JP4398037B2 - Rust prevention tool insertion device and continuous water method - Google Patents

Rust prevention tool insertion device and continuous water method Download PDF

Info

Publication number
JP4398037B2
JP4398037B2 JP2000006172A JP2000006172A JP4398037B2 JP 4398037 B2 JP4398037 B2 JP 4398037B2 JP 2000006172 A JP2000006172 A JP 2000006172A JP 2000006172 A JP2000006172 A JP 2000006172A JP 4398037 B2 JP4398037 B2 JP 4398037B2
Authority
JP
Japan
Prior art keywords
existing pipe
opening
rust preventive
preventive tool
gate valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000006172A
Other languages
Japanese (ja)
Other versions
JP2001193893A (en
Inventor
敏之 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suiken Co Ltd
Original Assignee
Suiken Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suiken Co Ltd filed Critical Suiken Co Ltd
Priority to JP2000006172A priority Critical patent/JP4398037B2/en
Priority to US09/758,283 priority patent/US6622747B2/en
Publication of JP2001193893A publication Critical patent/JP2001193893A/en
Application granted granted Critical
Publication of JP4398037B2 publication Critical patent/JP4398037B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)
  • Pipe Accessories (AREA)

Description

【0001】
【発明のバックグラウンド】
発明の分野:
本発明は、既設管に不断水で施工した円形ないし溝形の開孔の防錆処理に関するものである。
【0002】
従来の技術:
従来より、既設管に不断水下において開孔を形成し、該開孔から仕切弁体を挿入し、管路内の水の流れを遮断可能にする不断水バルブ挿入工法は周知である(U.S.P.3,948,282,U.S.P.4,516,598)。
かかる工法では、バルブ挿入後に仕切弁体で水の流れを遮断し、目的とする配管変更などの作業を行うと、当該仕切弁体が不要になるので、当該仕切弁体を撤去(除去)する場合がある。かかる場合、前記開孔は穿孔ないし切削して形成したものであるため、防錆処理ができていない。
【0003】
25mm以下の給水工事では、かかる開孔に銅製の中空ブッシュをかしめて挿入する防錆処理を行っている。しかし、かかる防錆処理ではブッシュを押し拡げてかしめる工程が必要になるので配水工事(φ50以上) のような口径の大きい場合には適用できない。また、前記開孔を閉封しないので、工法が複雑になる。
【0004】
したがって、本発明の目的は、配水工事(φ50以上) に適用し得ると共に、開孔を閉封し得る防錆処理具や方法を提供することである。
【0005】
【発明の概要】
前記目的を達成するために、本発明の防錆具は、既設管の周方向に概ね 180°ないし180 °よりも若干小さな角度の範囲にわたる円形ないし溝形の開孔を閉封する不断水工事用の防錆具である。該防錆具は前記開孔に対応する形状を持ち、かつ、前記既設管内の水の流れを止めることのない(弁体ではない)ものである。前記防錆具は、前記開孔の切削された面に略全周にわたって圧接するエラストマーからなる圧接部と、該圧接部に一体で前記開孔に作用する水圧に抗する剛性を持つ剛体部とを備えている。
なお、円形の開孔は周知のホールソーにより形成することができる。また、溝形の開孔はエンドミルやフライスにより形成することができる。
本発明において、「剛体部」は、一般に、ダクタイル鋳鉄、スチール、ステンレスなどの金属で形成される。
【0006】
かかる防錆具は、以下の仕切弁体と共に密閉ケースに収容して防錆具挿入装置を構成することができる。
ここに、前記仕切弁体は、前記開孔から前記既設管内に侵入することで、前記既設管内の水の流れを止める。一方、前記密閉ケースは、前記防錆具および前記仕切弁体を収容すると共に、前記既設管の周方向に複数個に分割されている。
【0007】
一方、本発明の不断水工法は、前記防錆具挿入装置等を用いて、以下に説明する囲繞工程、孔形成工程、止水工程、取出工程および閉封工程とを有する。
前記囲繞工程では、既設管の一部を、該既設管の周方向に複数個に分割された密閉ケースによって気密状態で囲繞する。
前記孔形成工程では、前記密閉ケース内において、既設管の周方向に概ね 180°ないし180 °よりも若干小さな角度の範囲にわたって円形ないし溝形の開孔を形成する。
前記止水工程では、前記開孔から前記既設管内に仕切弁体を侵入させて、該仕切弁体により前記既設管内の水の流れを止める。
前記取出工程では、前記仕切弁体を前記開孔から取り出す。
前記閉封工程では、前記開孔の切削された(金属)面に略全周にわたって接触するエラストマーからなる圧接部と、該圧接部に一体で前記開孔に作用する水圧に抗する剛性を持つ剛体部とを備えた防錆具を前記開孔に嵌め込む。
【0008】
かかる不断水工法によって、本発明の配管構造が得られる。
すなわち、本発明の配管構造は、既設管の周方向に概ね 180°ないし180 °よりも若干小さな角度の範囲にわたって切欠されて形成された開孔を側面に有する既設管と、前記開孔に対応する形状を持ち、かつ、前記既設管内の水の流れを止めることのない防錆具とを備えている。前記防錆具は、前記開孔の切削された面に略全周にわたって圧接するエラストマーからなる圧接部と、該圧接部に一体で前記開孔に作用する水圧に抗する剛性を持つ剛体部とを備えている。
なお、前記防錆具は密閉ケースで収容したまま密閉ケース内で固定しておいてもよいが、バンドで既設管に固定して前記密閉ケースを取り外してもよい。
【0009】
なお、本発明において、「エラストマー」としては、ゴムの他にゲル、未架橋の樹脂または樹脂スポンジなどを採用することができる。
【0010】
【発明の効果】
本発明によれば、銅製のブッシュを押し拡げる必要がないから、口径の大きい配水工事にも適用することができる。また、防錆具には開孔を閉封する剛体部を備えているので、閉封後の板フランジの取付などが容易になる。
【0011】
【実施例の説明】
以下、本発明の実施例を図面にしたがって説明する。
図1ないし図7は第1実施例を示す。
防錆具挿入装置10
図1および図2に示すように、防錆具挿入装置10は、密閉ケース2、仕切弁体8A、弁棒8C、防錆具7および防錆具挿入用ボルト7Aを有している。前記密閉ケース2は、前記仕切弁体8Aおよび防錆具7を収容すると共に、周方向Rに2分割された第1および第2分割ケース21,22を備えている。弁蓋23は、第1および第2分割ケース21,22と共に前記密閉ケース2を構成する。前記弁棒8Cおよび防錆具挿入用ボルト7Aは前記仕切弁体8Aおよび防錆具7を既設管1の管径方向Cにスライドさせる。
前記第1分割ケース21と第2分割ケース22との間や、図2に示す密閉ケース2と既設管1との間は、ゴムパッキン14でシールされている。また、前記弁蓋23と第2分割ケース22との間はゴムリング15でシールされている。なお、前記密閉ケース2の両端部には、ゴムリング16(図5)が押し込まれるパッキン挿入部26が設けてある。
【0012】
前記第1分割ケース21には、既設管1の管径方向Cの外方に向って分岐状に突出して防錆具7を収容する防錆具収容部210が形成されている。前記防錆具収容部210には、図1に示すように、既設管1の管径方向Cの外方に向って分岐状に突出した、ボルト挿入部211と一対の固定ネジ挿入部213,213とが形成されている。前記ボルト挿入部211には、前記防錆具挿入用ボルト7Aが螺合している。また、前記ボルト挿入部211は外周面にキャップ65(図7)が螺合する雄ネジ部212を有している。前記固定ネジ挿入部213,213は、前記防錆具収容部210内の防錆具7の両端部に近接した位置において既設管1の概ね中心に向って形成されている。前記固定ネジ挿入部213,213には、固定ネジ61が螺合している。ボルト挿入部211と一対の固定ネジ挿入部213,213には、それぞれ、防錆具挿入用ボルト7Aおよび固定ネジ61がねじ込まれた際に、前記各挿入部211,213と、防錆具挿入用ボルト7Aおよび固定ネジ61との間をシールするゴムリング17が固着されている。
【0013】
前記第2分割ケース22には、既設管1の管径方向Cの外方に向って分岐状に突出する第1分岐状部221と第2分岐状部222とが形成されている。前記第2分岐状部222は、前記第1分岐状部221から分岐するように前記第1分岐状部221に対して斜めに形成されている。
【0014】
前記第1分岐状部221には、前記弁蓋23が組立ボルト62によって締結されている。前記第1分岐状部221および弁蓋23は、開弁時に仕切弁体8Aを収容する。
前記第2分岐状部222は、既設管1の中心に向って開口しており、該第2分岐状部222に装着されるミリング状の切削工具4が前記第1分岐状部221を貫通する。前記第2分岐状部222には、作業用仕切弁70を介して切削装置3のアタッチメント34が固定されている。前記第2分岐状部222と前記作業用仕切弁70との間や、前記作業用仕切弁70とアタッチメント34との間は、図示しないゴムリングによってシールされている。前記第2分岐状部222は、内側に図4のプラグ60をねじ込むための雌ネジ部22aを有している。
【0015】
仕切弁体8A
仕切弁体8Aは、弁棒8Cを正逆方向に回転させることにより、第2分割ケース22内において既設管1の管径方向Cにスライドする。仕切弁体8Aには、ゴムパッキン8dが装着されている。該ゴムパッキン8dは、仕切弁体8Aが開孔12Cから既設管1内に侵入すると、開孔12Cを閉塞すると共に、既設管1の内周面1bに圧接して、既設管1内の水の流れを止める。なお、弁棒8Cには周知のコマ140が螺合している。
【0016】
防錆具7
図1および図2に示すように、防錆具7は前記仕切弁体8Aとは既設管1の周方向Rに約180 °離れた位置に配設されている。防錆具7は、切削工具4により既設管1の周方向Rに形成される概ね180 °ないし180 °よりも若干小さな角度の範囲にわたる長円形の開孔12Cに対応する形状を有している。すなわち、前記防錆具7は、既設管1に沿う半円環状に湾曲した形状に形成されており、かつ、既設管1に押し込まれた後、既設管1内の水の流れを止めることのない形状を有している。前記防錆具7は、エラストマーからなる圧接部71と、芯材部(剛体部)72とを備えている。前記圧接部71は、開孔12Cの切削された面に略全周にわたって圧接する。前記芯材部72は、開孔12Cに作用する水圧に抗する剛性を持ち、圧接部71が一体に焼付けられている。また、前記芯材部72は、防錆具挿入用ボルト7Aの先端に一体に形成された押込部7Bが係合する係合部73を有している。さらに、図2に示すように、前記芯材部72は既設管1内への侵入部分以外の部分の幅が開孔12Cよりも若干大きく形成されてなる。
【0017】
切削装置3
図1において、第2分岐状部222には、作業用仕切弁70を介して切削装置3が取り付けられている。該切削装置3は、前記開孔12C(図2)を形成するためのもので、ミリング状の切削工具4を備えている。前記切削工具4は切削装置3のカッタ軸32の先端部に固定されている。前記カッタ軸32は、図示しないモータなどの原動機に連結されており、原動機の動力で回転される。したがって、切削工具4は、原動機の動力でカッタ軸32のまわりに回転する。
なお、本切削装置3は、切削工具4がエンドミル状である他は、周知の穿孔機と同様の構造のものを用いることができる。
【0018】
つぎに、工法について説明する。
囲繞工程
まず、図1の既設管1内に液体(水)が流れている状態で、密閉ケース2を既設管1の切削位置に取り付けると共に、図示しない組立ボルトにより、防錆具7を収容した第1分割ケース21と第2分割ケース22とを組み立てる。この後、切削装置3を第2分岐状部222に取り付ける。こうして、図1のように、密閉ケース2が既設管1の一部を気密状態で囲繞する。
【0019】
孔形成工程
前記組立工程の後、作業者は切削装置3を操作して、図示しない原動機を駆動させると、切削工具4がカッタ軸32と共に回転し、既設管1を切削する切削運動を開始する。該切削運動を行っている状態で、作業者が切削装置3を操作して、切削工具4を切込方向C1に向って送ると、やがて、図1の二点鎖線および図3(a)に示すように、切削工具4の先端面40が既設管1の管壁1aの一部を貫通する位置まで進む。こうして、切削工具4による切込みが完了する。
この切込後、前記切削運動を切削工具4が行っている状態で、図3(b)に示すように、作業者が密閉ケース2を既設管1の周方向Rに回転させる。すなわち、前記切削工具4は前記カッタ軸32のまわりを回転しながら密閉ケース2と共に前記周方向Rに回転する送り運動を行う。このように作業者は切削工具4が送り運動を行っている状態で、切削工具4を既設管1の周方向Rに概ね180 °ないし180 °よりも若干小さな角度の範囲にわたって回転させる。その後、作業者は、切削工具4を元の位置まで退避させて、図3(c)に示すように、密閉ケース2を元の位置戻す。このようにして、既設管1を切片を生成することなく、既設管1に前記周方向Rに概ね180 °ないし180 °よりも若干小さな角度の範囲にわたって切欠された長円形の開孔12Cを形成する。
【0020】
止水工程
前記孔形成工程の後、作業者は、図1の作業用仕切弁70の作業レバー700を操作して作業用仕切弁70を閉弁する。その後、作業者は切削装置3を取り外す。この取り外し後、作業者は、周知のプラグ挿入器(図示せず)を作業用仕切弁70に取り付けて、作業用仕切弁70を開弁する。この開弁後、作業者はプラグ挿入器(図示せず)を操作して、図4のプラグ60を第2分岐状部222の雌ネジ部22aにねじ込む。このねじ込み後、作業者は、作業用仕切弁70(図1)とプラグ挿入器を取り外す。その後、図4に示すように、作業者は、弁棒8Cを正方向に回転させることにより、仕切弁体8Aを開孔12Cから既設管1内に侵入させて、該仕切弁体8Aにより既設管1内の水の流れを止める。この既設管1の閉塞状態において、たとえば、既設管1の配管変更箇所を切断した後、メカ帽51(図7)を取り付けて、配管変更などの作業を行う。
【0021】
取出工程
前記配管変更などの作業を行った後、作業者は、弁棒8Cを逆方向に回転させて、図5(a)に示すように、仕切弁体8Aを開孔12Cから取り出す。
【0022】
閉封工程
