JP4136984B2 - Photoconductor management device, photoconductor management method, storage medium storing computer-readable program, and program - Google Patents

Photoconductor management device, photoconductor management method, storage medium storing computer-readable program, and program Download PDF

Info

Publication number
JP4136984B2
JP4136984B2 JP2004094494A JP2004094494A JP4136984B2 JP 4136984 B2 JP4136984 B2 JP 4136984B2 JP 2004094494 A JP2004094494 A JP 2004094494A JP 2004094494 A JP2004094494 A JP 2004094494A JP 4136984 B2 JP4136984 B2 JP 4136984B2
Authority
JP
Japan
Prior art keywords
photoconductor
photosensitive member
amount
replacement
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004094494A
Other languages
Japanese (ja)
Other versions
JP2005283736A (en
JP2005283736A5 (en
Inventor
圭太 野沢
力夫 柴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Canon Inc
Original Assignee
Canon Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Canon Inc filed Critical Canon Inc
Priority to JP2004094494A priority Critical patent/JP4136984B2/en
Publication of JP2005283736A publication Critical patent/JP2005283736A/en
Publication of JP2005283736A5 publication Critical patent/JP2005283736A5/ja
Application granted granted Critical
Publication of JP4136984B2 publication Critical patent/JP4136984B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control Or Security For Electrophotography (AREA)

Description

本発明は、所定のデバイスに備えられる感光体の消耗状態を管理する感光体管理装置および感光体管理方法およびコンピュータが読み取り可能なプログラムを格納した記憶媒体およびプログラムに関するものである。   The present invention relates to a photosensitive member management apparatus and a photosensitive member management method for managing a consumption state of a photosensitive member included in a predetermined device, a storage medium storing a computer-readable program, and a program.

従来、電子写真方式を用いたプリンタ・複写機・ファクシミリといった印字装置あるいは表示装置は、その画像形成部に感光体を用いている。感光体は一般的に装置内の様々な部材との摩擦による表層の消耗・傷の発生により、使用不能になる交換寿命があり、適切なタイミングで交換する必要が生じる。   2. Description of the Related Art Conventionally, a printing apparatus or a display apparatus such as a printer, a copier, or a facsimile using an electrophotographic method uses a photoconductor for its image forming unit. Photoreceptors generally have a replacement life that makes them unusable due to surface wear and scratches caused by friction with various members in the apparatus, and it is necessary to replace them at an appropriate timing.

この種の感光体を有する装置の形態としては、感光体単体のみで構成される場合、感光体とクリーニング部材、帯電部材等が一緒にユニットになって構成されている場合、さらには、現像部とトナー収納部も一体となったユニットで構成されている場合等さまざまな形態が存在する。なお、この種の技術の課題に対して、下記特許文献1が既に公開されている。   As a form of the apparatus having this type of photoconductor, when the photoconductor is constituted by only a single photoconductor, when the photoconductor and the cleaning member, the charging member, etc. are configured as a unit, the developing unit In addition, there are various forms such as a case where the toner storage unit is configured as an integrated unit. In addition, the following patent document 1 has already been published with respect to this type of technical problem.

また、感光体の寿命を予測する技術として、特許文献2には、感光体ドラムの回転数を感光体ドラム上に設けたマーカと反射型センサによって直接に検知して不揮発性メモリに記憶し、該感光体ドラムの交換時期を示す回転数総和と比較判断し、該回転数総和に到達したときに感光体ドラムの交換を操作卓上に表示する技術が知られている。
特開20010−228761号公報 特開平05−188674号公報
In addition, as a technique for predicting the life of a photoconductor, Patent Document 2 directly detects the number of rotations of the photoconductor drum by a marker provided on the photoconductor drum and a reflective sensor, and stores it in a nonvolatile memory. A technique is known that compares and determines the total number of rotations indicating the replacement timing of the photosensitive drum, and displays the replacement of the photosensitive drum on the console when the total number of rotations is reached.
Japanese Patent Laid-Open No. 2010-228761 Japanese Patent Laid-Open No. 05-188664

従来、上記のような感光体の寿命の予測は、ユーザには困難であり、業務時間中に常時使用可能にしておくためには、感光体が寿命に達したなら直ちに交換できるよう、常時予備の感光体を6を確保しておかなければならない管理負担をユーザに強いる環境となっていた。   Conventionally, it is difficult for a user to predict the life of a photoconductor as described above, and in order to keep the photoconductor usable at all times during business hours, it is always reserved so that the photoconductor can be replaced immediately when it reaches the end of its life. In this environment, the user is forced to bear the management burden of having to secure 6 photoconductors.

また、上記感光体のための保管場所を設けて常時在庫をおくことになれば、そのための費用が発生することになり、ユーザの経済的負担も強いる環境となっていた。   In addition, if a storage place for the photoconductor is provided and stocked at all times, the cost for that is generated, and the user is burdened with an economic burden.

さらに、感光体を供給するメーカにおいても、感光体寿命予測の困難さゆえにその需要予測から、生産計画、在庫計画を策定するのが困難であった。   Furthermore, it is difficult for manufacturers supplying photoconductors to formulate production plans and inventory plans from demand forecasts due to the difficulty of photoconductor lifetime prediction.

さらに、従来物品の需要予測を行う方法はさまざまな方法が考えられていて、例えば特開平09-101947号公報のような時系列の実績を使う方法が一般的であるが、図13に概念的に示す通り一般的に感光体は現像剤など他の消耗品と比べて著しく寿命が長く交換頻度が少ないために発売開始からしばらくは交換実績が少なく実績を利用した統計上の分析に必要な母数に満たない場合も多い、感光体はユーザの利用頻度、利用場所の温度、湿度などの利用環境により消耗度が著しく変わるために交換時期のばらつきも大きいなどの理由からも、上記文献ような手法は感光体を扱う物品の需要予測には不向きであり、需要予測の精度を上げるのは非常に困難であった。以下、その要因は、図13に示すように、感光体の寿命と交換数量との相対関係が成立するからである。   Furthermore, there are various methods for predicting the demand for conventional articles. For example, a method using time-series results as in Japanese Patent Application Laid-Open No. 09-101947 is generally used. In general, photoconductors have a significantly longer life and less frequent replacement than other consumables such as developer, so replacement has been rare for a while since the start of sales, and is necessary for statistical analysis using actual results. There are many cases where the number of photoconductors is less than the number, and the degree of wear varies greatly depending on the usage environment such as the usage frequency of the user, the temperature and humidity of the usage location, and the variation in the replacement time is also large. This method is unsuitable for demand prediction of articles that handle photoreceptors, and it is very difficult to improve the accuracy of demand prediction. Hereinafter, the reason is that, as shown in FIG. 13, the relative relationship between the life of the photosensitive member and the replacement quantity is established.

図13は、この種の感光体の寿命と交換数量との相対関係を説明する特性図であり、縦軸は交換数量を示し、横軸は寿命(日数)を示す。   FIG. 13 is a characteristic diagram for explaining the relative relationship between the life and the replacement quantity of this type of photoconductor, where the vertical axis indicates the replacement quantity and the horizontal axis indicates the life (days).

このように感光体の寿命予測の精度を上げながら、かつ、ユーザによる経済的負担や予備の感光体をあらかじめ保持管理する負担を改善することが切望されている。   Thus, there is an urgent need to improve the accuracy of predicting the life of a photoconductor and improve the economic burden on the user and the burden of holding and managing a spare photoconductor in advance.

本発明は、上記の課題を解決するためになされたもので、本発明の目的は、所定のデバイスに備えられる感光体の消耗状態を管理する感光体管理装置において、異なる複数の消耗パラメータに基づいて前記感光体の消耗量を算定し、該算定される前記感光体の消耗量に基づいて、前記感光体が交換規定量に達する時期を予測することにより、膜厚の薄い保護層を有する感光体に対する寿命予測精度を格段に向上できる感光体管理装置および感光体管理方法およびコンピュータが読み取り可能なプログラムを格納した記憶媒体およびプログラムを提供することである。   The present invention has been made to solve the above-described problems, and an object of the present invention is based on a plurality of different consumption parameters in a photoconductor management apparatus that manages the wear state of a photoconductor provided in a predetermined device. The photosensitive member having a thin protective layer is calculated by calculating the amount of consumption of the photosensitive member and predicting the time when the photosensitive member reaches the specified replacement amount based on the calculated consumption amount of the photosensitive member. A photoconductor management device and a photoconductor management method capable of remarkably improving the life prediction accuracy for a body, and a storage medium and a program storing a computer-readable program are provided.

また、予測された感光体に対する寿命から感光体の適正な交換時期を算定して、該算定された時期までに前記感光体を含むデバイスの交換を促す警告を出力することにより、感光体の交換時期に、ユーザに対して交換を催促する警告を提示できる感光体管理装置および感光体管理方法およびコンピュータが読み取り可能なプログラムを格納した記憶媒体およびプログラムを提供することである。   In addition, the appropriate replacement time of the photoconductor is calculated from the predicted lifetime of the photoconductor, and a warning that prompts replacement of the device including the photoconductor is output by the calculated time, thereby replacing the photoconductor. To provide a photosensitive member management apparatus and a photosensitive member management method capable of presenting a warning for prompting replacement to a user at a time, and a storage medium and a program storing a computer-readable program.

本発明に係る感光体管理装置は、以下の特徴的構成を備える。
電子写真方式の印字装置に備えられる感光体の消耗状態を管理する感光体管理装置であって、異なる複数の消耗パラメータに基づいて前記感光体の消耗量を算定する算定手段と、前記算定手段により算定される前記感光体の消耗量に基づいて、前記感光体が交換規定量に達する時期を予測する予測手段とを備え、前記複数の消耗パラメータとして、感光体の回転数と感光体を帯電させる帯電電流量と稼動時の湿度情報とを含み、前記算定手段は、稼動時の湿度情報による補正計数と単位回転数あたりの磨耗量と感光体の回転数の積と稼動時の湿度情報による補正計数と単位電流量あたりの磨耗量と帯電電流量の積との和をとることにより感光体の消耗量を算定することを特徴とする。
The photoconductor management device according to the present invention has the following characteristic configuration.
A photoconductor management device for managing a consumption state of a photoconductor provided in an electrophotographic printing apparatus , the calculation unit calculating a consumption amount of the photoconductor based on a plurality of different consumption parameters, and the calculation unit Prediction means for predicting when the photosensitive member reaches a predetermined replacement amount based on the calculated consumption amount of the photosensitive member, and charging the rotational speed of the photosensitive member and the photosensitive member as the plurality of consumption parameters. The calculation means includes a correction current based on the humidity information during operation, a product of a wear amount per unit rotational speed and the rotational speed of the photosensitive member, and a correction based on humidity information during operation. by taking the sum of the amount of wear per count and unit current amount and a product of the charging current amount, it characterized that you calculate the consumption of the photosensitive member.

本発明に係る感光体管理方法は、以下の特徴的構成を備える。
電子写真方式の印字装置に備えられる感光体の消耗状態を管理する感光体管理装置における感光体管理方法であって、算定手段が、異なる複数の消耗パラメータに基づいて前記感光体の消耗量を算定する算定ステップと、予測手段が、前記算定ステップにより算定される前記感光体の消耗量に基づいて、前記感光体が交換規定量に達する時期を予測する予測ステップと、出力手段が、前記予測ステップにより予測された時期までに前記感光体を含む感光体の交換を促す警告を出力する出力ステップとを備え、前記複数の消耗パラメータとして、感光体の回転数と感光体を帯電させる帯電電流量と稼動時の湿度情報とを含み、前記算定手段は、稼動時の湿度情報による補正計数と単位回転数あたりの磨耗量と感光体の回転数の積と稼動時の湿度情報による補正計数と単位電流量あたりの磨耗量と帯電電流量の積との和をとることにより感光体の消耗量を算定することを特徴とする。
The photoconductor management method according to the present invention has the following characteristic configuration.
A photoconductor management method in a photoconductor management device for managing a wear state of a photoconductor provided in an electrophotographic printing apparatus , wherein a calculation unit calculates a consumption amount of the photoconductor based on a plurality of different wear parameters. A calculating step for predicting, a prediction step for predicting a time when the photosensitive member reaches a predetermined replacement amount based on the consumed amount of the photosensitive member calculated by the calculating step, and an output unit for calculating the predicting step. And an output step for outputting a warning prompting replacement of the photoconductor including the photoconductor by the time predicted by the above, and as the plurality of consumption parameters, a rotation speed of the photoconductor and a charging current amount for charging the photoconductor, Humidity information during operation, and the calculation means calculates the product of the correction count based on the humidity information during operation, the amount of wear per unit rotation speed, and the rotation speed of the photosensitive member, and the humidity during operation. It characterized that you calculate the consumption of the photosensitive member by taking the sum of the product of the wear amount and the charging current per correction factor and the unit amount of current due to distribution.

本発明によれば、膜厚の薄い保護層を有する感光体に対する寿命予測精度を格段に向上できる。   According to the present invention, the life prediction accuracy for a photoreceptor having a thin protective layer can be significantly improved.

また、感光体の交換時期に、ユーザに対して交換を催促する警告を提示できるという効果を奏する。   In addition, it is possible to present a warning prompting the user to replace the photosensitive member at the time of replacement of the photosensitive member.

次に本発明を実施するための最良の形態について図面を参照して説明する。   Next, the best mode for carrying out the present invention will be described with reference to the drawings.

〔第1実施形態〕
図1は、本発明に係る印刷装置を適用可能な電子写真方式を採用した画像形成装置の一例を示す断面図である。
[First Embodiment]
FIG. 1 is a cross-sectional view showing an example of an image forming apparatus employing an electrophotographic system to which a printing apparatus according to the present invention can be applied.

まず最初に、印刷装置の構成について説明をする。なお、本発明に係る感光体は、印刷装置等のデバイスに適用される場合に限らず、例えば、書き換え可能な「掲示板」、書き換え可能なディスプレイ等のように感光体を利用する表示装置等のデバイスであっても本発明を適用可能である。   First, the configuration of the printing apparatus will be described. The photoconductor according to the present invention is not limited to being applied to a device such as a printing apparatus. For example, a rewritable “bulletin board”, a display device using the photoconductor such as a rewritable display, etc. The present invention can be applied even to a device.

図1において、リーダ部1の原稿給送装置1101は原稿を最終頁から順に1枚ずつプラテンガラス1102上へ給送し、原稿の読み取り動作終了後、プラテンガラス1102上の原稿を排出する。原稿がプラテンガラス1102上に搬送されると、ランプ1103を点灯し、そしてスキャナユニット1104の移動を開始させて、原稿を露光走査する。この時の原稿からの反射光は、ミラー1105,1106,1107、及びレンズ1108によってCCDイメージセンサ(以下CCDという)1109へ導かれる。このように、走査された原稿の画像はCCD1109によって読み取られる。CCD1109から出力される画像データは、画像入出力制御部1110へ転送され、エンコードされて、画像入出力制御部1110に接続された不図示の回線を介して遠隔通信網上の宛先へと送信される。   In FIG. 1, a document feeder 1101 of the reader unit 1 feeds documents one by one from the last page to the platen glass 1102, and discharges the document on the platen glass 1102 after the document reading operation is completed. When the original is transported onto the platen glass 1102, the lamp 1103 is turned on, and the movement of the scanner unit 1104 is started to expose and scan the original. Reflected light from the original at this time is guided to a CCD image sensor (hereinafter referred to as CCD) 1109 by mirrors 1105, 1106, 1107 and a lens 1108. Thus, the scanned image of the original is read by the CCD 1109. Image data output from the CCD 1109 is transferred to the image input / output control unit 1110, encoded, and transmitted to a destination on a remote communication network via a line (not shown) connected to the image input / output control unit 1110. The

一方、遠隔通信網からファクシミリ信号を受信すると、それをデコードし、デコードされた画像データに応じて、プリンタ部2のレーザドライバによってレーザ発光部1201を駆動する。そうして、画像データに応じたレーザ光をレーザ発光部1201に発光させる。このレーザ光は、予め、帯電装置1212により均一に帯電された感光ドラム1202に照射され、感光ドラム1202にはレーザ光に応じた潜像が形成される。   On the other hand, when a facsimile signal is received from the remote communication network, it is decoded, and the laser light emitting unit 1201 is driven by the laser driver of the printer unit 2 in accordance with the decoded image data. Then, the laser light emitting unit 1201 emits laser light corresponding to the image data. This laser beam is applied to the photosensitive drum 1202 uniformly charged in advance by the charging device 1212, and a latent image corresponding to the laser beam is formed on the photosensitive drum 1202.

帯電装置1212には、電流量を測定する装置が設置され、帯電電流量情報を測定している。この感光体1202の潜像の部分には、感光体1202に含まれる現像器によって現像剤が付着される。そして、レーザ光の照射開始と同期したタイミングで、カセット1204及びカセット1205のいずれかから記録紙を給紙して転写部1206へ搬送し、感光体1202に付着された現像剤を記録紙に転写する。現像剤の乗った記録紙は定着部1207に搬送され、定着部1207の熱と圧力により現像剤は記録紙に定着される。定着部1207を通過した記録紙は排出ローラ1208によって排出され、ソータ1220は排出された記録紙をそれぞれのビンに収納して記録紙の仕分けを行う。   The charging device 1212 is provided with a device for measuring a current amount, and measures charging current amount information. A developer is attached to the latent image portion of the photoconductor 1202 by a developing device included in the photoconductor 1202. Then, at the timing synchronized with the start of laser light irradiation, the recording paper is fed from either the cassette 1204 or the cassette 1205 and conveyed to the transfer unit 1206, and the developer attached to the photosensitive member 1202 is transferred to the recording paper. To do. The recording paper on which the developer is placed is conveyed to the fixing unit 1207, and the developer is fixed to the recording paper by the heat and pressure of the fixing unit 1207. The recording paper that has passed through the fixing unit 1207 is discharged by a discharge roller 1208, and the sorter 1220 stores the discharged recording paper in each bin and sorts the recording paper.

なお、ソータ1220は仕分けが設定されていない場合は最上ビンに記録紙を収納する。また、両面記録が設定されている場合は、排出ローラ1208のところまで記録紙を搬送した後、排出ローラ1208の回転方向を逆転させ、フラッパ1209によって再給紙搬送路ローラ部1210へ導く。   Note that the sorter 1220 stores the recording paper in the uppermost bin when the sorting is not set. If double-sided recording is set, the recording paper is conveyed to the discharge roller 1208 and then the rotation direction of the discharge roller 1208 is reversed and guided to the refeed conveyance path roller unit 1210 by the flapper 1209.

多重記録が設定されている場合は、記録紙を排出ローラ1208まで搬送しないようにフラッパ1209によって再給紙搬送路へ導く。再給紙搬送路へ導かれた記録紙は上述したタイミングで転写部1206へ給紙される。感光体1202の近傍には、表面粗さセンサ1211が設置され、感光体1202の表面粗さ量情報を測定している。また、感光体1202の近傍には、湿度センサ1213が設置され、感光体1202の近傍での湿度情報を測定している。   When multiple recording is set, the recording paper is guided to the refeed conveyance path by the flapper 1209 so as not to be conveyed to the discharge roller 1208. The recording sheet guided to the refeed conveyance path is fed to the transfer unit 1206 at the timing described above. A surface roughness sensor 1211 is installed in the vicinity of the photoconductor 1202 and measures surface roughness amount information of the photoconductor 1202. Further, a humidity sensor 1213 is installed in the vicinity of the photoconductor 1202 to measure humidity information in the vicinity of the photoconductor 1202.

図2は、図1に示した画像形成装置の制御構成を示すブロック図である。   FIG. 2 is a block diagram showing a control configuration of the image forming apparatus shown in FIG.

図2において、ROM206にはプリンタを駆動するために制御プログラムやフォントデータなどが格納されており、CPU201により、デバイスモジュールを含むそのプログラムを実行することでファクシミリ受信や印刷動作が実現される。外部メモリ205には、外部から供給されるデータ等が格納される。操作部207は表示部と一体となったパネルであり、これによって状態が表示されるほか、使用者が操作入力を行うことができる。リモートインタフェース203は、通信手段として動作する部位であり、例えば、モデムなど遠隔通信網に接続するためのインタフェースのひとつである。イーサネット(登録商標)方式に準じたLANインタフェースであっても良い。   In FIG. 2, a ROM 206 stores a control program, font data, and the like for driving the printer, and facsimile reception and printing operations are realized by the CPU 201 executing the program including the device module. The external memory 205 stores data supplied from the outside. The operation unit 207 is a panel integrated with the display unit, which displays a state and allows a user to perform an operation input. The remote interface 203 is a part that operates as a communication means, and is one of interfaces for connecting to a remote communication network such as a modem. A LAN interface conforming to the Ethernet (registered trademark) system may be used.

スキャナ部204は、図1に示したスキャナ部1に相当するものであり、印刷部208は、図1に示したプリンタ部2に相当する。   The scanner unit 204 corresponds to the scanner unit 1 shown in FIG. 1, and the printing unit 208 corresponds to the printer unit 2 shown in FIG.

印刷部208には感光体1202が装着される。カートリッジ1203内の感光体1202には不揮発性の書き込み可能なメモリ1203aが備えられており、感光体1202の装着とともに、メモリ1203aは画像形成装置の制御部と電気的に接続されて、CPU201、あるいは、印刷部208がローカルに有する不図示のCPUから書き込み及び読み出しが可能となる。   A photosensitive member 1202 is attached to the printing unit 208. The photosensitive member 1202 in the cartridge 1203 is provided with a nonvolatile writable memory 1203a. When the photosensitive member 1202 is mounted, the memory 1203a is electrically connected to the control unit of the image forming apparatus, and the CPU 201 or The printing unit 208 can perform writing and reading from a CPU (not shown) locally provided.

メモリ1203aから読み出されたデータは、LANインタフェースあるいはホストインタフェース等のリモートI/F203を介してLANあるいはホストに送出することができる。なお、感光体ユニット上のメモリと制御部とは必ずしも電気的な接点で接続しているとは限らず、電波や光信号などの非接触の形態でも接続され得るが、ここでは信号を送受可能なこれらの接続形態を含めて単に電気的な接続と呼んでいる。   Data read from the memory 1203a can be sent to the LAN or the host via a remote I / F 203 such as a LAN interface or a host interface. Note that the memory on the photoconductor unit and the control unit are not necessarily connected by electrical contacts, and can be connected in a non-contact form such as radio waves or optical signals, but here signals can be transmitted and received. These connection forms are simply called electrical connections.

プリンタ部2は、前出の画像形成装置から、スキャナ部204を除いた形態であり、本発明の感光体管理システムに関連する部分は同様の構成である。   The printer unit 2 has a configuration in which the scanner unit 204 is removed from the above-described image forming apparatus, and the parts related to the photoreceptor management system of the present invention have the same configuration.

〔感光体の寿命予測〕
最初に、感光体膜厚の消耗量の予測と寿命時期予測の方法について説明する。
[Estimation of photoconductor life]
First, a method of predicting the consumption amount of the photosensitive member film thickness and predicting the lifetime will be described.

ユーザに負担なく、必要な時に感光体が入手できるようにするためには、感光体の寿命予測を高い精度で行う必要がある。本発明での感光体の寿命予測手段としては、下記の方法を用いる。   In order to be able to obtain the photoconductor when necessary without burden on the user, it is necessary to predict the life of the photoconductor with high accuracy. The following method is used as means for predicting the life of the photoreceptor in the present invention.

感光体の寿命を決定する重要な因子である消耗量の予測方法としては、本発明では感光体の総回転時間と感光体の総帯電電流量の2つを測定する方法を用いる。その2つの変数(消耗パラメータ)から予測される感光体の消耗量の計算式を予め作成して記憶装置に記憶しておき、その記憶された数値から感光体の消耗量の予測演算処理をCPUが実行する。感光体の消耗量は1次帯電による劣化が要因の1つとなっており、プリント枚数、感光体の回転時間だけで、消耗量を予測演算処理する方法に比べて、より高い精度で予測が可能になる。   As a method for predicting the amount of consumption, which is an important factor for determining the life of the photoconductor, the present invention uses a method of measuring the total rotation time of the photoconductor and the total charging current amount of the photoconductor. A formula for calculating the consumption amount of the photosensitive member predicted from the two variables (consumption parameters) is created in advance and stored in the storage device, and the calculation processing for predicting the consumption amount of the photosensitive member from the stored numerical value is performed by the CPU. Will run. Deterioration due to primary charging is one of the causes of the consumption of the photoconductor, and it is possible to predict with a higher degree of accuracy than the method of predictive calculation processing based on the number of printed sheets and the rotation time of the photoconductor. become.

感光体の回転数の測定方法としては、感光体の回転そのものを光や磁気センサで直接測定する方法、感光体に連動するモーターの回転数から換算する方法等がある。   As a method for measuring the rotation speed of the photosensitive member, there are a method in which the rotation of the photosensitive member itself is directly measured by light or a magnetic sensor, a method in which the rotation number of a motor linked to the photosensitive member is converted, and the like.

帯電電流量の測定方法としては、帯電装置への電力供給部に電流計を備え、その電流量を積分処理していくことにより求める方法等がある。   As a method for measuring the amount of charging current, there is a method of obtaining an ammeter in a power supply unit to the charging device and obtaining the amount of current by integrating the current amount.

感光体の消耗量(M)の計算式の例としては、下記第(1)式のようなものである。   An example of a formula for calculating the consumption amount (M) of the photoconductor is the following formula (1).

感光体の回転数と1次帯電の帯電電流量の2つの数値に基づいて予測する場合
Ax+By=M……(1)
ただし、上記第(1)式中のAは単位回転数あたりの磨耗量を示し、xは感光体の回転数を示し、Bは電流が流れることにより磨耗する単位電流量あたりの磨耗量を示し、yは帯電による電流量を示す。
When predicting based on the two values of the rotational speed of the photosensitive member and the amount of primary charging current Ax + By = M (1)
In the above equation (1), A represents the amount of wear per unit number of revolutions, x represents the number of revolutions of the photosensitive member, and B represents the amount of wear per unit amount of current that is worn when current flows. Y represents the amount of current due to charging.

また、さらに好ましい予測演算処理方法としては、上記の方法に湿度環境の数値を加味して予測演算処理する方法がある。その印刷或いは表示装置が稼動される環境の湿度によっても、感光体の消耗量は異なる。   Further, as a more preferable prediction calculation processing method, there is a method of performing prediction calculation processing in consideration of the numerical value of the humidity environment in the above method. The consumption amount of the photoconductor also varies depending on the humidity of the environment in which the printing or display device is operated.

湿度によって、感光体表面の摩擦抵抗や帯電による影響の度合いが異なるためである。稼動時の湿度情報によってもより高い制度で予測することが可能になる。   This is because the degree of the influence of frictional resistance and charging on the surface of the photoreceptor varies depending on the humidity. Predictions can be made with a higher system based on humidity information during operation.

湿度情報も用いて予測する場合は、下記第(2)式により算出される。   When the prediction is performed using the humidity information, it is calculated by the following equation (2).

aAx+bBy=M……(2)
ただし、Aは単位回転数あたりの磨耗量を示し、aは湿度によるAの補正係数を示し、xは感光体の回転数を示し、Bは電流が流れることにより磨耗する単位電流量あたりの磨耗量を示し、bは湿度によるBの補正係数を示し、yは帯電による電流量を示す。
aAx + bBy = M (2)
However, A shows the amount of wear per unit number of revolutions, a shows the correction coefficient of A due to humidity, x shows the number of revolutions of the photoreceptor, and B shows the amount of wear per unit amount of current that wears when current flows. B represents the correction coefficient of B due to humidity, and y represents the amount of current due to charging.

なお、湿度を測定する方法としては、一般に市販の電気抵抗変化を用いる湿度センサ−等を利用することで測定することが出来る。   In addition, as a method of measuring humidity, it can measure by utilizing the humidity sensor etc. which generally use a commercially available electrical resistance change.

図3は、本発明の第1実施形態を示す感光体管理システムの一例を示すブロック図であり、感光体ユニットメモリ部10、本体主制御装置20、本体内感光体状態測定部30を備えるデバイス部と、該デバイス部の前記感光体ユニットメモリ部10を管理するサービスサイトPCサーバ40とが通信可能なシステム例に対応する。   FIG. 3 is a block diagram illustrating an example of the photoconductor management system according to the first embodiment of the present invention, and includes a photoconductor unit memory unit 10, a main body main controller 20, and a photoconductor state measurement unit 30 in the main body. And a service site PC server 40 that manages the photosensitive unit memory unit 10 of the device unit.

図3において、10は感光体ユニットメモリ部で、通信手段CM1を備え本体主制御装置20と通信可能に構成されている。また、メモリ本体10−1には、感光体回転数記憶手段11、帯電電流量記憶手段12、湿度情報記憶手段13を備えている。   In FIG. 3, reference numeral 10 denotes a photoconductor unit memory unit which includes a communication unit CM1 and is communicable with the main body main controller 20. Further, the memory main body 10-1 is provided with a photosensitive member rotation number storage unit 11, a charging current amount storage unit 12, and a humidity information storage unit 13.

本体制御装置20は、通信手段CM3,CM5備えて、感光体ユニットメモリ部10や本体内感光体状態測定部30と通信、あるいは、サービスサイトPCサーバ40と通信可能に構成されている。   The main body control device 20 includes communication means CM3 and CM5, and is configured to be able to communicate with the photoconductor unit memory unit 10 and the photoconductor state measuring unit 30 within the main body or with the service site PC server 40.

20−1は感光体寿命予測手段で、図2に示したようなROM206や外部メモリ205に記憶されるモジュールとして構成され、膜厚量予測手段21、寿命予測手段22とを備え、データベース20−2が管理するテーブルTBを参照して、予測演算処理を行う。   Reference numeral 20-1 denotes a photoreceptor life prediction means, which is configured as a module stored in the ROM 206 or the external memory 205 as shown in FIG. 2, and includes a film thickness prediction means 21 and a life prediction means 22, and includes a database 20- The prediction calculation process is performed with reference to the table TB managed by the No. 2.

本体内感光体状態測定部30は、通信手段CM2を備え、本体制御装置20と通信可能に構成されている。また、測定部30−11は、感光体回転数測定部31、帯電電流量測定部32、湿度測定部33、感光体表面粗さ量測定部34とを備え、測定された結果のデータがメモリ本体10−1の感光体回転数記憶手段11、帯電電流量記憶手段12、湿度情報記憶手段13に記憶される。   The in-body photoconductor state measurement unit 30 includes a communication unit CM2, and is configured to be communicable with the main body control device 20. The measurement unit 30-11 includes a photoconductor rotation number measurement unit 31, a charging current amount measurement unit 32, a humidity measurement unit 33, and a photoconductor surface roughness amount measurement unit 34, and data of the measurement results is stored in a memory. The data is stored in the photosensitive member rotation number storage unit 11, the charging current amount storage unit 12, and the humidity information storage unit 13 of the main body 10-1.

サービスサイトPCサーバ40は、通信手段CM4を備え本体主制御装置20と通信可能に構成されている。この通信手段CM4は、図2において説明した通り、リモートI/F203に該当させることができる。なお、図3中では説明の簡略化の為に通信手段CM4と通信手段CM5とが直接に通信を行っているように示しているが、無論、集線装置(HUB)や、通信中継サーバを介して通信を行うようにしても良い。   The service site PC server 40 includes a communication unit CM4 and is configured to be able to communicate with the main body main controller 20. This communication means CM4 can correspond to the remote I / F 203 as described in FIG. In FIG. 3, the communication means CM4 and the communication means CM5 are shown as communicating directly for the sake of simplification, but of course, via a line concentrator (HUB) or a communication relay server. Communication may be performed.

また、寿命予測手段22により予測された時期に基づいて、所定の出力を行う主制御装置20が図示しないインタフェースを介して本体操作パネル部に所定のメッセージで表示出力したり、あるいは、通信手段CM5を介して、ユーザのPCに接続される表示装置に、例えばプリンタドライバを介して所定のUIで交換時期が近いことを提示する制御をユーザPCのCPUに実行させたり、あるいは、サービスサイトPCサーバ40に所定のUIで交換時期が近いことを提示するように制御してもよい。   Further, based on the time predicted by the life prediction means 22, the main controller 20 that performs a predetermined output displays and outputs a predetermined message on the main body operation panel section via an interface (not shown), or the communication means CM5. Via the PC, the CPU of the user PC is caused to execute control for indicating that the replacement time is near with a predetermined UI via a printer driver to the display device connected to the user's PC, or the service site PC server Control may be performed so as to indicate that the replacement time is near to 40 with a predetermined UI.

その際、一例として、ユーザのPCのプリンタドライバが主制御装置20より交換時期が近いことを検知した場合には、ユーザのPCのプリンタドライバが通信手段CM5を介して、あるいは図示しないインターネット等に接続して、あらかじめ設定されているURLにアクセスして、後述するような感光体の発注を直接指示可能な画面(HTMLによる)を表示制御するように構成してもよい。   At this time, as an example, if the printer driver of the user's PC detects that the replacement time is nearer than that of the main control device 20, the printer driver of the user's PC is connected via the communication means CM5 or to the Internet (not shown). It may be configured to connect and access a URL that is set in advance, and to display and control a screen (using HTML) that can directly instruct the ordering of the photoreceptor as described later.

図4は、本発明に係る感光体管理装置における第1のデータ処理手順の一例を示すフローチャートであり、図3に示した本体内感光体状態測定部30による測定結果に基づき感光体寿命予測手段20−1が予測したデータに従いメモリ本体10−1の内容を更新するとともに、データベース20−2の内容を更新する処理手順に対応する。なお、(41)〜(44)は各ステップを示す。   FIG. 4 is a flowchart showing an example of the first data processing procedure in the photoconductor management device according to the present invention, and the photoconductor life prediction means based on the measurement result by the photoconductor state measurement unit 30 in the main body shown in FIG. It corresponds to the processing procedure for updating the contents of the database 20-2 while updating the contents of the memory main body 10-1 according to the data predicted by 20-1. In addition, (41)-(44) shows each step.

また、本体主制御装置20内のデータベース20−2には未使用時の感光体膜厚、交換日時の予測をすべき感光体膜厚、寿命時の感光体膜厚のデータ、過去の感光体膜厚データ、過去の感光体表面粗さデータ等が書き込まれている。また、感光体ユニットに装着されているメモリには、感光体膜厚データ・感光体表面粗さデータ等が書き込まれている。   In addition, the database 20-2 in the main controller 20 stores the photoconductor film thickness when not in use, photoconductor film thickness for which replacement date / time should be predicted, photoconductor film thickness data at the end of life, and past photoconductors. Film thickness data, past photoconductor surface roughness data, and the like are written. Further, photoconductor film thickness data, photoconductor surface roughness data, and the like are written in a memory mounted on the photoconductor unit.

例えば、感光体の膜厚予測は、毎日・毎週等の定期的に行う。予測開始の指示を本体主制御装置20より受けると、感光体寿命予測手段20−1は電流センサ、回転数カウンタ、表面粗さセンサ等の本体内感光体状態測定部30から、今回の帯電電流値・感光体回転数・湿度・感光体表面粗さ量等を読み込む。そして、上記第(1)式に基づく消耗量計算式を用いて、今回の感光体消耗量を感光体寿命予測手段20−1が算出し、感光体ユニットメモリ部10に格納されている前回測定した感光体膜厚データから今回の感光体消耗量を引き、今回測定の感光体膜厚データとし新たに書き加える。   For example, the photoconductor film thickness prediction is performed periodically such as daily or weekly. When an instruction to start prediction is received from the main controller 20, the photoconductor lifetime predicting means 20-1 receives the current charging current from the photoconductor state measuring unit 30 in the main body such as a current sensor, a rotation speed counter, and a surface roughness sensor. Read values, photoconductor rotation speed, humidity, photoconductor surface roughness, etc. Then, using the consumption amount calculation formula based on the above formula (1), the photosensitive member lifetime prediction unit 20-1 calculates the current consumption amount of the photosensitive member, and the previous measurement stored in the photosensitive unit memory unit 10. The current photoconductor consumption is subtracted from the photoconductor film thickness data, and newly written as the photoconductor film thickness data of this measurement.

感光体固有情報である現在の膜厚量・表面粗さ量の情報に関しては、感光体ユニットに装着されたメモリに格納される形態が特に好ましい。   Regarding the information on the current film thickness and surface roughness, which is information specific to the photoconductor, a form stored in a memory mounted on the photoconductor unit is particularly preferable.

上記実施形態によれば、寿命前の感光体ユニットを印字装置本体から外し、別の本体に装着した場合でも、現在の感光体膜厚情報が保存されており、精度の高い寿命予測管理が可能になる。   According to the above embodiment, even when the photoconductor unit before the end of its life is removed from the main body of the printing apparatus and attached to another main body, the current photoconductor film thickness information is stored, and accurate life prediction management is possible. become.

次に、本体データベースに格納されている感光体寿命日時の予測をすべき感光体膜厚と比較し(41)、感光体寿命予測手段20−1がその膜厚に達していたと判定した場合は、感光体が寿命膜厚に達する日時の予測を下記第(3)式等に基づいて演算処理する(42)。   Next, the photoconductor life date and time stored in the main body database is compared with the photoconductor film thickness to be predicted (41), and if the photoconductor life prediction means 20-1 determines that the film thickness has been reached, The date and time when the photoconductor reaches the life film thickness is calculated based on the following equation (3) (42).

予測演算処理の方法としては、データベース20−2内に格納されている過去の平均膜厚消耗量C(μm/日)と現在の膜厚量D(μm)、寿命となる膜厚量E(μm)、現在の日時F(日)から用いて、例えば下記第(3)式により感光体寿命予測手段20−1が算出する。   As a method of the prediction calculation processing, the past average film thickness consumption amount C (μm / day) and the current film thickness amount D (μm) stored in the database 20-2, and the film thickness amount E (lifetime) that is the lifetime are stored. μm) and the current date and time F (day), for example, the photoconductor lifetime prediction means 20-1 calculates by the following equation (3).

F+(D−E)/C=感光体が寿命となる日時……(3)
また、補正を加えた場合の方がより精度が高い予測が可能であるため、感光体の寿命時期の予測の補正は下記のような方法で行う。
F + (D−E) / C = Date and time when the photosensitive member reaches the end of its life (3)
Further, since the prediction with higher accuracy is possible when the correction is applied, the correction of the prediction of the lifetime of the photoconductor is performed by the following method.

例えば、前年の月別の膜厚消耗量のデータを参照し、ある月は特別に多く消耗している場合は、今年の同じ月でも同程度の消耗量が予測されるとし、平均の消耗量ではなく、こちらの期間の消耗量を用いて、寿命に達する時期を予測する。   For example, referring to the data on monthly film consumption in the previous year, if a particular month is consumed significantly, it is assumed that the same amount of consumption will be expected in the same month of this year. Rather, the amount of consumption during this period is used to predict when to reach the end of life.

そして、本体主制御装置20より感光体を配送すべき日時と送付先をサービスサイトPCサーバ40に送信して(43)、データベース20−2のテーブルを更新して(44)、ステップ(41)へ戻る。   The main controller 20 transmits the date and time to which the photosensitive member should be delivered and the destination to the service site PC server 40 (43), updates the table of the database 20-2 (44), and step (41). Return to.

以上のようにして、データベース20−2に蓄積されたデータに基づいて、感光体寿命予測手段20−1がまず平均的な値から予想交換時期を求め、さらに、これもデータベース20−2から獲得できる周期的な変動や最近の傾向などから、求められた予想交換時期を補正している。こうしてより正確な感光体寿命の期日時期を予測演算処理し、それまでに感光体を交換可能なようにユーザにその予想日を画像形成装置の操作部上に画面表示制御で示すことができる。   As described above, based on the data stored in the database 20-2, the photoconductor lifetime predicting means 20-1 first obtains an expected replacement time from an average value, and this is also obtained from the database 20-2. The expected exchange time is corrected based on possible periodic fluctuations and recent trends. In this way, a more accurate photoconductor life date can be predicted and calculated, and the expected date can be indicated to the user on the operation unit of the image forming apparatus by screen display control so that the photoconductor can be replaced by that time.

また、寿命となる日時の予測と同時に、寿命となるまでに、およそ何枚の印字が可能かも予測ができる。   Further, at the same time as predicting the date and time when the service life is reached, it is possible to predict how many sheets can be printed before the service life is reached.

例えば、膜厚量D(μm)、寿命となる膜厚量E(μm)、1枚あたりに要する感光体回転数G、1枚あたりに要する1次帯電電流量Hとすると下記第(4)式に基づいて予測することが出来る。   For example, assuming that the film thickness D (μm), the film thickness E (μm) for the life, and the photoreceptor rotation speed G required per sheet, and the primary charging current amount H required per sheet, (4) Can be predicted based on the formula.

(D−E)/(aAG+bBH)=寿命になるまでに印字可能な枚数……(4)
このようにして、予測した印字可能枚数をユーザに後述するユーザインタフェースを介して、図示しない操作パネルや通信インタフェースを介して後述するユーザサイトPCサーバ60等のプリントドライバ等によりUIとして表示装置に提示することにより、今後の交換需要の発生日時時期がより高精度に予測が出来るようになる。
(D−E) / (aAG + bBH) = Number of printable sheets before the end of the life …… (4)
In this way, the predicted number of printable sheets is presented to the display device as a UI by a print driver or the like such as a user site PC server 60 described later via an operation panel (not shown) or a communication interface via a user interface described later. By doing so, it becomes possible to predict the generation date and time of future replacement demand with higher accuracy.

なお、感光体寿命を決定する感光体膜厚とは別な因子として、感光体表面の粗さ量がある。感光体表面の粗さがある一定の値以上になると、感光体膜厚が寿命膜厚より厚い場合でも、その傷のパターンが画像上に、筋状画像として現れ使用不能となるケースもある。そのため、感光体表面の粗さの値を測定し、上記方法に加味して感光体寿命予測手段20−1が予測演算処理することにより、さらに高い精度で感光体寿命を予測演算処理することができる。以下、その実施形態について説明する。   Note that the surface roughness of the photoconductor is another factor different from the photoconductor film thickness that determines the photoconductor life. If the surface roughness of the photosensitive member exceeds a certain value, even if the photosensitive member film thickness is larger than the lifetime film thickness, the scratch pattern may appear as a streak image on the image and become unusable. Therefore, by measuring the roughness value of the surface of the photoconductor and taking into consideration the above method, the photoconductor life prediction means 20-1 performs the prediction calculation processing, so that the photoconductor life prediction processing can be performed with higher accuracy. it can. The embodiment will be described below.

図5は、本発明に係る感光体管理装置における第2のデータ処理手順の一例を示すフローチャートであり、感光体表面の粗さ量情報も加味した寿命予測処理手順に対応する。なお、(51)〜(55)は各ステップを示す。また、感光体膜厚の予測は上記とほぼ同様の方法で行う。そこで、図4とは異なるステップ(52)と(53)についてのみ説明する。   FIG. 5 is a flowchart showing an example of a second data processing procedure in the photoconductor management device according to the present invention, and corresponds to a life prediction processing procedure that also takes into account roughness amount information on the surface of the photoconductor. In addition, (51)-(55) shows each step. Also, the photoconductor film thickness is predicted by the same method as described above. Therefore, only steps (52) and (53) different from FIG. 4 will be described.

異なるところは、今回の感光体膜厚のデータと、メモリ本体10−1に格納されている交換日時の予測をすべき感光体膜厚値とを感光体寿命予測手段20−1が比較し、その膜厚に達していたと判断した場合は、さらに、メモリ本体10−1に格納されている交換日時の予測をすべき感光体表面粗さ値と感光体寿命予測手段20−1が比較して現在の感光体の粗さ量が所定の数値より粗いかどうかを感光体寿命予測手段20−1が判断し(52)。表面粗さ数値も所定の数値に達していた(粗い)と感光体寿命予測手段20−1が判断したと場合には、表面粗さ情報も用いて、感光体が寿命に達する日時を予測演算処理する(53)。   The difference is that the photoconductor film thickness data of this time and the photoconductor film thickness value for which the replacement date and time stored in the memory body 10-1 should be predicted are compared by the photoconductor lifetime prediction means 20-1. When it is determined that the film thickness has been reached, the photoconductor surface roughness value to be predicted for the replacement date stored in the memory body 10-1 is compared with the photoconductor life prediction means 20-1. The photoconductor lifetime predicting means 20-1 judges whether the current photoconductor roughness amount is coarser than a predetermined value (52). If the photoconductor life prediction means 20-1 determines that the surface roughness value has also reached a predetermined value (rough), the date and time when the photoconductor reaches the end of its life is also predicted using the surface roughness information. Process (53).

そして、予測演算処理の方法としては、データベース内に格納されている過去の平均表面粗さ増加量J(μm/日)と現在の表面粗さ量K(μm)、寿命となる表面粗さ量L(μm)、現在の日時F(日)から感光体寿命予測手段20−1が求める。例えば下記第(5)式に基づいて算出する。   As a method of predictive calculation processing, the past average surface roughness increase amount J (μm / day) stored in the database, the current surface roughness amount K (μm), and the surface roughness amount that will be the lifetime. The photoconductor lifetime predicting means 20-1 obtains L (μm) and the current date and time F (day). For example, it is calculated based on the following formula (5).

F+(K−L)/J=感光体が寿命となる日時……(5)
一方、ステップ(52)で、表面粗さが所定の膜厚に達していないと感光体寿命予測手段20−1が判定した場合は、感光体寿命予測手段20−1が膜厚情報に基づいて感光体寿命時期を予測する。
F + (K−L) / J = the date and time when the photoconductor has reached the end of life …… (5)
On the other hand, when the photoconductor lifetime predicting unit 20-1 determines that the surface roughness has not reached the predetermined film thickness in step (52), the photoconductor lifetime predicting unit 20-1 is based on the film thickness information. Estimate photoconductor lifetime.

なお、感光体の表面粗さを測定する方法としては、非接触型の光学式の表面粗さ測定センサ−を用いる等の方法により測定することが出来る。   In addition, as a method for measuring the surface roughness of the photoreceptor, it can be measured by a method such as using a non-contact type optical surface roughness measuring sensor.

なお、図4、図5のそれぞれのフローチャートで判定の基準となる感光体寿命予測開始膜厚値・寿命膜厚値は同じものである必要はない。   It should be noted that the photoconductor life prediction start film thickness value and the life film thickness value that are the criteria for determination in the flowcharts of FIGS. 4 and 5 do not have to be the same.

予測された寿命日時情報は、遠隔通信手段を用いて、サービスサイトPCサーバ40に送られる。   The predicted life date information is sent to the service site PC server 40 using remote communication means.

次に、感光体の寿命時期の予測がなされた後の工程の例について説明する。   Next, an example of a process after the lifetime of the photoconductor is predicted will be described.

ユーザのところにある印字装置本体の操作部による操作指示に基づき、サービスサイトPCサーバ40に感光体寿命予測日時が入力されると、その予測に基づいて配送日の候補が決定される。この操作は人手で行っても良いが、自動化されてもよい。   When the photoconductor lifetime prediction date and time is input to the service site PC server 40 based on an operation instruction from the operation unit of the printing apparatus main body at the user's place, a delivery date candidate is determined based on the prediction. This operation may be performed manually or may be automated.

上記のようにして配送日の候補が決定されると、その日を配送業者へ通知する。配送業者は適当な配送車あるいは配送車の候補が決定されると、サービスサイトPCサーバ40から本体主制御装置20へと予想交換時期が通知される。なお、上記処理を電子メール等で行えるように構成してもよい。   When a delivery date candidate is determined as described above, the date is notified to the delivery company. When an appropriate delivery vehicle or a delivery vehicle candidate is determined, the delivery company is notified of the expected replacement time from the service site PC server 40 to the main controller 20. In addition, you may comprise so that the said process can be performed by an email etc.

これを受けたユーザサイトのデータ処理装置(PC)では、データ処理装置(PC)のユーザモジュール(UIモジュール)により、図6に示すような感光体交換要求メッセージ画面となるユーザインタフェース(UI)画面を表示する制御をデータ処理装置(PC)のCPUが行う。   Upon receiving this, the data processing device (PC) at the user site receives a user interface (UI) screen as a photoconductor replacement request message screen as shown in FIG. 6 by the user module (UI module) of the data processing device (PC). Is controlled by the CPU of the data processing apparatus (PC).

図6〜図8は、図2に示した操作部207に表示されるUI画面の一例を示す図であり、図6は感光体交換要求メッセージ画面に対応し、図7は感光体配送設定画面に対応し、図8は訪問日(配送日)確認通知画面に対応する。   6 to 8 are diagrams showing examples of the UI screen displayed on the operation unit 207 shown in FIG. 2. FIG. 6 corresponds to the photoconductor replacement request message screen, and FIG. 7 shows the photoconductor delivery setting screen. FIG. 8 corresponds to a visit date (delivery date) confirmation notification screen.

操作者が図6に示す画面に対して感光体交換を行う旨の入力(OK)を操作部207のキー操作で行うと、表示画面が図7に示す配送設定画面に切り替える表示制御がCPU201により実行される。   When the operator inputs (OK) that the photoconductor replacement is to be performed on the screen shown in FIG. 6 by key operation of the operation unit 207, the display control for switching the display screen to the delivery setting screen shown in FIG. Executed.

そして、図7に示す発送設定画面では、操作者が予想交換期間の中から、希望する日時を操作部207のキーを押下して入力する。   Then, on the shipping setting screen shown in FIG. 7, the operator inputs a desired date and time by pressing the key of the operation unit 207 from the expected exchange period.

次に、操作部207から入力された指定日は、リモートインタフェース203を介してサービスサイトPCサーバ40に送信される。サービスサイトPCサーバ40では、この指定日に基づいて決定された配送・回収の予定日時情報を操作部207上に通知し、最終的な確認を求める。この時に、操作部207では、例えば図8に示す確認画面が表示される。   Next, the specified date input from the operation unit 207 is transmitted to the service site PC server 40 via the remote interface 203. The service site PC server 40 notifies the operation unit 207 of the scheduled delivery / collection date / time information determined based on the designated date, and requests final confirmation. At this time, the operation unit 207 displays, for example, a confirmation screen shown in FIG.

以上の手順によって確定した日時が配送業者にもネットワークを介して、あるいは電話により通知され、指定された日時に配送業者が感光体の配送及び交換された感光体ユニットの回収を実施する。   The delivery date and time determined by the above procedure is also notified to the delivery company via the network or by telephone, and the delivery company delivers the photoreceptor and collects the replaced photoreceptor unit at the designated date and time.

上記実施形態によれば、感光体の寿命を決定する重要な因子である消耗量の予測方法とし、本実施形態では感光体の総回転時間と感光体の総帯電電流量の2つを測定し、該測定される変数である、2つの変数(消耗パラメータ)から予測される感光体の消耗量の計算式を予め作成しておき、その数値から感光体の消耗量を予測するように構成したので、感光体の消耗量は1次帯電による劣化が要因の1つとなっておりプリント枚数、感光体の回転時間だけで、感光体の消耗量を予測する方法に比べて、より高い精度で感光体の消耗量を予測することが可能になる。特に、膜厚の薄い保護層を有する感光体に対する寿命予測精度が格段に向上することが期待される。   According to the above-described embodiment, the consumption amount prediction method, which is an important factor for determining the life of the photoconductor, is used. In this embodiment, the total rotation time of the photoconductor and the total charging current amount of the photoconductor are measured. In addition, a formula for calculating the consumption amount of the photoconductor predicted from the two variables (consumption parameters), which are the measured variables, is prepared in advance, and the photoconductor consumption amount is predicted from the numerical value. Therefore, the amount of consumption of the photosensitive member is caused by deterioration due to primary charging, and the photosensitive member is exposed with higher accuracy than the method of predicting the consumption amount of the photosensitive member only by the number of printed sheets and the rotation time of the photosensitive member. It becomes possible to predict the amount of body consumption. In particular, it is expected that the life prediction accuracy for a photoreceptor having a thin protective layer will be significantly improved.

さらに、予測された感光体の寿命から、最適な交換時期に、ユーザに対して交換を催促する警告を提示するので、感光体の寿命が近いことを使用者が装置本体のパネル表示や、プリントジョブを出力可能なユーザPC上で確実に認識することができる。   In addition, the user is warned to replace the sensor at the optimal replacement time based on the predicted lifetime of the photoconductor. The user can be surely recognized on the user PC that can output the job.

また、この警告に連動して、感光体の発注を管理するサーバ等に自動接続して、感光体発注画面等をユーザPC上にダウンロードすることも可能となり、ユーザPCによる感光体の発注先に対するURL入力等の作業が軽減され、適時に感光体の発注指示を行うことも可能となる。   In conjunction with this warning, it is possible to automatically connect to a server or the like that manages the ordering of the photoconductor, and to download the photoconductor ordering screen or the like onto the user PC. Work such as URL input is reduced, and it becomes possible to instruct the ordering of photoreceptors in a timely manner.

〔第2実施形態〕
図9は、本発明の第2実施形態を示す感光体管理システムの一例を示すブロック図であり、感光体ユニットメモリ部10、本体主制御装置20、本体内感光体状態測定部30を備えるデバイス部と、該デバイス部の前記感光体ユニットメモリ部10を管理するサービスサイトPCサーバ40とが通信可能なシステム例に対応する。なお、図3と同一のものには同一の符号を付してある。
[Second Embodiment]
FIG. 9 is a block diagram showing an example of a photoconductor management system according to the second embodiment of the present invention, and includes a photoconductor unit memory unit 10, a main body main controller 20, and a photoconductor state measuring unit 30 in the main body. And a service site PC server 40 that manages the photosensitive unit memory unit 10 of the device unit. In addition, the same code | symbol is attached | subjected to the same thing as FIG.

この実施形態の特徴は、第1実施形態で印字装置本体内で行っていた感光体寿命予測をサービスサイトPCサーバ40で行うところが異なっている。   The feature of this embodiment is that the service site PC server 40 performs the photoconductor lifetime prediction which is performed in the printing apparatus main body in the first embodiment.

このように構成することで、過去のドラム回転数情報・帯電電流量情報・湿度情報等を格納するメモリを本体内に持つ必要が無い点で優れている。   Such a configuration is excellent in that it is not necessary to have a memory for storing past drum rotation number information, charging current amount information, humidity information, etc. in the main body.

〔第3実施形態〕
図10は、本発明の第3実施形態を示す感光体管理システムの一例を示すブロック図であり、感光体ユニットメモリ部10、本体主制御装置20、本体内感光体状態測定部30を備えるデバイス部と、該デバイス部の前記感光体ユニットメモリ部10を管理するユーザサイトPCサーバ60とが通信可能なシステム例に対応する。なお、図3、図9と同一のものには同一の符号を付してある。
[Third Embodiment]
FIG. 10 is a block diagram showing an example of a photoconductor management system according to the third embodiment of the present invention, and includes a photoconductor unit memory unit 10, a main body main controller 20, and a photoconductor state measuring unit 30 in the main body. And a user site PC server 60 that manages the photosensitive unit memory unit 10 of the device unit correspond to a system example that can communicate with each other. In addition, the same code | symbol is attached | subjected to the same thing as FIG. 3, FIG.

この第3実施形態の特徴は、第1実施形態で印刷装置本体内で行っていた感光体寿命予測をユーザサイトPCサーバで行うところが異なっている。   The third embodiment is different from the first embodiment in that the photoconductor life prediction performed in the printing apparatus main body in the first embodiment is performed by the user site PC server.

このように構成することで、過去の感光体回転数情報・帯電電流量情報・湿度情報等を格納するメモリを本体内に持つ必要が無い点で優れている。   This configuration is excellent in that it is not necessary to have a memory for storing past photoconductor rotation speed information, charging current amount information, humidity information, etc. in the main body.

また、第3実施形態では、ユーザサイト内の消耗品管理者のPCで処理が行われ、管理者からサービスサイト・消耗品配送業者に対して、感光体の配送依頼を行う。   Further, in the third embodiment, processing is performed by the PC of the consumables manager in the user site, and the administrator issues a photoconductor delivery request to the service site / consumables delivery company.

上記実施形態によれば、第1実施形態における寿命予測機能実行手段をユーザサイトPCサーバ60に移管したので、本体主制御装置20におる寿命予測機能処理をユーザサイトPCサーバ60に代行させるシステムを自在に構築して、本体主制御装置20におる寿命予測負担を無くして、ユーザサイトPCサーバ60側で本体主制御装置20を含む、複数台の印刷装置における感光体の寿命予測を一元管理することが可能となる。   According to the above embodiment, since the life prediction function execution means in the first embodiment has been transferred to the user site PC server 60, a system that substitutes the user site PC server 60 for the life prediction function processing in the main controller 20. It is constructed freely, and the life prediction burden on the main body main control device 20 is eliminated, and the life prediction of the photoconductors in a plurality of printing apparatuses including the main body main control device 20 is centrally managed on the user site PC server 60 side. It becomes possible.

〔第4実施形態〕
第1実施形態、第2実施形態、又は第3実施形態に加え、さらに、第4実施形態も想定される。
[Fourth Embodiment]
In addition to the first embodiment, the second embodiment, or the third embodiment, a fourth embodiment is also assumed.

第4実施形態ではサービスサイトPCサーバ60において同じ種類の複数の感光体寿命を管理し、感光体の種類ごとの需要予測が可能となる。   In the fourth embodiment, the service site PC server 60 manages a plurality of photoconductor lifetimes of the same type, and enables demand prediction for each type of photoconductor.

従来の方法(特開平9−101947号公報)では、販売実績(消耗品の場合は交換実績)のみを需要予測の統計分析用データとして用いているが、本実施形態では前述した実施形態で集積した感光体ごとの交換時期データを交換直後から蓄積し、交換前の交換時期予測データを用いることで同じ種類の複数の感光体時期別交換本数のより精度の高い予測を可能とする。   In the conventional method (Japanese Patent Laid-Open No. 9-101947), only sales results (replacement results in the case of consumables) are used as data for statistical analysis of demand prediction, but in this embodiment, integration is performed in the above-described embodiment. The replacement time data for each photoconductor is accumulated immediately after the replacement, and the replacement time prediction data before replacement is used, so that it is possible to predict the number of replacements of the same type of the plurality of photoconductors with higher accuracy.

具体的な予測方法について、図11を参照して説明する。   A specific prediction method will be described with reference to FIG.

図11は、図9に示したサービスサイトPCサーバ60で管理される管理テーブルの一例を示す図であり、サービスサイトPCサーバ60は、図11の(a)に示すテーブル形式で本体機器ID毎の感光体の交換時期予測データをネットワークで接続された本体主制御装置20から通信手段CM5を介して蓄積する。   FIG. 11 is a diagram showing an example of a management table managed by the service site PC server 60 shown in FIG. 9, and the service site PC server 60 has a table format shown in FIG. The photoconductor replacement time prediction data is stored from the main controller 20 connected via the network via the communication means CM5.

図11の(a)に示す例では、サービスサイトPCサーバ60に本体機器ID毎にユニークなデータレコードを持ち、各データレコードには本体機器ID,交換規定量時期までの日数、日数を月に変換した値(日数÷30、あまりは切り下げ,例えば交換規定量までの時期が70日の場合は70÷30=2あまり10で値は「2」となる)などのデータが蓄積される。なお、本実施形態において、交換規定量とは、消耗品の残存量が残り「0」というような物理的な量としてもいいし、あるいは、全体から算定される割合となる、例えば「10%」というような相対的な量を基準ととしても良い。また、後者の場合には、基準量の目安をユーザが操作部やホスト側から指定できるように構成してもよい。   In the example shown in FIG. 11A, the service site PC server 60 has a unique data record for each main body device ID, and each data record includes the main body device ID, the number of days until the replacement specified amount time, and the number of days. Data such as a converted value (number of days / 30, too much is rounded down, for example, 70 ÷ 30 = 2 is too much and the value is “2” when the time to the replacement prescribed amount is 70 days) is accumulated. In the present embodiment, the specified replacement amount may be a physical amount such that the remaining amount of consumables is “0”, or a ratio calculated from the whole, for example, “10% The relative amount of “ In the latter case, the reference amount may be configured so that the user can specify the reference amount from the operation unit or the host side.

そして、データの蓄積はあらかじめ設定された時期に定期的に繰り返し行われ、感光体の消耗度に関わらず、可能な限りデータ蓄積対象となっているすべての感光体のデータを蓄積するのが望ましい。   The accumulation of data is periodically repeated at a preset time, and it is desirable to accumulate the data of all photoconductors that are data accumulation targets as much as possible regardless of the degree of wear of the photoconductor. .

図11の(a)では本体機器毎に蓄積されたデータとそれを月毎に変換したデータを持つ例を示したが、蓄積単位、集計単位は他に時間、週、年などさまざまな時間単位が想定される。   FIG. 11A shows an example of having data accumulated for each main device and data obtained by converting the data every month. However, the accumulation unit and the aggregation unit are various time units such as time, week, and year. Is assumed.

次にサービスサイトPCサーバ60は需要予測を行う感光体の種類ごとにすべてのデータをメモリに読み込み、図11の(a)の交換時期予測データ数を月ごとに集計することで、感光体の各月ごとの交換数予測が可能になり、生産計画、在庫計画などの精度の高い計画策定が可能となる。   Next, the service site PC server 60 reads all the data for each type of photoconductor for which the demand is predicted, and totals the number of replacement time prediction data shown in FIG. It is possible to predict the number of replacements every month, and it is possible to create highly accurate plans such as production plans and inventory plans.

例えば、図11の(a)の本体機器ID D001の交換規定量時期(月)は「0」であり、現在が、例えば5月1日なので交換規定量時期は当月中に迎えることなり、図11の(b)の5月のデータが「0」から「1」にインクリメントされる。   For example, the replacement specified amount time (month) of the main device ID D001 in FIG. 11A is “0”, and since the current time is, for example, May 1, the replacement specified amount time comes within the current month. 11 (b) May data is incremented from “0” to “1”.

同様に本体機器IDがD002の交換規定量時期(月)は「3」であるため、図11の(b)の8月のデータが「1」になる。   Similarly, since the replacement specified amount time (month) of the main device ID D002 is “3”, the data for August in FIG. 11B is “1”.

さらに、本体機器IDがD003の交換規定量時期(月)は「0」であるため図11の(b)の5月のデータは「1」から「2」にインクリメントされる。   Further, since the replacement specified amount time (month) of the main device ID D003 is “0”, the May data in FIG. 11B is incremented from “1” to “2”.

同様にすべてのデータを集計し図11の(b)に示したような時期別交換規定量予測本数(交換予測数量)が算出される。   Similarly, all the data are totaled, and the predicted number of replacement prescribed amounts per period (replacement predicted quantity) as shown in FIG. 11B is calculated.

なお、同様の方法で週、年などの集計も可能となる。詳細は記述しないが時期別交換規定量予測本数データの具体的な利用方法としては蓄積されたデータをサーバに接続されたディスプレイで表示する、プリンタで印刷する、生産管理システムなど他のシステムにデータを送信するなどの方法が想定される。   In addition, the same method can be used to aggregate weeks and years. Although the details are not described, the specific usage method of the estimated amount of exchange prescribed amount by time is as follows. The accumulated data is displayed on the display connected to the server, printed on the printer, and the data in other systems such as the production management system. A method such as sending a message is assumed.

尚、第4実施形態で示した需要予測方法は感光体以外にも電子写真方式の印刷機で利用される寿命の長い他のパーツ(例えば、ブレード)などネットワークで接続された消耗部品などにも利用可能となる。   Note that the demand prediction method shown in the fourth embodiment applies not only to the photoconductor but also to consumable parts connected by a network such as other parts (for example, blades) having a long life used in electrophotographic printing machines. Be available.

これまで説明した管理システムの情報処理は、印刷装置内で行い最終的な配送の指示をしてもよいし、LAN、或いは遠隔通信手段を用いて接続されるユーザのパーソナルコンピュータ・データサーバ、或いは、サービスセンタ(印刷装置・感光体のメーカ・管理会社・販売店)のパーソナルコンピュータ・データサーバで処理を行う形態でもよい。   The information processing of the management system described so far may be performed within the printing apparatus and instructed for final delivery, or the personal computer / data server of the user connected using a LAN or remote communication means, or Alternatively, the processing may be performed by a personal computer / data server of a service center (printing apparatus / photosensitive body manufacturer / management company / sales store).

また、上記各実施形態によれば、感光体が表面に保護層を有する感光体である場合に特に効果的である。保護層は従来の電荷輸送層に比べて、通常膜厚が1〜5μmと薄く、その寿命予測のためには、より精度の高い予測手段が必要である。本発明のシステムであれば、より高い精度での寿命予測が可能であり、膜厚の薄い保護層を有する感光体の管理システムでも、無駄なく、また、欠品も無く行うことが出来る。   Further, according to each of the embodiments described above, it is particularly effective when the photoreceptor is a photoreceptor having a protective layer on the surface. The protective layer is usually thinner than the conventional charge transport layer, with a film thickness as thin as 1 to 5 μm, and more accurate prediction means are required to predict its life. With the system of the present invention, it is possible to predict the lifetime with higher accuracy, and even a photoconductor management system having a thin protective layer can be performed without waste and without missing parts.

以下、図12に示すメモリマップを参照して本発明に係る感光体管理装置を含む感光体管理システムで読み取り可能なデータ処理プログラムの構成について説明する。   The configuration of the data processing program that can be read by the photoconductor management system including the photoconductor management device according to the present invention will be described below with reference to the memory map shown in FIG.

図12は、本発明に係る感光体管理システムで読み取り可能な各種データ処理プログラムを格納する記憶媒体のメモリマップを説明する図である。   FIG. 12 is a diagram for explaining a memory map of a storage medium for storing various data processing programs readable by the photoconductor management system according to the present invention.

なお、特に図示しないが、記憶媒体に記憶されるプログラム群を管理する情報、例えばバージョン情報,作成者等も記憶され、かつ、プログラム読み出し側のOS等に依存する情報、例えばプログラムを識別表示するアイコン等も記憶される場合もある。   Although not particularly illustrated, information for managing a program group stored in the storage medium, for example, version information, creator, etc. is also stored, and information depending on the OS on the program reading side, for example, a program is identified and displayed. Icons may also be stored.

さらに、各種プログラムに従属するデータも上記ディレクトリに管理されている。また、各種プログラムをコンピュータにインストールするためのプログラムや、インストールするプログラムが圧縮されている場合に、解凍するプログラム等も記憶される場合もある。   Further, data depending on various programs is also managed in the directory. In addition, a program for installing various programs in the computer, and a program for decompressing when the program to be installed is compressed may be stored.

本実施形態における図4,図5に示す機能が外部からインストールされるプログラムによって、ホストコンピュータにより遂行されていてもよい。そして、その場合、CD−ROMやフラッシュメモリやFD等の記憶媒体により、あるいはネットワークを介して外部の記憶媒体から、プログラムを含む情報群を出力装置に供給される場合でも本発明は適用されるものである。   The functions shown in FIGS. 4 and 5 in this embodiment may be performed by a host computer by a program installed from the outside. In this case, the present invention is applied even when an information group including a program is supplied to the output device from a storage medium such as a CD-ROM, a flash memory, or an FD, or from an external storage medium via a network. Is.

以上のように、前述した実施形態の機能を実現するソフトウエアのプログラムコードを記録した記憶媒体を、システムあるいは装置に供給し、そのシステムあるいは装置のコンピュータ(またはCPUやMPU)が記憶媒体に格納されたプログラムコードを読出し実行することによっても、本発明の目的が達成されることは言うまでもない。   As described above, a storage medium storing software program codes for realizing the functions of the above-described embodiments is supplied to the system or apparatus, and the computer (or CPU or MPU) of the system or apparatus stores the storage medium in the storage medium. It goes without saying that the object of the present invention can also be achieved by reading and executing the programmed program code.

この場合、記憶媒体から読み出されたプログラムコード自体が本発明の新規な機能を実現することになり、そのプログラムコードを記憶した記憶媒体は本発明を構成することになる。   In this case, the program code itself read from the storage medium realizes the novel function of the present invention, and the storage medium storing the program code constitutes the present invention.

従って、プログラムの機能を有していれば、オブジェクトコード、インタプリタにより実行されるプログラム、OSに供給するスクリプトデータ等、プログラムの形態を問わない。   Therefore, as long as it has the function of the program, the form of the program such as an object code, a program executed by an interpreter, or script data supplied to the OS is not limited.

プログラムを供給するための記憶媒体としては、例えばフレキシブルディスク、ハードディスク、光ディスク、光磁気ディスク、MO、CD−ROM、CD−R、CD−RW、磁気テープ、不揮発性のメモリカード、ROM、DVDなどを用いることができる。   As a storage medium for supplying the program, for example, a flexible disk, hard disk, optical disk, magneto-optical disk, MO, CD-ROM, CD-R, CD-RW, magnetic tape, nonvolatile memory card, ROM, DVD, etc. Can be used.

この場合、記憶媒体から読出されたプログラムコード自体が前述した実施形態の機能を実現することになり、そのプログラムコードを記憶した記憶媒体は本発明を構成することになる。   In this case, the program code itself read from the storage medium realizes the functions of the above-described embodiments, and the storage medium storing the program code constitutes the present invention.

その他、プログラムの供給方法としては、クライアントコンピュータのブラウザを用いてインターネットのホームページに接続し、該ホームページから本発明のコンピュータプログラムそのもの、もしくは、圧縮され自動インストール機能を含むファイルをハードディスク等の記録媒体にダウンロードすることによっても供給できる。また、本発明のプログラムを構成するプログラムコードを複数のファイルに分割し、それぞれのファイルを異なるホームページからダウンロードすることによっても実現可能である。つまり、本発明の機能処理をコンピュータで実現するためのプログラムファイルを複数のユーザに対してダウンロードさせるWWWサーバやftpサーバ等も本発明の請求項に含まれるものである。   As another program supply method, a browser of a client computer is used to connect to a homepage on the Internet, and the computer program itself of the present invention or a compressed file including an automatic installation function is stored on a recording medium such as a hard disk from the homepage. It can also be supplied by downloading. It can also be realized by dividing the program code constituting the program of the present invention into a plurality of files and downloading each file from a different homepage. That is, a WWW server, an ftp server, and the like that allow a plurality of users to download a program file for realizing the functional processing of the present invention on a computer are also included in the claims of the present invention.

また、本発明のプログラムを暗号化してCD−ROM等の記憶媒体に格納してユーザに配布し、所定の条件をクリアしたユーザに対し、インターネットを介してホームページから暗号化を解く鍵情報をダウンロードさせ、その鍵情報を使用することにより暗号化されたプログラムを実行してコンピュータにインストールさせて実現することも可能である。   In addition, the program of the present invention is encrypted, stored in a storage medium such as a CD-ROM, distributed to users, and key information for decryption is downloaded from a homepage via the Internet to users who have cleared predetermined conditions. It is also possible to execute the encrypted program by using the key information and install the program on a computer.

また、コンピュータが読み出したプログラムコードを実行することにより、前述した実施形態の機能が実現されるだけでなく、そのプログラムコードの指示に基づき、コンピュータ上で稼働しているOS(オペレーティングシステム)等が実際の処理の一部または全部を行い、その処理によって前述した実施形態の機能が実現される場合も含まれることは言うまでもない。   Further, by executing the program code read by the computer, not only the functions of the above-described embodiments are realized, but also an OS (operating system) or the like running on the computer based on the instruction of the program code. It goes without saying that a case where the function of the above-described embodiment is realized by performing part or all of the actual processing and the processing is included.

さらに、記憶媒体から読み出されたプログラムコードが、コンピュータに挿入された機能拡張ボードやコンピュータに接続された機能拡張ユニットに備わるメモリに書き込まれた後、そのプログラムコードの指示に基づき、その機能拡張ボードや機能拡張ユニットに備わるCPU等が実際の処理の一部または全部を行い、その処理によって前述した実施形態の機能が実現される場合も含まれることは言うまでもない。   Further, after the program code read from the storage medium is written to a memory provided in a function expansion board inserted into the computer or a function expansion unit connected to the computer, the function expansion is performed based on the instruction of the program code. It goes without saying that the case where the CPU or the like provided in the board or the function expansion unit performs part or all of the actual processing and the functions of the above-described embodiments are realized by the processing.

本発明は上記実施形態に限定されるものではなく、本発明の趣旨に基づき種々の変形(各実施形態の有機的な組合せを含む)が可能であり、それらを本発明の範囲から排除するものではない。   The present invention is not limited to the above embodiments, and various modifications (including organic combinations of the embodiments) are possible based on the spirit of the present invention, and these are excluded from the scope of the present invention. is not.

本発明の様々な例と実施形態を示して説明したが、当業者であれば、本発明の趣旨と範囲は、本明細書内の特定の説明に限定されるものではない。   Although various examples and embodiments of the present invention have been shown and described, the spirit and scope of the present invention are not limited to the specific descriptions in the present specification by those skilled in the art.

なお、本発明は、上記した実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々変更を加え得ることは勿論である。   Note that the present invention is not limited to the above-described embodiment, and it is needless to say that various modifications can be made without departing from the gist of the present invention.

上記実施形態では、所定のデバイスとして、表示装置と印刷装置とを例としたが、感光体を具備するデバイスであれば、これに限定されることなく、本発明を適用可能である。   In the above-described embodiment, the display device and the printing device are exemplified as the predetermined device. However, the present invention is not limited to this as long as the device includes a photoconductor.

本発明に係る印刷装置を適用可能な画像形成装置の一例を示す断面図である。1 is a cross-sectional view illustrating an example of an image forming apparatus to which a printing apparatus according to the present invention can be applied. 図1に示した画像形成装置の制御構成を示すブロック図である。FIG. 2 is a block diagram illustrating a control configuration of the image forming apparatus illustrated in FIG. 1. 本発明の第1実施形態を示す感光体管理システムの一例を示すブロック図である。It is a block diagram which shows an example of the photoreceptor management system which shows 1st Embodiment of this invention. 本発明に係る感光体管理装置における第1のデータ処理手順の一例を示すフローチャートである。It is a flowchart which shows an example of the 1st data processing procedure in the photoconductor management apparatus concerning this invention. 本発明に係る感光体管理装置における第2のデータ処理手順の一例を示すフローチャートである。It is a flowchart which shows an example of the 2nd data processing procedure in the photoconductor management apparatus concerning this invention. 図2に示した操作部に表示されるUI画面の一例を示す図である。FIG. 3 is a diagram illustrating an example of a UI screen displayed on an operation unit illustrated in FIG. 2. 図2に示した操作部に表示されるUI画面の一例を示す図である。FIG. 3 is a diagram illustrating an example of a UI screen displayed on an operation unit illustrated in FIG. 2. 図2に示した操作部に表示されるUI画面の一例を示す図である。FIG. 3 is a diagram illustrating an example of a UI screen displayed on an operation unit illustrated in FIG. 2. 本発明の第2実施形態を示す感光体管理システムの一例を示すブロック図である。It is a block diagram which shows an example of the photoreceptor management system which shows 2nd Embodiment of this invention. 本発明の第3実施形態を示す感光体管理システムの一例を示すブロック図である。It is a block diagram which shows an example of the photoreceptor management system which shows 3rd Embodiment of this invention. 図9に示したサービスサイトPCサーバで管理される管理テーブルの一例を示す図である。It is a figure which shows an example of the management table managed with the service site PC server shown in FIG. 本発明に係る画像処理装置で読み取り可能な各種データ処理プログラムを格納する記憶媒体のメモリマップを説明する図である。It is a figure explaining the memory map of the storage medium which stores the various data processing program which can be read with the image processing apparatus which concerns on this invention. この種の感光体の寿命と交換数量との相対関係を説明する特性図である。FIG. 5 is a characteristic diagram for explaining the relative relationship between the life of this type of photoconductor and the replacement quantity.

符号の説明Explanation of symbols

10−1 メモリ本体
20−1 感光体寿命予測手段
20−2 データベース
21 膜厚量予測手段
22 寿命予測手段
10-1 Memory Main Body 20-1 Photoconductor Life Prediction Unit 20-2 Database 21 Film Thickness Prediction Unit 22 Life Prediction Unit

Claims (18)

電子写真方式の印字装置に備えられる感光体の消耗状態を管理する感光体管理装置であって、
異なる複数の消耗パラメータに基づいて前記感光体の消耗量を算定する算定手段と、
前記算定手段により算定される前記感光体の消耗量に基づいて、前記感光体が交換規定量に達する時期を予測する予測手段と備え
前記複数の消耗パラメータとして、感光体の回転数と感光体を帯電させる帯電電流量と稼動時の湿度情報とを含み、
前記算定手段は、稼動時の湿度情報による補正計数と単位回転数あたりの磨耗量と感光体の回転数の積と稼動時の湿度情報による補正計数と単位電流量あたりの磨耗量と帯電電流量の積との和をとることにより感光体の消耗量を算定することを特徴とする感光体管理装置。
A photoconductor management device for managing a consumption state of a photoconductor provided in an electrophotographic printing apparatus ,
A calculating means for calculating a consumption amount of the photoreceptor based on a plurality of different consumption parameters;
Based on the consumption of the photosensitive member is calculated by the calculating means, and a prediction means for predicting the time at which the photosensitive member reaches a replacement specified amount,
As the plurality of consumption parameters, the rotational speed of the photosensitive member, the charging current amount for charging the photosensitive member, and humidity information during operation are included.
The calculation means includes a product of a correction count based on humidity information during operation, a wear amount per unit rotation number, and a rotation number of the photosensitive member, a correction count based on humidity information during operation, a wear amount per unit current amount, and a charging current amount. photoreceptor management apparatus characterized that you calculate the consumption of the photosensitive member by taking the sum of the product of.
前記予測手段は、測定される光体の表面の粗さ量と感光体の表面粗さの交換規定量の差分を過去の平均表面粗さ増加量で割ることで求められる数値で、前記感光体が交換規定量に達する時期を予測することを特徴とする請求項1載の感光体管理装置。 Said predicting means, a numerical value obtained by dividing the difference between the exchange defined amount of surface roughness of the roughness volume and the photosensitive member on the surface of the sensitive light body to be measured by average surface roughness increase of the past, the photosensitive body according to claim 1 Symbol placement of the photosensitive member management device, characterized in that predict when reaching the replacement specified amount. 前記感光体は、表面保護層を有していることを特徴とする請求項1又は2のいずれかに記載の感光体管理装置。 The photosensitive member, the photosensitive member management apparatus according to claim 1 or 2, characterized in that it has a surface protective layer. 前記感光体の消耗量示すデータを積するデータ蓄積手段と、
前記予測手段により予測された交換規定量に達する時期を、前記データ蓄積手段に蓄積されたデータを参照して補正する補正手段と、
を有することを特徴とする請求項1乃至のいずれかに記載の感光体管理装置。
A data storing means for accumulation of data indicating the consumption of the photosensitive member,
Correction means for correcting the time when the prescribed exchange amount predicted by the prediction means is reached with reference to the data stored in the data storage means;
Photoreceptor management apparatus according to any one of claims 1 to 3, characterized in that it has a.
前記印字装置とは所定の通信手段により接続されることを特徴とする請求項1乃至のいずれかに記載の感光体管理装置。 Photoreceptor management apparatus according to any one of claims 1 to 4, characterized in that said the printer is connected by a predetermined communication means. 前記印字装置に対応する感光体の消耗度に応じた予測される交換時期を複数記憶し、かつ、交換時期毎に前記感光体の交換数量を算出する感光体管理手段を有することを特徴とする請求項1乃至のいずれかに記載の感光体管理装置。 A plurality of predicted replacement times corresponding to the degree of wear of the photoconductor corresponding to the printing apparatus are stored, and photoconductor management means for calculating the replacement quantity of the photoconductor for each replacement time is provided. photoreceptor management apparatus according to any one of claims 1 to 5. 前記予測手段により予測された時期に基づいて、前記感光体を含む感光体の交換を促す警告を出力する出力手段を設けたことを特徴とする請求項1乃至のいずれかに記載の感光体管理装置。 On the basis of the time predicted by the prediction means, the photosensitive member according to any one of claims 1 to 6, characterized by comprising output means for outputting a warning to prompt the replacement of the photosensitive member including the photosensitive member Management device. 前記出力手段は、前記感光体を含む感光体の交換を促す警告を印字装置の操作部、あるいは通信可能な外部器に対して出力することを特徴とする請求項に記載の感光体管理装置。 8. The photoconductor management device according to claim 7 , wherein the output unit outputs a warning prompting replacement of the photoconductor including the photoconductor to an operation unit of the printing apparatus or an external device capable of communication. . 電子写真方式の印字装置に備えられる感光体の消耗状態を管理する感光体管理装置における感光体管理方法であって、
算定手段が、異なる複数の消耗パラメータに基づいて前記感光体の消耗量を算定する算定ステップと、
予測手段が、前記算定ステップにより算定される前記感光体の消耗量に基づいて、前記感光体が交換規定量に達する時期を予測する予測ステップと、
出力手段が、前記予測ステップにより予測された時期までに前記感光体を含む感光体の交換を促す警告を出力する出力ステップと備え
前記複数の消耗パラメータとして、感光体の回転数と感光体を帯電させる帯電電流量と稼動時の湿度情報とを含み、
前記算定手段は、稼動時の湿度情報による補正計数と単位回転数あたりの磨耗量と感光体の回転数の積と稼動時の湿度情報による補正計数と単位電流量あたりの磨耗量と帯電電流量の積との和をとることにより感光体の消耗量を算定することを特徴とする感光体管理方法。
A photoconductor management method in a photoconductor management device for managing a consumption state of a photoconductor provided in an electrophotographic printing apparatus ,
A calculating step for calculating a consumption amount of the photoconductor based on a plurality of different consumption parameters;
A predicting step for predicting a time when the photoconductor reaches a predetermined replacement amount based on the consumed amount of the photoconductor calculated by the calculating step;
Output means, and an output step of outputting a warning to prompt the replacement of the photosensitive member including the photosensitive member by the time predicted by the prediction step,
As the plurality of consumption parameters, the rotational speed of the photosensitive member, the charging current amount for charging the photosensitive member, and humidity information during operation are included.
The calculation means includes a product of a correction count based on humidity information during operation, a wear amount per unit rotation number, and a rotation number of the photosensitive member, a correction count based on humidity information during operation, a wear amount per unit current amount, and a charging current amount. photoreceptor managing method characterized that you calculate the consumption of the photosensitive member by taking the sum of the product of.
前記予測ステップは、測定される感光体の表面の粗さ量と感光体の表面粗さの交換規定量の差分を過去の平均表面粗さ増加量で割ることで求められる数値で、前記感光体が交換規定量に達する時期を予測することを特徴とする請求項に記載の感光体管理方法。 The predicting step is a numerical value obtained by dividing the difference between the measured surface roughness amount of the photoconductor and the exchange prescribed amount of the surface roughness of the photoconductor by the past average surface roughness increase amount, and the photoconductor The photosensitive member management method according to claim 9 , wherein a time when the replacement amount reaches a predetermined replacement amount is predicted. 前記感光体は、表面保護層を有していることを特徴とする請求項9又は10のいずれかに記載の感光体管理方法。 The photoconductor management method according to claim 9 , wherein the photoconductor has a surface protective layer. 前記算定ステップの前に、蓄積手段が、前記感光体の消耗量示すデータを積するデータ蓄積ステップと、
前記予測ステップと前記出力ステップとの間で、補正手段が、前記予測ステップにより予測された交換規定量に達する時期を、前記データ蓄積ステップで蓄積されたデータを参照して補正する補正ステップと、
を有することを特徴とする請求項9乃至11のいずれかに記載の感光体管理方法。
Prior to said calculating step, storing means, the data indicating the consumption of the photosensitive member and the data accumulating step of accumulation,
A correction step for correcting the time when the correction means reaches the exchange prescribed amount predicted by the prediction step with reference to the data stored in the data storage step between the prediction step and the output step ;
The photoconductor management method according to claim 9, comprising :
前記印字装置とは所定の通信手段により接続されることを特徴とする請求項9乃至12のいずれかに記載の感光体管理方法。 The photoconductor management method according to claim 9, wherein the photoconductor is connected to the printing apparatus by a predetermined communication unit. 感光体管理手段が、前記印字装置に対応する感光体の消耗度に応じた予測される交換時期を複数記憶し、かつ、交換時期毎に前記感光体の交換数量を算出する感光体管理ステップを有することを特徴とする請求項9乃至13のいずれかに記載の感光体管理方法。 A photoconductor management step in which the photoconductor management means stores a plurality of predicted replacement times corresponding to the degree of wear of the photoconductor corresponding to the printing apparatus , and calculates the replacement quantity of the photoconductor for each replacement time. The photoconductor management method according to claim 9, wherein the photoconductor management method is provided. 出力手段が、前記予測ステップにより予測された時期に基づいて、前記感光体を含む感光体の交換を促す警告を出力する出力ステップを設けたことを特徴とする請求項9乃至14のいずれかに記載の感光体管理方法。 15. The output unit according to claim 9 , further comprising an output step of outputting a warning prompting replacement of the photoconductor including the photoconductor based on the time predicted by the prediction step. The photoreceptor management method according to claim. 前記出力ステップは、前記感光体を含む感光体の交換を促す警告を印字装置の操作部、あるいは通信可能な外部器に対して出力することを特徴とする請求項15に記載の感光体管理方法。 16. The photoconductor management method according to claim 15 , wherein the output step outputs a warning prompting replacement of a photoconductor including the photoconductor to an operation unit of a printing apparatus or an external device capable of communication. . 請求項9乃至16のいずれかに記載の感光体管理方法を実行させるためのプログラムを格納したことを特徴とするコンピュータが読み取り可能な記憶媒体。 17. A computer-readable storage medium storing a program for executing the photosensitive member management method according to claim 9 . 請求項9乃至16のいずれかに記載の感光体管理方法を実行させることを特徴とするプログラム。 17. A program for causing the photosensitive member management method according to claim 9 to be executed.
JP2004094494A 2004-03-29 2004-03-29 Photoconductor management device, photoconductor management method, storage medium storing computer-readable program, and program Expired - Fee Related JP4136984B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004094494A JP4136984B2 (en) 2004-03-29 2004-03-29 Photoconductor management device, photoconductor management method, storage medium storing computer-readable program, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004094494A JP4136984B2 (en) 2004-03-29 2004-03-29 Photoconductor management device, photoconductor management method, storage medium storing computer-readable program, and program

Publications (3)

Publication Number Publication Date
JP2005283736A JP2005283736A (en) 2005-10-13
JP2005283736A5 JP2005283736A5 (en) 2007-05-24
JP4136984B2 true JP4136984B2 (en) 2008-08-20

Family

ID=35182211

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004094494A Expired - Fee Related JP4136984B2 (en) 2004-03-29 2004-03-29 Photoconductor management device, photoconductor management method, storage medium storing computer-readable program, and program

Country Status (1)

Country Link
JP (1) JP4136984B2 (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7983575B1 (en) * 2009-12-28 2011-07-19 Xerox Corporation Apparatus and method for determining photoreceptor charge transport layer thickness of apparatus using a scorotron charge device
JP2009098279A (en) * 2007-10-15 2009-05-07 Fuji Xerox Co Ltd Managing device and managing program for consumables, and consumed amount estimating method
JP5287219B2 (en) * 2008-12-22 2013-09-11 富士ゼロックス株式会社 Consumables replacement time prediction system and management device
JP5246553B2 (en) * 2009-03-17 2013-07-24 株式会社リコー Photoconductor life predictor detection apparatus and image forming apparatus having the same
JP2011102851A (en) * 2009-11-10 2011-05-26 Fuji Xerox Co Ltd Image forming apparatus and processing program
JP2011128345A (en) * 2009-12-17 2011-06-30 Kyocera Mita Corp Image forming apparatus
JP5778933B2 (en) * 2011-01-28 2015-09-16 キヤノン株式会社 Printing apparatus, printing apparatus control method, and program
JP2013257481A (en) * 2012-06-14 2013-12-26 Ricoh Co Ltd Image forming apparatus
JP6422299B2 (en) * 2013-12-19 2018-11-14 キヤノン株式会社 Image forming apparatus and image forming system
JP2016009036A (en) * 2014-06-23 2016-01-18 京セラドキュメントソリューションズ株式会社 Equipment management system, equipment management device, and equipment management method
JP2016045308A (en) * 2014-08-21 2016-04-04 富士ゼロックス株式会社 Control device, printer and program
JP6331912B2 (en) * 2014-09-17 2018-05-30 富士ゼロックス株式会社 Consumables management device and consumables management system
JP6524257B2 (en) * 2015-11-30 2019-06-05 日本郵船株式会社 Hull maintenance support device
JP6881955B2 (en) 2016-11-18 2021-06-02 キヤノン株式会社 Image forming device
JP6961935B2 (en) 2016-12-15 2021-11-05 コニカミノルタ株式会社 Image forming device
JP6898752B2 (en) * 2017-02-28 2021-07-07 キヤノン株式会社 Image forming device
JP7147151B2 (en) * 2017-11-07 2022-10-05 コニカミノルタ株式会社 Image forming apparatus, calculation method, and calculation program
JP2020204660A (en) * 2019-06-14 2020-12-24 コニカミノルタ株式会社 Image forming apparatus and method for setting image forming apparatus

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08220950A (en) * 1995-02-20 1996-08-30 Canon Inc Image forming device
JP2003186652A (en) * 2001-12-18 2003-07-04 Canon Inc Lifetime management and order management of service parts for printer connected to network line, and production management system
JP2003263079A (en) * 2002-03-11 2003-09-19 Fuji Xerox Co Ltd Image forming device and method for estimating life of photoreceptor used in the device
JP2003287986A (en) * 2002-03-28 2003-10-10 Canon Inc Image forming apparatus

Also Published As

Publication number Publication date
JP2005283736A (en) 2005-10-13

Similar Documents

Publication Publication Date Title
JP4136984B2 (en) Photoconductor management device, photoconductor management method, storage medium storing computer-readable program, and program
JP4851232B2 (en) Image forming apparatus and operation method thereof
US7510112B2 (en) Data processing device, consumable information notification method, storage medium for storing computer-readable program, and program
US6820039B2 (en) Facilitating device upkeep
US7865090B2 (en) Maintenance management system and image forming apparatus
US20110216359A1 (en) Maintenance scheduling system and maintenance schedule creating method
JP5194664B2 (en) Consumables management apparatus, method and program
US8588626B2 (en) Apparatus and output setting method of consumed status of consumable items of the apparatus
JP2008269476A (en) Information processor, information processing method and information processing system
JP2008185824A (en) Control system and method for controlling consumable
US20090092402A1 (en) Image forming apparatus and image forming method
CN104903111B (en) Network printer system
JP2016038710A (en) Information processing apparatus and lifetime management system
EP1363218A1 (en) System, apparatus, and method for generating and providing information on customer apparatuses
JP2015148751A (en) consumables management system
EP0782048A2 (en) Image forming apparatus having remote maintenance function and method of remote maintenance
JP2004151703A (en) Information processing apparatus and information processing method
US20090220255A1 (en) Maintenance unit and maintenance method of image forming apparatus
JP2012008162A (en) Management device for replacement toner cartridge and system for the same, image forming apparatus, and management method and management program for replacement toner cartridge
JP2005202120A (en) Expendables management device, image forming apparatus, expendables management program and expendables management method
JP2002297359A (en) Method and system for managing unit
JP4497920B2 (en) Image forming apparatus
JP6349994B2 (en) Information management control device, information management control program
JP2020095149A (en) Device, control method for device, and program
JP2004070444A (en) System and method for managing consumable of image processor, computer program, and computer readable storage medium

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070330

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20080107

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080219

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20080219

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080417

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080520

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080603

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110613

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120613

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120613

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130613

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees