JP4148617B2 - Chemical injection method - Google Patents

Chemical injection method Download PDF

Info

Publication number
JP4148617B2
JP4148617B2 JP34859499A JP34859499A JP4148617B2 JP 4148617 B2 JP4148617 B2 JP 4148617B2 JP 34859499 A JP34859499 A JP 34859499A JP 34859499 A JP34859499 A JP 34859499A JP 4148617 B2 JP4148617 B2 JP 4148617B2
Authority
JP
Japan
Prior art keywords
injection
guide hole
ground
excavation
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP34859499A
Other languages
Japanese (ja)
Other versions
JP2001164548A (en
Inventor
田 想 三 太
原 孝 彦 三
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chemical Grouting Co Ltd
Original Assignee
Chemical Grouting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chemical Grouting Co Ltd filed Critical Chemical Grouting Co Ltd
Priority to JP34859499A priority Critical patent/JP4148617B2/en
Publication of JP2001164548A publication Critical patent/JP2001164548A/en
Application granted granted Critical
Publication of JP4148617B2 publication Critical patent/JP4148617B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、例えば液状化対策のために施工される薬液注入工法であって、所謂「曲がりボーリング」により施工される薬液注入工法に関する。
【0002】
【従来の技術】
例えば図1に示す様に、建物Bの地下等の地中の液状化軟弱地盤Gを改良するためには、垂直ボーリングでなく、所謂「曲がりボーリング」により、図1中符号Lで示す様な複数の湾曲した掘削孔を掘削しなければならない場合が多い。
そして、この様な曲がりボーリングは公知である。
【0003】
しかし、従来の曲がりボーリングでは、施工するべき地盤が軟弱であるため、先行削孔されたガイド孔が崩落して、薬液注入のための内管挿入、その他の操作ができなくなる、という不都合があった。
また、ボーリング孔を1本ずつ削孔して掘削改良するので、改良するべき軟弱地盤が広範囲に亘っており、複数の掘削孔を曲がりボーリングにより掘削しなければならない場合には、地盤改良工事の工期が非常に長期間となってしまう、という問題点がある。
【0004】
【発明が解決しようとする課題】
本発明は、上述した従来技術の問題点に鑑みて提案されたものであり、先行削孔のガイド孔の崩落を防止して薬液注入を確実に行うことができ、しかも、地盤改良の工期を短縮させることができる薬液注入工法の提供を目的としている。
【0005】
【課題を解決するための手段】
本発明の薬液注入工法は、各々が外管及びその内側に配置された内管から成る二重管として構成されている複数管を用いて同時に曲がりボーリングを行い、曲線部分を有するガイド孔を複数本先行削孔する曲がり先行削孔工程と、該曲がり先行削孔工程で使用した掘削用モニタを取り外すために内管を地上に引抜く内管引抜き工程と、ガイド孔にシールグラウトを注入して充填するシールグラウト工程と、前記掘削用モニタに換えて内管先端部にスリーブ管および薬液注入手段を装着して前記ガイド孔に挿入するスリーブ管挿入工程と、前記外管を地上に引き抜く外管引抜き工程と、シールグラウトで防護された前記ガイド孔から施工するべき地盤に注入材を注入して改良する注入材注入工程、とを含んでいる。
【0006】
本発明の薬液注入工法の実施に先だって、複数管を同時に駆動、制御する複数管同時推進機を所定位置に設置する複数管同時推進機設置工程を実施することが好ましい。
【0007】
ここで、前記掘削用モニタは、地盤掘削用ジェット噴流を噴射する噴射ノズルを設けたモニタであっても良く、或いは、機械的な掘削用ビットを設けた掘削装置であっても良い。
【0008】
上述した様な構成を具備する本発明の薬液注入工法によれば、ガイド孔にシールグラウトを噴射してガイド孔内壁を適宜範囲まで防護するシールグラウト工程により、ガイド孔をあらかじめシールグラウトで内壁を防護してから注入材を注入させるので、ガイド孔の崩落による薬液注入の中断、不全がない。
【0009】
また本発明によれば、例えば曲がりボーリングによる複数管同時推進機等を用いて、複数の二重管で同時に先行削孔を行い、複数の内管から同時に注入材を注入して地盤改良を行うことが出来る。従って、1本の二重管のみを用いる場合に比較して、1度に広範囲の軟弱地盤領域を地盤改良出来るので、広域の地盤改良を短期間で施工出来る。
【0010】
さらに本発明によれば、障害物が存在する等の理由により垂直ボーリングでは地盤改良工法を施工できない領域の軟弱地盤であっても、複数の二重管で曲がりボーリングを行っているので、地盤改良が可能である。
【0011】
本発明の薬液注入工法で行われる曲がりボーリングの実施に際しては、鋼管先端に掘削手段を回転自在に設け、該掘削手段により地盤を掘削しつつ推進する推進工法で用いられる軌道修正方法であって、前記掘削手段は、ばね機構により前記鋼管の先端部に傾斜可能に支持され、駆動源により回転し、半径方向に伸縮する姿勢制御用シリンダの回転および伸縮により傾斜角度および傾斜方向が制御される様に構成されており、軌道修正を必要とするか否かを判断する判断工程と、軌道修正を必要としない場合に駆動源により掘削手段を正転し且つジェット噴流を噴射しつつ直線的に推進する直線掘進工程と、軌道修正を必要とする場合に掘削手段を所定方向に傾斜させて前記掘削手段を推進することにより軌道を修正する軌道修正工程とを含み、該軌道修正工程は、駆動源により掘削手段を逆転してワンウエイクラッチの作動方向に回動して姿勢制御用シリンダを円周方向の所定位置へ配置せしめる工程と、姿勢制御用シリンダを伸長して掘削手段を所定方向に傾斜させ且つ当該掘削手段を推進することにより軌道を修正する工程と、軌道の修正が完了したら姿勢制御用シリンダを縮め掘削手段の傾斜を戻して直線掘進を再開する工程とを有している軌道修正方法を実施することが好ましい。
【0012】
この軌道修正方法の実施に際して、鋼管先端に掘削手段を回転自在に設け、該掘削手段により地盤を掘削しつつ推進する推進工法で用いられる軌道修正装置であって、前記掘削手段を前記鋼管内先端部にばね機構を介して傾斜可能に支持し、前記掘削手段は先端回転部を有し、該先端回転部をワンウエイクラッチを介して回転駆動する駆動源を設け、半径方向へ伸縮可能に構成されている姿勢制御用シリンダを前記先端回転部に設け、制御手段を有し、該制御手段は、掘削手段を所定方向に傾斜させて軌道修正することを必要とする場合に、駆動源により掘削手段を逆転してワンウエイクラッチの作動方向に回動し、前記姿勢制御用シリンダを円周方向の所定位置まで移動し、前記姿勢制御用シリンダを半径方向に伸長する様に構成されている軌道修正装置を用いることが好ましい。
【0013】
【発明の実施の形態】
以下、図面を参照して本発明の実施の形態を説明する。
【0014】
図1において、上述した通り、建物(既設構造物)Bが築造されている領域は、その地下部分は要改良地盤Gとなっている。
ここで、図示の実施形態においては、複数本の掘削孔を曲がりボーリングにより掘削する場合について、説明されている。
【0015】
なお、図1において、符号BBは基礎杭を示している。また、符号Goは地表面を示している。
【0016】
図2に示すように、その複数管同時推進機1Aに、前、後進駆動される内管2と、内管2の先端にジェット噴孔3aを有するモニタ3とが装着されている。
【0017】
内管2とモニタ3による削孔の形態は、図2で示す様に、地上から供給される高圧掘削水Hが内管2からスイベル4を介してモニタ3に到達し、回転するジェット噴孔3aからジェットJ1、J2となって掘削前進する様になっている。
【0018】
ここで、図2におけるジェットJ1は所謂「交差噴流」(クロスジェット)であるが、通常のジェット噴流であっても良い。
【0019】
掘削泥排水Hwは、地上に排出される様に構成されている。そして、モニタ3の前進と共に、外管5をガイド孔10に設置する様に構成されている。
【0020】
図6、図8、図10、図12は、先行削孔したガイド孔10の内壁をシールグラウトで防護するための形態を示している。
【0021】
図8において、内管2Aの先端部には、前記の掘削用モニタ3に換えて、噴孔3Aaを備えた薬液噴射装置のインジェクション3Aが装着され、その前部には内管2Aの先端部保護用フレキシブルスリーブ8が取り付けられている。
【0022】
詳細は後述するが、上記した様な内管2Aを、グラウト材を注入・充填したガイド孔10及び外管5(図6参照)に挿入する。その状態で外管5を引き抜いても(図10参照)、前記グラウト材がガイド孔10の内壁を補強防護しているので、ガイド孔10の崩落を未然に防止することが出来る。
【0023】
以上の装置を使用した曲がりボーリングによる薬液注入工法の作業手順を、図13のフローチャートをも参照して説明する。
【0024】
先ず、図示しない複数管同時推進機を地上Goの所定位置に据え付けする(ステップS1:図示せず)。
図示の実施例においては、縦方向に3本の管で、横方向には4本の管(内管2および外管5を1組の管として)を同時に推進できる様に据え付けする。そして、地中への進入掘進は、直線斜め孔L1で行う様に調整して設置する(複数管同時推進機設置工程)。
【0025】
次に、図1で示す様に、複数管を同時に作動させて所定位置までガイド孔10を先行削孔する(ステップS2:曲がり先行削孔工程)。
即ち、直線斜め孔L1から曲がり孔Cpを経て、水平孔Lpを掘削用モニタ3(図2を参照)によって高圧水Hで所定位置Eg1までジェット掘削する。このとき、ガイド孔10に外管5を設置する。
【0026】
そして図3および図4で示す様に、先行削孔のガイド孔10を使用して地盤改良をする準備を行うため、換言すれば、掘削用モニタ3を薬液噴射装置に換えるために、内管2をモニタ3と共に地上側へ引き抜く(ステップS3:内管引き抜き工程)。
このとき、外管5は設置した状態のまま、ガイド孔10内に残留せしめる。
【0027】
次に図5、図6で示す様に、ガイド孔10(及び/又は外管5)内へ、シールグラウトMgを注入・充填する(ステップS4:シールグラウト工程)。
地上側の図示しないシールグラウト充填用手段により、掘削されたガイド孔10と外管5との隙間と、ガイド孔10の内壁とをシールグラウトMgで充填し、以って、ガイド孔10内壁の崩落を防止するためである。なお、崩落防止については、後述する。
【0028】
次の工程では、図7、図8で示す様に、上記シールグラウト工程でシールグラウトMgが充填された外管5内に、内管(スリーブ管)2Aを挿入する(ステップS5:スリーブ管挿入工程)。
ここで内管(スリーブ管)2Aは、ステップS3で引き抜かれた内管2から掘削用モニタ3を取り外し、薬液噴射用のフレキシブルスリーブ8およびインジェクション3Aを装着したものである。
【0029】
内管(スリーブ管)2Aの挿入が完了したならば(ステップS5の完了)、図9及び図10で示す様に、内管2Aをそのままにして、外管5を地上側に向かって引抜く(ステップS6:外管引抜き工程)。
ステップS4に関連して上述した様に、ガイド孔10内にはシールグラウトMgが充填されているため、外管5を引き抜いても、ガイド孔10の内壁面が崩落することは防止される。
【0030】
換言すれば、図示の実施形態によれば、外管5が引き抜かれた後のガイド孔10内において、ガイド孔10の内壁面と内管(スリーブ管)3Aとの間の空間にはグラウト材Mgが充填されている。そのため、ガイド孔10内壁面から岩石、土砂が崩落するのが防止されるのである。
【0031】
その状態で、シールグラウトMgが固結するのに十分な期間だけ養生する。
【0032】
ステップS1−S6が完了いたならば、ガイド孔10に沿った全領域において、上述した工程が未だに施工されていない領域が存在しているか否かを確認する(ステップS7)。
【0033】
ステップS1−S6が完了していない領域があれば(ステップS8がNo)、ステップS1に戻り、上述の処理を繰り返す。
【0034】
一方、ガイド孔10の全領域が終了していれば(ステップS8がYes)、薬液注入を行う。
【0035】
薬液注入に際しては、スリーブ管2Aのインジェクション3Aの薬液吐出口3Aaから、懸濁型注入材等を注入する(ステップS8:一次注入)
ついで、ステップS10では、溶液型注入材(超微粒子系)等を注入する(ステップS9:二次注入)。
【0036】
この一次注入及び二次注入の態様は、図11、図12で示されている。
なお、注入方法は、公知の方法の何れでも良い。
【0037】
図示の実施形態では、液状化対策のための注入材注入工程は、ステップS8の一次注入と、ステップS10の二次注入とにより、構成されている。但し、単一工程により注入材注入工程を施工しても良く、或いは、3段階以上の工程に分離して施工しても良い。
【0038】
注入工程が完了したならば(ステップS9が完了)、液状化対策のための注入材注入工程を行うべき領域が残っているか否かを確認する(ステップS10)。
全領域が終了していれば(ステップS10がYes)、複数管同時推進機1Aの撤去等の終了作業を行って施工を終了をする(ステップS11)。
一方、注入工程が完了していない領域が存在するのであれば(ステップS10がNo)、ステップS8、S9を繰り返し、液状化対策注入を行う。
【0039】
上記した様な手順に従って、既設構造物Bの下方領域における要改良地盤Gを改良するのである。
【0040】
以下、図14−図20を参照して、図1−図13で説明した本発明の薬液注入工法の曲がりボーリングを施工するに際して、好適に実施される軌道修正方法及び装置について説明する。
【0041】
図14において、二重の鋼管115は外管116および内管117で構成され、その先端の内部には、全体を符号Mで示すモニタの軌道修正装置110が挿入されている。その軌道修正装置110は、軸受部104が支持スプリング108によって傾斜可能に支持されている。
【0042】
モニタMの先端回転部101の先端部(図14における右側端部)には、掘削用のジェット噴流J2、J2(通常のジェット噴流:交差噴流を構成しないジェット噴流)を噴射する噴射ノズルN1、N1が設けられいる。また、先端回転部101の側面には、ジェット噴流J2、J2で穿孔された孔を半径方向に拡径するため、交差噴流J1を形成する一対ノノズルN1、N1が設けられている。
さらに先端回転部101は、後端部(図14における左側端部)に設けられた油圧モータ105(駆動手段)によって、駆動されている。
【0043】
先端回転部101は符号102で示す制御シリンダ部を有しており、該制御シリンダ部102には、その外周部に半径方向に伸縮する姿勢制御用シリンダ106が設けられている。(換言すれば、姿勢制御用シリンダ106は先端回転部101に設けられている。)この姿勢制御用シリンダ106は、油圧モータ105による逆転時には、図示しないワンウエークラッチによって先端回転部101と共に回転するように構成されている。なお、図示しないワンウエークラッチによれば、一方向の回転は伝達されるが、他方向の回転は伝達されない。
制御シリンダ部102の後方(図14では左方)には、油スイベル部103が設けられて制御シリンダ駆動用の油が供給されており、そして前記軸受部104を隔てた後方には水スイベル部107が設けられて水が供給されている。
【0044】
次に、図15〜図17を参照し、軌道修正方法を説明する。
まず、図15には、直線掘進時の状態が示されている。先端回転部101は油圧モータ105によって正回転(A)で駆動され、その噴射ノズルからジェット噴流J1、J2が噴出されて掘削が行われ、鋼管115は直線で推進される。
【0045】
図16〜図19には軌道修正の状態が示されている。まず、図16に示すように、油圧モータ105を逆回転すると、図示の実施形態においては逆回転方向はワンウエイクラッチの作動方向であるので、図示しないワンウエイクラッチの作動により制御シリンダ部102が(逆)回転(図16の矢印C)し、制御シリンダ部102の外周部に設けられた制御用シリンダ106を、修正方向の逆方向に向けて停止させる。すなわち、制御用シリンダ106を周方向の所定位置まで回転移動させる。
そして、図17に示すように、制御用シリンダ106を伸長して内管117内周に当接させると、モニタ110はスプリング108で支持されているので、容易に所定角度に傾斜させることができる。
【0046】
そこで油圧モータ105を正回転させ(矢印A方向)、ジェット噴射して推進を再開すると、図18に示すように符号a側が(クロスジェットJ1による)余堀量が少なくなり、且つ、外管116の符号a側の領域が地盤に対して「そり」の様に作用して、矢視X方向に軌道が修正される。
軌道の修正が完了したら、制御用シリンダ106を縮め、モニタ110の傾斜を戻す。そして、油圧モータ105を正転駆動(矢印A方向)して、直線掘進を再開する(図17)。
【0047】
上記軌道修正方法の制御手順を、図18のフローチャートを参照しつつ、さらに説明する。
推進開始は、まずステップS11でジェット噴射を行い、ステップS12にて油圧モータ105の正転によって先端回転部101を回転させる(図15)。
【0048】
そして、ステップS13では、軌道修正が必要か否か判断し、NoであればステップS19へ進み、Yesであれば、ステップS14に進む。
なお、軌道修正が必要であるか否かについては、ジャイロ或いはロケータ等を使用する公知技術により、判断することが可能である。
【0049】
ステップS14では、軌道修正のために、まず油圧モータ105を逆転(ワンウェイクラッチが作動する回転方向)させて、姿勢制御用シリンダ106を所定の方向に向ける(図16の状態)。
そして、ステップS15で、姿勢制御用シリンダ106を伸ばしてモニタ110を傾ける(図17で示す状態)。
次に、ステップS16に進み、油圧モータ105を正転させ、先端回転部101を回転して推進する。
【0050】
ステップS17では軌道が修正されたか否か判断し、Noであれば、ステップS14に戻って軌道の修正ルーチンを繰り返し、Yesであれば、ステップS18に進んで姿勢制御シリンダ106を縮め、モニタ110の傾きを戻す。
ステップS19では、掘進の目標に到達したか否か判断し、到達していなければ(ステップS19がNo)、ステップS12に戻る。一方、掘進の目標位置に到達したのであれば(ステップS19がYes)、推進を終了する。
【0051】
図14−図20で示す軌道修正方法及び装置は、掘削手段が噴射ノズルN1、N2を有するモニタ1であり、噴射ノズルN1、N2からの交差噴流J1、J2により地盤を掘削しつつ推進する場合に関するものである。
これに対して、掘削手段として機械的な掘削用ビットを用いた軌道修正方法及び装置が、図21、図22で示されている。
【0052】
図21及び図22で示す軌道修正方法及び装置においては、全体を符号Maで示す掘削用部材の先端回転部101aには、掘削用ビット150が設けられており、該ビット150の円形の端面の切羽側には掘削用チップ152が複数設けられている。
ここで、図21は直進時を示しており、姿勢制御用シリンダ106は収縮した状態となっている。これに対して、図22は軌道修正時を示しており、姿勢制御用シリンダ106は伸長している。
図21及び図22で示す軌道修正方法及び装置における掘削手段以外の構成及び作用効果については、図14−図20で示す軌道修正方法及び装置と同様である。
【0053】
なお、図示の実施形態はあくまでも例示であり、本発明の技術的範囲を限定する趣旨の記載ではない。
【0054】
【発明の効果】
本発明の作用効果を、以下に列挙する。
(1) 本発明の曲がりボーリングによる薬液注入工法により、地上、地中の障害物により垂直ボーリングでは施工できない地下の液状化軟弱地盤を、複数管同時推進機で複数管を同時に地盤改良させるので広域の地盤改良施工を短期間でできる。
(2) ガイド孔をあらかじめシールグラウトで内壁を防護してから注入材を注入させるので、ガイド孔の崩落による薬液注入の中断、不全がなく確実な注入が行える。
【図面の簡単な説明】
【図1】本発明の実施形態の複数管同時曲がり削孔工程を示す側面図。
【図2】図1のガイド孔削孔状態を示す拡大説明図。
【図3】内管引抜き工程を示す側面図。
【図4】図3の内管引抜きの状態を示す拡大説明図。
【図5】ガイド孔にシールグラウトをするシールグラウト工程を示す側面図。
【図6】図5のシールグラウト注入・充填状態を示す拡大説明図。
【図7】スリーブ管およびインジェクションを装着した内管をガイド孔に挿入するスリーブ管挿入工程を示す側面図。
【図8】図7の内管挿入の状態を示す拡大説明図。
【図9】外管引抜き工程を示す側面図。
【図10】図8の外管引抜きとシールグラウトの状態を示す拡大説明図。
【図11】薬液注入工程を示す側面図。
【図12】図11の薬液注入工程を拡大して説明する図。
【図13】本発明の薬液注入工法の作業手順を示すフローチャート図。
【図14】本発明で行われる曲がりボーリングの際に好適に実施出来る軌道修正装置の構成を示す断面図。
【図15】図14の装置を用いた直線掘進時を示す断面図。
【図16】図14の装置における制御シリンダの回転状態を示す断面図。
【図17】図14の装置の制御シリンダが伸長した際のモニタ傾斜状態を示す断面図。
【図18】図14の装置におけるモニタ傾斜による軌道修正の推進状態を示す断面図。
【図19】図14の装置における直進再開推進状態を示す断面図。
【図20】図14の装置を用いた軌道修正のフローチャート図。
【図21】本発明と好適に組み合わせることが出来る軌道修正装置のその他の例における直線掘進時を示す断面図。
【図22】図21の軌道修正装置における制御シリンダの伸長によるモニタ傾斜状態を示す断面図。
【符号の説明】
1A・・複数管同時推進装置
B・・・建物(既設構造物)
Go・・地表
G・・要改良地盤
BB・・基礎杭
J・・ジェット
L・・曲がりボーリングにより削孔された孔
Lp・・水平孔
2、2A・・内管
3、3A・・モニタ
3a、3Aa・・ジェット噴孔
5・・外管
10・・ガイド孔
101・・先端回転部
102・・制御シリンダ部
103・・油スイベル部
104・・軸受部
105・・油圧モータ
106・・姿勢制御用シリンダ
107・・水スイベル部
108・・モニタ支持スプリング
110・・軌道修正装置
115・・鋼管
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to, for example, a chemical solution injection method constructed for liquefaction countermeasures, and relates to a chemical solution injection method constructed by so-called “curved boring”.
[0002]
[Prior art]
For example, as shown in FIG. 1, in order to improve the liquefied soft ground G in the ground such as the basement of the building B, the so-called “curved boring” is used instead of the vertical boring, as indicated by the symbol L in FIG. Often it is necessary to drill a plurality of curved drill holes.
Such bending boring is well known.
[0003]
However, the conventional curved boring has the disadvantage that the ground to be constructed is soft, so that the previously drilled guide hole collapses, making it impossible to insert the inner tube for injecting chemicals and perform other operations. It was.
In addition, since drilling is improved by drilling one borehole at a time, there is a wide range of soft ground to be improved. If multiple drilling holes must be drilled by bending, There is a problem that the construction period becomes very long.
[0004]
[Problems to be solved by the invention]
The present invention has been proposed in view of the above-mentioned problems of the prior art, can prevent the collapse of the guide hole of the preceding drilling hole, and can reliably inject the chemical solution, and can further improve the ground improvement period. The purpose is to provide a chemical injection method that can be shortened.
[0005]
[Means for Solving the Problems]
The chemical solution injection method of the present invention performs simultaneous boring using a plurality of tubes each configured as a double tube comprising an outer tube and an inner tube disposed inside thereof, and a plurality of guide holes having curved portions are formed. Bending preceding drilling process for this preceding drilling, an inner pipe drawing process for pulling the inner pipe to the ground to remove the excavation monitor used in the bending preceding drilling process, and injecting seal grout into the guide hole A seal grout process for filling, a sleeve pipe insertion process for inserting a sleeve pipe and a chemical solution injection means at the tip of the inner pipe in place of the excavation monitor and inserting it into the guide hole, and an outer pipe for pulling the outer pipe to the ground A drawing process, and an injection material injection process for injecting and improving the injection material to the ground to be constructed from the guide hole protected by the seal grout.
[0006]
Prior to the execution of the chemical solution injection method of the present invention, it is preferable to carry out a multi-tube simultaneous propulsion device installation step in which a multi-tube simultaneous propulsion device that simultaneously drives and controls a plurality of tubes is installed at a predetermined position.
[0007]
Here, the excavation monitor may be a monitor provided with an injection nozzle for jetting a ground excavation jet or may be an excavator provided with a mechanical excavation bit.
[0008]
According to the chemical injection method of the present invention having the above-described configuration, the guide hole is previously sealed with the seal grout by the seal grout process in which the seal grout is injected into the guide hole to protect the inner wall of the guide hole to an appropriate range. Since the injection material is injected after protection, there is no interruption or failure of chemical injection due to collapse of the guide hole.
[0009]
In addition, according to the present invention, for example, using a multi-pipe simultaneous propulsion machine by bending boring, etc., the preliminary drilling is simultaneously performed with a plurality of double pipes, and the injection material is simultaneously injected from the plurality of inner pipes to improve the ground. I can do it. Therefore, compared with the case where only one double pipe is used, a wide soft ground area can be improved at a time, so a wide area ground improvement can be performed in a short period of time.
[0010]
Furthermore, according to the present invention, even in the soft ground where the ground improvement method cannot be applied by vertical boring due to the presence of obstacles, etc. Is possible.
[0011]
When performing the curved boring performed by the chemical injection method of the present invention, a drilling means is rotatably provided at the tip of the steel pipe, and the trajectory correcting method used in the propulsion method of propelling while excavating the ground by the excavating means, The excavation means is supported by a spring mechanism so as to be tiltable at the tip of the steel pipe, rotated by a driving source, and controlled in inclination and direction by rotation and expansion / contraction of a posture control cylinder that expands and contracts in the radial direction. It is configured to determine whether or not the trajectory correction is required, and when the trajectory correction is not required, the excavation means is rotated forward by the drive source and propelled linearly while jetting jets. A straight excavation process, and a trajectory correction process for correcting the trajectory by propelling the excavation means by tilting the excavation means in a predetermined direction when the trajectory correction is required. The trajectory correcting step includes a step of rotating the excavating means by a drive source and rotating the one-way clutch in an operating direction to dispose the posture control cylinder at a predetermined position in the circumferential direction, and extending the posture control cylinder. Tilting the excavating means in a predetermined direction and correcting the trajectory by propelling the excavating means; and, when the correction of the trajectory is completed, retracting the attitude control cylinder to return the inclination of the excavating means and restarting linear excavation It is preferable to implement a trajectory correction method having
[0012]
In carrying out this trajectory correction method, a trajectory correcting device used in a propulsion method in which excavating means is rotatably provided at the tip of a steel pipe and propelled while excavating the ground by the excavating means, wherein the excavating means is connected to the tip of the steel pipe The excavation means has a tip rotating part, and a driving source for rotating the tip rotating part via a one-way clutch is provided, and is configured to be extendable and contractable in the radial direction. A posture control cylinder is provided at the tip rotating portion and has a control means, and the control means is provided with a digging means by a drive source when it is necessary to correct the trajectory by inclining the digging means in a predetermined direction. Is rotated in the direction of operation of the one-way clutch, the posture control cylinder is moved to a predetermined circumferential position, and the posture control cylinder is extended in the radial direction. It is preferable to use a trajectory correction device.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
[0014]
In FIG. 1, as described above, the area where the building (existing structure) B is built has an improved ground G in the underground portion.
Here, in the illustrated embodiment, a case where a plurality of excavation holes are excavated by bending and boring is described.
[0015]
In addition, in FIG. 1, code | symbol BB has shown the foundation pile. The symbol Go indicates the ground surface.
[0016]
As shown in FIG. 2, an inner tube 2 that is driven forward and backward, and a monitor 3 that has a jet injection hole 3 a at the tip of the inner tube 2 are attached to the multi-tube simultaneous propulsion device 1 </ b> A.
[0017]
As shown in FIG. 2, the shape of the hole drilled by the inner pipe 2 and the monitor 3 is a jet nozzle hole in which high-pressure drilling water H supplied from the ground reaches the monitor 3 from the inner pipe 2 via the swivel 4 and rotates. From 3a, jets J1 and J2 become digging forward.
[0018]
Here, although the jet J1 in FIG. 2 is a so-called “cross jet” (cross jet), it may be a normal jet jet.
[0019]
The drilling mud drainage Hw is configured to be discharged to the ground. The outer tube 5 is installed in the guide hole 10 as the monitor 3 advances.
[0020]
6, 8, 10, and 12 show a form for protecting the inner wall of the previously drilled guide hole 10 with a seal grout.
[0021]
In FIG. 8, an injection 3A of a chemical injection device provided with an injection hole 3Aa is attached to the tip of the inner tube 2A in place of the excavation monitor 3, and the tip of the inner tube 2A is attached to the front thereof. A protective flexible sleeve 8 is attached.
[0022]
Although the details will be described later, the inner tube 2A as described above is inserted into the guide hole 10 and the outer tube 5 (see FIG. 6) filled and filled with grout material. Even if the outer tube 5 is pulled out in this state (see FIG. 10), the grout material reinforces and protects the inner wall of the guide hole 10, so that the collapse of the guide hole 10 can be prevented.
[0023]
The work procedure of the chemical injection method by bending boring using the above apparatus will be described with reference to the flowchart of FIG.
[0024]
First, a multi-pipe simultaneous propulsion device (not shown) is installed at a predetermined position on the ground Go (step S1: not shown).
In the illustrated embodiment, three tubes are installed in the vertical direction and four tubes in the horizontal direction (the inner tube 2 and the outer tube 5 as a set of tubes) are installed so that they can be simultaneously propelled. Then, the underground excavation into the ground is adjusted and installed so as to be performed in the straight oblique hole L1 (multiple pipe simultaneous propulsion device installation step).
[0025]
Next, as shown in FIG. 1, a plurality of pipes are simultaneously operated to drill the guide hole 10 up to a predetermined position (step S2: bending preceding drilling step).
That is, the horizontal hole Lp is jet excavated from the straight oblique hole L1 to the predetermined position Eg1 with the high-pressure water H by the excavation monitor 3 (see FIG. 2). At this time, the outer tube 5 is installed in the guide hole 10.
[0026]
As shown in FIGS. 3 and 4, in order to prepare for ground improvement using the guide hole 10 of the preceding drilling hole, in other words, to replace the excavation monitor 3 with a chemical injection device, 2 is pulled out to the ground side together with the monitor 3 (step S3: inner pipe pulling step).
At this time, the outer tube 5 is left in the guide hole 10 in the installed state.
[0027]
Next, as shown in FIGS. 5 and 6, seal grout Mg is injected and filled into the guide hole 10 (and / or the outer tube 5) (step S4: seal grout process).
The gap between the excavated guide hole 10 and the outer tube 5 and the inner wall of the guide hole 10 are filled with the seal grout Mg by means of a seal grout filling means (not shown) on the ground side. This is to prevent the collapse. The collapse prevention will be described later.
[0028]
In the next step, as shown in FIGS. 7 and 8, the inner tube (sleeve tube) 2A is inserted into the outer tube 5 filled with the seal grout Mg in the seal grout step (step S5: sleeve tube insertion). Process).
Here, the inner pipe (sleeve pipe) 2A is obtained by removing the excavation monitor 3 from the inner pipe 2 pulled out in step S3 and mounting the flexible sleeve 8 for chemical solution injection and the injection 3A.
[0029]
When insertion of the inner tube (sleeve tube) 2A is completed (completion of step S5), as shown in FIGS. 9 and 10, the inner tube 2A is left as it is, and the outer tube 5 is pulled out toward the ground side. (Step S6: Outer tube drawing step).
As described above with reference to step S4, since the seal grout Mg is filled in the guide hole 10, the inner wall surface of the guide hole 10 is prevented from collapsing even when the outer tube 5 is pulled out.
[0030]
In other words, according to the illustrated embodiment, in the guide hole 10 after the outer tube 5 has been pulled out, there is no grout material in the space between the inner wall surface of the guide hole 10 and the inner tube (sleeve tube) 3A. It is filled with Mg. Therefore, rocks and earth and sand are prevented from collapsing from the inner wall surface of the guide hole 10.
[0031]
In that state, the seal grout Mg is cured for a sufficient period of time to solidify.
[0032]
If step S1-S6 is completed, it will be confirmed whether the area | region where the process mentioned above has not yet been performed exists in the whole area | region along the guide hole 10 (step S7).
[0033]
If there is an area where Steps S1 to S6 are not completed (No in Step S8), the process returns to Step S1 and the above-described processing is repeated.
[0034]
On the other hand, if the entire region of the guide hole 10 has been completed (Yes in step S8), the chemical solution is injected.
[0035]
When injecting the chemical solution, a suspension type injection material or the like is injected from the chemical solution discharge port 3Aa of the injection 3A of the sleeve tube 2A (step S8: primary injection).
Next, in step S10, a solution type injection material (ultrafine particle type) or the like is injected (step S9: secondary injection).
[0036]
This mode of primary injection and secondary injection is shown in FIGS.
The injection method may be any known method.
[0037]
In the illustrated embodiment, the injection material injection step for liquefaction countermeasures is configured by primary injection at step S8 and secondary injection at step S10. However, the injection material injection process may be performed in a single process, or may be performed separately in three or more stages.
[0038]
If the injection process is completed (step S9 is completed), it is confirmed whether or not there remains a region where the injection material injection process for liquefaction countermeasures should remain (step S10).
If the entire region has been completed (step S10 is Yes), the work is finished by performing a finishing operation such as removal of the multi-pipe simultaneous propulsion device 1A (step S11).
On the other hand, if there is a region where the injection process has not been completed (No in step S10), steps S8 and S9 are repeated to perform liquefaction countermeasure injection.
[0039]
In accordance with the procedure as described above, the improvement ground G in the lower region of the existing structure B is improved.
[0040]
Hereinafter, with reference to FIG. 14 to FIG. 20, a trajectory correcting method and apparatus that are preferably implemented when performing the curved boring of the chemical injection method of the present invention described in FIG. 1 to FIG. 13 will be described.
[0041]
In FIG. 14, a double steel pipe 115 is constituted by an outer pipe 116 and an inner pipe 117, and a monitor trajectory correcting device 110, indicated as a whole by the symbol M, is inserted inside the tip thereof. In the track correcting device 110, the bearing portion 104 is supported by a support spring 108 so as to be tiltable.
[0042]
An injection nozzle N1 that injects jet jets J2 and J2 for excavation (normal jet jets: jet jets that do not constitute cross jets) at the tip end portion (right end portion in FIG. 14) of the tip rotating portion 101 of the monitor M. N1 is provided. Further, a pair of nozzles N1 and N1 that form a cross jet J1 are provided on the side surface of the tip rotating portion 101 in order to radially expand the holes drilled by the jet jets J2 and J2.
Further, the leading end rotating part 101 is driven by a hydraulic motor 105 (driving means) provided at the rear end (left end in FIG. 14).
[0043]
The tip rotating portion 101 has a control cylinder portion denoted by reference numeral 102, and the control cylinder portion 102 is provided with a posture control cylinder 106 that expands and contracts in the radial direction on the outer peripheral portion thereof. (In other words, the posture control cylinder 106 is provided in the tip rotation unit 101.) When the hydraulic motor 105 rotates in the reverse direction, the posture control cylinder 106 is rotated together with the tip rotation unit 101 by a one-way clutch (not shown). It is configured. Note that according to a one-way clutch (not shown), rotation in one direction is transmitted, but rotation in the other direction is not transmitted.
An oil swivel portion 103 is provided behind the control cylinder portion 102 (leftward in FIG. 14), and oil for driving the control cylinder is supplied, and a water swivel portion is provided behind the bearing portion 104. 107 is provided to supply water.
[0044]
Next, the trajectory correction method will be described with reference to FIGS.
First, FIG. 15 shows a state during straight excavation. The tip rotating portion 101 is driven in a normal rotation (A) by a hydraulic motor 105, jet jets J1 and J2 are ejected from the injection nozzle, excavation is performed, and the steel pipe 115 is propelled in a straight line.
[0045]
16 to 19 show the state of trajectory correction. First, as shown in FIG. 16, when the hydraulic motor 105 is rotated in the reverse direction, in the illustrated embodiment, the reverse rotation direction is the direction of operation of the one-way clutch. ) Rotate (arrow C in FIG. 16), and stop the control cylinder 106 provided on the outer periphery of the control cylinder 102 in the direction opposite to the correction direction. That is, the control cylinder 106 is rotationally moved to a predetermined position in the circumferential direction.
Then, as shown in FIG. 17, when the control cylinder 106 is extended and brought into contact with the inner periphery of the inner pipe 117, the monitor 110 is supported by the spring 108, so that it can be easily inclined at a predetermined angle. .
[0046]
Therefore, when the hydraulic motor 105 is rotated forward (in the direction of arrow A) and propulsion is resumed by jetting, the amount of surplus on the side of the symbol a (by the cross jet J1) decreases as shown in FIG. The region on the code a side acts like a “sledge” on the ground, and the trajectory is corrected in the direction of arrow X.
When the correction of the trajectory is completed, the control cylinder 106 is contracted and the inclination of the monitor 110 is returned. Then, the hydraulic motor 105 is driven in the normal direction (in the direction of arrow A) to resume linear digging (FIG. 17).
[0047]
The control procedure of the trajectory correction method will be further described with reference to the flowchart of FIG.
To start propulsion, jet injection is first performed in step S11, and the tip rotating portion 101 is rotated by forward rotation of the hydraulic motor 105 in step S12 (FIG. 15).
[0048]
In step S13, it is determined whether or not trajectory correction is necessary. If No, the process proceeds to step S19. If Yes, the process proceeds to step S14.
Whether or not the trajectory needs to be corrected can be determined by a known technique using a gyro or a locator.
[0049]
In step S14, in order to correct the trajectory, first, the hydraulic motor 105 is reversely rotated (rotation direction in which the one-way clutch is operated), and the attitude control cylinder 106 is directed in a predetermined direction (state shown in FIG. 16).
In step S15, the attitude control cylinder 106 is extended and the monitor 110 is tilted (state shown in FIG. 17).
Next, it progresses to step S16, the hydraulic motor 105 is rotated forward, and the front-end | tip rotation part 101 is rotated and propelled.
[0050]
In step S17, it is determined whether or not the trajectory has been corrected. If No, the process returns to step S14 to repeat the trajectory correction routine. If Yes, the process proceeds to step S18 to contract the attitude control cylinder 106 and Return the tilt.
In step S19, it is determined whether or not the target for excavation has been reached. If not reached (No in step S19), the process returns to step S12. On the other hand, if the target position for excavation has been reached (step S19 is Yes), the promotion is terminated.
[0051]
The track correction method and apparatus shown in FIGS. 14 to 20 are cases where the excavation means is a monitor 1 having injection nozzles N1 and N2, and propulsion is performed while excavating the ground by cross jets J1 and J2 from the injection nozzles N1 and N2. It is about.
On the other hand, a trajectory correcting method and apparatus using a mechanical excavating bit as excavating means are shown in FIGS.
[0052]
In the trajectory correcting method and apparatus shown in FIGS. 21 and 22, the excavation bit 150 is provided on the tip rotating portion 101a of the excavation member as a whole indicated by reference numeral Ma, and the circular end surface of the bit 150 is provided. A plurality of excavation tips 152 are provided on the face side.
Here, FIG. 21 shows a straight traveling time, and the attitude control cylinder 106 is in a contracted state. On the other hand, FIG. 22 shows the time of trajectory correction, and the attitude control cylinder 106 is extended.
The configuration and operational effects of the trajectory correcting method and apparatus shown in FIGS. 21 and 22 other than the excavating means are the same as those of the trajectory correcting method and apparatus shown in FIGS.
[0053]
The illustrated embodiments are merely examples, and are not intended to limit the technical scope of the present invention.
[0054]
【The invention's effect】
The effects of the present invention are listed below.
(1) With the chemical injection method using curved boring of the present invention, the underground liquefied soft ground that cannot be constructed by vertical boring due to obstacles on the ground and underground, and the multiple pipes simultaneous propulsion machine improve the multiple pipes simultaneously. The ground improvement construction can be done in a short period of time.
(2) Since the injection material is injected after protecting the inner wall of the guide hole with a seal grout in advance, the injection of chemical solution due to the collapse of the guide hole is interrupted and reliable injection can be performed.
[Brief description of the drawings]
FIG. 1 is a side view showing a multiple pipe simultaneous bending drilling step of an embodiment of the present invention.
FIG. 2 is an enlarged explanatory view showing a guide hole drilling state in FIG. 1;
FIG. 3 is a side view showing an inner tube drawing process.
4 is an enlarged explanatory view showing a state in which the inner pipe is pulled out in FIG. 3. FIG.
FIG. 5 is a side view showing a seal grouting process for sealing grouting the guide hole.
6 is an enlarged explanatory view showing a seal grout injection / filling state of FIG. 5; FIG.
FIG. 7 is a side view showing a sleeve tube insertion process for inserting a sleeve tube and an inner tube equipped with an injection into a guide hole.
8 is an enlarged explanatory view showing a state in which the inner tube is inserted in FIG.
FIG. 9 is a side view showing an outer tube drawing process.
FIG. 10 is an enlarged explanatory view showing a state of the outer tube drawing and the seal grout of FIG. 8;
FIG. 11 is a side view showing a chemical solution injection step.
12 is an enlarged view for explaining the chemical liquid injection process of FIG. 11. FIG.
FIG. 13 is a flowchart showing the work procedure of the chemical injection method of the present invention.
FIG. 14 is a cross-sectional view showing the configuration of a trajectory correcting apparatus that can be suitably implemented during the curved boring performed in the present invention.
15 is a cross-sectional view showing a straight excavation using the apparatus of FIG.
16 is a cross-sectional view showing a rotation state of a control cylinder in the apparatus of FIG.
17 is a cross-sectional view showing a monitor tilt state when the control cylinder of the apparatus of FIG. 14 is extended.
18 is a cross-sectional view showing a propulsion state of trajectory correction by monitor inclination in the apparatus of FIG.
FIG. 19 is a cross-sectional view showing a state of propelling rectilinear advance in the apparatus of FIG.
20 is a flowchart of trajectory correction using the apparatus of FIG.
FIG. 21 is a cross-sectional view showing a straight excavation in another example of a trajectory correcting apparatus that can be suitably combined with the present invention.
22 is a cross-sectional view showing a monitor tilt state by extension of a control cylinder in the trajectory correcting apparatus of FIG. 21. FIG.
[Explanation of symbols]
1A ・ ・ Multi-pipe simultaneous propulsion device B ・ ・ ・ Building (existing structure)
Go ·· Ground surface G ···················································································· L 3Aa ・ ・ Jet injection hole 5 ・ ・ Outer tube 10 ・ ・ Guide hole 101 ・ ・ Rotating tip part 102 ・ ・ Control cylinder part 103 ・ ・ Oil swivel part 104 ・ ・ Bearing part 105 ・ ・ Hydraulic motor 106 ・ ・ For posture control Cylinder 107 ·· Water swivel 108 · · Monitor support spring 110 · · Track correction device 115 · · Steel pipe

Claims (1)

各々が外管及びその内側に配置された内管から成る二重管として構成されている複数管を用いて同時に曲がりボーリングを行い、曲線部分を有するガイド孔を複数本先行削孔する曲がり先行削孔工程と、該曲がり先行削孔工程で使用した掘削用モニタを取り外すために内管を地上に引抜く内管引抜き工程と、ガイド孔にシールグラウトを注入して充填するシールグラウト工程と、前記掘削用モニタに換えて内管先端部にスリーブ管および薬液注入手段を装着して前記ガイド孔に挿入するスリーブ管挿入工程と、前記外管を地上に引き抜く外管引抜き工程と、シールグラウトで防護された前記ガイド孔から施工するべき地盤に注入材を注入して改良する注入材注入工程、とを含むことを特徴とする薬液注入工法。Bending pre-cutting is performed in which a plurality of guide holes each having a curved portion are drilled at the same time by using a plurality of pipes each configured as a double pipe consisting of an outer pipe and an inner pipe arranged inside the outer pipe. A hole process, an inner pipe drawing process for drawing the inner pipe to the ground to remove the excavation monitor used in the bending preceding drilling process, a seal grout process for injecting and filling a seal grout into the guide hole, In place of the excavation monitor, a sleeve tube and chemical solution injection means are attached to the tip of the inner tube and inserted into the guide hole, the outer tube is pulled out to the ground, the outer tube is pulled out, and the seal grout protects it. And a pouring material injection step for improving the pouring material by pouring the pouring material into the ground to be constructed from the guide hole.
JP34859499A 1999-12-08 1999-12-08 Chemical injection method Expired - Fee Related JP4148617B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34859499A JP4148617B2 (en) 1999-12-08 1999-12-08 Chemical injection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34859499A JP4148617B2 (en) 1999-12-08 1999-12-08 Chemical injection method

Publications (2)

Publication Number Publication Date
JP2001164548A JP2001164548A (en) 2001-06-19
JP4148617B2 true JP4148617B2 (en) 2008-09-10

Family

ID=18398065

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34859499A Expired - Fee Related JP4148617B2 (en) 1999-12-08 1999-12-08 Chemical injection method

Country Status (1)

Country Link
JP (1) JP4148617B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4623482B2 (en) * 2001-06-25 2011-02-02 ケミカルグラウト株式会社 Solidification method using sleeve tube
JP4515307B2 (en) * 2005-03-31 2010-07-28 小野田ケミコ株式会社 Ground improvement method
JP4916758B2 (en) * 2006-04-12 2012-04-18 鉄建建設株式会社 Ground improvement method by high-pressure jet agitation
JP4952108B2 (en) * 2006-07-20 2012-06-13 株式会社大林組 Ground improvement device and ground improvement method
JP4913494B2 (en) * 2006-07-27 2012-04-11 大成建設株式会社 Ground improvement device.
JP5185084B2 (en) * 2008-11-20 2013-04-17 大成建設株式会社 Ground improvement method
JP2018162577A (en) * 2017-03-24 2018-10-18 株式会社深沢工務所 Hole drilling device, hole drilling method and method for installing anchor material
CN111519604A (en) * 2020-04-30 2020-08-11 河北建设勘察研究院有限公司 Deep-hole sleeve valve pipe grouting device and application method thereof

Also Published As

Publication number Publication date
JP2001164548A (en) 2001-06-19

Similar Documents

Publication Publication Date Title
JP4148617B2 (en) Chemical injection method
JP2934819B2 (en) Shield machine
JP2683515B2 (en) Male / female joint of earth retaining pipe, connecting device, and method for forming mountain retaining wall using earth retaining pipe
JP2005180112A (en) Ground improvement structure and ground improvement method
JPH11173072A (en) Chemical grouting method and chemical grouting equipment
JP3237797B2 (en) Excavation method for tunnels
JP4183040B2 (en) Method for retreating shield machine and jig for retreating shield
JPH0442520B2 (en)
JP3811482B2 (en) Shield tunnel joining method
JP2756593B2 (en) Underground drilling rig
JP2756594B2 (en) Underground drilling rig
JPH04155099A (en) Underground installation of tube and pilot tube therefor
JP4172706B2 (en) Ground improvement method and construction method of underground support using it
JP2966173B2 (en) Tunnel excavation ground reinforcement method
JP4942059B2 (en) Drilling direction control method
JPH09184391A (en) Chemical injector of tunnel excavator
JPH0734768A (en) Excavator
JP4349522B2 (en) Ground improvement method
JP2005083007A (en) Method for laying square pipe
JPH03119288A (en) Underground excavating device
JPS6322997A (en) Method of controlling direction of shield machine by movement of mud
JP2531513B2 (en) Digging device
JP2000034886A (en) Shield machine and soil improvement method using the same
JP3253544B2 (en) Bent tube propulsion machine
JP2005213848A (en) Excavating tool and excavating apparatus

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080620

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080624

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080624

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110704

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees