House transfer judgment method Download PDFInfo
- Publication number
- JP4156320B2 JP4156320B2 JP2002282660A JP2002282660A JP4156320B2 JP 4156320 B2 JP4156320 B2 JP 4156320B2 JP 2002282660 A JP2002282660 A JP 2002282660A JP 2002282660 A JP2002282660 A JP 2002282660A JP 4156320 B2 JP4156320 B2 JP 4156320B2
- Authority
- JP
- Japan
- Prior art keywords
- change
- house
- mesh
- data
- new
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Image Analysis (AREA)
- Image Processing (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、家屋異動判定方法に関するものである。
【0002】
【従来の技術】
固定資産の異動の判別等を空中測量技術を利用して行う従来例には、例えば特許文献1に記載されたものが知られている。
【0003】
この従来例において、異動判別に際して、先ず、対象地域の航空写真画像を取得し、前年に取得した航空写真画像と比較することにより新築、あるいは改築等の異動が判定される。
【0004】
【特許文献1】
特開平9-61164号公報
【0005】
【発明が解決しようとする課題】
しかし、航空写真画像の比較により異動箇所を抽出する上述した従来例には以下の欠点がある。すなわち、航空写真画像には、撮影時の日照条件の差による影位置の違い、撮影主点の差による建物の傾きの違い、人、車等の移動体の存在等がすべて画像上の差として現れ、これらの要素による画像変化と建物の異動による画像変化とは画像上の情報だけでは分別不能であるために、結局人手を要することとなり、完全自動化が困難であるという問題がある。
【0006】
本発明は、以上の欠点を解消すべくなされたものであって、完全自動化が可能な建物異動判別方法を提供することを目的とする。
【0007】
【課題を解決するための手段】
本発明によれば上記目的は、
上空から所定領域について新旧二時期で取得した地上位置情報と標高情報を含むレーザデータ1の各々に対して、標高情報を地上位置情報に基づいて設定されたメッシュ上にサンプリングしてメッシュの各マス目に標高代表値を設定し、
新旧二時期のメッシュ間の標高代表値差分が家屋の一階高さ程度に設定した閾値を越える判定対象マス目2の数により新旧二時期間での家屋異動の有無を判定する家屋異動判定方法を提供することにより達成される。
【0008】
標高情報を独立した情報として含むレーザデータ1は、家屋異動時に必ず伴う家屋の高さ変化を標高情報の変化として把握することができる点で、画像を利用した家屋異動判定に比して自動化しやすい利点がある反面、取得されたデータは位置がランダムなために、二時期の測定ポイント間を比較することはできない。
【0009】
本発明はこの点を、地上位置情報に基づいてメッシュ化することにより解決し、新旧二時期に取得されたレーザデータ1のマス目に付与される標高代表値の差分をもとに家屋異動判定を可能にするものである。
【0010】
この結果、新旧レーザデータ1を操作することにより、直接家屋異動の有無を判定することが可能であるために、完全自動化が可能となる。
【0011】
以上のようにして得られた家屋異動の有無の結果は、種々の手段により利用者に表示することが可能であり、例えば、レーザデータ1との間で地上位置情報の共有が図られた航空写真画像等に異動ありと判定された部分を強調表示することができる。
【0012】
また、上記標高代表値差分の正負を識別することにより、異動が増築方向か減築方向かを識別でき、より詳細な異動態様を把握することが可能となる。すなわち、標高代表値差分が(新データ)-(旧データ)により取られている場合には、標高代表値差分が正の場合には、家屋の高さが高くなる方向、すなわち、”増築”方向の異動であり、逆の場合には”減築”方向の異動であると判定できる。
【0013】
このように増築傾向と減築傾向とを区分することにより、例えば、固定資産課税等での利用時において、増築方向の異動のみを抽出して、別途詳細に調査する等、利用者の利用目的に応じて種々の出力をすることができる。
【0014】
さらに、上記増築方向の異動には、例えば、図2(b)に示すように、もともと存在していた家屋の高さが高くなるいわゆる”増築”と、図2(a)に示すように、更地にあらたに家屋が建てられる”新築”とがあり、減築方向の異動には、図2(e)に示すように、家屋の高さが低くなるいわゆる”減築”と、図2(d)のように、家屋がなくなる”滅失”と各々2種の態様があり、これらをさらに区別するためには、
前記判定対象マス目2が増築方向の異動である場合には、旧地表標高データ、減築方向の異動である場合には新地表標高データのいずれかにおける地上位置情報に基づいて設定され、地物を真とする地表標高メッシュ3において、前記閾値を越えるときを真とした前記判定対象マス目2との間で論理演算を行い、
論理積の結果が真であるなら前記判定対象マス目2を”減築”または”増築”、偽であるなら”滅失”または”新築”と区分する家屋異動判定方法が使用できる。
【0015】
また、上記判定対象マス目2を求めるためには、
縦横方向にそれぞれに半メッシュずれた新旧各一対の暫定メッシュ4間で標高代表値差分を取った後、一対の暫定メッシュ4を各々半分のメッシュサイズに分解し、
前記一対の分割メッシュ5において、前記閾値を越えるときを真として、いずれかの分割メッシュ5において前記閾値を越えるマス目間で論理演算を行い、
論理積の結果が真となるマス目を前記判定対象マス目2とする家屋異動判定方法が使用でき、このように構成することにより、メッシュ化に際する基準の取り方によるばらつきを軽減させることが可能になり、信頼性が向上する。
【0016】
この場合、前記分割メッシュ5間の論理演算において、排他的論理和の結果が真となるマス目の位置を異動境界として抽出することができる。
【0017】
このようにして抽出された異動境界は、例えば、新旧の航空写真画像等に表示して利用者に注意喚起したり、あるいは、新築の場合、前記異動境界に基づいて家屋形状を自動作成することもできる。
【0018】
さらに、家屋ポリゴン等の従前家屋形状6データが予め用意されている場合には、前記二時期の各メッシュは、従前家屋形状6の基線と、これに直交する方向を分割方向として該従前家屋形状6により囲まれる範囲に設定することができる。
【0019】
この場合には、従前家屋形状6データとの詳細な比較が可能であるために、より詳細、かつ正確な異動区分の分類が可能となる。
【0020】
【発明の実施の形態】
先ず、本実施の形態により判別される建物異動の種類を図2に示す。図2において実線により描かれた領域は建物の外形を、破線による輪郭は建物がないことを示し、例えば、図2(d)は建物がなくなったことを、図2(a)は建物が新築されたことを示す。また、外形の白抜き部分は一階建て部分を、ハッチング部分は二階建て部分を示し、例えば、図2(b)は一階建てが二階建てになったことを、図2(g)は二階建ての一部が一階建てになったことを示す。
【0021】
なお、説明を容易にするために、図2(h)に示すように、家屋に新たに外郭形状の変更を伴う増築がなされた場合には、通常の固定資産評価においては、増築として扱われるが、本実施の形態においては、増築部分は”新築”として評価することとする。
【0022】
図1に新旧のレーザデータ1に加えて家屋ポリゴンデータ(従前家屋形状6のデータ)がある場合の判定方法のフローチャートを示す。家屋異動の判定に際して、まず、レーザデータ1を地上位置情報に基づいてメッシュ化するために、ステップS1において新旧のレーザデータ1に家屋ポリゴン6を重ね合わせ、重合領域をクリッピングする。図3(a)に旧レーザデータ1、図3(b)に新データ1への家屋ポリゴン6の重合状態を、図3(c)、(d)にこれらをクリップ処理した結果を示す。
【0023】
次いで、ステップS2において、クリッピング範囲についてマス目が正方形のメッシュを設定する。メッシュの設定は、図3(e)に示すように、クリッピング範囲を、家屋ポリゴン6の図心位置6aを基準点として家屋ポリゴン6の基線方向、すなわち、長辺方向に分割して行われる。メッシュサイズ(メッシュの一辺長)は、小さい方が詳細な異動判定が可能になる反面、過小であると、レーザデータ1が含まれない空白メッシュが発生し、後述する新旧の比較が困難になるために、レーザデータ1の平均間隔の2〜3倍程度、この実施の形態においては5(m)程度に設定される。
【0024】
この後、設定された各メッシュに標高代表値を設定する(ステップS3)。この実施の形態において、標高代表値には、増築方向の異動を見過ごさないように、メッシュ内の標高データのうち最大値が採用されるが、最小値を採用して減築方向の感度を上げることも可能である。図3(e)に旧データをメッシュ化した結果、図3(f)に新データをメッシュ化した結果を示す。
【0025】
以上のようにして新旧レーザデータ1のメッシュ化を行った後、ステップS4で新データから旧データを減算して標高代表値差分をメッシュのマス目単位に取り、この結果を利用して家屋異動の判定を行う。
【0026】
異動判定に際し、データの取り扱いを容易にするために、まず、ステップS5で標高代表値差分をフラグ化する。フラグ化の基準値は、家屋一階分の通常の高さ3(m)程度に設定され、|差分|>3がフラグ”1”の立設条件となり、フラグ”1”が立てられたマス目(判定対象マス目2)で、差分<0の場合には滅失方向の変更が想定され、フラグ”0”のメッシュに対しては変更なしが想定される。これに対し、フラグ”1”が立てられたメッシュで差分>0の場合には、増築方向の変更が想定される。図4(a)にステップS4が完了した状態を、図4(b)に(差分)<-3(m)をフラグ化条件として使用したフラグ化の結果をそれぞれ示す。
【0027】
以上のようにしてフラグ化を完了すると、次いで、ステップS6でフラグ割合計算を行う。フラグ割合計算は、(フラグ”1”のメッシュ数)/(全メッシュ数)×100で求められ、計算値が”10”未満のときは、”異動なし”、それ以外は”異動あり”として異動の有無を判定する(S7)。また、異動判定において、”異動あり”をフラグ割合”90”を分別閾値として、さらにフラグ割合”90”以上を”全面異動あり”と、残余を”一部異動あり”に区分する。
【0028】
なお、この実施の形態において、誤差を考慮して、フラグ割合が”10”と”90”とを分別閾値に設定したが、両側で異なった値を設定することも可能である。
【0029】
図4に示す例においては、フラグ割合は”100”となり、閾値”90”を越えているために、”全面異動あり”と判定される。
【0030】
次に、上記異動判定において異動ありと判定された場合には(S8)、必要に応じて異動種類が特定される。異動種類は、発生した異動が図2に示すいずれのモードであるかを判別することを目的とするもので、まず、差分の正負が識別される(S9)。
【0031】
上述したように、図2(h)に示す異動の態様を”新築”として扱うこの実施の形態において、家屋ポリゴン6によるクリッピング範囲内での”新築”はあり得ないために、差分が正の場合には、後述する地表包含判定をする必要はなく、異動区分が”全面異動あり”の場合には、図2(b)に示す”全面増築”であり、異動区分が”一部異動あり”の場合には、図2(c)に示す”一部増築”と判定する(S10)。
【0032】
これに対し、差分が負の場合には、ステップS11で地表包含判定を行う。地表包含判定は、減築方向の異動部分が地表面となったか、あるいは未だ家屋の一部であるのかを判別することにより、図2(d)における”滅失”と図2(e)の”全面減築”、および図2(f)の”外郭形状変化一部滅失”と図2(g)の”外郭形状不変化一部滅失”とを峻別することを目的とするもので、まず、図5(a)に示すように、新データ取得時における地表、地物を含めた標高データであるDSM(Digital Surface Model)を用意し、このDSM(地表標高データ)に同一のメッシュ(地表標高メッシュ3)を設定し、さらに、地表=”0”、地物=”1”のフラグを割り当てる。
【0033】
この後、DSMの各マス目と、ステップS5で得た差分フラグ化データの各マス目との間で論理積をとる。理解を容易にするために、図5(b)に差分<−3の例として示した差分フラグ化データ(図4(b))を再掲する。図5(b)の例によれば、差分フラグ化データの全マス目は”1”で、DSMの全メッシュは” 0”であるから、論理積データの全マス目は、図5(c)に示すように”0”となる。
【0034】
この論理積データにおいてフラグ”1”が立つメッシュは、差分フラグ化データとDSMデータの双方においてフラグ”1”が立つメッシュ、すなわち、高さが3(m)以上低くなり、かつ、それが地表ではなく建物の一部であることを意味することとなるために、異動は減築であることが判定できる。これに対し、論理積データにおいてフラグ”0”のメッシュは、異動がないか(差分フラグ化データにおける”0”)、あるいは異動がある場合には、異動後に地表になった(DSMデータにおける”0”)か、さらにはその双方であることとなり、異動ありと判定されている本ステップにおいては、滅失の異動であると判定できる。
【0035】
以上をまとめると、異動判定で”全面異動あり”と判定され、かつ、論理積データにおいてフラグ”1”のメッシュが存在する場合には、”全面減築”と判定され、図5(c)に示す例のように、論理積データにおいてフラグ”1”のメッシュが存在しない場合には、”滅失”と判定される。
【0036】
これに対し、異動判定で”一部異動あり”に区分された場合で、論理積データにおいてフラグ”1”のマス目が存在する場合には、”外郭形状不変化一部滅失”、存在しない場合には、”外郭形状変化一部滅失”と判定する。
【0037】
以上の異動種類の特定が終了し、さらに、判定区分が”一部異動あり”である場合には(S13)、ステップS14が実行されて家屋形状更新がなされる。家屋形状更新に際し、まず、論理積データにおけるフラグ”1”とフラグ”0”との境界を抽出した後、境界線で家屋ポリゴン6を分割して行われる。
【0038】
図6に”外郭形状不変化一部滅失”時の家屋形状更新例を示し、図6(a)は論理積データ、図6(b)は境界線を抽出した状態、図6(c)は家屋ポリゴン6を分割して得られた更新後の家屋形状を示す。
【0039】
また、本方法を固定資産評価用に使用する場合で、”一部増築”、”外郭形状不変化一部滅失”と判定された際には、上述した家屋ポリゴン6の分割をすることなく、図6(a)に示すように、△マーク等でマーキングし、変更箇所を現地調査対象物件として特定することもできる。
【0040】
図7に本発明の第2の実施の形態を示す。この実施の形態は、例えば、図に2(a)示す”新築”の場合のように、家屋のポリゴンデータがない場合の判定方法を示すもので、この他に、”全面増築”、”滅失”、”全面減築”の異動種類の判別も可能である。
【0041】
異動判定に際して、まず、新旧データにメッシュを設定する(S20)。メッシュサイズは、上述した実施の形態と同様に、5(m)程度に設定される。また、標高データをメッシュ化するに際しては、その基準位置とサイズにより相違が生じるために、半メッシュずらせた2種類のメッシュ(暫定メッシュ4)を新旧データにそれぞれ設定することにより相違を軽減する。また、暫定メッシュ4の代表値には、上述した実施の形態と同様に、メッシュ内の最大値を採用する。図8に新旧データに対して暫定メッシュ4を設定した状態を示す。図8(a)、(b)はメッシュ基準が半メッシュずらせて作られた旧メッシュ化データ、図8(c)、(d)は新メッシュ化データを示し、図8(a)と図8(c)、および図8(b)と図8(d)に示すメッシュ化データは、互いにメッシュ基準が一致する。
【0042】
次いで、ステップS21においてメッシュ基準の一致する新旧のメッシュ化データを対象に、各マス目間の差分を取り、フラグ化する(S22)。フラグ化は、差分値3(m)を閾値とし、|差分|>3の場合に、対応するメッシュにフラグ”1”を立てて行われる。図9(a)、(b)に図8(a)(c)と図8(b)(d)で示すメッシュ化データの差分データを、図9(c)に差分<-3(m)を閾値とする図9(a)のフラグ化データを、図9(d)に図9(b)のフラグ化データを示す。
【0043】
以上のようにしてフラグ化されたデータは、ステップS23において、リサンプリングされた後、和による合成が実行される(S24)。リサンプリングは、図10に示すように、各フラグ化データを半分のメッシュサイズ(この実施の形態では2.5m)の分割メッシュ5に分割し、分割メッシュ5の各マス目に分割前フラグデータのフラグ値を配分して行われる。また、和による合成は、対応する各メッシュのフラグ値を足し算して行われ、フラグ値”2”のマス目を判定対象マス目2として抽出する。
【0044】
図10(a)に図9(c)に示すフラグ化データのリサンプリング結果を、図10(b)に図9(d)のリサンプリング結果を示し、図10(c)にこれらの和による合成データを示す。
【0045】
異動判定は、以上のようにして求めた合成データをもとに行われる。異動判定に際して、まず、ステップS25でフラグ数計算を行う。フラグ数計算は、上記合成データ内の判定対象マス目2の数をカウントすることにより行われる。ノイズデータによる判定精度の低下を防止するために、この実施の形態においては、フラグ数計算を行う前に、フラグ値”2”のグループ化を行われる。グループ化は、フラグ値”2”のメッシュが縦横に2以上連続する場合にのみグループ属性を有するものと見なし、グループ属性を有するフラグ値”2”のマス目のみを判定対象マス目2として抽出し、カウントすることにより、単一メッシュ内に偶然現れたものを排除する。
【0046】
このフラグ数計算結果に基づいて行われる異動有無判定(S26)は、予め設定された判定マス目数と上記フラグ数計算によるカウント値とを比較して行われる。判定マス目数は、家屋の変化部分が家屋の異動と認められる面積を基準に決定される。この実施の形態においては、50m2、すなわち、8個に設定され、カウント値>判定メッシュ数の場合には”異動あり”、その他の場合には”異動なし”と判定する。
【0047】
ステップS27で異動有無判定結果が”異動あり”の場合には、異動種類の特定が行われ、”異動なし”の場合には処理を終了する。
【0048】
異動種類の特定に際し、まず、地表包含判定を行う(S28)。家屋ポリゴン6があった上述した実施の形態においては、建物外形が予め与えられているために、地表包含判定は、差分<0の場合、すなわち、減築方向への異動の場合にのみ実行されたが、家屋ポリゴン6のないこの実施の形態においては、減築方向に加えて増築方向の異動に対しても地表包含判定が行われる。
【0049】
地表包含判定は、DSMフラグデータを利用して異動箇所(メッシュ)が地表面を含むか否かを判断するものであり、具体的には、合成データ内での判定対象マス目2と、DSMフラグデータとの論理積をとり、論理積フラグデータが”0”のみのメッシュで構成される場合には、地表を含む異動、それ以外は地表を含まない異動と判断する。この地表包含判定に際して使用されるDSMフラグデータは、差分が正、すなわち、増築方向の異動の場合には、旧DSMフラグデータを使用し、差分が負の場合には、新DSMフラグデータが使用される。
【0050】
したがって、この実施の形態において、図9(a)、(b)に示すように、差分が負である図10(c)に示される合成データに対し、新DSMフラグデータの全マス目が”0”であった場合には、論理積フラグデータの全マス目は”0”となり、”滅失”と判定される。これに対し、論理積フラグデータが”0”フラグのみで構成されない場合には、”減築”と判定される。
【0051】
さらに、図10(c)に示す合成データが、例えば、差分>0の条件で作られたものと仮定し、旧DSMフラグデータとの論理積フラグデータが”0”フラグのみのメッシュで構成される場合には、”新築”、これ以外は、”増築”と判定される(S29)。
【0052】
また、この実施の形態において、差分>0の場合には、家屋ポリゴン6を新規作成することができる。ステップS31における家屋ポリゴン6作成は、合成データにおけるフラグ”2”周囲のフラグ”1”を抽出した後、抽出されたフラグ”1”をライン化することにより実行される。図11(a)に差分>0の条件で得られた合成データを、図11(b)に抽出されたメッシュを、図11(c)にこれから得られた家屋ポリゴン6の外形を示す。
【0053】
このようにして得られた家屋外形形状は、例えば、航空写真画像上に重ねられて、確認用に使用される。
【0054】
図12に本発明の第3の実施の形態を示す。この実施の形態は、家屋ポリゴン6のない場合の判定方法の変形を示すもので、判定に際し、まず、ステップS40で新旧データにメッシュを設定する。メッシュの代表値は、着目メッシュを中心とする3×3行列のメッシュ群内の最大値が選択される。このように、メッシュ化に際して各メッシュに設定される代表値は、周囲のメッシュの標高データを参照して得られるために、メッシュサイズは比較的小さく設定することができ、この実施の形態においては、2(m)に設定される。
【0055】
この後、ステップS41において新旧データ間の差分(新データ-旧データ)を取り、3(m)を閾値としてフラグ化し(S42)、フラグ化データをもとに異動判定を行う。
【0056】
異動有無の判定は、フラグ化データにおけるフラグ”1”のマス目(判定対象マス目2)の数が所定の閾値以上であるか否かにより行い、閾値となるフラグ数は、判定対象となる異動面積が50m2程度(メッシュサイズが2mに設定されるこの実施の形態においては、2×2×13=52m2)となるように、13個とされる。
【0057】
したがってこの実施の形態において、上記フラグ化データにおいて、フラグ”1”の数をカウントし(S43)、異動メッシュ数(フラグ”1”のメッシュ数)が13個以上である場合には”異動あり”、それ以下の場合には”異動なし”と判定される(S44)。
【0058】
異動有無判定で異動ありと判定された場合で(S45)、かつ、差分>0の場合(S46)には、フラグ”1”により囲まれる領域をライン化し、家屋ポリゴン6として抽出して(S47)処理を終了する。
【0059】
なお、以上において説明した各処理における手順(各ステップ)は、適宜のコンピュータシステムを動作させるプログラムとして記述し、該コンピュータシステムにより実行させることが可能である。この場合、説明の便宜上、家屋ポリゴン6の有無により処理を相互に全く無関係の2種類の処理として説明したが、実際の家屋異動判定においては、まず、新旧レーザデータ1と家屋ポリゴン6を重ね合わせ、家屋ポリゴン6内にあるレーザデータ1に対しては、図1に示す処理を行い、家屋ポリゴン6外にあるレーザデータ1に対しては、図7または図12に示す処理を行うように分岐処理することができる。
【0060】
【発明の効果】
以上の説明から明らかなように、本発明によれば、建物異動をコンピュータシステム等を使用して完全自動化することが可能になる。
【図面の簡単な説明】
【図1】本発明の第1の実施の形態を示すフローチャートである。
【図2】家屋異動の態様を示す説明図である。
【図3】レーザデータのメッシュ化を示す説明図である。
【図4】代表標高差分を取った状態を示す説明図である。
【図5】地表包含判定を示す説明図である。
【図6】家屋形状更新手順を示す説明図である。
【図7】本発明の第2の実施の形態を示すフローチャートである。
【図8】暫定メッシュを示す図である。
【図9】差分を取った状態を示す説明図である。
【図10】リサンプリングの状態を示す説明図である。
【図11】家屋形状更新手順を示す説明図である。
【図12】本発明の第3の実施の形態を示すフローチャートである。
【符号の説明】
1 レーザデータ
2 判定対象マス目
3 地表標高メッシュ
4 暫定メッシュ
5 分割メッシュ
6 従前家屋形状[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a house change determination method.
[0002]
[Prior art]
As a conventional example in which a change in fixed assets is discriminated using an aerial surveying technique, for example, one described in
[0003]
In this conventional example, when a change is determined, first, an aerial photograph image of the target area is acquired and compared with the aerial photograph image acquired in the previous year, a change such as a new construction or a reconstruction is determined.
[0004]
[Patent Document 1]
JP-A-9-61164
[Problems to be solved by the invention]
However, the above-described conventional example in which the moving part is extracted by comparing the aerial photograph images has the following drawbacks. In other words, in the aerial photograph image, the difference in shadow position due to the difference in the sunlight conditions at the time of shooting, the difference in the inclination of the building due to the difference in the shooting main point, the presence of moving objects such as people, cars etc. are all as differences in the image Appearing, the image change due to these elements and the image change due to the movement of the building cannot be distinguished only by the information on the image, so that there is a problem that it is necessary to work manually and it is difficult to fully automate.
[0006]
The present invention has been made to solve the above-described drawbacks, and an object of the present invention is to provide a building change determination method that can be fully automated.
[0007]
[Means for Solving the Problems]
According to the present invention, the object is
For each of the
House change determination method for determining whether or not there is a house change in the old and new 2 o'clock period based on the number of
[0008]
[0009]
The present invention solves this problem by meshing based on the ground position information, and the house change determination based on the difference of the elevation representative value given to the grid of the
[0010]
As a result, by manipulating the new and
[0011]
The result of the presence / absence of the house change obtained as described above can be displayed to the user by various means. For example, an aircraft in which ground position information is shared with the
[0012]
Further, by identifying the positive / negative of the difference in elevation representative value, it is possible to identify whether the change is an extension direction or a reduction direction, and it is possible to grasp a more detailed change mode. In other words, when the elevation representative value difference is taken from (new data)-(old data), if the elevation representative value difference is positive, the height of the house is increased, that is, "extension" In the opposite case, it can be determined that the movement is in the “deconstruction” direction.
[0013]
In this way, by distinguishing the tendency of extension from the tendency of reduction, for example, when using for fixed asset taxation etc., only the change in the extension direction is extracted, and the user's purpose of use is examined separately. Various outputs can be made according to the above.
[0014]
Furthermore, in the change of the extension direction, for example, as shown in FIG. 2B, so-called “extension” in which the height of the house that originally existed is increased, and as shown in FIG. There is a “new construction” where a new house is built on the vacant land. As shown in FIG. 2 (e), there is a so-called “reconstruction” in which the height of the house is lowered, as shown in FIG. As shown in (d), there are two types of “lost” and disappearance of the house.
When the
If the result of the logical product is true, a house change judging method can be used in which the
[0015]
In addition, in order to obtain the
After taking the elevation representative value difference between the new and old pairs of temporary meshes 4 shifted by half a mesh in the vertical and horizontal directions, the pair of temporary meshes 4 is decomposed into half mesh sizes,
In the pair of divided
A house change determination method can be used in which the square where the result of the logical product is true is the
[0016]
In this case, in the logical operation between the divided
[0017]
The change boundary extracted in this way is displayed on old and new aerial photograph images, for example, to alert the user, or in the case of a new construction, a house shape is automatically created based on the change boundary. You can also.
[0018]
Further, when the previous house shape 6 data such as a house polygon is prepared in advance, each of the meshes of the two periods has the previous house shape with the base line of the
[0019]
In this case, since detailed comparison with the
[0020]
DETAILED DESCRIPTION OF THE INVENTION
First, FIG. 2 shows the types of building changes determined by the present embodiment. The area drawn by the solid line in FIG. 2 shows the outline of the building, the outline by the broken line shows that there is no building, for example, FIG. 2 (d) shows that the building has disappeared, and FIG. Indicates that Further, the outline portion of the outline indicates a one-storied portion, and the hatched portion indicates a two-storied portion. For example, FIG. 2 (b) shows that one story has become two stories, and FIG. 2 (g) shows two stories. Indicates that part of the building has become a single floor.
[0021]
For ease of explanation, as shown in FIG. 2 (h), when an extension is newly added to the house with a change in the outer shape, it is treated as an extension in the normal fixed asset evaluation. However, in this embodiment, the extension part is evaluated as “new construction”.
[0022]
FIG. 1 shows a flowchart of a determination method in the case where there is house polygon data (data of the previous house shape 6) in addition to the old and
[0023]
Next, in step S2, a square mesh is set for the clipping range. As shown in FIG. 3E, the mesh is set by dividing the clipping range in the base line direction of the
[0024]
Thereafter, an elevation representative value is set for each set mesh (step S3). In this embodiment, the maximum value among the elevation data in the mesh is adopted as the elevation representative value so as not to overlook the change in the extension direction, but the minimum value is adopted to increase the sensitivity in the reduction direction. It is also possible. FIG. 3E shows the result of meshing the old data, and FIG. 3F shows the result of meshing the new data.
[0025]
After meshing the old and
[0026]
In order to facilitate the handling of data in the change determination, first, the elevation representative value difference is flagged in step S5. The standard value for flagging is set to a normal height of about 3 m for the first floor of the house, and | difference |> 3 is the standing condition for flag “1”, and the flag “1” is set In the case of the eye (the determination target cell 2), if the difference is <0, a change in the loss direction is assumed, and no change is assumed for the mesh with the flag “0”. On the other hand, if the difference is> 0 for a mesh with flag “1” set, a change in the extension direction is assumed. FIG. 4A shows the state where step S4 is completed, and FIG. 4B shows the result of flagging using (difference) <− 3 (m) as the flagging condition.
[0027]
When flagging is completed as described above, flag ratio calculation is then performed in step S6. The flag ratio calculation is obtained by (number of meshes of flag “1”) / (total number of meshes) × 100. When the calculated value is less than “10”, “no change”, otherwise “with change” The presence or absence of a change is determined (S7). In the change determination, “change” is classified as a flag threshold “90”, a flag ratio “90” or more is classified as “full change”, and the remainder is classified as “partially changed”.
[0028]
In this embodiment, considering the error, the flag ratios “10” and “90” are set as the separation thresholds. However, different values can be set on both sides.
[0029]
In the example shown in FIG. 4, since the flag ratio is “100” and exceeds the threshold value “90”, it is determined that “the entire surface has changed”.
[0030]
Next, when it is determined in the change determination that there is a change (S8), the change type is specified as necessary. The change type is intended to determine which mode shown in FIG. 2 is the change that has occurred, and first, the sign of the difference is identified (S9).
[0031]
As described above, in this embodiment in which the mode of change shown in FIG. 2 (h) is treated as “new construction”, there is no “new construction” within the clipping range by the
[0032]
On the other hand, if the difference is negative, the ground surface inclusion determination is performed in step S11. In determining whether or not there is a change in the direction of the earth's surface, it is determined whether the part of the change in the direction of reconstruction is the ground surface or is still part of the house. The purpose is to distinguish between “total reconstruction” and “partial shape change partial loss” in FIG. 2 (f) and “outer shape change partial loss” in FIG. 2 (g). As shown in Fig. 5 (a), prepare DSM (Digital Surface Model), which is elevation data including the ground surface and features at the time of new data acquisition, and the same mesh (ground elevation) for this DSM (ground elevation data). Mesh 3) is set, and flags of ground surface = “0” and feature = “1” are assigned.
[0033]
Thereafter, a logical product is obtained between each square of the DSM and each square of the differential flag data obtained in step S5. In order to facilitate understanding, the difference flagized data (FIG. 4B) shown in FIG. 5B as an example of difference < −3 is shown again. According to the example of FIG. 5B, all the squares of the difference flagized data are “1” and all the meshes of the DSM are “0”. "0" as shown in FIG.
[0034]
The mesh in which the flag “1” is set in the logical product data is the mesh in which the flag “1” is set in both the difference flagged data and the DSM data, that is, the height is lower than 3 (m), and the mesh is the ground surface. It can be determined that the transfer is a reduction because it means a part of the building. On the other hand, the mesh with the flag “0” in the logical product data does not change (“0” in the differential flag data), or if there is a change, it becomes the ground surface after the change (“DSM data”). 0 ″) or both of them, and in this step where it is determined that there is a change, it can be determined that the change is a loss .
[0035]
To summarize the above, when it is determined that there is a “change in the entire surface” in the transfer determination, and there is a mesh with the flag “1” in the logical product data, it is determined as “the entire reconstruction”, and FIG. As shown in the example, if there is no mesh with the flag “1” in the logical product data, it is determined as “lost”.
[0036]
On the other hand, when the change determination is classified as “partially changed” and there is a cell with the flag “1” in the logical product data, “outer shape change unchanged partially lost” does not exist In this case, it is determined that “the outer shape change is partially lost”.
[0037]
When the above-mentioned type of change is completed and the determination classification is “partially changed” (S13), step S14 is executed to update the house shape. When updating the house shape, first, after extracting the boundary between the flag “1” and the flag “0” in the logical product data, the
[0038]
FIG. 6 shows an example of a house shape update at the time of “partial shape invariant partial loss”, FIG. 6A shows logical product data, FIG. 6B shows a state where boundary lines are extracted, and FIG. The updated house shape obtained by dividing the
[0039]
In addition, when this method is used for fixed asset evaluation and it is determined that “partial extension” or “outer shape unchanged partial loss”, the above-described
[0040]
FIG. 7 shows a second embodiment of the present invention. This embodiment shows a determination method in the case where there is no polygon data of a house as in the case of “new construction” shown in FIG. 2 (a), for example. In addition to this, “full extension”, “destruction” It is also possible to discriminate the type of change of “Fully Destructed”.
[0041]
When determining the change, first, a mesh is set in the old and new data (S20). The mesh size is set to about 5 (m) as in the above-described embodiment. Further, when the altitude data is meshed, a difference occurs depending on the reference position and size. Therefore, the difference is reduced by setting two types of meshes (temporary mesh 4) shifted by half a mesh as the new and old data. Further, the maximum value in the mesh is adopted as the representative value of the temporary mesh 4 as in the above-described embodiment. FIG. 8 shows a state in which the temporary mesh 4 is set for new and old data. FIGS. 8A and 8B show old mesh data generated by shifting the mesh reference by a half mesh, FIGS. 8C and 8D show new mesh data, and FIGS. 8A and 8B. The mesh data shown in (c), FIG. 8 (b), and FIG. 8 (d) have the same mesh criteria.
[0042]
Next, in step S21, the difference between each square is taken and flagged for new and old meshed data that match the mesh criteria (S22). The flagging is performed by setting the flag “1” to the corresponding mesh when | difference |> 3 with the difference value 3 (m) as a threshold value. 9A and 9B show the difference data of the meshed data shown in FIGS. 8A and 8C and FIGS. 8B and 8D, and FIG. 9C shows the difference <−3 (m). FIG. 9A shows the flagged data in FIG. 9B, and FIG. 9D shows the flagged data in FIG. 9B.
[0043]
The data flagged as described above is resampled in step S23 and then synthesized by summation (S24). In the resampling, as shown in FIG. 10, each flagged data is divided into divided
[0044]
FIG. 10 (a) shows the resampling result of the flagged data shown in FIG. 9 (c), FIG. 10 (b) shows the resampling result of FIG. 9 (d), and FIG. 10 (c) shows the sum of these results. Composite data is shown.
[0045]
The change determination is performed based on the composite data obtained as described above. When determining the change, first, the number of flags is calculated in step S25. The number of flags is calculated by counting the number of
[0046]
The transfer presence / absence determination (S26) performed based on the flag number calculation result is performed by comparing the predetermined determination grid number with the count value obtained by the flag number calculation. The number of determination squares is determined based on the area where the changed part of the house is recognized as a change of the house. In this embodiment, it is set to 50 m 2 , that is, 8 pieces, and “counter change” is determined when the count value> the number of determination meshes, and “no change” is determined otherwise.
[0047]
If the change presence / absence determination result is “with change” in step S27, the change type is specified, and if “no change”, the process ends.
[0048]
When specifying the type of change, first the ground surface inclusion determination is performed (S28). In the above-described embodiment in which the
[0049]
The ground surface inclusion determination uses the DSM flag data to determine whether or not the transfer location (mesh) includes the ground surface. Specifically, the
[0050]
Therefore, in this embodiment, as shown in FIGS. 9A and 9B, all the squares of the new DSM flag data are compared with the composite data shown in FIG. 10C where the difference is negative. If it is “0”, all squares of the logical product flag data are “0”, and it is determined as “lost”. On the other hand, when the logical product flag data is not composed of only the “0” flag, it is determined as “reconstruction”.
[0051]
Furthermore, it is assumed that the composite data shown in FIG. 10C is created under the condition that the difference> 0, for example, and the logical product flag data with the old DSM flag data is composed of only the “0” flag mesh. In the case of “new construction”, it is judged as “extension” in other cases (S29).
[0052]
In this embodiment, when the difference> 0, the
[0053]
The house outdoor shape thus obtained is superimposed on an aerial photograph image and used for confirmation, for example.
[0054]
FIG. 12 shows a third embodiment of the present invention. This embodiment shows a modification of the determination method in the case where the
[0055]
Thereafter, in step S41, the difference between the new and old data (new data-old data) is taken and flagged with 3 (m) as a threshold value (S42), and the transfer determination is performed based on the flagged data.
[0056]
The presence / absence of the change is determined based on whether or not the number of cells of the flag “1” (determination target cell 2) in the flagged data is equal to or greater than a predetermined threshold value. The number of transfer areas is set to 13 so as to be about 50 m 2 (in this embodiment in which the mesh size is set to 2 m, 2 × 2 × 13 = 52 m 2 ).
[0057]
Therefore, in this embodiment, in the flagged data, the number of flags “1” is counted (S43). If the number of changed meshes (the number of meshes of flag “1”) is 13 or more, “changed” If it is less than that, it is determined that there is no change (S44).
[0058]
When it is determined that there is a change in the presence / absence of change (S45) and the difference> 0 (S46), the region surrounded by the flag “1” is lined and extracted as a house polygon 6 (S47). ) End the process.
[0059]
The procedure (each step) in each process described above can be described as a program for operating an appropriate computer system and executed by the computer system. In this case, for convenience of explanation, the processing has been described as two types of processing that are completely unrelated to each other depending on the presence / absence of the
[0060]
【The invention's effect】
As is clear from the above description, according to the present invention, it is possible to fully automate the building movement using a computer system or the like.
[Brief description of the drawings]
FIG. 1 is a flowchart showing a first embodiment of the present invention.
FIG. 2 is an explanatory view showing an aspect of house change.
FIG. 3 is an explanatory diagram showing meshing of laser data.
FIG. 4 is an explanatory diagram showing a state in which a representative elevation difference is taken.
FIG. 5 is an explanatory diagram showing ground surface inclusion determination;
FIG. 6 is an explanatory diagram showing a house shape update procedure.
FIG. 7 is a flowchart showing a second embodiment of the present invention.
FIG. 8 is a diagram showing a temporary mesh.
FIG. 9 is an explanatory diagram showing a state in which a difference is taken.
FIG. 10 is an explanatory diagram showing a state of resampling.
FIG. 11 is an explanatory diagram showing a house shape update procedure.
FIG. 12 is a flowchart showing a third embodiment of the present invention.
[Explanation of symbols]
1
Claims (10)
新旧二時期のメッシュ間の標高代表値差分が家屋の一階高さ程度に設定した閾値を越える判定対象マス目の数により新旧二時期間での家屋異動の有無を判定する家屋異動判定方法。For each of the laser data including ground position information and altitude information acquired in the new and old periods for a given area from the sky, the altitude information is sampled on a mesh set based on the ground position information, and each square of the mesh is sampled. Set the altitude representative value to
A house change determination method for determining whether or not there is a house change in the old and new 2 o'clock period based on the number of determination target cells where the difference in elevation representative value between the meshes of the old and new two periods exceeds the threshold set to the height of the first floor of the house.
論理積の結果が真であるなら前記判定対象マス目を”減築”または”増築”、偽であるなら”滅失”または”新築”と区分する請求項2記載の家屋異動判定方法。When the determination target grid is a change in the extension direction, it is set based on the ground position information in either the old surface elevation data, or in the case of a change in the reduction direction, In the ground elevation mesh that is true , perform a logical operation with the determination target cell that is true when the threshold value is exceeded ,
3. The house change judging method according to claim 2, wherein if the result of logical product is true, the judgment target cell is classified as “deconstruction” or “extension”, and if false, it is classified as “destruction” or “new construction”.
前記一対の分割メッシュにおいて、前記閾値を越えるときを真として、いずれかの分割メッシュにおいて前記閾値を越えるマス目間で論理演算を行い、
論理積の結果が真となるマス目を前記判定対象マス目とする請求項1、2または3記載の家屋異動判定方法。After taking the elevation representative value difference between each pair of new and old provisional meshes shifted by half a mesh in the vertical and horizontal directions , each pair of temporary meshes is broken down into half mesh sizes,
In the pair of divided meshes, when the threshold value is exceeded, it is true, and a logical operation is performed between the squares exceeding the threshold value in any of the divided meshes .
The house change determination method according to claim 1, 2, or 3, wherein a square in which a logical product is true is the determination target square.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002282660A JP4156320B2 (en) | 2002-09-27 | 2002-09-27 | House transfer judgment method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002282660A JP4156320B2 (en) | 2002-09-27 | 2002-09-27 | House transfer judgment method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004117245A JP2004117245A (en) | 2004-04-15 |
JP4156320B2 true JP4156320B2 (en) | 2008-09-24 |
Family
ID=32276756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002282660A Expired - Fee Related JP4156320B2 (en) | 2002-09-27 | 2002-09-27 | House transfer judgment method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4156320B2 (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4566074B2 (en) * | 2005-06-21 | 2010-10-20 | 株式会社パスコ | House change judgment method and house change judgment program |
JP4339289B2 (en) | 2005-07-28 | 2009-10-07 | Necシステムテクノロジー株式会社 | Change determination device, change determination method, and change determination program |
JP2007188117A (en) * | 2006-01-11 | 2007-07-26 | Asahi Koyo Kk | Cave-in area extraction method, device and program |
JP4747122B2 (en) * | 2007-03-23 | 2011-08-17 | Necシステムテクノロジー株式会社 | Specific area automatic extraction system, specific area automatic extraction method, and program |
JP4378571B2 (en) | 2007-05-31 | 2009-12-09 | Necシステムテクノロジー株式会社 | MAP CHANGE DETECTION DEVICE, MAP CHANGE DETECTION METHOD, AND PROGRAM |
EP2207010B1 (en) * | 2007-10-19 | 2015-05-20 | PASCO Corporation | House change judgment method and house change judgment program |
EP2207138B1 (en) * | 2007-10-30 | 2016-12-28 | PASCO Corporation | House movement determining method, house movement determining program, house movement determining image generating method, and house movement determining image |
JP5097629B2 (en) * | 2008-07-04 | 2012-12-12 | 株式会社日立ソリューションズ | Feature shape change detection program and feature shape change detection system |
US8682064B2 (en) | 2008-11-25 | 2014-03-25 | Nec System Technologies, Ltd. | Building change detection apparatus, building change detection method and program |
JP5409451B2 (en) * | 2010-03-15 | 2014-02-05 | 三菱電機株式会社 | 3D change detector |
JP5566307B2 (en) * | 2011-01-05 | 2014-08-06 | 株式会社パスコ | Map data update device, map data update method, and map data update program |
US11195324B1 (en) | 2018-08-14 | 2021-12-07 | Certainteed Llc | Systems and methods for visualization of building structures |
JP7498843B1 (en) | 2023-12-19 | 2024-06-12 | 朝日航洋株式会社 | Change interpretation system, change interpretation method, and change interpretation program |
-
2002
- 2002-09-27 JP JP2002282660A patent/JP4156320B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2004117245A (en) | 2004-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4156320B2 (en) | House transfer judgment method | |
JP4545219B1 (en) | Analysis method of topographic change using topographic image and program thereof | |
Vu et al. | LIDAR-based change detection of buildings in dense urban areas | |
US7142984B2 (en) | Method and apparatus for enhancing a digital elevation model (DEM) for topographical modeling | |
Matikainen et al. | Automatic detection of buildings from laser scanner data for map updating | |
CA2597056C (en) | Method and apparatus for distinguishing foliage from buildings for topographical modeling | |
US10115165B2 (en) | Management of tax information based on topographical information | |
JP2009545032A (en) | Geospatial modeling system and associated method providing building roof type identification function | |
JP2005234603A (en) | Map information updating method and map updating device | |
Labiak et al. | Automated method for detection and quantification of building damage and debris using post-disaster LiDAR data | |
Linke et al. | A disturbance-inventory framework for flexible and reliable landscape monitoring | |
BRPI0714264A2 (en) | geospatial modeling system, computer readable geospatial modeling method and computer executable modules | |
Miura et al. | Updating GIS building inventory data using high-resolution satellite images for earthquake damage assessment: application to metro Manila, Philippines | |
JP2004198530A (en) | Map updating system, map updating method and computer program | |
CN109242786B (en) | Automatic morphological filtering method suitable for urban area | |
JP6146731B2 (en) | Coordinate correction apparatus, coordinate correction program, and coordinate correction method | |
BRPI0714260A2 (en) | geospatial modeling system and geospatial modeling methods | |
EP2057580A2 (en) | Geospatial modeling system for performing filtering operations based upon a sum of differences of a given and neighboring location points and related methods | |
JP3900361B2 (en) | Damage area automatic extraction system | |
JP3924569B2 (en) | Damage area automatic extraction system | |
Peled et al. | Toward automatic updating of the Israeli National GIS-Phase II | |
Rehor et al. | Segmention of Damaged Buildings from Laser Scanning Data | |
Labiak | A method for detection and quantification of building damage using post-disaster lidar data | |
Gerke et al. | Automated update of road databases using aerial imagery and road construction data | |
He | Change detection for map updating with classification posterior probability of HJ image and TM image |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050926 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080401 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20080602 Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080602 |
|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20080602 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080708 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080709 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110718 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4156320 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110718 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120718 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120718 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130718 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |