JP4184538B2 - Column base semi-fixed joint structure, building and building design method - Google Patents

Column base semi-fixed joint structure, building and building design method Download PDF

Info

Publication number
JP4184538B2
JP4184538B2 JP15548299A JP15548299A JP4184538B2 JP 4184538 B2 JP4184538 B2 JP 4184538B2 JP 15548299 A JP15548299 A JP 15548299A JP 15548299 A JP15548299 A JP 15548299A JP 4184538 B2 JP4184538 B2 JP 4184538B2
Authority
JP
Japan
Prior art keywords
column
concrete
joint structure
building
fixed joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP15548299A
Other languages
Japanese (ja)
Other versions
JP2000336770A (en
Inventor
英樹 木戸
政悟 櫻井
靖和 大西
勝己 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP15548299A priority Critical patent/JP4184538B2/en
Publication of JP2000336770A publication Critical patent/JP2000336770A/en
Application granted granted Critical
Publication of JP4184538B2 publication Critical patent/JP4184538B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、高層ビルなどの複数階および1階の建物の各階部分における梁を挟んで接合する上柱と下柱との柱脚半固定接合構造に関する。
【0002】
【従来の技術】
従来、鉄筋コンクリート造(RC構造)の柱は、上階からの鉛直軸力を常時支持し、地震などにより発生する水平力(慣性力)による曲げ応力および剪断力に耐えるため、上下階の梁に固定されている。
【0003】
上記応力を伝達させるために、コンクリート柱内を通る柱主筋は、直上階部で直下階から伸ばしてきた柱主筋と、さらにその上の階に伸ばす柱主筋とを、重ね継手、または圧接(溶接)継手で接合して、コンクリート柱内を最下階から最上階まで通して配筋されている。
【0004】
【発明が解決しようとする課題】
上記構成では、各階で、下階から伸ばした柱主筋と、直上階に伸ばす柱主筋とを、重ね継手あるいは圧接継手で接合しなければならず、接合位置がずれないように、下階からの柱主筋を所定位置に正確に伸ばしておく必要がある。
【0005】
そのため、下階側の柱にコンクリート打設して形成する際には、柱を通す柱主筋の通し方向が逸れないように、柱主筋の位置確保の養生が必要となる。
【0006】
そのために、柱にコンクリートを打設するに際しては、コンクリートの充填均しを慎重に行わなければならない。かかる作業は難しく、慎重を要するため、どうしても手間がかかり、継手作業の施工コストが高くなっている。
【0007】
さらに、かかる継手作業を含めて、柱主筋と帯筋との鉄筋工事作業を終了させないと、次の工程には進めず、継手作業工程を早く行う技術の開発が現場からは強く求められていた。
【0008】
また、上記従来構成の梁と柱とを剛接合したラーメン構造では、地震に対して十分に対応出来ない場合もあり、本発明者は、特段の免震装置を介在させることなく、柱の接合構造に幾分かの柔構造を加味して、従来より高い耐震力を得ることができないかと考えた。
【0009】
本発明の目的は、柱の接合構造において、柱主筋の継手を不要とすることにある。
【0010】
本発明の他の目的は、従来の柱の接合構造よりも、柱脚部での剛性を低減させて、水平力などに対する変形能力を向上させることにある。
【0011】
【課題を解決するための手段】
本発明は、ラーメン架構を有する建物で、梁を介して、前記梁の上に設ける上柱と、梁の下に設ける下柱とを接合する柱脚半固定接合構造であって、前記梁と前記柱との間には、コンクリート部の周囲を鋼板で囲んでなるコンクリート接合部が介在され、前記コンクリート部を通して前記柱に鉄筋が配筋されていることを特徴とする。
【0012】
前記鉄筋は、複数階の梁を通して設けられていることを特徴とする。前記コンクリート接合部のコンクリート部は、延長されて、前記上柱、前記下柱の少なくともいずれかに貫入させられていることを特徴とする。
【0013】
上記いずれかの柱脚半固定接合構造において、前記鋼板はリングに形成されていることを特徴とする。
【0014】
前記リングの径(φ)は、前記上柱が四角柱である場合には、前記上柱の最大の辺の長さ(D)との間に、φ=(0.6〜0.8)Dなる関係があることを特徴とする。
【0015】
前記コンクリート接合部の高さ(h)は、前記リングの径(φ)と、φ/7≦h ≦ φ/5の関係があることを特徴とする。前記鋼板の厚さ(t)は、前記リングの径(φ)に対して、t≧φ/60なる関係があることを特徴とする。
【0016】
本発明は、建物の各階における梁と、前記梁の上に設ける上柱と、前記梁の下に設ける下柱との接合に、上記いずれかの柱脚半固定接合構造が使用されていることを特徴とする。
【0017】
本発明では、上記のように、梁と上柱とは、コンクリート部の周囲を鋼板で囲まれたコンクリート接合部で接合されているため、梁に上柱を固定する剛接合の従来構造と比べて、柱脚部の剛性を低減して、その分変形性能を大きくすることができる。剛性の大きな従来構成の柱の接合構造に比べて、耐震力の向上が図れる。
【0018】
複数階建物の一階部分、あるいは一階建て建物では、地上階部分で、基礎梁と柱との間にコンクリート接合部を介在させて、上記と同様に、柱脚の半固定接合を行えばよい。
【0019】
コンクリート接合部のコンクリート部は、梁と上柱との間だけではなく、上柱側に貫入する構造としてもよい。あるいは、梁側に貫入するようにしてもよい。あるいは、上柱と梁の双方に貫入するように構成してもよい。さらには、上柱、梁および下柱のそれぞれに貫入するようにしてもよい。
【0020】
かかる柱脚半固定接合構造では、コンクリート接合部が高圧縮力(支圧)を受けても、コンクリート部の周囲に設けた鋼板により拘束されるため、圧縮力、剪断力に対して優れた耐力性能を発揮することとなる。
【0021】
本発明の前記構成では、従来構成の柱主筋の重なり継手、あるいは圧接継手を使用せずに、コンクリート接合部を通して、上柱と下柱との双方に亙って鉄筋を配筋することにより、この鉄筋を、軸力が小さい柱に必要な定着筋として機能させている。
【0022】
定着筋には、両端が例えば鉤型などの曲げ部を有した構成の鉄筋、または定着耐力を有した異径直鉄筋を使用すればよい。かかる構成の鉄筋は、コンクリート接合部の略中央を通すようにして配筋しておけばよい。
【0023】
かかる柱の接合構造を採用することにより、柱主筋、帯筋に関わる鉄筋工事作業の手間を省くことができ、鉄筋工事の施工が容易になる。また、かかる手間を省くことにより、その分次工程への取りかかりが早くでき、施工期間の短縮も図れる。
【0024】
上記構成のコンクリート接合部では、例えば、鋼板をリングに形成して、このリング内にコンクリートを充填して施工すればよい。鋼板の厚さtは、リングの径をφとしたとき、t≧φ/60となるように設定すればよい。鋼板の厚さtが、φ/60未満の場合には、幅厚比が大きくなり、座屈が生じて十分な構造耐力が得られない場合がある。但し、十分な構造耐力が得られれば、鋼板の厚さは上記値に限定する必要はない。
【0025】
コンクリート接合部の高さ(リング状鋼板の高さに等しい)hは、鋼板のリング径φと、φ/7≦ h ≦ φ/5の関係となるように設定すればよい。高さhがφ/7より小さい場合には、柱脚部の剛性低下が十分に得られない場合がある。高さhが、φ/5より大きいときは、接合部に剪断ひび割れが生じて十分な構造耐力が得られない場合がある。但し、十分な構造耐力が得られれば、hの大きさは上記値に限定する必要はない。
【0026】
本発明の構成を採用することにより、柱脚の耐力を一定とした架構が設計でき、コンピュータシュミレーションなどでの架構の崩壊メカニズムが明快に解析でき、柱、梁の設計をより合理的に行うことができる。
【0027】
本発明の柱脚半固定接合構造は、例えば、免震建物、高層鉄筋コンクリート造建物在来のマンション建物など、種々の分野の広範囲の建物の現場打ちコンクリート柱、あるいはプレキャストコンクリート柱の接合構造に適用できる。
【0028】
【発明の実施の形態】
以下、本発明の実施の形態を図面に基づいて詳細に説明する。
【0029】
図1は、ラーメン架構を有する建物で本発明の柱脚半固定接合構造を適用した様子を示す断面図である。図2は、図1の丸で囲んだ柱接合部の要部拡大図である。図3は、図2に示す切断線A−A線でコンクリート接合部を切断した様子を示す断面図である。
【0030】
建物の各階には、図1に示すように、大梁1が柱2、3間を通して渡されている。図1で示す大梁1a(1)は、大梁1aの下に下柱として設けた柱2a(2)、3a(3)により支持されている。大梁1aの上には、上柱として柱2b(2)、3b(3)が、下柱としての柱2a、3aとそれぞれ柱の通し方向、すなわち軸方向が一致するように設けられている。
【0031】
大梁1aと柱2b、3bとの間には、コンクリート接合部4が介在させられている。コンクリート接合部4は、図2に示すように、リングに形成した鋼板5の内側にコンクリートが充填されたコンクリート部4aを有する構造に構成されている。図1に示す場合には、鋼板5はリングに形成したが、他の形状に形成しても構わない。
【0032】
本実施の形態では、図3に示すように、鋼板5のリング径をφとして、柱2bを四角柱に形成した場合には、柱2bの一辺の長さDに対して、φは約0.7Dとなるケースを示したが、φを0.6≦φ≦0.8の範囲内に設定すればよい。これは、円形のリングの鋼板5の拘束効果で内部のコンクリート部4aの耐力が2〜3倍になるからである。
【0033】
また、鋼板5の厚さ(t)は、例えば、前記リングの径(φ)に対して、t≧φ/60となるように設定すればよい。また、コンクリート接合部4の高さ(h)は、前記リングの径(φ)に対して、例えば、φ/7≦ h ≦ φ/5となるように設定した。
【0034】
上記構成では、さらに、上柱としての柱2bと、下柱としての柱2aとの間に、コンクリート接合部4を通して、引張用の定着筋として鉄筋7が配筋されている。鉄筋7は、両端が略鉤型に曲げられた曲げ部7aを有し、両端の曲げ部7aがそれぞれ、図1に示すように、柱2b、2aのコンクリート内に配在させられている。
【0035】
なお、定着筋としての鉄筋7には、定着耐力を有していれば、上記のように両端部に曲げ部7aを設けない異径直鉄筋を使用してもよい。
【0036】
かかる定着筋としての鉄筋7は、図3に示すように、コンクリート接合部4の略中央を通すように複数本配筋されている。図3に示す場合には、かかる鉄筋7の周囲には帯筋7bが設けられているが、かかる帯筋7bはなくても構わない。
【0037】
かかる構成のコンクリート接合部4を介して、大梁1aに対して上柱の柱2bが設けられている。柱3bも同様に、コンクリート接合部4を介して大梁1aの上に上柱として設けられている。柱3a、3bにも、上記構成と同様の鉄筋7が定着筋として配筋されている。
【0038】
柱2b、3bの柱頭部には、大梁1b(1)が渡されている。大梁1bの上には、柱2b、3bを下柱とみなして、これらと柱の通し方向を一致させるように、上柱の柱2c(2)、3c(3)が、コンクリート接合部4を介して設けられている。鉄筋7も定着筋として上記と同様に上柱と下柱とに配筋されている。
【0039】
柱2c、3cの柱頭部には、大梁1c(1)が渡されている。大梁1cの上に、上柱として柱2d(2)、3d(3)が、コンクリート接合部4を介して、設けられている。柱2c、3cをそれぞれ下柱とみなして、柱2d、3dの双方に鉄筋7が定着筋として配筋されている。
【0040】
上記コンクリート接合部4を使用した柱の接合は、以下のようにして施工すればよい。例えば、下柱として柱2a、3aを現場打設でコンクリート成形する際に、柱2a、3aの柱頭側から、定着筋としての上記構成の鉄筋7を突出させておく。この状態で柱2a、3aをコンクリート成形する。
【0041】
その後、梁形成用の型枠を形成して、柱頭部側に大梁1aをコンクリート成形する。コンクリート成形した大梁1a面には、鉄筋7が突出されていることとなる。この状態で、鉄筋7を囲むように、リング状に形成した鋼板5を大梁1a面上に配置し、さらに柱成形用の型枠を形成して柱3aにコンクリートを打設して、併せてリング状の鋼板5の内側にコンクリートを充填する。
【0042】
あるいは、柱にプレキャストコンクリートを使用する場合には、予め穴抜きをしておき、この穴抜きにコンクリートを打設することにより、コンクリート接合部4のコンクリート部4aにコンクリートを充填すればよい。かかる施工方法をとれば、図4に示すように、コンクリート接合部4のコンクリート部4aが、上柱側に貫入した構造とすることができる。
【0043】
また、上記柱脚半固定接合構造を採用することにより、図5に示すように、構造設計時の柱耐力の算出が簡単に行える。従来とは異なり、図5に示す場合には、柱脚曲げ応力(耐力)と梁の曲げ応力(耐力)とが一定ヒンジ状態となって終局メカニズムが構成され、柱の反曲点高さが定まり、柱頭の曲げ応力(耐力)が決定できる。
【0044】
しかし、従来の構成では、地震外力により各階の柱の反曲点高さが変化するため、柱頭、柱脚の両方に生ずる最大の曲げ耐力で設計するしかなかった。
【0045】
本発明は上記の実施の形態に限定されるものではなく、その要旨を逸脱しない範囲で、種々変更してもよい。
【0046】
例えば、上記説明では、ラーメン架構を有する建物の中間階における上柱と下柱との接合状況について説明したが、例えば、複数階の建物の地上1階部分、あるいは一階建ての建物の地上階部分で、基礎梁に柱を接合する際に、柱と基礎梁との間に前記構成のコンクリート接合部を介在させる構成としてもよい。鉄筋は、柱と基礎梁とに亙って、コンクリート接合部を通して配筋させておけばよい。
【0047】
例えば、上記説明では、鋼板のリングの径φを断面形状が正方形の四角柱の一辺の長さDの0.6〜0.8倍と設定したが、柱の断面形状が正方形以外の四角形である場合には、断面形状よりコンクリート接合部の断面積が小面積となるように設定すればよい。また、柱形状は、上記角柱以外にも、円柱に形成しても構わない。鋼板5の形状は、リングではなく、正方形などの多角形でもよい。
【0048】
上記説明では、コンクリート接合部のコンクリート部を上柱側に延長して貫入させた場合について説明したが、梁側に貫入させる構造にしても構わない。あるいは、下柱側に延長して、すなわち下柱の柱頭側に貫入させる構造にしても構わない。あるいは、下柱、上柱の両方に、梁部分を通して貫入させるようにしてもよい。
【0049】
また、前記説明では、定着筋として使用する鉄筋は、各階毎に、梁の上下に設けた上柱、下柱の双方に配筋する構成を示したが、一本の鉄筋を長く構成して、複数階の梁を通して、上柱、下柱に配筋させるようにしてもよい。
【0050】
【発明の効果】
本発明によれば、建物を構成するラーメン構造の柱の柱脚が半固定ヒンジとなるので、外力に影響されないで、各階毎の耐力が簡便に算出でき、構造設計の簡略化が図れる。
【0051】
柱主筋の重ね継手などの接合が不要となるので、その分鉄筋作業の手間が省けて施工が容易になる。鉄筋工事費用の削減にも繋がる。
【0052】
柱、梁の一体鉄筋先組、柱プレキャストコンクリート部材の接合継手が不要となるので、工期の短縮も図れる。工費の低減も図れる。
【図面の簡単な説明】
【図1】本発明の柱脚半固定接合構造をラーメン架構を有する建物に適用した一例を示す断面図である。
【図2】柱の接合構造の一例を示す断面図である。
【図3】図2の切断線A−Aでコンクリート接合部を切断した様子を示す断面図である。
【図4】柱の接合構造の他の例を示す断面図である。
【図5】柱、梁の曲げ応力の算出方法を示す説明図である。
【符号の説明】
1 大梁
1a、1b、1c、大梁
2a、2b、2c、2d 柱
3a、3b、3c、3d 柱
4 コンクリート接合部
4a コンクリート部
5 鋼板
6 コンクリート
7 鉄筋
7a 曲げ部
7b 帯筋
φ 径
t 厚さ
h 高さ
D 長さ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a column base semi-fixed joint structure of an upper column and a lower column that are joined with a beam in each floor portion of a multi-storey and a first-floor building such as a high-rise building.
[0002]
[Prior art]
Conventionally, reinforced concrete columns (RC structure) always support the vertical axial force from the upper floor and withstand the bending stress and shearing force caused by the horizontal force (inertial force) generated by earthquakes, etc. It is fixed.
[0003]
In order to transmit the above stress, the column reinforcement passing through the concrete column is the lap joint or pressure welding (welding) with the column reinforcement extending from the immediately lower floor in the upper floor and the column reinforcement extending further up the floor. ) Joined with joints, the bars are arranged through the concrete columns from the lowest floor to the top floor.
[0004]
[Problems to be solved by the invention]
In the above configuration, on each floor, the column main reinforcement extending from the lower floor and the column main reinforcement extending to the immediately upper floor must be joined by a lap joint or a pressure joint, so that the joining position does not deviate. It is necessary to accurately extend the column main reinforcement to a predetermined position.
[0005]
For this reason, when the concrete is cast on the lower floor side column, it is necessary to cure the position of the column main bars so that the direction of the column main bars passing through the columns does not deviate.
[0006]
Therefore, when placing concrete on the pillar, it is necessary to carefully fill and level the concrete. Since such work is difficult and requires carefulness, it is time consuming and the construction cost of the joint work is high.
[0007]
Furthermore, if the rebar construction work between the column main reinforcement and the strip reinforcement is not completed, including such joint work, the development of technology to quickly advance the joint work process is strongly demanded from the field without proceeding to the next process. .
[0008]
In addition, in the case of the rigid frame structure in which the beam and the column having the above-described conventional structure are rigidly connected, there may be a case where it is not possible to sufficiently cope with an earthquake, and the present inventor cannot connect a column without interposing a special seismic isolation device. We thought that it would be possible to obtain higher earthquake resistance than before by adding some soft structure to the structure.
[0009]
An object of the present invention is to eliminate the need for a column main reinforcement joint in a column connection structure.
[0010]
Another object of the present invention is to reduce the rigidity at the column base portion and improve the deformability against a horizontal force or the like as compared with the conventional column joining structure.
[0011]
[Means for Solving the Problems]
The present invention is a column-base semi-fixed joint structure for joining an upper column provided on the beam and a lower column provided below the beam via a beam in a building having a rigid frame structure, Between the pillars, a concrete joint part is provided in which a concrete part is surrounded by a steel plate, and reinforcing bars are arranged in the pillars through the concrete part.
[0012]
The reinforcing bars are provided through beams on a plurality of floors. The concrete part of the concrete joint is extended and penetrated into at least one of the upper pillar and the lower pillar.
[0013]
In any one of the column base semi-fixed joint structures, the steel plate is formed in a ring.
[0014]
When the upper column is a quadrangular column, the diameter (φ) of the ring is φ = (0.6 to 0.8) between the maximum side length (D) of the upper column. It is characterized by the relationship D.
[0015]
The height (h) of the concrete joint is characterized by having a relationship of φ / 7 ≦ h ≦ φ / 5 with the diameter (φ) of the ring. The thickness (t) of the steel sheet has a relationship of t ≧ φ / 60 with respect to the diameter (φ) of the ring.
[0016]
In the present invention, any of the above-described column base semi-fixed joint structures is used for joining a beam on each floor of a building, an upper column provided on the beam, and a lower column provided below the beam. It is characterized by.
[0017]
In the present invention, as described above, the beam and the upper column are joined by the concrete joint surrounded by the steel plate around the concrete part, so that it is compared with the conventional structure of rigid joint that fixes the upper column to the beam. Thus, the rigidity of the column base can be reduced, and the deformation performance can be increased accordingly. The seismic force can be improved as compared with the column-joint structure of the conventional structure with high rigidity.
[0018]
In the first floor part of a multi-storey building, or in a one-story building, if a concrete joint is interposed between the foundation beam and the column in the ground floor part, the column base is semi-fixed in the same manner as above. Good.
[0019]
The concrete portion of the concrete joint may have a structure that penetrates not only between the beam and the upper column but also on the upper column side. Or you may make it penetrate in the beam side. Or you may comprise so that it may penetrate into both an upper pillar and a beam. Furthermore, you may make it penetrate each of an upper pillar, a beam, and a lower pillar.
[0020]
In such a column base semi-fixed joint structure, even if the concrete joint receives a high compressive force (support pressure), it is restrained by the steel plate provided around the concrete part, so it has excellent resistance to compressive force and shear force. The performance will be demonstrated.
[0021]
In the above-mentioned configuration of the present invention, without using the overlapped joint of the column main bars of the conventional configuration or the pressure-welded joint, the reinforcing bars are arranged over both the upper column and the lower column through the concrete joint, This reinforcing bar functions as a fixing bar necessary for a column with a small axial force.
[0022]
As the fixing bar, a reinforcing bar having a bent part such as a saddle shape at both ends, or a different diameter straight reinforcing bar having fixing strength may be used. The reinforcing bars having such a configuration may be arranged so as to pass through the substantially center of the concrete joint.
[0023]
By adopting such a column joining structure, it is possible to save the labor of the reinforcing bar work relating to the column main reinforcing bar and the reinforcing bar and to facilitate the construction of the reinforcing bar work. Further, by omitting such labor, it is possible to quickly start the subsequent process and shorten the construction period.
[0024]
In the concrete joint having the above-described configuration, for example, a steel plate may be formed in a ring, and concrete may be filled in the ring. The thickness t of the steel sheet may be set so that t ≧ φ / 60, where φ is the diameter of the ring. When the thickness t of the steel sheet is less than φ / 60, the width-thickness ratio becomes large, buckling occurs, and sufficient structural yield strength may not be obtained. However, the thickness of the steel plate need not be limited to the above value as long as sufficient structural yield is obtained.
[0025]
What is necessary is just to set the height (equal to the height of a ring-shaped steel plate) h of a concrete junction part so that it may become the relationship of the ring diameter (phi) of a steel plate, and φ / 7 <= h <= φ / 5. If the height h is smaller than φ / 7, the rigidity of the column base may not be sufficiently reduced. When the height h is larger than φ / 5, there is a case where shear cracks occur at the joint and sufficient structural strength cannot be obtained. However, as long as sufficient structural yield is obtained, the magnitude of h need not be limited to the above value.
[0026]
By adopting the configuration of the present invention, it is possible to design a frame with a constant column base strength, to analyze the collapse mechanism of the frame in computer simulation, etc., and to make the design of columns and beams more rational. Can do.
[0027]
The column-base semi-fixed joint structure of the present invention is applied to a joint structure of a cast-in-place concrete column or a precast concrete column in a wide range of buildings in various fields such as a base-isolated building and a high-rise reinforced concrete building. it can.
[0028]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0029]
FIG. 1 is a cross-sectional view showing a state where the column base semi-fixed joint structure of the present invention is applied to a building having a rigid frame. FIG. 2 is an enlarged view of a main part of the column joint part circled in FIG. FIG. 3 is a cross-sectional view showing a state where the concrete joint is cut along the cutting line AA shown in FIG. 2.
[0030]
On each floor of the building, as shown in FIG. 1, a large beam 1 is passed between the columns 2 and 3. The large beam 1a (1) shown in FIG. 1 is supported by columns 2a (2) and 3a (3) provided as lower columns below the large beam 1a. On the large beam 1a, pillars 2b (2) and 3b (3) are provided as upper pillars, and the pillars 2a and 3a as lower pillars are provided so that the passing directions of the pillars, that is, axial directions coincide with each other.
[0031]
A concrete joint 4 is interposed between the large beam 1a and the columns 2b and 3b. As shown in FIG. 2, the concrete joint portion 4 has a structure having a concrete portion 4 a in which concrete is filled inside a steel plate 5 formed in a ring. In the case shown in FIG. 1, the steel plate 5 is formed in a ring, but may be formed in other shapes.
[0032]
In the present embodiment, as shown in FIG. 3, when the ring diameter of the steel plate 5 is φ and the column 2b is formed as a square column, φ is about 0 with respect to the length D of one side of the column 2b. Although a case of .7D is shown, φ may be set in a range of 0.6 ≦ φ ≦ 0.8. This is because the yield strength of the internal concrete portion 4a is increased 2 to 3 times due to the restraining effect of the steel plate 5 of the circular ring.
[0033]
Further, the thickness (t) of the steel plate 5 may be set so that, for example, t ≧ φ / 60 with respect to the diameter (φ) of the ring. In addition, the height (h) of the concrete joint 4 was set such that, for example, φ / 7 ≦ h ≦ φ / 5 with respect to the diameter (φ) of the ring.
[0034]
In the above configuration, the reinforcing bar 7 is arranged as a tension fixing bar through the concrete joint 4 between the column 2b as the upper column and the column 2a as the lower column. The reinforcing bar 7 has bent portions 7a whose both ends are bent in a substantially bowl shape, and the bent portions 7a at both ends are respectively disposed in the concrete of the columns 2b and 2a as shown in FIG.
[0035]
In addition, as long as it has fixing proof stress, you may use the different diameter straight reinforcing bar which does not provide the bending part 7a at both ends as mentioned above, as the reinforcing bar 7 as a fixing bar.
[0036]
As shown in FIG. 3, a plurality of reinforcing bars 7 as the fixing bars are arranged so as to pass through substantially the center of the concrete joint 4. In the case shown in FIG. 3, the band 7 b is provided around the reinforcing bar 7, but the band 7 b may not be provided.
[0037]
An upper pillar 2b is provided to the large beam 1a through the concrete joint 4 having such a configuration. Similarly, the column 3b is provided as an upper column on the large beam 1a via the concrete joint 4. Reinforcing bars 7 similar to the above configuration are also arranged as anchoring bars in the columns 3a and 3b.
[0038]
A large beam 1b (1) is passed to the column heads of the columns 2b and 3b. On the large beam 1b, the pillars 2b and 3b are regarded as the lower pillars, and the pillars 2c (2) and 3c (3) of the upper pillars are provided with the concrete joints 4 so that the passing directions of these pillars coincide with each other. Is provided. The reinforcing bar 7 is also arranged as an anchoring bar on the upper column and the lower column in the same manner as described above.
[0039]
A large beam 1c (1) is passed to the column heads of the columns 2c and 3c. Columns 2 d (2) and 3 d (3) are provided as upper columns via the concrete joints 4 on the large beams 1 c. The pillars 2c and 3c are regarded as lower pillars, and the reinforcing bars 7 are arranged as fixing bars on both the pillars 2d and 3d.
[0040]
What is necessary is just to construct the joining of the pillar using the said concrete junction part 4 as follows. For example, when the pillars 2a and 3a are cast on site as the lower pillars, the reinforcing bars 7 having the above-described structure as the fixing bars are protruded from the stigma side of the pillars 2a and 3a. In this state, the columns 2a and 3a are concrete-molded.
[0041]
Thereafter, a beam forming mold is formed, and the large beam 1a is concrete-molded on the column head side. The reinforcing bars 7 are projected on the surface of the large beam 1a formed with concrete. In this state, the steel plate 5 formed in a ring shape so as to surround the reinforcing bar 7 is disposed on the surface of the large beam 1a, and further, a formwork for forming a column is formed and concrete is placed on the column 3a. The inside of the ring-shaped steel plate 5 is filled with concrete.
[0042]
Or when using precast concrete for a pillar, what is necessary is just to fill concrete into the concrete part 4a of the concrete junction part 4 by punching a hole beforehand and placing concrete in this hole punch. If this construction method is taken, as shown in FIG. 4, it can be set as the structure where the concrete part 4a of the concrete junction part 4 penetrated to the upper pillar side.
[0043]
Further, by adopting the above-mentioned column base semi-fixed joint structure, as shown in FIG. 5, it is possible to easily calculate the column strength at the time of structural design. Unlike the conventional case, in the case shown in FIG. 5, the column base bending stress (strength) and the bending stress (strength) of the beam are in a constant hinge state to form the ultimate mechanism, and the height of the inflection point of the column is The bending stress (proof strength) of the stigma can be determined.
[0044]
However, in the conventional configuration, the height of the inflection point of the column on each floor changes due to the external force of the earthquake, so the design must be made with the maximum bending strength that occurs at both the column head and the column base.
[0045]
The present invention is not limited to the above embodiment, and various modifications may be made without departing from the scope of the invention.
[0046]
For example, in the above description, the state of joining the upper and lower pillars on the intermediate floor of a building having a ramen frame has been described. For example, the first floor portion of a multi-storey building or the ground floor of a one-storey building It is good also as a structure which interposes the concrete junction part of the said structure between a pillar and a foundation beam when joining a pillar to a foundation beam by a part. Reinforcing bars may be arranged through the concrete joints over the columns and foundation beams.
[0047]
For example, in the above description, the diameter φ of the ring of the steel plate is set to 0.6 to 0.8 times the length D of one side of a square column having a square cross section, but the cross section of the column is a quadrangle other than a square. In some cases, the cross-sectional area of the concrete joint may be set smaller than the cross-sectional shape. Further, the column shape may be formed in a cylinder other than the prism. The shape of the steel plate 5 may be a polygon such as a square instead of a ring.
[0048]
In the above description, the case where the concrete portion of the concrete joint is extended and penetrated to the upper column side has been described. However, it may be structured to penetrate the beam side. Or you may make it the structure extended in the lower pillar side, ie, the penetrating side of the lower pillar. Or you may make it penetrate into both a lower pillar and an upper pillar through a beam part.
[0049]
In the above description, the reinforcing bars used as anchoring bars are arranged on both the upper and lower pillars provided on the top and bottom of the beam for each floor. In addition, the upper and lower pillars may be arranged through beams on a plurality of floors.
[0050]
【The invention's effect】
According to the present invention, since the column base of the frame of the ramen structure constituting the building becomes a semi-fixed hinge, the yield strength of each floor can be easily calculated without being affected by external force, and the structure design can be simplified.
[0051]
Since it becomes unnecessary to join the lap joints of the column main bars, the work of the reinforcing bars can be saved and the construction can be facilitated. It also leads to reduction of rebar construction costs.
[0052]
Since the joints of columns and beams, and the joints for precast concrete members are not required, the construction period can be shortened. Construction cost can also be reduced.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing an example in which a column base semi-fixed joint structure of the present invention is applied to a building having a rigid frame.
FIG. 2 is a cross-sectional view showing an example of a column bonding structure.
FIG. 3 is a cross-sectional view showing a state where a concrete joint is cut along a cutting line AA in FIG. 2;
FIG. 4 is a cross-sectional view showing another example of a column bonding structure.
FIG. 5 is an explanatory diagram showing a method of calculating bending stresses of columns and beams.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Large beam 1a, 1b, 1c, Large beam 2a, 2b, 2c, 2d Column 3a, 3b, 3c, 3d Column 4 Concrete joint part 4a Concrete part 5 Steel plate 6 Concrete 7 Reinforcement 7a Bending part 7b Band reinforcement φ Diameter t Thickness h Height D Length

Claims (5)

ラーメン架構を有する建物で、コンクリート製の梁を介して、前記梁の上に設けるコンクリート製の上柱と、梁の下に設けるコンクリート製の下柱とを接合する柱脚半固定接合構造であって、
前記上柱と前記梁との間には、コンクリート部の周囲を鋼板で囲んでなるコンクリート接合部が介在され、
前記上柱と前記下柱とには、前記コンクリート部の中央を通して主筋とは異なる定着用の鉄筋が各階毎に前記梁の上下に設けた前記上柱と前記下柱とに配筋されていることを特徴とする柱脚半固定接合構造。
In a building with a rigid frame, it is a column base semi-fixed joint structure that connects a concrete upper column provided above the beam and a concrete lower column provided below the beam via a concrete beam. And
Between the upper column and the beam, there is a concrete joint part surrounded by a steel plate around the concrete part,
To said on pillars and the lower pillar reinforcement for different fixation is the main reinforcement through the center of the concrete part is Haisuji to said on pillars and the lower pillar formed on the upper and lower surfaces of the beam on each floor Column base semi-fixed joint structure characterized by
請求項1記載の柱脚半固定接合構造において、
前記コンクリート接合部のコンクリート部は、延長されて、前記上柱、前記下柱の少なくともいずれかに貫入させられていることを特徴とする柱脚半固定接合構造。
In column base Trimmer joint structure according to claim 1 Symbol placement,
The column base semi-fixed joint structure, wherein the concrete part of the concrete joint is extended and penetrated into at least one of the upper pillar and the lower pillar.
請求項1または2に記載の柱脚半固定接合構造において、
前記鋼板はリングに形成されていることを特徴とする柱脚半固定接合構造。
In the column base semi-fixed joint structure according to claim 1 or 2 ,
A column base semi-fixed joint structure, wherein the steel plate is formed in a ring.
建物の各階における梁と、前記梁の上に設ける上柱と、前記梁の下に設ける下柱との接合に、請求項1ないしのいずれか1項に記載の柱脚半固定接合構造が使用されていることを特徴とする建物。The column base semi-fixed joint structure according to any one of claims 1 to 3 , wherein a beam on each floor of a building, an upper column provided on the beam, and a lower column provided below the beam are joined. A building characterized by being used. コンクリート製の梁を介して、前記梁の上に設けるコンクリート製の上柱と、梁の下に設けるコンクリート製の下柱とを接合する柱脚半固定接合構造のラーメン架構を有する建物の設計方法であって、Method of designing a building having a rigid frame structure of a column base semi-fixed joint structure in which a concrete upper column provided on the beam and a concrete lower column provided below the beam are joined via a concrete beam Because
前記上柱と前記梁との間には、コンクリート部の周囲を鋼板で囲んでなるコンクリート接合部が介在され、Between the upper column and the beam, there is a concrete joint part surrounded by a steel plate around the concrete part,
前記上柱と前記下柱とには、前記コンクリート部の中央を通して主筋とは異なる定着用の鉄筋が各階毎に前記梁の上下に設けた前記上柱と前記下柱とに配筋された柱脚半固定接合構造の柱の柱頭曲げ応力を、梁の曲げ応力の4/3以上と算出することを特徴とする柱脚半固定接合構造を有する建物の設計方法。The upper column and the lower column are columns in which reinforcing bars different from the main bar through the center of the concrete portion are arranged on the upper and lower columns of the beam on each floor. A design method for a building having a column base semi-fixed joint structure, wherein the column head bending stress of a column having a leg semi-fixed joint structure is calculated to be 4/3 or more of a beam bending stress.
JP15548299A 1999-06-02 1999-06-02 Column base semi-fixed joint structure, building and building design method Expired - Lifetime JP4184538B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15548299A JP4184538B2 (en) 1999-06-02 1999-06-02 Column base semi-fixed joint structure, building and building design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15548299A JP4184538B2 (en) 1999-06-02 1999-06-02 Column base semi-fixed joint structure, building and building design method

Publications (2)

Publication Number Publication Date
JP2000336770A JP2000336770A (en) 2000-12-05
JP4184538B2 true JP4184538B2 (en) 2008-11-19

Family

ID=15607020

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15548299A Expired - Lifetime JP4184538B2 (en) 1999-06-02 1999-06-02 Column base semi-fixed joint structure, building and building design method

Country Status (1)

Country Link
JP (1) JP4184538B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6202711B2 (en) * 2013-01-16 2017-09-27 平石 久廣 Building structure

Also Published As

Publication number Publication date
JP2000336770A (en) 2000-12-05

Similar Documents

Publication Publication Date Title
KR101809687B1 (en) Joining Members of Steel Concrete Column and Steel Beam and Construction Method Thereof
JP2000104336A (en) Joint structure of pile and superstructure building frame in structure, and method for constructing superstructure building frame at upper section of pile
KR101521946B1 (en) Enlarged capital of steel framed reinforced concrete column
JP2001342679A (en) CONNECTING METHOD FOR PCa BEAM MEMBER AT COLUMN/BEAM JUNCTION AND PCa BEAM MEMBER FOR IT
JP2001303584A (en) Structure for connecting head of foundation pile with footing
JP2003090050A (en) Structure for joining pile and column together
JP4184538B2 (en) Column base semi-fixed joint structure, building and building design method
JP6855296B2 (en) Building foundation structure and its construction method
JPH0652001B2 (en) Structural columns and frame structures
JP2600961B2 (en) Connection structure between reinforced concrete columns and steel beams
JP3284391B2 (en) Reinforced concrete frame and construction method
JP3043938B2 (en) Joint structure between reinforced concrete columns and steel beams
JP2006169837A (en) Column-beam joint structure of reinforced concrete construction
JP7137978B2 (en) Plate-shaped member for pillar
JP2592224Y2 (en) Structure of joint between RC beam and steel structure
JP3700129B2 (en) Joint structure of composite structure and construction method thereof
JP2001248167A (en) Structure of building foundation
JPH0366878A (en) Construction method for precast column and beam and precast anti-seismic wall
JPH0830360B2 (en) Connection method for columns and beams
JP3122739B2 (en) Frame consisting of precast RC columns and precast RC beams
JPS62264230A (en) Construction of body of multistairs building
JP2603427B2 (en) Foundation structure of reinforced concrete building
JPH0868115A (en) Connecting structure for column/beam and construction method for underground skeleton using it
JPH0782817A (en) Building wall structure and its construction work
JP2023112579A (en) Reinforcing structure of column and method of reinforcing column

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060405

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070919

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080430

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080620

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080826

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080904

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110912

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4184538

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110912

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120912

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120912

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130912

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term