JP4926857B2 - Power feeding system and method for controlling power feeding system - Google Patents

Power feeding system and method for controlling power feeding system Download PDF

Info

Publication number
JP4926857B2
JP4926857B2 JP2007172394A JP2007172394A JP4926857B2 JP 4926857 B2 JP4926857 B2 JP 4926857B2 JP 2007172394 A JP2007172394 A JP 2007172394A JP 2007172394 A JP2007172394 A JP 2007172394A JP 4926857 B2 JP4926857 B2 JP 4926857B2
Authority
JP
Japan
Prior art keywords
power supply
generator output
time stamp
generator
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007172394A
Other languages
Japanese (ja)
Other versions
JP2009011124A (en
Inventor
一成 真木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2007172394A priority Critical patent/JP4926857B2/en
Publication of JP2009011124A publication Critical patent/JP2009011124A/en
Application granted granted Critical
Publication of JP4926857B2 publication Critical patent/JP4926857B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Eletrric Generators (AREA)

Description

本発明は、給電システム、及び給電システムの制御方法に関し、とくに給電指令機関から発電設備に対して需給制御を行う際の応答特性を正確に把握し需給バランスを適切に制御するための技術に関する。   The present invention relates to a power feeding system and a method for controlling the power feeding system, and more particularly to a technique for accurately grasping a response characteristic when performing power supply / demand control from a power supply command engine to a power generation facility and appropriately controlling a supply / demand balance.

電力の需給バランスを適切に保つため、中央給電指令所等の給電指令機関を設置し、給電指令機関において需要を予測し、この需要予測値と発電機出力に基づいて、発電設備に指令値を送信することにより需給バランスを確保することが行われている(例えば特許文献1を参照)。
特開2004−311426号公報
In order to maintain an appropriate balance between power supply and demand, a power supply command engine such as a central power supply command center is installed, and the power supply command engine predicts demand, and based on this demand prediction value and generator output, the command value is The supply and demand balance is ensured by transmitting (see, for example, Patent Document 1).
JP 2004-31426 A

ところで、上記給電指令機関では、当該給電指令機関において測定した指令値と、発電設備から通信手段を介して送られてくる発電機出力とから把握される応答特性に基づいて上記需要予測を行っている。しかしながら通信手段の伝送遅延時間は必ずしも一定でなく、上記応答特性を正確に把握することができず、需給バランスを適切に制御することは困難であった。   By the way, in the power supply command engine, the demand prediction is performed based on the response value grasped from the command value measured in the power supply command engine and the generator output sent from the power generation equipment via the communication means. Yes. However, the transmission delay time of the communication means is not always constant, the response characteristics cannot be accurately grasped, and it is difficult to appropriately control the supply and demand balance.

また近年、分散型電源等の小規模発電設備の高効率化等の発電技術、パワーエレクトロニクス技術を駆使した発電設備と商用系統との系統連系技術、IT関連技術を駆使した監視・制御・保守技術等の発展により電力系統や発電システムが多様化しており、発電機の応答特性を正確に把握し、需給バランスを適切に保つ技術が求められている。とくにマイクログリッドにおいては、通信速度が必ずしも安定しないインターネット等の通信手段を用いることも予想され、伝送遅延を考慮した発電機出力の制御技術は必須と考えられる。   In recent years, power generation technologies such as high efficiency of small-scale power generation facilities such as distributed power sources, grid connection technologies between power generation facilities and commercial systems using power electronics technology, and monitoring, control and maintenance using IT-related technologies With the development of technology and the like, power systems and power generation systems are diversifying, and there is a need for technology that accurately grasps the response characteristics of generators and maintains an appropriate balance between supply and demand. In particular, in the microgrid, it is expected to use communication means such as the Internet whose communication speed is not always stable, and it is considered essential to control the generator output in consideration of transmission delay.

本発明はこのような背景に鑑みてなされたもので、給電指令機関から発電設備に対して需給制御を行う際の応答特性を正確に把握し、需給バランスを適切に制御することが可能な給電システム、及び給電システムの制御方法を提供することを目的とする。   The present invention has been made in view of such a background, and it is possible to accurately grasp the response characteristics when performing supply-demand control from the power supply command engine to the power generation equipment, and to appropriately control the supply-demand balance. It is an object of the present invention to provide a system and a control method for a power feeding system.

上記目的を達成するための請求項1に記載の発明は、発電機を制御するための指令値を生成する給電指令装置と、前記給電指令装置と通信手段を介して通信可能に接続する発電制御装置とを含んで構成される給電システムであって、前記給電指令装置は、前記指令値を、送信時刻を示すタイムスタンプT1を付加して前記通信手段により前記発電制御装置に送信する指令値送信部を有し、前記発電制御装置は、前記指令値を受信する指令値受信部と、受信した前記指令値に基づいて発電機を制御する発電機制御部と、前記発電機から発電機出力を取得する発電機出力取得部と、取得した前記発電機出力を、前記指令値に付加されている前記タイムスタンプT1を付加して前記通信手段により前記給電指令装置に送信する発電機出力送信部とを有し、前記給電指令装置は、前記発電機出力を受信する発電機出力値受信部と、前記発電機出力値受信部が前記発電機出力を受信するとその受信時刻を示すタイムスタンプT2を生成するタイムスタンプT2生成部と、受信した前記発電機出力に付加されている前記タイムスタンプT1と生成した前記タイムスタンプT2とに基づいて、前記通信手段における伝送遅延時間を算出する伝送遅延時間算出部とを有するものである。   The invention described in claim 1 for achieving the above object is a power supply command device that generates a command value for controlling a generator, and a power generation control that is communicably connected to the power supply command device via a communication means. A power supply system configured to include a device, wherein the power supply command device adds a time stamp T1 indicating a transmission time and transmits the command value to the power generation control device by the communication unit. The power generation control device includes a command value receiving unit that receives the command value, a generator control unit that controls a generator based on the received command value, and a generator output from the generator. A generator output acquisition unit to acquire, and a generator output transmission unit for transmitting the acquired generator output to the power supply command device by adding the time stamp T1 added to the command value by the communication means; The The power supply command device receives a generator output value receiving unit that receives the generator output, and generates a time stamp T2 indicating the reception time when the generator output value receiving unit receives the generator output. A stamp T2 generating unit; and a transmission delay time calculating unit for calculating a transmission delay time in the communication means based on the time stamp T1 added to the received generator output and the generated time stamp T2. I have it.

本発明のうち請求項2に記載の発明は、請求項1に記載の給電システムであって、前記伝送遅延時間算出部は、(T2−T1)/2を計算することにより前記伝送遅延時間を求めることとする。   Invention of Claim 2 among this invention is the electric power feeding system of Claim 1, Comprising: The said transmission delay time calculation part calculates the said transmission delay time by calculating (T2-T1) / 2. We will ask for it.

本発明のうち請求項3に記載の発明は、発電機を制御するための指令値を生成する給電指令装置と、前記給電指令装置と通信手段を介して通信可能に接続する発電制御装置とを含んで構成される給電システムであって、前記給電指令装置は、前記指令値を、送信時刻を示すタイムスタンプT1を付加して前記通信手段により前記発電制御装置に送信する指令値送信部を有し、前記発電制御装置は、前記指令値を受信する指令値受信部と、受信した前記指令値に基づいて発電機を制御する発電機制御部と、前記発電機制御部が前記指令値を受信するとその受信時刻を示すタイムスタンプT3を生成するタイムスタンプT3生成部と、前記発電機から発電機出力を取得する発電機出力取得部と、取得した前記発電機出力を、前記指令値に付加されている前記タイムスタンプT1及び前記タイムスタンプT3を付加して前記通信手段により前記給電指令装置に送信する発電機出力送信部とを有し、前記給電指令装置は、前記発電機出力を受信する発電機出力値受信部と、受信した前記発電機出力に付加されている前記タイムスタンプT1と前記タイムスタンプT3とに基づいて、前記通信手段における伝送遅延時間を算出する伝送遅延時間算出部とを有することとする。   According to a third aspect of the present invention, a power supply command device that generates a command value for controlling the generator, and a power generation control device that is communicably connected to the power supply command device via a communication means. The power supply command device includes a command value transmission unit that adds a time stamp T1 indicating a transmission time to the power generation control device by the communication unit. The power generation control device includes a command value receiving unit that receives the command value, a generator control unit that controls a generator based on the received command value, and the generator control unit receives the command value. Then, a time stamp T3 generation unit that generates a time stamp T3 indicating the reception time, a generator output acquisition unit that acquires a generator output from the generator, and the acquired generator output are added to the command value. A generator output transmitting unit that adds the time stamp T1 and the time stamp T3 and transmits the time stamp T1 and the time stamp T3 to the power supply command device by the communication means, and the power supply command device receives the generator output. An output value receiving unit; and a transmission delay time calculating unit that calculates a transmission delay time in the communication unit based on the time stamp T1 and the time stamp T3 added to the received generator output. And

本発明のうち請求項4に記載の発明は、請求項5に記載の給電システムであって、前記伝送遅延時間算出部は、T3−T1を計算することにより前記伝送遅延時間を求めることとする。   According to a fourth aspect of the present invention, in the power feeding system according to the fifth aspect, the transmission delay time calculating unit calculates the transmission delay time by calculating T3-T1. .

本発明のうち請求項5に記載の発明は、請求項5に記載の給電システムであって、前記給電指令装置は、前記発電機出力値受信部が前記発電機出力を受信するとその受信時刻を示すタイムスタンプT2を生成するタイムスタンプT2生成部を有し、前記伝送遅延時間算出部は、T2−T3を計算することにより前記伝送遅延時間を求めることとする。   The invention according to claim 5 of the present invention is the power supply system according to claim 5, wherein the power supply command device sets the reception time when the generator output value reception unit receives the generator output. The transmission delay time calculation unit has a time stamp T2 generation unit for generating the time stamp T2 shown, and the transmission delay time calculation unit calculates the transmission delay time by calculating T2-T3.

本発明のうち請求項6に記載の発明は、発電機を制御するための指令値を生成する給電指令装置と、前記給電指令装置と通信手段を介して通信可能に接続する発電制御装置とを含んで構成される給電システムの制御方法であって、前記給電指令装置が、前記指令値を、送信時刻を示すタイムスタンプT1を付加して前記通信手段により前記発電制御装置に送信するステップと、前記発電制御装置が、前記指令値を受信し、受信した前記指令値に基づいて発電機を制御し、前記発電機から発電機出力を取得し、取得した前記発電機出力を、前記指令値に付加されている前記タイムスタンプT1を付加して前記通信手段により前記給電指令装置に送信するステップと、前記給電指令装置が、前記発電機出力を受信し、前記発電機出力値受信部が前記発電機出力を受信するとその受信時刻を示すタイムスタンプT2を生成し、受信した前記発電機出力に付加されている前記タイムスタンプT1と生成した前記タイムスタンプT2とに基づいて、前記通信手段における伝送遅延時間を算出するステップとを含むこととする。   According to a sixth aspect of the present invention, a power supply command device that generates a command value for controlling the generator, and a power generation control device that is communicably connected to the power supply command device via a communication unit. A method of controlling the power supply system including the step of transmitting the command value to the power generation control device by the communication unit with the command value added with a time stamp T1 indicating a transmission time; The power generation control device receives the command value, controls a generator based on the received command value, acquires a generator output from the generator, and uses the acquired generator output as the command value. Adding the added time stamp T1 and transmitting to the power supply command device by the communication means; the power supply command device receives the generator output; and the generator output value receiving unit When the generator output is received, a time stamp T2 indicating the reception time is generated, and transmission in the communication means is performed based on the time stamp T1 added to the received generator output and the generated time stamp T2. And calculating a delay time.

本発明のうち請求項7に記載の発明は、発電機を制御するための指令値を生成する給電指令装置と、前記給電指令装置と通信手段を介して通信可能に接続する発電制御装置とを含んで構成される給電システムの制御方法であって、前記給電指令装置が、前記指令値を、送信時刻を示すタイムスタンプT1を付加して前記通信手段により前記発電制御装置に送信するステップと、前記発電制御装置が、前記指令値を受信し、受信した前記指令値に基づいて発電機を制御し、前記発電機制御部が前記指令値を受信するとその受信時刻を示すタイムスタンプT3を生成し、前記発電機から発電機出力を取得し、取得した前記発電機出力を、前記指令値に付加されている前記タイムスタンプT1及び前記タイムスタンプT3を付加して前記通信手段により前記給電指令装置に送信するステップと、前記給電指令装置が、前記発電機出力を受信し、受信した前記発電機出力に付加されている前記タイムスタンプT1と前記タイムスタンプT3とに基づいて、前記通信手段における伝送遅延時間を算出するステップとを含むこととする。   The invention according to claim 7 of the present invention includes a power supply command device that generates a command value for controlling the generator, and a power generation control device that is communicably connected to the power supply command device via a communication means. A method of controlling the power supply system including the step of transmitting the command value to the power generation control device by the communication unit with the command value added with a time stamp T1 indicating a transmission time; The power generation control device receives the command value, controls a generator based on the received command value, and generates a time stamp T3 indicating the reception time when the generator control unit receives the command value. The generator output is acquired from the generator, and the acquired generator output is added to the communication means by adding the time stamp T1 and the time stamp T3 added to the command value. Transmitting to the power supply command device, the power supply command device receives the generator output, and based on the time stamp T1 and the time stamp T3 added to the received generator output, And calculating a transmission delay time in the communication means.

本発明によれば、給電指令機関から発電設備に対して需給制御を行う際の応答特性を正確に把握し、需給バランスを適切に制御することが可能となる。   ADVANTAGE OF THE INVENTION According to this invention, it becomes possible to grasp | ascertain correctly the response characteristic at the time of performing supply-and-demand control with respect to power generation equipment from a power supply instruction | command engine, and to control a supply-and-demand balance appropriately.

以下、本発明の一実施形態につき詳細に説明する。   Hereinafter, one embodiment of the present invention will be described in detail.

[実施例1]
図1に実施例1として説明する給電システム1の概略的な構成を示している。同図に示すように、この給電システム1は、中央給電指令所等の給電指令機関2に設置されている給電指令装置20と、発電所等の発電施設3に設置され、第1通信手段4を介して給電指令装置20と通信可能に接続する発電制御装置30と、第2通信手段5を介して発電制御装置30に通信可能に接続する発電機40とを含んで構成されている。
[Example 1]
FIG. 1 shows a schematic configuration of a power feeding system 1 described as a first embodiment. As shown in the figure, the power feeding system 1 is installed in a power feeding command device 20 installed in a power feeding command engine 2 such as a central power feeding command station, and in a power generation facility 3 such as a power plant. The power generation control device 30 that is communicably connected to the power supply command device 20 via the power generator and the generator 40 that is communicably connected to the power generation control device 30 via the second communication means 5 are configured.

第1通信手段4は、例えば専用線(サイクリックデジタル情報伝送装置(CDT:Cyclic Digital data Transmission equipment)、メタル線、光ファイバ等)やインターネット等である。また第2通信手段5は、例えばLANや専用線(メタル線、光ファイバ)等である。   The first communication unit 4 is, for example, a dedicated line (cyclic digital data transmission equipment (CDT), metal line, optical fiber, etc.), the Internet, or the like. The second communication means 5 is, for example, a LAN or a dedicated line (metal line, optical fiber).

図2に給電指令装置20のハードウエア構成を示している。給電指令装置20は、メインフレームやワークステーション、パーソナルコンピュータ等の情報処理装置である。同図に示すように、給電指令装置20は、CPU21、RAM・ROM等のメモリ22、ハードディスク等の大容量の記憶装置23、給電指令機関2において操作卓の構成要素となるキーボードやマウス等の入力装置24、監視制御用コンソール等として用いられる液晶ディスプレイ等の表示装置25、第1通信手段4により発電制御装置30と通信するための通信インタフェースである通信装置26、現在時刻等の時刻情報(タイムスタンプ)を生成するタイマ27を有している。   FIG. 2 shows a hardware configuration of the power supply command device 20. The power supply command device 20 is an information processing device such as a mainframe, a workstation, or a personal computer. As shown in the figure, the power supply command device 20 includes a CPU 21, a memory 22 such as a RAM / ROM, a large-capacity storage device 23 such as a hard disk, and a keyboard and a mouse that are components of an operation console in the power supply command engine 2. Input device 24, display device 25 such as a liquid crystal display used as a monitoring control console, communication device 26 which is a communication interface for communicating with power generation control device 30 by first communication means 4, time information such as current time ( Timer 27 for generating (time stamp).

なお、給電指令装置20は、必ずしも図2に示すハードウエアを有する一台の情報処理装置のみで構成されている必要はなく、通信可能に接続された複数台の情報処理装置で構成されていてもよい。   Note that the power supply command device 20 does not necessarily need to be configured by only one information processing device having the hardware illustrated in FIG. 2, and is configured by a plurality of information processing devices that are communicably connected. Also good.

図3に発電制御装置30のハードウエア構成を示している。同図に示すように、発電制御装置30は、CPU31、RAM・ROM等のメモリ32、第1通信手段4により給電指令装置20と通信するための通信インタフェースである第1通信装置33、第2通信手段5により発電機40と通信するための通信インタフェースである第2通信装置34、現在時刻等の時刻情報(タイムスタンプ)を生成するタイマ35を有している。   FIG. 3 shows a hardware configuration of the power generation control device 30. As shown in the figure, the power generation control device 30 includes a CPU 31, a memory 32 such as a RAM / ROM, a first communication device 33, which is a communication interface for communicating with the power supply command device 20 through the first communication means 4, and a second communication device. The communication unit 5 includes a second communication device 34 that is a communication interface for communicating with the generator 40, and a timer 35 that generates time information (time stamp) such as the current time.

図4に給電指令装置20の機能を示している。同図に示す機能は、給電指令装置20のハードウエア自体の機能、又は、CPU21がメモリ22や記憶装置23に格納されているプログラムを実行することにより実現される。   FIG. 4 shows functions of the power supply command device 20. The function shown in the figure is realized by the function of the hardware itself of the power supply command device 20 or when the CPU 21 executes a program stored in the memory 22 or the storage device 23.

同図において、発電機出力値受信部211は、発電機制御装置30から第1通信手段4により送られてくる発電機出力値を受信し、受信した発電機出力値を発電機出力値記憶部212に記憶する。また発電機出力値受信部211は、タイムスタンプT1が付加された発電機出力値を受信した旨を、タイムスタンプT2生成部213に通知する。また発電機出力値受信部211は、受信した発電機出力値に付帯するタイムスタンプT1を、伝送遅延時間算出部214に入力する。   In the figure, a generator output value receiving unit 211 receives a generator output value sent from the generator control device 30 by the first communication means 4 and uses the received generator output value as a generator output value storage unit. 212. Further, the generator output value receiving unit 211 notifies the time stamp T2 generation unit 213 that the generator output value to which the time stamp T1 is added has been received. Further, the generator output value receiving unit 211 inputs a time stamp T1 attached to the received generator output value to the transmission delay time calculating unit 214.

タイムスタンプT2生成部213は、発電機出力値受信部211が発電機出力値を受信した時刻を示すタイムスタンプT2を生成する。   The time stamp T2 generating unit 213 generates a time stamp T2 indicating the time when the generator output value receiving unit 211 receives the generator output value.

伝送遅延時間算出部214は、タイムスタンプT2生成部213によって生成されたタイムスタンプT2と、発電機出力値受信部211が受信した発電機出力値に付帯するタイムスタンプT1とに基づいて、第1通信手段4の伝送遅延時間を求め、求めた伝送遅延時間を指令値生成部217に入力する。   Based on the time stamp T2 generated by the time stamp T2 generation unit 213 and the time stamp T1 attached to the generator output value received by the generator output value reception unit 211, the transmission delay time calculation unit 214 The transmission delay time of the communication unit 4 is obtained, and the obtained transmission delay time is input to the command value generation unit 217.

周波数取得部215は、給電指令機関2等に設置されている周波数計測器50から供給される、発電機40に接続される電力系統の周波数の時系列的な計測値を取得して、取得した計測値を、計測値を取得した時刻に対応づけて周波数計測値記憶部216に記憶する。   The frequency acquisition unit 215 acquires and acquires a time-series measurement value of the frequency of the power system connected to the generator 40 supplied from the frequency measuring device 50 installed in the power supply command engine 2 or the like. The measurement value is stored in the frequency measurement value storage unit 216 in association with the time when the measurement value is acquired.

指令値生成部217は、発電機出力値記憶部212に記憶されている情報、周波数計測値記憶部216に記憶されている情報、及び伝送遅延時間算出部214から入力される伝送遅延時間に基づいて、発電機制御装置30に送信する発電機の出力制御のための指令値のスケジュールを生成し、生成したスケジュールを指令値スケジュール記憶部218に記憶する。   The command value generation unit 217 is based on the information stored in the generator output value storage unit 212, the information stored in the frequency measurement value storage unit 216, and the transmission delay time input from the transmission delay time calculation unit 214. Then, a command value schedule for output control of the generator to be transmitted to the generator control device 30 is generated, and the generated schedule is stored in the command value schedule storage unit 218.

なお、図4には示していないが、指令値生成部217は、発電機制御装置30に送信した指令値の履歴、需要量の履歴、発電機40が負担すべき経済的な付加等、上記以外の情報も適宜利用して指令値のスケジュールを生成する。   Although not shown in FIG. 4, the command value generation unit 217 includes the command value history transmitted to the generator control device 30, the demand amount history, the economical addition to be borne by the generator 40, etc. A schedule of command values is generated by appropriately using other information.

指令値送信部220は、指令値取得部219が取得した指令値のスケジュールに従い、当該スケジュールに指定されたタイミングで第1通信手段4により発電機制御装置30に指令値を送信する。この際、指令値送信部220は、送信する指令値に、タイムスタンプT1生成部221によって生成される、現在時刻を示すタイムスタンプT1を付加する。   The command value transmission unit 220 transmits the command value to the generator control device 30 by the first communication unit 4 at the timing specified in the schedule according to the schedule of the command value acquired by the command value acquisition unit 219. At this time, the command value transmission unit 220 adds a time stamp T1 indicating the current time generated by the time stamp T1 generation unit 221 to the command value to be transmitted.

図5に発電制御装置30の機能を示している。同図に示す機能は、発電制御装置30のハードウエア自体の機能、又は、CPU31がメモリ22や記憶装置23に格納されているプログラムを実行することにより実現される。   FIG. 5 shows functions of the power generation control device 30. The function shown in the figure is realized by the function of the hardware itself of the power generation control device 30 or when the CPU 31 executes a program stored in the memory 22 or the storage device 23.

同図において、指令値受信部311は、給電指令装置20から送信されてくる指令値を受信すると、受信した指令値を発電機制御部312に入力する。また受信した指令値に付加されているタイムスタンプT1を、タイムスタンプT1取得部313に入力する。タイムスタンプT1取得部313は、指令値受信部311から取得したタイムスタンプT1を、発電機出力値送信部315に入力する。   In the figure, when receiving a command value transmitted from the power supply command device 20, the command value receiving unit 311 inputs the received command value to the generator control unit 312. The time stamp T1 added to the received command value is input to the time stamp T1 acquisition unit 313. The time stamp T1 acquisition unit 313 inputs the time stamp T1 acquired from the command value reception unit 311 to the generator output value transmission unit 315.

発電機制御部312は、指令値受信部311から入力される指令値に従い、発電機40の出力を制御する。また発電機40は、発電機制御部312によって行われる制御に応じて出力を制御する機能の他、リアルタイムに発電機出力を計測する機能を有しており、発電機出力値取得部314は、発電機40から出力されてくる発電機出力を受信して発電機出力値送信部315に入力する。   The generator control unit 312 controls the output of the generator 40 according to the command value input from the command value receiving unit 311. The generator 40 has a function of measuring the output of the generator in real time in addition to the function of controlling the output in accordance with the control performed by the generator control unit 312. The generator output value acquisition unit 314 includes: The generator output output from the generator 40 is received and input to the generator output value transmission unit 315.

発電機出力値送信部315は、発電機出力値取得部314から入力される発電機出力値を、第1通信手段4を介して給電指令装置20に送信する。またこの送信に際し、発電機出力値送信部315は、送信する発電機出力値に、タイムスタンプT1取得部313から入力されるタイムスタンプT1を付加する。   The generator output value transmission unit 315 transmits the generator output value input from the generator output value acquisition unit 314 to the power supply command device 20 via the first communication unit 4. At the time of this transmission, the generator output value transmission unit 315 adds the time stamp T1 input from the time stamp T1 acquisition unit 313 to the generator output value to be transmitted.

次に図6に示すフローチャートとともに、本実施例の給電システム1によって行われる処理を説明する。   Next, processing performed by the power supply system 1 of the present embodiment will be described with reference to the flowchart shown in FIG.

まず給電指令装置20の指令値取得部219が、指令値スケジュール記憶部218から指令値のスケジュールを取得する(S611)。
次に指令値送信部220が、取得した指令値のスケジュールに従い、タイムスタンプT1生成部221によって生成される、現在時刻のタイムスタンプT1を付加した指令値を、第1通信手段4により発電機制御装置20に送信する(S612,S613)。
First, the command value acquisition unit 219 of the power supply command device 20 acquires a command value schedule from the command value schedule storage unit 218 (S611).
Next, the command value transmission unit 220 controls the generator by using the first communication unit 4 to control the command value added by the time stamp T1 of the current time, which is generated by the time stamp T1 generation unit 221 in accordance with the acquired command value schedule. It transmits to the apparatus 20 (S612, S613).

発電機制御装置30では、指令値受信部311が、給電制御装置20から送られてくる指令値を受信する(S614)。
次に指令値受信部311は、受信した指令値を発電機制御部312に入力する。これにより発電機制御部312が、入力された指令値に従った発電機40の出力制御を開始する(S615)。
In the generator control device 30, the command value receiving unit 311 receives the command value sent from the power supply control device 20 (S614).
Next, the command value receiving unit 311 inputs the received command value to the generator control unit 312. Thereby, the generator control part 312 starts output control of the generator 40 according to the input command value (S615).

一方、上記制御の開始時に、発電機出力値取得部314は、発電機40から送られてくる発電機出力値を取得し、取得した発電機出力値を発電機出力値送信部315に入力する(S616)。発電機出力値送信部315は、発電機出力値取得部314から入力された発電機出力値に、タイムスタンプT1取得部313から入力されるタイムスタンプT1を付加し(S617)、第1通信手段4により発電機出力値を給電指令装置20に送信する(S618)。   On the other hand, at the start of the control, the generator output value acquisition unit 314 acquires the generator output value sent from the generator 40 and inputs the acquired generator output value to the generator output value transmission unit 315. (S616). The generator output value transmission unit 315 adds the time stamp T1 input from the time stamp T1 acquisition unit 313 to the generator output value input from the generator output value acquisition unit 314 (S617), and first communication means. 4, the generator output value is transmitted to the power supply command device 20 (S618).

給電指令装置20の発電機出力値受信部211は、発電制御装置30から送られてくる、タイムスタンプT1が付加された発電機出力値を受信する(S619)。
給電指令装置20の発電機出力値受信部211は発電機出力値を受信すると、受信した発電機出力値に付加されているタイムスタンプT1に対応づけて発電機出力値記憶部212に記憶する。また発電機出力値受信部211は、受信した発電機出力値に付加されているタイムスタンプT1を、伝送遅延時間算出部214に入力する。また発電機出力値受信部211は、タイムスタンプT1が付加された発電機出力値を受信した旨を、タイムスタンプT2生成部213に通知する(S620)。
The generator output value reception unit 211 of the power supply command device 20 receives the generator output value to which the time stamp T1 is added, which is sent from the power generation control device 30 (S619).
When receiving the generator output value, the generator output value receiving unit 211 of the power supply command device 20 stores the generator output value in the generator output value storage unit 212 in association with the time stamp T1 added to the received generator output value. The generator output value reception unit 211 inputs the time stamp T1 added to the received generator output value to the transmission delay time calculation unit 214. Further, the generator output value receiving unit 211 notifies the time stamp T2 generation unit 213 that the generator output value to which the time stamp T1 has been added has been received (S620).

上記通知を受けたタイムスタンプT2生成部213は、発電機出力値の受信時刻を示すタイムスタンプT2を生成し、生成したタイムスタンプT2を伝送遅延時間算出部214に入力する(S621)。
伝送遅延時間算出部214は、タイムスタンプT2が入力されると、タイムスタンプT2と、発電機出力値受信部211が受信した発電機出力値に付帯するタイムスタンプT1とに基づいて、第1通信手段4の伝送遅延時間を求める。具体的には、伝送遅延時間算出部214は、(T2−T1)/2を計算することにより伝送遅延時間を求める。そして伝送遅延時間算出部214は、求めた伝送遅延時間を指令値生成部217に入力する(S622)。
Upon receiving the notification, the time stamp T2 generation unit 213 generates a time stamp T2 indicating the reception time of the generator output value, and inputs the generated time stamp T2 to the transmission delay time calculation unit 214 (S621).
When the time stamp T2 is input, the transmission delay time calculating unit 214 performs the first communication based on the time stamp T2 and the time stamp T1 attached to the generator output value received by the generator output value receiving unit 211. The transmission delay time of means 4 is obtained. Specifically, the transmission delay time calculation unit 214 calculates the transmission delay time by calculating (T2−T1) / 2. Then, the transmission delay time calculation unit 214 inputs the obtained transmission delay time to the command value generation unit 217 (S622).

次に指令値生成部217は、発電機出力値記憶部212に記憶されている情報、周波数計測値記憶部216に記憶されている情報、及び伝送遅延時間算出部214から入力される伝送遅延時間に基づいて、発電機制御装置30に送信する発電機の出力制御のための指令値のスケジュールを生成し、生成したスケジュールを指令値スケジュール記憶部218に記憶する(S623)。   Next, the command value generation unit 217 includes information stored in the generator output value storage unit 212, information stored in the frequency measurement value storage unit 216, and transmission delay time input from the transmission delay time calculation unit 214. The command value schedule for the generator output control to be transmitted to the generator control device 30 is generated based on, and the generated schedule is stored in the command value schedule storage unit 218 (S623).

以上に説明したように、本実施例の給電システム1にあっては、第1通信手段4により給電指令装置20から発電機制御装置30に指令値を送信する際に送信時刻を示すタイムスタンプT1を付加する。また発電機制御装置30は、受信した指令値に付加されていたタイムスタンプT1を付加した発電機出力値を、第1通信手段4により発電機制御装置30から給電指令装置20に送信する。そして給電指令装置20は、発電機出力値の受信時刻に対応するタイムスタンプT2を生成し、生成したタイムスタンプT2と発電機出力値に付加されているタイムスタンプT1とに基づいて伝送遅延時間を求める。   As described above, in the power supply system 1 of the present embodiment, the time stamp T1 indicating the transmission time when the command value is transmitted from the power supply command device 20 to the generator control device 30 by the first communication unit 4. Is added. Further, the generator control device 30 transmits the generator output value with the time stamp T1 added to the received command value from the generator control device 30 to the power supply command device 20 by the first communication means 4. The power supply command device 20 generates a time stamp T2 corresponding to the reception time of the generator output value, and sets the transmission delay time based on the generated time stamp T2 and the time stamp T1 added to the generator output value. Ask.

このように、本実施例の給電システム1によれば、給電指令装置20と発電制御装置30との間で通信される指令値及び発電機出力値にタイムスタンプを付加するという簡素な仕組みにより伝送遅延時間を把握することができる。   As described above, according to the power feeding system 1 of the present embodiment, transmission is performed by a simple mechanism in which a time stamp is added to the command value and the generator output value communicated between the power feeding command device 20 and the power generation control device 30. The delay time can be grasped.

また給電指令装置20が発電制御装置30から受信した発電機出力値にタイムスタンプT1が付加されているため、給電指令装置20においてその発電機出力値がタイムスタンプT1に送信した指令値に対する応答であることがわかる。このため、給電指令装置20において指令値と発電機出力との関係、すなわち応答特性を正確に知ることができる。   In addition, since the time stamp T1 is added to the generator output value received by the power supply command device 20 from the power generation control device 30, the power generator command value in the power supply command device 20 is a response to the command value transmitted to the time stamp T1. I know that there is. For this reason, the power supply command device 20 can accurately know the relationship between the command value and the generator output, that is, the response characteristic.

また本実施例の給電システム1は、上記仕組みにより把握した正確な伝送遅延時間に基づいて指令値のスケジュールを生成するため、需給バランスを適切に制御することが可能となる。   Moreover, since the power supply system 1 of the present embodiment generates a command value schedule based on the accurate transmission delay time grasped by the above mechanism, it is possible to appropriately control the supply and demand balance.

[実施例2]
次に実施例2に係る給電システム1について説明する。実施例2として説明する給電システム1の概略構成、給電指令装置20のハードウエア構成、及び発電制御装置30のハードウエア構成については、図1乃至図3とともに説明した実施例1の給電システム1の場合と同様である。
[Example 2]
Next, the power feeding system 1 according to the second embodiment will be described. The schematic configuration of the power supply system 1 described as the second embodiment, the hardware configuration of the power supply command device 20, and the hardware configuration of the power generation control device 30 are the same as those of the power supply system 1 of the first embodiment described with reference to FIGS. Same as the case.

図7に本実施例の給電システム1における給電指令装置20の機能を示している。実施例1と異なり、本実施例の給電指令装置20の発電機出力値受信部211は、発電機制御装置30から送られてくる発電機出力値とともに、この発電機出力値に付加されているタイムスタンプT1及びタイムスタンプT3を受信する。また発電機出力値受信部211は、受信したタイムスタンプT1及びタイムスタンプT3を伝送遅延時間算出部214に入力する。   FIG. 7 shows the function of the power supply command device 20 in the power supply system 1 of the present embodiment. Unlike the first embodiment, the generator output value receiving unit 211 of the power supply command device 20 of this embodiment is added to the generator output value together with the generator output value sent from the generator control device 30. The time stamp T1 and the time stamp T3 are received. The generator output value receiving unit 211 inputs the received time stamp T1 and time stamp T3 to the transmission delay time calculating unit 214.

伝送遅延時間算出部214は、入力されたタイムスタンプT1及びタイムスタンプT3と、タイプスタンプ生成部213から入力されるタイムスタンプT2とに基づいて、第1通信手段4の伝送遅延時間を求め、求めた伝送遅延時間を指令値生成部217に入力する。   The transmission delay time calculation unit 214 obtains the transmission delay time of the first communication unit 4 based on the input time stamp T1 and time stamp T3 and the time stamp T2 input from the type stamp generation unit 213. The transmission delay time is input to the command value generation unit 217.

図8に本実施例の給電システム1における発電制御装置30の機能を示している。実施例2の発電制御装置30の指令値受信部311は、実施例1の発電制御装置30の機能に加え、指令値の受信時刻を示す情報であるタイムスタンプT3を生成するタイムスタンプT3生成部316を有している。また指令値受信部311は、給電指令装置20から送信されてくる指令値を受信すると、受信した指令値を発電機制御部312に入力し、受信した指令値に付加されているタイムスタンプT1を、タイムスタンプT1取得部313に入力し、また指令値を受信した旨をタイムスタンプT3生成部316に通知する。   FIG. 8 shows functions of the power generation control device 30 in the power supply system 1 of the present embodiment. In addition to the function of the power generation control device 30 of the first embodiment, the command value reception unit 311 of the power generation control device 30 of the second embodiment generates a time stamp T3 generation unit that generates a time stamp T3 that is information indicating the reception time of the command value. 316. In addition, when the command value receiving unit 311 receives the command value transmitted from the power supply commanding device 20, the command value receiving unit 311 inputs the received command value to the generator control unit 312, and the time stamp T1 added to the received command value is received. The time stamp T1 acquisition unit 313 is input, and the time stamp T3 generation unit 316 is notified that the command value has been received.

タイムスタンプT3生成部316は、指令値を受信した旨が通知されるとその受信時刻を示すタイムスタンプT3を生成し、生成したタイムスタンプT3を発電機出力値送信部315に入力する。   When notified that the command value has been received, the time stamp T3 generation unit 316 generates a time stamp T3 indicating the reception time, and inputs the generated time stamp T3 to the generator output value transmission unit 315.

発電機出力値送信部315は、発電機出力値取得部314から入力される発電機出力値を、第1通信手段4を介して給電指令装置20に送信する。またこの送信に際し、発電機出力値送信部315は、送信する発電機出力値にタイムスタンプT1取得部313から入力されるタイムスタンプT1、及びタイムスタンプT3から入力されるT3を付加する。   The generator output value transmission unit 315 transmits the generator output value input from the generator output value acquisition unit 314 to the power supply command device 20 via the first communication unit 4. In this transmission, the generator output value transmission unit 315 adds the time stamp T1 input from the time stamp T1 acquisition unit 313 and T3 input from the time stamp T3 to the generator output value to be transmitted.

次に図9に示すフローチャートとともに、本実施例の給電システム1によって行われる処理を説明する。   Next, processing performed by the power supply system 1 of this embodiment will be described with reference to the flowchart shown in FIG.

まず給電指令装置20の指令値取得部219が、指令値スケジュール記憶部218から指令値のスケジュールを取得する(S911)。
次に指令値送信部220が、取得した指令値のスケジュールに従い、タイムスタンプT1生成部221によって生成される、現在時刻のタイムスタンプT1を付加した指令値を、第1通信手段4により発電機制御装置20に送信する(S912,S913)。
First, the command value acquisition unit 219 of the power supply command device 20 acquires a command value schedule from the command value schedule storage unit 218 (S911).
Next, the command value transmission unit 220 controls the generator by using the first communication unit 4 to control the command value added by the time stamp T1 of the current time, which is generated by the time stamp T1 generation unit 221 in accordance with the acquired command value schedule. It transmits to the apparatus 20 (S912, S913).

発電機制御装置30では、指令値受信部311が、給電制御装置20から送られてくる指令値を受信する(S914)。
次に指令値受信部311は、受信した指令値を発電機制御部312に入力する。これにより発電機制御部312が入力された指令値に従った発電機40の出力制御を開始する(S915)。
In the generator control device 30, the command value receiving unit 311 receives the command value sent from the power supply control device 20 (S914).
Next, the command value receiving unit 311 inputs the received command value to the generator control unit 312. Thus, the generator control unit 312 starts output control of the generator 40 according to the input command value (S915).

一方、上記制御の開始時に、発電機出力値取得部314は、発電機40から送られてくる発電機出力値を取得し、取得した発電機出力値を発電機出力値送信部315に入力する(S916)。発電機出力値送信部315は、発電機出力値取得部314から入力された発電機出力値に、タイムスタンプT1取得部313から入力されるタイムスタンプT1を付加し(S917)、またタイムスタンプT3生成部316によって生成されたタイムスタンプT3を付加する(S918)。そして発電機出力値送信部315は、発電機出力値を第1通信手段4により給電指令装置20に送信する(S919)。   On the other hand, at the start of the control, the generator output value acquisition unit 314 acquires the generator output value sent from the generator 40 and inputs the acquired generator output value to the generator output value transmission unit 315. (S916). The generator output value transmission unit 315 adds the time stamp T1 input from the time stamp T1 acquisition unit 313 to the generator output value input from the generator output value acquisition unit 314 (S917), and the time stamp T3. The time stamp T3 generated by the generation unit 316 is added (S918). And the generator output value transmission part 315 transmits a generator output value to the electric power feeding instruction | command apparatus 20 by the 1st communication means 4 (S919).

給電指令装置20の発電機出力値受信部211は、発電制御装置30から送られてくる、タイムスタンプT1及びタイムスタンプT3が付加された発電機出力値を受信する(S920)。
給電指令装置20の発電機出力値受信部211は、タイムスタンプT1が付加された発電機出力値を受信すると、受信した発電機出力値に付加されているタイムスタンプT1に対応づけて発電機出力値記憶部212に記憶する。また発電機出力値受信部211は、受信した発電機出力値に付加されているタイムスタンプT1及びタイムスタンプT3を伝送遅延時間算出部214に入力する(S921)。
The generator output value receiving unit 211 of the power supply command device 20 receives the generator output value to which the time stamp T1 and the time stamp T3 are added sent from the power generation control device 30 (S920).
When the generator output value receiving unit 211 of the power supply command device 20 receives the generator output value to which the time stamp T1 is added, the generator output value is associated with the time stamp T1 added to the received generator output value. Store in the value storage unit 212. Further, the generator output value receiving unit 211 inputs the time stamp T1 and the time stamp T3 added to the received generator output value to the transmission delay time calculating unit 214 (S921).

伝送遅延時間算出部214は、入力されたタイムスタンプT1及びタイムスタンプT3と、タイプスタンプ生成部213から入力されるタイムスタンプT2とに基づいて、第1通信手段4の伝送遅延時間を求め第1通信手段4の伝送遅延時間を求める。具体的には、伝送遅延時間算出部214は、往路の伝送遅延時間をT3−T1を計算することにより求め、また復路の伝送遅延時間をT2−T3を計算することにより求め(S922)、求めた往路及び復路の伝送遅延時間を指令値生成部217に入力する(S923)。   The transmission delay time calculation unit 214 obtains the transmission delay time of the first communication unit 4 based on the input time stamp T1 and time stamp T3 and the time stamp T2 input from the type stamp generation unit 213, and first The transmission delay time of the communication means 4 is obtained. Specifically, the transmission delay time calculation unit 214 obtains the transmission delay time for the forward path by calculating T3-T1, and calculates the transmission delay time for the return path by calculating T2-T3 (S922). The forward and backward transmission delay times are input to the command value generation unit 217 (S923).

次に指令値生成部217は、発電機出力値記憶部212に記憶されている情報、周波数計測値記憶部216に記憶されている情報、及び伝送遅延時間算出部214から入力される往路及び復路の伝送遅延時間に基づいて、発電機制御装置30に送信する発電機の出力制御のための指令値のスケジュールを生成し、生成したスケジュールを指令値スケジュール記憶部218に記憶する(S923)。   Next, the command value generation unit 217 includes information stored in the generator output value storage unit 212, information stored in the frequency measurement value storage unit 216, and forward and return routes input from the transmission delay time calculation unit 214. Based on this transmission delay time, a command value schedule for output control of the generator to be transmitted to the generator control device 30 is generated, and the generated schedule is stored in the command value schedule storage unit 218 (S923).

以上に説明したように、本実施例の給電システム1にあっては、第1通信手段4により給電指令装置20から発電機制御装置30に指令値を送信する際に送信時刻を示すタイムスタンプT1を付加する。また発電機制御装置30は、指令値を受信した時刻を示すタイムスタンプT3を生成し、受信した指令値に付加されていたタイムスタンプT1及びタイムスタンプT3を付加した発電機出力値を、第1通信手段4により発電機制御装置30から給電指令装置20に送信する。そして、給電指令装置20は、発電機出力値に付加されているタイムスタンプT1及びタイムスタンプT3、及びタイムスタンプT2生成部213とに基づいて、往路の伝送遅延時間についてはT3−T1を計算することにより求め、また復路の伝送遅延時間についてはT2−T3を計算することにより求める。   As described above, in the power supply system 1 of the present embodiment, the time stamp T1 indicating the transmission time when the command value is transmitted from the power supply command device 20 to the generator control device 30 by the first communication unit 4. Is added. Further, the generator control device 30 generates a time stamp T3 indicating the time when the command value is received, and sets the time stamp T1 added to the received command value and the generator output value added with the time stamp T3 as the first value. The data is transmitted from the generator control device 30 to the power supply command device 20 by the communication means 4. Then, based on the time stamp T1 and time stamp T3 added to the generator output value and the time stamp T2 generation unit 213, the power supply command device 20 calculates T3-T1 for the transmission delay time of the forward path. In addition, the transmission delay time of the return path is obtained by calculating T2-T3.

このように、本実施例の給電システム1によれば、給電指令装置20と発電制御装置30との間で通信される指令値及び発電機出力値にタイムスタンプを付加するという簡素な仕組みにより、往路及び復路の伝送遅延時間を正確に把握することができる。このように往路と復路の正確な伝送遅延時間を個別に把握することができるので、本実施例の構成はとくに第1通信手段4がADSLのように上りと下りの通信時間の格差が大きい場合に有効である。   Thus, according to the power supply system 1 of the present embodiment, by a simple mechanism of adding a time stamp to the command value and the generator output value communicated between the power supply command device 20 and the power generation control device 30, It is possible to accurately grasp the transmission delay time of the forward path and the backward path. As described above, since the accurate transmission delay times for the forward path and the backward path can be grasped individually, the configuration of the present embodiment is particularly suitable when the first communication means 4 has a large difference between the upstream and downstream communication times, such as ADSL. It is effective for.

また本実施例の給電システム1は、指令値を受信した際の受信時刻を示すタイムスタンプT3を発電制御装置30側で生成しているので、発電機出力を取得した時刻を正確に把握することができる。このため、指令値と発電機出力との関係、すなわち応答特性を正確に知ることができる。   Moreover, since the power feeding system 1 of the present embodiment generates the time stamp T3 indicating the reception time when the command value is received on the power generation control device 30 side, it accurately grasps the time when the generator output is acquired. Can do. For this reason, it is possible to accurately know the relationship between the command value and the generator output, that is, the response characteristic.

また本実施例の給電システム1は、上記仕組みにより把握した正確な伝送遅延時間に基づいて指令値のスケジュールを生成するため、需給バランスを適切に制御することが可能となる。   Moreover, since the power supply system 1 of the present embodiment generates a command value schedule based on the accurate transmission delay time grasped by the above mechanism, it is possible to appropriately control the supply and demand balance.

なお、以上の実施形態の説明は、本発明の理解を容易にするためのものであり、本発明を限定するものではない。本発明はその趣旨を逸脱することなく、変更、改良され得ると共に本発明にはその等価物が含まれることは勿論である。   In addition, the description of the above embodiment is for facilitating understanding of the present invention, and does not limit the present invention. It goes without saying that the present invention can be changed and improved without departing from the gist thereof, and that the present invention includes equivalents thereof.

実施例1として説明する給電システム1の概略的な構成を示す図である。1 is a diagram illustrating a schematic configuration of a power feeding system 1 described as a first embodiment. 実施例1として説明する給電指令装置20のハードウエア構成を示す図である。FIG. 2 is a diagram illustrating a hardware configuration of a power supply command device 20 described as a first embodiment. 実施例1として説明する発電制御装置30のハードウエア構成を示す図である。1 is a diagram illustrating a hardware configuration of a power generation control device 30 described as a first embodiment. 実施例1として説明する給電指令装置20の機能を示す図である。It is a figure which shows the function of the electric power feeding instruction | command apparatus 20 demonstrated as Example 1. FIG. 実施例1として説明する発電制御装置30の機能を示す図である。It is a figure which shows the function of the electric power generation control apparatus 30 demonstrated as Example 1. FIG. 実施例1として説明する給電システム1によって行われる処理を説明するフローチャートである。3 is a flowchart illustrating processing performed by the power supply system 1 described as the first embodiment. 実施例2として説明する給電指令装置20の機能を示す図である。It is a figure which shows the function of the electric power feeding instruction | command apparatus 20 demonstrated as Example 2. FIG. 実施例2として説明する発電制御装置30の機能を示す図である。It is a figure which shows the function of the electric power generation control apparatus 30 demonstrated as Example 2. FIG. 実施例2として説明する給電システム1によって行われる処理を説明するフローチャートである。10 is a flowchart illustrating processing performed by the power supply system 1 described as a second embodiment.

符号の説明Explanation of symbols

1 給電システム
2 給電指令機関
3 発電施設
4 第1通信手段
5 第2通信手段
211 発電機出力値受信部
212 発電機出力値記憶部
213 タイムスタンプT2生成部
214 伝送遅延時間算出部
215 周波数取得部
216 周波数計測値記憶部
217 指令値生成部
218 指令値スケジュール記憶部
219 指令値取得部
220 指令値送信部
221 タイムスタンプT1生成部
311 指令値受信部
312 発電機制御部
313 タイムスタンプT1取得部
314 発電機出力値取得部
315 発電機出力値送信部
316 タイムスタンプT3生成部
DESCRIPTION OF SYMBOLS 1 Power supply system 2 Power supply instruction | command engine 3 Power generation facility 4 1st communication means 5 2nd communication means 211 Generator output value receiving part 212 Generator output value memory | storage part 213 Time stamp T2 production | generation part 214 Transmission delay time calculation part 215 Frequency acquisition part 216 Frequency measurement value storage unit 217 Command value generation unit 218 Command value schedule storage unit 219 Command value acquisition unit 220 Command value transmission unit 221 Time stamp T1 generation unit 311 Command value reception unit 312 Generator control unit
313 Time stamp T1 acquisition unit 314 Generator output value acquisition unit 315 Generator output value transmission unit 316 Time stamp T3 generation unit

Claims (7)

発電機を制御するための指令値を生成する給電指令装置と、
前記給電指令装置と通信手段を介して通信可能に接続する発電制御装置と
を含んで構成される給電システムであって、
前記給電指令装置は、
前記指令値を、送信時刻を示すタイムスタンプT1を付加して前記通信手段により前記発電制御装置に送信する指令値送信部を有し、
前記発電制御装置は、
前記指令値を受信する指令値受信部と、
受信した前記指令値に基づいて発電機を制御する発電機制御部と、
前記発電機から発電機出力を取得する発電機出力取得部と、
取得した前記発電機出力を、前記指令値に付加されている前記タイムスタンプT1を付加して前記通信手段により前記給電指令装置に送信する発電機出力送信部とを有し、
前記給電指令装置は、
前記発電機出力を受信する発電機出力値受信部と、
前記発電機出力値受信部が前記発電機出力を受信するとその受信時刻を示すタイムスタンプT2を生成するタイムスタンプT2生成部と、
受信した前記発電機出力に付加されている前記タイムスタンプT1と生成した前記タイムスタンプT2とに基づいて、前記通信手段における伝送遅延時間を算出する伝送遅延時間算出部とを有すること
を特徴とする給電システム。
A power supply command device for generating a command value for controlling the generator;
A power supply system configured to include the power supply command device and a power generation control device that is communicably connected via a communication unit,
The power supply command device
A command value transmitting unit for transmitting the command value to the power generation control device by the communication unit with a time stamp T1 indicating a transmission time;
The power generation control device
A command value receiving unit for receiving the command value;
A generator control unit for controlling the generator based on the received command value;
A generator output acquisition unit for acquiring a generator output from the generator;
A generator output transmitter for transmitting the acquired generator output to the power supply command device by adding the time stamp T1 added to the command value by the communication means;
The power supply command device
A generator output value receiving unit for receiving the generator output;
A time stamp T2 generating unit that generates a time stamp T2 indicating a reception time when the generator output value receiving unit receives the generator output;
A transmission delay time calculation unit for calculating a transmission delay time in the communication means based on the time stamp T1 added to the received generator output and the generated time stamp T2. Power supply system.
請求項1に記載の給電システムであって、
前記伝送遅延時間算出部は、(T2−T1)/2を計算することにより前記伝送遅延時間を求めることを特徴とする給電システム。
The power supply system according to claim 1,
The transmission delay time calculating unit obtains the transmission delay time by calculating (T2-T1) / 2.
発電機を制御するための指令値を生成する給電指令装置と、
前記給電指令装置と通信手段を介して通信可能に接続する発電制御装置と
を含んで構成される給電システムであって、
前記給電指令装置は、
前記指令値を、送信時刻を示すタイムスタンプT1を付加して前記通信手段により前記発電制御装置に送信する指令値送信部を有し、
前記発電制御装置は、
前記指令値を受信する指令値受信部と、
受信した前記指令値に基づいて発電機を制御する発電機制御部と、
前記発電機制御部が前記指令値を受信するとその受信時刻を示すタイムスタンプT3を生成するタイムスタンプT3生成部と、
前記発電機から発電機出力を取得する発電機出力取得部と、
取得した前記発電機出力を、前記指令値に付加されている前記タイムスタンプT1及び前記タイムスタンプT3を付加して前記通信手段により前記給電指令装置に送信する発電機出力送信部とを有し、
前記給電指令装置は、
前記発電機出力を受信する発電機出力値受信部と、
受信した前記発電機出力に付加されている前記タイムスタンプT1と前記タイムスタンプT3とに基づいて、前記通信手段における伝送遅延時間を算出する伝送遅延時間算出部とを有すること
を特徴とする給電システム。
A power supply command device for generating a command value for controlling the generator;
A power supply system configured to include the power supply command device and a power generation control device that is communicably connected via a communication unit,
The power supply command device
A command value transmitting unit for transmitting the command value to the power generation control device by the communication unit with a time stamp T1 indicating a transmission time;
The power generation control device
A command value receiving unit for receiving the command value;
A generator control unit for controlling the generator based on the received command value;
A time stamp T3 generating unit that generates a time stamp T3 indicating a reception time when the generator control unit receives the command value;
A generator output acquisition unit for acquiring a generator output from the generator;
A generator output transmission unit that adds the acquired time stamp T1 and time stamp T3 added to the command value to the acquired power generator output to the power supply command device by the communication means;
The power supply command device
A generator output value receiving unit for receiving the generator output;
A power supply system comprising: a transmission delay time calculation unit that calculates a transmission delay time in the communication unit based on the time stamp T1 and the time stamp T3 added to the received generator output. .
請求項3に記載の給電システムであって、
前記伝送遅延時間算出部は、T3−T1を計算することにより前記伝送遅延時間を求めることを特徴とする給電システム。
The power supply system according to claim 3,
The transmission delay time calculating unit obtains the transmission delay time by calculating T3-T1.
請求項3に記載の給電システムであって、
前記給電指令装置は、
前記発電機出力値受信部が前記発電機出力を受信するとその受信時刻を示すタイムスタンプT2を生成するタイムスタンプT2生成部を有し、
前記伝送遅延時間算出部は、T2−T3を計算することにより前記伝送遅延時間を求めることを特徴とする給電システム。
The power supply system according to claim 3,
The power supply command device
When the generator output value receiving unit receives the generator output, the generator output value receiving unit includes a time stamp T2 generating unit that generates a time stamp T2 indicating the reception time,
The transmission delay time calculating unit obtains the transmission delay time by calculating T2-T3.
発電機を制御するための指令値を生成する給電指令装置と、
前記給電指令装置と通信手段を介して通信可能に接続する発電制御装置と
を含んで構成される給電システムの制御方法であって、
前記給電指令装置が、前記指令値を、送信時刻を示すタイムスタンプT1を付加して前記通信手段により前記発電制御装置に送信するステップと、
前記発電制御装置が、前記指令値を受信し、受信した前記指令値に基づいて発電機を制御し、前記発電機から発電機出力を取得し、取得した前記発電機出力を、前記指令値に付加されている前記タイムスタンプT1を付加して前記通信手段により前記給電指令装置に送信するステップと、
前記給電指令装置が、前記発電機出力を受信し、前記発電機出力値受信部が前記発電機出力を受信するとその受信時刻を示すタイムスタンプT2を生成し、受信した前記発電機出力に付加されている前記タイムスタンプT1と生成した前記タイムスタンプT2とに基づいて、前記通信手段における伝送遅延時間を算出するステップと
を含むことを特徴とする給電システムの制御方法。
A power supply command device for generating a command value for controlling the generator;
A power supply system control method comprising the power supply command device and a power generation control device that is communicably connected via a communication means,
The power supply command device transmits the command value to the power generation control device by the communication unit with a time stamp T1 indicating a transmission time;
The power generation control device receives the command value, controls a generator based on the received command value, acquires a generator output from the generator, and uses the acquired generator output as the command value. Adding the added time stamp T1 and transmitting to the power supply command device by the communication means;
When the power supply command device receives the generator output, and the generator output value receiving unit receives the generator output, it generates a time stamp T2 indicating the reception time, and is added to the received generator output. And a step of calculating a transmission delay time in the communication means based on the time stamp T1 and the generated time stamp T2.
発電機を制御するための指令値を生成する給電指令装置と、
前記給電指令装置と通信手段を介して通信可能に接続する発電制御装置と
を含んで構成される給電システムの制御方法であって、
前記給電指令装置が、前記指令値を、送信時刻を示すタイムスタンプT1を付加して前記通信手段により前記発電制御装置に送信するステップと、
前記発電制御装置が、前記指令値を受信し、受信した前記指令値に基づいて発電機を制御し、前記発電機制御部が前記指令値を受信するとその受信時刻を示すタイムスタンプT3を生成し、前記発電機から発電機出力を取得し、取得した前記発電機出力を、前記指令値に付加されている前記タイムスタンプT1及び前記タイムスタンプT3を付加して前記通信手段により前記給電指令装置に送信するステップと、
前記給電指令装置が、前記発電機出力を受信し、受信した前記発電機出力に付加されている前記タイムスタンプT1と前記タイムスタンプT3とに基づいて、前記通信手段における伝送遅延時間を算出するステップと
を含むことを特徴とする給電システムの制御方法。
A power supply command device for generating a command value for controlling the generator;
A power supply system control method comprising the power supply command device and a power generation control device that is communicably connected via a communication means,
The power supply command device transmits the command value to the power generation control device by the communication unit with a time stamp T1 indicating a transmission time;
The power generation control device receives the command value, controls a generator based on the received command value, and generates a time stamp T3 indicating the reception time when the generator control unit receives the command value. The generator output is acquired from the generator, and the acquired generator output is added to the command value by adding the time stamp T1 and the time stamp T3 added to the command value to the power supply command device. Sending, and
The power supply command device receives the generator output, and calculates a transmission delay time in the communication means based on the time stamp T1 and the time stamp T3 added to the received generator output. A method for controlling a power feeding system, comprising:
JP2007172394A 2007-06-29 2007-06-29 Power feeding system and method for controlling power feeding system Expired - Fee Related JP4926857B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007172394A JP4926857B2 (en) 2007-06-29 2007-06-29 Power feeding system and method for controlling power feeding system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007172394A JP4926857B2 (en) 2007-06-29 2007-06-29 Power feeding system and method for controlling power feeding system

Publications (2)

Publication Number Publication Date
JP2009011124A JP2009011124A (en) 2009-01-15
JP4926857B2 true JP4926857B2 (en) 2012-05-09

Family

ID=40325619

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007172394A Expired - Fee Related JP4926857B2 (en) 2007-06-29 2007-06-29 Power feeding system and method for controlling power feeding system

Country Status (1)

Country Link
JP (1) JP4926857B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022042116A1 (en) * 2020-08-24 2022-03-03 哲库科技(北京)有限公司 Power management apparatus and method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4693835B2 (en) * 2007-12-07 2011-06-01 中国電力株式会社 Power feeding system and method for controlling power feeding system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63181617A (en) * 1987-01-23 1988-07-26 株式会社東芝 Automatic demand controller
JP2000224766A (en) * 1999-01-28 2000-08-11 Meidensha Corp Time synchronizing method in distributed power monitoring control system
JP3926342B2 (en) * 2004-03-17 2007-06-06 埼玉日本電気株式会社 Radio base station system and delay time measuring method
JP2005269488A (en) * 2004-03-22 2005-09-29 Fujitsu Access Ltd Communication control system and communication control processing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022042116A1 (en) * 2020-08-24 2022-03-03 哲库科技(北京)有限公司 Power management apparatus and method

Also Published As

Publication number Publication date
JP2009011124A (en) 2009-01-15

Similar Documents

Publication Publication Date Title
TW200947341A (en) Method of making operation plan for an energy storage equipment and operation plan making equipment
JPWO2014020951A1 (en) Grid integrated control device, grid control system, grid control device, program, and control method
JP2015503891A5 (en)
JP4926857B2 (en) Power feeding system and method for controlling power feeding system
JP4343212B2 (en) Data transmission / reception method
JP4693835B2 (en) Power feeding system and method for controlling power feeding system
JP2017151810A (en) Information processing device, information processing method, and program
Khatami et al. Continuous-time locational marginal price of electricity
US11157333B2 (en) Data processing device, data processing system, data processing method, and program
JP5412332B2 (en) Generator operation plan determination device, generator operation plan determination method, and generator operation plan determination program
CN108027947B (en) Power plant analysis device, power plant analysis method, and computer-readable recording medium
JPWO2021131576A5 (en) Control device, power conditioning system, distributed power supply system, power control system, control method and program
EP3133452A1 (en) Energy management system, energy management method, and program
US20190392534A1 (en) Power management apparatus, power management method, and non-transitory storage medium
JP2008136268A (en) Method for controlling demand and supply of small-scale power system, and device thereof
JP6733656B2 (en) Information processing apparatus, information processing system, plant system, information processing method, and program
JP5857228B2 (en) Frequency control method and frequency control system
JP5937047B2 (en) Load control device, load control system, load control method and program
KR20170125580A (en) Method and System for Verifying Control Logic in Nuclear Power Plant PLC
JP6089407B2 (en) Verification method and verification program
JP6477293B2 (en) System operation support apparatus, system operation support method, and program thereof
JP4883139B2 (en) Monitoring system performance measuring program, monitoring system performance measuring method, and monitoring system performance measuring apparatus
Gui et al. Intra-day unit commitment for wind farm using model predictive control method
JP6248820B2 (en) Cooperative simulation device
CN105701055A (en) Electronic device and data transmission method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090811

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110616

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110726

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120131

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120208

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150217

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4926857

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150217

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees