JP4117261B2 - Demand monitoring system and apparatus - Google Patents

Demand monitoring system and apparatus Download PDF

Info

Publication number
JP4117261B2
JP4117261B2 JP2004110356A JP2004110356A JP4117261B2 JP 4117261 B2 JP4117261 B2 JP 4117261B2 JP 2004110356 A JP2004110356 A JP 2004110356A JP 2004110356 A JP2004110356 A JP 2004110356A JP 4117261 B2 JP4117261 B2 JP 4117261B2
Authority
JP
Japan
Prior art keywords
power
value
pulse
demand
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2004110356A
Other languages
Japanese (ja)
Other versions
JP2005012995A (en
Inventor
裕二 亀
央登 藤原
雅雄 友田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2004110356A priority Critical patent/JP4117261B2/en
Publication of JP2005012995A publication Critical patent/JP2005012995A/en
Application granted granted Critical
Publication of JP4117261B2 publication Critical patent/JP4117261B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

この発明は、現時点から所定時点前まで遡った時間をパルス積算期間とし、このパルス積算期間における、予め定められた電力量毎に発生する電力量パルスの数に基づいて、デマンド時限内に複数回予測電力デマンド値を演算する電力量のデマンド監視方式およびデマンド監視装置に関するものである。   According to the present invention, a time that goes back from the present time to a predetermined point in time is defined as a pulse integration period, and a plurality of times within a demand time period based on the number of power amount pulses generated for each predetermined amount of power in the pulse integration period. The present invention relates to a demand monitoring method and a demand monitoring apparatus for calculating the predicted power demand value.

従来の一般的なデマンド監視方式においては、電力需要家は、デマンド時限毎の平均使用電力(デマンド電力)が電力会社との契約電力を超過するのを防ぐため、予め定めた電力量毎に発生する電力量パルス(電力会社から送られてくる電力量パルス)に基づいて、所定のサンプリング時間毎に予測電力デマンド値を演算することによりデマンド監視を行っている。   In conventional general demand monitoring methods, power consumers generate every predetermined amount of power in order to prevent the average power used per demand period (demand power) from exceeding the contracted power with the power company. Demand monitoring is performed by calculating a predicted power demand value at every predetermined sampling time based on a power amount pulse to be performed (a power amount pulse transmitted from a power company).

一定サンプリング周期内の電力量は、電力量パルス数に1パルスあたりの重みを乗算して求めているが、この場合1パルス当りの重みを大きくしすぎると、サンプリング周期のすべてにパルスが必ず入力されるとは限らなくなる。すなわち、数サンプリング周期に亘って電力量パルスが入力されず、その後に大きな電力使用量としてパルスが入力されることがある。   The electric energy within a certain sampling period is obtained by multiplying the number of electric energy pulses by the weight per pulse. In this case, if the weight per pulse is too large, pulses are always input to the entire sampling period. It is not always done. That is, a power amount pulse may not be input over several sampling periods, and a pulse may be input as a large power usage amount thereafter.

このように、入力パルスが少なくなった場合には、正確な電力量を予想することができず、パルスが入力されるたびに警報等の制御出力がなされる惧れがある。   Thus, when the number of input pulses decreases, an accurate amount of electric power cannot be predicted, and a control output such as an alarm may occur each time a pulse is input.

従来、例えば特開2002−277493号公報(特許文献1)に示されているように、入力される電力量パルスから当該電力量パルスの入力周期を演算し、この電力量パルス入力周期間に使用した電力量から予測電力デマンド値を演算するデマンド監視方式があり、この方式によれば、入力される電力量パルスが少なくなった場合も、予測電力デマンド値が大きく変動することがなく、安定した制御が行える。   Conventionally, as disclosed in, for example, Japanese Patent Application Laid-Open No. 2002-277493 (Patent Document 1), an input period of the electric energy pulse is calculated from the input electric energy pulse, and used between the electric energy pulse input periods. There is a demand monitoring method that calculates the predicted power demand value from the amount of power that has been generated. According to this method, the predicted power demand value does not fluctuate greatly even when the input power amount pulse decreases, and it is stable. Control is possible.

特開2002−277493号公報(図1、段落番号0008〜0017)JP 2002-277493 A (FIG. 1, paragraph numbers 0008 to 0017)

前述した特許文献1に示されるようなパルス入力周期を基に予測電力デマンド値の演算を行う方式では、予測電力デマンド値がデマンド電力(電力会社と電力需要家との間で契約したデマンド時限毎の平均使用電力)を超える場合は警報等の制御出力を出すが、例えばその直後に電力量パルスが長時間入力されなかった場合、次に電力量パルスが入力されるまで予測電力デマンド値を演算しないため、次に電力量パルスが入力されるまで警報等の制御出力が出力され続けるという問題点がある。   In the method of calculating the predicted power demand value based on the pulse input period as shown in Patent Document 1 described above, the predicted power demand value is calculated based on demand power (for each demand time period contracted between a power company and a power consumer). If the power consumption pulse is not input for a long time immediately after that, for example, the predicted power demand value is calculated until the next power consumption pulse is input. Therefore, there is a problem that a control output such as an alarm continues to be output until the next power amount pulse is input.

この発明は、前述のような従来の実情に鑑みてなされたもので、次の電力量パルスが入力されるまでの時間が長い場合や、電力量パルスの1パルスあたりの重みが大きく電力量パルス入力間隔が広い場合、警報等の制御出力が出力され続けることを抑制することを目的とするものである。   The present invention has been made in view of the above-described conventional situation. When the time until the next power amount pulse is input is long, or when the weight per power pulse is large, the power amount pulse When the input interval is wide, the purpose is to suppress the continuous output of a control output such as an alarm.

この発明に係るデマンド監視方式は、現時点から所定時点前まで遡った時間をパルス積算期間とし、このパルス積算期間における、予め定められた電力量毎に発生する電力量パルスの数に基づいて、デマンド時限内に複数回予測電力デマンド値を演算するデマンド監視方式において、パルス積算期間における前記電力量パルスの数に基づく使用電力量が前回値より今回値の方が小さい場合には前記所定時点より所定時間前まで遡った時点から現時点までを前記パルス積算期間とすることにより前記パルス積算期間を所定時間長くするものである。   In the demand monitoring system according to the present invention, a time retroactive from the present time to a predetermined point in time is set as a pulse integration period, and the demand integration method is based on the number of electric energy pulses generated for each predetermined electric energy in the pulse integration period. In a demand monitoring method that calculates a predicted power demand value a plurality of times within a time limit, when the current power value based on the number of power energy pulses in the pulse integration period is smaller than the previous value, the predetermined value is determined from the predetermined time point. The pulse integration period is lengthened by a predetermined time by setting the pulse integration period from the time point before the time to the present time.

この発明のデマンド監視方式は、現時点から所定時点前まで遡った時間をパルス積算期間とし、このパルス積算期間における、予め定められた電力量毎に発生する電力量パルスの数に基づいて、デマンド時限内に複数回予測電力デマンド値を演算するデマンド監視方式において、パルス積算期間における前記電力量パルスの数に基づく使用電力量が前回値より今回値の方が小さい場合には前記所定時点より所定時間前まで遡った時点から現時点までを前記パルス積算期間することにより前記パルス積算期間を所定時間長くするので、長い間隔のパルス入力の場合に、警報出力状態でパルス入力が途切れた場合に、警報出力状態を長期間継続するようなことがなくなる効果がある。   The demand monitoring method of the present invention uses a time that goes back from the present time to a point before a predetermined time as a pulse integration period, and based on the number of power amount pulses generated for each predetermined amount of power in the pulse integration period, In the demand monitoring method for calculating the predicted power demand value a plurality of times within a predetermined time from the predetermined time when the current power value based on the number of the power energy pulses in the pulse integration period is smaller than the previous value. The pulse integration period is lengthened by a predetermined time by performing the pulse integration period from the time point traced back to the present time, so in the case of a pulse input at a long interval, if the pulse input is interrupted in the alarm output state, the alarm output There is an effect that the state does not continue for a long time.

実施の形態1.
以下、この発明の実施の形態1を図1〜図5に基づいて説明する。図1はこの発明の実施の形態1のデマンド監視方式およびデマンド監視装置の構成の一例を示すブロック構成図、図2はパルス積算時間を決定するまでのフローを説明するフローチャート図、図3はパルス積算時間固定での電力デマンド値予測例をデマンド時限、パルス積算時間、演算周期、及び電力量パルスを関連付けて示す線図、図4はパルス積算時間の説明図で、(a)はパルス積算時間が長くなる場合、(b)はパルス積算時間が初期値に戻る場合の例である。図5は予測電力デマンド値の変化を、この発明の実施の形態1の場合と従来装置(特許文献1)の場合とで比較して示す図で、(a)は従来装置(特許文献1)の場合の予測電力デマンド値の変化を示し、(b)はこの発明の実施の形態1の場合の予測電力デマンド値の変化を示してある。
Embodiment 1 FIG.
Embodiment 1 of the present invention will be described below with reference to FIGS. 1 is a block configuration diagram showing an example of the configuration of a demand monitoring system and a demand monitoring apparatus according to Embodiment 1 of the present invention, FIG. 2 is a flowchart illustrating a flow until a pulse integration time is determined, and FIG. An example of predicting power demand value with fixed integration time is a diagram showing a demand time period, pulse integration time, calculation cycle, and electric energy pulse in association with each other, FIG. 4 is an explanatory diagram of pulse integration time, and (a) is a pulse integration time. (B) is an example when the pulse integration time returns to the initial value. FIG. 5 is a diagram showing changes in the predicted power demand value in the case of the first embodiment of the present invention and the case of the conventional device (Patent Document 1). FIG. 5A shows the conventional device (Patent Document 1). (B) shows the change in the predicted power demand value in the first embodiment of the present invention.

図1において、デマンド監視装置は、電力量パルス入力手段1、パルス変換比演算手段2、現在電力デマンド値演算手段3、現在電力デマンド値増分演算手段4、パルス積算時間および現在電力デマンド値増分設定手段5、測電力デマンド値演算手段6、デマンド値表示手段7、及び制御出力手段8で構成されている。   In FIG. 1, the demand monitoring apparatus includes a power amount pulse input means 1, a pulse conversion ratio calculation means 2, a current power demand value calculation means 3, a current power demand value increment calculation means 4, a pulse integration time and a current power demand value increment setting. It comprises means 5, power measurement demand value calculation means 6, demand value display means 7, and control output means 8.

予め定めた電力量毎に使用電力量に応じて電力会社から送られてくる電力量パルスは、前記電力量パルス入力手段1で受ける。   The power amount pulse input means 1 receives a power amount pulse sent from the power company according to the amount of power used for each predetermined amount of power.

前記パルス変換比演算手段2は、パルス変換比(a)を次の式1により演算する。
a=合成変成比{(VT比×CT比)×60}/(入力パルス定数×デマンド時限)
・・・・・・・・・・・・・・・(式1)
この式1は一般に知られた式であり、VT(計器用変圧器)及びCT(変流器)の2次側から見た前記電力量パルスの重み係数である。
The pulse conversion ratio calculation means 2 calculates the pulse conversion ratio (a) by the following equation 1.
a = composite metamorphic ratio {(VT ratio x CT ratio) x 60} / (input pulse constant x demand time limit)
... (Formula 1)
This expression 1 is a generally known expression, which is a weighting factor of the electric energy pulse as seen from the secondary side of VT (instrument transformer) and CT (current transformer).

前記現在電力デマンド値演算手段3は、前記パルス変換比(a)と前記電力量パルス入力手段1から入力される電力量パルスをデマンド時限開始から現時点までの期間中カウントし、現在電力デマンド値(P)を次式2により演算する。
P=(デマンド時限開始から現時点までの入力パルス数×a)・・・(式2)
The current power demand value calculation means 3 counts the pulse conversion ratio (a) and the power amount pulse input from the power amount pulse input means 1 during the period from the start of the demand time limit to the present time, and the current power demand value ( P) is calculated by the following equation 2.
P = (number of input pulses from start of demand time limit to present time × a) (Equation 2)

前記現在電力デマンド値増分演算手段4は、現時点から所定時点前まで遡った時間に設定されたパルス積算時間(以後、初期値と呼称する)(△t)の間に電力量パルス入力手段1から入力された電力量パルスの数(△n)をカウントし、この初期値のパルス積算時間(△t)の間にカウントされた前記電力量パルス数(△n)と前記パルス変換比演算手段2で演算された前記パルス変換比(a)とより、前記初期値のパルス積算時間(△t)の現在電力デマンド値増分(△P)を次式3で演算をする。
△P=△n×a・・・・・・・・・・・・・・・・・・・・・・・(式3)
The current power demand value increment calculation means 4 is a power amount pulse input means 1 during a pulse integration time (hereinafter referred to as an initial value) (Δt L ) set to a time that goes back from the present time to a predetermined time point. counting the number of the input power amount pulse (△ n L) from the pulse converter the initial value of the pulse integration time (△ t L) said power amount number of pulses counted during the (△ n L) and more and said pulse conversion ratio calculated by the ratio calculation means 2 (a), the current operation power demand value increment (△ P L) in the following equation 3 of the initial value of the pulse integration time (△ t L).
ΔP L = Δn L × a (Equation 3)

更に、この現在電力デマンド値増分演算手段4は、予測電力デマンド値を演算する周期N秒間(以下演算周期間と呼称する)における前記電力量パルスの前記電力量パルス入力手段1への入力の有無を、前記電力量パルス入力手段1の出力から判定する。   Further, the present power demand value increment calculating means 4 has the presence / absence of the input of the power amount pulse to the power amount pulse input means 1 in a period N seconds (hereinafter referred to as a calculation period) for calculating the predicted power demand value. Is determined from the output of the electric energy pulse input means 1.

前記パルス積算時間および現在電力デマンド値増分設定手段5は、前記現在電力デマンド値増分演算手段4で演算された現在電力デマンド値増分(△P)の前回値と今回値の比較と、前記演算周期間のパルス入力有無の判定結果とにより、図2のフローに従い、現在電力デマンド値増分(△P)とパルス積算時間(△t)を設定する。 The pulse integration time and current power demand value increment setting means 5 compares the previous value of the current power demand value increment (ΔP L ) calculated by the current power demand value increment calculation means 4 with the current value, and the calculation. The current power demand value increment (ΔP) and the pulse integration time (Δt) are set in accordance with the flow of FIG.

前記予測電力デマンド値演算手段6は、前記現在電力デマンド値演算手段3で演算された現在電力デマンド値(P)と、前記パルス積算時間および現在電力デマンド値増分設定手段5で設定されたパルス積算時間(△t)と、前記現在電力デマンド値増分(△P)とにより、予測電力デマンド値(Px)を次式4により、演算周期N秒毎に移動平均をとり演算する。
Px=P+△P/△t×(デマンド時限−デマンド時限経過時間)・・・(式4)
The predicted power demand value calculation means 6 includes the current power demand value (P) calculated by the current power demand value calculation means 3 and the pulse integration time set by the pulse integration time and current power demand value increment setting means 5. Based on the time (Δt) and the current power demand value increment (ΔP), the predicted power demand value (Px) is calculated by calculating the moving average every N seconds according to the following equation 4.
Px = P + ΔP / Δt × (demand time period−demand time period elapsed time) (Equation 4)

前記デマンド値表示手段7は、前記予測電力デマンド値演算手段6で演算された前記予測電力デマンド値(Px)と、前記現在電力デマンド値演算手段3で演算された前記現在電力デマンド値(P)とを表示し、前記制御出力手段8は、前記予測電力デマンド値演算手段6で演算された前記予測デマンド値(Px)が契約電力(デマンド電力)を超過する恐れのあるときに警報の出力、負荷の制御等を行う。   The demand value display means 7 includes the predicted power demand value (Px) calculated by the predicted power demand value calculation means 6 and the current power demand value (P) calculated by the current power demand value calculation means 3. The control output means 8 outputs an alarm when the predicted demand value (Px) calculated by the predicted power demand value calculating means 6 may exceed contract power (demand power). Control the load.

次に、前記パルス積算時間および現在電力デマンド値増分設定手段5の処理を、つまり、パルス積算時間を決定するまでのフローを図2のフローチャート図により説明する。   Next, the process of the pulse integration time and current power demand value increment setting means 5, that is, the flow until the pulse integration time is determined will be described with reference to the flowchart of FIG.

前記パルス積算時間および現在電力デマンド値増分設定手段5は、前記現在電力デマンド値増分演算手段4で演算された現在電力デマンド値増分(△P)の今回値と前回値とを比較する。(ステップST201) The pulse integration time and current power demand value increment setting means 5 compares the current value of current power demand value increment (ΔP L ) calculated by the current power demand value increment calculation means 4 with the previous value. (Step ST201)

ステップST201で前記現在電力デマンド値増分(△P)の今回値と前回値とを比較した結果、今回値が前回値以上(今回△P<前回△Pの判断結果がNO)の場合、前記パルス積算時間(△t)にパルス積算時間初期値(△t)を設定する。(ステップST202) When the current value of the current power demand value increment (ΔP L ) is compared with the previous value in step ST201, the current value is equal to or greater than the previous value (current ΔP L <previous ΔP L is determined as NO). The initial pulse integration time (Δt L ) is set in the pulse integration time (Δt). (Step ST202)

そして、前記予測電力デマンド値演算手段3により、前記予測電力デマンド値(Px)の演算に用いる前記現在電力デマンド値増分(△P)は、今回値の現在電力デマンド値増分(△P)を選択し、前回の現在電力デマンド値増分(△P)を今回の現在電力デマンド値増分(△P)に更新し処理を終了する。(ステップST203) The current power demand value increment (ΔP) used for calculating the predicted power demand value (Px) by the predicted power demand value calculation means 3 is the current power demand value increment (ΔP L ) of the current value. selected, and ends the update processing previous current power demand value increment (△ P L) to the current of the current power demand value increment (△ P L). (Step ST203)

一方、前記ステップST201で前記現在電力デマンド値増分(△P)の今回値と前回値とを比較した結果、今回値が前回値未満(今回△P<前回△Pの判断結果がYES)の場合は、前回の予測電力デマンド値の演算から今回の予測電力デマンド値の演算までの前記演算周期間の前記電力量パルスの入力の有無の判定を行い、以下の通り、処理を選択する。(ステップST204) On the other hand, as a result of comparing the current value of the current power demand value increment (ΔP L ) with the previous value in step ST201, the current value is less than the previous value (current determination result of ΔP L <previous ΔP L is YES). ), It is determined whether or not the power pulse is input during the calculation period from the previous calculation of the predicted power demand value to the calculation of the current predicted power demand value, and the processing is selected as follows. . (Step ST204)

即ち、ステップST204での判定結果が、入力パルス有り(以後、前記電力量パルスの入力が有る場合は「入力パルス有り」と呼称し、電力量パルスの入力が無い場合は「入力パルス無し」と呼称する)であれば(図4の下段にその一例を示す)、前記ステップST202以降を実行する。   That is, the determination result in step ST204 is that there is an input pulse (hereinafter, when there is an input of the electric energy pulse, it is referred to as “with input pulse”, and when there is no input of the electric energy pulse, “no input pulse”. Step ST202 and the subsequent steps are executed.

前記ステップST204での判定結果、前記入力パルスが無い場合は(図4の上段にその一例を示す)、前記パルス積算時間(△t)を、前回のパルス積算時間(△t)に演算周期Nを加えた値とする。(ステップST205)   If the result of determination in step ST204 is that there is no input pulse (an example is shown in the upper part of FIG. 4), the pulse integration time (Δt) is set to the previous pulse integration time (Δt) as the calculation cycle N. The value is added. (Step ST205)

更に、演算用の現在電力デマンド値増分(△P)は、前回の現在電力デマンド値増分(△P)を選択し処理を終了する。(ステップST206) Further, as the current power demand value increment (ΔP) for calculation, the previous current power demand value increment (ΔP L ) is selected and the processing is terminated. (Step ST206)

図4(a)に、前述のパルス積算時間が長くなる場合の例を、図4(b)に、前述のパルス積算時間の初期値に戻る場合の例を示してある。   FIG. 4A shows an example in which the above-described pulse integration time becomes long, and FIG. 4B shows an example in which the above-mentioned pulse integration time is returned to the initial value.

前述のようにして前記パルス積算時間および現在電力デマンド値増分設定手段5により処理設定された前記パルス積算時間および現在電力デマンド値増分を使って、前記予測電力デマンド値(Px)を、前記Px=P+△P/△t×(デマンド時限−デマンド時限経過時間)(式4)により求める。   Using the pulse integration time and current power demand value increment set by the pulse integration time and current power demand value increment setting means 5 as described above, the predicted power demand value (Px) is calculated as Px = P + ΔP / Δt × (demand time period−demand time period elapsed time) (Expression 4)

なお、前記今回の次の演算周期間にも前記入力パルスが無い場合は、次の演算周期から見た前回のパルス積算時間は前記今回のパルス積算時間(△t+N)であるので、次の演算におけるパルス積算時間は△t+N+Nとなり、また、次の演算における演算用電力デマンド値増分(△P)は、前々回の電力デマンド値増分(△P)となる。 If there is no input pulse during the next calculation cycle, the previous pulse integration time viewed from the next calculation cycle is the current pulse integration time (Δt + N), so the next calculation The pulse integration time at is Δt + N + N, and the calculation power demand value increment (ΔP) in the next calculation is the previous power demand value increment (ΔP L ).

つまり、パルス積算時間(△t)間の現在電力デマンド値増分(△P)が減少し、かつ、演算周期間のパルス入力が無い場合には、演算周期間のパルス入力が連続して無い場合も、その都度、現在電力デマンド値増分(△P)を減少前の値に固定にし、その都度、パルス積算時間(△t)を演算周期分延長し予測電力デマンド値を演算するものである。   That is, when the current power demand value increment (ΔP) decreases during the pulse integration time (Δt) and there is no pulse input during the calculation cycle, there is no continuous pulse input during the calculation cycle Each time, the current power demand value increment (ΔP) is fixed to the value before the decrease, and each time the pulse integration time (Δt) is extended by the calculation cycle, the predicted power demand value is calculated.

なお、デマンド時限、前記パルス積算時間、及び前記演算周期の長さの関係は、パルス積算時間固定での電力デマンド値予測例をデマンド時限、パルス積算時間、演算周期、及び電力量パルスを関連付けて示す図3に事例を示してあるように、
前記デマンド時限(例えば30分間)>パルス積算時間(例えば3分間)>演算周期(例えば10秒間)の関係にある。
It should be noted that the relationship between the demand time period, the pulse integration time, and the length of the calculation cycle is as follows. As shown in Figure 3
The demand time limit (for example, 30 minutes)> pulse integration time (for example, 3 minutes)> calculation cycle (for example, 10 seconds).

この発明の実施の形態1において前述のようにして予測電力デマンド値Px=P+△P/△t×(デマンド時限−デマンド時限経過時間)を演算した場合の予測電力デマンド値Pxの出力波形の事例は図5(b)の通りとなる。一方、従来の方式(前述の特許文献1の方式)における予測電力デマンド値Pxの出力波形の事例は図5(a)の通りとなる。パルス入力が無い場合、従来方式の場合の事例を示す図5(a)の出力波形は一定値を維持しているのに対し、この発明の実施の形態1の場合の事例を示す図5(b)の出力波形は滑らかに減少しており、パルス入力が長期間無い場合には、従来方式の場合は図5(a)に示すように警報発生が次にパルス入力が入るまで継続するのに対し、この発明の実施の形態1の場合は図5(b)に示すように警報発生の継続は抑制される。   Example of output waveform of predicted power demand value Px when predicted power demand value Px = P + ΔP / Δt × (demand time period−demand time elapsed time) is calculated as described above in the first embodiment of the present invention. Is as shown in FIG. On the other hand, an example of the output waveform of the predicted power demand value Px in the conventional method (the method of Patent Document 1 described above) is as shown in FIG. When there is no pulse input, the output waveform of FIG. 5A showing the case of the conventional method maintains a constant value, whereas FIG. 5 showing the case of the first embodiment of the present invention. The output waveform of b) decreases smoothly, and when there is no pulse input for a long time, in the case of the conventional method, the alarm generation continues until the next pulse input is input as shown in FIG. 5 (a). On the other hand, in the case of Embodiment 1 of the present invention, the continuation of alarm generation is suppressed as shown in FIG.

前述のこの発明の実施の形態1を整理すると、予め定められた電力量毎に発生する電力量パルスを入力する電力量パルス入力手段1と、現在電力デマンド値(P)をP=(デマンド時限開始より現時点までの入力パルス数×パルス変換比a)の式によって演算する現在電力デマンド値演算手段3と、デマンド時限を複数に分割して設定されたパルス積算時間(△t)中に前記電力量パルス入力手段1に入力された電力量パルス数(△n)から前記パルス積算時間(△t)中の現在電力デマンド値増分(△P)を△P=△n×aの式から演算する現在電力デマンド値増分演算手段4と、予測電力デマンド値(Px)をPx=P+△P/△t×(デマンド時限−デマンド時限経過時間)の式から演算する予測電力デマンド値演算手段6と、この予測電力デマンド値演算手段と前記現在電力デマンド値演算手段によって演算された前記予測電力デマンド値及び前記現在電力デマンド値を表示する電力デマンド値表示手段7を備えたデマンド監視装置であって、前記パルス積算時間(△t)における前回の現在電力デマンド値増分(△PL)より今回の現在電力デマンド値増分(△P)が減少し、かつ、演算周期中に前記電力量パルスの入力がない場合に、上記予測電力デマンド値(Px)の演算式中の現在電力デマンド値増分(△P)を前記減少前の値に固定にし、前記パルス積算時間(△t)を予測電力デマンド値の演算周期分延長し演算する手段5を備えたデマンド監視装置であり、パルス積算時間の現在電力デマンド値増分が減少し、かつ、演算周期間のパルス入力がない場合に、デマンド増分を減少前の値に固定にし、パルス積算時間を演算周期分延長し予測デマンド値を演算することで、パルス積算時間より長い間隔のパルス入力の場合にも、予測デマンド値を滑らかに減少でき、警報出力状態でパルス入力が途切れた場合に、警報出力状態を継続することがなくなるものであると言える。 To summarize the first embodiment of the present invention, the power amount pulse input means 1 for inputting a power amount pulse generated for each predetermined amount of power and the current power demand value (P) is expressed as P = (demand time limit). Current power demand value calculation means 3 for calculating the number of input pulses from the start to the present time × pulse conversion ratio a), and the power during the pulse integration time (Δt) set by dividing the demand time period into a plurality of times The current power demand value increment (ΔP) during the pulse integration time (Δt) is calculated from the number of power amount pulses (Δn) input to the amount pulse input means 1 from the formula ΔP = Δn × a. A current power demand value increment calculating means 4; a predicted power demand value calculating means 6 for calculating a predicted power demand value (Px) from an expression of Px = P + ΔP / Δt × (demand time period−demand time period elapsed time); This predicted power A demand monitoring device comprising a power demand value display means for displaying the predicted power demand value calculated by the current value demand means and the current power demand value computation means and the current power demand value, wherein the pulse integration time When the current power demand value increment (ΔP L ) is decreased from the previous current power demand value increment (ΔP L ) at (Δt), and the power amount pulse is not input during the calculation cycle. The current power demand value increment (ΔP) in the calculation formula of the predicted power demand value (Px) is fixed to the value before the decrease, and the pulse integration time (Δt) is equal to the calculation cycle of the predicted power demand value. This is a demand monitoring apparatus having means 5 for extending and calculating, and when the current power demand value increment of the pulse integration time decreases and there is no pulse input during the calculation period, the demand increase Is fixed to the value before the decrease, and the estimated demand value is calculated smoothly by extending the pulse integration time by the calculation period and calculating the predicted demand value, even when the pulse input is longer than the pulse integration time. It can be said that the alarm output state is not continued when the pulse input is interrupted in the alarm output state.

また、電力会社から需要家に送られてくる前記電力量パルスの数が需要家での使用電力量に基づいていることから、この発明の実施の形態1は、更に概念的には、現時点から所定時点前まで遡った時間をパルス積算期間とし、このパルス積算期間における、予め定められた電力量毎に発生する電力量パルスの数に基づいて、デマンド時限内に複数回予測電力デマンド値を演算するデマンド監視方式において、パルス積算期間における前記電力量パルスの数に基づく使用電力量が前回値より今回値の方が小さい場合には前記所定時点より所定時間前まで遡った時点から現時点までを前記パルス積算期間とすることにより前記パルス積算期間を所定時間長くするデマンド監視方式であり、長い間隔のパルス入力の場合に、警報出力状態でパルス入力が途切れた場合に、警報出力状態を長期間継続するようなことがなくなるものと言える。   Further, since the number of the electric energy pulses sent from the electric power company to the consumer is based on the electric energy used by the consumer, the first embodiment of the present invention is more conceptually from the present time. The time that goes back before the predetermined time is defined as the pulse integration period, and the predicted power demand value is calculated multiple times within the demand time period based on the number of power amount pulses generated for each predetermined amount of power during this pulse integration period. In the demand monitoring method, in the case where the amount of power used based on the number of power amount pulses in the pulse integration period is smaller than the previous value, the current time is traced back to a predetermined time before the predetermined time. This is a demand monitoring system that makes the pulse integration period longer by a predetermined time by setting it as a pulse integration period. If the interrupted, it can be said that such things as long-lasting the alarm output state is eliminated.

実施の形態2.
以下、この発明の実施の形態1を図6〜図8に基づいて説明する。図6はこの発明の実施の形態2のデマンド監視方式およびデマンド監視装置の構成の一例を示すブロック構成図、図7は仮想瞬時電力表示値を決定するまでのフローを説明するフローチャート図、図8は仮想瞬時電力値の変化を示す線図である。なお、図6において、前述の図1と同一又は相当する部分には同一符号を付してある。
Embodiment 2. FIG.
Embodiment 1 of the present invention will be described below with reference to FIGS. 6 is a block diagram showing an example of the configuration of the demand monitoring system and demand monitoring apparatus according to Embodiment 2 of the present invention, FIG. 7 is a flowchart for explaining the flow until the virtual instantaneous power display value is determined, and FIG. FIG. 6 is a diagram showing a change in virtual instantaneous power value. In FIG. 6, the same or corresponding parts as those in FIG.

この発明の実施の形態2は、前述のこの発明の実施の形態1のデマンド監視方式およびデマンド監視装置に、仮想瞬時電力表示方式を組み合わせた場合を例示するものである。   Embodiment 2 of the present invention exemplifies a case where a virtual instantaneous power display system is combined with the demand monitoring system and demand monitoring apparatus of Embodiment 1 of the present invention described above.

従来、デマンド制御により負荷を遮断しても、デマンド監視装置には瞬時電力値表示がないため、デマンド監視装置では前記負荷遮断による電力減少の確認ができなかった。デマンド監視装置の入力としてはパルスだけしかなく、デマンド監視装置に瞬時電力を表示するためには、計器用変圧器即ちVT及び変流器即ちCTが必要であり、接続が複雑となる。更に、小口需要家にとってVT,CTおよび取り付けのための費用が増えるため受け入れられないという問題があった。また、従来パルスピックの出力パルスは、即ちデマンド監視装置の入力パルス数は2000pulse/kWhと少なかったため、前記出力パルス即ちデマンド監視装置の入力パルス数から瞬時電力値を演算することは不可能であった。しかし、近年パルスピックの出力パルス数が50000pulse/kWhのものが多くなってきており、その場合は、出力パルスから瞬時電力値を演算することが可能であることが分かった。   Conventionally, even if a load is interrupted by demand control, the demand monitoring device does not display an instantaneous power value, and thus the demand monitoring device cannot confirm the power reduction due to the load interruption. The input of the demand monitoring device is only a pulse, and in order to display instantaneous power on the demand monitoring device, an instrument transformer or VT and a current transformer or CT are required, and the connection is complicated. Furthermore, there is a problem that it is unacceptable for small consumers because of the increased costs for VT, CT and installation. Further, since the number of output pulses of the conventional pulse pick, that is, the number of input pulses of the demand monitoring device is as small as 2000 pulses / kWh, it is impossible to calculate the instantaneous power value from the number of output pulses, that is, the number of input pulses of the demand monitoring device. It was. However, in recent years, the number of pulse pick output pulses has increased to 50000 pulses / kWh, and in that case, it has been found that the instantaneous power value can be calculated from the output pulses.

このような実情に鑑み、この発明の実施の形態2のデマンド監視装置は、VT,CTを取付けることなく、パルス入力のみから瞬時電力値を演算し、表示できるようにしたものである。   In view of such a situation, the demand monitoring apparatus according to the second embodiment of the present invention can calculate and display an instantaneous power value from only a pulse input without attaching VT and CT.

以下、この発明の実施の形態2について、前述の図1と異なる部分を主体的に、具体的に説明する。   In the following, the second embodiment of the present invention will be specifically described mainly with respect to portions different from those in FIG.

図6において、デマンド監視装置は、電力量パルス入力手段1、パルス変換比演算手段2、現在電力デマンド値演算手段3、現在電力デマンド値増分演算手段4、パルス積算時間および現在電力デマンド値増分設定手段5、測電力デマンド値演算手段6、デマンド値表示手段7、制御出力手段8,仮想瞬時電力演算手段9,仮想瞬時電力表示値設定手段10及び仮想瞬時電力値表示手段11で構成されている。   In FIG. 6, the demand monitoring apparatus includes a power amount pulse input means 1, a pulse conversion ratio calculation means 2, a current power demand value calculation means 3, a current power demand value increment calculation means 4, a pulse integration time and a current power demand value increment setting. Means 5, power measurement demand value calculation means 6, demand value display means 7, control output means 8, virtual instantaneous power calculation means 9, virtual instantaneous power display value setting means 10, and virtual instantaneous power value display means 11. .

前記仮想瞬時電力演算手段9は、前記現在電力デマンド値演算手段3で演算された現在電力デマンド値(P)と、前記パルス積算時間および現在電力デマンド値増分設定手段5で設定されたパルス積算時間(△t)と、前記現在電力デマンド値増分(△P)とにより、仮想瞬時電力値(W)を次式5により、演算周期N秒毎に移動平均をとり演算する。
W=△P/△t・・・・・・・・・・・・・・・・・・・・・・・・・(式5)
The virtual instantaneous power calculation means 9 includes a current power demand value (P) calculated by the current power demand value calculation means 3 and a pulse integration time set by the pulse integration time and current power demand value increment setting means 5. Based on (Δt) and the current power demand value increment (ΔP), the virtual instantaneous power value (W) is calculated by the following equation 5 by taking a moving average every N seconds.
W = △ P / △ t (Equation 5)

前記仮想瞬時電力表示値設定手段10は、前記パルス積算時間および現在電力デマンド値増分設定手段5で設定されたパルス積算時間(△t)の前回値と今回値の比較及びパルス積算時間△t<A+△tの判定により、図7のフローに従い、仮想瞬時電力表示値を設定する。 The virtual instantaneous power display value setting means 10 compares the previous value and the current value of the pulse integration time (Δt) set by the pulse integration time and the current power demand value increment setting means 5 and the pulse integration time Δt < Based on the determination of A + Δt L , a virtual instantaneous power display value is set according to the flow of FIG.

前記仮想瞬時電力値表示手段11は、前記仮想瞬時電力表示値設定手段10で設定された前記仮想瞬時電力表示値(W)を表示する。   The virtual instantaneous power value display means 11 displays the virtual instantaneous power display value (W) set by the virtual instantaneous power display value setting means 10.

次に、前記仮想瞬時電力表示値設定手段10の処理を、つまり、仮想瞬時電力表示値を決定するまでのフローを図7のフローチャートにより説明する。   Next, the processing up to the virtual instantaneous power display value setting means 10, that is, the flow until the virtual instantaneous power display value is determined will be described with reference to the flowchart of FIG.

前記仮想瞬時電力表示値設定手段10は、前記パルス積算時間および現在電力デマンド値増分設定手段5で設定される前記パルス積算時間の前回値と今回値とを比較する。(ステップST301)   The virtual instantaneous power display value setting means 10 compares the previous value and the current value of the pulse integration time set by the pulse integration time and the current power demand value increment setting means 5. (Step ST301)

ステップST301で前記パルス積算時間の前回値と今回値とを比較した結果、今回値が前回値未満(前回△t≦今回△tの判定結果がNO)の場合,前記仮想瞬時電力演算手段9での演算結果(W=△P/△t)を今回仮想瞬時電力表示値に更新し処置を終了する。(ステップST302)   As a result of comparing the previous value and the current value of the pulse integration time in step ST301, if the current value is less than the previous value (the determination result of previous Δt ≦ current Δt is NO), the virtual instantaneous power calculating means 9 The calculation result (W = ΔP / Δt) is updated to the current virtual instantaneous power display value and the procedure is terminated. (Step ST302)

一方、ステップST301で前記パルス積算時間の前回値と今回値とを比較した結果,今回値が前回値以上(前回△t≦今回△tの判定結果がYES)の場合、今回△tがA+△t(例えばA=5分)未満であるかを判定する(ステップST303)。これは図2のフローチャートより、今回△t=A+△tになるということは、Aの間(5分間)、パルス入力がなかったことであり、つまりAの間パルス入力がなかったかを判定していることと同じである。 On the other hand, as a result of comparing the previous value and the current value of the pulse integration time in step ST301, if the current value is equal to or greater than the previous value (the determination result of previous Δt ≦ current Δt is YES), the current Δt is A + Δ. It is determined whether it is less than t L (for example, A = 5 minutes) (step ST303). From the flowchart of FIG. 2, this time Δt = A + Δt L means that there was no pulse input during A (5 minutes), that is, whether there was no pulse input during A. Is the same as

ステップST303で今回△tがA+△t未満であるかを判定した結果,今回△tがA+△t未満(今回△t<A+△tの判定結果がYES)の場合、前記ステップST302以降を実行する。 Results This in step ST 303 △ t is determined whether the below A + △ t L, when the current △ t is A + △ t less than L (this △ t <A + △ t L of the determination result is YES), the step ST302 Perform the following.

また、ステップST303で今回△tがA+△t未満であるかを判定した結果,今回△tがA+△t以上(今回△t<A+△tの判定結果がNO)の場合、今回仮想瞬時電力表示値=0に更新し処置を終了する(ステップST304)。 If it is determined in step ST303 whether or not this time Δt is less than A + Δt L , this time Δt is equal to or greater than A + Δt L (the current Δt <A + Δt L determination result is NO). The virtual instantaneous power display value is updated to 0 and the treatment is terminated (step ST304).

この発明の実施の形態2において、前述のようにして仮想瞬時電力値Wを設定した場合の仮想瞬時電力値Wの出力波形の事例は図8の通りとなる。   In Embodiment 2 of the present invention, an example of the output waveform of the virtual instantaneous power value W when the virtual instantaneous power value W is set as described above is as shown in FIG.

前述のこの発明の実施の形態2を整理すると、予め定められた電力量毎に発生する電力量パルスを入力する電力量パルス入力手段1と、現在電力デマンド値(P)を P=(デマンド時限開始より現時点までの入力パルス数×パルス変換比a)の式によって演算する現在電力デマンド値演算手段3と、デマンド時限を複数に分割して設定されたパルス積算時間(△t)中に前記電力量パルス入力手段に入力された電力量パルス数(△n)から前記パルス積算時間(△t)中の現在電力デマンド値増分(△P)を △P=△n×a の式で演算する現在電力デマンド値増分演算手段4と、予測電力デマンド値(Px)を Px=P+△P/△t×(デマンド時限−デマンド時限経過時間) の式から演算する予測電力デマンド値演算手段6と、この予測電力デマンド値演算手段と前記現在電力デマンド値演算手段によって演算された前記予測電力デマンド値及び前記現在電力デマンド値を表示する電力デマンド値表示手段7とを備えたデマンド監視装置であって、前記パルス積算時間(△t)における前回の現在電力デマンド値増分(△PL)より今回の現在電力デマンド値増分(△P)が減少し、かつ、演算周期中に前記電力量パルスの入力がない場合に、上記予測電力デマンド値(Px)の演算式中の現在電力デマンド値増分(△P)を前記減少前の値に固定し、前記パルス積算時間(△t)を予測電力デマンド値の演算周期分延長し演算する手段5と、仮想瞬時電力値(W)をW=△P/△tの式から演算する仮想瞬時電力演算手段9と、この仮想瞬時電力演算手段によって演算された仮想瞬時電力を表示する仮想瞬時電力値表示手段11と、を備えており、警報出力状態でパルス入力が途切れた場合に、警報出力状態を継続することがなくなり、更に、デマンド監視装置に仮想瞬時電力を表示するものであると言える。 To summarize the above-described second embodiment of the present invention, the power amount pulse input means 1 for inputting a power amount pulse generated for each predetermined amount of power, and the current power demand value (P) are expressed as P = (demand time limit). Current power demand value calculation means 3 for calculating the number of input pulses from the start to the present time × pulse conversion ratio a), and the power during the pulse integration time (Δt) set by dividing the demand time period into a plurality of times The current power demand value increment (ΔP) during the pulse integration time (Δt) is calculated from the number of power amount pulses (Δn) input to the amount pulse input means by the equation: ΔP = Δn × a A power demand value increment calculating means 4; a predicted power demand value calculating means 6 for calculating a predicted power demand value (Px) from an expression of Px = P + ΔP / Δt × (demand time period−demand time period elapsed time); Predicted power hoax A demand monitoring device comprising: a power value display means for displaying the predicted power demand value calculated by the current value demanding means and the current power demand value computing means and the current power demand value; When the current power demand value increment (ΔP L ) is decreased from the previous current power demand value increment (ΔP L ) at time (Δt), and the power amount pulse is not input during the calculation cycle. Further, the current power demand value increment (ΔP) in the calculation formula of the predicted power demand value (Px) is fixed to the value before the decrease, and the pulse integration time (Δt) is calculated as the calculation cycle of the predicted power demand value. A means 5 for calculating by extending the minutes, a virtual instantaneous power calculating means 9 for calculating the virtual instantaneous power value (W) from the equation W = ΔP / Δt, and a virtual instantaneous calculated by the virtual instantaneous power calculating means. Virtual instantaneous power value display means 11 for displaying the force, and when the pulse input is interrupted in the alarm output state, the alarm output state is not continued, and the virtual instantaneous power is supplied to the demand monitoring device. It can be said that it is what is displayed.

また、予め定められた電力量毎に発生する電力量パルスを入力する電力量パルス入力手段1と、現在電力デマンド値(P)を P=(デマンド時限開始より現時点までの入力パルス数×パルス変換比a)の式によって演算する現在電力デマンド値演算手段3と、デマンド時限を複数に分割して設定されたパルス積算時間(△t)中に前記電力量パルス入力手段に入力された電力量パルス数(△n)から前記パルス積算時間(△t)中の現在電力デマンド値増分(△P)を △P=△n×a の式で演算する現在電力デマンド値増分演算手段4と、前記現在電力デマンド値増分演算手段で演算された現在電力デマンド値増分(△P)から、仮想瞬時電力値(W)をW=△P/△tの式で演算する仮想瞬時電力演算手段9と、この仮想瞬時電力演算手段によって演算された仮想瞬時電力を表示する仮想瞬時電力値表示手段11と、を備えたデマンド監視装置であると言える。   Also, a power amount pulse input means 1 for inputting a power amount pulse generated for each predetermined amount of power, and a current power demand value (P) P = (number of input pulses from the start of the demand time limit to the present time × pulse conversion) Current power demand value calculating means 3 for calculating by the formula of ratio a), and the electric energy pulse input to the electric energy pulse input means during the pulse integration time (Δt) set by dividing the demand time period into a plurality of times Current power demand value increment calculating means 4 for calculating the current power demand value increment (ΔP) during the pulse integration time (Δt) from the number (Δn) by the formula: ΔP = Δn × a; A virtual instantaneous power calculation means 9 for calculating a virtual instantaneous power value (W) by an expression of W = ΔP / Δt from a current power demand value increment (ΔP) calculated by the power demand value increment calculation means; Virtual instantaneous power calculator It can be said that this is a demand monitoring device provided with the virtual instantaneous power value display means 11 for displaying the virtual instantaneous power calculated by the stage.

また、前記パルス積算時間(△t)における前回の現在電力デマンド値増分(△PL)より今回の現在電力デマンド値増分(△P)が減少し、かつ、演算周期中に前記電力量パルスの入力が無い場合に、前記瞬時電力値(W)の演算式中の現在電力デマンド値増分(△P)を前記減少前の値に固定し、前記パルス積算時間(△t)を仮想瞬時電力値の演算周期分延長し演算する手段5を備えたデマンド監視装置であり、更に、前記電力量パルスの入力が所定期間無い場合、仮想瞬時電力値表示手段11に前記仮想瞬時電力(W)を0と表示するデマンド監視装置であると言える。 Further, the current current power demand value increment (ΔP L ) is decreased from the previous current power demand value increment (ΔP L ) in the pulse integration time (Δt), and the power amount pulse is calculated during the calculation cycle. When there is no input, the current power demand value increment (ΔP) in the calculation formula of the instantaneous power value (W) is fixed to the value before the decrease, and the pulse integration time (Δt) is set to the virtual instantaneous power. A demand monitoring device provided with a means 5 for extending and calculating the value by the calculation period of the value, and further, when the power amount pulse is not input for a predetermined period, the virtual instantaneous power (W) is displayed on the virtual instantaneous power value display means 11. It can be said that this is a demand monitoring device that displays 0.

なお、前述の仮想瞬時電力値の精度について、前述のパルスピックの出力パルス数(即ちデマンド監視装置の入力パルス数)が2000pulse/kWhの場合と50000pulse/kWhの場合との違いを以下に説明する。   In addition, regarding the accuracy of the virtual instantaneous power value, the difference between the case where the number of output pulses of the pulse pick (that is, the number of input pulses of the demand monitoring device) is 2000 pulses / kWh and 50000 pulses / kWh will be described below. .

通常負荷は3割程度しか使われないこと、及びデマンド時限が通常30分であることから、前述のデマンド監視装置の入力パルス数が2000pulse/kWhの場合、
デマンド時限内の入力パルス数=2000pulse/kWh×0.3 kWh×30分/60分=300pulse
となる。
従って、負荷が一定であるとすると、
その時のパルス間隔は、30分×60秒/300pulse=6秒となる。
Since only about 30% of the normal load is used and the demand time limit is usually 30 minutes, when the number of input pulses of the demand monitoring device is 2000 pulses / kWh,
Number of input pulses within the demand period = 2000 pulses / kWh x 0.3 kWh x 30 minutes / 60 minutes = 300 pulses
It becomes.
Therefore, if the load is constant,
The pulse interval at that time is 30 minutes × 60 seconds / 300 pulses = 6 seconds.

これに対し、前述のデマンド監視装置の入力パルス数が50000pulse/kWhの場合は、同じ条件下で、
デマンド時限内の入力パルス数=50000pulse/kWh×0.3 kWh×30分/60分=7500pulse
となる。
その時のパルス間隔は、30分×60秒/7500pulse=0.24秒となる。
On the other hand, when the number of input pulses of the aforementioned demand monitoring device is 50000 pulses / kWh,
Number of input pulses within demand time limit = 50000 pulses / kWh x 0.3 kWh x 30 minutes / 60 minutes = 7500 pulses
It becomes.
The pulse interval at that time is 30 minutes × 60 seconds / 7500 pulses = 0.24 seconds.

つまり、パルス間隔は、前記入力パルス数が2000pulse/kWhの場合に比較し前記入力パルス数が50000pulse/kWhの場合は、1/25となる。   That is, the pulse interval is 1/25 when the number of input pulses is 50,000 pulses / kWh, compared to when the number of input pulses is 2000 pulses / kWh.

前述のように、瞬時電力値を前述のデマンド監視装置の入力パルス数から求める場合、前記入力パルス数が2000pulse/kWhの場合は6秒経過しなければ瞬時電力値の変化は把握できない為、この6秒の間に実負荷の変化が大きい場合、当該実負荷と前記入力パルス数から求めた瞬時電力値との間に大きな差(誤差)が生じる。これに対し、前記入力パルス数が50000pulse/kWhの場合は0.24秒で瞬時電力値の変化を把握できるので、前記実負荷と前記入力パルス数から求めた瞬時電力値との誤差は極めて小さくなる。換言すれば、瞬時電力値を前述のデマンド監視装置の入力パルス数から求める場合、端的には前記入力パルス数が50000pulse/kWhの場合は、前記入力パルス数が2000pulse/kWhの場合に比べ、前記条件下で25倍の精度が出る。   As described above, when the instantaneous power value is obtained from the number of input pulses of the demand monitoring device, if the input pulse number is 2000 pulses / kWh, the change in the instantaneous power value cannot be grasped unless 6 seconds elapse. When the change in the actual load is large within 6 seconds, a large difference (error) occurs between the actual load and the instantaneous power value obtained from the number of input pulses. On the other hand, when the number of input pulses is 50000 pulses / kWh, the change in instantaneous power value can be grasped in 0.24 seconds, so the error between the actual load and the instantaneous power value obtained from the number of input pulses is extremely small. In other words, when the instantaneous power value is obtained from the number of input pulses of the demand monitoring device described above, when the number of input pulses is 50000 pulses / kWh, compared with the case where the number of input pulses is 2000 pulses / kWh, 25 times more accurate under certain conditions.

目視での感覚では、実負荷の変化が大きい場合、表示されている瞬時電力値は、前記入力パルス数が、2000pulse/kWhの場合は6秒毎に急変するが、50000pulse/kWhの場合は連続的に刻々と変化する。   Visually, if the change in actual load is large, the displayed instantaneous power value changes suddenly every 6 seconds when the number of input pulses is 2000 pulses / kWh, but continuous when 50000 pulses / kWh. It changes every moment.

また、前述のように、前記パルス積算時間(△t)における前回の現在電力デマンド値増分(△P)より今回の現在電力デマンド値増分(△P)が減少し、かつ、演算周期中に電力量パルスの入力がない場合に、前記仮想瞬時電力値の演算式(W=△P/△t)中の現在電力デマンド値増分(△P)を減少前の値に固定にしパルス積算時間(△t)を仮想瞬時電力値の演算周期分延長して演算するようにし、前述の図7のステップST303で今回△tがA+△t未満であるかを判定した結果、今回△tがA+△t以上(今回△t<A+△tの判定結果がNO)の場合、今回仮想瞬時電力表示値=0に更新し処置を終了するようにすれば、負荷が無くなって(即ち瞬時電力値=0(W))パルス入力が無いのか或は負荷が減少して(瞬時電力値が減少して)パルス入力が無いのかを判別できないというようなことが無くなり、
負荷が無くなって(即ち瞬時電力値=0(W))パルス入力が無い場合は前記入力パルス数から求められた前記仮想瞬時電力値は所定時間の間は減少し、前記時間Aが経過すると今回仮想瞬時電力表示値=0に更新するので、仮想瞬時電力値は実際の瞬時電力値(即ち0(W))と一致することになる。
負荷が減少して(瞬時電力値が減少して)パルス間隔が長くなった場合は、実際の瞬時電力値と同様に仮想瞬時電力値も減少することになる。
Further, as described above, the current current power demand value increment (ΔP L ) is decreased from the previous current power demand value increment (ΔP L ) in the pulse integration time (Δt), and the calculation cycle is in progress. When there is no input of a power amount pulse, the current power demand value increment (ΔP) in the calculation formula (W = ΔP / Δt) of the virtual instantaneous power value is fixed to the value before the decrease, and the pulse integration time (Δt) is calculated by extending the calculation period of the virtual instantaneous power value, and it is determined in step ST303 of FIG. 7 whether or not this time Δt is less than A + Δt L. If A + Δt L or more (the determination result of this time Δt <A + Δt L is NO), if the current virtual instantaneous power display value is updated to 0 and the treatment is terminated, the load is eliminated (ie, instantaneous (Power value = 0 (W)) No pulse input or load decreased (The momentary power value decreases) and it is no longer possible to determine whether there is no pulse input,
When there is no load (ie, instantaneous power value = 0 (W)) and there is no pulse input, the virtual instantaneous power value obtained from the number of input pulses decreases for a predetermined time, and when the time A elapses, Since the virtual instantaneous power display value is updated to 0, the virtual instantaneous power value matches the actual instantaneous power value (that is, 0 (W)).
When the load decreases (the instantaneous power value decreases) and the pulse interval becomes long, the virtual instantaneous power value decreases as well as the actual instantaneous power value.

なお、前記入力パルス数が50000pulse/kWhの場合であっても、デマンド監視装置の入力パルス数から求めた瞬時電力値は、その時の実際の瞬時電力値と同一ではなく時間的に前の時点の瞬時電力値となるので、前述のように「仮想瞬時電力値」と表現してある。   Even if the number of input pulses is 50000 pulses / kWh, the instantaneous power value obtained from the number of input pulses of the demand monitoring device is not the same as the actual instantaneous power value at that time, but at the time point before the time. Since it is an instantaneous power value, it is expressed as “virtual instantaneous power value” as described above.

この発明の実施の形態1を示す図で、デマンド監視方式およびデマンド監視装置の構成の一例を示すブロック構成図である。It is a figure which shows Embodiment 1 of this invention, and is a block block diagram which shows an example of a structure of a demand monitoring system and a demand monitoring apparatus. この発明の実施の形態1を示す図で、パルス積算時間を決定するまでのフローを説明するフローチャート図である。It is a figure which shows Embodiment 1 of this invention, and is a flowchart figure explaining the flow until it determines pulse integration time. この発明の実施の形態1を示す図で、パルス積算時間固定での電力デマンド値予測例をデマンド時限、パルス積算時間、演算周期、及び電力量パルスを関連付けて示す線図である。FIG. 5 is a diagram illustrating the first embodiment of the present invention, and is a diagram illustrating an example of predicting a power demand value with a fixed pulse integration time in association with a demand time period, a pulse integration time, a calculation cycle, and a power amount pulse. この発明の実施の形態1を示すパルス積算時間の説明図で、(a)はパルス積算時間が長くなる場合、(b)はパルス積算時間が初期値に戻る場合の例である。FIG. 4 is an explanatory diagram of a pulse integration time showing Embodiment 1 of the present invention, where (a) shows an example in which the pulse integration time becomes long, and (b) shows an example in which the pulse integration time returns to the initial value. 予測電力デマンド値の変化を、この発明の実施の形態1の場合と従来装置(特許文献1)の場合とで比較して示す図で、(a)は従来装置(特許文献1)の場合の予測電力デマンド値の変化を示し、(b)はこの発明の実施の形態1の場合の予測電力デマンド値の変化を示してある。The figure which shows the change of a predicted electric power demand value in the case of Embodiment 1 of this invention compared with the case of a conventional apparatus (patent document 1), (a) is the case of a conventional apparatus (patent document 1). A change in the predicted power demand value is shown, and (b) shows a change in the predicted power demand value in the first embodiment of the present invention. この発明の実施の形態2を示す図で、デマンド監視方式およびデマンド監視装置の構成の一例を示すブロック構成図である。It is a figure which shows Embodiment 2 of this invention, and is a block block diagram which shows an example of a structure of a demand monitoring system and a demand monitoring apparatus. この発明の実施の形態2を示す図で、仮想瞬時電力表示値を決定するまでのフローを説明するフローチャート図である。It is a figure which shows Embodiment 2 of this invention, and is a flowchart figure explaining the flow until a virtual instantaneous electric power display value is determined. この発明の実施の形態2の場合の仮想瞬時電力値の変化を示す線図である。It is a diagram which shows the change of the virtual instantaneous electric power value in the case of Embodiment 2 of this invention.

符号の説明Explanation of symbols

1 電力量パルス入力手段、
2 パルス変換比演算手段、
3 現在電力デマンド値演算手段、
4 現在電力デマンド値増分演算手段、
5 パルス積算時間および現在電力デマンド値増分設定手段、
6 予測電力デマンド値設定手段、
7 デマンド値表示手段、
8 制御出力手段、
9 仮想瞬時電力演算手段、
10 仮想瞬時電力値設定手段、
11 仮想瞬時電力値表示手段。
1 Electric energy pulse input means,
2 pulse conversion ratio calculation means,
3 Current power demand value calculation means,
4 Current power demand value increment calculation means,
5 Pulse integration time and current power demand value increment setting means,
6 Predictive power demand value setting means,
7 Demand value display means,
8 control output means,
9 virtual instantaneous power calculation means,
10 virtual instantaneous power value setting means,
11 Virtual instantaneous power value display means.

Claims (6)

現時点から所定時点前まで遡った時間をパルス積算期間とし、このパルス積算期間における、予め定められた電力量毎に発生する電力量パルスの数に基づいて、デマンド時限内に複数回予測電力デマンド値を演算するデマンド監視方式において、パルス積算期間における前記電力量パルスの数に基づく使用電力量が前回値より今回値の方が小さい場合には前記所定時点より所定時間前まで遡った時点から現時点までを前記パルス積算期間とすることにより前記パルス積算期間を所定時間長くすることを特徴とするデマンド監視方式。   Based on the number of power pulses generated for each predetermined amount of power during this pulse integration period, the time that goes back from the current time to the time before the predetermined time is used as the predicted power demand value multiple times within the demand time limit. In the demand monitoring method for calculating the above, when the current power value based on the number of power pulses in the pulse integration period is smaller than the previous value, from the time point before the predetermined time point to the current time point Demand monitoring system characterized in that the pulse integration period is lengthened by a predetermined time by setting the pulse integration period as. 予め定められた電力量毎に発生する電力量パルスを入力する電力量パルス入力手段と、
現在電力デマンド値(P)を P=(デマンド時限開始より現時点までの入力パルス数×パルス変換比a)の式によって演算する現在電力デマンド値演算手段と、
デマンド時限を複数に分割して設定されたパルス積算時間(△t)中に前記電力量パルス入力手段に入力された電力量パルス数(△n)から前記パルス積算時間(△t)中の現在電力デマンド値増分(△P)を △P=△n×a の式で演算する現在電力デマンド値増分演算手段と、
予測電力デマンド値(Px)を Px=P+△P/△t×(デマンド時限−デマンド時限経過時間) の式から演算する予測電力デマンド値演算手段と、
この予測電力デマンド値演算手段と前記現在電力デマンド値演算手段によって演算された前記予測電力デマンド値及び前記現在電力デマンド値を表示する電力デマンド値表示手段とを備えたデマンド監視装置であって、
前記パルス積算時間(△t)における前回の現在電力デマンド値増分(△PL)より今回の現在電力デマンド値増分(△P)が減少し、かつ、演算周期中に前記電力量パルスの入力がない場合に、上記予測電力デマンド値(Px)の演算式中の現在電力デマンド値増分(△P)を前記減少前の値に固定し、前記パルス積算時間(△t)を予測電力デマンド値の演算周期分延長し演算する手段を備えたデマンド監視装置。
An electric energy pulse input means for inputting an electric energy pulse generated for each predetermined electric energy;
A current power demand value calculation means for calculating a current power demand value (P) by an equation of P = (number of input pulses from the start of demand time period to the present time × pulse conversion ratio a);
The current time during the pulse integration time (Δt) from the number of power pulses (Δn) input to the power amount pulse input means during the pulse integration time (Δt) set by dividing the demand time period into a plurality of times Current power demand value increment calculating means for calculating the power demand value increment (ΔP) by the formula: ΔP = Δn × a;
A predicted power demand value calculating means for calculating a predicted power demand value (Px) from the formula: Px = P + ΔP / Δt × (demand time period−demand time period elapsed time);
A demand monitoring device comprising the predicted power demand value calculating means and the predicted power demand value calculated by the current power demand value calculating means and a power demand value display means for displaying the current power demand value,
The current current power demand value increment (ΔP L ) is decreased from the previous current power demand value increment (ΔP L ) in the pulse integration time (Δt), and the power amount pulse is input during the calculation cycle. If there is no current power demand value increment (ΔP) in the calculation formula for the predicted power demand value (Px), the pulse power integration time (Δt) is set to the predicted power demand value. Demand monitoring device provided with means for calculating by extending the calculation period.
請求項2に記載のデマンド監視装置において、
仮想瞬時電力値(W)をW=△P/△tの式から演算する仮想瞬時電力演算手段と、
この仮想瞬時電力演算手段によって演算された仮想瞬時電力を表示する仮想瞬時電力値表示手段と、
を備えていることを特徴とするデマンド監視装置。
The demand monitoring apparatus according to claim 2,
Virtual instantaneous power calculation means for calculating a virtual instantaneous power value (W) from an equation of W = ΔP / Δt;
Virtual instantaneous power value display means for displaying the virtual instantaneous power calculated by the virtual instantaneous power calculation means;
A demand monitoring apparatus comprising:
予め定められた電力量毎に発生する電力量パルスを入力する電力量パルス入力手段と、
現在電力デマンド値(P)を P=(デマンド時限開始より現時点までの入力パルス数×パルス変換比a)の式によって演算する現在電力デマンド値演算手段と、
デマンド時限を複数に分割して設定されたパルス積算時間(△t)中に前記電力量パルス入力手段に入力された電力量パルス数(△n)から前記パルス積算時間(△t)中の現在電力デマンド値増分(△P)を △P=△n×a の式で演算する現在電力デマンド値増分演算手段と、
前記現在電力デマンド値増分演算手段で演算された現在電力デマンド値増分(△P)から、仮想瞬時電力値(W)をW=△P/△tの式で演算する仮想瞬時電力演算手段と、
この仮想瞬時電力演算手段によって演算された仮想瞬時電力を表示する仮想瞬時電力値表示手段と、
を備えたデマンド監視装置。
An electric energy pulse input means for inputting an electric energy pulse generated for each predetermined electric energy;
A current power demand value calculation means for calculating a current power demand value (P) by an equation of P = (number of input pulses from the start of demand time period to the present time × pulse conversion ratio a);
The current time during the pulse integration time (Δt) from the number of power pulses (Δn) input to the power amount pulse input means during the pulse integration time (Δt) set by dividing the demand time period into a plurality of times Current power demand value increment calculating means for calculating the power demand value increment (ΔP) by the formula: ΔP = Δn × a;
Virtual instantaneous power calculation means for calculating a virtual instantaneous power value (W) by an equation of W = ΔP / Δt from the current power demand value increment (ΔP) calculated by the current power demand value increment calculation means;
Virtual instantaneous power value display means for displaying the virtual instantaneous power calculated by the virtual instantaneous power calculation means;
Demand monitoring device with
請求項4に記載のデマンド監視装置において、
前記パルス積算時間(△t)における前回の現在電力デマンド値増分(△PL)より今回の現在電力デマンド値増分(△P)が減少し、かつ、演算周期中に前記電力量パルスの入力が無い場合に、前記瞬時電力値(W)の演算式中の現在電力デマンド値増分(△P)を前記減少前の値に固定し、前記パルス積算時間(△t)を仮想瞬時電力値の演算周期分延長し演算する手段、
を備えていることを特徴とするデマンド監視装置。
The demand monitoring apparatus according to claim 4,
The current current power demand value increment (ΔP L ) is decreased from the previous current power demand value increment (ΔP L ) in the pulse integration time (Δt), and the power amount pulse is input during the calculation cycle. When there is no value, the current power demand value increment (ΔP) in the calculation formula of the instantaneous power value (W) is fixed to the value before the decrease, and the pulse integration time (Δt) is set to the virtual instantaneous power value. Means for calculating by extending the calculation period,
A demand monitoring apparatus comprising:
請求項5に記載のデマンド監視装置において、
前記電力量パルスの入力が所定期間無い場合、前記仮想瞬時電力値表示手段に、前記仮想瞬時電力(W)を0と表示する
ことを特徴とするデマンド監視装置。
The demand monitoring apparatus according to claim 5, wherein
The demand monitoring device, wherein the virtual instantaneous power (W) is displayed as 0 on the virtual instantaneous power value display means when the power amount pulse is not input for a predetermined period.
JP2004110356A 2003-05-28 2004-04-02 Demand monitoring system and apparatus Expired - Lifetime JP4117261B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004110356A JP4117261B2 (en) 2003-05-28 2004-04-02 Demand monitoring system and apparatus

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003150951 2003-05-28
JP2004110356A JP4117261B2 (en) 2003-05-28 2004-04-02 Demand monitoring system and apparatus

Publications (2)

Publication Number Publication Date
JP2005012995A JP2005012995A (en) 2005-01-13
JP4117261B2 true JP4117261B2 (en) 2008-07-16

Family

ID=34106729

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004110356A Expired - Lifetime JP4117261B2 (en) 2003-05-28 2004-04-02 Demand monitoring system and apparatus

Country Status (1)

Country Link
JP (1) JP4117261B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7422956B2 (en) * 2004-12-08 2008-09-09 Advanced Micro Devices, Inc. Semiconductor device and method of making semiconductor device comprising multiple stacked hybrid orientation layers

Also Published As

Publication number Publication date
JP2005012995A (en) 2005-01-13

Similar Documents

Publication Publication Date Title
JP2006197795A (en) Method, system and adjustment technology for measuring and saving power in plural time frames
US20120245868A1 (en) Reserve capacity calculating apparatus and method therefor, and computer readable medium
JP5127799B2 (en) Power demand monitoring apparatus and power demand monitoring method
CN105991667B (en) The method and apparatus for correcting resources error
WO2007073632A1 (en) Method for reducing power consumption of processor
JP2008079441A (en) Motor controller and controller comprising the same
JP7366352B2 (en) Power generation control device, power generation control method, power generation control program, and power generation system
RU2003129160A (en) METHOD FOR CONTROL AND MANAGEMENT OF TECHNICAL PROCESS
JP6203449B2 (en) System stability estimation apparatus and system stability estimation method
JP2008102816A (en) Energy saving report preparation device and method of predicting energy consumption by using the same
JP4117261B2 (en) Demand monitoring system and apparatus
JP4354480B2 (en) Abnormal traffic detection apparatus and method
EP3079227A1 (en) Calculation device
JP3272874B2 (en) Battery capacity / remaining time display
JP5915313B2 (en) Power control support program, power control support device, and power control support method
JP2007129837A (en) Demand control device
JP2007310704A (en) Method of estimating service use change
JP2016208556A (en) Demand prediction device and demand prediction method
JP5700693B2 (en) Elevator power control device and elevator power control method
CN112418534A (en) Method and device for predicting collection quantity, electronic equipment and computer readable storage medium
JP4032870B2 (en) Control effect estimation apparatus and control effect estimation method
JP6438548B1 (en) Power demand prediction method and power demand prediction system
Hong et al. Time series multistep‐ahead predictability estimation and ranking
CN114243769B (en) System, method and inverter for reducing control strategy operand
KR20210028794A (en) Semiconductor device and Prediction method for resource usage in semiconductor device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061129

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080404

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080415

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080421

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 3

R151 Written notification of patent or utility model registration

Ref document number: 4117261

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120425

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120425

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130425

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130425

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140425

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term