JP4922265B2 - Plant monitoring apparatus and plant monitoring method - Google Patents

Plant monitoring apparatus and plant monitoring method Download PDF

Info

Publication number
JP4922265B2
JP4922265B2 JP2008211088A JP2008211088A JP4922265B2 JP 4922265 B2 JP4922265 B2 JP 4922265B2 JP 2008211088 A JP2008211088 A JP 2008211088A JP 2008211088 A JP2008211088 A JP 2008211088A JP 4922265 B2 JP4922265 B2 JP 4922265B2
Authority
JP
Japan
Prior art keywords
monitoring
plant
principal component
estimated deviation
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2008211088A
Other languages
Japanese (ja)
Other versions
JP2010049359A (en
Inventor
哲男 玉置
行徳 廣瀬
俊文 林
光広 榎本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2008211088A priority Critical patent/JP4922265B2/en
Publication of JP2010049359A publication Critical patent/JP2010049359A/en
Application granted granted Critical
Publication of JP4922265B2 publication Critical patent/JP4922265B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Description

本発明は、プラントの運転状態の変化を監視する監視装置および監視方法に係り、特に、種々の異常に対する汎用性をより高めたプラント監視装置およびプラント監視方法に関する。   The present invention relates to a monitoring apparatus and a monitoring method for monitoring changes in the operating state of a plant, and more particularly, to a plant monitoring apparatus and a plant monitoring method with higher versatility for various abnormalities.

原子力発電プラントあるいは火力発電プラント等の大規模プラントにおいては、多数のプラント信号を計算機に取り込み、監視画面にプラントデータを表示して監視することが行われている。プラント信号の数は数千点に及ぶため、全てのプラントデータを運転員が常時監視するのは困難であることから、主要なプラントデータについては予め設定された管理しきい値との比較による監視が計算機により行われている。タービンからの抽気蒸気で給水を加熱する原子力あるいは火力発電プラントの給・復水系の例を引くまでも無く、大規模プラントのプラント信号は相互に密接な関係をもって変化するため、運転員は関連するプラントデータのトレンドを表示して監視する他、相関図等を確認しながら監視を行っている。プラントに異常が発生し、プラント信号のレベルが管理しきい値を超えた場合には、警報が発報されて運転員による対応がとられるようになっている。   In a large-scale plant such as a nuclear power plant or a thermal power plant, a large number of plant signals are taken into a computer and plant data is displayed on a monitoring screen for monitoring. Since there are thousands of plant signals, it is difficult for operators to constantly monitor all plant data. Therefore, monitoring of main plant data by comparison with preset control thresholds Is done by the computer. Operators are relevant because the plant signals of large plants change in close relation to each other, not to mention examples of feed and condensate systems in nuclear or thermal power plants that heat feed water with steam extracted from turbines. In addition to displaying and monitoring plant data trends, monitoring is performed while checking correlation diagrams and the like. When an abnormality occurs in the plant and the level of the plant signal exceeds the management threshold value, an alarm is issued and an operator can take action.

しかしながら、異常の初期段階に現れる兆候を、多数のプラントデータの中から早期に検知し、運転条件の変化の影響と識別して異常と認識することは、運転員にとって非常に困難な作業となる。発電プラントのような大規模プラントではなく、複数の設備の運転状態を遠隔で集中監視する場合等においても、多数の信号のデータを少数の要員で監視する困難は同様である。   However, it is a very difficult task for operators to detect signs that appear in the initial stage of abnormalities from a large number of plant data at an early stage and identify them as abnormal due to the effects of changes in operating conditions. . Even when a large-scale plant such as a power plant is used, and the operation state of a plurality of facilities is remotely monitored centrally, the difficulty of monitoring data of a large number of signals with a small number of personnel is the same.

このため、多数のプラントデータに対して統計的プロセス管理技術の分野で一般的に用いられる主成分分析を適用して、元のプラントデータの特徴を捉えた少数の統計量データに変換し、変換後の統計量データの時間トレンドあるいは統計量データ同士の相関特性に管理しきい値を設けて監視する技術が考案されている(例えば特許文献1〜3参照)。   For this reason, principal component analysis generally used in the field of statistical process management technology is applied to a large number of plant data to convert it into a small number of statistical data that captures the characteristics of the original plant data. A technique has been devised in which a management threshold value is provided for monitoring a temporal trend of statistical data later or correlation characteristics between statistical data (see, for example, Patent Documents 1 to 3).

また、前記変換された少数の統計量データの相関特性のパターンを正常時のパターンと比較することにより監視する技術が考案されている(特許文献4,5参照)。   Further, a technique has been devised for monitoring by comparing a pattern of correlation characteristics of a small number of converted statistic data with a normal pattern (see Patent Documents 4 and 5).

さらに、前記変換された少数の統計量データにウェーブレット変換を適用した結果に管理しきい値を設けて監視する技術が考案されている(特許文献6参照)。   Furthermore, a technique has been devised in which a management threshold is provided for monitoring the result of applying wavelet transform to the small number of converted statistical data (see Patent Document 6).

これとは別に、監視対象データと、プラントデータ間の関係を表わすモデルを用いて推定した当該データの推定値との偏差に対して主成分分析を適用し、得られた統計量データに監視しきい値を設けて監視する技術も考案されている(特許文献7参照)。あるいは、モデルによる推定偏差に対して統計的プロセス管理で行われている種々の管理チャートを作成し、これに管理しきい値を設けて監視する方法も考案されている(特許文献8参照)。
特許第3970483号公報 特開2002−25981号公報 特開2006−135412号公報 特許第3495129号公報 特許第3472729号公報 特開2008−59270号公報 特開2004−303007号公報 特開平5−157449号公報
Separately, principal component analysis is applied to the deviation between the monitored data and the estimated value of the data estimated using a model representing the relationship between plant data, and the obtained statistical data is monitored. A technique for monitoring by providing a threshold has also been devised (see Patent Document 7). Alternatively, a method has been devised in which various management charts used in statistical process management are created for estimated deviations from a model and a management threshold value is provided for monitoring the charts (see Patent Document 8).
Japanese Patent No. 3970483 JP 2002-25981 A JP 2006-135212 A Japanese Patent No. 3495129 Japanese Patent No. 3472729 JP 2008-59270 A JP 2004-303007 A JP-A-5-157449

上述の従来の主成分分析により変換された統計量データに直接管理しきい値を設定して監視する技術のうち、特許文献1に記載の技術においては、相互に関連した3つのプロセス状態量の変化から外乱の影響を判定するために、主成分分析を行って得られる3次元主成分空間を特定の主成分方向からの視点に回転させたデータに対して最小二乗法による近似曲線を作成し、その曲線からの距離を許容範囲と比較することで異常を判定しているが、特定の主成分方向から見た2次元平面において、1つの状態量の影響を除去あるいは強調することが可能か否かは全て対象プロセスの特性に依存しており、広く一般のプロセスに適用できるものではないという問題があった。   Among the techniques for setting and monitoring the management threshold value directly on the statistical data converted by the above-described conventional principal component analysis, the technique described in Patent Document 1 includes three process state quantities related to each other. In order to determine the influence of disturbance from changes, an approximate curve by the least square method is created for the data obtained by rotating the three-dimensional principal component space obtained by performing principal component analysis from the viewpoint of a specific principal component direction. The abnormality is determined by comparing the distance from the curve with the permissible range, but is it possible to remove or emphasize the influence of one state quantity in the two-dimensional plane viewed from a specific principal component direction? Whether or not all depends on the characteristics of the target process, there is a problem that it can not be widely applied to general processes.

また、特許文献2に記載の技術は、後述する特許文献7においても指摘されているように、プラントの運転条件が変更された場合に、異常ではない状態を異常として検出する問題があった。そして、特許文献3に記載された技術においては、主成分分析により変換した統計量データのうち、Q統計量のみを用いて監視を行っているが、プラントに生じる可能性のある種々の異常の中には、Q統計量では検知されず、主成分得点あるいはT統計量にのみ影響が現われるものがあることを考えると、汎用性に欠けるという問題があった。 In addition, the technique described in Patent Document 2 has a problem of detecting a non-abnormal state as an abnormality when the plant operating conditions are changed, as pointed out in Patent Document 7 described later. In the technique described in Patent Document 3, monitoring is performed using only the Q statistics among the statistics data converted by the principal component analysis. However, various abnormalities that may occur in the plant are detected. Considering that some of them are not detected by the Q statistic but only affect the main component score or the T 2 statistic, there is a problem that the versatility is lacking.

一方、前記主成分分析によって変換された少数の統計量データの相関特性のパターンを正常時のパターンと比較することにより監視する技術のうち特許文献4に記載された方法では累積寄与率が規定値の範囲内となる主成分を選択し、これらをパラメータとする直交座標系上で算出した被判定データと履歴データとの距離がしきい値を超える場合に異常と判定しているが、この方法では正常な状態から徐々に異常が進展するような状態を把握することができず、また一過性のノイズの影響等を受けやすいという問題があった。   On the other hand, among the techniques for monitoring by comparing the pattern of correlation characteristics of a small number of statistical data converted by the principal component analysis with a normal pattern, the cumulative contribution ratio is a specified value in the method described in Patent Document 4 This method is used to select a principal component that falls within the range of, and when the distance between the judged data calculated on the Cartesian coordinate system using these as parameters and the history data exceeds a threshold, However, there is a problem that it is difficult to grasp a state in which an abnormality gradually develops from a normal state, and it is easily affected by a transient noise.

また、特許文献5に記載された技術では、前記特許文献3の場合とは逆に主成分得点のみを用いているため、汎用性に欠ける問題があった。   Further, the technique described in Patent Document 5 has a problem of lack of versatility because only the main component score is used, contrary to the case of Patent Document 3.

主成分分析によって変換された少数の統計量データにウェーブレット変換を適用した結果に管理しきい値を設けて監視する特許文献6、7に記載の技術は何れも、前記特許文献2と同様にプラント運転条件の変化の影響を異常と判定する可能性が高いという問題があった。   The techniques described in Patent Documents 6 and 7 that monitor the result of applying the wavelet transform to a small number of statistical data converted by principal component analysis are managed in the same manner as in Patent Document 2 described above. There was a problem that there is a high possibility that the influence of changes in operating conditions is judged as abnormal.

また、特許文献6に記載の技術ではT統計量あるいはQ統計量のウェーブレット変換に管理しきい値を設けて、T統計量あるいはQ統計量そのもの、あるいはそれらの寄与量に対して管理しきい値を設けているが、T統計量とQ統計量は何れも二乗量であることから、仮に管理しきい値設定に用いるデータに含まれる異常データの割合が既知であったとしても、設定された管理しきい値のデータ依存性が高くなる問題があった。 In the technique described in Patent Document 6, a management threshold is provided for the wavelet transform of the T 2 statistic or Q statistic to manage the T 2 statistic or the Q statistic itself or their contribution. Although thresholds are provided, since both the T 2 statistic and the Q statistic are square quantities, even if the ratio of abnormal data included in the data used for setting the management threshold is known, There was a problem that the data dependency of the set management threshold became high.

以上の従来技術で指摘されたプラント運転条件の変化の影響を受ける問題に対して、特許文献7に記載の技術では複数のプロセスデータを運転条件の変更を直接的に表わす外部変数とそれ以外の主変数に分け、外部変数の主変数への影響を最小二乗法で得た偏回帰係数により推定除去し、得られた推定偏差に対して主成分分析を適用してT統計量あるいはQ統計量に変換し監視する方法が開示されている。しかしながら、この方法では変換後の統計量に対する監視しきい値は統計量の分布特性を考慮することなく、例えば参照データの99%が含まれる値(換言すると参照データの1%が超える値)、というように試行錯誤的に決定していた。管理しきい値をこのように決定する方法は、例えば参照データに一瞬でも大きいノイズが入ると、参照データの1%が超える値(管理しきい値と設定する値)が高い値となり、管理しきい値が高くなる、といったように、前記特許文献6の場合と同様に検出性能のデータ依存性が大きいという問題あった。 In contrast to the problem affected by changes in the plant operating conditions pointed out in the prior art described above, the technique described in Patent Document 7 uses a plurality of process data as external variables that directly represent changes in operating conditions and other variables. divided into main variable, estimated removed by partial regression coefficient of influence of the main variables were obtained by least squares method of external variables, by applying the principal component analysis on the resulting estimated differential T 2 statistic or Q statistic A method of converting to a quantity and monitoring is disclosed. However, in this method, the monitoring threshold for the converted statistic does not consider the distribution characteristics of the statistic, for example, a value including 99% of the reference data (in other words, a value exceeding 1% of the reference data), It was determined by trial and error. The management threshold value is determined in this way. For example, if a large amount of noise enters the reference data even for a moment, the value exceeding 1% of the reference data (the value set as the management threshold value) becomes a high value. As in the case of Patent Document 6, there is a problem that the data dependence of the detection performance is large, such that the threshold value becomes high.

特許文献8には主成分分析を用いない技術として、プロセス変数の観測値、またはARIMA(Autoregressive Integrated Moving Average)モデルによる推定偏差に対して従来の統計的プロセス管理で行われている形式の制御チャート、例えば平均値、標準偏差、等のチャートを作成して、これを通常時に設定した管理しきい値と比較することにより監視を行う方法が開示されている。しかしながら、制御チャートの管理しきい値の設定は試行錯誤的であり、検出性能のデータ依存性が大きいという問題があった。また、例えば測定器の不具合によりプラントデータにドリフトを生じた場合にも、ARIMAモデルの自己回帰項の効果によって推定偏差にはその影響が現われず、従って種々の異常に対して汎用性のあるモデルとはなっていない問題があった。   As a technique that does not use principal component analysis, Patent Document 8 discloses a control chart in a format that is used in the conventional statistical process management with respect to an observation value of a process variable or an estimated deviation based on an ARIMA (Autogressive Integrated Moving Average) model. For example, a method is disclosed in which monitoring is performed by creating a chart of average values, standard deviations, etc., and comparing the chart with a management threshold value set in a normal state. However, the setting of the control threshold value of the control chart is a trial and error, and there is a problem that the data dependence of the detection performance is large. In addition, for example, when the plant data drifts due to a malfunction of the measuring instrument, the estimated deviation is not affected by the effect of the autoregressive term of the ARIMA model, so that the model is versatile for various abnormalities. There was a problem that was not.

本発明はかかる従来の事情に対処してなされたものであり、プラントの運転状態が変化した場合にもそれが正常な変化であれば異常と判定することが無く、また監視指標に対する管理しきい値の設定に用いた参照データへの監視性能の依存性が少なく、さらにプラント特性の異常から測定器のドリフトまで種々の異常に対して適用可能な汎用性の高いプラント監視装置を提供することを目的とする。   The present invention has been made in response to such a conventional situation, and even when the operation state of the plant is changed, if it is a normal change, it is not determined to be abnormal, and the management threshold for the monitoring index is not limited. To provide a highly versatile plant monitoring device that is less dependent on the monitoring performance to the reference data used to set the value, and that can be applied to various abnormalities from abnormal plant characteristics to drift in measuring instruments. Objective.

本発明に係るプラント監視装置は、プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力・保存手段と、前記プラントデータ入力・保存手段で保存された時系列データに基づいて監視モデルを作成する監視モデル作成手段と、前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理手段と、を備えたプラント監視装置であって、前記監視モデル作成手段は、前記時系列データを用いて出力誤差モデルを同定する出力誤差モデル同定部と、前記出力誤差モデルを前記時系列データに適用して算出した前記出力変数の推定偏差の統計的特性を評価する推定偏差特性評価部と、を具備し、前記監視処理手段は、前記測定データに前記出力誤差モデルを適用して前記出力変数の推定偏差を算出する出力推定偏差算出部と、前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理部と、前記推定偏差の分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定部と、を具備することを特徴とする。   A plant monitoring apparatus according to the present invention includes plant data input / storage means for inputting measurement data of input variables and output variables of a plant and storing them as time series data, and time series data stored by the plant data input / storage means. A monitoring model generating means for generating a monitoring model based on the monitoring data, and a monitoring processing means for applying the monitoring model to the measurement data to determine normality / abnormality of the plant state and outputting the determination result In the monitoring apparatus, the monitoring model creating means includes an output error model identifying unit that identifies an output error model using the time series data, and the output calculated by applying the output error model to the time series data. An estimated deviation characteristic evaluation unit that evaluates a statistical characteristic of the estimated deviation of the variable, and the monitoring processing means outputs the output to the measurement data. An output estimated deviation calculation unit that calculates an estimated deviation of the output variable by applying an error model, and an estimated deviation test processing unit that tests a variance value change hypothesis of the estimated deviation by applying a sequential probability ratio test to the estimated deviation And a hypothesis adoption rate determination unit that monitors plant abnormality based on the adoption rate of the estimated deviation variance change hypothesis.

また、本発明に係るプラント監視装置は、プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力・保存手段と、前記プラントデータ入力・保存手段で保存された時系列データに基づいて監視モデルを作成する監視モデル作成手段と、前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理手段と、を備えたプラント監視装置であって、前記監視モデル作成手段は前記時系列データに主成分分析を適用して寄与率の大きな複数の主成分に対する負荷行列を構成する主成分分析部と、前記負荷行列を前記時系列データに適用して算出した推定偏差の統計的特性を評価する推定偏差特性評価部と、を具備し、前記監視処理手段は、前記測定データに前記負荷行列を適用して推定偏差を算出する出力推定偏差部と、前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理部と、前記推定偏差の分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定部と、を具備することを特徴とする。   Further, the plant monitoring apparatus according to the present invention includes plant data input / storage means for inputting measurement data of plant input variables and output variables and storing them as time-series data, and when the data is stored by the plant data input / storage means Monitoring model creating means for creating a monitoring model based on series data; and monitoring processing means for applying the monitoring model to the measurement data to determine normality / abnormality of the plant state and outputting the determination result. The monitoring model creating means is configured to apply a principal component analysis to the time series data to construct a load matrix for a plurality of principal components having a large contribution rate, and to calculate the load matrix. An estimated deviation characteristic evaluation unit that evaluates a statistical characteristic of the estimated deviation calculated by applying to the time series data, and the monitoring processing means includes the An output estimated deviation unit that calculates an estimated deviation by applying the load matrix to constant data; an estimated deviation test processing unit that tests a variance value change hypothesis of the estimated deviation by applying a sequential probability ratio test to the estimated deviation; And a hypothesis adoption rate determination unit that monitors plant abnormality based on the adoption rate of the estimated deviation variance change hypothesis.

また、本発明に係るプラント監視装置は、プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力・保存手段と、前記プラントデータ入力・保存手段で保存された時系列データに基づいて監視モデルを作成する監視モデル作成手段と、前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理手段と、を備えたプラント監視装置であって、前記監視モデル作成手段は前記時系列データに主成分分析を適用して寄与率の小さな複数の主成分に対する負荷行列を構成する主成分分析部と、前記負荷行列を前記時系列データに適用して算出した主成分得点の統計的特性を評価する主成分得点特性評価部と、を具備し、前記監視処理手段は、前記測定データに前記負荷行列を適用して主成分得点を算出する主成分得点算出部と、前記主成分得点に逐次確率比検定を適用して前記主成分得点の分散値変化仮説を検定する主成分得点検定処理部と、前記主成分得点の分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定部と、を具備することを特徴とする。   Further, the plant monitoring apparatus according to the present invention includes plant data input / storage means for inputting measurement data of plant input variables and output variables and storing them as time-series data, and when the data is stored by the plant data input / storage means Monitoring model creating means for creating a monitoring model based on series data; and monitoring processing means for applying the monitoring model to the measurement data to determine normality / abnormality of the plant state and outputting the determination result. The monitoring model creating means is configured to apply a principal component analysis to the time series data to construct a load matrix for a plurality of principal components having a small contribution rate; and the load matrix A principal component score characteristic evaluation unit that evaluates a statistical characteristic of the principal component score calculated by applying to the time series data, the monitoring processing means, A principal component score calculation unit that calculates the principal component score by applying the load matrix to the measured data, and a principal value test for the variance value change hypothesis of the principal component score by applying a sequential probability ratio test to the principal component score A component score test processing unit; and a hypothesis adoption rate determination unit that monitors plant abnormality based on the adoption rate of the variance change hypothesis of the principal component score.

また、本発明に係るプラント監視装置は、プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力・保存手段と、前記プラントデータ入力・保存手段で保存された時系列データに基づいて監視モデルを作成する監視モデル作成手段と、前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理手段と、を備えたプラント監視装置であって、前記監視モデル作成手段は前記時系列データに主成分分析を適用して寄与率の大きな複数の主成分に対する第1の負荷行列を構成する第1の主成分分析部と、前記主成分分析の結果から寄与率の小さな複数の主成分に対する第2の負荷行列を構成する第2の主成分分析部と、前記第1の負荷行列を前記時系列データに適用して算出した推定偏差の統計的特性を評価する推定偏差特性評価部と、前記第2の負荷行列を前記時系列データに適用して算出した主成分得点の統計的特性を評価する主成分得点特性評価部と、を具備し、前記監視処理手段は前記測定データに前記第1の負荷行列を適用して推定偏差を算出する推定偏差算出部と、前記測定データに前記第2の負荷行列を適用して主成分得点を算出する主成分得点算出部と、前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理部と、前記主成分得点に逐次確率比検定を適用して前記主成分得点の分散値変化仮説を検定する主成分得点検定処理部と、前記推定偏差の分散値変化仮説の採択率および主成分得点の分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定部と、を具備することを特徴とする。   Further, the plant monitoring apparatus according to the present invention includes plant data input / storage means for inputting measurement data of plant input variables and output variables and storing them as time-series data, and when the data is stored by the plant data input / storage means Monitoring model creating means for creating a monitoring model based on series data; and monitoring processing means for applying the monitoring model to the measurement data to determine normality / abnormality of the plant state and outputting the determination result. A first principal component analyzer configured to apply a principal component analysis to the time-series data to form a first load matrix for a plurality of principal components having a large contribution ratio. A second principal component analysis unit constituting a second load matrix for a plurality of principal components having a small contribution rate from the result of the principal component analysis, and the first load matrix An estimated deviation characteristic evaluation unit that evaluates a statistical characteristic of an estimated deviation calculated by applying to the time series data, and a statistical characteristic of a principal component score calculated by applying the second load matrix to the time series data A principal component score characteristic evaluation unit that evaluates the estimated deviation calculation unit that calculates an estimated deviation by applying the first load matrix to the measurement data; and A principal component score calculation unit that calculates a principal component score by applying a second load matrix; and an estimated deviation test processing unit that tests a variance value change hypothesis of the estimated deviation by applying a sequential probability ratio test to the estimated deviation A principal component score test processing unit that applies a sequential probability ratio test to the principal component score to test the variance value change hypothesis of the principal component score, and the adoption rate and principal component score of the variance deviation hypothesis of the estimated deviation Adoption of the variance change hypothesis Characterized in that it comprises a a hypothesis adoption rate determination unit for monitoring the abnormality of the plant based on.

また、本発明に係るプラント監視方法は、プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力保存ステップと、前記プラントデータ入力保存ステップで保存された時系列データに基づいて監視モデルを作成する監視モデル作成ステップと、前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理ステップと、を備えるプラント監視方法であって、記監視モデル作成ステップは、前記時系列データを用いて出力誤差モデルを同定する出力誤差モデル同定ステップと、前記出力誤差モデルを前記時系列データに適用して算出した前記出力変数の推定偏差の統計的特性を評価する推定偏差特性評価ステップと、を具備し、前記出力監視処理ステップは、前記測定データに前記出力誤差モデルを適用して前記出力変数の推定偏差を算出する出力推定偏差算出ステップと、前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理ステップと、前記分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定ステップと、を具備することを特徴とする。   Further, the plant monitoring method according to the present invention includes a plant data input storage step for inputting measurement data of input variables and output variables of a plant and storing them as time series data, and time series data stored in the plant data input storage step. A monitoring model creating step for creating a monitoring model based on the above, and a monitoring processing step for applying the monitoring model to the measurement data to determine normality / abnormality of the plant state and outputting the determination result The monitoring model creation step includes an output error model identification step for identifying an output error model using the time series data, and the output variable calculated by applying the output error model to the time series data. An estimated deviation characteristic evaluation step for evaluating a statistical characteristic of the estimated deviation of the output deviation, The processing step includes an output estimated deviation calculating step of calculating the estimated deviation of the output variable by applying the output error model to the measurement data, and a variance value of the estimated deviation by applying a sequential probability ratio test to the estimated deviation. It comprises an estimated deviation test processing step for testing a change hypothesis, and a hypothesis adoption rate determination step for monitoring a plant abnormality based on the adoption rate of the variance change hypothesis.

また、本発明に係るプラント監視方法は、プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力保存ステップと、前記プラントデータ入力保存ステップで保存された時系列データに基づいて監視モデルを作成する監視モデル作成ステップと、前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理ステップと、を備えるプラント監視方法であって、前記監視モデル作成ステップは前記時系列データに主成分分析を適用して寄与率の大きな複数の主成分に対する第1の負荷行列を構成する第1の主成分分析ステップと、前記第1の負荷行列を前記時系列データに適用して算出した推定偏差の統計的特性を評価する推定偏差特性評価ステップと、を具備し、前記出力監視処理ステップは、前記測定データに前記負荷行列を適用して推定偏差を算出する出力推定偏差ステップと、前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理ステップと、前記推定偏差の分散値変化仮説の採択率に基づいてプラントの異常を監視する第1の仮説採択率判定ステップと、を具備することを特徴とする。   Further, the plant monitoring method according to the present invention includes a plant data input storage step for inputting measurement data of input variables and output variables of a plant and storing them as time series data, and time series data stored in the plant data input storage step. A monitoring model creating step for creating a monitoring model based on the above, and a monitoring processing step for applying the monitoring model to the measurement data to determine normality / abnormality of the plant state and outputting the determination result In the method, the monitoring model creation step includes applying a principal component analysis to the time series data to form a first load matrix for a plurality of principal components having a large contribution rate; Estimated deviation characteristic evaluation for evaluating a statistical characteristic of the estimated deviation calculated by applying the first load matrix to the time series data The output monitoring processing step includes an output estimated deviation step for calculating an estimated deviation by applying the load matrix to the measurement data, and a sequential probability ratio test is applied to the estimated deviation. An estimated deviation test processing step for testing a variance variation change hypothesis of the deviation, and a first hypothesis adoption rate determination step for monitoring a plant abnormality based on the adoption rate of the variance variation hypothesis of the estimated deviation. It is characterized by.

本発明に係るプラント監視装置およびプラント監視方法によれば、プラントの運転条件の変化に起因してプラントの状態が変化した場合であっても、それが正常な変化であれば、異常と判定することが無い。すなわち、プラントの運転条件の変更に伴うプラント状態の変化を考慮した上でプラントの状態が正常か異常かを正しく判断して監視を行うことができる。   According to the plant monitoring apparatus and the plant monitoring method according to the present invention, even if the state of the plant is changed due to a change in the operating condition of the plant, it is determined as abnormal if it is a normal change. There is nothing. That is, monitoring can be performed by correctly determining whether the state of the plant is normal or abnormal in consideration of changes in the plant state accompanying changes in the operating conditions of the plant.

また、監視指標に対する管理しきい値の設定の際には、統計的特性を考慮して設定しているため、参照データへの監視性能の依存性が少なくなり、監視結果の信頼性をより高まめることができる。   In addition, when setting management thresholds for monitoring indicators, they are set in consideration of statistical characteristics, so the dependency of the monitoring performance on the reference data is reduced, and the reliability of the monitoring results is improved. Can be blistered.

さらに、プラント特性の異常から測定器のドリフトまで種々の異常に対して適用することが可能となるので、従来のプラント監視装置およびプラント監視方法よりも、さらに汎用性を高めたプラント監視装置およびプラント監視方法を提供することができる。   Furthermore, since it can be applied to various abnormalities from abnormality of plant characteristics to drift of measuring instruments, a plant monitoring apparatus and a plant with higher versatility than the conventional plant monitoring apparatus and plant monitoring method. A monitoring method can be provided.

以下、本発明に係るプラント監視装置およびプラント監視方法について、図面を参照して説明する。   Hereinafter, a plant monitoring device and a plant monitoring method according to the present invention will be described with reference to the drawings.

図1は、本発明に係るプラント監視装置の一例であるプラント監視装置1の基本構成を示した概略図である。   FIG. 1 is a schematic diagram showing a basic configuration of a plant monitoring apparatus 1 which is an example of a plant monitoring apparatus according to the present invention.

図1に示されるプラント監視装置1は、監視対象となるプラント2からプラントの運転条件の変化の入力となる変数とその影響を受けて変化する出力変数の測定信号を入力し保存するプラントデータ入力・保存手段11と、監視実行に先立って監視モデルを作成する監視モデル作成手段12と、監視実行開始後にプラントデータ入力・保存手段11によって入力された入力変数データ及び出力変数データに監視モデル作成手段12で作成された監視モデルを適用して得られる出力変数データの推定偏差の統計的特性の変化を監視することにより異常を検出し、処理結果を外部へ出力する監視処理手段13とを具備して構成される。   A plant monitoring apparatus 1 shown in FIG. 1 inputs plant data input for storing a variable that is an input of a change in the operating condition of the plant from a plant 2 to be monitored and a measurement signal of an output variable that changes under the influence of the variable. Storage means 11, monitoring model creation means 12 for creating a monitoring model prior to monitoring execution, and monitoring model creation means for input variable data and output variable data input by plant data input / storage means 11 after the start of monitoring execution And monitoring processing means 13 for detecting an abnormality by monitoring a change in the statistical characteristics of the estimated deviation of the output variable data obtained by applying the monitoring model created in 12 and outputting the processing result to the outside. Configured.

また、プラント監視装置1は、ユーザの要求をプラントデータ入力・保存手段11、監視モデル作成手段12および監視処理手段13に与える入力手段4を具備しており、例えば後述する図4に示される参照データの設定(ステップS1)等の処理要求や設定範囲の情報等の処理実行に必要な情報を、当該処理実行手段に与える際に使用される。入力手段4は、例えばタッチスクリーンやマウスとキーボード等で構成する。   Further, the plant monitoring apparatus 1 includes an input unit 4 that gives a user request to the plant data input / storage unit 11, the monitoring model creation unit 12, and the monitoring processing unit 13. For example, the reference shown in FIG. It is used when information required for processing execution such as processing request such as data setting (step S1) and setting range information is given to the processing execution means. The input means 4 is composed of, for example, a touch screen, a mouse and a keyboard.

プラントデータ入力・保存手段11は、監視対象となるプラントからプラントの運転条件の変化の入力となる変数とその影響を受けて変化する出力変数の測定信号をプラント監視装置1に入力する機能と、入力機能を用いて取り込んだ信号を測定結果として保存する機能とを有する。プラントデータ入力・保存手段11では、監視対象となるプラントからプラントの運転条件の変化の入力となる変数とその影響を受けて変化する出力変数の測定信号が連続的又は所定の周期毎に入力され、各変数の測定結果(時系列データ)は履歴データとして保存される。以降、入力変数と出力変数の双方を指す場合は入出力変数と記述する。   The plant data input / storage means 11 has a function of inputting, to the plant monitoring apparatus 1, a variable as an input of a change in plant operating conditions from a plant to be monitored and a measurement signal of an output variable that changes under the influence thereof. And a function of storing a signal captured using the input function as a measurement result. In the plant data input / storage means 11, a variable as an input of a change in plant operating conditions and a measurement signal of an output variable that changes under the influence are input continuously or at predetermined intervals from the plant to be monitored. The measurement results (time series data) of each variable are stored as history data. Henceforth, when referring to both an input variable and an output variable, it describes as an input / output variable.

監視モデル作成手段12は、プラント2の監視を実行する際に必要となる監視モデルを作成する機能および作成した監視モデルを保存する機能を有する。監視モデル作成手段12では、プラントデータ入力・保存手段11によって入力された入出力の変数の履歴データ(時系列データ)を使ってプラント2の監視実行に必要な監視モデルが作成され、保存される。上記監視モデル作成機能には、監視モデル作成時に入力手段4を介して必要なユーザ要求を受け付ける機能および当該ユーザ要求に従い監視モデルの作成に必要な処理を実行する機能も含まれる。   The monitoring model creating means 12 has a function of creating a monitoring model necessary for executing monitoring of the plant 2 and a function of storing the created monitoring model. In the monitoring model creation means 12, a monitoring model necessary for monitoring execution of the plant 2 is created and saved using the history data (time series data) of the input / output variables input by the plant data input / storage means 11. . The monitoring model creation function includes a function of accepting a user request necessary via the input unit 4 when the monitoring model is created and a function of executing processing necessary for creating the monitoring model according to the user request.

監視処理手段13は、監視実行開始後にプラントデータ入力・保存手段11によって入力された入出力変数データについて監視モデル作成手段12に保存された監視モデルを適用して得られる出力変数データの推定偏差の統計的特性の変化を監視することによって、正常の範囲を脱した状態、すなわち、異常状態を検出する機能と、入力手段4を介して監視処理実行に必要な情報を受け付ける機能と、当該入力情報に従って処理を実行する機能を有する。監視処理手段13では、監視実行開始後にプラントデータ入力・保存手段11によって入力された入出力変数データに監視モデル作成手段12に保存された監視モデルを適用して、プラント2の異常の有無が検出される。   The monitoring processing unit 13 calculates the estimated deviation of the output variable data obtained by applying the monitoring model stored in the monitoring model creating unit 12 to the input / output variable data input by the plant data input / storage unit 11 after the start of monitoring execution. A function that detects a state out of the normal range by monitoring a change in statistical characteristics, that is, an abnormal state, a function that receives information necessary for executing the monitoring process via the input unit 4, and the input information The function to execute processing according to The monitoring processing unit 13 detects the presence or absence of an abnormality in the plant 2 by applying the monitoring model stored in the monitoring model creating unit 12 to the input / output variable data input by the plant data input / storage unit 11 after the start of monitoring execution. Is done.

プラント2の異常の有無の検出結果(監視処理結果)は、監視処理手段13からプラント監視装置1と接続された外部装置の一例である表示装置3へ送られ、表示装置3の表示部に表示される。ユーザは表示装置3の表示部に表示された監視処理結果を見ることでプラント2の異常の有無を視認することができる。   The detection result (monitoring processing result) of whether there is an abnormality in the plant 2 is sent from the monitoring processing means 13 to the display device 3 which is an example of an external device connected to the plant monitoring device 1 and displayed on the display unit of the display device 3. Is done. The user can visually recognize whether there is an abnormality in the plant 2 by looking at the monitoring processing result displayed on the display unit of the display device 3.

次に、本発明の各実施の形態に係るプラント監視装置1A〜1Fについて説明する。以下に説明するプラント監視装置1A〜1Fは、図1に示される監視モデル作成手段12および監視処理手段13の少なくとも何れかに特徴があり、それぞれのプラント監視装置1A〜1Fにおいて監視モデル作成手段12および監視処理手段13の少なくとも何れかが相違するが、その他の構成要素については各実施形態で共通である。そこで、以下の各実施の形態に係るプラント監視装置1A〜1Fおよびプラント監視方法の説明では、監視モデル作成手段12および監視処理手段13を中心に説明し、その他の構成要素については、適宜説明を簡略又は省略する。   Next, the plant monitoring apparatuses 1A to 1F according to the respective embodiments of the present invention will be described. The plant monitoring apparatuses 1A to 1F described below are characterized by at least one of the monitoring model creating means 12 and the monitoring processing means 13 shown in FIG. 1, and the monitoring model creating means 12 in each of the plant monitoring apparatuses 1A to 1F. And at least one of the monitoring processing means 13 is different, but the other components are common to the respective embodiments. Therefore, in the description of the plant monitoring devices 1A to 1F and the plant monitoring method according to the following embodiments, the monitoring model creating unit 12 and the monitoring processing unit 13 will be mainly described, and the other components will be described as appropriate. Simplified or omitted.

[第1の実施の形態]
本発明の第1の実施の形態に係るプラント監視装置1Aの構成は、図1において、プラント監視装置1、監視モデル作成手段12および監視処理手段13を、それぞれ、プラント監視装置1A、監視モデル作成手段12Aおよび監視処理手段13Aと読み替えた構成である。すなわち、プラント監視装置1Aは、プラントデータ入力・保存手段11、監視モデル作成手段12Aおよび監視処理手段13Aを具備する。
[First Embodiment]
The configuration of the plant monitoring apparatus 1A according to the first embodiment of the present invention is the same as that shown in FIG. 1 except that the plant monitoring apparatus 1, the monitoring model creating means 12 and the monitoring processing means 13 are the plant monitoring apparatus 1A and the monitoring model creating respectively. The configuration is replaced with means 12A and monitoring processing means 13A. That is, the plant monitoring apparatus 1A includes a plant data input / storage unit 11, a monitoring model creation unit 12A, and a monitoring processing unit 13A.

図2は、本発明の第1の実施の形態に係るプラント監視装置1Aが具備する監視モデル作成手段12Aの構成を示した概略図である。   FIG. 2 is a schematic diagram showing the configuration of the monitoring model creating means 12A provided in the plant monitoring apparatus 1A according to the first embodiment of the present invention.

図2に示されるように、監視モデル作成手段12Aは、プラント2の監視を実行する際に必要となる出力誤差モデル(Output error model)を同定する出力誤差モデル同定部21と、同定された出力誤差モデルにより生成される推定偏差の統計的特性を評価する第1の推定偏差特性評価部22とを備える。   As shown in FIG. 2, the monitoring model creation unit 12A includes an output error model identification unit 21 that identifies an output error model (Output error model) necessary for monitoring the plant 2, and the identified output. A first estimated deviation characteristic evaluation unit 22 that evaluates a statistical characteristic of the estimated deviation generated by the error model.

図3は、プラント監視装置1Aに具備される監視処理手段13Aの構成を示した概略図である。   FIG. 3 is a schematic diagram showing the configuration of the monitoring processing means 13A provided in the plant monitoring apparatus 1A.

図3に示されるように、監視処理手段13Aは、入出力変数データに前記監視モデル作成手段12Aで作成された監視モデルを適用して出力変数の推定偏差を算出する出力推定偏差算出部(以下、「第1の出力推定偏差算出部」と称する)25と、第1の出力推定偏差算出部25が算出した推定偏差に対して逐次確率比検定を適用して推定偏差の分散値が変化したか否かの仮説を検定する推定偏差検定処理部(以下、「第1の推定偏差検定処理部」と称する)26と、逐次確率比検定の結果の分散変化仮説の採択率を算定し、採択率が管理しきい値を超えたことにより異常を検出する仮説採択率判定部27とを備える。   As shown in FIG. 3, the monitoring processing unit 13A applies an output model of the output variable by applying the monitoring model created by the monitoring model creating unit 12A to the input / output variable data (hereinafter, referred to as an output estimated deviation calculating unit). (Referred to as “first output estimated deviation calculation unit”) and the estimated deviation calculated by the first output estimated deviation calculation unit 25 is applied to the probability ratio test to change the variance of the estimated deviation. Estimated deviation test processing unit (hereinafter referred to as “first estimated deviation test processing unit”) 26 for testing the hypothesis of whether or not, and the adoption rate of the variance change hypothesis as a result of the sequential probability ratio test is calculated and adopted A hypothesis adoption rate determination unit 27 that detects an abnormality when the rate exceeds the management threshold.

プラント監視装置1Aが実行する処理内容について概説すると、まず、プラントデータ入力・保存手段11は、監視対象となるプラント2の入力変数および出力変数の測定信号を取り込んで保存する(プラントデータ入力・保存ステップ)。ここで、プラントデータ入力・保存ステップにおいて、プラントデータ入力・保存手段11に保存される測定結果の時系列データが履歴データである。   The processing contents executed by the plant monitoring apparatus 1A will be briefly described. First, the plant data input / storage means 11 takes in and stores measurement signals of input variables and output variables of the plant 2 to be monitored (plant data input / storage). Step). Here, in the plant data input / storage step, the time series data of the measurement results stored in the plant data input / storage means 11 is the history data.

プラントデータ入力・保存ステップに続いて、監視モデル作成手段12Aは、プラントデータ入力・保存手段11に保存される履歴データを使ってプラント2の監視実行に必要な監視モデルを作成し保存する(監視モデル作成・保存ステップ)。   Following the plant data input / storing step, the monitoring model creating unit 12A creates and stores a monitoring model necessary for monitoring execution of the plant 2 using the history data stored in the plant data inputting / storing unit 11 (monitoring). Model creation / save step).

監視モデル作成・保存ステップの後、監視処理手段13Aは、プラントデータ入力・保存手段11によって入力された入出力変数データに監視モデル作成手段12Aに保存された監視モデルを適用してプラント2の異常の検出を試みる(監視処理ステップ)。監視処理手段13Aがプラント2の異常の有無の検出を行った結果は、監視処理手段13Aから表示装置3へ送られ(監視処理結果出力ステップ)、表示装置3の表示部に表示される(監視処理結果表示ステップ)。   After the monitoring model creating / storing step, the monitoring processing unit 13A applies the monitoring model stored in the monitoring model creating unit 12A to the input / output variable data input by the plant data input / storing unit 11, and the abnormality of the plant 2 is detected. Is detected (monitoring process step). The result of the monitoring processing means 13A detecting whether or not there is an abnormality in the plant 2 is sent from the monitoring processing means 13A to the display device 3 (monitoring processing result output step) and displayed on the display unit of the display device 3 (monitoring). Processing result display step).

次に、監視モデル作成手段12Aで実行される処理内容(監視モデル作成・保存ステップ)および監視処理手段13Aで実行される処理内容(監視処理ステップ)について、より詳細に説明する。   Next, the processing content (monitoring model creation / storing step) executed by the monitoring model creation unit 12A and the processing content (monitoring processing step) executed by the monitoring processing unit 13A will be described in more detail.

図4は、監視モデル作成手段12Aで実行される処理内容(監視モデル作成・保存ステップ)を示した処理フロー図である。   FIG. 4 is a process flow diagram showing the processing contents (monitoring model creation / storing step) executed by the monitoring model creation means 12A.

図4に示されるように、監視モデル作成・保存ステップは、参照データを設定するステップ(ステップS1)と、出力誤差モデルを同定するステップ(ステップS2)と、ステップS2で同定された出力誤差モデルによる推定偏差の特性評価を行うステップ(ステップS3)とを有する。   As shown in FIG. 4, the monitoring model creation / storing step includes a step of setting reference data (step S1), a step of identifying an output error model (step S2), and an output error model identified in step S2. (Step S3).

監視モデル作成・保存ステップ開始直後のステップS1では、例えばプラント2の設計情報や入力変数と出力変数の因果関係等のプラント2の動的および静的特性に関する事前知識を基に、履歴データのうちでプラントの運転条件の変化を直接的に表わす入力変数uと、その影響を受けて変化するプラントの出力変数zを定義し、これらの集合を参照データとして設定するとともに、参照データを出力誤差モデル同定部21において使用するモデル作成用データと、第1の推定偏差特性評価部22において使用する特性評価用データに分割する。参照データの設定は、ユーザが入力手段4から入力して設定することによって行われ、当該参照データの設定情報は、入力手段4から出力誤差モデル同定部21および第1の推定偏差特性評価部22に与えられる。   In step S1 immediately after the start of the monitoring model creation / storing step, for example, based on prior knowledge about the plant 2 design information and the dynamic and static characteristics of the plant 2 such as the causal relationship between input variables and output variables, Defines an input variable u that directly represents a change in the operating conditions of the plant and an output variable z of the plant that changes under the influence thereof, sets these sets as reference data, and sets the reference data as an output error model. The data is divided into model creation data used in the identification unit 21 and characteristic evaluation data used in the first estimated deviation characteristic evaluation unit 22. The setting of the reference data is performed by the user inputting and setting from the input unit 4, and the setting information of the reference data is input from the input unit 4 to the output error model identification unit 21 and the first estimated deviation characteristic evaluation unit 22. Given to.

ステップS1に続いて、ステップS2では、出力誤差モデル同定部21が、モデル作成用データを用いて、以下の式(1)で定義される出力誤差モデルを同定する。

Figure 0004922265
Subsequent to step S1, in step S2, the output error model identification unit 21 identifies an output error model defined by the following equation (1) using the model creation data.
Figure 0004922265

式(1)において、B(q)は以下の式(2)で定義される伝達関数、e(k)は白色雑音、kは時刻tを表わす。 In equation (1), B (q) is a transfer function defined by the following equation (2), e (k) is white noise, and k is time t k .

Figure 0004922265
Figure 0004922265

式(2)において、q−1はq−1u(k)≡u(k−1)のように定義される時間シフトオペレータである。このとき、次数nと遅れnを変えてモデルのパラメータを求めた中から、以下の式(3)で計算した最終予測誤差(FPE: Final prediction error)を最小とする次数と遅れ、およびパラメータの組を使用する。 In equation (2), q −1 is a time shift operator defined as q −1 u (k) ≡u (k−1). At this time, the order n b and delay n d from which to determine the parameters of the model by changing the following formula (3) with the calculated final prediction error (FPE: Final prediction error) the orders and delays to minimize, and Use a set of parameters.

Figure 0004922265
Figure 0004922265

上記式(3)において、Nはモデルの作成に用いた参照データの点数であり、Vは前記次数nと遅れnとパラメータ[b,・・・,bnb]を与えて計算した推定誤差の分散を表わす。 In the above formula (3), N is the number of the reference data used to create the model, V is calculated to give the degree n b and delay n d and the parameter [b 1, ···, b nb ] This represents the variance of the estimation error.

このようにして出力誤差モデルが同定されると、ステップS2に続いて、ステップS3で、推定偏差の特性評価部22が、ステップS2で同定された出力誤差モデルを特性評価用データに適用して、入力変数uの参照データから以下の式(4)で表わされる出力変数zの推定値を算出する。   When the output error model is identified in this way, following step S2, in step S3, the estimated deviation characteristic evaluation unit 22 applies the output error model identified in step S2 to the characteristic evaluation data. Then, an estimated value of the output variable z represented by the following equation (4) is calculated from the reference data of the input variable u.

Figure 0004922265
Figure 0004922265

ステップS3で出力変数の推定偏差dzの統計的特性値である平均および分散値が算出されると、監視モデル作成・保存ステップ(ステップS1〜ステップS3)は、全処理ステップを完了して終了となる。   When the mean and variance values, which are statistical characteristic values of the estimated deviation dz of the output variable, are calculated in step S3, the monitoring model creation / storing step (steps S1 to S3) is completed after completing all the processing steps. Become.

図5は、監視処理手段13Aで実行される処理内容(監視処理ステップ)を示した処理フロー図である。   FIG. 5 is a processing flow diagram showing the processing contents (monitoring processing step) executed by the monitoring processing means 13A.

図5に示されるように、監視処理ステップは、監視データを設定するステップ(ステップS11)と、出力誤差モデルによる推定偏差を算出するステップ(ステップS12)と、推定偏差dzの分散値の逐次確率比検定を行うステップ(ステップS13)と、仮説採択率を監視するステップ(ステップS14)とを有する。   As shown in FIG. 5, the monitoring processing step includes a step of setting monitoring data (step S11), a step of calculating an estimated deviation based on the output error model (step S12), and a sequential probability of a variance value of the estimated deviation dz. A step of performing a ratio test (step S13) and a step of monitoring a hypothesis acceptance rate (step S14) are included.

監視処理ステップ開始直後のステップS11では、監視実行開始後にプラントデータ入力・保存手段11によって入力されたプラントデータのうち、監視モデル作成手段12Aにおいて参照データを設定したのと同じ条件で監視に使用する入出力変数データ(以下、「監視データ」と称する。)を設定する。監視データの設定は、ユーザが入力手段4から入力して設定することによって行われ、当該監視データの設定情報は、入力手段4から第1の推定処理部25に与えられる。   In step S11 immediately after the start of the monitoring process step, the plant data input by the plant data input / save unit 11 after the start of the monitoring execution is used for monitoring under the same conditions as the reference data set in the monitoring model creating unit 12A. Input / output variable data (hereinafter referred to as “monitoring data”) is set. The setting of the monitoring data is performed by the user inputting and setting from the input unit 4, and the setting information of the monitoring data is given from the input unit 4 to the first estimation processing unit 25.

監視データの設定(ステップS11)が終わると、続くステップS12では、第1の推定処理部25が、ステップS11で設定された監視データに対して、監視モデル作成手段12Aで作成された出力誤差モデルを適用して、出力変数の推定偏差dzを算出する。   When the monitoring data setting (step S11) is completed, in the subsequent step S12, the first estimation processing unit 25 outputs the output error model created by the monitoring model creating means 12A for the monitoring data set in step S11. Is applied to calculate the estimated deviation dz of the output variable.

出力変数の推定偏差の算出(ステップS12)が終わると、続くステップS13では、第1の推定偏差検定処理部26が、ステップS12で算出された推定偏差dzに対して逐次確率比検定(Sequential probability ratio test)を適用し、次のような方法で推定偏差の分散値が変化したか否かを判定する。   When the calculation of the estimated deviation of the output variable (step S12) is completed, in the subsequent step S13, the first estimated deviation test processing unit 26 performs a sequential probability ratio test (Sequential probability test) on the estimated deviation dz calculated in step S12. (ratio test) is applied, and it is determined whether or not the variance value of the estimated deviation has changed by the following method.

より詳細には、推定偏差の時系列dZ={dz(i),i=1〜k}が第1の推定偏差特性評価部22で求めた正常状態の特性と同じ特性を持つとする仮説H、正常状態に対して分散値が増加したとする仮説H、および正常状態に対して分散値が減少したとする仮説Hの3つの間で、次式(5)で定義される対数尤度比を検定指標λ1,kおよびλ2,kとして算出し、これらの検定指標を予め与えた誤検出確率(False−alarm rate)αと検出失敗確率(Miss−alarm rate)βより後述する式(7)で定まるしきい値A、Bとそれぞれ比較することにより前記仮説を検定する。 More specifically, the hypothesis that the time series of estimated deviations dZ k = {dz (i), i = 1 to k} has the same characteristics as the characteristics of the normal state obtained by the first estimated deviation characteristic evaluation unit 22. H 0 , hypothesis H 1 that the variance value has increased with respect to the normal state, and hypothesis H 2 that the variance value has decreased with respect to the normal state are defined by the following equation (5): Log-likelihood ratios are calculated as test indices λ 1, k and λ 2, k , and these test indices are given in advance from a false detection probability (False-alarm rate) α and a detection failure probability (Miss-alarm rate) β. The hypothesis is tested by comparing with threshold values A and B determined by the equation (7) described later.

Figure 0004922265
Figure 0004922265

推定偏差dzが相互に独立な正規分布変数の場合、そしてこの仮定は監視モデルが妥当な場合にはほぼ成立し、上式(5)のλi,k(i=1,2)は下記の逐次式(6)のように変形される。 When the estimated deviation dz is a normally distributed variable independent from each other, and this assumption is almost valid when the monitoring model is valid, λ i, k (i = 1, 2) in the above equation (5) is It is transformed as the sequential formula (6).

Figure 0004922265
Figure 0004922265

Figure 0004922265
Figure 0004922265

推定偏差dzの分散値が変化したか否かの判定(ステップS13)が終わると、続くステップS14では、仮説採択率判定部27が予め与えられた時間幅内における分散変化仮説H(i=1,2)の採択率を算定し、算定した仮説採択率が管理しきい値を超えた場合に異常と判断することによって異常を検出する。 When the determination of whether or not the variance value of the estimated deviation dz has changed (step S13) is completed, in step S14, the hypothesis acceptance rate determination unit 27 performs a variance change hypothesis H i (i = i) within a predetermined time width. (1) and (2) are calculated, and when the calculated hypothesis selection rate exceeds the management threshold, an abnormality is detected.

推定偏差dzが相互に独立な正規分布変数の場合、正常状態において一定の時間幅内での分散変化仮説の採択率は二項分布に従い、同時間幅内での総採択回数と誤検出確率αで決まる。ここでは分散変化仮説の採択率に対して二項分布の分散値も考慮して決まる正常時の誤判定率を管理しきい値として設定し、監視を行う。   When the estimated deviation dz is a mutually independent normal distribution variable, the adoption rate of the variance change hypothesis within a certain time width in a normal state follows a binomial distribution, and the total number of adoptions and the false detection probability α within the same time width. Determined by. Here, monitoring is performed by setting a normal misjudgment rate determined by considering the variance value of the binomial distribution with respect to the adoption rate of the variance change hypothesis as a management threshold value.

仮説採択率を監視するステップ(ステップS14)が終わると、監視処理ステップ(ステップS11〜ステップS14)は、全処理ステップを完了して終了となる。   When the step of monitoring the hypothesis acceptance rate (step S14) is completed, the monitoring processing steps (step S11 to step S14) are completed after completing all the processing steps.

図6は、第1のプラント監視装置1Aの監視処理結果の一例を示す図であって、どの様にプラント2を監視するかを説明する説明図である。より詳細には、図6(a)〜(e)の何れの図も横軸をステップ数としたグラフであって、それぞれ縦軸を、図6(a)では出力(測定値(実線)28,推定値(破線)29)とし、図6(b)では入力とし、図6(c)では推定偏差とし、図6(d)では検定指標とし、図6(e)では仮説採択率として表わしたものである。また、図7は図6(a)の900ステップから1100ステップの範囲を拡大して示した部分拡大図である。   FIG. 6 is a diagram illustrating an example of a monitoring process result of the first plant monitoring apparatus 1A, and is an explanatory diagram for explaining how the plant 2 is monitored. More specifically, each of FIGS. 6A to 6E is a graph in which the horizontal axis indicates the number of steps, and the vertical axis indicates the output (measured value (solid line) 28 in FIG. 6A. , Estimated value (broken line) 29), input in FIG. 6B, estimated deviation in FIG. 6C, test index in FIG. 6D, and hypothesis acceptance rate in FIG. 6E. It is a thing. FIG. 7 is a partially enlarged view showing the range from 900 steps to 1100 steps in FIG.

図6に示される監視結果は、1〜999ステップまでは正常状態にあり、1000ステップ目以降でプラントの伝達ゲインが約20%低下した場合のデータに対する結果の一例である。   The monitoring result shown in FIG. 6 is an example of the result for the data when the 1st to 999th steps are in a normal state and the transfer gain of the plant is reduced by about 20% after the 1000th step.

図6(a)および図7に示される実線は測定値28であり、破線は図6(b)に示される入力変数を監視モデルに適用して式(4)で求めた推定値29である。図6(a)および図7を見ると測定値29を見ても1000ステップ目の前後で顕著な変化は見られないが、図6(c)に示されるように、推定偏差では1000ステップ辺りから大きな変化が現われており、図6(d)に示される検定指標によれば、分散増加仮説Hに対する検定指標λ1,kが同図中に破線で示されたしきい値Aを1000ステップ目以降で頻繁に超えている。ここで、前記誤検出確率αおよび検出失敗確率βはともに0.1%としている。 The solid line shown in FIGS. 6 (a) and 7 is the measured value 28, and the broken line is the estimated value 29 obtained by the equation (4) by applying the input variable shown in FIG. 6 (b) to the monitoring model. . 6A and 7, no significant change is seen before and after the 1000th step even when the measured value 29 is seen, but as shown in FIG. 6C, the estimated deviation is around 1000 steps. From FIG. 6D, the test index λ 1, k for the variance increase hypothesis H 1 has a threshold A indicated by a broken line of 1000 It is frequently exceeded after the first step. Here, both the false detection probability α and the detection failure probability β are set to 0.1%.

図6(e)に示される仮説採択率は、400ステップの時間幅を与えて算出した分散増加仮説Hの採択率であり、図6(e)によれば、仮説採択率でも同図に示された管理しきい値を1000点目以降で大きく超えており、異常が検出されている。 Hypothesis acceptance rate shown in FIG. 6 (e), 400 is a selection rate of the dispersion increases hypothesis H 1 which is calculated by giving the time width of the step, according to FIG. 6 (e), the in FIG even hypothesis acceptance rate The indicated management threshold value is greatly exceeded after the 1000th point, and an abnormality is detected.

本実施の形態によれば、プラントの運転条件が変化したために出力変数が変化した場合には監視モデルによる推定偏差には変化が現われないため、誤って異常と判定することはない。また、監視モデルに出力誤差モデルを用いているため、出力変数の測定信号にドリフトを生じた場合にも、推定偏差に変化が現われるため正しく検出することができ、これにより種々の異常の検出に対して適用可能である。   According to the present embodiment, when the output variable changes because the operating condition of the plant has changed, no change appears in the estimated deviation by the monitoring model, so that it is not erroneously determined to be abnormal. In addition, since an output error model is used for the monitoring model, even if a drift occurs in the measurement signal of the output variable, the estimated deviation changes, so that it can be detected correctly, thereby detecting various abnormalities. It is applicable to.

さらに、監視指標に対する管理しきい値を統計的特性を考慮して設定しているため、参照データに対する依存性が小さい。逐次確率比検定の結果は、設定した誤検出率に対応して正常状態においても一定の割合で分散変化仮説が採択されるが、一定時間幅内での採択率に対して統計的特性を考慮した管理しきい値を設定しているので、一過性のノイズによる誤検出は発生せず、監視結果の信頼性が高まる。   Furthermore, since the management threshold for the monitoring index is set in consideration of statistical characteristics, the dependency on the reference data is small. As for the result of the sequential probability ratio test, the variance change hypothesis is adopted at a constant rate in the normal state corresponding to the set false detection rate, but the statistical characteristics are taken into account for the adoption rate within a certain time range. Since the management threshold is set, no erroneous detection due to transient noise occurs, and the reliability of the monitoring result is improved.

[第2の実施の形態]
本発明の第2の実施の形態に係るプラント監視装置およびプラント監視方法について説明する。尚、プラント監視装置1Bと同一の構成要素には同一の符号を付し、重複する説明は省略する。
[Second Embodiment]
A plant monitoring apparatus and a plant monitoring method according to the second embodiment of the present invention will be described. In addition, the same code | symbol is attached | subjected to the component same as the plant monitoring apparatus 1B, and the overlapping description is abbreviate | omitted.

本発明の第2の実施の形態に係るプラント監視装置1Bの構成は、図1において、プラント監視装置1、監視モデル作成手段12および監視処理手段13を、それぞれ、プラント監視装置1B、監視モデル作成手段12Bおよび監視処理手段13Bと読み替えた構成である。すなわち、プラント監視装置1Bは、プラントデータ入力・保存手段11、監視モデル作成手段12Bおよび監視処理手段13Bを具備する。   The configuration of the plant monitoring apparatus 1B according to the second embodiment of the present invention is the same as that shown in FIG. 1 except that the plant monitoring apparatus 1, the monitoring model creating means 12 and the monitoring processing means 13 are respectively the plant monitoring apparatus 1B and the monitoring model creating. The configuration is replaced with the means 12B and the monitoring processing means 13B. That is, the plant monitoring apparatus 1B includes a plant data input / storage unit 11, a monitoring model creation unit 12B, and a monitoring processing unit 13B.

図8は、本発明の第2の実施の形態に係るプラント監視装置(以下、「第2の監視モデル作成手段」と称する。)1Bが具備する監視モデル作成手段12Bの構成を示した概略図である。   FIG. 8 is a schematic diagram showing the configuration of the monitoring model creating means 12B included in the plant monitoring apparatus (hereinafter referred to as “second monitoring model creating means”) 1B according to the second embodiment of the present invention. It is.

図8に示されるように、第2の監視モデル作成手段12Bは、主成分分析を行い固有値の一番大きい方からの累積寄与率が予め設定した値以上となる個数r個までの主成分を選択し対応するr個の固有ベクトルを列に持つ負荷行列を監視モデルとして作成する第1の主成分分析部31と、第1の主成分分析部31が作成した監視モデルにより生成される推定偏差の特性を評価する第2の推定偏差特性評価部32とを備える。   As shown in FIG. 8, the second monitoring model creating means 12B performs principal component analysis and displays up to r principal components whose cumulative contribution rate from the largest eigenvalue is equal to or greater than a preset value. A first principal component analyzing unit 31 that creates a load matrix having selected r eigenvectors in a column as a monitoring model, and an estimated deviation generated by the monitoring model created by the first principal component analyzing unit 31 And a second estimated deviation characteristic evaluation unit 32 for evaluating the characteristic.

図9は、プラント監視装置1Bに具備される監視処理手段13B(以下、「第2の監視処理手段」と称する。)の構成を示した概略図である。   FIG. 9 is a schematic diagram showing the configuration of the monitoring processing means 13B (hereinafter referred to as “second monitoring processing means”) provided in the plant monitoring apparatus 1B.

第2の監視処理手段13Bは、入出力変数データに前記監視モデル作成手段12Bで作成された監視モデルを適用して入出力変数に相当する監視変数の推定偏差を算出する第2の出力推定偏差算出部35と、前記推定偏差に対して逐次確率比検定を適用して推定偏差の分散値が変化したか否かの仮説を検定する第2の推定偏差検定処理部36と、前記逐次確率比検定の結果の分散変化仮説の採択率を算定し、採択率が管理しきい値を超えた状態を異常と判定することによって異常を検出する仮説採択率判定部27とを備える。   The second monitoring processing means 13B applies the monitoring model created by the monitoring model creating means 12B to the input / output variable data to calculate the estimated deviation of the monitoring variable corresponding to the input / output variable. A calculating unit 35; a second estimated deviation test processing unit 36 for applying a sequential probability ratio test to the estimated deviation to test a hypothesis as to whether or not a variance value of the estimated deviation has changed; and the sequential probability ratio A hypothesis adoption rate determination unit 27 that calculates an acceptance rate of the variance change hypothesis as a result of the test and detects an abnormality by determining that the acceptance rate exceeds a management threshold value as an abnormality.

プラント監視装置1Bが実行する処理内容は、プラント監視装置1Aで実行される処理内容に対して、作成され適用される監視モデルが異なるものの、本質的な処理ステップについては同様である。すなわち、プラント監視装置1Bでは、まず、プラントデータ入力・保存ステップが実行され、続いて、監視モデル作成・保存ステップが実行され、当該処理ステップでは、プラントデータ入力・保存手段11に保存される履歴データを使ってプラント2の監視実行に必要な監視モデルとなる負荷行列が第2の監視モデル作成手段12Bによって作成され保存される。   The processing content executed by the plant monitoring device 1B is the same as the processing content executed by the plant monitoring device 1A, although the processing model created and applied is different, but the essential processing steps are the same. That is, in the plant monitoring apparatus 1B, first, a plant data input / storage step is executed, and subsequently, a monitoring model creation / storage step is executed. In this processing step, a history stored in the plant data input / storage means 11 A load matrix serving as a monitoring model necessary for the monitoring execution of the plant 2 is created and stored by the second monitoring model creating means 12B using the data.

監視モデル作成・保存ステップに続いては、監視処理ステップが実行され、当該処理ステップでは、第2の監視処理手段13Bによって、第2の監視モデル作成手段12Bに保存された監視モデルを適用したプラント2の異常の検出がなされる。監視処理ステップ後は、監視処理結果出力ステップおよび監視処理結果表示ステップが実行され、第2の監視処理手段13Bがプラント2の異常の有無の検出を行った結果が表示装置3の表示部に表示される。   Following the monitoring model creation / storage step, a monitoring processing step is executed, and in this processing step, a plant to which the monitoring model stored in the second monitoring model creation means 12B is applied by the second monitoring processing means 13B. Two abnormalities are detected. After the monitoring processing step, the monitoring processing result output step and the monitoring processing result display step are executed, and the result of the second monitoring processing means 13B detecting whether there is an abnormality in the plant 2 is displayed on the display unit of the display device 3. Is done.

次に、第2の監視モデル作成手段12Bで実行される処理内容(以下、「第2の監視モデル作成・保存ステップ」と称する。)および第2の監視処理手段13Bで実行される処理内容(「第2の監視処理ステップ」と称する。)について、より詳細に説明する。   Next, the processing contents executed by the second monitoring model creation means 12B (hereinafter referred to as “second monitoring model creation / storage step”) and the processing contents executed by the second monitoring processing means 13B ( The “second monitoring process step” will be described in more detail.

図10は、第2の監視モデル作成手段12Bで実行される第2の監視モデル作成・保存ステップを示した処理フロー図である。   FIG. 10 is a process flow diagram showing the second monitoring model creation / storing step executed by the second monitoring model creation means 12B.

図10に示されるように、第2の監視モデル作成・保存ステップは、参照データを設定するステップ(ステップS21)と、主成分分析をするステップ(ステップS22)と寄与率の大きな主成分に対する負荷行列を構成するステップ(ステップS23)と、ステップS23で構成された負荷行列(監視モデル)を適用した場合における推定偏差を算出するステップ(ステップS24)と、ステップS24で算出された推定偏差の特性評価を行うステップ(ステップS25)とを有する。   As shown in FIG. 10, the second monitoring model creation / storing step includes a step of setting reference data (step S21), a step of performing principal component analysis (step S22), and a load on the principal component having a large contribution rate. A step of forming a matrix (step S23), a step of calculating an estimated deviation when the load matrix (monitoring model) configured in step S23 is applied (step S24), and a characteristic of the estimated deviation calculated in step S24 And a step of performing an evaluation (step S25).

第2の監視モデル作成・保存ステップは、開始直後のステップS21では、プラント2の動的および静的特性に関する事前知識を基に、履歴データのうちでプラントの運転条件の変化を直接的に表わす変数およびその影響を受けて変化する変数を含む監視変数xを定義し、これらの集合を参照データとして設定するとともに、参照データを第1の主成分分析部31において使用するモデル作成用データと、推定偏差の特性評価部32において使用する特性評価用データXに分割する。参照データの設定は、ユーザが入力手段4から入力して設定することによって行われ、当該参照データの設定情報は、入力手段4から出力第1の主成分分析部31および第2の推定偏差特性評価部32に与えられる。   In the step S21 immediately after the start of the second monitoring model creation / storing step, the change in the operating condition of the plant is directly expressed in the history data based on the prior knowledge regarding the dynamic and static characteristics of the plant 2. Defining a monitoring variable x including a variable and a variable that is affected by the variable, setting these sets as reference data, and data for creating a model for using the reference data in the first principal component analysis unit 31; This is divided into characteristic evaluation data X used in the estimated deviation characteristic evaluation unit 32. The setting of the reference data is performed by the user inputting and setting from the input unit 4, and the setting information of the reference data is output from the input unit 4 to the output first principal component analysis unit 31 and the second estimated deviation characteristic. It is given to the evaluation unit 32.

ステップS21に続いて、ステップS22では、第1の主成分分析部31が、モデル作成用データを用いて、主成分分析を行う。そして、ステップS23では、第1の主成分分析部31が、固有値の一番大きい方からの累積寄与率、すなわち、順に固有値を加算した値が全固有値の総和に占める割合が予め設定した値以上となる個数r個までの主成分を選択し、対応するr個の固有ベクトルを列に持つ負荷行列Aを構築する。ステップS23で構築された負荷行列Aがプラント監視装置1Bで適用される監視用モデルとなる。   Subsequent to step S21, in step S22, the first principal component analysis unit 31 performs principal component analysis using the model creation data. In step S23, the first principal component analysis unit 31 determines that the cumulative contribution ratio from the largest eigenvalue, that is, the ratio of the value obtained by adding eigenvalues in order to the total sum of all eigenvalues is equal to or greater than a preset value. Up to r principal components, and a load matrix A having r corresponding eigenvectors in a column is constructed. The load matrix A constructed in step S23 becomes a monitoring model applied by the plant monitoring apparatus 1B.

Figure 0004922265
Figure 0004922265

ステップS24に続いて、ステップS25では、第2の推定偏差特性評価部32が、ステップS24で算出された推定偏差の統計的特性値である平均値と分散値を算出する。これらの特性値は第2の監視処理手段13Bの逐次確率比検定の処理に用いられる。ステップS25で推定偏差dXの統計的特性値である平均および分散値が算出されると、第2の監視モデル作成・保存ステップ(ステップS21〜ステップS25)は、全処理ステップを完了して終了となる。   Subsequent to step S24, in step S25, the second estimated deviation characteristic evaluation unit 32 calculates an average value and a variance value, which are statistical characteristic values of the estimated deviation calculated in step S24. These characteristic values are used for the sequential probability ratio test processing of the second monitoring processing means 13B. When the mean and variance values, which are statistical characteristic values of the estimated deviation dX, are calculated in step S25, the second monitoring model creation / storing step (steps S21 to S25) completes all processing steps and ends. Become.

図11は、第2の監視処理手段13Bで実行される第2の監視処理ステップを示した処理フロー図である。   FIG. 11 is a process flow diagram showing the second monitoring processing step executed by the second monitoring processing means 13B.

図11に示されるように、第2の監視処理ステップは、監視データを設定するステップ(ステップS31)と、負荷行列による推定偏差を算出するステップ(ステップS32)と、推定偏差dXの分散値の逐次確率比検定を行うステップ(ステップS33)と、仮説採択率を監視するステップ(ステップS14)とを有する。   As shown in FIG. 11, the second monitoring processing step includes a step of setting monitoring data (step S31), a step of calculating an estimated deviation based on a load matrix (step S32), and a variance value of the estimated deviation dX. A step of performing a sequential probability ratio test (step S33) and a step of monitoring a hypothesis acceptance rate (step S14).

監視処理ステップ開始直後のステップS31では、監視実行開始後にプラントデータ入力・保存手段11により入力されたプラントデータのうち、前記監視モデル作成手段2において参照データを設定したのと同じ監視変数に対する監視データを設定する。監視データの設定は、ユーザが入力手段4から入力して設定することによって行われ、当該監視データの設定情報は、入力手段4から第2の推定処理部35に与えられる。   In step S31 immediately after the start of the monitoring process step, among the plant data input by the plant data input / save unit 11 after the start of the monitoring execution, the monitoring data for the same monitoring variable for which the reference data is set in the monitoring model creation unit 2 Set. The setting of the monitoring data is performed by the user inputting and setting from the input unit 4, and the setting information of the monitoring data is given from the input unit 4 to the second estimation processing unit 35.

監視データの設定(ステップS31)が終わると、続くステップS32では、第2の出力推定算出部35が、監視データに対して、第2の監視モデル作成手段12Bによって作成された監視モデル(負荷行列)を適用して監視変数の推定偏差dXを算出する。   When the monitoring data setting (step S31) is completed, in the subsequent step S32, the second output estimation calculation unit 35 creates the monitoring model (load matrix) created by the second monitoring model creation means 12B for the monitoring data. ) To calculate the estimated deviation dX of the monitored variable.

監視変数の推定偏差の算出(ステップS32)が終わると、続くステップS33では、第2の推定偏差検定処理部36が、ステップS32で算出された推定偏差dXに対して逐次確率比検定を適用し、推定偏差の分散値が変化したか否かを判定する。判定手法は、ステップS13の場合と実質的に同様である。   When the calculation of the estimated deviation of the monitoring variable (step S32) is completed, in the subsequent step S33, the second estimated deviation test processing unit 36 applies the sequential probability ratio test to the estimated deviation dX calculated in step S32. Then, it is determined whether or not the variance value of the estimated deviation has changed. The determination method is substantially the same as in step S13.

推定偏差dXの分散値が変化したか否かの判定(ステップS33)が終わると、続くステップS14では、仮説採択率判定部27が予め与えられた時間幅内における分散変化仮説H(i=1,2)の採択率を算定し、算定した仮説採択率が管理しきい値を超えた場合に異常と判断することによって異常を検出する。仮説採択率を監視するステップ(ステップS14)が終わると、第2の監視処理ステップ(ステップS31〜ステップS14)は、全処理ステップを完了して終了となる。 When the determination of whether or not the variance value of the estimated deviation dX has changed (step S33) is completed, in step S14, the hypothesis acceptance rate determination unit 27 performs a variance change hypothesis H i (i = i) within a predetermined time width. (1) and (2) are calculated, and when the calculated hypothesis selection rate exceeds the management threshold, an abnormality is detected. When the step of monitoring the hypothesis acceptance rate (step S14) is completed, the second monitoring processing steps (step S31 to step S14) are completed after completing all the processing steps.

図12は、第2のプラント監視装置1Bが、どの様にプラント2を監視するかを説明する説明図であって、第1のプラント監視装置1Aの監視処理結果の一例を示した図6に相当する図である。   FIG. 12 is an explanatory diagram for explaining how the second plant monitoring device 1B monitors the plant 2. FIG. 6 shows an example of the monitoring processing result of the first plant monitoring device 1A. It is an equivalent figure.

より詳細には、図12(a)〜(e)の何れの図も横軸をステップ数としたグラフであって、それぞれ縦軸を、図12(a)では、プラント2の運転条件の変化の影響を受けて変化する出力相当の変数zとし、図12(b)ではプラント2の運転条件の変化を直接表わす入力相当の変数uとし、図12(c)では推定偏差とし、図12(d)では検定指標とし、図12(e)では仮説採択率として表わしたものである。   More specifically, each of FIGS. 12A to 12E is a graph in which the horizontal axis indicates the number of steps, and the vertical axis indicates the change in operating conditions of the plant 2 in FIG. The variable z corresponding to the output that changes due to the influence of FIG. 12B, the variable u corresponding to the input that directly represents the change in the operating condition of the plant 2 in FIG. 12B, the estimated deviation in FIG. In FIG. 12 (d), it is expressed as a test index, and in FIG. 12 (e), it is expressed as a hypothesis acceptance rate.

図12に示される例では監視変数xとして

Figure 0004922265
In the example shown in FIG.
Figure 0004922265

図12で示される例の場合、2つの主成分の累積寄与率は99%以上となった。図12(c)乃至(e)においても、プラント2の出力変数に相当する変数zの推定偏差dzには異常が発生した1000ステップ目以降で大きな変化が現われている。特に図12(d)に示される推定偏差dzの分散増加仮説に対する検定指標は1000ステップ目以降で非常に大きな値を示している。図12(e)に示される仮説採択率は、400ステップの時間幅を与えて算出した分散増加仮説の採択率であり、同図中に破線で示された管理しきい値を1000ステップ目以降で大きく超えており、これにより異常が検出されている。   In the case of the example shown in FIG. 12, the cumulative contribution ratio of the two main components is 99% or more. 12C to 12E, a large change appears in the estimated deviation dz of the variable z corresponding to the output variable of the plant 2 after the 1000th step when the abnormality occurs. In particular, the test index for the variance increase hypothesis of the estimated deviation dz shown in FIG. 12D shows a very large value after the 1000th step. The hypothesis adoption rate shown in FIG. 12 (e) is the adoption rate of the variance increase hypothesis calculated by giving a time width of 400 steps, and the management threshold indicated by a broken line in the figure is the 1000th step and after. In this case, an abnormality is detected.

本実施の形態によれば、プラントの運転条件が変化したために出力変数が変化した場合には監視モデルによる推定が良好に行われるために推定偏差には変化が現われず、従って誤って異常と判定することはない。   According to the present embodiment, when the output variable changes due to a change in the operating conditions of the plant, the estimation by the monitoring model is performed well, so the estimated deviation does not appear, and thus it is erroneously determined as abnormal. Never do.

また、監視変数をプラントの入出力変数に相当する変数より構成することにより、出力変数相当の変数の測定信号にドリフトを生じた場合には推定偏差に変化が現われるため、正しく異常として検出することができる。このように種々の異常に対して適用が可能である。   In addition, by constructing the monitoring variables from variables corresponding to plant input / output variables, if the measurement signal of the variable corresponding to the output variable drifts, the estimated deviation will change. Can do. Thus, it can be applied to various abnormalities.

さらに、監視指標に対する管理しきい値を統計的特性を考慮して設定しているため、参照データに対する異常検出性能の依存性が小さい。また、逐次確率比検定の結果から一定時間幅内での採択率を求め、その統計的特性を考慮した管理しきい値を設定して監視しているために、一過性のノイズによる誤検出は発生せず、監視結果の信頼性が高い。このように、本実施の形態においても、第1の実施の形態と同様の効果を奏し得る。   Furthermore, since the management threshold for the monitoring index is set in consideration of statistical characteristics, the dependency of the abnormality detection performance on the reference data is small. In addition, the adoption rate within a certain time range is obtained from the results of the sequential probability ratio test, and monitoring is performed by setting a management threshold considering its statistical characteristics. The monitoring results are highly reliable. As described above, also in this embodiment, the same effect as that of the first embodiment can be obtained.

[第3の実施の形態]
本発明の第3の実施の形態に係るプラント監視装置およびプラント監視方法について説明する。尚、プラント監視装置1A,1Bと同一の構成要素には同一の符号を付し、重複する説明は省略する。
[Third Embodiment]
A plant monitoring apparatus and a plant monitoring method according to a third embodiment of the present invention will be described. In addition, the same code | symbol is attached | subjected to the component same as plant monitoring apparatus 1A, 1B, and the overlapping description is abbreviate | omitted.

本発明の第3の実施の形態に係るプラント監視装置1Cの構成は、図1において、プラント監視装置1、監視モデル作成手段12および監視処理手段13を、それぞれ、プラント監視装置1C、監視モデル作成手段12Cおよび監視処理手段13Cと読み替えた構成である。すなわち、プラント監視装置1Cは、プラントデータ入力・保存手段11、監視モデル作成手段12Cおよび監視処理手段13Cを具備する。   The configuration of the plant monitoring apparatus 1C according to the third embodiment of the present invention is the same as that shown in FIG. 1 except that the plant monitoring apparatus 1, the monitoring model creating means 12 and the monitoring processing means 13 are respectively the plant monitoring apparatus 1C and the monitoring model creating. The configuration is replaced with the means 12C and the monitoring processing means 13C. That is, the plant monitoring apparatus 1C includes a plant data input / storage unit 11, a monitoring model creation unit 12C, and a monitoring processing unit 13C.

図13は、本発明の第3の実施の形態に係るプラント監視装置1Cが具備する監視モデル作成手段(以下、「第3の監視モデル作成手段」と称する。)12Cの構成を示した概略図である。   FIG. 13 is a schematic diagram showing the configuration of a monitoring model creation means (hereinafter referred to as “third monitoring model creation means”) 12C included in the plant monitoring apparatus 1C according to the third embodiment of the present invention. It is.

図13に示されるように、監視モデル作成手段12Cは、主成分分析を行い固有値の一番小さい方からの累積寄与率が予め設定した値以下となる個数s個までの主成分を選択し、対応するs個の固有ベクトルを列に持つ負荷行列を監視モデルとして作成する第2の主成分分析部41と、第2の主成分分析部41が作成した監視モデルにより生成される主成分得点の特性評価を行う主成分得点特性評価部42を備える。   As shown in FIG. 13, the monitoring model creation means 12C performs principal component analysis, selects up to s principal components whose cumulative contribution rate from the smallest eigenvalue is equal to or less than a preset value, A second principal component analysis unit 41 that creates a load matrix having columns of corresponding s eigenvectors as a monitoring model, and characteristics of principal component scores generated by the monitoring model created by the second principal component analysis unit 41 A principal component score characteristic evaluation unit 42 that performs evaluation is provided.

図14は、プラント監視装置1Cに具備される監視処理手段13C(以下、「第3の監視処理手段」と称する。)の構成を示した概略図である。   FIG. 14 is a schematic diagram showing the configuration of the monitoring processing means 13C (hereinafter referred to as “third monitoring processing means”) provided in the plant monitoring apparatus 1C.

監視処理手段13Cは、監視変数のデータに監視モデル作成手段12Cで作成された監視モデルを適用して主成分得点を算出する主成分得点算出部45と、主成分得点算出部45が算出した主成分得点に対して逐次確率比検定を適用して前記主成分得点の分散値が変化したか否かの仮説を検定する主成分得点検定処理部46と、前記逐次確率比検定の結果の分散変化仮説の採択率を算定し、採択率が管理しきい値を超えた状態を異常と判定することによって異常を検出する仮説採択率判定部27とを備える。   The monitoring processing unit 13C applies the monitoring model created by the monitoring model creation unit 12C to the monitoring variable data to calculate the principal component score, and the main component score calculation unit 45 calculates the principal component score. Principal component score test processing unit 46 that tests the hypothesis as to whether or not the variance value of the principal component score has changed by applying a sequential probability ratio test to the component score, and the variance change of the result of the sequential probability ratio test A hypothesis adoption rate determination unit 27 that detects the abnormality by calculating the hypothesis adoption rate and determining that the state in which the acceptance rate exceeds the management threshold value is abnormal.

プラント監視装置1Cが実行する処理内容は、プラント監視装置1Bで実行される処理内容に対して、作成され適用される監視モデルが異なるものの、本質的な処理ステップについては同様である。すなわち、プラント監視装置1Cでは、まず、プラントデータ入力・保存ステップが実行され、続いて、監視モデル作成・保存ステップが実行され、当該処理ステップでは、プラントデータ入力・保存手段11に保存される履歴データを使ってプラント2の監視実行に必要な監視モデルとなる負荷行列が第3の監視モデル作成手段12Cによって作成され保存される。   The processing contents executed by the plant monitoring apparatus 1C are the same as the processing contents executed by the plant monitoring apparatus 1B, although the processing models created and applied are different, but the essential processing steps are the same. That is, in the plant monitoring apparatus 1C, first, a plant data input / storing step is executed, and subsequently, a monitoring model creation / storing step is executed. In this processing step, a history stored in the plant data input / storing means 11 Using the data, a load matrix serving as a monitoring model necessary for the monitoring execution of the plant 2 is created and stored by the third monitoring model creating means 12C.

監視モデル作成・保存ステップに続いては、監視処理ステップが実行され、当該処理ステップでは、第3の監視処理手段13Cによって、第3の監視モデル作成手段12Cに保存された監視モデルを適用したプラント2の異常の検出がなされる。監視処理ステップ後は、監視処理結果出力ステップおよび監視処理結果表示ステップが実行され、第3の監視処理手段13Cがプラント2の異常の有無の検出を行った結果が表示装置3の表示部に表示される。   Subsequent to the monitoring model creation / storage step, a monitoring processing step is executed. In this processing step, a plant to which the monitoring model stored in the third monitoring model creation means 12C is applied by the third monitoring processing means 13C. Two abnormalities are detected. After the monitoring processing step, a monitoring processing result output step and a monitoring processing result display step are executed, and the result of detection of the presence or absence of abnormality of the plant 2 by the third monitoring processing means 13C is displayed on the display unit of the display device 3. Is done.

次に、第3の監視モデル作成手段12Cで実行される処理内容(以下、「第3の監視モデル作成・保存ステップ」と称する。)および第3の監視処理手段13Cで実行される処理内容(「第3の監視処理ステップ」と称する。)について、より詳細に説明する。   Next, the processing contents executed by the third monitoring model creation means 12C (hereinafter referred to as “third monitoring model creation / storing step”) and the processing contents executed by the third monitoring processing means 13C ( The “third monitoring processing step” will be described in more detail.

図15は、第3の監視モデル作成手段12Cで実行される第3の監視モデル作成・保存ステップを示した処理フロー図である。   FIG. 15 is a process flow diagram showing a third monitoring model creation / storing step executed by the third monitoring model creation means 12C.

図15に示されるように、第3の監視モデル作成・保存ステップは、参照データを設定するステップ(ステップS21)と、主成分分析をするステップ(ステップS22)と寄与率の小さな主成分に対する負荷行列を構成するステップ(ステップS43)と、ステップS43で構成された負荷行列(監視モデル)を適用した場合における主成分得点を算出するステップ(ステップS44)と、ステップS44で算出された主成分得点の特性評価を行うステップ(ステップS45)とを有する。   As shown in FIG. 15, the third monitoring model creation / storing step includes a step of setting reference data (step S21), a step of performing principal component analysis (step S22), and a load on a principal component having a small contribution rate. A step of constructing a matrix (step S43), a step of calculating principal component scores when the load matrix (monitoring model) constructed in step S43 is applied (step S44), and a principal component score calculated in step S44 (Step S45).

第3の監視モデル作成・保存ステップでは、まず、第2の監視モデル作成・保存ステップと同様に、ステップS21およびステップS22が実行される。ステップS22の主成分分析が終わると、続くステップS43で、第2の主成分分析部41が、ステップS22で行われた主成分分析の結果に基づき、固有値の一番小さい方からの累積寄与率が予め設定した値以下となる個数s個までの主成分を選択し、対応するs個の固有ベクトルを列に持つ負荷行列Aを構成する。ステップS43で構築された負荷行列Aがプラント監視装置1Cで適用される監視用モデルとなる。   In the third monitoring model creation / storing step, first, similarly to the second monitoring model creating / storing step, steps S21 and S22 are executed. When the principal component analysis of step S22 is completed, in the subsequent step S43, the second principal component analysis unit 41, based on the result of the principal component analysis performed in step S22, the cumulative contribution rate from the smallest eigenvalue. Select up to s principal components that are equal to or less than a preset value, and construct a load matrix A having corresponding s eigenvectors in columns. The load matrix A constructed in step S43 is a monitoring model applied by the plant monitoring apparatus 1C.

ステップS43に続いて、ステップS44では、主成分得点検定処理部46が、ステップS43で構築された負荷行列AをステップS21で設定した特性評価用データXに適用し、以下の式(10)で与えられる主成分得点Tを算出する。

Figure 0004922265
Subsequent to step S43, in step S44, the principal component score test processing unit 46 applies the load matrix A constructed in step S43 to the characteristic evaluation data X set in step S21. The given principal component score T is calculated.
Figure 0004922265

ステップS44に続いて、ステップS45では、主成分得点検定処理部46が、ステップS44で算出された主成分得点Tの統計的特性値である平均値と分散値を算出する。これらの特性値は第3の監視処理手段13Cの逐次確率比検定の処理に用いられる。   Subsequent to step S44, in step S45, the principal component score test processing unit 46 calculates an average value and a variance value which are statistical characteristic values of the principal component score T calculated in step S44. These characteristic values are used for the sequential probability ratio test processing of the third monitoring processing means 13C.

ステップS45で主成分得点Tの統計的特性値である平均および分散値が算出されると、第3の監視モデル作成・保存ステップ(ステップS21〜ステップS45)は、全処理ステップを完了して終了となる。 When the mean and variance values, which are statistical characteristic values of the principal component score T, are calculated in step S45, the third monitoring model creation / storing step (steps S21 to S45) is completed after completing all the processing steps. It becomes.

図16は、第3の監視処理手段13Cで実行される第3の監視処理ステップを示した処理フロー図である。   FIG. 16 is a process flow diagram showing the third monitoring processing step executed by the third monitoring processing means 13C.

図16に示されるように、第3の監視処理ステップは、監視データを設定するステップ(ステップS31)と、負荷行列による主成分得点を算出するステップ(ステップS52)と、主成分得点分散値の逐次確率比検定を行うステップ(ステップS53)と、仮説採択率を監視するステップ(ステップS14)とを有する。   As shown in FIG. 16, the third monitoring processing step includes a step of setting monitoring data (step S31), a step of calculating principal component scores based on the load matrix (step S52), and a principal component score variance value. A step of performing a sequential probability ratio test (step S53) and a step of monitoring a hypothesis acceptance rate (step S14).

第3の監視処理ステップでは、まず、第2の監視処理ステップと同様に、ステップS31が実行される。監視データの設定(ステップS31)が終わると、続くステップS52では、主成分得点算出部45が、監視データに対して前記監視モデル作成手段12Cで作成された負荷行列を適用して主成分得点を算出する。   In the third monitoring process step, step S31 is first executed as in the second monitoring process step. When the monitoring data setting (step S31) is completed, in the subsequent step S52, the principal component score calculation unit 45 applies the load matrix created by the monitoring model creation means 12C to the monitoring data to obtain the principal component score. calculate.

負荷行列による主成分得点の算出(ステップS52)が終わると、続くステップS53では、主成分得点検定処理部46が、ステップS52で算出された主成分得点に対して逐次確率比検定を適用し、主成分得点の分散値が変化したか否かを判定する。主成分得点の分散値が変化したか否かの判定(ステップS53)が終わると、続いてステップS14が実行され、ステップS14が終わると、第3の監視処理ステップ(ステップS31〜ステップS14)は、全処理ステップを完了して終了となる。   When the calculation of the principal component score using the load matrix (step S52) ends, in the subsequent step S53, the principal component score test processing unit 46 applies the sequential probability ratio test to the principal component score calculated in step S52, It is determined whether or not the variance value of the principal component score has changed. When the determination of whether or not the variance of the principal component score has changed (step S53) is completed, step S14 is subsequently executed. When step S14 is completed, the third monitoring processing steps (steps S31 to S14) are performed. Then, all processing steps are completed and the process ends.

第2のプラント監視装置1Bが正常時の変数間の相関関係では説明の付けられない、新たな成分が異常の影響により発生したことを検出するのに対し、第3のプラント監視装置1Cは、正常時にはほとんど認められないほど小さかった相関成分が異常の発生によって増大したことを検出するものといえる。   Whereas the second plant monitoring device 1B detects that a new component has occurred due to the influence of an abnormality, which cannot be explained by the correlation between variables during normal operation, the third plant monitoring device 1C It can be said that it detects that the correlation component, which was so small that it was hardly recognized at normal time, increased due to the occurrence of an abnormality.

図17は、第3のプラント監視装置1Cが、どの様にプラント2を監視するかを説明する説明図であって、第1のプラント監視装置1Aの監視処理結果の一例を示した図6や第2のプラント監視装置1Bの監視処理結果の一例を示した図12に相当する図である。   FIG. 17 is an explanatory diagram for explaining how the third plant monitoring device 1C monitors the plant 2, and FIG. 6 shows an example of the monitoring processing result of the first plant monitoring device 1A. It is a figure equivalent to FIG. 12 which showed an example of the monitoring process result of the 2nd plant monitoring apparatus 1B.

より詳細には、図17(a)〜(e)の何れの図も横軸をステップ数としたグラフであって、それぞれ縦軸を、図17(a)では、プラント2の運転条件の変化の影響を受けて変化する出力相当の変数zとし、図17(b)ではプラント2の運転条件の変化を直接表わす入力相当の変数uとし、図17(c)では主成分得点とし、図17(d)では検定指標とし、図17(e)では仮説採択率として表わしたものである。   More specifically, each of the diagrams of FIGS. 17A to 17E is a graph in which the horizontal axis indicates the number of steps, and the vertical axis indicates the change in the operating condition of the plant 2 in FIG. 17 is a variable z corresponding to the output that changes under the influence of FIG. 17B, a variable u corresponding to the input that directly represents a change in the operating condition of the plant 2 in FIG. 17B, a principal component score in FIG. In (d), it is set as a test index, and in FIG. 17 (e), it is expressed as a hypothesis acceptance rate.

尚、監視変数xは図12の場合と同様に式(9)により構成した例であって、最小固有値に対応する固有ベクトルより負荷行列を構成している。図12で示される例の場合には、2つの主成分の累積寄与率は99%以上となったが、図17に示される例では、累積寄与率は1%以下のため、図17(a)および図17(b)に示される推定値29は、測定値28とは大きく異なる(乖離している)。   Note that the monitoring variable x is an example configured by Expression (9) as in the case of FIG. 12, and a load matrix is configured from the eigenvector corresponding to the minimum eigenvalue. In the example shown in FIG. 12, the cumulative contribution ratio of the two principal components is 99% or more. However, in the example shown in FIG. 17, the cumulative contribution ratio is 1% or less. ) And the estimated value 29 shown in FIG. 17 (b) are significantly different from (deviated from) the measured value 28.

図17(c)に示される主成分得点Tには異常が発生した1000ステップ目以降で大きな変化が現われており、図17(d)に示される主成分得点の分散増加仮説に対する検定指標は1000ステップ目以降で非常に大きな値を示している。また、図17(e)に示される仮説採択率は、400ステップの時間幅を与えて算出した分散増加仮説の採択率であり、同図中に破線で示された管理しきい値を1000ステップ目以降で大きく超えており、これにより異常が検出されている。   The principal component score T shown in FIG. 17 (c) shows a large change after the 1000th step when the abnormality occurred, and the test index for the variance increase hypothesis of the principal component score shown in FIG. Very large values are shown after the step. Further, the hypothesis adoption rate shown in FIG. 17 (e) is the adoption rate of the variance increase hypothesis calculated by giving a time width of 400 steps, and the management threshold indicated by the broken line in the figure is 1000 steps. This is greatly exceeded after the first eye, and an abnormality is detected.

本実施の形態によれば、監視変数をプラントの入出力変数に相当する変数によって構成することで、出力変数相当の変数の測定信号にドリフトを生じた場合にも推定偏差に変化が現われるため、正しく検出することができ、種々の異常に対して適用可能である。   According to the present embodiment, by configuring the monitoring variable by a variable corresponding to the input / output variable of the plant, a change appears in the estimated deviation even when a drift occurs in the measurement signal of the variable corresponding to the output variable. It can be detected correctly and can be applied to various abnormalities.

また、監視指標に対する管理しきい値を統計的特性を考慮して設定しているため、参照データに対する依存性が小さい。さらに、逐次確率比検定の結果から一定時間幅内での採択率を求め、その統計的特性を考慮した管理しきい値を設定して監視しているために、一過性のノイズによる誤検出は発生せず、監視結果の信頼性が高い。このように、本実施の形態においても、第1の実施の形態と同様の効果を奏し得る。   In addition, since the management threshold for the monitoring index is set in consideration of statistical characteristics, the dependence on the reference data is small. In addition, the adoption rate within a certain time range is obtained from the results of the sequential probability ratio test, and monitoring is performed by setting a management threshold considering its statistical characteristics. The monitoring results are highly reliable. As described above, also in this embodiment, the same effect as that of the first embodiment can be obtained.

[第4の実施の形態]
本発明の第4の実施の形態に係るプラント監視装置およびプラント監視方法について説明する。尚、プラント監視装置1A,1B,1Cと同一の構成要素には同一の符号を付し、重複する説明は省略する。
[Fourth Embodiment]
A plant monitoring apparatus and a plant monitoring method according to the fourth embodiment of the present invention will be described. In addition, the same code | symbol is attached | subjected to the component same as plant monitoring apparatus 1A, 1B, 1C, and the overlapping description is abbreviate | omitted.

本発明の第4の実施の形態に係るプラント監視装置1Dの構成は、図1において、プラント監視装置1、監視モデル作成手段12および監視処理手段13を、それぞれ、プラント監視装置1D、監視モデル作成手段12Dおよび監視処理手段13Dと読み替えた構成である。すなわち、プラント監視装置1Dは、プラントデータ入力・保存手段11、監視モデル作成手段12Dおよび監視処理手段13Dを具備する。   The configuration of the plant monitoring apparatus 1D according to the fourth embodiment of the present invention is the same as that shown in FIG. 1 except that the plant monitoring apparatus 1, the monitoring model creating means 12, and the monitoring processing means 13 are the plant monitoring apparatus 1D and the monitoring model creating respectively. The configuration is replaced with the means 12D and the monitoring processing means 13D. That is, the plant monitoring apparatus 1D includes a plant data input / storage unit 11, a monitoring model creation unit 12D, and a monitoring processing unit 13D.

図18は、本発明の第4の実施の形態に係るプラント監視装置1Dが具備する監視モデル作成手段(以下、「第4の監視モデル作成手段」と称する。)12Dの構成を示した概略図である。   FIG. 18 is a schematic diagram showing the configuration of a monitoring model creation means (hereinafter referred to as “fourth monitoring model creation means”) 12D provided in the plant monitoring apparatus 1D according to the fourth embodiment of the present invention. It is.

図18に示されるように、第4の監視モデル作成手段12Dは、第1の主成分分析部31と第2の主成分分析部41とを有して構成された主成分分析部51と、主成分分析部51が作成した監視モデルにより生成される推定偏差および主成分得点から成る統計量データ特性評価52とを備える。   As shown in FIG. 18, the fourth monitoring model creation unit 12D includes a first principal component analysis unit 51 including a first principal component analysis unit 31 and a second principal component analysis unit 41, And a statistical data characteristic evaluation 52 including an estimated deviation and a principal component score generated by the monitoring model created by the principal component analysis unit 51.

統計量データ特性評価52は、第2の推定偏差特性評価部32および主成分得点特性評価部42が持つ機能を有しており、第1の主成分分析部31が作成した監視モデルにより生成される監視変数の推定偏差の特性評価については第2の推定偏差特性評価部32の機能を、第2の主成分分析部41が作成した監視モデルにより生成される主成分得点の特性評価については主成分得点特性評価部42の機能を用いて特性評価を行う。   The statistic data characteristic evaluation 52 has the functions of the second estimated deviation characteristic evaluation part 32 and the principal component score characteristic evaluation part 42, and is generated by the monitoring model created by the first principal component analysis part 31. The characteristic evaluation of the estimated deviation of the monitoring variable is the function of the second estimated deviation characteristic evaluation unit 32, and the characteristic evaluation of the principal component score generated by the monitoring model created by the second principal component analysis unit 41 is mainly used. Characteristic evaluation is performed using the function of the component score characteristic evaluation unit 42.

図19は、プラント監視装置1Dに具備される監視処理手段13D(以下、「第4の監視処理手段」と称する。)の構成を示した概略図である。   FIG. 19 is a schematic diagram showing the configuration of the monitoring processing means 13D (hereinafter referred to as “fourth monitoring processing means”) provided in the plant monitoring apparatus 1D.

図19に示されるように、第4の監視処理手段13Dは、入出力変数データに監視モデル作成手段12Dで作成された監視モデルである負荷行列を適用して入出力変数の推定偏差および主成分得点を算出する統計量データ算出部55と、統計量データ算出部55で算出された推定偏差および主成分得点から成る統計量データに対して逐次確率比検定を適用して当該統計量データの分散値が変化したか否かの仮説を検定する統計量データ検定処理部56と、前記逐次確率比検定の結果の分散変化仮説の採択率を算定し、採択率が管理しきい値を超えた状態を異常と判定することによって異常を検出する仮説採択率判定部27とを備える。   As shown in FIG. 19, the fourth monitoring processing unit 13D applies the load matrix, which is the monitoring model created by the monitoring model creation unit 12D, to the input / output variable data, and the estimated deviations and principal components of the input / output variables. A statistical data calculation unit 55 for calculating scores, and a probability ratio test applied to the statistical data composed of the estimated deviation and principal component scores calculated by the statistical data calculation unit 55 to distribute the statistical data A statistical data test processing unit 56 for testing a hypothesis as to whether or not the value has changed, and a rate of adoption of a variance change hypothesis as a result of the sequential probability ratio test, and the rate of adoption exceeds a management threshold And a hypothesis adoption rate determination unit 27 that detects an abnormality by determining that it is abnormal.

統計量データ算出部55は、第2の出力推定偏差算出部35および主成分得点算出部45が持つ機能を有し、第1の主成分分析部31が作成した監視モデルを適用しての推定偏差の算出については第2の出力推定偏差算出部35の機能を、第2の主成分分析部41が作成した監視モデルを適用しての主成分得点の算出については、主成分得点算出部45の機能を用いて計算を行う。   The statistic data calculation unit 55 has the functions of the second output estimation deviation calculation unit 35 and the principal component score calculation unit 45, and is estimated by applying the monitoring model created by the first principal component analysis unit 31. For the calculation of the deviation, the function of the second output estimated deviation calculation unit 35 is applied, and for the calculation of the principal component score by applying the monitoring model created by the second principal component analysis unit 41, the principal component score calculation unit 45 The calculation is performed using the function.

統計量データ検定処理部56は、第2の推定偏差検定処理部36および主成分得点検定処理部46が持つ機能を有し、算出された推定偏差の検定については第2の推定偏差検定処理部36の機能を、算出された主成分得点の検定については主成分得点検定処理部46の機能を用いて計算を行う。   The statistic data test processing unit 56 has the functions of the second estimated deviation test processing unit 36 and the principal component score test processing unit 46, and the second estimated deviation test processing unit for testing the estimated deviation calculated. The function of 36 is calculated by using the function of the principal component score test processing unit 46 for the calculation of the calculated principal component score.

プラント監視装置1Dが実行する処理内容は、他のプラント監視装置1A,1B,1C等で実行される処理内容と同様に、まず、プラントデータ入力・保存手段11によるプラントデータ入力・保存ステップが実行され、続いて、第4の監視モデル作成手段12Dによる監視モデル作成・保存ステップが実行され、続いて、第4の監視処理手段13Dによる監視処理ステップが実行される。そして、監視処理ステップ後は、監視処理結果出力ステップおよび監視処理結果表示ステップが実行され、第4の監視処理手段13Dがプラント2の異常の有無の検出を行った結果が表示装置3の表示部に表示される。   The processing contents executed by the plant monitoring device 1D are first executed by the plant data input / storing step by the plant data input / storing means 11 in the same manner as the processings executed by the other plant monitoring devices 1A, 1B, 1C, etc. Subsequently, the monitoring model creation / storage step by the fourth monitoring model creation means 12D is executed, and then the monitoring processing step by the fourth monitoring processing means 13D is executed. After the monitoring process step, the monitoring process result output step and the monitoring process result display step are executed, and the result of the fourth monitoring processing unit 13D detecting whether or not there is an abnormality in the plant 2 is the display unit of the display device 3. Is displayed.

また、プラント監視装置1Dが実行する処理内容は、プラント監視装置1B,1Cで実行される処理内容に対して、それぞれの一部の処理ステップを組み合わせたステップと考えることができる。すなわち、第4の監視モデル作成手段12Dで実行される処理内容(以下、「第4の監視モデル作成・保存ステップ」と称する。)では、まず、主成分分析部51によって参照データを設定するステップS21、主成分分析をするステップS22、寄与率の大きな主成分に対する負荷行列を構成するステップS23、寄与率の小さな主成分に対する負荷行列を構成するステップS43が実行される。続いて、統計量データの特性評価として統計量データ特性評価部52によって、ステップS23で構成された負荷行列(監視モデル)を適用した場合における推定偏差を算出するステップS24、ステップS24で算出された推定偏差の特性評価を行うステップS25、ステップS43で構成された負荷行列(監視モデル)を適用した場合における主成分得点を算出するステップS44、ステップS44で算出された主成分得点の特性評価を行うステップS45が実行される。   Further, the processing content executed by the plant monitoring device 1D can be considered as a step in which some processing steps are combined with the processing content executed by the plant monitoring devices 1B and 1C. That is, in the processing contents executed by the fourth monitoring model creating means 12D (hereinafter referred to as “fourth monitoring model creating / saving step”), first, the reference data is set by the principal component analysis unit 51. S21, step S22 for principal component analysis, step S23 for constructing a load matrix for a principal component with a large contribution ratio, and step S43 for constructing a load matrix for a principal component with a small contribution ratio are executed. Subsequently, as a characteristic evaluation of the statistic data, the statistic data characteristic evaluation unit 52 calculates the estimated deviation when the load matrix (monitoring model) configured in step S23 is applied, and is calculated in steps S24 and S24. Characteristic evaluation of the principal component score calculated in step S44 and step S44 for calculating the principal component score when the load matrix (monitoring model) configured in step S25 and step S43 for evaluating the characteristic of the estimated deviation is applied. Step S45 is executed.

主成分分析部51および統計量データ特性評価部52が一連の処理ステップを完了すると、第4の監視モデル作成・保存ステップは終了する。換言すれば、第4の監視モデル作成・保存ステップは、第2の監視モデル作成・保存ステップと第3の監視モデル作成・保存ステップとを備え、第2の監視モデル作成・保存ステップおよび第3の監視モデル作成・保存ステップを別個に処理する処理ステップである。   When the principal component analysis unit 51 and the statistic data characteristic evaluation unit 52 complete a series of processing steps, the fourth monitoring model creation / storage step ends. In other words, the fourth monitoring model creation / storing step includes a second monitoring model creating / storing step and a third monitoring model creating / storing step. This is a processing step for separately processing the monitoring model creation / storage step.

第4の監視処理手段13Dで実行される処理内容(「第4の監視処理ステップ」と称する。)では、まず、統計量データ算出部55によって、監視データを設定するステップS31、負荷行列による推定偏差を算出するステップS32および負荷行列による主成分得点の算出をするステップS52が実行される。続いて、統計量データ検定処理部56によって推定偏差dXの分散値の逐次確率比検定を行うステップS33、主成分得点分散値の逐次確率比検定を行うステップS53が実行される。続いて、仮説採択率判定部27が統計量データ検定処理部56でなされた統計量データに対する逐次確率比検定の結果の分散変化仮説の採択率を算定し、算定した仮説採択率が管理しきい値を超えた場合に異常と判断することによって異常を検出する。仮説採択率を監視するステップ(ステップS14)が終わると、第4の監視処理ステップは、全処理ステップを完了して終了となる。   In the processing contents (referred to as “fourth monitoring processing step”) executed by the fourth monitoring processing means 13D, first, the statistical data calculation unit 55 sets monitoring data by step S31, estimation by load matrix. Step S32 for calculating the deviation and step S52 for calculating the principal component score by the load matrix are executed. Subsequently, step S33 for performing the sequential probability ratio test of the variance value of the estimated deviation dX and the step S53 of performing the sequential probability ratio test of the principal component score variance value are executed by the statistical data test processing unit 56. Subsequently, the hypothesis adoption rate determination unit 27 calculates the adoption rate of the variance change hypothesis as a result of the sequential probability ratio test for the statistical data performed by the statistical data test processing unit 56, and the calculated hypothesis adoption rate is managed. Abnormality is detected by judging that it is abnormal when the value is exceeded. When the step of monitoring the hypothesis acceptance rate (step S14) is finished, the fourth monitoring processing step is completed after completing all the processing steps.

上述したように本実施の形態によれば、第1乃至第3の実施の形態で説明したプラント監視装置1A,1B,1Cおよび各プラント監視方法と同様の効果を奏する他、正常時の変数間の相関関係では説明の付けられない新たな成分が発生するような広い範囲の異常と、正常時にも存在する弱い相関成分が増大するようなタイプの異常の何れにも適用可能な汎用性の高い監視が可能になる。   As described above, according to the present embodiment, the same effects as those of the plant monitoring apparatuses 1A, 1B, 1C and the respective plant monitoring methods described in the first to third embodiments can be obtained, and between normal variables. High versatility applicable to both a wide range of abnormalities that cause new components that cannot be explained by the correlation, and types of abnormalities that increase weak correlation components that exist even during normal operation Monitoring becomes possible.

[第5の実施の形態]
本発明の第5の実施の形態に係るプラント監視装置およびプラント監視方法について説明する。尚、プラント監視装置1A,1B,1C,1Dと同一の構成要素には同一の符号を付し、重複する説明は省略する。
[Fifth Embodiment]
A plant monitoring apparatus and a plant monitoring method according to the fifth embodiment of the present invention will be described. In addition, the same code | symbol is attached | subjected to the component same as plant monitoring apparatus 1A, 1B, 1C, 1D, and the overlapping description is abbreviate | omitted.

本発明の第5の実施の形態に係るプラント監視装置1Eの構成は、図1において、プラント監視装置1、監視モデル作成手段12および監視処理手段13を、それぞれ、プラント監視装置1E、監視モデル作成手段12Eおよび監視処理手段13Eと読み替えた構成である。すなわち、プラント監視装置1Eは、プラントデータ入力・保存手段11、監視モデル作成手段12Eおよび監視処理手段13Eを具備する。   The configuration of the plant monitoring apparatus 1E according to the fifth embodiment of the present invention is the same as that shown in FIG. 1, except that the plant monitoring apparatus 1, the monitoring model creating means 12 and the monitoring processing means 13 are respectively the plant monitoring apparatus 1E and the monitoring model creating. The configuration is replaced with the means 12E and the monitoring processing means 13E. That is, the plant monitoring apparatus 1E includes a plant data input / storage unit 11, a monitoring model creation unit 12E, and a monitoring processing unit 13E.

図20は、本発明の第5の実施の形態に係るプラント監視装置1Eの概略を示しており、特にプラント監視装置1Eが具備する監視モデル作成手段(以下、「第5の監視モデル作成手段」と称する。)12Eの構成を詳細に示した概略図である。   FIG. 20 shows an outline of a plant monitoring apparatus 1E according to the fifth embodiment of the present invention, and in particular, a monitoring model creating means (hereinafter referred to as “fifth monitoring model creating means”) provided in the plant monitoring apparatus 1E. It is a schematic diagram showing the configuration of 12E in detail.

図20に示されるように、第5の監視モデル作成手段12Eは、出力誤差モデル同定部21および第1の推定偏差特性評価部22に加え、プラント2の運転状態の変化を直接的に引き起こす入力変数特性を評価する入力変数特性評価部58をさらに備えたものである。すなわち、第5の監視モデル作成手段12Eは、第1の監視モデル作成手段12Aに、入力変数特性評価部58をさらに備えて構成される。   As shown in FIG. 20, in addition to the output error model identifying unit 21 and the first estimated deviation characteristic evaluating unit 22, the fifth monitoring model creating unit 12E directly causes the change in the operating state of the plant 2. An input variable characteristic evaluation unit 58 for evaluating variable characteristics is further provided. That is, the fifth monitoring model creation unit 12E is configured by further including an input variable characteristic evaluation unit 58 in addition to the first monitoring model creation unit 12A.

図21は、プラント監視装置1Eの概略を示しており、特にプラント監視装置1Eが具備する監視処理手段13E(以下、「第5の監視処理手段」と称する。)の構成を詳細に示した概略図である。   FIG. 21 shows an outline of the plant monitoring apparatus 1E, and in particular, an outline showing in detail the configuration of the monitoring processing means 13E (hereinafter referred to as “fifth monitoring processing means”) provided in the plant monitoring apparatus 1E. FIG.

図21に示されるように、第5の監視処理手段13Eは、第1の監視処理手段13Aと、入力変数特性の異常の有無について監視する入力異常監視処理手段60を備える。

Figure 0004922265
As shown in FIG. 21, the fifth monitoring processing unit 13E includes the first monitoring processing unit 13A and an input abnormality monitoring processing unit 60 that monitors whether there is an abnormality in the input variable characteristics.
Figure 0004922265

プラント監視装置1Eが実行する処理内容は、他のプラント監視装置1A,1B,1C,1D等で実行される処理内容と同様に、まず、プラントデータ入力・保存手段11によるプラントデータ入力・保存ステップが実行され、続いて、第5の監視モデル作成手段12Eによる監視モデル作成・保存ステップが実行され、続いて、第5の監視処理手段13Eによる監視処理ステップが実行される。そして、監視処理ステップ後は、監視処理結果出力ステップおよび監視処理結果表示ステップが実行され、第5の監視処理手段13Eがプラント2の異常の有無の検出を行った結果が表示装置3の表示部に表示される。   The processing content executed by the plant monitoring device 1E is similar to the processing content executed by the other plant monitoring devices 1A, 1B, 1C, 1D, etc. First, the plant data input / storage step by the plant data input / storage means 11 is performed. Then, the monitoring model creation / storage step by the fifth monitoring model creation means 12E is executed, and then the monitoring processing step by the fifth monitoring processing means 13E is executed. Then, after the monitoring process step, the monitoring process result output step and the monitoring process result display step are executed, and the result of the fifth monitoring processing unit 13E detecting whether there is an abnormality in the plant 2 is the display unit of the display device 3. Is displayed.

Figure 0004922265
Figure 0004922265

第5の監視処理手段13Eによる監視処理ステップのうち、第1の監視処理手段13Aが行う処理内容については、第1の実施の形態で説明した通りである。プラント監視装置1Eでは、プラント2の入力変数の測定値から出力誤差モデルによりプラント2の出力変数の値を推定し、出力変数の測定値と推定値との偏差を監視することにより、入力変数の変化では説明の付けられない出力変数の変化を監視する。つまり、第1の監視処理手段13Aでは、入出力変数の変化が出力誤差モデルに従っている限りは、入力変数がどのような変化をしても異常は検出されない。   Of the monitoring processing steps by the fifth monitoring processing means 13E, the processing contents performed by the first monitoring processing means 13A are as described in the first embodiment. In the plant monitoring apparatus 1E, the value of the output variable of the plant 2 is estimated from the measured value of the input variable of the plant 2 by the output error model, and the deviation between the measured value of the output variable and the estimated value is monitored. Monitor changes in output variables that cannot be explained by changes. That is, in the first monitoring processing unit 13A, as long as the change in the input / output variable follows the output error model, no abnormality is detected regardless of the change in the input variable.

これに対して、入力異常監視処理手段60では、予め与えられた時間幅内における入力変数の分散値が正常状態における分散値と同じか否かを分散検定により監視する。分散検定は次のように行う。

Figure 0004922265
On the other hand, the input abnormality monitoring processing means 60 monitors whether or not the variance value of the input variable within the predetermined time width is the same as the variance value in the normal state by a variance test. The variance test is performed as follows.
Figure 0004922265

図22は、第5のプラント監視装置1Eの入力異常監視処理結果の一例を示した図であって、入力変数の分散値が変化した場合のデータに適用した例を示している。   FIG. 22 is a diagram showing an example of the input abnormality monitoring processing result of the fifth plant monitoring device 1E, and shows an example applied to data when the variance value of the input variable changes.

図22(a)が入力変数の測定値を示すグラフ、図22(b)が式(11)で算出される分散監視指標を示すグラフ、図22(c)が前記の分散変化仮説の採択率、すなわち異常検出率である。図22(c)では式(12)のnを200ステップ、異常検出率を算出する時間幅を400ステップとしている。図22によれば、異常が発生した1000ステップ目以降で異常検出率が大きく変化を始めており、破線で示された管理しきい値を超えた時点で異常と検出されている。   22A is a graph showing the measured values of the input variables, FIG. 22B is a graph showing the dispersion monitoring index calculated by the equation (11), and FIG. 22C is the adoption rate of the dispersion change hypothesis. That is, the abnormality detection rate. In FIG. 22C, n in the equation (12) is 200 steps, and the time width for calculating the abnormality detection rate is 400 steps. According to FIG. 22, the abnormality detection rate starts to change greatly after the 1000th step when an abnormality has occurred, and an abnormality is detected when the management threshold value indicated by the broken line is exceeded.

上述したように、本実施の形態によれば第1の実施の形態と同様の効果を奏する他、第1の実施の形態では検出できないプラントの入力変数の異常な変化も検出することができ、適用範囲をより拡大することができる。   As described above, according to the present embodiment, in addition to the same effects as the first embodiment, it is also possible to detect abnormal changes in plant input variables that cannot be detected in the first embodiment, The scope of application can be further expanded.

[第6の実施の形態]
本発明の第6の実施の形態に係るプラント監視装置およびプラント監視方法について説明する。尚、プラント監視装置1A,1B,1C,1D,1Eと同一の構成要素には同一の符号を付し、重複する説明は省略する。
[Sixth Embodiment]
A plant monitoring apparatus and a plant monitoring method according to a sixth embodiment of the present invention will be described. In addition, the same code | symbol is attached | subjected to the component same as plant monitoring apparatus 1A, 1B, 1C, 1D, 1E, and the overlapping description is abbreviate | omitted.

本発明の第6の実施の形態に係るプラント監視装置1Fの構成は、図1において、プラント監視装置1、監視モデル作成手段12および監視処理手段13を、それぞれ、プラント監視装置1F、監視モデル作成手段12Fおよび監視処理手段13Fと読み替えた構成である。すなわち、プラント監視装置1Fは、プラントデータ入力・保存手段11、監視モデル作成手段12Fおよび監視処理手段13Fを具備する。   The configuration of the plant monitoring device 1F according to the sixth embodiment of the present invention is the same as that shown in FIG. 1 except that the plant monitoring device 1, the monitoring model creation means 12, and the monitoring processing means 13 are the plant monitoring device 1F and the monitoring model creation, respectively. The configuration is replaced with the means 12F and the monitoring processing means 13F. That is, the plant monitoring apparatus 1F includes a plant data input / storage unit 11, a monitoring model creation unit 12F, and a monitoring processing unit 13F.

図23は、本発明の第6の実施の形態に係るプラント監視装置1Fと、プラント監視装置1Fが具備する監視モデル作成手段(以下、「第6の監視モデル作成手段」と称する。)12Fおよび監視処理手段13F(以下、「第6の監視処理手段」と称する。)の構成を示した概略図である。   FIG. 23 shows a plant monitoring apparatus 1F according to the sixth embodiment of the present invention, a monitoring model creation means (hereinafter referred to as “sixth monitoring model creation means”) 12F included in the plant monitoring apparatus 1F, and It is the schematic which showed the structure of the monitoring process means 13F (henceforth "the 6th monitoring process means").

第6の監視モデル作成手段12Fは、図23に示されるように、主成分分析部51と、統計量データ特性評価部52と、入力変数特性評価部58を備えて構成される。また、第6の監視処理手段13Fは、第4の監視処理手段13Dと、入力異常監視処理手段60とを備えて構成される。   As shown in FIG. 23, the sixth monitoring model creation unit 12F includes a principal component analysis unit 51, a statistic data characteristic evaluation unit 52, and an input variable characteristic evaluation unit 58. The sixth monitoring processing unit 13F includes a fourth monitoring processing unit 13D and an input abnormality monitoring processing unit 60.

プラント監視装置1Fが実行する処理内容は、他のプラント監視装置1A,1B,1C,1D,1E等で実行される処理内容と同様に、まず、プラントデータ入力・保存手段11によるプラントデータ入力・保存ステップが実行され、続いて、第6の監視モデル作成手段12Fによる監視モデル作成・保存ステップ(以下、「第6の監視モデル作成・保存ステップ」と称する。)、続いて、第6の監視処理手段13Fによる監視処理ステップ(「第6の監視処理ステップ」と称する。)が実行される。   The processing content executed by the plant monitoring device 1F is the same as the processing content executed by the other plant monitoring devices 1A, 1B, 1C, 1D, 1E, etc. A storage step is executed, followed by a monitoring model creation / storing step (hereinafter referred to as a “sixth monitoring model creation / storing step”) by the sixth monitoring model creation means 12F, followed by a sixth monitoring. A monitoring process step (referred to as “sixth monitoring process step”) by the processing means 13F is executed.

第6の監視処理ステップが実行された後は、監視処理結果出力ステップおよび監視処理結果表示ステップが実行され、第6の監視処理手段13Fがプラント2の異常の有無の検出を行った結果が表示装置3の表示部に表示される。   After the sixth monitoring processing step is executed, the monitoring processing result output step and the monitoring processing result display step are executed, and the result of the sixth monitoring processing means 13F detecting whether there is an abnormality in the plant 2 is displayed. It is displayed on the display unit of the device 3.

第6の監視モデル作成・保存ステップのうち、主成分分析手段51および統計量データ特性評価部52が実行する処理内容は、第4の監視モデル作成・保存ステップと同様に実行される処理内容である。また、入力変数特性評価部58が実行する処理内容は、第5の監視モデル作成手段12Eによる監視モデル作成・保存ステップと同様に実行される処理内容である。   Of the sixth monitoring model creation / storage step, the processing contents executed by the principal component analysis means 51 and the statistic data characteristic evaluation unit 52 are the same as the fourth monitoring model creation / storage step. is there. Further, the processing content executed by the input variable characteristic evaluation unit 58 is processing content executed in the same manner as the monitoring model creation / storage step by the fifth monitoring model creation means 12E.

一方、第6の監視処理ステップのうち、第4の監視処理手段13Dが実行する処理内容については、第4の監視処理ステップと同様に実行される処理内容であり、入力異常監視処理手段60が実行する処理内容については、第5の監視処理ステップで説明したように、予め与えられた時間幅内における入力変数の分散値が正常状態における分散値と同じか否かを分散検定により監視する。   On the other hand, in the sixth monitoring processing step, the processing content executed by the fourth monitoring processing means 13D is the processing content executed in the same manner as the fourth monitoring processing step, and the input abnormality monitoring processing means 60 As to the processing content to be executed, as described in the fifth monitoring processing step, whether or not the variance value of the input variable within the predetermined time width is the same as the variance value in the normal state is monitored by variance test.

上述したように、本実施の形態によれば第4の実施の形態と同様の効果を奏する他、第4の実施の形態では検出できないプラントの入力変数の異常な変化も検出することができ、適用範囲をより拡大することができる。   As described above, according to this embodiment, in addition to the same effects as the fourth embodiment, it is also possible to detect abnormal changes in plant input variables that cannot be detected by the fourth embodiment, The scope of application can be further expanded.

また、上述した第2の実施の形態および第3の実施の形態においては、主成分分析の対象として、プラントの入力変数uと出力変数zの異なる時間の測定値より式(9)のように構成した監視変数xを用いたが、入出力関係が必ずしも明確ではないプラントにおいては全てを出力変数zとみなして、以下の式(13)又は(14)で示されるように、監視変数を構成してもよい。
[数14]
x(t)=z(t) ・・・(13)
又は
x(t)=[z(t−1) z(t)] ・・・(14)
Further, in the second embodiment and the third embodiment described above, as an object of principal component analysis, the measured values at different times of the plant input variable u and the output variable z are expressed as shown in Equation (9). In the plant where the configured monitoring variable x is used but the input / output relationship is not necessarily clear, all are regarded as the output variable z, and the monitoring variable is configured as shown in the following formula (13) or (14). May be.
[Formula 14]
x (t) = z (t) (13)
Or x (t) = [z (t−1) z (t)] (14)

さらに、プラント2の動特性に比べてプラントデータの入力時間間隔が短いような場合には、以下の式(15)で示されるように、より長い区間のデータで監視変数を構成してもよい。
[数15]
x(t)=[z(t−h) … z(t−1) z(t)] ・・・(15)
Furthermore, when the input time interval of the plant data is shorter than the dynamic characteristics of the plant 2, the monitoring variable may be configured with data of a longer section as shown by the following equation (15). .
[Equation 15]
x (t) = [z (t−h)... z (t−1) z (t)] (15)

尚、本発明は上記の各実施形態そのままに限定されるものではなく、実施段階ではその要旨を逸脱しない範囲で構成要素を変形して具体化しても良い。例えば、図1に示すプラント監視装置1の例では、プラント監視装置1と表示装置3とは独立した装置として示されているが、一体的な装置として構成される場合もある。すなわち、プラント監視装置1は、表示装置3又はこれと同等の機能を有する表示手段を具備していても良い。   Note that the present invention is not limited to the above-described embodiments as they are, and may be embodied by modifying constituent elements without departing from the scope of the invention in the implementation stage. For example, in the example of the plant monitoring device 1 shown in FIG. 1, the plant monitoring device 1 and the display device 3 are shown as independent devices, but may be configured as an integrated device. That is, the plant monitoring apparatus 1 may include a display unit 3 or a display unit having a function equivalent to this.

また、上記の各実施形態に開示されている複数の構成要素の適宜な組み合わせにより、種々の発明を形成したり、実施形態に示される全構成要素から幾つかの構成要素を削除したりすることによって本発明を構成しても良い。   Also, various inventions can be formed by appropriately combining a plurality of constituent elements disclosed in the above embodiments, or some constituent elements can be deleted from all the constituent elements shown in the embodiments. The present invention may be configured as follows.

さらに、上述した各実施形態において記載した手法は、コンピュータに実行させることのできるプログラムとして、例えば磁気ディスク、光ディスク、半導体メモリなどの記憶媒体に書き込んで各種装置に適用したり、通信媒体により伝送して各種装置に適用することも可能である。本装置を実現するコンピュータは、記憶媒体に記録されたプログラムを読み込み、このプログラムによって動作が制御されることにより、上述した処理を実行する。   Further, the method described in each of the above-described embodiments is applied as a program that can be executed by a computer to a storage medium such as a magnetic disk, an optical disk, or a semiconductor memory and applied to various apparatuses, or transmitted by a communication medium. It can also be applied to various devices. A computer that implements the apparatus reads the program recorded in the storage medium, and executes the above-described processing by controlling the operation by the program.

本発明に係るプラント監視装置の基本構成を示した概略図。The schematic diagram showing the basic composition of the plant monitoring device concerning the present invention. 本発明の第1の実施の形態に係るプラント監視装置に具備される監視モデル作成手段の概略図。The schematic diagram of the monitoring model preparation means with which the plant monitoring apparatus which concerns on the 1st Embodiment of this invention is equipped. 本発明の第1の実施の形態に係るプラント監視装置に具備される監視処理手段の概略図。The schematic diagram of the monitoring processing means with which the plant monitoring apparatus concerning a 1st embodiment of the present invention is equipped. 本発明の第1の実施の形態に係るプラント監視装置に具備される監視モデル作成手段が実行する処理内容を示した処理フロー図。The processing flowchart which showed the processing content which the monitoring model preparation means with which the plant monitoring apparatus which concerns on the 1st Embodiment of this invention comprises is equipped. 本発明の第1の実施の形態に係るプラント監視装置に具備される監視処理手段が実行する処理内容を示した処理フロー図。The processing flowchart which showed the processing content which the monitoring process means with which the plant monitoring apparatus which concerns on the 1st Embodiment of this invention is equipped performs. 本発明の第1の実施の形態に係るプラント監視装置の監視処理結果の一例を示した図であって、(a)は縦軸を出力(測定値,推定値),横軸をステップ数としたグラフ、(b)は縦軸を入力,横軸をステップ数としたグラフ、(c)は縦軸を推定偏差,横軸をステップ数としたグラフ、(d)は縦軸を検定指標,横軸をステップ数としたグラフ、(e)は縦軸を仮説採択率,横軸をステップ数としたグラフ。It is the figure which showed an example of the monitoring process result of the plant monitoring apparatus which concerns on the 1st Embodiment of this invention, Comprising: (a) is an output (measurement value, estimated value) on a vertical axis | shaft, and a horizontal axis | shaft is the number of steps. (B) is a graph in which the vertical axis is input, the horizontal axis is the number of steps, (c) is a graph in which the vertical axis is the estimated deviation, and the horizontal axis is the number of steps, (d) is the test index, the vertical axis. A graph with the horizontal axis representing the number of steps, (e) is a graph with the vertical axis representing the hypothesis acceptance rate and the horizontal axis representing the number of steps. 図6(a)のグラフにおいて900ステップから1100ステップの範囲を拡大して示した部分拡大図。The partial enlarged view which expanded and showed the range of 900 steps to 1100 steps in the graph of Fig.6 (a). 本発明の第2の実施の形態に係るプラント監視装置に具備される監視モデル作成手段の概略図。The schematic of the monitoring model preparation means with which the plant monitoring apparatus which concerns on the 2nd Embodiment of this invention is equipped. 本発明の第2の実施の形態に係るプラント監視装置に具備される監視処理手段の概略図。The schematic of the monitoring processing means with which the plant monitoring apparatus which concerns on the 2nd Embodiment of this invention is equipped. 本発明の第2の実施の形態に係るプラント監視装置に具備される監視モデル作成手段が実行する処理内容を示した処理フロー図。The processing flowchart which showed the processing content which the monitoring model preparation means with which the plant monitoring apparatus which concerns on the 2nd Embodiment of this invention comprises is executed. 本発明の第2の実施の形態に係るプラント監視装置に具備される監視処理手段が実行する処理内容を示した処理フロー図。The processing flowchart which showed the processing content which the monitoring process means with which the plant monitoring apparatus which concerns on the 2nd Embodiment of this invention is equipped performs. 本発明の第2の実施の形態に係るプラント監視装置の監視処理結果の一例を示した図であって、(a)は縦軸を出力(測定値,推定値),横軸をステップ数としたグラフ、(b)は縦軸を入力,横軸をステップ数としたグラフ、(c)は縦軸を推定偏差,横軸をステップ数としたグラフ、(d)は縦軸を検定指標,横軸をステップ数としたグラフ、(e)は縦軸を仮説採択率,横軸をステップ数としたグラフ。It is the figure which showed an example of the monitoring process result of the plant monitoring apparatus which concerns on the 2nd Embodiment of this invention, Comprising: (a) is a vertical axis | shaft output (measurement value, estimated value), and a horizontal axis | shaft is set with the number of steps. (B) is a graph in which the vertical axis is input, the horizontal axis is the number of steps, (c) is a graph in which the vertical axis is the estimated deviation, and the horizontal axis is the number of steps, (d) is the test index, the vertical axis. A graph with the horizontal axis representing the number of steps, (e) is a graph with the vertical axis representing the hypothesis acceptance rate and the horizontal axis representing the number of steps. 本発明の第3の実施の形態に係るプラント監視装置に具備される監視モデル作成手段の概略図。The schematic of the monitoring model preparation means with which the plant monitoring apparatus which concerns on the 3rd Embodiment of this invention is equipped. 本発明の第3の実施の形態に係るプラント監視装置に具備される監視処理手段の概略図。Schematic of the monitoring process means with which the plant monitoring apparatus which concerns on the 3rd Embodiment of this invention is equipped. 本発明の第3の実施の形態に係るプラント監視装置に具備される監視モデル作成手段が実行する処理内容を示した処理フロー図。The processing flowchart which showed the processing content which the monitoring model preparation means with which the plant monitoring apparatus which concerns on the 3rd Embodiment of this invention comprises is equipped. 本発明の第3の実施の形態に係るプラント監視装置に具備される監視処理手段が実行する処理内容を示した処理フロー図。The processing flowchart which showed the processing content which the monitoring process means with which the plant monitoring apparatus which concerns on the 3rd Embodiment of this invention is equipped performs. 本発明の第3の実施の形態に係るプラント監視装置の監視処理結果の一例を示した図であって、(a)は縦軸を出力(測定値,推定値),横軸をステップ数としたグラフ、(b)は縦軸を入力(測定値,推定値),横軸をステップ数としたグラフ、(c)は縦軸を推定偏差,横軸をステップ数としたグラフ、(d)は縦軸を検定指標,横軸をステップ数としたグラフ、(e)は縦軸を仮説採択率,横軸をステップ数としたグラフ。It is the figure which showed an example of the monitoring process result of the plant monitoring apparatus which concerns on the 3rd Embodiment of this invention, Comprising: (a) is a vertical axis | shaft output (measurement value, estimated value), and a horizontal axis | shaft is the number of steps. (B) is a graph in which the vertical axis is input (measurement value, estimated value), the horizontal axis is the number of steps, (c) is a graph in which the vertical axis is the estimated deviation, and the horizontal axis is the number of steps, (d) Is a graph with the test index on the vertical axis and the number of steps on the horizontal axis. (E) is a graph with the hypothesis acceptance rate on the vertical axis and the number of steps on the horizontal axis. 本発明の第4の実施の形態に係るプラント監視装置に具備される監視モデル作成手段の概略図。The schematic of the monitoring model preparation means with which the plant monitoring apparatus which concerns on the 4th Embodiment of this invention is equipped. 本発明の第4の実施の形態に係るプラント監視装置に具備される監視処理手段の概略図。Schematic of the monitoring process means with which the plant monitoring apparatus which concerns on the 4th Embodiment of this invention is equipped. 本発明の第5の実施の形態に係るプラント監視装置と、プラント監視装置に具備される監視モデル作成手段の概略図。The schematic diagram of the monitoring model creation means with which the plant monitoring apparatus which concerns on the 5th Embodiment of this invention, and a plant monitoring apparatus is equipped. 本発明の第5の実施の形態に係るプラント監視装置と、プラント監視装置に具備される監視処理手段の概略図。The schematic diagram of the monitoring processing means with which the plant monitoring apparatus which concerns on the 5th Embodiment of this invention, and a plant monitoring apparatus is equipped. 本発明の第5の実施の形態に係るプラント監視装置の入力異常監視処理結果の一例を示した図であって、(a)は縦軸を入力(測定値,推定値),横軸をステップ数としたグラフ、(b)は縦軸を分散監視指標,横軸をステップ数としたグラフ、(e)は縦軸を異常検出率,横軸をステップ数としたグラフ。It is the figure which showed an example of the input abnormality monitoring process result of the plant monitoring apparatus which concerns on the 5th Embodiment of this invention, Comprising: (a) is a vertical axis | shaft input (measurement value, estimated value), and a horizontal axis is a step. (B) is a graph with the vertical axis representing the distributed monitoring index, the horizontal axis representing the number of steps, and (e) a graph with the vertical axis representing the abnormality detection rate and the horizontal axis representing the number of steps. 本発明の第6の実施の形態に係るプラント監視装置と、プラント監視装置に具備される監視モデル作成手段および監視処理手段の概略図。Schematic of the plant monitoring apparatus which concerns on the 6th Embodiment of this invention, the monitoring model preparation means with which a plant monitoring apparatus is equipped, and the monitoring process means.

符号の説明Explanation of symbols

1(1A〜1F) プラント監視装置
2 プラント
3 表示装置
4 入力手段
11 プラントデータ入力・保存手段
12(12A〜12F) 監視モデル作成手段
13(13A〜13F) 監視処理手段
21 出力誤差モデル同定部
22 第1の推定偏差特性評価部
25 第1の出力推定偏差算出部
26 第1の推定偏差検定処理部
27 仮説採択率判定部
31 第1の主成分分析部
32 第2の推定偏差特性評価部
35 第2の出力推定偏差算出部
36 第2の推定偏差検定処理部
41 第2の主成分分析部
42 主成分得点特性評価部
45 主成分得点算出部
46 主成分得点検定処理部
51 主成分分析部
52 統計量データ特性評価部
55 統計量データ算出部
56 統計量データ検定処理部
58 入力変数特性評価部
60 入力異常監視処理手段
61 統計量算出部
62 仮説検定処理部
1 (1A to 1F) Plant monitoring device 2 Plant 3 Display device 4 Input means 11 Plant data input / storage means 12 (12A to 12F) Monitoring model creation means 13 (13A to 13F) Monitoring processing means 21 Output error model identification unit 22 First estimation deviation characteristic evaluation unit 25 First output estimation deviation calculation unit 26 First estimation deviation test processing unit 27 Hypothesis adoption rate determination unit 31 First principal component analysis unit 32 Second estimation deviation characteristic evaluation unit 35 Second output estimated deviation calculation unit 36 Second estimated deviation test processing unit 41 Second principal component analysis unit 42 Principal component score characteristic evaluation unit 45 Principal component score calculation unit 46 Principal component score test processing unit 51 Principal component analysis unit 52 statistic data characteristic evaluation unit 55 statistic data calculation unit 56 statistic data test processing unit 58 input variable characteristic evaluation unit 60 input abnormality monitoring processing means 61 statistic calculation unit 62 Hypothesis testing processor

Claims (10)

プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力・保存手段と、
前記プラントデータ入力・保存手段で保存された時系列データに基づいて監視モデルを作成する監視モデル作成手段と、
前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理手段と、を備えたプラント監視装置であって、
前記監視モデル作成手段は、前記時系列データを用いて出力誤差モデルを同定する出力誤差モデル同定部と、
前記出力誤差モデルを前記時系列データに適用して算出した前記出力変数の推定偏差の統計的特性を評価する推定偏差特性評価部と、を具備し、
前記監視処理手段は、前記測定データに前記出力誤差モデルを適用して前記出力変数の推定偏差を算出する出力推定偏差算出部と、
前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理部と、
前記推定偏差の分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定部と、
を具備することを特徴とするプラント監視装置。
Plant data input / storage means for inputting measured data of plant input variables and output variables and storing them as time series data,
Monitoring model creating means for creating a monitoring model based on the time-series data stored in the plant data input / storing means;
A monitoring processing unit that applies the monitoring model to the measurement data to determine normality / abnormality of a plant state and outputs the determination result;
The monitoring model creating means includes an output error model identifying unit that identifies an output error model using the time series data;
An estimated deviation characteristic evaluation unit that evaluates a statistical characteristic of the estimated deviation of the output variable calculated by applying the output error model to the time series data, and
The monitoring processing means applies an output error model to the measurement data to calculate an estimated deviation of the output variable;
An estimated deviation test processing unit that tests a variance value change hypothesis of the estimated deviation by applying a sequential probability ratio test to the estimated deviation;
A hypothesis adoption rate determination unit that monitors plant abnormalities based on the adoption rate of the variance variation hypothesis of the estimated deviation;
A plant monitoring apparatus comprising:
プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力・保存手段と、
前記プラントデータ入力・保存手段で保存された時系列データに基づいて監視モデルを作成する監視モデル作成手段と、
前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理手段と、を備えたプラント監視装置であって、
前記監視モデル作成手段は前記時系列データに主成分分析を適用して寄与率の大きい複数の主成分に対する負荷行列を構成する主成分分析部と、
前記負荷行列を前記時系列データに適用して算出した推定偏差の統計的特性を評価する推定偏差特性評価部と、を具備し、
前記監視処理手段は、前記測定データに前記負荷行列を適用して推定偏差を算出する出力推定偏差部と、
前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理部と、
前記推定偏差の分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定部と、を具備することを特徴とするプラント監視装置。
Plant data input / storage means for inputting measured data of plant input variables and output variables and storing them as time series data,
Monitoring model creating means for creating a monitoring model based on the time-series data stored in the plant data input / storing means;
A monitoring processing unit that applies the monitoring model to the measurement data to determine normality / abnormality of a plant state and outputs the determination result;
The monitoring model creating means applies a principal component analysis to the time series data to constitute a load matrix for a plurality of principal components having a large contribution rate;
An estimated deviation characteristic evaluation unit that evaluates a statistical characteristic of the estimated deviation calculated by applying the load matrix to the time series data; and
The monitoring processing means includes an output estimated deviation unit that calculates an estimated deviation by applying the load matrix to the measurement data;
An estimated deviation test processing unit that tests a variance value change hypothesis of the estimated deviation by applying a sequential probability ratio test to the estimated deviation;
A hypothesis adoption rate determination unit that monitors a plant abnormality based on an adoption rate of a variance value change hypothesis of the estimated deviation.
プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力・保存手段と、
前記プラントデータ入力・保存手段で保存された時系列データに基づいて監視モデルを作成する監視モデル作成手段と、
前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理手段と、を備えたプラント監視装置であって、
前記監視モデル作成手段は前記時系列データに主成分分析を適用して寄与率の小さい複数の主成分に対する負荷行列を構成する主成分分析部と、
前記負荷行列を前記時系列データに適用して算出した主成分得点の統計的特性を評価する主成分得点特性評価部と、を具備し、
前記監視処理手段は、前記測定データに前記負荷行列を適用して主成分得点を算出する主成分得点算出部と、
前記主成分得点に逐次確率比検定を適用して前記主成分得点の分散値変化仮説を検定する主成分得点検定処理部と、
前記主成分得点の分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定部と、を具備することを特徴とするプラント監視装置。
Plant data input / storage means for inputting measured data of plant input variables and output variables and storing them as time series data,
Monitoring model creating means for creating a monitoring model based on the time-series data stored in the plant data input / storing means;
A monitoring processing unit that applies the monitoring model to the measurement data to determine normality / abnormality of a plant state and outputs the determination result;
The monitoring model creating means applies a principal component analysis to the time series data to constitute a load matrix for a plurality of principal components having a small contribution rate;
A principal component score characteristic evaluation unit that evaluates a statistical characteristic of the principal component score calculated by applying the load matrix to the time series data, and
The monitoring processing means includes a principal component score calculation unit that calculates a principal component score by applying the load matrix to the measurement data;
A principal component score test processing unit that tests a variance value change hypothesis of the principal component score by applying a sequential probability ratio test to the principal component score;
A hypothesis adoption rate determination unit that monitors a plant abnormality based on an acceptance rate of a variance value change hypothesis of the principal component score.
プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力・保存手段と、
前記プラントデータ入力・保存手段で保存された時系列データに基づいて監視モデルを作成する監視モデル作成手段と、
前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理手段と、を備えたプラント監視装置であって、
前記監視モデル作成手段は前記時系列データに主成分分析を適用して寄与率の大きな複数の主成分に対する第1の負荷行列を構成する第1の主成分分析部と、
前記主成分分析の結果から寄与率の小さな複数の主成分に対する第2の負荷行列を構成する第2の主成分分析部と、
前記第1の負荷行列を前記時系列データに適用して算出した推定偏差の統計的特性を評価する推定偏差特性評価部と、
前記第2の負荷行列を前記時系列データに適用して算出した主成分得点の統計的特性を評価する主成分得点特性評価部と、を具備し、
前記監視処理手段は前記測定データに前記第1の負荷行列を適用して推定偏差を算出する推定偏差算出部と、
前記測定データに前記第2の負荷行列を適用して主成分得点を算出する主成分得点算出部と、
前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理部と、
前記主成分得点に逐次確率比検定を適用して前記主成分得点の分散値変化仮説を検定する主成分得点検定処理部と、
前記推定偏差の分散値変化仮説の採択率および主成分得点の分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定部と、を具備することを特徴とするプラント監視装置。
Plant data input / storage means for inputting measured data of plant input variables and output variables and storing them as time series data,
Monitoring model creating means for creating a monitoring model based on the time-series data stored in the plant data input / storing means;
A monitoring processing unit that applies the monitoring model to the measurement data to determine normality / abnormality of a plant state and outputs the determination result;
The monitoring model creating means applies a principal component analysis to the time series data to form a first load matrix for a plurality of principal components having a large contribution rate;
A second principal component analysis unit constituting a second load matrix for a plurality of principal components having a small contribution rate from the result of the principal component analysis;
An estimated deviation characteristic evaluation unit that evaluates a statistical characteristic of the estimated deviation calculated by applying the first load matrix to the time series data;
A principal component score characteristic evaluation unit that evaluates a statistical characteristic of the principal component score calculated by applying the second load matrix to the time-series data; and
The monitoring processing means applies an estimated deviation by applying the first load matrix to the measurement data;
A principal component score calculating unit for calculating a principal component score by applying the second load matrix to the measurement data;
An estimated deviation test processing unit that tests a variance value change hypothesis of the estimated deviation by applying a sequential probability ratio test to the estimated deviation;
A principal component score test processing unit that tests a variance value change hypothesis of the principal component score by applying a sequential probability ratio test to the principal component score;
And a hypothesis adoption rate determination unit that monitors plant abnormalities based on the adoption rate of the variance deviation hypothesis of the estimated deviation and the adoption rate of the variance change hypothesis of the principal component score. .
前記入力変数の分散検定によりプラント状態を監視する入力異常監視処理手段と、を備えることを特徴とする請求項1乃至請求項4の何れか1項記載のプラント監視装置。 The plant monitoring apparatus according to any one of claims 1 to 4, further comprising an input abnormality monitoring processing unit that monitors a plant state by a variance test of the input variable.
Figure 0004922265
Figure 0004922265
プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力保存ステップと、
前記プラントデータ入力保存ステップで保存された時系列データに基づいて監視モデルを作成する監視モデル作成ステップと、
前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理ステップと、を備えるプラント監視方法であって、
前記監視モデル作成ステップは、前記時系列データを用いて出力誤差モデルを同定する出力誤差モデル同定ステップと、
前記出力誤差モデルを前記時系列データに適用して算出した前記出力変数の推定偏差の統計的特性を評価する推定偏差特性評価ステップと、を具備し、
前記出力監視処理ステップは、前記測定データに前記出力誤差モデルを適用して前記出力変数の推定偏差を算出する出力推定偏差算出ステップと、
前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理ステップと、
前記分散値変化仮説の採択率に基づいてプラントの異常を監視する仮説採択率判定ステップと、を具備することを特徴とするプラント監視方法。
A plant data input saving step for inputting measurement data of plant input variables and output variables and saving them as time series data,
A monitoring model creating step for creating a monitoring model based on the time-series data saved in the plant data input saving step;
A monitoring process step of applying the monitoring model to the measurement data to determine normality / abnormality of the plant state and outputting the determination result,
The monitoring model creation step includes an output error model identification step for identifying an output error model using the time series data;
An estimated deviation characteristic evaluation step for evaluating a statistical characteristic of an estimated deviation of the output variable calculated by applying the output error model to the time series data, and
The output monitoring processing step calculates an estimated deviation of the output variable by applying the output error model to the measurement data,
An estimated deviation test processing step of testing a variance value change hypothesis of the estimated deviation by applying a sequential probability ratio test to the estimated deviation;
A hypothesis adoption rate determination step for monitoring a plant abnormality based on the adoption rate of the variance value change hypothesis.
プラントの入力変数および出力変数の測定データを入力し時系列データとして保存するプラントデータ入力保存ステップと、
前記プラントデータ入力保存ステップで保存された時系列データに基づいて監視モデルを作成する監視モデル作成ステップと、
前記監視モデルを前記測定データに適用してプラント状態の正常/異常を判定し、当該判定結果を出力する監視処理ステップと、を備えるプラント監視方法であって、
前記監視モデル作成ステップは前記時系列データに主成分分析を適用して寄与率の大きな複数の主成分に対する第1の負荷行列を構成する第1の主成分分析ステップと、
前記第1の負荷行列を前記時系列データに適用して算出した推定偏差の統計的特性を評価する推定偏差特性評価ステップと、を具備し、
前記出力監視処理ステップは、前記測定データに前記負荷行列を適用して推定偏差を算出する出力推定偏差ステップと、
前記推定偏差に逐次確率比検定を適用して前記推定偏差の分散値変化仮説を検定する推定偏差検定処理ステップと、
前記推定偏差の分散値変化仮説の採択率に基づいてプラントの異常を監視する第1の仮説採択率判定ステップと、を具備することを特徴とするプラント監視方法。
A plant data input saving step for inputting measurement data of plant input variables and output variables and saving them as time series data,
A monitoring model creating step for creating a monitoring model based on the time-series data saved in the plant data input saving step;
A monitoring process step of applying the monitoring model to the measurement data to determine normality / abnormality of the plant state and outputting the determination result,
The monitoring model creation step includes applying a principal component analysis to the time series data to form a first load matrix for a plurality of principal components having a large contribution rate;
An estimated deviation characteristic evaluation step for evaluating a statistical characteristic of the estimated deviation calculated by applying the first load matrix to the time series data, and
The output monitoring processing step includes an output estimated deviation step of calculating an estimated deviation by applying the load matrix to the measurement data;
An estimated deviation test processing step of testing a variance value change hypothesis of the estimated deviation by applying a sequential probability ratio test to the estimated deviation;
And a first hypothesis adoption rate determination step of monitoring a plant abnormality based on an adoption rate of the estimated deviation variance change hypothesis.
前記監視モデル作成ステップは前記時系列データに主成分分析を適用して寄与率の小さな複数の主成分に対する第2の負荷行列を構成する第2の主成分分析ステップと、
前記第2の負荷行列を前記時系列データに適用して算出した主成分得点の統計的特性を評価する主成分得点特性評価ステップとをさらに備え、
前記出力監視処理ステップは、前記測定データに前記第2の負荷行列を適用して主成分得点を算出する主成分得点算出ステップと、
前記主成分得点に逐次確率比検定を適用して前記主成分得点の分散値変化仮説を検定する主成分得点検定処理ステップと、
前記主成分得点の分散値変化仮説の採択率に基づいてプラントの異常を監視する第2の仮説採択率判定ステップとをさらに備えたことを特徴とする請求項8記載のプラント監視方法。
The monitoring model creation step includes applying a principal component analysis to the time series data to configure a second load matrix for a plurality of principal components having a small contribution rate;
A principal component score characteristic evaluation step for evaluating a statistical characteristic of the principal component score calculated by applying the second load matrix to the time series data;
The output monitoring processing step includes a principal component score calculating step of calculating a principal component score by applying the second load matrix to the measurement data;
A principal component score test processing step of testing a variance value change hypothesis of the principal component score by applying a sequential probability ratio test to the principal component score;
9. The plant monitoring method according to claim 8, further comprising a second hypothesis adoption rate determination step of monitoring an abnormality of the plant based on an acceptance rate of the variance value change hypothesis of the principal component score.
前記監視処理ステップは、前記監視モデルを前記時系列データに適用してプラント状態を監視する出力監視処理ステップと、前記入力変数の分散検定によりプラント状態を監視する入力異常監視処理ステップと、を備えることを特徴とする請求項7乃至請求項9の何れか1項記載のプラント監視方法。 The monitoring processing step includes an output monitoring processing step for monitoring the plant state by applying the monitoring model to the time series data, and an input abnormality monitoring processing step for monitoring the plant state by a variance test of the input variable. 10. The plant monitoring method according to any one of claims 7 to 9, wherein:
JP2008211088A 2008-08-19 2008-08-19 Plant monitoring apparatus and plant monitoring method Active JP4922265B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008211088A JP4922265B2 (en) 2008-08-19 2008-08-19 Plant monitoring apparatus and plant monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008211088A JP4922265B2 (en) 2008-08-19 2008-08-19 Plant monitoring apparatus and plant monitoring method

Publications (2)

Publication Number Publication Date
JP2010049359A JP2010049359A (en) 2010-03-04
JP4922265B2 true JP4922265B2 (en) 2012-04-25

Family

ID=42066408

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008211088A Active JP4922265B2 (en) 2008-08-19 2008-08-19 Plant monitoring apparatus and plant monitoring method

Country Status (1)

Country Link
JP (1) JP4922265B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018014093A (en) * 2016-07-06 2018-01-25 Jfeスチール株式会社 Process state diagnosis method and state diagnosis device
US11112782B2 (en) 2017-06-19 2021-09-07 Jfe Steel Corporation Process anomalous state diagnostic device and process anomalous state diagnosis method
WO2022085350A1 (en) 2020-10-22 2022-04-28 Jfeスチール株式会社 Method for building abnormality diagnosis model, abnormality diagnosis method, device for building abnormality diagnosis model, and abnormality diagnosis device
WO2022091639A1 (en) 2020-10-27 2022-05-05 Jfeスチール株式会社 Abnormality diagnosing model construction method, abnormality diagnosing method, abnormality diagnosing model construction device, and abnormality diagnosing device

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8892382B2 (en) * 2011-09-26 2014-11-18 General Electric Company Systems and methods for condition-based power plant sensor calibration
JP2016031568A (en) * 2014-07-28 2016-03-07 株式会社Ihi Abnormality diagnosis apparatus, abnormality diagnosis method, and abnormality diagnosis program
KR102492514B1 (en) * 2022-10-21 2023-01-30 가온플랫폼 주식회사 Alarm method using sequential probability ratio
CN116384817B (en) * 2023-03-30 2024-01-09 沧州市农林科学院 Method for evaluating stress resistance of plants

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2721799B2 (en) * 1994-04-14 1998-03-04 四国電力株式会社 Machine abnormality judgment method
JP4046309B2 (en) * 1999-03-12 2008-02-13 株式会社東芝 Plant monitoring device
JP2001356818A (en) * 2000-06-12 2001-12-26 Mitsubishi Heavy Ind Ltd On-line maintenance device for in-plant detector

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018014093A (en) * 2016-07-06 2018-01-25 Jfeスチール株式会社 Process state diagnosis method and state diagnosis device
US11112782B2 (en) 2017-06-19 2021-09-07 Jfe Steel Corporation Process anomalous state diagnostic device and process anomalous state diagnosis method
WO2022085350A1 (en) 2020-10-22 2022-04-28 Jfeスチール株式会社 Method for building abnormality diagnosis model, abnormality diagnosis method, device for building abnormality diagnosis model, and abnormality diagnosis device
WO2022091639A1 (en) 2020-10-27 2022-05-05 Jfeスチール株式会社 Abnormality diagnosing model construction method, abnormality diagnosing method, abnormality diagnosing model construction device, and abnormality diagnosing device

Also Published As

Publication number Publication date
JP2010049359A (en) 2010-03-04

Similar Documents

Publication Publication Date Title
JP4922265B2 (en) Plant monitoring apparatus and plant monitoring method
EP3776113B1 (en) Apparatus and method for controlling system
US10747188B2 (en) Information processing apparatus, information processing method, and, recording medium
JP5306902B2 (en) System and method for high performance condition monitoring of asset systems
JP5179086B2 (en) Industrial process monitoring method and monitoring system
JP4046309B2 (en) Plant monitoring device
CN111459700A (en) Method and apparatus for diagnosing device failure, diagnostic device, and storage medium
US11657121B2 (en) Abnormality detection device, abnormality detection method and computer readable medium
JP3651693B2 (en) Plant monitoring diagnosis apparatus and method
KR20190025474A (en) Apparatus and Method for Predicting Plant Data
JP6521096B2 (en) Display method, display device, and program
WO2017138238A1 (en) Monitoring device, and method for controlling monitoring device
JP7031743B2 (en) Anomaly detection device
JP6164311B1 (en) Information processing apparatus, information processing method, and program
US20190265088A1 (en) System analysis method, system analysis apparatus, and program
WO2019087508A1 (en) Monitoring target selecting device, monitoring target selecting method and program
US7949497B2 (en) Machine condition monitoring using discontinuity detection
TWI755794B (en) Abnormality diagnosis method, abnormality diagnosis apparatus, and abnormality diagnosis program
WO2017138239A1 (en) Monitoring device, and method for controlling monitoring device
JP6915693B2 (en) System analysis method, system analyzer, and program
KR102340395B1 (en) Apparatus for diagnosing plant failure and method therefor
JP2016080585A (en) Plant state analysis device
JP6734362B2 (en) Monitoring device, monitoring method, program
JP5948998B2 (en) Abnormality diagnosis device
JP6347771B2 (en) Abnormality diagnosis apparatus, abnormality diagnosis method, and abnormality diagnosis program

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20100424

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20101214

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20111220

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20111217

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120110

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120203

R151 Written notification of patent or utility model registration

Ref document number: 4922265

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150210

Year of fee payment: 3