Prior art keywords
distribution system
power
data
loss
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006042937A
Other languages
Japanese (ja)
Other versions
JP2007221975A (en
Inventor
繁雄 藤井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006042937A priority Critical patent/JP4597068B2/en
Publication of JP2007221975A publication Critical patent/JP2007221975A/en
Application granted granted Critical
Publication of JP4597068B2 publication Critical patent/JP4597068B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y04S10/58

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、配電系統評価装置および配電系統評価方法に関する。   The present invention relates to a distribution system evaluation apparatus and a distribution system evaluation method.

配電系統による電力供給の信頼度を示す指標としては、停電の実績の統計データから算出される、年間における1需要家あたりの平均停電持続時間(分/戸)や平均停電回数(回/戸)が使用される。そして、それらの指標が所定の水準以下になるように、配電系統に対する設備投資が行われる。なお、非特許文献1には、需要家における停電コストの推定について記載されている。
仲村宏一,山城迪,「停電コストの推定に関する調査研究」,電気学会論文誌B,平成11年2月1日,119巻2号,p.284−290
As an index indicating the reliability of the power supply by the distribution system, the average power outage duration per minute (min / house) and average number of times of power outage (times / door) calculated from statistical data of power outages Is used. And the capital investment with respect to a distribution system is performed so that those indicators may become below a predetermined level. Non-Patent Document 1 describes estimation of power outage cost at a consumer.
Nakamura Koichi and Yamashiro Satoshi, “Survey Study on Power Outage Cost Estimation”, IEEJ Transactions B, February 1, 1999, Vol. 119, No. 2, p. 284-290

しかしながら、従来の電力供給の信頼度を示す指標は、系統構成や個々の電気使用量、季節や時間による電力需要の変動を考慮することなく、一般的で平均的な統計データだけから求めており、販売電力量減などの損失については関知していない。   However, the index indicating the reliability of conventional power supply is obtained only from general and average statistical data, without taking into account fluctuations in power demand due to system configuration, individual power consumption, season and time. We do not know about losses such as a reduction in sales of electricity.

また、各需要家や配電系統区間の負荷は想定されているが、停電による料金収入減額は想定されておらず、各停電区間における停電による料金収入減、すなわち損失の差を考慮しながら、配電系統に対する設備投資を効率的に検討することができない。   In addition, although the load on each customer and distribution system section is assumed, the reduction in fee revenue due to power outage is not expected, and the power distribution in each power outage section is considered to be reduced, that is, the distribution of power is taken into account. The capital investment for the system cannot be considered efficiently.

そこで、本発明は、上記課題を鑑みてなされたものであり、停電による減収を考慮することで、配電系統に対する設備投資を効率的に検討するための手段を提供することを主たる目的とする。   Then, this invention is made | formed in view of the said subject, and it aims at providing the means for examining the capital investment with respect to a distribution system efficiently by considering the reduction | decrease by a power failure.

上記課題を解決するために、本発明は、配電系統において想定される事故による電力会社の損失料金を計算する配電系統評価装置であって、少なくとも、配電系統の構成を含む配電系統データ、配電系統および需要家の接続構成を含む配電設備データならびに需要家ごとの契約条件および電力使用量を含む需要家データを格納する記憶部と、事故区間および停電時間を入力する入力部と、入力部によって入力された事故区間から、配電系統データに基づいて停電区間を特定する停電区間特定部と、停電区間特定部によって特定された停電区間から、配電設備データに基づいて停電区間に含まれる需要家を特定し、その特定した需要家ごとに、入力部によって入力された停電時間から、当該需要家データの電力使用量に基づいて事故による供給支障電力量を算出する電力量算出部と、電力量算出部によって算出された需要家ごとの供給支障電力量から、当該需要家データの契約条件に基づいて需要家ごとの損失額を算出し、その損失額を合計して損失料金を算出する損失料金算出部と、損失料金算出部によって算出された損失料金を表示する表示部とを備えることを特徴とする。   In order to solve the above problems, the present invention is a distribution system evaluation apparatus for calculating a loss charge of an electric power company due to an accident assumed in the distribution system, and at least distribution system data including the configuration of the distribution system, the distribution system Distribution unit data including the connection configuration of the customer and the customer, as well as a storage unit for storing customer data including contract conditions and power consumption for each customer, an input unit for inputting the accident section and power failure time, and input by the input unit The outage section identifies the outage section based on the distribution system data, and the outage section identified by the outage section identification section identifies the customers included in the outage section based on the distribution facility data Then, for each identified consumer, supply from an accident based on the power usage of the customer data from the power outage time entered by the input unit From the power amount calculation unit that calculates the amount of faulty power, and the supply hindrance power amount for each customer calculated by the power amount calculation unit, the amount of loss for each customer is calculated based on the contract conditions of the customer data, A loss fee calculation unit that calculates a loss fee by totaling the loss amounts and a display unit that displays the loss fee calculated by the loss fee calculation unit are provided.

この構成によれば、事故による停電がなければ得られるはずの需要家からの電気料金が、事故が発生した場合の電力会社の損失料金として表示されるので、ユーザはその損失料金を考慮しながら配電系統に対する設備投資について効率的に検討することができる。   According to this configuration, since the electricity charge from the consumer that should be obtained if there is no power outage due to an accident is displayed as the loss charge of the electric power company when the accident occurs, the user considers the loss charge It is possible to efficiently examine the capital investment for the distribution system.

また、本発明は、配電系統評価装置であって、記憶部に格納された需要家データが、時期ごとの電力使用量をさらに含み、入力部が、事故発生時期をさらに入力し、電力量算出部が、需要家ごとの供給支障電力量を算出する場合に、入力部によって入力された停電時間および入力部によって入力された事故発生時期に応じた電力使用量に基づいて供給支障電力量を算出することを特徴とする。   In addition, the present invention is a distribution system evaluation device, wherein the consumer data stored in the storage unit further includes power consumption for each period, and the input unit further inputs the accident occurrence time, and calculates the electric energy Department calculates the supply disruptive power based on the power outage time input by the input section and the accident occurrence time input by the input section when calculating the supply disturbing power amount for each consumer It is characterized by doing.

この構成によれば、必ずしも一律固定の実績データ(平均値)である電力使用量ではなく、季節や時間帯など時期ごとの実績データである電力使用量を用いて供給支障電力量を算出するので、供給支障電力量の精度がよくなり、ひいては損失料金の精度が高くなる。   According to this configuration, the power hindering power supply is calculated using the power usage amount that is the actual data for each period such as the season or time zone, not the power usage amount that is not necessarily fixed actual data (average value). Therefore, the accuracy of the power hindrance to supply is improved, and the accuracy of the loss fee is increased.

また、本発明は、配電系統評価装置であって、記憶部が、配電系統の変更に応じた建設費の算出に必要な工事費データをさらに格納し、入力部が、配電系統の変更内容をさらに入力し、配電系統評価装置が、入力部によって入力された配電系統の変更内容に従って、記憶部に格納された配電系統データおよび配電設備データを更新する配電構成データ更新部と、入力部によって入力された配電系統の変更内容から、工事費データに基づいて配電系統の変更に応じた建設費を算出する建設費算出部とをさらに備え、損失料金算出部が、需要家ごとの損失額を合計した値に、建設費算出部によって算出された建設費を加えて損失料金を算出することを特徴とする。   Further, the present invention is a distribution system evaluation device, wherein the storage unit further stores construction cost data necessary for calculating construction costs according to the change of the distribution system, and the input unit stores the change contents of the distribution system. Further, the distribution system evaluation device inputs the distribution configuration data update unit that updates the distribution system data and the distribution facility data stored in the storage unit according to the change contents of the distribution system input by the input unit, and the input unit inputs And a construction cost calculation unit that calculates the construction cost according to the change of the distribution system based on the construction cost data, and the loss fee calculation unit totals the amount of loss for each customer. The loss fee is calculated by adding the construction cost calculated by the construction cost calculation unit to the calculated value.

この構成によれば、配電系統を変更した場合の事故発生による損失料金を、配電系統の変更に応じた建設費を含めて計算し、表示するので、ユーザはその総計された損失料金を考慮しながら配電系統に対する設備投資について効率的に検討することができる。   According to this configuration, the loss fee due to the occurrence of an accident when the distribution system is changed is calculated and displayed including the construction cost according to the change of the distribution system, so the user considers the total loss fee. However, it is possible to efficiently examine the capital investment for the distribution system.

また、本発明は、配電系統評価装置であって、記憶部が、配電系統データおよび配電設備データに対応した地図データをさらに格納し、損失料金算出部が、さらに需要家ごとの損失額を区間ごとに合計して区間ごとの損失料金を算出し、表示部が、さらに地図データを表示するとともに、損失料金算出部によって算出された区間ごとの損失料金を、地図データ上の区間ごとに対応させて表示することを特徴とする。   Further, the present invention is a distribution system evaluation device, wherein the storage unit further stores map data corresponding to the distribution system data and the distribution facility data, and the loss fee calculation unit further calculates the amount of loss for each consumer as a section. The display unit displays the map data, and the loss fee for each section calculated by the loss charge calculation unit is associated with each section on the map data. It is characterized by being displayed.

この構成によれば、地図を表示するとともに、その地図上に配電系統の区間ごとに損失料金を表示するので、ユーザは、事故発生による損失料金の分布を把握することができ、配電系統に対する設備投資について効率的に検討することができる。   According to this configuration, a map is displayed and a loss fee is displayed for each section of the distribution system on the map, so that the user can grasp the distribution of the loss fee due to the occurrence of an accident, and the facility for the distribution system Investment can be considered efficiently.

なお、本発明は、配電系統評価方法を含む。その他、本願が開示する課題およびその解決方法は、発明を実施するための最良の形態の欄、及び図面により明らかにされる。   The present invention includes a distribution system evaluation method. In addition, the problems disclosed in the present application and the solutions thereof will be clarified by the description of the best mode for carrying out the invention and the drawings.

本発明によれば、停電による減収を考慮することで、配電系統に対する設備投資を効率的に検討することができる。   According to the present invention, it is possible to efficiently examine the capital investment for the power distribution system by considering the decrease in revenue due to the power failure.

以下、図面を参照しながら、本発明を実施するための最良の形態を説明する。本発明の実施の形態に係る配電系統評価装置は、配電系統において想定される事故による電力会社の損失料金を計算する装置である。すなわち、事故が発生したことを想定する変電所名や区間などを入力し、その事故の発生による電気料金に係る経済的損失を出力する装置であり、配電系統に対する設備投資の検討を効率的に行うためのものである。なお、配電系統は、変電所、フィーダ、配電線および開閉器から構成されるものとする。   Hereinafter, the best mode for carrying out the present invention will be described with reference to the drawings. The distribution system evaluation apparatus according to the embodiment of the present invention is an apparatus that calculates a loss charge of a power company due to an accident assumed in the distribution system. In other words, it is a device that inputs the name of a substation, section, etc., assuming that an accident has occurred, and outputs the economic loss related to electricity charges due to the occurrence of the accident. Is to do. In addition, a power distribution system shall be comprised from a substation, a feeder, a distribution line, and a switch.

≪装置の構成と概要≫
図1は、配電系統評価装置の構成を示す図である。配電系統評価装置1は、入力部2、表示部3、処理部4および記憶部5を含んで構成され、PC(Personal Computer)やサーバなどのコンピュータによって実現される。入力部2は、ユーザの操作によって所定のデータを入力し、その入力したデータを処理部4に渡すものであり、キーボードやマウスなどによって実現される。表示部3は、処理部4から渡されたデータを表示するものであり、液晶ディスプレイなどによって実現される。処理部4は、入力部2から所定のデータを受け付けて、記憶部5のデータを参照しながら所定の処理を行い、その処理した結果を表示部3に渡す。処理部4は、所定のメモリに格納されたプログラムをCPU(Central Processing Unit)が実行することによって実現される。記憶部5は、処理部4の処理に必要なデータを記憶するものであり、処理部4からの要求に応じてデータの読み出しまたは書き込みを行う。記憶部5は、ハードディスク装置などの不揮発性記憶装置によって実現される。なお、配電系統評価装置1は、必ずしもスタンドアロンの構成である必要はなく、その機能をクライアント・サーバシステムによって実現してもよい。
≪Device configuration and overview≫
FIG. 1 is a diagram illustrating a configuration of a power distribution system evaluation apparatus. The power distribution system evaluation device 1 includes an input unit 2, a display unit 3, a processing unit 4, and a storage unit 5, and is realized by a computer such as a PC (Personal Computer) or a server. The input unit 2 inputs predetermined data by a user operation and passes the input data to the processing unit 4 and is realized by a keyboard, a mouse, or the like. The display unit 3 displays data passed from the processing unit 4 and is realized by a liquid crystal display or the like. The processing unit 4 receives predetermined data from the input unit 2, performs predetermined processing while referring to data in the storage unit 5, and passes the processed result to the display unit 3. The processing unit 4 is realized by a CPU (Central Processing Unit) executing a program stored in a predetermined memory. The storage unit 5 stores data necessary for processing by the processing unit 4, and reads or writes data in response to a request from the processing unit 4. The storage unit 5 is realized by a non-volatile storage device such as a hard disk device. The distribution system evaluation apparatus 1 does not necessarily have a stand-alone configuration, and the function may be realized by a client / server system.

入力部2は、必要な入力項目として、変電所名、フィーダ(電力供給設備)名、事故区間および停電時間を入力する。変電所名およびフィーダ名の入力によって、その変電所のフィーダに係る配電系統が特定できるので、ユーザはその配電系統における事故区間を容易に指定することが可能になる。なお、ユーザは、予め事故区間が分かっていれば、変電所名やフィーダ名を入力しなくてもよい。事故区間とは、停止したと想定する配電線のことである。停電時間とは、配電線の停止により停電する時間、すなわち、停電が発生してから復旧するまでの時間のことである。この停電時間によって、電気料金の損失額の算出が可能になる。   The input unit 2 inputs a substation name, a feeder (power supply equipment) name, an accident section, and a power failure time as necessary input items. By inputting the substation name and the feeder name, the distribution system related to the feeder of the substation can be specified, so that the user can easily specify the fault section in the distribution system. If the user knows the accident section in advance, the user does not have to input a substation name or feeder name. An accident section is a distribution line that is assumed to have stopped. The power failure time is a time during which a power failure occurs due to a stop of the distribution line, that is, a time from when a power failure occurs until recovery. The power loss time can be calculated based on the power failure time.

ここで、配電線が停止したと想定する時間帯、季節などの事故発生時期を入力してもよい。この事故発生時期の入力によって経済的損失を高精度に算出できる。また、ユーザが、現状の配電系統ではなく、その配電系統の変更(配電系統や配電設備の新増設工事を含む)を行った場合の経済的損失を知りたいときには、その配電系統の変更内容を入力する。その変更内容とは、例えば、開閉器および配電線の接続構成の変更や、それに伴う需要家への電力供給系統の変更などである。そして、入力部2は、入力したデータを処理部4に渡す。   Here, an accident occurrence time such as a time zone and a season when the distribution line is assumed to be stopped may be input. Economic loss can be calculated with high accuracy by inputting the accident occurrence time. In addition, when the user wants to know the economic loss when the user changes the distribution system (including new expansion of the distribution system and distribution equipment) instead of the current distribution system, input. The change content includes, for example, a change in the connection configuration of the switch and the distribution line, and a change in the power supply system to consumers associated therewith. Then, the input unit 2 passes the input data to the processing unit 4.

表示部3は、入力部2が入力した変電所、フィーダ、事故区間および停電時間に基づいて、処理部4が算出した、電気料金に係る電力会社の経済的損失を受け付けて、表示する。この場合、損出料金そのものを表示してもよいし、各需要家に係る損失額を配電系統図上に表示してもよい。さらに、各需要家に係る損失額の状態を、予め設定された金額範囲に応じて色分けして配電系統図上に表示してもよい。この場合、損失額そのものは、表示してもよいし、表示しなくてもよい。   The display unit 3 receives and displays the economic loss of the electric power company related to the electricity bill calculated by the processing unit 4 based on the substation, feeder, accident section and power failure time input by the input unit 2. In this case, the loss fee itself may be displayed, or the loss amount associated with each customer may be displayed on the distribution system diagram. Furthermore, the state of the loss amount relating to each consumer may be displayed in a color distribution according to a predetermined amount range on the distribution system diagram. In this case, the loss amount itself may or may not be displayed.

処理部4は、図1に示すように、全体制御部41、停電区間特定部42、電力量算出部43、損失料金算出部44、配電構成データ更新部45および建設費算出部46を含んで構成される。全体制御部41は、処理部4全体の処理の流れを制御するものであり、一般にスケジューラまたはカーネルと呼ばれるものである。   As shown in FIG. 1, the processing unit 4 includes an overall control unit 41, a power outage section specifying unit 42, an electric energy calculation unit 43, a loss fee calculation unit 44, a distribution configuration data update unit 45, and a construction cost calculation unit 46. Composed. The overall control unit 41 controls the overall processing flow of the processing unit 4 and is generally called a scheduler or a kernel.

停電区間特定部42は、入力部2が入力した変電所名、フィーダ名および事故区間に従って、記憶部5の配電系統データ51を参照して、停電区間を特定する。配電系統の変更の場合には、その変更内容により配電系統データ51および配電設備データ52を更新したものに従って、停電区間を特定する。   The power outage section specifying unit 42 specifies the power outage section with reference to the distribution system data 51 of the storage unit 5 according to the substation name, feeder name, and accident section input by the input unit 2. In the case of a change of the distribution system, the power failure section is specified in accordance with the update of the distribution system data 51 and the distribution facility data 52 according to the changed contents.

電力量算出部43は、停電区間特定部42が特定した停電区間から、記憶部5の配電設備データ52を参照して、その停電区間に含まれる需要家を特定する。そして、記憶部5の需要家データ53を参照して、各需要家の電力使用量と入力部2が入力した停電時間とから、事故によって各需要家が使用できなくなる電力量(供給支障電力量)を算出する。   The power amount calculation unit 43 refers to the power distribution facility data 52 of the storage unit 5 from the power outage section specified by the power outage section specifying unit 42 and specifies the consumers included in the power outage section. Then, referring to the customer data 53 in the storage unit 5, the amount of power that can be used by each customer due to an accident (the amount of power hindering supply) from the amount of power used by each customer and the power failure time input by the input unit 2. ) Is calculated.

損失料金算出部44は、記憶部5の需要家データ53を参照して、契約種別による単位電力あたりの電気料金(契約条件)と、電力量算出部43が算出した供給支障電力量とから、各需要家に係る電気料金の損失額を算出し、その各需要家の損失額を合計した値を損失料金として出力する。配電系統の変更の場合には、各需要家の損失額の合計値に配電系統の変更に応じた建設費を加えた値を損失料金として出力する。   The loss charge calculation unit 44 refers to the customer data 53 of the storage unit 5 and calculates the electricity charge per unit power (contract condition) according to the contract type and the supply hindering electric energy calculated by the electric energy calculation unit 43. The amount of loss of the electricity charge relating to each consumer is calculated, and a value obtained by summing the amount of loss of each consumer is output as a loss fee. In the case of a change in the distribution system, a value obtained by adding a construction cost corresponding to the change in the distribution system to the total loss value of each customer is output as a loss fee.

配電構成データ更新部45は、配電系統の変更の場合に必要な処理を行う。すなわち、入力部2が入力した配電系統の変更内容に応じて、記憶部5の配電系統データ51および配電設備データ52を更新する。   The power distribution configuration data update unit 45 performs processing necessary for changing the power distribution system. That is, the distribution system data 51 and the distribution facility data 52 in the storage unit 5 are updated according to the change contents of the distribution system input by the input unit 2.

建設費算出部46は、配電系統の変更の場合に必要な処理を行う。すなわち、入力部2が入力した配電系統の変更内容に応じた建設費を、記憶部5の工事費データ55に基づいて算出し、損失料金算出部44に出力する。   The construction cost calculation unit 46 performs processing necessary for changing the distribution system. That is, the construction cost corresponding to the change contents of the distribution system input by the input unit 2 is calculated based on the construction cost data 55 of the storage unit 5 and output to the loss fee calculation unit 44.

≪データの構成≫
記憶部5は、図1に示すように、配電系統データ51、配電設備データ52、需要家データ53、地図データ54および工事費データ55を含んで格納している。
<< Data structure >>
As shown in FIG. 1, the storage unit 5 stores distribution system data 51, distribution facility data 52, customer data 53, map data 54, and construction cost data 55.

配電系統データ51は、例えば、図3に示すように、変電所、フィーダ、配電線および開閉器の接続構成(配電系統の構成)を含む配電系統のデータである。配電系統データ51を参照することにより、変電所およびフィーダが指定されれば、そこから電力の供給を受ける配電線および開閉器の接続構成を特定できる。   For example, as shown in FIG. 3, the distribution system data 51 is data of a distribution system including a connection configuration of a substation, feeder, distribution line, and switch (configuration of the distribution system). By referring to the distribution system data 51, if a substation and a feeder are specified, the connection configuration of the distribution lines and switches that receive power supply from the substation and the feeder can be specified.

配電設備データ52は、配電系統、電柱および需要家の接続構成を含むデータである。配電設備データ52を参照することにより、停止する配電線、開閉器が特定されれば、停電になる電柱および需要家を特定できる。   The distribution facility data 52 is data including a connection configuration of a distribution system, a power pole, and a customer. By referring to the distribution facility data 52, if the distribution line and the switch to be stopped are specified, the power pole and the customer that will be out of power can be specified.

需要家データ53は、契約種別および電力使用量を含むデータである。契約種別とは、需要家が電力会社と交わした契約の種別であり、例えば、単位電力あたりの電気料金[円/kwh]のことをいう。単位電力あたりの電気料金531は、一律固定の料金であってもよいし、季節や時間帯などに応じて変動する料金であってもよい。電力使用量532は、需要家が過去において使用した電力量の実績データである。電力使用量には、例えば、過去数年間に使用した電力量の単位時間あたりの平均値を用意することが考えられる。また、季節や時間帯などの事故発生時期が入力される場合に備えて、その時期ごとの電力使用量の過去数年間における平均値を用意してもよい。   The customer data 53 is data including a contract type and power usage. The contract type is a type of contract that a customer exchanges with an electric power company. For example, the contract type refers to an electric charge [yen / kwh] per unit power. The electricity charge 531 per unit power may be a fixed charge, or may be a charge that varies according to the season or time zone. The power consumption 532 is actual data of the amount of power used by the customer in the past. As the power consumption, for example, it is conceivable to prepare an average value per unit time of the power consumption used in the past several years. Further, in preparation for the case where an accident occurrence time such as a season or a time zone is input, an average value of the power consumption for each time in the past several years may be prepared.

地図データ54は、配電系統データ51および配電設備データ52に対応した地図のデータである。これは、表示部3に地図を表示するために使用される。   The map data 54 is map data corresponding to the distribution system data 51 and the distribution facility data 52. This is used to display a map on the display unit 3.

工事費データ55は、配電系統の変更の場合に必要なデータである。すなわち、配電系統の変更に応じた建設費の算出の基になるデータであり、具体的には、単位距離あたりの配電線の工事費や開閉器の設置工事費が含まれる。   The construction cost data 55 is data necessary for changing the distribution system. That is, it is data that is the basis for calculating construction costs in accordance with changes in the distribution system, and specifically includes construction costs for distribution lines and unit installation costs per unit distance.

≪装置の処理≫
続いて、本発明の実施の形態に係る配電系統評価装置の処理について説明する。
≪Device processing≫
Then, the process of the distribution system evaluation apparatus which concerns on embodiment of this invention is demonstrated.

<現状の配電系統の評価を行う場合の処理>
図2は、現状の配電系統の評価を行う場合の、配電系統評価装置の処理を示すフローチャートである。
<Processing when evaluating the current distribution system>
FIG. 2 is a flowchart showing processing of the power distribution system evaluation apparatus when evaluating the current power distribution system.

最初に、入力部2は、ユーザの操作によって変電所名、フィーダ名、事故区間および停電時間を入力する(ステップS201)。そして、入力部2は、入力した変電所名、フィーダ名、事故区間および停電時間を処理部4に渡す。この場合、入力部2は、時間帯や季節などの事故発生時期を含めて入力し、渡すようにしてもよい。これによれば、その入力した事故発生時期に応じた実績データを電力使用量として用いることによって、別途算出する損失額の精度をよくすることができる。また、入力部2が変電所名およびフィーダ名を入力し、処理部4が記憶部5の配電系統データ51を参照して、その変電所名およびフィーダ名に係る配電系統図を検索し、表示部3がその配電系統図を表示してもよい。これによれば、ユーザは、その表示された配電系統図を見ながら、容易に事故区間の入力を行うことができる。   First, the input unit 2 inputs a substation name, a feeder name, an accident section, and a power failure time by a user operation (step S201). Then, the input unit 2 passes the input substation name, feeder name, accident section, and power failure time to the processing unit 4. In this case, the input unit 2 may input and pass the accident occurrence time such as a time zone or season. According to this, the accuracy of the amount of loss calculated separately can be improved by using the input performance data according to the accident occurrence time as the power consumption. The input unit 2 inputs the substation name and feeder name, and the processing unit 4 refers to the distribution system data 51 in the storage unit 5 to search for and display the distribution system diagram related to the substation name and feeder name. The unit 3 may display the distribution system diagram. According to this, the user can easily input the accident section while looking at the displayed distribution system diagram.

ここで、表示部3に表示される配電系統図について説明する。図4は、配電系統図の表示イメージを示す図である。当初は、図4の中央から左側に示される配電系統図は表示されておらず、変電所名、フィーダ名、事故区間および停電時間の各項目欄が入力可能に設定される。また、変電所名およびフィーダ名が入力されたときに、それに係る配電系統図を表示し、ユーザによる事故区間の指定を、事故区間の項目欄への入力の代わりに、表示された配電系統図上の配電線や開閉器のクリックによって可能にしてもよい。   Here, the distribution system diagram displayed on the display unit 3 will be described. FIG. 4 is a diagram showing a display image of the distribution system diagram. Initially, the distribution system diagram shown on the left side from the center of FIG. 4 is not displayed, and the fields of the substation name, feeder name, accident section, and power failure time are set to be inputable. Also, when the substation name and feeder name are input, the distribution system diagram is displayed, and the specified distribution section is displayed in place of the input to the item section of the accident section by the user. It may be made possible by clicking on the upper distribution line or switch.

次に、処理部4では、まず、停電区間特定部42が、入力部2から渡された変電所名、フィーダ名および事故区間から、その事故区間で事故が発生した場合の停電区間を特定する(ステップS202)。具体的には、記憶部5の配電系統データ51の接続構成を参照して、変電所名、フィーダ名に係る配電系統のうち事故区間の配電線が停止した場合に、電力供給を受けられなくなることによって停電する区間(停電区間)を特定する。   Next, in the processing unit 4, first, the power outage section specifying unit 42 specifies the power outage section when an accident occurs in the accident section from the substation name, feeder name, and accident section passed from the input unit 2. (Step S202). Specifically, with reference to the connection configuration of the distribution system data 51 in the storage unit 5, when the distribution line in the accident section of the distribution system related to the substation name and feeder name stops, the power supply cannot be received. To identify the section where the power failure occurs (power failure section).

図3は、配電系統の構成を示す図である。図3(a)は、現状の構成を示す図であり、図3(b)は、配電線L2が故障で停止した場合の影響を示す図である。図3(a)に示すように、変電所6は、電力供給設備であるフィーダ61、62を備えている。そして、フィーダ61は、配電線L1、開閉器A1、配電線L2、開閉器A2、配電線L3、開閉器A3および配電線L4に接続されている。一方、フィーダ62は、配電線L5、開閉器A4、配電線L6、開閉器A5、配電線L7、開閉器A6および配電線L8に接続されている。開閉器A1ないしA3は閉状態になっており、これによって、フィーダ61から配電線L1ないしL4に電力が供給される。同様に、開閉器A4ないしA6は閉状態になっており、これによって、フィーダ62から配電線L5ないしL8に電力が供給される。さらに、開閉器A7が配電線L3とL7との間に接続されている。この開閉器A7は、通常は開状態になっており、電力の供給を行うことはない。ただし、フィーダ61に係る配電系統またはフィーダ62に係る配電系統に支障が発生した場合には、支障のない配電系統の電力を支障のある配電系統に補給するために、開閉器A7が閉状態になる。   FIG. 3 is a diagram illustrating a configuration of a power distribution system. Fig.3 (a) is a figure which shows the present structure, FIG.3 (b) is a figure which shows the influence when the distribution line L2 stops by failure. As shown in FIG. 3A, the substation 6 includes feeders 61 and 62 which are power supply facilities. And feeder 61 is connected to distribution line L1, switch A1, distribution line L2, switch A2, distribution line L3, switch A3, and distribution line L4. On the other hand, the feeder 62 is connected to the distribution line L5, the switch A4, the distribution line L6, the switch A5, the distribution line L7, the switch A6, and the distribution line L8. The switches A1 to A3 are in a closed state, whereby electric power is supplied from the feeder 61 to the distribution lines L1 to L4. Similarly, the switches A4 to A6 are in a closed state, whereby electric power is supplied from the feeder 62 to the distribution lines L5 to L8. Further, the switch A7 is connected between the distribution lines L3 and L7. The switch A7 is normally in an open state and does not supply power. However, when trouble occurs in the power distribution system related to the feeder 61 or the power distribution system related to the feeder 62, the switch A7 is brought into a closed state in order to replenish the troubled power distribution system with power from the troublesome power distribution system. Become.

この具体例を、図3(b)を用いて説明する。例えば、配電線L2が切断し、その配電線L2を介した電力供給が不可になった場合を想定する。この場合、配電線L2に係る区間は、電力供給はできなくなり、停電区間として特定される。ここで、配電線L2の切断に伴って配電線L3に電力が供給されていないことが検知されると、開閉器A7は、通常の開状態から配電線L7→L3の方向に電力を補給する閉状態になる。これによって、配電線L3およびL4に対しては、一旦電力供給不可になった状態から復旧状態になる。なお、開閉器A7を介した電力補給が行われても、配電線L7およびL8には充分な電力供給が行われるものとする。   A specific example will be described with reference to FIG. For example, the case where the power distribution L2 cut | disconnects and the electric power supply via the power distribution L2 becomes impossible is assumed. In this case, the section related to the distribution line L2 cannot be supplied with power and is specified as a power outage section. Here, when it is detected that power is not supplied to the distribution line L3 along with the disconnection of the distribution line L2, the switch A7 supplies power from the normal open state in the direction of the distribution line L7 → L3. Closed. As a result, the distribution lines L3 and L4 are restored from a state where power supply is once disabled. It is assumed that sufficient power is supplied to the distribution lines L7 and L8 even if power is supplied through the switch A7.

次に、電力量算出部43が、停電区間特定部42によって特定された停電区間および入力部2によって入力された停電時間から、需要家に対する供給に支障が出る電力量(供給支障電力量)を算出する(ステップS203)。具体的には、記憶部5の配電設備データ52の接続構成を参照して、停電区間に含まれる電柱および需要家を特定する。そして、需要家データ53の電力使用量532を参照して、各需要家に対する供給支障電力量を算出する。この場合、停電区間に含まれる需要家の一覧データを表示部3に出力してもよい。それに対して、表示部3は、図4に示すように、電力量算出部43から受けた需要家の一覧データを停電お客さまの欄に表示する。また、各需要家の供給支障電力量を合計して、その合計値を表示部3に出力してもよい。それに対して、表示部3は、図4に示すように、電力量算出部43から受けた合計値を供給支障電力量の欄に表示する。   Next, the power amount calculation unit 43 calculates the amount of power that interferes with the supply to the consumer from the power outage period specified by the power outage section specifying unit 42 and the power outage time input by the input unit 2 (supply hindering power amount). Calculate (step S203). Specifically, with reference to the connection configuration of the distribution facility data 52 in the storage unit 5, the utility pole and the customer included in the power outage section are specified. Then, with reference to the power consumption 532 of the customer data 53, the supply hindrance power amount for each consumer is calculated. In this case, list data of customers included in the power outage section may be output to the display unit 3. On the other hand, as shown in FIG. 4, the display unit 3 displays the customer list data received from the power amount calculation unit 43 in the column of the power outage customer. In addition, the supply hindering electric energy of each consumer may be summed and the total value may be output to the display unit 3. On the other hand, as shown in FIG. 4, the display unit 3 displays the total value received from the power amount calculation unit 43 in the column of supply hindrance power amount.

続いて、損失料金算出部44が、電力量算出部43によって算出された供給支障電力量から、損失料金を算出する(ステップS204)。具体的には、まず、各需要家の供給支障電力量と需要家データ53の単位電力あたりの電気料金531とを掛け合わせて損失額を算出する。次に、各需要家の損失額を合計して、損失料金とする。   Subsequently, the loss fee calculation unit 44 calculates a loss fee from the supply hindrance power amount calculated by the power amount calculation unit 43 (step S204). Specifically, first, the amount of loss is calculated by multiplying each customer's supply-disturbing power amount by the electricity rate 531 per unit power of the customer data 53. Next, the loss amount of each customer is totaled to obtain a loss fee.

そして、損失料金算出部44は、損失料金を表示部3に渡す。これを受けて、表示部3は、その損失料金を表示する(ステップS205)。この場合、損害料金および各需要家の損害額を表形式で示してもよいし、配電系統図の上に損失額の状態を、予め設定された金額範囲ごとに色を変えて表示するようにしてもよい。   Then, the loss fee calculation unit 44 passes the loss fee to the display unit 3. Receiving this, the display unit 3 displays the loss fee (step S205). In this case, the damage fee and the damage amount of each customer may be displayed in a table format, and the loss amount state may be displayed on the distribution system diagram in different colors for each predetermined amount range. May be.

図4および図5は、配電系統図の表示イメージを示す図である。既に説明したように、図の右側に示す変電所名、フィーダ名、事故区間および停電時間の欄は、入力項目欄である。一方、停電区間、供給支障電力量、損失料金および停電お客さまの欄は、出力(表示)項目欄である。ここで、図4は、変電所名およびフィーダ名によって特定される配電系統の全体図が表示部3に表示された状態を示している。そして、拡大ボタンは活性化されているが、縮小ボタンは非活性化されている。そこで、ユーザが入力部2(マウスなど)の操作によって拡大ボタンをクリックすると、図5に示す地図上表示イメージに移行する。この場合、表示部3は、処理部4から記憶部5の地図データ54を受けて、縮尺に応じた地図データとともに配電系統図の拡大イメージを表示する。なお、図5では、拡大ボタンは非活性化されているが、縮小ボタンは活性化されている。そこで、ユーザが入力部2の操作によって縮小ボタンをクリックすると、図4に示す全体表示イメージに移行する。   4 and 5 are diagrams showing display images of the distribution system diagram. As already described, the substation name, feeder name, accident section, and power failure time columns shown on the right side of the figure are input item columns. On the other hand, the blackout section, supply hindering electric energy, loss charge and blackout customer column are output (display) item columns. Here, FIG. 4 shows a state where an overall view of the distribution system specified by the substation name and feeder name is displayed on the display unit 3. The enlarge button is activated, but the reduced button is deactivated. Therefore, when the user clicks on the enlarge button by operating the input unit 2 (such as a mouse), the display image on the map shown in FIG. 5 is displayed. In this case, the display unit 3 receives the map data 54 of the storage unit 5 from the processing unit 4 and displays an enlarged image of the distribution system diagram together with the map data corresponding to the scale. In FIG. 5, the enlarge button is deactivated, but the reduce button is activated. Therefore, when the user clicks the reduction button by operating the input unit 2, the whole display image shown in FIG. 4 is displayed.

<配電系統の変更を想定した評価を行う場合の処理>
図6は、配電系統の変更を想定した評価を行う場合の、配電系統評価装置の処理を示すフローチャートである。ここでは、現状の配電系統の評価を行う場合の処理と重複する部分については最小限必要な説明に留めて、配電系統の変更を想定した評価を行う場合の処理固有の部分について詳細に説明する。
<Processing for evaluation assuming changes in the distribution system>
FIG. 6 is a flowchart showing the processing of the power distribution system evaluation apparatus when the evaluation is performed assuming the change of the power distribution system. Here, only the part that overlaps with the process when evaluating the current distribution system is described as a minimum, and the process-specific part when performing the evaluation assuming the change of the distribution system will be described in detail. .

まず、入力部2は、配電系統の変更内容を入力する(ステップS601)。ここで、配電系統の変更とは、配電線の新設、撤去、ルート変更や開閉器の新設、撤去などをいう。配電線の変更は、開閉器の変更に伴って行われる場合もあるし、開閉器の変更とは無関係に、安全性や経済性などの向上を図るために行われる場合もある。具体的な入力方法としては、例えば、撤去の場合には現状の配電線や開閉器の番号を指定することができる。また、新設やルート変更の場合には、予め現状の配電系統図を表示部3に表示しておいて、ユーザが入力部2(マウスなど)の操作によって、配電線や開閉器を新設したい箇所や配電線の変更ルートを配電系統図上で指定することもできる。この現状の配電系統図による指定は、撤去の場合に適用してもよい。そして、入力部2は、入力した配電系統の変更内容を処理部4に出力する。   First, the input part 2 inputs the change content of a power distribution system (step S601). Here, the change of the distribution system means the new establishment and removal of the distribution line, the route change and the new establishment and removal of the switch. The change of the distribution line may be performed in accordance with the change of the switch, or may be made in order to improve safety and economy regardless of the change of the switch. As a specific input method, for example, in the case of removal, it is possible to specify the current distribution line or switch number. In addition, in the case of new installation or route change, the current distribution system diagram is displayed on the display unit 3 in advance, and the user wants to newly install distribution lines and switches by operating the input unit 2 (such as a mouse) You can also specify the change route of the distribution line on the distribution system diagram. The designation based on the current distribution system diagram may be applied in the case of removal. Then, the input unit 2 outputs the input details of the distribution system change to the processing unit 4.

次に、処理部4の配電構成データ更新部45は、入力部2から入力した配電系統の変更内容に従って、記憶部5の配電系統データ51および配電設備データ52を更新する(ステップS602)。ここで、配電系統データ51は、配電系統の変更内容に従ってそのまま更新する。一方、配電設備データ52は配電系統、電柱および需要家の接続構成であるので、配電系統の変更の結果、配電線と電柱との位置関係が変化したため、安全性や経済性の観点からそれらの接続を見直した方がよい場合に、配電設備データ52の更新が行われる。換言すれば、配電線と電柱との位置関係が変化しない場合や、その位置関係が変化してもそれらの接続を見直す必要がない場合には、配電設備データ52の更新は行われない。なお、この更新処理においては、記憶部5の配電系統データ51および配電設備データ52をそのまま更新してもよいし、現状のデータを残すべく別のデータを新たに生成して保存するようにしてもよい。   Next, the distribution configuration data update unit 45 of the processing unit 4 updates the distribution system data 51 and the distribution facility data 52 of the storage unit 5 in accordance with the change contents of the distribution system input from the input unit 2 (step S602). Here, the power distribution system data 51 is updated as it is according to the change contents of the power distribution system. On the other hand, since the distribution facility data 52 is a connection configuration of the distribution system, the utility pole, and the customer, the positional relationship between the distribution line and the utility pole has changed as a result of the change of the distribution system. When it is better to review the connection, the distribution facility data 52 is updated. In other words, when the positional relationship between the distribution line and the utility pole does not change, or when it is not necessary to review the connection even if the positional relationship changes, the distribution facility data 52 is not updated. In this update process, the distribution system data 51 and the distribution facility data 52 in the storage unit 5 may be updated as they are, or another data is newly generated and stored so as to leave the current data. Also good.

続いて、処理部4の建設費算出部46は、記憶部5の配電系統データ51および配電設備データ52の更新内容に応じた建設費を算出する(ステップS603)。具体的には、記憶部5の工事費データ55に含まれる、単位距離あたりの配電線の工事費や開閉器の設置工事費を用いて、建設費を算出する。そして、算出した建設費を損失料金算出部44に出力する。   Subsequently, the construction cost calculation unit 46 of the processing unit 4 calculates the construction cost according to the update contents of the distribution system data 51 and the distribution facility data 52 in the storage unit 5 (step S603). Specifically, the construction cost is calculated using the construction cost of the distribution line per unit distance and the installation cost of the switch included in the construction cost data 55 of the storage unit 5. Then, the calculated construction cost is output to the loss fee calculation unit 44.

次に、入力部2は、変電所名、フィーダ名、事故区間および停電時間を入力する(ステップS604)。この処理は、図2のステップS201と同様である。そして、処理部4の停電区間特定部42は、入力部2から変電所名、フィーダ名および事故区間を受けて、停電区間を特定する(ステップS605)。この処理は、ステップS602で更新された配電系統データ51を参照して行われる。それ以外は、図2のステップS202と同様である。   Next, the input unit 2 inputs the substation name, feeder name, accident section, and power failure time (step S604). This process is the same as step S201 in FIG. And the blackout section specific | specification part 42 of the process part 4 receives a substation name, a feeder name, and an accident section from the input part 2, and specifies a blackout section (step S605). This process is performed with reference to the distribution system data 51 updated in step S602. The rest is the same as step S202 in FIG.

続いて、電力量算出部43は、停電区間特定部42によって特定された停電区間および入力部2によって入力された停電時間から各需要家に係る供給支障電力量を算出する(ステップS606)。この処理は、ステップS602で更新された配電設備データ52を参照して行われる。それ以外は、図2のステップS203と同様である。さらに、損失料金算出部44は、電力量算出部43によって算出された供給支障電力量および建設費算出部46によって算出された建設費から、損失料金を算出する(ステップS607)。具体的には、まず、各需要家の供給支障電力量と需要家データ53の単位電力あたりの電気料金531とを掛け合わせて損失額を算出する。次に、各需要家の損失額を合計して、その合計値に建設費を加えた値を損失料金とする。   Then, the electric energy calculation part 43 calculates the supply trouble electric energy which concerns on each consumer from the power failure area specified by the power failure area specific | specification part 42, and the power failure time input by the input part 2 (step S606). This process is performed with reference to the distribution facility data 52 updated in step S602. The rest is the same as step S203 in FIG. Further, the loss fee calculation unit 44 calculates a loss fee from the supply trouble power amount calculated by the power amount calculation unit 43 and the construction cost calculated by the construction cost calculation unit 46 (step S607). Specifically, first, the amount of loss is calculated by multiplying each customer's supply-disturbing power amount by the electricity rate 531 per unit power of the customer data 53. Next, the loss amount of each customer is totaled, and the value obtained by adding the construction cost to the total value is defined as the loss fee.

そして、損失料金算出部44は、損失料金を表示部3に渡す。これを受けて、表示部3は、その損失料金を表示する(ステップS608)。この処理は、図2のステップS205と同様である。   Then, the loss fee calculation unit 44 passes the loss fee to the display unit 3. In response to this, the display unit 3 displays the loss fee (step S608). This process is the same as step S205 in FIG.

以上本発明の実施の形態について説明したが、図1に示す配電系統評価装置1内の各部を機能させるために、処理部4で実行されるプログラムをコンピュータにより読み取り可能な記録媒体に記録し、その記録したプログラムをコンピュータに読み込ませ、実行させることにより、本発明の実施の形態に係る配電系統評価装置が実現されるものとする。なお、プログラムをインターネットなどのネットワーク経由でコンピュータに提供してもよいし、プログラムが書き込まれた半導体チップなどをコンピュータに組み込んでもよい。   Although the embodiment of the present invention has been described above, in order to make each part in the distribution system evaluation apparatus 1 shown in FIG. 1 function, a program executed by the processing unit 4 is recorded on a computer-readable recording medium, It is assumed that the distribution system evaluation apparatus according to the embodiment of the present invention is realized by causing the computer to read and execute the recorded program. Note that the program may be provided to the computer via a network such as the Internet, or a semiconductor chip or the like in which the program is written may be incorporated in the computer.

以上説明した本発明の実施の形態によれば、配電系統評価装置1の処理部4が、事故による停電がなければ得られるはずの需要家からの電気料金を、事故が発生した場合の電力会社の損失料金として計算し、表示部3がその損失料金を表示するので、ユーザはその損失料金を考慮しながら配電系統に対する設備投資について効率的に検討することができる。次に、記憶部5の需要家データ53が、一律固定の実績データ(平均値)である電力使用量だけでなく、季節や時間帯など時期ごとの実績データを含むことで、処理部4の電力量算出部43がその時期ごとの電力使用量を用いて事故による供給支障電力量を算出できるので、供給支障電力量の精度がよくなり、ひいては損失料金算出部44が算出する損失料金の精度が高くなる。そして、損失料金算出部44が、配電系統を変更した場合の事故発生による損失料金を、建設費算出部46が配電系統の変更に応じて算出した建設費を含めて計算し、表示部3がその損失料金を表示するので、ユーザは総計された損失料金を考慮しながら配電系統に対する設備投資についてさらに効率的に検討することができる。   According to the embodiment of the present invention described above, the processing unit 4 of the power distribution system evaluation apparatus 1 uses the electricity charge from the consumer that should be obtained if there is no power failure due to the accident, as the power company when the accident occurs. Since the display unit 3 displays the loss fee, the user can efficiently consider the capital investment for the distribution system while considering the loss fee. Next, the customer data 53 of the storage unit 5 includes not only the power consumption which is uniformly fixed actual data (average value) but also actual data for each period such as season and time zone, so that the processing unit 4 Since the power amount calculation unit 43 can calculate the supply hindrance power amount due to an accident using the power consumption for each period, the accuracy of the supply hindrance power amount is improved, and consequently the accuracy of the loss fee calculated by the loss fee calculation unit 44 Becomes higher. The loss fee calculation unit 44 calculates the loss fee due to the occurrence of an accident when the distribution system is changed, including the construction cost calculated by the construction cost calculation unit 46 according to the change of the distribution system, and the display unit 3 Since the loss fee is displayed, the user can more efficiently study the capital investment in the distribution system while taking into account the total loss fee.

≪その他の実施の形態≫
以上、本発明を実施するための最良の形態について説明したが、上記実施の形態は本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明はその趣旨を逸脱することなく変更、改良され得るとともに、本発明にはその等価物も含まれる。例えば、以下のような実施の形態が考えられる。
<< Other embodiments >>
Although the best mode for carrying out the present invention has been described above, the above embodiment is intended to facilitate understanding of the present invention and is not intended to limit the present invention. The present invention can be changed and improved without departing from the gist thereof, and equivalents thereof are also included in the present invention. For example, the following embodiments can be considered.

(1)前記実施の形態では、配電系統における事故区間などを入力して処理を行った結果として、表示部3が供給支障電力量、損失料金および停電お客さまを表示するように記載したが、損失料金算出部44がそれらに加えて事故の影響を受けない各区間における料金収入額や、料金収入額および損失料金から得られる全体の利益または損失を算出し、表示部3がそれらを表示するようにしてもよい。これによれば、事故発生による損失だけでなく事故が発生しても得られる利益を含めて表示されるので、ユーザは配電系統に対する設備投資について総合的な検討を行うことができる。また、損失料金算出部44が各区間の供給支障電力量および損失料金、または料金収入額を算出し、表示部3がそれらを電子地図上に表示してもよい。これによれば、損失が発生する区間および利益が確保される区間の分布状況やそれらの額がビジュアルに表現されることになるので、ユーザは各地域における配電系統の状態を容易に把握することができ、配電系統に対する設備投資について効率的に検討することができる。 (1) In the above embodiment, as a result of processing by inputting an accident section or the like in the power distribution system, the display unit 3 has been described so as to display the supply trouble electric energy, the loss fee, and the power failure customer. In addition to them, the loss fee calculation unit 44 calculates the fee income in each section not affected by the accident, and the total profit or loss obtained from the fee income amount and the loss fee, and the display unit 3 displays them You may do it. According to this, since it is displayed including not only the loss due to the occurrence of the accident but also the profits obtained even if the accident occurs, the user can comprehensively examine the capital investment for the distribution system. In addition, the loss fee calculation unit 44 may calculate the supply hindrance power amount and the loss fee or fee income of each section, and the display unit 3 may display them on the electronic map. According to this, the distribution situation of the section where the loss occurs and the section where the profit is secured and the amount thereof are visually expressed, so the user can easily grasp the state of the distribution system in each region. It is possible to efficiently examine the capital investment for the distribution system.

(2)前記実施の形態では、現状の配電系統の評価と、配電系統の変更を想定した評価とを個別に行って、その評価結果を表示するように記載したが、同一の事故発生条件(事故区間や停電時間など)に関して、現状の配電系統の評価結果(供給支障電力量、損失料金など)と、配電系統の変更を想定した評価結果とを対比して表示してもよい。また、後者には、配電系統の変更に応じた建設費を含めて表示してもよい。これによれば、配電系統の変更の前後における、事故発生時の供給支障電力量、損失料金などが対比して表示されるので、ユーザは配電系統の変更について効率的に検討を行うことができる。 (2) In the above embodiment, it is described that the evaluation of the current distribution system and the evaluation assuming the change of the distribution system are individually performed and the evaluation result is displayed. Regarding the accident section, power failure time, etc.), the current distribution system evaluation results (such as the amount of power hindering supply and loss charges) may be displayed in comparison with the evaluation results assuming a change in the distribution system. Further, the latter may be displayed including the construction cost according to the change of the distribution system. According to this, the amount of power hindering supply at the time of the accident before and after the change of the distribution system, the loss fee, etc. are displayed in comparison, so that the user can efficiently examine the change of the distribution system. .

(3)前記実施の形態では、配電系統の変更を想定した評価の場合に、配電系統の変更に応じた建設費を損失料金に含めて表示するように記載したが、その建設費を損失料金に含めることなく、個別に表示するようにしてもよい。これによれば、配電系統の変更後の停電による損失料金と、配電系統の変更に応じた建設費とを別に表示するので、ユーザは配電系統の変更についてきめ細かく検討を行うことができる。 (3) In the above embodiment, in the case of the evaluation assuming the change of the distribution system, it is described that the construction cost corresponding to the change of the distribution system is included in the loss fee. You may make it display separately, without including. According to this, since the loss fee due to the power failure after the change of the distribution system and the construction cost according to the change of the distribution system are displayed separately, the user can perform detailed examination on the change of the distribution system.

本発明の実施の形態に係る配電系統評価装置の構成を示す図である。It is a figure which shows the structure of the power distribution system evaluation apparatus which concerns on embodiment of this invention. 現状の配電系統の評価を行う場合の、配電系統評価装置の処理を示すフローチャートである。It is a flowchart which shows the process of a power distribution system evaluation apparatus in the case of evaluating the current power distribution system. 変電所、フィーダ、配電線および開閉器の構成を示す図であり、(a)は現状の構成を示し、(b)は配電線が故障で停止した場合の影響を示す。It is a figure which shows the structure of a substation, a feeder, a distribution line, and a switch, (a) shows the present structure, (b) shows the influence at the time of a distribution line stopping by failure. 配電系統図の表示イメージを示す図である。It is a figure which shows the display image of a power distribution system diagram. 配電系統図の地図上表示イメージ(拡大表示イメージ)を示す図である。It is a figure which shows the display image (enlarged display image) on a map of a power distribution system diagram. 配電系統の変更を想定した評価を行う場合の、配電系統評価装置の処理を示すフローチャートである。It is a flowchart which shows the process of a power distribution system evaluation apparatus in the case of performing evaluation supposing the change of a power distribution system.

符号の説明Explanation of symbols

1 配電系統評価装置
2 入力部
3 表示部
4 処理部
41 全体制御部
42 停電区間特定部
43 電力量算出部
44 損失料金算出部
45 配電構成データ更新部
46 建設費算出部
5 記憶部
51 配電系統データ
52 配電設備データ
53 需要家データ
531 単位電力あたりの電気料金(契約条件)
532 電力使用量
54 地図データ
55 工事費データ
DESCRIPTION OF SYMBOLS 1 Distribution system evaluation apparatus 2 Input part 3 Display part 4 Processing part 41 Overall control part 42 Power failure area specific | specification part 43 Electricity amount calculation part 44 Loss charge calculation part 45 Distribution configuration data update part 46 Construction cost calculation part 5 Storage part 51 Distribution system Data 52 Distribution facility data 53 Customer data 531 Electricity charge per unit power (Contract conditions)
532 Electricity consumption 54 Map data 55 Construction cost data

Claims (8)

配電系統において想定される事故による電力会社の損失料金を計算する配電系統評価装置であって、
少なくとも、配電系統の構成を含む配電系統データ、配電系統および需要家の接続構成を含む配電設備データならびに需要家ごとの契約条件および電力使用量を含む需要家データを格納する記憶部と、
事故区間および停電時間を入力する入力部と、
前記入力部によって入力された事故区間から、前記配電系統データに基づいて停電区間を特定する停電区間特定部と、
前記停電区間特定部によって特定された停電区間から、前記配電設備データに基づいて前記停電区間に含まれる需要家を特定し、その特定した需要家ごとに、前記入力部によって入力された停電時間から、当該需要家データの電力使用量に基づいて事故による供給支障電力量を算出する電力量算出部と、
前記電力量算出部によって算出された需要家ごとの供給支障電力量から、当該需要家データの契約条件に基づいて需要家ごとの損失額を算出し、その損失額を合計して損失料金を算出する損失料金算出部と、
前記損失料金算出部によって算出された損失料金を表示する表示部と、
を備えることを特徴とする配電系統評価装置。
A distribution system evaluation device for calculating a loss charge of an electric power company due to an assumed accident in the distribution system,
A storage unit storing at least distribution system data including a configuration of the distribution system, distribution facility data including a connection configuration of the distribution system and the customer, and customer data including contract conditions and power usage for each customer;
An input section for entering the accident section and power outage time;
From the accident section input by the input unit, a power outage section identifying unit that identifies a power outage section based on the power distribution system data,
From the power outage section identified by the power outage section identifying unit, identify the consumers included in the power outage section based on the power distribution equipment data, and for each identified consumer, from the power outage time input by the input unit A power amount calculation unit that calculates a supply hindrance power amount due to an accident based on the power usage amount of the customer data;
Calculate the loss amount for each customer based on the contract condition of the customer data from the supply hindrance power amount for each customer calculated by the power amount calculation unit, and calculate the loss fee by totaling the loss amount A loss fee calculator to
A display unit for displaying the loss fee calculated by the loss fee calculation unit;
A distribution system evaluation device comprising:
前記記憶部に格納された需要家データは、時期ごとの電力使用量をさらに含み、
前記入力部は、事故発生時期をさらに入力し、
前記電力量算出部は、前記需要家ごとの供給支障電力量を算出する場合に、前記入力部によって入力された停電時間および前記入力部によって入力された事故発生時期に応じた電力使用量に基づいて供給支障電力量を算出する
ことを特徴とする請求項1に記載の配電系統評価装置。
The customer data stored in the storage unit further includes power consumption for each period,
The input unit further inputs the accident occurrence time,
The power amount calculation unit, when calculating the supply hindrance power amount for each consumer, based on the power usage amount according to the power failure time input by the input unit and the accident occurrence time input by the input unit The distribution system evaluation device according to claim 1, wherein a supply hindering electric energy is calculated.
前記記憶部は、配電系統の変更に応じた建設費の算出に必要な工事費データをさらに格納し、
前記入力部は、配電系統の変更内容をさらに入力し、
前記配電系統評価装置は、
前記入力部によって入力された配電系統の変更内容に従って、前記記憶部に格納された配電系統データおよび配電設備データを更新する配電構成データ更新部と、
前記入力部によって入力された配電系統の変更内容から、前記工事費データに基づいて前記配電系統の変更に応じた建設費を算出する建設費算出部と、
をさらに備え、
前記損失料金算出部は、前記需要家ごとの損失額を合計した値に、前記建設費算出部によって算出された建設費を加えて損失料金を算出する
ことを特徴とする請求項1または請求項2に記載の配電系統評価装置。
The storage unit further stores construction cost data necessary for calculating the construction cost according to the change of the distribution system,
The input unit further inputs changes of the distribution system,
The power distribution system evaluation device
A distribution configuration data update unit that updates distribution system data and distribution facility data stored in the storage unit according to the change of the distribution system input by the input unit,
From the change contents of the distribution system input by the input unit, a construction cost calculation unit that calculates a construction cost according to the change of the distribution system based on the construction cost data;
Further comprising
The loss fee calculation unit calculates the loss fee by adding the construction cost calculated by the construction cost calculation unit to a value obtained by adding the losses for each of the consumers. 2. Distribution system evaluation apparatus according to 2.
前記記憶部は、前記配電系統データおよび前記配電設備データに対応した地図データをさらに格納し、
前記損失料金算出部は、さらに前記需要家ごとの損失額を区間ごとに合計して区間ごとの損失料金を算出し、
前記表示部は、さらに前記地図データを表示するとともに、前記損失料金算出部によって算出された区間ごとの損失料金を、前記地図データ上の区間ごとに対応させて表示する
ことを特徴とする請求項1ないし請求項3のいずれか一項に記載の配電系統評価装置。
The storage unit further stores map data corresponding to the distribution system data and the distribution facility data,
The loss fee calculation unit further calculates the loss fee for each section by totaling the amount of loss for each consumer for each section,
The display unit further displays the map data, and displays the loss fee for each section calculated by the loss fee calculation unit in association with each section on the map data. The distribution system evaluation apparatus according to any one of claims 1 to 3.
配電系統において想定される事故による電力会社の損失料金を計算する配電系統評価方法であって、
コンピュータが、
少なくとも、配電系統の構成を含む配電系統データ、配電系統および需要家の接続構成を含む配電設備データならびに需要家ごとの契約条件および電力使用量を含む需要家データを格納する記憶部を備え、
事故区間および停電時間を入力する第1のステップと、
前記入力された事故区間から、前記配電系統データに基づいて停電区間を特定する第2のステップと、
前記特定された停電区間から、前記配電設備データに基づいて前記停電区間に含まれる需要家を特定し、その特定した需要家ごとに、前記入力された停電時間から、当該需要家データの電力使用量に基づいて事故による供給支障電力量を算出する第3のステップと、
前記算出された需要家ごとの供給支障電力量から、当該需要家データの契約条件に基づいて需要家ごとの損失額を算出し、その損失額を合計して損失料金を算出する第4のステップと、
前記算出された損失料金を表示する第5のステップと、
を含んで実行することを特徴とする配電系統評価方法。
A distribution system evaluation method for calculating a loss charge of an electric power company due to an assumed accident in the distribution system,
Computer
At least a storage unit for storing distribution system data including the configuration of the distribution system, distribution facility data including the connection configuration of the distribution system and the customer, and customer data including contract conditions and power usage for each customer,
A first step of entering the accident section and power outage time;
A second step of identifying a power outage section based on the distribution system data from the input accident section;
From the identified power outage section, identify the consumers included in the power outage section based on the power distribution equipment data, and for each identified consumer, from the input power outage time, use the power of the customer data A third step of calculating the amount of power hindering supply due to an accident based on the amount;
A fourth step of calculating a loss fee for each consumer based on the contracted conditions of the customer data from the calculated power hindering power supply for each consumer and summing the loss amounts When,
A fifth step of displaying the calculated loss fee;
A distribution system evaluation method characterized by comprising:
前記記憶部に格納された需要家データは、時期ごとの電力使用量をさらに含み、
前記コンピュータは、
前記第1のステップでは、事故発生時期をさらに入力し、
前記第3のステップでは、前記需要家ごとの供給支障電力量を算出する場合に、前記入力された停電時間および前記入力された事故発生時期に応じた電力使用量に基づいて供給支障電力量を算出する
ことを特徴とする請求項5に記載の配電系統評価方法。
The customer data stored in the storage unit further includes power consumption for each period,
The computer
In the first step, the accident occurrence time is further input,
In the third step, when calculating the supply hindrance power amount for each consumer, the supply hindrance power amount is calculated based on the input power outage time and the power usage amount according to the input accident occurrence time. The distribution system evaluation method according to claim 5, wherein the distribution system evaluation method is calculated.
前記記憶部は、配電系統の変更に応じた建設費の算出に必要な工事費データをさらに格納し、
前記コンピュータは、
前記第1のステップの前に、
配電系統の変更内容を入力するステップと、
前記入力された配電系統の変更内容に従って、前記記憶部に格納された配電系統データおよび配電設備データを更新するステップと、
前記入力された配電系統の変更内容から、前記工事費データに基づいて前記配電系統の変更に応じた建設費を算出するステップと、
をさらに含んで実行し、
前記第4のステップでは、前記需要家ごとの損失額を合計した値に、前記算出された建設費を加えて損失料金を算出する
ことを特徴とする請求項5または請求項6に記載の配電系統評価方法。
The storage unit further stores construction cost data necessary for calculating the construction cost according to the change of the distribution system,
The computer
Before the first step,
A step of inputting changes to the distribution system;
Updating the distribution system data and distribution facility data stored in the storage unit according to the input distribution system change content;
Calculating the construction cost according to the change of the power distribution system based on the construction cost data, from the input content of the change of the power distribution system;
And further including
7. The power distribution according to claim 5, wherein, in the fourth step, a loss fee is calculated by adding the calculated construction cost to a value obtained by totaling the loss amount for each consumer. System evaluation method.
前記記憶部は、前記配電系統データおよび前記配電設備データに対応した地図データをさらに格納し、
前記コンピュータは、
前記第4のステップでは、さらに前記需要家ごとの損失額を区間ごとに合計して区間ごとの損失料金を算出し、
前記第5のステップでは、さらに前記地図データを表示するとともに、前記算出された区間ごとの損失料金を、前記地図データ上の区間ごとに対応させて表示する
ことを特徴とする請求項5ないし請求項7のいずれか一項に記載の配電系統評価方法。

The storage unit further stores map data corresponding to the distribution system data and the distribution facility data,
The computer
In the fourth step, the loss amount for each section is further calculated for each section by calculating the loss fee for each section,
In the fifth step, the map data is further displayed, and the calculated loss fee for each section is displayed corresponding to each section on the map data. Item 8. The distribution system evaluation method according to any one of Items 7.

JP2006042937A 2006-02-20 2006-02-20 Distribution system evaluation apparatus and distribution system evaluation method Expired - Fee Related JP4597068B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006042937A JP4597068B2 (en) 2006-02-20 2006-02-20 Distribution system evaluation apparatus and distribution system evaluation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006042937A JP4597068B2 (en) 2006-02-20 2006-02-20 Distribution system evaluation apparatus and distribution system evaluation method

Publications (2)

Publication Number Publication Date
JP2007221975A JP2007221975A (en) 2007-08-30
JP4597068B2 true JP4597068B2 (en) 2010-12-15

Family

ID=38498598

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006042937A Expired - Fee Related JP4597068B2 (en) 2006-02-20 2006-02-20 Distribution system evaluation apparatus and distribution system evaluation method

Country Status (1)

Country Link
JP (1) JP4597068B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103400305A (en) * 2013-07-19 2013-11-20 国家电网公司 Analysis and vacancy processing method for unreasonable-line-loss distribution room
CN105375477A (en) * 2015-11-27 2016-03-02 国网重庆市电力公司电力科学研究院 Rural power distribution network line loss calculation method and system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103972883B (en) * 2014-04-11 2016-05-04 广州供电局有限公司 Closed loop network point selection method and system
CN110045212A (en) * 2019-05-17 2019-07-23 中国电力科学研究院有限公司 A kind of method and system that line loss per unit is evaluated based on electric energy metering device uncertainty

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0454828A (en) * 1990-06-22 1992-02-21 Kyushu Electric Power Co Inc Distribution system facility schedule assisting system
JPH05115125A (en) * 1991-10-18 1993-05-07 Toshiba Corp Distribution system planning device
JPH07227042A (en) * 1994-02-10 1995-08-22 Meidensha Corp Power failure information managing system
JP2005027426A (en) * 2003-07-02 2005-01-27 Tokyo Electric Power Co Inc:The Method of providing instantaneous voltage drop data, method of computing estimated amount of loss, program, and device
JP2006048267A (en) * 2004-08-03 2006-02-16 Chugoku Electric Power Co Inc:The Facility reinforcement plan support system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0454828A (en) * 1990-06-22 1992-02-21 Kyushu Electric Power Co Inc Distribution system facility schedule assisting system
JPH05115125A (en) * 1991-10-18 1993-05-07 Toshiba Corp Distribution system planning device
JPH07227042A (en) * 1994-02-10 1995-08-22 Meidensha Corp Power failure information managing system
JP2005027426A (en) * 2003-07-02 2005-01-27 Tokyo Electric Power Co Inc:The Method of providing instantaneous voltage drop data, method of computing estimated amount of loss, program, and device
JP2006048267A (en) * 2004-08-03 2006-02-16 Chugoku Electric Power Co Inc:The Facility reinforcement plan support system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103400305A (en) * 2013-07-19 2013-11-20 国家电网公司 Analysis and vacancy processing method for unreasonable-line-loss distribution room
CN105375477A (en) * 2015-11-27 2016-03-02 国网重庆市电力公司电力科学研究院 Rural power distribution network line loss calculation method and system

Also Published As

Publication number Publication date
JP2007221975A (en) 2007-08-30

Similar Documents

Publication Publication Date Title
Kurata et al. After-sales service competition in a supply chain: does uncertainty affect the conflict between profit maximization and customer satisfaction?
JP4660281B2 (en) Power trading support system and method, and program
US8751291B2 (en) Economic analysis of grid infrastructure
JP2015064877A (en) Systems and methods for evaluating risks associated with contractual service agreement
JP4597068B2 (en) Distribution system evaluation apparatus and distribution system evaluation method
Geetha et al. Optimal replenishment policy for deteriorating items with time sensitive demand under trade credit financing
JP2017034797A (en) Baseline load estimation device and baseline load estimation program
JP2015042071A (en) Power distribution system facility evaluation device and power distribution system facility evaluation method
Li et al. To share or not to share: the optimal advertising effort with asymmetric advertising effectiveness
JP4261471B2 (en) Distribution system load assumption method and apparatus
JPH11259562A (en) Estimation method and system for settlement of accounts using computer and computer readable recording medium recording settlement-of-accounts estimation program
Zheng et al. Impact of an emergency order opportunity on supply chain coordination
JP2007272825A (en) Power sale support system
JP2005284420A (en) Power resource transaction system and power resource transaction management server
JP6543846B2 (en) Propane gas sales management system
JP2007003358A (en) System, method and program for processing electric energy information
JP5979669B2 (en) Simplified evaluation system for customer economy by gas turbine upgrade
JP2009020674A (en) Electric power sales contract management system
Elkasrawy et al. Positive demand response and multi-hour net benefit test
JP6884115B2 (en) Electricity rate management device for power generation system
JP7262255B2 (en) Monitoring system and simultaneous power equality monitoring method
JP5468097B2 (en) Pension information management program, annuity information management apparatus and annuity information management method
JP2014115736A (en) Sale expansion support system of boiler fuel conversion
JP2012252561A (en) Estimated value calculation device and program
JP7060748B1 (en) Information processing equipment, information processing methods, and programs for building a carbon-free society

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090209

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100713

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100914

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100921

R150 Certificate of patent or registration of utility model

Ref document number: 4597068

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131001

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131001

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees