JP4367830B2 - Hydrogen filling device - Google Patents

Hydrogen filling device Download PDF

Info

Publication number
JP4367830B2
JP4367830B2 JP2003090374A JP2003090374A JP4367830B2 JP 4367830 B2 JP4367830 B2 JP 4367830B2 JP 2003090374 A JP2003090374 A JP 2003090374A JP 2003090374 A JP2003090374 A JP 2003090374A JP 4367830 B2 JP4367830 B2 JP 4367830B2
Authority
JP
Japan
Prior art keywords
pressure
filling
hydrogen
gas
storage means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003090374A
Other languages
Japanese (ja)
Other versions
JP2004293752A (en
Inventor
田 博 貴 古
木 延 夫 青
藤 要 加
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP2003090374A priority Critical patent/JP4367830B2/en
Publication of JP2004293752A publication Critical patent/JP2004293752A/en
Application granted granted Critical
Publication of JP4367830B2 publication Critical patent/JP4367830B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/32Hydrogen storage
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/34Hydrogen distribution

Description

【0001】
【発明の属する技術分野】
本発明は、水素を燃料として走行する自動車(例えば、燃料電池搭載車両)等に対して、水素を供給するための水素充填設備の改良に関する。
【0002】
【従来の技術】
近年、環境に対する意識の高まり、排気ガスの清浄化の要請、二酸化炭素発生量削減の要請等により、水素ガスを燃料とする車両の実用化が進んでいる。そのような水素ガスを燃料とする車両の実用化に必要不可欠な設備として、当該車両へ水素を供給するための水素ステーションがある。
図7は、そのような水素ステーションの1例を示している。
【0003】
現状では、水素ステーションSでの充填圧は25M、35Mの2種類の規格(現時点における水素ガス自動車の標準の最高充填圧力:以下、「標準圧力」と記載する)となっている。
水素ガスを燃料とする車両C(C1及び/又はC2)が走行して、車両Cに搭載された貯蔵手段(車両側蓄ガス手段Rc)内の水素ガスを消費すると、車両C側蓄ガス手段Rc内の圧力が、当該車両Cの標準圧力よりも低下する。
また、ステーションSから車両側Cの前記蓄ガス手段Rcへの水素ガスの充填の仕組みは、車両側蓄ガス手段Rc内の圧力と蓄ガス器(通常、ステーションのボンベRg)の内圧との圧力差により、水素ガスを充填する。
【0004】
ここで、高圧の気体が絞り弁等を含む流路抵抗により圧力が下がる(等エンタルピー膨張)と、通常、温度が下がる、所謂「ジュールトムソン効果」が発生する。
これに対して、水素の場合は、等エンタルピー膨張により圧力が降下する際に、その他の気体とは異なり、逆に温度が上昇する性状を示す。
【0005】
すなわち、水素ステーションS内で水素を充填中の車両側蓄ガス手段Rc内では、水素ステーションS内の蓄ガス器Rgから供給された高圧(例えば40MPa)の水素ガスは、車両側蓄ガス手段Rc内に進入した際には非常に低圧となり(例えば、40MPaから大気圧程度まで圧力低下する)、等エンタルピー膨張する結果、その温度が上昇する。
例えば40MPaから大気圧程度まで水素ガスを減圧すると約14℃昇温し、70MPaから大気圧程度まで水素ガスを減圧すると約28℃昇温する。
【0006】
ここで、車両C側の蓄ガス手段Rcは、その構造上、内部温度に制限がある。例えば、一定温度以上となれば、車両側の蓄ガス手段Rcに設けられた溶栓(一定温度以上になった際に作動して、内部のガスを逃がす機構)が作動してしまう。
【0007】
そのため、車両側の蓄ガス手段(例えば、車両側容器)の所定温度内で水素ガスを充填するため、
(A) 充填速度を遅くして車両側容器内での水素と容器内壁との熱交換時間を長くし、容器への放熱量を増加させ、温度上昇を抑制する、
(B) 車両側容器内に水素ガスを充填する際に冷却する(特許文献1参照)、
(C) 車両側容器にフィン等の伝熱促進体を設け、部分的な温度上昇を緩和する(特許文献2参照)、
という手法が、従来、一般的であった。
【0008】
しかし、上記(A)では、充填速度が遅いため、充填時間がかかりすぎてしまう。
一方、上記(B)では、冷却水や冷却設備が必要となり、レイアウト上の制限が多い車両に適用するのは困難である。
また、上記(C)では、車両側容器の構造が複雑となり、コスト高となる。
【0009】
【特許文献1】
特開2002−89793号公報
【特許文献2】
特開2002−181295号公報
【0010】
【発明が解決しようとする課題】
本発明は上述した従来技術の問題点に鑑みて提案されたものであり、水素ガス充填の際の温度上昇を防止して、車両側の構造を複雑化しないような水素充填装置及びその制御方法の提供を目的としている。
【0011】
【課題を解決するための手段】
発明者は種々研究の結果、圧力差が5MPa〜7MPa以内だと、温度上昇が比較的少ない(2℃〜3℃程度)ことを見出した。
本発明は係る見地に基づいて創作されたものである。
本発明の水素充填装置(1)は、複数の蓄ガス手段(例えば3段のボンベB1〜B3)と、該蓄ガス手段(B1〜B3)の各々の充填対象(例えば、水素を燃料とする車両2)に連通する配管系(L1〜L3)に介装された開閉弁(V1〜V3)とを有しており、該複数の蓄ガス手段(B1〜B3)の圧力は所定圧力(例えば5MPa〜7MPa)以内ずつ相違するように設定されており、圧力が低い蓄ガス手段(B1)から充填対象への充填を順次開始し、圧力が低い蓄ガス手段(B1)による充填が完了してから圧力が高い蓄ガス手段(B2)からの充填を開始するよう開閉弁(V1〜V3)の開閉制御を行う制御手段(10)を有している水素充填装置において、
該所定圧力(例えば5MPa〜7MPa)以内の相違は、蓄ガス手段(B1〜B3)から充填対象(2)へ充填するための圧力差を、充填対象(2)内部の水素温度上昇を比較的少なくできる圧力差にするために設けられるものであり、該複数の蓄ガス手段(B1〜B3)に水素を供給する水素供給機構(例えば圧縮機3)を備え、該複数の蓄ガス手段(B1〜B3)のうち、圧力が前記設定した圧力よりも所定値(例えば5MPa)降圧したものから順に前記設定した圧力へと自動的に水素を供給するようにしたことを特徴としている(請求項1)。
【0013】
係る構成を具備する本発明によれば、車両(2)側の蓄ガス手段(Rc)と水素充填装置(1)との圧力差が、水素ガスを充填しても温度上昇が比較的少ない(例えば、2℃〜3℃程度)様に設定されているので、車両(2)側の蓄ガス手段(Rc)の内部における水素の温度(断熱圧縮により水素充填装置の温度より数十度上昇している)の更なる上昇を、水素充填装置からの温度上昇が比較的少ない充填ガスと混合することにより、抑制する。
【0014】
ここで、最終段の(最も圧力が高い段の)蓄ガス手段(水素ステーション側のボンベB3)による充填が終了する際には、圧力容器に対して所定の充填圧の気体を充填する際に行われる既存のルーチン(流量を絞る等の工程)を実行することが好ましい。
【0015】
ここで、従来、異なる圧力のボンベからガスを充填する場合において、ボンベ内の圧力が減少し充填を行う際には、高圧段の蓄ガス器(ボンベ)が優先され、高圧段の蓄ガス器が充填された場合のみ、低圧断の蓄ガス器を充填する。
これに対して、上述した本発明では、何れの段であっても、所定の圧力よりも低下すれば、優劣をつけること無く、水素ステーションの水素供給機構(例えば圧縮機3)より水素ガスを充填する(例えば、水素ステーション1)側の各ボンベ(B1〜B3)の内圧が5MPa程度降圧すると、圧縮機(3)より水素ガスを充填する)のが好ましい。
【0020】
【発明の実施の形態】
以下、添付図面を参照して、本発明の実施形態について説明する。
【0021】
先ず、図1〜図4を参照して第1実施形態を説明する。
図1において、全体を符号1で表す水素充填装置は、充填対象の自動車2に水素ガスを充填するためのディスペンサーDと、水素供給機構である圧縮機3と、前記ディスペンサーDと圧縮機3を接続し水素を配送する水素供給ラインLとを有している。
【0022】
該水素供給管ラインは途中で3本の分岐ラインL1〜L3に一旦分岐した後再び水素供給ラインLに合流する。分岐ラインL1には上流側から順に第2の開閉弁VC1、圧力計PB1を備えた水素ボンベB1、第1の開閉弁V1が介装されている。同様に、分岐ラインL2、L3にも第2の開閉弁VC2、VC3;圧力計PB2、PB3を備えた水素ボンベB2、B3;第1の開閉弁V2、V3が介装されている。
図示の例では、ボンベB1の内圧<ボンベB2の内圧<ボンベB3の内圧となっており、隣合うボンベの圧力差は5〜7MPa(温度上昇が問題にならない程度の圧力差)である。
【0023】
前記ディスペンサーDは、充填開始前及び充填の終了時に開閉を行う供給バルブV0と、その供給バルブV0に対して被供給側の圧力センサP1と供給側の圧力センサP2とを有している。なお、ディスペンサーDは流量計F1を有しており、該流量計F1の計測結果は信号ラインLsfによりコントロールユニット10に送られる。
【0024】
前記ボンベに設けた圧力計PB1〜PB3は信号ラインLsiによって制御手段であるコントロールユニット10にボンベの内圧情報である信号が送られる。また、コントロールユニット10は前記ディスペンサーDを構成する前記圧力センサP1、P2とも信号ラインLsiで接続され、圧力センサP1、P2の圧力差の大きさによって被供給側である自動車2への水素ガスの供給が完了したか否かを判断している。
すなわち、ディスペンサーD内の圧力センサP1、P2により、ボンベ(B1〜B3)側と車両2に装備された容器Rc側との圧力差を求め、圧力差が等しくなれば(所定圧よりも小さくなれば)、そのボンベによる充填が完了したと看做す。
【0025】
更に、コントロールユニット10は、信号ラインLsoによって前記第1の開閉弁V1〜V3、及び第2の開閉弁VC1〜VC3の全てと接続されており、前記ボンベに設けた圧力計PB1からPB3からの情報及び前記ディスペンサーD内の圧力センサP1、P2の情報によって前記第1及び第2の開閉弁V1〜V3、VC1〜VC3の開閉を後述する制御方法によって行うように構成されている。
【0026】
尚、前記圧力センサP1、P2に代えて、流量計(質量流量を計測するタイプ)を設けてもよい。そのボンベによる充填が終了しつつあり、ボンベ側と車両容器側との圧力差が小さくなれば、水素ガス流量が小さくなることによって充填の完了を知ることが出来る。
【0027】
次に、図2を参照して水素ガス充填が完了したことを、圧力センサP1、P2の圧力差によって判断する場合の制御について説明する。
【0028】
先ず、圧力センサP1、P2によって被充填側である自動車2側の圧力とボンベ側の圧力を計測し(ステップS1)、圧力差ΔP(ΔP=P2−P1)を計算する(ステップS2)。
コントロールユニット10は、圧力差ΔPが1MPa以下であるか否かを判断し、1MPa以下であれば(ステップS3のYES)次のステップS4に進み、1MPaを超す場合(ステップS3のNO)、はステップS1以降を繰り返す。
【0029】
ステップS4では、コントロールユニット10は水素ガスH2供給中のボンベによる充填は終了したと判断する。引き続きコントロールユニット10は第1開閉弁V1〜V3の何れが開放されているかを判断する(ステップS5)。
【0030】
最も内圧の低い第1開閉弁のV1が開放されているのであれば、V2を開き、V1及びV3は閉じて(ステップS6)、再びステップS1から制御を繰り返す。また、内圧が中間である第1開閉弁のV2が開放されているのであれば、V3を開きV1及びV2は閉じて(ステップS7)、同様に再びステップS1から制御を繰り返す。更に内圧が最も高い第1開閉弁V3が開放されている(ステップS8)場合は車両への充填が終了しているので、それ以降は既存のルーチンで制御は行われる。
なお、そのルーチンは、既存のものと同一であるので、説明は省略する。
【0031】
次に、図3を参照して水素ガス充填が完了したことを、H2ガス流量により判断する場合の制御について説明する。
【0032】
先ず、水素供給ラインL0に介装した図示しない流量計によって水素供給ラインを流れるH2ガスの流量を計測する(ステップS11)。コントロールユニット10はH2ガス流量が所定流量以下になったか否かを判断しており(ステップS12)、所定流量以下となっていなければ(ステップS12のNO)、ステップS11以降を繰返し、所定流量以下となっていれば(ステップS12のYES)、H2ガス供給中のボンベによる充填は終了したと判断する(ステップS13)。
【0033】
次のステップS14では、コントロールユニット10は第1回閉弁V1〜V3の何れが開放されているかを判断する。
そして、最も内圧の低い第1開閉弁のV1が開放されているのであれば、V2を開き、V1及びV3は閉じて(ステップS15)、再びステップS11から制御を繰り返す。
また、内圧が中間である第1開閉弁のV2が開放されているのであれば、V3を開き、V1及びV2は閉じて(ステップS16)、同様に再びステップS1から制御を繰り返す。更に内圧が最も高い第1開閉弁V3が開放されている(ステップS17)場合は車両への充填が終了しているので、それ以降は既存のルーチンで制御は行われる。
【0034】
従来、異なる圧力のボンベからガスを充填する場合において、ボンベ内の圧力が減少し充填を行う際には、高圧段のボンベの充填が優先され、高圧段のボンベが充填された場合のみ、低圧段のボンベを充填していた。
これに対して、本発明では、何れの段であっても、所定の圧力よりも低下すれば(例えば、5MPa程度降圧すると)、低圧段と高圧段の優劣をつけること無く、圧縮機より水素ガスを充填する。
図4は、そのように低圧段と高圧段の優劣をつけること無く、圧縮機より水素ガスを充填する場合のルーチンを示している。
【0035】
図4を参照して、圧縮機よりボンベに水素ガスを充填する制御の流れを説明する。
各ボンベB1〜B3に設けられた圧力計PB1〜PB3によって各ボンベの内圧を測定する(ステップS21)。コントロールユニット10は、前記圧力計PB1〜PB3の内何れかが所定値以下になっているか否かを判断し(ステップS22)何れかが所定値以下となっていれば(ステップS22のYES)次のステップS23に進み、そうでない場合(ステップS22のNO)、ステップS21に戻る。
【0036】
ステップS23では、コントロールユニット10は、第2の開閉弁VC1〜VC3の内、何れかが開放状態であるか否かを判断して、何れかが開放状態であれば(ステップS23のYES)次のステップS24に進み、そうでなければ(ステップS23のNO)、ステップS26まで跳ぶ。
【0037】
ステップS24では、コントロールユニット10は、既に開放している弁に連通するボンベ、すなわち既にH2ガスの充填を行っているボンベへの充填が完了したか否かを判断しており、まだ完了していなければ(ステップS24のNO)、一旦待機して(ステップS25)、その後ステップS24以降を繰返し、完了していれば(ステップS24のYES)ステップS26に進む。
【0038】
ステップS26では、ステップS22に該当するボンベ(所定値以下のボンベ)へ充填し、開放状体の弁を閉鎖した後、制御を終了するか否かを判断し(ステップS27)、終了するのであれば(ステップS27のYES)そのまま終了し、まだ続行するなら元のステップS21から制御を繰り返す。
【0039】
前述のステップS24では、あるボンベが所定圧力以下になった場合であって、既に他のボンベが水素ガス充填中である場合には、既に充填中のボンベを優先する。換言すれば、所定圧力よりも低圧となったボンベから順に、水素ガスが充填されることを意味している。
【0040】
上述したような構成及び制御の第1実施形態に撚れば、自動車2側の蓄ガス手段Rcと水素充填装置1との圧力差が、水素ガスを充填しても温度上昇が比較的少ない(例えば、2℃〜3℃程度)様に設定されているので、車両2側の蓄ガス手段Rcの内部温度上昇を抑制できる。
また、何れの段であっても、所定の圧力よりも低下すれば、優劣をつけること無く、圧縮機3より水素ガスを充填する水素ガス充填装置1側の各ボンベ(B1〜B3)の内圧が5MPa程度降圧すると、自動的に圧縮機3より水素ガスをボンベに充填することが出来る。
【0041】
図5を参照して、第2実施形態を説明する。
図5の第2実施形態において、符号1Aで示す水素充填装置は、ガス供給側の圧縮機3とディスペンサーDとの間に、タービン4(高圧気体が保有するエネルギーにより仕事を行う機器:レシプロ型機械でも可)を介装している。そして、圧縮機3で昇圧された水素ガスの圧力を、タービン4で仕事をさせることにより、大雑把に減圧している。
水素供給ラインLのタービン4と圧縮機3との間の領域には、蓄ガス器Rgと流量計F2とが介装されている。
【0042】
ディスペンサーDは、流量調整弁V0(気体圧力調整用の流量調整機構)と、そのバルブV0に対して車両側に位置している圧力センサP1とを備えている。そして、その圧力センサP1で計測された圧力と、流量計F2で計測された流量に基いて、コントロールユニット10Aが流量調整弁V0の弁開度を調節する。それにより、車両2に充填される水素ガスの圧力、すなわち車両2の容器Rc内の(その時点における)圧力に対応して、供給される水素ガスの流量が適切となる様に制御している。
【0043】
なお、タービン4は発電機5を回しているが、発電量が不均一となりがちである。そのため、キャパシタ或いはコンデンサC等により発電した電力は蓄電するように構成されている。
【0044】
第2実施形態において、車両2側に供給される水素ガスの流量が、車両2の容器Rc内の(その時点における)圧力に対して適切となる様に制御する態様について、図6を参照して説明する。
【0045】
先ず、圧力センサP1の計測結果と、流量計F2の計測結果とを読み込む(ステップS31)。そして、流量計F2で計測された流量を、コントロールユニット10Aに予め記憶された流量(予定された数値)と比較する(ステップS32)。ここで、「予め記憶された流量」は、コントロールユニット10Aの図示しない保存手段に記憶されており、圧力センサP1の計測値に対応して定められている。
【0046】
流量計F2で計測された流量が、予定された数値よりも小さければ(ステップS32で「流量が小」)、流量調整弁V0の開度を増加して(ステップS33)、流量を増加する。
一方、計測された流量が予定された数値よりも大きければ(ステップS32で「流量が大」)、流量調整弁V0の開度を減少して(ステップS34)、流量を減少する。
さらに、計測された流量が、予定された数値に対して許容範囲内にあれば(ステップS32でYes)、流量調整弁V0の開度はそのまま維持する(ステップS35)。
【0047】
次に、圧力計P1の計測結果が、第1の所定圧力を超えたか否かを判定する(ステップS36)。
ここで、「第1の所定圧力」は、水素供給ラインLの流量調整弁V0よりも車両2側の領域における圧力が車両2の充填圧力を超えない様にする趣旨で設定される圧力であり、車両2の充填圧力よりも配管抵抗の分と、安全を考慮した圧力の分とを合計した若干の数値だけ低圧に設定されている(例えば、充填圧力が35MPaならば、第1の所定圧力は33MPa)。
圧力計P1の計測結果が、第1の所定圧力を超えているのであれば(ステップS36でNo)、当該圧力を低下させるべく、流量調整弁V0の開度を減少する(ステップS37)。
【0048】
ステップS36がYesの場合、或いは、ステップS37の後、ステップS38において、圧力計P1の計測結果が第2の所定圧力に達したか否かを判定する(ステップS38)。
ここで、「第2の所定圧力」は、水素供給ラインLの流量調整弁V0よりも車両2側の領域における圧力(車両2の容器Rc内の圧力と概略等しい)が車両2の充填圧力に殆ど等しくなり、充填が完了しつつあることを把握するために設定された圧力である。前記「第1の所定圧力」と重点圧力の中間程度の数値に設定されている(例えば、充填圧力が35MPaならば、第2の所定圧力は34MPa)。
【0049】
圧力計P1の計測結果が第2の所定圧力に達していなければ、ステップS31以下を繰り返す(ステップS38がNoのループ)。
そして、圧力計P1の計測結果が第2の所定圧力に達していれば(ステップS38がYes)、水素供給ラインLを流れる水素ガスの流量を絞り、以下、各メーカー毎に定められた充填終了の為のルーチンを実行する(ステップS39)。
【0050】
図示の実施形態はあくまでも例示であり、本発明の技術範囲を限定する趣旨ではない旨を付記する。
例えば上述の第2実施形態において、タービンではなく、ピストン・シリンダ機構等のレシプロ型の機械に仕事をさせても良い。高圧であれば、タービンよりもレシプロ型の機械の方が有利であるからである。
【0051】
【発明の効果】
本発明の作用効果を以下に列記する。
(1) 車両側の蓄ガス手段と水素充填装置との圧力差が、水素ガスを充填しても温度上昇が比較的少ない(例えば、2℃〜3℃程度)様に設定されているので、車両側蓄ガス手段の内部温度上昇を抑制する効果が大きい。
(2) 蓄ガス手段の内圧が所定圧力よりも高ければ当該蓄ガス手段と水素供給機構との間の第2の開閉手段を閉鎖し、何れかの蓄ガス手段の内圧が所定圧力以下となった場合には当該蓄ガス手段と水素供給機構との間の第2の開閉手段を開放するが、既に別の第2の開閉手段が開放されている場合には既に開放されている別の第2の開閉手段が閉鎖されるまで、第2の開閉手段の閉鎖状態を維持するので、何れの段であっても、所定の圧力よりも低下すれば、優劣をつけること無く、水素ステーションの水素供給機構より水素ガスを充填する側の各ボンベの内圧が5MPa程度降圧すると、圧縮機より自動的に水素ガスが充填される
【図面の簡単な説明】
【図1】本発明の第1実施形態の水素充填装置の全体構成を示すブロック図。
【図2】本発明の第1実施形態の圧力差によりH2ガスの充填完了を判断する場合のフローチャート。
【図3】本発明の第1実施形態のガス流量によりH2ガスの充填完了を判断する場合のフローチャート。
【図4】本発明の第1実施例のボンベV1〜V3へH2ガスを充填するルーチンを示すフローチャート
【図5】本発明の第2実施形態の水素充填装置の全体構成を示すブロック図。
【図6】本発明の第2実施例の充填側、被充填側の圧力差を小さくする制御のルーチンを示すフローチャート。
【図7】従来技術による水素充填装置の全体構成を示すブロック図。
【符号の説明】
1、1A・・・水素充填装置
2・・・車両
3・・・圧縮機
4・・・タービン
5・・・発電機
6・・・コンデンサ
10・・・コントロールユニット
B1、B2、B3・・・ボンベ
D・・・ディスペンサー
L・・・水素供給管
P1、P2・・・圧力センサ
PB1、PB2、PB3・・・圧力計
V1、V2、V3・・・開閉弁
VC1、VC2、VC3・・・第2の開閉弁
Vs・・・流量調整弁
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an improvement of a hydrogen filling facility for supplying hydrogen to an automobile (for example, a vehicle equipped with a fuel cell) that travels using hydrogen as fuel.
[0002]
[Prior art]
In recent years, a vehicle using hydrogen gas as fuel has been put into practical use due to a heightened awareness of the environment, a request for purifying exhaust gas, a request for reducing carbon dioxide generation, and the like. A hydrogen station for supplying hydrogen to the vehicle is an indispensable facility for practical use of a vehicle using such hydrogen gas as a fuel.
FIG. 7 shows an example of such a hydrogen station.
[0003]
At present, the filling pressure at the hydrogen station S has two types of standards, 25M and 35M (the maximum filling pressure of the standard hydrogen gas vehicle at the present time: hereinafter referred to as “standard pressure”).
When the vehicle C (C1 and / or C2) using hydrogen gas as a fuel travels and consumes the hydrogen gas in the storage means (vehicle side gas storage means Rc) mounted on the vehicle C, the vehicle C side gas storage means The pressure in Rc is lower than the standard pressure of the vehicle C.
The mechanism for filling hydrogen gas from the station S to the gas storage means Rc on the vehicle side C is based on the pressure between the pressure in the vehicle side gas storage means Rc and the internal pressure of the gas storage device (usually the tank cylinder Rg). Due to the difference, hydrogen gas is filled.
[0004]
Here, when the pressure of the high-pressure gas decreases due to the flow resistance including the throttle valve or the like (isoenthalpy expansion), a so-called “Joule-Thompson effect” is usually generated in which the temperature decreases.
On the other hand, in the case of hydrogen, when the pressure drops due to isoenthalpy expansion, unlike other gases, the temperature rises conversely.
[0005]
That is, in the vehicle-side gas storage means Rc that is being filled with hydrogen in the hydrogen station S, the high-pressure (for example, 40 MPa) hydrogen gas supplied from the gas storage device Rg in the hydrogen station S is converted into the vehicle-side gas storage means Rc. When entering the inside, the pressure becomes very low (for example, the pressure decreases from 40 MPa to about atmospheric pressure), and the temperature rises as a result of isoenthalpy expansion.
For example, when the pressure of hydrogen gas is reduced from 40 MPa to about atmospheric pressure, the temperature rises by about 14 ° C., and when the pressure of hydrogen gas is reduced from 70 MPa to about atmospheric pressure, the temperature rises by about 28 ° C.
[0006]
Here, the internal temperature of the gas storage means Rc on the vehicle C side is limited due to its structure. For example, if the temperature exceeds a certain temperature, a fusing plug (a mechanism that operates when the temperature rises above a certain temperature and releases the internal gas) provided in the vehicle-side gas storage means Rc is activated.
[0007]
Therefore, in order to fill the hydrogen gas within a predetermined temperature of the vehicle side gas storage means (for example, the vehicle side container),
(A) Decreasing the filling rate to increase the heat exchange time between hydrogen and the container inner wall in the vehicle-side container, increase the heat radiation to the container, and suppress the temperature rise.
(B) Cooling when filling the vehicle side container with hydrogen gas (see Patent Document 1),
(C) A heat transfer promoting body such as a fin is provided in the vehicle side container to alleviate a partial temperature rise (see Patent Document 2).
Conventionally, this method has been common.
[0008]
However, in the above (A), since the filling speed is slow, it takes too much filling time.
On the other hand, in the above (B), cooling water and cooling equipment are required, and it is difficult to apply to a vehicle having many layout restrictions.
In (C) above, the structure of the vehicle-side container is complicated and the cost is increased.
[0009]
[Patent Document 1]
JP 2002-89793 A [Patent Document 2]
Japanese Patent Laid-Open No. 2002-181295
[Problems to be solved by the invention]
The present invention has been proposed in view of the above-described problems of the prior art, and a hydrogen filling apparatus and a control method therefor that prevent a temperature rise during hydrogen gas filling and do not complicate the structure on the vehicle side. The purpose is to provide.
[0011]
[Means for Solving the Problems]
As a result of various studies, the inventors have found that when the pressure difference is within 5 MPa to 7 MPa, the temperature rise is relatively small (about 2 ° C. to 3 ° C.).
The present invention has been created based on such a viewpoint.
The hydrogen filling device (1) of the present invention has a plurality of gas storage means (for example, three-stage cylinders B1 to B3) and the respective filling objects (for example, hydrogen as fuel) of the gas storage means (B1 to B3). And an on-off valve (V1 to V3) interposed in a piping system (L1 to L3) communicating with the vehicle 2), and the pressure of the plurality of gas storage means (B1 to B3) is a predetermined pressure (for example, 5MPa ~ 7MPa) are set to be different from each other , the filling from the gas storage means (B1) having a low pressure to the filling object is started sequentially, and the filling by the gas storage means (B1) having a low pressure is completed. in line intends control means (10) hydrogen filling apparatus that have the opening and closing control of the on-off valve (V1 to V3) such that the pressure starts to fill from higher gas storage means (B2) from,
The difference within the predetermined pressure (for example, 5 MPa to 7 MPa) is that the pressure difference for filling the filling object (2) from the gas storage means (B1 to B3) is relatively higher than the hydrogen temperature rise inside the filling object (2). It is provided in order to make a pressure difference that can be reduced, and includes a hydrogen supply mechanism (for example, compressor 3) that supplies hydrogen to the plurality of gas storage means (B1 to B3), and the plurality of gas storage means (B1) To B3), hydrogen is automatically supplied to the set pressure in order from a pressure lower than the set pressure by a predetermined value (for example, 5 MPa) (claim 1). ).
[0013]
According to the present invention having such a configuration, even if the pressure difference between the gas storage means (Rc) on the vehicle (2) side and the hydrogen filling device (1) is filled with hydrogen gas, the temperature rise is relatively small ( For example, since the temperature is set to about 2 ° C. to 3 ° C., the temperature of the hydrogen inside the gas storage means (Rc) on the vehicle (2) side is increased by several tens of degrees from the temperature of the hydrogen filling device due to adiabatic compression. Is further suppressed by mixing with a filling gas with relatively little temperature rise from the hydrogen filling device.
[0014]
Here, when the filling by the gas storage means (the cylinder B3 on the hydrogen station side) at the final stage (the highest pressure stage) is completed, the gas at the predetermined filling pressure is filled into the pressure vessel. It is preferable to execute an existing routine (step of reducing the flow rate).
[0015]
Here, conventionally, when gas is filled from cylinders of different pressures, when the pressure in the cylinder is reduced and filling is performed, the high pressure stage gas accumulator (cylinder) is given priority, and the high pressure stage gas accumulator is used. Only when the gas is filled, the low-pressure gas accumulator is filled.
On the other hand, in the above-described present invention, hydrogen gas is supplied from the hydrogen supply mechanism (for example, the compressor 3) of the hydrogen station without any superiority or inferiority at any stage as long as it falls below a predetermined pressure. Filling (for example, hydrogen gas is charged from the compressor (3) when the internal pressure of each cylinder (B1 to B3) on the hydrogen station 1 side is reduced by about 5 MPa) is preferable.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the accompanying drawings.
[0021]
First, a first embodiment will be described with reference to FIGS.
In FIG. 1, a hydrogen filling apparatus denoted as a whole by reference numeral 1 includes a dispenser D for filling a vehicle 2 to be filled with hydrogen gas, a compressor 3 that is a hydrogen supply mechanism, and the dispenser D and the compressor 3. And a hydrogen supply line L for connecting and delivering hydrogen.
[0022]
The hydrogen supply pipe line once branches into three branch lines L1 to L3 on the way and then joins the hydrogen supply line L again. In the branch line L1, a second opening / closing valve VC1, a hydrogen cylinder B1 including a pressure gauge PB1, and a first opening / closing valve V1 are interposed in this order from the upstream side. Similarly, second branch valves VC2 and VC3; hydrogen cylinders B2 and B3 having pressure gauges PB2 and PB3; first switch valves V2 and V3 are also provided in the branch lines L2 and L3.
In the illustrated example, the internal pressure of the cylinder B <b> 1 <the internal pressure of the cylinder B <b> 2 <the internal pressure of the cylinder B <b> 3, and the pressure difference between adjacent cylinders is 5 to 7 MPa (pressure difference that does not cause a rise in temperature).
[0023]
The dispenser D has a supply valve V0 that opens and closes before the start of filling and at the end of filling, and a pressure sensor P1 on the supply side and a pressure sensor P2 on the supply side with respect to the supply valve V0. The dispenser D has a flow meter F1, and the measurement result of the flow meter F1 is sent to the control unit 10 through a signal line Lsf.
[0024]
The pressure gauges PB1 to PB3 provided in the cylinders send signals, which are the internal pressure information of the cylinders, to the control unit 10 which is a control means through a signal line Lsi. The control unit 10 is also connected to the pressure sensors P1 and P2 constituting the dispenser D by a signal line Lsi, and hydrogen gas is supplied to the vehicle 2 on the supply side depending on the pressure difference between the pressure sensors P1 and P2. It is determined whether or not the supply has been completed.
That is, the pressure difference between the cylinder (B1 to B3) side and the container Rc side mounted on the vehicle 2 is obtained by the pressure sensors P1 and P2 in the dispenser D, and the pressure difference becomes equal (becomes smaller than the predetermined pressure). ), It is considered that the filling with the cylinder has been completed.
[0025]
Further, the control unit 10 is connected to all of the first on-off valves V1 to V3 and the second on-off valves VC1 to VC3 by a signal line Lso, and from the pressure gauges PB1 to PB3 provided in the cylinder. The first and second on-off valves V1 to V3 and VC1 to VC3 are configured to be opened and closed by a control method to be described later based on the information and information on the pressure sensors P1 and P2 in the dispenser D.
[0026]
Instead of the pressure sensors P1 and P2, a flow meter (a type for measuring a mass flow rate) may be provided. If the filling by the cylinder is being completed and the pressure difference between the cylinder side and the vehicle container side becomes small, the completion of the filling can be known by reducing the hydrogen gas flow rate.
[0027]
Next, referring to FIG. 2, a description will be given of the control in the case where it is determined by the pressure difference between the pressure sensors P1 and P2 that hydrogen gas filling has been completed.
[0028]
First, the pressure sensors P1 and P2 measure the pressure on the filling side of the vehicle 2 and the pressure on the cylinder side (step S1), and calculate the pressure difference ΔP (ΔP = P2−P1) (step S2).
The control unit 10 determines whether or not the pressure difference ΔP is 1 MPa or less. If the pressure difference ΔP is 1 MPa or less (YES in step S3), the control unit 10 proceeds to the next step S4, and if it exceeds 1 MPa (NO in step S3), Step S1 and subsequent steps are repeated.
[0029]
In step S4, the control unit 10 determines that the filling with the cylinder during the supply of the hydrogen gas H2 has been completed. Subsequently, the control unit 10 determines which of the first on-off valves V1 to V3 is open (step S5).
[0030]
If V1 of the first on-off valve having the lowest internal pressure is opened, V2 is opened, V1 and V3 are closed (step S6), and the control is repeated from step S1 again. If V2 of the first on-off valve having an intermediate internal pressure is open, V3 is opened, V1 and V2 are closed (step S7), and the control is repeated again from step S1. Further, when the first on-off valve V3 having the highest internal pressure is opened (step S8), since the filling of the vehicle is completed, the control is performed by the existing routine thereafter.
Since the routine is the same as the existing one, the description thereof is omitted.
[0031]
Next, referring to FIG. 3, a description will be given of the control in the case where it is determined from the H2 gas flow rate that the hydrogen gas filling is completed.
[0032]
First, the flow rate of H2 gas flowing through the hydrogen supply line is measured by a flow meter (not shown) interposed in the hydrogen supply line L0 (step S11). The control unit 10 determines whether or not the H2 gas flow rate is equal to or lower than the predetermined flow rate (step S12). If not lower than the predetermined flow rate (NO in step S12), the control unit 10 repeats step S11 and subsequent steps, If it is (YES in step S12), it is determined that the filling with the cylinder during the H2 gas supply has been completed (step S13).
[0033]
In the next step S14, the control unit 10 determines which of the first closing valves V1 to V3 is open.
If V1 of the first on-off valve having the lowest internal pressure is opened, V2 is opened, V1 and V3 are closed (step S15), and the control is repeated again from step S11.
If V2 of the first on-off valve having an intermediate internal pressure is open, V3 is opened, V1 and V2 are closed (step S16), and the control is repeated again from step S1. Further, when the first on-off valve V3 having the highest internal pressure is opened (step S17), the filling of the vehicle is completed, and thereafter, the control is performed by the existing routine.
[0034]
Conventionally, when filling gas from cylinders of different pressures, when the pressure in the cylinder is reduced and filling, priority is given to filling of the high-pressure cylinder, and only when the high-pressure cylinder is filled, the low pressure It was filled with a cylinder of steps.
On the other hand, in the present invention, in any stage, if the pressure falls below a predetermined pressure (for example, when the pressure is reduced by about 5 MPa), the hydrogen is supplied from the compressor without the superiority of the low pressure stage and the high pressure stage. Fill with gas.
FIG. 4 shows a routine in the case of filling the hydrogen gas from the compressor without giving the superiority or inferiority of the low pressure stage and the high pressure stage.
[0035]
With reference to FIG. 4, the flow of control for filling the cylinder with hydrogen gas from the compressor will be described.
The internal pressure of each cylinder is measured by pressure gauges PB1 to PB3 provided in each cylinder B1 to B3 (step S21). The control unit 10 determines whether any one of the pressure gauges PB1 to PB3 is equal to or less than a predetermined value (step S22). If any one is equal to or less than the predetermined value (YES in step S22), the next If not (NO in step S22), the process returns to step S21.
[0036]
In step S23, the control unit 10 determines whether any of the second on-off valves VC1 to VC3 is open, and if any is open (YES in step S23), next. If not (NO in step S23), the process jumps to step S26.
[0037]
In step S24, the control unit 10 determines whether or not the filling of the cylinder communicating with the valve that has already been opened, that is, the filling of the cylinder that has already been filled with the H2 gas, has been completed. If not (NO in step S24), the process waits once (step S25), and then repeats step S24 and subsequent steps. If completed (YES in step S24), the process proceeds to step S26.
[0038]
In step S26, after filling the cylinder corresponding to step S22 (the cylinder below the predetermined value) and closing the valve of the open body, it is determined whether or not to end the control (step S27), and the process ends. (YES in step S27), the process ends as it is, and if the process is still continued, the control is repeated from the original step S21.
[0039]
In step S24 described above, when a certain cylinder is lower than the predetermined pressure, and when another cylinder is already being charged with hydrogen gas, the cylinder that is already being charged is prioritized. In other words, it means that hydrogen gas is filled in order from the cylinder whose pressure is lower than the predetermined pressure.
[0040]
If the first embodiment of the configuration and control as described above is twisted, even if the pressure difference between the gas storage means Rc on the automobile 2 side and the hydrogen filling device 1 is filled with hydrogen gas, the temperature rise is relatively small ( For example, since the temperature is set to about 2 ° C. to 3 ° C., an increase in the internal temperature of the gas storage means Rc on the vehicle 2 side can be suppressed.
In any stage, if the pressure falls below a predetermined pressure, the internal pressure of each cylinder (B1 to B3) on the hydrogen gas filling device 1 side that fills the hydrogen gas from the compressor 3 without dominating the gas is obtained. When the pressure is reduced by about 5 MPa, hydrogen gas can be automatically filled into the cylinder from the compressor 3.
[0041]
The second embodiment will be described with reference to FIG.
In the second embodiment shown in FIG. 5, a hydrogen filling apparatus denoted by reference numeral 1A is provided between a compressor 3 and a dispenser D on the gas supply side, and a turbine 4 (equipment that performs work using energy held by high-pressure gas: a reciprocating type. It is possible to use a machine). The pressure of the hydrogen gas increased in pressure by the compressor 3 is roughly reduced by causing the turbine 4 to work.
In a region between the turbine 4 and the compressor 3 in the hydrogen supply line L, a gas accumulator Rg and a flow meter F2 are interposed.
[0042]
The dispenser D includes a flow rate adjustment valve V0 (a flow rate adjustment mechanism for gas pressure adjustment) and a pressure sensor P1 located on the vehicle side with respect to the valve V0. Then, based on the pressure measured by the pressure sensor P1 and the flow rate measured by the flow meter F2, the control unit 10A adjusts the valve opening degree of the flow rate adjustment valve V0. Thus, the flow rate of the supplied hydrogen gas is controlled in accordance with the pressure of the hydrogen gas charged in the vehicle 2, that is, the pressure in the container Rc of the vehicle 2 (at that time). .
[0043]
Although the turbine 4 rotates the generator 5, the power generation amount tends to be uneven. For this reason, the power generated by the capacitor or the capacitor C is stored.
[0044]
In the second embodiment, referring to FIG. 6, an aspect of controlling the flow rate of the hydrogen gas supplied to the vehicle 2 side to be appropriate for the pressure in the container Rc of the vehicle 2 (at that time) will be described. I will explain.
[0045]
First, the measurement result of the pressure sensor P1 and the measurement result of the flow meter F2 are read (step S31). Then, the flow rate measured by the flow meter F2 is compared with the flow rate (scheduled numerical value) stored in advance in the control unit 10A (step S32). Here, the “prestored flow rate” is stored in a storage unit (not shown) of the control unit 10A and is determined corresponding to the measured value of the pressure sensor P1.
[0046]
If the flow rate measured by the flow meter F2 is smaller than the planned numerical value (“flow rate is low” in step S32), the opening degree of the flow rate adjustment valve V0 is increased (step S33), and the flow rate is increased.
On the other hand, if the measured flow rate is larger than the expected numerical value (“flow rate is high” in step S32), the opening degree of the flow rate adjustment valve V0 is decreased (step S34), and the flow rate is decreased.
Furthermore, if the measured flow rate is within an allowable range with respect to the scheduled numerical value (Yes in step S32), the opening degree of the flow rate adjustment valve V0 is maintained as it is (step S35).
[0047]
Next, it is determined whether or not the measurement result of the pressure gauge P1 has exceeded the first predetermined pressure (step S36).
Here, the “first predetermined pressure” is a pressure that is set to prevent the pressure in the region on the vehicle 2 side of the hydrogen supply line L from the flow rate adjustment valve V0 from exceeding the filling pressure of the vehicle 2. Further, the pressure is set to a low value by a slight numerical value obtained by adding the pipe resistance and the pressure considering the safety to the filling pressure of the vehicle 2 (for example, if the filling pressure is 35 MPa, the first predetermined pressure is set). 33 MPa).
If the measurement result of the pressure gauge P1 exceeds the first predetermined pressure (No in step S36), the opening degree of the flow rate adjustment valve V0 is decreased to decrease the pressure (step S37).
[0048]
If Step S36 is Yes or after Step S37, it is determined in Step S38 whether or not the measurement result of the pressure gauge P1 has reached the second predetermined pressure (Step S38).
Here, the “second predetermined pressure” means that the pressure in the region closer to the vehicle 2 than the flow rate adjustment valve V0 of the hydrogen supply line L (approximately equal to the pressure in the container Rc of the vehicle 2) is the filling pressure of the vehicle 2. The pressure is set to be almost equal and to know that filling is being completed. The numerical value is set to an intermediate value between the “first predetermined pressure” and the priority pressure (for example, if the filling pressure is 35 MPa, the second predetermined pressure is 34 MPa).
[0049]
If the measurement result of the pressure gauge P1 does not reach the second predetermined pressure, step S31 and subsequent steps are repeated (step S38 is No loop).
If the measurement result of the pressure gauge P1 has reached the second predetermined pressure (Yes in step S38), the flow rate of the hydrogen gas flowing through the hydrogen supply line L is reduced, and the filling end determined for each manufacturer is completed. A routine for this is executed (step S39).
[0050]
It should be noted that the illustrated embodiment is merely an example and is not intended to limit the technical scope of the present invention.
For example, in the above-described second embodiment, a reciprocating machine such as a piston / cylinder mechanism may be used instead of the turbine. This is because a reciprocating machine is more advantageous than a turbine at high pressure.
[0051]
【The invention's effect】
The effects of the present invention are listed below.
(1) Since the pressure difference between the gas storage means on the vehicle side and the hydrogen filling device is set so that the temperature rise is relatively small (for example, about 2 ° C. to 3 ° C.) even if hydrogen gas is charged, The effect of suppressing the internal temperature rise of the vehicle side gas storage means is great.
(2) If the internal pressure of the gas storage means is higher than the predetermined pressure, the second opening / closing means between the gas storage means and the hydrogen supply mechanism is closed, and the internal pressure of any of the gas storage means becomes equal to or lower than the predetermined pressure. In this case, the second opening / closing means between the gas storage means and the hydrogen supply mechanism is opened, but when another second opening / closing means is already opened, another second opening / closing means already opened is opened. Since the closed state of the second opening / closing means is maintained until the opening / closing means 2 is closed, the hydrogen of the hydrogen station can be obtained without any advantage if the pressure drops below a predetermined pressure at any stage. When the internal pressure of each cylinder on the side charged with hydrogen gas from the supply mechanism is lowered by about 5 MPa, hydrogen gas is automatically charged from the compressor .
[Brief description of the drawings]
FIG. 1 is a block diagram showing the overall configuration of a hydrogen filling apparatus according to a first embodiment of the present invention.
FIG. 2 is a flowchart for determining completion of filling with H 2 gas based on a pressure difference according to the first embodiment of the present invention.
FIG. 3 is a flowchart for determining completion of filling of H 2 gas based on the gas flow rate according to the first embodiment of the present invention.
FIG. 4 is a flowchart showing a routine for filling the cylinders V1 to V3 with H2 gas in the first embodiment of the present invention. FIG. 5 is a block diagram showing the overall configuration of the hydrogen filling apparatus according to the second embodiment of the present invention.
FIG. 6 is a flowchart showing a control routine for reducing the pressure difference between the filling side and the filling side according to the second embodiment of the present invention.
FIG. 7 is a block diagram showing the overall configuration of a hydrogen filling apparatus according to the prior art.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1, 1A ... Hydrogen filling apparatus 2 ... Vehicle 3 ... Compressor 4 ... Turbine 5 ... Generator 6 ... Capacitor 10 ... Control unit B1, B2, B3 ... Cylinder D ... dispenser L ... hydrogen supply pipes P1, P2 ... pressure sensors PB1, PB2, PB3 ... pressure gauges V1, V2, V3 ... open / close valves VC1, VC2, VC3 ... No. 2 open / close valve Vs ... Flow control valve

Claims (1)

複数の蓄ガス手段と、該蓄ガス手段の各々の充填対象に連通する配管系に介装された開閉弁とを有しており、該複数の蓄ガス手段の圧力は所定圧力以内ずつ相違するように設定されており、圧力が低い蓄ガス手段から充填対象への充填を順次開始し、圧力が低い蓄ガス手段による充填が完了してから圧力が高い蓄ガス手段からの充填を開始するよう開閉弁の開閉制御を行う制御手段を有している水素充填装置において、
該所定圧力以内の相違は、蓄ガス手段から充填対象へ充填するための圧力差を、充填対象内部の水素温度上昇を比較的少なくできる圧力差にするために設けられるものであり、該複数の蓄ガス手段に水素を供給する水素供給機構を備え、該複数の蓄ガス手段のうち、圧力が前記設定した圧力よりも所定値降圧したものから順に前記設定した圧力へと自動的に水素を供給するようにしたことを特徴とする水素充填装置。
A plurality of gas storage means has a closing valve which each interposed in the piping system in communication with the filling target accumulating gas means, the pressure of the gas storage means of said plurality of different portions within a predetermined pressure is set as such that the pressure is low to begin filling of the gas storage means to be charged with successively, starting the filling of the gas storage unit the pressure is high after completion of filling by pressure is low gas storage means in line intends braking hydrogen filling device that have a control means for opening and closing control of the opening and closing valve,
The difference within the predetermined pressure is provided to make the pressure difference for filling the filling object from the gas storage means into a pressure difference that can relatively reduce the increase in the hydrogen temperature inside the filling object. A hydrogen supply mechanism for supplying hydrogen to the gas storage means is provided, and hydrogen is automatically supplied from the plurality of gas storage means to the set pressure in order from a pressure lower than the set pressure by a predetermined value. A hydrogen filling apparatus characterized in that the hydrogen filling apparatus is provided.
JP2003090374A 2003-03-28 2003-03-28 Hydrogen filling device Expired - Fee Related JP4367830B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003090374A JP4367830B2 (en) 2003-03-28 2003-03-28 Hydrogen filling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003090374A JP4367830B2 (en) 2003-03-28 2003-03-28 Hydrogen filling device

Publications (2)

Publication Number Publication Date
JP2004293752A JP2004293752A (en) 2004-10-21
JP4367830B2 true JP4367830B2 (en) 2009-11-18

Family

ID=33404016

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003090374A Expired - Fee Related JP4367830B2 (en) 2003-03-28 2003-03-28 Hydrogen filling device

Country Status (1)

Country Link
JP (1) JP4367830B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10072799B2 (en) 2016-04-28 2018-09-11 Hyundai Motor Company Hydrogen filling method for fuel cell vehicle
JP2020118683A (en) * 2019-01-22 2020-08-06 株式会社タツノ Calibration method of hydrogen fueling apparatus
CN112283577A (en) * 2020-11-04 2021-01-29 太原理工大学 Vehicle-mounted high-pressure hydrogen grading filling system

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005207561A (en) * 2004-01-26 2005-08-04 Honda Motor Co Ltd Fuel gas station and fuel gas supply method
US7637292B2 (en) * 2005-05-09 2009-12-29 Honda Motor Co., Ltd. Pressure powered cooling system for enhancing the refill speed and capacity of on board high pressure vehicle gas storage tanks
JP2007092927A (en) * 2005-09-29 2007-04-12 Hitachi Ltd Gas feeder
JP4560841B2 (en) * 2006-03-02 2010-10-13 株式会社タツノ・メカトロニクス High pressure gas filling device
US7905252B2 (en) * 2006-03-20 2011-03-15 Tescom Corporation Apparatus and methods to dispense fluid from a bank of containers and to refill same
JP4941730B2 (en) * 2007-03-08 2012-05-30 トヨタ自動車株式会社 Fuel supply device and vehicle
CN100580305C (en) * 2007-07-12 2010-01-13 徐焕恩 Safe and low consumption intelligent gas-supplying system for gas bottle group
US8061392B2 (en) * 2008-12-23 2011-11-22 Texaco Inc. Variable volume hydrogen storage
US8899278B2 (en) * 2011-06-17 2014-12-02 Air Products And Chemicals, Inc. Pressure cycle management in compressed gas dispensing systems
ES2734553T3 (en) * 2013-05-31 2019-12-10 Nuvera Fuel Cells Llc Method and system of resupply of distributed hydrogen
AU2014312438B2 (en) * 2013-08-28 2018-09-13 Nuvera Fuel Cells, LLC Integrated electrochemical compressor and cascade storage method and system
CN104266081B (en) * 2014-09-11 2016-10-19 新兴能源装备股份有限公司 A kind of hydraulic pressure natural gas automobile secondary gas filling station
JP6391425B2 (en) * 2014-10-28 2018-09-19 Jxtgエネルギー株式会社 Operation method of hydrogen station and hydrogen station
JP6526984B2 (en) * 2015-02-20 2019-06-05 株式会社神戸製鋼所 Gas filling system
JP6389440B2 (en) * 2015-03-13 2018-09-12 株式会社神戸製鋼所 Gas supply system, hydrogen station provided with the same, pressure accumulator life determination method, and method of using gas supply system
JP6440545B2 (en) * 2015-03-25 2018-12-19 Jxtgエネルギー株式会社 Accumulator unit, hydrogen station, and hydrogen filling method
JP6747935B2 (en) * 2016-10-17 2020-08-26 大陽日酸株式会社 Gas filling method and gas filling equipment
JP7252037B2 (en) 2019-03-29 2023-04-04 株式会社キッツ Hydrogen gas filling method and hydrogen station
CN113090933B (en) * 2020-01-08 2022-12-09 国家能源投资集团有限责任公司 Control method of hydrogen filling station
JP7022396B2 (en) * 2020-03-10 2022-02-18 株式会社タツノ Filling device
CN114909604A (en) * 2021-02-08 2022-08-16 国家能源投资集团有限责任公司 Hydrogenation control method and device for hydrogenation station and hydrogenation station

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10072799B2 (en) 2016-04-28 2018-09-11 Hyundai Motor Company Hydrogen filling method for fuel cell vehicle
JP2020118683A (en) * 2019-01-22 2020-08-06 株式会社タツノ Calibration method of hydrogen fueling apparatus
JP7033277B2 (en) 2019-01-22 2022-03-10 株式会社タツノ Calibration method of hydrogen filling device
CN112283577A (en) * 2020-11-04 2021-01-29 太原理工大学 Vehicle-mounted high-pressure hydrogen grading filling system

Also Published As

Publication number Publication date
JP2004293752A (en) 2004-10-21

Similar Documents

Publication Publication Date Title
JP4367830B2 (en) Hydrogen filling device
CN108087717B (en) A kind of liquid hydrogen and High Pressure Hydrogen Unionfining system and charging method
CN104204650B (en) Gas-filling system and vehicle
KR101388162B1 (en) Gas charging apparatus and gas charging method
US8539972B2 (en) Low consumption and intelligent safe gas-supply system using gas tanks
CN102667302B (en) Gas filling system, gas filling method, and vehicle
CN109708000B (en) L-CH2 type hydrogen station heat management system
JP5327382B2 (en) Hydrogen filling system
US6619336B2 (en) System and method for dispensing pressurized gas
US7647194B1 (en) Method for calculating hydrogen temperature during vehicle fueling
CN112253990B (en) High-pressure hydrogen filling system based on temperature rise control and filling method thereof
CN110953480A (en) Safe and rapid hydrogenation machine, hydrogenation system, hydrogenation station and hydrogenation method
US20050178463A1 (en) Control method for high-pressure hydrogen vehicle fueling station dispensers
JP7022396B2 (en) Filling device
JP2011017406A (en) Hydrogen filling system, hydrogen filling method, movable body, and hydrogen filling device
JP2007092927A (en) Gas feeder
JP2004332757A (en) Method and device for filling hydrogen in pressure hydrogen tank
JP7120844B2 (en) hydrogen station
JP2023550394A (en) Method and apparatus for performing real-time hydrogen filling process
CN113130940B (en) Fuel cell automobile hydrogen storage system with high-pressure hydrogen cylinder and low-pressure hydrogen cylinder mixed
JP2005273811A (en) Hydrogen gas filling method and hydrogen gas filling device
JP2012077858A (en) Gas filling system, gas filling method, gas filling device and tank mounting device
KR102286842B1 (en) The method for detecting malfunction of the high pressure cylinder disposed in a fuel cell system
KR20220067502A (en) Apparatys and method for controlling real time responding hydrogen fueling
JP7070350B2 (en) vehicle

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090109

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090128

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090330

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090821

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090821

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120904

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130904

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees