JP4107452B2 - Joint structure of pile and foundation concrete slab - Google Patents

Joint structure of pile and foundation concrete slab Download PDF

Info

Publication number
JP4107452B2
JP4107452B2 JP31787998A JP31787998A JP4107452B2 JP 4107452 B2 JP4107452 B2 JP 4107452B2 JP 31787998 A JP31787998 A JP 31787998A JP 31787998 A JP31787998 A JP 31787998A JP 4107452 B2 JP4107452 B2 JP 4107452B2
Authority
JP
Japan
Prior art keywords
pile
concrete slab
foundation concrete
fixing
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP31787998A
Other languages
Japanese (ja)
Other versions
JP2000144763A (en
Inventor
勝巳 小林
靖和 大西
隆宏 丸
太郎 中川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=18093085&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP4107452(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP31787998A priority Critical patent/JP4107452B2/en
Publication of JP2000144763A publication Critical patent/JP2000144763A/en
Application granted granted Critical
Publication of JP4107452B2 publication Critical patent/JP4107452B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は構造物における杭と基礎コンクリートスラブとの接合構造に関する。
【0002】
【従来の技術】
図21乃至図24を参照して従来一般的に行われている杭と基礎コンクリートスラブの接合構造を説明する。
図21(A)は場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
図21(A)に示す場所打ちコンクリート杭1201では、まず孔14が掘削され、この孔14の外周部に周方向に間隔をおきそれらの上部が孔の上方に突出する複数の杭主筋16が配筋された後、コンクリートCが打設される。これにより、複数の杭主筋16が杭頭部1201Aよりも上方に突出する場所打ちコンクリート杭1201が得られる。
次に、場所打ちコンクリート杭1201上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の杭主筋16の上部が埋設され、かつ、その下面が杭頭部1201Aの上面よりも下位に位置するように形成される。
そして、このように場所打ちコンクリート杭1201の杭主筋16を基礎コンクリートスラブ18に直接定着させることで、杭頭部1201Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1201Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0003】
また、図21(B)に示す場所打ち鋼管コンクリート杭1202では、14が掘削され、孔14に鋼管1222が打ち込まれ、この鋼管1222の内部に定着筋19が配筋される。定着筋19は鋼管1222の内部で外周寄り部分に周方向に間隔をおいて上下に延在する複数の主筋1902と、これら複数の主筋1902を連結する補強筋1904を備えている。そして、鋼管1222の内部にコンクリートCが打設されることで、複数の主筋1902が杭頭部1202Aよりも上方に突出する場所打ち鋼管コンクリート杭1202が得られる。
次に、場所打ち鋼管コンクリート杭1202上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1202Aの上面よりも下位に位置するように形成される。
そして、このように場所打ち鋼管コンクリート杭1202の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1202Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1202Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0004】
また、図22(A)に示す鋼管杭1203では、地盤に鋼管杭1203が打ち込まれる。鋼管杭1203の杭頭部1203Aには、鋼管1222の内部に中詰めコンクリート20が充填されており、中詰めコンクリート20に定着筋19が取着されている。定着筋19は鋼管1222の内部で外周寄り部分に周方向に間隔をおいて上下に延在し杭頭部1203Aの上方に突出する複数の主筋1902と、これら複数の主筋1902を連結する補強筋1904を備えている。
そして、鋼管杭1203上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1203Aの上面よりも下位に位置するように形成される。
そして、このように場所打ち鋼管コンクリート杭1203の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1203Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1203Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0005】
また、図22(B)に示す既製コンクリート杭1204では、地盤に既製コンクリート杭(鋼管巻き既製コンクリート杭などを含む)1204が打ち込まれる。既製コンクリート杭1204の杭頭部1204Aには、コンクリート管(または鋼管)1222の内部に中詰めコンクリート20が充填されており、中詰めコンクリート20に定着筋19が取着されている。定着筋19はコンクリート管1222の内部で外周寄り部分に周方向に間隔をおいて上下に延在し杭頭部1204Aの上方に突出する複数の主筋1902と、これら複数の主筋1902を連結する補強筋1904を備えている。
そして、既製コンクリート杭1204上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1204Aの上面よりも下位に位置するように形成される。
そして、このように既製コンクリート杭1204の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1204Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1204Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0006】
また、図23(A)に示す場所打ち鋼管コンクリート杭1205では、鋼管1222の上端部外周に定着筋19が溶接などにより取着されている。定着筋19は鋼管1222の周方向に間隔をおいて上下に延在する複数の主筋1902を備えている。そして、鋼管1222の内部にコンクリートCが打設されることで、複数の主筋1902が杭頭部1205Aよりも上方に突出する場所打ち鋼管コンクリート杭1205が得られる。
次に、場所打ち鋼管コンクリート杭1205上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1205Aの上面よりも下位に位置するように形成される。
そして、このように場所打ち鋼管コンクリート杭1205の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1205Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1205Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0007】
また、図23(B)に示す鋼管杭(SC杭などを含む)1206では、鋼管1222の上端部外周に定着筋19が溶接などにより取着されている。定着筋19は鋼管1222の周方向に間隔をおいて上下に延在する複数の主筋1902を備えている。
そして、鋼管杭1206が地盤に打ち込まれた後、鋼管杭1206上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1206Aの上面よりも下位に位置するように形成される。
そして、このように場所打ち鋼管コンクリート杭1206の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1206Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1206Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0008】
また、図24(A)に示す既製コンクリート杭1207では、杭頭部1207Aに補強バンド1232が取着され、補強バンド1232の外周に定着筋19が溶接により取着されている。定着筋19は周方向に間隔をおいて上下に延在し杭頭部1207Aの上方に突出する複数の主筋1902を備えている。
そして、既製コンクリート杭1207が地盤に打ち込まれた後、既製コンクリート杭1207上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1204Aの上面よりも下位に位置するように形成される。
そして、このように既製コンクリート杭1207の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1207Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1207Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0009】
また、図24(B)に示す既製コンクリート杭1208では、杭頭部1207Aに端板1234が取着され、この端板1234に定着筋19がスタッド溶接またはねじ式結合により取着されている。定着筋19は周方向に間隔をおいて上下に延在し杭頭部1208Aの上方に突出する複数の主筋1902を備えている。そして、既製コンクリート杭1208が地盤に打ち込まれた後、既製コンクリート杭1208上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1208Aの上面よりも下位に位置するように形成される。
そして、このように既製コンクリート杭1208の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1208Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1208Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0010】
【発明が解決しようとする課題】
しかしながら、上述のように杭1201乃至1208の杭主筋16や定着筋19を基礎コンクリートスラブ18に直接定着させると、杭頭部1201A乃至1208Aに水平力が生じた時の杭主筋16あるいは定着筋19の伸びが小さく、また、基礎コンクリートスラブ18からの抜け出し量も小さいため、杭頭部1201A乃至1208Aの拘束条件は固定に近い。
そのため、水平力が大きい場合には、大きな曲げモーメントが杭頭部1201A乃至1208Aに作用することになり、杭頭部1201A乃至1208Aがその大きな曲げモーメントに耐えられるように杭頭部1201A乃至1208Aの配筋量を増大させる必要がある。
さらに、その大きな曲げモーメントは、基礎梁にも伝達され、それに対して基礎梁もそれに耐えられるような配筋量とする必要がある。したがって、杭頭部と基礎梁の双方の配筋量が増大する。
その結果、基礎コンクリートスラブ周辺は、杭主筋あるいは定着筋と基礎梁主筋の込み合った配筋となり、配筋作業が煩雑化し、施工性および経済性の点で不利があった。
本発明は前記事情に鑑み案出されたものであって、本発明の目的は、杭頭部や基礎梁の配筋を簡素化して施工性および経済性を向上できる杭と基礎コンクリートスラブとの接合構造を提供することにある。
【0011】
【課題を解決するための手段】
前記目的を達成するため本発明は、上下に延在する鉄筋が取着された杭の杭頭部を基礎コンクリートスラブに接合する構造であって、前記鉄筋は杭頭部から上方に突出しており、前記杭頭部から上方に突出する鉄筋部分は基礎コンクリートスラブに埋設され、前記基礎コンクリートスラブに埋設された鉄筋部分に、基礎コンクリートスラブのコンクリートと非定着状態を保ちつつ鉄筋の長手方向に沿って延在する非定着部が設けられ、前記非定着部の端部に、鉄筋が基礎コンクリートスラブに定着された定着部が設けられ、前記杭頭部に水平力が作用した場合、前記非定着部において前記鉄筋が伸び、前記杭頭部に働く曲げモーメントが減じられることを特徴とする。
また、本発明は、前記非定着部の下端が杭頭部の上端面上に位置していることを特徴とする。
また、本発明は、前記定着部が前記基礎コンクリートスラブの上面上に位置していることを特徴とする。
また、本発明は、前記定着部が前記基礎コンクリートスラブ中に位置していることを特徴とする。
また、本発明は、前記杭頭部がコンクリートを有し、前記鉄筋は前記コンクリートに埋設され、前記鉄筋が前記コンクリートに埋設された部分で杭頭部の上端面近傍に位置する箇所に、前記コンクリートと非定着状態を保ちつつ鉄筋の長手方向に沿って延在する非定着部が設けられ、この非定着部と、前記基礎コンクリートスラブ側に設けられた非定着部は連続していることを特徴とする。
また、本発明は、前記非定着部が、コンクリート中に筒体が埋設され、この筒体の内部に前記鉄筋が挿通されることで形成されていることを特徴とする。また、本発明は、前記定着部が、前記鉄筋に定着部材が取着されることで形成されていることを特徴とする。
また、本発明は、前記定着部が基礎コンクリートスラブ中でコンクリートとの定着状態を保ちつつ延在するに前記鉄筋の部分により形成されていることを特徴とする。
また、本発明は、前記杭が杭主筋を有する場所打ちコンクリート杭であり、前記鉄筋は前記杭主筋であることを特徴とする。
また、本発明は、前記杭が定着筋を有する場所打ち鋼管コンクリート杭であり、前記定着筋は上下に延在する主筋を有し、前記鉄筋は前記主筋であることを特徴とする。
また、本発明は、前記杭が定着筋を有する鋼管杭であり、前記定着筋は上下に延在する主筋を有し、前記鉄筋は前記主筋であることを特徴とする。
また、本発明は、前記杭が定着筋を有する既製コンクリート杭であり、前記定着筋は上下に延在する主筋を有し、前記鉄筋は前記主筋であることを特徴とする。
【0012】
本発明によれば、杭頭部に水平力が作用した場合、非定着部において鉄筋が伸び、この非定着部における鉄筋の伸びは杭頭部の拘束を緩めることになる。
すなわち、非定着部を設けることで杭頭部の固定度が低下し、杭頭部に働く曲げモーメントが減じられる。
したがって、杭頭部や基礎梁の配筋量を減らし、基礎コンクリートスラブ周辺の配筋を簡素化できる。
【0013】
【発明の実施の形態】
以下、本発明の実施の形態を図面を参照して説明する。
まず、第1の実施の形態から説明すると、図1は第1の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
鉄筋コンクリート造りの構造物は、場所打ちコンクリート杭1201の上に設けられた基礎コンクリートスラブ18を備えている。
場所打ちコンクリート杭1201の杭頭部1201Aは基礎コンクリートスラブ18の底部に埋設され、場所打ちコンクリート杭1201の杭頭部1201Aの上端面1201Bは基礎コンクリートスラブ18の下面よりも上方に位置している。
場所打ちコンクリート杭1201は、円柱状のコンクリートCの外周部に周方向に間隔をおいて上下に延在する複数の杭主筋16を有しており、これら杭主筋16は杭頭部1201Aよりも上方に突出し、それらの上端は基礎コンクリートスラブ18の上面上に位置している。
【0014】
前記複数の杭主筋16が基礎コンクリートスラブ18中を延在する部分には筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201Aの上端面1201Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面に一致している。前記筒体30は、その内部において杭主筋16が長手方向に移動できるものであればよく、例えば、シース管などを用いることができる。
したがって、杭主筋16は基礎コンクリートスラブ18中では筒体30の内部を挿通し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態(杭主筋16とコンクリートとが付着していない状態)を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。本実施の形態では、非定着部32は、杭頭部1201Aの上端面1201Bから基礎コンクリートスラブ18の上面にわたって設けられ、言い換えると、杭主筋16が基礎コンクリートスラブ18中を延在する部分全てに非定着部32が設けられている。
【0015】
また、基礎コンクリートスラブ18の上面上に位置する複数の杭主筋16の上端には定着金物34が取着され、定着金物34により杭主筋16の上端が基礎コンクリートスラブ18の上面に定着された定着部36が設けられ、本実施の形態では、定着部36は基礎コンクリートスラブ18の上面上に位置している。前記定着金物34は杭主筋16の上端を基礎コンクリートスラブ18の上面に定着できるものであればよく、例えば、ナットなどを用いることができる。
なお、杭主筋16の上端が基礎コンクリートスラブ18の上面に定着された状態とは、杭主筋16の上端が基礎コンクリートスラブ18の上面と一体的に連結される状態や、あるいは、杭主筋16の上端が基礎コンクリートスラブ18の上面よりも下方に変位することが阻止された状態をいう。
【0016】
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ちコンクリート杭1201を施工した後、杭頭部1201Aの上端面1201Bから突出する杭主筋16に筒体30を被せ、その後、杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する杭主筋16の上端に定着金物34を取着することで行われる。
【0017】
本実施の形態によれば、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸びる。
そして、この杭主筋16の伸び量はコンクリートとの付着がある場合に比べて大きい。非定着部32における杭主筋16の伸びは杭頭部1201Aに回転を生じさせるため、非定着部32を設けて杭主筋16の伸び量を増加させることは、杭頭部1201Aの拘束を緩めることになる。
すなわち、非定着部32を設けることで杭頭部1201Aの固定度が低下し、同じ水平力に対し、従来工法に比べ杭頭部1201Aに働く曲げモーメントが減じられる。
したがって、杭頭部1201Aや基礎梁の配筋量を減らし、基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0018】
次に、第2の実施の形態について説明する。
図2は第2の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第2の実施の形態では、非定着部32と定着部36の構成が前記第1の実施の形態と異なっている。
すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が基礎コンクリートスラブ18中を延在する部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201Aの上端面1201Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0019】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の杭主筋16の上端には定着金物34が取着され、定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ちコンクリート杭1201を施工した後、杭頭部1201Aの上端面1201Bから突出する杭主筋16に筒体30を被せ、筒体30から突出する杭主筋16の上端に定着金物34を取着し、その後、杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第2の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0020】
次に、第3の実施の形態について説明する。
図3は第3の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第3の実施の形態では、定着部36の構成が前記第2の実施の形態と異なっている。
すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ下半部に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201Aの上端面1201Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0021】
また、杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ上半部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ上半部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ちコンクリート杭1201を施工した後、杭頭部1201Aの上端面1201Bから突出する杭主筋16のほぼ下半部に筒体30を被せ、杭頭部1201Aの上端面1201Bから突出する杭主筋16のほぼ上半部を筒体30の上端から露出させた状態で、杭頭部1201A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第2の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0022】
次に、第4の実施の形態について説明する。
図4は第4の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第4の実施の形態では、定着部36の構成が前記第3の実施の形態と異なっている。
すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201Aの上端面1201Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0023】
また、杭主筋16が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する杭主筋16の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する杭主筋16部分と定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ちコンクリート杭1201を施工した後、杭頭部1201Aの上端面1201Bから突出する杭主筋16に筒体30を被せ、さらに、筒体30から杭主筋16の上部から露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1201A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第4の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0024】
次に、第5の実施の形態について説明する。
図5は第5の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第5の実施の形態は非定着部32の構成が第1の実施の形態と異なっている。すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が杭頭部1201A中を延在する部分から基礎コンクリートスラブ18中を延在する部分にわたって筒体30が被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面上に位置している。
したがって、杭主筋16は杭頭部1201Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0025】
また、基礎コンクリートスラブ18の上面上に位置する杭主筋16の上端に定着金物34が取着され、定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ちコンクリート杭1201の施工時に、杭主筋16に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1201を得、その後、杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する杭主筋16の上端に定着金物34を取着することで行われる。
第5の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0026】
次に、第6の実施の形態について説明する。
図6は第6の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第6の実施の形態は非定着部32の構成が第2の実施の形態と異なっている。すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が杭頭部1201A中を延在する部分から基礎コンクリートスラブ18中を延在する部分にわたって筒体30が被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。したがって、杭主筋16は杭頭部1201Aおよび基礎コンクリートスラブ18中で筒体30の内部に挿通され、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0027】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の杭主筋16の上端には定着金物34が取着され、定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ちコンクリート杭1201の施工時に、杭主筋16に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1201を得、その後、筒体30から突出する杭主筋16の上端に定着金物34を取着し、次に、杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第6の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0028】
次に、第7の実施の形態について説明する。
図7は第7の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第7の実施の形態は非定着部32の構成が第3の実施の形態と異なっている。すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が杭頭部1201A中を延在する部分から杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ下半部にわたり筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は杭頭部1201Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0029】
また、杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ上半部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ上半部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ちコンクリート杭1201の施工時に、杭主筋16に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1201を得、その後、筒体30から杭主筋16の上部を露出させた状態で杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第7の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0030】
次に、第8の実施の形態について説明する。
図8は第8の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第8の実施の形態は非定着部32の構成が第4の実施の形態と異なっている。すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が杭頭部1201A中を延在する部分から基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は杭頭部1201Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0031】
また、杭主筋16が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する杭主筋16の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する杭主筋16部分と定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ちコンクリート杭1201の施工時に、杭主筋16に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1201を得、その後、筒体30から杭主筋16の上部から露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1201A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第8の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0032】
次に、第9の実施の形態について説明する。
図9は第9の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第9の実施の形態では杭が場所打ち鋼管コンクリート杭1202であり、定着筋19と基礎コンクリートスラブ18との接合に本発明が適用されている点が前記第1乃至第8実施の形態と異なっている。
場所打ち鋼管コンクリート杭1202の杭頭部1202Aは基礎コンクリートスラブ18の底部に埋設され、場所打ち鋼管コンクリート杭1202の杭頭部1202Aの上端面1202Bは基礎コンクリートスラブ18の下面よりも上方に位置している。
そして、場所打ち鋼管コンクリート杭1202では、鋼管1222の内部にその下部を埋設固定して定着筋19が配筋されている。定着筋19は鋼管1222の内部で外周寄り部分に周方向に間隔をおいて上下に延在する複数の主筋1902と、これら複数の主筋1902を連結する補強筋1904を備えている。複数の主筋1902の上部は杭頭部1202Aよりも上方に突出し、その上端は基礎コンクリートスラブ18の上面上に位置している。
【0033】
前記複数の主筋1902が基礎コンクリートスラブ18中を延在する部分には筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202Aの上端面1202Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面に一致している。前記筒体30は、その内部において主筋1902が長手方向に移動できるものであればよく、第1乃至第8の実施の形態と同様にシース管などを用いることができる。
したがって、主筋1902は基礎コンクリートスラブ18中では筒体30の内部を挿通し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。本実施の形態では、非定着部32は、杭頭部1202Aの上端面1202Bから基礎コンクリートスラブ18の上面にわたって設けられ、言い換えると、主筋1902が基礎コンクリートスラブ18中を延在する部分全てに非定着部32が設けられている。
また、基礎コンクリートスラブ18の上面上に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18の上面に定着された定着部36が設けられ、本実施の形態では、定着部36は基礎コンクリートスラブ18の上面上に位置している。前記定着金物34は主筋1902の上端を基礎コンクリートスラブ18の上面に定着できるものであればよく、第1乃至第8の実施の形態と同様にナットなどを用いることができる。
【0034】
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ち鋼管コンクリート杭1202を施工した後、杭頭部1202Aの上端面1202Bから突出する主筋1902に筒体30を被せ、その後、杭頭部1202A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する主筋1902の上端に定着金物34を取着することで行われる。
本実施の形態によれば、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸びる。
そして、この主筋1902の伸び量はコンクリートとの付着がある場合に比べて大きい。非定着部32における主筋1902の伸びは杭頭部1202Aに回転を生じさせるため、非定着部32を設けて主筋1902の伸び量を増加させることは、杭頭部1202Aの拘束を緩めることになる。
すなわち、非定着部32を設けることで杭頭部1202Aの固定度が低下し、同じ水平力に対し、従来工法に比べ杭頭部1202Aに働く曲げモーメントが減じられる。
したがって、杭頭部1202Aや基礎梁の配筋量を減らし、基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0035】
次に、第10の実施の形態について説明する。
図10は第10の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第10の実施の形態では、非定着部32と定着部36の構成が前記第10の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202Aの上端面1202Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0036】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ち鋼管コンクリート杭1202を施工した後、杭頭部1202Aの上端面1202Bから突出する主筋1902に筒体30を被せ、筒体30から突出する主筋1902の上端に定着金物34を取着し、その後、杭頭部1202A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第10の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0037】
次に、第11の実施の形態について説明する。
図11は第11の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第11の実施の形態では、定着部36の構成が前記第10の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ下半部に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202Aの上端面1202Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0038】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ上半部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ上半部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ち鋼管コンクリート杭1202を施工した後、杭頭部1202Aの上端面1202Bから突出する主筋1902のほぼ下半部に筒体30を被せ、杭頭部1202Aの上端面1202Bから突出する主筋1902のほぼ上半部を筒体30の上端から露出させた状態で、杭頭部1202A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第11の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0039】
次に、第12の実施の形態について説明する。
図12は第12の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第12の実施の形態では、定着部36の構成が前記第11の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202Aの上端面1202Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0040】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する主筋1902の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する主筋1902部分と定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ち鋼管コンクリート杭1202を施工した後、杭頭部1202Aの上端面1202Bから突出する主筋1902に筒体30を被せ、さらに、筒体30から主筋1902の上部から露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1202A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第12の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋19026が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0041】
次に、第13の実施の形態について説明する。
図13は第13の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第13の実施の形態は非定着部32の構成が第9の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202から定着筋19の複数の主筋1902が突出しており、これら主筋1902が杭頭部1202A中を延在する部分から基礎コンクリートスラブ18中を延在する部分にわたって筒体30が被せられている。各筒体30の下端は杭頭部1202A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面上に位置している。
したがって、主筋1902は杭頭部1202Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0042】
また、基礎コンクリートスラブ18の上面上に位置する主筋1902の上端に定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ち鋼管コンクリート杭1202の施工時に、定着筋19の主筋1902に筒体30を被せた後コンクリートを打設して場所打ち鋼管コンクリート杭1202を得、その後、杭頭部1202A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する主筋1902の上端に定着金物34を取着することで行われる。
第13の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0043】
次に、第14の実施の形態について説明する。
図14は第14の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第14の実施の形態は非定着部32の構成が第10の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が杭頭部1202A中を延在する部分から基礎コンクリートスラブ18中を延在する部分にわたって筒体30が被せられている。各筒体30の下端は杭頭部1202A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は杭頭部1202Aおよび基礎コンクリートスラブ18中で筒体30の内部に挿通され、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0044】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ち鋼管コンクリート杭1202の施工時に、主筋1902に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1202を得、その後、筒体30から突出する主筋1902の上端に定着金物34を取着し、次に、杭頭部1202A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第14の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0045】
次に、第15の実施の形態について説明する。
図15は第15の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第15の実施の形態は非定着部32の構成が第11の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が杭頭部1202A中を延在する部分から主筋1902が基礎コンクリートスラブ18中を延在する部分の下部にわたり筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は杭頭部1202Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0046】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ち鋼管コンクリート杭1202の施工時に、主筋1902に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1202を得、その後、筒体30から主筋1902の上部を露出させた状態で杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第15の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0047】
次に、第16の実施の形態について説明する。
図16は第16の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第16の実施の形態は非定着部32の構成が第12の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が杭頭部1202A中を延在する部分から基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は杭頭部1202Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0048】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する主筋1902の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する主筋1902部分と定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ち鋼管コンクリート杭1202の施工時に、主筋1902に筒体30を被せた後コンクリートを打設して場所打ち鋼管コンクリート杭1202を得、その後、筒体30から主筋1902の上部を露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1202A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第16の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0049】
次に、第17の実施の形態について説明する。
図17は第17の実施の形態に係る鋼管杭(鋼管巻き既製コンクリート杭などを含む)と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第17の実施の形態では杭が鋼管杭1206であり、定着筋19と基礎コンクリートスラブ18との接合に本発明が適用されている点が前記第1乃至第16実施の形態と異なっている。
鋼管杭1206の杭頭部1206Aは基礎コンクリートスラブ18の底部に埋設され、鋼管杭1206の杭頭部1206Aの上端面1206Bは基礎コンクリートスラブ18の下面よりも上方に位置している。
そして、鋼管杭1206では、鋼管1222の上端部外周に定着筋19が溶接などにより取着されている。定着筋19は鋼管1222の周方向に間隔をおいて上下に延在する複数の主筋1902を備えており、これら複数の主筋1902は杭頭部1206Aよりも上方に突出し、その上端は基礎コンクリートスラブ18の上面上に位置している。
【0050】
前記複数の主筋1902が基礎コンクリートスラブ18中を延在する部分には筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1206Aの上端面1206Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面に一致している。前記筒体30は、その内部において主筋1902が長手方向に移動できるものであればよく、筒体30としてシース管などを用いることができる。
したがって、主筋1902は基礎コンクリートスラブ18中では筒体30の内部を挿通し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
本実施の形態では、非定着部32は、杭頭部1206Aの上端面1206Bから基礎コンクリートスラブ18の上面にわたって設けられ、言い換えると、主筋1902が基礎コンクリートスラブ18中を延在する部分全てに非定着部32が設けられている。
また、基礎コンクリートスラブ18の上面上に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18の上面に定着された定着部36が設けられ、本実施の形態では、定着部36は基礎コンクリートスラブ18の上面上に位置している。前記定着金物34は主筋1902の上端を基礎コンクリートスラブ18の上面に定着できるものであればよく、第1乃至第8の実施の形態と同様にナットなどを用いることができる。
【0051】
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に鋼管杭1206を施工した後、杭頭部1206Aの上端面1206Bから突出する主筋1902に筒体30を被せ、その後、杭頭部1206A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する主筋1902の上端に定着金物34を取着することで行われる。
本実施の形態によれば、地震時に杭頭部1206Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸びる。
そして、この主筋1902の伸び量はコンクリートとの付着がある場合に比べて大きい。
非定着部32における主筋1902の伸びは杭頭部1206Aに回転を生じさせるため、非定着部32を設けて主筋1902の伸び量を増加させることは、杭頭部1206Aの拘束を緩めることになる。
すなわち、非定着部32を設けることで杭頭部1206Aの固定度が低下し、同じ水平力に対し、従来工法に比べ杭頭部1206Aに働く曲げモーメントが減じられる。
したがって、杭頭部1206Aや基礎梁の配筋量を減らし、基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0052】
次に、第18の実施の形態について説明する。
図18は第18の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第18の実施の形態では、非定着部32と定着部36の構成が前記第17の実施の形態と異なっている。
すなわち、杭頭部1206Aの上端面1206Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1206Aの上端面1206Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0053】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に鋼管杭1206を施工した後、杭頭部1206Aの上端面1206Bから突出する主筋1902に筒体30を被せ、筒体30から突出する主筋1902の上端に定着金物34を取着し、その後、杭頭部1206A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第18の実施の形態によっても、地震時に杭頭部1206Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1206Aの拘束が緩められる。これにより、杭頭部1206Aに働く曲げモーメントを減じ、杭頭部1206Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0054】
次に、第19の実施の形態について説明する。
図19は第19の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第19の実施の形態では、定着部36の構成が前記第18の実施の形態と異なっている。
すなわち、杭頭部1206Aの上端面1206Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ下半部に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1206Aの上端面1206Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0055】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ上半部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ上半部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に鋼管杭1206を施工した後、杭頭部1206Aの上端面1206Bから突出する主筋1902のほぼ下半部に筒体30を被せ、杭頭部1206Aの上端面1206Bから突出する主筋1902のほぼ上半部を筒体30の上端から露出させた状態で、杭頭部1206A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第19の実施の形態によっても、地震時に杭頭部1206Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1206Aの拘束が緩められる。これにより、杭頭部1206Aに働く曲げモーメントを減じ、杭頭部1206Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0056】
次に、第20の実施の形態について説明する。
図20は第20の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第20の実施の形態では、定着部36の構成が前記第18の実施の形態と異なっている。
すなわち、杭頭部1206Aの上端面1206Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1206Aの上端面1206Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0057】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する主筋1902の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する主筋1902部分と定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に鋼管杭1206を施工した後、杭頭部1206Aの上端面1206Bから突出する主筋1902に筒体30を被せ、さらに、筒体30から主筋1902の上部から露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1206A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第20の実施の形態によっても、地震時に杭頭部1206Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1206Aの拘束が緩められる。これにより、杭頭部1206Aに働く曲げモーメントを減じ、杭頭部1206Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0058】
なお、上述した実施の形態では、杭が場所打ちコンクリート杭である場合にその杭主筋と基礎コンクリートスラブとの接合構造と、杭が場所打ち鋼管コンクリート杭である場合にその定着筋の主筋と基礎コンクリートスラブとの接合構造と、杭が鋼管杭である場合にその定着筋の主筋と基礎コンクリートスラブとの接合構造について説明したが、本発明は従来の技術で述べたように杭がその他の既製コンクリート杭(鋼管巻き既製コンクリート杭を含む)などである場合にも、それらの定着筋と基礎コンクリートスラブとの接合部分に広く適用されるものである。
【0059】
【発明の効果】
以上の説明で明らかなように本発明は、上下に延在する鉄筋が取着された杭の杭頭部を基礎コンクリートスラブに接合する構造であって、前記鉄筋は杭頭部から上方に突出しており、前記杭頭部から上方に突出する鉄筋部分は基礎コンクリートスラブに埋設され、前記基礎コンクリートスラブに埋設された鉄筋部分に、基礎コンクリートスラブのコンクリートと非定着状態を保ちつつ鉄筋の長手方向に沿って延在する非定着部が設けられ、前記非定着部の端部に、鉄筋が基礎コンクリートスラブに定着された定着部が設けられ、前記杭頭部に水平力が作用した場合、前記非定着部において前記鉄筋が伸び、前記杭頭部に働く曲げモーメントが減じられる構成とした。そのため、地震時に杭頭部に水平力が作用した場合、非定着部において鉄筋に引っ張り応力が生じ、非定着部において鉄筋が伸びる。この鉄筋の伸び量はコンクリートとの付着がある場合に比べて大きく、非定着部における鉄筋の伸びは杭頭部に回転を生じさせ、杭頭部の拘束を緩める。すなわち、非定着部を設けることで杭頭部の固定度が低下し、従来工法に比べ杭頭部に働く曲げモーメントが減じられる。これにより、杭頭部や基礎梁の配筋量を減らし、杭頭部や基礎梁の配筋を簡素化して施工性および経済性を向上できる。また、鋼管杭や鋼管巻き既製コンクリート杭の場合には、鉄筋の取付部近傍にひずみが集中することがなくなるので、大変形時において、鉄筋の破断とそれに伴う耐力の低下を防止することができ、安定した復元力特性が得られる。
【図面の簡単な説明】
【図1】第1の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図2】第2の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図3】第3の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図4】第4の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図5】第5の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図6】第6の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図7】第7の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図8】第8の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図9】第9の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図10】第10の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図11】第11の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図12】第12の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図13】第13の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図14】第14の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図15】第15の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図16】第16の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図17】第17の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図18】第18の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図19】第19の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図20】第20の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図21】(A)は従来の場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は従来の場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図22】(A)は従来の鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は従来の既製コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図23】(A)は従来の場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は従来の鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図24】(A)は従来の既製コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は従来の既製コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【符号の説明】
1201 場所打ちコンクリート杭
1202 場所打ち鋼管コンクリート杭
1206 鋼管杭
1201A、1202A、1206A 杭頭部
16 杭主筋
18 基礎コンクリートスラブ
19 定着筋
1902 主筋
30 筒体
32 非定着部
34 定着金物
36 定着部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a joint structure between a pile and a foundation concrete slab in a structure.
[0002]
[Prior art]
With reference to FIG. 21 to FIG. 24, description will be given of a joint structure of a pile and a foundation concrete slab which is generally performed conventionally.
FIG. 21 (A) is a sectional front view of the joint portion between the cast-in-place concrete pile and the foundation concrete slab, and FIG. 21 (B) is a sectional front view of the joint portion between the cast-in-place steel pipe concrete pile and the foundation concrete slab.
In the cast-in-place concrete pile 1201 shown in FIG. 21 (A), the holes 14 are first excavated, and a plurality of pile main bars 16 that are spaced apart in the circumferential direction on the outer periphery of the holes 14 and whose upper portions protrude above the holes are provided. After the bar arrangement, concrete C is placed. Thereby, the cast-in-place concrete pile 1201 in which the plurality of pile main bars 16 protrude upward from the pile head 1201A is obtained.
Next, after reinforcing bars are placed on the cast-in-place concrete pile 1201, concrete is placed and the foundation concrete slab 18 is formed. The foundation concrete slab 18 is formed such that the upper portions of the plurality of pile main bars 16 are embedded, and the lower surface thereof is positioned lower than the upper surface of the pile head 1201A.
Then, by fixing the pile main reinforcement 16 of the cast-in-place concrete pile 1201 directly to the foundation concrete slab 18 in this way, the pile head 1201A and the foundation concrete slab 18 are structurally connected, and the pile is generated by the horizontal force acting during the earthquake. It resists the shearing force, bending moment and pulling force generated in the head 1201A.
[0003]
Further, in the cast-in-place steel pipe concrete pile 1202 shown in FIG. 21B, 14 is excavated, the steel pipe 1222 is driven into the hole 14, and the fixing bar 19 is arranged inside the steel pipe 1222. The fixing bar 19 includes a plurality of main bars 1902 extending vertically at intervals in the circumferential direction inside the steel pipe 1222 and a reinforcing bar 1904 connecting the plurality of main bars 1902. Then, by placing concrete C inside the steel pipe 1222, a cast-in-place steel pipe concrete pile 1202 in which a plurality of main bars 1902 protrude upward from the pile head 1202A is obtained.
Next, after reinforcing bars are placed on the cast-in-place steel pipe concrete pile 1202, concrete is placed and the foundation concrete slab 18 is formed. The foundation concrete slab 18 is formed such that the upper portions of the plurality of main bars 1902 are embedded and the lower surface thereof is positioned lower than the upper surface of the pile head 1202A.
And by fixing the main reinforcement 1902 of the cast-in-place steel pipe concrete pile 1202 directly to the foundation concrete slab 18 in this way, the pile head 1202A and the foundation concrete slab 18 are structurally connected, and the pile is generated by the horizontal force acting during the earthquake. It resists the shearing force, bending moment and pulling force generated in the head 1202A.
[0004]
Moreover, in the steel pipe pile 1203 shown to FIG. 22 (A), the steel pipe pile 1203 is driven into the ground. The pile head 1203 </ b> A of the steel pipe pile 1203 is filled with the inside filling concrete 20 inside the steel pipe 1222, and the fixing bar 19 is attached to the inside filling concrete 20. The fixing bar 19 includes a plurality of main bars 1902 that extend vertically in the steel pipe 1222 in the circumferential direction at a portion near the outer periphery and project above the pile head 1203 </ b> A, and reinforcing bars that connect the plurality of main bars 1902. 1904 is provided.
And after a reinforcing bar is arranged on the steel pipe pile 1203, concrete is laid and the foundation concrete slab 18 is formed. The foundation concrete slab 18 is formed such that the upper portions of the plurality of main bars 1902 are embedded, and the lower surface thereof is positioned lower than the upper surface of the pile head 1203A.
And by fixing the main reinforcement 1902 of the cast-in-place steel pipe concrete pile 1203 directly to the foundation concrete slab 18 in this way, the pile head 1203A and the foundation concrete slab 18 are structurally connected, and the pile is generated by the horizontal force acting during the earthquake. It resists the shearing force, bending moment and pulling force generated in the head 1203A.
[0005]
In addition, in the ready-made concrete pile 1204 shown in FIG. 22B, a ready-made concrete pile (including a steel pipe-wrapped ready-made concrete pile) 1204 is driven into the ground. The pile head 1204 </ b> A of the ready-made concrete pile 1204 is filled with the inside filling concrete 20 inside the concrete pipe (or steel pipe) 1222, and the fixing bar 19 is attached to the inside filling concrete 20. The fixing bars 19 extend in the vertical direction at intervals in the circumferential direction inside the concrete pipe 1222 and vertically extend to protrude above the pile head 1204 </ b> A, and the reinforcement connecting the plurality of main bars 1902. A muscle 1904 is provided.
And after reinforcing bars are arranged on the ready-made concrete pile 1204, concrete is laid and the foundation concrete slab 18 is formed. The foundation concrete slab 18 is formed such that the upper portions of the plurality of main bars 1902 are embedded, and the lower surface thereof is positioned lower than the upper surface of the pile head 1204A.
And by fixing the main reinforcement 1902 of the ready-made concrete pile 1204 directly to the foundation concrete slab 18 in this way, the pile head 1204A and the foundation concrete slab 18 are structurally connected, and the pile head is caused by a horizontal force acting during an earthquake. Resists shearing force, bending moment, and pulling force generated in 1204A.
[0006]
Further, in the cast-in-place steel pipe concrete pile 1205 shown in FIG. 23A, the fixing bar 19 is attached to the outer periphery of the upper end of the steel pipe 1222 by welding or the like. The fixing bar 19 includes a plurality of main bars 1902 extending in the vertical direction at intervals in the circumferential direction of the steel pipe 1222. Then, by placing concrete C inside the steel pipe 1222, a cast-in-place steel pipe concrete pile 1205 in which a plurality of main bars 1902 protrude upward from the pile head 1205A is obtained.
Next, after reinforcing bars are placed on the cast-in-place steel pipe concrete pile 1205, the concrete is placed and the foundation concrete slab 18 is formed. The foundation concrete slab 18 is formed such that the upper portions of the plurality of main bars 1902 are embedded, and the lower surface thereof is positioned lower than the upper surface of the pile head 1205A.
Then, by fixing the main bar 1902 of the cast-in-place steel pipe concrete pile 1205 directly to the foundation concrete slab 18 in this way, the pile head 1205A and the foundation concrete slab 18 are structurally connected, and the pile is generated by a horizontal force acting during an earthquake. It resists the shearing force, bending moment and pulling force generated in the head 1205A.
[0007]
Further, in the steel pipe pile (including SC pile) 1206 shown in FIG. 23B, the fixing bar 19 is attached to the outer periphery of the upper end of the steel pipe 1222 by welding or the like. The fixing bar 19 includes a plurality of main bars 1902 extending in the vertical direction at intervals in the circumferential direction of the steel pipe 1222.
After the steel pipe pile 1206 is driven into the ground, a reinforcing bar is placed on the steel pipe pile 1206, and then concrete is placed to form the foundation concrete slab 18. The foundation concrete slab 18 is formed such that the upper portions of the plurality of main bars 1902 are embedded and the lower surface thereof is positioned lower than the upper surface of the pile head portion 1206A.
Then, by fixing the main bar 1902 of the cast-in-place steel pipe concrete pile 1206 directly to the foundation concrete slab 18 in this way, the pile head 1206A and the foundation concrete slab 18 are structurally connected, and the pile is generated by the horizontal force acting during the earthquake. It resists the shearing force, bending moment and pulling force generated in the head 1206A.
[0008]
In addition, in the ready-made concrete pile 1207 shown in FIG. 24A, the reinforcing band 1232 is attached to the pile head 1207A, and the fixing bar 19 is attached to the outer periphery of the reinforcing band 1232 by welding. The fixing bar 19 includes a plurality of main bars 1902 extending in the vertical direction at intervals in the circumferential direction and protruding above the pile head 1207A.
Then, after the ready-made concrete pile 1207 is driven into the ground, a reinforcing bar is placed on the ready-made concrete pile 1207, and then the concrete is placed to form the foundation concrete slab 18. The foundation concrete slab 18 is formed such that the upper portions of the plurality of main bars 1902 are embedded, and the lower surface thereof is positioned lower than the upper surface of the pile head 1204A.
And by fixing the main reinforcement 1902 of the ready-made concrete pile 1207 directly to the foundation concrete slab 18 in this way, the pile head 1207A and the foundation concrete slab 18 are structurally connected, and the pile head is applied by the horizontal force acting at the time of the earthquake. Resists shearing force, bending moment, and pulling force generated at 1207A.
[0009]
Further, in the ready-made concrete pile 1208 shown in FIG. 24B, the end plate 1234 is attached to the pile head 1207A, and the fixing bar 19 is attached to the end plate 1234 by stud welding or screw connection. The fixing bar 19 includes a plurality of main bars 1902 that extend in the circumferential direction at an interval and protrude above the pile head 1208A. Then, after the ready-made concrete pile 1208 is driven into the ground, a reinforcing bar is placed on the ready-made concrete pile 1208, and then the concrete is placed to form the foundation concrete slab 18. The foundation concrete slab 18 is formed such that the upper portions of the plurality of main bars 1902 are embedded, and the lower surface thereof is positioned lower than the upper surface of the pile head portion 1208A.
Then, by fixing the main bar 1902 of the ready-made concrete pile 1208 directly to the foundation concrete slab 18, the pile head 1208A and the foundation concrete slab 18 are structurally connected, and the pile head is caused by the horizontal force acting at the time of the earthquake. It resists the shearing force, bending moment and pulling force generated in 1208A.
[0010]
[Problems to be solved by the invention]
However, as described above, when the pile main bars 16 and the anchor bars 19 of the piles 1201 to 1208 are directly fixed to the foundation concrete slab 18, the pile main bars 16 or the anchor bars 19 when a horizontal force is generated in the pile heads 1201A to 1208A. Therefore, the restraint conditions of the pile heads 1201A to 1208A are close to being fixed.
Therefore, when the horizontal force is large, a large bending moment acts on the pile heads 1201A to 1208A, and the pile heads 1201A to 1208A can withstand the large bending moment. It is necessary to increase the amount of bar arrangement.
Furthermore, the large bending moment is transmitted to the foundation beam, and it is necessary to set the bar arrangement amount so that the foundation beam can withstand it. Therefore, the bar arrangement amount of both the pile head and the foundation beam increases.
As a result, the surrounding area of the foundation concrete slab became a bar arrangement with pile main reinforcement or anchoring reinforcement and the foundation beam main reinforcement, making the arrangement work complicated and disadvantageous in terms of workability and economy.
The present invention has been devised in view of the above circumstances, and the object of the present invention is to provide a pile and a foundation concrete slab that can improve the workability and economy by simplifying the reinforcement of the pile head and foundation beams. It is to provide a joint structure.
[0011]
[Means for Solving the Problems]
In order to achieve the above object, the present invention is a structure in which a pile head of a pile to which reinforcing bars extending vertically are attached to a foundation concrete slab, wherein the reinforcing bars protrude upward from the pile head. The rebar part protruding upward from the pile head is embedded in the foundation concrete slab, and the rebar part embedded in the foundation concrete slab is along the longitudinal direction of the rebar while maintaining the non-fixed state with the concrete of the foundation concrete slab. A non-fixing part extending in the direction is provided, and a fixing part in which a reinforcing bar is fixed to the foundation concrete slab is provided at the end of the non-fixing part. When a horizontal force acts on the pile head, the reinforcing bars extend in the non-fixed portion, and the bending moment acting on the pile head is reduced. It is characterized by that.
Further, the present invention is characterized in that the lower end of the non-fixing portion is located on the upper end surface of the pile head.
Moreover, the present invention is characterized in that the fixing portion is located on the upper surface of the foundation concrete slab.
Further, the present invention is characterized in that the fixing portion is located in the foundation concrete slab.
In the present invention, the pile head includes concrete, the reinforcing bar is embedded in the concrete, and the portion where the reinforcing bar is embedded in the concrete is positioned near the upper end surface of the pile head, A non-fixing part extending along the longitudinal direction of the reinforcing bar is provided while maintaining a non-fixed state with the concrete, and the non-fixing part and the non-fixing part provided on the foundation concrete slab side are continuous. Features.
Further, the present invention is characterized in that the non-fixed portion is formed by embedding a cylindrical body in concrete and inserting the reinforcing bar into the cylindrical body. Further, the present invention is characterized in that the fixing portion is formed by attaching a fixing member to the reinforcing bar.
Further, the present invention is characterized in that the fixing portion is formed by the portion of the reinforcing bar so as to extend while maintaining a fixing state with the concrete in the basic concrete slab.
Moreover, this invention is a cast-in-place concrete pile in which the said pile has a pile main reinforcement, and the said reinforcing bar is the said pile main reinforcement.
Moreover, this invention is a cast-in-place steel pipe concrete pile in which the said pile has a fixing reinforcement, the said fixing reinforcement has the main reinforcement extended up and down, and the said reinforcing bar is the said main reinforcement.
Further, the present invention is characterized in that the pile is a steel pipe pile having a fixing bar, the fixing bar has a main bar extending vertically, and the reinforcing bar is the main bar.
Moreover, this invention is a ready-made concrete pile in which the said pile has a fixed reinforcement, the said fixed reinforcement has the main reinforcement extended up and down, and the said reinforcing bar is the said main reinforcement.
[0012]
According to the present invention, when a horizontal force acts on the pile head, the reinforcing bar extends in the non-fixed portion, and the extension of the reinforcing bar in the non-fixed portion loosens the restraint of the pile head.
That is, by providing the non-fixed portion, the fixing degree of the pile head is lowered, and the bending moment acting on the pile head is reduced.
Therefore, it is possible to reduce the amount of reinforcement of the pile head and the foundation beam and simplify the arrangement of the reinforcement around the foundation concrete slab.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
First, from the first embodiment, FIG. 1 shows a cross-sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to the first embodiment.
The reinforced concrete structure includes a foundation concrete slab 18 provided on a cast-in-place concrete pile 1201.
The pile head 1201A of the cast-in-place concrete pile 1201 is embedded in the bottom of the foundation concrete slab 18, and the upper end surface 1201B of the pile head 1201A of the cast-in-place concrete pile 1201 is located above the lower surface of the foundation concrete slab 18. .
The cast-in-place concrete pile 1201 has a plurality of pile main bars 16 extending vertically at intervals in the circumferential direction on the outer peripheral portion of the columnar concrete C, and these pile main bars 16 are more than the pile head 1201A. Projecting upwards, their upper ends are located on the upper surface of the foundation concrete slab 18.
[0014]
Cylindrical bodies 30 are respectively covered on portions where the plurality of pile main bars 16 extend through the foundation concrete slab 18. The lower end of each cylinder 30 is in contact with the upper end surface 1201B of the pile head 1201A, and the upper end of each cylinder 30 coincides with the upper surface of the foundation concrete slab 18. The cylindrical body 30 may be anything as long as the pile main reinforcement 16 can move in the longitudinal direction in the inside thereof. For example, a sheath tube or the like can be used.
Accordingly, the pile main reinforcement 16 is inserted through the inside of the cylindrical body 30 in the foundation concrete slab 18, and thereby, the concrete of the foundation concrete slab 18 and the non-fixed state (the pile principal reinforcement 16 and the concrete are not attached). The non-fixing part 32 extended along the longitudinal direction of the pile main reinforcement 16 is provided, maintaining a state). In the present embodiment, the non-fixed portion 32 is provided from the upper end surface 1201B of the pile head 1201A to the upper surface of the foundation concrete slab 18, in other words, in all the portions where the pile main reinforcement 16 extends in the foundation concrete slab 18. A non-fixing portion 32 is provided.
[0015]
Further, a fixing hardware 34 is attached to the upper ends of the plurality of pile main bars 16 positioned on the upper surface of the foundation concrete slab 18, and the fixing metal 34 fixes the upper ends of the pile main bars 16 to the upper surface of the foundation concrete slab 18. A portion 36 is provided, and in this embodiment, the fixing portion 36 is located on the upper surface of the foundation concrete slab 18. The fixing hardware 34 only needs to be capable of fixing the upper end of the pile main reinforcement 16 to the upper surface of the foundation concrete slab 18, and for example, a nut or the like can be used.
The state in which the upper end of the pile main reinforcement 16 is fixed to the upper surface of the foundation concrete slab 18 is a state in which the upper end of the pile reinforcement 16 is integrally connected to the upper surface of the foundation concrete slab 18, or A state in which the upper end is prevented from being displaced below the upper surface of the foundation concrete slab 18.
[0016]
For the joining of the pile and the foundation concrete slab as described above, the cast-in-place concrete pile 1201 is constructed in the same manner as before, and then the pile main bar 16 protruding from the upper end surface 1201B of the pile head 1201A is covered with the cylinder 30 and then After placing the reinforcing bar on the pile head 1201A and placing concrete to construct the foundation concrete slab 18, and hardening the concrete, the fixing hardware is attached to the upper end of the pile reinforcement 16 protruding on the upper surface of the foundation concrete slab 18. This is done by attaching 34.
[0017]
According to the present embodiment, when a horizontal force acts on the pile head 1201A during an earthquake, a substantially uniform tensile stress is generated in the pile main reinforcement 16 in the non-fixing portion 32, and the pile main reinforcement 16 extends in the non-fixing portion 32. .
And the extension amount of this pile main reinforcement 16 is large compared with the case where there exists adhesion with concrete. Since the extension of the pile main bars 16 in the non-fixed portion 32 causes the pile head 1201A to rotate, increasing the amount of extension of the pile main bars 16 by providing the non-fixed portion 32 loosens the restraint of the pile head 1201A. become.
That is, by providing the non-fixing portion 32, the fixing degree of the pile head 1201A is lowered, and the bending moment acting on the pile head 1201A is reduced compared to the conventional method for the same horizontal force.
Therefore, the amount of reinforcement of the pile head 1201A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0018]
Next, a second embodiment will be described.
FIG. 2: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 2nd Embodiment.
In the second embodiment, the configurations of the non-fixing unit 32 and the fixing unit 36 are different from those of the first embodiment.
That is, a plurality of pile main bars 16 protrude from the upper end surface 1201B of the pile head 1201A, and the cylinders 30 are respectively covered on portions where the pile main bars 16 extend through the foundation concrete slab 18. The lower end of each cylinder 30 is in contact with the upper end surface 1201B of the pile head 1201A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18.
Therefore, the pile main reinforcement 16 has a portion that passes through the inside of the cylindrical body 30 in the foundation concrete slab 18, and thereby the pile reinforcement 16 has a longitudinal direction of the pile reinforcement 16 while keeping the concrete of the foundation concrete slab 18 in an unfixed state. A non-fixing portion 32 extending along the direction is provided.
[0019]
In addition, a fixing hardware 34 is attached to the upper ends of the plurality of pile main bars 16 located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18, and the upper ends of the pile main bars 16 are fixed in the foundation concrete slab 18 by the fixing hardware 34. A fixing unit 36 fixed to the head is provided.
For the joining of the pile and the foundation concrete slab, the cast-in-place concrete pile 1201 is constructed in the same manner as before, and then the pile main bar 16 protruding from the upper end surface 1201B of the pile head 1201A is covered with the tubular body 30, The fixing hardware 34 is attached to the upper end of the pile main reinforcing bar 16 protruding from the body 30, and then the foundation concrete slab 18 is constructed by arranging reinforcing bars and placing concrete on the pile head 1201A.
Also according to the second embodiment, when a horizontal force is applied to the pile head 1201A during an earthquake, a substantially uniform tensile stress is generated in the pile main reinforcement 16 in the non-fixed portion 32, and the pile main reinforcement 16 is in the non-fixed portion 32. Elongation and the restraint of the pile head 1201A are loosened. Thereby, the bending moment which acts on the pile head 1201A can be reduced, the amount of reinforcement of the pile head 1201A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0020]
Next, a third embodiment will be described.
FIG. 3: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 3rd Embodiment.
In the third embodiment, the configuration of the fixing unit 36 is different from that of the second embodiment.
That is, a plurality of pile main bars 16 protrude from the upper end surface 1201B of the pile head 1201A, and the cylinders 30 are respectively covered on substantially lower half portions of the pile main bars 16 extending through the foundation concrete slab 18. Yes. The lower end of each cylinder 30 is in contact with the upper end surface 1201B of the pile head 1201A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 in the middle portion of the foundation concrete slab 18 in the thickness direction.
Therefore, the pile main reinforcement 16 has a portion that passes through the inside of the cylindrical body 30 in the foundation concrete slab 18, and thereby the pile reinforcement 16 has a longitudinal direction of the pile reinforcement 16 while keeping the concrete of the foundation concrete slab 18 in an unfixed state. A non-fixing portion 32 extending along the direction is provided.
[0021]
The upper half of the portion where the pile main reinforcement 16 extends through the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends through the foundation concrete slab 18. Attached to the foundation concrete slab 18. That is, the fixing part 36 fixed in the foundation concrete slab 18 is provided by the substantially upper half part of the part where the pile main reinforcement 16 extends in the foundation concrete slab 18.
The above-mentioned pile and the foundation concrete slab are joined to the cylindrical body in the lower half of the pile main bar 16 protruding from the upper end surface 1201B of the pile head 1201A after constructing the cast-in-place concrete pile 1201 as in the past. 30, with the upper half of the pile main reinforcement 16 protruding from the upper end surface 1201B of the pile head 1201A exposed from the upper end of the cylinder 30, a reinforcing bar is arranged on the pile head 1201A, and the concrete is This is done by placing and constructing the foundation concrete slab 18.
Also according to the second embodiment, when a horizontal force is applied to the pile head 1201A during an earthquake, a substantially uniform tensile stress is generated in the pile main reinforcement 16 in the non-fixed portion 32, and the pile main reinforcement 16 is in the non-fixed portion 32. Elongation and the restraint of the pile head 1201A are loosened. Thereby, the bending moment which acts on the pile head 1201A can be reduced, the amount of reinforcement of the pile head 1201A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0022]
Next, a fourth embodiment will be described.
FIG. 4: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 4th Embodiment.
In the fourth embodiment, the configuration of the fixing unit 36 is different from that of the third embodiment.
That is, a plurality of pile main bars 16 protrude from the upper end surface 1201B of the pile head 1201A, and the cylindrical bodies 30 are respectively covered on portions other than the upper parts of the pile main bars 16 extending through the foundation concrete slab 18. ing. The lower end of each cylinder 30 is in contact with the upper end surface 1201B of the pile head 1201A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 in the middle portion of the foundation concrete slab 18 in the thickness direction.
Therefore, the pile main reinforcement 16 has a portion that passes through the inside of the cylindrical body 30 in the foundation concrete slab 18, and thereby the pile reinforcement 16 has a longitudinal direction of the pile reinforcement 16 while keeping the concrete of the foundation concrete slab 18 in an unfixed state. A non-fixing portion 32 extending along the direction is provided.
[0023]
Moreover, the upper part of the part where the pile main reinforcement 16 extends in the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends in the foundation concrete slab 18, and the fixing hardware 34 is attached to the upper end. Yes. That is, the upper portion of the pile main bar 16 exposed from the upper end of the cylindrical body 30 adheres to the concrete of the foundation concrete slab 18, and the fixing hardware 34 is embedded and fixed in the concrete of the foundation concrete slab 18. A fixing portion 36 in which the upper end of the pile main reinforcing bar 16 is fixed in the foundation concrete slab 18 by the pile main reinforcing bar 16 exposed from the upper end of 30 and the fixing hardware 34 is provided.
For the joining of the pile and the foundation concrete slab as described above, after the cast-in-place concrete pile 1201 is constructed as in the conventional case, the pile main bar 16 protruding from the upper end surface 1201B of the pile head 1201A is covered with the tubular body 30, and The fixing metal 34 is attached to the upper end of the cylinder 30 exposed from the upper part of the pile main bar 16, and then a reinforcing bar is placed on the pile head 1201A, and concrete is placed to form a foundation concrete slab. It is done by constructing 18.
Also according to the fourth embodiment, when a horizontal force acts on the pile head 1201A during an earthquake, a substantially uniform tensile stress is generated in the pile main reinforcement 16 in the non-fixed portion 32, and the pile main reinforcement 16 is Elongation and the restraint of the pile head 1201A are loosened. Thereby, the bending moment which acts on the pile head 1201A can be reduced, the amount of reinforcement of the pile head 1201A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0024]
Next, a fifth embodiment will be described.
FIG. 5: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 5th Embodiment.
In the fifth embodiment, the configuration of the non-fixing portion 32 is different from that of the first embodiment. That is, a plurality of pile main bars 16 protrude from the upper end surface 1201B of the pile head 1201A, and the cylinder extends over a part where these pile main bars 16 extend in the foundation concrete slab 18 from a part extending in the pile head 1201A. 30 is covered. The lower end of each cylinder 30 is located in the pile head 1201 </ b> A, and the upper end of each cylinder 30 is located on the upper surface of the foundation concrete slab 18.
Therefore, the pile main bar 16 has a portion that penetrates the inside of the cylinder 30 in the pile head 1201A and the foundation concrete slab 18, and thereby the pile main bar 16 maintains a non-fixed state with the concrete of the foundation concrete slab 18. A non-fixing portion 32 extending along the longitudinal direction of the pile main reinforcement 16 is provided.
[0025]
In addition, a fixing hardware 34 is attached to the upper end of the pile main reinforcement 16 located on the upper surface of the foundation concrete slab 18, and a fixing portion 36 in which the upper end of the pile main reinforcement 16 is fixed in the foundation concrete slab 18 by the fixing hardware 34 is provided. It has been.
The above-mentioned pile and the foundation concrete slab are joined at the time of construction of the cast-in-place concrete pile 1201 by placing the tubular body 30 on the pile main reinforcement 16 and then casting the concrete to obtain the cast-in-place concrete pile 1201. Reinforcing bars are placed on the pile head 1201A, concrete is laid and the foundation concrete slab 18 is constructed. After the concrete has hardened, the fixing hardware 34 is attached to the upper end of the pile main reinforcement 16 protruding on the upper surface of the foundation concrete slab 18. It is done by attaching.
Also according to the fifth embodiment, when a horizontal force acts on the pile head 1201A during an earthquake, a substantially uniform tensile stress is generated in the pile main reinforcement 16 in the non-fixed portion 32, and the pile main reinforcement 16 is Elongation and the restraint of the pile head 1201A are loosened. Thereby, the bending moment which acts on the pile head 1201A can be reduced, the amount of reinforcement of the pile head 1201A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0026]
Next, a sixth embodiment will be described.
FIG. 6: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab based on 6th Embodiment.
The sixth embodiment is different from the second embodiment in the configuration of the non-fixing portion 32. That is, a plurality of pile main bars 16 protrude from the upper end surface 1201B of the pile head 1201A, and the cylinder extends over a part where these pile main bars 16 extend in the foundation concrete slab 18 from a part extending in the pile head 1201A. 30 is covered. The lower end of each cylinder 30 is located in the pile head 1201 </ b> A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18. Therefore, the pile main reinforcement 16 is inserted into the inside of the cylindrical body 30 in the pile head 1201A and the foundation concrete slab 18, and thereby the pile principal reinforcement 16 is kept in a non-fixed state with the concrete of the foundation concrete slab 18. A non-fixing portion 32 extending along the longitudinal direction is provided.
[0027]
In addition, a fixing hardware 34 is attached to the upper ends of the plurality of pile main bars 16 located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18, and the upper ends of the pile main bars 16 are fixed in the foundation concrete slab 18 by the fixing hardware 34. A fixing unit 36 fixed to the head is provided.
The above-mentioned pile and the foundation concrete slab are joined at the time of construction of the cast-in-place concrete pile 1201 by placing the tubular body 30 on the pile main reinforcement 16 and then casting the concrete to obtain the cast-in-place concrete pile 1201. The fixing hardware 34 is attached to the upper end of the pile main bar 16 protruding from the cylindrical body 30, and then the foundation concrete slab 18 is constructed by placing reinforcing bars and placing concrete on the pile head 1201A. The
Also according to the sixth embodiment, when a horizontal force acts on the pile head 1201A during an earthquake, a substantially uniform tensile stress is generated in the pile main bar 16 in the non-fixed portion 32, and the pile main bar 16 is in the non-fixed portion 32. Elongation and the restraint of the pile head 1201A are loosened. Thereby, the bending moment which acts on the pile head 1201A can be reduced, the amount of reinforcement of the pile head 1201A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0028]
Next, a seventh embodiment will be described.
FIG. 7: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 7th Embodiment.
In the seventh embodiment, the configuration of the non-fixing portion 32 is different from that of the third embodiment. That is, a plurality of pile main bars 16 protrude from the upper end surface 1201B of the pile head 1201A, and the pile main bars 16 extend through the foundation concrete slab 18 from a portion where these pile main bars 16 extend through the pile head 1201A. The cylindrical bodies 30 are respectively covered over substantially the lower half of the portion. The lower end of each cylinder 30 is located in the pile head 1201 </ b> A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18.
Therefore, the pile main bar 16 has a portion that penetrates the inside of the cylinder 30 in the pile head 1201A and the foundation concrete slab 18, and thereby the pile main bar 16 maintains a non-fixed state with the concrete of the foundation concrete slab 18. A non-fixing portion 32 extending along the longitudinal direction of the pile main reinforcement 16 is provided.
[0029]
The upper half of the portion where the pile main reinforcement 16 extends through the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends through the foundation concrete slab 18. Attached to the foundation concrete slab 18. That is, the fixing part 36 fixed in the foundation concrete slab 18 is provided by the substantially upper half part of the part where the pile main reinforcement 16 extends in the foundation concrete slab 18.
The above-mentioned pile and the foundation concrete slab are joined at the time of construction of the cast-in-place concrete pile 1201 by placing the tubular body 30 on the pile main reinforcement 16 and then casting the concrete to obtain the cast-in-place concrete pile 1201. In the state where the upper part of the pile main reinforcing bar 16 is exposed from the cylindrical body 30, a reinforcing bar is arranged on the pile head 1201A, concrete is placed, and the foundation concrete slab 18 is constructed.
Also according to the seventh embodiment, when a horizontal force acts on the pile head 1201A during an earthquake, a substantially uniform tensile stress is generated in the pile main reinforcement 16 in the non-fixed portion 32, and the pile main reinforcement 16 is Elongation and the restraint of the pile head 1201A are loosened. Thereby, the bending moment which acts on the pile head 1201A can be reduced, the amount of reinforcement of the pile head 1201A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0030]
Next, an eighth embodiment will be described.
FIG. 8: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 8th Embodiment.
The eighth embodiment is different from the fourth embodiment in the configuration of the non-fixing portion 32. That is, a plurality of pile main bars 16 protrude from the upper end surface 1201B of the pile head 1201A, and the upper part of the part in which the pile main bars 16 extend in the foundation concrete slab 18 from the part in which the pile head 1201A extends. Each of the removed portions is covered with a cylindrical body 30. The lower end of each cylinder 30 is located in the pile head 1201 </ b> A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18.
Therefore, the pile main bar 16 has a portion that penetrates the inside of the cylinder 30 in the pile head 1201A and the foundation concrete slab 18, and thereby the pile main bar 16 maintains a non-fixed state with the concrete of the foundation concrete slab 18. A non-fixing portion 32 extending along the longitudinal direction of the pile main reinforcement 16 is provided.
[0031]
Moreover, the upper part of the part where the pile main reinforcement 16 extends in the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends in the foundation concrete slab 18, and the fixing hardware 34 is attached to the upper end. Yes. That is, the upper portion of the pile main bar 16 exposed from the upper end of the cylindrical body 30 adheres to the concrete of the foundation concrete slab 18, and the fixing hardware 34 is embedded and fixed in the concrete of the foundation concrete slab 18. A fixing portion 36 in which the upper end of the pile main reinforcing bar 16 is fixed in the foundation concrete slab 18 by the pile main reinforcing bar 16 exposed from the upper end of 30 and the fixing hardware 34 is provided.
The above-mentioned pile and the foundation concrete slab are joined at the time of construction of the cast-in-place concrete pile 1201 by placing the tubular body 30 on the pile main reinforcement 16 and then casting the concrete to obtain the cast-in-place concrete pile 1201. In the state exposed from the upper part of the pile main reinforcement 16 from the cylindrical body 30, the fixing hardware 34 is attached to the upper end thereof, and then a reinforcing bar is arranged on the pile head 1201A, concrete is placed, and the foundation concrete slab 18 is placed. It is made by constructing.
Also according to the eighth embodiment, when a horizontal force acts on the pile head 1201A during an earthquake, a substantially uniform tensile stress is generated in the pile main bar 16 in the non-fixed portion 32, and the pile main bar 16 is Elongation and the restraint of the pile head 1201A are loosened. Thereby, the bending moment which acts on the pile head 1201A can be reduced, the amount of reinforcement of the pile head 1201A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0032]
Next, a ninth embodiment will be described.
FIG. 9: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 9th Embodiment.
The ninth embodiment is different from the first to eighth embodiments in that the pile is a cast-in-place steel pipe concrete pile 1202 and the present invention is applied to the joining of the anchor reinforcement 19 and the foundation concrete slab 18. ing.
The pile head 1202A of the cast-in-place steel pipe concrete pile 1202 is embedded in the bottom of the foundation concrete slab 18, and the upper end surface 1202B of the pile head 1202A of the cast-in-place steel pipe concrete pile 1202 is located above the lower surface of the foundation concrete slab 18. ing.
And in the cast-in-place steel pipe concrete pile 1202, the lower part is embed | buried and fixed to the inside of the steel pipe 1222, and the fixed reinforcement 19 is arranged. The fixing bar 19 includes a plurality of main bars 1902 extending vertically at intervals in the circumferential direction inside the steel pipe 1222 and a reinforcing bar 1904 connecting the plurality of main bars 1902. The upper parts of the plurality of main bars 1902 protrude above the pile head 1202A, and the upper ends thereof are located on the upper surface of the foundation concrete slab 18.
[0033]
The cylindrical bodies 30 are respectively covered on portions where the plurality of main bars 1902 extend through the foundation concrete slab 18. The lower end of each cylinder 30 is in contact with the upper end surface 1202B of the pile head 1202A, and the upper end of each cylinder 30 coincides with the upper surface of the foundation concrete slab 18. The cylindrical body 30 only needs to be capable of moving the main bar 1902 in the longitudinal direction inside thereof, and a sheath tube or the like can be used as in the first to eighth embodiments.
Therefore, the main reinforcing bar 1902 passes through the inside of the cylindrical body 30 in the basic concrete slab 18, and thereby extends along the longitudinal direction of the main reinforcing bar 1902 while keeping the main reinforcing bar 1902 in a non-fixed state with the concrete of the basic concrete slab 18. A non-fixing portion 32 is provided. In the present embodiment, the non-fixing portion 32 is provided from the upper end surface 1202B of the pile head portion 1202A to the upper surface of the foundation concrete slab 18, in other words, the non-fixing portion 32 is not attached to all portions where the main bars 1902 extend in the foundation concrete slab 18. A fixing unit 32 is provided.
Further, a fixing metal 34 is attached to the upper ends of the plurality of main bars 1902 located on the upper surface of the foundation concrete slab 18, and the fixing portion 36 where the upper ends of the main bars 1902 are fixed to the upper surface of the foundation concrete slab 18 by the fixing metal 34. In the present embodiment, the fixing portion 36 is located on the upper surface of the foundation concrete slab 18. The fixing hardware 34 only needs to be capable of fixing the upper end of the main bar 1902 to the upper surface of the foundation concrete slab 18, and a nut or the like can be used as in the first to eighth embodiments.
[0034]
For the joining of the pile and the foundation concrete slab as described above, after the cast-in-place steel pipe concrete pile 1202 is constructed as before, the main body 1902 protruding from the upper end surface 1202B of the pile head 1202A is covered with the cylindrical body 30, and thereafter Then, reinforcing bars are placed on the pile head 1202A, concrete is laid and the foundation concrete slab 18 is constructed, and after the concrete is hardened, the fixing hardware 34 is placed on the upper end of the main reinforcement 1902 protruding on the upper surface of the foundation concrete slab 18. It is done by attaching.
According to the present embodiment, when a horizontal force acts on the pile head 1202 </ b> A during an earthquake, a substantially uniform tensile stress is generated in the main reinforcing bar 1902 in the non-fixing portion 32, and the main reinforcing bar 1902 extends in the non-fixing portion 32.
And the extension amount of this main reinforcement 1902 is large compared with the case where there exists adhesion with concrete. Since the extension of the main reinforcing bar 1902 in the non-fixing portion 32 causes the pile head 1202A to rotate, providing the non-fixing portion 32 to increase the extension amount of the main reinforcing bar 1902 loosens the restraint of the pile head 1202A. .
That is, by providing the non-fixing portion 32, the fixing degree of the pile head 1202A is reduced, and the bending moment acting on the pile head 1202A is reduced with respect to the same horizontal force as compared with the conventional construction method.
Therefore, the amount of reinforcement of the pile head 1202A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0035]
Next, a tenth embodiment will be described.
FIG. 10: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 10th Embodiment.
In the tenth embodiment, the configurations of the non-fixing part 32 and the fixing part 36 are different from those of the tenth embodiment.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1202B of the pile head part 1202A, and the cylinders 30 are respectively covered on portions where these main bars 1902 extend through the foundation concrete slab 18. The lower end of each cylinder 30 is in contact with the upper end surface 1202B of the pile head 1202A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18.
Accordingly, the main reinforcing bar 1902 has a portion that passes through the inside of the cylindrical body 30 in the foundation concrete slab 18, whereby the main reinforcing bar 1902 is kept along the longitudinal direction of the main reinforcing bar 1902 while maintaining a non-fixed state with the concrete of the basic concrete slab 18. A non-fixing portion 32 is provided.
[0036]
In addition, a fixing metal 34 is attached to the upper ends of a plurality of main bars 1902 located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18, and the upper ends of the main bars 1902 are fixed in the basic concrete slab 18 by the fixing metal 34. A fixed fixing unit 36 is provided.
For the joining of the pile and the foundation concrete slab as described above, after the cast-in-place steel pipe concrete pile 1202 is constructed as in the conventional case, the main body 1902 protruding from the upper end surface 1202B of the pile head 1202A is covered with the tubular body 30, The fixing hardware 34 is attached to the upper end of the main reinforcing bar 1902 protruding from the body 30, and then the foundation concrete slab 18 is constructed by arranging reinforcing bars and placing concrete on the pile head 1202A.
Also according to the tenth embodiment, when a horizontal force acts on the pile head 1202A during an earthquake, a substantially uniform tensile stress is generated in the main bar 1902 in the non-fixed part 32, and the main bar 1902 extends in the non-fixed part 32. The restraint of the pile head 1202A is loosened. Thereby, the bending moment which acts on the pile head 1202A can be reduced, the amount of reinforcement of the pile head 1202A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0037]
Next, an eleventh embodiment will be described.
FIG. 11: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 11th Embodiment.
In the eleventh embodiment, the configuration of the fixing unit 36 is different from that of the tenth embodiment.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1202B of the pile head part 1202A, and the cylinders 30 are respectively covered on substantially lower half portions of the main bars 1902 extending through the foundation concrete slab 18. It has been. The lower end of each cylinder 30 is in contact with the upper end surface 1202B of the pile head 1202A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 in the middle portion of the foundation concrete slab 18 in the thickness direction.
Accordingly, the main reinforcing bar 1902 has a portion that passes through the inside of the cylindrical body 30 in the foundation concrete slab 18, whereby the main reinforcing bar 1902 is kept along the longitudinal direction of the main reinforcing bar 1902 while maintaining a non-fixed state with the concrete of the basic concrete slab 18. A non-fixing portion 32 is provided.
[0038]
The upper half of the portion where the main reinforcement 1902 extends through the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends through the foundation concrete slab 18. It adheres and is fixed to the foundation concrete slab 18. That is, the fixing portion 36 fixed in the foundation concrete slab 18 is provided by the substantially upper half of the portion where the main reinforcement 1902 extends in the foundation concrete slab 18.
The above-mentioned pile and the foundation concrete slab are joined to the cylindrical body in the lower half of the main bar 1902 projecting from the upper end surface 1202B of the pile head 1202A after constructing the cast-in-place steel pipe concrete pile 1202 as in the prior art. 30 with the upper half of the main bar 1902 protruding from the upper end surface 1202B of the pile head part 1202A exposed from the upper end of the cylinder 30, a reinforcing bar is placed on the pile head part 1202A, and concrete is struck. This is done by installing and constructing the foundation concrete slab 18.
Also according to the eleventh embodiment, when a horizontal force acts on the pile head 1202A at the time of an earthquake, a substantially uniform tensile stress is generated in the main bar 1902 in the non-fixed part 32, and the main bar 1902 extends in the non-fixed part 32, The restraint of the pile head 1202A is loosened. Thereby, the bending moment which acts on the pile head 1202A can be reduced, the amount of reinforcement of the pile head 1202A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0039]
Next, a twelfth embodiment will be described.
FIG. 12: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 12th Embodiment.
In the twelfth embodiment, the configuration of the fixing unit 36 is different from that of the eleventh embodiment.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1202B of the pile head part 1202A, and the cylinders 30 are respectively formed in portions other than the upper part of the main bar 1902 extending through the foundation concrete slab 18. It is covered. The lower end of each cylinder 30 is in contact with the upper end surface 1202B of the pile head 1202A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 in the middle portion of the foundation concrete slab 18 in the thickness direction.
Accordingly, the main reinforcing bar 1902 has a portion that passes through the inside of the cylindrical body 30 in the foundation concrete slab 18, whereby the main reinforcing bar 1902 is kept along the longitudinal direction of the main reinforcing bar 1902 while maintaining a non-fixed state with the concrete of the basic concrete slab 18. A non-fixing portion 32 is provided.
[0040]
Further, the upper part of the portion where the main reinforcing bar 1902 extends through the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends through the foundation concrete slab 18, and the fixing hardware 34 is attached to the upper end thereof. . That is, the upper part of the main bar 1902 exposed from the upper end of the cylindrical body 30 adheres to the concrete of the foundation concrete slab 18, and the fixing hardware 34 is embedded and fixed in the concrete of the foundation concrete slab 18. A fixing portion 36 in which the upper end of the main reinforcing bar 1902 is fixed in the foundation concrete slab 18 by the main reinforcing bar 1902 portion exposed from the upper end of the steel plate and the fixing hardware 34 is provided.
For the joining of the pile and the foundation concrete slab as described above, after the cast-in-place steel pipe concrete pile 1202 is constructed as in the past, the main body 1902 protruding from the upper end surface 1202B of the pile head 1202A is covered with the cylindrical body 30, The fixing metal 34 is attached to the upper end of the cylindrical body 30 exposed from the upper part of the main reinforcing bar 1902, and then a reinforcing bar is arranged on the pile head 1202A, and concrete is laid and the foundation concrete slab 18 is placed. It is made by constructing.
Also according to the twelfth embodiment, when a horizontal force acts on the pile head 1202A during an earthquake, a substantially uniform tensile stress is generated in the main reinforcing bar 1902 in the non-fixing portion 32, and the main reinforcing bar 19026 extends in the non-fixing portion 32. The restraint of the pile head 1202A is loosened. Thereby, the bending moment which acts on the pile head 1202A can be reduced, the amount of reinforcement of the pile head 1202A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0041]
Next, a thirteenth embodiment will be described.
FIG. 13: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 13th Embodiment.
In the thirteenth embodiment, the configuration of the non-fixing portion 32 is different from that of the ninth embodiment.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1202 of the pile head part 1202A, and these main bars 1902 extend from a part extending through the pile head part 1202A to a part extending through the foundation concrete slab 18. A cylindrical body 30 is covered. The lower end of each cylinder 30 is located in the pile head 1202 </ b> A, and the upper end of each cylinder 30 is located on the upper surface of the foundation concrete slab 18.
Therefore, the main reinforcement 1902 has a portion that passes through the inside of the cylinder 30 in the pile head 1202A and the foundation concrete slab 18, and thereby the main reinforcement 1902 keeps the main reinforcement 1902 in an unfixed state with the concrete of the foundation concrete slab 18. A non-fixing portion 32 extending along the longitudinal direction is provided.
[0042]
Further, a fixing metal member 34 is attached to the upper end of the main bar 1902 located on the upper surface of the foundation concrete slab 18, and a fixing part 36 in which the upper end of the main bar 1902 is fixed in the foundation concrete slab 18 by the fixing metal member 34 is provided. Yes.
When the cast-in-place steel pipe concrete pile 1202 is constructed, the above-mentioned pile and the foundation concrete slab are joined by placing the tubular body 30 on the main bar 1902 of the anchor bar 19 and then placing the concrete into the cast-in-place steel pipe concrete pile 1202. After that, reinforcing bars are placed on the pile head 1202A, concrete is placed to construct the foundation concrete slab 18, and after the concrete hardens, the upper ends of the main bars 1902 projecting on the upper surface of the foundation concrete slab 18 are obtained. This is done by attaching the fixing hardware 34 to the head.
Also according to the thirteenth embodiment, when a horizontal force acts on the pile head 1202A during an earthquake, a substantially uniform tensile stress is generated in the main bar 1902 in the non-fixing part 32, and the main bar 1902 extends in the non-fixing part 32, The restraint of the pile head 1202A is loosened. Thereby, the bending moment which acts on the pile head 1202A can be reduced, the amount of reinforcement of the pile head 1202A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0043]
Next, a fourteenth embodiment will be described.
FIG. 14: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 14th Embodiment.
The fourteenth embodiment is different from the tenth embodiment in the configuration of the non-fixing portion 32.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1202B of the pile head part 1202A, and these main bars 1902 extend from a part extending through the pile head part 1202A to a part extending through the foundation concrete slab 18. A cylindrical body 30 is covered. The lower end of each cylinder 30 is located in the pile head 1202 </ b> A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18.
Therefore, the main reinforcement 1902 is inserted into the cylinder 30 in the pile head 1202A and the foundation concrete slab 18, and thereby the main reinforcement 1902 is maintained in the longitudinal direction of the main reinforcement 1902 while maintaining a non-fixed state with the concrete of the foundation concrete slab 18. A non-fixing portion 32 extending along the line is provided.
[0044]
In addition, a fixing metal 34 is attached to the upper ends of a plurality of main bars 1902 located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18, and the upper ends of the main bars 1902 are fixed in the basic concrete slab 18 by the fixing metal 34. A fixed fixing unit 36 is provided.
Joining the pile and the foundation concrete slab as described above is performed by placing the cylindrical body 30 on the main bar 1902 and placing the concrete after the cast-in-place steel pipe concrete pile 1202 is constructed. The fixing hardware 34 is attached to the upper end of the main reinforcing bar 1902 protruding from the cylindrical body 30, and then a reinforcing bar is placed on the pile head 1202 </ b> A and concrete is placed to construct the foundation concrete slab 18. .
Also according to the fourteenth embodiment, when a horizontal force acts on the pile head 1202A during an earthquake, a substantially uniform tensile stress is generated in the main reinforcement 1902 in the non-fixing portion 32, and the main reinforcement 1902 extends in the non-fixing portion 32. The restraint of the pile head 1202A is loosened. Thereby, the bending moment which acts on the pile head 1202A can be reduced, the amount of reinforcement of the pile head 1202A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0045]
Next, a fifteenth embodiment is described.
FIG. 15: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 15th Embodiment.
The fifteenth embodiment differs from the eleventh embodiment in the configuration of the non-fixing portion 32.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1202B of the pile head part 1202A, and the main bar 1902 extends through the foundation concrete slab 18 from a part where these main bars 1902 extend through the pile head part 1202A. The cylindrical body 30 is covered over the lower part of the part to be performed. The lower end of each cylinder 30 is located in the pile head 1202 </ b> A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18.
Therefore, the main reinforcement 1902 has a portion that passes through the inside of the cylinder 30 in the pile head 1202A and the foundation concrete slab 18, and thereby the main reinforcement 1902 keeps the main reinforcement 1902 in an unfixed state with the concrete of the foundation concrete slab 18. A non-fixing portion 32 extending along the longitudinal direction is provided.
[0046]
Further, the upper part of the portion where the main reinforcement 1902 extends through the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends through the foundation concrete slab 18, and adheres to the concrete of the foundation concrete slab 18, Established on the foundation concrete slab 18. That is, the fixing part 36 fixed in the foundation concrete slab 18 is provided by the upper part of the part where the main reinforcement 1902 extends in the foundation concrete slab 18.
Joining the pile and the foundation concrete slab as described above is performed by placing the cylindrical body 30 on the main bar 1902 and placing the concrete after the cast-in-place steel pipe concrete pile 1202 is constructed. In the state where the upper part of the main reinforcement 1902 is exposed from the cylindrical body 30, reinforcing bars are placed on the pile head 1201 </ b> A, concrete is placed, and the foundation concrete slab 18 is constructed.
Also according to the fifteenth embodiment, when a horizontal force acts on the pile head 1202A during an earthquake, a substantially uniform tensile stress is generated in the main bar 1902 in the non-fixed part 32, and the main bar 1902 extends in the non-fixed part 32, The restraint of the pile head 1202A is loosened. Thereby, the bending moment which acts on the pile head 1202A can be reduced, the amount of reinforcement of the pile head 1202A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0047]
Next, a sixteenth embodiment will be described.
FIG. 16: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab based on 16th Embodiment.
The sixteenth embodiment differs from the twelfth embodiment in the configuration of the non-fixing portion 32.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1202B of the pile head part 1202A, and a part of the main bar 1902 that extends in the foundation concrete slab 18 from a part that extends in the pile head part 1202A. The cylindrical bodies 30 are respectively covered on the portions excluding the upper part. The lower end of each cylinder 30 is located in the pile head 1201 </ b> A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18.
Therefore, the main reinforcement 1902 has a portion that passes through the inside of the cylinder 30 in the pile head 1202A and the foundation concrete slab 18, and thereby the main reinforcement 1902 keeps the main reinforcement 1902 in an unfixed state with the concrete of the foundation concrete slab 18. A non-fixing portion 32 extending along the longitudinal direction is provided.
[0048]
Further, the upper part of the portion where the main reinforcing bar 1902 extends through the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends through the foundation concrete slab 18, and the fixing hardware 34 is attached to the upper end thereof. . That is, the upper part of the main bar 1902 exposed from the upper end of the cylindrical body 30 adheres to the concrete of the foundation concrete slab 18, and the fixing hardware 34 is embedded and fixed in the concrete of the foundation concrete slab 18. A fixing portion 36 in which the upper end of the main reinforcing bar 1902 is fixed in the foundation concrete slab 18 by the main reinforcing bar 1902 portion exposed from the upper end of the steel plate and the fixing hardware 34 is provided.
In the construction of the cast-in-place steel pipe concrete pile 1202, the above-mentioned pile and the foundation concrete slab are joined by placing the cylindrical body 30 on the main bar 1902 and then casting the concrete to obtain the cast-in-place steel pipe concrete pile 1202. In the state where the upper part of the main bar 1902 is exposed from the cylindrical body 30, the fixing hardware 34 is attached to the upper end thereof, and then a reinforcing bar is arranged on the pile head 1202A, and concrete is laid and the foundation concrete slab 18 is placed. It is made by constructing.
Also according to the sixteenth embodiment, when a horizontal force acts on the pile head 1202A at the time of an earthquake, a substantially uniform tensile stress is generated in the main bar 1902 in the non-fixed part 32, and the main bar 1902 extends in the non-fixed part 32, The restraint of the pile head 1202A is loosened. Thereby, the bending moment which acts on the pile head 1202A can be reduced, the amount of reinforcement of the pile head 1202A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0049]
Next, a seventeenth embodiment will be described.
FIG. 17: shows the cross-sectional front view of the junction part of the steel pipe pile (including steel pipe winding ready-made concrete pile etc.) and the foundation concrete slab which concern on 17th Embodiment.
The seventeenth embodiment differs from the first to sixteenth embodiments in that the pile is a steel pipe pile 1206 and that the present invention is applied to the joining of the anchoring bar 19 and the foundation concrete slab 18.
The pile head 1206A of the steel pipe pile 1206 is embedded in the bottom of the foundation concrete slab 18, and the upper end surface 1206B of the pile head 1206A of the steel pipe pile 1206 is located above the lower surface of the foundation concrete slab 18.
In the steel pipe pile 1206, the fixing bar 19 is attached to the outer periphery of the upper end of the steel pipe 1222 by welding or the like. The fixing bar 19 includes a plurality of main bars 1902 extending vertically with a space in the circumferential direction of the steel pipe 1222, and the plurality of main bars 1902 protrude above the pile head 1206A, and an upper end thereof is a foundation concrete slab. 18 is located on the upper surface.
[0050]
The cylindrical bodies 30 are respectively covered on portions where the plurality of main bars 1902 extend through the foundation concrete slab 18. The lower end of each cylinder 30 abuts on the upper end surface 1206B of the pile head 1206A, and the upper end of each cylinder 30 coincides with the upper surface of the foundation concrete slab 18. The cylindrical body 30 may be anything as long as the main bar 1902 can move in the longitudinal direction, and a sheath tube or the like can be used as the cylindrical body 30.
Therefore, the main reinforcing bar 1902 passes through the inside of the cylindrical body 30 in the basic concrete slab 18, and thereby extends along the longitudinal direction of the main reinforcing bar 1902 while keeping the main reinforcing bar 1902 in a non-fixed state with the concrete of the basic concrete slab 18. A non-fixing portion 32 is provided.
In the present embodiment, the non-fixing portion 32 is provided from the upper end surface 1206B of the pile head portion 1206A to the upper surface of the foundation concrete slab 18, in other words, the non-fixing portion 32 is not attached to all portions where the main bars 1902 extend in the foundation concrete slab 18. A fixing unit 32 is provided.
Further, a fixing metal 34 is attached to the upper ends of the plurality of main bars 1902 located on the upper surface of the foundation concrete slab 18, and the fixing portion 36 where the upper ends of the main bars 1902 are fixed to the upper surface of the foundation concrete slab 18 by the fixing metal 34. In the present embodiment, the fixing portion 36 is located on the upper surface of the foundation concrete slab 18. The fixing hardware 34 only needs to be capable of fixing the upper end of the main bar 1902 to the upper surface of the foundation concrete slab 18, and a nut or the like can be used as in the first to eighth embodiments.
[0051]
For the joining of the pile and the foundation concrete slab as described above, the steel pipe pile 1206 is constructed in the same manner as before, and then the main body 1902 protruding from the upper end surface 1206B of the pile head 1206A is covered with the cylindrical body 30, and then the pile head Reinforcing bars are placed on the part 1206A and concrete is placed to construct the foundation concrete slab 18, and after the concrete has hardened, the fixing hardware 34 is attached to the upper end of the main reinforcement 1902 protruding above the upper surface of the foundation concrete slab 18. It is done by doing.
According to the present embodiment, when a horizontal force acts on the pile head 1206 </ b> A during an earthquake, a substantially uniform tensile stress is generated in the main reinforcing bar 1902 in the non-fixing portion 32, and the main reinforcing bar 1902 extends in the non-fixing portion 32.
And the extension amount of this main reinforcement 1902 is large compared with the case where there exists adhesion with concrete.
Since the extension of the main reinforcing bar 1902 in the non-fixing portion 32 causes the pile head 1206A to rotate, the provision of the non-fixing portion 32 to increase the extension amount of the main reinforcing bar 1902 loosens the restraint of the pile head 1206A. .
That is, by providing the non-fixing portion 32, the fixing degree of the pile head 1206A is lowered, and the bending moment acting on the pile head 1206A is reduced with respect to the same horizontal force as compared with the conventional construction method.
Therefore, the amount of reinforcement of the pile head 1206A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0052]
Next, an eighteenth embodiment will be described.
FIG. 18: shows the cross-sectional front view of the junction part of the steel pipe pile and foundation concrete slab based on 18th Embodiment.
In the eighteenth embodiment, the configurations of the non-fixing portion 32 and the fixing portion 36 are different from those in the seventeenth embodiment.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1206B of the pile head part 1206A, and the cylinders 30 are respectively covered on portions where the main bars 1902 extend through the foundation concrete slab 18. The lower end of each cylinder 30 is in contact with the upper end surface 1206B of the pile head 1206A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18.
Accordingly, the main reinforcing bar 1902 has a portion that passes through the inside of the cylindrical body 30 in the foundation concrete slab 18, whereby the main reinforcing bar 1902 is kept along the longitudinal direction of the main reinforcing bar 1902 while maintaining a non-fixed state with the concrete of the basic concrete slab 18. A non-fixing portion 32 is provided.
[0053]
In addition, a fixing metal 34 is attached to the upper ends of a plurality of main bars 1902 located in the foundation concrete slab 18 near the upper surface of the foundation concrete slab 18, and the upper ends of the main bars 1902 are fixed in the basic concrete slab 18 by the fixing metal 34. A fixed fixing unit 36 is provided.
For the joining of the pile and the foundation concrete slab as described above, the steel pipe pile 1206 is constructed in the same manner as before, and then the main body 1902 protruding from the upper end surface 1206B of the pile head 1206A is covered with the cylinder 30 and The fixing metal 34 is attached to the upper end of the projecting main bar 1902, and then the foundation concrete slab 18 is constructed by placing a reinforcing bar on the pile head 1206A and placing concrete.
Also according to the eighteenth embodiment, when a horizontal force acts on the pile head 1206A during an earthquake, a substantially uniform tensile stress is generated in the main reinforcement 1902 in the non-fixing portion 32, and the main reinforcement 1902 extends in the non-fixing portion 32. The restraint of the pile head 1206A is loosened. Thereby, the bending moment acting on the pile head 1206A can be reduced, the amount of reinforcement of the pile head 1206A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0054]
Next, a nineteenth embodiment will be described.
FIG. 19: shows the cross-sectional front view of the junction part of the steel pipe pile and foundation concrete slab based on 19th Embodiment.
In the nineteenth embodiment, the configuration of the fixing unit 36 is different from that in the eighteenth embodiment.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1206B of the pile head part 1206A, and the cylinders 30 cover the lower half parts of the main bars 1902 extending through the foundation concrete slab 18 respectively. It has been. The lower end of each cylinder 30 is in contact with the upper end surface 1206B of the pile head 1206A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 in the middle portion of the foundation concrete slab 18 in the thickness direction.
Accordingly, the main reinforcing bar 1902 has a portion that passes through the inside of the cylindrical body 30 in the foundation concrete slab 18, whereby the main reinforcing bar 1902 is kept along the longitudinal direction of the main reinforcing bar 1902 while maintaining a non-fixed state with the concrete of the basic concrete slab 18. A non-fixing portion 32 is provided.
[0055]
The upper half of the portion where the main reinforcement 1902 extends through the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends through the foundation concrete slab 18. It adheres and is fixed to the foundation concrete slab 18. That is, the fixing portion 36 fixed in the foundation concrete slab 18 is provided by the substantially upper half of the portion where the main reinforcement 1902 extends in the foundation concrete slab 18.
For the joining of the pile and the foundation concrete slab as described above, the steel pipe pile 1206 is constructed in the same manner as in the past, and then the cylinder 30 is put on the substantially lower half of the main bar 1902 protruding from the upper end surface 1206B of the pile head 1206A. In the state where the upper half of the main reinforcement 1902 protruding from the upper end surface 1206B of the pile head 1206A is exposed from the upper end of the cylindrical body 30, a reinforcing bar is arranged on the pile head 1206A and concrete is placed. This is done by constructing the foundation concrete slab 18.
Also according to the nineteenth embodiment, when a horizontal force acts on the pile head 1206A during an earthquake, a substantially uniform tensile stress is generated in the main bar 1902 in the non-fixed part 32, and the main bar 1902 extends in the non-fixed part 32. The restraint of the pile head 1206A is loosened. Thereby, the bending moment acting on the pile head 1206A can be reduced, the amount of reinforcement of the pile head 1206A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0056]
Next, a twentieth embodiment will be described.
FIG. 20: shows the cross-sectional front view of the junction part of the steel pipe pile and foundation concrete slab which concerns on 20th Embodiment.
In the twentieth embodiment, the configuration of the fixing unit 36 is different from that in the eighteenth embodiment.
That is, a plurality of main bars 1902 of the fixing bar 19 protrude from the upper end surface 1206B of the pile head part 1206A, and the cylinders 30 are respectively formed on portions other than the upper part of the part where the main bars 1902 extend in the foundation concrete slab 18. It is covered. The lower end of each cylinder 30 is in contact with the upper end surface 1206B of the pile head 1206A, and the upper end of each cylinder 30 is located in the foundation concrete slab 18 in the middle portion of the foundation concrete slab 18 in the thickness direction.
Accordingly, the main reinforcing bar 1902 has a portion that passes through the inside of the cylindrical body 30 in the foundation concrete slab 18, whereby the main reinforcing bar 1902 is kept along the longitudinal direction of the main reinforcing bar 1902 while maintaining a non-fixed state with the concrete of the basic concrete slab 18. A non-fixing portion 32 is provided.
[0057]
Further, the upper part of the portion where the main reinforcing bar 1902 extends through the foundation concrete slab 18 is exposed from the upper end of the cylindrical body 30 and extends through the foundation concrete slab 18, and the fixing hardware 34 is attached to the upper end thereof. . That is, the upper part of the main bar 1902 exposed from the upper end of the cylindrical body 30 adheres to the concrete of the foundation concrete slab 18, and the fixing hardware 34 is embedded and fixed in the concrete of the foundation concrete slab 18. A fixing portion 36 in which the upper end of the main reinforcing bar 1902 is fixed in the foundation concrete slab 18 by the main reinforcing bar 1902 portion exposed from the upper end of the steel plate and the fixing hardware 34 is provided.
In the joining of the pile and the foundation concrete slab as described above, the steel pipe pile 1206 is constructed in the same manner as before, and then the main body 1902 protruding from the upper end surface 1206B of the pile head 1206A is covered with the cylinder 30, and further The fixing metal 34 is attached to the upper end of the main bar 1902 exposed from the upper part of the main bar 1902, and then a reinforcing bar is placed on the pile head 1206A, and concrete is placed to construct the foundation concrete slab 18. That is done.
Also according to the twentieth embodiment, when a horizontal force acts on the pile head 1206A at the time of an earthquake, a substantially uniform tensile stress is generated in the main bar 1902 in the non-fixed part 32, and the main bar 1902 extends in the non-fixed part 32, The restraint of the pile head 1206A is loosened. Thereby, the bending moment acting on the pile head 1206A can be reduced, the amount of reinforcement of the pile head 1206A and the foundation beam can be reduced, and the reinforcement around the foundation concrete slab 18 can be simplified.
[0058]
In the above-described embodiment, when the pile is a cast-in-place concrete pile, the joint structure between the pile main bar and the foundation concrete slab, and when the pile is a cast-in-place steel pipe concrete pile, the main bar and the foundation of the anchor bar Although the joint structure with the concrete slab and the joint structure between the main reinforcement of the anchoring bar and the foundation concrete slab when the pile is a steel pipe pile have been described, the present invention is not limited to other ready-made piles as described in the prior art. Even in the case of concrete piles (including steel pipe-wrapped ready-made concrete piles) and the like, it is widely applied to the joint portion between these anchoring bars and the foundation concrete slab.
[0059]
【The invention's effect】
As apparent from the above description, the present invention has a structure in which a pile head of a pile to which a reinforcing bar extending vertically is attached to a foundation concrete slab, and the reinforcing bar protrudes upward from the pile head. The rebar part protruding upward from the pile head is embedded in the foundation concrete slab, and the reinforcing bar part embedded in the foundation concrete slab is in the longitudinal direction of the reinforcing bar while maintaining a non-fixed state with the concrete of the foundation concrete slab. A non-fixing part extending along the non-fixing part is provided, and a fixing part in which a reinforcing bar is fixed to the foundation concrete slab is provided at the end of the non-fixing part. When a horizontal force acts on the pile head, the reinforcing bars extend in the non-fixed portion, and the bending moment acting on the pile head is reduced. The configuration. Therefore, when a horizontal force acts on the pile head during an earthquake, tensile stress is generated in the reinforcing bar in the non-fixed part, and the reinforcing bar extends in the non-fixed part. The amount of extension of the reinforcing bar is larger than that when there is adhesion with concrete, and the extension of the reinforcing bar in the non-fixed part causes the pile head to rotate and loosens the pile head. That is, the fixing degree of the pile head is lowered by providing the non-fixing portion, and the bending moment acting on the pile head is reduced as compared with the conventional method. Thereby, the amount of reinforcement of a pile head and a foundation beam can be reduced, the arrangement of a pile head and a foundation beam can be simplified, and workability and economical efficiency can be improved. In addition, in the case of steel pipe piles and pre-cast concrete piles wound with steel pipes, strain does not concentrate near the rebar attachment part, so it is possible to prevent breakage of the rebar and the accompanying decrease in yield strength during large deformations. A stable restoring force characteristic can be obtained.
[Brief description of the drawings]
FIG. 1 is a cross-sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a first embodiment.
FIG. 2 is a cross-sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a second embodiment.
FIG. 3 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a third embodiment.
FIG. 4 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a fourth embodiment.
FIG. 5 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a fifth embodiment.
FIG. 6 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a sixth embodiment.
FIG. 7 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a seventh embodiment.
FIG. 8 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to an eighth embodiment.
FIG. 9 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a ninth embodiment.
FIG. 10 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a tenth embodiment.
FIG. 11 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to an eleventh embodiment.
FIG. 12 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a twelfth embodiment.
FIG. 13 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a thirteenth embodiment.
FIG. 14 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a fourteenth embodiment.
FIG. 15 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a fifteenth embodiment.
FIG. 16 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a sixteenth embodiment.
FIG. 17 is a sectional front view of a joint portion between a steel pipe pile and a foundation concrete slab according to a seventeenth embodiment.
FIG. 18 is a sectional front view of a joint portion between a steel pipe pile and a foundation concrete slab according to an eighteenth embodiment.
FIG. 19 is a sectional front view of a joint portion between a steel pipe pile and a foundation concrete slab according to a nineteenth embodiment.
FIG. 20 is a cross-sectional front view of a joint portion between a steel pipe pile and a foundation concrete slab according to a twentieth embodiment.
21A is a cross-sectional front view of a joint portion between a conventional cast-in-place concrete pile and a foundation concrete slab, and FIG. 21B is a cross-sectional front view of a joint portion between a conventional cast-in-place concrete pipe and a foundation concrete slab. It is.
FIG. 22A is a sectional front view of a joint portion between a conventional steel pipe pile and a foundation concrete slab, and FIG. 22B is a sectional front view of a joint portion between a conventional ready-made concrete pile and a foundation concrete slab.
FIG. 23A is a sectional front view of a joint portion between a conventional cast-in-place steel pipe concrete pile and a foundation concrete slab, and FIG. 23B is a sectional front view of a joint portion between a conventional steel pipe pile and a foundation concrete slab. .
24A is a cross-sectional front view of a joint portion between a conventional ready-made concrete pile and a foundation concrete slab, and FIG. 24B is a cross-sectional front view of a joint portion between a conventional ready-made concrete pile and a foundation concrete slab.
[Explanation of symbols]
1201 Cast-in-place concrete pile
1202 Cast-in-place steel pipe concrete pile
1206 Steel pipe pile
1201A, 1202A, 1206A Pile head
16 Pile main bar
18 Foundation concrete slab
19 Anchorage
1902 main muscle
30 cylinder
32 Non-fixing part
34 Fixing hardware
36 Fixing part

Claims (12)

上下に延在する鉄筋が取着された杭の杭頭部を基礎コンクリートスラブに接合する構造であって、
前記鉄筋は杭頭部から上方に突出しており、
前記杭頭部から上方に突出する鉄筋部分は基礎コンクリートスラブに埋設され、
前記基礎コンクリートスラブに埋設された鉄筋部分に、基礎コンクリートスラブのコンクリートと非定着状態を保ちつつ鉄筋の長手方向に沿って延在する非定着部が設けられ、
前記非定着部の端部に、鉄筋が基礎コンクリートスラブに定着された定着部が設けられ、
前記杭頭部に水平力が作用した場合、前記非定着部において前記鉄筋が伸び、前記杭頭部に働く曲げモーメントが減じられる、
ことを特徴とする杭と基礎コンクリートスラブとの接合構造。
It is a structure that joins the pile head of the pile to which the reinforcing bars extending vertically are attached to the foundation concrete slab,
The rebar protrudes upward from the pile head,
The rebar part protruding upward from the pile head is embedded in the foundation concrete slab,
A non-fixed portion extending along the longitudinal direction of the reinforcing bar is provided in the reinforcing bar portion embedded in the basic concrete slab while maintaining a non-fixed state with the concrete of the basic concrete slab,
At the end of the non-fixing part, a fixing part in which a reinforcing bar is fixed to the foundation concrete slab is provided ,
When a horizontal force acts on the pile head, the rebar extends in the non-fixed portion, and the bending moment acting on the pile head is reduced.
The joint structure of the pile and the foundation concrete slab characterized by this.
前記非定着部の下端は杭頭部の上端面上に位置していることを特徴とする請求項1記載の杭と基礎コンクリートスラブとの接合構造。  The joint structure of a pile and a foundation concrete slab according to claim 1, wherein a lower end of the non-fixing portion is located on an upper end surface of the pile head. 前記定着部は前記基礎コンクリートスラブの上面上に位置していることを特徴とする請求項1または2記載の杭と基礎コンクリートスラブとの接合構造。  The joint structure of a pile and a foundation concrete slab according to claim 1, wherein the fixing portion is located on an upper surface of the foundation concrete slab. 前記定着部は前記基礎コンクリートスラブ中に位置していることを特徴とする請求項1または2記載の杭と基礎コンクリートスラブとの接合構造。  The joint structure between a pile and a foundation concrete slab according to claim 1 or 2, wherein the fixing portion is located in the foundation concrete slab. 前記杭頭部はコンクリートを有し、前記鉄筋は前記コンクリートに埋設され、前記鉄筋が前記コンクリートに埋設された部分で杭頭部の上端面近傍に位置する箇所に、前記コンクリートと非定着状態を保ちつつ鉄筋の長手方向に沿って延在する非定着部が設けられ、この非定着部と、前記基礎コンクリートスラブ側に設けられた非定着部は連続していることを特徴とする請求項1乃至4に何れか1項記載の杭と基礎コンクリートスラブとの接合構造。  The pile head has concrete, the reinforcing bar is embedded in the concrete, and the portion where the reinforcing bar is embedded in the concrete is located near the upper end surface of the pile head, the concrete and the non-fixed state. 2. A non-fixing portion extending along the longitudinal direction of the reinforcing bar is provided while being maintained, and the non-fixing portion and the non-fixing portion provided on the foundation concrete slab side are continuous. The joint structure of the pile and foundation concrete slab as described in any one of 4 thru | or 4. 前記非定着部は、コンクリート中に筒体が埋設され、この筒体の内部に前記鉄筋が挿通されることで形成されていることを特徴とする請求項1乃至5に何れか1項記載の杭と基礎コンクリートスラブとの接合構造。  6. The non-fixing portion is formed by embedding a cylindrical body in concrete and inserting the reinforcing bar into the cylindrical body. Joint structure between pile and foundation concrete slab. 前記定着部は、前記鉄筋に定着部材が取着されることで形成されていることを特徴とする請求項1乃至6に何れか1項記載の杭と基礎コンクリートスラブとの接合構造。請求項1または2記載の杭と基礎コンクリートスラブとの接合構造。  The said fixing | fixed part is formed by attaching a fixing member to the said reinforcing bar, The joining structure of the pile and foundation concrete slab of any one of Claim 1 thru | or 6 characterized by the above-mentioned. The joint structure of the pile according to claim 1 or 2 and a foundation concrete slab. 前記定着部は基礎コンクリートスラブ中でコンクリートとの定着状態を保ちつつ延在するに前記鉄筋の部分により形成されていることを特徴とする請求項1乃至7に何れか1項記載の杭と基礎コンクリートスラブとの接合構造。  The pile and foundation according to any one of claims 1 to 7, wherein the fixing portion is formed by the reinforcing bar portion so as to extend in a foundation concrete slab while maintaining a fixing state with concrete. Bonding structure with concrete slab. 前記杭は杭主筋を有する場所打ちコンクリート杭であり、前記鉄筋は前記杭主筋であることを特徴とする請求項1乃至8に何れか1項記載の杭と基礎コンクリートスラブとの接合構造。  The said pile is a cast-in-place concrete pile which has a pile main reinforcement, The said reinforcing bar is the said pile main reinforcement, The joining structure of the pile and foundation concrete slab in any one of Claim 1 thru | or 8 characterized by the above-mentioned. 前記杭は定着筋を有する場所打ち鋼管コンクリート杭であり、前記定着筋は上下に延在する主筋を有し、前記鉄筋は前記主筋であることを特徴とする請求項1乃至8に何れか1項記載の杭と基礎コンクリートスラブとの接合構造。  9. The pile according to claim 1, wherein the pile is a cast-in-place steel pipe concrete pile having a fixing bar, the fixing bar has a main bar extending vertically, and the reinforcing bar is the main bar. Joining structure of pile described in item and foundation concrete slab. 前記杭は定着筋を有する鋼管杭であり、前記定着筋は上下に延在する主筋を有し、前記鉄筋は前記主筋であることを特徴とする請求項1乃至8に何れか1項記載の杭と基礎コンクリートスラブとの接合構造。  9. The pile according to claim 1, wherein the pile is a steel pipe pile having a fixing bar, the fixing bar has a main bar extending vertically, and the reinforcing bar is the main bar. Joint structure between pile and foundation concrete slab. 前記杭は定着筋を有する既製コンクリート杭であり、前記定着筋は上下に延在する主筋を有し、前記鉄筋は前記主筋であることを特徴とする請求項1乃至8に何れか1項記載の杭と基礎コンクリートスラブとの接合構造。  9. The pile according to claim 1, wherein the pile is a ready-made concrete pile having a fixing bar, the fixing bar has a main bar extending vertically, and the reinforcing bar is the main bar. Structure of piles and foundation concrete slabs.
JP31787998A 1998-11-09 1998-11-09 Joint structure of pile and foundation concrete slab Expired - Lifetime JP4107452B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31787998A JP4107452B2 (en) 1998-11-09 1998-11-09 Joint structure of pile and foundation concrete slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31787998A JP4107452B2 (en) 1998-11-09 1998-11-09 Joint structure of pile and foundation concrete slab

Publications (2)

Publication Number Publication Date
JP2000144763A JP2000144763A (en) 2000-05-26
JP4107452B2 true JP4107452B2 (en) 2008-06-25

Family

ID=18093085

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31787998A Expired - Lifetime JP4107452B2 (en) 1998-11-09 1998-11-09 Joint structure of pile and foundation concrete slab

Country Status (1)

Country Link
JP (1) JP4107452B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4508854B2 (en) * 2004-12-15 2010-07-21 株式会社フジタ Pile and footing joint structure
JP4890069B2 (en) * 2006-03-29 2012-03-07 株式会社フジタ Pile head joint design method
JP5052396B2 (en) * 2008-04-23 2012-10-17 岡部株式会社 Pile head joint structure and temporary tool for pile head joint used in its construction
JP5574840B2 (en) * 2010-06-17 2014-08-20 大和小田急建設株式会社 PC joint structure between pile and foundation in structure
JP5661514B2 (en) * 2011-03-04 2015-01-28 東日本旅客鉄道株式会社 Seismic construction method using seismic isolation mechanism
JP5633525B2 (en) * 2012-01-27 2014-12-03 新日鐵住金株式会社 Pile head joint structure
JP2020037787A (en) * 2018-09-03 2020-03-12 東京電力ホールディングス株式会社 Joint structure between cast-in-place pile and floor plate
KR102430502B1 (en) * 2020-12-11 2022-08-08 목포대학교 산학협력단 Reinforcing structure for pile head

Also Published As

Publication number Publication date
JP2000144763A (en) 2000-05-26

Similar Documents

Publication Publication Date Title
KR101136926B1 (en) Composite beam by prestressed concrete filled tube
JP4844928B2 (en) Pile head joint structure and construction method
WO2005066419A1 (en) Method of applying prestress and connecting means used therein and prestressed concrete beam therefrom
JP4107452B2 (en) Joint structure of pile and foundation concrete slab
JP2008231799A (en) Base isolation structure
KR102034760B1 (en) Construction method of Sing column drilled pier foundation introduced the tension system and Pile structure-GNS Pile Method
KR20110027022A (en) Connecting structure between footing and hybrid concrete pile having various cross-section
JP6703816B2 (en) Footing foundation structure
JP4430496B2 (en) Pile head joint structure and construction method
JP3300162B2 (en) Joint structure between steel wall and reinforced concrete floor slab
JP5008683B2 (en) Pile head reinforcement member and pile head reinforcement structure using it
JP5574840B2 (en) PC joint structure between pile and foundation in structure
JP4572038B2 (en) Truss structure
JP2004027727A (en) Foundation pile and construction method for foundation pile
JP3681367B2 (en) Joint structure of steel column and foundation concrete
JP3096660B2 (en) Pile head structure of cast-in-place steel pipe concrete pile and its construction method
JP7409834B2 (en) Pile cap joint structure and pile cap joint method
KR100694763B1 (en) Construction methods of underground structure adopting concrete-composite crossbeam
JP7419627B2 (en) Welded reinforcing bar joint structure
KR102483445B1 (en) Composite pile connectiing device, structure and construction method using the same
JP7427507B2 (en) Bonding structure and bonding method
KR100662774B1 (en) Steel beam joint attachment
JP2001107373A (en) Joint structure of steel column base with foundation concrete
JP6905817B2 (en) Pile head structure
KR100541162B1 (en) Composite Beam Stiffened with Prestressed Concrete Panel Having Embedded Lower Flange and Constructing Method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051101

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070823

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071025

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071220

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080327

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080327

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110411

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120411

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130411

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130411

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130411

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130411

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140411

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term