temperature
information
backup
layer capacitor
electric double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007154029A
Other languages
Japanese (ja)
Other versions
JP2008306895A (en
Inventor
雄一 田村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pioneer Corp
Original Assignee
Pioneer Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pioneer Corp filed Critical Pioneer Corp
Priority to JP2007154029A priority Critical patent/JP4838762B2/en
Publication of JP2008306895A publication Critical patent/JP2008306895A/en
Application granted granted Critical
Publication of JP4838762B2 publication Critical patent/JP4838762B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/13Energy storage using capacitors

Landscapes

  • Electric Double-Layer Capacitors Or The Like (AREA)
  • Fixed Capacitors And Capacitor Manufacturing Machines (AREA)
  • Stand-By Power Supply Arrangements (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To precisely calculate a time allowing backup supply of an electric double-layer capacitor element mounted on an information processor. <P>SOLUTION: In a temperature estimating part 212, in addition to a detection result or the like by a temperature sensor during normal power supply, the temperature of the electric double-layer capacitor not only during normal power supply but also during backup, is estimated by utilizing the standard information on temperature change, and the information on the observed temperature or the like obtained via the Internet. In a capacity estimating part 213, on the basis of the temperature estimated in the temperature estimating part 212 and temperature characteristic information 123, a reduced amount of electrostatic capacity of the electric double-layer capacitor element is estimated. In a backup time calculation part 215, according to a calculation instruction CAC issued from a control processing part 211 just before the information processor is turned OFF, and on the basis of an estimation result by the capacity estimating part 213, the time BKT allowing the backup supply is calculated. <P>COPYRIGHT: (C)2009,JPO&amp;INPIT

Description

本発明は、情報処理装置、バックアップ供給時間算出方法、バックアップ供給時間算出プログラム、及び、当該バックアップ供給時間算出プログラムを記録した記録媒体に関する。   The present invention relates to an information processing apparatus, a backup supply time calculation method, a backup supply time calculation program, and a recording medium on which the backup supply time calculation program is recorded.

従来から、ノート型パソコン等の様々な可搬型の電子機器においては、多くの機器において、バックアップ用電源として、バッテリが搭載されている。かかるバッテリとしては、一般に充電可能な2次電池が採用されている。   Conventionally, in various portable electronic devices such as notebook personal computers, a battery is mounted as a backup power source in many devices. As such a battery, a rechargeable secondary battery is generally employed.

かかるバックアップ用電源がバックアップ電源として搭載されている電子機器は、安定した電力供給の行える家庭内等の場所以外でも、バッテリを動作電力源として使用することができ、非常に便利なものである。しかし、バッテリの電力供給能力には限りがあるため、長時間にわたって電子機器への電力供給を継続すると、電子機器の使用中にバッテリからの電力供給が途絶えてしまう。かかる動作電力の供給の停止が突然発生することは、利用者にとって重要な情報の消失につながり、好ましくない。   An electronic device in which such a backup power source is mounted as a backup power source is very convenient because it can use a battery as an operating power source in places other than homes where stable power supply can be performed. However, since the power supply capability of the battery is limited, if the power supply to the electronic device is continued for a long time, the power supply from the battery is interrupted while the electronic device is being used. Sudden stoppage of the supply of operating power leads to loss of information important for the user, which is not preferable.

そこで、バッテリ切れとなる前にバッテリ残量を精度良く知る技術が提案されている(特許文献1等参照:以下、「従来例」と呼ぶ)。この従来例の技術では、バッテリにおける放電特性の温度特性の変化を考慮しつつ、バッテリパックの内部温度を精度良く推定したうえで、バッテリにおける放電温度特性の変化を考慮して、バッテリ残量、ひいてはバッテリによる動作電力のバックアップ可能期間の算出誤差を低減するようにしている。   Therefore, a technique for accurately knowing the remaining battery level before the battery runs out has been proposed (see Patent Document 1 and the like: hereinafter referred to as “conventional example”). In this conventional technique, the internal temperature of the battery pack is accurately estimated while considering the change in the temperature characteristic of the discharge characteristic in the battery, and the remaining battery level, As a result, the calculation error of the backupable period of the operating power by the battery is reduced.

特開2005−147814号公報JP 2005-147814 A

ところで、電荷の蓄積機能を有するキャパシタ素子技術の進歩を背景として、近年における環境への配慮の要請に応えて、電子機器の全体とまではいかなくとも、一部の部品について、大容量の電気二重層キャパシタ素子で動作電力のバックアップ供給を行うことが提唱されている。かかる電気二重層キャパシタ素子による動作電力のバックアップ供給においても、上述のバッテリによるバックアップの場合と同様に、動作電力のバックアップ可能期間の算出誤差を低減することが求められる。   By the way, in response to the recent demand for environmental considerations, against the background of advances in capacitor element technology that has a charge storage function, high-capacity electrical It has been proposed to provide a backup supply of operating power with a double layer capacitor element. Also in the backup supply of the operating power by the electric double layer capacitor element, it is required to reduce the calculation error of the operation power backup possible period, as in the case of the backup by the battery.

しかしながら、バッテリと電気二重層キャパシタ素子とでは、動作特性が異なるため、電気二重層キャパシタ素子の場合に、バッテリと同様の方法で動作電力のバックアップ可能期間の算出誤差を低減させることはできない。すなわち、バッテリの場合には、バックアップ期間中における放電特性の温度変化が算出誤差の重要な要因となるが、電気二重層キャパシタ素子の場合には、バックアップ期間中における放電特性の温度変化は小さく、バックアップ可能期間の算出誤差に対する大きな要因とはならない。   However, since the operation characteristics are different between the battery and the electric double layer capacitor element, in the case of the electric double layer capacitor element, it is not possible to reduce the calculation error of the operation power backup possible period in the same manner as the battery. That is, in the case of a battery, the temperature change in the discharge characteristics during the backup period is an important factor in the calculation error, but in the case of an electric double layer capacitor element, the temperature change in the discharge characteristics during the backup period is small. It is not a big factor for the calculation error of the backup possible period.

このため、電気二重層キャパシタ素子をバックアップ電源として採用した場合に、バックアップ可能期間の算出誤差を低減する技術が待望されている。かかる要望に応えることが、本発明が解決すべき課題の一つとして挙げられる。   For this reason, when an electric double layer capacitor element is employed as a backup power source, a technique for reducing the calculation error of the backup possible period is desired. Meeting this demand is one of the problems to be solved by the present invention.

本発明は、上記の事情を鑑みてなされたものであり、電気二重層キャパシタ素子をバックアップ電源に採用した場合に、バックアップ期間を精度良く算出することにより、利用者の利便性を向上することができる情報処理装置及びバックアップ供給時間算出方法を提供することを目的とする。   The present invention has been made in view of the above circumstances, and when an electric double layer capacitor element is adopted as a backup power source, it is possible to improve the convenience of the user by calculating the backup period with high accuracy. An object of the present invention is to provide an information processing apparatus and a backup supply time calculation method.

請求項1に記載の発明は、供給された電圧値に対応する電荷を蓄積する電気二重層キャパシタ素子と;外部電源から供給された動作電力を利用して動作するとともに、前記外部電源からの動作電力の供給が途絶えた場合には、前記電気二重層キャパシタ素子から動作電力のバックアップ供給を受けて動作する特定部品と;前記電気二重層キャパシタ素子の温度の過去における変化の履歴を推定する温度履歴推定手段と;前記温度履歴推定手段による推定結果に基づいて、前記電気二重層キャパシタ素子の静電容量情報を推定する容量推定手段と;前記容量推定手段による推定結果に基づいて、前記電気二重層キャパシタ素子から前記特定部品への動作電力のバックアップ供給が可能な時間を算出するバックアップ時間算出手段と;所定の地域ごとに推定された気温変動の情報である標準的気温情報を記憶する気温情報記憶手段と;を備え、前記温度履歴推定手段は、前記外部電源から動作電力が供給されていない期間であるバックアップ期間については、前記気温情報記憶手段に記憶されている標準的気温情報の中から、設置地点が属すると推定される地域の標準的気温情報である推定気温情報を特定し、前記推定気温情報に基づいて前記電気二重層キャパシタ素子の温度変化を推定する、ことを特徴とする情報処理装置である。
According to the first aspect of the present invention, there is provided an electric double layer capacitor element that accumulates electric charges corresponding to a supplied voltage value; and operates using operating power supplied from an external power source, and operates from the external power source A specific component that operates by receiving a backup supply of operating power from the electric double layer capacitor element when power supply is interrupted; a temperature history that estimates a history of changes in the temperature of the electric double layer capacitor element in the past Estimating means; capacity estimating means for estimating capacitance information of the electric double layer capacitor element based on the estimation result by the temperature history estimating means; and based on the estimation result by the capacity estimating means, the electric double layer and backup time calculation means for calculating the operating power backup supply possible time of the to a particular component from the capacitor element; predetermined region Temperature information storage means for storing standard temperature information, which is information on the temperature fluctuation estimated in step (b), and the temperature history estimation means is a backup period in which operating power is not supplied from the external power source. For the standard temperature information stored in the temperature information storage means, the estimated temperature information, which is the standard temperature information of the region where the installation point is estimated to belong, is specified, and based on the estimated temperature information An information processing apparatus characterized by estimating a temperature change of the electric double layer capacitor element .

請求項8に記載の発明は、供給された電圧値に対応する電荷を蓄積する電気二重層キャパシタ素子と;外部電源から供給された動作電力を利用して動作するとともに、前記外部電源からの動作電力の供給が途絶えた場合には、前記電気二重層キャパシタ素子から動作電力のバックアップ供給を受けて動作する特定部品と;所定の地域ごとに推定された気温変動の情報である標準的気温情報を記憶する気温情報記憶手段と;を備える情報処理装置において使用されるバックアップ供給時間算出方法であって、前記電気二重層キャパシタ素子の温度の過去における変化の履歴を推定する温度履歴推定工程と;前記温度履歴推定工程における推定結果に基づいて、前記電気二重層キャパシタ素子の静電容量情報を推定する容量推定工程と;前記容量推定工程における推定結果に基づいて、前記電気二重層キャパシタ素子から前記特定部品への動作電力のバックアップ供給が可能な時間を算出するバックアップ時間算出工程と;を備え、前記温度履歴推定工程では、前記外部電源から動作電力が供給されていない期間であるバックアップ期間については、前記気温情報記憶手段に記憶されている標準的気温情報の中から、設置地点が属すると推定される地域の標準的気温情報である推定気温情報を特定し、前記推定気温情報に基づいて前記電気二重層キャパシタ素子の温度変化を推定する、ことを特徴とするバックアップ供給時間算出方法である。
According to an eighth aspect of the present invention, there is provided an electric double layer capacitor element that accumulates electric charges corresponding to a supplied voltage value; and operates using operating power supplied from an external power source, and operates from the external power source When the supply of electric power is interrupted, a specific part that operates by receiving a backup supply of operating power from the electric double layer capacitor element; and standard temperature information that is information of temperature fluctuation estimated for each predetermined region A temperature supply estimation method for estimating a history of changes in the temperature of the electric double layer capacitor element in the past; A capacitance estimation step of estimating capacitance information of the electric double layer capacitor element based on an estimation result in the temperature history estimation step; Based on the estimation result in the constant step, the electrical double layer backup time calculation step of the capacitor element to calculate the operating power backup supply possible time of the to a particular component; comprises a, in the temperature history estimation step, wherein For the backup period during which no operating power is supplied from the external power supply, the standard temperature information of the area where the installation point is estimated to belong to from the standard temperature information stored in the temperature information storage means The estimated supply temperature information is specified, and the temperature change of the electric double layer capacitor element is estimated based on the estimated temperature information .

請求項9に記載の発明は、請求項8に記載のバックアップ供給時間算出方法を演算手段に実行させる、ことを特徴するバックアップ供給時間算出プログラムである。
The invention according to claim 9 is a backup supply time calculation program characterized by causing a calculation means to execute the backup supply time calculation method according to claim 8 .

請求項10に記載の発明は、請求項9に記載のバックアップ供給時間算出プログラムが、演算手段により読み取り可能に記録されている、ことを特徴とする記録媒体である。

A tenth aspect of the present invention is a recording medium in which the backup supply time calculation program according to the ninth aspect is recorded so as to be readable by a calculation means.

以下、本発明の一実施形態を、図1〜図9を参照して説明する。なお、以下の説明及び図面においては、同一又は同等の要素には同一の符号を付し、重複する説明は省略する。   Hereinafter, an embodiment of the present invention will be described with reference to FIGS. In the following description and drawings, the same or equivalent elements will be denoted by the same reference numerals, and redundant description will be omitted.

[構成]
図1及び図2には、一実施形態に係る情報処理装置100の概略的な構成がブロック図にて示されている。なお、この情報処理装置100は、図1に示されるように、ナビゲーション本体部600と一体となって車両に搭載されるナビゲーション装置の一部を構成するものであり、ナビゲーション本体部600から自由に着脱できるものとする。また、情報処理装置100は、図2に示されるように、装着キット800に挿入することで、家庭内においても使用することができるものとする。
[Constitution]
1 and 2 are block diagrams illustrating a schematic configuration of an information processing apparatus 100 according to an embodiment. As shown in FIG. 1, the information processing apparatus 100 constitutes a part of a navigation device that is integrated with the navigation main body 600 and is mounted on the vehicle. It shall be removable. In addition, as shown in FIG. 2, the information processing apparatus 100 can be used at home by being inserted into the mounting kit 800.

この図1及び図2に示されるように、情報処理装置100は、制御ユニット110と、ハードディスク装置等の気温情報記憶手段及び容量情報記憶手段としての記憶装置120とを備えている。また、情報処理装置100は、温度検出手段としての温度検出ユニット130と、表示手段としての表示部140とを備えている。   As shown in FIGS. 1 and 2, the information processing apparatus 100 includes a control unit 110 and a storage device 120 as temperature information storage means such as a hard disk device and capacity information storage means. In addition, the information processing apparatus 100 includes a temperature detection unit 130 as a temperature detection unit and a display unit 140 as a display unit.

なお、上記の制御ユニット110以外の要素120〜140は、制御ユニット110に接続されている。   The elements 120 to 140 other than the control unit 110 are connected to the control unit 110.

制御ユニット110は、情報処理装置100、ひいてはナビゲーション装置の全体を統括制御する。この制御ユニット110の詳細については、後述する。   The control unit 110 performs overall control of the information processing apparatus 100 and thus the entire navigation apparatus. Details of the control unit 110 will be described later.

記憶装置120は、不揮発性の記憶装置であるハードディスク装置等から構成される。記憶装置120内には、ナビゲーション利用情報121、標準的気温情報122、温度特性情報123などの様々な情報が記憶されている。ここで、ナビゲーション利用情報121には、地図情報等のナビゲーションのために利用される情報が含まれている。   The storage device 120 includes a hard disk device that is a nonvolatile storage device. In the storage device 120, various information such as navigation usage information 121, standard air temperature information 122, and temperature characteristic information 123 are stored. Here, the navigation usage information 121 includes information used for navigation such as map information.

標準的気温情報122とは、所定の地域ごとに推定された気温変動の情報である。この標準的気温情報122には、過去の気温の観測結果等に基づいて推定した、1月1日から12月31日までの1時間ごとの気温情報が含まれている。   The standard temperature information 122 is information on temperature fluctuation estimated for each predetermined area. The standard temperature information 122 includes hourly temperature information from January 1 to December 31 estimated based on past temperature observation results and the like.

温度特性情報123とは、後述する電気二重層キャパシタ素子113の、静電容量の時間変化の温度特性情報である。かかる温度特性情報123の例をグラフ化したものが、図3に示されている。図3において、横軸は電気二重層キャパシタ素子113がさらされる温度であり、縦軸はその温度において電気二重層キャパシタ素子113の静電容量が、劣化により、当初の値の所定割合以下になるまでの時間(以下、「寿命時間」と呼ぶ)である。この図3に示されるように、電気二重層キャパシタ素子113は、一般に、低温下に比べて、高温下の方が、寿命時間が短いという特性を有している。   The temperature characteristic information 123 is temperature characteristic information of capacitance change with time of an electric double layer capacitor element 113 described later. A graph of an example of such temperature characteristic information 123 is shown in FIG. In FIG. 3, the horizontal axis represents the temperature to which the electric double layer capacitor element 113 is exposed, and the vertical axis represents the capacitance of the electric double layer capacitor element 113 at that temperature that falls below a predetermined ratio of the initial value due to deterioration. (Hereinafter referred to as “lifetime”). As shown in FIG. 3, the electric double layer capacitor element 113 generally has a characteristic that the lifetime is shorter at a high temperature than at a low temperature.

図1及び図2に戻り、温度検出ユニット130は、温度センサ等を備えて構成され、情報処理装置100の内部における電気二重層キャパシタ素子113と所定の位置関係にある位置に配設されている。このため、温度検出ユニット130による検出結果と、電気二重層キャパシタ素子113がさらされる温度とは、情報処理装置100に通常の通電が行われている場合には、所定の関係を有している。   1 and 2, the temperature detection unit 130 includes a temperature sensor and the like, and is disposed at a position that is in a predetermined positional relationship with the electric double layer capacitor element 113 inside the information processing apparatus 100. . Therefore, the detection result by the temperature detection unit 130 and the temperature at which the electric double layer capacitor element 113 is exposed have a predetermined relationship when the information processing apparatus 100 is normally energized. .

本実施形態においては、温度検出ユニット130は、記憶装置120に内蔵されている。この温度検出ユニット130は、記憶装置120内の温度を検出する。温度検出ユニット130による検出結果は、ディスク温度TPDとして、制御ユニット110へ向けて送られる。   In the present embodiment, the temperature detection unit 130 is built in the storage device 120. The temperature detection unit 130 detects the temperature in the storage device 120. The detection result by the temperature detection unit 130 is sent to the control unit 110 as the disk temperature TPD.

表示部140は、コレステリック液晶表示部等を備えて構成されている。コレステリック液晶は、一度画面に画像を表示すれば、動作電力を供給しなくても表示の維持が可能な記憶型液晶である。この表示部140は、制御ユニット110による制御のもとで、制御ユニットから送られてきた表示データIMDに基づく画像を表示する。   The display unit 140 includes a cholesteric liquid crystal display unit and the like. A cholesteric liquid crystal is a storage-type liquid crystal that can maintain a display once an image is displayed on the screen without supplying operating power. The display unit 140 displays an image based on the display data IMD sent from the control unit under the control of the control unit 110.

情報処理装置100は、上述したように、ナビゲーション本体部600と一体となって、ナビゲーション装置の一部を構成する(図1参照)。このナビゲーション本体部600は、音出力ユニット610と、表示ユニット620と、操作入力ユニット630と、走行センサインターフェイス部640と、GPS受信ユニット650とを備えている。また、ナビゲーション本体部600は、電力供給部660を備えている。情報処理装置100がナビゲーション本体部600に装着された場合、上記の要素のうち要素610〜650は、コネクタによって、制御ユニット110に接続される。   As described above, the information processing apparatus 100 is integrated with the navigation main body 600 and constitutes a part of the navigation apparatus (see FIG. 1). The navigation main body 600 includes a sound output unit 610, a display unit 620, an operation input unit 630, a travel sensor interface unit 640, and a GPS receiving unit 650. In addition, the navigation main body 600 includes a power supply unit 660. When the information processing apparatus 100 is mounted on the navigation main body 600, the elements 610 to 650 among the above elements are connected to the control unit 110 by connectors.

音出力ユニット610は、(i)制御ユニット110から受信したデジタル音声データをアナログ信号に変換するDA変換器(Digital to Analog Converter)と、(ii)当該DA変換器から出力されたアナログ信号を増幅する増幅器と、(iii)増幅されたアナログ信号を音声に変換するスピーカとを備えて構成されている。この音出力ユニット610は、制御ユニット110による制御のもとで、車両の進行方向、走行状況、交通状況等の案内用音声、音楽等を出力する。   The sound output unit 610 includes (i) a DA converter (Digital to Analog Converter) that converts digital audio data received from the control unit 110 into an analog signal, and (ii) amplifies the analog signal output from the DA converter. And (iii) a speaker that converts the amplified analog signal into sound. Under the control of the control unit 110, the sound output unit 610 outputs guidance voice, music, and the like such as the traveling direction of the vehicle, the traveling situation, and the traffic situation.

表示ユニット620は、(i)液晶パネル、有機EL(Electric Luminescence)パネル、PDP(Plasma Display Panel)等の表示デバイスと、(ii)制御ユニット110から送出された表示制御データに基づいて、表示ユニット620全体の制御を行うグラフィックレンダラ等の表示コントローラと、(iii)表示画像データを記憶する表示画像メモリ等を備えて構成されている。この表示ユニット620は、制御ユニット110による制御のもとで、地図情報、ルート情報、操作ガイダンス情報等を表示する。   The display unit 620 is based on (i) a display device such as a liquid crystal panel, an organic EL (Electric Luminescence) panel, a PDP (Plasma Display Panel), and (ii) display control data sent from the control unit 110. The display 620 includes a display controller such as a graphic renderer that controls the entire 620, and (iii) a display image memory that stores display image data. The display unit 620 displays map information, route information, operation guidance information, and the like under the control of the control unit 110.

操作入力ユニット630は、ナビゲーション本体部600に設けられたキー部、あるいはキー部を備えるリモート入力装置等により構成される。ここで、本体部に設けられたキー部としては、表示ユニット620の表示デバイスに設けられたタッチパネルを用いることができる。なお、キー部を有する構成に代えて、音声入力する構成を採用することもできる。   The operation input unit 630 includes a key unit provided in the navigation main body 600 or a remote input device including the key unit. Here, as a key part provided in the main body part, a touch panel provided in a display device of the display unit 620 can be used. In addition, it can replace with the structure which has a key part, and the structure which inputs voice can also be employ | adopted.

この操作入力ユニット630を利用者が操作することにより、ナビゲーション装置の動作内容の設定が行われる。例えば、目的地の設定、情報の検索設定、車両の走行状況表示設定等を、利用者が操作入力ユニット630を利用して行う。こうした入力内容は、操作入力ユニット630から制御ユニット110へ送られる。   When the user operates the operation input unit 630, the operation content of the navigation device is set. For example, the user uses the operation input unit 630 to perform destination setting, information search setting, vehicle travel status display setting, and the like. Such input contents are sent from the operation input unit 630 to the control unit 110.

走行センサインターフェイス部640は、車両に搭載された走行センサユニット500との間におけるデータ授受に関して利用される。ここで、走行センサユニット500は、(i)車両の移動速度を検出する車速センサと、(ii)車両に作用している加速度を検出する加速度センサと、(iii)車両の角速度を検出する角速度センサとを備えている。ここで、車速センサは、車軸や車輪の回転により出力されるパルス信号を検出する。また、加速度センサは、例えば、3次元方向の加速度を検出する。また、加速度センサは、例えば、いわゆるジャイロセンサとして構成され、加速度を検出する。これらの検出結果は、走行センサインターフェイス部640を介して、制御ユニット110へ向けて送られる。   The travel sensor interface unit 640 is used for data exchange with the travel sensor unit 500 mounted on the vehicle. Here, the traveling sensor unit 500 includes (i) a vehicle speed sensor that detects the moving speed of the vehicle, (ii) an acceleration sensor that detects acceleration acting on the vehicle, and (iii) an angular velocity that detects the angular speed of the vehicle. And a sensor. Here, the vehicle speed sensor detects a pulse signal output by rotation of an axle or a wheel. The acceleration sensor detects, for example, acceleration in a three-dimensional direction. The acceleration sensor is configured as a so-called gyro sensor, for example, and detects acceleration. These detection results are sent to the control unit 110 via the travel sensor interface unit 640.

GPS受信ユニット650は、複数のGPS衛星からの電波の受信結果に基づいて、車両の現在位置の擬似座標値を算出し、制御ユニット110へ報告する。また、GPS受信ユニット650は、GPS衛星から送出された時刻情報に基づいて、現在時刻を計時し、制御ユニット110へ送る。   The GPS receiving unit 650 calculates a pseudo coordinate value of the current position of the vehicle based on reception results of radio waves from a plurality of GPS satellites, and reports it to the control unit 110. Further, the GPS receiving unit 650 measures the current time based on the time information transmitted from the GPS satellite and sends the current time to the control unit 110.

電力供給部660は、車両電源700から供給された電力を使用して、要素610〜650の動作用電力と、情報処理装置100へ供給する動作用電力APWを生成する。   The power supply unit 660 uses the power supplied from the vehicle power supply 700 to generate the power for operation of the elements 610 to 650 and the power for operation APW supplied to the information processing apparatus 100.

また、情報処理装置100は、上述したように、装着キット800に挿入することで、家庭内においても使用することできる(図2参照)。この装着キット800は、パーソナルコンピュータとの接続に際してインターフェイシングを行うパソコンインターフェイス部810と、映像情報供給部820と、音声情報供給部830とを備えている。また、装着キット800は、電力供給部860を備えている。情報処理装置100が装着キット800に挿入された場合、上記の要素のうち要素810〜830は、コネクタによって、制御ユニット110に接続される。   Further, as described above, the information processing apparatus 100 can be used at home by inserting it into the mounting kit 800 (see FIG. 2). The mounting kit 800 includes a personal computer interface unit 810 that performs interfacing when connected to a personal computer, a video information supply unit 820, and an audio information supply unit 830. The mounting kit 800 includes a power supply unit 860. When the information processing apparatus 100 is inserted into the mounting kit 800, the elements 810 to 830 among the above elements are connected to the control unit 110 by connectors.

パソコンインターフェイス部810は、情報処理装置100と外部機器であるパーソナルコンピュータ(以下、略して「パソコン」とも呼ぶ)との間におけるデータ授受に際して利用される。本実施形態では、装着キット800にパソコンが接続されている場合に、制御ユニット110から後述する設置位置情報PSI及び指定時間帯を伴う観測気温情報の取得要求を受けると、パソコンは、インターネットを介して、設置位置情報PSIが属する地域において指定時間帯に実際に観測された気温情報である観測気温OTIを取得し、当該観測気温OTIを、制御ユニット110へ向けて送る。   The personal computer interface unit 810 is used for data exchange between the information processing apparatus 100 and a personal computer (hereinafter also referred to as “personal computer” for short) as an external device. In the present embodiment, when a personal computer is connected to the mounting kit 800, upon receiving an acquisition request for observation temperature information accompanied by installation position information PSI and a specified time zone, which will be described later, from the control unit 110, the personal computer is connected via the Internet. Thus, the observed temperature OTI, which is the temperature information actually observed in the designated time zone in the area to which the installation position information PSI belongs, is acquired, and the observed temperature OTI is sent to the control unit 110.

映像情報供給部820は、制御ユニット110からの映像情報を受ける。そして、装着キット800にテレビジョン受像機等の映像表示装置が接続されている場合には、映像情報供給部820は、この映像情報を、映像表示装置へ向けて出力する。   The video information supply unit 820 receives video information from the control unit 110. When a video display device such as a television receiver is connected to the mounting kit 800, the video information supply unit 820 outputs this video information to the video display device.

音声情報供給部830は、制御ユニットからの音声情報を受ける。そして、装着キット800にミニコンポ等の音響装置が接続されている場合には、音声情報供給部830は、この音声情報を、音響装置へ向けて出力する。   The audio information supply unit 830 receives audio information from the control unit. When an audio device such as a mini component is connected to the mounting kit 800, the audio information supply unit 830 outputs this audio information toward the audio device.

電力供給部860は、家庭電源900(例えば、日本国内においては、交流100Vの商用電源)から供給された電力を使用して、要素810〜830の動作用電力と、情報処理装置100へ供給する動作用電力APWを生成する。   The power supply unit 860 supplies power for operation of the elements 810 to 830 and the information processing apparatus 100 using power supplied from the home power supply 900 (for example, commercial power supply of AC 100V in Japan). Operation power APW is generated.

制御ユニット110は、図4及び図5に示されるように、ナビゲーション処理部111と、計算処理部112とを備えている。また、制御ユニット110は、電気二重層キャパシタ素子113と、タイマ集積回路114とを備えている。なお、図4には、情報処理装置100がナビゲーション本体部600に装着されたときにおけるナビゲーション本体部600の構成要素との接続態様が示され、図5には、情報処理装置100が装着キット800に挿入されたときにおける装着キット800の構成要素との接続態様が示されている。   As shown in FIGS. 4 and 5, the control unit 110 includes a navigation processing unit 111 and a calculation processing unit 112. The control unit 110 includes an electric double layer capacitor element 113 and a timer integrated circuit 114. 4 shows a connection mode with the components of the navigation main body 600 when the information processing apparatus 100 is mounted on the navigation main body 600, and FIG. The connection aspect with the component of the mounting | wearing kit 800 when inserted in is shown.

ナビゲーション処理部111は、記憶装置120にアクセスして、ナビゲーション利用情報121における地図情報等を適宜参照し、かつ上述した構成要素610〜650を利用して、利用者にナビゲーション情報を提供する。すなわち、ナビゲーション処理に対する操作入力ユニット630からの入力結果に沿って、走行センサユニット500による検出結果及びGPS受信ユニット650による測位結果に対応して、記憶装置120に記憶されたナビゲーション用のデータを適宜読み出す。つまり、ナビゲーション処理部111は、(a)利用者が指定する地域の地図を表示ユニット620の表示デバイスに表示するための地図表示、(b)自車が地図上のどこに位置するのか、また、どの方角に向かっているのかを算出し、表示ユニット620の表示デバイスに表示して利用者に提示するマップマッチング、(c)現在自車が存在する位置から、利用者が指定する任意の位置である目的地までの最適ルート検索、(d)設定されたルートに沿って目的地まで運転するときに、表示ユニット620の表示デバイスに案内表示をしたり、音出力ユニット610のスピーカを用いて音声案内を出力したりする、といったようなルート案内等を行う。   The navigation processing unit 111 accesses the storage device 120, appropriately refers to the map information or the like in the navigation usage information 121, and provides the navigation information to the user by using the above-described components 610 to 650. That is, according to the input result from the operation input unit 630 for the navigation process, the navigation data stored in the storage device 120 is appropriately stored corresponding to the detection result by the traveling sensor unit 500 and the positioning result by the GPS receiving unit 650. read out. That is, the navigation processing unit 111 (a) a map display for displaying a map of an area specified by the user on the display device of the display unit 620, (b) where the vehicle is located on the map, Calculate which direction it is heading and display it on the display device of the display unit 620 and present it to the user. (C) From the position where the vehicle is present, at any position specified by the user Optimal route search to a certain destination, (d) When driving to a destination along a set route, guidance display is displayed on the display device of the display unit 620, and voice is output using the speaker of the sound output unit 610. Route guidance such as outputting guidance is performed.

なお、ナビゲーション処理部111は、新たに現在位置を計測するたびに、計測結果を設置位置情報PSIとして、計算処理部112へ向けて送るようになっている。   The navigation processing unit 111 sends the measurement result to the calculation processing unit 112 as installation position information PSI every time a new current position is measured.

計算処理部112は、温度検出ユニット130による検出結果、標準的気温情報STI、観測気温情報OTI等に基づいて、情報処理装置100に搭載された電気二重層キャパシタ素子113のバックアップ供給時間を算出する。この計算処理部112は、図6に示されるように、表示制御手段としての制御処理部211と、温度履歴推定手段としての温度推定部212とを備えている。また、計算処理部112は、容量推定手段としての容量推定部213と、履歴記憶部214と、バックアップ時間算出手段としてのバックアップ時間算出部215とを備えている。   The calculation processing unit 112 calculates the backup supply time of the electric double layer capacitor element 113 mounted on the information processing apparatus 100 based on the detection result by the temperature detection unit 130, the standard temperature information STI, the observed temperature information OTI, and the like. . As shown in FIG. 6, the calculation processing unit 112 includes a control processing unit 211 as a display control unit and a temperature estimation unit 212 as a temperature history estimation unit. The calculation processing unit 112 includes a capacity estimation unit 213 as a capacity estimation unit, a history storage unit 214, and a backup time calculation unit 215 as a backup time calculation unit.

制御処理部211は、計算処理部112におけるバックアップ供給時間の算出処理を制御する。制御処理部211は、温度推定部212へ向けて、温度推定指令ESCを発行する。この温度推定指令ESCには、「通常推定指令」と「バックアップ期間推定指令」の2種類がある。「通常推定指令」は、情報処理装置100がナビゲーション本体部600に装着されている間、または、情報処理装置100が装着キット800に挿入されている間において、情報処理装置100が、安定した動作電力APWの供給をうけて動作している期間の、電気二重層キャパシタ素子113の温度を推定すべき旨の命令であり、1時間ごとに発行される。一方、「バックアップ期間推定指令」は、情報処理装置100がバックアップ期間中の電気二重層キャパシタ素子113の温度を推定すべき旨の命令であり、情報処理装置100の電源が投入されたときに発行される。   The control processing unit 211 controls the backup supply time calculation process in the calculation processing unit 112. The control processing unit 211 issues a temperature estimation command ESC to the temperature estimation unit 212. There are two types of temperature estimation command ESC: “normal estimation command” and “backup period estimation command”. The “normal estimation command” indicates that the information processing apparatus 100 operates stably while the information processing apparatus 100 is mounted on the navigation main body 600 or the information processing apparatus 100 is inserted into the mounting kit 800. This is an instruction that the temperature of the electric double layer capacitor element 113 should be estimated during a period of operation with the supply of power APW, and is issued every hour. On the other hand, the “backup period estimation command” is an instruction that the information processing apparatus 100 should estimate the temperature of the electric double layer capacitor element 113 during the backup period, and is issued when the information processing apparatus 100 is turned on. Is done.

また、制御処理部211は、バックアップ期間の特定を行う。バックアップ期間の開始時刻は、制御処理部211が、情報処理装置100の電源をオフにすべき旨の指示を受け取ったときの時刻である。制御処理部211は、電源をオフにすべき旨の指示を受け取ったとき、その時点における時刻情報をタイマ集積回路114から取得して、記憶装置120に対して書き込みを行う。バックアップ期間の終点は、情報処理装置100の電源がオンとなったときの時刻である。制御処理部211は、電源がオンとなったとき、その時点における時刻情報をタイマ集積回路114から取得し、温度推定指令ESCによるバックアップ期間推定指令とともに、温度推定部212へ向けて送る。   Further, the control processing unit 211 specifies the backup period. The start time of the backup period is the time when the control processing unit 211 receives an instruction to turn off the power of the information processing apparatus 100. When receiving an instruction to turn off the power, the control processing unit 211 acquires time information at that time from the timer integrated circuit 114 and writes the time information to the storage device 120. The end point of the backup period is the time when the information processing apparatus 100 is turned on. When the power is turned on, the control processing unit 211 acquires time information at that time from the timer integrated circuit 114 and sends it to the temperature estimation unit 212 together with the backup period estimation command by the temperature estimation command ESC.

また、制御処理部211は、ナビゲーション処理部111からの計測された設置位置PSIを受け続ける。制御処理部211は、設置位置PSIを受けるごとに、設置位置PSIを更新する。そして、制御処理部211は、情報処理装置100の電源をオフにすべき旨の指令を受けたときは、最新の設置位置情報PSIを、記憶装置120における設置位置格納領域への書き込みを行う。   In addition, the control processing unit 211 continues to receive the measured installation position PSI from the navigation processing unit 111. The control processing unit 211 updates the installation position PSI every time it receives the installation position PSI. When the control processing unit 211 receives a command to turn off the power of the information processing apparatus 100, the control processing unit 211 writes the latest installation position information PSI into the installation position storage area in the storage device 120.

また、制御処理部211は、バックアップ時間算出部215へ向けて、電気二重層キャパシタ素子113からタイマ集積回路114への動作電力CPWのバックアップ供給が可能な時間を算出すべき旨の計算指令CACを発行する。計算指令CACは、情報処理装置100の電源をオフにすべき旨の指令があったときに、電力供給部から情報処理装置100への動作電力APWが途絶える前に発行され、この指令に基づく処理も、動作電力APWが途絶える前に行われる。   In addition, the control processing unit 211 sends a calculation command CAC to the backup time calculation unit 215 to calculate a time during which the operating power CPW can be supplied from the electric double layer capacitor element 113 to the timer integrated circuit 114. Issue. The calculation command CAC is issued before the operating power APW from the power supply unit to the information processing device 100 stops when there is a command to turn off the power of the information processing device 100, and processing based on this command Is also performed before the operating power APW is interrupted.

また、制御処理部211は、上記の計算が終了すると、バックアップ時間算出部215から、算出結果であるバックアップ時間BKTを受ける。制御処理部211は、このバックアップ時間BKTの表示用情報を表示データIMDとして、表示部140へ向けて送る。   Further, when the above calculation is completed, the control processing unit 211 receives the backup time BKT that is the calculation result from the backup time calculation unit 215. The control processing unit 211 sends the display information for the backup time BKT to the display unit 140 as display data IMD.

温度推定部212は、制御処理部211からの温度推定指令ESCを受けると、電気二重層キャパシタ素子113の温度を、以下のようにして推定する。   When temperature estimation unit 212 receives temperature estimation command ESC from control processing unit 211, temperature estimation unit 212 estimates the temperature of electric double layer capacitor element 113 as follows.

情報処理装置100がナビゲーション本体部600に装着されており、温度推定指令ESCが「通常推定指令」であるときは、温度推定部212は、まず、温度検出ユニット130からディスク温度TPDを取得する。そして、温度推定部212は、温度センサと電気二重層キャパシタ素子113の位置関係、車内環境等を考慮した温度補正計算を行い、ディスク温度TPDから、電気二重層キャパシタ素子113の温度TMPを推定する。このようにして推定した温度TMPは、温度の検出時刻とともに、容量推定部213へ向けて送られる。なお、この温度補正計算に用いる係数等は、実験やシミュレーションなどにより予め定められている。   When the information processing apparatus 100 is attached to the navigation main body 600 and the temperature estimation command ESC is the “normal estimation command”, the temperature estimation unit 212 first acquires the disk temperature TPD from the temperature detection unit 130. Then, the temperature estimation unit 212 performs temperature correction calculation in consideration of the positional relationship between the temperature sensor and the electric double layer capacitor element 113, the vehicle interior environment, and the like, and estimates the temperature TMP of the electric double layer capacitor element 113 from the disk temperature TPD. . The temperature TMP estimated in this way is sent to the capacity estimation unit 213 together with the temperature detection time. The coefficient used for the temperature correction calculation is determined in advance by experiments, simulations, and the like.

また、情報処理装置100がナビゲーション本体部600に装着されており、温度推定指令ESCが「バックアップ期間推定指令」であるときは、温度推定部212は、まず、記憶装置120から設置位置情報PSIとバックアップ期間の開始時刻を取得する。引き続き、温度推定部212は、「バックアップ期間推定指令」とともに制御処理部211から受けたバックアップ期間の終了時刻と、記憶装置120から取得したバックアップ期間の開始時刻とに基づいて、最新のバックアップ期間を特定する。   When the information processing apparatus 100 is mounted on the navigation main body 600 and the temperature estimation command ESC is the “backup period estimation command”, the temperature estimation unit 212 first stores the installation position information PSI from the storage device 120. Get the start time of the backup period. Subsequently, the temperature estimation unit 212 determines the latest backup period based on the end time of the backup period received from the control processing unit 211 together with the “backup period estimation command” and the start time of the backup period acquired from the storage device 120. Identify.

次いで、温度推定部212は、設置位置情報PSIの属する地域における特定されたバックアップ期間中の1時間ごとの標準気温STIを、標準的気温情報122から取得する。標準気温STIを取得した温度推定部212は、車外環境、車内環境等を考慮した温度補正計算を行い、標準気温STIから、電気二重層キャパシタ素子113の温度TMPを推定する。このようにして推定された温度TMPは、バックアップ期間中の1時間ごとの時刻とともに、容量推定部213へ向けて送られる。なお、この場合の温度補正計算に用いる係数等は、実験やシミュレーションなどにより予め定められている。   Next, the temperature estimation unit 212 acquires the standard temperature STI for each hour during the specified backup period in the area to which the installation position information PSI belongs from the standard temperature information 122. The temperature estimation unit 212 that has acquired the standard temperature STI performs temperature correction calculation in consideration of the outside environment, the inside environment, and the like, and estimates the temperature TMP of the electric double layer capacitor element 113 from the standard temperature STI. The temperature TMP estimated in this way is sent toward the capacity estimation unit 213 together with the hourly hour during the backup period. Note that the coefficients used for the temperature correction calculation in this case are determined in advance by experiments or simulations.

さらに、情報処理装置100が装着キット800に挿入されており、温度推定指令ESCが「通常推定指令」であるときは、温度推定部212は、まず、温度検出ユニット130からディスク温度TPDを取得する。そして、温度推定部212は、温度センサと電気二重層キャパシタ素子113の位置関係、外部環境等を考慮した温度補正計算を行い、ディスク温度TPDから、電気二重層キャパシタ素子113の温度TMPを推定する。このようにして推定した温度TMPは、温度の検出時刻とともに、容量推定部213へ向けて送られる。なお、この場合の温度補正計算に用いる係数等も、実験やシミュレーションなどにより予め定められている。   Further, when the information processing apparatus 100 is inserted in the mounting kit 800 and the temperature estimation command ESC is “normal estimation command”, the temperature estimation unit 212 first acquires the disk temperature TPD from the temperature detection unit 130. . Then, the temperature estimation unit 212 performs temperature correction calculation considering the positional relationship between the temperature sensor and the electric double layer capacitor element 113, the external environment, and the like, and estimates the temperature TMP of the electric double layer capacitor element 113 from the disk temperature TPD. . The temperature TMP estimated in this way is sent to the capacity estimation unit 213 together with the temperature detection time. Note that the coefficients used for the temperature correction calculation in this case are also determined in advance by experiments or simulations.

また、情報処理装置100が装着キット800に挿入されており、温度推定指令ESCが「バックアップ期間推定指令」であるときは、ナビゲーション本体部600に装着されているときと同様に、温度推定部212は、まず、記憶装置120から設置地点PSIと、バックアップ期間の開始時刻とを取得する。引き続き、温度推定部212は、「バックアップ期間推定指令」とともに制御処理部211から受けたバックアップ期間の終了時刻と、記憶装置120から取得したバックアップ期間の開始時刻とに基づいて、最新のバックアップ期間を特定する。   When the information processing apparatus 100 is inserted in the mounting kit 800 and the temperature estimation command ESC is “backup period estimation command”, the temperature estimation unit 212 is the same as when the navigation main body unit 600 is mounted. First, the installation point PSI and the start time of the backup period are acquired from the storage device 120. Subsequently, the temperature estimation unit 212 determines the latest backup period based on the end time of the backup period received from the control processing unit 211 together with the “backup period estimation command” and the start time of the backup period acquired from the storage device 120. Identify.

次いで、温度推定部212は、設置位置情報PSIの属する地域におけるバックアップ期間中の1時間ごとの観測気温OTIを、パソコンインターフェイス部810を介して、パソコンに設置位置情報PSI及び指定時間帯を伴う観測気温情報の取得要求を送る。この要求に応答したパソコンから、当該パソコンがインターネットを介して取得した観測気温OTIを受けると、温度推定部212は、外部環境等を考慮した温度補正計算を行い、観測気温OTIから、電気二重層キャパシタ素子113の温度TMPを推定する。このようにして推定した温度TMPは、バックアップ期間中の1時間ごとの時刻とともに、容量推定部213へ向けて送られる。なお、この場合における温度補正計算に用いる係数等も、実験やシミュレーションなどにより予め定められている。   Next, the temperature estimation unit 212 observes the observation temperature OTI for each hour during the backup period in the area to which the installation position information PSI belongs, via the personal computer interface unit 810, with the installation position information PSI and the designated time zone. Send a request to get temperature information. When the personal computer receives the observed temperature OTI acquired via the Internet from the personal computer responding to this request, the temperature estimation unit 212 performs temperature correction calculation considering the external environment and the like, and from the observed temperature OTI, the electric double layer The temperature TMP of the capacitor element 113 is estimated. The temperature TMP estimated in this way is sent toward the capacity estimation unit 213 together with the hourly hour during the backup period. In this case, the coefficients used for the temperature correction calculation are also determined in advance through experiments, simulations, and the like.

容量推定部213は、温度推定部212から温度TMPを受けると、記憶部120から温度特性情報123(CTI)を取得する。そして、容量推定部213は、電気二重層キャパシタ素子113の温度特性情報123に基づいて、1時間ごとの推定した電気二重層キャパシタ素子113の温度TMPから、当該温度TMPに対応する静電容量が所定値以下になるまでの時間TTを算出する。次いで、容量推定部213は、温度の測定間隔(本実施形態では1時間)をこの時間TTで除算することで、無次元の寿命指数CPIを算出する。容量推定部213は、情報処理装置100の利用開始後の寿命指数CPIの総和を計算することで、累積寿命指数CLIを算出する。累積寿命指数CLIは、その値が1以上になったときに、電気二重層キャパシタ素子113の静電容量が、当初の値の所定割合以下となったことを意味する。現在の電気二重層キャパシタ素子113の静電容量値Cは、累積寿命指数CLIから算出することができる。容量推定部213は、温度TMP、寿命時間TT、寿命指数CPI、累積寿命指数CLIを、容量履歴情報CAPとして、履歴記憶部へ向けて送る。   When the capacity estimation unit 213 receives the temperature TMP from the temperature estimation unit 212, the capacity estimation unit 213 acquires the temperature characteristic information 123 (CTI) from the storage unit 120. Then, the capacitance estimation unit 213 calculates the capacitance corresponding to the temperature TMP from the temperature TMP of the electric double layer capacitor element 113 estimated every hour based on the temperature characteristic information 123 of the electric double layer capacitor element 113. Time TT until it becomes below a predetermined value is calculated. Next, the capacity estimation unit 213 calculates a dimensionless life index CPI by dividing the temperature measurement interval (1 hour in the present embodiment) by this time TT. The capacity estimation unit 213 calculates the cumulative life index CLI by calculating the sum of the life index CPI after the use of the information processing apparatus 100 is started. The cumulative life index CLI means that when the value becomes 1 or more, the capacitance of the electric double layer capacitor element 113 becomes equal to or less than a predetermined ratio of the initial value. The capacitance value C of the current electric double layer capacitor element 113 can be calculated from the cumulative life index CLI. The capacity estimation unit 213 sends the temperature TMP, life time TT, life index CPI, and cumulative life index CLI to the history storage unit as capacity history information CAP.

履歴記憶部214は、不揮発性の半導体メモリで構成されている。この履歴記憶部214には、容量推定部213から送られてくる温度TMP、寿命時間TT、寿命指数CPI、累積寿命指数CLIを、容量履歴情報CPIの履歴が記憶されている。これらの履歴データのうち、最新の累積寿命指数CLIが、バックアップ時間算出部215によって読み出される。   The history storage unit 214 is composed of a nonvolatile semiconductor memory. The history storage unit 214 stores the history of the capacity history information CPI, the temperature TMP, the lifetime TT, the lifetime index CPI, and the cumulative lifetime index CLI sent from the capacity estimation unit 213. Of these history data, the latest cumulative life index CLI is read by the backup time calculation unit 215.

バックアップ時間算出部215は、制御処理部211からの計算指令CACを受けると履歴記憶部214から累積寿命指数CLIを読み取る。そして、バックアップ時間算出部215は、この累積寿命指数CLIを利用して、その時点における電気二重層キャパシタ素子113の静電容量の推定値を算出する。引き続き、バックアップ時間算出部215は、静電容量の推定値に基づいて、タイマ集積回路114への動作電力のバックアップ供給が可能な時間を算出する。算出結果は、バックアップ時間BKTとして、制御処理部211へ向けて送られる。   When receiving the calculation command CAC from the control processing unit 211, the backup time calculation unit 215 reads the cumulative life index CLI from the history storage unit 214. Then, the backup time calculation unit 215 calculates the estimated value of the capacitance of the electric double layer capacitor element 113 at that time using the cumulative life index CLI. Subsequently, the backup time calculation unit 215 calculates a time during which the operating power can be supplied to the timer integrated circuit 114 based on the estimated capacitance value. The calculation result is sent to the control processing unit 211 as the backup time BKT.

図4及び図5に戻り、電気二重層キャパシタ素子113は、バックアップ用電源として、情報処理装置100に搭載されている。この電気二重層キャパシタ素子113は、通常通電時においては、動作電力APWによる充電が行われるとともに、バックアップ期間中においては、タイマ集積回路114に動作電力CPWを供給する。なお、本実施形態においては、電気二重層キャパシタ素子113は、タイマ集積回路114についてのバイパスコンデンサとしての機能も果たすようになっており、一方の端子が接地されるとともに、他方の端子がタイマ集積回路114の動作電力供給用端子に接続され、当該他方の端子に電力供給部660又は860から給電が行われるようになっている。   Returning to FIG. 4 and FIG. 5, the electric double layer capacitor element 113 is mounted on the information processing apparatus 100 as a backup power source. The electric double layer capacitor element 113 is charged with the operating power APW during normal energization, and supplies the operating power CPW to the timer integrated circuit 114 during the backup period. In the present embodiment, the electric double layer capacitor element 113 also functions as a bypass capacitor for the timer integrated circuit 114. One terminal is grounded and the other terminal is a timer integrated circuit. The circuit 114 is connected to the operating power supply terminal, and the other terminal is supplied with power from the power supply unit 660 or 860.

タイマ集積回路114は、情報処理装置100がナビゲーション本体部600に装着されている間は電力供給部660から動作電力APWの供給を受け、また、装着キット800に挿入されている間は電力供給部860から動作電力APWを受けて計時動作を行う。一方、バックアップ期間中においては、タイマ集積回路114は、電気二重層キャパシタ素子113から動作電力のバックアップ供給を受けて計時動作を行う。   The timer integrated circuit 114 is supplied with the operating power APW from the power supply unit 660 while the information processing apparatus 100 is mounted on the navigation main body 600, and the power supply unit while the information processing apparatus 100 is inserted into the mounting kit 800. In response to the operating power APW from 860, a timekeeping operation is performed. On the other hand, during the backup period, the timer integrated circuit 114 receives a backup supply of operating power from the electric double layer capacitor element 113 and performs a time measuring operation.

[動作]
次に、上記のように構成された情報処理装置100の動作について、計算処理部112によるバックアップ供給時間の算出処理に、主に着目して説明する。
[Operation]
Next, the operation of the information processing apparatus 100 configured as described above will be described mainly focusing on the calculation process of the backup supply time by the calculation processing unit 112.

前提として、当初は、情報処理装置100は、工場出荷後、直ちにナビゲーション本体部600に装着されているものとする。なお、情報処理装置100は、図7に示したように、ある日の15:30に利用が開始され、その後18:35まではナビゲーション装置に装着されて給電されたものとする。また、その翌日の0:25〜2:30までは装着キット800に装着されて給電されたものとする。また、情報処理装置100は、その後4:35〜6:30まではナビゲーション装置に装着されて給電されたものとする。   As a premise, initially, it is assumed that the information processing apparatus 100 is mounted on the navigation main body 600 immediately after shipment from the factory. As shown in FIG. 7, the information processing apparatus 100 starts to be used at 15:30 on a certain day, and is then attached to the navigation apparatus and supplied with power until 18:35 thereafter. In addition, from 0:25 to 2:30 on the next day, it is assumed that power is supplied to the mounting kit 800. Further, it is assumed that the information processing apparatus 100 is attached to the navigation apparatus and supplied with power from 4:35 to 6:30 thereafter.

なお、情報処理装置100は、ナビゲーション本体部600と接続キット800のいずれかにしか、装着されないものとする。   It is assumed that the information processing apparatus 100 is attached only to either the navigation main body 600 or the connection kit 800.

情報処理装置100がナビゲーション本体部600又は装着キット800に装着されて電源が投入されると、計算処理部112によるバックアップ供給時間の算出処理が開始される。このバックアップ供給時間の算出処理に際しては、図8に示されるように、まず、ステップS11において、計算処理部112が、情報処理装置100がナビゲーション本体部600に装着されているか否かを判定する。この判定は、制御処理部211が行う。この判定の結果が肯定的であった場合(ステップS11:Y)には、処理はステップS12へ進む。   When the information processing apparatus 100 is mounted on the navigation main body 600 or the mounting kit 800 and the power is turned on, the calculation processing unit 112 starts calculating the backup supply time. In the backup supply time calculation process, as shown in FIG. 8, first, in step S <b> 11, the calculation processing unit 112 determines whether or not the information processing apparatus 100 is attached to the navigation main body 600. This determination is performed by the control processing unit 211. If the result of this determination is affirmative (step S11: Y), the process proceeds to step S12.

一方、ステップS11における判定の結果が否定的であった場合(ステップS11:N)、すなわち、情報処理装置100が装着キット800に挿入されている場合には、処理はステップS13へ進む。   On the other hand, if the result of the determination in step S11 is negative (step S11: N), that is, if the information processing apparatus 100 is inserted in the mounting kit 800, the process proceeds to step S13.

本使用例では、情報処理装置100は、使用開始時点(当初日の15:30)においては、ナビゲーション本体部600に装着されているので、ステップS12の処理へ進むこととなる。   In this usage example, the information processing apparatus 100 is attached to the navigation main body 600 at the start of use (15:30 on the original day), and thus the process proceeds to step S12.

ステップS12では、情報処理装置100のバックアップ期間中における電気二重層キャパシタ素子113の温度TMPを推定し、この推定結果に基づいて、寿命指数CPI及び累積寿命指数CLIを算出する。なお、使用開始時点においては、その前にバックアップ期間は存在していないので、ステップS12においては、電気二重層キャパシタ素子113の温度TMPの推定、並びに、寿命指数CPI及び累積寿命指数CLIの算出は行われずに、処理はステップS14へ進む。   In step S12, the temperature TMP of the electric double layer capacitor element 113 during the backup period of the information processing apparatus 100 is estimated, and the life index CPI and the cumulative life index CLI are calculated based on the estimation result. Since no backup period exists before the start of use, in step S12, the estimation of the temperature TMP of the electric double layer capacitor element 113 and the calculation of the life index CPI and the cumulative life index CLI are performed. The process proceeds to step S14 without being performed.

なお、使用開始時点以外の時点、すなわち、その時点前にバックアップ期間は存在していた場合には、ステップS12において、以下の処理が実行される。   If a backup period exists at a time other than the use start time, that is, before that time, the following processing is executed in step S12.

まず、制御処理部211が、時刻情報をタイマ集積回路114から取得し、バックアップ期間の終了時刻を特定する。引き続き、制御処理部211は、特定されたバックアップ期間の終了時刻とともに、「バックアップ期間推定指令」である旨の温度推定指令ESCを、温度推定部212へ向けて発行する。この温度推定指令ESCを受けた温度推定部212は、バックアップ期間における電気二重層キャパシタ素子113の温度TMPを推定する。   First, the control processing unit 211 acquires time information from the timer integrated circuit 114, and specifies the end time of the backup period. Subsequently, the control processing unit 211 issues, to the temperature estimation unit 212, a temperature estimation command ESC indicating that it is a “backup period estimation command” together with the end time of the specified backup period. Upon receiving this temperature estimation command ESC, the temperature estimation unit 212 estimates the temperature TMP of the electric double layer capacitor element 113 during the backup period.

かかる温度推定に際して、温度推定部212は、バックアップ期間、及び、バックアップ期間中に情報処理装置100が設置されていた位置を特定する。このバックアップ期間及び設置位置の特定に際しては、温度推定部212は、バックアップ期間の開始時刻及び設置位置情報PSIを、記憶装置120から読み取る。そして、温度推定部212は、読み取られた開始時刻と、「バックアップ期間推定指令」とともに制御処理部211から受信したバックアップ期間の終了時刻とに基づいて、バックアップ期間を特定する。また、温度推定部212は、読み取られた設置位置情報PSIに基づいて、バックアップ期間中における情報処理装置100の設置位置を特定する。   In the temperature estimation, the temperature estimation unit 212 identifies the backup period and the position where the information processing apparatus 100 was installed during the backup period. In specifying the backup period and the installation position, the temperature estimation unit 212 reads the backup period start time and the installation position information PSI from the storage device 120. Then, the temperature estimation unit 212 identifies the backup period based on the read start time and the backup period end time received from the control processing unit 211 together with the “backup period estimation command”. Further, the temperature estimation unit 212 identifies the installation position of the information processing apparatus 100 during the backup period based on the read installation position information PSI.

次に、温度推定部212は、特定されたバックアップ期間中における設置位置情報PSIの属する地域におけるバックアップ期間中の所定時間(本実施形態においては、1時間)ごとの標準気温STIを、記憶装置120の標準的気温情報122から取得する。引き続き、標準気温STIを取得した温度推定部212は、車外環境、車内環境等を考慮した温度補正計算を行い、標準気温STIから、電気二重層キャパシタ素子113の温度TMPを推定する。そして、この温度TMPは、容量推定部213へ向けて送られる。   Next, the temperature estimation unit 212 stores the standard temperature STI for each predetermined time (1 hour in the present embodiment) during the backup period in the area to which the installation position information PSI belongs during the specified backup period. Is obtained from the standard air temperature information 122. Subsequently, the temperature estimation unit 212 that has acquired the standard temperature STI performs temperature correction calculation in consideration of the outside environment, the inside environment, and the like, and estimates the temperature TMP of the electric double layer capacitor element 113 from the standard temperature STI. The temperature TMP is sent to the capacity estimation unit 213.

容量推定部213は、温度推定部212からの温度TMPを受けると、温度特性情報(CTI)を、記憶装置120から取得する。そして、容量推定部213は、温度TMPと、取得された温度特性情報に基づいて、寿命時間TT、寿命指数CPI、累積寿命指数CLIを算出する。これらの計算結果は、温度TMPとともに、履歴記憶部214へ向けて送られ、履歴記憶部214に記憶される。こうして、履歴記憶部214へのデータ書き込みが終了すると、ステップS12の処理は終了し、処理は、ステップS14へ進む。   When the capacity estimation unit 213 receives the temperature TMP from the temperature estimation unit 212, the capacity estimation unit 213 acquires temperature characteristic information (CTI) from the storage device 120. Then, the capacity estimation unit 213 calculates the life time TT, the life index CPI, and the cumulative life index CLI based on the temperature TMP and the acquired temperature characteristic information. These calculation results are sent to the history storage unit 214 together with the temperature TMP and stored in the history storage unit 214. Thus, when the data writing to the history storage unit 214 is completed, the process of step S12 is terminated, and the process proceeds to step S14.

ステップS14では、制御処理部211は、情報処理装置100への電源供給をオフにすべき旨の指令があったか否かを判定する。この判定の結果が否定的であった場合(ステップS14:N)には、処理はステップS15へ進む。   In step S <b> 14, the control processing unit 211 determines whether there is a command to turn off the power supply to the information processing apparatus 100. If the result of this determination is negative (step S14: N), the process proceeds to step S15.

ステップS15では、制御処理部211が、タイマ集積回路114から受け取った時刻をもとに、所定の時間間隔が経過したか否かを判定する。本実施形態においては、所定の時間間隔は1時間である。この判定の結果が否定的であった場合(ステップS15:N)には、処理はステップS14へ戻る。   In step S15, the control processing unit 211 determines whether or not a predetermined time interval has elapsed based on the time received from the timer integrated circuit 114. In the present embodiment, the predetermined time interval is 1 hour. If the result of this determination is negative (step S15: N), the process returns to step S14.

一方、この判定の結果が肯定的であった場合(ステップS15:Y)には、制御処理部211は、温度推定部212へ向けて、「通常推定指令」である旨の温度推定指令ESCを発行する。その後、処理はステップS16へ進む。なお、前述したように、この温度推定指令ESCは、1時間ごとに発行される。   On the other hand, if the result of this determination is affirmative (step S15: Y), the control processing unit 211 sends a temperature estimation command ESC indicating “normal estimation command” to the temperature estimation unit 212. Issue. Thereafter, the process proceeds to step S16. As described above, this temperature estimation command ESC is issued every hour.

ステップS16では、動作電力APWが情報処理装置100へ供給されている期間の電気二重層キャパシタ素子113の温度TMPを推定し、この推定結果に基づいて、寿命指数CPIと累積寿命指数CLIを算出する。   In step S16, the temperature TMP of the electric double layer capacitor element 113 during the period when the operating power APW is supplied to the information processing apparatus 100 is estimated, and the life index CPI and the cumulative life index CLI are calculated based on the estimation result. .

電気二重層キャパシタ素子113の温度TMPは、ステップS12と同様に、温度推定部212によって推定される。このステップS16においては、温度推定部212は、まず、温度検出ユニット130からディスク温度TPDを取得する。ディスク温度TPDを取得した温度推定部212は、温度センサと電気二重層キャパシタ素子113の位置関係、車内環境等を考慮した温度補正計算を行い、ディスク温度TPDから、電気二重層キャパシタ素子113の温度TMPを推定する。この推定した温度TMPは、容量推定部213へ向けて送られる。   The temperature TMP of the electric double layer capacitor element 113 is estimated by the temperature estimation unit 212 as in step S12. In step S <b> 16, the temperature estimation unit 212 first acquires the disk temperature TPD from the temperature detection unit 130. The temperature estimation unit 212 that has obtained the disk temperature TPD performs temperature correction calculation considering the positional relationship between the temperature sensor and the electric double layer capacitor element 113, the in-vehicle environment, and the like, and the temperature of the electric double layer capacitor element 113 is calculated from the disk temperature TPD. TMP is estimated. This estimated temperature TMP is sent to the capacity estimation unit 213.

容量推定部213は、温度TMPと温度特性情報123(CTI)に基づいて、ステップS12の場合と同様の処理を行い、寿命時間TT、寿命指数CPI、累積寿命指数CLIを算出する。これらの計算結果は、温度TMPとともに、履歴記憶部214に記憶される。その後、処理は、履歴記憶部214へのデータ書き込むが終了すると、ステップS15の処理は終了し、処理は、ステップS14へ戻る。   The capacity estimation unit 213 performs the same processing as in step S12 based on the temperature TMP and the temperature characteristic information 123 (CTI), and calculates the life time TT, the life index CPI, and the cumulative life index CLI. These calculation results are stored in the history storage unit 214 together with the temperature TMP. Thereafter, when the data writing to the history storage unit 214 ends, the process of step S15 ends, and the process returns to step S14.

本使用例では、当初日の16:00,17:00,18:00の時点で、ステップS15における判定の結果が肯定的となり、ステップS16の処理が行われる。そして、その時点における温度TMP、寿命時間TT、寿命指数CPI、累積寿命指数CLIが、履歴記憶部214に書き込まれる(図9参照)。   In this usage example, at the time of 16:00, 17:00, and 18:00 on the first day, the determination result in step S15 becomes affirmative, and the process of step S16 is performed. Then, the temperature TMP, life time TT, life index CPI, and cumulative life index CLI at that time are written in the history storage unit 214 (see FIG. 9).

一方、ステップS14における判定の結果が肯定的となると(ステップS14:Y)、処理はステップS17へ進む。このステップS17では、タイマ集積回路114への動作電力のバックアップ供給が可能な時間を算出する。この処理は、制御処理部211がバックアップ時間算出部215へ向けて、計算指令CACを発行することにより開始される(図6参照)。   On the other hand, when the result of the determination in step S14 is affirmative (step S14: Y), the process proceeds to step S17. In step S <b> 17, a time during which backup supply of operating power to the timer integrated circuit 114 is possible is calculated. This process is started when the control processing unit 211 issues a calculation command CAC to the backup time calculation unit 215 (see FIG. 6).

計算指令CACを受けたバックアップ時間算出部215は、履歴記憶部214に記録されたから累積寿命指数CLIを読み取る。引き続き、バックアップ時間算出部215は、読み取られた累積寿命指数CLIを利用して、その時点における電気二重層キャパシタ素子113の静電容量の推定値を算出する。そして、バックアップ時間算出部215は、静電容量の推定値に基づいて、タイマ集積回路114への動作電力のバックアップ供給が可能な時間を算出する。この算出結果は、バックアップ時間BKTとして、制御処理部211へ向けて送られる。この後、ステップS17の処理は終了し、処理はステップS18へ進む。   Receiving the calculation command CAC, the backup time calculation unit 215 reads the cumulative life index CLI recorded in the history storage unit 214. Subsequently, the backup time calculation unit 215 calculates an estimated value of the capacitance of the electric double layer capacitor element 113 at that time using the read cumulative life index CLI. Then, the backup time calculation unit 215 calculates a time during which the operating power can be supplied to the timer integrated circuit 114 based on the estimated capacitance value. This calculation result is sent to the control processing unit 211 as the backup time BKT. Thereafter, the process of step S17 ends, and the process proceeds to step S18.

ステップS18では、制御処理部211は、バックアップ時間算出部215からのバックアップ供給時間BKTを受ける。そして、制御処理部211は、バックアップ時間BKTの表示用情報を表示データIMDとして、表示部140へ向けて送る。これにより、コレステリック液晶表示部にバックアップ供給時間が表示される。   In step S18, the control processing unit 211 receives the backup supply time BKT from the backup time calculation unit 215. Then, the control processing unit 211 sends the display information for the backup time BKT to the display unit 140 as display data IMD. Thereby, the backup supply time is displayed on the cholesteric liquid crystal display unit.

その後、電力供給部660から情報処理装置100への動作電力APWは途絶え、情報処理装置100は、バックアップ期間に入る。バックアップ期間中においては、電気二重層キャパシタ素子113から、タイマ集積回路114に対してのみ、動作電力CPWが供給される。   Thereafter, the operating power APW from the power supply unit 660 to the information processing apparatus 100 stops, and the information processing apparatus 100 enters a backup period. During the backup period, the operating power CPW is supplied only from the electric double layer capacitor element 113 to the timer integrated circuit 114.

本使用例では、情報処理装置100への電力給電を遮断すべき旨の指令があった18:35の時点で、ステップS14における判定の結果が否定的となり、ステップS17及びステップS18の処理が行われる。そして、情報処理部100の表示部140に、バックアップ供給可能時間が表示される。   In this usage example, at 18:35 when there is a command to cut off power supply to the information processing apparatus 100, the result of the determination in step S14 is negative, and the processing in steps S17 and S18 is performed. Is called. Then, the backup supply available time is displayed on the display unit 140 of the information processing unit 100.

また、本使用例では、情報処理装置100は、翌日の0:25の時点で、接続キット800に挿入された状態で、再度、給電オンとされる。この給電オンにより、図8の処理が開始される。今回の場合には、情報処理装置100は、接続キット800に挿入されているので、ステップS11における判定の結果は否定的となり、処理はステップS13へ進むこととなる。   In this usage example, the information processing apparatus 100 is turned on again in the state of being inserted into the connection kit 800 at 0:25 on the next day. The process of FIG. 8 is started by turning on the power supply. In this case, since the information processing apparatus 100 is inserted in the connection kit 800, the determination result in step S11 is negative, and the process proceeds to step S13.

ステップS13において、温度推定部212が、情報処理装置100のバックアップ期間中における電気二重層キャパシタ素子113の温度TMPを推定し、この推定結果に基づいて、容量推定部213が寿命指数CPIと累積寿命指数CLIを算出する処理を行う。   In step S13, the temperature estimation unit 212 estimates the temperature TMP of the electric double layer capacitor element 113 during the backup period of the information processing apparatus 100, and based on this estimation result, the capacity estimation unit 213 performs the life index CPI and the cumulative life. Processing for calculating the index CLI is performed.

かかるステップS13における処理では、まず、制御処理部211が、上述したステップS12の場合と同様にして、時刻情報をタイマ集積回路114から取得し、バックアップ期間の終了時刻を特定した後、特定されたバックアップ期間の終了時刻とともに、「バックアップ期間推定指令」である旨の温度推定指令ESCを、温度推定部212へ向けて発行する。この温度推定指令ESCを受けた温度推定部212は、バックアップ期間における電気二重層キャパシタ素子113の温度TMPを推定する。   In the process in step S13, first, the control processing unit 211 acquires time information from the timer integrated circuit 114 and specifies the end time of the backup period, in the same manner as in step S12 described above. Along with the end time of the backup period, a temperature estimation command ESC indicating “backup period estimation command” is issued to the temperature estimation unit 212. Upon receiving this temperature estimation command ESC, the temperature estimation unit 212 estimates the temperature TMP of the electric double layer capacitor element 113 during the backup period.

ステップS13における温度推定に際して、温度推定部212は、まず、ステップS12の場合と同様にして、バックアップ期間、及び、バックアップ期間中に情報処理装置100が設置されていた位置を特定する。引き続き、温度推定部212は、設置位置情報PSIの属する地域におけるバックアップ期間中の1時間ごとの観測気温OTIを、パソコンインターフェイス部810を介して、パソコンに設置位置情報PSI及び指定時間帯を伴う観測気温情報の取得要求を送る。   When estimating the temperature in step S13, the temperature estimation unit 212 first identifies the backup period and the position where the information processing apparatus 100 was installed during the backup period, as in step S12. Subsequently, the temperature estimation unit 212 observes the observation temperature OTI for each hour during the backup period in the area to which the installation position information PSI belongs, via the personal computer interface unit 810, with the installation position information PSI and the specified time zone on the personal computer. Send a request to get temperature information.

この要求に応答したパソコンは、インターネットを介して観測気温OTIを取得する。そして、パソコンは、パソコンインターフェイス部810を介して、取得された観測気温OTIを温度推定部212へ送る。   The personal computer responding to this request acquires the observed temperature OTI via the Internet. Then, the personal computer sends the acquired observed temperature OTI to the temperature estimating unit 212 via the personal computer interface unit 810.

観測気温OTIを受けた温度推定部212は、当初日の19:00から翌日の0:00までのバックアップ期間中における温度TMPを、観測気温OTIに基づいて算出する。こうして得られた温度TMPは、温度推定部212から容量推定部213へ向けて送られる。   Upon receiving the observed temperature OTI, the temperature estimation unit 212 calculates a temperature TMP during the backup period from 19:00 on the first day to 0:00 on the next day based on the observed temperature OTI. The temperature TMP obtained in this way is sent from the temperature estimation unit 212 to the capacity estimation unit 213.

温度TMPを受けた容量推定部213は、上述したステップS12の場合と同様にして、寿命時間TT、寿命指数CPI、累積寿命指数CLIを算出する。これらの計算結果は、温度TMPとともに、履歴記憶部214へ向けて送られ、履歴記憶部214に記憶される。こうして、履歴記憶部214へのデータ書き込みが終了すると、ステップS13の処理は終了し、処理はステップS14へ進む。   The capacity estimation unit 213 that has received the temperature TMP calculates the life time TT, the life index CPI, and the cumulative life index CLI in the same manner as in step S12 described above. These calculation results are sent to the history storage unit 214 together with the temperature TMP and stored in the history storage unit 214. Thus, when the data writing to the history storage unit 214 is completed, the process of step S13 is terminated, and the process proceeds to step S14.

以後、情報処理装置100が、給電オフ状態となるまでの間は、前述したステップS14からステップS16の処理が繰り返される。そして、情報処理装置100への電力供給を遮断すべき旨の指令があった時点(翌日の2:30)で、ステップS17とステップS18の処理が行われ、これらの処理終了後に、情報処理部100の表示部140に、バックアップ供給可能時間が表示される。   Thereafter, the processing from step S14 to step S16 described above is repeated until the information processing apparatus 100 is in the power-off state. Then, at the time when there is a command to cut off the power supply to the information processing apparatus 100 (2:30 on the next day), the processing of step S17 and step S18 is performed. The display unit 140 of 100 displays the backup supply available time.

また、本使用例では、翌日の4:30から6:30までの期間においては、情報処理装置100は、ナビゲーション本体部600に装着されて、ナビゲーション装置として動作している。かかる翌日の4:30の時点で給電オン状態となると、図8の処理が開始される。今回の場合には、情報処理装置100は、ナビゲーション本体部600に挿入されているので、ステップS11における判定の結果は肯定的となり、処理はステップS12へ進むこととなる。   In this usage example, in the period from 4:30 to 6:30 on the next day, the information processing apparatus 100 is mounted on the navigation main body 600 and operates as a navigation apparatus. When the power supply is turned on at 4:30 on the next day, the process of FIG. 8 is started. In this case, since the information processing apparatus 100 is inserted in the navigation main body 600, the determination result in step S11 is affirmative, and the process proceeds to step S12.

今回の場合、給電オンとされる前にバックアップ期間が存在しているので、そうした場合における上述したステップS12の処理が実行される。その後、ステップS14〜S18の処理が実行されて、翌日の6:30の時点で、表示部140にバックアップ供給可能時間が表示される。   In this case, since the backup period exists before the power supply is turned on, the process of step S12 described above in that case is executed. Thereafter, the processing of steps S14 to S18 is executed, and the backup supply available time is displayed on the display unit 140 at 6:30 on the next day.

以上説明したように、本実施形態では、外部電源からの電力供給期間だけでなく、情報処理装置100への給電がオフされた状態であるバックアップ期間においても、電気二重層キャパシタ素子113の温度を精度よく推定することができる。一般に、電気二重層キャパシタ素子の場合には、バックアップ期間中であるか否かにかかわらず、全期間にわたっての温度の時間変化に伴う静電容量の時間変化特性が、バックアップ可能期間の算出誤差に対する大きな要因となる。このため、全期間にわたる温度を精度よくバックアップ可能期間を算出することは、欠かせない。   As described above, in the present embodiment, the temperature of the electric double layer capacitor element 113 is set not only in the power supply period from the external power supply but also in the backup period in which the power supply to the information processing apparatus 100 is turned off. It can be estimated with high accuracy. In general, in the case of an electric double layer capacitor element, regardless of whether or not it is in the backup period, the time change characteristic of the capacitance with the time change of the temperature over the entire period corresponds to the calculation error of the backup possible period. It becomes a big factor. For this reason, it is indispensable to accurately calculate the backup possible period of the temperature over the entire period.

したがって、本実施形態によれば、電気二重層キャパシタ素子をバックアップ電源に採用した場合に、バックアップ期間を精度良く算出することができ、これにより、利用者の利便性を向上させることができる。   Therefore, according to the present embodiment, when the electric double layer capacitor element is adopted as the backup power source, the backup period can be calculated with high accuracy, and the convenience for the user can be improved.

[実施形態の変形]
本発明は、上記の実施形態に限定されるものではなく、様々な変形が可能である。
[Modification of Embodiment]
The present invention is not limited to the above-described embodiment, and various modifications are possible.

例えば、上記の実施形態では、電気二重層キャパシタ素子の温度を推定する時間間隔を1時間ごとにしたが、時間間隔は任意であってもよい。   For example, in the above embodiment, the time interval for estimating the temperature of the electric double layer capacitor element is set every hour, but the time interval may be arbitrary.

また、上記の実施形態では、電気二重層キャパシタ素子113は、バックアップ期間中においては、タイマ集積回路114に動作電力CPWを供給することとしたが、電気二重層キャパシタ素子113からの動作電力のバックアップ供給を受ける特定部品はタイマ集積回路114に限らない。   In the above embodiment, the electric double layer capacitor element 113 supplies the operating power CPW to the timer integrated circuit 114 during the backup period. However, the electric double layer capacitor element 113 backs up the operating power from the electric double layer capacitor element 113. The specific component to be supplied is not limited to the timer integrated circuit 114.

また、上記の実施形態では、温度検出ユニット130は記憶装置120に内蔵されることとしたが、温度センサが検出した温度から電気二重層キャパシタ素子113の温度を推定できるのであれば、いかなるところに温度検出ユニット130を配設してもよい。   In the above-described embodiment, the temperature detection unit 130 is built in the storage device 120. However, as long as the temperature of the electric double layer capacitor element 113 can be estimated from the temperature detected by the temperature sensor, it can be anywhere. A temperature detection unit 130 may be provided.

また、上記の実施形態では、情報処理装置100が装着キット800に挿入されているはインターネットを通じて、実際の観測気温OTIを利用することとしたが、観測気温OTIを取得することができない場合には標準気温STIを利用してもよい。   In the above embodiment, the information processing apparatus 100 is inserted into the mounting kit 800 or the actual observed temperature OTI is used through the Internet. However, when the observed temperature OTI cannot be acquired. A standard temperature STI may be used.

また、上記の実施形態では、バックアップ期間中における電気二重層キャパシタ素子の温度推定に標準気温STIと観測気温OTIを利用したが、信頼のおける気温データであれば、いかなるものであってもよい。   In the above embodiment, the standard air temperature STI and the observed air temperature OTI are used for estimating the temperature of the electric double layer capacitor element during the backup period.

また、温度推定部212が、車内環境等を考慮して電気二重層キャパシタ素子113の温度を推定するが、温度補正計算は夏季日中の密閉した車内空間が異常な高温下となるといった車内環境を考慮するようにすることもできる。   In addition, the temperature estimation unit 212 estimates the temperature of the electric double layer capacitor element 113 in consideration of the vehicle interior environment, etc., but the temperature correction calculation is performed in the vehicle interior environment where the sealed vehicle interior space is abnormally hot during summer days. Can also be considered.

また、上記の実施形態では、情報処理装置100はナビゲーション装置の一部を構成するものとしたが、ナビゲーション装置以外の移動体搭載機器の一部として本発明を適用することができるのは、勿論である。   Further, in the above embodiment, the information processing apparatus 100 constitutes a part of the navigation apparatus, but it goes without saying that the present invention can be applied as a part of a mobile body mounted device other than the navigation apparatus. It is.

なお、上記の実施形態における制御ユニット110の一部又は全部を中央処理装置(CPU:Central Processing Unit)、DSP(Digital Signal Processor)、読出専用メモリ(ROM:Read Only Memory)、ランダムアクセスメモリ(RAM:Random Access Memory)等を備えた演算手段としてのコンピュータとして構成し、予め用意されたプログラムを当該コンピュータで実行することにより、上記の実施形態における処理の一部又は全部を実行するようにしてもよい。このプログラムはハードディスク、CD−ROM、DVD等のコンピュータで読み取り可能な記録媒体に記録され、当該コンピュータによって記録媒体から読み出されて実行される。また、このプログラムは、CD−ROM、DVD等の可搬型記録媒体に記録された形態で取得されるようにしてもよいし、インターネットなどのネットワークを介した配送の形態で取得されるようにしてもよい。   In addition, a part or all of the control unit 110 in the above-described embodiment includes a central processing unit (CPU), a DSP (Digital Signal Processor), a read only memory (ROM), a random access memory (RAM). : Random Access Memory) or the like, and configured as a computer, and a part of or all of the processing in the above embodiment is executed by executing a program prepared in advance on the computer. Good. This program is recorded on a computer-readable recording medium such as a hard disk, CD-ROM, or DVD, and is read from the recording medium and executed by the computer. The program may be acquired in a form recorded on a portable recording medium such as a CD-ROM or DVD, or may be acquired in a form of delivery via a network such as the Internet. Also good.

本発明の一実施形態に係る情報処理装置の構成を概略的に示すブロック図である(その1)。1 is a block diagram schematically showing the configuration of an information processing apparatus according to an embodiment of the present invention (No. 1). FIG. 本発明の一実施形態に係る情報処理装置の構成を概略的に示すブロック図である(その2)。It is a block diagram which shows schematically the structure of the information processing apparatus which concerns on one Embodiment of this invention (the 2). 電気二重層キャパシタ素子の静電容量の時間変化としての温度特性情報を説明するための図である。It is a figure for demonstrating the temperature characteristic information as a time change of the electrostatic capacitance of an electric double layer capacitor element. 図1の制御ユニットの構成を示すブロック図である。It is a block diagram which shows the structure of the control unit of FIG. 図2の制御ユニットの構成を示すブロック図である。It is a block diagram which shows the structure of the control unit of FIG. 図4及び図5の計算処理部112の構成を示すブロック図である。FIG. 6 is a block diagram illustrating a configuration of a calculation processing unit 112 in FIGS. 4 and 5. 図1の装置による動作を説明するための使用例の時系列図である。It is a time series diagram of the usage example for demonstrating the operation | movement by the apparatus of FIG. 図6の計算処理部におけるバックアップ供給時間の算出処理を説明するためのフローチャートである。It is a flowchart for demonstrating the calculation process of the backup supply time in the calculation process part of FIG. 履歴記憶部に記憶される温度履歴、寿命指数及び累積寿命指数の例である。It is an example of the temperature history memorize | stored in a log | history memory | storage part, a life index, and a cumulative life index.

符号の説明Explanation of symbols

100 … 情報処理装置
113 … 電気二重層キャパシタ素子
114 … タイマ集積回路(特定部品)
120 … 記憶装置(気温情報記憶手段、容量情報記憶手段)
130 … 温度検出ユニット(温度検出手段)
140 … 表示部(表示手段)
211 … 制御処理部(表示制御手段)
212 … 温度推定部(温度履歴推定手段)
213 … 容量推定部(容量推定手段)
215 … バックアップ時間算出部(バックアップ時間算出手段)
DESCRIPTION OF SYMBOLS 100 ... Information processing apparatus 113 ... Electric double layer capacitor element 114 ... Timer integrated circuit (specific component)
120 ... Storage device (temperature information storage means, capacity information storage means)
130 ... temperature detection unit (temperature detection means)
140 ... Display section (display means)
211 ... Control processing unit (display control means)
212 ... Temperature estimation unit (temperature history estimation means)
213 ... Capacity estimation unit (capacity estimation means)
215 ... Backup time calculation unit (backup time calculation means)

Claims (10)

供給された電圧値に対応する電荷を蓄積する電気二重層キャパシタ素子と;
外部電源から供給された動作電力を利用して動作するとともに、前記外部電源からの動作電力の供給が途絶えた場合には、前記電気二重層キャパシタ素子から動作電力のバックアップ供給を受けて動作する特定部品と;
前記電気二重層キャパシタ素子の温度の過去における変化の履歴を推定する温度履歴推定手段と;
前記温度履歴推定手段による推定結果に基づいて、前記電気二重層キャパシタ素子の静電容量情報を推定する容量推定手段と;
前記容量推定手段による推定結果に基づいて、前記電気二重層キャパシタ素子から前記特定部品への動作電力のバックアップ供給が可能な時間を算出するバックアップ時間算出手段と;
所定の地域ごとに推定された気温変動の情報である標準的気温情報を記憶する気温情報記憶手段と;を備え、
前記温度履歴推定手段は、前記外部電源から動作電力が供給されていない期間であるバックアップ期間については、前記気温情報記憶手段に記憶されている標準的気温情報の中から、設置地点が属すると推定される地域の標準的気温情報である推定気温情報を特定し、前記推定気温情報に基づいて前記電気二重層キャパシタ素子の温度変化を推定する、
ことを特徴とする情報処理装置。
An electric double layer capacitor element for accumulating electric charge corresponding to a supplied voltage value;
The operation is performed using the operating power supplied from the external power supply, and when the supply of the operating power from the external power supply is interrupted, the specific operation is performed by receiving a backup supply of the operating power from the electric double layer capacitor element. With parts;
Temperature history estimation means for estimating a history of changes in the temperature of the electric double layer capacitor element in the past;
Capacity estimation means for estimating capacitance information of the electric double layer capacitor element based on the estimation result by the temperature history estimation means;
Backup time calculation means for calculating a time during which backup of operating power can be supplied from the electric double layer capacitor element to the specific component based on the estimation result by the capacity estimation means;
Temperature information storage means for storing standard temperature information, which is information on temperature fluctuations estimated for each predetermined area, and
The temperature history estimation means estimates that an installation point belongs from the standard temperature information stored in the temperature information storage means for a backup period in which operating power is not supplied from the external power source. Identifying estimated temperature information that is standard temperature information of the area to be estimated, and estimating a temperature change of the electric double layer capacitor element based on the estimated temperature information,
An information processing apparatus characterized by that.
前記特定部品は、時刻計時を行うタイマ集積回路である、ことを特徴とする請求項1に記載の情報処理装置。   The information processing apparatus according to claim 1, wherein the specific component is a timer integrated circuit that performs timekeeping. 前記電気二重層キャパシタ素子の位置と所定の位置関係にある位置に設置された温度検出手段を更に備え、
前記温度履歴推定手段は、前記外部電源から動作電力が供給されている期間については、前記温度検出手段による検出結果と前記所定の位置関係に基づいて、前記電気二重層キャパシタ素子の温度変化を推定する、
ことを特徴とする請求項1又は2に記載の情報処理装置。
Temperature detecting means installed at a position in a predetermined positional relationship with the position of the electric double layer capacitor element,
The temperature history estimation unit estimates a temperature change of the electric double layer capacitor element based on a detection result by the temperature detection unit and the predetermined positional relationship during a period when operating power is supplied from the external power source. To
The information processing apparatus according to claim 1 or 2.
前記電気二重層キャパシタ素子の静電容量の時間変化の温度特性情報が記憶された容量情報記憶手段を更に備え、
前記容量推定手段は、前記温度履歴推定手段による推定結果と、前記電気二重層キャパシタ素子の静電容量の時間変化の温度特性情報とに基づいて、前記電気二重層キャパシタ素子の静電容量情報を推定する、
ことを特徴とする請求項1〜3のいずれか一項に記載の情報処理装置。
Capacitance information storage means for storing temperature characteristic information of the change in capacitance of the electric double layer capacitor element over time,
The capacitance estimating means obtains the capacitance information of the electric double layer capacitor element based on the estimation result by the temperature history estimating means and the temperature characteristic information of the change in capacitance of the electric double layer capacitor element over time. presume,
The information processing apparatus according to any one of claims 1 to 3 .
画像を表示する表示手段と;
前記バックアップ時間算出手段による算出結果を前記表示手段に表示させる表示制御手段と;
を更に備えることを特徴とする請求項1〜4のいずれか一項に記載の情報処理装置。
Display means for displaying an image;
Display control means for causing the display means to display a calculation result by the backup time calculating means;
The information processing apparatus according to claim 1 , further comprising:
前記表示手段は、コレステリック液晶表示部を備える、ことを特徴とする請求項5に記載の情報処理装置。 The information processing apparatus according to claim 5 , wherein the display unit includes a cholesteric liquid crystal display unit. 移動体に搭載可能である、ことを特徴とする請求項1〜6のいずれか一項に記載の情報処理装置。 The information processing apparatus according to claim 1 , wherein the information processing apparatus can be mounted on a moving body. 供給された電圧値に対応する電荷を蓄積する電気二重層キャパシタ素子と;外部電源から供給された動作電力を利用して動作するとともに、前記外部電源からの動作電力の供給が途絶えた場合には、前記電気二重層キャパシタ素子から動作電力のバックアップ供給を受けて動作する特定部品と;所定の地域ごとに推定された気温変動の情報である標準的気温情報を記憶する気温情報記憶手段と;を備える情報処理装置において使用されるバックアップ供給時間算出方法であって、
前記電気二重層キャパシタ素子の温度の過去における変化の履歴を推定する温度履歴推定工程と;
前記温度履歴推定工程における推定結果に基づいて、前記電気二重層キャパシタ素子の静電容量情報を推定する容量推定工程と;
前記容量推定工程における推定結果に基づいて、前記電気二重層キャパシタ素子から前記特定部品への動作電力のバックアップ供給が可能な時間を算出するバックアップ時間算出工程と;を備え
前記温度履歴推定工程では、前記外部電源から動作電力が供給されていない期間であるバックアップ期間については、前記気温情報記憶手段に記憶されている標準的気温情報の中から、設置地点が属すると推定される地域の標準的気温情報である推定気温情報を特定し、前記推定気温情報に基づいて前記電気二重層キャパシタ素子の温度変化を推定する、
ことを特徴とするバックアップ供給時間算出方法。
An electric double layer capacitor element that accumulates electric charge corresponding to the supplied voltage value; and operates using operating power supplied from an external power supply, and when the supply of operating power from the external power supply is interrupted A specific component that operates by receiving a back-up supply of operating power from the electric double layer capacitor element ; and temperature information storage means that stores standard temperature information that is information of temperature fluctuation estimated for each predetermined region; A backup supply time calculation method used in an information processing apparatus comprising:
A temperature history estimating step of estimating a history of changes in the temperature of the electric double layer capacitor element in the past;
A capacitance estimation step of estimating capacitance information of the electric double layer capacitor element based on an estimation result in the temperature history estimation step;
Comprising a; on the basis of the estimation result in the capacity estimation step, and the backup time calculation step of calculating the electric double layer capacitor wherein operating power backup supply possible time of a particular component from the device
In the temperature history estimation step, it is estimated that the installation point belongs from the standard temperature information stored in the temperature information storage unit for the backup period in which the operating power is not supplied from the external power source. Identifying estimated temperature information that is standard temperature information of the area to be estimated, and estimating a temperature change of the electric double layer capacitor element based on the estimated temperature information,
A backup supply time calculation method characterized by the above.
請求項8に記載のバックアップ供給時間算出方法を演算手段に実行させる、ことを特徴するバックアップ供給時間算出プログラム。 A backup supply time calculation program, characterized by causing a calculation means to execute the backup supply time calculation method according to claim 8 . 請求項9に記載のバックアップ供給時間算出プログラムが、演算手段により読み取り可能に記録されている、ことを特徴とする記録媒体。 10. A recording medium, wherein the backup supply time calculation program according to claim 9 is recorded so as to be readable by a calculation means.
JP2007154029A 2007-06-11 2007-06-11 Information processing apparatus and backup supply time calculation method Expired - Fee Related JP4838762B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007154029A JP4838762B2 (en) 2007-06-11 2007-06-11 Information processing apparatus and backup supply time calculation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007154029A JP4838762B2 (en) 2007-06-11 2007-06-11 Information processing apparatus and backup supply time calculation method

Publications (2)

Publication Number Publication Date
JP2008306895A JP2008306895A (en) 2008-12-18
JP4838762B2 true JP4838762B2 (en) 2011-12-14

Family

ID=40235090

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007154029A Expired - Fee Related JP4838762B2 (en) 2007-06-11 2007-06-11 Information processing apparatus and backup supply time calculation method

Country Status (1)

Country Link
JP (1) JP4838762B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3160000B1 (en) * 2015-10-20 2020-12-23 Siemens Aktiengesellschaft Adjusting an operating point of an electrical energy storage device which is ready for operation

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08166293A (en) * 1994-12-13 1996-06-25 Yazaki Corp Estimating method for temperature history
JP3389725B2 (en) * 1995-02-01 2003-03-24 カシオ計算機株式会社 Navigation device
JP3376813B2 (en) * 1995-03-20 2003-02-10 アイシン・エィ・ダブリュ株式会社 Navigation device and detachable unit for detachable unit
JP2001136659A (en) * 1999-11-08 2001-05-18 Auto Network Gijutsu Kenkyusho:Kk Current supply circuit
JP3562633B2 (en) * 2000-01-12 2004-09-08 株式会社岡村研究所 Capacitor uninterruptible power supply
JP4077376B2 (en) * 2003-08-08 2008-04-16 富士通株式会社 Route proposal apparatus and route proposal program
JP4011016B2 (en) * 2003-12-05 2007-11-21 株式会社東芝 Electric double layer capacitor system monitoring device
JP2006238660A (en) * 2005-02-28 2006-09-07 Seiko Epson Corp Information display device and charging control circuit
JP2006275929A (en) * 2005-03-30 2006-10-12 Fujitsu Ten Ltd Component deterioration degree evaluating apparatus and component deterioration degree evaluating method

Also Published As

Publication number Publication date
JP2008306895A (en) 2008-12-18

Similar Documents

Publication Publication Date Title
JP5094475B2 (en) Navigation equipment
JP4525578B2 (en) Imaging apparatus, GPS control method, and computer program
TWI321019B (en) Information processing device, power supply control method, and computer program
JP4356688B2 (en) Imaging apparatus, data recording method, data display control method, and computer program
JP5973422B2 (en) Navigation device, cruising range display system
JP2020169845A (en) Electronic timepiece, information update control method, and program
JP2010032459A (en) On-vehicle device
JP2010027021A (en) Electronic device and program
CN101464156B (en) Travel track recording apparatus, portable electronic apparatus and method thereof
JP6115219B2 (en) COMMUNICATION TERMINAL DEVICE, BATTERY REMAINING PRESENTATION METHOD, AND PROGRAM
JP2009128310A (en) Navigation device and navigation related information displaying technique
JP2006290209A (en) On-vehicle information processor
JP2011128751A (en) Data recording device and method for controlling the same
JP4838762B2 (en) Information processing apparatus and backup supply time calculation method
JP2006319585A (en) Electronic apparatus and display method
US10009851B1 (en) Battery charge level based mobile navigation system
JP2014143883A (en) Charge control device, program, and recording medium
JP2005088779A (en) On-vehicle information terminal unit
JP2013068431A (en) Battery level indicator, battery level indication method and program
JP4645181B2 (en) Computer start control device and computer start control method
JPH10290526A (en) Power unit for on-vehicle computer
JP6779806B2 (en) Navigation device and current location calculation method
JP2009115721A (en) Navigation apparatus and method for controlling consumption current
JP2005207934A (en) Navigator
JP2010127898A (en) Navigation system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100112

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101111

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101124

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110106

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110907

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110930

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141007

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4838762

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees