JP4658020B2 - Connected water system operation planning support system - Google Patents

Connected water system operation planning support system Download PDF

Info

Publication number
JP4658020B2
JP4658020B2 JP2006301440A JP2006301440A JP4658020B2 JP 4658020 B2 JP4658020 B2 JP 4658020B2 JP 2006301440 A JP2006301440 A JP 2006301440A JP 2006301440 A JP2006301440 A JP 2006301440A JP 4658020 B2 JP4658020 B2 JP 4658020B2
Authority
JP
Japan
Prior art keywords
plan
water level
dam
temporary
display device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006301440A
Other languages
Japanese (ja)
Other versions
JP2008118810A (en
Inventor
篤史 川田
義将 和田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2006301440A priority Critical patent/JP4658020B2/en
Publication of JP2008118810A publication Critical patent/JP2008118810A/en
Application granted granted Critical
Publication of JP4658020B2 publication Critical patent/JP4658020B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Feedback Control In General (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は複数のダムおよび発電所を有する連接水系の運用計画作成支援システムに関し、特に複数のダムおよび発電所を有する連接水系における当日計画、翌日計画の作成を支援する運用計画作成支援システムに関するものである。   TECHNICAL FIELD The present invention relates to an operation plan creation support system for a connected water system having a plurality of dams and power plants, and more particularly to an operation plan creation support system that supports the creation of the same day plan and the next day plan in a connected water system having a plurality of dams and power plants. It is.

複数のダムおよび発電所を有する連接水系の各ダムの計画水位カーブ、発電運用計画、放流計画などの運用計画の作成方法として、自動計算と手動計算がある。   There are automatic calculation and manual calculation as methods for creating operation plans such as planned water level curves, power generation operation plans, discharge plans for each dam in a connected water system with multiple dams and power plants.

特開2006−39838号公報には、複数のダムおよび発電所を有する連接水系における各発電所の発電機運転計画及び各ダムの水位計画を自動計算して画面上に表示する技術が開示されている。   Japanese Patent Application Laid-Open No. 2006-39838 discloses a technique for automatically calculating and displaying on a screen a generator operation plan for each power plant and a water level plan for each dam in a connected water system having a plurality of dams and power plants. Yes.

特開2006−39838号公報JP 2006-39838 A

特開2006−39838号公報に記載された縮約勾配法や水力発電所群日間発電計画立案方式の自動計算では運用計画作成者が望む最適解が得られるとは限らない。このため、連接水系の運用計画の作成ではマニュアルで計算機を操作して計画を作成する手動計算が必要である。   The automatic calculation of the contracted gradient method and hydroelectric power station group daily power generation planning method described in Japanese Patent Application Laid-Open No. 2006-39838 does not always provide the optimum solution desired by the operation plan creator. For this reason, manual calculation to create a plan by manually operating a computer is required in the creation of an operation plan for a connected water system.

ところで、複数のダムおよび発電所を有する連接水系では上流のダムの放流が流下遅れをもって、下流のダムへ影響を及ぼす。このため、手動計算では上流のダムの運用計画を作成する際に下流のダムの運用計画を修正・勘案する必要がある。   By the way, in an articulated water system having a plurality of dams and power plants, the discharge of the upstream dam affects the downstream dam with a flow-down delay. For this reason, in the manual calculation, it is necessary to modify and take into account the downstream dam operation plan when creating the upstream dam operation plan.

下流のダムの運用計画は、下流のダムの更に下流のダムの運用計画に影響を及ぼす。このため、上流のダムの運用計画を作成する際には、下流のダム、および下流のダムの更に下流のダムの運用計画を修正・勘案する必要がある。   The operation plan of the downstream dam affects the operation plan of the dam further downstream of the downstream dam. Therefore, when creating an upstream dam operation plan, it is necessary to modify and take into account the downstream dam and downstream dam operation plans.

また、計画作成対象ダムの下流のダムにむけ放流するダムが複数ある際には、計画作成対象ダムと、下流のダム、および下流のダムの更に下流のダムの運用計画の他に、下流のダムにむけ放流するダムの運用計画を修正・勘案する必要が生じる。   In addition, when there are multiple dams that are released toward the dam downstream of the target dam, in addition to the operation plan for the target dam, the downstream dam, and the dam further downstream of the downstream dam, It will be necessary to revise and take into account the operation plan of the dam to be released to the dam.

このように、連接水系における手動計算では、対象ダムの運用計画の修正を実施するために、連接水系の全てのダムを修正・勘案しながら計画を修正していく必要があるので、連接水系における手動計算では関連する複数のダムおよび発電所の運用計画を作成するには多くの労力が必要となるので困難が伴う。   In this way, in manual calculation in the connected water system, it is necessary to revise the plan while correcting and taking into account all the dams in the connected water system in order to correct the operation plan of the target dam. Manual calculation is difficult because it requires a lot of labor to create an operation plan for multiple related dams and power plants.

連接水系における手動計算では関連する複数のダムおよび発電所の運用計画を確認しながら計算を行う必要があるため、連接水系で手動計算を実施する際に計算対象ダム以外のダムを繰り返し確認した上で計算せざるを得ず、よって連接水系の関連する複数のダムおよび発電所の運用計画を作成するのに非常に多くの労力が必要で運用者に大きな負担が掛かかり、連接水系の適切な運用計画を容易に作成することは非常に困難であった。   In manual calculation in the connected water system, it is necessary to perform the calculation while confirming the operation plan of multiple related dams and power plants.Therefore, when performing manual calculation in the connected water system, dams other than the target dam are repeatedly checked. Therefore, it takes a lot of labor to create an operation plan for multiple dams and power plants related to the connected water system, which puts a heavy burden on the operator and It was very difficult to create an operation plan easily.

本発明の目的は、連接水系の関連する複数のダムおよび発電所の運用計画を同時に確認しながら夫々のダムおよび発電所の適切な運用計画を手動計算にて容易に作成することを可能にして運用者の負担を低減し得る連接水系の運用計画作成支援システムを提供することにある。   It is an object of the present invention to make it possible to easily create an appropriate operation plan for each dam and power plant by manual calculation while simultaneously confirming operation plans for a plurality of dams and power plants related to the connected water system. The purpose is to provide an operation plan creation support system for a connected water system that can reduce the burden on the operator.

本発明の連接水系の運用計画作成支援システムは、複数の発電所の発電運用計画或いはダムの放流計画を表示する第1表示装置と、複数のダムの計画水位カーブを表示する第2表示装置とを備え、複数のダム及び発電所の運用計画の手動計算に必要なデータを入力する入力手段を備え、発電所及びダムの実績データである発電出力、放流量、及び水位を保持する実績データベース、発電所及びダムの当日計画と翌日計画を保持する計画データベース、発電所及びダムの当日仮計画と翌日仮計画を保持する仮計画データベース、及び発電所及びダムの設備データを保持する設備データベースを夫々格納し、入力手段から入力されたデータ及び前記データベースを基に演算を実行する計算機を備え、前記計算機の演算によって相互に関連の深い複数のダムの計画水位カーブを前記第2表示装置に表示させ、第1表示装置に表示される前記複数のダムに設置されて発電する複数の発電所の発電運用計画或いはダムの放流計画を前記第1表示装置に表示させるように構成し、発電所及びダムの当日計画では前記入力手段から当日仮計画の現在時刻以降の発電出力と放流量を入力して現在時刻までの発電出力、放流量、水位とこれらの入力値を基に計算機によって当日の仮計画水位の計算を実行して複数のダムについて水位を実績水位カーブ、計画水位カーブ及び仮計画水位カーブに分類して第2表示装置に表示し、発電所及びダムの翌日計画では前記入力手段から翌日仮計画の発電出力、放流量、初期水位を入力してこれらの入力値を基に計算機によって翌日の仮計画水位の計算を実行し、複数のダムについて水位を計画水位カーブ及び仮計画水位カーブに分類して第2表示装置に表示するようにし、前記計算機によって演算して第2表示装置に表示された複数のダムの仮計画水位の水位カーブを確認する手段を備え、この確認の手段に基づいて前記入力手段から所望のダム及び発電所の発電出力と放流量を入力することによってこの所望のダムとは影響する関係にある他のダムの仮計画水位の再計算をこの前記計算機によって実行して前記他のダムの仮計画水位の再計算結果を第2表示装置に表示し、前記他のダムの仮計画水位の再計算結果を前記計画データベースに保存するように構成したことを特徴とする。
The connected water system operation plan creation support system of the present invention includes a first display device that displays a power generation operation plan of a plurality of power plants or a discharge plan of a dam, and a second display device that displays a planned water level curve of the plurality of dams. A data base for storing the power generation output, discharge flow rate, and water level, which are the actual data of the power plant and dam, with input means for inputting data necessary for manual calculation of the operation plan of a plurality of dams and power plants, A plan database that holds the current day plan and the next day plan for the power plant and dam, a temporary plan database that holds the current day temporary plan and the next day temporary plan, and a facility database that holds the power plant and dam facility data, respectively. A computer for storing and executing an operation based on the data input from the input means and the database; and a computer that is closely related to each other by the operation of the computer. Dam plan level curve is displayed on the second display device, the plurality of power generating operation of the power plant planning or discharge planning dam to generate power installed in the plurality of dams that are displayed on the first display device the It is configured to display on one display device, and the power generation output and discharge flow up to the current time by inputting the power generation output and discharge flow after the current time of the temporary plan of the day from the input means in the current day plan of the power plant and dam, Based on the water level and these input values, the computer calculates the tentative planned water level for the day and classifies the water level for multiple dams into the actual water level curve, the planned water level curve and the temporary planned water level curve and displays them on the second display device. and, power plants and power output of the next day temporary plan from the input means at the next day plan dam, discharge amount, and perform calculations for the next day of the provisional planning level by computer on the basis of these input values by entering the initial level, The water level is classified into a planned water level curve and a temporary planned water level curve for a number of dams and displayed on the second display device, and calculated by the computer and displayed on the second display device. A means for confirming a water level curve is provided, and the desired dam and the power generation output and discharge flow of the power plant are input from the input means based on the confirmation means. The recalculation of the tentative plan water level of the dam is executed by the computer, the recalculation result of the tentative plan water level of the other dam is displayed on the second display device, and the recalculation result of the tentative plan water level of the other dam is displayed. It is configured to store in the plan database .

本発明によれば、連接水系の関連する複数のダムおよび発電所の運用計画を同時に確認しながら夫々のダムおよび発電所の適切な運用計画を手動計算にて容易に作成することを可能にして運用者の負荷を低減し得る連接水系の運用計画作成支援システムを実現することができる。   According to the present invention, it is possible to easily create an appropriate operation plan of each dam and power plant by manual calculation while simultaneously confirming operation plans of a plurality of dams and power plants related to the connected water system. It is possible to realize a connected water system operation plan creation support system that can reduce the load on the operator.

次に本発明の実施例である連接水系の運用計画作成支援システムについて図面を参照して説明する。   Next, a connected water system operation plan creation support system according to an embodiment of the present invention will be described with reference to the drawings.

図1〜図7は本発明の一実施例である連接水系の運用計画作成支援システムを示すものである。図1は本実施例である連接水系の運用計画作成支援システムの概略構成図であり、第1表示装置10と第2表示装置20の2つの表示装置と、仮計画データベース31、計画データベース32、実績データベース33及び設備データベース34などのデータベースを有する計算機30を備えた連接水系の運用計画作成支援システムを示している。   1 to 7 show a connected water system operation plan creation support system according to an embodiment of the present invention. FIG. 1 is a schematic configuration diagram of a connected water system operation plan creation support system according to the present embodiment, which includes two display devices, a first display device 10 and a second display device 20, a temporary plan database 31, a plan database 32, The connected water system operation plan preparation support system provided with the computer 30 which has databases, such as the results database 33 and the equipment database 34, is shown.

図2及び図3は図1に示した連接水系の運用計画作成支援システムにおける第1表示装置10と、第2表示装置20において表示する表示画面の一例を夫々表したものである。   2 and 3 show examples of display screens displayed on the first display device 10 and the second display device 20 in the connected water system operation plan creation support system shown in FIG.

図2の第1表示装置10には複数の水力発電所である発電所A、発電所B、発電所C、発電所Fの夫々の発電運用計画や、ダムであるダムD、ダムEや調整池の夫々の放流計画を1時間単位で表示した画面を表示している。   The first display device 10 of FIG. 2 includes a power generation operation plan for each of a plurality of hydroelectric power stations A, B, C, and F, a dam D, a dam E, and adjustments. A screen showing the discharge plan of each pond in units of 1 hour is displayed.

図3の第2表示装置20には複数のダムであるダムA、ダムB、ダムC、ダムD、ダムE、ダムF、あるいは調整池に貯蔵する計画水位の変化の状況を10分単位で所望の時間に亘って表示した計画水位カーブ画面を表示している。   The second display device 20 shown in FIG. 3 indicates the status of changes in the planned water level stored in a plurality of dams A, B, C, D, E, F, or a regulating pond in units of 10 minutes. The planned water level curve screen displayed over the desired time is displayed.

そして図2の第1表示装置10では計算機30に直結した画面入力手段が備えられており、符号4で示した発電出力OR放流量入力欄となるデータ入力欄に各発電所における発電計画の発電出力(MW)や、各ダムにおける放流計画の放流量(m3/s)などを入力すると、第1表示装置10に直結した図1の計算機3にて水位計算を実行し、計算機3による水位計算の結果を同じく計算機3に直結した図3の第2表示装置20に符号5で示した複数のダムA、ダムB、ダムC、ダムD、ダムE、ダムFにおける計画水位の変化の状況を示す各水位カーブを表示するようになっている。 The first display device 10 of FIG. 2 includes screen input means directly connected to the computer 30, and the power generation plan power generation plan at each power plant is displayed in the data input column, which is the power generation output OR discharge flow input column 4. When the output (MW) and the discharge flow (m 3 / s) of the discharge plan in each dam are input, the water level is calculated by the computer 3 in FIG. 1 directly connected to the first display device 10, and the water level by the computer 3 is calculated. The result of calculation is also shown in the second display device 20 of FIG. 3 that is directly connected to the computer 3, and the change in the planned water level in the plurality of dams A, B, C, D, E, and F indicated by reference numeral 5 Each water level curve is displayed.

尚、第1表示装置10の画面入力手段としては、符号1で示した計画・仮計画選択コンボボックス、符号2で示した仮計画取消ボタン、符号3で示した仮計画登録ボタンが、符号4の発電出力OR放流量入力欄以外にも夫々備えられていて計算機30と直結している。   The screen input means of the first display device 10 includes a plan / provisional plan selection combo box indicated by reference numeral 1, a temporary plan cancel button indicated by reference numeral 2, and a temporary plan registration button indicated by reference numeral 3. In addition to the power generation output OR discharge flow rate input field, each is provided and directly connected to the computer 30.

同様に、第2表示装置20の画面入力手段としては、符号6で示した水位グラフ拡大ボタンがあり、この水位グラフ拡大ボタン6によって選択されたダムについて、符号5で示す計画水位カーブが拡大されて表示されるようになっている。   Similarly, as the screen input means of the second display device 20, there is a water level graph enlargement button indicated by reference numeral 6, and the planned water level curve indicated by reference numeral 5 is enlarged for the dam selected by this water level graph enlargement button 6. Is displayed.

また、第2表示装置20の画面入力手段には符号7で示す水位表示・非表示チェックボックスも備えられており、対象となるダムの水位の表示・非表示を色分け表示も含めて選択して表示できるようになっている。   Further, the screen input means of the second display device 20 is also provided with a water level display / non-display check box indicated by reference numeral 7, and the display / non-display of the water level of the target dam is selected including color-coded display. It can be displayed.

次に図1〜図3及び図7を用いて本実施例である複数のダムおよび発電所を有する連接水系の運用計画作成支援システムを説明すると、この連接水系の運用計画作成支援システムは計算機30によって演算された連接水系の複数のダム、あるいは調整池の計画水位カーブを表示するディスプレイである第2表示装置20と、同じく計算機30によって演算された複数の発電所の発電運用計画、あるいはダムや調整池の放流計画を表示および入力するディスプレイである第1表示装置10とを有している。   Next, an operation plan creation support system for a connected water system having a plurality of dams and power plants according to this embodiment will be described with reference to FIGS. 1 to 3 and FIG. The second display device 20 which is a display for displaying a plurality of dams in a connected water system calculated by the above, or a planned water level curve of a regulating pond, and a power generation operation plan for a plurality of power plants calculated by the computer 30 or a dam It has the 1st display apparatus 10 which is a display which displays and inputs the discharge plan of a regulation pond.

この運用計画作成支援システムに備えられた計算機30では、発電所及びダムの実績データである発電出力、放流量、水位を保持する実績データベース33と、発電所及びダムの当日計画、翌日計画を保持する計画データベース32と、発電所及びダムの当日仮計画と翌日仮計画を保持する仮計画データベース31と、発電所及びダムの設備データなどを保持する設備データベース34とを格納しており、この計算機30によって入力データおよび上記データベース31〜34に格納された発電所及びダムの各種データを基に連接水系の運用計画作成支援に必要な計算を実行している。   In the computer 30 provided in this operation plan creation support system, a performance database 33 that holds power generation output, discharge flow rate, and water level, which is actual data of the power plant and dam, and the same day plan and next day plan of the power plant and dam are retained. A plan database 32, a temporary plan database 31 for holding the temporary plan for the power plant and the dam and the temporary plan for the next day, and a facility database 34 for storing the plant data of the power plant and the dam. Based on the input data and various data of the power plant and dam stored in the databases 31 to 34, the calculation necessary for supporting the creation of an operation plan for the connected water system is executed.

前記した連接水系の運用計画作成支援システムでは、計算機30によって演算して第2表示装置20に表示される相互に関連の深い複数のダム、あるいは調整池の計画水位カーブと、同様に計算機30によって演算して第1表示装置10に表示される前記ダムに設置されて発電する複数の発電所の発電運用計画、あるいはダムや調整池の放流計画とを、第1表示装置10と第2表示装置20に同時に表示する。   In the above-described connected water system operation plan creation support system, the computer 30 calculates a plurality of dams that are closely related to each other and are displayed on the second display device 20 or the planned water level curve of the adjustment pond. A power generation operation plan for a plurality of power plants installed in the dam that is calculated and displayed on the first display device 10 or a discharge plan for a dam or a regulating pond is displayed on the first display device 10 and the second display device. 20 at the same time.

そして、この運用計画作成支援システムには前記した各ダムの詳細な水位カーブを確認する手段と画面入力手段を備えており、第1表示装置10の画面ディスプレイの入力手段から各ダム及び発電所の発電出力、放流量を入力してリターンの押下操作することによって直結された計算機30によって影響のあるダムの水位の再計算を実行し、この計算結果を第1表示装置10に表示するものである。   The operation plan creation support system includes a means for confirming the detailed water level curve of each dam and a screen input means. The input means of the screen display of the first display device 10 can be used for each dam and power plant. By inputting the power generation output and discharge flow and pressing the return button, the computer 30 connected directly performs recalculation of the water level of the affected dam, and the calculation result is displayed on the first display device 10. .

また、この運用計画作成支援システムにおいて、当日計画では、第1表示装置10の画面ディスプレイから当日仮計画の現在時刻以降の発電出力、放流量を入力すると、現在時刻までの発電出力、放流量、水位と入力値などを基に、計算機30によって当日の仮計画水位の計算を実行し、この計算結果を第2表示装置20の画面ディスプレイに、水位を実績水位カーブ、計画水位カーブ、仮計画水位カーブに分類し色替えして表示する。   Further, in this operation plan creation support system, in the current day plan, when the power generation output and discharge flow after the current time of the temporary plan of the day are input from the screen display of the first display device 10, the power generation output, discharge flow up to the current time, Based on the water level and the input value, etc., the calculator 30 calculates the tentative planned water level for the current day. The calculation result is displayed on the screen display of the second display device 20, and the water level is the actual water level curve, the planned water level curve, and the temporary planned water level. Sort into curves and change colors.

ここで、この当日の仮計画に係わる仮計画水位の計算結果に修正がなければ、この仮計画水位の値を登録操作すれば当日の仮計画が当日計画の計画水位として登録される。   Here, if there is no correction in the calculation result of the temporary plan water level related to the temporary plan of the current day, the temporary plan of the day is registered as the planned water level of the current plan by performing the registration operation of the value of the temporary plan water level.

同様に、翌日計画では、第1表示装置10の画面ディスプレイから翌日仮計画の発電出力、放流量を入力すると、これらの入力値などを基に、計算機30によって翌日の仮計画水位の計算を実行し、この計算結果を第2表示装置20の画面ディスプレイに、水位を計画水位カーブ、仮計画水位カーブに分類し色替えして表示する。   Similarly, in the next day plan, when the power generation output and discharge flow of the next day temporary plan are input from the screen display of the first display device 10, the calculation of the temporary plan water level for the next day is executed by the computer 30 based on these input values and the like. Then, this calculation result is displayed on the screen display of the second display device 20 by classifying the water level into a planned water level curve and a temporary planned water level curve and changing the color.

ここで、この翌日の仮計画に係わる仮計画水位の計算結果に修正がなければ、この仮計画水位の値を登録操作すれば翌日の仮計画が翌日計画の計画水位として登録される。   Here, if there is no correction in the calculation result of the temporary plan water level related to the temporary plan of the next day, the temporary plan of the next day is registered as the planned water level of the next day plan by registering the value of the temporary plan water level.

また、運用計画作成支援システムでは作成した仮計画を取消することも可能であり、仮計画の取消操作を行うと計算機30によって前回登録した計画を呼び出して第1表示装置10と第2表示装置20に表示するようにしたものであり、作成した仮計画の登録操作を行うとすると計算機30によって計画のデータとして保存されるものである。   The operation plan creation support system can also cancel the created temporary plan. When the temporary plan is canceled, the computer 30 calls the previously registered plan and the first display device 10 and the second display device 20. If the created temporary plan is registered, it is stored as plan data by the computer 30.

図7は本実施例である連接水系の運用計画作成支援システムの詳細構成を制御ブロック図として示したものである。図7において、連接水系の運用計画作成支援システムの計算機30には入力手段から入力される各種入力値及び各種データベースに保管されているデータ値に基づいて計画水位を演算する計画演算手段30aと、入力手段から入力される各種入力値及び各種データベースに保管されているデータ値に基づいて仮計画水位を演算する仮計画演算手段30bとが備えられている。   FIG. 7 is a control block diagram showing the detailed configuration of the connected water system operation plan creation support system according to this embodiment. In FIG. 7, the calculation unit 30a for calculating the planned water level based on the various input values input from the input unit and the data values stored in the various databases is included in the computer 30 of the connected water system operation plan creation support system. Temporary plan calculation means 30b for calculating a temporary plan water level based on various input values input from the input means and data values stored in various databases is provided.

即ち、第1表示装置10に設けた入力手段から、当日の計画に係わる当日の発電出力、放流量、水位をインプットしてリターンの押下操作することによって直結された計算機30に備えられた計画演算手段30aに入力する。計画演算手段30aには計算機30に備えられたデータベースである仮計画データベース31、計画データベース32、実績データベース33、及び設備データベース34に夫々保存された各種データ値も入力しており、この計画演算手段30aでは入力手段から入力した当日の発電出力、放流量、水位の入力値とデータベースから入力する各種データ値に基づいて当日計画の計画水位を演算する。   That is, the plan calculation provided in the computer 30 directly connected by inputting the power generation output, discharge flow rate, and water level of the day related to the plan of the day from the input means provided in the first display device 10 and pressing the return. Input to means 30a. Various data values stored in the temporary plan database 31, the plan database 32, the performance database 33, and the equipment database 34, which are databases provided in the computer 30, are also input to the plan calculation means 30 a, and this plan calculation means In 30a, the planned water level of the current day plan is calculated based on the power generation output, discharge flow, and water level input values input from the input means and various data values input from the database.

そして計画演算手段30aで演算した当日計画の計画水位演算値を第2表示装置に入力して相互に関連の深い複数のダム、あるいは調整池の計画水位カーブを表示するように構成されている。   And the plan water level calculation value of the day plan calculated by the plan calculation means 30a is inputted to the second display device, and a plurality of dams or adjustment ponds that are closely related to each other are displayed.

同様に、第1表示装置10に設けた入力手段から、翌日の仮計画に係わる翌日の発電出力、放流量、水位をインプットしてリターンの押下操作することによって直結された計算機30に備えられた仮計画演算手段30bに入力する。仮計画演算手段30bにも計算機30に備えられたデータベースである仮計画データベース31、計画データベース32、実績データベース33、及び設備データベース34に夫々保存された各種データ値が入力しており、この仮計画演算手段30bでは入力手段から入力した翌日の発電出力、放流量、水位の入力値とデータベースから入力する各種データ値に基づいて翌日仮計画の仮計画水位を演算する。   Similarly, the computer 30 connected directly by inputting the power generation output, discharge flow rate, and water level for the next day's temporary plan from the input means provided in the first display device 10 and pressing the return button is provided. It inputs into the temporary plan calculating means 30b. Various data values stored in the temporary plan database 31, the plan database 32, the result database 33, and the equipment database 34, which are databases provided in the computer 30, are also input to the temporary plan calculation unit 30 b. The calculating means 30b calculates the temporary plan water level of the next day temporary plan based on the power generation output, discharge flow rate, water level input value input from the input means, and various data values input from the database.

そして仮計画演算手段30bで演算した翌日仮計画の仮計画水位演算値を第2表示装置に入力して相互に関連の深い複数のダム、あるいは調整池の仮計画水位カーブを表示するように構成されている。   The temporary plan water level calculation value of the next day temporary plan calculated by the temporary plan calculation means 30b is input to the second display device, and a plurality of deeply related dams or the temporary planned water level curve of the adjustment pond are displayed. Has been.

次に本実施例の運用計画作成支援システムの運用計画作成の手順について説明する。   Next, an operation plan creation procedure of the operation plan creation support system according to the present embodiment will be described.

図4は図1の連接水系の運用計画作成支援システムにおける運用計画作成の詳細を示すフローチャートであり、この運用計画作成のフローチャートは図1及び図7の計算機30、第1表示装置10及び第2表示装置20と夫々関連付けされている。   FIG. 4 is a flowchart showing details of the operation plan creation in the connected water system operation plan creation support system of FIG. 1. The operation plan creation flowchart is shown in FIG. 1 and FIG. 7 with the computer 30, the first display device 10 and the second display. Each is associated with the display device 20.

まず、運用計画作成のフローチャートにおける計画対象日画面選択のステップ110では当日計画画面OR翌日計画画面のステップ111によって計画対象日画面を選択する。   First, in step 110 for selecting a planning target date screen in the operational plan creation flowchart, a planning target date screen is selected in step 111 of the current day planning screen OR the next day planning screen.

当日計画画面OR翌日計画画面のステップ111で当日計画画面を選択した場合は実績データの取得のステップ115に進んで計算機30に格納されている実績データベース33のデータを取得する。   If the current day plan screen is selected in step 111 of the current day plan screen OR next day plan screen, the process proceeds to step 115 for acquiring actual data, and data in the actual result database 33 stored in the computer 30 is acquired.

また、当日計画画面OR翌日計画画面のステップ111で翌日計画画面を選択した場合、又は実績データの取得のステップ115を経た次には、計画、仮計画データの取得のステップ112に進んで計算機30に格納されている計画データベース32及び仮計画データベース31の計画データ及び仮計画データを取得する。   Further, when the next day plan screen is selected in step 111 of the current day plan screen OR next day plan screen, or after the step 115 for obtaining actual data, the process proceeds to the step 112 for obtaining plan and provisional plan data, and the computer 30 The plan data and provisional plan data of the plan database 32 and the provisional plan database 31 stored in FIG.

次に当日計画画面OR翌日計画画面のステップ111で当日計画画面を選択、又は翌日計画画面を選択するが、何れを選択した場合でも設備データなどの取得のステップ114に進んで計算機30に格納されている設備データ34からデータを取得する。   Next, in step 111 of the current day plan screen OR next day plan screen, the current day plan screen is selected, or the next day plan screen is selected. However, in either case, the process proceeds to step 114 for acquiring equipment data and the like and is stored in the computer 30. The data is acquired from the existing equipment data 34.

当日計画画面を選択、又は翌日計画画面を選択したいずれも場合でも、計画と仮計画とを計算機30にて演算することになる。詳細は後述するが、計画の演算では計算機30の計画演算手段30aによって計画水位値を演算し、仮計画の演算では計算機30の仮計画演算手段30bによって仮計画水位値を演算して第2表示装置20に表示することになる。   In either case of selecting the current day plan screen or the next day plan screen, the computer 30 calculates the plan and the temporary plan. Although details will be described later, in the calculation of the plan, the plan water level value is calculated by the plan calculation means 30a of the computer 30, and in the temporary plan calculation, the temporary plan water level value is calculated by the temporary plan calculation means 30b of the computer 30 and displayed second. It will be displayed on the device 20.

データベース31〜34から取得した各種データを基にデフォルト画面(計画画面)表示のステップ120に進んでデフォルトし、その後の計画選択のステップ120に進む。   Based on the various data acquired from the databases 31 to 34, the process proceeds to step 120 for displaying a default screen (planning screen) and defaults, and then proceeds to step 120 for selecting a plan thereafter.

計画選択のステップ120では、第1表示装置10に計画と仮計画の画面を表示して次の仮計画OR計画のステップ121によって計画と仮計画の何れかを選択する。   In the plan selection step 120, the screen of the plan and the temporary plan is displayed on the first display device 10, and either the plan or the temporary plan is selected in the step 121 of the next temporary plan OR plan.

計画選択のステップ120によって第1表示装置10に表示する計画画面と仮計画画面との違いは、第1表示装置10に示した画面には、符号1を操作して計画と仮計画とを選択することによって計画を選択した場合は計画データが表示され、仮計画を選択した場合には仮計画データが表示される。ただし、計画画面では発電出力等のデータの入力はできない。   The difference between the plan screen and the temporary plan screen displayed on the first display device 10 in the plan selection step 120 is that the screen shown in the first display device 10 is operated by selecting reference numeral 1 to select the plan and the temporary plan. Thus, the plan data is displayed when the plan is selected, and the temporary plan data is displayed when the temporary plan is selected. However, data such as power generation output cannot be entered on the planning screen.

一方、第2表示装置20には、計画画面又は仮計画画面の何れであっても、複数のダムA〜ダムFに関して計画水位、仮計画水位、水位上限、水位下限、実績水位(翌日計画の場合は表示なし)が表示されるようになっている。   On the other hand, the second display device 20 has a plan water level, a provisional plan water level, a water level upper limit, a water level lower limit, an actual water level (the next day's plan (No display in case) is displayed.

仮計画と計画の選択は図2に示した第1表示装置10の符号1を操作して何れか一方を選択する。ここで、計画を選択したときは、発電出力などの入力禁止のステップ123に進み、図2に示した第1表示装置10の符号4で示した縦軸欄に各発電所における発電計画の発電出力(MW)や、各ダムにおける放流計画の放流量(m3/s)などの入力は禁止される。 The temporary plan and the plan are selected by operating the reference numeral 1 of the first display device 10 shown in FIG. Here, when a plan is selected, the process proceeds to step 123 for prohibiting input of power generation output and the like, and the power generation plan of the power generation plan at each power plant is indicated in the vertical axis column indicated by reference numeral 4 of the first display device 10 shown in FIG. Inputs such as output (MW) and discharge flow (m 3 / s) of discharge plan in each dam are prohibited.

また、仮計画を選択したときは、発電出力などの入力許可のステップ122に進み、次の発電出力などの入力のステップ130にて図2に示した第1表示装置10の符号4で示した縦軸欄に運用者が各発電所における発電計画の発電出力(MW)や、各ダムにおける放流計画の放流量(m3/s)などのデータの入力を行う。 When the temporary plan is selected, the process proceeds to step 122 for permitting input of power generation output, etc., and is indicated by reference numeral 4 of the first display device 10 shown in FIG. In the vertical axis column, the operator inputs data such as the power generation output (MW) of the power generation plan at each power plant and the discharge flow rate (m 3 / s) of the discharge plan at each dam.

次に仮計画の水位再計算のステップ131に進んで発電出力などの入力のステップ130における第1表示装置10に設けた入力手段である画面上から運用者による発電出力、放流量、水位のデータの入力に基づいて計算機30の仮計画演算手段30bによって仮計画水位の再計算を行う。   Next, the process proceeds to step 131 for recalculating the water level of the temporary plan, and the power generation output, discharge flow rate, and water level data by the operator from the screen, which is the input means provided in the first display device 10 in step 130 for inputting the power generation output and the like Based on the input, the temporary plan water level is recalculated by the temporary plan calculation means 30b of the computer 30.

第1表示装置10の画面で前記データを入力後の運用者によるリターン押下操作(改行操作)により、例えば運用者が入力したデータである発電所の発電出力に対して計算機30によって関連するダムの水位を再計算し、この後に仮計画の保存のステップ132に進んでこの仮計画を仮計画データーベース31に保存する。   By the operator's return pressing operation (line feed operation) after inputting the data on the screen of the first display device 10, for example, the power generation output of the power plant that is the data input by the operator is related to the The water level is recalculated, and then the process proceeds to step 132 for saving the temporary plan, and the temporary plan is stored in the temporary plan database 31.

また、計算機30による再計算結果は画面表示のステップ133によって保存した仮計画を第1表示装置10及び第2表示装置20の画面に表示する。   Further, the recalculation result by the computer 30 displays the temporary plan stored in the screen display step 133 on the screens of the first display device 10 and the second display device 20.

その後、運用者の確認のステップ140に進んで、計算機30の仮計画演算手段30bで再計算して第1表示装置10及び第2表示装置20の画面に表示された仮計画データに対して運用者が満足のいく計画であると判断した場合には、登録ボタン押下のステップ150に進んで運用者が登録ボタンを操作し、仮計画データを計画データにコピーのステップ151に進行してこの仮計画データを計算機30の計画データベース32に格納する計画データとして保存することになる。   Thereafter, the process proceeds to step 140 for confirmation by the operator, and the temporary plan calculation means 30b of the computer 30 recalculates and operates on the temporary plan data displayed on the screens of the first display device 10 and the second display device 20. If the administrator determines that the plan is satisfactory, the process proceeds to step 150 where the registration button is pressed, and the operator operates the registration button to proceed to step 151 where the temporary plan data is copied to the plan data. The plan data is saved as plan data stored in the plan database 32 of the computer 30.

一方、運用者の確認のステップ140にて計算機30の仮計画演算手段30bで再計算して第1表示装置10或いは第2表示装置20の画面に表示された仮計画データに対して運用者が満足しない計画であり修正要と判断した場合には、元に戻すステップ160を経て、再度、発電出力などの入力のステップ130に進んで前述した各ステップをやり直すことになる。   On the other hand, in step 140 for confirmation of the operator, the operator recalculates the temporary plan calculation means 30b of the computer 30 and displays the temporary plan data displayed on the screen of the first display device 10 or the second display device 20 by the operator. If it is determined that the plan is not satisfied and needs to be corrected, the process proceeds to step 160 for returning to the original state, and again proceeds to step 130 for inputting power generation output and the like, and the above steps are repeated.

即ち、運用者の確認のステップ140にて、入力手段である図2に示した第1表示装置10の符号4で示した縦軸欄に運用者によって再度発電出力等のデータを入力して計算機30の仮計画演算手段30bで再々度計算させて新たな仮計画の作成を行う。   That is, in step 140 of the operator's confirmation, the operator again inputs data such as the power generation output into the vertical axis column indicated by reference numeral 4 of the first display device 10 shown in FIG. Thirty temporary plan calculation means 30b calculate again and create a new temporary plan.

ただし、運用者が第1表示装置10の画面に表示された仮計画データを見て元の計画に戻したいと思った場合は、元に戻すステップ160を経て取消ボタン押下のステップ170に進み、運用者による取消ボタンの押下操作することにより計算機30によって前回登録した計画を表示することができる。   However, if the operator wants to return to the original plan by looking at the temporary plan data displayed on the screen of the first display device 10, the process proceeds to step 170 for pressing the cancel button through the step 160 for returning to the original plan. The plan previously registered by the computer 30 can be displayed by pressing the cancel button by the operator.

即ち、計画データを仮計画データにコピーのステップ171に進行してこのコピーした計画データに基づいて、再度、発電出力などの入力のステップ130に進んで前述した各ステップをやり直すことになる。   That is, the program proceeds to step 171 for copying the plan data to temporary plan data, and based on the copied plan data, the program proceeds to step 130 for inputting power generation output and the like, and the above-described steps are repeated.

図5は本発明の対象となる連接水系Zの水系図を模式的に示したものであり、ダムAの下流にダムCが連接され、ダムCの下流にダムDが連接されている。また、ダムCにはダムBからも水が流下して連接されている。尚、図中、各ダムに流入する破線の矢印は自然の流量を表している。   FIG. 5 schematically shows a water system diagram of an articulated water system Z that is an object of the present invention. A dam C is connected downstream of the dam A, and a dam D is connected downstream of the dam C. Further, water also flows from dam B and is connected to dam C. In the figure, broken arrows flowing into each dam represent natural flow rates.

ダム間の流下遅れについては、ダムAからダムC、ダムBからダムC、ダムCからダムDの間が夫々1時間の流下遅れとなっている。   Regarding the flow delay between dams, the flow between dam A to dam C, dam B to dam C, and dam C to dam D is 1 hour.

そして、これらのダムA、ダムB、ダムC、ダムDには発電所A、発電所B、発電所C、発電所Dが夫々設置されており、これらの発電所で発電出力を夫々発生するようになっている。   The dam A, dam B, dam C, and dam D are provided with a power plant A, a power plant B, a power plant C, and a power plant D, respectively, and generate power generation at these power plants. It is like that.

図6は図5に示した連接水系Zの発電計画及び連接水系に属するダムA、ダムB、ダムC、ダムDに関する仮計画における水位カーブと水位上限、水位下限を夫々示したものである。   FIG. 6 shows the water level curve, the water level upper limit, and the water level lower limit in the power generation plan of the connected water system Z shown in FIG. 5 and the temporary plans related to the dam A, dam B, dam C, and dam D belonging to the connected water system.

図5及び図6を用いて運用者が実施する運用計画の仮計画の修正・勘案方法の一例を示す。ここでは運用計画の最終水位は固定として運用計画の仮計画を修正していくこととする。すなわち、一日のダムからの放流量は変更せずに、放流する時間帯を変更することでダムの水位逸脱を解消していく。   FIG. 5 and FIG. 6 show an example of a method for correcting / considering a temporary plan of an operation plan executed by an operator. Here, the final water level of the operation plan is fixed, and the temporary plan of the operation plan is revised. In other words, the deviation from the water level of the dam is eliminated by changing the discharge time zone without changing the discharge flow from the dam of the day.

図6に示した水位グラフではダムCの水位が水位下限を逸脱して低くなった状況を示している。この場合、ダムCの水位下限逸脱を解消する方法として次の3つの方法の何れかを採用すれば良い。   The water level graph shown in FIG. 6 shows a situation where the water level of the dam C has become lower than the water level lower limit. In this case, any one of the following three methods may be employed as a method of eliminating the dam C water level lower limit deviation.

1つ目の方法は図5に示したダム間の流下遅れを勘案してダムCの水位逸脱時刻以降の時間帯におけるダムCの上流側となるダムAに設置された発電所Aからの放流量を、ダムCの水位逸脱時刻以前の時間帯に移動する方法であり、例えば発電所Aが22〜24時に計画している各5.0MWの発電出力を13〜15時に移動させ、13時を5.0MW、14〜15時を13.0MW程度にすることによりダムCの水位下限逸脱を解消するものである。   The first method considers the flow delay between the dams shown in Fig. 5 and releases it from the power plant A installed in the dam A upstream of the dam C in the time zone after the dam C water level departure time. This is a method of moving the flow rate to a time zone before the water level departure time of dam C. For example, the power generation output of 5.0 MW planned by the power plant A from 24:00 to 24:00 is moved from 13:00 to 15:00, and 13:00 Is set to 5.0 MW, and 14 to 15:00 is set to about 13.0 MW, so that the water level lower limit deviation of dam C is eliminated.

2つ目の方法は流下遅れを勘案してダムCの水位逸脱時刻以降の時間帯におけるダムCの上流側となるダムBに設置された発電所Bからの放流量を、ダムCの水位逸脱時刻以前の時間帯に移動する方法であり、例えば発電所Bの22〜24時に計画している各3.0MWの発電出力を13〜15時に移動させ、13〜15時を各6.0MW程度にすることによりダムCの水位下限逸脱を解消するものである。   The second method is based on the discharge from the power plant B installed in the dam B upstream of the dam C in the time zone after the deviance of the dam C It is a method of moving to a time zone before the time, for example, each 3.0 MW power generation output planned for 22:00 to 24:00 of power plant B is moved to 13:00 to 15:00, and 13.0 to 15:00 is about 6.0 MW each This eliminates the water level lower limit deviation of dam C.

3つ目の方法はダムCの水位逸脱時刻以前の時間帯における放流量を水位逸脱時刻以降の時間帯に移動する方法であり、ダムCに設置された発電所Cの13〜16時に計画している発電出力を減らして17〜24時の時間帯に移動する。例えば、13〜16時の発電出力を各7.0MW程度にし、17時〜21時の発電出力を各6.5MW程度にすることによりダムCの水位下限逸脱を解消するものである。   The third method is to move the discharge flow in the time zone before the water level departure time of dam C to the time zone after the water level departure time, which is planned at 13:00 to 16:00 of the power plant C installed in the dam C. Reduce the generated power output and move to the time zone from 17:00 to 24:00. For example, the deviation of the water level lower limit of the dam C is eliminated by setting the power generation output from 13:00 to 16:00 to about 7.0 MW and the power generation output from 17:00 to 21:00 to about 6.5 MW each.

ところで、仮にダムの水位グラフとして1つのダムの水位グラフしか表示されない場合は、運用者は各ダムの運用計画を確認して上記3つの方法のうちのどれが適切かを考えていずれかの方法を実施し、更に各ダムの運用計画を確認する必要がある。   By the way, if only one dam water level graph is displayed as a dam water level graph, the operator confirms the operation plan of each dam and considers which of the above three methods is appropriate. It is necessary to confirm the operation plan of each dam.

これに対して上述した本実施例の連接水系の運用計画作成支援システムにおける運用計画作成方法では、運用者はダムA〜ダムDの水位を同時に確認できることにより、例えば2つ目の方法と3つ目の方法ではダムCの水位逸脱は解消できても、ダムB、ダムDに逸脱が起こることを簡単に予想および検証できる。   On the other hand, in the operation plan creation method in the connected water system operation plan creation support system of the present embodiment described above, the operator can confirm the water levels of the dams A to D at the same time. Even if the water level deviation of dam C can be eliminated by the eye method, it is possible to easily predict and verify that deviations occur in dam B and dam D.

また、上述した本実施例では、運用者は例えば1つ目の方法によってダムAの水位が逸脱しないことを予想および検証できる。   In the present embodiment described above, the operator can predict and verify that the water level of the dam A does not deviate by the first method, for example.

また、上記3つの方法以外にも、ダムDの午前中の放流量を午後に移動することにより、ダムDの水位下限に対する余裕を作り、ダムCの水位下限逸脱時間帯の放流量を後ろの時間帯に移動するという方法も容易に検討することができる。   In addition to the above three methods, the morning discharge of dam D is moved in the afternoon to make room for the lower limit of dam D's water level, and the discharge of dam C's water level lower limit deviation time zone is A method of moving to a time zone can also be easily considered.

このように連接水系において関連する複数のダムおよび発電所の運用計画を同時に確認しながら、計画を作成する手段を提供することで、より簡単に適切な発電運用計画を作成できる。   Thus, an appropriate power generation operation plan can be created more easily by providing means for creating a plan while simultaneously confirming the operation plans of a plurality of dams and power plants related to the connected water system.

上述した本実施例の連接水系の運用計画作成支援システムでは、所望のダムに関するデータ入力後のリターンの押下により、この所望のダムと影響のある他のダムの水位の再計算を手動計算で実行することができる。すなわち、計画作成を計算機に直結したキーボードの操作だけで再計算することが可能となる。これにより、発電出力、あるいは放流量の入力から水位までの再計算を例えばマウス移動の操作によって中断されることなく実施することが可能となる。   In the connected water system operation plan creation support system of the above-described embodiment, the recalculation of the water level of the desired dam and other affected dams is performed by manual calculation by pressing the return after inputting data on the desired dam. can do. In other words, it is possible to recalculate the plan creation only by operating the keyboard directly connected to the computer. This makes it possible to perform recalculation from the input of the power generation output or discharge flow to the water level without being interrupted by, for example, a mouse movement operation.

また、本実施例の連接水系の運用計画作成支援システムでは、修正した計画(仮計画)を計算機に登録することで計画として保存する機能と、修正した計画を取消することで前回登録した計画を表示する機能を有しており、運用者が修正に失敗したときにも、最適な計画(仮計画)が得られるまで前回の計画をベースに何度でも修正することが可能となる。   In addition, in the connected water system operation plan creation support system of the present embodiment, the function of saving the revised plan (provisional plan) as a plan by registering it in the computer and the plan registered last time by canceling the revised plan. It has a display function, and even when the operator fails to make corrections, it is possible to make corrections any number of times based on the previous plan until an optimal plan (provisional plan) is obtained.

よって本実施例によれば、運用者の日々の業務である連接水系の運用計画の作成が容易となり、運用者の負荷を低減することが可能となる。   Therefore, according to the present embodiment, it becomes easy to create an operation plan for a connected water system, which is a daily work of the operator, and the load on the operator can be reduced.

また、本実施例の連接水系の運用計画作成支援システムでは、連接水系において関連する複数のダム及び発電所の運用計画を同時に確認しながら計画を作成することにより、簡単に適切な発電運用計画を手動計算にて作成できる。   In addition, in the connected water system operation plan creation support system of this embodiment, an appropriate power generation operation plan can be easily created by creating a plan while simultaneously confirming the operation plans of a plurality of dams and power plants related to the connected water system. Can be created by manual calculation.

表示装置に複数のダムの水位を表示することにより1つのダムの水位を表示する範囲が狭くなり水位カーブの識別が難しくなることが考えられるが、本実施例の連接水系の運用計画作成支援システムでは、水位カーブの拡大表示機能、各種水位カーブの色替え表示、チェックボックスによる水位カーブの一括表示・非表示設定の機能を運用計画作成支援システムに備えたことによって、運用者が水位カーブを簡単に把握できるようになっている。   By displaying the water levels of a plurality of dams on the display device, it is considered that the range for displaying the water level of one dam is narrowed, making it difficult to identify the water level curve. With the operation plan creation support system, the operator can easily create a water level curve by providing a function for enlarging and displaying the water level curve, changing the color of each water level curve, and displaying and hiding the water level curve all at once using check boxes. To be able to grasp.

以上のことから明らかなように、本実施例によれば連接水系の関連する複数のダムおよび発電所の運用計画を同時に確認しながら夫々のダムおよび発電所の適切な運用計画を手動計算にて容易に作成することを可能にして運用者の負荷を低減し得る連接水系の運用計画作成支援システムを実現することができる。   As is clear from the above, according to the present embodiment, an appropriate operation plan for each dam and power plant can be manually calculated while simultaneously confirming operation plans for a plurality of dams and power plants related to the connected water system. It is possible to realize a connected water system operation plan creation support system that can be easily created and reduce the load on the operator.

本発明は連接水系の運用計画作成支援システムに適用可能である。   The present invention is applicable to a connected water system operation plan creation support system.

本発明の一実施例である連接水系の運用計画作成支援システムを示す概略構成図。The schematic block diagram which shows the operation plan preparation assistance system of the connection water system which is one Example of this invention. 図1の実施例における第1表示装置で表示する表示画面の一例。An example of the display screen displayed on the 1st display apparatus in the Example of FIG. 図1の実施例における第2表示装置で表示する表示画面の一例。An example of the display screen displayed on the 2nd display apparatus in the Example of FIG. 図1の実施例である連接水系の運用計画作成支援システムにおける計画作成フローチャート。The plan creation flowchart in the operation plan creation support system of the connection water system which is the Example of FIG. 本発明の対象となる連接水系Zの水系図の一例を示す模式図。The schematic diagram which shows an example of the water system figure of the connection water system Z used as the object of this invention. 図5に示した連接水系Zの発電計画及び連接水系に属するダムの仮計画における水位カーブと水位上限、水位下限を示す説明図。Explanatory drawing which shows the water level curve in the power generation plan of the connection water system Z shown in FIG. 5, and the temporary plan of the dam which belongs to a connection water system, a water level upper limit, and a water level lower limit. 図1の実施例である連接水系の運用計画作成支援システムの詳細構成を示す制御ブロック図。The control block diagram which shows the detailed structure of the operation plan preparation assistance system of the connection water system which is the Example of FIG.

符号の説明Explanation of symbols

1:計画・仮計画選択コンボボックス、2:仮計画取消ボタン、3:仮計画登録ボタン、4:発電出力OR放流量入力欄、5:水位グラフ、6:水位グラフ拡大ボタン、7:水位表示・非表示チェックボックス、10:第1表示装置、20:第2表示装置、30:計算機、31:仮計画データベース、32:計画データベース、33:実績データベース、34:設備データベース。   1: Plan / provisional plan selection combo box, 2: Temporary plan cancel button, 3: Temporary plan registration button, 4: Power generation output OR discharge input field, 5: Water level graph, 6: Water level graph enlarge button, 7: Water level display Non-display check box, 10: first display device, 20: second display device, 30: computer, 31: temporary plan database, 32: plan database, 33: results database, 34: equipment database.

Claims (3)

複数のダムおよび発電所を有する連接水系の運用計画作成支援システムにおいて、複数の発電所の発電運用計画或いはダムの放流計画を表示する第1表示装置と、複数のダムの計画水位カーブを表示する第2表示装置とを備え、複数のダム及び発電所の運用計画の手動計算に必要なデータを入力する入力手段を備え、発電所及びダムの実績データである発電出力、放流量、及び水位を保持する実績データベース、発電所及びダムの当日計画と翌日計画を保持する計画データベース、発電所及びダムの当日仮計画と翌日仮計画を保持する仮計画データベース、及び発電所及びダムの設備データを保持する設備データベースを夫々格納し、入力手段から入力されたデータ及び前記データベースを基に演算を実行する計算機を備え、前記計算機の演算によって相互に関連の深い複数のダムの計画水位カーブを前記第2表示装置に表示させ、前記複数のダムに設置されて発電する複数の発電所の発電運用計画或いはダムの放流計画を前記第1表示装置に表示させるように構成し、
発電所及びダムの当日計画では前記入力手段から当日仮計画の現在時刻以降の発電出力と放流量を入力して現在時刻までの発電出力、放流量、水位とこれらの入力値を基に計算機によって当日の仮計画水位の計算を実行して複数のダムについて水位を実績水位カーブ、計画水位カーブ及び仮計画水位カーブに分類して第2表示装置に表示し、
発電所及びダムの翌日計画では前記入力手段から翌日仮計画の発電出力、放流量、初期水位を入力してこれらの入力値を基に計算機によって翌日の仮計画水位の計算を実行し、複数のダムについて水位を計画水位カーブ及び仮計画水位カーブに分類して第2表示装置に表示するようにし、
前記計算機によって演算して第2表示装置に表示された複数のダムの仮計画水位の水位カーブを確認する手段を備え、この確認の手段に基づいて前記入力手段から所望のダム及び発電所の発電出力と放流量を入力することによってこの所望のダムとは影響する関係にある他のダムの仮計画水位の再計算をこの前記計算機によって実行して前記他のダムの仮計画水位の再計算結果を第2表示装置に表示し、前記他のダムの仮計画水位の再計算結果を前記計画データベースに保存するように構成したことを特徴とする連接水系の運用計画作成支援システム。
In a connected water system operation plan creation support system having a plurality of dams and power plants, a first display device for displaying a power generation operation plan for a plurality of power plants or a discharge plan for a dam and a planned water level curve for the plurality of dams are displayed. A second display device, and input means for inputting data necessary for manual calculation of the operation plans of a plurality of dams and power plants, and the power generation output, discharge flow rate, and water level, which are actual data of the power plants and dams. Maintains the actual database to be maintained, the plan database to hold the current day plan and the next day plan of the power plant and dam, the temporary plan database to hold the current day temporary plan and the next day temporary plan of the power plant and dam, and the power plant and dam facility data Each of which stores a database of equipment to be operated, and includes a computer that performs operations based on the data input from the input means and the database. By display the planned level curves of mutually closely related plurality of dams on the second display device, the plurality of power generating operation plan of the plurality of power plants for generating power installed in the dam or said discharge plan of the dam first Configure to display on the display device,
In the same day plan for power plants and dams, the power generation output and discharge flow after the current time of the temporary plan of the day is input from the input means, and the power generation output, discharge flow, water level and these input values up to the current time are calculated by the computer. Calculate the temporary plan water level on the day, classify the water level for multiple dams into the actual water level curve, the planned water level curve and the temporary planned water level curve, and display them on the second display device.
In the next day plan for power plants and dams, the power generation output, discharge flow, and initial water level of the next day temporary plan are input from the input means, and the next day's temporary plan water level is calculated by the computer based on these input values. The water level of the dam is classified into a planned water level curve and a temporary planned water level curve and displayed on the second display device .
Means for confirming the water level curve of the tentative planned water level of the plurality of dams calculated by the computer and displayed on the second display device, and based on the confirmation means, the input means generates power from the desired dam and power plant. The recalculation result of the tentative design water level of the other dam is calculated by executing the recalculation of the tentative design water level of the other dam that has a relationship with the desired dam by inputting the output and discharge flow. Is displayed on the second display device, and the recalculation result of the provisional planned water level of the other dam is stored in the plan database .
請求項1に記載の連接水系の運用計画作成支援システムにおいて、発電所及びダムの当日計画では第1表示装置に備えた入力手段から当日仮計画の現在時刻以降の発電出力と放流量を入力して、現在時刻までの発電出力、放流量及び水位と入力されたデータを基に計算機によって当日の仮計画水位の計算を実行してその計算結果を第2表示装置に水位を実績水位カーブ、計画水位カーブ及び仮計画水位カーブに分類し色替えして表示し、発電所及びダムの翌日計画では、前記入力手段から翌日仮計画の発電出力及び放流量を入力して、この入力されたデータを基に計算機によって翌日の仮計画水位の計算を実行してその計算結果を第2表示装置に水位を計画水位カーブ及び仮計画水位カーブに分類し色替えして表示するように構成したことを特徴とする連接水系の運用計画作成支援システム。 In the connected water system operation plan creation support system according to claim 1, in the same day plan of the power plant and dam, the power generation output and the discharge flow after the current time of the temporary plan of the day are input from the input means provided in the first display device. Based on the power generation output, discharge flow rate and water level input up to the current time, the computer calculates the tentative planned water level for the day, and the calculation result is displayed on the second display device as the actual water level curve and plan. The water level curve and the temporary plan water level curve are classified and displayed in color, and in the next day plan of the power plant and dam, the power generation output and discharge flow of the next day temporary plan are input from the input means, and this input data is run the calculation of the next day provisional planning level based on the computer by being configured to display the color change classifying the water level of the calculation result to the second display device in the planning level curve and the temporary plan level curve Operational planning support system of the connecting water systems and butterflies. 請求項1に記載の連接水系の運用計画作成支援システムにおいて、仮計画の取消操作を行うと計算機によって前回登録した計画のデータを計画データベースから呼び出して第1表示装置と第2表示装置に表示し、作成した仮計画の登録操作を行うと計算機によって計画のデータとして計画データベースに保存されるように構成したことを特徴とする連接水系の運用計画作成支援システム。 In the connected water system operation plan creation support system according to claim 1, when the temporary plan is canceled, the data of the plan previously registered by the computer is called from the plan database and displayed on the first display device and the second display device. An operation plan creation support system for a connected water system, characterized in that when the created temporary plan is registered, the computer stores the plan data as plan data in the plan database .
JP2006301440A 2006-11-07 2006-11-07 Connected water system operation planning support system Expired - Fee Related JP4658020B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006301440A JP4658020B2 (en) 2006-11-07 2006-11-07 Connected water system operation planning support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006301440A JP4658020B2 (en) 2006-11-07 2006-11-07 Connected water system operation planning support system

Publications (2)

Publication Number Publication Date
JP2008118810A JP2008118810A (en) 2008-05-22
JP4658020B2 true JP4658020B2 (en) 2011-03-23

Family

ID=39504289

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006301440A Expired - Fee Related JP4658020B2 (en) 2006-11-07 2006-11-07 Connected water system operation planning support system

Country Status (1)

Country Link
JP (1) JP4658020B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5191308B2 (en) * 2008-08-12 2013-05-08 中国電力株式会社 Water-based power generation output calculation device and water-based power generation output calculation program
WO2010071158A1 (en) * 2008-12-19 2010-06-24 中国電力株式会社 System for aiding operation of reservoir facility, method for aiding operation of reservoir facility, and program
JP5208983B2 (en) * 2010-03-02 2013-06-12 中国電力株式会社 Reservoir operation plan creation method and apparatus
JP5042341B2 (en) 2010-06-08 2012-10-03 中国電力株式会社 Hydroelectric power generation plan adjusting device, hydroelectric power generation plan adjusting method, and program
JP2014105468A (en) * 2012-11-27 2014-06-09 Toshiba Corp Monitoring control method and monitoring control system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0819194A (en) * 1994-06-27 1996-01-19 Toshiba Corp Power-system supervisory control apparatus
JPH11262298A (en) * 1998-03-09 1999-09-24 Toshiba Corp Generator control system
JP2006039838A (en) * 2004-07-26 2006-02-09 Mitsubishi Electric Corp Water type power generation operation plan preparation supporting apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0819194A (en) * 1994-06-27 1996-01-19 Toshiba Corp Power-system supervisory control apparatus
JPH11262298A (en) * 1998-03-09 1999-09-24 Toshiba Corp Generator control system
JP2006039838A (en) * 2004-07-26 2006-02-09 Mitsubishi Electric Corp Water type power generation operation plan preparation supporting apparatus

Also Published As

Publication number Publication date
JP2008118810A (en) 2008-05-22

Similar Documents

Publication Publication Date Title
JP4658020B2 (en) Connected water system operation planning support system
SA519402260B1 (en) Automatic control of production and injection wells in a hydrocarbon field
US8095346B2 (en) Operation simulation system for plant construction
US20070129978A1 (en) Production plan apparatus
JP2019182342A (en) Diagram analysis supporting device and method
JP2017529586A (en) A cascade model predictive control (MPC) approach for plant-wide control and optimization
Wahlin et al. Canal automation for irrigation systems: American society of civil engineers manual of practice number 131
JP7186675B2 (en) Maintenance plan creation support device
JP5864387B2 (en) Process planning support device, process planning support method and program
JP6329022B2 (en) Renovation construction cost estimation system
JP2005285032A (en) Daily power generation planning system for hydroelectric power station group
JP2001255903A (en) Process control system
CN114971407A (en) Automatic scheduling control method and system for maintenance plan
JP3146300B2 (en) Process plan creation method and device
CN112654943A (en) Manufacturing system design assistance device
JP2009258881A (en) System, method, and program for editing production schedule
JP4319007B2 (en) Development period shortening support method
JP3631915B2 (en) Recording medium storing production planning system and production planning program
US20220374802A1 (en) Automated analysis of objects for construction planning
JP2001142866A (en) Power generation planning method for hydroelectric power plant
JPH09230911A (en) Process support system
KR20110091123A (en) Control pipe modeling system for a ship
JP5017019B2 (en) Plant optimum operation control system
JP3688972B2 (en) Batch information creation device
CA2463949C (en) Automatic parameter recording

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081027

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091214

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100105

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101221

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101222

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140107

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees