JP4684800B2 - Joint structure of steel plate concrete members - Google Patents

Joint structure of steel plate concrete members Download PDF

Info

Publication number
JP4684800B2
JP4684800B2 JP2005235446A JP2005235446A JP4684800B2 JP 4684800 B2 JP4684800 B2 JP 4684800B2 JP 2005235446 A JP2005235446 A JP 2005235446A JP 2005235446 A JP2005235446 A JP 2005235446A JP 4684800 B2 JP4684800 B2 JP 4684800B2
Authority
JP
Japan
Prior art keywords
steel plate
column
concrete
steel
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2005235446A
Other languages
Japanese (ja)
Other versions
JP2007051428A (en
Inventor
聖雅 西岡
信之 丹羽
弘 南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Tokyo Electric Power Co Inc
Original Assignee
Kajima Corp
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Tokyo Electric Power Co Inc filed Critical Kajima Corp
Priority to JP2005235446A priority Critical patent/JP4684800B2/en
Publication of JP2007051428A publication Critical patent/JP2007051428A/en
Application granted granted Critical
Publication of JP4684800B2 publication Critical patent/JP4684800B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、鋼板コンクリート造部材の接合構造に関する。   The present invention relates to a joining structure for steel plate concrete members.

近年、発電所のフレーム架構などとして鋼板コンクリート造梁および鋼板コンクリート造柱を用いらものがある。鋼板コンクリート梁および鋼板コンクリート柱は、たとえば鋼板を中空の四柱状体に形成し、その中空部にコンクリートを打設した構造のものである。   In recent years, steel frame concrete beams and steel plate concrete columns have been used as power frame structures. The steel plate concrete beam and the steel plate concrete column have a structure in which, for example, a steel plate is formed into a hollow four-column body and concrete is placed in the hollow portion.

このような鋼板コンクリートを用いたフレーム架構として、従来、特開平5−331807号公報に開示された鋼板コンクリート製大型フレーム架構がある。この鋼板コンクリート製大型フレーム架構は、構造物の規模に応じて所定サイズの矩形形状に加工された鋼板にコンクリートを打設した鋼板コンクリート製の長尺状の柱と梁とを溶接によって接合されて構成されているものである。
特開平5−331807号公報
As a frame structure using such steel plate concrete, there is a large steel frame concrete frame structure disclosed in Japanese Patent Laid-Open No. 5-331807. This steel frame concrete large frame is constructed by welding a long column made of steel plate concrete and a beam, which is made by placing concrete into a steel plate processed into a rectangular shape of a predetermined size according to the scale of the structure. It is configured.
JP-A-5-331807

しかし、上記特許文献1に開示された鋼板コンクリート製大型フレーム架構では、構造物の構築現場で柱と梁との溶接作業を行っている。現場における溶接作業は手間の掛かるものであるため、柱と梁とはボルト接合によって接合することが望まれる。このように、柱と梁とを接合するために、柱における梁の取り付け部分に梁の断面のほぼ同一形状の突出部を形成し、この突出部と梁の端部とをボルト留めすることによってボルト接合することが行われている。   However, in the steel frame concrete large frame structure disclosed in Patent Document 1, welding work between columns and beams is performed at the construction site of the structure. Since welding work in the field is time-consuming, it is desirable to join the column and beam by bolting. In this way, in order to join the column and the beam, a protruding portion having a substantially identical cross section of the beam is formed at the beam mounting portion of the column, and the protruding portion and the end of the beam are bolted to each other. Bolt joining is performed.

ところが、柱における梁の取り付け部分に突出部を形成すると、この突出部分が柱の製作作業・運搬作業の障害となるため、製作性・運搬性に劣ることになるという問題があった。   However, if a protruding portion is formed at the beam attachment portion of the column, this protruding portion becomes an obstacle to the column manufacturing and transporting operations, and thus there is a problem that the manufacturability and transportability are poor.

そこで、本発明の課題は、柱における突出部を回避することにより、柱の製作・運搬を容易なものとすることができる鋼板コンクリート造部材の接合構造を提供することにある。   Then, the subject of this invention is providing the joining structure of the steel-plate concrete structure member which can make manufacture and conveyance of a pillar easy by avoiding the protrusion part in a pillar.

上記課題を解決した本発明に係る鋼板コンクリート造部材の接合構造は、鋼板コンクリート造柱部材と鋼板コンクリート造梁部材とを接合してなる鋼板コンクリート造部材の接合構造であって、鋼板コンクリート造梁部材は、鋼板コンクリート造梁部材の端部に設けられた継手部材を介して鋼板コンクリート造柱部材の鋼板部位にボルト接合されており、鋼板コンクリート造梁部材はウエブ鋼板とフランジ鋼板とを備え、継手部材がフランジ鋼板の端部に取り付けられており、継手部材はT形鋼および山形鋼のうちの少なくとも一方とされており、フランジ鋼板における鋼板コンクリート造柱部材側端部には、フランジ鋼板のフランジ幅方向に両端部を残して切欠いた切欠き部が形成され、継手部材は、フランジ鋼板の幅よりも短く、切欠き部に取り付けられているものである。 The joint structure of a steel plate concrete member according to the present invention that has solved the above problems is a joint structure of a steel plate concrete member formed by joining a steel plate concrete column member and a steel plate concrete beam member. The member is bolted to the steel plate part of the steel plate concrete column member via a joint member provided at the end of the steel plate concrete beam member, and the steel plate concrete beam member includes a web steel plate and a flange steel plate, The joint member is attached to the end of the flange steel plate, the joint member is at least one of T-shaped steel and angle steel, and the steel plate concrete column member side end of the flange steel plate A notch is formed in the flange width direction by leaving both ends, and the joint member is shorter than the width of the flange steel plate. Those attached to.

本発明に係る鋼板コンクリート造部材の接合構造では、鋼板コンクリート造梁部材の端部に設けられた継手部材を介して鋼板コンクリート造柱部材の鋼板部位にボルト接合されている。このため、鋼板コンクリート造柱部材における梁部材との接合部分に突出部を設ける必要がない。したがって、運搬などの障害となる突出部を回避することができるので、鋼板コンクリート造柱部材の製作・運搬を容易に行うことができる。   In the joining structure of steel plate concrete members according to the present invention, the steel plate concrete column member is bolted to a steel plate portion via a joint member provided at an end portion of the steel plate concrete beam member. For this reason, it is not necessary to provide a protrusion part in the junction part with the beam member in a steel plate concrete column member. Therefore, since the protrusion part which becomes obstructions, such as conveyance, can be avoided, manufacture and conveyance of a steel plate concrete column member can be performed easily.

このように、鋼板コンクリート造梁部材のフランジ鋼板の端部にT形鋼または山形鋼が継手部材として取り付けられていることにより、鋼板コンクリート造柱部材と鋼板コンクリート造梁部材とを確実に接合することができる。   Thus, the steel plate concrete column member and the steel plate concrete beam member are reliably joined by attaching the T-shaped steel or the angle steel as the joint member to the end of the flange steel plate of the steel plate concrete beam member. be able to.

また、鋼板コンクリート造部材の接合構造は、鋼板コンクリート造柱部材と鋼板コンクリート造梁部材とを接合してなる鋼板コンクリート造部材の接合構造であって、鋼板コンクリート造梁部材は、鋼板コンクリート造梁部材の端部に設けられた継手部材を介して鋼板コンクリート造柱部材の鋼板部位にボルト接合されており、鋼板コンクリート造梁部材はウエブ鋼板とフランジ鋼板とを備え、継手部材がウエブ鋼板の端部に取り付けられており、継手部材は山形鋼とされており、継手部材の一辺はウエブ鋼板に対して内側から接合され、かつ継手部材の他の一辺は鋼板コンクリート造柱部材に対して外側から接合されているものである。 Moreover, the steel plate concrete structural member joining structure is a steel plate concrete structural member joining structure comprising a steel plate concrete pillar member and a steel concrete concrete beam member, and the steel concrete concrete beam member is a steel concrete concrete beam. It is bolted to a steel plate part of a steel plate concrete column member via a joint member provided at the end of the member, the steel plate concrete beam member includes a web steel plate and a flange steel plate, and the joint member is an end of the web steel plate. The joint member is angle steel, one side of the joint member is joined to the web steel plate from the inside, and the other side of the joint member is joined to the steel plate concrete column member from the outside It is what is joined.

このように、鋼板コンクリート造梁部材のウエブ鋼板の端部に山形鋼が継手部材として取り付けられていることにより、鋼板コンクリート造柱部材と鋼板コンクリート造梁部材とを確実に接合することができる。   Thus, the angle steel is attached as the joint member to the end of the web steel plate of the steel plate concrete beam member, so that the steel plate concrete column member and the steel plate concrete beam member can be reliably joined.

本発明に係る鋼板コンクリート造部材の接合構造によれば、柱における突出部を回避することができ、柱の製作・運搬を容易なものとすることができる。   According to the joining structure of steel plate concrete members according to the present invention, it is possible to avoid the protruding portion in the column, and it is possible to easily manufacture and transport the column.

以下、図面を参照して、本発明の好適な実施形態について説明する。なお、各実施形態において、同一の機能を有する部分については同一の符号を付し、重複する説明は省略することがある。図1は、本発明に係る鋼板コンクリート造部材の接合構造が適用される発電所のフレーム架構の斜視図、図2は、本発明に係る鋼板コンクリート造部材の接合構造の斜視図、図3は、本発明に係る鋼板コンクリート造部材の接合構造の断面図である。   Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings. In each embodiment, portions having the same function are denoted by the same reference numerals, and redundant description may be omitted. FIG. 1 is a perspective view of a frame structure of a power plant to which a joining structure of steel plate concrete members according to the present invention is applied. FIG. 2 is a perspective view of a joining structure of steel plate concrete members according to the present invention. It is sectional drawing of the joining structure of the steel plate concrete member based on this invention.

図1に示すように、本実施形態に係る鋼板コンクリート造部材である鋼板コンクリート造柱(以下「柱部材」という)1および鋼板コンクリート造梁(以下「梁部材」という)2は、フレーム架構Fに用いられる。フレーム架構Fは、複数の柱部材1および梁部材2を接合することによって構築される。   As shown in FIG. 1, a steel plate concrete column (hereinafter referred to as “column member”) 1 and a steel plate concrete beam (hereinafter referred to as “beam member”) 2 which are steel plate concrete members according to this embodiment are a frame frame F. Used for. The frame frame F is constructed by joining a plurality of column members 1 and beam members 2.

図2および図3に示すように、柱部材1には、その長手方向(高さ方向)略中央部と、上端部とに、それぞれ梁部材2が接合されて柱梁接合部が形成されている。柱部材1は、柱鋼板11を備えており、柱鋼板11の内側にコンクリートが充填されている。柱鋼板11は鋼板を断面矩形の中空状に折り曲げ加工して長尺状に形成されており、鉛直方向に沿うように立設されている。また、柱部材1は、複数の縦リブ12を有しており、複数の縦リブ12は、平面視して矩形状となっている柱鋼板11の内周面に沿って等間隔で合計12本配置されている。   As shown in FIG. 2 and FIG. 3, the column member 1 has a beam member 2 joined to a substantially central portion in the longitudinal direction (height direction) and an upper end portion to form a column beam joint portion. Yes. The column member 1 includes a column steel plate 11, and concrete is filled inside the column steel plate 11. The column steel plate 11 is formed in a long shape by bending a steel plate into a hollow shape having a rectangular cross section, and is erected along the vertical direction. Further, the column member 1 has a plurality of vertical ribs 12, and the plurality of vertical ribs 12 is a total of 12 at equal intervals along the inner peripheral surface of the column steel plate 11 that is rectangular in plan view. The book is arranged.

また、柱部材1には、複数の横リブ13が取り付けられている。横リブ13は、柱部材1の長手方向に交差する面、ここでは直交する面上で、それぞれ柱鋼板11の内周面に沿って配置された4本のリブ部材によって構成されている。複数の横リブ13は、互いに高さ方向に適宜の間隔をおいて配置されて取り付けられている。この横リブ13の内側には、図示しないブレースおよび束材が配設されている。また、図示はしないが、横リブ13には、複数のエア抜き穴が形成されている。このエア抜き孔により、柱鋼板11の内側におけるコンクリートの充填性を高めている。   A plurality of lateral ribs 13 are attached to the column member 1. The lateral ribs 13 are each constituted by four rib members arranged along the inner peripheral surface of the column steel plate 11 on a plane intersecting the longitudinal direction of the column member 1, that is, a plane orthogonal here. The plurality of lateral ribs 13 are attached so as to be arranged at appropriate intervals in the height direction. A brace and a bundle member (not shown) are disposed inside the lateral rib 13. Although not shown, the lateral rib 13 has a plurality of air vent holes. By this air vent hole, the filling property of the concrete inside the pillar steel plate 11 is enhanced.

さらに、柱部材1における梁部材2との接合部位には、ダイヤフラムプレート14が設けられている。ダイヤフラムプレート14は、鋼製の板状のものであり、図示しない人員用開口、バイブレータ用開口、空気孔などが形成されている。このダイヤフラムプレート14により、梁部材2との接合部における強度を高めている。   Further, a diaphragm plate 14 is provided at a joint portion of the column member 1 with the beam member 2. The diaphragm plate 14 is a steel plate-like member, and has a personnel opening, a vibrator opening, an air hole, and the like (not shown). The diaphragm plate 14 increases the strength at the joint with the beam member 2.

また、柱鋼板11における内側面には複数のスタッド15が柱鋼板11の内側面に対して直交する方向を向いて立設されている。スタッド15は、4面を向いた柱鋼板11のすべての面から内側に向けて立設されており、これらのスタッド15により、柱鋼板11の内側にコンクリートが打設された際における柱鋼板11とコンクリートとの強度を高めている。   A plurality of studs 15 are provided on the inner side surface of the column steel plate 11 so as to face in a direction orthogonal to the inner side surface of the column steel plate 11. The studs 15 are erected inward from all the surfaces of the column steel plates 11 facing the four surfaces, and the column steel plates 11 when the concrete is placed inside the column steel plates 11 by these studs 15. And the strength of concrete.

さらに、図3に示すように、基礎スラブ3が形成されており、柱部材1は、基礎スラブ3の上に立設されている。ここで、柱部材1は、基礎スラブ3に対して埋込柱脚型で立設されており、柱部材1における柱鋼板11が直接基礎スラブ3に埋め込まれている。基礎スラブ3は、鋼板架台31を備えており、鋼板架台31は、レベル調整ボルト32によって高さ位置の調整がなされている。この鋼板架台31の上に柱部材1における柱鋼板11が載置されて柱部材1が立設される。   Furthermore, as shown in FIG. 3, a foundation slab 3 is formed, and the column member 1 is erected on the foundation slab 3. Here, the column member 1 is erected in an embedded column base with respect to the foundation slab 3, and the column steel plate 11 in the column member 1 is directly embedded in the foundation slab 3. The foundation slab 3 includes a steel plate mount 31, and the height position of the steel plate mount 31 is adjusted by a level adjustment bolt 32. The column steel plate 11 in the column member 1 is placed on the steel plate mount 31 and the column member 1 is erected.

また、基礎スラブ3における上部には、上部補強鉄筋33が平面視して網目状に配筋されており、基礎スラブ3における下部には、下部補強鉄筋34が平面視して網目状に配筋されている。上部補強鉄筋33は、その一部が柱部材1における柱鋼板11を貫通する高さ位置に配筋されて基礎スラブ筋通し配筋とされており、下部補強鉄筋34はレベル調整ボルト32を縫うようにして配筋されている。上部補強鉄筋33における柱鋼板11の貫通位置には、カプラー35が設けられている。このカプラー35により、柱鋼板11における上部補強鉄筋33の貫通位置を補強している。また、柱部材1におけるスタッド15は、基礎スラブ3に埋め込まれる位置にも設けられている。   In addition, the upper reinforcing bars 33 are arranged in a mesh pattern in the upper part of the foundation slab 3, and the lower reinforcing bars 34 are arranged in a mesh pattern in the lower part of the foundation slab 3 in a plan view. Has been. A part of the upper reinforcing bar 33 is arranged at a height position penetrating the column steel plate 11 in the column member 1 to be a basic slab reinforcing bar, and the lower reinforcing bar 34 sews the level adjusting bolt 32. It is arranged in this way. A coupler 35 is provided at the penetration position of the column steel plate 11 in the upper reinforcing steel bar 33. The coupler 35 reinforces the penetration position of the upper reinforcing bar 33 in the column steel plate 11. Further, the stud 15 in the column member 1 is also provided at a position embedded in the foundation slab 3.

梁部材2は、柱部材1と同様、梁鋼板21を備えており、梁鋼板21の内側にコンクリートが充填されている。梁鋼板21は鋼板を断面矩形の中空状に折り曲げ加工して長尺状に形成されており、水平方向に沿うように配設されている。こうして、梁鋼板21としては、表面および裏面が水平方向を向いて配置される上下フランジ鋼板22,23と表面および裏面が水平方向を向いて配置される左右ウエブ鋼板24,25とが形成される。   Similar to the column member 1, the beam member 2 includes a beam steel plate 21, and the beam steel plate 21 is filled with concrete. The beam steel plate 21 is formed in a long shape by bending a steel plate into a hollow shape having a rectangular cross section, and is arranged along the horizontal direction. Thus, as the beam steel plate 21, the upper and lower flange steel plates 22 and 23 whose front and rear surfaces are arranged in the horizontal direction and the left and right web steel plates 24 and 25 which are arranged with the front and rear surfaces in the horizontal direction are formed. .

また、梁部材2は、複数の縦リブ26を有している。縦リブ26は、梁鋼板21の内側面で、鉛直方向に沿って配置されている。複数の縦リブ26は、梁部材2の長手方向に適宜の間隔をおいて配置されている。さらに、梁部材2には、横リブ27が設けられている。横リブ27は、梁部材2の長手方向に直交する面上で対向する縦リブ26同士の上端部および下端部を結ぶ位置に配置されている。さらに、梁部材2の長手方向に直交する面上における縦リブ26と横リブ27との間には、図示しないブレースおよび束材が設けられている。   The beam member 2 has a plurality of vertical ribs 26. The vertical ribs 26 are arranged along the vertical direction on the inner surface of the beam steel plate 21. The plurality of vertical ribs 26 are arranged at appropriate intervals in the longitudinal direction of the beam member 2. Further, the rib 2 is provided on the beam member 2. The lateral rib 27 is disposed at a position connecting the upper end portion and the lower end portion of the longitudinal ribs 26 facing each other on the surface orthogonal to the longitudinal direction of the beam member 2. Further, braces and bundles (not shown) are provided between the vertical ribs 26 and the horizontal ribs 27 on the surface orthogonal to the longitudinal direction of the beam member 2.

さらに、図4に示すように、梁部材2の柱部材1との接合位置における上フランジ鋼板22の端部には、継手部材であるスプリットティ4が取り付けられている。また、図5(a)に示すように、下フランジ鋼板23の端部に対しても同様のスプリットティ4が設けられている。図5(a)に示すように、スプリットティ4は、本体部41を備えている。本体部41は、縦板41Aと横板41Bとを備えており、横板41Bの先端部が縦板41Aの高さ方向略中央位置に配置されて断面形状が略T字をなすT形鋼とされている。また、本体部41は長尺状をなしており、その長手方向の長さは、フランジ鋼板22,23の幅よりもわずかに短い長さとされている。   Further, as shown in FIG. 4, a split tee 4, which is a joint member, is attached to an end portion of the upper flange steel plate 22 at a position where the beam member 2 is joined to the column member 1. Further, as shown in FIG. 5A, the same split tee 4 is also provided at the end of the lower flange steel plate 23. As shown in FIG. 5A, the split tee 4 includes a main body 41. The main body 41 includes a vertical plate 41A and a horizontal plate 41B, and the tip of the horizontal plate 41B is disposed at a substantially central position in the height direction of the vertical plate 41A, and a T-shaped steel having a substantially T-shaped cross section. It is said that. The main body 41 has a long shape, and the length in the longitudinal direction is slightly shorter than the width of the flange steel plates 22 and 23.

スプリットティ4における本体部41には、複数の補強プレート42が取り付けられている。補強プレート42は、略三角形状の板材からなり、本体部41のうち、縦板41Aと横板41Bとの間に取り付けられている。また、複数の補強プレート42が、本体部41の長手方向に略等間隔で離間して配置されており、スプリットティ4の強度を高めている。   A plurality of reinforcing plates 42 are attached to the main body 41 of the split tee 4. The reinforcing plate 42 is made of a substantially triangular plate material, and is attached between the vertical plate 41A and the horizontal plate 41B in the main body 41. In addition, a plurality of reinforcing plates 42 are spaced apart at substantially equal intervals in the longitudinal direction of the main body portion 41 to increase the strength of the split tee 4.

さらに、梁部材2におけるフランジ鋼板22,23にはスプリットティ4における本体部41の横板41Bの表面形状と略同形状の切欠き部が形成されている。本体部41における横板41Bの外周部は梁部材2におけるフランジ鋼板22,23の切欠き部に対して溶接固定されており、梁部材2における下フランジ鋼板23と、スプリットティ4における横板41Bとが略面一となるように配置されている。   Further, the flange steel plates 22 and 23 in the beam member 2 are formed with notches having substantially the same shape as the surface shape of the horizontal plate 41B of the main body 41 in the split tee 4. The outer peripheral portion of the horizontal plate 41B in the main body portion 41 is welded and fixed to the notched portions of the flange steel plates 22 and 23 in the beam member 2, and the horizontal flange 41B in the split tee 4 and the horizontal plate 41B in the split tee 4. Are arranged so as to be substantially flush with each other.

また、柱部材1における梁部材2との接続位置には、接合部補強プレート5が設けられており、スプリットティ4と接合部補強プレート5との間には、柱鋼板11とスプライスプレート6とが設けられている。さらに、スプリットティ4と接合部補強プレート5とは、柱鋼板11およびスプライスプレート6を介してボルトBによってボルト接合されている。こうして、柱部材1に対して梁部材2が接合されて固定されている。   Further, a joint portion reinforcing plate 5 is provided at a position where the pillar member 1 is connected to the beam member 2. Between the split tee 4 and the joint portion reinforcing plate 5, a pillar steel plate 11 and a splice plate 6 are provided. Is provided. Further, the split tee 4 and the joint reinforcement plate 5 are bolted together by a bolt B via a column steel plate 11 and a splice plate 6. Thus, the beam member 2 is joined and fixed to the column member 1.

また、継手部材としては、図5(b)に示す山形鋼からなるフランジ状継手部材50を用いることもできる。フランジ状継手部材50は、上アングル材51および下アングル材52を備えている。上アングル材51は、縦板51Aおよび横板51Bを有しており、縦板51Aと横板51Bとで断面略L字形状を形成している。また、縦板51Aと横板51Bとの間には、補強プレート53が配設されている。一方、下アングル材52は、縦板52Aおよび横板51Bを有しており、縦板52Aと横板52Bとで断面略L字形状を形成している。また、縦板52Aと横板52Bとの間には、補強プレート53が配設されている。   Moreover, as a joint member, the flange-shaped joint member 50 which consists of angle iron shown in FIG.5 (b) can also be used. The flange-shaped joint member 50 includes an upper angle member 51 and a lower angle member 52. The upper angle member 51 includes a vertical plate 51A and a horizontal plate 51B, and the vertical plate 51A and the horizontal plate 51B form a substantially L-shaped cross section. A reinforcing plate 53 is disposed between the vertical plate 51A and the horizontal plate 51B. On the other hand, the lower angle member 52 has a vertical plate 52A and a horizontal plate 51B, and the vertical plate 52A and the horizontal plate 52B form a substantially L-shaped cross section. A reinforcing plate 53 is disposed between the vertical plate 52A and the horizontal plate 52B.

このうち、上下アングル材51,52における縦板51A,52Aが、それぞれ柱部材1の柱鋼板11にボルトBによって固定されている。また、上下アングル材51,52の横板51B,52Bによって梁部材2のフランジ鋼板23が挟まれており、上下アングル材51,52の横板51B,52Bおよびフランジ鋼板23がボルトBによってボルト固定されている。   Among these, the vertical plates 51 </ b> A and 52 </ b> A in the upper and lower angle members 51 and 52 are fixed to the column steel plate 11 of the column member 1 by bolts B, respectively. Further, the flange steel plate 23 of the beam member 2 is sandwiched between the horizontal plates 51B and 52B of the upper and lower angle members 51 and 52, and the horizontal plates 51B and 52B and the flange steel plate 23 of the upper and lower angle members 51 and 52 are bolted by bolts B. Has been.

さらに、図6に示すように、梁部材2におけるウエブ鋼板24には、山形鋼であるアングル材7が配設されている。アングル材7の一辺は、梁部材2におけるウエブ鋼板24に対して内側からボルトBによってボルト接合されて固定されている。ウエブ鋼板24に対するアングル材7へのボルト接合は、工場における梁部材2の製造工程で行われる。さらに、アングル材7の他の一辺は、柱部材1における柱鋼板11に対して外側からボルトBによってボルト接合されて固定されている。柱鋼板11に対するアングル材7のボルト接合は、フレーム架構Fの構築現場における製造工程で行われる。   Further, as shown in FIG. 6, an angle member 7, which is an angle steel, is disposed on the web steel plate 24 in the beam member 2. One side of the angle member 7 is fixed to the web steel plate 24 of the beam member 2 by bolts B from the inside. Bolt joining to the angle member 7 with respect to the web steel plate 24 is performed in the manufacturing process of the beam member 2 in a factory. Furthermore, the other side of the angle member 7 is bolted and fixed to the column steel plate 11 in the column member 1 by a bolt B from the outside. The bolting of the angle member 7 to the pillar steel plate 11 is performed in the manufacturing process at the construction site of the frame frame F.

以上の構成を有する本実施形態に係る接合構造においては、梁部材2を柱部材1に接合して固定する際に、スプリットティ4を用いている。このスプリットティ4を用いることにより、梁部材を接合する際の突出部などを柱部材に設ける必要がなくなる。このため、柱部材における突出部を回避することができるので、柱部材の製作および運搬を容易なものとすることができる。さらには、突出部を設ける必要がないことから、たとえば梁部材2に配管などを設置する場合に、突出部と配管などが干渉して配管の設置の妨げになるといった事態を防止することができる。   In the joint structure according to the present embodiment having the above configuration, the split tee 4 is used when the beam member 2 is joined and fixed to the column member 1. By using the split tee 4, it is not necessary to provide a protruding part or the like on the column member when joining the beam members. For this reason, since the protrusion part in a pillar member can be avoided, manufacture and conveyance of a pillar member can be made easy. Furthermore, since it is not necessary to provide a protruding portion, for example, when a pipe or the like is installed on the beam member 2, it is possible to prevent a situation in which the protruding portion and the pipe interfere with each other and hinder the installation of the pipe. .

また、本実施形態に係る接合構造においては、梁部材2におけるフランジ鋼板22,23を固定する継手部材としてスプリットティ4を用いていることから、梁部材2におけるフランジ鋼板22,23を柱部材1に対して確実に固定することができる。また、ウエブ鋼板24,25については、アングル材7を用いて柱部材1に対して固定していることにより、梁部材2を柱部材1に対してより確実に固定することができる。   In the joint structure according to the present embodiment, since the split tee 4 is used as a joint member for fixing the flange steel plates 22 and 23 in the beam member 2, the flange steel plates 22 and 23 in the beam member 2 are connected to the column member 1. It can be securely fixed against. Further, the web steel plates 24 and 25 are fixed to the column member 1 using the angle member 7, so that the beam member 2 can be more reliably fixed to the column member 1.

また、本実施形態に係る接合構造では、埋込柱脚型で柱部材1を立設している。このため、たとえばアンカーボルトを用いて柱部材1を立設する場合に比較して、基礎スラブ下の鋼板架台より調整することができ、建方精度を高いものとすることができる。また、施工を行う際の工期を短縮することができる。   Moreover, in the joining structure according to the present embodiment, the column member 1 is erected in an embedded column base. For this reason, compared with the case where the column member 1 is erected using an anchor bolt, for example, it can adjust from the steel-plate mount under a foundation slab, and can make a construction accuracy high. Moreover, the construction period at the time of construction can be shortened.

次に、本実施形態に係るフレーム架構Fの製造工程について説明する。フレーム架構Fを製造するにあたり、まず、柱部材1を立設する作業を行う。柱部材1を立設するにあたり、まず、基礎スラブ3における下層構造として鋼板架台31を構築する。鋼板架台31を構築する際には、レベル調整ボルト32を用いて、鋼板架台31を水平に構築する。   Next, the manufacturing process of the frame structure F according to this embodiment will be described. In manufacturing the frame frame F, first, an operation of standing the column member 1 is performed. In erecting the column member 1, first, a steel plate frame 31 is constructed as a lower layer structure in the foundation slab 3. When the steel plate pedestal 31 is constructed, the steel plate pedestal 31 is constructed horizontally using the level adjustment bolts 32.

次に、基礎スラブ3における下部補強鉄筋34を配筋する。下部補強鉄筋34は、鋼板架台31の下層に形成されたレベル調整ボルト32を縫うようにして配筋される。下部補強鉄筋34の配筋が済んだら、梁部材2に用いられる梁鋼板21を立設する。この梁鋼板21は、鋼板架台31の上に立設される。続いて、基礎スラブ3の上層に配置される上部補強鉄筋33を配筋する。上部補強鉄筋33を配筋する際には、柱鋼板11に形成された貫通孔に鉄筋を貫通させる。柱鋼板11に鉄筋を貫通させる際には、鉄筋における柱鋼板11の内側近傍部位がカプラー35に挿入されるようにする。   Next, the lower reinforcing bar 34 in the foundation slab 3 is arranged. The lower reinforcing steel bars 34 are arranged so as to sew level adjustment bolts 32 formed in the lower layer of the steel plate frame 31. After the lower reinforcing bar 34 is arranged, the beam steel plate 21 used for the beam member 2 is erected. The beam steel plate 21 is erected on a steel plate frame 31. Subsequently, the upper reinforcing bar 33 arranged in the upper layer of the foundation slab 3 is arranged. When arranging the upper reinforcing bar 33, the reinforcing bar is passed through the through hole formed in the column steel plate 11. When penetrating the reinforcing bar through the column steel plate 11, a portion near the inside of the column steel plate 11 in the reinforcing bar is inserted into the coupler 35.

こうして上部補強鉄筋33を配筋したら、上部補強鉄筋33のわずかに上方位置までコンクリートを打設し、基礎スラブ3を設ける。この基礎スラブ3に柱部材1の下部が埋設された状態で柱鋼板11が立設される。   When the upper reinforcing bar 33 is arranged in this way, the concrete is cast to a position slightly above the upper reinforcing bar 33 to provide the foundation slab 3. A column steel plate 11 is erected in a state where the lower part of the column member 1 is embedded in the foundation slab 3.

基礎スラブ3が設けられ、柱鋼板11が立設されたら、柱鋼板11における梁鋼板21との接合位置において、柱鋼板11と梁鋼板21とを接合する。柱鋼板11と梁鋼板21とを接合するにあたり、まず、梁鋼板21を柱鋼板11における所定の高さ位置となる接合位置に配置したら、柱鋼板11における接合位置には、その内側に接合部補強プレート5を配置し、外側にフィラープレート6を配置する。また、梁鋼板21には、スプリットティ4およびアングル材7が取り付けられている。   When the foundation slab 3 is provided and the pillar steel plate 11 is erected, the pillar steel plate 11 and the beam steel plate 21 are joined at the joining position of the pillar steel plate 11 with the beam steel plate 21. In joining the column steel plate 11 and the beam steel plate 21, first, when the beam steel plate 21 is arranged at a joining position that is a predetermined height position in the column steel plate 11, the joining position in the column steel plate 11 is a joint portion on the inside thereof. The reinforcing plate 5 is disposed, and the filler plate 6 is disposed outside. Further, the split tee 4 and the angle member 7 are attached to the beam steel plate 21.

それから、梁鋼板21を柱鋼板11における柱梁接合部に配置し、梁鋼板21を柱鋼板11に接合して固定する。梁鋼板21を柱鋼板11に接合する際には、スプリットティ4における本体部41の縦板41Aと柱鋼板11に取り付けられた接合部補強プレート5にボルトBによって固定する。ここで、ボルトBは、柱鋼板11およびスプライスプレート6をそれぞれ貫通している。   Then, the beam steel plate 21 is disposed at the column beam joint portion of the column steel plate 11, and the beam steel plate 21 is joined and fixed to the column steel plate 11. When the beam steel plate 21 is joined to the column steel plate 11, the vertical plate 41 </ b> A of the main body 41 in the split tee 4 and the joining portion reinforcing plate 5 attached to the column steel plate 11 are fixed with bolts B. Here, the bolt B passes through the column steel plate 11 and the splice plate 6, respectively.

スプリットティ4を接合部補強プレート5に接合する一方で、梁鋼板21のウエブ鋼板24,25に固定されたアングル材7の一面を柱鋼板11の表面に沿って配置する。それから、アングル材7における一面と柱鋼板11とをボルトBによってボルト接合する。このような接合構造とされていることにより、柱鋼板11と梁鋼板21との接合部位における梁鋼板21のウエブ鋼板24,25側では、梁鋼板21のウエブ鋼板24,25からわずかにボルトBの頭部が突出し、柱鋼板11からは突出部がない構造となっている。このため、非常に収まりの良い構造となっている。   While the split tee 4 is joined to the joining portion reinforcing plate 5, one surface of the angle member 7 fixed to the web steel plates 24 and 25 of the beam steel plate 21 is arranged along the surface of the column steel plate 11. Then, one surface of the angle member 7 and the column steel plate 11 are bolted together by the bolt B. By having such a joining structure, the bolt B slightly extends from the web steel plates 24 and 25 of the beam steel plate 21 on the side of the web steel plates 24 and 25 of the beam steel plate 21 at the joining portion of the column steel plate 11 and the beam steel plate 21. The head protrudes from the pillar steel plate 11 and has no protruding portion. For this reason, it has a very good structure.

他方、継手部材として図5(b)に示すフランジ状継手部材50を用いる際には、まず下アングル材52の縦板52Aを柱鋼板11にボルトBによってボルト接合する。次に、下アングル材52の横板52Bの上面に梁鋼板21の下フランジ鋼板23の下面を接触させた状態で載置する。続いて、上アングル材51をボルトBによって柱鋼板11にボルト接合するとともに、上アングル材51の横板51Bと下アングル材52の横板52Bとによって梁鋼板21の下フランジ鋼板23を挟み込む。その後、上下アングル材51,52の横板51B,52Bおよび下フランジ鋼板23をボルトBによってボルト接合する。こうして、柱鋼板11と梁鋼板21とを固定する。このように、フランジ状継手部材50を用いた場合には、下アングル材52を建方時のブラケットとして利用することができる。   On the other hand, when the flange-shaped joint member 50 shown in FIG. 5B is used as the joint member, the vertical plate 52A of the lower angle member 52 is first bolted to the column steel plate 11 with the bolt B. Next, the lower angle member 52 is placed in a state where the lower surface of the lower flange steel plate 23 of the beam steel plate 21 is in contact with the upper surface of the horizontal plate 52B. Subsequently, the upper angle member 51 is bolted to the column steel plate 11 with the bolt B, and the lower flange steel plate 23 of the beam steel plate 21 is sandwiched between the horizontal plate 51B of the upper angle member 51 and the horizontal plate 52B of the lower angle member 52. Thereafter, the horizontal plates 51B and 52B of the upper and lower angle members 51 and 52 and the lower flange steel plate 23 are bolted together by the bolt B. Thus, the column steel plate 11 and the beam steel plate 21 are fixed. Thus, when the flange-shaped joint member 50 is used, the lower angle member 52 can be used as a bracket during construction.

また、柱鋼板11と梁鋼板21とを接合するにあたり、スプリットティ4およびアングル材7をボルト接合しているのみであり、いずれもボルト接合により、溶接による接合をなくしている。したがって、フレーム架構Fの構築現場において手間の係る溶接作業をなくすことができ、その分施工を容易に行うことができるとともに、短い工期で済ませることができる。   Further, when joining the column steel plate 11 and the beam steel plate 21, only the split tee 4 and the angle member 7 are bolt-joined, both of which are joined by welding. Therefore, it is possible to eliminate the time-consuming welding work at the construction site of the frame structure F, and it is possible to easily perform the construction and shorten the construction period.

こうして、柱鋼板11と梁鋼板21とを接合したら柱鋼板11に形成された図示しないコンクリート孔からコンクリートを充填して、柱鋼板11で囲まれた領域にコンクリートを打設する。柱鋼板11で囲まれた領域のうち、梁部材2の高さ位置までコンクリートと打設したら、続いて梁鋼板21で囲まれた部位にコンクリートを打設する。このようにして、柱部材1および梁部材2にコンクリートを打設して、フレーム架構Fを構築する。   In this way, when the column steel plate 11 and the beam steel plate 21 are joined, concrete is filled from a concrete hole (not shown) formed in the column steel plate 11, and the concrete is placed in a region surrounded by the column steel plate 11. In the region surrounded by the columnar steel plate 11, when concrete is placed up to the height position of the beam member 2, the concrete is subsequently placed in the region surrounded by the beam steel plate 21. In this way, concrete is placed on the column member 1 and the beam member 2 to construct the frame frame F.

このように、上記実施形態に係る接合構造においては、フレーム架構Fの構築現場では、柱部材1と梁部材2とを接合するにあたり、ボルト接合を行えばよく、溶接作業を行わないようにすることができる。したがって、柱梁の接合を行う際の手間を大幅に省くことができる。   As described above, in the joint structure according to the above-described embodiment, at the construction site of the frame structure F, when joining the column member 1 and the beam member 2, it is only necessary to perform bolt joining and not perform welding work. be able to. Therefore, it is possible to greatly save the labor for joining the column beams.

本発明に係る鋼板コンクリート造部材の接合構造が適用される発電所のフレーム架構の斜視図である。It is a perspective view of the frame structure of the power plant to which the joined structure of steel plate concrete members according to the present invention is applied. 本発明に係る鋼板コンクリート造部材の接合構造の斜視図である。It is a perspective view of the joining structure of the steel-plate concrete member based on this invention. 本発明に係る鋼板コンクリート造部材の接合構造の断面図である。It is sectional drawing of the joining structure of the steel plate concrete structure member which concerns on this invention. 梁部材における柱部材との接合部の斜視図である。It is a perspective view of a junction part with a pillar member in a beam member. (a)は、梁部材の梁フランジ鋼板と柱部材との接合部の断面図、(b)は、他の例に係る梁部材の梁フランジ鋼板と柱部材との接合部の断面図である。(A) is sectional drawing of the junction part of the beam flange steel plate and column member of a beam member, (b) is sectional drawing of the junction part of the beam flange steel plate and column member of the beam member which concerns on another example. . 梁部材の梁ウエブ鋼板と柱部材との接合部の断面図である。It is sectional drawing of the junction part of the beam web steel plate of a beam member, and a column member.

符号の説明Explanation of symbols

1…柱部材
2…梁部材
3…基礎スラブ
4…スプリットティ
5…接合部補強プレート
6…スプライスプレート
7…アングル材
11…柱鋼板
12…縦リブ
13…横リブ
14…ダイヤフラムプレート
15…スタッド
21…梁鋼板
22…上フランジ鋼板
23…下フランジ鋼板
24,25…ウエブ鋼板
26…縦リブ
27…横リブ
31…鋼板架台
32…レベル調整ボルト
33…上部補強鉄筋
34…下部補強鉄筋
35…カプラー
41…本体部
42…補強プレート
50…フランジ状継手部材
51…上アングル材
52…下アングル材
B…ボルト
F…フレーム架構
DESCRIPTION OF SYMBOLS 1 ... Column member 2 ... Beam member 3 ... Foundation slab 4 ... Split tee 5 ... Joint reinforcement plate 6 ... Splice plate 7 ... Angle material 11 ... Column steel plate 12 ... Vertical rib 13 ... Horizontal rib 14 ... Diaphragm plate 15 ... Stud 21 ... steel plate 22 ... upper flange steel plate 23 ... lower flange steel plate 24, 25 ... web steel plate 26 ... vertical rib 27 ... horizontal rib 31 ... steel plate mount 32 ... level adjusting bolt 33 ... upper reinforcing bar 34 ... lower reinforcing bar 35 ... coupler 41 ... Main body 42 ... Reinforcement plate 50 ... Flange-shaped joint member 51 ... Upper angle member 52 ... Lower angle member B ... Bolt F ... Frame frame

Claims (2)

鋼板コンクリート造柱部材と鋼板コンクリート造梁部材とを接合してなる鋼板コンクリート造部材の接合構造であって、
前記鋼板コンクリート造梁部材は、前記鋼板コンクリート造梁部材の端部に設けられた継手部材を介して前記鋼板コンクリート造柱部材の鋼板部位にボルト接合されており、
前記鋼板コンクリート造梁部材はウエブ鋼板とフランジ鋼板とを備え、
前記継手部材が前記フランジ鋼板の端部に取り付けられており、
前記継手部材はT形鋼および山形鋼のうちの少なくとも一方とされており、
前記フランジ鋼板における前記鋼板コンクリート造柱部材側端部には、前記フランジ鋼板のフランジ幅方向に両端部を残して切欠いた切欠き部が形成され、前記継手部材は、前記フランジ鋼板の幅よりも短く、前記切欠き部に取り付けられていることを特徴とする鋼板コンクリート造部材の接合構造。
It is a joint structure of a steel plate concrete member formed by joining a steel plate concrete column member and a steel plate concrete beam member,
The steel plate concrete beam member is bolted to a steel plate portion of the steel plate concrete column member through a joint member provided at an end of the steel plate concrete beam member ,
The steel plate concrete beam member comprises a web steel plate and a flange steel plate,
The joint member is attached to an end of the flange steel plate;
The joint member is at least one of T-shaped steel and angle steel,
At the end of the flange steel plate on the side of the steel plate concrete column member, a notch is formed by leaving both ends in the flange width direction of the flange steel plate, and the joint member is larger than the width of the flange steel plate. A joining structure for steel concrete members, which is short and is attached to the notch .
鋼板コンクリート造柱部材と鋼板コンクリート造梁部材とを接合してなる鋼板コンクリート造部材の接合構造であって、
前記鋼板コンクリート造梁部材は、前記鋼板コンクリート造梁部材の端部に設けられた継手部材を介して前記鋼板コンクリート造柱部材の鋼板部位にボルト接合されており、
前記鋼板コンクリート造梁部材はウエブ鋼板とフランジ鋼板とを備え、
前記継手部材がウエブ鋼板の端部に取り付けられており、
前記継手部材は山形鋼とされており、
前記継手部材の一辺は前記ウエブ鋼板に対して内側から接合され、かつ前記継手部材の他の一辺は前記鋼板コンクリート造柱部材に対して外側から接合されていることを特徴とする鋼板コンクリート造部材の接合構造。
It is a joint structure of a steel plate concrete member formed by joining a steel plate concrete column member and a steel plate concrete beam member,
The steel plate concrete beam member is bolted to a steel plate portion of the steel plate concrete column member through a joint member provided at an end of the steel plate concrete beam member ,
The steel plate concrete beam member comprises a web steel plate and a flange steel plate,
The joint member is attached to the end of the web steel plate,
The joint member is an angle steel,
One side of the joint member is joined from the inside to the web steel plate, and the other side of the joint member is joined from the outside to the steel concrete column member. Bonding structure.
JP2005235446A 2005-08-15 2005-08-15 Joint structure of steel plate concrete members Active JP4684800B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005235446A JP4684800B2 (en) 2005-08-15 2005-08-15 Joint structure of steel plate concrete members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005235446A JP4684800B2 (en) 2005-08-15 2005-08-15 Joint structure of steel plate concrete members

Publications (2)

Publication Number Publication Date
JP2007051428A JP2007051428A (en) 2007-03-01
JP4684800B2 true JP4684800B2 (en) 2011-05-18

Family

ID=37916045

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005235446A Active JP4684800B2 (en) 2005-08-15 2005-08-15 Joint structure of steel plate concrete members

Country Status (1)

Country Link
JP (1) JP4684800B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6512428B2 (en) * 2015-02-06 2019-05-15 清水建設株式会社 Connection structure between pile foundation and frame

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63181828A (en) * 1987-01-21 1988-07-27 株式会社日立製作所 Stand for turbine dynamo made of steel plate concrete
JPH06240749A (en) * 1993-02-22 1994-08-30 Kajima Corp Connection structure of square steel pipe column or square steel pipe concrete column and beam
JPH07207758A (en) * 1994-01-10 1995-08-08 Kajima Corp Connection structure of steel pipe column and beam
JP2001271420A (en) * 2000-03-27 2001-10-05 Nakajima Steel Pipe Co Ltd Steel structure
JP2001295365A (en) * 2000-04-17 2001-10-26 Mitsui Constr Co Ltd Steel framed structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63181828A (en) * 1987-01-21 1988-07-27 株式会社日立製作所 Stand for turbine dynamo made of steel plate concrete
JPH06240749A (en) * 1993-02-22 1994-08-30 Kajima Corp Connection structure of square steel pipe column or square steel pipe concrete column and beam
JPH07207758A (en) * 1994-01-10 1995-08-08 Kajima Corp Connection structure of steel pipe column and beam
JP2001271420A (en) * 2000-03-27 2001-10-05 Nakajima Steel Pipe Co Ltd Steel structure
JP2001295365A (en) * 2000-04-17 2001-10-26 Mitsui Constr Co Ltd Steel framed structure

Also Published As

Publication number Publication date
JP2007051428A (en) 2007-03-01

Similar Documents

Publication Publication Date Title
JP4649360B2 (en) Seismic joint structure and construction method thereof
KR102217178B1 (en) Non-welding beam-to-column connection structure with reinforcing plate and through bolt
JP6283839B2 (en) Rigid connection method of large beam and small beam
JP2017066624A (en) Unit Building
JP4684800B2 (en) Joint structure of steel plate concrete members
JP5607384B2 (en) Construction method for beam-column joints
JP2017172139A (en) Antiseismic structure and antiseismic reinforcement method
JP6802675B2 (en) Beam-column joining method and joint member
KR101942567B1 (en) Rigid joint structures using end face of beam as mold support and, construction methods using the same
JP4964528B2 (en) Floor structure of steel structure building and construction method of floor structure
JP6753043B2 (en) Beam joining structure and beam joining method
JP4841446B2 (en) Construction method for steel beam columns with RC beam ends
JP7265417B2 (en) Column-beam connection method
JP3138112U (en) Roof unit structure and connecting hardware used therefor
KR102029001B1 (en) Wall structure and the construction method therefor
JP7024163B2 (en) Column-beam joint structure and column-beam construction method
JP6611615B2 (en) Precast foundation structure and precast foundation method
KR102661173B1 (en) Structure Of Connecting Continuous Beam And Column
JP4072274B2 (en) Building unit
JP7425168B1 (en) How to build a composite structure
JP7211915B2 (en) Seismic reinforcement structure
KR102499318B1 (en) End reinforced steel frame
JP7361561B2 (en) Brace mounting structure, structure and brace mounting method
JP7377617B2 (en) Connection structure, foundation structure, and construction method of foundation structure
KR102076130B1 (en) Shear Reinforcing Device At the Connection Between Flat Plate Slab and Steel Column

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080227

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20080228

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20080228

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100805

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100810

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101007

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110208

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110209

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140218

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4684800

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250