JP4274992B2 - Distribution automation system and power outage construction management method - Google Patents

Distribution automation system and power outage construction management method Download PDF

Info

Publication number
JP4274992B2
JP4274992B2 JP2004107757A JP2004107757A JP4274992B2 JP 4274992 B2 JP4274992 B2 JP 4274992B2 JP 2004107757 A JP2004107757 A JP 2004107757A JP 2004107757 A JP2004107757 A JP 2004107757A JP 4274992 B2 JP4274992 B2 JP 4274992B2
Authority
JP
Japan
Prior art keywords
construction
information
section
switch
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004107757A
Other languages
Japanese (ja)
Other versions
JP2005295701A (en
Inventor
重久 栗栖
光章 鐘撞
豪雄 松本
和彦 折本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2004107757A priority Critical patent/JP4274992B2/en
Publication of JP2005295701A publication Critical patent/JP2005295701A/en
Application granted granted Critical
Publication of JP4274992B2 publication Critical patent/JP4274992B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、主に配電自動化システムの誤操作防止方法に係り、特に停電工事を行っている区間へ誤って送電することによる感電や機器の損傷等の事故を防止する配電自動化システムおよび停電工事管理方法に関する。   The present invention mainly relates to a method for preventing erroneous operation of a power distribution automation system, and in particular, a power distribution automation system and a power failure construction management method for preventing accidents such as electric shock and equipment damage due to erroneous power transmission to a section where power failure work is being performed. About.

従来、配電系統の制御においては、各営業所に設置されている配電自動化システム(以下、システムという)によって高圧配電線路の停電の有無の監視や同線路に設置されている自動開閉器の入切の制御が行われている。また、通常、計画的な停電工事(停電を伴う工事)の際の系統切替操作や配電線事故時に故障区間を自動的に切り離す操作は、システムが自動開閉器の操作手順を計算して操作指令を出力している。(例えば、特許文献1を参照)。   Conventionally, in the control of the distribution system, the distribution automation system (hereinafter referred to as the system) installed at each sales office monitors whether there is a power failure in the high-voltage distribution line, and turns on / off the automatic switch installed on the same line. Control is being performed. Normally, system switching operation during planned power outage work (work involving power outage) and operation to automatically disconnect the fault section in the event of a distribution line accident, the system calculates the operation procedure of the automatic switch Is output. (For example, see Patent Document 1).

一方、工事の予約をしていない突発的な停電工事や配電線事故時に故障区間が判別できないような場合は、システムが自動的に操作手順を作成しないため、配電自動化システムの画面で操作すべき自動開閉器を確認しながら操作者が自分で判断して自動開閉器を選択し入切操作を行っていた。
特許第3178063号公報
On the other hand, if the failure section cannot be determined during a sudden power outage or distribution line accident that has not been reserved for construction, the system does not automatically create an operation procedure and should be operated on the screen of the distribution automation system. While checking the automatic switch, the operator judged it by himself and selected the automatic switch to perform the on / off operation.
Japanese Patent No. 3178063

このため、配電系統が複雑な場合、操作者が誤って他の開閉器を選択して操作することにより、停電工事を行っている区間へ送電してしまい、感電事故や機器の損傷を引き起こす恐れがある。また、計画的な停電工事の場合でも、工事に先立って入念な打ち合わせをして作業を開始するものの、現地作業者のミスや誤解によって工事予定区域と異なる区域や時間帯での作業を実施する潜在的な危険性もある。この他、システムへの工事情報の入力ミスというヒューマンエラーも想定される。   For this reason, when the power distribution system is complicated, the operator may accidentally select and operate another switch to transmit power to the section where the power outage work is performed, which may cause an electric shock accident or damage to the equipment. There is. In addition, even in the case of planned power outage work, work will be started in a careful meeting prior to the work, but work will be carried out in an area or time zone that is different from the planned work area due to mistakes or misunderstandings by local workers. There is also a potential danger. In addition, a human error such as an input error of construction information to the system is also assumed.

本発明は、上述のかかる事情に鑑みてなされたものであり、停電工事を行う際の事故を未然に防ぐことのできる配電自動化システムおよび停電工事管理方法を提供することを目的とする。   This invention is made | formed in view of the above-mentioned situation, and it aims at providing the power distribution automation system and power failure construction management method which can prevent the accident at the time of performing a power failure construction beforehand.

本発明に係わる配電自動化システムは、停電工事の際に開閉器へ操作指令を送信する配電自動化システムであって、工事区間と開閉器の入操作を禁止するとのインターロック情報とを関連付けて保存するインターロック条件登録手段と、配電系統図に対して工事区間情報を入力する工事区間入力手段と、前記インターロック情報に基づいて、前記入力された工事区間に対応する開閉器への入操作を禁止する開閉器遠制手段と、前記配電系統図へ工事中の停電区間を表示する工事情報出力手段とを備えたことを特徴とする。   The power distribution automation system according to the present invention is a power distribution automation system that transmits an operation command to a switch during a power outage work, and stores the work section and interlock information that prohibits the switch on operation. Interlock condition registration means, construction section input means for inputting construction section information to the distribution system diagram, and entry operation to the switch corresponding to the inputted construction section is prohibited based on the interlock information And a construction information output means for displaying a power outage section under construction on the distribution system diagram.

インターロック情報に基づいて開閉器の入操作を禁止して配電系統図を用いて工事区間の入力や停電区間の表示を行うようにしたのでヒューマンエラーによる誤操作を削減することができる。   Based on the interlock information, the switching operation of the switch is prohibited and the construction section is input and the power outage section is displayed using the power distribution system diagram, so that erroneous operations due to human errors can be reduced.

好ましくは、前記インターロック条件登録手段は、さらに工事件名情報を関連付けて保存し、前記工事区間入力手段は、工事区間情報として工事件名情報を入力し、前記開閉器遠制手段は、前記工事区間入力手段によって入力された工事件名情報に基づいて工事区間を抽出して該当する開閉器の入操作を禁止するようにするとよい。   Preferably, the interlock condition registration means further stores construction subject information in association with each other, the construction section input means inputs construction subject information as construction section information, and the switch distance control means includes the construction section information. It is preferable to extract the construction section based on the construction subject information input by the input means and prohibit the operation of turning on the corresponding switch.

これにより工事件名で工事区間の開閉器のインターロックを行うことができるので操作ミスを削減することができる。   As a result, the construction section switches can be interlocked with the construction subject, so that operation errors can be reduced.

なお、「工事件名情報」とは、工事件名そのものの他、工事件名に対応する番号や記号など、広く工事を特定できる情報を意味する。また、「停電」は、区間全域の停電のほか、一部停電も含む。   The “construction subject information” means information that can widely identify construction, such as the construction subject itself, numbers and symbols corresponding to the construction subject. “Power outage” includes not only power outages throughout the section but also part of the power outages.

さらに、前記工事情報出力手段は、工事区間に対応する開閉器区間を配電系統図へ表示したり、あるいは、切状態の開閉器であって該開閉器を入操作することによって停電区間へ送電することになる開閉器を選択時に、入操作後に送電される区間を操作前に配電系統図上に識別表示することにより、操作員は、配電系統図上に表示されている開閉器の状態および区間の送電状態がどうなるかを確認して操作を行うことができるため、工事区間へ誤送電するような事態を未然に防ぐことができる。   Further, the construction information output means displays the switch section corresponding to the construction section on the distribution system diagram, or is a switch in the off state and transmits power to the power outage section by turning on the switch. When selecting the switch to be switched, the section to be transmitted after the turning-on operation is identified and displayed on the distribution system diagram before the operation, so that the operator can display the status and section of the switch displayed on the distribution system diagram. Therefore, it is possible to check the state of the power transmission state and to perform an operation, so that it is possible to prevent a situation where power is erroneously transmitted to the construction section.

なお、前記工事情報出力手段は、入状態の開閉器であって該開閉器を切操作することによってある区間を停電させることになる開閉器を選択時に、切操作後に停電となる区間を操作前に配電系統図上に識別表示するようにしてもよい。   The construction information output means is an on-state switch, and when the switch that cuts off a section by turning off the switch is selected, the section that is cut off after turning off is selected before the operation. In addition, an identification display may be made on the distribution system diagram.

これにより、その区間の不慮の停電を回避することができる。特に、区間情報ごとに該区間に属する電柱番号、変圧器、開閉器、高圧需要家などの顧客情報を含む付帯情報を保存する手段を備え、前記工事情報出力手段は、開閉器を操作することによって、停電、送電状態が変化する区間を識別表示すると共に、該区間の前記付帯情報を表示することによって、その区間の設備や需要家等を確認して、送電あるいは停電の操作を行うことができる。   Thereby, the unexpected power failure of the area can be avoided. In particular, each section information is provided with means for storing incidental information including customer information such as telephone pole numbers belonging to the section, transformers, switches, and high voltage consumers, and the construction information output means operates the switches By identifying and displaying the section where the power outage and power transmission state change, displaying the incidental information of the section, and confirming the equipment and customers in that section, and performing the operation of power transmission or power outage it can.

より好ましくは、配電線事故によって故障の可能性のある開閉器情報と該開閉器の状態を入状態として保存する手段を備え、前記工事情報出力手段は、前記故障の可能性のある開閉器および該開閉器によって送電される可能性のある区間を識別表示するとよい。   More preferably, it comprises means for storing switch information that may be broken due to a distribution line accident and the state of the switch as an on state, and the construction information output means includes the switch that may be broken and It is preferable to identify and display a section in which power can be transmitted by the switch.

これにより、本来送電してはならない区間に送電するような事態を回避することができ、故障の可能性のある開閉器を現地作業者に確認させることも可能である。   As a result, it is possible to avoid a situation where power is transmitted to a section where power transmission should not be performed, and it is also possible to make a local worker confirm a switch with a possibility of failure.

また、本発明の配電自動化システムは、停電工事の際に開閉器へ操作指令を送信する配電自動化システムであって、区間ごとに該区間の設備が属する位置情報の範囲を記憶する手段と、工事区間情報を入力する工事区間入力手段と、現地作業者の位置情報を入力する位置情報入力手段と、前記位置情報入力手段によって入力された位置情報が、前記工事区間の位置情報の範囲に含まれているか否かを判定し、含まれていない場合には注意メッセージを出力する判定手段とを備えたことを特徴とする。   The distribution automation system of the present invention is a distribution automation system that transmits an operation command to a switch during a power outage construction, and stores a range of position information to which equipment in the section belongs for each section, The construction section input means for inputting the section information, the position information input means for inputting the position information of the local worker, and the position information input by the position information input means are included in the position information range of the construction section. And a judging means for outputting a caution message when it is not included.

現地作業者が工事区間の範囲に居るか否かを判定することにより、現地作業者の誤解により本来の予定場所と異なる場所で作業することによる事故を未然に防ぐことができる。   By determining whether or not the local worker is within the construction section, it is possible to prevent an accident caused by working in a location different from the original planned location due to misunderstanding of the local worker.

好ましくは、前記現地作業者の位置に近接する区間を抽出し、開閉器を操作することによって前記区間へ送電することになる場合は、該開閉器を選択時に注意表示を行うようにするとよい。これにより、現地作業者が誤って近接区間へ立ち入ることによる事故の発生を防ぐことができる。   Preferably, when a section close to the position of the local worker is extracted and power is transmitted to the section by operating the switch, a caution display is performed when the switch is selected. As a result, it is possible to prevent an accident caused by a local worker entering the adjacent section by mistake.

また、本発明に係わる停電工事管理方法は、現地作業者の携帯端末から送られてくる工事情報をサーバへ入力して、該工事情報を用いて工事区間へ送電する開閉器の制御を行う停電工事管理方法であって、前記サーバには、区間ごとに該区間の設備が属する位置範囲を記憶すると共に、工事件名情報に関連付けて工事区間を記憶するステップと、前記携帯端末から送られてくる工事件名情報と現地作業者の位置情報とを入力するステップと、前記入力した工事件名情報をもとに工事区間を抽出し、現地作業者の位置が工事区間の位置範囲に含まれているか否かを判定して、含まれていない場合には注意メッセージを出力するステップと、を含むことを特徴とする。   In addition, the power failure work management method according to the present invention is a power failure control method in which construction information sent from a portable terminal of a local worker is input to a server, and the switch that controls power transmission to the construction section using the construction information is controlled. In the construction management method, the server stores a location range to which equipment of the section belongs for each section, stores the construction section in association with construction subject information, and is sent from the portable terminal A step of inputting construction subject information and location information of the local worker, a construction section is extracted based on the inputted construction subject information, and whether or not the location of the local worker is included in the construction section location range. And a step of outputting a caution message if it is not included.

本発明によれば、現地作業者の携帯端末を通して送られてくる位置情報をもとに、現地作業者が工事予定区間に居るか否かを判定する。   According to the present invention, it is determined whether or not the local worker is in the planned construction section based on the position information sent through the portable terminal of the local worker.

また、本発明に係わる停電工事管理方法は、現地作業者の携帯端末から送られてくる工事情報をサーバへ入力して、該工事情報を用いて工事区間へ送電する開閉器の制御を行う停電工事管理方法であって、前記サーバには、区間ごとに該区間の設備が属する位置範囲を記憶すると共に、工事件名情報に関連付けて工事区間情報を記憶するステップと、前記携帯端末から送られてくる工事件名情報と現地作業者の位置情報とを入力するステップと、前記入力した工事件名情報をもとに工事区間情報を抽出し、現地作業者の位置が工事区間以外の区間の位置範囲に含まれているか否かを判定して、含まれている場合には注意メッセージを出力するステップとを含むことを特徴とする。   In addition, the power failure work management method according to the present invention is a power failure control method in which construction information sent from a portable terminal of a local worker is input to a server, and the switch that controls power transmission to the construction section using the construction information is controlled. In the construction management method, the server stores, for each section, a position range to which the equipment in the section belongs, and stores construction section information in association with construction subject information, and is sent from the portable terminal Entering the construction subject information and the location information of the local worker, and extracting the construction section information based on the inputted construction subject information, so that the location of the local worker is within the position range of the sections other than the construction section. Determining whether it is included, and outputting a caution message if it is included.

本発明では、特に区間が近接あるいは重複しているような場合、現地作業者が誤って他の区間の設備に触れて事故を起こすような事態を回避することができる。   In the present invention, it is possible to avoid a situation in which a local worker accidentally touches equipment in another section and causes an accident, particularly when sections are close or overlapping.

好ましくは、前記注意メッセージが出力された場合は、該メッセージに対する確認入力により、開閉器の制御を許可するステップを含むようにするとよい。
未確認の間はインターロックを働かせて開閉器を操作できないようにしておくことにより事故を未然に防ぐことができる。
Preferably, when the caution message is output, a step of permitting control of the switch by a confirmation input for the message may be included.
Accidents can be prevented by making the switch inoperable during the unconfirmed period so that the switch cannot be operated.

より好ましくは、携帯端末に関連付けて位置の誤差情報を保存し、前記携帯端末から送られてくる位置情報と前記誤差情報とを用いて、現地作業者の位置を判定するようにするとよい。   More preferably, the position error information is stored in association with the portable terminal, and the position of the local worker is determined using the position information and the error information sent from the portable terminal.

GPS機能によって位置を特定する携帯端末や基地局によって位置を特定する携帯端末など、いろいろな方式の端末があり収集した位置情報の誤差が異なるため、現地作業者の携帯端末ごとに誤差を記憶しておき、その誤差を加味して位置を判定する。これにより、一律同じ誤差として判定するのに比べて、位置情報の正確なものについては精度を高くして判定することができる。   Since there are various types of terminals such as mobile terminals that specify the position by the GPS function and mobile terminals that specify the position by the base station, the error of the collected location information differs, so the error is stored for each mobile terminal of the local worker. The position is determined in consideration of the error. As a result, it is possible to determine the accurate position information with higher accuracy as compared with the case where the same error is determined.

本発明によれば、停電工事を行う際の操作者または現地作業者のヒューマンエラーによる感電事故や機器の損傷を防止することができる。   ADVANTAGE OF THE INVENTION According to this invention, the electric shock accident and damage of an apparatus by the human error of the operator at the time of a power failure construction or a local worker can be prevented.

以下、本発明の第1の実施の形態を説明する。図1は、本実施の形態に係わる配電自動化システム1のブロック図である。ここで、配電自動化システム1は、配電系統の開閉器の監視制御や表示出力処理などを実行するサーバ4、設定データや配電系統図の表示を行うマンマシン装置6、および、データの入力を行う入力装置9を備えている。また、サーバ4は、演算処理を実行する制御部2とデータを記憶する記憶部3から構成されている。マンマシン装置6は、設定した工事(作業)情報等のデータの一覧を表示する設定一覧表示部7、配電系統図や地図を表示する配電系統図表示部8、および、音声出力装置12とを備えている。   Hereinafter, a first embodiment of the present invention will be described. FIG. 1 is a block diagram of a power distribution automation system 1 according to the present embodiment. Here, the distribution automation system 1 performs a server 4 for executing monitoring control of a switch of a distribution system, a display output process, a man-machine apparatus 6 for displaying setting data and a distribution system diagram, and inputting data. An input device 9 is provided. The server 4 includes a control unit 2 that executes arithmetic processing and a storage unit 3 that stores data. The man-machine device 6 includes a setting list display unit 7 that displays a list of data such as set construction (work) information, a distribution system diagram display unit 8 that displays a distribution system diagram and a map, and an audio output device 12. I have.

さらに、サーバ4は、遠方監視制御装置親局11を介して子局である遠制開閉器へ操作出力し、また地図情報システム10と繋がり地図情報を取得してマンマシン装置6へ出力できるようになっている。   Further, the server 4 can be operated and output to the remote control switch which is the slave station via the remote monitoring control device master station 11 and can be connected to the map information system 10 to acquire the map information and output it to the man-machine device 6. It has become.

また、配電自動化システム1の記憶部3には、図2に示す工事区間設定テーブルが保存されている。   The storage section 3 of the distribution automation system 1 stores a construction section setting table shown in FIG.

ここで、工事区間設定テーブルは、事業所名や登録日のほか、発変電所フィーダ名、停電期間、停電区間、操作禁止開閉器、操作開始予定日時等の情報が保存されている。なお、操作禁止開閉器情報については、事前に開閉器操作手順を作成したときに停電予定の工事区間に対して工事区間を設定し、操作禁止開閉器を登録しておくものとする。   Here, the construction section setting table stores information such as establishment name and registration date, as well as information on the power station substation feeder name, power outage period, power outage section, operation prohibited switch, scheduled operation start date and time, and the like. As for operation prohibited switch information, it is assumed that when a switch operating procedure is created in advance, a construction section is set for a construction section scheduled for a power outage and an operation prohibited switch is registered.

この工事区間設定テーブルの内容は、設定一覧表示部7へ表示され、また、新たな工事情報は、表示部7を通して入力可能になっている。   The contents of the construction section setting table are displayed on the setting list display unit 7, and new construction information can be input through the display unit 7.

工事区間設定画面の例を図3に示す。系統図上で設定した区間を選択すると工事区間設定のダイアログボックスが表示され、設定ボタンを押下することで、選択した区間が工事区間として登録される。   An example of the construction section setting screen is shown in FIG. When a section set on the system diagram is selected, a construction section setting dialog box is displayed. By pressing a setting button, the selected section is registered as a construction section.

このように構成された配電自動化システム1の動作を図4のフローチャートを用いて説明する。なお、この動作は、制御部の機能として実行されるものである。   The operation of the distribution automation system 1 configured as described above will be described with reference to the flowchart of FIG. This operation is executed as a function of the control unit.

開閉器操作手順が有るか否かを判定し(S101)、「Yes」の場合は、自動実行処理として、まず、システム1に保存されている工事件名に対応する開閉器操作手順により系統の自動切換えを行い(S102)、工事区間を停電状態する(S103)。また、この停電区間に対して、工事区間設定テーブルの操作禁止開閉器情報をもとにインターロックをかけ、系統図の該当区間に工事区間であることの表示出力を行い、設定一覧表示部の工事区間一覧への登録および音声出力を行うことによって工事区間の自動設定を行う(S104)。

It is determined whether or not there is a switch operation procedure (S101). If “Yes”, as an automatic execution process, first, the automatic operation of the system is performed by the switch operation procedure corresponding to the construction title stored in the system 1. Switching is performed (S102), and the construction section is brought into a power failure state (S103). Also, this power failure section is interlocked based on the operation prohibition switch information in the construction section setting table, and a display output indicating that it is a construction section is displayed in the corresponding section of the system diagram. The construction section is automatically set by registration in the construction section list and voice output (S104).

すなわち、予め工事件名の開閉器操作手順で工事区間を含む区間を停電させる操作手順と工事区間の範囲を設定しておき、その設定情報からまず工事区間を含む区間を停電させる操作手順を実行して当該区間を停電させた後に自動的に工事区間の設定を行う。   In other words, the operation procedure for powering off the section including the construction section and the range of the construction section are set in advance using the switch operation procedure of the construction subject, and the operation procedure for powering off the section including the construction section is first executed from the setting information. The construction section is automatically set after the section is blacked out.

一方、ステップS101で「No」の場合、すわなち、緊急工事や配電線事故の場合は、操作者は、システムの系統図より操作開閉器を選択し、その選択情報はシステムに入力される(S105)。なお、配電線の事故の場合には、制御部が自動的に故障区間を判定して開閉器を操作して故障区間を健全区間から切り離して故障区間を停電させる。そして、制御部2は、図5に示す設備情報ファイルをもとに状態が変わる区間の点滅表示、および、該当開閉器付近の地図表示を行う(S106)。操作者は、配電系統図表示部8のフリッカ表示で操作後の配電系統の状況を確認しながら個別に遠制開閉器を操作し、その操作情報はシステムに入力される(S107)。そして、工事区間を停電したか否かの判定を行い、操作すべき全ての開閉器について実行する(S108、S109)。   On the other hand, if “No” in step S101, that is, in the case of emergency construction or distribution line accident, the operator selects an operation switch from the system diagram of the system, and the selection information is input to the system. (S105). In the case of a distribution line accident, the control unit automatically determines the failure section, operates the switch, disconnects the failure section from the healthy section, and causes the failure section to power out. And the control part 2 performs the blink display of the area from which a state changes based on the equipment information file shown in FIG. 5, and the map display of an applicable switch vicinity (S106). The operator individually operates the distance control switch while confirming the status of the power distribution system after the operation on the flicker display of the power distribution system diagram display unit 8, and the operation information is input to the system (S107). Then, it is determined whether or not the construction section has a power failure, and is executed for all the switches to be operated (S108, S109).

また、個別操作では、システムが自動的に工事区間を設定できないため、操作者は設定一覧表示部の工事区間一覧から新規登録ボタンを押下し、配電系統図の該当区間を選択することによって、手動で工事区間の設定を行い、この区間へ送電する開閉器の操作を禁止状態にする(S110)。   In addition, since the system cannot automatically set the construction section in individual operation, the operator manually presses the new registration button from the construction section list in the setting list display section and selects the corresponding section in the distribution system diagram. Then, the construction section is set and the operation of the switch for transmitting power to this section is prohibited (S110).

その後、停電工事を行い(S111)、工事終了の連絡を受けると(S112)、システム操作者は、設定一覧表示部7の工事区間一覧から該当工事区間を選択して、その区間の配電系統図およびその周辺の地図を表示しそれを確認しながら設定を解除する(S113)。これによりインターロックが解かれる。
次に、自動実行(ステップS114で「Yes」)の場合は、システムの工事件名の開閉器操作手順により通常の配電系統の開閉器状態へ切替が行われる(S115)。
After that, when a power outage work is performed (S111) and a notification of the completion of the work is received (S112), the system operator selects a corresponding work section from the work section list in the setting list display section 7, and a distribution system diagram of that section. And the map is canceled while displaying the map around it and confirming it (S113). As a result, the interlock is released.
Next, in the case of automatic execution (“Yes” in step S114), switching to the normal switch state of the distribution system is performed by the switch operation procedure of the system construction subject (S115).

一方、個別操作(ステップS114で「No」)の場合は、システムの系統図より操作開閉器を選択すると(S116)、制御部2により状態が変わる区間の点滅表示、および、該当開閉器付近の地図表示が行われる(S117)。操作者は、配電系統図表示部8のフリッカ表示で操作後の配電系統の状況を確認しながら個別に遠制開閉器を操作し、その操作情報はシステムに入力される(S118)。操作すべき全ての開閉器についてステップS116からステップS118までの処理を繰り返す(S108、S119)。   On the other hand, in the case of individual operation (“No” in step S114), when an operation switch is selected from the system diagram of the system (S116), the flashing display of the section whose state is changed by the control unit 2 and the vicinity of the corresponding switch A map display is performed (S117). The operator individually operates the distance control switch while confirming the status of the distribution system after the operation on the flicker display on the distribution system diagram display unit 8, and the operation information is input to the system (S118). The processing from step S116 to step S118 is repeated for all the switches to be operated (S108, S119).

ここで、上記のステップS104またはステップS110で工事区間の設定を行ったときの配電系統図表示部への表示は図6のようになる。
すなわち、配電系統図表示部には、系統図に対して、工事区間が表示されており、工事区間Aの両側の開閉器2a、3aは、切状態となっている。このとき、開閉器2aまたは3aは、インターロック機能により操作できない状態になっている。このインターロックは、ステップS113で工事区間の設定解除の入力が行われることにより解除される。
Here, the display on the distribution system diagram display section when the construction section is set in step S104 or step S110 is as shown in FIG.
That is, the distribution system diagram display unit displays a construction section with respect to the system diagram, and the switches 2a and 3a on both sides of the construction section A are in a cut-off state. At this time, the switch 2a or 3a cannot be operated by the interlock function. This interlock is released by inputting the work section setting cancellation in step S113.

図7は、配電系統図表示部に表示される系統図の一例である。ここで、工事区間に送電するための開閉器は、操作禁止状態となっており、識別表示される。また、各開閉器のインターロック状態も表示可能になっている。なお、図3の工事区間設定ウィンドウで設定ボタンを選択することによりシステム画面に工事中の区間が識別表示される。図8にこの表示例を示す。図中、網がけの箇所が工事中であることを示す。   FIG. 7 is an example of a system diagram displayed on the power distribution system diagram display unit. Here, the switch for transmitting power to the construction section is in an operation-prohibited state and is identified and displayed. In addition, the interlock state of each switch can be displayed. Note that the section under construction is identified and displayed on the system screen by selecting a setting button in the construction section setting window of FIG. FIG. 8 shows an example of this display. In the figure, the shaded area is under construction.

工事区間を設定しない場合は、図9のように開閉器を選択したときにその開閉器の色が変化すると共に、図5の設備情報ファイルを参照することによって、その開閉器に繋がる区間が点滅表示される。   When the construction section is not set, the color of the switch changes when the switch is selected as shown in FIG. 9, and the section connected to the switch blinks by referring to the equipment information file of FIG. Is displayed.

本実施の形態によれば、配電自動化システムの操作による故障の復旧等の計画外の停電工事の場合、工事区間への送電は、工事区間設定によるインターロックにより、開閉器の入操作を禁止して工事区間への誤送電をできないようにしたため、感電や機器損傷を防止することができる。   According to the present embodiment, in the case of unscheduled power outage work such as failure recovery by operation of the distribution automation system, power transmission to the construction section is prohibited by the interlock by setting the construction section. In this way, it is possible to prevent electric shock and damage to the equipment.

計画的な工事の場合は、開閉器操作の手順が予め配電自動化システムによって計算して登録されているので、停電工事のためにシステムが自動的に開閉器を操作し、停電予定区間を停電にしたときから自動的に工事中の設定を行い、インターロックをかけるので工事の都度設定する操作を省略することができ、労力の削減やヒューマンエラーの発生を防止することができる。   In the case of planned construction, the switch operation procedure is calculated and registered in advance by the distribution automation system, so the system automatically operates the switch for power outage work, and the power outage scheduled section is Since the setting during construction is automatically performed and the interlock is applied, the operation to be set every construction can be omitted, and labor can be reduced and the occurrence of human error can be prevented.

また、途中で配電自動化システムの操作者が交代しても、工事中の区間はシステムの画面の一覧表により確認することができ、引継ぎも容易にでき、万一誤って異なる操作をしても工事区間に送電するような開閉器操作はできないので現地作業者の安全を確保することができる。   Even if the operator of the distribution automation system changes during the process, the section under construction can be confirmed from the list on the screen of the system, it can be easily taken over, and even if a wrong operation is performed by mistake. The operator cannot ensure the safety of local workers because the switch cannot be operated to transmit power to the construction section.

停電箇所へ送電するとき、あるいは、停電させる開閉器操作をする際に、該当開閉器を配電自動化システムの配電系統図上で選択すると、操作後に送電あるいは停電する開閉器区間を系統図上で点滅表示させるようにしたので、操作者の注意を喚起することができる。   When power is transmitted to a power outage location or when operating a switch that causes a power outage, if the corresponding switch is selected on the power distribution system diagram of the distribution automation system, the section of the switch that performs power transmission or power outage after the operation flashes on the system diagram Since it is displayed, the operator's attention can be alerted.

また、操作する開閉器をシステムの画面で選択すると、その付近の電柱番号、変圧器、開閉器、高圧需要家の位置や停電状況を表示した地図をポップアップ表示するようにしたので、操作対象箇所の確認を容易に行うことができる。   In addition, when a switch to be operated is selected on the system screen, a map showing the power pole number, transformer, switch, high voltage consumer location and power outage in the vicinity is displayed in a pop-up. Can be easily confirmed.

さらに、工事設定箇所をシステム画面の一覧表で管理するようにしたため設定を解除するとき系統図上の設定箇所を探すことなく該当件名を選択することで、配電系統図で該当箇所へジャンプして解除箇所を確認することができる。なお、このとき、区間の設備情報と地図情報とのリンクをとって、付近の地図を表示させて確認を行えるようにしてもよい。   In addition, because the construction setting location is managed in the system screen list, when canceling the setting, select the subject without searching the setting location on the system diagram, and jump to the corresponding location in the distribution system diagram. The release location can be confirmed. At this time, a link between the facility information of the section and the map information may be taken to display a nearby map so that confirmation can be performed.

次に、本発明の第2の実施の形態を説明する。図10は、第2の実施の形態に係わる配電自動化システムの機能ブロック図である。ここで、配電自動化システム1の基本的な構成は図1と同様であるが、本実施の形態では、配電自動化システム1は通信ネットワーク51を介して現地作業者の携帯端末52と繋がっている。また、配電自動化システム1には、携帯端末52と通信を行うための通信部13、親局を介して遠制開閉器と通信を行うための通信部14を設けている。さらに、制御部2は、通信部13または14を介してデータ通信を行うための送受信処理手段(機能)21、入力装置9やマンマシン装置6へのデータの入出力を行う入出力処理手段(機能)22、開閉器のインターロック情報を登録するインターロック条件登録手段(機能)23、工事区間の設定を行う工事区間入力手段(機能)24、現地作業者の位置情報の入力を行う位置情報入力手段(機能)25、位置情報に基づいて現地作業者が所定の範囲にいるか否かを判定する判定手段(機能)26、開閉器の入切指令を送信する開閉器遠制手段(機能)27、および、マンマシン装置6へ配電系統図や工事中の停電区間を表示する工事情報出力手段(機能)28を備えている。   Next, a second embodiment of the present invention will be described. FIG. 10 is a functional block diagram of a power distribution automation system according to the second embodiment. Here, the basic configuration of the distribution automation system 1 is the same as that in FIG. 1, but in the present embodiment, the distribution automation system 1 is connected to the portable terminal 52 of the local worker via the communication network 51. Further, the power distribution automation system 1 is provided with a communication unit 13 for communicating with the portable terminal 52 and a communication unit 14 for communicating with the distance control switch via the master station. Further, the control unit 2 includes a transmission / reception processing unit (function) 21 for performing data communication via the communication unit 13 or 14, and an input / output processing unit (input / output processing unit for inputting / outputting data to / from the input device 9 or the man-machine device 6). Function) 22, interlock condition registration means (function) 23 for registering the interlock information of the switch, construction section input means (function) 24 for setting the construction section, and position information for inputting the position information of the local worker Input means (function) 25, determination means (function) 26 for determining whether or not a local worker is within a predetermined range based on position information, switch distance control means (function) for transmitting a switch on / off command 27, and a construction information output means (function) 28 for displaying a distribution system diagram and a power outage section under construction on the man-machine device 6.

また、記憶部3は、配電系統の設備情報を保存する設備情報ファイル31、工事区間と操作すべき開閉器などの情報を保存するインターロック条件ファイル32、工事の予定日時、工事区間など工事に関する情報を保存する工事情報ファイル33、および、区間ごとの位置範囲を保存する区間位置範囲ファイル34を有している。   The storage unit 3 also includes an equipment information file 31 for storing equipment information of the power distribution system, an interlock condition file 32 for storing information such as a construction section and a switch to be operated, a construction date and time, a construction section, and the like. A construction information file 33 for storing information and a section position range file 34 for storing a position range for each section are provided.

設備情報ファイル31には、図5に示すように、開閉器識別番号ごとに、たとえば遠方制御(遠制)タイプか手動タイプか、あるいは、連系か区分かなどの種別情報、開閉器に繋がる配電線の区分識別番号、および、開閉器の入切状態やインターロック中か否かを表すフラグなどの情報が保存されている。   In the equipment information file 31, as shown in FIG. 5, for each switch identification number, for example, remote control (distance control) type or manual type, or type information such as linkage or classification, it is connected to the switch. Information such as a distribution line classification identification number and a flag indicating whether or not the switch is turned on or off or interlocking is stored.

また、区間位置範囲ファイル34は、図11に示すように開閉器で区分された区間ごとに、その地理上の位置の範囲情報を保存したファイルである。たとえば、配電系統図上では直線で示されていても実際の設備の配置は、図12に示すように分散している。区間位置範囲とは、区間ごとにその設備の地理的な範囲を示したものである。たとえば、区分C82およびその両端の開閉器S62とS71を包含するように一点鎖線の四角で囲み、その左下(位置X)の座標(東経133°30′26.7″、北緯35°25′16.8″)と右上(位置Y)の座標(東経133°30′28.3″、北緯35°25′18.1″)を位置範囲情報として保存する。同様に他の開閉器で区分される区間についてもその位置範囲を保存しておく。   Further, the section position range file 34 is a file in which range information of the geographical position is stored for each section divided by a switch as shown in FIG. For example, the arrangement of the actual facilities is dispersed as shown in FIG. The section position range indicates the geographical range of the equipment for each section. For example, it is surrounded by a dashed-dotted line so as to include the section C82 and the switches S62 and S71 at both ends thereof, and the coordinates of its lower left (position X) (133 ° 30'26.7 ″ east longitude, 35 ° 25′16 north latitude) .8 ″) and upper right (position Y) coordinates (east longitude 133 ° 30′28.3 ″, north latitude 35 ° 25′18.1 ″) are stored as position range information. Similarly, the position range of the section divided by other switches is stored.

以上の構成において、配電自動化システム1の動作を説明する。
まず、予め入力装置9から工事区間ごとの遠制開閉器の入切情報を登録しておく。この情報は、インターロック条件登録手段23によって、記憶部3のインターロック条件ファイル32に保存される。図13は、インターロック条件ファイルの一例である。工事区間は、開閉器で区分可能な最小区間単位で保存しておき、工事区間画複数の区間に跨るときは、そのOR条件で遠制開閉器を切操作するようにすれば、確実に工事区間を停電状態にすることができる。なお、停電区間を最小範囲に留めるため、停電区間の下流系統は遠制連係開閉器を入にして、別系統から電力を供給するようにする。
In the above configuration, the operation of the distribution automation system 1 will be described.
First, on / off information of the distance control switch for each construction section is registered in advance from the input device 9. This information is stored in the interlock condition file 32 of the storage unit 3 by the interlock condition registration means 23. FIG. 13 is an example of an interlock condition file. The construction section is stored in units of the minimum section that can be classified by the switch, and when spanning multiple sections of the construction section image, if the distance control switch is turned off under that OR condition, the construction section will be securely constructed. The section can be in a power outage state. In order to keep the power outage section in the minimum range, the downstream system in the power outage section is provided with a distance linkage switch to supply power from another system.

工事情報は、入力装置9から入力され、工事区間入力手段24によって、工事情報ファイル33に書き込まれる。図14は、工事情報ファイルの一例である。工事件名ごとに停電区間、フィーダ、停電予定時刻等の情報が保存されている。   The construction information is input from the input device 9 and written into the construction information file 33 by the construction section input means 24. FIG. 14 is an example of a construction information file. Information such as power outage sections, feeders, and scheduled power outages are stored for each construction subject.

停電工事の際の開閉器の操作は、第1の実施の形態で説明した図4の手順に従って行う。開閉器への操作指令は、開閉器遠制手段27から送られる。このとき、ステップS111の停電工事の開始の際、現地作業者の携帯端末52より工事開始の連絡を行うようにする。この連絡は、携帯端末52に工事件名を入力することにより行う。なお、工事件名を現地作業者が直接入力することに代え、携帯端末52に、工事情報ファイル33に登録されているその日の未実施の工事件名を表示し、その中から選択させるようにしてもよい。   The operation of the switch during the power outage work is performed according to the procedure of FIG. 4 described in the first embodiment. An operation command to the switch is sent from the switch distance control means 27. At this time, at the start of the power outage construction in step S111, the local worker's portable terminal 52 notifies the construction start. This communication is performed by inputting the construction subject to the portable terminal 52. In addition, instead of inputting the construction subject directly by the local worker, the construction subject not yet implemented on that day registered in the construction information file 33 may be displayed on the portable terminal 52 and selected from among them. Good.

工事件名の送信と共にその携帯端末51の位置情報が送られ、位置情報入力手段25によって、記憶部3の工事情報ファイル33に保存される。
そして、判定手段26は、区間位置ファイル34を参照して、取得した現地作業者の位置情報が、工事件名に対応する停電区間の位置範囲に含まれているか否かを判定する。
The location information of the portable terminal 51 is sent together with the transmission of the construction subject, and is stored in the construction information file 33 of the storage unit 3 by the location information input means 25.
Then, the determination unit 26 refers to the section position file 34 and determines whether or not the acquired position information of the local worker is included in the position range of the power outage section corresponding to the construction title.

以下、判定手段26の詳細な処理手順について図15を用いて説明する。
判定手段26は、位置情報入力手段25が現地作業者からの位置情報を受信完了することによって起動される。起動されると、まず、予定時刻の所定範囲内か否かを判定し(S201)、予定時刻外の場合は、時刻異常フラグをセットする(S202)。次に、受信した工事件名から工事情報ファイル33を参照してその工事区間を抽出し、続いて区間位置範囲ファイル34を参照して、位置範囲データを抽出する(S203)。そして、現地作業者の位置が、その位置範囲データの範囲内に含まれているか否かを判定して(S204)、含まれていなければ、位置情報異常フラグをセットする(S205)。
Hereinafter, a detailed processing procedure of the determination unit 26 will be described with reference to FIG.
The determination means 26 is activated when the position information input means 25 completes receiving position information from the local worker. When activated, it is first determined whether or not it is within a predetermined range of the scheduled time (S201). If it is outside the scheduled time, a time abnormality flag is set (S202). Next, the construction section is extracted by referring to the construction information file 33 from the received construction subject, and then the position range data is extracted by referring to the section position range file 34 (S203). Then, it is determined whether or not the position of the local worker is included in the range of the position range data (S204). If not included, the position information abnormality flag is set (S205).

次に、時刻異常フラグ、位置情報異常フラグのいずれかがセットされておれば(S206)、注意メッセージを携帯端末52に送信すると共にマンマシン装置6へ注意表示を行う(S208)。いずれのフラグにも異常がない場合は、作業許可通知を携帯端末52へ送信する(S207)。   Next, if either the time abnormality flag or the position information abnormality flag is set (S206), a caution message is transmitted to the portable terminal 52 and a caution display is displayed on the man-machine device 6 (S208). If there is no abnormality in any of the flags, a work permission notification is transmitted to the portable terminal 52 (S207).

この位置情報の収集は、作業終了の連絡があるまで定期的に行われ、現地作業者が予定外の区間に入っていないか否かを監視する。
そして、ステップS112の停電工事終了時に携帯端末52から終了の連絡が行われる。
This collection of position information is periodically performed until a notification of the end of work is received, and it is monitored whether or not the local worker is not in an unscheduled section.
Then, at the end of the power outage construction in step S112, the mobile terminal 52 notifies the end.

なお、区間は異なっていても、地理的には近接している区間が存在する場合がある。区間の位置範囲情報は、携帯端末の測位誤差を考慮して一定のマージンをもって設定されるが、現地作業者の位置が他の区間の位置範囲にも含まれるか否かを判定して他の区間にも含まれる場合には、その区間の開閉器の入操作を禁止するよう開閉器遠制手段27に指令を出すようにしてもよい。   Even if the sections are different, there may be sections that are geographically close to each other. The position range information of the section is set with a certain margin in consideration of the positioning error of the mobile terminal, but it is determined whether the position of the local worker is also included in the position range of other sections If it is also included in a section, a command may be issued to the switch distance control means 27 so as to prohibit the on / off operation of the switch in that section.

本実施の形態によれば、現地作業者から工事開始の連絡の際に位置情報を取得して、工事予定区間に居るか否かを判定するので、現地作業者の誤解、操作者の設定ミス等のヒューマンエラーによる事故を防止することができる。   According to the present embodiment, the location information is acquired when the construction worker starts to contact the local worker, and it is determined whether or not he / she is in the planned construction section. Accidents due to human errors such as can be prevented.

なお、本発明は上述した実施形態に限定されるものではなく、その要旨を逸脱しない範囲内において、種々変形して実施することができる。たとえば、区分位置範囲ファイル34は、図16に例示するように遠制開閉器の区分ごとに位置範囲情報を保存するようにしてもよい。   In addition, this invention is not limited to embodiment mentioned above, In the range which does not deviate from the summary, it can implement in various deformation | transformation. For example, the section position range file 34 may store position range information for each section of the distance control switch as illustrated in FIG.

また、上述の停電工事の管理方法は、鉄道の工事などのように電力設備の管理が必要な工事ならば配電系統以外にも適用できることは明白である。   In addition, it is obvious that the power outage construction management method described above can be applied to other power distribution systems as long as it requires construction of power facilities such as railway construction.

本発明の第1の実施の形態に係わる配電自動化システム1のブロック図である。1 is a block diagram of a power distribution automation system 1 according to a first embodiment of the present invention. 本発明の第1の実施の形態に係わる工事区間設定テーブルのデータ構成の説明図である。It is explanatory drawing of the data structure of the construction area setting table concerning the 1st Embodiment of this invention. 本発明の第1の実施の形態に係わる工事区間設定画面の例である。It is an example of the construction area setting screen concerning the 1st Embodiment of this invention. 図1の制御部で実行される停電工事処理のフローチャートである。It is a flowchart of the power failure construction process performed by the control part of FIG. 本発明の実施の形態に係わる設備情報ファイルのデータ構成の説明図である。It is explanatory drawing of the data structure of the equipment information file concerning embodiment of this invention. 工事区間の設定を行ったときの配電系統図表示部8への表示例の説明図である。It is explanatory drawing of the example of a display to the distribution system diagram display part 8 when the setting of a construction area is performed. 配電系統図表示部8に表示される系統図の一例である。It is an example of the system diagram displayed on the power distribution system diagram display part 8. FIG. 本発明の第1の実施の形態に係わる工事中の区間表示画面の例である。It is an example of the section display screen under construction concerning the 1st Embodiment of this invention. 工事区間を設定しない場合の配電系統図表示部8への表示例の説明図である。It is explanatory drawing of the example of a display to the distribution system diagram display part 8 when not setting a construction area. 本発明の第2の実施の形態に係わる配電自動化システムの機能ブロック図であるIt is a functional block diagram of the distribution automation system concerning the 2nd Embodiment of this invention. 図10の区間位置範囲ファイル34のデータ構成の説明図である。It is explanatory drawing of the data structure of the area position range file of FIG. 区間の位置範囲の説明図である。It is explanatory drawing of the position range of an area. 図10のインターロック条件ファイル32のデータ構成の説明図である。It is explanatory drawing of the data structure of the interlock condition file 32 of FIG. 図10の工事情報ファイル33のデータ構成の説明図である。It is explanatory drawing of the data structure of the construction information file 33 of FIG. 図10の判定手段26の処理手順のフローチャートである。It is a flowchart of the process sequence of the determination means 26 of FIG. 図12と異なる方法による区間の位置範囲の説明図である。It is explanatory drawing of the position range of the area by a method different from FIG.

符号の説明Explanation of symbols

1 配電自動化システム
2 制御部
3 記憶部
4 サーバ
5 データ伝送部
6 マンマシン装置
7 設定一覧表示部
8 配電系統図表示部(地図表示も含む)
9 入力装置
10 地図情報システム
11 親局
12 音声出力装置
13、14 通信部
21 送受信処理手段
22 入出力処理手段
23 インターロック条件登録手段
24 工事区間入力手段
25 位置情報入力手段
26 判定手段
27 開閉器遠制手段
28 工事情報出力手段
31 設備情報ファイル
32 インターロック条件ファイル
33 工事情報ファイル
34 区間位置範囲ファイル
51 通信ネットワーク
52 携帯端末
DESCRIPTION OF SYMBOLS 1 Distribution automation system 2 Control part 3 Memory | storage part 4 Server 5 Data transmission part 6 Man-machine apparatus 7 Setting list display part 8 Distribution system diagram display part (including map display)
DESCRIPTION OF SYMBOLS 9 Input device 10 Map information system 11 Master station 12 Voice output device 13, 14 Communication part 21 Transmission / reception processing means 22 Input / output processing means 23 Interlock condition registration means 24 Construction section input means 25 Position information input means 26 Judgment means 27 Switch Distance control means 28 Construction information output means 31 Equipment information file 32 Interlock condition file 33 Construction information file 34 Section position range file 51 Communication network 52 Mobile terminal

Claims (7)

停電工事の際に開閉器へ操作指令を送信する配電自動化システムであって、
工事区間と開閉器の入操作を禁止するインターロック情報とを関連付けて保存するインターロック条件登録手段と、
配電線事故によって故障の可能性のある開閉器情報と該開閉器の状態を入状態として保存する手段と、
配電系統図に対して工事区間情報を入力する工事区間入力手段と、
前記インターロック情報に基づいて、前記入力された工事区間情報に対応する開閉器への入操作を禁止する開閉器遠制手段と、
前記配電系統図へ工事中の停電区間を表示する工事情報出力手段と、
を備え
前記工事情報出力手段は、前記故障の可能性のある開閉器および該開閉器によって送電される可能性のある区間を識別表示することを特徴とする配電自動化システム。
A power distribution automation system that sends operation instructions to the switch during power outage work,
Interlock condition registration means for associating and saving the construction section and the interlock information prohibiting the switching operation of the switch;
Means for storing switch information that may be broken due to a distribution line accident and the state of the switch as an on state,
Construction section input means for inputting construction section information to the distribution system diagram;
Based on the interlock information, the switch distance control means for prohibiting the entry operation to the switch corresponding to the input construction section information,
Construction information output means for displaying a power outage section under construction on the distribution system diagram;
Equipped with a,
The distribution information automation system characterized in that the construction information output means identifies and displays the switch with the possibility of failure and the section with the possibility of power transmission by the switch .
停電工事の際に開閉器へ操作指令を送信する配電自動化システムであって、
区間ごとに該区間の設備が属する位置情報の範囲を記憶する手段と、
工事区間情報を入力する工事区間入力手段と、
現地作業者の位置情報を入力する位置情報入力手段と、
前記位置情報入力手段によって入力された位置情報が、前記工事区間の位置情報の範囲に含まれているか否かを判定し、含まれていない場合には注意メッセージを出力する判定手段と、
を備えたことを特徴とする配電自動化システム。
A power distribution automation system that sends operation instructions to the switch during power outage work,
Means for storing a range of position information to which equipment of the section belongs for each section;
Construction section input means for inputting construction section information;
Position information input means for inputting the position information of the local worker;
Determining whether the position information input by the position information input means is included in a range of the position information of the construction section, and if not included, a determination means for outputting a caution message;
Power distribution automation system characterized by comprising
前記現地作業者の位置に近接する区間を抽出し、開閉器を操作することによって前記区間へ送電することになる場合は、該開閉器を選択時に注意表示を行うことを特徴とする請求項記載の配電自動化システム。 The extracting section close to the local operator's position, if will be transmitting to the section by operating the switchgear, according to claim 2, characterized in that to perform warning display when selecting the switch The described distribution automation system. 現地作業者の携帯端末から送られてくる工事情報をサーバへ入力して、該工事情報を用いて工事区間へ送電する開閉器の制御を行う停電工事管理方法であって、
前記サーバには、区間ごとに該区間の設備が属する位置範囲を記憶すると共に、工事件名情報に関連付けて工事区間情報を記憶するステップと、
前記携帯端末から送られてくる工事件名情報と現地作業者の位置情報とを入力するステップと、
前記入力した工事件名情報をもとに工事区間情報を抽出し、現地作業者の位置が工事区間の位置範囲に含まれているか否かを判定して、含まれていない場合には注意メッセージを出力するステップと、
を含むことを特徴とする停電工事管理方法。
A power outage construction management method for controlling a switch that inputs construction information sent from a mobile terminal of a local worker to a server and transmits power to the construction section using the construction information,
The server stores, for each section, a position range to which equipment in the section belongs, and stores construction section information in association with construction subject information;
Inputting the construction subject information sent from the mobile terminal and the location information of the local worker;
The construction section information is extracted based on the inputted construction subject information, and it is determined whether or not the position of the local worker is included in the position range of the construction section. Output step;
Power outage construction management method characterized by including.
現地作業者の携帯端末から送られてくる工事情報をサーバへ入力して、該工事情報を用いて工事区間へ送電する開閉器の制御を行う停電工事管理方法であって、
前記サーバには、区間ごとに該区間の設備が属する位置範囲を記憶すると共に、工事件名情報に関連付けて工事区間情報を記憶するステップと、
前記携帯端末から送られてくる工事件名情報と現地作業者の位置情報とを入力するステップと、
前記入力した工事件名情報をもとに工事区間情報を抽出し、現地作業者の位置が工事区間以外の区間の位置範囲に含まれているか否かを判定して、含まれている場合には注意メッセージを出力するステップと、
を含むことを特徴とする停電工事管理方法。
A power outage construction management method for controlling a switch that inputs construction information sent from a mobile terminal of a local worker to a server and transmits power to the construction section using the construction information,
The server stores, for each section, a position range to which equipment in the section belongs, and stores construction section information in association with construction subject information;
Inputting the construction subject information sent from the mobile terminal and the location information of the local worker;
If the construction section information is extracted based on the inputted construction subject information, it is determined whether or not the position of the local worker is included in the position range of the section other than the construction section. A step to output a caution message;
Power outage construction management method characterized by including.
前記注意メッセージが出力された場合は、該メッセージに対する確認入力により、開閉器の制御を許可するステップを含むことを特徴とする請求項または記載の停電工事管理方法。 Wherein when the warning message is output, by the confirmation input for the message, according to claim 4 or 5 outage work management method according to, characterized in that it comprises a step of permitting the control of the switch. 携帯端末に関連付けて位置の誤差情報を保存し、前記携帯端末から送られてくる位置情報と前記誤差情報とを用いて、現地作業者の位置を判定することを特徴とする請求項ないしのいずれか一に記載の停電工事方法。 In association with the mobile terminal saves the error information on the position, the using the position information sent from the mobile terminal and the error information, to 4 claims, characterized in that to determine the position of the local operator 6 Power outage construction method as described in any one of.
JP2004107757A 2004-03-31 2004-03-31 Distribution automation system and power outage construction management method Expired - Fee Related JP4274992B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004107757A JP4274992B2 (en) 2004-03-31 2004-03-31 Distribution automation system and power outage construction management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004107757A JP4274992B2 (en) 2004-03-31 2004-03-31 Distribution automation system and power outage construction management method

Publications (2)

Publication Number Publication Date
JP2005295701A JP2005295701A (en) 2005-10-20
JP4274992B2 true JP4274992B2 (en) 2009-06-10

Family

ID=35328024

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004107757A Expired - Fee Related JP4274992B2 (en) 2004-03-31 2004-03-31 Distribution automation system and power outage construction management method

Country Status (1)

Country Link
JP (1) JP4274992B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008052461A (en) * 2006-08-24 2008-03-06 Tootec:Kk Power distribution construction management system
JP4722016B2 (en) * 2006-11-09 2011-07-13 中国電力株式会社 Operation support system
JP5115191B2 (en) * 2007-12-28 2013-01-09 東京電力株式会社 Power equipment misoperation prevention system
JP5223406B2 (en) * 2008-03-24 2013-06-26 株式会社明電舎 Blackout plan management system and blackout plan management method
JP5197639B2 (en) * 2010-01-05 2013-05-15 中国電力株式会社 Construction and construction management device, construction and construction management system, and construction and construction management method
JP5562815B2 (en) * 2010-11-29 2014-07-30 株式会社日立製作所 Work management method and apparatus using portable terminal
CN113869729A (en) * 2021-09-28 2021-12-31 广东电网有限责任公司 Power distribution network power failure monitoring system

Also Published As

Publication number Publication date
JP2005295701A (en) 2005-10-20

Similar Documents

Publication Publication Date Title
JP4408839B2 (en) Power failure information transmission device and power failure information transmission system
JP4274992B2 (en) Distribution automation system and power outage construction management method
CN103003765A (en) Monitoring control system for electrical power equipment
TW201320018A (en) Area monitoring system
JP2003299263A (en) Monitor control system
JP4386927B2 (en) Monitoring control system and position switching method in monitoring control system
JP2007025911A (en) Damage restoration status management system
JP2002203064A (en) Maintenance system and maintenance method
JP4386955B1 (en) Distributed monitoring and control system and data updating method for the same
JP5033774B2 (en) Railway maintenance work management system
JP2005293600A (en) Maintenance support system and its server
JP5235544B2 (en) Accident recovery support system
JP2010259175A (en) System and method for supporting protective relay device
JP6675044B2 (en) Monitoring and control system
US20140306819A1 (en) System and a method for locating and notifying fault and handling alarm thereof
JP5197639B2 (en) Construction and construction management device, construction and construction management system, and construction and construction management method
JP2018207297A (en) Worker monitoring system and worker monitoring method
KR101654882B1 (en) System and method for failure analysis and fault indication by distribution lines
JP2017163689A (en) Monitoring control device
JP3684366B2 (en) Maintenance support system
JPH09261896A (en) Power restoring work guiding apparatus
JP2007143227A (en) Information receiving system at the time of disaster
JP7043433B2 (en) Protection control system
KR20190030139A (en) Safety apprication program, train control network system and method using the same
JP2008234172A (en) Accident information control system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080627

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080708

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080828

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090217

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090303

R150 Certificate of patent or registration of utility model

Ref document number: 4274992

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120313

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120313

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120313

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130313

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130313

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130313

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140313

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees