JP4560167B2 - Variable load device and method of using the same - Google Patents

Variable load device and method of using the same Download PDF

Info

Publication number
JP4560167B2
JP4560167B2 JP2000055566A JP2000055566A JP4560167B2 JP 4560167 B2 JP4560167 B2 JP 4560167B2 JP 2000055566 A JP2000055566 A JP 2000055566A JP 2000055566 A JP2000055566 A JP 2000055566A JP 4560167 B2 JP4560167 B2 JP 4560167B2
Authority
JP
Japan
Prior art keywords
power
capacity
load
resistor
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000055566A
Other languages
Japanese (ja)
Other versions
JP2001242946A (en
Inventor
斉司 川▲崎▼
裕二 中井
幸三 山室
宏之 大見
清二 田中
宏憲 永松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2000055566A priority Critical patent/JP4560167B2/en
Publication of JP2001242946A publication Critical patent/JP2001242946A/en
Application granted granted Critical
Publication of JP4560167B2 publication Critical patent/JP4560167B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control Of Voltage And Current In General (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、電力容量を変化させることができる可変負荷装置およびその使用方法に関する。
【0002】
【従来の技術】
従来から、図8に示すような模擬負荷装置1が、発電機2などの試験のために使用されている。発電機2は、実際の使用状態では複数の需要家A,需要家B,…,需要家Zから成る負荷3に対して電力を供給するけれども、発電機2の製造過程での各種試験などのためには模擬負荷装置1を用いる。模擬負荷装置1は、たとえば抵抗体であり、発電機2の容量に応じた電力を消費する。消費された電力は、熱として大気中に放散される。模擬負荷装置1の容量を大きくすると、発生する熱量も大きくなるので、模擬負荷装置1も大型化してしまう。また、模擬負荷装置1は抵抗体であり、発電機2の出力電圧と定格電力とに対応して抵抗値が決定される。したがって、単なる抵抗体を用いる模擬負荷装置1では、発電機2の容量が異なる場合に兼用することは困難であり、発電機2の容量に応じた模擬負荷装置1を1つ1つ用意しなければならない。また、種々の負荷状態で発電機2の試験を行うためにも、容量の異なる模擬負荷装置1を用意しなければならない。
【0003】
図9は、サイリスタ方式の模擬負荷装置の大略的な構成を示す。サイリスタ方式の模擬負荷装置では、サイリスタ回路を位相角設定回路によって設定される位相角で抵抗体に電力が供給されるように位相制御する。たとえば、負荷に100Vで100Aの電力を供給する場合を想定する。すなわち抵抗体は、100V×100A=10kWの容量を有し、10kWの発電機1の試験に負荷として用いることができるはずである。サイリスタ方式の模擬負荷装置で10kWの発電機2を試験する場合、負荷の容量は10kW以下であることが望ましい。なぜなら、サイリスタ方式では後述するように、瞬間的に発電機2の能力より大きな負荷がかかる可能性があり、発電機2の電圧・周波数がともに低下してしまうおそれがあるからである。そのため、通常、発電機2を試験する場合には、サイリスタ方式で容量が可変であっても、発電機2の容量以下の模擬負荷装置1を用いる。しかも、複数種類の発電機2の試験では、複数の容量の負荷を用いる必要がある。このため、サイリスタ方式の模擬負荷装置も、複数の容量に対応して複数用意しなければならない。
【0004】
図10は、図9に示すサイリスタ方式の模擬負荷装置で負荷の容量を変更可能な原理を示す。サイリスタ回路では、交流電力の全波形のうち、位相角設定回路で設定される位相角に対応する期間は負荷電流を遮断し、位相角に対応する期間が経過してからサイリスタを導通させ、塗りつぶして示すような負荷電流を抵抗体に供給する。たとえば位相角α=90度のときには、0度から180度までの正弦波の半分だけ負荷電流が流れる。位相角αをより大きくすれば、負荷電流が流れる期間が短くなり、容量を小さくすることができる。位相角αをより小さくすれば、負荷電流が流れる期間が長くなり、容量を大きくすることができる。
【0005】
【発明が解決しようとする課題】
図9に示すようなサイリスタ方式の模擬負荷装置は、サイリスタ回路の位相制御によって、1台で複数の負荷容量を実現可能である。しかしながら、たとえば図10でα=90度の場合について示すように、負荷電流が流れる期間は半分でも、発電機としては180度分の負荷電流を供給し得るように、負荷容量の2倍が必要となる。このように、図9に示すようなサイリスタ方式の模擬負荷装置では、大容量の負荷で小容量を模擬することが可能なように見えても、電源容量の問題があり、大容量の模擬負荷装置で小容量の発電機の試験のために連続した負荷変化を模擬することは実質的には不可能である。
【0006】
図8に示すような模擬負荷装置1で、数10本の負荷抵抗を内蔵し、それぞれに対応するスイッチのON/OFFによって負荷抵抗の容量を段階的に変化させる方式も考えられる。しかしながら、このような方式では負荷の変化は段階的となり、細かな負荷変化を模擬することは不可能である。
【0007】
さらに、図8に示す模擬負荷装置1や図9に示すサイリスタ方式の模擬負荷装置5は、発電機2の試験のためにのみしか使用していない。このため需要が限られ、量産化によるコスダウンを図ることも困難である。
【0008】
本発明の目的は、種々の状態で負荷の模擬などを行うことができる可変負荷装置およびその使用方法を提供することである。
【0009】
【課題を解決するための手段】
本発明は、3相交流電力を出力する交流電源の負荷となる抵抗体と、
交流電源の各相と抵抗体との間に設けられ、交流電源から抵抗体に供給される電力を各相毎にスイッチング可能なスイッチング素子と、
交流電源から抵抗体に供給される電力を計測する電力計測手段と、
負荷となる容量を設定する容量設定手段と、
電力計測手段によって計測された電力と容量設定手段によって設定された容量とを比較し、電力計測手段によって計測される電力が、容量設定手段に設定される容量に一致するように、スイッチング素子をPWM制御する制御手段とを含むことを特徴とする可変負荷装置である。
【0010】
本発明に従えば、交流電源と負荷となる抵抗体との間にはスイッチング素子が設けられ、制御手段によってPWM制御が行われる。制御手段は、容量設定手段に設定される容量値の電力が抵抗体に供給されるように、計測手段の計測結果に基づいてスイッチング素子を制御する。スイッチング素子による電力調整がPWM制御によって行われるので、負荷側と電源側の容量を同じにすることができ、抵抗体の電力容量を上限とする範囲で、負荷の容量を変更することができる。
【0011】
さらに本発明は、3相交流電力を出力する交流電源の負荷となる抵抗体と、
交流電源の各相と抵抗体との間に設けられ、交流電源から抵抗体に供給される電力を各相毎にスイッチング可能なスイッチング素子と、
交流電源から抵抗体に供給される電力を計測する電力計測手段と、
負荷となる容量を設定する容量設定手段と、
電力計測手段によって計測された電力と容量設定手段によって設定された容量とを比較し、電力計測手段によって計測される電力が、容量設定手段に設定される容量に一致するように、スイッチング素子をPWM制御する制御手段とを含む可変負荷装置を、
電力供給装置を試験するための模擬負荷として使用することを特徴とする可変負荷装置の使用方法である。
【0012】
本発明に従えば、スイッチング素子によるPWM制御によって抵抗体で消費する電力を変更し、負荷の容量を変更することができるので、発電機などの模擬負荷として用いるときに、発電機として必要な電源容量を増大させることなく容易に小容量の負荷を実現することができる。
【0013】
さらに本発明は、3相交流電力を出力する交流電源の負荷となる抵抗体と、
交流電源の各相と抵抗体との間に設けられ、交流電源から抵抗体に供給される電力を各相毎にスイッチング可能なスイッチング素子と、
交流電源から抵抗体に供給される電力を計測する電力計測手段と、
負荷となる容量を設定する容量設定手段と、
電力計測手段によって計測された電力と容量設定手段によって設定された容量とを比較し、電力計測手段によって計測される電力が、容量設定手段に設定される容量に一致するように、スイッチング素子をPWM制御する制御手段とを含む可変負荷装置を、
商用電力系統と自家発電設備とを併用する際の逆潮防止用として使用することを特徴とする可変負荷装置の使用方法である。
【0014】
本発明に従えば、可変負荷装置は、抵抗体で消費する電力をスイッチング素子のPWM制御で、容量設定手段に設定する容量に従って容易に変更することができる。このような可変負荷装置を商用電力系統と自家発電設備とを併用する際に用い、自家発電設備からの電力が過剰になって商用電力系統側に流出する逆潮流が生じようとするときに、負荷の容量を増大し、過剰な電力を吸収して逆潮流を有効に防止することができる。
【0015】
図1は、本発明の実施の一形態としての可変負荷装置10の概略的な構成を示す。可変負荷装置10は、制御部11によって設定される容量で、発電機12の模擬負荷装置として利用することができる。可変負荷装置10には、制御部11のほかに、抵抗体としての負荷13と、交流電力調整機14と、負荷電流検出用の変流器15と、負荷電圧検出用の変圧器16と、変流器15および変圧器16からの検出出力に基づいて、電流計測および電圧計測をそれぞれ行い、電圧と電流との積として電力値を算出する演算部17とが含まれる。制御部11は、演算部17が算出する電力値と、外部入力信号端子18を介して外部のコンピュータ装置などから与えられる容量値とを比較し、演算部17で算出される電力値が外部から入力される容量値と一致するように、交流電力調整機14を制御するための入力信号を与える。
【0016】
図2は、図1に示す交流電力調整機14の内部構成を示す。PWM制御回路20は、スイッチング素子であって、絶縁ゲートバイポーラトランジスタ(Insulated Gate Bipolar Transistor)であるIGBT21,22,23,24,25,26の各ゲート電極を駆動し、負荷13に対して供給する電力のパルス幅変調(PWM)制御を行う。PWM制御回路20が制御を行うための指令は、図1の制御部11から与えられる。図1では説明の便宜上簡略化して示すけれども、本実施形態の可変負荷装置10は、U,V,W相から成る3相交流電力に対して可変な負荷となる。負荷13と3相の交流電源U,V,W相配線との間には、それぞれ一対のIGBT21,22;23,24;25,26が介在し、負荷13に供給される負荷電流をPWMでスイッチング制御する。本実施形態では、スイッチング素子としてIGBT21〜26を用いているので、高速でスイッチングして負荷容量連続的に変化させることができる。なお、スイッチング素子としては、ゲートターンオンサイリスタ(GTO)など、他の素子を用いることもできる。また、3相の全部でスイッチングするのではなく、2相でスイッチングしても、同様の効果を得ることができる。
【0017】
図3は、図2に示すようなPWM制御で、負荷13の容量が電源側に対して増大しないことを示す。PWM制御では、仮に負荷13に対して100Vの電圧で100Aの電流が供給され、電源の電圧が200Vであるとすると、電源側での電流は50Aとなり、変成器作用をもっていることが示されている。すなわち、PWM制御を行えば、図9に示すようなサイリスタ方式とは異なり、電源側の電流は、電圧に容量を換算した電流となり、負荷側よりも電源側の電圧が高いときには電流を小さくすることができる点で大きく異なっている。
【0018】
図4は、図7に示すような模擬負荷装置1を、スイッチで複数の容量に切換える場合を(a)で、本実施形態のようにPWM制御を用いて容量を連続的に変更する場合を(b)で比較して示す。(a)に示すようなスイッチ切換式でも、外部入力信号に基づいて負荷の大きさを切換えることは可能であるけれども、出力は段階的にしか変化させることができない。また、機械的なスイッチを用いるときには切換速度が遅くなってしまう。サイリスタのようなスイッチング素子を用いて切換えを行えば、切換速度を速めることはできるけれども、段差を小さくして切換えの段数を多くしようとすれば、多くのスイッチング素子を必要としてしまう。(b)に示すように、PWM制御を用いれば、連続的な出力変化が可能となり、(a)に示すような段階的な負荷変動となるのを回避することができる。
【0019】
図5は、3相交流の1つの相について、図9に示すようなサイリスタ回路6による位相制御を行う場合を(a)に示し、本実施形態のようなPWM制御を行う場合を(b)に示す。サイリスタによる位相制御の場合、電圧(電流)が急激に立上がる部分があり、波形は高調波を含んだ形になる。また、他の相でサイリスタが導通するときには、その影響が逆極性側に現れる。一方(b)に示すPWM制御では、交流電源の周波数に比べて非常に短い周期でスイッチングを繰返し、電線のインダクタンス分やリアクタンス分などによって平滑化され、波形は高調波をほどんど含まなく、元の電源電圧波形と近くなる。たとえば、スイッチングの周波数は16kHz程度である。
【0020】
一般に、電気設備を使用することによって発生する高調波電流の抑制が求められている。通産省・資源エネルギ庁では、社団法人日本電気協会の電気用品調査委員会の高調波専門部会が検討した結果に基づいて、平成6年5月26日付で「家電・汎用品高調波抑制対策ガイドライン」、「高圧又は、特別高圧で受電する需要家の高調波抑制対策ガイドライン」を制定している。このガイドラインで、電圧形PWM制御や電流形PWM制御を用いる自励3相ブリッジ回路や自励単相ブリッジ回路では、換算係数Kが0となり、高調波発生機器としての等価容量が0となって高調波を発生しない機器とみなせることが示されている。このようにPWM制御の場合には、電圧(電流)は連続変化し、高調波が発生しない。このため高調波対策は不要である。次の表1は、高調波ガイドラインのうちで、自励単相ブリッジと、サイリスタ方式を用いる交流電力調整装置との部分を抽出して示す。
【0021】
【表1】

Figure 0004560167
【0022】
図6は、図8に示すサイリスタ方式の模擬負荷装置と、本実施形態の可変負荷装置10とで、入力と出力との間の電流および電圧の波形の違いを比較して示す。図6(a)は、サイリスタによる位相制御での、入力波形を示す。細い実線は入力電圧Vinの波形を示し、太い実線は入力電流Iinの波形を示す。入力電圧Vinは正弦波の波形であるけれども、入力電流Iinは、設定された位相角だけ遅れてから急激に立上がる波形である。図6(b)に示すように、出力電圧Voutと出力電流Ioutの波形は、(a)に示す入力電流Iinの波形に対応し、設定された位相角だけ遅れてから急激に立上がる波形となる。このようなサイリスタ制御では、負荷に供給される電力は、1周期間で積分すれば小さくなるけれども、瞬間的には大きくなる。このため、電源の容量は位相角の大きな所に負荷の定格容量をとるほど、大きな容量を必要とする。位相角が90度のところで定格電流をとるとすると、電源容量は負荷容量の2倍必要となる。
【0023】
図6(c)は、PWM制御の場合の入力波形を示す。細い実線は入力電圧Vinの波形を示し、太い実線は入力電流Iinの波形を示す。PWM制御では、入力電圧Vinの波形は変わらず、負荷容量に応じて入力電流Iinの振幅が変化する。図6(d)は、PWM制御の場合の出力波形を示す。出力波形では、負荷容量に応じて、出力電圧Voutと出力電流Ioutの振幅が変化するけれども、波形は変化しない。すなわちPWM制御の場合、直接電力を調整しているため、出力電圧Voutの低いところで負荷の定格電流をとっても、電源から流れる入力電流Iinは電源電圧Vinに容量換算した電流となる。
【0024】
図7は、本発明の実施の他の形態の構成を示す。本実施形態では、図1に示す可変負荷装置10を、商用電力系統30と自家発電設備31とを併用する際の逆潮防止用に使用する。商用電力系統30と自家発電設備31とを併用することによって、信頼性が高い電力供給を行うことができるけれども、使用する負荷32の容量が変動し、自家発電設備31の発電量が負荷32で使用する電力量より大きくなってしまう場合が有り得る。自家発電設備31の発電量が過剰になると、商用電力系統30側に流出するおそれがある。このような逆潮流は商用電力系統30にとって好ましくないので、厳重に注意して避ける必要がある。本実施形態の可変負荷装置10を接続し、自家発電設備30からの発電電力が過剰になるときには、過剰分を消費させて、逆潮流を防ぐことができる。逆潮流となる過剰分の消費は、たとえば自家発電設備30の電力の超過分を表すデータを外部入力信号端子18を介して図1の制御部11に入力し、交流電力調整機14でのPWM制御で、過剰分を吸収させることで行うことができる。また、商用電力系統30側に流出しようとする電力を直接測定し、その電力が0になるように制御部11に対してフィードバックを行って、逆潮流を防ぐようにすることもできる。
【0025】
【発明の効果】
以上のように本発明によれば、交流電源から負荷に供給する電力を、スイッチング素子のPWM制御によって、容量設定手段に設定された値と一致するように制御することができるので、1つの可変負荷装置で多くの負荷容量を実現することができる。負荷容量の変化は、スイッチング素子のPWM制御によって行うので、サイリスタによる位相角制御の場合のような実質的に容量が増大する問題はなく、負荷容量の変更も容易に行うことができる。
【0026】
さらに本発明によれば、発電機などの発電設備を試験する際に用いる模擬負荷装置としてPWM制御によって負荷容量を変更することができる可変負荷装置を用いるので、発電機などに実質的な電力容量の増大を要求することなく、小容量の負荷を実現することができる。また、容量設定手段に設定する値に従って負荷容量を変えることができるので、発電設備の負荷の需要の変化のパターンを種々設定して、発電設備の試験を行うことができる。
【0027】
さらに本発明によれば、PWM制御で負荷容量を容易に変化させることができる可変負荷装置を商用電力系統と自家発電設備とを併用する際の逆潮防止用として使用するので、自家発電設備の発電能力が増大して逆潮が生じようとする際に、可変負荷装置の負荷容量を増大させて過剰な電力を吸収し、逆潮流を有効に防止することができる。
【図面の簡単な説明】
【図1】本発明の実施の一形態の可変負荷装置10の概略的な電気的構成を示すブロック図である。
【図2】図1の交流電力調整機14の概略的な構成を示すブロック図である。
【図3】本実施形態で、負荷側と電源側との電力容量の関係を示す図である。
【図4】従来の多段式の切換えによる容量変化と、本実施形態の容量変化とを比較して示すグラフである。
【図5】従来のサイリスタ制御による電圧波形に比べて、本実施形態によるPWM制御による電圧波形で高調波が改善されている状態を示すグラフである。
【図6】従来からのサイリスタ制御の場合の入出力波形と本実施形態のPWM制御の入出力波形とを比較して示すグラフである。
【図7】本発明の実施の他の形態として、図1に示す可変負荷装置10を逆潮防止に使用する例を示すブロック図である。
【図8】模擬負荷装置を用いて発電機の試験を行う状態を示す簡略化したブロック図である。
【図9】 サイリスタ方式の模擬負荷装置の大略的な構成を示す図である。
【図10】 図9のサイリスタ方式の模擬負荷装置で位相制御によって負荷容量を変更する状態を示す波形図である。
【符号の説明】
10 可変負荷装置
11 制御部
12 発電機
13 負荷部
14 交流電力調整機
17 演算部
18 外部入力信号端子
20 PWM制御回路
21〜26 IGBT
30 商用電力系統
31 自家発電設備[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a variable load device capable of changing power capacity and a method of using the same.
[0002]
[Prior art]
Conventionally, a simulated load device 1 as shown in FIG. 8 has been used for testing the generator 2 and the like. The generator 2 supplies power to a load 3 composed of a plurality of consumers A, consumers B,..., A consumer Z in an actual usage state, but various tests in the manufacturing process of the generator 2 are performed. For this purpose, the simulated load device 1 is used. The simulated load device 1 is a resistor, for example, and consumes electric power according to the capacity of the generator 2. The consumed power is dissipated as heat into the atmosphere. When the capacity of the simulated load device 1 is increased, the amount of heat generated is also increased, so that the simulated load device 1 is also increased in size. The simulated load device 1 is a resistor, and the resistance value is determined in accordance with the output voltage of the generator 2 and the rated power. Therefore, it is difficult for the simulated load device 1 using a simple resistor to be combined when the capacity of the generator 2 is different, and the simulated load device 1 corresponding to the capacity of the generator 2 must be prepared one by one. I must. Moreover, in order to test the generator 2 under various load conditions, the simulated load device 1 having different capacities must be prepared.
[0003]
Figure 9 illustrates a generally configuration of a simulated load equipment of the thyristor type. The simulated load equipment of the thyristor type, phase control so that the power resistor is supplied with a phase angle that is set by the phase angle setting circuits thyristor circuits. For example, it is assumed that 100 A of power is supplied to the load at 100V. That resistor has a capacity of 100 V × 100A = 10 kW, it should be able to use as a load to the test of the generator 1 of 10 kW. When testing simulates the load equipment of 10kW generator 2 of thyristor type, it is desirable that the capacitance of the load is less than 10kW. This is because in the thyristor method, as will be described later, there is a possibility that a load larger than the capacity of the generator 2 may be applied instantaneously, and both the voltage and frequency of the generator 2 may be reduced. Therefore, normally, when testing the generator 2, even if the capacity is variable by the thyristor method, the simulated load device 1 having a capacity equal to or less than the capacity of the generator 2 is used. Moreover, it is necessary to use loads having a plurality of capacities in the test of the plurality of types of generators 2. Therefore, the simulated load equipment of the thyristor type must also be more prepared corresponding to the plurality of capacitors.
[0004]
Figure 10 shows the principle capable of changing the capacitance of the load in the simulated load equipment of the thyristor type shown in Figure 9. The thyristor circuits, conduction of all the waveform of the AC power, the period corresponding to the phase angle to be set by the phase angle setting circuitry shuts off the load current, the thyristor after the elapse of a period corresponding to the phase angle Then, a load current as shown by being filled is supplied to the resistor. For example, when the phase angle α = 90 degrees, the load current flows by half of the sine wave from 0 degrees to 180 degrees. If the phase angle α is further increased, the period during which the load current flows is shortened, and the capacity can be reduced. If the phase angle α is made smaller, the period during which the load current flows becomes longer and the capacity can be increased.
[0005]
[Problems to be solved by the invention]
Simulated load equipment thyristor system as shown in FIG. 9, the phase control of the thyristor circuits, it is possible to realize a plurality of load capacitance per unit. However, for example, as shown for the case of alpha = 90 degrees in Figure 10, the period during which the load current flows even half way is as a power generator capable of supplying the load current of 180 degrees, twice the load capacity Is required. Thus, in the simulated load equipment thyristor method shown in FIG. 9, also seem to be able to simulate a small capacity load of large capacity, there is the power capacity problems, large-capacity It is virtually impossible to simulate continuous load changes for testing small capacity generators with simulated load devices.
[0006]
In the simulated load device 1 as shown in FIG. 8, a system in which several tens of load resistors are built in and the capacity of the load resistors is changed stepwise by turning on / off the corresponding switches. However, in such a system, the load change is stepwise, and it is impossible to simulate a fine load change.
[0007]
Further, the simulated load device 1 shown in FIG. 8 and the thyristor type simulated load device 5 shown in FIG. 9 are used only for testing the generator 2. Therefore demand limited, it is difficult to reduce the cost reduction due to mass production.
[0008]
An object of the present invention is to provide Hisage variable load device and methods of use thereof can be conducted mock loads in various states.
[0009]
[Means for Solving the Problems]
The present invention provides a resistor serving as a load of an AC power source that outputs three-phase AC power ;
A switching element provided between each phase of the AC power source and the resistor, and capable of switching the power supplied from the AC power source to the resistor for each phase ;
A power measuring means for measuring the power supplied to the AC power supply or al resistor antibodies,
Capacity setting means for setting the capacity to be a load;
The power measured by the power measuring means is compared with the capacity set by the capacity setting means, and the switching element is PWMed so that the power measured by the power measuring means matches the capacity set by the capacity setting means. And a control unit that controls the variable load device.
[0010]
According to the present invention, the switching element is provided between the AC power source and the resistor serving as a load, and PWM control is performed by the control means. The control unit controls the switching element based on the measurement result of the measurement unit so that the electric power having the capacitance value set in the capacitance setting unit is supplied to the resistor. Since the power adjustment by the switching element is performed by PWM control, the capacity on the load side and the power supply side can be made the same, and the capacity of the load can be changed within the range where the power capacity of the resistor is the upper limit.
[0011]
The present invention includes a resistor as a load of an AC power source for outputting the three-phase AC power,
A switching element provided between each phase of the AC power source and the resistor, and capable of switching the power supplied from the AC power source to the resistor for each phase ;
A power measuring means for measuring the power supplied to the AC power supply or al resistor antibodies,
Capacity setting means for setting the capacity to be a load;
The power measured by the power measuring means is compared with the capacity set by the capacity setting means, and the switching element is PWMed so that the power measured by the power measuring means matches the capacity set by the capacity setting means. A variable load device including control means for controlling,
The variable load device is used as a simulated load for testing the power supply device.
[0012]
According to the present invention, the power consumed by the resistor can be changed by the PWM control by the switching element, and the capacity of the load can be changed. Therefore, when using as a simulated load such as a generator, a power source necessary for the generator A small-capacity load can be easily realized without increasing the capacity.
[0013]
Furthermore, the present invention provides a resistor serving as a load of an AC power source that outputs three-phase AC power ;
A switching element provided between each phase of the AC power source and the resistor, and capable of switching the power supplied from the AC power source to the resistor for each phase ;
A power measuring means for measuring the power supplied to the AC power supply or al resistor antibodies,
Capacity setting means for setting the capacity to be a load;
The power measured by the power measuring means is compared with the capacity set by the capacity setting means, and the switching element is PWMed so that the power measured by the power measuring means matches the capacity set by the capacity setting means. A variable load device including control means for controlling,
This is a method for using a variable load device, characterized in that it is used for preventing a reverse tide when a commercial power system and a private power generation facility are used in combination.
[0014]
According to the present invention, the variable load device can easily change the power consumed by the resistor according to the capacity set in the capacity setting means by PWM control of the switching element. When such a variable load device is used when the commercial power system and the private power generation facility are used in combination, when the power from the private power generation facility is excessive and the reverse power flow that flows out to the commercial power system side is about to occur, The capacity of the load can be increased and excess power can be absorbed to prevent reverse power flow effectively.
[0015]
FIG. 1 shows a schematic configuration of a variable load device 10 as an embodiment of the present invention. The variable load device 10 has a capacity set by the control unit 11 and can be used as a simulated load device for the generator 12. The variable load device 1 0, in addition to the control unit 11, and the load 1 3 as a resistor, an AC power regulator 14, a current transformer 15 for load current detection transformer for the load voltage detected 16 and a calculation unit 17 that performs current measurement and voltage measurement based on detection outputs from the current transformer 15 and the transformer 16 and calculates a power value as a product of the voltage and the current, respectively. The control unit 11 compares the power value calculated by the calculation unit 17 with a capacitance value given from an external computer device or the like via the external input signal terminal 18, and the power value calculated by the calculation unit 17 is externally supplied. An input signal for controlling the AC power adjuster 14 is provided so as to coincide with the input capacitance value.
[0016]
FIG. 2 shows an internal configuration of the AC power regulator 14 shown in FIG. The PWM control circuit 20 is a switching element and drives each gate electrode of IGBTs 21, 22, 23, 24, 25, 26 which are insulated gate bipolar transistors, and supplies the gate electrode 13 to the load 13. Power pulse width modulation (PWM) control is performed. A command for the PWM control circuit 20 to perform control is given from the control unit 11 in FIG. Although shown in a simplified manner in FIG. 1 for convenience of explanation, the variable load device 10 of the present embodiment is a load that is variable with respect to three-phase AC power composed of U, V, and W phases. Load 13 and three-phase AC power supply U, V, between the W-phase wiring, each of the pair of IGBT21,22; 23,24; interposed is 25, the load current supplied to the load 13 by PWM Control switching. In the present embodiment, because of the use of IGBT21~26 as switching elements, and switching at a high speed, it is Rukoto continuously changes the load capacitance. Note that other elements such as a gate turn-on thyristor (GTO) can be used as the switching element. Moreover, the same effect can be acquired even if it switches by two phases instead of switching by all three phases.
[0017]
FIG. 3 shows that the capacity of the load 13 does not increase with respect to the power supply side in the PWM control as shown in FIG. In PWM control, if a current of 100 A is supplied to the load 13 at a voltage of 100 V and the voltage of the power supply is 200 V, the current on the power supply side is 50 A, indicating that it has a transformer action. Yes. That is, if PWM control is performed, unlike the thyristor system as shown in FIG. 9, the current on the power supply side becomes a current obtained by converting the capacity into a voltage, and the current is reduced when the voltage on the power supply side is higher than the load side. It is very different in that it can.
[0018]
FIG. 4A shows a case where the simulated load device 1 as shown in FIG. 7 is switched to a plurality of capacities with a switch. FIG. 4 shows a case where the capacities are continuously changed using PWM control as in this embodiment. Comparison is shown in (b). Even with the switch switching type as shown in (a), the magnitude of the load can be switched based on the external input signal, but the output can be changed only in steps. Further, when a mechanical switch is used, the switching speed becomes slow. If switching is performed using a switching element such as a thyristor, the switching speed can be increased. However, if the number of switching stages is increased by reducing the level difference, a large number of switching elements are required. As shown in (b), when PWM control is used, a continuous output change is possible, and it is possible to avoid a stepwise load fluctuation as shown in (a).
[0019]
FIG. 5A shows a case where phase control by the thyristor circuit 6 as shown in FIG. 9 is performed for one phase of three-phase alternating current, and FIG. 5B shows a case where PWM control as in this embodiment is performed. Shown in In the case of phase control by a thyristor, there is a portion where the voltage (current) rises rapidly, and the waveform has a form including harmonics. Further, when the thyristor conducts in another phase, the influence appears on the reverse polarity side. On the other hand, in the PWM control shown in (b), switching is repeated with an extremely short period compared to the frequency of the AC power supply, and smoothed by the inductance and reactance of the wire, and the waveform contains almost no harmonics. The power supply voltage waveform becomes close. For example, the switching frequency is about 16 kHz.
[0020]
In general, there is a demand for suppression of harmonic currents generated by using electrical equipment. The Ministry of International Trade and Industry's Agency for Natural Resources and Energy, based on the results of a study by the Harmonics Subcommittee of the Electrical Appliances Research Committee of the Japan Electric Association, dated May 26, 1994 "Guidelines for Suppressing Harmonics for Home Appliances and General-purpose Products" , “Guidelines for Harmonic Suppression for Consumers Receiving Power at High Voltage or Extra High Voltage” have been established. In this guideline, in the self-excited three-phase bridge circuit and the self-excited single-phase bridge circuit using the voltage type PWM control and the current type PWM control, the conversion coefficient K is 0, and the equivalent capacity as a harmonic generator is 0. It is shown that it can be regarded as a device that does not generate harmonics. Thus, in the case of PWM control, the voltage (current) continuously changes and no harmonics are generated. For this reason, measures against harmonics are not required. Table 1 below shows extracted portions of the self-excited single-phase bridge and the AC power adjustment device using the thyristor method in the harmonic guideline.
[0021]
[Table 1]
Figure 0004560167
[0022]
FIG. 6 shows a comparison of current and voltage waveform differences between input and output in the thyristor type simulated load device shown in FIG. 8 and the variable load device 10 of the present embodiment. FIG. 6A shows an input waveform in the phase control by the thyristor. The thin solid line shows the waveform of the input voltage Vin, and the thick solid line shows the waveform of the input current Iin. Although the input voltage Vin is a sine wave waveform, the input current Iin is a waveform that rises rapidly after being delayed by a set phase angle. As shown in FIG. 6B, the waveforms of the output voltage Vout and the output current Iout correspond to the waveform of the input current Iin shown in FIG. 6A, and are waveforms that rise rapidly after being delayed by the set phase angle. Become. In such thyristor control, the power supplied to the load becomes small if integrated during one period, but instantaneously becomes large. For this reason, the capacity | capacitance of a power supply requires large capacity | capacitance, so that the rated capacity | capacitance of load is taken in the place where a phase angle is large. If the rated current is taken when the phase angle is 90 degrees, the power source capacity is required to be twice the load capacity.
[0023]
FIG. 6C shows an input waveform in the case of PWM control. The thin solid line shows the waveform of the input voltage Vin, and the thick solid line shows the waveform of the input current Iin. In PWM control, the waveform of the input voltage Vin does not change, and the amplitude of the input current Iin changes according to the load capacity. FIG. 6D shows an output waveform in the case of PWM control. In the output waveform, the amplitudes of the output voltage Vout and the output current Iout change according to the load capacitance, but the waveform does not change. That is, in the case of PWM control, since the power is directly adjusted, the input current Iin flowing from the power supply is a current converted to the power supply voltage Vin even when the rated current of the load is taken at a low output voltage Vout.
[0024]
FIG. 7 shows a configuration of another embodiment of the present invention. In the present embodiment, the variable load device 10 shown in FIG. 1 is used for preventing a reverse tide when the commercial power system 30 and the private power generation facility 31 are used in combination. Although the commercial power system 30 and the private power generation facility 31 can be used together to provide highly reliable power supply, the capacity of the load 32 to be used varies, and the power generation amount of the private power generation facility 31 is the load 32. There may be a case where it becomes larger than the amount of power used. If the power generation amount of the private power generation facility 31 is excessive, there is a risk that it will flow out to the commercial power system 30 side. Such a reverse power flow is not preferable for the commercial power system 30 and must be avoided with great care. When the variable load device 10 of the present embodiment is connected and the generated power from the private power generation facility 30 becomes excessive, the excess amount can be consumed to prevent reverse power flow. For the consumption of the excess amount that becomes a reverse power flow, for example, data representing the excess amount of the electric power of the private power generation facility 30 is input to the control unit 11 of FIG. It can be performed by absorbing excess by control. Further, it is also possible to directly measure the power that is about to flow out to the commercial power system 30 side and feed back to the control unit 11 so that the power becomes 0, thereby preventing reverse power flow.
[0025]
【The invention's effect】
As described above, according to the present invention, the electric power supplied from the AC power supply to the load can be controlled by the PWM control of the switching element so as to coincide with the value set in the capacity setting means. Many load capacities can be realized with the load device. Since the change of the load capacity is performed by PWM control of the switching element, there is no problem that the capacity is substantially increased as in the case of the phase angle control by the thyristor, and the load capacity can be easily changed.
[0026]
Furthermore, according to the present invention, since a variable load device that can change the load capacity by PWM control is used as a simulated load device used when testing a power generation facility such as a generator, a substantial power capacity is provided to the generator or the like. A small-capacity load can be realized without requiring an increase in the amount of power. In addition, since the load capacity can be changed according to the value set in the capacity setting means, it is possible to test the power generation equipment by setting various patterns of changes in the load demand of the power generation equipment.
[0027]
Furthermore, according to the present invention, since the variable load device capable of easily changing the load capacity by PWM control is used for preventing reverse power when the commercial power system and the private power generation facility are used together, When the power generation capacity increases and reverse power flow is about to occur, the load capacity of the variable load device can be increased to absorb excessive power and effectively prevent reverse power flow.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a schematic electrical configuration of a variable load device according to an embodiment of the present invention.
2 is a block diagram showing a schematic configuration of an AC power regulator 14 of FIG.
FIG. 3 is a diagram showing the relationship between the power capacity on the load side and the power supply side in the present embodiment.
FIG. 4 is a graph showing a comparison between a change in capacitance due to conventional multi-stage switching and a change in capacitance according to the present embodiment.
FIG. 5 is a graph showing a state in which harmonics are improved in a voltage waveform by PWM control according to the present embodiment as compared with a voltage waveform by conventional thyristor control.
FIG. 6 is a graph showing comparison of input / output waveforms in the case of conventional thyristor control and input / output waveforms of PWM control of the present embodiment.
FIG. 7 is a block diagram showing an example in which the variable load device 10 shown in FIG. 1 is used for preventing reverse tide as another embodiment of the present invention.
FIG. 8 is a simplified block diagram illustrating a state in which a generator test is performed using a simulated load device.
FIG. 9 is a diagram showing a schematic configuration of a thyristor type simulated load device ;
10 is a waveform diagram showing a state in which the load capacity is changed by phase control in the thyristor type simulated load device of FIG. 9. FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 Variable load apparatus 11 Control part 12 Generator 13 Load part 14 AC power regulator 17 Calculation part 18 External input signal terminal 20 PWM control circuits 21-26 IGBT
30 Commercial power system 31 Private power generation facility

Claims (3)

3相交流電力を出力する交流電源の負荷となる抵抗体と、
交流電源の各相と抵抗体との間に設けられ、交流電源から抵抗体に供給される電力を各相毎にスイッチング可能なスイッチング素子と、
交流電源から抵抗体に供給される電力を計測する電力計測手段と、
負荷となる容量を設定する容量設定手段と、
電力計測手段によって計測された電力と容量設定手段によって設定された容量とを比較し、電力計測手段によって計測される電力が、容量設定手段に設定される容量に一致するように、スイッチング素子をPWM制御する制御手段とを含むことを特徴とする可変負荷装置。
A resistor serving as a load of an AC power source that outputs three-phase AC power ;
A switching element provided between each phase of the AC power source and the resistor, and capable of switching the power supplied from the AC power source to the resistor for each phase ;
A power measuring means for measuring the power supplied to the AC power supply or al resistor antibodies,
Capacity setting means for setting the capacity to be a load;
The power measured by the power measuring means is compared with the capacity set by the capacity setting means, and the switching element is PWMed so that the power measured by the power measuring means matches the capacity set by the capacity setting means. And a control means for controlling the variable load device.
3相交流電力を出力する交流電源の負荷となる抵抗体と、
交流電源の各相と抵抗体との間に設けられ、交流電源から抵抗体に供給される電力を各相毎にスイッチング可能なスイッチング素子と、
交流電源から抵抗体に供給される電力を計測する電力計測手段と、
負荷となる容量を設定する容量設定手段と、
電力計測手段によって計測された電力と容量設定手段によって設定された容量とを比較し、電力計測手段によって計測される電力が、容量設定手段に設定される容量に一致するように、スイッチング素子をPWM制御する制御手段とを含む可変負荷装置を、
電力供給装置を試験するための模擬負荷として使用することを特徴とする可変負荷装置の使用方法。
A resistor serving as a load of an AC power source that outputs three-phase AC power ;
A switching element provided between each phase of the AC power source and the resistor, and capable of switching the power supplied from the AC power source to the resistor for each phase ;
A power measuring means for measuring the power supplied to the AC power supply or al resistor antibodies,
Capacity setting means for setting the capacity to be a load;
The power measured by the power measuring means is compared with the capacity set by the capacity setting means, and the switching element is PWMed so that the power measured by the power measuring means matches the capacity set by the capacity setting means. A variable load device including control means for controlling,
A method of using a variable load device, characterized by being used as a simulated load for testing a power supply device.
3相交流電力を出力する交流電源の負荷となる抵抗体と、
交流電源の各相と抵抗体との間に設けられ、交流電源から抵抗体に供給される電力を各相毎にスイッチング可能なスイッチング素子と、
交流電源から抵抗体に供給される電力を計測する電力計測手段と、
負荷となる容量を設定する容量設定手段と、
電力計測手段によって計測された電力と容量設定手段によって設定された容量とを比較し、電力計測手段によって計測される電力が、容量設定手段に設定される容量に一致するように、スイッチング素子をPWM制御する制御手段とを含む可変負荷装置を、
商用電力系統と自家発電設備とを併用する際の逆潮防止用として使用することを特徴とする可変負荷装置の使用方法。
A resistor serving as a load of an AC power source that outputs three-phase AC power ;
A switching element provided between each phase of the AC power source and the resistor, and capable of switching the power supplied from the AC power source to the resistor for each phase ;
A power measuring means for measuring the power supplied to the AC power supply or al resistor antibodies,
Capacity setting means for setting the capacity to be a load;
The power measured by the power measuring means is compared with the capacity set by the capacity setting means, and the switching element is PWMed so that the power measured by the power measuring means matches the capacity set by the capacity setting means. A variable load device including control means for controlling,
A method for using a variable load device, characterized in that it is used for preventing a reverse power flow when a commercial power system and a private power generation facility are used in combination.
JP2000055566A 2000-03-01 2000-03-01 Variable load device and method of using the same Expired - Fee Related JP4560167B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000055566A JP4560167B2 (en) 2000-03-01 2000-03-01 Variable load device and method of using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000055566A JP4560167B2 (en) 2000-03-01 2000-03-01 Variable load device and method of using the same

Publications (2)

Publication Number Publication Date
JP2001242946A JP2001242946A (en) 2001-09-07
JP4560167B2 true JP4560167B2 (en) 2010-10-13

Family

ID=18576661

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000055566A Expired - Fee Related JP4560167B2 (en) 2000-03-01 2000-03-01 Variable load device and method of using the same

Country Status (1)

Country Link
JP (1) JP4560167B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100447452B1 (en) * 2001-11-06 2004-09-07 한국전기연구원 Multi-functional apparatus for testing variable load
ITRM20070494A1 (en) * 2007-09-24 2009-03-25 Energhes Srl EQUIPMENT FOR THE SIMULATION OF A NON-LINEAR LOAD TO BE CONNECTED TO AN ELECTRIC DISTRIBUTION NETWORK.
JP2013165618A (en) * 2012-02-13 2013-08-22 Sharp Corp Electric apparatus
KR101535372B1 (en) * 2014-02-21 2015-07-08 동의대학교 산학협력단 Electric Load for Performance Test of Marine Micro Hydropower Turbines

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61254070A (en) * 1985-05-01 1986-11-11 Nec Corp Electronic load device
JP3183559B2 (en) * 1992-05-13 2001-07-09 株式会社エヌエフ回路設計ブロック AC electronic load device
JPH11299109A (en) * 1998-02-10 1999-10-29 Souwa Giken Service Kk Counter power flow preventive device for private generation equipment

Also Published As

Publication number Publication date
JP2001242946A (en) 2001-09-07

Similar Documents

Publication Publication Date Title
US20210159697A1 (en) Active filter for resonance reduction
Iman-Eini et al. A modular strategy for control and voltage balancing of cascaded H-bridge rectifiers
Nishida et al. A predictive instantaneous-current PWM controlled rectifier with AC-side harmonic current reduction
CN105917549B (en) Split-phase power conversion device, method and system
da Silva et al. Reduced switch count step-up/step-down switched-capacitor three-phase AC–AC converter
CN104508967A (en) Device, method, and program for controlling converter, and air conditioner
Razali et al. Performance analysis of three-phase PWM rectifier using direct power control
TW201526492A (en) Electrical conversion
KR101782078B1 (en) Grid simulator and the control method of the same
JP4560167B2 (en) Variable load device and method of using the same
Gopalakrishnan et al. Space vector based modulation scheme for reducing capacitor RMS current in three-level diode-clamped inverter
Rodriguez et al. Dual-tap chopping stabilizer with subcyclic AC soft switching
JPH0495882A (en) Test load facility
Denoun et al. A DSP (TMS320lf2407) based implementation of PWM for single-phase ac dc bipolar converter with a unity power factor
Han et al. New controller for single-phase PWM converter without AC source voltage sensor
Kambey et al. Performance Analysis of a Static Synchronous Compensator (STATCOM)
Yalçın et al. Buck-type Single-phase AC-AC Active Tracking Voltage Regulator Controlled by an Enhanced Hybrid Control Method
Ismail Design and development of unipolar spwm switching pulses for single phase full bridge inverter application
Korotyeyev et al. Steady and transient state analysis of a matrix-reactance frequency converter based on a boost PWM AC matrix-reactance chopper
Dorrell Understanding and modeling of matrix converters for application in renewable energy and micro grid applications
Mhatre et al. Power Factor Improvement using PWM Rectifier in Shrink Fitting
Al-Kababjie et al. Modeling and Simulation of multi-pulse Cycloconvereter-fed AC induction motor and study of output power factor
Hao et al. The Simulation of SVPWM Rectifier
EP3285386B1 (en) Matrix direct ac/ac converter
Mahajan et al. Implementation of matrix converter for standalone power supplies employing induction generator system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070301

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091117

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100118

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100316

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100514

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100720

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100726

R150 Certificate of patent or registration of utility model

Ref document number: 4560167

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130730

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees