JP4140542B2 - Scaffolding beam insertion device and scaffolding beam insertion method - Google Patents

Scaffolding beam insertion device and scaffolding beam insertion method Download PDF

Info

Publication number
JP4140542B2
JP4140542B2 JP2004077983A JP2004077983A JP4140542B2 JP 4140542 B2 JP4140542 B2 JP 4140542B2 JP 2004077983 A JP2004077983 A JP 2004077983A JP 2004077983 A JP2004077983 A JP 2004077983A JP 4140542 B2 JP4140542 B2 JP 4140542B2
Authority
JP
Japan
Prior art keywords
scaffolding
boiler
insertion device
scaffold
gripping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2004077983A
Other languages
Japanese (ja)
Other versions
JP2005264546A (en
Inventor
邦彦 小原
益栄 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2004077983A priority Critical patent/JP4140542B2/en
Publication of JP2005264546A publication Critical patent/JP2005264546A/en
Application granted granted Critical
Publication of JP4140542B2 publication Critical patent/JP4140542B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Description

本発明は、ボイラ炉内に設置される足場用梁挿入装置及び足場用梁挿入方法に関する。   The present invention relates to a scaffold beam insertion device and a scaffold beam insertion method installed in a boiler furnace.

ボイラ炉内点検用足場を組立てる際、ボイラの操業を停止し、ボイラ炉内で作業を行うことができる温度にボイラ炉内の温度が下がってから作業員がボイラ炉内に入って作業していたため、莫大なボイラ操業停止時間を要していた。そこで、ボイラ操業停止時間を短縮するための装置として、作業員が炉内に入れない程の高温であっても温度低下を待たずに足場用梁をボイラ炉内に設置することができる足場用梁挿入装置の提案がなされている。例えば、ボイラ炉壁に形成した足場用梁入口部の前面に、足場用梁を挟持してボイラ炉内へ送り込む上下対の足場用梁送りローラをボイラ炉壁に対し前後方向に複数組配設するとともに、ボイラ炉壁の足場用梁入口部より上方に設けた設置口からボイラ炉内へ挿入しかつ先端にボイラ炉内足場用梁と係合可能な係合具が取付けられたワイヤを備えたワイヤ繰出し用ドラムを設けた装置がある(特許文献1参照)。
また、例えば、炉壁の前面に設置されるボイラ鉄骨に固定され、かつ足場用梁置き台から送り出された足場用梁を受け取りボイラ炉内へ送り出すよう足場用梁送りローラを複数本回転自在に備えた下側足場用梁挿入枠体と、足場用梁送りローラと上下に対をなし足場用梁を挟持した状態でボイラ炉内に送り出す足場用梁送りローラを複数本回転自在に備えた上側足場用梁挿入枠体とからなる装置がある(特許文献2参照)。
特開平5−5358号公報 実開平5−3481号公報
When assembling a scaffold for inspection in the boiler furnace, the operation of the boiler is stopped and the worker enters the boiler furnace after the temperature in the boiler furnace has dropped to a temperature at which operation can be performed in the boiler furnace. For this reason, a huge boiler operation stoppage time was required. Therefore, as a device for shortening the boiler shutdown time, the scaffold beam can be installed in the boiler furnace without waiting for the temperature to drop even if the temperature is too high for workers to enter the furnace. A beam insertion device has been proposed. For example, a plurality of pairs of upper and lower scaffolding beam feed rollers that sandwich the scaffolding beam and feed it into the boiler furnace on the front surface of the scaffolding beam entrance formed on the boiler furnace wall. In addition, a wire inserted into the boiler furnace from the installation port provided above the scaffold beam entrance portion of the boiler furnace wall and provided with an engagement tool attached to the boiler furnace scaffolding beam at the tip is provided. There is a device provided with a wire feeding drum (see Patent Document 1).
Also, for example, a plurality of scaffolding beam feed rollers can be rotated to receive a scaffolding beam that is fixed to a boiler steel frame installed on the front surface of the furnace wall and that is sent out from a scaffolding table for the scaffolding and sent out into the boiler furnace. The lower scaffolding beam insertion frame body and the scaffolding beam feeding roller that are paired up and down and the scaffolding beam feeding roller that feeds into the boiler furnace while sandwiching the scaffolding beam is provided on the upper side. There is an apparatus comprising a beam insertion frame for a scaffold (see Patent Document 2).
JP-A-5-5358 Japanese Utility Model Publication No. 5-3481

ところで、このような足場用梁挿入装置は、ボイラ炉壁の複数箇所に形成された各足場用梁入口部にそれぞれ設置されていた。そのため、それら足場用梁挿入装置を個々に設置しなければならず、その際の設置コスト、及びそれら足場用梁挿入装置を個々にメンテナンスするためのメンテナンスコストが膨大なものとなってしまうという問題があった。   By the way, such a scaffold beam insertion device has been installed at each scaffold beam entrance portion formed at a plurality of locations on the boiler furnace wall. Therefore, the beam insertion devices for the scaffolds must be individually installed, and the installation cost at that time and the maintenance cost for individually maintaining the beam insertion devices for the scaffolds become enormous. was there.

本発明は、このような事情を考慮してなされたもので、設置コスト及びメンテナンスコストを削減できる足場用梁挿入装置及び足場用梁挿入方法を提供することを目的とする。   The present invention has been made in view of such circumstances, and an object of the present invention is to provide a scaffolding beam insertion device and a scaffolding beam insertion method that can reduce installation costs and maintenance costs.

本発明は、上記課題を解決するため、以下の手段を採用する。すなわち本発明に係る足場用梁挿入装置は、ボイラに複数組立てられる足場用梁を把持する把持部と、前記ボイラの炉壁に形成された複数の梁入口部のいずれか一つから前記把持部に把持された前記足場用梁を前記ボイラの内部に送り出す送出部と、前記ボイラの外部を走行する走行部とを備え、前記走行部は、前記複数の梁入口部のいずれか一つの外側に停止できるよう前記把持部及び前記送出部とともに走行することを特徴とする。
本発明によれば、足場用梁挿入装置が複数の梁入口部のいずれか一つの外側に停止できるようボイラの外部を走行できるため、足場用梁を把持して梁入口部から足場用梁をボイラの内部に送り出す作業を1台の足場用梁挿入装置のみで順次行うことが可能となる。
The present invention employs the following means in order to solve the above problems. That is, the scaffolding beam insertion device according to the present invention includes a gripping part that grips a plurality of scaffolding beams assembled in a boiler, and a gripping part from any one of a plurality of beam inlets formed on a furnace wall of the boiler. A feeding section that sends the scaffold beam held by the inside of the boiler, and a traveling section that travels outside the boiler, and the traveling section is disposed outside any one of the plurality of beam entrance sections. It travels with the grip part and the delivery part so that it can stop.
According to the present invention, since the scaffold beam insertion device can run outside the boiler so that it can stop outside one of the plurality of beam entrance portions, the scaffold beam is gripped from the beam entrance portion by gripping the scaffold beam. It is possible to sequentially perform the work of feeding into the boiler with only one scaffold beam insertion device.

また、本発明に係る足場用梁挿入装置において、前記走行部は、前記ボイラの外部に敷設されたレール上を走行することを特徴とする。
本発明によれば、足場用梁挿入装置がレール上を走行することにより、足場用梁挿入装置の走行が安定し、また、足場用梁挿入装置の走行に関する操作が容易となる。
The scaffold beam insertion device according to the present invention is characterized in that the traveling unit travels on a rail laid outside the boiler.
According to the present invention, the scaffolding beam insertion device travels on the rail, so that the scaffolding beam insertion device travels stably, and the operation related to the scaffolding beam insertion device traveling becomes easy.

また、本発明に係る足場用梁挿入方法は、ボイラに複数組立てられる足場用梁を把持する把持部と、前記ボイラの炉壁に形成された複数の梁入口部のいずれか一つから前記把持部に把持された前記足場用梁を前記ボイラの内部に送り出す送出部とを備えた足場用梁挿入装置を、前記複数の梁入口部のいずれか一つの外側に停止できるよう前記ボイラの外部で走行させることを特徴とする。
本発明によれば、足場用梁を把持しボイラの内部に送り出した後、足場用梁挿入装置を複数の梁入口部のいずれか一つの外側に停止できるようボイラの外部で走行させるため、足場用梁を把持して梁入口部から足場用梁をボイラの内部に送り出す作業を1台の足場用梁挿入装置のみで順次行うことが可能となる。
The scaffold beam insertion method according to the present invention includes the gripping portion that grips a plurality of scaffold beams assembled in a boiler, and the gripping portion from any one of a plurality of beam inlet portions formed on a furnace wall of the boiler. A scaffold beam insertion device having a delivery section for feeding the scaffold beam held by the section to the inside of the boiler, so that the scaffold beam insertion apparatus can be stopped outside any one of the plurality of beam entrance sections. It is made to run.
According to the present invention, after the scaffolding beam is gripped and sent to the inside of the boiler, the scaffolding beam insertion device is allowed to travel outside the boiler so that it can be stopped outside any one of the plurality of beam entrance portions. The work of grasping the beam and sending the scaffold beam from the beam entrance to the inside of the boiler can be sequentially performed by only one scaffold beam insertion device.

本発明の足場用梁挿入装置及び足場用梁挿入方法によれば、足場用梁を把持して梁入口部から足場用梁をボイラの内部に送り出す作業を1台の足場用梁挿入装置のみで順次行うことが可能となるので、足場用梁挿入装置を設置する際の設置コスト、及びそれら足場用梁挿入装置をメンテナンスするためのメンテナンスコストを削減することができる。   According to the scaffolding beam insertion device and the scaffolding beam insertion method of the present invention, the work of grasping the scaffolding beam and sending the scaffolding beam from the beam entrance to the inside of the boiler can be performed with only one scaffolding beam insertion device. Since it becomes possible to carry out sequentially, the installation cost at the time of installing the beam insertion apparatus for scaffolds, and the maintenance cost for maintaining these beam insertion apparatuses for scaffolds can be reduced.

以下、本発明の実施の形態について、図面を参照して説明する。
図1は、本発明を適用した足場用梁挿入装置を示す図である。この足場用梁挿入装置10は、ボイラ1の炉壁2に形成された複数の梁入口部3からボイラ1の内部に足場用梁4を把持しながら挿入し、炉壁2に対向する炉壁5に形成された複数の梁出口部6からボイラ1の外部に足場用梁4の一部を排出する装置である。
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a view showing a scaffold beam insertion apparatus to which the present invention is applied. This scaffold beam insertion device 10 inserts a scaffolding beam 4 into a boiler 1 from a plurality of beam entrances 3 formed on the furnace wall 2 of the boiler 1 and opposes the furnace wall 2. 5 is a device for discharging a part of the scaffolding beam 4 to the outside of the boiler 1 from a plurality of beam outlets 6 formed in the beam 5.

なお、これら梁入口部3は、ボイラ1の炉壁2に一定の間隔で例えば6個配置されている。ここで、便宜上、炉壁2の外側から見て左側から梁入口部3a,3b,3c,3d,3e,3fとする。また、これら梁出口部6は、梁入口部3a,3b,3c,3d,3e,3fにそれぞれ挿入された足場用梁4が排出できるように、ボイラ1の炉壁5に梁入口部3の間隔と等しい間隔で例えば6個配置されている。ここで、便宜上、炉壁5の外側から見て右側から梁出口部6a,6b,6c,6d,6e,6fとする。
足場用梁4は、それら梁入口部3からそれぞれ挿入されてボイラ1の内部に組立てられる梁であり、分断された複数の小梁4a,4b,4c,・・・が直列に接合された構成となっている。
For example, six of these beam inlet portions 3 are arranged on the furnace wall 2 of the boiler 1 at regular intervals. Here, for convenience, the beam entrance portions 3a, 3b, 3c, 3d, 3e, and 3f are assumed from the left side when viewed from the outside of the furnace wall 2. Further, these beam outlet portions 6 are provided on the furnace wall 5 of the boiler 1 so that the scaffolding beams 4 respectively inserted into the beam inlet portions 3a, 3b, 3c, 3d, 3e, 3f can be discharged. For example, six are arranged at intervals equal to the interval. Here, for convenience, the beam exit portions 6a, 6b, 6c, 6d, 6e, and 6f are viewed from the right side when viewed from the outside of the furnace wall 5.
The scaffolding beam 4 is a beam that is inserted from each of the beam entrance portions 3 and is assembled inside the boiler 1, and a plurality of divided small beams 4a, 4b, 4c,... Are joined in series. It has become.

また、梁入口部3の外側であって炉壁2とレール7との間には、それぞれの足場用梁4を支持する支持台8が設けられており、便宜上、炉壁2の外側から見て左側から支持台8a,8b,8c,8d,8e,8fとする。そして、梁出口部6の外側には、それぞれの足場用梁4を支持する支持台9が設けられており、便宜上、炉壁5の外側から見て右側から支持台9a,9b,9c,9d,9e,9fとする。   Further, a support base 8 for supporting each scaffolding beam 4 is provided outside the beam entrance 3 and between the furnace wall 2 and the rail 7. The support bases 8a, 8b, 8c, 8d, 8e, and 8f are defined from the left side. And the support stand 9 which supports each beam 4 for scaffolding is provided in the outer side of the beam exit part 6, and the support stands 9a, 9b, 9c, 9d seeing from the outer side of the furnace wall 5 from the right side for convenience. , 9e, 9f.

図2は、足場用梁挿入装置10の概略の構成を示す図である。なお、足場用梁挿入装置10において主要な構成要素のみを示し、他の構成要素については図示を省略する。
足場用梁挿入装置10は、足場用梁挿入装置本体11と、足場用梁挿入装置本体11の上部に配置された2つの足場用梁支持部12とを備えている。
足場用梁挿入装置本体11は、ボイラ1の炉壁2に沿うようにボイラ1の外部の地面に敷設されたレール7上に設置されている。この足場用梁挿入装置本体11の各隅角部には、レール7を把持してレール7上を走行可能な走行部13が設けられている。
FIG. 2 is a diagram illustrating a schematic configuration of the scaffold beam insertion device 10. In addition, only the main components in the scaffold beam insertion device 10 are shown, and the other components are not shown.
The scaffolding beam insertion device 10 includes a scaffolding beam insertion device body 11 and two scaffolding beam support portions 12 disposed on the upper part of the scaffolding beam insertion device body 11.
The scaffold beam insertion device main body 11 is installed on a rail 7 laid on the ground outside the boiler 1 along the furnace wall 2 of the boiler 1. In each corner portion of the scaffold beam inserting apparatus main body 11, a traveling portion 13 is provided that can grip the rail 7 and travel on the rail 7.

また、これら2つの足場用梁支持部12は、いずれも同形状であり、それぞれ2本の脚部12a,12bと梁部12cとを有して門型に構成され、走行方向に対して平行となるように配置されている。それぞれの脚部12a,12bには、足場用梁4を両側から挟み込むように把持する把持部14が設けられている。また、足場用梁挿入装置本体11及び梁部12cには、梁入口部3からボイラ1の内部に足場用梁4を送り出すローラ(送出部)15が設けられている。なお、これら走行部13、把持部14及びローラ15は、油圧モータを用いて駆動されている。ここで、走行部13は、図示しないローラがレール7の上側及び下側からレール7を把持しており、それらローラを回転駆動することによって、レール7上をレール7に沿って走行可能となる。また、把持部14は、足場用梁4に対して接近及び離間する方向に駆動する。また、ローラ15は、足場用梁を送り出す方向に回転駆動する。これら走行部13、把持部14及びローラ15を駆動するためのスイッチ16は、足場用梁挿入装置本体11に取付けられ、オペレータによって操作される。   The two scaffold beam supports 12 have the same shape, each having two leg portions 12a and 12b and a beam portion 12c, and are formed in a portal shape, and are parallel to the traveling direction. It is arranged to become. Each leg part 12a, 12b is provided with a gripping part 14 for gripping the scaffolding beam 4 from both sides. In addition, the scaffold beam insertion device main body 11 and the beam portion 12 c are provided with a roller (sending portion) 15 that feeds the scaffold beam 4 from the beam entrance portion 3 into the boiler 1. The traveling unit 13, the gripping unit 14, and the roller 15 are driven using a hydraulic motor. Here, the travel unit 13 is configured such that a roller (not shown) grips the rail 7 from the upper side and the lower side of the rail 7, and can travel along the rail 7 by rotating the rollers. . The gripping portion 14 is driven in a direction approaching and separating from the scaffold beam 4. Further, the roller 15 is rotationally driven in a direction in which the scaffold beam is sent out. A switch 16 for driving the traveling unit 13, the gripping unit 14, and the roller 15 is attached to the scaffolding beam insertion device body 11 and operated by an operator.

このような足場用梁挿入装置10を用いて梁入口部3からボイラ1の内部に複数の足場用梁4を挿入する場合、足場用梁挿入装置10は、梁入口部3aの外側、すなわち正面で停止し、1本の足場用梁4を把持した後、1本の足場用梁4を送出して梁入口部3aからボイラ1の内部に1本の足場用梁4を挿入し、足場用梁4の一部を梁出口部6aから排出して足場用梁4を設置した後、レール7上を走行して梁入口部3bの正面まで移動して停止し、同様にして梁入口部3bからボイラ1の内部に1本の足場用梁4を設置する。このような工程を繰り返すことによって、梁入口部3からボイラ1の内部に複数の足場用梁4を設置する。すなわち、以下のような手順で複数の足場用梁4を設置する。   When a plurality of scaffolding beams 4 are inserted into the boiler 1 from the beam entrance 3 using such a scaffolding beam insertion device 10, the scaffolding beam insertion device 10 is located outside the beam entrance 3 a, that is, in front. After stopping and holding one scaffolding beam 4, one scaffolding beam 4 is sent out, and one scaffolding beam 4 is inserted into the boiler 1 from the beam entrance 3a. After a part of the beam 4 is discharged from the beam exit portion 6a and the scaffolding beam 4 is installed, the beam 4 travels on the rail 7 and moves to the front of the beam entrance portion 3b to stop, and similarly, the beam entrance portion 3b. From the above, one scaffolding beam 4 is installed inside the boiler 1. By repeating such a process, a plurality of scaffolding beams 4 are installed from the beam entrance 3 to the inside of the boiler 1. That is, a plurality of scaffolding beams 4 are installed in the following procedure.

まず、ボイラ1の炉壁2の最も左側に配置されている梁入口部3aの正面まで足場用梁挿入装置10が走行して停止する。そして、足場用梁4の一部である小梁4aを運搬して足場用梁支持部12内に挿入し、その小梁4aを把持部14で把持する。その後、小梁4aの把持部14での把持を解除して小梁4aをローラ15で炉壁2の梁入口部3aの方向に送出する。
小梁4aの一端が支持台8aに支持されたとき、小梁4aの送出を一時的に停止し、足場用梁4の一部である小梁4bを運搬して小梁4aの他端に直列に接合する。小梁4aと小梁4bとを接合した後、小梁4bを送出して小梁4aの先端を梁入口部3aに挿入する。
First, the scaffolding beam insertion device 10 travels to the front of the beam entrance 3a disposed on the leftmost side of the furnace wall 2 of the boiler 1 and stops. Then, the small beam 4 a which is a part of the scaffolding beam 4 is transported and inserted into the scaffolding beam support part 12, and the small beam 4 a is gripped by the gripping part 14. After that, the grip of the small beam 4a at the grip 14 is released, and the small beam 4a is sent by the roller 15 in the direction of the beam inlet 3a of the furnace wall 2.
When one end of the small beam 4a is supported by the support base 8a, the delivery of the small beam 4a is temporarily stopped, and the small beam 4b which is a part of the scaffolding beam 4 is transported to the other end of the small beam 4a. Join in series. After joining the small beam 4a and the small beam 4b, the small beam 4b is sent out, and the tip of the small beam 4a is inserted into the beam entrance 3a.

上記と同様にして小梁4bに小梁4c,4d,4e,4f,4gをそれぞれ直列に接合しながら、梁入口部3aからボイラ1の内部にこれら小梁4a〜4gによって構成された1本の足場用梁4を挿入し、足場用梁4の一部、すなわち小梁4aの先端を梁出口部6aから排出して足場用梁4を設置する。このとき、小梁4aの先端が支持台9aに支持される。その後、小梁4aを支持台9aに固定し、小梁4fを支持台8aに固定し、小梁4fと小梁4gとの接合を解除することで、梁入口部3aに挿入された足場用梁4の設置が完了する。   In the same manner as described above, the small beams 4c, 4d, 4e, 4f, and 4g are joined in series to the small beam 4b, and one beam composed of the small beams 4a to 4g is formed inside the boiler 1 from the beam entrance portion 3a. The scaffold beam 4 is inserted, and a part of the scaffold beam 4, that is, the tip of the small beam 4 a is discharged from the beam exit portion 6 a to install the scaffold beam 4. At this time, the tip of the small beam 4a is supported by the support base 9a. Thereafter, the small beam 4a is fixed to the support base 9a, the small beam 4f is fixed to the support base 8a, and the joint between the small beam 4f and the small beam 4g is released, so that the scaffold is inserted into the beam entrance 3a. Installation of the beam 4 is completed.

梁入口部3aに挿入された足場用梁4の設置が完了した後、梁入口部3aの隣りに配置された梁入口部3bの正面まで足場用梁挿入装置10が走行して停止する。そして、上記と同様の方法で、梁入口部3bに挿入された足場用梁4を設置する。
その後、足場用梁挿入装置10が梁入口部3c,3d,3e,3fそれぞれの正面に移動して、上記と同様の方法を繰り返すことで、梁入口部3c,3d,3e,3fそれぞれに挿入された足場用梁4の設置が完了することとなる。
After the installation of the scaffolding beam 4 inserted into the beam entrance 3a is completed, the scaffolding beam insertion device 10 travels to the front of the beam entrance 3b arranged adjacent to the beam entrance 3a and stops. And the beam 4 for scaffolds inserted in the beam entrance part 3b is installed by the method similar to the above.
Thereafter, the scaffold beam insertion device 10 is moved to the front of each of the beam entrance portions 3c, 3d, 3e, and 3f, and is inserted into each of the beam entrance portions 3c, 3d, 3e, and 3f by repeating the same method as described above. The installation of the scaffold beam 4 is completed.

この場合、足場用梁4を把持部14で把持しボイラ1の内部に挿入した後、足場用梁挿入装置10が梁入口部3a〜3fのいずれか一つの正面に停止できるようボイラ1の外部に敷設されたレール7を走行できるため、足場用梁4を把持部14で把持して梁入口部3aから足場用梁4をボイラ1の内部に挿入する作業を1台の足場用梁挿入装置10のみで順次行うことが可能となる。したがって、足場用梁挿入装置10を設置する際の設置コスト、及びそれら足場用梁挿入装置10をメンテナンスするためのメンテナンスコストを削減することができる。   In this case, after the scaffolding beam 4 is gripped by the gripping part 14 and inserted into the boiler 1, the scaffolding beam insertion device 10 can be stopped outside the boiler 1 so as to be stopped at any one of the beam entrance parts 3 a to 3 f. The scaffolding beam 4 is gripped by the gripping portion 14 and the scaffolding beam 4 is inserted into the boiler 1 from the beam entrance portion 3a. It becomes possible to carry out sequentially with only 10. Accordingly, it is possible to reduce the installation cost when installing the scaffold beam insertion device 10 and the maintenance cost for maintaining the scaffold beam insertion device 10.

また、足場用梁挿入装置10がボイラ1の外部に敷設されたレール7上を走行することにより、足場用梁挿入装置10の走行がレール7上で安定し、また、足場用梁挿入装置10の走行に関する操作が容易となる。   Further, when the scaffold beam insertion device 10 travels on the rail 7 laid outside the boiler 1, the scaffold beam insertion device 10 travels on the rail 7, and the scaffold beam insertion device 10. This makes it easier to operate the vehicle.

なお、上記実施の形態において、梁入口部3a,3b,3c,3d,3e,3fの順に足場用梁4を挿入して設置することは、作業効率を向上させるという点で好ましいが、必ずしもこの順番で足場用梁4を挿入して設置することはない。足場用梁4を挿入して設置する順番を任意に変化させても、足場用梁挿入装置10がレール7上を自由に移動できることで、上記実施の形態と同様、1台の足場用梁挿入装置10のみで対応可能である。したがって、このような場合においても、足場用梁挿入装置10の設置コスト及びメンテナンスコストの点において十分な効果が得られる。   In the above embodiment, it is preferable to insert and install the scaffolding beams 4 in the order of the beam entrance portions 3a, 3b, 3c, 3d, 3e, and 3f from the viewpoint of improving work efficiency. The scaffolding beams 4 are not inserted and installed in order. Even if the order of installing and installing the scaffolding beams 4 is arbitrarily changed, the scaffolding beam insertion device 10 can freely move on the rails 7, so that one scaffolding beam can be inserted as in the above embodiment. This can be handled only by the device 10. Therefore, even in such a case, a sufficient effect can be obtained in terms of installation cost and maintenance cost of the scaffold beam insertion device 10.

また、上記実施の形態において、足場用梁挿入装置10は、ボイラ1の外部に敷設されたレール7上を走行するものでなくてもよい。すなわち、レール7が敷設されていない場合、ボイラ1の炉壁2に沿って走行可能な足場用梁挿入装置10であれば、レール7上を走行する足場用梁挿入装置10と同様の効果が得られる。   Moreover, in the said embodiment, the beam insertion apparatus 10 for scaffolds does not need to run on the rail 7 laid outside the boiler 1. FIG. That is, when the rail 7 is not laid, the scaffold beam insertion device 10 that can travel along the furnace wall 2 of the boiler 1 has the same effect as the scaffold beam insertion device 10 that travels on the rail 7. can get.

本発明における実施の形態に係る足場用梁挿入装置が配置されたボイラの部分斜視図である。It is a fragmentary perspective view of the boiler by which the beam insertion apparatus for scaffolds concerning embodiment in this invention is arrange | positioned. 本発明における実施の形態に係る足場用梁挿入装置の概略構成図である。It is a schematic block diagram of the beam insertion apparatus for scaffolds concerning embodiment in this invention.

符号の説明Explanation of symbols

1 ボイラ
2 炉壁
3 梁入口部
4 足場用梁
5 炉壁
6 梁出口部
10 足場用梁挿入装置
11 足場用梁挿入装置本体
12 足場用梁支持部
13 走行部
14 把持部
15 ローラ(送出部)
DESCRIPTION OF SYMBOLS 1 Boiler 2 Furnace wall 3 Beam entrance part 4 Scaffolding beam 5 Furnace wall 6 Beam exit part 10 Scaffolding beam insertion apparatus 11 Scaffolding beam insertion apparatus main body 12 Scaffolding beam support part 13 Running part 14 Gripping part 15 Roller (sending part) )

Claims (3)

ボイラに複数組立てられる足場用梁を把持する把持部と、
前記ボイラの炉壁に形成された複数の梁入口部のいずれか一つから前記把持部に把持された前記足場用梁を前記ボイラの内部に送り出す送出部と、
前記ボイラの外部を走行する走行部とを備え、
前記走行部は、前記複数の梁入口部のいずれか一つの外側に停止できるよう前記把持部及び前記送出部とともに走行することを特徴とする足場用梁挿入装置。
A gripping part for gripping a scaffolding beam that is assembled in a boiler,
A delivery section for sending out the scaffold beam gripped by the gripping section from any one of a plurality of beam entrance sections formed on the furnace wall of the boiler;
A traveling unit that travels outside the boiler,
The scaffolding beam insertion device, wherein the traveling unit travels with the gripping unit and the delivery unit so that the traveling unit can be stopped outside any one of the plurality of beam entrance portions.
前記走行部は、前記ボイラの外部に敷設されたレール上を走行することを特徴とする請求項1記載の足場用梁挿入装置。     The scaffolding beam insertion device according to claim 1, wherein the traveling unit travels on a rail laid outside the boiler. ボイラに複数組立てられる足場用梁を把持する把持部と、前記ボイラの炉壁に形成された複数の梁入口部のいずれか一つから前記把持部に把持された前記足場用梁を前記ボイラの内部に送り出す送出部とを備えた足場用梁挿入装置を、前記複数の梁入口部のいずれか一つの外側に停止できるよう前記ボイラの外部で走行させることを特徴とする足場用梁挿入方法。     The scaffolding beam gripped by the gripping part from any one of a gripping part for gripping the scaffolding beam assembled to the boiler and a plurality of beam inlet parts formed on the furnace wall of the boiler. A scaffolding beam insertion method comprising: driving a scaffolding beam insertion device including a delivery unit that feeds the inside out of the boiler so as to be stopped outside one of the plurality of beam entrances.
JP2004077983A 2004-03-18 2004-03-18 Scaffolding beam insertion device and scaffolding beam insertion method Expired - Lifetime JP4140542B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004077983A JP4140542B2 (en) 2004-03-18 2004-03-18 Scaffolding beam insertion device and scaffolding beam insertion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004077983A JP4140542B2 (en) 2004-03-18 2004-03-18 Scaffolding beam insertion device and scaffolding beam insertion method

Publications (2)

Publication Number Publication Date
JP2005264546A JP2005264546A (en) 2005-09-29
JP4140542B2 true JP4140542B2 (en) 2008-08-27

Family

ID=35089383

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004077983A Expired - Lifetime JP4140542B2 (en) 2004-03-18 2004-03-18 Scaffolding beam insertion device and scaffolding beam insertion method

Country Status (1)

Country Link
JP (1) JP4140542B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6172632B2 (en) * 2013-08-23 2017-08-02 株式会社日立プラントコンストラクション Main beam structure for work scaffold in boiler furnace, main beam transfer device for work scaffold, and installation method of work scaffold

Also Published As

Publication number Publication date
JP2005264546A (en) 2005-09-29

Similar Documents

Publication Publication Date Title
KR101895983B1 (en) Automation in-line system of horizontal material welding for system scaffolding and system floor post
KR101159137B1 (en) Apparatus for Automatically forming Pin-hole of Aluminum form
CN110453842B (en) Automatic production system of split-free composite floor slab
JP6172632B2 (en) Main beam structure for work scaffold in boiler furnace, main beam transfer device for work scaffold, and installation method of work scaffold
CN107107284B (en) Production system and its component
KR102189173B1 (en) Manufacturing equipment for Construction Pipe Supports
JP2011167692A (en) Tack welding fixture for bridge girder structure
JP4140542B2 (en) Scaffolding beam insertion device and scaffolding beam insertion method
KR101940549B1 (en) Apparatus for feeding main rebar and apparatus for manufacturing rebar grid thereof
CN207104130U (en) A kind of major diameter stud welding automatic nail-feeding mechanism
JP2005171529A (en) Execution method of glass curtain wall
CN210614704U (en) T-shaped section bar correcting device
CN210451511U (en) T-shaped section surface and web plate assembling device
CN210588072U (en) T-shaped section production line
CN210475944U (en) T-shaped section assembling spot welding assembly
CN210767439U (en) Exempt from to tear open automated production system of coincide floor
CN210475943U (en) T-shaped section electric welding device
JP5272514B2 (en) Welding surface plate equipment
JP6036333B2 (en) Pipeline laying method
JP4442975B2 (en) Reinforcing bar mat transfer device in rebar mat manufacturing equipment for ALC panel
JP5368269B2 (en) Work can assembly equipment
JP2710523B2 (en) Rail support structure for vertical transfer device and rail construction method
JPS58159982A (en) Method and apparatus for manufacturing structure
JP2011080668A (en) Scaffold structure for boiler furnace interior work
JP2696660B2 (en) Heat exchanger transport device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070130

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080515

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080520

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080602

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110620

Year of fee payment: 3

R151 Written notification of patent or utility model registration

Ref document number: 4140542

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110620

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110620

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120620

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120620

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130620

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140620

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term