JP4475448B2 - Shaft opening structure - Google Patents

Shaft opening structure Download PDF

Info

Publication number
JP4475448B2
JP4475448B2 JP2001070274A JP2001070274A JP4475448B2 JP 4475448 B2 JP4475448 B2 JP 4475448B2 JP 2001070274 A JP2001070274 A JP 2001070274A JP 2001070274 A JP2001070274 A JP 2001070274A JP 4475448 B2 JP4475448 B2 JP 4475448B2
Authority
JP
Japan
Prior art keywords
opening
steel plate
plate
shaft
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2001070274A
Other languages
Japanese (ja)
Other versions
JP2002276280A (en
Inventor
修一 佐藤
和義 佐藤
明俊 ▲鶴▼見
修 須藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Metal Products and Engineering Inc
Original Assignee
JFE Metal Products and Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Metal Products and Engineering Inc filed Critical JFE Metal Products and Engineering Inc
Priority to JP2001070274A priority Critical patent/JP4475448B2/en
Publication of JP2002276280A publication Critical patent/JP2002276280A/en
Application granted granted Critical
Publication of JP4475448B2 publication Critical patent/JP4475448B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、例えばセグメントを複数連結して地下に沈設して構築された立坑から掘削機を発進させてトンネルを形成するときに、掘削機の発進口や到達口を構成可能な立坑の開口部構造に関するものである。
【0002】
【従来の技術】
例えばシールド掘削機等の掘削機によってトンネルや地下空間を構築する場合、まず、トンネルを掘削しようとするルートの両端部あるいは中間部に、掘削機を発進、到達させるための立坑(発進立坑及び到達立坑)を構築し、掘削機を発進立坑内部へ降ろし、降ろした掘削機を発進立坑から発進させて所定のルートを掘削した後に到達立坑へ到達させる。
【0003】
立坑の構築には種々の工法があり、例えば、アーバンリング工法(商品名)等が知られている。構築する立坑の大深度化に伴ない、立坑を構成する土留め壁の外部には非常に大きな土圧や水圧が作用し、掘削機を発進させるために土留め壁を取り壊した際に、その部分の土砂が崩壊して立坑内に流入し、掘削機を発進させることができない問題がある。
【0004】
そこで、従来は、開口時に周囲の地山が崩壊するのを防止するためあるいは地下水の立坑内への流入を防止するために、発進口の前方に地盤改良部あるいは凍結部を形成する方法が行なわれている(以下、「先行技術1」という)。
【0005】
しかし、先行技術1は、地盤改良部や凍結部の形成に多くの費用と工期を必要とするといった問題がある。
【0006】
このため、発進口周囲の地盤改良工事をせずに掘削機を発進することができる工法が求められ、特開平10−205280号公報には下記に示すシャッタを用いるトンネル施工方法が開示されている。
【0007】
発進立坑を構成する土留め壁(構築壁等ともいう)に設けた発進口は、掘削機により掘削可能な封止材により封鎖されている。更に、発進口には開閉可能なシャッタが設けられている。シャッタは、発進立坑の周囲の土圧、水圧を支持できる強度を備える。更に、掘削機の発進の際に発進立坑内に形成される圧力室の充填材が、シャッタの解放時にシャッタと構築壁との間から漏れるのを防止するための漏出防止部材が、シャッタに設けられている。シャッタと掘削機との間に構築壁外部の圧力に対抗する圧力室を形成し、その後、シャッタを移動して発進口を解放し、掘削機により発進口を封鎖している封止材を掘削して掘削機を発進立坑の外に向けて発進させる(以下、「先行技術2」という)。
【0008】
【発明が解決しようとする課題】
この発明の目的は、先行技術よりも簡便な装置により掘削機の発進口や到達口を構成可能な立坑の開口部構造を提供することにある。
【0009】
【課題を解決するための手段】
請求項1記載の発明は、土留め壁に設けられた開口の内側に配された、開口を有する開口部板材と、前記土留め壁と前記開口部板材との間に前記開口部板材の開口を開閉するために移動可能に配された開閉板と、前記開口部板材と前記土留め壁との間において、前記開口部板材の開口及び前記土留め壁の開口の周囲を枠状に囲んで配された、前記開口部板材と前記土留め壁とを接続する接続部材と、前記接続部材に設けられた、前記開閉板を移動可能に挿通するためのスリットと、前記開口部板材と前記開閉板とを固定するための固定手段とを備え、
前記固定手段は、前記開口部板材及び前記開閉板に設けられた複数のねじ孔と、前記ねじ孔に螺合可能なボルトとを備え、前記開口部板材に設けられた前記ねじ孔は前記開口部板材を貫通しており、前記開閉板に設けられた前記ねじ孔は、前記土留め壁の開口側の部位が閉塞されて前記開閉板を貫通しておらず、前記開口部板材には、前記開口部に設けられた複数のねじ孔の外周側に前記開口部板材と前記開閉板との隙間を閉塞するためのパッキンが配されていることに特徴を有するものである。
【0010】
請求項2記載の発明は、前記接続部材の前記スリットが設けられている位置には、前記接続部材の外側の空間を隙間無く覆って配された、前記開閉板が挿通可能なスリットを有する第1止水部材と、前記第1止水部材の外側に配された、前記開閉板が挿通可能なスリットを有する第2止水部材とが設けられ、前記第1止水部材には、前記第1止水部材と前記開閉板との隙間を充填するセルフシール型のパッキンが配され、前記第2止水部材には、前記第1止水部材と前記開閉板との隙間を充填するスキューズシール型のパッキンが配されていることに特徴を有するものである。
【0011】
請求項3記載の発明は、前記土留め壁は、前記開口部板材の開口を閉塞している状態の前記開閉板を前記土留め壁に固定するための補強部材を備え、前記補強部材は、前記開口部板材の開口を閉塞している状態の前記開閉板の端部と接触して取り付けられていることに特徴を有するものである。
【0012】
請求項4記載の発明は、前記開閉板は分割されており、分割されたうちのひとつは、前記接続部材のスリット部の止水のため、前記スリット部に挿通されたまま残置されていることに特徴を有するものである。
【0013】
【発明の実施の形態】
次に、この発明の実施の形態を図面を参照しながら説明する。
【0014】
図1は、この発明の実施の形態に係る立坑の開口部構造の全体構成を示す斜視図、図2は、断面図、図3は、スライド鋼板によって開口部鋼板の開口を閉塞した状態を示す斜視図、図4は、スライド鋼板のB部をスリット内に残置した状態を示す斜視図、図5は、スライド鋼板を示す斜視図である。なお、図1においては、第1、第2止水部材の記載は省略されている。
【0015】
筒型の立坑1は、例えば、アーバンリング工法により構築される。立坑1を構成する土留め壁2は、鋼製セグメント等からなっている。立坑1が筒型の場合には土留め壁2はやや彎曲している。土留め壁2には、開口部鋼板4よりやや小さい四角形の開口3が設けられている。開口3は掘削機15(図6等参照)が通過可能な大きさを有している。
【0016】
開口3の内側、即ち、立坑1の内部には、土留め壁2とほぼ平行に、四角形の開口部鋼板(開口部板材)4が配されている。開口部鋼板4は土留め壁2とほぼ同じ曲率で彎曲している。立坑には、本例のような筒型の他にも角型や小判型等があり、立坑を構成する土留め壁2の形状(彎曲の有無等)に合わせて開口部鋼板4を作成する。開口部鋼板4には円形の開口5が設けられている。開口5は掘削機が通過可能な大きさを有している。
【0017】
開口部鋼板4は、開口部鋼板4と土留め壁2との間において、開口3及び開口5の周囲を四角く枠状に囲んで配された接続鋼板(接続部材)6によって、土留め壁2に接続されて取付けられている。
【0018】
土留め壁2と開口部鋼板4との間には、四角形のスライド鋼板(開閉板)7が土留め壁2及び開口部鋼板4とほぼ平行に配されている。スライド鋼板7は、開口部鋼板4の開口5を閉塞可能な大きさを有している。スライド鋼板7も土留め壁2及び開口部鋼板4とほぼ同じ曲率で彎曲している。開口部鋼板4とスライド鋼板7とは、ボルト9及び補強部材(ボルトの外周のリング状のもの)により一体構造となっている。接続鋼板6の上部6aには、スライド鋼板7を挿通可能な、スライド鋼板7の断面積よりもやや大きな面積のスリット12が設けられている。
【0019】
スライド鋼板7はスリット12に挿通されて配されており、土留め壁2及び開口部鋼板4とほぼ平行な方向に上下にスライド移動可能である。また、スライド鋼板7は、その下端を接続鋼板6の下部6bと近接されており、このとき、その上端部が接続鋼板6の上部6aよりもやや上方に突出する高さを有している(図1〜3)。
【0020】
図4、図5に示すように、スライド鋼板7は、ほぼ全体の大きさを占める上部のA部(7a)と、その下部の一部を占めるB部(7b)とからなる2分割構造となっており、A部(7a)とB部(7b)とは接合部材55及びボルト56によって結合されて一体となっている。スライド鋼板7をこのように構成することにより、開口5を開けた後も、B部(7b)をA部(7a)と切り離して、スリット12、43、44の内部に残置させることができる(図4)。かくして、スリット部の止水効果を向上することができる。
【0021】
上記のように、スライド鋼板7を、A部(7a)とB部(7b)とが分離可能な2分割構造とした場合において、B部(7b)をスリット部に残置する工程は、以下のとおりである。まず、スライド鋼板7を所定の位置まで引き上げる。次いで、接合部材55のB部(7b)側のボルト56を外す。留め金具57を、B部(7b)の接合部材55及び第2止水部材42とに当てる。ボルト56によって接合部材55と止め金具57を取り付ける。更に、ボルト58によって第2止水部材42と留め金具57を取り付ける。B部(7b)と接合部材55と止め金具57とが一体化される。接合部材55の各箇所において、順次上記作業を繰り返す。これにより、B部(7b)はスリット部に固定される。最後に、A部(7a)のボルト56を外す。このようにしてA部(7a)と切り離されてスリット部に固定されたB部(7b)は、最終的にこのままスリット部に残置される(図4参照)。
【0022】
なお、スライド鋼板は、2分割構造としなくてもよい。この場合には、スライド鋼板全体をスリット部に残置してもよい。
【0023】
図1、図2に示すように、開口部鋼板4には、開口部鋼板4とスライド鋼板7との隙間を充填するためのゴムパッキン13及び鉄板59が、開口5の周囲の上下及び左右の全周にわたり配されている。図2に示すように、ゴムパッキン13は、鉄板59とスライド鋼板7とにより圧縮され止水機能を発揮する。
【0024】
次に、スリット部の止水機構について説明する。図1〜4に示すように、接続部材6の上部6aの、スリット12が設けられている位置の上側(接続部材6の外側)には、スリット12の周囲を囲み、その下端部が接続部材6に溶接によって固着された鋼製の枠体40と、枠体40の上方を塞ぐための、鋼板からなる板体41とが設けられている。枠体40と板体41とによって、接続部材6の外側の空間が隙間無く覆われている。板体41には、スライド鋼板7が挿通可能なスリット43が設けられている。枠体40と板体41とによって第1止水部材が構成されている。
【0025】
第1止水部材の上側には、板体41と所定間隔をあけて、鋼板からなる板体42が設けられている。板体42にも、スライド鋼板7が挿通可能なスリット44が設けられている。板体42によって第2止水部材が構成されている。板体41及び板体42は、スライド鋼板7が挿通可能なようにスリット43及び44の位置を配置して、複数のボルト49及びナット50によって、枠体40及び接続部材6に固定されている(図3、4)。
【0026】
枠体40と板体41と接続部材6とによる空間内には、スリット43の隙間(板体40とスライド鋼板7との間の隙間)を充填するためのセルフシール型のパッキン51が、スリット43の両側(図2参照)に配されている。更に、板体42には、パッキン押さえ用の切欠き部42aがスリット44の両側(図2参照)に設けられ、この両側の切欠き部42a内にスリット43の隙間(板体40、42とスライド鋼板7との間の隙間)を充填するためのスキューズシール型のパッキン52が配されている。2段のパッキン51及び52の作用によって、優れた止水効果が得られる。
【0027】
次に、開口部鋼板とスライド鋼板の固定手段について説明する。図2、図5に示すように、開口部鋼板4には、複数のねじ孔8が開口部鋼板4を貫通して設けられている。スライド鋼板7にも複数のねじ孔9が設けられている。ただし、ねじ孔9は、土留め壁6の開口3側の部位が閉塞されており、スライド鋼板7を貫通していない。
【0028】
開口部鋼板4とスライド鋼板7との固定は、スライド鋼板7が開口部鋼板4の開口5を閉塞している状態において、開口部鋼板4の内側からねじ孔8にボルト10を螺合してねじ込んで行き、更に、ねじ孔9に螺合する。ボルト10の先端がねじ孔9の閉塞部に当接すれば停止する。これにより開口部鋼板4とスライド鋼板7とを固定することができる。スライド鋼板7の固定は、アーバンリング工法により立坑1を構築する前に行なわれる。
【0029】
立坑1の構築が終了後、掘削機を発進するとき等において、スライド鋼板7を上方に移動して開けるときは、開口部鋼板4とスライド鋼板7とを固定しているボルト10を緩めてねじ孔8から内側に抜けば、ボルト10を容易に回収できる。このとき、立坑1の外側(地山側)からスライド鋼板7に水圧又は泥土圧が掛かっているが、ねじ孔9が閉塞しているため、ボルト10を抜いてもねじ孔8、9から地下水が漏れたり吹き出したりすることはない。
【0030】
また、スライド鋼板7を上昇させるときに、セルフシール型のパッキン44がボルト10を抜いた後のねじ孔9内に食い込んでパッキンのゴムが損傷することも考えられるが、ねじ孔9を充填物で塞いでおけばこれを回避できる。
【0031】
開口部鋼板4は、開口5の周囲を枠状に囲んだ接続鋼板6によって土留め壁2に漏れなく接続されて取付けられているので、スライド鋼板7によって開口部鋼板4の開口5を閉塞することにより、立坑1の内と外とは遮断される。
【0032】
次に、補強部材について説明する。本発明の立坑の開口部は、立坑の施工(アーバンリング工法)開始前に、スライド鋼板7が開口5を閉塞した状態で土留め壁2に構築される。従って、本発明においては、下記の補強対策を備えている。すなわち、図1に示すように、接続部材の上部6aの上方において、土留め壁2の縦桁53には、本実施の形態では7つの縦桁53のそれぞれに、補強部材46が取り付けられている。図2に示すように、補強部材46は、補助板47及びボルト48によってスライド鋼板7の上端と当接して取り付けられ、スライド鋼板7を固定している。このようにしてスライド鋼板7を固定した補強部材46は、立坑1の施工時(アーバンリング工法)に、ジャッキ推力及び垂直方向の軸力をスライド鋼板7に伝達する部材として作用する。更に、補強部材46は、推進機械15を立坑1内に吊り下ろす際に、推進機械15がスライド鋼板7の上部突出部と直接衝突するのを避ける作用も有している。推進機械15が補強部材46と衝突することによりスライド鋼板7への衝撃が緩衝される。補強部材46は、立坑1の構築が完了した時点で撤去する。
【0033】
縦桁53の桁高{土留め壁2の本体からの突出量H(図2参照)}は、スライド鋼板7の開閉(上下移動)時に該スライド鋼板7と接触しない高さとなっている。従って、図1に示すように、スリット12の上方に位置する縦桁53は、土留め壁2に通常設けられている他の縦桁54の桁高よりも低い桁高となっている。
【0034】
【実施例】
次に、この発明の開口部構造を、発進口及び到達口に適用する実施例を説明する。図6〜16は、この発明の実施例に係る図面であり、図6〜9は、本発明を発進口に適用する例、図10〜16は、到達口に適用する例を示す。図6〜16において、斜線によって示されている部分は、斜線が無い部分よりも水圧(泥土圧)が掛かっている状態であることを示している。図17(A)〜(G)は、立坑を構築してトンネルを掘削する工事全体の概略工程図、図18は、立坑を構築する際の様子を示す図である。
【0035】
立坑1は、例えば、アーバンリング工法等により構築される。実施例に示すアーバンリング工法では、まず、地上において中空筒体19を据え付ける{図17(A)}。この中空筒体をアーバンリング(商品名)という。この中空筒体(アーバンリング)19は、鋼製セグメント等からなる複数のピース部材20を連結して組み立てる。中空筒体19の内部を掘削すると同時に、最上端から加圧を行い、中空筒体19を地下に埋設する。中空筒体19の最上端にはピース部材20が順次連結され、中空筒体19の上下方向の全長が増加する{図17(A)、(B)}。そして、掘削と加圧を繰り返すことで、地中深く土留め壁(沈設体)2が構築される{図17(C)}。なお、本発明の開口部構造は、鋼製セグメント等からなるピース部材20を連結して組立てる中で中空筒体19に組込まれる。
【0036】
立坑(発進立坑、到達立坑)を構築する際の様子{図17(B)}を詳しく説明する。図18に示すように、中空筒体19が加圧され沈設されるスペースの周囲には、予め複数のグランドアンカー22が打ち込まれ、このグランドアンカー22に接続されたアンカワイヤー24は、中空筒体19の上方に備えられる上部ビーム21に固定される。中空筒体19の上部にはプレスリング23を介して圧入桁25が乗せられ、この圧入桁25と上部ビーム21との間に、ジャッキ受け台27及び圧入ジャッキ29が設けられる。圧入ジャッキ29が働いて上部ビーム21と圧入桁25の間を広げると、圧入力が圧入桁25及びプレスリング23を介して中空筒体19に伝えられ、中空筒体19は下方へ地盤に向かって圧入される。また、掘削機の一種であるハンマーグラブバケット31がワイヤー33によって吊下げられ、中空筒体19内部の地盤を掘削する。このようにして、中空筒体19が地下に沈設され、立坑1が構築される。
【0037】
立坑1から掘削機15を発進させるまでは、スライド鋼板7はボルト10により開口部鋼板4に固定され、開口部鋼板の開口5はスライド鋼板7により閉塞されている。
【0038】
そして、掘削機15を立坑(発進立坑)1内に吊り下ろす{図17(D)}。
【0039】
掘削機15が吊り下ろされたら、ボルト48及び補助板47を取り外して補強部材46を撤去する。
【0040】
次いで、ボルト10を緩めてスライド鋼板7の固定を解除する。この時スライド鋼板7は地山側の水圧によりパッキン13に押し付けられた状態となるため、ねじ孔8、9から内側にボルト10を回収してもパッキン13から水が漏れることはない。なお、ねじ孔8はボルト10と同径で短いボルトにより閉塞する。次いで、図6に示すように、立坑1内において、エントランスシール17を開口部鋼板の開口5に取付け、エントランスシール17内に掘削機15を装着する。次いで、エントランスシール17を膨らませて掘削機15の外周部に押付ける。次いで、図7に示すように、スライド鋼板7と掘削機15との間に形成された空間(圧力室)に泥土等の充填材を注入し、地山側と対抗した水圧(泥土圧)をかける。立坑1の内側(立坑側)の水圧(泥土圧)を地山側よりも高くすることにより、立坑側と地山側の圧力のバランスがとれ、スライド鋼板7とパッキン13とが離れる。
【0041】
次いで、図8に示すようにスライド鋼板7を上方に引き上げる。次いで、図9に示すように、掘削機15を発進させて、トンネル30を立坑(到達立坑)1まで掘削する{図17(E)、(F)}。
【0042】
所定のルートの最終端に構築された立坑(到達立坑)1に掘削機15が到達する{図10〜16、図17(G)}。立坑(到達立坑)1では、スライド鋼板7により開口5が閉塞されている。次いで、ボルト10を緩め、ねじ孔8、9から該ボルト10を引き抜いてスライド鋼板7の固定を解除する。この時スライド鋼板7は地山側の水圧によりパッキン13に押し付けられる状態となるため、ねじ孔8、9から内側にボルト10を回収してもパッキン13から水が漏れることはない。図10に示すように、立坑1内において、エントランスシール17及びチャンバー盲蓋18を開口5に取付ける。そして、図11に示すようにエントランスシール17とチャンバー盲蓋18との間の空間内に立坑(到達立坑)1の内部の注入パイプ32(図4参照)から泥土等の充填材を注入し、地山側と対抗する水圧(泥土圧)をかける。地山側水圧よりも水圧を高くすることにより、立坑側と地山側との圧力が均衡する。また、これによりスライド鋼板7とパッキン13とが離れる。図12に示すようにスライド鋼板7を上方に引抜いて開口5を開放する。次いで、図13に示すように、到達した掘削機15をエントランスシール17とチャンバー盲蓋18との間の空間内に推進せしめ、図14に示すようにエントランスシール17を膨らませて掘削機15の外周部に押付ける。次いで、図15に示すように、裏込注入し、止水確認後、図16に示すように、チャンバー盲蓋18を撤去し、トンネルが貫通する。
【図面の簡単な説明】
【図1】この発明の実施の形態に係る立坑の開口部構造の全体構成を示す斜視図である。
【図2】この発明の実施の形態に係る断面図である。
【図3】この発明の実施の形態に係るスライド鋼板によって開口部鋼板の開口を閉塞した状態を示す斜視図である。
【図4】この発明の実施の形態に係るスライド鋼板のB部をスリット内に残置した状態を示す斜視図である。
【図5】この発明の実施の形態に係るスライド鋼板を示す斜視図である。
【図6】この発明を発進口に適用する実施例を示す平面図である。
【図7】この発明を発進口に適用する実施例を示す平面図である。
【図8】この発明を発進口に適用する実施例を示す平面図である。
【図9】この発明を発進口に適用する実施例を示す平面図である。
【図10】この発明を到達口に適用する実施例を示す平面図である。
【図11】この発明を到達口に適用する実施例を示す平面図である。
【図12】この発明を到達口に適用する実施例を示す平面図である。
【図13】この発明を到達口に適用する実施例を示す平面図である。
【図14】この発明を到達口に適用する実施例を示す平面図である。
【図15】この発明を到達口に適用する実施例を示す平面図である。
【図16】この発明を到達口に適用する実施例を示す平面図である。
【図17】(A)〜(G)は、立坑を構築してトンネルを掘削する工事全体の概略工程図である。
【図18】立坑を構築する際の様子を示す概略図である。
【符号の説明】
1 立坑
2 土留め壁
3 土留め壁の開口
4 開口部鋼板
5 開口部鋼板の開口
6 接続鋼板
6a 接続鋼板の上部
6b 接続鋼板の下部
7 スライド鋼板
7a スライド鋼板のA部
7b スライド鋼板のB部
8 開口部鋼板のねじ孔
9 スライド鋼板のねじ孔
10 ボルト
12 スリット
13 パッキン
15 掘削機
17 エントランスシール
18 チャンバー盲蓋
19 中空筒体
20 ピース部材
21 上部ビーム
22 グランドアンカー
23 プレスリング
24 アンカーワイヤー
25 圧入桁
26 スペーサ
27 ジャッキ受け台
29 圧入ジャッキ
30 トンネル
31 ハンマーグラブバケット
32 注入パイプ
33 ワイヤー
40 枠体
41 板体
42 板体
42a 切欠き部
43 スリット、
44 スリット
46 補強部材
47 補助板
48 ボルト
49 ボルト
50 ナット
51 セルフシール型のパッキン
52 スキューズシール型のパッキン
53 桁高の低い縦桁
54 通常の桁高の縦桁
55 接合部材
56 ボルト
57 留め金具
58 ボルト
59 鉄板
[0001]
BACKGROUND OF THE INVENTION
The present invention provides, for example, an opening portion of a shaft that can form a starting port and a reaching port of an excavator when a tunnel is formed by starting the excavator from a shaft constructed by connecting a plurality of segments and setting them underground. Concerning structure.
[0002]
[Prior art]
For example, when a tunnel or underground space is constructed by an excavator such as a shield excavator, first, a shaft for starting and reaching the excavator at both ends or an intermediate portion of the route for excavating the tunnel (starting shaft and reaching) A shaft is constructed, the excavator is lowered into the start shaft, and the lowered excavator is started from the start shaft to excavate a predetermined route, and then reach the destination shaft.
[0003]
There are various methods for constructing a shaft, for example, an urban ring method (trade name) and the like are known. Along with the deepening of the shaft to be constructed, very large earth pressure and water pressure act on the outside of the retaining wall that constitutes the shaft, and when the retaining wall is demolished to start the excavator, There is a problem that part of the earth and sand collapses and flows into the shaft, and the excavator cannot be started.
[0004]
Therefore, conventionally, a method of forming a ground improvement part or a frozen part in front of the starting port has been performed in order to prevent the surrounding natural ground from collapsing at the time of opening or to prevent inflow of groundwater into the shaft. (Hereinafter referred to as “prior art 1”).
[0005]
However, the prior art 1 has a problem that a lot of cost and work period are required for forming the ground improvement part and the frozen part.
[0006]
For this reason, a construction method capable of starting the excavator without requiring ground improvement work around the start opening is required, and Japanese Patent Application Laid-Open No. 10-205280 discloses a tunnel construction method using a shutter shown below. .
[0007]
A start port provided in a retaining wall (also referred to as a construction wall) constituting the start shaft is sealed with a sealing material that can be excavated by an excavator. Further, a shutter that can be opened and closed is provided at the start opening. The shutter has a strength capable of supporting earth pressure and water pressure around the start shaft. Further, the shutter is provided with a leakage preventing member for preventing the pressure chamber filling material formed in the starting shaft when the excavator starts from leaking between the shutter and the building wall when the shutter is released. It has been. A pressure chamber against the pressure outside the building wall is formed between the shutter and the excavator, and then the shutter is moved to release the start port, and the excavator seals the start port. The excavator is then started out of the starting shaft (hereinafter referred to as “prior art 2”).
[0008]
[Problems to be solved by the invention]
An object of the present invention is to provide an opening structure of a shaft that can configure a start port and a reach port of an excavator with a simpler device than the prior art.
[0009]
[Means for Solving the Problems]
According to the first aspect of the present invention, there is provided an opening plate material having an opening disposed inside an opening provided in the retaining wall, and an opening of the opening plate material between the retaining wall and the opening plate material. An opening / closing plate that is movably arranged to open and close, and between the opening plate material and the retaining wall, surrounds the opening of the opening plate material and the opening of the retaining wall in a frame shape A connecting member for connecting the opening plate and the retaining wall, a slit provided in the connecting member for movably inserting the opening and closing plate, the opening plate and the opening and closing A fixing means for fixing the plate,
The fixing means includes a plurality of screw holes provided in the opening plate material and the opening and closing plate, and a bolt that can be screwed into the screw hole, and the screw hole provided in the opening plate material is the opening. The screw hole provided in the opening and closing plate is not penetrating the opening and closing plate because the opening side portion of the retaining wall is closed, and the opening plate material includes: It is characterized in that packing for closing the gap between the opening plate and the opening / closing plate is arranged on the outer peripheral side of the plurality of screw holes provided in the opening.
[0010]
According to a second aspect of the present invention, the connection member has a slit at which the opening and closing plate can be inserted at a position where the slit is provided so as to cover the space outside the connection member without any gap. A first water stop member, and a second water stop member disposed outside the first water stop member and having a slit through which the opening and closing plate can be inserted, and the first water stop member includes the first water stop member. A self-sealing type packing that fills a gap between one water stop member and the opening / closing plate is disposed, and a skew seal that fills a gap between the first water stopping member and the opening / closing plate is disposed on the second water blocking member. It is characterized by the fact that the packing of the mold is arranged.
[0011]
According to a third aspect of the present invention, the earth retaining wall includes a reinforcing member for fixing the opening / closing plate in a state of closing the opening of the opening plate member to the earth retaining wall, It is characterized by being attached in contact with an end of the opening / closing plate in a state of closing the opening of the opening plate.
[0012]
In the invention according to claim 4, the opening / closing plate is divided, and one of the divided plates is left inserted in the slit portion for water stoppage of the slit portion of the connecting member. It has the characteristics.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described with reference to the drawings.
[0014]
FIG. 1 is a perspective view showing the overall structure of an opening structure of a shaft according to an embodiment of the present invention, FIG. 2 is a cross-sectional view, and FIG. 3 shows a state in which the opening of the opening steel plate is closed by a slide steel plate. FIG. 4 is a perspective view showing a state in which a portion B of the slide steel plate is left in the slit, and FIG. 5 is a perspective view showing the slide steel plate. In addition, in FIG. 1, description of the 1st, 2nd water stop member is abbreviate | omitted.
[0015]
The cylindrical shaft 1 is constructed by, for example, an urban ring method. The earth retaining wall 2 constituting the shaft 1 is made of a steel segment or the like. When the vertical shaft 1 is cylindrical, the earth retaining wall 2 is slightly bent. The earth retaining wall 2 is provided with a rectangular opening 3 that is slightly smaller than the opening steel plate 4. The opening 3 has a size through which the excavator 15 (see FIG. 6 and the like) can pass.
[0016]
Inside the opening 3, that is, inside the shaft 1, a rectangular opening steel plate (opening plate material) 4 is arranged substantially parallel to the retaining wall 2. The opening steel plate 4 is bent with substantially the same curvature as the retaining wall 2. The vertical shaft includes a square shape, an oval shape, etc. in addition to the cylindrical shape as in this example, and the opening steel plate 4 is created in accordance with the shape of the retaining wall 2 (the presence or absence of bending, etc.) constituting the vertical shaft. . A circular opening 5 is provided in the opening steel plate 4. The opening 5 has a size through which the excavator can pass.
[0017]
The opening steel plate 4 is formed between the opening steel plate 4 and the retaining wall 2 by a connecting steel plate (connecting member) 6 that surrounds the periphery of the opening 3 and the opening 5 in a frame shape. Connected to and installed.
[0018]
Between the retaining wall 2 and the opening steel plate 4, a rectangular slide steel plate (opening / closing plate) 7 is arranged substantially parallel to the retaining wall 2 and the opening steel plate 4. The slide steel plate 7 has a size capable of closing the opening 5 of the opening steel plate 4. The slide steel plate 7 is also bent with substantially the same curvature as the retaining wall 2 and the opening steel plate 4. The opening steel plate 4 and the slide steel plate 7 are integrated with each other by a bolt 9 and a reinforcing member (ring-shaped one on the outer periphery of the bolt). A slit 12 having an area slightly larger than the cross-sectional area of the slide steel plate 7 through which the slide steel plate 7 can be inserted is provided in the upper portion 6 a of the connection steel plate 6.
[0019]
The slide steel plate 7 is inserted through the slit 12 and is slidable up and down in a direction substantially parallel to the retaining wall 2 and the opening steel plate 4. Further, the lower end of the slide steel plate 7 is close to the lower portion 6b of the connecting steel plate 6, and at this time, the upper end portion has a height that protrudes slightly above the upper portion 6a of the connecting steel plate 6 ( 1-3).
[0020]
As shown in FIGS. 4 and 5, the slide steel plate 7 has a two-part structure comprising an upper part A (7a) occupying almost the entire size and a part B (7b) occupying a part of the lower part. The A part (7a) and the B part (7b) are joined together by a joining member 55 and a bolt 56 to be integrated. By configuring the slide steel plate 7 in this way, even after opening the opening 5, the B part (7b) can be separated from the A part (7a) and left inside the slits 12, 43, 44 ( FIG. 4). Thus, the water stop effect of the slit portion can be improved.
[0021]
As described above, when the slide steel plate 7 has a two-part structure in which the A part (7a) and the B part (7b) can be separated, the process of leaving the B part (7b) in the slit part is as follows. It is as follows. First, the slide steel plate 7 is pulled up to a predetermined position. Next, the bolt 56 on the B part (7b) side of the joining member 55 is removed. The fasteners 57 are brought into contact with the joining member 55 and the second water stopping member 42 of the B part (7b). The joining member 55 and the fastener 57 are attached by the bolt 56. Furthermore, the 2nd water stop member 42 and the fastener 57 are attached with the volt | bolt 58. FIG. B part (7b), the joining member 55, and the metal fitting 57 are integrated. The above operation is repeated sequentially at each location of the joining member 55. Thereby, B part (7b) is fixed to a slit part. Finally, the bolt 56 of part A (7a) is removed. Thus, the B part (7b) separated from the A part (7a) and fixed to the slit part is finally left in the slit part (see FIG. 4).
[0022]
Note that the slide steel plate may not have a two-part structure. In this case, the entire slide steel plate may be left in the slit portion.
[0023]
As shown in FIGS. 1 and 2, the opening steel plate 4 is provided with rubber packing 13 and an iron plate 59 for filling the gap between the opening steel plate 4 and the slide steel plate 7. It is distributed all around. As shown in FIG. 2, the rubber packing 13 is compressed by the iron plate 59 and the slide steel plate 7 and exhibits a water stop function.
[0024]
Next, the water stop mechanism of a slit part is demonstrated. As shown in FIGS. 1 to 4, the upper portion 6 a of the connection member 6 is surrounded above the position where the slit 12 is provided (outside the connection member 6), and the lower end portion of the connection member 6 is connected to the lower end portion A steel frame 40 fixed by welding to 6 and a plate 41 made of a steel plate for closing the upper side of the frame 40 are provided. The frame body 40 and the plate body 41 cover the outer space of the connection member 6 without a gap. The plate body 41 is provided with a slit 43 through which the slide steel plate 7 can be inserted. The frame body 40 and the plate body 41 constitute a first water stop member.
[0025]
On the upper side of the first water stop member, a plate body 42 made of a steel plate is provided at a predetermined interval from the plate body 41. The plate body 42 is also provided with a slit 44 through which the slide steel plate 7 can be inserted. The plate body 42 constitutes a second water stop member. The plate body 41 and the plate body 42 are fixed to the frame body 40 and the connection member 6 with a plurality of bolts 49 and nuts 50, with the positions of the slits 43 and 44 arranged so that the slide steel plate 7 can be inserted. (FIGS. 3 and 4).
[0026]
A self-sealing type packing 51 for filling a gap of the slit 43 (a gap between the plate body 40 and the slide steel plate 7) is formed in the space formed by the frame body 40, the plate body 41, and the connecting member 6. 43 (see FIG. 2). Further, the plate body 42 is provided with notches 42a for holding the packing on both sides (see FIG. 2) of the slit 44, and the gaps (the plate bodies 40, 42 and the plate bodies 40, 42) between the notches 42a on both sides. A skew seal type packing 52 for filling a gap between the slide steel plate 7) is provided. An excellent water stop effect is obtained by the action of the two-stage packings 51 and 52.
[0027]
Next, fixing means for the opening steel plate and the slide steel plate will be described. As shown in FIGS. 2 and 5, the opening steel plate 4 is provided with a plurality of screw holes 8 penetrating the opening steel plate 4. The slide steel plate 7 is also provided with a plurality of screw holes 9. However, the screw hole 9 is closed at the opening 3 side of the retaining wall 6 and does not penetrate the slide steel plate 7.
[0028]
The opening steel plate 4 and the slide steel plate 7 are fixed by screwing a bolt 10 into the screw hole 8 from the inside of the opening steel plate 4 in a state where the slide steel plate 7 closes the opening 5 of the opening steel plate 4. It is screwed and further screwed into the screw hole 9. When the tip of the bolt 10 comes into contact with the closed portion of the screw hole 9, the bolt 10 stops. Thereby, the opening part steel plate 4 and the slide steel plate 7 can be fixed. The slide steel plate 7 is fixed before the shaft 1 is constructed by the urban ring method.
[0029]
When the excavator is started after the construction of the shaft 1 is completed, when the slide steel plate 7 is moved upward and opened, the bolt 10 that fixes the opening steel plate 4 and the slide steel plate 7 is loosened and screwed. The bolt 10 can be easily recovered if it is pulled inward from the hole 8. At this time, water pressure or mud pressure is applied to the slide steel plate 7 from the outside of the shaft 1 (the natural ground side), but since the screw hole 9 is closed, groundwater is not removed from the screw holes 8 and 9 even if the bolt 10 is pulled out. There are no leaks or blowouts.
[0030]
Further, when the slide steel plate 7 is raised, it is conceivable that the self-sealing type packing 44 bites into the screw hole 9 after the bolt 10 is pulled out and damages the rubber of the packing. You can avoid this if you plug it in.
[0031]
Since the opening steel plate 4 is connected and attached to the retaining wall 2 without leakage by the connection steel plate 6 surrounding the opening 5 in a frame shape, the opening 5 of the opening steel plate 4 is closed by the slide steel plate 7. Thus, the inside and outside of the shaft 1 are blocked.
[0032]
Next, the reinforcing member will be described. The opening of the shaft according to the present invention is constructed in the retaining wall 2 in a state where the slide steel plate 7 closes the opening 5 before the shaft construction (urban ring method) is started. Therefore, in the present invention, the following reinforcing measures are provided. That is, as shown in FIG. 1, a reinforcing member 46 is attached to each of the seven stringers 53 in the present embodiment on the stringers 53 of the retaining wall 2 above the upper part 6a of the connection member. Yes. As shown in FIG. 2, the reinforcing member 46 is attached in contact with the upper end of the slide steel plate 7 by the auxiliary plate 47 and the bolt 48, and fixes the slide steel plate 7. The reinforcing member 46 to which the slide steel plate 7 is fixed in this manner acts as a member that transmits the jack thrust and the axial force in the vertical direction to the slide steel plate 7 when the shaft 1 is constructed (urban ring method). Further, the reinforcing member 46 also has an effect of preventing the propulsion machine 15 from directly colliding with the upper protruding portion of the slide steel plate 7 when the propulsion machine 15 is suspended in the shaft 1. When the propulsion machine 15 collides with the reinforcing member 46, the impact on the slide steel plate 7 is buffered. The reinforcing member 46 is removed when the construction of the shaft 1 is completed.
[0033]
The girder height {projecting amount H from the main body of the retaining wall 2 (see FIG. 2)} is a height that does not contact the slide steel plate 7 when the slide steel plate 7 is opened and closed (moved up and down). Therefore, as shown in FIG. 1, the stringer 53 located above the slit 12 has a lower digit height than that of other stringers 54 normally provided on the retaining wall 2.
[0034]
【Example】
Next, an embodiment in which the opening structure of the present invention is applied to the start port and the arrival port will be described. 6 to 16 are drawings according to an embodiment of the present invention. FIGS. 6 to 9 show an example in which the present invention is applied to a departure port, and FIGS. 6-16, the part shown with the oblique line has shown that it is in the state where the water pressure (mud pressure) is applied rather than the part without the oblique line. FIGS. 17A to 17G are schematic process diagrams of the entire construction for constructing a shaft and excavating a tunnel, and FIG. 18 is a diagram illustrating a state when a shaft is constructed.
[0035]
The shaft 1 is constructed by, for example, an urban ring method. In the urban ring construction method shown in the embodiment, first, the hollow cylinder 19 is installed on the ground {FIG. 17 (A)}. This hollow cylinder is referred to as an urban ring (trade name). The hollow cylinder (urban ring) 19 is assembled by connecting a plurality of piece members 20 made of steel segments or the like. At the same time as excavating the inside of the hollow cylinder 19, pressurization is performed from the uppermost end, and the hollow cylinder 19 is buried underground. The piece members 20 are sequentially connected to the uppermost end of the hollow cylinder 19 so that the total length of the hollow cylinder 19 in the vertical direction increases {FIGS. 17A and 17B}. Then, by repeating excavation and pressurization, the earth retaining wall (sedimentation body) 2 is built deeply in the ground {FIG. 17C}. In addition, the opening part structure of this invention is integrated in the hollow cylinder 19 in connecting and assembling the piece member 20 which consists of steel segments.
[0036]
A state {FIG. 17 (B)} when building a vertical shaft (starting vertical shaft, reaching vertical shaft) will be described in detail. As shown in FIG. 18, a plurality of ground anchors 22 are driven in advance around the space where the hollow cylinder 19 is pressurized and set, and the anchor wires 24 connected to the ground anchors 22 are hollow cylinders. 19 is fixed to an upper beam 21 provided above 19. A press-fitting girder 25 is placed on the upper portion of the hollow cylinder 19 via a press ring 23, and a jack cradle 27 and a press-fitting jack 29 are provided between the press-fitting girder 25 and the upper beam 21. When the press-in jack 29 works to widen the space between the upper beam 21 and the press-in beam 25, the press-in force is transmitted to the hollow cylinder 19 through the press-in beam 25 and the press ring 23, and the hollow cylinder 19 moves downward toward the ground. And press-fitted. A hammer grab bucket 31, which is a kind of excavator, is suspended by a wire 33 to excavate the ground inside the hollow cylinder 19. Thus, the hollow cylinder 19 is sunk underground and the shaft 1 is constructed.
[0037]
Until the excavator 15 is started from the shaft 1, the slide steel plate 7 is fixed to the opening steel plate 4 by the bolt 10, and the opening 5 of the opening steel plate is closed by the slide steel plate 7.
[0038]
Then, the excavator 15 is suspended in the shaft (starting shaft) 1 {FIG. 17 (D)}.
[0039]
When the excavator 15 is suspended, the bolt 48 and the auxiliary plate 47 are removed, and the reinforcing member 46 is removed.
[0040]
Next, the bolt 10 is loosened to release the fixation of the slide steel plate 7. At this time, since the slide steel plate 7 is pressed against the packing 13 by the water pressure on the natural ground side, water does not leak from the packing 13 even if the bolt 10 is recovered inward from the screw holes 8 and 9. The screw hole 8 has the same diameter as the bolt 10 and is closed with a short bolt. Next, as shown in FIG. 6, the entrance seal 17 is attached to the opening 5 of the opening steel plate in the shaft 1, and the excavator 15 is mounted in the entrance seal 17. Next, the entrance seal 17 is inflated and pressed against the outer periphery of the excavator 15. Next, as shown in FIG. 7, a filler such as mud is injected into the space (pressure chamber) formed between the slide steel plate 7 and the excavator 15, and water pressure (mud pressure) that opposes the natural ground side is applied. . By making the water pressure (mud pressure) inside the shaft 1 (the shaft side) higher than the ground side, the pressure on the shaft side and the ground side is balanced, and the slide steel plate 7 and the packing 13 are separated.
[0041]
Next, as shown in FIG. 8, the slide steel plate 7 is pulled up. Next, as shown in FIG. 9, the excavator 15 is started and the tunnel 30 is excavated to the vertical shaft (reach shaft) 1 {FIGS. 17E and 17F}.
[0042]
The excavator 15 reaches a shaft (reach shaft) 1 constructed at the final end of a predetermined route {FIGS. 10-16, FIG. 17 (G)}. In the vertical shaft (destination vertical shaft) 1, the opening 5 is closed by the slide steel plate 7. Next, the bolt 10 is loosened, and the bolt 10 is pulled out from the screw holes 8 and 9 to release the fixation of the slide steel plate 7. At this time, since the slide steel plate 7 is pressed against the packing 13 by the water pressure on the natural ground side, water does not leak from the packing 13 even if the bolt 10 is recovered inward from the screw holes 8 and 9. As shown in FIG. 10, the entrance seal 17 and the chamber blind cover 18 are attached to the opening 5 in the shaft 1. Then, as shown in FIG. 11, a filler such as mud is injected into the space between the entrance seal 17 and the chamber blind 18 from the injection pipe 32 (see FIG. 4) inside the shaft (reach shaft) 1, Apply water pressure (mud pressure) against the natural mountain side. By making the water pressure higher than the ground pressure, the pressure on the shaft side and the ground side is balanced. Moreover, the slide steel plate 7 and the packing 13 leave | separate by this. As shown in FIG. 12, the slide steel plate 7 is pulled upward to open the opening 5. Next, as shown in FIG. 13, the reached excavator 15 is propelled into the space between the entrance seal 17 and the chamber blind lid 18, and the entrance seal 17 is inflated as shown in FIG. Press on the part. Next, as shown in FIG. 15, back injection is performed, and after water stoppage is confirmed, as shown in FIG. 16, the chamber blind cover 18 is removed and the tunnel penetrates.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an overall configuration of a shaft opening structure according to an embodiment of the present invention.
FIG. 2 is a cross-sectional view according to an embodiment of the present invention.
FIG. 3 is a perspective view showing a state in which the opening of the opening steel plate is closed by the slide steel plate according to the embodiment of the present invention.
FIG. 4 is a perspective view showing a state in which a portion B of the slide steel plate according to the embodiment of the present invention is left in the slit.
FIG. 5 is a perspective view showing a slide steel plate according to an embodiment of the present invention.
FIG. 6 is a plan view showing an embodiment in which the present invention is applied to a start opening.
FIG. 7 is a plan view showing an embodiment in which the present invention is applied to a start opening.
FIG. 8 is a plan view showing an embodiment in which the present invention is applied to a start opening.
FIG. 9 is a plan view showing an embodiment in which the present invention is applied to a start opening.
FIG. 10 is a plan view showing an embodiment in which the present invention is applied to a reaching port.
FIG. 11 is a plan view showing an embodiment in which the present invention is applied to a reaching port.
FIG. 12 is a plan view showing an embodiment in which the present invention is applied to a reaching port.
FIG. 13 is a plan view showing an embodiment in which the present invention is applied to a reaching port.
FIG. 14 is a plan view showing an embodiment in which the present invention is applied to an arrival port.
FIG. 15 is a plan view showing an embodiment in which the present invention is applied to an arrival port.
FIG. 16 is a plan view showing an embodiment in which the present invention is applied to a reaching port.
FIGS. 17A to 17G are schematic process diagrams of the entire construction for constructing a shaft and excavating a tunnel.
FIG. 18 is a schematic view showing a state when a shaft is constructed.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Shaft 2 Earth retaining wall 3 Earth retaining wall opening 4 Opening steel plate 5 Opening steel plate opening 6 Connection steel plate 6a Connection steel plate upper part 6b Connection steel plate lower part 7 Slide steel plate 7a Slide steel plate part A 7b Slide steel plate part B 8 Screw hole 9 in the opening steel plate 10 Screw hole in the slide steel plate 10 Bolt 12 Slit 13 Packing 15 Excavator 17 Entrance seal 18 Chamber blind lid 19 Hollow cylinder 20 Piece member 21 Upper beam 22 Ground anchor 23 Press ring 24 Anchor wire 25 Press fit Girder 26 Spacer 27 Jack cradle 29 Press-fit jack 30 Tunnel 31 Hammer grab bucket 32 Injection pipe 33 Wire 40 Frame body 41 Plate body 42 Plate body 42a Notch 43 Slit,
44 Slit 46 Reinforcing member 47 Auxiliary plate 48 Bolt 49 Bolt 50 Nut 51 Self-sealing type packing 52 Skew-seal type packing 53 Low girder vertical girder 54 Normal girder vertical girder 55 Joint member 56 Bolt 57 Fastener 58 Bolt 59 Iron plate

Claims (4)

土留め壁に設けられた開口の内側に配された、開口を有する開口部板材と、前記土留め壁と前記開口部板材との間に前記開口部板材の開口を開閉するために移動可能に配された開閉板と、前記開口部板材と前記土留め壁との間において、前記開口部板材の開口及び前記土留め壁の開口の周囲を枠状に囲んで配された、前記開口部板材と前記土留め壁とを接続する接続部材と、前記接続部材に設けられた、前記開閉板を移動可能に挿通するためのスリットと、前記開口部板材と前記開閉板とを固定するための固定手段とを備え、
前記固定手段は、前記開口部板材及び前記開閉板に設けられた複数のねじ孔と、前記ねじ孔に螺合可能なボルトとを備え、前記開口部板材に設けられた前記ねじ孔は前記開口部板材を貫通しており、前記開閉板に設けられた前記ねじ孔は、前記土留め壁の開口側の部位が閉塞されて前記開閉板を貫通しておらず、前記開口部板材には、前記開口部に設けられた複数のねじ孔の外周側に前記開口部板材と前記開閉板との隙間を閉塞するためのパッキンが配されていることを特徴とする、立坑の開口部構造。
An opening plate material having an opening disposed inside an opening provided in the retaining wall, and movable to open and close the opening of the opening plate material between the retaining wall and the opening plate material The opening plate material arranged between the opening and closing plate and the opening plate material and the retaining wall so as to surround the opening of the opening plate material and the opening of the retaining wall in a frame shape. A connecting member that connects the retaining wall, a slit provided in the connecting member for movably inserting the opening and closing plate, and a fixing for fixing the opening plate member and the opening and closing plate Means and
The fixing means includes a plurality of screw holes provided in the opening plate material and the opening and closing plate, and a bolt that can be screwed into the screw hole, and the screw hole provided in the opening plate material is the opening. The screw hole provided in the opening and closing plate is not penetrating the opening and closing plate because the opening side portion of the retaining wall is closed, and the opening plate material includes: An opening structure for a shaft, wherein packing for closing a gap between the opening plate material and the opening / closing plate is arranged on the outer peripheral side of a plurality of screw holes provided in the opening.
前記接続部材の前記スリットが設けられている位置には、前記接続部材の外側の空間を隙間無く覆って配された、前記開閉板が挿通可能なスリットを有する第1止水部材と、前記第1止水部材の外側に配された、前記開閉板が挿通可能なスリットを有する第2止水部材とが設けられ、前記第1止水部材には、前記第1止水部材と前記開閉板との隙間を充填するセルフシール型のパッキンが配され、前記第2止水部材には、前記第1止水部材と前記開閉板との隙間を充填するスキューズシール型のパッキンが配されていることを特徴とする、請求項1記載の立坑の開口部構造。A first water-stop member having a slit through which the opening and closing plate can be inserted, and is disposed so as to cover the space outside the connection member without a gap at a position where the slit of the connection member is provided; A second water stop member having a slit through which the opening and closing plate can be inserted is provided on the outer side of the first water stopping member, and the first water stopping member includes the first water stopping member and the opening and closing plate. A self-sealing type packing that fills the gap between the first water-stopping member and the opening / closing plate is arranged on the second water-stopping member. The opening structure of a shaft according to claim 1, wherein 前記土留め壁は、前記開口部板材の開口を閉塞している状態の前記開閉板を前記土留め壁に固定するための補強部材を備え、前記補強部材は、前記開口部板材の開口を閉塞している状態の前記開閉板の端部と接触して取り付けられている、請求項1又は2記載の立坑の開口部構造。The retaining wall includes a reinforcing member for fixing the opening / closing plate in a state of closing the opening of the opening plate material to the retaining wall, and the reinforcing member blocks the opening of the opening plate material. The opening structure of a shaft according to claim 1 or 2, wherein the structure is attached in contact with an end of the opening and closing plate in a state where the shaft is open. 前記開閉板は分割されており、分割されたうちのひとつは、前記接続部材のスリット部の止水のため、前記スリット部に挿通されたまま残置されている請求項1、2又は3記載の立坑の開口部構造。The said opening-and-closing plate is divided | segmented, The one of the division | segmentation is left behind with being inserted in the said slit part for the water stop of the slit part of the said connection member. Opening structure of shaft.
JP2001070274A 2001-03-13 2001-03-13 Shaft opening structure Expired - Lifetime JP4475448B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001070274A JP4475448B2 (en) 2001-03-13 2001-03-13 Shaft opening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001070274A JP4475448B2 (en) 2001-03-13 2001-03-13 Shaft opening structure

Publications (2)

Publication Number Publication Date
JP2002276280A JP2002276280A (en) 2002-09-25
JP4475448B2 true JP4475448B2 (en) 2010-06-09

Family

ID=18928175

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001070274A Expired - Lifetime JP4475448B2 (en) 2001-03-13 2001-03-13 Shaft opening structure

Country Status (1)

Country Link
JP (1) JP4475448B2 (en)

Also Published As

Publication number Publication date
JP2002276280A (en) 2002-09-25

Similar Documents

Publication Publication Date Title
JP4475448B2 (en) Shaft opening structure
KR100758502B1 (en) Entrance machine for driving waterwork pipe and method for constructing it
JP4323075B2 (en) Shaft opening structure
JP3903371B2 (en) Opening structure of shaft and start and arrival method from shaft
JP2000297590A (en) Excavation wall construction method
JP4264049B2 (en) Branch construction method of shield tunnel and slide gate device
JP3439859B2 (en) Press-fit caisson
JP4833089B2 (en) Water stop device for underground penetrating body and construction method of underground penetrating body using the same
JP3520358B2 (en) Connection structure between horizontal shaft structure and vertical shaft structure
JPH074174A (en) Pit mouth sealing device
CN217870574U (en) Structure for applying locking steel sheet pile to water-stop curtain between piles
JP4259969B2 (en) Double-section shield method
JPH06158980A (en) Method and device for starting shield machine and arriving method and device for the same
JP2807587B2 (en) Water sheet for steel sheet pile and ground excavation method
JP2777540B2 (en) Tunnel connection method and tunnel connection segment
JPH10176329A (en) Temporary anchor and temporary anchor execution working method
JP2891915B2 (en) Tunnel connection method and tunnel connection segment
JP2002256790A (en) Method and device for filling drilled hole based on grout material injection via down-the-hole drill
JP4275296B2 (en) A sinking body having an opening forming portion structure
JP2006152680A (en) Joining construction method for shield tunnel and structure of shield tunnel by its construction method
JP3990589B2 (en) Reinforcing structure for shaft opening
JPH10176483A (en) Reinforcement and reinforcing pipe, and reinforcing and repairing method for embedded body in underground by use of the pipe
JP2698316B2 (en) Tunnel connection method and tunnel connection segment
JPH0882188A (en) Tunnel sealing device
JPH07301089A (en) Launching method of shield machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090826

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091208

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100203

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100302

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100303

R150 Certificate of patent or registration of utility model

Ref document number: 4475448

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130319

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140319

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees