JP4125068B2 - Temporary beams for reinforcing secondary lining panels - Google Patents
Temporary beams for reinforcing secondary lining panels Download PDFInfo
- Publication number
- JP4125068B2 JP4125068B2 JP2002232611A JP2002232611A JP4125068B2 JP 4125068 B2 JP4125068 B2 JP 4125068B2 JP 2002232611 A JP2002232611 A JP 2002232611A JP 2002232611 A JP2002232611 A JP 2002232611A JP 4125068 B2 JP4125068 B2 JP 4125068B2
- Authority
- JP
- Japan
- Prior art keywords
- support
- panel
- secondary lining
- temporary beam
- present
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、例えばセグメントなどにより一次覆工された、主としてトンネル内壁を二次覆工する際に使用される二次覆工用パネルの裏面に二次覆工コンクリートを打設するため、前記二次覆工用パネルをその表面側から補強して支持するための仮設梁に関する。
【0002】
【従来の技術】
従来から、一次覆工されたトンネルの漏水防止対策用などの目的で二次覆工を施すことが行われているが、二次覆工コンクリートを一次覆工面に打設するため、一次覆工面に適宜ピッチで取付けたH型鋼などによる支保工に、打設される二次覆工コンクリート用の型枠を兼用して二次覆工外面としてトンネル内に残る二次覆工用パネルを取付け、このパネルの裏面に二次覆工コンクリートを打設することが行われている。なお、このような二次覆工はトンネルに限られず一次覆工された壁面などの構築物に施工されることがあるので、本発明はトンネル以外の構築物の二次覆工に適用できる。
【0003】
上記の二次覆工においては、二次覆工用の型枠となるパネルを現場で支保工に取付ける作業に時間がかかり、結果として工事期間が長期化してしまうという難点があった。その理由は、支保工に型枠となるパネルをボルト止めしたり、当該パネルが二次覆工用コンクリートの打設によってトンネル内面側に膨出することを防ぐため、そのパネルの外面に仮設の押え梁部材を当てがいこの梁部材を支保工にボルト止めするのに時間がかかるほか、仮設の前記梁部材を支保工から取外すのにも、また手間と時間を要していたからである。
【0004】
【発明が解決しようとする課題】
本発明は上記のようなトンネルなどの二次覆工に使用されるパネルを補強するための仮設梁部材の着脱形態に起因した問題点、即ち、支保工に対する取付けや取外しに手間と時間がかかるという難点を解消できる着脱構造を具備した、二次覆工用パネルの補強用の仮設梁を提供することをその課題とするものである。
【0005】
【課題を解決するための手段】
上記課題を解決することを目的としてなされた二次覆工用パネルを補強して支持する本発明仮設梁の構成は、二次覆工用パネルの左右側部を支持している左右の支保工における支持辺間の距離と略同長に形成した梁部材の左右の両端部に、中間部が当該梁部材に軸止めされ、その軸より先端側が前記支持辺の裏面に係止される掛鉤部に形成され、かつ、前記軸より後端側がレバー部に形成された係止部材を、当該係止部材の回転により、前記掛鉤部が前記支持辺に係止,離脱させられると共に、離脱時に前記掛鉤部がコンクリート打設後の前記パネル表面側に旋回されるように設けたことを特徴とするものである。
【0006】
本発明では、前記レバー部を回して係止部材の掛鉤部を支保工の支持辺の裏面に係止させた状態において、当該レバー部の旋回を阻止する拘束部材を、前記レバー部の旋回位置に対応させて設けた構成とする。
【0007】
本発明において、上記梁部材に設けた左右の係止部材の掛鉤部を、既に取付けられている二次覆工用パネルを通して支保工の支持辺に係止させるため、当該支保工に先に装着されている二次覆工用パネルの前記掛鉤部に対応する部位に、その係止部材が旋回されて支保工の支持辺の裏側に入るための***を形成しなければならない。この***は、二次覆工コンクリートの打設完了後、仮設した上記梁部材を外した後に、エポキシ樹脂などの充填剤によって埋められる。
【0008】
【発明の実施の形態】
次に本発明の実施の形態例について、図に拠り説明する。図1は本発明二次覆工用パネルと仮設梁を一次覆工されたトンネルに施工する状態の概略を示した斜視図、図2はパネル補強用の本発明仮設梁の配置状態を示す全体の平断面図、図3は図2におけるA部の拡大断面図、図4はパネル補強用の仮設梁の左側(図2のA部)における本発明仮設梁の取付第一段階の拡大平断面図、図5は図4に示した部位における仮設梁取付の第二段階の拡大平断面図、図6は仮設梁を除去した後の平断面図、図7は本発明仮設梁の別例の中間を省略した平面図である。
【0009】
図1において、1は地山Eに構築されるトンネルの一次覆工として既に設置されているセグメント、2は前記セグメント1の外面に二次覆工を施工するため、当該セグメント1の外面に沿って設置した平断面I型鋼(H鋼を横向きに使う)による支保工で、支保工2の設置間隔は、二次覆工用の型枠を兼用する後述するパネル3の正面幅(左右幅)に見合ったスパンで設置される。2a,2bは前記支保工2において、当該支保工2の外側に向いた左右の支持辺である。
【0010】
本発明仮設梁により補強,支持される二次覆工用パネル3としては、本出願人が先に特願2000−156768として提案している漏水対策用不燃軽量板を使用することが好ましい。即ち、この不燃軽量板は、不燃性のプラスチック発泡体を芯材と、この芯材を不燃性の繊維強化プラスチック製の外皮材により包むようにして、トンネルの曲面に合せた曲面状に形成したものであるが、二次覆工用パネル3としては、上記例の不燃軽量板に限らず、他の材料,構造により形成された二次覆工用パネルであってもよい。
【0011】
図2において、本発明二次覆工用パネル3は、左右の支保工2,2の芯々間の距離より少し小さ目の正面幅に形成されたものであり、その裏面に水平方向でほぼ等間隔に平行な3本のリブ状部材4を具備している。リブ状部材4の左,右両側には、左右の支保工2,2における対向した支持辺2a,2bのほぼ全幅(左右の長さ)をすべて嵌入できる大きさ(深さ)の切欠部4a,4bが、各支持辺2a,2bの左右の長さ(全幅)と厚さよりも少し大き目に形成されている。5は前記パネル3と一時覆工面のセグメント1の間に形成された二次覆工用コンクリートが打設される空間である。
【0012】
上記パネル3は、その左,右の切欠部4a,4bにおいて、当該切欠部4a,4bの切欠形状を利用して左右の支保工2,2のそれぞれ互に対向した2つの支持辺2a,2bに装着される。
【0013】
ここでは、まず図2のパネル3の右側を、右側の支保工2の支持辺2bに対してリブ状部材4の右側の切欠部4bが対向するように位置付け、前記支持辺2bが切欠部4bに入ってしまうようにこのパネル3を押し付ける。
【0014】
このようにしてパネル3における右側の切欠部4bに、右側の支保工4の支持辺2bが入り込んでしまうと、リブ状部材4における左側端は、左側の支保工2の支持辺2aに対して、切欠部4aが支持辺2aと同じレベルに位置する。つまり、パネル3の左側の裏面が支保工2の支持辺2aの前面に当るレベルに配置されることになるのである。そこで、パネル3を少し左側に平行にずらしてやると、左右のバネ5a,5bの作用により当該パネル3の左右側は、左右の支保工2,2の支持辺2a,2bに対してほぼ均等な位置関係で保持される。
【0015】
上記のようにして、各支保工2に二次覆工用の本発明パネル3が装着されて一次覆工面(セグメント1)を覆うと、その一次覆工面と前記パネル3の裏面側の空間5に二次覆工用のコンクリートが裏打ちされるが、図2に示したパネル装着状態で打設すると、コンクリートの打設圧によりパネル3がトンネルの内部側に膨出するおそれがあるので、本発明では、各支保工2に装着されたパネル3を、同じ支保工2に仮設する本発明仮設梁6によって補強,支持する。この点について、図3〜図6を参照しつつ説明する。
【0016】
図3〜図5に例示した本発明仮設梁6は、ここでは角型鋼管を用い、その左右側を手前側に向けて斜めにカットした平面から見て横長の逆台形状に形成したものを使用しているが、本発明ではこの仮設梁6の材質や形態は例示したものに限られるものではない。
【0017】
本発明仮設梁6は、左,右両側端の斜めカット部位に、先端側が支保工2における支持辺2a,2bの裏面に回り込んで当該辺2a,2bを裏面から挟持する掛鉤部7aを有すると共に、該掛鉤部7aより後方部を軸8で梁6の壁面に軸止めし、かつ、該軸8より後方をレバー部7bに形成した係止部材7が、それぞれに取付けられている。
【0018】
上記係止部材7は、その掛鉤部7aが支持辺2a,2bの裏面に回り込み、当該掛鉤部7aにおいて支保工2の支持辺2a又は2bを挟持するようにレバー部7bが軸8を中心に起立(図4から図5の状態に旋回変位)させられたとき、起立した当該レバー部7bをその起立位置に拘束するための環状の拘束部材9が、この仮設梁6の前面側の壁6aの外面に設けられている。なお、9aは拘束部材9の取付座、9bは拘束部材9の先端係止部である。
【0019】
上記梁6における左右の係止部材7の掛鉤部7aを、支保工2に装着したパネル3の外面から支保工2の支持辺2a,2bの裏面側に通すには、当該パネル3の掛鉤部7aに対応部位に、その掛鉤部7aが挿通できる空間(穴)を要する。このため本発明では、各パネル3の左,右側において上記掛鉤部7aに対応する部位に、仮設穴3aを予め形成しておく。この穴3aの形態の一例は、掛鉤部7aの形態に対応して、図3,図4に例示するように先細のテーパ穴であるが、穴3aの形態はこれに限られず、任意である。
【0020】
本発明では、上記構成を具備した本発明仮設梁6を、パネル3の一枚当り例えば2本〜3本程度、水平方向で平行にして当該パネル3の前面にほぼ等間隔で当てがい(図1,図2参照)、この状態で左,右の係止部材7のレバー部7bを起立させ、この状態を拘束部材9により保持する(図5参照)ことにより、当該左,右の係止部材7,7における掛鉤部7a,7aを左右の支保工2,2のそれぞれの支持辺2a,2bの裏面に回り込ませてそこに係止させることにより、各仮設梁6をパネル3の前面において支保工2に仮設するのである(図5参照)。
【0021】
各支保工2に左,右側部において装着された各二次覆工用パネル3が、上記のようにして各仮設梁6により補強された時点で、前記各パネル3の裏面と一次覆工面の間の空間5に二次覆工コンクリートCoを打設して養生する。二次覆工コンクリートCoの打設,養生が終ると、仮設梁6を除去するのであるが、拘束部材9をレバー部7bから外し係止部材7を装着前の元の姿勢に戻すと、各仮設梁6は各パネル3の前面から取り外すことができるが、各係止部材7においてパネル3に設けた穴3aから二次覆工側に位置していた部分が取り除かれると、この部位には、コンクリートCoが打たれていないので空洞gが残ることとなる。そこで、本発明では、この空洞gの部分に、一例としてエポキシ樹脂などによる充填剤を詰めて固化させることにより、二次覆工を完了することとなる。
【0022】
図3〜図5により説明した本発明仮設梁6には、図7に例示した別の形態のものがある。図7の本発明仮設梁6は、図3〜図5における仮設梁6とは係止部材7に設けた拘束部材9の形態が異なっている。即ち、図7の本発明仮設梁6では、その梁6の手前側の壁6aの内面にナット部材91aを設け、このナット部材91aに、係止部材7のレバー部7bに明けた長穴7cを通して座金付き頭部91bがストッパとして作用するボルト91cを螺合して成る拘束部材91が設けられている。
【0023】
【発明の効果】
以上に説明したように、二次覆工用パネル補強用の本発明仮設梁は、支保工に対してボルト,ナットを一切用いることなく、型鋼などにより形成された支保工の支持辺に、いわばワンタッチ操作的に取付けることができるので、二次覆工用パネルを補強するための仮設梁を、至って省力的かつ容易な作業内容で取付け施工することが可能になる。
【0024】
また、上記のように省力的かつ容易に取付けた本発明仮設梁は、その取付状態がボルト,ナット以外の部材であって、ワンタッチ操作、或は、簡易な操作による係止部材とその拘束部材を以て機械的に取付状態が拘束されるので、二次覆工コンクリートの打設時に当該仮設梁の取付けが外れるようなおそれは皆無である。
【0025】
更に、上記のように堅固に取付けられた本発明仮設梁であっても、その取外しは前記係止部材を取付時とは逆方向に回転させる操作をするだけで、取外すことができるから、従来の支保工にボルト止めしていた仮設梁のように、その取外しに多くの労力と時間を要するという問題点を、ほぼ完璧といってよいレベルで解決することができる。
【図面の簡単な説明】
【図1】本発明二次覆工用パネルと仮設梁を一次覆工されたトンネルに施工する状態の概略を示した斜視図
【図2】パネル補強用の本発明仮設梁の配置状態を示す全体の平断面図
【図3】図2におけるD部の拡大断面図
【図4】パネル補強用の仮設梁の左側(図2のA部)における本発明仮設梁の取付第一段階の拡大平断面図
【図5】図4に示した部位における仮設梁取付の第二段階の拡大平断面図
【図6】仮設梁を除去した後の平断面図
【図7】本発明仮設梁の別例の中間を省略した平面図
【符号の説明】
1 セグメント
2 支保工
2a,2b 支持辺
3 二次覆工用パネル
4 リブ状部材
4a,4b 切欠部
6 仮設梁
7 係止部材
7a 掛鉤部
7b レバー部
8 軸
9 拘束部材[0001]
BACKGROUND OF THE INVENTION
In the present invention, for example, the secondary lining concrete is placed on the back surface of the secondary lining panel mainly used when secondary lining the inner wall of the tunnel, which is primarily laid by a segment or the like. The present invention relates to a temporary beam for reinforcing and supporting the next lining panel from the surface side.
[0002]
[Prior art]
Conventionally, secondary lining has been applied for the purpose of preventing leakage of primary lining tunnels, but the primary lining surface is used for placing secondary lining concrete on the primary lining surface. A secondary lining panel that remains in the tunnel as a secondary lining outer surface is attached to the support work with H-shaped steel, etc., which is attached at an appropriate pitch to the secondary lining concrete formwork. A secondary lining concrete is placed on the back surface of the panel. In addition, since such a secondary lining is not limited to a tunnel but may be applied to a structure such as a wall surface subjected to primary lining, the present invention can be applied to a secondary lining of a structure other than a tunnel.
[0003]
In the above-mentioned secondary lining, there is a problem that it takes time to attach a panel, which will be a mold for secondary lining, to a support on site, resulting in a prolonged construction period. The reason for this is that a panel that becomes a formwork is bolted to the support work, or the panel is temporarily placed on the outer surface of the panel in order to prevent the panel from bulging to the inner surface of the tunnel due to the placement of concrete for secondary lining. This is because it takes time to apply the presser beam member and to bolt the beam member to the support work, and it also takes time and effort to remove the temporary beam member from the support work.
[0004]
[Problems to be solved by the invention]
The present invention is a problem due to the attachment and detachment mode of the temporary beam member for reinforcing the panel used for the secondary lining such as the tunnel as described above, that is, it takes time and effort to attach and remove the support beam. It is an object of the present invention to provide a temporary beam for reinforcing a panel for secondary lining, which is equipped with a detachable structure that can eliminate the difficulty described above.
[0005]
[Means for Solving the Problems]
The structure of the temporary beam of the present invention that reinforces and supports the secondary lining panel made for the purpose of solving the above-mentioned problem is that the left and right supporters that support the left and right sides of the secondary lining panel At the left and right ends of the beam member formed approximately the same length as the distance between the support sides, the intermediate portion is fixed to the beam member, and the hook portion is locked to the back surface of the support side from the axis. It is formed on, and a locking member which the rear end side is formed in the lever portion from the front Kijiku, by rotation of the locking member, wherein the hanging hook is locked in the support side, with is is disengaged, during withdrawal The hanging portion is provided so as to be turned to the panel surface side after the concrete is placed.
[0006]
In the present invention, in the state in which the lever portion is turned and the hook portion of the locking member is locked to the back surface of the support side of the support work, the restraining member that prevents the lever portion from turning is the turning position of the lever portion. It is set as the structure provided corresponding to.
[0007]
In the present invention, the hooks of the left and right locking members provided on the beam member are locked to the support side of the support through the already installed secondary lining panel, so that the support is attached to the support first. A small hole for turning the locking member to enter the back side of the support side of the support work must be formed in a portion corresponding to the hanging portion of the secondary lining panel. The small hole is filled with a filler such as an epoxy resin after the temporary beam member is removed after the secondary lining concrete is placed.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a perspective view showing an outline of a state in which a secondary lining panel of the present invention and a temporary beam are constructed in a primary-covered tunnel, and FIG. 2 is an overall view showing an arrangement state of the temporary beam of the present invention for panel reinforcement. FIG. 3 is an enlarged sectional view of part A in FIG. 2, and FIG. 4 is an enlarged sectional view of the first stage of mounting the temporary beam of the present invention on the left side (part A of FIG. 2) of the temporary beam for panel reinforcement. FIG. 5, FIG. 5 is an enlarged plan sectional view of the second stage of mounting the temporary beam at the site shown in FIG. 4, FIG. 6 is a plan sectional view after removing the temporary beam, and FIG. 7 is another example of the temporary beam of the present invention. It is the top view which abbreviate | omitted the middle.
[0009]
In FIG. 1, 1 is a segment that has already been installed as a primary lining for a tunnel built on natural ground E, 2 is along the outer surface of the segment 1 in order to construct a secondary lining on the outer surface of the segment 1 The installation interval of the
[0010]
As the
[0011]
In FIG. 2, the
[0012]
In the left and
[0013]
Here, the right side of the
[0014]
In this way, when the
[0015]
As described above, when the
[0016]
The
[0017]
The
[0018]
As for the said
[0019]
To pass the hanging
[0020]
In the present invention, the
[0021]
When the
[0022]
The
[0023]
【The invention's effect】
As described above, the temporary beam of the present invention for reinforcing the panel for secondary lining is, so to speak, on the support side of the support formed by a steel plate or the like without using any bolts and nuts for the support. Since it can be attached in a one-touch operation, a temporary beam for reinforcing the secondary lining panel can be attached and installed with labor-saving and easy work contents.
[0024]
In addition, the temporary beam of the present invention, which is labor-saving and easily attached as described above, is a member other than bolts and nuts in an attached state, and is a locking member and its restraining member by one-touch operation or simple operation. Thus, since the mounting state is mechanically restricted, there is no possibility that the temporary beam will be unattached when the secondary lining concrete is placed.
[0025]
Further, even the temporary beam of the present invention firmly attached as described above can be removed simply by rotating the locking member in the direction opposite to the direction of attachment. The problem of requiring a lot of labor and time for removing the temporary beam, such as a temporary beam that has been bolted to the support, can be solved at a level that is almost perfect.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an outline of a state in which a secondary lining panel of the present invention and a temporary beam are installed in a primary lining tunnel. FIG. 2 shows an arrangement state of the temporary beam of the present invention for panel reinforcement. Fig. 3 is an enlarged cross-sectional view of part D in Fig. 2. Fig. 4 is an enlarged plan view of the first stage of mounting the temporary beam of the present invention on the left side (A part of Fig. 2) of the temporary beam for panel reinforcement. Sectional view [Fig. 5] An enlarged plan sectional view of the second stage of the temporary beam attachment at the site shown in Fig. 4. [Fig. 6] Plan sectional view after removing the temporary beam. [Fig. 7] Another example of the temporary beam of the present invention Plan view with the middle omitted [Explanation of symbols]
1
2a,
4a,
7a Hanging part
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002232611A JP4125068B2 (en) | 2002-08-09 | 2002-08-09 | Temporary beams for reinforcing secondary lining panels |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002232611A JP4125068B2 (en) | 2002-08-09 | 2002-08-09 | Temporary beams for reinforcing secondary lining panels |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004068520A JP2004068520A (en) | 2004-03-04 |
JP4125068B2 true JP4125068B2 (en) | 2008-07-23 |
Family
ID=32017957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002232611A Expired - Fee Related JP4125068B2 (en) | 2002-08-09 | 2002-08-09 | Temporary beams for reinforcing secondary lining panels |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4125068B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110936249A (en) * | 2015-10-23 | 2020-03-31 | 坂东机工株式会社 | Glass plate processing device |
-
2002
- 2002-08-09 JP JP2002232611A patent/JP4125068B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110936249A (en) * | 2015-10-23 | 2020-03-31 | 坂东机工株式会社 | Glass plate processing device |
Also Published As
Publication number | Publication date |
---|---|
JP2004068520A (en) | 2004-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6345472B1 (en) | Apparatus and method for anchoring and erecting concrete or similar materials | |
JPH02503339A (en) | Road traffic tunnels and railway tunnels | |
JP4125068B2 (en) | Temporary beams for reinforcing secondary lining panels | |
JP3277793B2 (en) | Reinforcement method for wall structures | |
JP3728728B2 (en) | Column and steel pipe pile positioning device | |
JP3543229B2 (en) | Construction method of ready-made concrete pile and foundation | |
JPS6122088B2 (en) | ||
JP3299596B2 (en) | Construction method of reinforced concrete retaining wall using large precast plate. | |
JP3838165B2 (en) | Joining structure and joining method of steel pipe column and steel pipe pile | |
JPH0634080A (en) | Piping hole clearance filling auxiliary panel | |
JPH10259697A (en) | Concrete board piece, tunnel lining body, and manufacture of concrete board piece | |
JP2579331Y2 (en) | Formwork for concrete sleepers and track slabs | |
JP4079340B2 (en) | Steel form for forming a fall-prevention block and method for forming a fall-prevention block | |
JPH0220271Y2 (en) | ||
JPH07102639A (en) | Column base hardware and construction method for steel frame column base section | |
US20070235628A1 (en) | Concrete tie with reusable wedge | |
JPH08209683A (en) | Steel pipe sheet pile having outside surface projection | |
JP3205653B2 (en) | Precast floor slab for semi-underground parking and its mounting structure | |
JP3665412B2 (en) | Concrete wall reinforcement | |
JP3119117B2 (en) | PC version driving formwork and formwork method | |
JP2004044324A (en) | Segment having incidental equipment mounting part | |
JPH089274Y2 (en) | Tunnel lining structure with curved plate for tunnel lining | |
JPH0634520Y2 (en) | Formwork assembly equipment | |
JPS6315435Y2 (en) | ||
JP2898938B2 (en) | Joint structure for caisson, its construction method and joint material for caisson |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20050701 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050701 |
|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20050701 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20050701 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070525 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070724 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070925 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080408 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080507 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110516 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120516 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130516 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130516 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |