JP4775895B2 - Seismic isolation device restraint - Google Patents

Seismic isolation device restraint Download PDF

Info

Publication number
JP4775895B2
JP4775895B2 JP2006038773A JP2006038773A JP4775895B2 JP 4775895 B2 JP4775895 B2 JP 4775895B2 JP 2006038773 A JP2006038773 A JP 2006038773A JP 2006038773 A JP2006038773 A JP 2006038773A JP 4775895 B2 JP4775895 B2 JP 4775895B2
Authority
JP
Japan
Prior art keywords
seismic isolation
isolation device
flange
segment
restraint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006038773A
Other languages
Japanese (ja)
Other versions
JP2007217934A (en
Inventor
康久 比志島
Original Assignee
株式会社川金コアテック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社川金コアテック filed Critical 株式会社川金コアテック
Priority to JP2006038773A priority Critical patent/JP4775895B2/en
Publication of JP2007217934A publication Critical patent/JP2007217934A/en
Application granted granted Critical
Publication of JP4775895B2 publication Critical patent/JP4775895B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、既存建物の耐震改修の技術分野に属し、詳しくは、免震装置を用いた免震化工事の施工時に用いられる免震装置の拘束具に関するものである。   The present invention belongs to the technical field of seismic retrofitting of an existing building, and particularly relates to a seismic isolation device restraint used during construction of seismic isolation work using a seismic isolation device.

従来より、建物に施される免震構造は、新築の建物のみならず、既存建物の耐震改修(レトロフィット)に適用されることが多い。これは、免震構造を施すことにより上部構造の地震入力が低減し、建物本体に手を加える必要が少なくなるからである。このような既存建物を免震化する耐震改修工法の一つとして、既設の柱に免震装置としてのゴム支承を設置する免震荷重受替え方法がある。   Conventionally, seismic isolation structures applied to buildings are often applied not only to newly built buildings but also to seismic retrofitting (retrofit) of existing buildings. This is because the seismic isolation structure reduces the earthquake input of the superstructure and reduces the need to modify the building body. As one of the seismic retrofitting methods for making such existing buildings seismic isolation, there is a seismic isolation load exchange method in which a rubber bearing as a seismic isolation device is installed on an existing pillar.

この免震化工事の施工手順の大まかな流れは、「柱の無応力化」→「柱の切断」→「免震装置の設置・固定」→「免震装置への軸力移行」である。そして、柱の切断から層全体の免震装置取付けが完了するまでの間、それまで柱(及び耐力壁)で保有していた水平耐力が確保できなくなるため、何らかの形でそれを補う必要がある。そこで、このような水平耐力を確保する手段として、例えば特許文献1に記載のような免震装置の拘束具を用いる方法が提案されている。
特開2000−73613号公報
The general flow of the seismic isolation construction procedure is as follows. . And from the cutting of the pillar until the installation of the seismic isolation device for the entire layer is completed, it will be impossible to secure the horizontal strength that had been held in the pillar (and bearing wall) until then, so it is necessary to compensate for it in some way . Therefore, as a means for ensuring such horizontal proof stress, for example, a method of using a seismic isolation device restraint as described in Patent Document 1 has been proposed.
JP 2000-73613 A

この文献に記載の拘束具は、免震ゴムの上下部にフランジプレートが設けられた免震装置を拘束するためのものであって、上下部のフランジプレートの双方を包囲するように、上下部のフランジプレートの外周に配置される部分円筒形の複数のセグメントと、互いに隣接するセグメントのクランププレート(継ぎ手)を緊締して、各セグメントを上下部のフランジプレートの外周に密着させるためのボルトとを備えている。したがって、免震化工事の際にこの拘束具を用いると、上下部のフランジプレートが一体化することにより、免震ゴムが拘束され、その水平変位が生じなくなるというものである。   The restraint described in this document is for restraining a seismic isolation device having a flange plate on the upper and lower parts of the seismic isolation rubber, and includes upper and lower portions so as to surround both the upper and lower flange plates. A plurality of partially cylindrical segments arranged on the outer periphery of the flange plate, and bolts for tightening the clamp plates (joints) of the segments adjacent to each other to bring the segments into close contact with the outer periphery of the upper and lower flange plates; It has. Therefore, when this restraining tool is used during the seismic isolation construction, the upper and lower flange plates are integrated, so that the seismic isolation rubber is restrained and its horizontal displacement does not occur.

上記した免震装置の拘束具は、構造物の施工中に免震装置を確実に拘束することができるという効果を奏し、しかも簡単に設置・解体することができ、その設置面積も少ない利点があるとされている。しかしながら、水平力が働いてセグメントの周方向端部にあるクランププレート間を緊締するボルトに引張力が働くと、このボルトの位置がセグメントと芯がずれているため、クランププレートの間が開いてガタつく恐れがあり、強度上の問題がある。また、拘束具自体では高さの調整ができないため、高さの異なる免震装置ごとにセグメントを作り替える必要があり、コスト高になるという問題がある。   The seismic isolation device restraint described above has the advantage that the seismic isolation device can be reliably restrained during construction of the structure, and can be easily installed and disassembled, and has the advantage of a small installation area. It is said that there is. However, if a tensile force is applied to the bolt that tightens between the clamp plates at the circumferential end of the segment due to the horizontal force, the position of this bolt is misaligned with the segment. There is a risk of rattling and there is a problem with strength. Moreover, since the height cannot be adjusted with the restraint itself, it is necessary to recreate the segment for each seismic isolation device having a different height, which increases the cost.

本発明は、このような事情に鑑みてなされたものであり、その目的とするところは、水平力に対する強度が高く、しかも、高さの調整が簡単な免震装置の拘束具を提供することにある。   The present invention has been made in view of such circumstances, and an object thereof is to provide a seismic isolation device restraint having high strength against horizontal force and easy height adjustment. It is in.

上記の目的を達成するため、本発明の免震装置の拘束具は、免震ゴムの上下部にそれぞれフランジプレートが設けられてなる免震装置を包囲するようにして、上下部のフランジプレートの外側に筒状に設置される拘束具であって、2つを組み合わせるとフランジプレートを筒状に取り囲む大きさとなる互いに同じ形状をした4つのセグメントと、組み合わせるとフランジプレートを円板状に取り囲む大きさとなる複数のライナーとを備え、各セグメントは、セグメント本体と、セグメント本体の水平方向の両端部からそれぞれ外方に縦向きに延びる連結用リブと、セグメント本体の高さ方向の一端部から外方に水平に延びる連結用フランジと、セグメント本体の高さ方向の他端部の内側にフランジプレートと接するための突起とを有しており、セグメントの2つずつをそれらの連結用リブ同士をボルトで締結することで2つの枠体が形成され、その2つの枠体が連結用リブの位置が90度ずれると共に連結用フランジの間にライナーを挟んだ状態で上下に配置され、上下の枠体がその連結用フランジ同士をボルトで締結することでライナーとともに一体とされていることを特徴としている。   In order to achieve the above object, the seismic isolation device restraint of the present invention surrounds the seismic isolation device in which the flange plate is provided on the upper and lower portions of the seismic isolation rubber, and A restraint installed in a cylindrical shape on the outside. When two are combined, four segments with the same shape that surround the flange plate in a cylindrical shape, and when combined, a size that surrounds the flange plate in a disk shape. And each segment has a segment main body, connecting ribs extending vertically outward from both horizontal end portions of the segment main body, and one end portion in the height direction of the segment main body. A connecting flange extending horizontally, and a projection for coming into contact with the flange plate inside the other end of the segment body in the height direction. Two frames are formed by fastening two segments of each of the connecting ribs with bolts, and the positions of the connecting ribs are shifted by 90 degrees, and the liner is interposed between the connecting flanges. The upper and lower frame bodies are integrated with the liner by fastening the connecting flanges with bolts.

そして、上記構成の拘束具において、フランジプレートと接するための突起を各セグメントにそれぞれ2つずつ設け、枠体とした時の各セグメントの突起が90度ずつずれた4箇所でフランジプレートと接触するようにすることが好ましい。   Then, in the restraining device having the above-described configuration, two projections for contacting the flange plate are provided on each segment, and the projections of each segment, when used as a frame body, come into contact with the flange plate at four positions shifted by 90 degrees. It is preferable to do so.

本発明の免震装置の拘束具は、拘束具にかかる水平せん断力を連結用リブを締結するボルトの他に、上下の枠体を締結してあるボルトが主に負担し、また上下の枠体の縦方向の連結用リブが互いに連結用フランジで補強されるため、水平力に対する強度の高いものとなっており、しかもセグメントの内側にある突起がフランジプレートと接するので、大きな水平力がかかっても、ガタつくことなく上部構造の力を確実に下部構造に伝えることができる。また、上下の枠体の間に入れるライナーの厚さを変えることによって簡単に高さの調整を行うことができる。   In the seismic isolation device according to the present invention, the horizontal shearing force applied to the restraint is mainly borne by the bolts that fasten the upper and lower frames in addition to the bolts that fasten the connecting ribs, and the upper and lower frames. Since the longitudinal connecting ribs of the body are reinforced by the connecting flanges, the strength against horizontal force is high, and the projections inside the segments are in contact with the flange plate, so a large horizontal force is applied. However, the force of the upper structure can be reliably transmitted to the lower structure without rattling. Further, the height can be easily adjusted by changing the thickness of the liner inserted between the upper and lower frames.

以下、本発明の実施形態について図面を参照しながら説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1は本発明に係る免震装置の拘束具の一例を示す斜視図、図2は図1の拘束具を設置状態で示す側面図、図3は図2のA−A断面図、図4は図2のB−B断面図、図5は図3のC−Cを通る位置に対応した図1の断面図、図6は図4のD−Dを通る位置に対応した図1の断面図である。   1 is a perspective view showing an example of a restraint of the seismic isolation device according to the present invention, FIG. 2 is a side view showing the restraint of FIG. 1 in an installed state, FIG. 3 is a cross-sectional view taken along the line AA of FIG. 2 is a sectional view taken along the line BB in FIG. 2, FIG. 5 is a sectional view taken along the line CC in FIG. 3, and FIG. 6 is a sectional view taken along the line DD in FIG. FIG.

図1に示すように、免震装置の拘束具は、半円筒状をした4つのセグメント10と、リング状としたライナー20とを組み立てて構成されている。これら4つのセグメント10は同じ形状であり、各セグメント10は、半円筒形のセグメント本体11と、その周方向両端部からそれぞれ半径方向外方に縦向きに延びる連結用リブ12を備えている。また、セグメント本体11の高さ方向の一端部には外方に水平に延びる連結用フランジ13が形成されており、セグメント本体11の高さ方向の他端部の内側には免震装置のフランジプレートと接するための突起14が2つ設けられている。   As shown in FIG. 1, the seismic isolation device restraint is constructed by assembling four semi-cylindrical segments 10 and a ring-shaped liner 20. These four segments 10 have the same shape, and each segment 10 includes a semi-cylindrical segment main body 11 and a connecting rib 12 extending longitudinally outward from each end in the circumferential direction. Further, a connecting flange 13 extending horizontally outward is formed at one end portion of the segment body 11 in the height direction, and a flange of the seismic isolation device is formed inside the other end portion of the segment body 11 in the height direction. Two protrusions 14 for contacting the plate are provided.

この突起14は、図4及び図6を見れば分かるように、2つのセグメント10をそれらの連結用リブ12同士をボルト12aで締結して枠体とした時の各セグメント10の突起14が90度ずつずれた4箇所で免震装置の上部フランジプレート3及び下部フランジプレート4と接触する位置に設けられている。この突起14は、溶接ビードで盛り上がりを作ってそれをサンダーで滑らかに削ることで形成することができる。   As can be seen from FIGS. 4 and 6, the protrusion 14 has 90 protrusions 14 in each segment 10 when the two segments 10 are fastened together with bolts 12 a to connect the connecting ribs 12 to each other. It is provided at a position where it comes into contact with the upper flange plate 3 and the lower flange plate 4 of the seismic isolation device at four locations shifted by degrees. The protrusions 14 can be formed by creating a swell with a weld bead and smoothly shaving it with a sander.

さらに、セグメント本体11の高さ方向の他端部には外方に水平に延びる補強用フランジ15が形成され、連結用フランジ13とこの補強用フランジ15との間には補強用リブ16が形成されている。したがって、連結用リブ12は連結用フランジ13と補強用フランジ15の間に跨がって確りとした状態で設けられている。そして、連結用リブ12には一つ又は数個のボルト12a用の孔が設けられており、連結用フランジ13には所定の間隔でボルト13a用の孔が設けられている。また、補強用フランジ15には、図5に示すように、連結ボルトの頭をかわすための貫通孔15aが必要に応じて設けられる。   Further, a reinforcing flange 15 extending horizontally outward is formed at the other end of the segment body 11 in the height direction, and a reinforcing rib 16 is formed between the connecting flange 13 and the reinforcing flange 15. Has been. Therefore, the connecting rib 12 is provided in a clear state across the connecting flange 13 and the reinforcing flange 15. The connection rib 12 is provided with one or several holes for bolts 12a, and the connection flange 13 is provided with holes for bolts 13a at a predetermined interval. Further, as shown in FIG. 5, the reinforcing flange 15 is provided with a through-hole 15a for dodging the head of the connecting bolt as required.

ライナー20は、組み合わせるとリング状となる複数枚の部材からなる。施工上は、同じ形状に2分割したものを用いるようにした方が取り扱いやすい。例えば、図3の分割線aのところで2分割したものが好適である。いずれにしても、このライナー20には、セグメント10における連結用フランジ13のボルト13a用の孔に対応した孔を設けておく必要がある。   The liner 20 is composed of a plurality of members that form a ring shape when combined. In terms of construction, it is easier to handle if the same shape is divided into two parts. For example, the one divided into two at the dividing line a in FIG. 3 is suitable. In any case, it is necessary to provide the liner 20 with a hole corresponding to the hole for the bolt 13a of the connecting flange 13 in the segment 10.

この拘束具を設置する時は、セグメント10の2つずつをそれらの連結用リブ12同士をボルト12aで締結することで2つのリング状の枠体を形成し、連結用リブ12の位置が90度ずれると共にライナー20を間に挟んだ状態で2つの枠体を上下に配置し、連結用フランジ13同士を円周方向にボルト13aで締結する。したがって、連結用フランジ13のボルト13a用の孔はこれに対応できるようにその位置が決められており、ライナー20の貫通孔もそれに対応するようにしてある。   When installing this restraint, two ring-shaped frame bodies are formed by fastening two of the segments 10 together with their connecting ribs 12 with bolts 12a, and the positions of the connecting ribs 12 are 90. The two frame bodies are vertically arranged with the liner 20 sandwiched therebetween, and the connecting flanges 13 are fastened with bolts 13a in the circumferential direction. Therefore, the positions of the holes for the bolts 13a of the connecting flange 13 are determined so as to correspond to the holes, and the through holes of the liner 20 are also adapted to the positions.

図2に示すように、拘束具は、耐震改修工事の途中において、免震装置1を包囲するようにして設置される。この免震装置1は一般に使用されている周知のものであり、ゴム層と補強鋼板を交互に積層してなる免震ゴム2と、その上下部にそれぞれ固定される円形の上部フランジプレート3と下部フランジプレート4とからなっている。ここで、本発明の拘束具を用いない通常の耐震改修工事は概ね次の手順で行われる。   As shown in FIG. 2, the restraining tool is installed so as to surround the seismic isolation device 1 during the earthquake-resistant repair work. This seismic isolation device 1 is a well-known device that is generally used, and a seismic isolation rubber 2 in which rubber layers and reinforcing steel plates are alternately laminated, and a circular upper flange plate 3 that is respectively fixed to the upper and lower portions thereof. It consists of a lower flange plate 4. Here, the normal earthquake-proof repair work that does not use the restraint of the present invention is generally performed in the following procedure.

(1)既存の躯体に補強配筋を施して補強部コンクリートを圧入することで、柱と梁を補強する。
(2)補強した柱と梁の間にサポートジャッキを設置し、これをジャッキアップして既存の柱部分を切断しその一部を除去する。
(3)免震装置の上下部にそれぞれ上部アンカープレートと下部アンカープレートを取り付けた免震装置1を組み立て、これを分離した柱間に設置する。
(4)配筋して上部ベースコンクリートと下部ベースコンクリートを打設する。
(5)サポートジャッキをジャッキダウンして除去する。
(1) Reinforce the pillars and beams by applying reinforcement reinforcement to the existing frame and press-fitting the reinforcement concrete.
(2) A support jack is installed between the reinforced column and the beam, and this is jacked up to cut the existing column part and remove a part thereof.
(3) The seismic isolation device 1 with the upper anchor plate and the lower anchor plate attached to the upper and lower parts of the seismic isolation device is assembled and installed between the separated columns.
(4) Arrange the upper base concrete and lower base concrete.
(5) Jack down the support jack and remove it.

本発明の拘束具は、この耐震改修工事において、切断した柱間に免震装置を設置した後、上下部のベースコンクリートの配筋前に免震装置に取り付けられる。すなわち、免震装置における上下部のフランジプレート3,4の外側に筒状に設置される。そして、層全体の免震装置取付けが完了するまでの間、失われた水平耐力を補う働きをする。図2及び図5において、5は上部アンカープレート、6は下部アンカープレート、7は上部ベースコンクリート、8は下部ベースコンクリートをそれぞれ示している。   In this seismic retrofitting work, the restraining tool of the present invention is attached to the seismic isolation device before placing the base concrete in the upper and lower parts after installing the seismic isolation device between the cut columns. That is, it is installed in a cylindrical shape outside the upper and lower flange plates 3 and 4 in the seismic isolation device. And it works to compensate for the lost horizontal strength until the seismic isolation device installation of the entire layer is completed. 2 and 5, 5 indicates an upper anchor plate, 6 indicates a lower anchor plate, 7 indicates an upper base concrete, and 8 indicates a lower base concrete.

拘束具の設置手順は次のようである。まず、免震装置1の下部フランジプレート4を包囲するようにして、2つのセグメント10をそれぞれ補強用フランジ15が下側になる状態で下部アンカープレート6の上に対向して載せ、それらの連結用リブ12同士をボルトとナットで連結して下側の枠体を形成する。そして、下側のリング体における連結用フランジ13の上にライナープ20を載せる。次いで、免震装置1の上部フランジプレート3を包囲するようにして、残り2つのセグメント10をそれぞれ連結用フランジ13が下側になる状態でライナー20の上に対向して載せ、それらの連結用リブ12同士をボルトとナットで連結して上側の枠体を形成する。この時、上下2つの枠体における連結用リブ12の位置が90度ずれるようにする。続いて、上下の枠体における連結用フランジ13同士を円周方向にボルトとナットで連結する。このように4つのセグメント10とライナー20とをボルトとナットで連結した後、全てのボルトを締め付け、上側の2つのセグメント10における4つの突起14を上部フランジプレート3に押し付けるとともに、下側の2つのセグメント10における4つの突起14を下部フランジプレート4に押し付ける。このボルトの締付けに際しては、連結用リブ12のボルトを強固に締め付けた後、連結用フランジ13のボルトを強固に締め付けるようにする。   The procedure for installing the restraint is as follows. First, the two segments 10 are placed on the lower anchor plate 6 so as to surround the lower flange plate 4 of the seismic isolation device 1 with the reinforcing flanges 15 facing downward, and their connection is made. The lower ribs are formed by connecting the ribs 12 to each other with bolts and nuts. Then, the liner 20 is placed on the connecting flange 13 in the lower ring body. Next, the upper two flange plates 3 of the seismic isolation device 1 are surrounded so that the remaining two segments 10 are placed on the liner 20 facing each other with the connecting flange 13 on the lower side. The ribs 12 are connected to each other with bolts and nuts to form an upper frame. At this time, the positions of the connecting ribs 12 in the two upper and lower frames are shifted by 90 degrees. Subsequently, the connecting flanges 13 in the upper and lower frames are connected to each other in the circumferential direction with bolts and nuts. After the four segments 10 and the liner 20 are connected with the bolts and nuts in this way, all the bolts are tightened, the four protrusions 14 in the upper two segments 10 are pressed against the upper flange plate 3, and the lower two Four projections 14 in one segment 10 are pressed against the lower flange plate 4. When tightening the bolt, the bolt of the connecting rib 12 is firmly tightened, and then the bolt of the connecting flange 13 is firmly tightened.

この設置手順において、4つのセグメント10とライナー20とをボルトとナットで連結した際、連結用リブ12同士が接触してしまうと、続く締付け工程で突起14がフランジプレートに接触しない場合がある。したがって、図2〜4に示すように、連結用リブ12同士の間に隙間が生じるようにする。   In this installation procedure, when the four segments 10 and the liner 20 are connected by bolts and nuts, if the connecting ribs 12 come in contact with each other, the projection 14 may not contact the flange plate in the subsequent tightening process. Therefore, as shown in FIGS. 2 to 4, a gap is generated between the connecting ribs 12.

また、免震装置の種類ごとの高さに応じて必要なライナー20の厚さを決めておくことにより、径が同じであれば、同じ拘束具を用いて高さの異なる免震装置に使用できる。なお、ライナー20は図示のような板状のものに限らず、例えば断面がコの字型をしたものでもよい。   In addition, if the diameter is the same by determining the necessary thickness of the liner 20 according to the height of each type of seismic isolation device, it can be used for seismic isolation devices with different heights using the same restraint. it can. The liner 20 is not limited to a plate shape as shown in the figure, and may be a U-shaped cross section, for example.

このようにして拘束具を設置すると、免震装置1の上部フランジプレート3と下部プレートプレート4が一体化し、免震ゴム2が拘束されてその水平変位が押さえられる。したがって、耐震改修工事中に、大きな地震が起きて大きな水平力が建物にかかった時、建物が水平移動しようとするが、この水平力は上部のフランジプレート3から拘束具を介して下部のフランジプレート4へと伝わり、建物が水平に動こうとする力が拘束されるのである。この拘束具は、施工終了後、サポートジャッキを撤去する前に免震装置1から外され、免震装置1は本来の機能を発揮するようになる。   When the restraint is installed in this manner, the upper flange plate 3 and the lower plate plate 4 of the seismic isolation device 1 are integrated, and the seismic isolation rubber 2 is restrained and its horizontal displacement is suppressed. Therefore, during a seismic retrofitting work, when a large earthquake occurs and a large horizontal force is applied to the building, the building attempts to move horizontally. This horizontal force is transferred from the upper flange plate 3 to the lower flange via a restraint. The force that is transmitted to the plate 4 and the building moves horizontally is restrained. After the construction is completed, the restraint tool is removed from the seismic isolation device 1 before the support jack is removed, and the seismic isolation device 1 exhibits its original function.

この拘束具は、同じ形状をした4つのセグメント10を使用する。したがって、セグメント10は鋼板製のみならず、鋳鋼品とすることもできる。鋳鋼品の場合、木型は1個でできるし、鋳鋼品の利点である応力に応じた板厚を考慮できるため、強度的に優れしかもコスト的にも安価に供給することができる。   This restraint uses four segments 10 having the same shape. Therefore, the segment 10 can be not only a steel plate but also a cast steel product. In the case of a cast steel product, a single wooden mold can be used, and the plate thickness corresponding to the stress, which is an advantage of the cast steel product, can be taken into account, so that it can be supplied with excellent strength and at a low cost.

以上、本発明の実施の形態について詳細に説明してきたが、本発明による免震装置の拘束具は、上記した実施の形態に何ら限定されるものではなく、本発明の趣旨を逸脱しない範囲において種々の変更が可能であることは当然のことである。   The embodiment of the present invention has been described in detail above. However, the seismic isolation device restraint according to the present invention is not limited to the above-described embodiment, and does not depart from the spirit of the present invention. Of course, various modifications are possible.

例えば、フランジプレートが上記のような丸型のものでなく、四角形のフランジプレートを備えた免震装置に用いる場合には、それに合わせた四角形の拘束具にも適用することができる。この場合、連結用リブは四辺の中央に位置させた方がよい。   For example, when the flange plate is used in a seismic isolation device having a square flange plate instead of the round shape as described above, the present invention can also be applied to a square restraint according to the flange plate. In this case, the connecting rib is preferably located at the center of the four sides.

本発明に係る免震装置の拘束具の一例を示す斜視図である。It is a perspective view which shows an example of the restraint tool of the seismic isolation apparatus which concerns on this invention. 図1の拘束具を設置状態で示す側面図である。It is a side view which shows the restraint tool of FIG. 1 in an installation state. 図2のA−A断面図である。It is AA sectional drawing of FIG. 図2のB−B断面図である。It is BB sectional drawing of FIG. 図3のC−Cを通る位置に対応した図1の断面図である。It is sectional drawing of FIG. 1 corresponding to the position which passes CC of FIG. 図4のD−Dを通る位置に対応した図1の断面図である。It is sectional drawing of FIG. 1 corresponding to the position which passes DD of FIG.

符号の説明Explanation of symbols

1 免震装置
2 免震ゴム
3 上部フランジプレート
4 下部フランジプレート
5 上部アンカープレート
6 下部アンカープレート
7 上部ベースプレート
8 下部ベースプレート
10 セグメント
11 セグメント本体
12 連結用リブ
12a ボルト
13 連結用ブフランジ
13a ボルト
14 突起
15 補強用フランジ
15a 貫通孔
16 補強用リブ
20 ライナー
DESCRIPTION OF SYMBOLS 1 Seismic isolation device 2 Seismic isolation rubber 3 Upper flange plate 4 Lower flange plate 5 Upper anchor plate 6 Lower anchor plate 7 Upper base plate 8 Lower base plate 10 Segment 11 Segment main body 12 Connecting rib 12a Bolt 13 Connecting buff flange 13a Bolt 14 Projection 15 Reinforcing flange 15a Through hole 16 Reinforcing rib 20 Liner

Claims (2)

免震ゴムの上下部にそれぞれフランジプレートが設けられてなる免震装置を包囲するようにして、上下部のフランジプレートの外側に筒状に設置される拘束具であって、2つを組み合わせるとフランジプレートを筒状に取り囲む大きさとなる互いに同じ形状をした4つのセグメントと、組み合わせるとフランジプレートを円板状に取り囲む大きさとなる複数のライナーとを備え、各セグメントは、セグメント本体と、セグメント本体の水平方向の両端部からそれぞれ外方に縦向きに延びる連結用リブと、セグメント本体の高さ方向の一端部から外方に水平に延びる連結用フランジと、セグメント本体の高さ方向の他端部の内側にフランジプレートと接するための突起とを有しており、セグメントの2つずつをそれらの連結用リブ同士をボルトで締結することで2つの枠体が形成され、その2つの枠体が連結用リブの位置が90度ずれると共に連結用フランジの間にライナーを挟んだ状態で上下に配置され、上下の枠体がその連結用フランジ同士をボルトで締結することでライナーとともに一体とされていることを特徴とする免震装置の拘束具。   It is a restraint that is installed cylindrically on the outside of the upper and lower flange plates so as to surround the seismic isolation device in which the upper and lower parts of the seismic isolation rubber are provided with flange plates. It has four segments of the same shape that surround the flange plate in a cylindrical shape, and a plurality of liners that, when combined, surround the flange plate in a disk shape. Each segment has a segment body and a segment body. Connecting ribs extending vertically outward from both horizontal end portions, a connecting flange extending horizontally outward from one end of the segment body in the height direction, and the other end of the segment body in the height direction There are protrusions to contact the flange plate on the inside of the part, and the connecting ribs are bolted to each of the two segments By fastening, two frame bodies are formed, the two frame bodies are arranged up and down with the position of the connecting ribs shifted by 90 degrees and a liner sandwiched between the connecting flanges. A restraint for a seismic isolation device, wherein the connecting flanges are integrated with a liner by fastening them with bolts. フランジプレートと接するための突起を各セグメントにそれぞれ2つずつ設け、枠体とした時の各セグメントの突起が90度ずつずれた4箇所でフランジプレートと接触するようにしたことを特徴とする請求項1に記載の免震装置の拘束具。
Two protrusions for contacting the flange plate are provided on each segment, and the projections of each segment when the frame is made to be in contact with the flange plate at four positions shifted by 90 degrees. Item 1. A seismic isolation device restraint according to item 1.
JP2006038773A 2006-02-16 2006-02-16 Seismic isolation device restraint Active JP4775895B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006038773A JP4775895B2 (en) 2006-02-16 2006-02-16 Seismic isolation device restraint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006038773A JP4775895B2 (en) 2006-02-16 2006-02-16 Seismic isolation device restraint

Publications (2)

Publication Number Publication Date
JP2007217934A JP2007217934A (en) 2007-08-30
JP4775895B2 true JP4775895B2 (en) 2011-09-21

Family

ID=38495513

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006038773A Active JP4775895B2 (en) 2006-02-16 2006-02-16 Seismic isolation device restraint

Country Status (1)

Country Link
JP (1) JP4775895B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505635B (en) * 2011-10-18 2014-01-15 中铁大桥局股份有限公司 Cast-in-situ formwork for bridge construction

Also Published As

Publication number Publication date
JP2007217934A (en) 2007-08-30

Similar Documents

Publication Publication Date Title
JP2012077471A (en) Joint structure of precast members and concrete precast members
JP4783232B2 (en) Turbine generator base
JP2010261270A (en) Composite structure and method for constructing composite structure building
JP2006249816A (en) Joint structure of reinforced concrete column and steel framed beam and its joint method
JP4775895B2 (en) Seismic isolation device restraint
JP4658005B2 (en) Seismic isolation method for existing buildings
JP2006200361A (en) Base isolating method for existing building
JP6832048B2 (en) Joint structure of seismic isolation device and steel pipe column and seismic isolation building
JP6669088B2 (en) Steel plate shear walls, frames and buildings equipped with them
JP2008038367A (en) Disassemblable column/beam joint
KR102169828B1 (en) Joint of columns
JP2005061081A (en) Joint structure of pre-cast slab, and joining method thereof
JPH10115104A (en) Installing method of vibration isolation device to existing structure and vibration isolation device used therefor
JP4124031B2 (en) How to install seismic isolation devices on existing pillars
JP2000008323A (en) Repair construction method for existing bridge supporting device
JP2002013297A (en) Earthquake resistant reinforcing method
JP6364210B2 (en) Bridge pier reinforcement structure
JP2006299584A (en) Aseismatic reinforcing joining structure
JP2006194002A (en) Joint structure of steel framed beam and reinforced concrete column and composite structure using the same
JP7504708B2 (en) Manufacturing method of pile head member, pile head seismic isolation structure, and construction method of pile head seismic isolation structure
JP3622100B2 (en) How to reinforce existing beams
JP5061004B2 (en) Seismic reinforcement structure for concrete structures
JP5660876B2 (en) Reactor vessel support structure and construction method of reactor vessel support structure
JP6825213B2 (en) Seismic isolation device support structure and construction method of seismic isolation device support structure
JPH11280266A (en) Construction method for base isolation of existing building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090209

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20090917

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091104

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100122

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110531

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110622

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110623

R150 Certificate of patent or registration of utility model

Ref document number: 4775895

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140708

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250