS34では、表示開
始時刻36や表示終了時刻37が指定開始時刻以後であって、終了時刻以下のものかどう
かという判断をする。この判断の結果がイエスのときはステップS35の処理に移行し、
ノーのときはステップS36の処理に移行する。ステップS35では、該当する時間範囲
のものを処理対象に指定する。ステップS36では、連動処理かどうかという判断をする
。複数のページが関係付けられていたときにイエスとなる。この判断の結果がイエスのと
きはステップS37の処理に移行し、ノーのときはステップS38の処理に移行する。ス
テップS37では、関係付けられたページの表示開始時刻36や表示終了時刻37を一括
シフトの対象に指定する。ステップS38以下では、これまでの処理で指定された処理対
象をひとつずつ順に選択して時刻の一括シフト処理をする。ステップS39では、表示開
始時刻36のシフトをする。ステップS40では、表示終了時刻37のシフトをする。ス
テップS41では、全ての対象について処理が終了したかどうかという判断をする。この
判断の結果がイエスのときはステップS42の処理に移行し、ノーのときはステップS3
8に戻る。ステップS42では、表示制御手段25が表示制御を開始する。以上の処理に
より、該当する表示開始時刻36や表示終了時刻37の一括シフトができる。
FIG. 7 is an operation flowchart branched depending on the type of change processing.
In step S31, it is determined whether or not the entire schedule is changed. If the result of this determination is yes, the process proceeds to step S32, and if no, step S3.
The process proceeds to 3. In step S32, the entire display start time 36 and display end time 37 included in the schedule data 35 are designated as processing targets. In step S33, it is determined whether it is a partial change process. When the result of this determination is yes, the process proceeds to step S34, and when no, the process proceeds to step S36. In step S34, it is determined whether the display start time 36 and the display end time 37 are after the specified start time and are less than or equal to the end time. If the result of this determination is yes, the process proceeds to step S35,
If no, the process proceeds to step S36. In step S35, the corresponding time range is designated as the processing target. In step S36, it is determined whether or not the interlocking process is performed. Yes when multiple pages are related. When the result of this determination is yes, the process proceeds to step S37, and when no, the process proceeds to step S38. In step S37, the display start time 36 and the display end time 37 of the associated pages are designated as batch shift targets. In step S38 and subsequent steps, the processing targets specified in the processing so far are selected one by one in order, and the time batch processing is performed. In step S39, the display start time 36 is shifted. In step S40, the display end time 37 is shifted. In step S41, it is determined whether or not processing has been completed for all objects. If the result of this determination is yes, the process proceeds to step S42, and if no, step S3.
Return to 8. In step S42, the display control means 25 starts display control. By the above processing, the corresponding display start time 36 and display end time 37 can be collectively shifted.

図8は時刻表示の変更処理動作フローチャートである。
この図により、図3で説明したシフト時間データの入力と表示時刻の変更動作を説明す
る。ステップS51では、入力受付手段21の起動をする。ステップS52では、スケジ
ュール処理手段23の起動をする。これにより、図3に示したスケジュール変更画面28
が表示される。ステップS53では、この画面で入力された修正対象のイベントを取得す
る。ステップS54では、シフト時間データ26の取得をする。ステップS55では、シ
フト方法の取得をする。ここで、例えば、ページ全体の時刻表示を一括シフトするか、特
定の時刻表示以下を一括シフトするか、指定されたグループの時刻表示を一括シフトする
かを特定する。ステップS56では、対象となる時刻表示を選択する。ステップS57で
は、シフト処理手段22を起動する。ステップS58では、シフト時間データ26を用い
てシフト演算処理をする。これで、該当する時刻表示の一括シフトデータが得られた。ス
テップS59では、ページ処理手段24の起動をする。ステップS60で、上記の結果を
利用して、表示すべきページの生成をする。ステップS61で、表示制御手段25により
、所定のタイミングでページの表示が行われる。
FIG. 8 is a flowchart of the time display change processing operation.
With reference to this figure, the shift time data input and display time changing operations described in FIG. 3 will be described. In step S51, the input receiving means 21 is activated. In step S52, the schedule processing means 23 is activated. Thereby, the schedule change screen 28 shown in FIG.
Is displayed. In step S53, the event to be corrected input on this screen is acquired. In step S54, the shift time data 26 is acquired. In step S55, the shift method is acquired. Here, for example, it is specified whether the time display of the entire page is batch-shifted, the time display below a specific time display is batch-shifted, or the time display of a specified group is batch-shifted. In step S56, a target time display is selected. In step S57, the shift processing means 22 is activated. In step S58, a shift calculation process is performed using the shift time data 26. Thus, collective shift data with the corresponding time display was obtained. In step S59, the page processing means 24 is activated. In step S60, a page to be displayed is generated using the above result. In step S61, the display control unit 25 displays a page at a predetermined timing.

なお、上記の演算処理装置で実行されるコンピュータプログラムは、機能ブロックで図
示した単位でモジュール化されてもよいし、複数の機能ブロックを組み合わせて一体化さ
れてもよい。また、上記のコンピュータプログラムは、既存のアプリケーションプログラ
ムに組み込んで使用してもよい。本発明を実現するためのコンピュータプログラムは、例
えばCD−ROMのようなコンピュータで読み取り可能な記録媒体に記録して、任意の情
報処理装置にインストールして利用することができる。
Note that the computer program executed by the arithmetic processing unit may be modularized in units illustrated in functional blocks, or may be integrated by combining a plurality of functional blocks. Further, the above computer program may be used by being incorporated into an existing application program. The computer program for realizing the present invention can be recorded on a computer-readable recording medium such as a CD-ROM and installed in any information processing apparatus for use.

図9は、スケジュールデータの設定方法説明図である。
スケジュールデータは、ページの表示時間を示すデータを任意の数だけ含む制御データ
である。表示時間には、ページの表示開始時刻36とページの表示終了時刻37とが含ま
れている。この図に示した画面80は、スケジュールデータの設定画面である。この画面
80をコンピュータ10(図1)のディスプレイ2に表示しながら、表示時間と表示され
るページを特定するためのタイトルとを入力する。いずれも自由に設定できる。
FIG. 9 is an explanatory diagram of a schedule data setting method.
The schedule data is control data including an arbitrary number of data indicating the page display time. The display time includes a page display start time 36 and a page display end time 37. A screen 80 shown in this figure is a schedule data setting screen. While displaying this screen 80 on the display 2 of the computer 10 (FIG. 1), a display time and a title for specifying a page to be displayed are input. Both can be set freely.

ページは、静止画のみならず動画データを含むことができる。また、特定のディスプレ
イに表示されるページだけでなく、他のDVD再生装置やVTR再生装置の再生開始時刻
や再生終了時刻を制御するページも対象になる。こうした機器の動作を制御するページは
、そのページの表示開始と連動して、機器機の動作を制御するプログラムが起動するペー
ジのことをいう。例えば、あるページの表示が開始されるとDVD再生装置が起動して、
DVD画像が表示され、そのページの表示終了時刻がくるとDVD再生装置が停止する。
従って、シフト処理手段22(図1)は、ページの表示開始時刻とページの表示終了時刻
を一括シフトするとともに、間接的であるが、任意の制御対象装置の動作開始時刻と動作
終了時刻もシフトする。これから説明する実施例では、シフト時間データの入力により、
スケジュールデータの設定内容やページに含まれた時刻表示を一括シフトする処理を説明
する。
The page can include moving image data as well as still images. Further, not only a page displayed on a specific display but also a page for controlling the playback start time and playback end time of other DVD playback devices and VTR playback devices. The page for controlling the operation of the device refers to a page on which a program for controlling the operation of the device is started in conjunction with the display start of the page. For example, when the display of a certain page is started, the DVD playback device is activated,
When the DVD image is displayed and the display end time of the page comes, the DVD playback device stops.
Therefore, the shift processing means 22 (FIG. 1) shifts the page display start time and the page display end time all together and indirectly, but also shifts the operation start time and operation end time of any control target device. To do. In the embodiment described below, by inputting the shift time data,
A process for collectively shifting the setting contents of the schedule data and the time display included in the page will be described.

図10は、スケジュールデータの内容説明図である。
このスケジュールデータ81は、図9の画面80により設定されたものである。これは
、図1に示した記憶装置30に記憶される。そして、図1に示した表示制御手段25は、
このスケジュールデータ81を参照して、表示時間を示すデータ中の表示開始時刻と現在
時刻とが一致したとき、タイトルを示すデータを参照して、該当するページを記憶装置か
ら読み出して表示する。図のイベントA、B・・・には、DVD再生装置等を制御するペ
ージが含まれる。制御対象装置に対しては、該当ページの表示開始後、所定のタイミング
で動作開始コマンドを送信する。また、該当ページの表示終了時刻前に動作終了コマンド
を送信する。表示制御手段25は、スケジュールデータ81に含まれた全てのページにつ
いて、表示時刻順に最後まで制御を実行する。
FIG. 10 is an explanatory diagram of the contents of the schedule data.
The schedule data 81 is set on the screen 80 of FIG. This is stored in the storage device 30 shown in FIG. And the display control means 25 shown in FIG.
With reference to this schedule data 81, when the display start time in the data indicating the display time coincides with the current time, the corresponding page is read from the storage device and displayed with reference to the data indicating the title. In the figure, events A, B,... Include pages for controlling the DVD playback device and the like. An operation start command is transmitted to the control target device at a predetermined timing after the display of the corresponding page is started. Also, an operation end command is transmitted before the display end time of the corresponding page. The display control unit 25 executes control for all pages included in the schedule data 81 to the end in the order of display time.

図11は、スケジュールデータによる表示装置の動作例説明図である。
この図は、縦方向に時間軸をとって示した。図10に示したスケジュールデータ81に
よれば、午前0時から「本日のご案内」というページ120の表示を開始する。このペー
ジ120は後で説明するようにベースページと呼び、他のページが表示されていないとき
に常に表示される。従って、スケジュールデータ81で、表示終了時刻は設定されていな
い。午前11時になるとイベントAの表示を開始し、午前11時45分になると、イベン
トAの表示を終了する。イベントAの表示が終了すると再び「本日のご案内」というペー
ジ120が表示される。次のページの表示開始までこの表示が継続する。
FIG. 11 is an explanatory diagram of an operation example of the display device based on the schedule data.
This figure is shown with the time axis in the vertical direction. According to the schedule data 81 shown in FIG. 10, the display of the page 120 “Guidance for today” is started from 0:00 am. This page 120 is called a base page as will be described later, and is always displayed when no other page is displayed. Therefore, the display end time is not set in the schedule data 81. The display of event A is started at 11 am, and the display of event A is ended at 11:45 am. When the display of the event A ends, the page 120 “Guidance for today” is displayed again. This display continues until the display of the next page starts.

12時55分になると「イベントBのご案内」というページ121が表示される。この
表示は13時まで続けられる。13時から、イベントBの表示が開始される。この例では
、イベントBは、プログラム1、プログラム2、プログラム3というコンテンツを300
秒ずつ表示する動作を含む。プログラム1、2、3は、動画データによるコンテンツを表
示制御するものだったり、DVDによるコンテンツを表示制御するものだったりする。イ
ベントBの表示が終了すると、再び「本日のご案内」というページ120が表示される。
次のページの表示開始までこの表示が継続する。15時になると、今度はイベントCの表
示が開始される。15時35分までイベントCの表示が行われ、その後再びページ120
が表示される。17時にはイベントDの表示が開始され17時55分にイベントDの表示
が終了する。その後はページ120が午前0時まで表示される。これで24時間分の制御
が終了するが、翌日も連続して制御することができる。このようにしてスケジュールデー
タ81による表示制御が行われる。
At 12:55, a page 121 “Guidance for Event B” is displayed. This display continues until 13:00. From 13:00, display of event B is started. In this example, the event B includes contents of program 1, program 2, and program 3 as 300.
Includes operations that display seconds. The programs 1, 2, and 3 are for controlling the display of content based on moving image data and for controlling the display of content based on a DVD. When the display of the event B ends, the page 120 “Guidance for today” is displayed again.
This display continues until the display of the next page starts. At 15 o'clock, display of event C is started this time. Event C is displayed until 15:35, then page 120 again
Is displayed. At 17:00, the display of event D is started, and at 17:55, the display of event D ends. Thereafter, the page 120 is displayed until midnight. This completes the control for 24 hours, but the next day can also be controlled continuously. In this way, display control by the schedule data 81 is performed.

図12は、シフト処理手段を起動するための画面説明図である。
スケジュールデータ81(図10)に含まれた、ページ等の表示開始時刻と表示終了時
刻を一括シフトするために、図のような画面122を使用する。画面122には、スケジ
ュール変更メニューと題して、ボタン123、124、125が設けられている。画面1
22のボタン123は、全体的にスケジュールを遅らせたり進めたりする処理を開始させ
るためのものである。ボタン124は、指定時間帯のスケジュールを遅らせたり進めたり
する処理を開始させるためのものである。既に説明した実施例では、ページ単位でシフト
時間を設定した。また、あるいは、特定の時刻以降という範囲を指定して、シフト時間を
設定する説明をした。この実施例では、指定された時間帯、即ち、ある時刻からある時刻
までの間のスケジュールをシフトさせることができる。ボタン125は、スケジュール表
の設定を直接変更する処理を開始させるためのものである。
FIG. 12 is an explanatory diagram of a screen for starting the shift processing means.
In order to collectively shift the display start time and the display end time of a page or the like included in the schedule data 81 (FIG. 10), a screen 122 as shown in the figure is used. On the screen 122, buttons 123, 124, and 125 are provided as a schedule change menu. Screen 1
The 22 buttons 123 are for starting a process of delaying or advancing the schedule as a whole. The button 124 is used to start a process of delaying or advancing the schedule for the specified time period. In the embodiment described above, the shift time is set for each page. Alternatively, the shift time is set by designating a range after a specific time. In this embodiment, it is possible to shift the schedule during a designated time period, that is, from a certain time to a certain time. The button 125 is for starting a process for directly changing the setting of the schedule table.

図13は、スケジュールデータの主要部を示す。
この図には、図10で説明したスケジュールデータ81の主要部を示す。この中の各ペ
ージの表示開始時刻と表示終了時刻を、図12の画面122で一括シフトする。この画面
は初期状態である。通常はこの画面に示すスケジュールで、ページの表示やイベントの動
作が制御される。しかし、様々な事情によって、予定を変更しなければならないことがあ
る。そのときに、以下の操作によって、管理者が簡単に、かつ、正確に予定を変更できる
。関連する各部の時刻設定を個別に操作しないでよい。一括して変更できる。また、初期
設定の状態にいつでも復帰できる。
FIG. 13 shows the main part of the schedule data.
This figure shows the main part of the schedule data 81 described in FIG. The display start time and display end time of each page are collectively shifted on the screen 122 of FIG. This screen is in the initial state. Normally, page display and event operations are controlled according to the schedule shown on this screen. However, the schedule may need to be changed for various reasons. At that time, the administrator can change the schedule easily and accurately by the following operation. It is not necessary to individually operate the time setting of each related part. Can be changed in a batch. In addition, the initial setting can be restored at any time.

図14は、シフト時間データの入力画面説明図である。
この画面130は、図12に示した画面のボタン123をクリックしたときに起動され
る。全体的にスケジュールを遅らせたり進めたりするための設定をする。オプションボタ
ン131は、スケジュールを遅らせるか進めるかを指定するボタンである。テキストボッ
クス132は、シフト時間を選択して入力するためのものである。ボタン133はオーケ
ーボタンで、これをクリックすると設定が完了する。ボタン134はキャンセルボタンで
、これをクリックすると設定処理がキャンセルされる。例えばこの画面130では、スケ
ジュールを全体的に5分遅らせるように設定できる。この画面で時刻をシフトできるのは
、「本日のご案内」というベースページを除く全てのページである。
FIG. 14 is an explanatory diagram of an input screen for shift time data.
This screen 130 is activated when the button 123 on the screen shown in FIG. 12 is clicked. Set to delay or advance the schedule as a whole. The option button 131 is a button for designating whether to delay or advance the schedule. The text box 132 is for selecting and inputting the shift time. The button 133 is an OK button. Clicking on this button completes the setting. A button 134 is a cancel button. Clicking this button cancels the setting process. For example, on this screen 130, the schedule can be set to be delayed by 5 minutes as a whole. The time can be shifted on this screen on all pages except the base page called “Today's Information”.

図15は、シフト処理後のスケジュールデータ説明図である。
この図と図13を比較してわかるように、イベントAの表示開始時刻が11時から11
時5分にシフトされている。イベントAの表示終了時刻も11時45分から11時50分
にシフトされている。「イベントBのご案内」というページ、イベントB、イベントC、
イベントDについても、一括して5分間、その表示開始時刻と表示終了時刻とがシフトさ
れている。即ち、この実施例によれば、スケジュールデータに含まれた、変更可能なペー
ジ表示時間を、一括して自由にシフトすることができる。
FIG. 15 is an explanatory diagram of schedule data after the shift processing.
As can be seen by comparing this figure with FIG. 13, the display start time of event A is 11 to 11
It is shifted to 5 minutes. The display end time of event A is also shifted from 11:45 to 11:50. "Event B Information" page, Event B, Event C,
For event D as well, the display start time and display end time are shifted together for 5 minutes. That is, according to this embodiment, the changeable page display time included in the schedule data can be freely shifted collectively.

図16は、時間帯を指定したシフト時間データの入力画面説明図である。
この画面140は、図12に示した画面のボタン124をクリックしたときに起動され
る。指定時間帯のスケジュールを遅らせたり進めたりするための設定をする。テキストボ
ックス141、142は、時間をシフトする対象を特定する。初期状態で、時刻が11時
30分から14時の間のデータを一括シフトするように設定する。テキストボックス14
1には、対象の開始時刻を入力し、テキストボックス142には対象の終了時刻を入力す
る。オプションボタン143は、スケジュールを遅らせるか進めるかを指定するボタンで
ある。テキストボックス144は、シフト時間を選択して入力するためのものである。ボ
タン145はオーケーボタンで、これをクリックすると設定が完了する。ボタン146は
キャンセルボタンで、これをクリックすると設定処理がキャンセルされる。例えばこの画
面140では、11時30分から14時の範囲で、スケジュールを全体的に10分遅らせ
るように設定できる。
FIG. 16 is an explanatory diagram of shift time data input screen designating a time zone.
This screen 140 is activated when the button 124 of the screen shown in FIG. 12 is clicked. Set to delay or advance the schedule for the specified time period. The text boxes 141 and 142 specify an object to be shifted in time. In an initial state, data is set so that data between 11:30 and 14:00 is collectively shifted. Text box 14
1, the target start time is input, and the target end time is input in the text box 142. The option button 143 is a button for designating whether to delay or advance the schedule. The text box 144 is for selecting and inputting the shift time. The button 145 is an OK button. Clicking this button completes the setting. A button 146 is a cancel button. Clicking this button cancels the setting process. For example, on this screen 140, the schedule can be set to be delayed by 10 minutes as a whole in the range from 11:30 to 14:00.

図17は、変更後のスケジュールデータの説明図である。
図13に示したものと比較するとわかるように、スケジュールデータ81の11時半か
ら14時までの間の時刻設定が変更されている。即ち、イベントAの表示終了時刻と、「
イベントBのご案内」の表示開始時刻及び表示終了時刻と、イベントBの表示開始時刻と
表示終了時刻とが、10分ずつシフトされている。これらも、上記の画面140により、
一括してシフト処理することができる。
FIG. 17 is an explanatory diagram of the schedule data after the change.
As can be seen from the comparison with that shown in FIG. 13, the time setting between 11:30 and 14:00 in the schedule data 81 is changed. That is, the display end time of event A and “
The display start time and display end time of “Guidance for Event B”, and the display start time and display end time of Event B are shifted by 10 minutes. These are also displayed on the screen 140 described above.
Shift processing can be performed collectively.

図18は、スケジュール表を直接変更する画面の説明図である。
これまでは、複数のページの表示時間を一括シフトした。この例では、特定のページの
表示時間を個別に変更する。これだけであれば、一括シフト処理の効果はない。しかしな
がら、変更をしたページの表示時間と密接に関係するページがあるときであって、予めそ
の関連性を定義しておくと、該当する表示開始時刻や表示終了時刻を自動的に連動してシ
フトできる。図の画面150のリストボックス151には、スケジュールデータに含まれ
た、表示開始時刻や表示終了時刻とページのタイトルが表示されている。ボタン152を
クリックすると、リストボックス151中で選択された項目の編集画面が表示される。ボ
タン153をクリックすると、スケジュールデータが初期状態に戻される。ボタン154
はオーケーボタンで、これをクリックするとリストボックス151に表示された内容で、
設定が完了する。ボタン155はキャンセルボタンで、これをクリックすると設定処理が
キャンセルされる。
FIG. 18 is an explanatory diagram of a screen for directly changing the schedule table.
Until now, the display time of multiple pages has been shifted at once. In this example, the display time of a specific page is individually changed. With this alone, there is no effect of the batch shift process. However, if there is a page that is closely related to the display time of the changed page and its relationship is defined in advance, the corresponding display start time and display end time are automatically linked and shifted. it can. In the list box 151 of the screen 150 in the figure, the display start time and display end time and the page title included in the schedule data are displayed. When the button 152 is clicked, an edit screen for the item selected in the list box 151 is displayed. When the button 153 is clicked, the schedule data is returned to the initial state. Button 154
Is an OK button. Clicking this button displays the contents displayed in the list box 151.
Setting is complete. A button 155 is a cancel button. Clicking this button cancels the setting process.

図19は、選択された項目の編集画面説明図である。
この図に示す画面160は、図18に示した画面150を用いて、イベントBの項目を
選択してから、ボタン152をクリックすると起動する。画面160には、スケジュール
変更の対象がイベントBであることが表示されている。テキストボックス161には、イ
ベントBの変更後の表示開始時刻を入力する。テキストボックス162には、イベントB
の変更後の表示終了時刻を入力する。ボタン163はオーケーボタンで、これをクリック
するとテキストボックス161、162に入力した内容で設定が完了する。ボタン164
はキャンセルボタンで、これをクリックすると設定処理がキャンセルされる。
FIG. 19 is an explanatory diagram of an edit screen for a selected item.
The screen 160 shown in this figure is activated when the item of event B is selected using the screen 150 shown in FIG. 18 and then the button 152 is clicked. The screen 160 displays that the schedule change target is the event B. In the text box 161, the display start time after the change of the event B is input. In the text box 162, event B
Enter the display end time after the change. A button 163 is an OK button. When this button is clicked, the setting is completed with the contents entered in the text boxes 161 and 162. Button 164
Is a cancel button. Clicking this button cancels the setting process.

図20は、変更後のスケジュールデータの説明図である。
図のように、イベントBの開始時刻と終了時刻とが、図19の画面160で入力された
とおりに変更された。さらに、このスケジュールデータの、「イベントBのご案内」とい
うページの表示開始時刻と表示終了時刻とが変更されている。「イベントBのご案内」と
いうページは、イベントBの表示開始時刻の直前の5分間、表示されるように予め定義さ
れている。従って、イベントBの開始時刻と終了時刻とがシフトされたときは、これと連
動して表示開始時刻と表示終了時刻とが自動的にシフトされる。故に、図19の画面16
0を使用して、個別にスケジュールデータを変更しても、一括シフト処理を実行すること
ができる。
FIG. 20 is an explanatory diagram of the schedule data after the change.
As shown in the figure, the start time and end time of the event B are changed as input on the screen 160 of FIG. Further, the display start time and display end time of the page “Guide for Event B” of the schedule data are changed. The “event B guidance” page is defined in advance to be displayed for 5 minutes immediately before the display start time of event B. Therefore, when the start time and end time of event B are shifted, the display start time and display end time are automatically shifted in conjunction with this. Therefore, the screen 16 in FIG.
Even if the schedule data is individually changed by using 0, the batch shift process can be executed.

図21は、スケジュールデータの項目定義説明図である。
図に示すように、スケジュールデータは、制御対象となるページのページ数とページデ
ータとスケジュールテーブルを含む。ページデータには、ベースページとイベントページ
と繰り返しページとサブページの4種類がある。ペースページは、既に説明した「本日の
ご案内」のページであり、表示開始時刻のみが設定される。イベントページは、表示開始
時刻と表示終了時刻が設定される。繰り返しページは、表示開始時刻と表示終了時刻まで
、その表示を繰り返しすように定義される。サブページは図10で示したプログラム1〜
3のようなページであって、表示開始時刻はイベントページで定義され、表示終了までの
時間のみが定義される。直接、時刻シフト制御の対象になるのは、イベントページと繰り
返しページである。このページデータで、表示対象になるイベント情報を特定する。また
、イベントページと一体に制御されるサブページも定義する。
FIG. 21 is an explanatory diagram of schedule data item definitions.
As shown in the figure, the schedule data includes the number of pages to be controlled, page data, and a schedule table. There are four types of page data: base page, event page, repeated page, and subpage. The pace page is the “Guidance for today” page already described, and only the display start time is set. In the event page, a display start time and a display end time are set. The repeat page is defined to repeat the display until the display start time and the display end time. The subpage is the program 1 to 1 shown in FIG.
The display start time is defined on the event page, and only the time until the display end is defined. The event page and the repetition page are directly subject to time shift control. This page data identifies event information to be displayed. In addition, a subpage that is integrally controlled with the event page is also defined.

図22はスケジュールデータの別の項目定義説明図である。
サブページデータの構成は、ページデータと同様である。定義すべき項目が異なるだけ
である。スケジュールテーブルは、イベント数とイベント情報を定義する。イベント情報
は、イベントを特定する識別情報とイベントのタイトル名等を含む。これは、スケジュー
ルデータのタイトルという項目に表示される。上映コンテンツ情報には、このページが、
時刻表示やイベントの時間、カウントダウンを表示する要素を含むかどうかが定義される
。こうした表示が、図1等で説明した時刻表示34に該当し、一括シフトの対象になる。
FIG. 22 is an explanatory diagram of another item definition of schedule data.
The configuration of the sub page data is the same as that of the page data. Only the items to be defined are different. The schedule table defines the number of events and event information. The event information includes identification information for identifying the event, the title name of the event, and the like. This is displayed in the item of title of schedule data. This page is the screening content information,
Whether to include an element that displays the time display, event time, or countdown is defined. Such a display corresponds to the time display 34 described with reference to FIG.

図23は、スケジュールデータのさらに別の項目の定義説明図である。
この図に示す時刻上演データも、上映コンテンツ情報と同様に、時刻表示等を含むかど
うかが定義できる。なお、表示される画像データに含まれた時刻表示の中にも、一括シフ
トすることができないデータが含まれていてよい。上映要素のデータは、例えば、絶対時
刻を表示する時計の画像データである。これはページの一部に例えば、図11に示したよ
うに含められる。これは時間シフト処理の対象から除外される。
FIG. 23 is an explanatory diagram of the definition of yet another item of schedule data.
Whether the time performance data shown in this figure also includes a time display or the like can be defined as in the case of the screening content information. Note that the time display included in the displayed image data may also include data that cannot be collectively shifted. The data of the screening element is, for example, image data of a clock that displays absolute time. This is included in a part of the page, for example, as shown in FIG. This is excluded from the target of the time shift process.

図24は、スケジュールデータ作成用画面の説明図である。
図の画面200には、スケジュールデータに含まれた各項目を表示したリストボックス
201が設けられている。スケジュールデータを最初に作成するときは、このリストボッ
クス201には何も表示されていない。図は、入力途中の状態を示す。ボタン202をク
リックすると項目の追加ができる。リストボックス201に表示されたいずれかの項目を
選択した後でボタン203をクリックすると、項目が削除できる。同じくいずれかの項目
を選択した後でボタン204をクリックすると、選択した項目を編集できる。ボタン20
5はオーケーボタンで、これをクリックすると設定が完了する。ボタン206はキャンセ
ルボタンで、これをクリックすると設定処理がキャンセルされる。
FIG. 24 is an explanatory diagram of a schedule data creation screen.
The screen 200 shown in the figure is provided with a list box 201 displaying each item included in the schedule data. When the schedule data is created for the first time, nothing is displayed in the list box 201. The figure shows a state in the middle of input. Clicking the button 202 can add an item. When a button 203 is clicked after selecting any item displayed in the list box 201, the item can be deleted. Similarly, when any item is selected and the button 204 is clicked, the selected item can be edited. Button 20
5 is an OK button. Clicking this button completes the setting. A button 206 is a cancel button. Clicking this button cancels the setting process.

図25は、項目追加画面の説明図である。
図24に示した画面200のボタン202をクリックすると、この画面210が表示さ
れる。テキストボックス211には、新たな項目のタイトル「イベントD」を入力する。
テキストボックス212には、イベントDの表示開始時刻を入力する。テキストボックス
213には、イベントDの変更後の表示終了時刻を入力する。ボタン214はオーケーボ
タンで、これをクリックするとテキストボックス212、213に入力した内容で設定が
完了する。ボタン215はキャンセルボタンで、これをクリックすると設定処理がキャン
セルされる。
FIG. 25 is an explanatory diagram of an item addition screen.
When the button 202 on the screen 200 shown in FIG. 24 is clicked, this screen 210 is displayed. In the text box 211, the title “event D” of the new item is input.
In the text box 212, the display start time of the event D is input. In the text box 213, the display end time after the change of the event D is input. A button 214 is an OK button, and when this button is clicked, the setting is completed with the contents entered in the text boxes 212 and 213. A button 215 is a cancel button. Clicking this button cancels the setting process.

図26は、項目の変更処理画面の説明図である。
図24に示した画面200のボタン203をクリックすると、この画面220が表示さ
れる。画面220のテキストボックス221には、変更する項目のタイトルが自動的に表
示される。これで、イベントBの内容を書き換えることができる。また、テキストボック
ス222、223にも、入力済みの表示開始時刻、表示終了時刻が自動的に表示される。
テキストボックス222には、イベントBの変更後の表示開始時刻を入力する。テキスト
ボックス223には、イベントBの変更後の表示終了時刻を入力する。ボタン224はオ
ーケーボタンで、これをクリックするとテキストボックス222、223に入力した内容
で設定が完了する。ボタン225はキャンセルボタンで、これをクリックすると設定処理
がキャンセルされる。
FIG. 26 is an explanatory diagram of an item change processing screen.
When the button 203 on the screen 200 shown in FIG. 24 is clicked, this screen 220 is displayed. In the text box 221 of the screen 220, the title of the item to be changed is automatically displayed. Thus, the contents of event B can be rewritten. In addition, the input display start time and display end time are also automatically displayed in the text boxes 222 and 223.
In the text box 222, the display start time after the change of the event B is input. In the text box 223, the display end time after the change of the event B is input. A button 224 is an OK button, and when this button is clicked, the setting is completed with the contents entered in the text boxes 222 and 223. A button 225 is a cancel button. Clicking this button cancels the setting process.

図27は、ページ設定画面の説明図である。
この画面230ではベースページを設定する。ベースページというのは、既に説明した
ように、イベントが何も表示されていないときに表示されるページである。テキストボッ
クス231には、ページのタイトル「本日のご案内」を入力する。ドロップダウンリスト
232でページの種類を選択する。ここで、ベースページであることを定義する。関係付
けられる対象イベントは無いから、ドロップダウンリスト233には何にも入力しない。
テキストボックス234には、表示開始時刻を入力する。ベースページを選択すると、表
示終了時刻を指定するテキストボックス235は入力禁止になる。ボタン236をクリッ
クすると設定が完了する。ボタン237をクリックすると処理がキャンセルされる。
FIG. 27 is an explanatory diagram of a page setting screen.
On this screen 230, a base page is set. As described above, the base page is a page displayed when no event is displayed. In the text box 231, the title of the page “Guidance for today” is input. A page type is selected from the drop-down list 232. Here, the base page is defined. Since there is no target event to be related, nothing is entered in the drop-down list 233.
In the text box 234, the display start time is input. When the base page is selected, the text box 235 for specifying the display end time is prohibited. Clicking on the button 236 completes the setting. Clicking on the button 237 cancels the process.

図28は、イベントの設定画面説明図である。
この画面240では、イベントページを設定する。この例では、テキストボックス24
1に、「イベントBのご案内」というページ名を入力してある。ドロップダウンリスト2
42で、ページの種類を選択する。ここで、イベントページであることを定義する。ドロ
ップダウンリスト243では、関連性のある対象イベントを特定する。「イベントBのご
案内」というページは、イベントBの開始時刻5分前からイベントBの開始時刻まで表示
されるページである。従って、対象イベントをイベントBと入力する。これにより、テキ
ストボックス244と245に、自動的に、イベントBの表示開始時刻と表示終了時刻と
が表示される。これらを、「イベントBのご案内」の表示開始時刻と表示終了時刻に修正
する。イベントBが13時から開始されるから、12時55分から表示を開始して、13
時に終了するように設定する。こうして対象イベントを特定しておくと、対象イベントの
時刻のシフト処理の際に、その表示開始時刻と表示終了時刻とが連動してシフトされる。
即ち、複数のページを相互に関係付けておくことで、関係付けられたページ群をシフト処
理の対象に含めることができる。
FIG. 28 is an explanatory diagram of an event setting screen.
On this screen 240, an event page is set. In this example, the text box 24
1, the page name “Information for Event B” is entered. Drop-down list 2
At 42, the page type is selected. Here, the event page is defined. In the drop-down list 243, relevant target events are specified. The page “Guide for Event B” is a page displayed from 5 minutes before the start time of Event B to the start time of Event B. Therefore, the target event is input as event B. As a result, the display start time and display end time of event B are automatically displayed in the text boxes 244 and 245. These are corrected to the display start time and display end time of “Information for Event B”. Event B starts at 13:00, so display starts at 12:55,
Set to end at times. If the target event is specified in this way, the display start time and the display end time are shifted in conjunction with each other when the time of the target event is shifted.
That is, by associating a plurality of pages with each other, the related page group can be included in the shift processing target.

図29は、繰り返しページの設定動作説明図である。
この画面250では、繰り返しページを設定する。イベントBは、サブページを繰り返
し実行するように制御するページであった。ここでその定義をする。テキストボックス2
51に、タイトル「イベントB」を入力する。ドロップダウンリスト252で繰り返しペ
ージを選択する。ドロップダウンリスト253で、対象イベントを選択する。テキストボ
ックス254と255には、イベントBの表示開始時刻と表示終了時刻とを入力する。ボ
タン256をクリックすると設定が完了する。ボタン257をクリックすると処理がキャ
ンセルされる。
FIG. 29 is an explanatory diagram of the repeated page setting operation.
On this screen 250, repeated pages are set. Event B was a page that was controlled to repeatedly execute a subpage. Here is the definition. Text box 2
In 51, the title “event B” is input. A page is repeatedly selected from the drop-down list 252. A target event is selected from the drop-down list 253. In the text boxes 254 and 255, the display start time and display end time of the event B are input. Clicking button 256 completes the setting. Clicking on the button 257 cancels the processing.

図30は、ペースページに含まれる予定時刻データの設定画面説明図である。
上記の「本日のご案内」としたベースページには、予定時刻データが含まれている。こ
れは、一括シフト処理の対象になる。この画面でそれを設定する。テキストボックス26
2には、ページのタイトルを入力する。テキストボックス268には予定時刻データを入
力する。テキストボックス269には、イベント名等を入力する。なお、画像データ26
1は、絶対時刻を表示するデータに従って変化する既知の動画データである。
FIG. 30 is an explanatory diagram of a setting screen for scheduled time data included in the pace page.
The base page designated as “Today's Guide” includes scheduled time data. This is an object of batch shift processing. Set it on this screen. Text box 26
In 2, enter the title of the page. In the text box 268, scheduled time data is input. In the text box 269, an event name or the like is input. The image data 26
Reference numeral 1 denotes known moving image data that changes according to data for displaying an absolute time.

図31は、ベースページのプロパティ制御画面説明図である。
画面260(図30)の例えば、1行目の項目をクリックすると、この画面270が起
動する。画面270のドロップダウンリスト271は、「開始時刻を表示する」を選択し
ている。ドロップダウンリスト272は、対象イベントがイベントAであるとしている。
即ち、「本日のご案内」の1行目が、イベントAのタイトルとその開始時刻を表示するよ
うに、この画面で設定することができる。他の行についても同様である。ボタン273を
クリックすると設定が完了する。ボタン274をクリックすると処理がキャンセルされる
FIG. 31 is an explanatory diagram of a base page property control screen.
For example, when an item on the first line of the screen 260 (FIG. 30) is clicked, the screen 270 is activated. The drop-down list 271 on the screen 270 selects “display start time”. The drop-down list 272 assumes that the target event is event A.
That is, the first line of “Today's guidance” can be set on this screen so that the title of event A and its start time are displayed. The same applies to the other rows. Clicking on the button 273 completes the setting. Clicking the button 274 cancels the process.

図32は、イベントBのご案内のページデータ説明図である。
図のように、このページ280には、「スペシャルイベントB開始まであと」というコ
メントと、「00時間00分00秒」という時刻表示とが含まれている。この時刻表示は
カウントダウン表示である。現在時刻とイベントBの表示開始時刻の差分を演算処理して
生成される。これもページに含まれる予定時刻データに基づいて生成される画像データで
ある。従って一括シフト処理の対象になる。
FIG. 32 is an explanatory diagram of page data for guidance of event B.
As shown in the figure, this page 280 includes a comment “after the start of special event B” and a time display “00 hours 00 minutes 00 seconds”. This time display is a countdown display. It is generated by computing the difference between the current time and the display start time of event B. This is also image data generated based on the scheduled time data included in the page. Therefore, it becomes an object of batch shift processing.

図33はカウントダウン表示のプロパティ画面説明図である。
画面280(図32)の「00時間00分00秒」という時刻表示をクリックすると、
このプロパティ画面290が表示される。テキストボックス291で、カウントダウン表
示をするデータであることを指定する。テキストボックス291でスペシャルイベントB
の開始までのカウントダウンであることを指定する。ボタン293をクリックすると設定
が完了する。ボタン294をクリックすると処理がキャンセルされる。
FIG. 33 is an explanatory diagram of a property screen for countdown display.
Clicking on the time display “00 hours 00 minutes 00 seconds” on the screen 280 (FIG. 32)
This property screen 290 is displayed. A text box 291 specifies that the data is for countdown display. Special event B in text box 291
Specifies that the countdown is until the start of. Clicking button 293 completes the setting. Clicking the button 294 cancels the process.

実施例1の画像表示制御システムブロック図。1 is an image display control system block diagram of Embodiment 1. FIG. 画像表示制御方法の具体例説明図。FIG. 3 is a diagram illustrating a specific example of an image display control method. ページデータ制御の具体例説明図。A specific example explanatory diagram of page data control. ページの表示予定時刻修正画面例説明図。Explanatory drawing of a screen display scheduled time correction screen example. システムのハードウエアブロック図。Hardware block diagram of the system. 時刻表示の変更処理動作フローチャート。The time display change processing flowchart. ページ表示時刻の変更動作フローチャート。The page display time change operation flowchart. ページ表示時刻の直接変更動作フローチャート。The page change time direct change operation flowchart. スケジュールデータの設定方法説明図。Explanatory drawing of the setting method of schedule data. スケジュールデータの内容説明図。The content explanatory view of schedule data. スケジュールデータによる表示装置の動作例説明図。Explanatory drawing of the operation example of the display apparatus by schedule data. シフト処理手段を起動するための画面説明図。Explanatory drawing for starting a shift processing means. スケジュールデータの主要部説明図。Explanatory drawing of the principal part of schedule data. シフト時間データの入力画面説明図。Shift screen data input screen explanatory diagram. シフト処理後のスケジュールデータ説明図。Explanatory drawing of the schedule data after a shift process. 時間帯を指定したシフト時間データの入力画面説明図。The input screen explanatory view of the shift time data which specified the time zone. 変更後のスケジュールデータの説明図。Explanatory drawing of the schedule data after a change. スケジュール表を直接変更する画面の説明図。Explanatory drawing of the screen which changes a schedule table directly. 選択された項目の編集画面説明図。Explanatory drawing of the edit screen of the selected item. 変更後のスケジュールデータの説明図。Explanatory drawing of the schedule data after a change. スケジュールデータの項目定義説明図。The item definition explanatory view of schedule data. スケジュールデータの別の項目定義説明図。Explanatory drawing of another item definition of schedule data. スケジュールデータのさらに別の項目の定義説明図。The definition explanatory view of another item of schedule data. スケジュールデータ作成用画面の説明図。Explanatory drawing of the screen for schedule data creation. 項目追加画面の説明図。Explanatory drawing of an item addition screen. 項目の変更処理画面の説明図。Explanatory drawing of the item change process screen. ページ設定画面の説明図。Explanatory drawing of a page setting screen. イベントの設定画面説明図。Event setting screen explanatory diagram. 繰り返しページの設定動作説明図。Explanatory drawing of setting operation of repeated page. ペースページに含まれる予定時刻データの設定画面説明図。Explanatory drawing of the setting screen of the schedule time data contained in a pace page. ベースページのプロパティ制御画面説明図。Explanatory drawing of the property control screen of the base page. イベントBのご案内のページデータ説明図。Page data explanatory diagram of the event B guidance. カウントダウン表示のプロパティ画面説明図。Explanatory drawing of property screen of countdown display.

符号の説明Explanation of symbols

1 コンピュータ、2 ディスプレイ、3 本体制御部、4 キーボード、5 マウス、
20 演算処理装置、21 入力受付手段、22 シフト処理手段、23 スケジュール
処理手段、24 ページ処理手段、25 表示制御手段、26 シフト時間データ、27
スケジュール設定画面、28 スケジュール変更画面、29 絶対時刻データ、30
記憶装置、31 画像データ、32 画像要素、34 時刻表示、35 スケジュールデ
ータ、36 表示開始時刻、37 表示終了時刻、38 タイトル、40 表示装置、4
1 スクリーン、43 DVD、44 VTR、45 入出力インタフェース
1 computer, 2 display, 3 main body control unit, 4 keyboard, 5 mouse,
20 arithmetic processing units, 21 input receiving means, 22 shift processing means, 23 schedule processing means, 24 page processing means, 25 display control means, 26 shift time data, 27
Schedule setting screen, 28 Schedule change screen, 29 Absolute time data, 30
Storage device, 31 image data, 32 image elements, 34 time display, 35 schedule data, 36 display start time, 37 display end time, 38 title, 40 display device, 4
1 screen, 43 DVD, 44 VTR, 45 I / O interface

Claims (10)

再生装置の動作を制御するページを含む表示制御の対象となる複数のページと、当該複数のページの表示開始時刻と表示終了時刻とを含むスケジュールとを記憶する記憶装置と、
前記記憶装置に記憶されている複数のページをそれぞれ、当該記憶装置に記憶されているスケジュールデータに含まれる当該ページの表示開始時刻から表示終了時刻まで表示装置に表示するよう制御する表示制御手段であって、前記再生装置の動作を制御するページの表示が開始されると、当該再生装置の動作を制御するプログラムを起動して、当該ページの表示開始後、所定のタイミングで当該再生装置に動作開始コマンドを送信することにより、当該再生装置を起動させて、当該再生装置により再生された画像を前記表示装置に表示させ、当該ページの表示終了時刻前に動作終了コマンドを送信することにより、当該ページの表示終了時刻に当該再生装置を停止させる表示制御手段と、
シフト時間データの入力を受け付ける入力受付手段と、
前記記憶装置に記憶されているスケジュールデータに含まれる前記表示開始時刻と前記表示終了時刻とを一括して、前記入力受付手段により入力が受け付けられたシフト時間データに従ってシフトさせるシフト処理手段を備えたことを特徴とする画像表示制御装置。
A storage device that stores a plurality of pages that are targets of display control including pages that control the operation of the playback device, and a schedule that includes display start times and display end times of the plurality of pages ;
Display control means for controlling to display a plurality of pages stored in the storage device from the display start time to the display end time of the page included in the schedule data stored in the storage device ; When the display of the page for controlling the operation of the playback device is started, the program for controlling the operation of the playback device is started, and the display device operates at a predetermined timing after the display of the page is started. By transmitting the start command, the playback device is activated, the image played back by the playback device is displayed on the display device, and the operation end command is transmitted before the display end time of the page, Display control means for stopping the playback device at the display end time of the page;
Input receiving means for receiving input of shift time data;
Shift processing means for collectively shifting the display start time and the display end time included in the schedule data stored in the storage device according to the shift time data received by the input receiving means. An image display control device characterized by that.
請求項1に記載の画像表示制御装置において、
前記シフト処理手段は、指定された時間範囲に含まれる前記表示開始時刻と前記表示終了時刻とを、前記シフト時間データに従ってシフトさせることを特徴とする画像表示制御装置。
The image display control device according to claim 1,
The image display control device, wherein the shift processing unit shifts the display start time and the display end time included in a specified time range according to the shift time data.
請求項1に記載の画像表示制御装置において、
前記シフト処理手段は、相互に関係付けられた複数の前記ページの表示開始時刻と表示終了時刻とを、前記シフト時間データに従ってシフトさせることを特徴とする画像表示制御装置。
The image display control device according to claim 1,
The image processing apparatus according to claim 1, wherein the shift processing unit shifts the display start time and the display end time of the plurality of pages related to each other according to the shift time data.
請求項1に記載の画像表示制御装置において、
前記ページは、画像表示用データもしくは機器の動作タイミングを制御する制御データを含むことを特徴とする画像表示制御装置。
The image display control device according to claim 1,
The image display control apparatus, wherein the page includes image display data or control data for controlling operation timing of the device.
請求項1に記載の画像表示制御装置において、
前記ページは、予め設定された時刻を含み、
前記シフト処理手段は、前記ページの表示開始時刻と前記表示終了時刻とともに、当該ページに含まれる前記時刻をシフトさせることを特徴とする画像表示制御装置。
The image display control device according to claim 1,
The page includes a preset time,
The shift processing means shifts the time included in the page together with the display start time and the display end time of the page.
請求項1に記載の画像表示制御装置において、
前記記憶装置は、予め設定された時刻を含むページを記憶し、
前記シフト処理手段は、前記ページに含まれる前記時刻を、前記入力受付手段によって入力が受け付けられたシフト時間データに従ってシフトさせ、
前記シフト処理手段により前記時刻がシフトされた前記ページを表示するためのデータを生成するページ処理手段を備え、
前記表示制御手段は、前記ページ処理手段によって生成された前記データに応じたページ前記表示装置に転送して表示制御をすることを特徴とする画像表示制御装置。
The image display control device according to claim 1,
The storage device stores a page including a preset time ,
The shift processing means shifts the time included in the page according to the shift time data received by the input receiving means ,
Page processing means for generating data for displaying the page shifted in time by the shift processing means ;
Wherein the display control unit, the image display control device comprising a to Turkey the display control transfers the pages in accordance with the data generated by the page processing unit on the display device.
請求項6に記載の画像表示制御装置において、
前記ページに含まれる前記時刻が複数のグループに区分され、
前記シフト処理手段は、指定されたグループの前記時刻を前記シフト時間データに従ってシフトさせることを特徴とする画像表示制御装置。
The image display control device according to claim 6,
The time included in the page is divided into a plurality of groups,
The image display control apparatus, wherein the shift processing means shifts the time of a specified group according to the shift time data.
請求項6に記載の画像表示制御装置において、
前記シフト処理手段は、前記ページ全体の前記時刻を前記シフト時間データに従って一括してシフトさせることを特徴とする画像表示制御装置。
The image display control device according to claim 6,
The image processing apparatus according to claim 1, wherein the shift processing unit shifts the time of the entire page in accordance with the shift time data.
コンピュータを、
再生装置の動作を制御するページを含む表示制御の対象となる複数のページと、当該複数のページの表示開始時刻と表示終了時刻とを含むスケジュールとを記憶する記憶装置に記憶されている複数のページをそれぞれ、当該記憶装置に記憶されているスケジュールデータに含まれる当該ページの表示開始時刻から表示終了時刻まで表示装置に表示するよう制御する表示制御手段であって、前記再生装置の動作を制御するページの表示が開始されると、当該再生装置の動作を制御するプログラムを起動して、当該ページの表示開始後、所定のタイミングで当該再生装置に動作開始コマンドを送信することにより、当該再生装置を起動させて、当該再生装置により再生された画像を前記表示装置に表示させ、当該ページの表示終了時刻前に動作終了コマンドを送信することにより、当該ページの表示終了時刻に当該再生装置を停止させる表示制御手段と、
前記記憶装置に記憶されているスケジュールデータに含まれる前記表示開始時刻と前記表示終了時刻とを一括して、シフト時間データの入力を受け付ける入力受付手段により入力が受け付けられたシフト時間データに従ってシフトさせるシフト処理手段、
として機能させる画像表示制御プログラム。
Computer
A plurality of pages stored in a storage device that stores a plurality of pages that are targets of display control including pages that control the operation of the playback device, and a schedule that includes display start times and display end times of the plurality of pages . Display control means for controlling each page to be displayed on the display device from the display start time to the display end time of the page included in the schedule data stored in the storage device, and controls the operation of the playback device When the display of the page to be started is started, a program for controlling the operation of the playback device is started, and after the display of the page is started, an operation start command is transmitted to the playback device at a predetermined timing. The device is activated to display the image reproduced by the reproduction device on the display device, and the operation is completed before the display end time of the page. By sending commands, and a display control means for stopping the reproducing apparatus to the display end time of the page,
The display start time and the display end time included in the schedule data stored in the storage device are collectively shifted according to the shift time data whose input is received by the input receiving means for receiving the input of the shift time data. Shift processing means,
An image display control program to function as.
表示制御手段が、再生装置の動作を制御するページを含む表示制御の対象となる複数のページと、当該複数のページの表示開始時刻と表示終了時刻とを含むスケジュールとを記憶する記憶装置に記憶されている複数のページをそれぞれ、当該記憶装置に記憶されているスケジュールデータに含まれる当該ページの表示開始時刻から表示終了時刻まで表示装置に表示するよう制御し、
前記再生装置の動作を制御するページの表示が開始されると、当該再生装置の動作を制御するプログラムを起動して、当該ページの表示開始後、所定のタイミングで当該再生装置に動作開始コマンドを送信することにより、当該再生装置を起動させて、当該再生装置により再生された画像を前記表示装置に表示させ、当該ページの表示終了時刻前に動作終了コマンドを送信することにより、当該ページの表示終了時刻に当該再生装置を停止させるステップと、
シフト処理手段が、前記記憶装置に記憶されているスケジュールデータに含まれる前記表示開始時刻と前記表示終了時刻とを一括して、シフト時間データの入力を受け付ける入力受付手段により入力が受け付けられたシフト時間データに従ってシフトさせるステップ、
とを含む画像表示制御方法。
The display control means stores a plurality of pages to be subjected to display control including a page for controlling the operation of the playback device and a schedule including a display start time and a display end time for the plurality of pages. Each of the plurality of pages being controlled to be displayed on the display device from the display start time to the display end time of the page included in the schedule data stored in the storage device,
When display of a page for controlling the operation of the playback device is started, a program for controlling the operation of the playback device is started, and an operation start command is sent to the playback device at a predetermined timing after the display of the page is started. By transmitting, the playback device is activated, the image played back by the playback device is displayed on the display device, and the operation end command is transmitted before the display end time of the page, thereby displaying the page. Stopping the playback device at the end time;
Shift in which the shift processing means receives the input by the input receiving means for receiving the input of the shift time data by collectively displaying the display start time and the display end time included in the schedule data stored in the storage device Shifting according to time data,
An image display control method including:
JP2006123035A 2006-04-27 2006-04-27 Image display control device, image display control program, and image display control method Active JP4983085B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006123035A JP4983085B2 (en) 2006-04-27 2006-04-27 Image display control device, image display control program, and image display control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006123035A JP4983085B2 (en) 2006-04-27 2006-04-27 Image display control device, image display control program, and image display control method

Publications (3)

Publication Number Publication Date
JP2007293742A JP2007293742A (en) 2007-11-08
JP2007293742A5 JP2007293742A5 (en) 2009-06-18
JP4983085B2 true JP4983085B2 (en) 2012-07-25

Family

ID=38764298

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006123035A Active JP4983085B2 (en) 2006-04-27 2006-04-27 Image display control device, image display control program, and image display control method

Country Status (1)

Country Link
JP (1) JP4983085B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5799216B2 (en) * 2011-01-20 2015-10-21 パナソニックIpマネジメント株式会社 Resource management system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3277141B2 (en) * 1997-04-18 2002-04-22 シャープ株式会社 Schedule management device and schedule management method
JPH11212527A (en) * 1998-01-27 1999-08-06 Hitachi Eng Co Ltd Multi-information guide display device and its information guide display method
JP2002251507A (en) * 2001-02-23 2002-09-06 Nec Corp Method and device for control and regulation of schedule by gantt chart, and program for control and regulation of schedule
JP2004008664A (en) * 2002-06-11 2004-01-15 Sumitomo Rubber Ind Ltd Display device for golf play start time

Also Published As

Publication number Publication date
JP2007293742A (en) 2007-11-08

Similar Documents

Publication Publication Date Title
US8589871B2 (en) Metadata plug-in application programming interface
US8555170B2 (en) Tool for presenting and editing a storyboard representation of a composite presentation
US6330004B1 (en) Multimedia program editing and presenting system with flexible layout capability by simplified input operations
US20100027959A1 (en) Image processing program, image processing device and image processing method
JP2008219920A (en) Editing system for audiovisual work and corresponding text for television news
JP2010191591A (en) Information processor
JP2022542451A (en) Video editing system, method and user interface
CN100512404C (en) Content playback unit and electronic device
JP4983085B2 (en) Image display control device, image display control program, and image display control method
JP2007267356A (en) File management program, thumb nail image display method, and moving image reproduction device
JP2004192510A (en) File transfer program
JP3092496B2 (en) Scenario editing device
JP6843905B2 (en) Schedule display controller
JP6509015B2 (en) Schedule management device, schedule management method
KR101827863B1 (en) System and method for providing multimedia contents
US8340508B2 (en) Record/playback apparatus and control method therefor
JP2001052026A (en) Document processor
JP2565049B2 (en) Dynamic scenario presentation method
JP3542293B2 (en) Multimedia title editing apparatus, multimedia title editing method, and recording medium recording multimedia title editing program
JP3835301B2 (en) Slide creator
JPH06282248A (en) Scenario editing method
JP3019730B2 (en) Maintenance information management device
JPH08147264A (en) Multimedia presentation editing executing device
JP2021170242A (en) Plant monitoring/controlling apparatus
JP2005352994A (en) Content reproducing method

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090422

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090422

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20090422

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110509

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110705

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110830

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120327

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120409

R150 Certificate of patent or registration of utility model

Ref document number: 4983085

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150511

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350