前記取出工程の後、図5(b)に示すように、作業者は、密閉ケース2を既設管1の周方向Rに約180 °回転させて、防錆具7を開孔12Cの位置に対応させる。この後、作業者は、パッキン挿入部26(図2)にゴムリング16および割押輪50を取り付ける。その後、作業者は、図6の防錆具挿入用ボルト7Aをねじ込んで防錆具7を開孔12Cに嵌め込む。この嵌込後、防錆具7の芯材部72を既設管1の内に向って押し付ける固定ネジ61(図1)をねじ込む。その後、ボルト挿入部211の雌ネジ部212にキャップ65(図7)をねじ込む。
【0023】
前記閉封工程の後、作業者は、仕切弁体8Aを収容した弁蓋23を取外し、弁蓋23に代えて図7のフランジ蓋55を取り付ける。このようにして、図7に示す配管構造が得られる。
なお、この第1実施例では、密閉ケース2内に仕切弁体8Aおよび防錆具7の両方を収容しているので、施工性が良いという利点を有する。
また、こうして開孔12Cが閉封された状態で密閉ケース2が既設管1を囲繞しているので、以下に説明するように再びバルブとしての機能を発揮することができる。すなわち、前記フランジ蓋55を取り外した後に、再び仕切弁体8Aおよび弁蓋23を取り付け、前記開孔12Cを再び開いた後、前記仕切弁体8Aを開孔12Cの位置まで移動させることにより、再びバルブとしての機能を発揮することもできる。
【0024】
第2実施例
図8ないし図14は第2実施例を示す。
防錆具挿入装置100
図8ないし図10に示すように、防錆具挿入装置100は、密閉ケース2、仕切弁体8A、弁棒8C、防錆具7および防錆具挿入用ボルト7Aを有している。前記密閉ケース2は、前記仕切弁体8Aおよび防錆具7を収容すると共に、周方向Rに2分割された第1および第2分割ケース21,22を備えている。前記第2分割ケース22の第1分岐状部221は、防錆具収容部210を一体に形成しており、防錆具7と仕切弁体8Aとが既設管1の管軸方向Sに離れて設けられている。
なお、防錆具挿入装置100のその他の構成は、第1実施例と同様であり、同一部分または相当部分に同一符号を付して、その詳しい説明を省略する。
【0025】
つぎに、工法について説明する。
囲繞工程
まず、図8の既設管1内に液体(水)が流れている状態で、密閉ケース2を既設管1の切削位置に取り付けると共に、図示しない組立ボルトにより、第1分割ケース21と、防錆具7を収容した第2分割ケース22とを組み立てる。この後、切削装置3を第2分岐状部222に取り付ける。こうして、図8のように、密閉ケース2が既設管1の一部を気密状態で囲繞する。
【0026】
孔形成工程
前記組立工程の後、前記第1実施例の孔形成工程と同様にして、図11(a)に示すように、既設管1に前記周方向Rに概ね180 °ないし180 °よりも若干小さな角度の範囲にわたって開孔12Cを形成する。
【0027】
止水工程
前記孔形成工程の後、前記第1実施例の止水工程と同様にして、図11(b)に示すように、仕切弁体8Aを開孔12Cから既設管1内に侵入させて、該仕切弁体8Aにより既設管1内の水の流れを止める。この既設管1の閉塞状態において、たとえば、既設管1の配管変更箇所を切断した後、図12(a)に示すように、メカ帽51を取り付けて、配管変更などの作業を行う。
【0028】
取出工程
前記配管変更などの作業を行った後、前記第1実施例の取出工程と同様にして、図12(b)に示すように、仕切弁体8Aを開孔12Cから取り出す。
【0029】
移動工程
前記取出工程の後、図13(a)に示すように、密閉ケース2を既設管1の管軸方向Sに移動させて、開孔12Cに対応する位置に防錆具7を移動させる。
【0030】
閉封工程
前記移動工程の後、図13(b)に示すように、防錆具挿入用ボルト7Aをねじ込んで防錆具7を開孔12Cに嵌め込む。この嵌込後、防錆具7の芯材部72を既設管1の内に向って押し付ける固定ネジ61をねじ込む。その後、ボルト挿入部211の雌ネジ部212にキャップ65をねじ込む。
【0031】
前記閉封工程の後、作業者は、仕切弁体8Aを収容した弁蓋23を取外し、弁蓋23に代えて図14のフランジ蓋55を取り付ける。このようにして、図14に示す配管構造が得られる。
なお、この第2実施例では、管下の掘削を浅くすることができる。
【0032】
参考例
図15ないし図19は本発明の理解に役立つ参考例を示す。
防錆具挿入装置200
図15に示すように、防錆具挿入装置200は、密閉ケース2、仕切弁体8A、弁棒8Cを有している。前記密閉ケース2は、周方向Rに2分割された第1および第2分割ケース21,22を備えている。弁蓋23は、第1および第2分割ケース21,22と共に前記密閉ケース2を構成する。
【0033】
前記第2分割ケース22には、既設管1の管径方向Cの外方に向って分岐状に突出する第1分岐状部221と第2分岐状部222とが形成されている。前記第2分岐状部222は、前記第1分岐状部221から分岐するように前記第1分岐状部221に対して斜めに形成されている。
【0034】
前記第1分岐状部221には、第1分岐状部221側から組立ボルト62によって前記弁蓋23が固定されている。前記第1分岐状部221のフランジ221aは、前記弁蓋23のフランジ23aよりも若干大きく形成されている。
なお、防錆具挿入装置200のその他の構成は、第1実施例と同様であり、同一部分または相当部分に同一符号を付して、その詳しい説明を省略する。
【0035】
つぎに、工法について説明する。
囲繞工程
まず、図15の既設管1内に液体(水)が流れている状態で、密閉ケース2を既設管1の切削位置に取り付けると共に、図示しない組立ボルトにより、第1分割ケース21と第2分割ケース22とを組み立てる。この後、切削装置3を第2分岐状部222に取り付ける。こうして、図15のように、密閉ケース2が既設管1の一部を気密状態で囲繞する。
【0036】
孔形成工程
前記組立工程の後、前記第1実施例の孔形成工程と同様にして、既設管1に前記周方向Rに概ね180 °ないし180 °よりも若干小さな角度の範囲にわたって切欠して形成された開孔12Cを形成する。
【0037】
止水工程
前記孔形成工程の後、前記第1実施例の止水工程と同様にして、仕切弁体8Aを開孔12Cから既設管1内に侵入させて、該仕切弁体8Aにより既設管1内の水の流れを止める。この既設管1の閉塞状態において、たとえば、既設管1の配管変更箇所を切断した後、図16(a)に示すように、メカ帽51を取り付けて、配管変更などの作業を行う。
【0038】
仕切弁体取出工程
前記配管変更などの作業を行った後、作業者は仕切弁体8Aを密閉ケース2の弁蓋23内に取り出す。その後、図16(a)に示すように、作業者は第1分岐状部221のフランジ221aに作業用仕切弁75を接合し、さらに、該作業用仕切弁75に作業用上部タンク76を重ねて接合する。この接合時に、作業用上部タンク76を貫通する昇降シャフト77の先端部に弁蓋23を接合する。この接合後、作業者は、組立ボルト62を取り外す。該取外し後、作業者は、図16(b)に示すように、昇降シャフト77を引き上げて弁蓋23と共に仕切弁体8Aを密閉ケース2から作業用上部タンク76内に取り出す。この取出後、作業者は作業用仕切弁75を閉弁する。該閉弁後、作業者は作業用上部タンク76を作業用仕切弁75から切り離す。
【0039】
防錆具取付工程
前記仕切弁体の取出工程の後、作業者は、図17(a)に示すように、防錆具7およびフランジ蓋78を収容した作業用上部タンク76を作業用仕切弁75に接合する。前記作業用上部タンク76を貫通する昇降シャフト77の先端部には、アダプタ79を介して防錆具押込軸7A(図19)が連結されている。この接合後、作業者は、昇降シャフト77を降下させて、前記フランジ蓋78を組立ボルト62によって固定する。その後、作業者は、図18(a)に示すように、作業用上部タンク76および作業用仕切弁75を密閉ケース2から取り外す。
【0040】
閉封工程
前記防錆具取付工程の後、図18(b)に示すように、防錆具押込軸7Aをねじ込んで防錆具7を開孔12Cに嵌め込む。この嵌込後、防錆具7の芯材部72を既設管1の内に向って押し付ける固定ネジ61をねじ込む。その後、ボルト挿入部211の雌ネジ部212にキャップ65をねじ込む。
このようにして、図19に示す配管構造が得られる。
【0041】
なお、図20(a),(b)に示すように、圧接部71は開孔12Cの切削面に圧接すればよく、板状であってもよい。また、剛体部72は前記圧接部71の圧接状態を保持する剛性があればよい。
また、防錆具7は固定ネジ61で押し付けて固定する必要はなく、図20(c)のようにバンドで既設管1に固定するなど他の方法で既設管1に固定すればよい。
【0042】
以上のとおり、図面を参照しながら好適な実施例を説明したが、当業者であれば、本明細書を見て、自明な範囲内で種々の変更および修正を容易に想定するであろう。
たとえば、切削工具に切削運動を与える原動機としては、モータの他にエンジンなどを用いてもよい。また、密閉ケースで既設管を囲繞する前に前記密閉ケースに切削装置を取り付けてもよい。
また、密閉ケースは周方向に3つないし4つに分割してもよい。
また、周知のホールソーにより既設管に形成した円形の開孔を閉封する場合についても本発明を適用し得る。
したがって、そのような変更および修正は、本発明の範囲のものと解釈される。
【図面の簡単な説明】
【図1】 図1は本発明の第1実施例にかかる工法の組立工程を示す横断面図である。
【図2】 図2は同縦断面図である。
【図3】 図3(a),図3(b)および図3(c)は孔形成工程を示す概略横断面図である。
【図4】 図4は止水工程を示す横断面図である。
【図5】 図5(a)は取出工程を示す概略縦断面図である。図5(b)は閉塞工程の前の状態を示す概略縦断面図である。
【図6】 図6は閉塞工程を示す概略縦断面図である。
【図7】 図7は第1実施例にかかる配管構造を示す縦断面図である。
【図8】 図8は本発明の第2実施例にかかる工法の組立工程を示す縦断面図である。
【図9】 図9は同IX−IX線断面図である。
【図10】 図10は図8のX−X線断面図である。
【図11】 図11(a),図11(b)は止水工程を示す概略縦断面図である。
【図12】 図12(a)は止水工程を示す概略縦断面図である。図12(b)は取出工程を示す概略縦断面図である。
【図13】 図13(a)は移動工程を示す概略縦断面図である。図13(b)は閉塞工程を示す概略縦断面図である。
【図14】 図14は第2実施例にかかる配管構造を示す縦断面図である。
【図15】 図15は本発明の理解に役立つ参考例にかかる工法の組立工程を示す縦断面図である。
【図16】 図16(a),図16(b)は仕切弁体の取出工程を示す概略図である。
【図17】 図17(a),図17(b)は防錆具取付工程を示す概略縦断面図である。
【図18】 図18(a),図18(b)は閉塞工程を示す概略縦断面図である。
【図19】 図19は同参考例にかかる配管構造を示す横断面図である。
【図20】 図20は防錆具の他の例を示す断面図である。
【符号の説明】
1:既設管
12C:開孔
2:密閉ケース
61:固定ネジ
7:防錆具
71:圧接部
72:剛体部
8A:仕切弁体
R:周方向
S:管軸方向
[0001]
[Background of the invention]
Field of Invention:
The present invention relates to a rust-proofing treatment for circular or groove-shaped openings constructed on an existing pipe with indefinite water.
[0002]
Conventional technology:
Conventionally, a continuous water valve insertion method for forming an opening in an existing pipe under constant water, inserting a gate valve body through the opening, and blocking the flow of water in the pipe is well known (USP3 , 948,282, USP4,516,598).
In such a construction method, after the valve is inserted, the flow of water is cut off by the gate valve body, and if the intended operation such as changing the piping is performed, the gate valve body becomes unnecessary, so the gate valve body is removed (removed). There is a case. In such a case, since the opening is formed by drilling or cutting, rust prevention treatment is not performed.
[0003]
In water supply work of 25 mm or less, rust prevention treatment is performed by caulking and inserting a copper hollow bush into such an opening. However, such a rust-proofing process requires a process of caulking and expanding the bush, and therefore cannot be applied to large diameters such as water distribution works (φ50 or more). Moreover, since the said opening is not sealed, a construction method becomes complicated.
[0004]
Accordingly, an object of the present invention is to provide a rust preventive treatment tool and method that can be applied to water distribution work (φ50 or more) and can close an opening.
[0005]
SUMMARY OF THE INVENTION
In order to achieve the above object, the rust preventive tool of the present invention is a continuous water work for sealing a circular or groove-shaped opening over a range of an angle slightly smaller than 180 ° to 180 ° in the circumferential direction of an existing pipe. It is a rust preventive tool. The rust preventive tool has a shape corresponding to the opening and does not stop the flow of water in the existing pipe (not a valve body). The rust preventive tool includes a pressure-contact portion made of an elastomer that is in pressure contact with the cut surface of the hole substantially over the entire circumference, and a rigid body portion that is integral with the pressure-contact portion and has rigidity against water pressure acting on the hole. It has.
The circular opening can be formed by a known hole saw. The groove-shaped opening can be formed by an end mill or a milling cutter.
In the present invention, the “rigid portion” is generally formed of a metal such as ductile cast iron, steel, or stainless steel.
[0006]
Such a rust preventive tool can be housed in a sealed case together with the following gate valve body to constitute a rust preventive tool inserting device.
Here, the gate valve body enters the existing pipe through the opening to stop the flow of water in the existing pipe. On the other hand, the sealed case accommodates the rust preventive tool and the gate valve body and is divided into a plurality of parts in the circumferential direction of the existing pipe.
[0007]
On the other hand, the continuous water construction method of the present invention includes an enclosing step, a hole forming step, a water stopping step, a removal step, and a sealing step, which will be described below, using the rust preventive tool insertion device and the like.
In the surrounding step, a part of the existing pipe is surrounded in an airtight state by a sealing case divided into a plurality in the circumferential direction of the existing pipe.
In the hole forming step, a circular or groove-shaped opening is formed in the sealed case in the circumferential direction of the existing pipe over a range of angles slightly smaller than 180 ° to 180 °.
In the water stop step, a gate valve body is caused to enter the existing pipe through the opening, and the flow of water in the existing pipe is stopped by the gate valve body.
In the extraction step, the gate valve body is extracted from the opening.
In the sealing step, a pressure contact portion made of an elastomer that is in contact with the cut (metal) surface of the opening substantially over the entire circumference, and a rigidity that resists the water pressure acting on the opening integrally with the pressure contact portion. A rust preventive tool having a rigid body portion is fitted into the opening.
[0008]
The pipe structure of the present invention is obtained by such a continuous water construction method.
That is, the pipe structure of the present invention corresponds to an existing pipe having an opening formed on a side surface, which is formed by being cut out over a range of angles slightly smaller than 180 ° to 180 ° in the circumferential direction of the existing pipe, and the opening. And a rust preventive tool that does not stop the flow of water in the existing pipe. The rust preventive tool includes a pressure-contact portion made of an elastomer that is in pressure contact with the cut surface of the hole substantially over the entire circumference, and a rigid body portion that is integral with the pressure-contact portion and has rigidity against water pressure acting on the hole. It has.
In addition, although the said rust preventive tool may be fixed in the sealed case while being accommodated in the sealed case, it may be fixed to an existing pipe with a band and the sealed case may be removed.
[0009]
In the present invention, as the “elastomer”, a gel, an uncrosslinked resin, a resin sponge, or the like can be employed in addition to rubber.
[0010]
【The invention's effect】
According to the present invention, since it is not necessary to expand the copper bush, the present invention can be applied to water distribution work having a large diameter. Moreover, since the rust preventive tool is provided with a rigid body portion that closes the opening, it is easy to attach the plate flange after closing.
[0011]
[Explanation of Examples]
Embodiments of the present invention will be described below with reference to the drawings.
1 to 7 show a first embodiment.
Rust preventive tool insertion device 10
As shown in FIGS. 1 and 2, the rust preventive tool insertion device 10 includes a sealed case 2, a gate valve body 8 </ b> A, a valve rod 8 </ b> C, a rust preventive tool 7, and a rust preventive tool insertion bolt 7 </ b> A. The sealed case 2 includes the first and second divided cases 21 and 22 that are divided into two in the circumferential direction R, while accommodating the gate valve body 8A and the rust preventive tool 7. The valve lid 23 constitutes the sealed case 2 together with the first and second divided cases 21 and 22. The valve stem 8C and the rust prevention tool insertion bolt 7A slide the gate valve body 8A and the rust prevention tool 7 in the pipe radial direction C of the existing pipe 1.
A rubber packing 14 seals between the first divided case 21 and the second divided case 22 and between the sealed case 2 and the existing pipe 1 shown in FIG. The valve lid 23 and the second divided case 22 are sealed with a rubber ring 15. In addition, packing insertion portions 26 into which the rubber ring 16 (FIG. 5) is pushed are provided at both ends of the sealed case 2.
[0012]
The first split case 21 is formed with a rust preventive tool accommodating portion 210 that projects in a branched shape toward the outside in the pipe radial direction C of the existing pipe 1 and accommodates the rust preventive tool 7. As shown in FIG. 1, the rust preventive tool housing portion 210 includes a bolt insertion portion 211 and a pair of fixing screw insertion portions 213, which project in a branched shape toward the outside in the pipe radial direction C of the existing pipe 1. 213 is formed. The bolt 7 </ b> A is inserted into the bolt insertion portion 211. The bolt insertion portion 211 has a male screw portion 212 with which the cap 65 (FIG. 7) is screwed onto the outer peripheral surface. The fixing screw insertion portions 213 and 213 are formed toward the approximate center of the existing pipe 1 at positions close to both ends of the rust prevention device 7 in the rust prevention device housing portion 210. A fixing screw 61 is screwed into the fixing screw insertion portions 213 and 213. When the rust prevention tool insertion bolt 7A and the fixing screw 61 are screwed into the bolt insertion part 211 and the pair of fixing screw insertion parts 213 and 213, respectively, the insertion parts 211 and 213 and the rust prevention tool are inserted. A rubber ring 17 for sealing between the bolt 7A and the fixing screw 61 is fixed.
[0013]
The second split case 22 is formed with a first branch portion 221 and a second branch portion 222 that project in a branch shape outward in the pipe diameter direction C of the existing pipe 1. The second branch portion 222 is formed obliquely with respect to the first branch portion 221 so as to branch from the first branch portion 221.
[0014]
The valve lid 23 is fastened to the first branch portion 221 by an assembly bolt 62. The first branch portion 221 and the valve lid 23 accommodate the gate valve body 8A when the valve is opened.
The second branch portion 222 opens toward the center of the existing pipe 1, and the milling cutting tool 4 attached to the second branch portion 222 penetrates the first branch portion 221. . An attachment 34 of the cutting device 3 is fixed to the second branch portion 222 via a work gate valve 70. A rubber ring (not shown) is sealed between the second branch portion 222 and the work gate valve 70 and between the work gate valve 70 and the attachment 34. The second branched portion 222 has a female screw portion 22a for screwing the plug 60 of FIG.
[0015]
Gate valve 8A
The gate valve body 8A slides in the radial direction C of the existing pipe 1 in the second divided case 22 by rotating the valve rod 8C in the forward and reverse directions. A rubber packing 8d is attached to the gate valve body 8A. When the gate valve 8A enters the existing pipe 1 through the opening 12C, the rubber packing 8d closes the opening 12C and presses against the inner peripheral surface 1b of the existing pipe 1 so that the water in the existing pipe 1 Stop the flow. A well-known piece 140 is screwed onto the valve stem 8C.
[0016]
Rust prevention tool 7
As shown in FIGS. 1 and 2, the rust preventer 7 is disposed at a position about 180 ° away from the gate valve body 8A in the circumferential direction R of the existing pipe 1. The rust preventive tool 7 has a shape corresponding to an oval opening 12C formed in the circumferential direction R of the existing pipe 1 by the cutting tool 4 and extending over a range of angles slightly smaller than 180 ° to 180 °. . That is, the rust preventive tool 7 is formed in a semicircular curved shape along the existing pipe 1 and after being pushed into the existing pipe 1, the flow of water in the existing pipe 1 is stopped. Has no shape. The rust preventive tool 7 includes a pressure contact portion 71 made of an elastomer and a core material portion (rigid body portion) 72. The pressure contact portion 71 is in pressure contact with the cut surface of the opening 12C over substantially the entire circumference. The core member 72 has rigidity against water pressure acting on the opening 12C, and the press contact portion 71 is integrally baked. Moreover, the said core part 72 has the engaging part 73 with which the pushing part 7B integrally formed at the front-end | tip of the rust prevention tool insertion bolt 7A engages. Furthermore, as shown in FIG. 2, the core member 72 is formed such that the width of the portion other than the portion entering the existing pipe 1 is slightly larger than the opening 12C.
[0017]
Cutting device 3
In FIG. 1, the cutting device 3 is attached to the second branch portion 222 via a work gate valve 70. The cutting device 3 is for forming the opening 12C (FIG. 2), and includes a milling cutting tool 4. The cutting tool 4 is fixed to the tip of the cutter shaft 32 of the cutting device 3. The cutter shaft 32 is connected to a motor such as a motor (not shown), and is rotated by the power of the motor. Therefore, the cutting tool 4 rotates around the cutter shaft 32 by the power of the prime mover.
In addition, this cutting device 3 can use the thing of the structure similar to a well-known drilling machine except the cutting tool 4 being an end mill shape.
[0018]
Next, the construction method will be described.
Go process First, in a state where the liquid (water) is flowing in the existing pipe 1 of FIG. 1, the sealing case 2 is attached to the cutting position of the existing pipe 1 and the assembly bolt (not shown) is used to prevent the corrosion. 1st division case 21 and 2nd division case 22 which accommodated 7 are assembled. Thereafter, the cutting device 3 is attached to the second branched portion 222. Thus, as shown in FIG. 1, the sealed case 2 surrounds a part of the existing pipe 1 in an airtight state.
[0019]
Hole forming step After the assembly step, when the operator operates the cutting device 3 to drive a prime mover (not shown), the cutting tool 4 rotates with the cutter shaft 32 to cut the existing pipe 1. Start exercise. When the operator operates the cutting device 3 and sends the cutting tool 4 in the cutting direction C1 while the cutting motion is being performed, the two-dot chain line in FIG. 1 and FIG. As shown, the tip surface 40 of the cutting tool 4 advances to a position that penetrates a part of the tube wall 1a of the existing tube 1. Thus, the cutting with the cutting tool 4 is completed.
After this cutting, the operator rotates the sealing case 2 in the circumferential direction R of the existing pipe 1 as shown in FIG. That is, the cutting tool 4 performs a feed motion that rotates in the circumferential direction R together with the sealing case 2 while rotating around the cutter shaft 32. Thus, the operator rotates the cutting tool 4 in the circumferential direction R of the existing pipe 1 over a range of angles slightly smaller than 180 ° to 180 ° in a state where the cutting tool 4 is moving. Thereafter, the operator retracts the cutting tool 4 to the original position, and returns the sealed case 2 to the original position as shown in FIG. In this way, an oval opening 12C is formed in the existing tube 1 by notching the existing tube 1 over a range of angles slightly smaller than 180 ° to 180 ° in the circumferential direction R without generating a section. To do.
[0020]
Water stop step After the hole forming step, the operator operates the work lever 700 of the work gate valve 70 of Fig. 1 to close the work gate valve 70. Thereafter, the operator removes the cutting device 3. After the removal, the operator attaches a known plug inserter (not shown) to the work gate valve 70 and opens the work gate valve 70. After this valve opening, the operator operates a plug insertion device (not shown) to screw the plug 60 of FIG. 4 into the female screw portion 22 a of the second branch portion 222. After this screwing, the operator removes the work gate valve 70 (FIG. 1) and the plug inserter. After that, as shown in FIG. 4, the operator rotates the valve stem 8C in the forward direction so that the gate valve body 8A enters the existing pipe 1 through the opening 12C, and the gate valve body 8A sets the gate valve body 8A. Stop the flow of water in the tube 1. In the closed state of the existing pipe 1, for example, after cutting a pipe change portion of the existing pipe 1, a mechanical cap 51 (FIG. 7) is attached and work such as pipe change is performed.
[0021]
Extraction process After performing the operation such as the pipe change, the operator rotates the valve stem 8C in the reverse direction to open the gate valve body 8A as shown in FIG. 5 (a). Take out from.
[0022]
Closing step After the removal step, as shown in Fig. 5 (b), the operator rotates the sealing case 2 in the circumferential direction R of the existing pipe 1 by about 180 ° to thereby provide the rust preventer 7. Is made to correspond to the position of the opening 12C. Thereafter, the operator attaches the rubber ring 16 and the split wheel 50 to the packing insertion portion 26 (FIG. 2). Thereafter, the operator screws the rust preventive tool insertion bolt 7A of FIG. 6 and fits the rust preventive tool 7 into the opening 12C. After this fitting, a fixing screw 61 (FIG. 1) that presses the core member 72 of the rust preventive tool 7 into the existing pipe 1 is screwed. Thereafter, the cap 65 (FIG. 7) is screwed into the female screw portion 212 of the bolt insertion portion 211.
[0023]
After the closing step, the operator removes the valve lid 23 that houses the gate valve body 8A, and attaches the flange lid 55 of FIG. In this way, the piping structure shown in FIG. 7 is obtained.
In addition, in this 1st Example, since both the gate valve 8A and the rust preventive tool 7 are accommodated in the airtight case 2, it has the advantage that workability is good.
Further, since the sealing case 2 surrounds the existing pipe 1 in a state where the opening 12C is thus closed, the function as a valve can be exhibited again as described below. That is, after removing the flange lid 55, the gate valve body 8A and the valve lid 23 are attached again, the opening 12C is opened again, and then the gate valve body 8A is moved to the position of the opening 12C. It can also function as a valve again.
[0024]
Second embodiment Figs. 8 to 14 show a second embodiment.
Rust prevention tool insertion device 100
As shown in FIGS. 8 to 10, the rust preventive tool insertion device 100 includes a sealed case 2, a gate valve body 8 </ b> A, a valve rod 8 </ b> C, a rust preventive tool 7, and a rust preventive tool inserting bolt 7 </ b> A. The sealed case 2 includes the first and second divided cases 21 and 22 that are divided into two in the circumferential direction R, while accommodating the gate valve body 8A and the rust preventive tool 7. The first bifurcated portion 221 of the second divided case 22 integrally forms a rust preventive tool accommodating portion 210, and the rust preventive tool 7 and the gate valve body 8 </ b> A are separated in the tube axis direction S of the existing pipe 1. Is provided.
In addition, the other structure of the rust prevention tool insertion apparatus 100 is the same as that of 1st Example, attaches | subjects the same code | symbol to the same part or an equivalent part, and abbreviate | omits the detailed description.
[0025]
Next, the construction method will be described.
Go process First, in a state where the liquid (water) is flowing in the existing pipe 1 of FIG. 8, the sealed case 2 is attached to the cutting position of the existing pipe 1 and the first divided by the assembly bolt (not shown). The case 21 and the second divided case 22 that houses the rust preventive tool 7 are assembled. Thereafter, the cutting device 3 is attached to the second branched portion 222. Thus, as shown in FIG. 8, the sealed case 2 surrounds a part of the existing pipe 1 in an airtight state.
[0026]
Hole forming step After the assembly step, in the same manner as the hole forming step of the first embodiment, as shown in FIG. The opening 12C is formed over a range of angles slightly smaller than 180 °.
[0027]
Water stop step After the hole forming step, as in the water stop step of the first embodiment, as shown in Fig. 11 (b), the gate valve body 8A is opened from the opening 12C to the existing pipe 1. The water flow in the existing pipe 1 is stopped by the gate valve body 8A. In the closed state of the existing pipe 1, for example, after cutting a pipe change portion of the existing pipe 1, as shown in FIG. 12A, a mechanical cap 51 is attached and work such as pipe change is performed.
[0028]
Extraction process After the operation such as the pipe change is performed, the gate valve body 8A is extracted from the opening 12C as shown in Fig. 12B in the same manner as the extraction process of the first embodiment. .
[0029]
Movement process After the extraction process, as shown in FIG. 13 (a), the sealing case 2 is moved in the tube axis direction S of the existing pipe 1 to a position corresponding to the opening 12C. 7 is moved.
[0030]
Closing step After the moving step, as shown in Fig. 13 (b), the rust preventive tool insertion bolt 7A is screwed to fit the rust preventive tool 7 into the opening 12C. After this fitting, the fixing screw 61 is screwed to press the core member 72 of the rust preventive tool 7 into the existing pipe 1. Thereafter, the cap 65 is screwed into the female screw portion 212 of the bolt insertion portion 211.
[0031]
After the closing step, the operator removes the valve lid 23 that houses the gate valve body 8A, and attaches the flange lid 55 of FIG. In this way, the piping structure shown in FIG. 14 is obtained.
In the second embodiment, excavation under the pipe can be shallowed.
[0032]
Reference Examples FIGS. 15 to 19 show reference examples useful for understanding the present invention .
Rust preventive tool insertion device 200
As shown in FIG. 15, the rust preventive tool insertion device 200 includes a sealed case 2, a gate valve body 8A, and a valve stem 8C. The sealed case 2 includes first and second divided cases 21 and 22 that are divided into two in the circumferential direction R. The valve lid 23 constitutes the sealed case 2 together with the first and second divided cases 21 and 22.
[0033]
The second split case 22 is formed with a first branch portion 221 and a second branch portion 222 that project in a branch shape outward in the pipe diameter direction C of the existing pipe 1. The second branch portion 222 is formed obliquely with respect to the first branch portion 221 so as to branch from the first branch portion 221.
[0034]
The valve lid 23 is fixed to the first branch portion 221 by an assembly bolt 62 from the first branch portion 221 side. The flange 221a of the first branch portion 221 is formed slightly larger than the flange 23a of the valve lid 23.
In addition, the other structure of the rust prevention tool insertion apparatus 200 is the same as that of 1st Example, attaches | subjects the same code | symbol to the same part or an equivalent part, and abbreviate | omits the detailed description.
[0035]
Next, the construction method will be described.
Enclosing step First, in a state where the liquid (water) is flowing in the existing pipe 1 of FIG. 15, the sealed case 2 is attached to the cutting position of the existing pipe 1 and the first divided by an assembly bolt (not shown). The case 21 and the second divided case 22 are assembled. Thereafter, the cutting device 3 is attached to the second branched portion 222. Thus, as shown in FIG. 15, the sealed case 2 surrounds a part of the existing pipe 1 in an airtight state.
[0036]
Hole forming step After the assembling step, in the same manner as the hole forming step of the first embodiment, the existing pipe 1 is extended in the circumferential direction R over a range of angles slightly smaller than 180 ° to 180 °. Opening 12C formed by notching is formed.
[0037]
Water stop step After the hole forming step, in the same manner as the water stop step of the first embodiment, the gate valve body 8A is caused to enter the existing pipe 1 through the opening 12C, and the gate valve body is inserted. The flow of water in the existing pipe 1 is stopped by 8A. In the closed state of the existing pipe 1, for example, after cutting a pipe change portion of the existing pipe 1, as shown in FIG. 16A, a mechanical cap 51 is attached and work such as pipe change is performed.
[0038]
Gate valve body extraction step After performing the operation such as the piping change, the operator takes out the gate valve body 8A into the valve lid 23 of the sealed case 2. Thereafter, as shown in FIG. 16A, the worker joins the work gate valve 75 to the flange 221 a of the first branch portion 221, and further superimposes the work upper tank 76 on the work gate valve 75. And join. At the time of this joining, the valve lid 23 is joined to the tip portion of the elevating shaft 77 that penetrates the working upper tank 76. After this joining, the operator removes the assembly bolt 62. After the removal, as shown in FIG. 16 (b), the operator pulls up the lifting shaft 77 and takes out the valve body 8 </ b> A together with the valve lid 23 from the sealed case 2 into the working upper tank 76. After this removal, the operator closes the work gate valve 75. After the valve closing, the operator disconnects the work upper tank 76 from the work gate valve 75.
[0039]
Rust preventive attachment step After the gate valve removal step, the operator removes the work upper tank 76 containing the rust preventive fixture 7 and the flange lid 78 as shown in FIG. 17 (a). Joined to the work gate valve 75. A rust preventive tool push-in shaft 7A (FIG. 19) is connected to the tip of the elevating shaft 77 that penetrates the work upper tank 76 via an adapter 79. After this joining, the operator lowers the lifting shaft 77 and fixes the flange lid 78 with the assembly bolt 62. Thereafter, the worker removes the work upper tank 76 and the work gate valve 75 from the sealed case 2 as shown in FIG.
[0040]
Closing process After the rust preventive tool mounting process, as shown in FIG. 18B, the rust preventive tool pushing shaft 7A is screwed to fit the rust preventive tool 7 into the opening 12C. After this fitting, the fixing screw 61 is screwed to press the core member 72 of the rust preventive tool 7 into the existing pipe 1. Thereafter, the cap 65 is screwed into the female screw portion 212 of the bolt insertion portion 211.
In this way, the piping structure shown in FIG. 19 is obtained.
[0041]
Note that, as shown in FIGS. 20A and 20B, the pressure contact portion 71 may be in pressure contact with the cutting surface of the opening 12 </ b> C, and may be plate-shaped. Further, the rigid body portion 72 only needs to have a rigidity for maintaining the pressure contact state of the pressure contact portion 71.
Further, the rust preventive tool 7 does not need to be pressed and fixed with the fixing screw 61, and may be fixed to the existing pipe 1 by other methods such as fixing to the existing pipe 1 with a band as shown in FIG.
[0042]
As described above, the preferred embodiments have been described with reference to the drawings. However, those skilled in the art will readily understand various changes and modifications within the obvious scope by looking at the present specification.
For example, as a prime mover that applies a cutting motion to a cutting tool, an engine or the like may be used in addition to a motor. Further, a cutting device may be attached to the sealed case before surrounding the existing pipe with the sealed case.
The sealed case may be divided into three or four in the circumferential direction.
The present invention can also be applied to a case where a circular opening formed in an existing pipe is sealed with a known hole saw.
Accordingly, such changes and modifications are to be construed as within the scope of the present invention.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing an assembly process of a construction method according to a first embodiment of the present invention.
FIG. 2 is a longitudinal sectional view of the same.
FIGS. 3A, 3B, and 3C are schematic cross-sectional views showing a hole forming step.
FIG. 4 is a cross-sectional view showing a water stop process.
FIG. 5 (a) is a schematic longitudinal sectional view showing an extraction process. FIG. 5B is a schematic longitudinal sectional view showing a state before the closing step.
FIG. 6 is a schematic longitudinal sectional view showing a closing process.
FIG. 7 is a longitudinal sectional view showing a piping structure according to the first embodiment.
FIG. 8 is a longitudinal sectional view showing an assembly process of the construction method according to the second embodiment of the present invention.
FIG. 9 is a sectional view taken along line IX-IX.
10 is a cross-sectional view taken along line XX of FIG.
11 (a) and 11 (b) are schematic longitudinal sectional views showing a water stop process.
FIG. 12 (a) is a schematic longitudinal sectional view showing a water stop process. FIG. 12B is a schematic longitudinal sectional view showing the extraction process.
FIG. 13A is a schematic longitudinal sectional view showing a moving process. FIG. 13B is a schematic longitudinal sectional view showing the closing process.
FIG. 14 is a longitudinal sectional view showing a piping structure according to a second embodiment.
FIG. 15 is a longitudinal sectional view showing an assembly process of a construction method according to a reference example useful for understanding the present invention.
FIGS. 16 (a) and 16 (b) are schematic diagrams showing a gate valve body removal step.
17 (a) and 17 (b) are schematic longitudinal sectional views showing a rust preventive tool attaching step.
18 (a) and 18 (b) are schematic longitudinal sectional views showing a closing process.
FIG. 19 is a cross-sectional view showing a piping structure according to the reference example.
FIG. 20 is a cross-sectional view showing another example of the rust preventive tool.
[Explanation of symbols]
1: Existing pipe 12C: Opening 2: Sealing case 61: Fixing screw 7: Rust prevention tool 71: Pressure contact part 72: Rigid body part 8A: Gate valve body R: Circumferential direction S: Pipe axis direction

Claims (3)

既設管の周方向に概ね 180°ないし180 °よりも若干小さな角度の範囲にわたって切欠された円形ないし溝形の開孔を閉封する不断水工事用の防錆具を挿入する防錆具挿入装置であって、
該防錆具は前記開孔に対応する形状を持ち、かつ、前記既設管内の水の流れを止めることのないものであって、
前記開孔の切削された面に略全周にわたって圧接するエラストマーからなる圧接部と、該圧接部に一体で前記開孔に作用する水圧に抗する剛性を持つ剛体部とを備え
前記防錆具挿入装置は、前記開孔から前記既設管内に侵入することで前記既設管内の水の流れを止める仕切弁体と、
前記防錆具および前記仕切弁体を収容すると共に、前記既設管の周方向に複数個に分割された密閉ケースとを更に備え、
前記防錆具と前記仕切弁体とが既設管の周方向に離れた位置に配設されている防錆具挿入装置。
Rust preventive tool insertion device for inserting a rust preventive tool for unreserved water construction that seals a circular or grooved opening cut out in the circumferential direction of the existing pipe in the range of approximately 180 ° to slightly smaller than 180 °. Because
The rust preventive tool has a shape corresponding to the opening, and does not stop the flow of water in the existing pipe,
A pressure contact portion made of an elastomer that is in pressure contact with the cut surface of the opening over substantially the entire circumference, and a rigid body portion that is integral with the pressure contact portion and has rigidity against water pressure acting on the opening ;
The rust preventive tool insertion device is a gate valve body that stops the flow of water in the existing pipe by entering the existing pipe from the opening,
While containing the rust preventive tool and the gate valve body, further comprising a sealed case divided into a plurality in the circumferential direction of the existing pipe,
The rust preventive tool insertion device in which the rust preventive tool and the gate valve body are disposed at positions separated in the circumferential direction of the existing pipe .
既設管の周方向に概ね 180°ないし180 °よりも若干小さな角度の範囲にわたって切欠された円形ないし溝形の開孔を閉封する不断水工事用の防錆具を挿入する防錆具挿入装置であって、
該防錆具は前記開孔に対応する形状を持ち、かつ、前記既設管内の水の流れを止めることのないものであって、
前記開孔の切削された面に略全周にわたって圧接するエラストマーからなる圧接部と、該圧接部に一体で前記開孔に作用する水圧に抗する剛性を持つ剛体部とを備え、
前記防錆具挿入装置は、前記開孔から前記既設管内に侵入することで前記既設管内の水の流れを止める仕切弁体と、
前記防錆具および前記仕切弁体を収容すると共に、前記既設管の周方向に複数個に分割された密閉ケースとを更に備え、
前記防錆具と前記仕切弁体とが既設管の管軸方向に離れて設けられている防錆具挿入装置。
Rust preventive tool insertion device for inserting a rust preventive tool for unreserved water construction that seals a circular or grooved opening cut out in the circumferential direction of the existing pipe in the range of approximately 180 ° to slightly smaller than 180 °. Because
The rust preventive tool has a shape corresponding to the opening, and does not stop the flow of water in the existing pipe,
A pressure contact portion made of an elastomer that is in pressure contact with the cut surface of the opening over substantially the entire circumference, and a rigid body portion that is integral with the pressure contact portion and has rigidity against water pressure acting on the opening;
The rust preventive tool insertion device is a gate valve body that stops the flow of water in the existing pipe by entering the existing pipe from the opening,
While containing the rust preventive tool and the gate valve body, further comprising a sealed case divided into a plurality in the circumferential direction of the existing pipe,
The rust preventive tool insertion device in which the rust preventive tool and the gate valve body are provided apart from each other in the tube axis direction of the existing pipe.
既設管の一部を、該既設管の周方向に複数個に分割された密閉ケースによって気密状態で囲繞する囲繞工程と、
前記密閉ケース内において、既設管の周方向に概ね 180°ないし180 °よりも若干小さな角度の範囲にわたって円形ないし溝形の開孔を形成する孔形成工程と、
前記開孔から前記既設管内に仕切弁体を侵入させて、該仕切弁体により前記既設管内の水の流れを止める止水工程と、
前記仕切弁体を前記開孔から取り出す取出工程と、
前記開孔の切削された面に略全周にわたって接触するエラストマーからなる圧接部と、該圧接部に一体で前記開孔に作用する水圧に抗する剛性を持つ剛体部とを備えた防錆具を前記開孔に嵌め込む閉封工程と
前記取出工程の後、前記閉封工程の前に、前記密閉ケースを移動させて、前記開孔に対応する位置に前記防錆具を移動させる移動工程とを備えた不断水工法。
A surrounding step of surrounding a part of the existing pipe in an airtight state by a sealing case divided into a plurality of circumferential directions of the existing pipe;
In the sealed case, a hole forming step for forming a circular or groove-shaped opening in a circumferential direction of the existing pipe over a range of angles slightly smaller than 180 ° to 180 °,
A water stop step of allowing the gate valve body to enter the existing pipe from the opening and stopping the flow of water in the existing pipe by the gate valve body;
Taking out the gate valve body from the opening;
A rust preventive tool comprising a pressure contact portion made of an elastomer that is in contact with the cut surface of the opening over substantially the entire circumference, and a rigid body portion that is integral with the pressure contact portion and has rigidity against water pressure acting on the opening. A sealing step of fitting into the opening ,
A continuous water construction method comprising a moving step of moving the sealing case and moving the rust preventive tool to a position corresponding to the opening after the extraction step and before the sealing step .
JP2000006172A 2000-01-11 2000-01-11 Rust prevention tool insertion device and continuous water method Expired - Lifetime JP4398037B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2000006172A JP4398037B2 (en) 2000-01-11 2000-01-11 Rust prevention tool insertion device and continuous water method
US09/758,283 US6622747B2 (en) 2000-01-11 2001-01-11 Cutting, valve insertion and corrosion-resistant works without fluid supply interruption

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000006172A JP4398037B2 (en) 2000-01-11 2000-01-11 Rust prevention tool insertion device and continuous water method

Publications (2)

Publication Number Publication Date
JP2001193893A JP2001193893A (en) 2001-07-17
JP4398037B2 true JP4398037B2 (en) 2010-01-13

Family

ID=18534745

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000006172A Expired - Lifetime JP4398037B2 (en) 2000-01-11 2000-01-11 Rust prevention tool insertion device and continuous water method

Country Status (1)

Country Link
JP (1) JP4398037B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5346721B2 (en) * 2009-07-15 2013-11-20 コスモ工機株式会社 Water control body installation device
FR3075668B1 (en) * 2017-12-22 2023-04-14 Soc Dassainissement Rationnel Et De Pompage PROTECTION DEVICE FOR CLEANING A PIPE CONTAINING ASBESTOS AND CLEANING METHOD USING SUCH A DEVICE
CN115264148B (en) * 2022-07-27 2023-03-24 济南迈克阀门科技有限公司 Water supply pipeline exhaust valve

Also Published As

Publication number Publication date
JP2001193893A (en) 2001-07-17

Similar Documents

Publication Publication Date Title
US6622747B2 (en) Cutting, valve insertion and corrosion-resistant works without fluid supply interruption
US6615859B2 (en) Fluid supply interruption free method of construction
JP4398037B2 (en) Rust prevention tool insertion device and continuous water method
JP2007309474A (en) Branch pipe connecting device and branch pipe connecting method
JP5944705B2 (en) Branch opening communication method
JP4717409B2 (en) Rust prevention method for the cutting edge in the installation work of the insert
JPH03265797A (en) Method of installing fluid control valve, etc. without cutting water and its sealed connection device
JP4516666B2 (en) Continuous flow equipment and method
JP4360529B2 (en) Split T-shaped tube removal method
JP3953269B2 (en) Plug mounting jig
JP3571574B2 (en) Continuous cutting method for existing fluid pipes
JP4652014B2 (en) Rust prevention method for the cutting edge in the installation work of the insert
JP2845260B2 (en) Pipe fitting seal structure
JP3317688B2 (en) Packing
JP4437221B2 (en) How to attach the faucet
JP3838897B2 (en) Method of attaching antirust bush to pipe branch port and pipe joint used therefor
JP5892572B2 (en) Pipe connection device
JP5674400B2 (en) Control valve
JP7165350B2 (en) Branch structure fixture and mounting method
JP2005098406A (en) Flow maintaining construction method for changing aperture of pipe joint
JPS5942195B2 (en) Temporary fixing device for fluid control valve
JP4047571B2 (en) Resin pipe fittings
JP2016114251A (en) Pipe connection device
JP4492836B2 (en) Fitting for branch pipe connection
JP2020085136A (en) Installation structure of valve lid, installation method and removal method

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20050202

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20050204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050404

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090713

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090728

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090915

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091020

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091022

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121030

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4398037

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131030

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term