JP4261278B2 - Flood control support device, program, and flood control support method - Google Patents

Flood control support device, program, and flood control support method Download PDF

Info

Publication number
JP4261278B2
JP4261278B2 JP2003209699A JP2003209699A JP4261278B2 JP 4261278 B2 JP4261278 B2 JP 4261278B2 JP 2003209699 A JP2003209699 A JP 2003209699A JP 2003209699 A JP2003209699 A JP 2003209699A JP 4261278 B2 JP4261278 B2 JP 4261278B2
Authority
JP
Japan
Prior art keywords
flood control
information
support
flood
necessary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003209699A
Other languages
Japanese (ja)
Other versions
JP2004164591A (en
Inventor
明弘 長岩
賢治 梅田
倫幸 萩
慎一郎 松原
俊介 岩崎
篤史 和角
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2003209699A priority Critical patent/JP4261278B2/en
Priority to CNA031470599A priority patent/CN1495648A/en
Priority to MYPI20033516A priority patent/MY140284A/en
Priority to TW092125650A priority patent/TWI242145B/en
Publication of JP2004164591A publication Critical patent/JP2004164591A/en
Application granted granted Critical
Publication of JP4261278B2 publication Critical patent/JP4261278B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Alarm Systems (AREA)
  • Stored Programmes (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、水害を回避するための水防活動を支援する水防支援装置及びプログラム並びに水防支援方法に関する。
【0002】
【従来の技術】
下水道又は河川における水防活動では、気象庁から発表される注意報又は警報などに基づいて人員の班体制が決定され、班は下水道又は河川の状況に応じて現場に急行する。
【0003】
従来において、雨量情報を取り込んで防災活動に利用する防災支援装置が提案されている。
【0004】
例えば、特許文献1の防災情報提供装置は、雨量情報、震度情報、ひずみ情報などのような防災情報を記憶する防災情報記憶部と、利用者が所持するブラウザ搭載機器と、利用者からのアクセスを受けてブラウザ搭載機器と接続し、防災情報の読出し要求を出力するWWW接続部とを具備する。そして、特許文献1の防災情報提供装置は、WWW接続部からの読出し要求を受け取り、防災情報記憶部の防災情報を提供するか否かを判定し、提供可能と判定した場合に防災情報をWWW接続部を経由して利用者に提供する。
【0005】
例えば、特許文献2の防災情報収集処理システムは、災害現場の地点情報をキーとし、既に登録されている災害発生予測地点の画像情報を取込む。そして、特許文献2の防災情報収集処理システムは、この画像情報と雨量情報とを結合し編集した後、編集された防災情報を記録装置に記憶し、情報提供部を介してインターネットサーバ上に掲示し、広く利用者に提供する。
【0006】
【特許文献1】
特開平11−110454号公報
【0007】
【特許文献2】
特開2001−337997号公報
【0008】
【発明が解決しようとする課題】
気象庁による注意報又は警報は、水防対象の地域に特化した情報でない場合がある。このため、気象庁による注意報又は警報にしたがって、人員の班の決定などを行った場合、決定された班は待機状態のまま何ら具体的な水防活動を行う必要がない場合がある。
【0009】
上述した従来の防災情報提供装置又は防災情報収集処理システムは、雨量情報等に基づいて作成された防災情報を広く利用者に提供し、地域住民の防災広報活動に利用される。
【0010】
しかしながら、従来の防災情報提供装置又は防災情報収集処理システムは、下水道又は河川によって発生する水害を未然に回避する広い意味での水防活動を支援する機能を具備していない。
【0011】
一般に、水防活動としては、地域住民への広報活動、現場の監視、例えば土壌を積み上げるなどの現場の保安、危険場所から安全場所への住民の移動、など種々の活動が挙げられる。
【0012】
しかし、従来の防災情報提供装置又は防災情報収集処理システムは、利用者に防災情報を提供するのみであるため、水害を回避するための対策及び他の水防活動に容易かつ有効に用いることは困難である。
【0013】
そのため、水害に対する従来の一般的な水防活動では、気象協会などの特定機関から地方に発令される大雨注意報、大雨警報、洪水注意報、洪水警報などが指標として用いられる。そして、従来の一般的な水防活動では、大雨注意報、大雨警報、洪水注意報、洪水警報のいずれかが発令された旨を示す情報と過去の経験とに基づいて、水害の発生場所が推測され、水防の必要な場所に必要な人員が配備される。
【0014】
しかしながら、専ら気象情報だけを指標として用いる水防活動では、気象情報が広い地域範囲を対象として出されるため、実際の水防活動場所で大雨にならず水防活動を行う必要がない場所に人員を割り当てて水防活動を行うなど、無用な水防活動が行われるという問題が発生する。
【0015】
本発明は上記事情に鑑みてなされたもので、水防活動の必要ない場所に対して水防活動を行うことを防止し、水防活動の必要な場所に対して水防活動を行い、効率的な水防活動を実現する水防支援装置及びプログラム並びに水防支援方法を提供することを目的とする。
【0016】
【課題を解決するための手段】
本発明を実現するにあたって講じた具体的手段について以下に説明する。
【0017】
本発明の第1の態様は、気象情報を取得する手段と、水防支援に必要な支援情報を取得する手段と、気象情報と支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理手段とを具備し、支援処理手段は、支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する手段と、水防活動が必要と判断された場合、しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する手段とを具備する水防支援装置である。
【0018】
本発明の第2の態様は、気象情報を取得する手段と、水害に関連する補助情報を取得する手段と、補助情報に基づいて水防支援に必要な支援情報を取得する補助情報処理手段と、気象情報と支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理手段とを具備し、支援処理手段は、支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する手段と、水防活動が必要と判断された場合、しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する手段とを具備する水防支援装置である。
【0019】
本発明の第3の態様は、気象情報を取得する手段と、水防支援に必要な支援情報を取得する手段と、気象情報と支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理手段とを具備し、支援処理手段は、気象情報が水防対象気象情報か判断する手段と、気象情報が水防対象気象情報と判断された場合、支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する手段と、水防活動が必要と判定された場合、しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する手段と、画面表示用の水防支援情報を出力する手段とを具備する水防支援装置である。
【0020】
本発明の第4の態様は、気象情報を取得する手段と、水害に関連する補助情報を取得する手段と、補助情報に基づいて水防支援に必要な支援情報を取得する補助情報処理手段と、気象情報と支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理手段とを具備し、支援処理手段は、気象情報が水防対象気象情報か判断する手段と、気象情報が水防対象気象情報と判断された場合、支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する手段と、水防活動が必要と判定された場合、しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する手段と、画面表示用の水防支援情報を出力する手段とを具備する水防支援装置である。
【0021】
【発明の実施の形態】
以下、図面を参照しながら本発明の実施の形態について説明する。なお、以下の説明において同一の要素については同一の符号を付してその説明を省略する。
【0022】
(第1の実施の形態)
図1は、本実施の形態に係る水防支援装置の一例を示すブロック図である。
【0023】
水防支援装置101は、気象情報取得部1、補助情報取得部2、補助情報処理部3、情報設定部4、支援処理部5、表示装置6、入力装置7a,7bを具備する。
【0024】
気象情報取得部1は、気象情報を取得する。気象情報としては、例えば、大雨注意報、大雨警報、洪水注意報、洪水警報等が発生したか否かを示す情報がある。
【0025】
例えば、気象情報取得部1は、気象衛星ひまわり11から気象情報を受信する。また、例えば気象情報取得部1は、公的な気象情報提供機関からインターネット12経由で気象情報を受信する。また、例えば、気象情報取得部1は、気象業務センタ、契約機関等の気象情報提供契約機関13から直接気象情報を受信する。
【0026】
補助情報取得部2は、気象情報を補助するための水害に関連する補助情報を取得する。
【0027】
例えば、補助情報は、下水道、河川などの水防対象地域に設置されている雨量計14によって計測される降雨量情報(雨量情報)を含む。
【0028】
また、例えば、補助情報は、水位計15によって計測された下水道幹線、河川などの水位情報を含む。
【0029】
なお、補助情報は、水害に関係する他の各種の情報を含むとしてもよい。補助情報は、降雨量情報、下水道幹線の水位情報、河川の水位情報などの情報のうちのいずれか一つでもよく、2種類以上を含むとしてもよい。
【0030】
補助情報処理部3は、補助情報取得部2によって取得された補助情報を水防活動支援に必要な支援情報に変換する処理を実行する。
【0031】
情報設定部4には、水防支援情報を作成するために必要な情報が設定されている。
【0032】
支援処理部5は、水防活動に必要な水防支援情報を作成する。
【0033】
表示装置6は、支援処理部5によって作成された水防支援情報を表示する。
【0034】
入力装置7a,7bは、例えば水防支援情報を作成するために必要な情報の入力、各種の指示などの入力に用いられる。
【0035】
図2は、A県B地方の中の水防対象地域AB1における下水道幹線16(又は河川)と、補助情報計測系である雨量計14と水位計15との設置場所との関係を示す図である。
【0036】
この図2の例では、水防対象地域AB1の所要の場所に2個の雨量計14が設置されている。また、水防対象地域AB1を流れる下水道幹線16にそって2個の水位計15が設置されている。
【0037】
気象情報取得部1は、例えば気象情報提供契約機関13から大雨注意報、大雨警報、洪水注意報、洪水警報等のような気象情報を受信した場合、この受信した気象情報を支援処理部5に提供する。
【0038】
補助情報取得部2は、例えば、雨量計14によって計測された降雨量情報、水位計15によって計測された水位情報、その他の水害(水害被害)に関連する情報を含む補助情報を受信し、補助情報から支援情報を作成するために、補助情報と補助情報を計測した機器の設置場所識別データとを補助情報処理部3に提供する。
【0039】
補助情報処理部3は、例えば、補助情報が水位情報を含む場合、設置場所識別データ毎に、補助情報を所定時間毎(例えば5分毎)の水位の変化を表わす水位状況情報に変換し、時系列的に得られる所定時間毎の水位情報と水位状況情報とを含む支援情報を情報記録部8に記録する。
【0040】
このように、水位情報が扱われる場合、情報記録部8には、設置場所識別データをキーとし、水位情報、水位状況情報、その他の情報を含む支援情報が情報記録部8に記録される。
【0041】
また、補助情報処理部3は、例えば、補助情報が降雨量情報を含む場合、設置場所識別データ毎に、補助情報を雨の降り始めからの積算降雨量情報又は所定時間毎の最大降雨量情報に変換し、時系列的に得られる積算降雨量情報又は所定時間毎の最大降雨量情報を含む支援情報を情報記録部8に記録する。
【0042】
このように、降雨量情報が扱われる場合、情報記録部8には、設置場所識別データをキーとし、降雨量情報、積算降雨量情報、最大降雨量情報その他の情報を含む支援情報が情報記録部8に記録される。
【0043】
情報設定部4には、例えば図3に示すような水防支援情報を作成するために必要な情報4aが設定されている。
【0044】
すなわち、情報設定部4には、設置場所識別データ「01」「02」…毎に、気象情報種別データ(D1:大雨注意報、D2:大雨警報、D3:洪水注意報、D4:洪水警報)、しきい値、メッセージ、人員配備場所、各配備場所での配備人数等のデータが設定される。
【0045】
なお、しきい値としては、降雨量情報[mm/h]、積算降雨量情報[mm]、最大降雨量情報[mm/h]、水位情報、水位状況情報、その他の情報のいずれについて設定されてもよいが、下水道又は河川にとって最も水害の影響を受けやすい情報について設定されることが望ましい。
【0046】
例えば、降雨量を「50mm/h〜99mm/h」、「100mm/h〜149mm/h」、「150mm/h以上」と分割するように、一種類の情報に対して複数のしきい値が設定されてもよい。また、例えば、積算降雨量情報と水位情報など、2種以上の情報に対してしきい値が設定されてもよい。
【0047】
しきい値は、過去の水害発生時の降雨量情報、過去の水害発生時における下水道幹線の水位情報、過去の水害発生時における河川の水位情報などに基づいて決定されてもよい。
【0048】
例えば、過去に50mm/hの降雨時に水害が発生した場合、降雨量のしきい値として50mm/hを設定する。しかし、降雨量の増大に応じて多くの配備人数を必要とするので、複数の降雨量についてしきい値を設定し、それぞれのしきい値に対応して配備人数を設定することが望ましい。
【0049】
なお、過去に水害等が発生していない場合には、施設設計時に算定された計画降雨量に基づいてしきい値を設定してもよい。
【0050】
情報設定部4に設定されるメッセージは、それぞれの下水道幹線又は河川、設置場所識別データ「01」「02」…毎に異なるため、それぞれの下水道幹線又は河川、設置場所識別データに応じた内容が記述される。
【0051】
下水道幹線又は河川の周辺には危険な場所が1以上存在する場合が多いため、下水道幹線又は河川毎に、複数の人員配備場所を設定するのが有効である。
【0052】
配備人数は、人員配置場所毎に設定される。
【0053】
なお、地方自治体は、1つの河川について特定の場所だけを水防する場合がある。この場合、情報4aから設置場所識別データを省略してもよい。
【0054】
どの気象情報種別データに該当する場合にも水防活動を行う場合、情報4aから気象情報種別データを省略してもよい。
【0055】
すなわち、情報設定部4には、設置場所識別データ、しきい値、メッセージのいずれかに対して、人員配備場所と各人員配備場所の配備人数のうちいずれか一つの情報が設定されていればよい。
【0056】
また、例えば、降雨量情報、下水道幹線の水位情報、河川の水位情報に基づいてしきい値を設定する場合、過去の統計データを用いた演算によってしきい値を設定してもよい。
【0057】
図4は過去の統計データの一例を示す図である。
【0058】
支援処理部5は、情報記録部8に記録されている過去の降雨量情報[mm/h]又は過去の積算降雨量情報[mm]と、下水道幹線の過去の水位情報又は河川の過去の水位情報との関係をプロットする。なお、この図4で示される過去の水害の状況を考慮し、しきい値が決定されてもよい。
【0059】
図4において、積算降雨量が29[mm]に達すると、過去の統計データを用いた近似曲線の上限が下水道幹線の警戒水位21の0.6mに達する。このため、例えば積算降雨量29mmと水位0.6mをしきい値として設定し、このしきい値を積算降雨量又は水位が超えた場合に水防活動のために人員配備を行う。
【0060】
支援処理部5は、自ら論理演算を実行して判断を行い水防支援情報を出力するとしてもよい。また、支援処理部は、例えばCPUによって構成されている場合、水防処理プログラムにしたがって所定の処理を実行し、水防支援情報を作成するとしてもよい。
【0061】
支援処理部5は、機能的には、気象判断部51と、必要性判断部52、作成部53、出力部54を具備する。
【0062】
気象判断部51は、気象情報取得部1に受け付けられた気象情報が水防対象の気象情報か判断する。例えば、大雨注意報、大雨警報、洪水注意報、洪水警報等の気象情報を水防対象の気象情報と定義する。
【0063】
必要性判断部52は、気象判断部51によって水防対象の気象情報と判断された場合、情報記録部8から現在時刻に最も近い時刻の例えば降雨量情報などの支援情報を参照し、当該支援情報が情報設定部4に設定されているしきい値を越えている場合に水防活動が必要と判断する。
【0064】
作成部53は、必要性判断部52によって水防活動が必要と判断された場合、情報設定部4からメッセージ、人員配備場所、配備人数データ等の情報を読み出し、所要のフォーマットにしたがって編集処理を実行し、水防支援情報を作成する。例えば、水防支援情報は、画面表示用の情報でもよい。
【0065】
出力部54は、作成部53によって作成された水防支援情報を表示装置6に出力する。
【0066】
次に、水防支援装置101の動作について説明する。
【0067】
先ず、入力装置7a,7bは、水防支援情報を作成するために必要な情報を入力し、情報設定部4に設定する。
【0068】
情報設定部4に設定される情報4aは、例えば過去の河川における水害の状況情報又は過去の統計データを用いて決定されたしきい値、水防対象地域の河川の状況等を考慮したメッセージ、危険な場所等の人員配備場所、配備人数等の情報を含む。
【0069】
次に、気象情報取得部1は、気象衛星ひまわり11、インターネット12、気象情報提供契約機関13の少なくとも一つから気象情報を受信した場合に、受信した気象情報を支援処理部5に提供する。
【0070】
一方、補助情報取得部2は、雨量計14によって計測された降雨量情報、水位計15によって計測された水位情報、その他の水害に関連する各種情報などを含む補助情報を受信した場合、雨量計14又は水位計15等などの計測機器の設置場所を示す設置場所識別データとともに受信した補助情報を、補助情報処理部3に提供する。なお、雨量計14及び水位計15は、下水道幹線16の水位情報(又は河川の水位情報)に基づいて水防が発動することを考慮して予め設置される。
【0071】
補助情報処理部3は、補助情報取得部2から補助情報を受け付けた場合、補助情報をユーザの要望する水防支援情報を作成するために用いられる支援情報に変換し、支援情報を情報記録部8に記録するとともに支援処理部5に提供する。
【0072】
次に、支援処理部5によって、図5に示す処理が実行される。
【0073】
ステップS1において、支援処理部5の気象判断部51は、気象情報取得部1から受け付けた気象情報が、例えば大雨注意報、大雨警報、洪水注意報、洪水警報等のような水防対象の気象情報か判断する。
【0074】
水防対象の気象情報と判断された場合、ステップS2a〜S2dにおいて、気象判断部51は、気象情報の種別が大雨注意報、大雨警報、洪水注意報、洪水警報のいずれであるか特定する。図5では、種別データD1か否かを判断するステップS2a、種別データD4か否かを判断するステップS2dを記載し、種別データD2,D3か否かを判断するステップS2b,S2cについては省略している。
【0075】
なお、ステップS1で、大雨注意報、大雨警報、洪水注意報、洪水警報のいずれかの種別であるか判断するとしてもよい。気象情報が大雨注意報、大雨警報、洪水注意報、洪水警報のいずれかの場合、気象判断部51から必要性判断部52に処理は移動する。
【0076】
ステップS3〜S5において、必要性判断部52は、情報記録部8から現在時刻に最も近い時間帯の例えば降雨量情報などを含む支援情報を取り出し、支援情報と情報設定部4に設定されているしきい値とを比較し、水防活動が必要か判断する。
【0077】
例えば、降雨量があるしきい値を越えている場合又は降雨量が複数のしきい値から定まる範囲内である場合、水防活動が必要であると判断される。
【0078】
より具体的には、しきい値が50mm/h以上と設定されている場合、必要性判断部52は、降雨量情報の示す降雨量がしきい値50mm/hを越えたときに水防活動が必要と判断する。
【0079】
複数のしきい値を用いて範囲が設定されている場合、必要性判断部52は、降雨量がその範囲内に属するときに水防活動が必要と判断する。
【0080】
必要性判断部52によって水防活動が必要と判断された場合、必要性判断部52から作成部53に処理は移動する。
【0081】
ステップS6において、作成部53は、水防活動が必要と判定された場合、情報設定部4から該当しきい値に対応するメッセージ、人員配備場所、配備人数等の情報を読み出し、読み出した情報を予め登録されている基礎画面データの所定のエリアに書込むなどの編集処理を実施し、例えば画面表示用の水防支援情報を作成する。
【0082】
図6は、作成された水防支援情報の一例である。
【0083】
なお、作成部53は、基礎画面データを用いることなく、メッセージ、人員配備場所(×A,×B,×C)、配備人数等の情報だけを用いて所定のフォーマットにしたがって画面表示用の水防支援情報を作成してもよい。自治体によって予め配備人数が決められている場合、作成部53は、現場人員配備要請の有無だけを表す水防支援情報を作成するとしてもよい。
【0084】
なお、作成部53は、画面表示用の水防支援情報に、所要エリアに現在発令されている気象情報、水防支援情報の作成に利用された降雨量情報、しきい値等の情報を追加してもよい。
【0085】
水防支援情報が作成されると、作成部53から出力部54に処理は移動する。
【0086】
ステップS7において、出力部54は、作成された水防支援情報を図示されていない適宜な記録手段に記録した後、表示制御を行い、表示制御の結果を図示されていない画像メモリなどに記録し、例えば上記図6示すような状態で水防支援情報を表示装置6に表示する。
【0087】
ステップS8において、出力部54は、所定時間経過後に、確認指示が入力されたか否かを判断する。
【0088】
確認指示が入力されていない場合、ステップS9において、出力部54は、アラームを出力し、再度ステップS8に処理を移す。
【0089】
確認指示が入力されている場合、ステップS10において、出力部54は、処理終了か否か判断する。処理終了しない場合、所定の周期ごとに上記のステップS1以下の処理を繰り返す。
【0090】
上述した支援処理部5の処理は、例えば大雨注意報、大雨警報、洪水注意報、洪水警報のような水防対象の気象情報を受け付けることを条件として実行される。
【0091】
しかしながら、水防対象の気象情報を受け付けていない場合であっても、水防対象地域に大雨が降っている場合がある。このような状況においては、水防活動が必要と判断し、水防支援情報を作成する必要がある。
【0092】
水防対象の気象情報を受け付けていない場合に支援情報から水防活動が必要か判断するためには、上記図5に示すステップS1またはステップS2dでNOと判断された場合であってもステップS3に処理を移す。そして、例えば降雨量としきい値とを比較するなど、水防活動が必要か判断を行う。
【0093】
これにより、水防対象の気象情報を受け付けていなくても水防支援が必要と判断された場合には、水防支援情報が作成され表示される。
【0094】
また、支援処理部5は、他の水防処理プログラムに基づき、図7に示すような画面表示用の水防支援情報を作成するとしてもよい。
【0095】
この図7に示す画面表示用の水防支援情報の例では、予め登録されている基礎画面データ22の所定のエリアに発令時間と発令された気象内容を含む気象情報23を書込み、さらに現在の降雨量と水位とをグラフ表示する。
【0096】
水位グラフにおいて、境界線21aは、上記図4の警戒水位21を表す。境界線24は、上記図4の積算降雨量35mmにおける下限ラインの水位を表す。境界線25は、上記図4の積算降雨量35mmにおける上限ラインの水位を表す。
【0097】
本実施の形態によれば、次のような効果を奏することができる。
【0098】
例えば、図8に示すように、100回の降雨に対して従来の気象情報だけを用いた水防活動を行うとする。この図8では、100回の降雨のうち、大雨警報が発令されかつ水害の発生した回数は5回、大雨警報が発令されたが水害が発生しなかった場合は15回となっている。
【0099】
気象情報のみを用いて従来の水防活動を行うと、20回の大雨警報に対応して20回の水防活動を行うことになる。
【0100】
すると、20回の水防活動のうち、5回の水防活動は必要(当り)であり、15回の水防活動は不要(ハズレ)であったことになる。
【0101】
一方、上記図8の状態において、降雨があったが大雨警報の発令がなかった回数は80回であるが、この80回のうち水害が1回発生している。この場合、水防活動が行われていない状態で1回水害が発生していることになり、1回の水害を完全に見逃したことになる。
【0102】
図9は、支援情報を付加して水防支援情報を作成し表示した場合の例を示す図である。この図9は、上記図5のステップS1〜S5の処理によって水防活動が必要か否か判断された結果の例である。
【0103】
この図9において、発令された大雨警報と支援情報とによって水防活動が必要か否か判断した場合、大雨警報が発令されかつ水害の発生した5回の全ての降雨について水防活動が必要と判断された。したがって、この大雨警報と支援情報とを用いた水防活動の必要性の有無の判断にしたがって水防活動を行うことで、大雨警報が発令されかつ水害の発生した5回の降雨の全てに対して水防活動が行われ、必要な人員が配備され、水害を回避でき、安全な状態の確保を図ることができる。
【0104】
上記図8に示すように、大雨警報のみを用いて水防活動の必要性を判断した場合、大雨警報が発令されたが水害が発生せず、水防活動の必要性の判断が外れた回数が、15回あった。
【0105】
これに対し、大雨警報と支援情報とを用いて水防活動の必要性を判断した場合、大雨警報が発令されたが水害が発生しなかった15回のうち、5回は危険と判断し水防支援(水防支援情報出力)が必要であると判断されたが、10回は水害の危険性はないと判断され、水防支援情報は出力されなかった。
【0106】
この結果は、大雨警報が発令されたが水害が発生しなかった15回のうち、10回が安全と判断され、その判断結果と同様に実際に水害が発生しなかったことを表す。このように、大雨警報と支援情報とを用いて水防活動の必要性を判断することにより、ハズレの回数を15回から5回まで減少させることができる。
【0107】
なお、図9の結果は、統計的に演算された上記図4の危険水位をしきい値として判断した場合の例である。しきい値の設定の仕方を変更することによって判断の結果はさらに正確になる。
【0108】
図8に示すように、大雨警報のみを用いて水防活動の必要性を判断した場合、大雨警報は発令されなかったのに水害が発生し、危険の見逃しが1回発生した。
【0109】
これに対し、図9に示すように、大雨警報と支援情報とを用いて水防活動の必要性を判断した場合、大雨警報は発令されていないが危険な状態であり水防活動が必要と判断された場合が1回あり、危険の見逃しは発生しなかった。
【0110】
大雨警報が発令されることなく水害も発生しなかった場合、つまり降雨量が少なかったとき、従来と同様に79回については水害の危険がないと判断され、水防支援情報は出力されなかった。
【0111】
以上のように、本実施の形態では、大雨注意報、大雨警報、洪水注意報、洪水警報等の気象情報に加えて、補助情報と支援情報とのうち少なくとも一方を用いて水防活動の必要性が判断される。これにより、水防活動のハズレ、見逃しを大幅に低減できる。
【0112】
また、本実施の形態では、水防活動に見合う人員の配備を促す水防支援情報が出力されるため、水害の発生を未然かつ容易に防止することができる。
【0113】
また、本実施の形態では、水防活動が必要と判断された場合に、メッセージと水防活動配備人数とが表示されるため、適切なメッセージを参考にして水防活動の必要な場所に適切な人数を配備することができる。
【0114】
なお、本実施の形態では、降雨量情報、水位情報などの支援情報(又は補助情報)をしきい値の決定に用いたが、例えば目的の達成度合いを算出する評価関数を用いて、しきい値を決定してもよい。
【0115】
例えば、例えば水防活動における現場出動コストxを1回3万円とし、例えば土壌を積むなどの現場出動による作業コストyを1回10万円とし、水害が発生した場合の水害作業コストzを1回100万円とし、コストによる評価関数を定義する。
【0116】
上記図8において、結果「(a)当り◎」は、発生回数が5回であり、コスト種類「y」である。このため、結果「(a)当り◎」の評価値は、50万円である。
【0117】
結果「(b)ハズレ△」は発生回数が15回であり、結果「(b)ハズレ△」のコストの種類は「x」である。このため、結果「(b)ハズレ△」の評価値は45万円である。
【0118】
結果「(c)見逃し×」は、発生回数が1回であり、結果「(c)見逃し×」のコストの種類は「z」である。このため、結果「(c)見逃し×」の評価値は100万円である。
【0119】
結果「(d)当り○」は、発生回数が79回であり、結果「(d)当り○」のコストは0である。この結果、結果「(d)当り○」の評価値は0円である。
【0120】
上記図8における評価値を合計すると、195万円となる。
【0121】
図8の結果「(a)当り◎」、結果「(b)ハズレ△」、結果「(c)見逃し×」、結果「(d)当り○」のそれぞれの発生回数をA,B,C,Dとし、コストx,y,zの値をそれぞれX,Y,Zとし、評価関数Jを表わすと、式(1)が得られる。
【0122】
J=A×Y+B×X+C×Z…(1)
例えば、上記図4に示すような積算降雨量情報があり、積算降雨量20mmをしきい値とし、水防活動を行った結果は、図10のようになったと仮定する。
【0123】
この図10に対して上記式(1)の評価関数を用いてコスト値の計算を行うと以下に示すような結果が得られる。
【0124】
20=A×Y+B×X+C×Z
=6×10+35×3+0×100
=165(万円)
上記式(1)の評価関数から算出される評価値を支援情報とし、この支援情報についてのしきい値を設定し、この設定されたしきい値に基づいて画面表示用の水防支援情報を作成し出力すると、従来より安全、かつ、高い評価値(低コスト)の水防活動を行うことが可能となる。
【0125】
図10については、ハズレの回数が多いがコストは安価になる。
【0126】
なお、評価関数は、支援情報を取得するために用いるのみではなく他の情報を求めるために用いられてもよい。例えば、上記図4に示す積算降雨量から演算される水位などのような、統計データから評価関数によって演算された値をしきい値として用いてもよい。
【0127】
(第2の実施の形態)
本実施の形態では、豪雨時の下水道又は河川の水防のために有効な情報を提供し、水防活動を支援する水防支援装置について説明する。
【0128】
図11は、本実施の形態に係る水防支援装置の構成の一例を示すブロック図である。
【0129】
水防支援装置102は、水防対象地域内の過去の降雨量情報、過去の河川又は下水道幹線内の水位情報、気象庁からの気象情報(数値データ)に基づいてデータマイニングを行い、任意の監視ポイントに対する人員配備に用いる危険度又は緊急措置度を数値で表した水防支援情報を作成する。
【0130】
この水防支援情報を用いることにより、水防対象地域の降雨量又は水位などの観測状況の把握、過去の経験に基づいた措置を行うことができ、高精度かつ迅速な人員配備活動を行うことができる。
【0131】
なお、本実施の形態では、データマイニングの手法として、ニューラルネットワークによるパターン認識を用いる場合について説明するが、例えば多変量解析、各種統計手法などを用いてもよい。
【0132】
水防支援装置102は、データマイニング部30、教師データ取得部31、気象情報取得部32、補助情報取得部33、補助情報処理部34、出力部35を具備する。
【0133】
データマイニング部30は、ニューラルネットワークによるパターン認識機能を具備する。
【0134】
教師データ取得部31は、過去情報記録部36からデータマイニング部30のニューラルネットワークの学習に用いる教師データを取得し、データマイニング部30に提供する。
【0135】
気象情報取得部32は、例えば気象庁から大雨警報等の気象情報を受信し、データマイニング部30に提供する。
【0136】
補助情報取得部33は、例えば、雨量計14によって計測された降雨量情報、水位計15によって計測された水位情報などの補助情報を取得し、補助情報処理部34に提供する。
【0137】
補助情報処理部34は、補助情報取得部33から受け付けた補助情報を支援情報に変換し、支援情報をデータマイニング部30に提供する。例えば、補助情報処理部34は、降雨量情報から単位時間当りの降雨量情報を取得し、また水位情報から単位時間当りの水位情報を取得し、単位時間当りの降雨量情報と水位情報の双方を含む支援情報をデータマイニング部30に提供する。
【0138】
データマイニング部30は、教師データを用いて学習後、気象情報取得部32によって取得された気象情報と補助情報処理部34によって取得された支援情報とを含む入力情報を入力し、入力情報に応じた出力情報を出力する。
【0139】
出力部35は、出力情報にしたがってデータマイニング結果を出力する。
【0140】
なお、補助情報取得部33は、取得した補助情報を補助情報処理部34を経由することなくデータマイニング部30に提供してもよい。この場合、補助情報処理部34は、省略してもよい。また、この場合、データマイニング部30は、気象情報と補助情報を含む入力情報を入力する。
【0141】
また、補助情報処理部34は、補助情報取得部33から受け付けた補助情報を含む支援情報を作成し、作成した支援情報をデータマイニング部30に提供するとしてもよい。
【0142】
また、補助情報取得部33によって取得された補助情報と補助情報処理部34によって取得された支援情報の双方がデータマイニング部30に提供されるとしてもよい。この場合、データマイニング部30は、気象情報、支援情報、補助情報を含む支援情報を入力する。
【0143】
図12は、本実施の形態に係る水防支援装置102のデータマイニング部30の具体例を示すブロック図である。
【0144】
式(1)〜(4)は、ニューラルネットワーク30aと入力情報と出力情報との関係を示す。
【0145】
【数1】

Figure 0004261278
式(1)〜(4)において、Xiは入力情報を表す。mはニューラルネットワーク30aの相数を表す。Yi (m)はm相i番目のニューロンの活性度を表す。Nmはm相でのニューロン数を表す。diは各監視ポイント(危険幹線ポイント)での危険値を表す。
【0146】
例えば、教師データに、過去の水防対象領域内の降雨量情報、下水道幹線内の水位情報、気象庁からの気象情報(数値データ)を含む入力情報(Xi (0))と、この入力情報の得られた時点での各監視ポイントでの危険度(又は緊急措置度)を含む出力情報(di)とが、用いられる。
【0147】
より具体的には、教師データの入力情報は、過去の水防対象地域内の単位時間当りの降雨量情報、過去の水防対象地域内の単位時間当りの水位情報、気象庁から大雨警報が発令された場合を「1」と表し発令されていない場合を「0」で表す情報を含むとする。
【0148】
過去において、単位時間当りの降雨量が30[mm/h]、水位が5.0[m]、気象庁から大雨警報が発令された場合、教師データの入力情報は(30,5.0,1)となる。
【0149】
また、教師データの出力情報として、この過去の入力情報の得られた時点で、各監視ポイントについて危険水位に到達した又は水が溢れたなど危険が発生した場合を「1」と表し危険が発生していない場合を「0」と表した情報を用いる。
【0150】
過去の入力情報の得られた時点で、監視ポイントP2のみで危険が発生した場合、教師データの出力情報は(0,1,…)となる。
【0151】
データマイニング部30は、教師データを入力すると、教師データを用いてニューラルネットワーク30aを学習させ、出力情報と実際のニューロン出力の二乗誤差が所定レベルより小さくなるまで学習を繰り返す。
【0152】
データマイニング部30は、学習によって得られたニューラルネットワーク30aの構成及び重みデータを保存する。
【0153】
データマイニング部30は、学習後に、気象情報取得部32及び補助情報処理部34から現時点の入力情報を受け付けると、入力情報をニューラルネットワーク30aに入力し、現時点の各監視ポイントの危険度を表す出力情報を出力する。
【0154】
ニューラルネットワーク30aの出力層からは、活性レベル0〜1のアナログ情報が出力される。
【0155】
データマイニング部30は、このアナログ情報を各監視ポイントの危険度のレベル(割合)とする。なお、危険度は、百分率で表してもよい。
【0156】
危険度を画面上に表示するための画面表示用の水防支援情報は、出力部35から出力される。オペレータは、水防支援情報に基づいて表示装置に表示される各監視ポイントの危険度に基づいて、現場に出動するか否か判断する。
【0157】
図13は、本実施の形態に係る水防支援装置102によって実行される処理の一例を示すフローチャートである。
【0158】
ステップT1において、教師データ取得部31は、過去情報記録部36を参照し、教師データを取得し、データマイニング部30に提供する。
【0159】
ステップT2において、データマイニング部30は、教師データに基づいてニューラルネットワーク30aの学習を行う。
【0160】
ステップT3aにおいて、気象情報取得部32は、気象庁から気象情報を取得し、取得した気象情報を数値化する。
【0161】
ステップT3bにおいて、補助情報取得部33は、雨量計と水位計とのうち少なくとも一つから補助情報を取得する。
【0162】
ステップT3cにおいて、補助情報処理部34は、補助情報を支援情報に変換する。
【0163】
なお、ステップT3aと、ステップT3b,T3cの実行順序は自由に設定可能である。すなわち、ステップT3aは、ステップT3b,T3cの前に実行してもよく、後に実行してもよく、ステップT3b,T3cの実行中に実行してもよい。
【0164】
ステップT4において、データマイニング部30は、数値化した気象情報と支援情報とを含む入力情報をニューラルネットワーク30aに入力する。
【0165】
ステップT5において、データマイニング部30は、入力情報に応じた出力情報を取得し、出力部35に提供する。
【0166】
ステップT6において、出力部35は、出力情報を表示装置に出力するための制御を行う。
【0167】
本実施の形態では、水防支援対象地域の降雨量情報や水位情報などの情報に基づいて過去の経験に基づいた水防支援情報を提供できる。オペレータは、水防支援情報を参考して、高精度かつ迅速な人員配備活動を行うことができる。また、危険が発生していないのに現地巡回を行うなど、水防活動におけるハズレの回数を大幅に削減できる。
【0168】
なお、本実施の形態において、例えば、過去の水防対象地域の降雨量情報、過去の下水道幹線内の水位情報、過去の水防活動内容(データ)を教師データの入力情報とし、各監視ポイントの過去の危険度を教師データの出力情報としてもよい。この場合、現時点の水防対象地域の降雨量情報、現時点の下水道幹線内の水位情報、現時点の水防活動内容を入力情報とし、ニューラルネットワーク30aを用いることで、現時点の出力情報が得られる。
【0169】
上記各実施の形態に係る水防支援装置101,102の実現する機能は、プログラムにより実現されるとしてもよい。
【0170】
図14に示すように、プログラム37によって水防支援装置101,102の機能が実現される場合、このプログラム37は、記録媒体38に記録されており、コンピュータ39に読み込まれる。そして、コンピュータ39に具備されている例えばCPU等の制御ユニットは、プログラム37の内容にしたがって動作する。
【0171】
また、上記各実施の形態に係る水防支援装置101,102において、各構成要素は同様の動作を実現可能であれば配置を変更させてもよく、また各構成要素を自由に組み合わせてもよく、各構成要素を自由に分割してもよく、いくつかの構成要素を削除してもよい。すなわち、上記各実施の形態については、上記の構成そのままに限定されるものではなく、実施段階ではその要旨を逸脱しない範囲で構成要素を変形して具体化できる。
【0172】
【発明の効果】
以上説明したように本発明によれば、水防活動が必要でない場合に水防活動が行われることを大幅に削減でき、効率的な水防活動を実現できる。
【図面の簡単な説明】
【図1】 本発明の第1の実施の形態に係る水防支援装置の一例を示すブロック図。
【図2】 水防対象地域内における雨量計と雨量計の設置状態を示す図。
【図3】 情報設定部に設定されるしきい値を含む設定情報の一例を示す図。
【図4】 過去の統計データとしきい値との関係の一例を示す図。
【図5】 同実施の形態に係る水防支援装置の支援処理部の処理の一例を示すフローチャート。
【図6】 画面表示用の水防支援情報の第1例を示す図。
【図7】 画面表示用の水防支援情報の第2例を示す図。
【図8】 支援情報を用いることなく大雨警報の発令の有無によって水防支援を行った結果の一例を示す図。
【図9】 支援情報を用いた水防支援結果の一例を示す図。
【図10】 評価関数を用いてしきい値を決定する場合の水防支援結果の一例を示す図。
【図11】 本発明の第2の実施の形態に係る水防支援装置の構成の一例を示すブロック図。
【図12】 同実施の形態に係る水防支援装置のデータマイニング部の具体例を示すブロック図。
【図13】 同実施の形態に係る水防支援装置によって実行される処理の一例を示すフローチャート。
【図14】 水防支援装置の動作をコンピュータにより実現する場合の構成の一例を示すブロック図。
【符号の説明】
101,102…水防支援装置、1,32…気象情報取得部、2,33…補助情報取得部、3,34…補助情報処理部、4…情報設定部、5…支援処理部、51…気象判断部、52…必要性判断部、53…作成部、54,35…出力部、6…表示装置、7a,7b…入力装置、14…雨量計、15…水位計、30…データマイニング部、31…教師データ取得部、30a…ニューラルネットワーク[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a flood control support apparatus and program for supporting flood control activities for avoiding flood damage, and a flood control support method.
[0002]
[Prior art]
In flood control activities in sewers or rivers, the team structure of personnel is determined based on warnings or warnings issued by the Japan Meteorological Agency, and the team rushes to the site according to the situation of the sewer or river.
[0003]
Conventionally, a disaster prevention support apparatus that captures rainfall information and uses it for disaster prevention activities has been proposed.
[0004]
For example, the disaster prevention information providing apparatus disclosed in Patent Document 1 includes a disaster prevention information storage unit that stores disaster prevention information such as rainfall information, seismic intensity information, and strain information, a browser-equipped device owned by the user, and access from the user. And a WWW connection unit for connecting to a browser-equipped device and outputting a read-out request for disaster prevention information. And the disaster prevention information provision apparatus of patent document 1 receives the read-out request | requirement from a WWW connection part, determines whether to provide the disaster prevention information of a disaster prevention information storage part, and when it determines with provision, it can send disaster prevention information to WWW Provide to users via the connection.
[0005]
For example, the disaster prevention information collection processing system of Patent Document 2 takes in image information of disaster occurrence prediction points that have already been registered, using the spot information on the disaster site as a key. And the disaster prevention information collection processing system of patent document 2 combines this image information and rainfall information, edits it, memorize | stores the edited disaster prevention information in a recording apparatus, and posts it on an internet server via an information provision part. And widely provided to users.
[0006]
[Patent Document 1]
JP-A-11-110454
[0007]
[Patent Document 2]
JP 2001-337997 A
[0008]
[Problems to be solved by the invention]
The Japan Meteorological Agency warning or warning may not be information specific to the flood control target area. For this reason, when a personnel group is determined in accordance with a warning or warning issued by the Japan Meteorological Agency, the determined team may not need to perform any specific flood control activities while in a standby state.
[0009]
The conventional disaster prevention information providing apparatus or the disaster prevention information collection processing system described above provides disaster prevention information created based on rainfall information and the like to users widely and is used for disaster prevention publicity activities of local residents.
[0010]
However, the conventional disaster prevention information providing apparatus or disaster prevention information collecting and processing system does not have a function of supporting flood prevention activities in a broad sense to avoid flood damage caused by sewers or rivers.
[0011]
In general, flood control activities include various activities such as publicity activities for local residents, site monitoring, site security such as building up soil, and movement of residents from hazardous locations to safe locations.
[0012]
However, since the conventional disaster prevention information providing apparatus or the disaster prevention information collecting and processing system only provides disaster prevention information to users, it is difficult to use it easily and effectively for measures for avoiding flood damage and other flood prevention activities. It is.
[0013]
Therefore, the conventional general flood control activities against flood damage use heavy rain warnings, heavy rain warnings, flood warnings, flood warnings, etc. issued by specific organizations such as the Meteorological Association as indicators. In the conventional general flood control activities, the location of flood damage is estimated based on information indicating that one of the heavy rain warning, heavy rain warning, flood warning or flood warning has been issued and past experience. The necessary personnel will be deployed where flood control is required.
[0014]
However, in flood control activities that use only weather information as an indicator, weather information is issued for a wide range of areas, so assign personnel to places where actual flood control activities do not result in heavy rain and do not require flood control activities. There is a problem that unnecessary flood control activities are performed, such as flood control activities.
[0015]
The present invention has been made in view of the above circumstances, and prevents flood control activities for places where flood protection activities are not required, and performs flood protection activities for places where flood protection activities are necessary, thereby providing efficient flood control activities. An object of the present invention is to provide a flood control support apparatus and program for realizing the above and a flood control support method.
[0016]
[Means for Solving the Problems]
Specific means taken for realizing the present invention will be described below.
[0017]
  According to a first aspect of the present invention, the necessity of flood control activities is determined based on means for acquiring weather information, means for acquiring support information necessary for flood control support, weather information and support information, and Support processing means for creating flood control support information including personnel deployment information necessary for flood control activities when it is determined thatThe support processing means compares the support information with a preset threshold value, determines the necessity of flood control activity, and if it is determined that flood protection activity is necessary, A means for creating flood control support information for screen display based on a preset message and the number of flood control deployment personnelIt is a flood control support device.
[0018]
  According to a second aspect of the present invention, means for acquiring weather information, means for acquiring auxiliary information related to flood damage, auxiliary information processing means for acquiring support information necessary for flood control support based on the auxiliary information, Determining the necessity of flood control activities based on weather information and support information, and when it is determined that flood control activities are necessary, support processing means for creating flood control support information including personnel deployment information necessary for flood control activities; EquippedThe support processing means compares the support information with a preset threshold value, determines the necessity of flood control activity, and if it is determined that flood protection activity is necessary, A means for creating flood control support information for screen display based on a preset message and the number of flood control deployment personnelIt is a flood control support device.
[0019]
  The third aspect of the present invention is:If the necessity of flood control activities is determined based on the means for acquiring weather information, the means for acquiring support information necessary for flood control support, the weather information and the support information, and if it is determined that flood control activities are necessary, Support processing means for creating flood control support information including personnel deployment information necessary for flood control activities, the support processing means includes means for determining whether the weather information is flood control target weather information, and the weather information is the flood control target weather information. If it is determined, the support information is compared with a preset threshold value, and a means for determining the necessity of flood control activity is set. If it is determined that flood control activity is required, the threshold value is set in advance. A means for creating flood control support information for screen display based on the message and the number of flood control activities deployed, and a means for outputting flood support information for screen displayA flood control support device comprising:
[0020]
  The fourth aspect of the present invention is:Based on weather information and support information, means for acquiring weather information, means for acquiring auxiliary information related to flood damage, auxiliary information processing means for acquiring support information necessary for flood control support based on the auxiliary information, and weather information and support information When the necessity of flood control activities is determined, and when it is determined that flood control activities are necessary, the flood protection support information including personnel deployment information necessary for flood control activities is prepared. A means for determining whether the information is flood control target weather information and a means for determining the necessity of flood control activity by comparing the support information with a preset threshold when the weather information is determined as flood control target weather information And a means for creating flood control support information for screen display based on a preset message for the threshold value and the number of people who have flood control activities when it is determined that flood control activity is necessary, and for screen display Flood control information And means for outputtingA flood control support apparatus comprising:
[0021]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the following description, the same elements are denoted by the same reference numerals and description thereof is omitted.
[0022]
(First embodiment)
FIG. 1 is a block diagram illustrating an example of a flood control support apparatus according to the present embodiment.
[0023]
The flood control support apparatus 101 includes a weather information acquisition unit 1, an auxiliary information acquisition unit 2, an auxiliary information processing unit 3, an information setting unit 4, a support processing unit 5, a display device 6, and input devices 7a and 7b.
[0024]
The weather information acquisition unit 1 acquires weather information. The weather information includes, for example, information indicating whether a heavy rain warning, a heavy rain warning, a flood warning, a flood warning, or the like has occurred.
[0025]
For example, the weather information acquisition unit 1 receives weather information from the weather satellite Himawari 11. Further, for example, the weather information acquisition unit 1 receives weather information via the Internet 12 from a public weather information provider. Further, for example, the weather information acquisition unit 1 directly receives weather information from a weather information providing contract organization 13 such as a weather business center or a contract organization.
[0026]
The auxiliary information acquisition unit 2 acquires auxiliary information related to flood damage to assist weather information.
[0027]
For example, the auxiliary information includes rainfall information (rainfall information) measured by a rain gauge 14 installed in a flood control target area such as a sewer or a river.
[0028]
Further, for example, the auxiliary information includes water level information such as sewer mains and rivers measured by the water level meter 15.
[0029]
The auxiliary information may include various other information related to flood damage. The auxiliary information may be any one of information such as rainfall information, sewer main water level information, river water level information, and may include two or more types.
[0030]
The auxiliary information processing unit 3 executes a process of converting the auxiliary information acquired by the auxiliary information acquisition unit 2 into support information necessary for flood control activity support.
[0031]
In the information setting unit 4, information necessary for creating flood control support information is set.
[0032]
The support processing unit 5 creates flood control support information necessary for flood control activities.
[0033]
The display device 6 displays flood control support information created by the support processing unit 5.
[0034]
The input devices 7a and 7b are used, for example, for inputting information necessary for creating flood control support information and inputting various instructions.
[0035]
FIG. 2 is a diagram showing the relationship between the sewer main line 16 (or river) in the flood control target area AB1 in the A prefecture B region, the installation location of the rain gauge 14 and the water level gauge 15 which are auxiliary information measurement systems. .
[0036]
In the example of FIG. 2, two rain gauges 14 are installed at a required location in the flood control target area AB1. In addition, two water level gauges 15 are installed along the sewer main line 16 flowing through the flood control target area AB1.
[0037]
When the weather information acquisition unit 1 receives weather information such as a heavy rain warning, a heavy rain warning, a flood warning, a flood warning, etc. from the weather information provision contractor 13, for example, the received weather information is sent to the support processing unit 5. provide.
[0038]
The auxiliary information acquisition unit 2 receives, for example, auxiliary information including rainfall information measured by the rain gauge 14, water level information measured by the water level gauge 15, and other information related to water damage (water damage) In order to create support information from the information, auxiliary information and installation location identification data of a device for which the auxiliary information is measured are provided to the auxiliary information processing unit 3.
[0039]
For example, when the auxiliary information includes water level information, the auxiliary information processing unit 3 converts the auxiliary information into water level status information representing a change in the water level every predetermined time (for example, every 5 minutes) for each installation location identification data, Support information including water level information and water level status information obtained every time in a time series is recorded in the information recording unit 8.
[0040]
Thus, when the water level information is handled, the information recording unit 8 records support information including the water level information, the water level status information, and other information using the installation location identification data as a key.
[0041]
In addition, for example, when the auxiliary information includes rainfall information, the auxiliary information processing unit 3 sets the auxiliary information as integrated rainfall information from the beginning of rain or maximum rainfall information for each predetermined time for each installation location identification data. The support information including the integrated rainfall information obtained in time series or the maximum rainfall information for each predetermined time is recorded in the information recording unit 8.
[0042]
As described above, when the rainfall information is handled, the information recording unit 8 records support information including the rainfall information, the integrated rainfall information, the maximum rainfall information, and other information using the installation location identification data as a key. Part 8 is recorded.
[0043]
In the information setting unit 4, for example, information 4a necessary for creating flood control support information as shown in FIG. 3 is set.
[0044]
That is, in the information setting unit 4, the weather information type data (D1: heavy rain warning, D2: heavy rain warning, D3: flood warning, D4: flood warning) for each installation location identification data “01”, “02”. , Threshold values, messages, personnel deployment locations, number of deployments at each deployment location, and the like are set.
[0045]
The threshold value is set for any of rainfall information [mm / h], integrated rainfall information [mm], maximum rainfall information [mm / h], water level information, water level status information, and other information. However, it is desirable to set information that is most susceptible to flood damage for sewers or rivers.
[0046]
For example, there are a plurality of threshold values for one type of information so that the rainfall is divided into “50 mm / h to 99 mm / h”, “100 mm / h to 149 mm / h”, and “150 mm / h or more”. It may be set. Further, for example, threshold values may be set for two or more types of information such as accumulated rainfall information and water level information.
[0047]
The threshold value may be determined based on rainfall information at the time of past flood damage, sewer main water level information at the time of past flood damage, river level information at the time of past flood damage, and the like.
[0048]
For example, if water damage has occurred in the past at 50 mm / h rainfall, 50 mm / h is set as the threshold for rainfall. However, since a large number of deployed persons are required according to an increase in rainfall, it is desirable to set a threshold for a plurality of rainfalls and set the number of deployed persons corresponding to each threshold.
[0049]
If no flood damage has occurred in the past, a threshold may be set based on the planned rainfall calculated at the time of facility design.
[0050]
Since the message set in the information setting unit 4 is different for each sewer main line or river, installation location identification data “01”, “02”..., The contents according to each sewer main line, river, installation location identification data are different. Described.
[0051]
Since there are often one or more dangerous places around the sewer main line or river, it is effective to set a plurality of personnel deployment places for each sewer main line or river.
[0052]
The number of persons to be deployed is set for each staff placement location.
[0053]
In some cases, the local government may flood only a specific place on one river. In this case, the installation location identification data may be omitted from the information 4a.
[0054]
When flood control activities are performed in any weather information type data, the weather information type data may be omitted from the information 4a.
[0055]
That is, in the information setting unit 4, if any one of the personnel deployment location and the number of deployed personnel at each personnel deployment location is set for any of the installation location identification data, threshold value, and message, Good.
[0056]
For example, when setting a threshold value based on rainfall amount information, sewer main water level information, and river water level information, the threshold value may be set by calculation using past statistical data.
[0057]
FIG. 4 is a diagram showing an example of past statistical data.
[0058]
The support processing unit 5 includes past rainfall information [mm / h] or past accumulated rainfall information [mm] recorded in the information recording unit 8, past water level information on the sewer main line, or past water level on the river. Plot the relationship with information. The threshold value may be determined in consideration of the past flood damage situation shown in FIG.
[0059]
In FIG. 4, when the integrated rainfall reaches 29 [mm], the upper limit of the approximate curve using the past statistical data reaches 0.6 m of the warning water level 21 of the sewer main line. For this reason, for example, an integrated rainfall amount of 29 mm and a water level of 0.6 m are set as threshold values, and when the integrated rainfall amount or water level exceeds these threshold values, personnel are deployed for flood control activities.
[0060]
The support processing unit 5 may execute a logical operation by itself to make a determination and output flood control support information. In addition, when the support processing unit is configured by a CPU, for example, the support processing unit may execute predetermined processing according to the water control processing program and create water control support information.
[0061]
The support processing unit 5 functionally includes a weather determination unit 51, a necessity determination unit 52, a creation unit 53, and an output unit 54.
[0062]
The weather determination unit 51 determines whether the weather information received by the weather information acquisition unit 1 is weather control target weather information. For example, weather information such as heavy rain warnings, heavy rain warnings, flood warnings, flood warnings, etc. is defined as meteorological information for flood control.
[0063]
When the weather determination unit 51 determines that the weather information is flood control target, the necessity determination unit 52 refers to support information such as rainfall information at the time closest to the current time from the information recording unit 8, and the support information Is over the threshold set in the information setting unit 4, it is determined that flood control activity is necessary.
[0064]
When the necessity determination unit 52 determines that the flood control activity is necessary, the creation unit 53 reads information such as a message, a personnel deployment location, and deployment number data from the information setting unit 4, and executes an editing process according to a required format. And create flood control support information. For example, the flood control support information may be information for screen display.
[0065]
The output unit 54 outputs the flood control support information created by the creation unit 53 to the display device 6.
[0066]
Next, the operation of the flood control support apparatus 101 will be described.
[0067]
First, the input devices 7 a and 7 b input information necessary for creating flood control support information, and set the information in the information setting unit 4.
[0068]
The information 4a set in the information setting unit 4 includes, for example, a message that takes into account the threshold value determined using past flood situation information or past statistical data, the river situation in the flood control target area, etc. This includes information such as where people are deployed and the number of people deployed.
[0069]
Next, the weather information acquisition unit 1 provides the received weather information to the support processing unit 5 when the weather information is received from at least one of the weather satellite Himawari 11, the Internet 12, and the weather information providing contract organization 13.
[0070]
On the other hand, when the auxiliary information acquisition unit 2 receives auxiliary information including rainfall information measured by the rain gauge 14, water level information measured by the water gauge 15, and various other information related to flood damage, the rain gauge The auxiliary information received together with the installation location identification data indicating the installation location of the measuring device such as 14 or the water level meter 15 is provided to the auxiliary information processing unit 3. The rain gauge 14 and the water level gauge 15 are installed in advance in consideration that the flood control is activated based on the water level information (or river water level information) of the sewer main line 16.
[0071]
When the auxiliary information processing unit 3 receives the auxiliary information from the auxiliary information acquisition unit 2, the auxiliary information processing unit 3 converts the auxiliary information into support information used to create flood control support information requested by the user, and converts the support information into the information recording unit 8. And provided to the support processing unit 5.
[0072]
Next, the support processing unit 5 executes the process shown in FIG.
[0073]
In step S1, the weather determination unit 51 of the support processing unit 5 has meteorological information received from the weather information acquisition unit 1 as flood control target weather information such as heavy rain warning, heavy rain warning, flood warning, flood warning, and the like. Judge.
[0074]
When it is determined that the weather information is flood control target, in steps S2a to S2d, the weather determination unit 51 identifies whether the type of the weather information is heavy rain warning, heavy rain warning, flood warning, or flood warning. In FIG. 5, step S2a for determining whether the data is the type data D1 and step S2d for determining whether the data is the type data D4 are described, and steps S2b, S2c for determining whether the data is the type data D2, D3 are omitted. ing.
[0075]
In step S1, it may be determined whether the type is a heavy rain warning, a heavy rain warning, a flood warning, or a flood warning. When the weather information is any one of a heavy rain warning, a heavy rain warning, a flood warning, and a flood warning, the process moves from the weather determination unit 51 to the necessity determination unit 52.
[0076]
In steps S <b> 3 to S <b> 5, the necessity determination unit 52 extracts support information including, for example, rainfall information in the time zone closest to the current time from the information recording unit 8, and is set in the support information and information setting unit 4. Compare with the threshold to determine if flood control activities are necessary.
[0077]
For example, if the rainfall exceeds a certain threshold or if the rainfall is within a range determined from a plurality of thresholds, it is determined that flood control activity is necessary.
[0078]
More specifically, when the threshold value is set to 50 mm / h or more, the necessity determination unit 52 performs flood control activities when the rainfall amount indicated by the rainfall amount information exceeds the threshold value 50 mm / h. Judge as necessary.
[0079]
When the range is set using a plurality of threshold values, the necessity determining unit 52 determines that the flood control activity is necessary when the rainfall falls within the range.
[0080]
When the necessity determination unit 52 determines that the flood control activity is necessary, the process moves from the necessity determination unit 52 to the creation unit 53.
[0081]
In step S6, when it is determined that flood control activities are necessary, the creation unit 53 reads information such as a message corresponding to the threshold value, the personnel deployment location, the number of deployed personnel, and the like from the information setting unit 4, and reads the read information in advance. Edit processing such as writing in a predetermined area of the registered basic screen data is performed, and for example, flood control support information for screen display is created.
[0082]
FIG. 6 is an example of the created flood control support information.
[0083]
Note that the creation unit 53 does not use the basic screen data, but uses only information such as a message, personnel deployment location (× A, × B, × C), the number of deployed personnel, and the like. Support information may be created. When the number of persons to be deployed is determined in advance by the local government, the creation unit 53 may create flood control support information that represents only the presence / absence of an on-site personnel deployment request.
[0084]
The creation unit 53 adds information such as the weather information currently issued in the required area, rainfall information used to create the flood control support information, threshold values, etc. to the flood control support information for screen display. Also good.
[0085]
When the flood control support information is created, the process moves from the creation unit 53 to the output unit 54.
[0086]
In step S7, the output unit 54 records the created flood control support information in an appropriate recording unit (not shown), performs display control, records the result of the display control in an image memory (not shown), and the like. For example, the flood control support information is displayed on the display device 6 in the state shown in FIG.
[0087]
In step S8, the output unit 54 determines whether or not a confirmation instruction has been input after a predetermined time has elapsed.
[0088]
If the confirmation instruction has not been input, in step S9, the output unit 54 outputs an alarm and moves the process to step S8 again.
[0089]
When the confirmation instruction is input, in step S10, the output unit 54 determines whether or not the process is finished. When the process is not finished, the processes after step S1 are repeated every predetermined cycle.
[0090]
The processing of the support processing unit 5 described above is executed on the condition that weather information on flood control targets such as heavy rain warnings, heavy rain warnings, flood warnings, and flood warnings is received.
[0091]
However, even if the weather information about flood control is not received, heavy rain may be falling in the flood control target area. In such a situation, it is necessary to prepare flood control information by judging that flood control activities are necessary.
[0092]
In order to determine whether the flood control activity is necessary from the support information when the weather information for flood control is not received, even if it is determined NO in step S1 or step S2d shown in FIG. Move. Then, for example, it is determined whether flood prevention activities are necessary, for example, by comparing the amount of rainfall with a threshold value.
[0093]
As a result, when it is determined that flood protection support is necessary even if the weather information for flood control is not received, flood protection support information is created and displayed.
[0094]
In addition, the support processing unit 5 may create screen support information for screen display as shown in FIG. 7 based on another water control processing program.
[0095]
In the example of the flood control support information for screen display shown in FIG. 7, the weather information 23 including the announcement time and the announced weather content is written in a predetermined area of the basic screen data 22 registered in advance, and further the current rainfall The amount and water level are displayed in a graph.
[0096]
In the water level graph, the boundary line 21a represents the warning water level 21 of FIG. The boundary line 24 represents the water level of the lower limit line at the accumulated rainfall of 35 mm in FIG. The boundary line 25 represents the water level of the upper limit line at the accumulated rainfall of 35 mm in FIG.
[0097]
According to the present embodiment, the following effects can be achieved.
[0098]
For example, as shown in FIG. 8, it is assumed that flood control activities using only conventional weather information are performed for 100 rainfalls. In FIG. 8, out of 100 rainfalls, the number of times that a heavy rain warning was issued and flood damage occurred was 5 times, and if the heavy rain warning was issued but no flood damage occurred, it was 15 times.
[0099]
When conventional flood control activities are performed using only weather information, 20 flood control activities are performed in response to 20 heavy rain warnings.
[0100]
Then, out of 20 flood control activities, 5 flood control activities were necessary (per hit), and 15 flood control activities were unnecessary (lost).
[0101]
On the other hand, in the state of FIG. 8 described above, the number of times that there was rain but no heavy rain warning was issued is 80 times. Of these 80 times, one flood has occurred. In this case, one flood damage has occurred in a state where no flood control activity is being performed, and one flood damage has been completely missed.
[0102]
FIG. 9 is a diagram showing an example of the case where flood control support information is created and displayed by adding support information. FIG. 9 is an example of a result of determining whether or not flood control activities are necessary by the processing of steps S1 to S5 of FIG.
[0103]
In FIG. 9, when it is determined whether or not flood prevention activities are necessary based on the issued heavy rain warning and support information, it is determined that flood protection activities are necessary for all five rainfalls for which heavy rain warning has been issued and flood damage has occurred. It was. Therefore, by conducting flood control activities according to the necessity of flood protection activities using this heavy rain warning and support information, flood protection is provided for all five rainfalls where heavy rain warnings are issued and floods occur. Activities are carried out, necessary personnel are deployed, flood damage can be avoided, and safe conditions can be ensured.
[0104]
As shown in FIG. 8 above, when the necessity of flood control activity is determined using only the heavy rain warning, the number of times that the heavy rain warning has been issued but no flood damage has occurred, There were 15 times.
[0105]
On the other hand, when the necessity of flood control activities is judged using heavy rain warning and support information, out of 15 times when heavy rain warning was issued but no flood damage occurred, 5 times were judged as dangerous and flood protection support Although it was determined that (water defense support information output) was necessary, it was determined that there was no danger of flooding 10 times, and flood control support information was not output.
[0106]
This result indicates that 10 out of 15 times when a heavy rain warning was issued but no water damage occurred was judged to be safe, and no water damage actually occurred in the same manner as the result of the determination. Thus, by determining the necessity of flood control activities using the heavy rain warning and the support information, the number of lost times can be reduced from 15 times to 5 times.
[0107]
The result of FIG. 9 is an example when the statistically calculated dangerous water level of FIG. 4 is determined as a threshold value. By changing the way of setting the threshold value, the judgment result becomes more accurate.
[0108]
As shown in FIG. 8, when the necessity of flood control activities was judged using only the heavy rain warning, the heavy rain warning was not issued, but flooding occurred, and the danger was missed once.
[0109]
On the other hand, as shown in FIG. 9, when the necessity of flood control activities is determined using heavy rain warnings and support information, it is determined that heavy rain warnings are not issued but are in a dangerous state and flood control activities are necessary. There was one case and there was no missed danger.
[0110]
When no heavy rain warning was issued and there was no flood damage, that is, when there was little rainfall, it was determined that there was no danger of flood damage for 79 times as before, and flood control information was not output.
[0111]
As described above, in this embodiment, in addition to weather information such as heavy rain warning, heavy rain warning, flood warning, flood warning, etc., the necessity of flood control activities using at least one of auxiliary information and support information Is judged. As a result, the loss and oversight of flood control activities can be greatly reduced.
[0112]
Further, in the present embodiment, flood protection support information that prompts the deployment of personnel appropriate for flood control activities is output, so that the occurrence of flood damage can be prevented easily.
[0113]
In the present embodiment, when it is determined that flood control activities are necessary, a message and the number of flood control activities are displayed. Can be deployed.
[0114]
In the present embodiment, support information (or auxiliary information) such as rainfall information and water level information is used to determine the threshold value. For example, a threshold value is calculated using an evaluation function that calculates the degree of achievement of the objective. The value may be determined.
[0115]
For example, the field dispatch cost x in flood control activities is set to 30,000 yen once, the work cost y by the field dispatch such as loading soil is set to 100,000 yen once, and the flood work cost z when the flood occurs is 1 The cost is 1 million yen, and the evaluation function by cost is defined.
[0116]
In FIG. 8 described above, the result “(per a)」 ”is generated five times and is the cost type“ y ”. For this reason, the evaluation value of the result “(a) per 万” is 500,000 yen.
[0117]
The result “(b) Loss Δ” is generated 15 times, and the cost type of the result “(b) Loss Δ” is “x”. Therefore, the evaluation value of the result “(b) Loss Δ” is 450,000 yen.
[0118]
The result “(c) Missed x” has one occurrence, and the cost type of the result “(c) Missed x” is “z”. For this reason, the evaluation value of the result “(c) missed over ×” is 1,000,000 yen.
[0119]
The result “circle per (d)” is generated 79 times, and the cost of the result “circle per (d)” is zero. As a result, the evaluation value of the result “(circle) per (d)” is 0 yen.
[0120]
The sum of the evaluation values in FIG. 8 is 19.95 million yen.
[0121]
The number of occurrences of each of the results “(a) ◎”, result “(b) losing Δ”, result “(c) missed x”, and result “(d) ○” in FIG. When D is set, and the values of the costs x, y, and z are X, Y, and Z, respectively, and the evaluation function J is expressed, Expression (1) is obtained.
[0122]
J = A * Y + B * X + C * Z (1)
For example, it is assumed that there is accumulated rainfall information as shown in FIG. 4 above, and the result of flood control activities with the accumulated rainfall of 20 mm as a threshold value is as shown in FIG.
[0123]
When the cost value is calculated with respect to FIG. 10 using the evaluation function of the above formula (1), the following results are obtained.
[0124]
J20= A x Y + B x X + C x Z
= 6 × 10 + 35 × 3 + 0 × 100
= 165 (10,000 yen)
Using the evaluation value calculated from the evaluation function of the above formula (1) as support information, setting a threshold value for this support information, and creating flood control support information for screen display based on the set threshold value When output, it is possible to carry out flood control activities that are safer and higher in evaluation value (low cost) than in the past.
[0125]
As for FIG. 10, the number of lost times is large, but the cost is low.
[0126]
Note that the evaluation function may be used not only to obtain support information but also to obtain other information. For example, a value calculated by an evaluation function from statistical data such as a water level calculated from the integrated rainfall shown in FIG. 4 may be used as a threshold value.
[0127]
(Second Embodiment)
In the present embodiment, a flood control support device that provides information effective for flood control of sewers or rivers during heavy rain and supports flood control activities will be described.
[0128]
FIG. 11 is a block diagram illustrating an example of the configuration of the flood control support apparatus according to the present embodiment.
[0129]
The flood control support device 102 performs data mining based on past rainfall information in the flood control target area, past water level information in the river or sewer main line, and meteorological information (numerical data) from the Japan Meteorological Agency. Create flood control support information that expresses the degree of risk or emergency measure used for personnel deployment in numerical values.
[0130]
By using this flood control information, it is possible to grasp the observation status such as rainfall or water level in the flood control target area, take measures based on past experience, and perform highly accurate and quick personnel deployment activities. .
[0131]
In the present embodiment, a case where pattern recognition using a neural network is used as a data mining method will be described. However, for example, multivariate analysis, various statistical methods, or the like may be used.
[0132]
The flood control support apparatus 102 includes a data mining unit 30, a teacher data acquisition unit 31, a weather information acquisition unit 32, an auxiliary information acquisition unit 33, an auxiliary information processing unit 34, and an output unit 35.
[0133]
The data mining unit 30 has a pattern recognition function using a neural network.
[0134]
The teacher data acquisition unit 31 acquires teacher data used for learning of the neural network of the data mining unit 30 from the past information recording unit 36 and provides it to the data mining unit 30.
[0135]
The weather information acquisition unit 32 receives weather information such as a heavy rain warning from the Japan Meteorological Agency, and provides it to the data mining unit 30.
[0136]
The auxiliary information acquisition unit 33 acquires auxiliary information such as rainfall information measured by the rain gauge 14 and water level information measured by the water level meter 15 and provides the auxiliary information to the auxiliary information processing unit 34.
[0137]
The auxiliary information processing unit 34 converts the auxiliary information received from the auxiliary information acquisition unit 33 into support information, and provides the support information to the data mining unit 30. For example, the auxiliary information processing unit 34 acquires rainfall amount information per unit time from the rainfall amount information, acquires water level information per unit time from the water level information, and both the rainfall amount information and the water level information per unit time. Is provided to the data mining unit 30.
[0138]
The data mining unit 30 inputs input information including the weather information acquired by the weather information acquiring unit 32 and the support information acquired by the auxiliary information processing unit 34 after learning using the teacher data, and according to the input information Output output information.
[0139]
The output unit 35 outputs a data mining result according to the output information.
[0140]
The auxiliary information acquisition unit 33 may provide the acquired auxiliary information to the data mining unit 30 without going through the auxiliary information processing unit 34. In this case, the auxiliary information processing unit 34 may be omitted. In this case, the data mining unit 30 inputs input information including weather information and auxiliary information.
[0141]
Further, the auxiliary information processing unit 34 may create support information including auxiliary information received from the auxiliary information acquisition unit 33 and provide the created support information to the data mining unit 30.
[0142]
Further, both the auxiliary information acquired by the auxiliary information acquisition unit 33 and the support information acquired by the auxiliary information processing unit 34 may be provided to the data mining unit 30. In this case, the data mining unit 30 inputs support information including weather information, support information, and auxiliary information.
[0143]
FIG. 12 is a block diagram illustrating a specific example of the data mining unit 30 of the flood control support apparatus 102 according to the present embodiment.
[0144]
Expressions (1) to (4) indicate the relationship among the neural network 30a, input information, and output information.
[0145]
[Expression 1]
Figure 0004261278
In the formulas (1) to (4), XiRepresents input information. m represents the number of phases of the neural network 30a. Yi (m)Represents the activity of the m-phase i-th neuron. NmRepresents the number of neurons in the m phase. diRepresents the danger value at each monitoring point (danger main line point).
[0146]
For example, input information (X) that includes, in the teacher data, rainfall information in the past flood control target area, water level information in the sewer main line, meteorological information (numerical data) from the Japan Meteorological Agencyi (0)) And output information (d) including the risk level (or emergency measure level) at each monitoring point when this input information is obtainedi) Is used.
[0147]
More specifically, the input information of the teacher data includes the rainfall information per unit time in the past flood control target area, the water level information per unit time in the past flood control target area, and a heavy rain warning issued by the Japan Meteorological Agency. The case is expressed as “1”, and the case where it is not issued includes information expressed as “0”.
[0148]
In the past, when the rainfall per unit time is 30 [mm / h], the water level is 5.0 [m], and a heavy rain warning is issued by the Japan Meteorological Agency, the input information of the teacher data is (30, 5.0, 1) )
[0149]
In addition, when the past input information is obtained as the output information of the teacher data, when a danger occurs such as reaching the dangerous water level or overflowing water at each monitoring point, the danger is indicated as “1”. If not, information representing “0” is used.
[0150]
If a danger occurs only at the monitoring point P2 when the past input information is obtained, the output information of the teacher data is (0, 1,...).
[0151]
When the teacher data is input, the data mining unit 30 learns the neural network 30a using the teacher data, and repeats the learning until the square error between the output information and the actual neuron output becomes smaller than a predetermined level.
[0152]
The data mining unit 30 stores the configuration and weight data of the neural network 30a obtained by learning.
[0153]
When the data mining unit 30 receives the current input information from the weather information acquisition unit 32 and the auxiliary information processing unit 34 after learning, the data mining unit 30 inputs the input information to the neural network 30a and outputs the degree of risk at each current monitoring point. Output information.
[0154]
Analog information of activity levels 0 to 1 is output from the output layer of the neural network 30a.
[0155]
The data mining unit 30 sets this analog information as the level (ratio) of the risk level of each monitoring point. The degree of risk may be expressed as a percentage.
[0156]
Screen display flood control support information for displaying the degree of danger on the screen is output from the output unit 35. The operator determines whether or not to go to the site based on the risk level of each monitoring point displayed on the display device based on the flood control support information.
[0157]
FIG. 13 is a flowchart showing an example of processing executed by the flood control support apparatus 102 according to the present embodiment.
[0158]
In step T <b> 1, the teacher data acquisition unit 31 refers to the past information recording unit 36, acquires teacher data, and provides it to the data mining unit 30.
[0159]
In step T2, the data mining unit 30 learns the neural network 30a based on the teacher data.
[0160]
In step T3a, the meteorological information acquisition unit 32 acquires meteorological information from the Japan Meteorological Agency, and digitizes the acquired meteorological information.
[0161]
In step T3b, the auxiliary information acquisition unit 33 acquires auxiliary information from at least one of the rain gauge and the water level gauge.
[0162]
In step T3c, the auxiliary information processing unit 34 converts auxiliary information into support information.
[0163]
The execution order of step T3a and steps T3b and T3c can be freely set. That is, step T3a may be executed before steps T3b and T3c, may be executed after step T3b, and may be executed during the execution of steps T3b and T3c.
[0164]
In step T4, the data mining unit 30 inputs input information including the digitized weather information and support information to the neural network 30a.
[0165]
In step T <b> 5, the data mining unit 30 acquires output information corresponding to the input information and provides it to the output unit 35.
[0166]
In step T6, the output unit 35 performs control for outputting the output information to the display device.
[0167]
In the present embodiment, flood control support information based on past experiences can be provided based on information such as rainfall information and water level information in the flood control target area. The operator can perform highly accurate and quick personnel deployment activities with reference to flood control support information. In addition, the number of misses in flood control activities can be greatly reduced, for example, on-site patrols when no danger has occurred.
[0168]
In the present embodiment, for example, the past rainfall information of the flood control target area, the past water level information in the sewer main line, and the past flood control activity content (data) are used as input information of teacher data, and the past of each monitoring point is recorded. May be used as output information of teacher data. In this case, current output information can be obtained by using the neural network 30a with the current rainfall information, current water level information in the sewer main line, and current flood control content as input information.
[0169]
The functions realized by the flood control support apparatuses 101 and 102 according to each of the above embodiments may be realized by a program.
[0170]
As shown in FIG. 14, when the functions of the flood control support apparatuses 101 and 102 are realized by the program 37, the program 37 is recorded on the recording medium 38 and read by the computer 39. A control unit such as a CPU provided in the computer 39 operates according to the contents of the program 37.
[0171]
Moreover, in the flood control support apparatuses 101 and 102 according to each of the above embodiments, each component may be changed in arrangement as long as a similar operation can be realized, or each component may be freely combined. Each component may be freely divided, and some components may be deleted. In other words, each of the above embodiments is not limited to the above-described configuration as it is, and can be embodied by modifying the components without departing from the scope of the invention in the implementation stage.
[0172]
【The invention's effect】
As described above, according to the present invention, when a flood control activity is not necessary, the flood control activity can be greatly reduced, and an efficient flood control activity can be realized.
[Brief description of the drawings]
FIG. 1 is a block diagram showing an example of a flood control support apparatus according to a first embodiment of the present invention.
FIG. 2 is a diagram showing an installation state of a rain gauge and a rain gauge in a flood control target area.
FIG. 3 is a diagram illustrating an example of setting information including a threshold value set in an information setting unit.
FIG. 4 is a diagram illustrating an example of a relationship between past statistical data and a threshold value.
FIG. 5 is a flowchart showing an example of processing of a support processing unit of the flood control support apparatus according to the embodiment.
FIG. 6 is a diagram showing a first example of flood control support information for screen display.
FIG. 7 is a diagram showing a second example of flood control support information for screen display.
FIG. 8 is a diagram illustrating an example of a result of flood control support depending on whether a heavy rain warning is issued without using support information.
FIG. 9 is a diagram showing an example of flood control support results using support information.
FIG. 10 is a diagram showing an example of a flood control support result when a threshold value is determined using an evaluation function.
FIG. 11 is a block diagram showing an example of the configuration of a flood control support apparatus according to a second embodiment of the present invention.
FIG. 12 is a block diagram showing a specific example of a data mining unit of the flood control support apparatus according to the embodiment;
FIG. 13 is a flowchart showing an example of processing executed by the flood control support apparatus according to the embodiment;
FIG. 14 is a block diagram showing an example of a configuration when the operation of the flood control support apparatus is realized by a computer.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 101,102 ... Flood control assistance apparatus, 1,32 ... Weather information acquisition part, 2,33 ... Auxiliary information acquisition part, 3,34 ... Auxiliary information processing part, 4 ... Information setting part, 5 ... Support processing part, 51 ... Weather Judgment part 52 ... Necessity judgment part 53 ... Creation part 54, 35 ... Output part 6 ... Display device 7a, 7b ... Input device 14 ... Rain gauge 15 ... Water level meter 30 ... Data mining part 31 ... Teacher data acquisition unit, 30a ... Neural network

Claims (18)

気象情報を取得する手段と、
水防支援に必要な支援情報を取得する手段と、
前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理手段と
を具備し、
前記支援処理手段は、
前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する手段と、
水防活動が必要と判断された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する手段と
を具備する
ことを特徴とする水防支援装置。
Means for obtaining weather information;
A means of obtaining support information necessary for flood control support;
Support processing means for determining the necessity of flood control activity based on the weather information and the support information, and creating flood control support information including personnel deployment information necessary for the flood control activity when it is determined that the flood control activity is necessary provided with a door,
The support processing means includes:
Means for comparing the support information with a preset threshold value to determine the necessity of flood control activities;
Means for creating flood control support information for screen display based on a message preset for the threshold and the number of deployed flood control activities when it is determined that flood control activity is necessary;
A flood control support apparatus comprising:
気象情報を取得する手段と、
水害に関連する補助情報を取得する手段と、
前記補助情報に基づいて水防支援に必要な支援情報を取得する補助情報処理手段と、
前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理手段と
を具備し、
前記支援処理手段は、
前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する手段と、
水防活動が必要と判断された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する手段と
を具備する
ことを特徴とする水防支援装置。
Means for obtaining weather information;
Means to obtain auxiliary information related to flood damage;
Auxiliary information processing means for acquiring support information necessary for flood control support based on the auxiliary information;
Support processing means for determining the necessity of flood control activity based on the weather information and the support information, and creating flood control support information including personnel deployment information necessary for the flood control activity when it is determined that the flood control activity is necessary provided with a door,
The support processing means includes:
Means for comparing the support information with a preset threshold value to determine the necessity of flood control activities;
Means for creating flood control support information for screen display based on a message preset for the threshold and the number of deployed flood control activities when it is determined that flood control activity is necessary;
A flood control support apparatus comprising:
気象情報を取得する手段と、
水防支援に必要な支援情報を取得する手段と、
前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理手段と
を具備し、
前記支援処理手段は、
前記気象情報が水防対象気象情報か判断する手段と、
前記気象情報が水防対象気象情報と判断された場合、前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する手段と、
水防活動が必要と判定された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する手段と、
前記画面表示用の水防支援情報を出力する手段と
を具備する
ことを特徴とする水防支援装置。
Means for obtaining weather information;
A means of obtaining support information necessary for flood control support;
Support processing means for determining the necessity of flood control activity based on the weather information and the support information, and creating flood control support information including personnel deployment information necessary for the flood control activity when it is determined that the flood control activity is necessary When
Comprising
The support processing means includes:
Means for determining whether the weather information is flood control target weather information;
When the weather information is determined to be flood control target weather information, the support information is compared with a preset threshold value, and means for determining the necessity of flood control activities;
If it is determined that flood control activity is necessary, a means for creating flood support information for screen display based on a message preset for the threshold and the number of flood control deployments;
Means for outputting flood support information for the screen display;
Waterproof support apparatus according to claim <br/> be provided with a.
気象情報を取得する手段と、
水害に関連する補助情報を取得する手段と、
前記補助情報に基づいて水防支援に必要な支援情報を取得する補助情報処理手段と、
前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理手段と
を具備し、
前記支援処理手段は、
前記気象情報が水防対象気象情報か判断する手段と、
前記気象情報が水防対象気象情報と判断された場合、前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する手段と、
水防活動が必要と判定された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する手段と、
前記画面表示用の水防支援情報を出力する手段と
を具備する
ことを特徴とする水防支援装置。
Means for obtaining weather information;
Means to obtain auxiliary information related to flood damage;
Auxiliary information processing means for acquiring support information necessary for flood control support based on the auxiliary information;
Support processing means for determining the necessity of flood control activity based on the weather information and the support information, and creating flood control support information including personnel deployment information necessary for the flood control activity when it is determined that the flood control activity is necessary When
Comprising
The support processing means includes:
Means for determining whether the weather information is flood control target weather information;
When the weather information is determined to be flood control target weather information, the support information is compared with a preset threshold value, and means for determining the necessity of flood control activities;
If it is determined that flood control activity is necessary, a means for creating flood support information for screen display based on a message preset for the threshold and the number of flood control deployments;
Means for outputting flood support information for the screen display;
Waterproof support apparatus according to claim <br/> be provided with a.
請求項1乃至請求項4のいずれか1項に記載の水防支援装置において、
前記しきい値は、水防対象地域に設置されている雨量計によって計測された降雨量を示す降雨量情報と前記水防対象地域に設置されている水位計によって計測された水位を示す水位情報とのうち少なくとも一つに基づいて決定された値であることを特徴とする水防支援装置。
In the flood control support device according to any one of claims 1 to 4,
The threshold value is a rainfall amount information indicating a rainfall amount measured by a rain gauge installed in a flood control target area and a water level information indicating a water level measured by a water level gauge installed in the flood control target area. A flood control support device characterized in that the value is determined based on at least one of them .
請求項5記載の水防支援装置において、
前記しきい値は、水防対象地域に設置されている雨量計によって過去の水害発生時に計測された降雨量を示す降雨量情報と前記水防対象地域に設置されている水位計によって過去の水害発生時に計測された水位を示す水位情報とのうち少なくとも一つに基づいて決定された値であることを特徴とする水防支援装置。
The flood control support device according to claim 5,
The threshold value includes rainfall information indicating rainfall measured at the time of past flood damage by a rain gauge installed in the flood control target area, and a past flood damage by a water level gauge installed in the flood control target area. A flood control support apparatus, which is a value determined based on at least one of water level information indicating the measured water level .
請求項1乃至請求項4のいずれか1項に記載の水防支援装置において、
前記しきい値は、水防対象地域に設置されている雨量計によって計測された降雨量情報から求めた積算降雨量情報と最大降雨量情報とのうち少なくとも一方に基づいて決定された値であることを特徴とする水防支援装置。
In the flood control support device according to any one of claims 1 to 4,
The threshold is a value determined based on at least one of accumulated rainfall information and maximum rainfall information obtained from rainfall information measured by a rain gauge installed in a flood control target area. A flood control support device characterized by
請求項1乃至請求項4のいずれか1項に記載の水防支援装置において、
前記しきい値は、水防対象地域に設置されている水位計によって計測された水位を示す水位情報の統計データに基づいて決定された値であることを特徴とする水防支援装置。
In the flood control support device according to any one of claims 1 to 4,
The threshold value is a value determined based on statistical data of water level information indicating a water level measured by a water level meter installed in a flood control target area .
請求項1乃至請求項4のいずれか1項に記載の水防支援装置において、
前記しきい値は、目的の達成度合いを算出する評価関数を用いて決定した値であることを特徴とする水防支援装置。
In the flood control support device according to any one of claims 1 to 4,
The flood control support apparatus according to claim 1, wherein the threshold value is a value determined by using an evaluation function for calculating a degree of achievement of the objective .
請求項9記載の水防支援装置において、
前記評価関数は、水防活動における人員の現場出動コスト、現場での作業コスト及び水害発生後の水害作業コストとに基づいて水防活動コストを算出する関数であることを特徴とする水防支援装置。
The flood control support device according to claim 9,
The flood protection support apparatus according to claim 1, wherein the evaluation function is a function for calculating a flood protection activity cost based on a field dispatch cost of personnel in flood control activities, an operation cost at the site, and a flood damage operation cost after the occurrence of flood damage .
コンピュータに、
気象情報を取得する機能、
情報記録部に記憶されている水防支援に必要な支援情報を取得する機能、
前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理機能
を実現させ、
前記支援処理機能は、
前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する機能と、
水防活動が必要と判断された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する機能と
を具備する
ことを特徴とするプログラム
On the computer,
The ability to get weather information,
A function to obtain support information necessary for flood control support stored in the information recording unit,
A support processing function that determines the necessity of flood control activities based on the weather information and the support information, and creates flood control support information including personnel deployment information necessary for flood control activities when it is determined that flood control activities are necessary
Realized
The support processing function is:
A function of comparing the support information with a preset threshold value to determine the necessity of flood control activities;
A function of creating flood control support information for screen display based on a message preset with respect to the threshold and the number of deployed flood control activities when it is determined that flood control activities are necessary;
With
A program characterized by that .
コンピュータに、
気象情報を取得する機能、
水害に関連する補助情報を取得する機能、
前記補助情報に基づいて情報記録部に記憶されている水防支援に必要な支援情報を取得する機能、
前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理機能
を実現させ、
前記支援処理機能は、
前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する機能と、
水防活動が必要と判断された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する機能と
を具備する
ことを特徴とするプログラム
On the computer,
The ability to get weather information,
Ability to obtain auxiliary information related to flood damage,
A function of acquiring support information necessary for flood control support stored in the information recording unit based on the auxiliary information;
A support processing function that determines the necessity of flood control activities based on the weather information and the support information, and creates flood control support information including personnel deployment information necessary for flood control activities when it is determined that flood control activities are necessary
Realized
The support processing function is:
A function of comparing the support information with a preset threshold value to determine the necessity of flood control activities;
A function of creating flood control support information for screen display based on a message preset with respect to the threshold and the number of deployed flood control activities when it is determined that flood control activities are necessary;
With
A program characterized by that .
コンピュータに、
気象情報を取得する機能、
情報記録部に記憶されている水防支援に必要な支援情報を取得する機能、
前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理機能
を実現させ、
前記支援処理機能は、
前記気象情報が水防対象気象情報か判断する機能と、
前記気象情報が水防対象気象情報と判断された場合、前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する機能と、
水防活動が必要と判定された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する機能と、
前記画面表示用の水防支援情報を出力する機能と
を具備する
ことを特徴とするプログラム
On the computer,
The ability to get weather information,
A function to obtain support information necessary for flood control support stored in the information recording unit,
A support processing function that determines the necessity of flood control activities based on the weather information and the support information, and creates flood control support information including personnel deployment information necessary for flood control activities when it is determined that flood control activities are necessary
Realized
The support processing function is:
A function of determining whether the weather information is weather information subject to flood control;
When the weather information is determined to be flood control target weather information, the support information is compared with a preset threshold value to determine the necessity of flood control activities;
When it is determined that flood control activity is necessary, a function for creating flood support information for screen display based on a message preset for the threshold and the number of flood control activities deployed; and
A function of outputting flood support information for the screen display;
With
A program characterized by that .
コンピュータに、
気象情報を取得する機能、
水害に関連する補助情報を取得する機能、
前記補助情報に基づいて情報記録部に記憶されている水防支援に必要な支援情報を取得する機能、
前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成する支援処理機能
を実現させ、
前記支援処理機能は、
前記気象情報が水防対象気象情報か判断する機能と、
前記気象情報が水防対象気象情報と判断された場合、前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断する機能と、
水防活動が必要と判定された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成する機能と、
前記画面表示用の水防支援情報を出力する機能と
を具備する
ことを特徴とするプログラム
On the computer,
The ability to get weather information,
Ability to obtain auxiliary information related to flood damage,
A function of acquiring support information necessary for flood control support stored in the information recording unit based on the auxiliary information;
A support processing function that determines the necessity of flood control activities based on the weather information and the support information, and creates flood control support information including personnel deployment information necessary for flood control activities when it is determined that flood control activities are necessary
Realized
The support processing function is:
A function of determining whether the weather information is weather information subject to flood control;
When the weather information is determined to be flood control target weather information, the support information is compared with a preset threshold value to determine the necessity of flood control activities;
When it is determined that flood control activity is necessary, a function for creating flood support information for screen display based on a message preset for the threshold and the number of flood control activities deployed; and
A function of outputting flood support information for the screen display;
With
A program characterized by that .
コンピュータにより水防活動を支援する水防支援方法において、In the flood control support method that supports flood control activities by computer,
前記コンピュータは、気象情報を取得し、  The computer obtains weather information;
前記コンピュータは、情報記録部に記憶されている水防支援に必要な支援情報を取得し、  The computer acquires support information necessary for flood control support stored in the information recording unit,
前記コンピュータは、前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成し、  The computer determines the necessity of flood control activities based on the weather information and the support information, and creates flood control support information including personnel deployment information necessary for flood control activities when it is determined that flood control activities are necessary And
前記コンピュータによる前記水防支援情報の作成は、  Creation of the flood control support information by the computer,
前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断することと、  Comparing the support information with a preset threshold value to determine the necessity of flood control activities;
水防活動が必要と判断された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成することと  If it is determined that flood control activities are necessary, creating flood control support information for screen display based on a message preset for the threshold and the number of flood control activities deployed;
を含むincluding
ことを特徴とする水防支援方法。A flood control support method characterized by that.
コンピュータにより水防活動を支援する水防支援方法において、
前記コンピュータは、気象情報を取得し、
前記コンピュータは、水害に関連する補助情報を取得し、
前記コンピュータは、前記補助情報に基づいて情報記録部に記憶されている水防支援に必要な支援情報を取得し、
前記コンピュータは、前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成し、
前記コンピュータによる前記水防支援情報の作成は、
前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断することと、
水防活動が必要と判断された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成することと
を含む
ことを特徴とする水防支援方法
In the flood control support method that supports flood control activities by computer,
The computer obtains weather information;
The computer obtains auxiliary information related to flood damage,
The computer acquires support information necessary for flood control support stored in the information recording unit based on the auxiliary information,
The computer determines the necessity of flood control activities based on the weather information and the support information, and creates flood control support information including personnel deployment information necessary for flood control activities when it is determined that flood control activities are necessary And
Creation of the flood control support information by the computer,
Comparing the support information with a preset threshold value to determine the necessity of flood control activities;
If it is determined that flood control activities are necessary, creating flood control support information for screen display based on a message preset for the threshold and the number of flood control activities deployed;
including
A flood control support method characterized by that .
コンピュータにより水防活動を支援する水防支援方法において、
前記コンピュータは、気象情報を取得し、
前記コンピュータは、情報記録部に記憶されている水防支援に必要な支援情報を取得し、
前記コンピュータは、前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成し、
前記コンピュータによる前記水防支援情報の作成は、
前記気象情報が水防対象気象情報か判断することと、
前記気象情報が水防対象気象情報と判断された場合、前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断することと、
水防活動が必要と判定された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成することと、
前記画面表示用の水防支援情報を出力することと
を含む
ことを特徴とする水防支援方法
In the flood control support method that supports flood control activities by computer,
The computer obtains weather information;
The computer acquires support information necessary for flood control support stored in the information recording unit,
The computer determines the necessity of flood control activities based on the weather information and the support information, and creates flood control support information including personnel deployment information necessary for flood control activities when it is determined that flood control activities are necessary And
Creation of the flood control support information by the computer,
Determining whether the weather information is weather-proof weather information;
When the weather information is determined to be flood control target weather information, comparing the support information with a preset threshold value to determine the necessity of flood control activities;
When it is determined that flood control activity is necessary, based on the message preset for the threshold and the number of flood control deployment personnel, creating flood support information for screen display;
Outputting flood support information for the screen display;
including
A flood control support method characterized by that .
コンピュータにより水防活動を支援する水防支援方法において、In the flood control support method that supports flood control activities by computer,
前記コンピュータは、気象情報を取得し、  The computer obtains weather information;
前記コンピュータは、水害に関連する補助情報を取得し、  The computer obtains auxiliary information related to flood damage,
前記コンピュータは、前記補助情報に基づいて情報記録部に記憶されている水防支援に  The computer supports flood control stored in the information recording unit based on the auxiliary information. 必要な支援情報を取得し、Obtain the necessary support information,
前記コンピュータは、前記気象情報と前記支援情報とに基づいて水防活動の必要性を判断し、水防活動が必要と判断された場合に、水防活動に必要な人員配備情報を含む水防支援情報を作成し、  The computer determines the necessity of flood control activities based on the weather information and the support information, and creates flood control support information including personnel deployment information necessary for flood control activities when it is determined that flood control activities are necessary And
前記コンピュータによる前記水防支援情報の作成は、  Creation of the flood control support information by the computer,
前記気象情報が水防対象気象情報か判断することと、  Determining whether the weather information is weather-proof weather information;
前記気象情報が水防対象気象情報と判断された場合、前記支援情報と予め設定されているしきい値とを比較し、水防活動の必要性を判断することと、  When the weather information is determined to be flood control target weather information, comparing the support information with a preset threshold value to determine the necessity of flood control activities;
水防活動が必要と判定された場合、前記しきい値に対して予め設定されているメッセージと水防活動配備人数とに基づいて、画面表示用の水防支援情報を作成することと、  When it is determined that flood control activity is necessary, based on the message preset for the threshold and the number of flood control deployment personnel, creating flood support information for screen display;
前記画面表示用の水防支援情報を出力することと  Outputting flood support information for the screen display;
を含むincluding
ことを特徴とする水防支援方法。A flood control support method characterized by that.
JP2003209699A 2002-09-17 2003-08-29 Flood control support device, program, and flood control support method Expired - Fee Related JP4261278B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2003209699A JP4261278B2 (en) 2002-09-17 2003-08-29 Flood control support device, program, and flood control support method
CNA031470599A CN1495648A (en) 2002-09-17 2003-09-09 Flood-preventing support device and program and flood-preventing support method
MYPI20033516A MY140284A (en) 2002-09-17 2003-09-16 Flood control support device, program, and flood control support method
TW092125650A TWI242145B (en) 2002-09-17 2003-09-17 Flood control supporting device and program, and flood control supporting method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2002270459 2002-09-17
JP2003209699A JP4261278B2 (en) 2002-09-17 2003-08-29 Flood control support device, program, and flood control support method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2009000252A Division JP2009080852A (en) 2002-09-17 2009-01-05 Flood control supporting device and program, and flood control supporting method

Publications (2)

Publication Number Publication Date
JP2004164591A JP2004164591A (en) 2004-06-10
JP4261278B2 true JP4261278B2 (en) 2009-04-30

Family

ID=32827591

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003209699A Expired - Fee Related JP4261278B2 (en) 2002-09-17 2003-08-29 Flood control support device, program, and flood control support method

Country Status (4)

Country Link
JP (1) JP4261278B2 (en)
CN (1) CN1495648A (en)
MY (1) MY140284A (en)
TW (1) TWI242145B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11295214B2 (en) 2018-02-16 2022-04-05 Lucas Pescarmona Analysis system and hydrology management for basin rivers

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4733925B2 (en) * 2004-02-17 2011-07-27 東日本旅客鉄道株式会社 Operation regulation judgment method
JP4799300B2 (en) * 2006-07-07 2011-10-26 株式会社東芝 Monitoring system
US9262124B2 (en) 2011-11-21 2016-02-16 International Business Machines Corporation Natural disaster forecasting
CN102520464B (en) * 2011-12-08 2013-06-12 南京成风大气信息技术有限公司 Regional waterlogging forecasting system and forecasting method thereof
JP5693491B2 (en) * 2012-02-24 2015-04-01 三菱電機株式会社 Reservoir dynamic monitoring system
US20140156232A1 (en) 2012-11-30 2014-06-05 International Business Machines Corporation Methods, systems and computer program storage devices for generating a flooding forecast
JP6786165B2 (en) * 2017-01-13 2020-11-18 日本アンテナ株式会社 Flood prediction system
AU2017436901B2 (en) * 2017-10-25 2021-04-08 Hitachi, Ltd. Methods and apparatus for automated surveillance systems
CN110956783B (en) * 2019-12-04 2021-11-16 江河瑞通(北京)技术有限公司 Urban waterlogging monitoring method and electronic equipment
JP7310638B2 (en) * 2020-02-18 2023-07-19 コベルコ建機株式会社 Disaster countermeasure support server, disaster countermeasure support system and disaster countermeasure support method
CN111598344A (en) * 2020-05-19 2020-08-28 浙江职信通信科技有限公司 Flood prevention resource allocation method and system based on WEB GIS
CN112733798A (en) * 2021-01-22 2021-04-30 上海高诚智能科技有限公司 Flood control emergency management system and method for dike facilities

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11295214B2 (en) 2018-02-16 2022-04-05 Lucas Pescarmona Analysis system and hydrology management for basin rivers
US11348014B2 (en) 2018-02-16 2022-05-31 Lucas Pescarmona System method and apparatus for AI-based adaptive control of hydrology management for basin rivers

Also Published As

Publication number Publication date
TWI242145B (en) 2005-10-21
JP2004164591A (en) 2004-06-10
TW200407731A (en) 2004-05-16
MY140284A (en) 2009-12-31
CN1495648A (en) 2004-05-12

Similar Documents

Publication Publication Date Title
JP4261278B2 (en) Flood control support device, program, and flood control support method
Burby et al. Creating hazard resilient communities through land-use planning
US12008483B2 (en) System to monitor and process water-related data
JP2003168179A (en) Real time hazard map system
JP2007263888A (en) Building diagnosis system
JP2010271877A (en) Disaster occurrence probability evaluation system and program thereof
JP4799300B2 (en) Monitoring system
Sangiorgio et al. User-reporting based decision support system for reinforced concrete building monitoring
JP2020066909A (en) Cut slope collapse prediction device, cut slope collapse prediction method, and cut slope collapse prediction program
JP2009080852A (en) Flood control supporting device and program, and flood control supporting method
KR102143039B1 (en) Remote monitoring and control apparatus for the type of multi-path
JP2006221402A (en) Underground water management system in underground water development institution
CN114396912B (en) Method and system for observing uneven settlement of two sides of high-altitude corridor of super-large super-high-rise building
KR101880571B1 (en) Flooded manhole theft anti apparatus and method
CN114048693A (en) Method and device for early warning of gale disaster
CN112348419B (en) Internet of things processing system and method
JP6976481B2 (en) Work support device, work support system, work support method
Viseu et al. Dam-break risk management and hazard mitigation
KR20220109929A (en) Smart radioactive prevention system
KR102517917B1 (en) Deep learning-based water management decision support information provision system and method
JP2001355218A (en) General water prevention support device
JP2012160029A (en) Warning system
JP4585462B2 (en) Weather information providing apparatus and program thereof
Sung et al. FloodViz: A Visual-Based Decision Support System for Flood Hazard Warning
JP2020201704A (en) Disaster prevention support apparatus, disaster prevention support system, disaster prevention support method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060724

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081023

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081104

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090105

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090203

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090205

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120220

Year of fee payment: 3

R151 Written notification of patent or utility model registration

Ref document number: 4261278

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120220

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120220

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130220

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140220

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees