JP4107452B2 - Joint structure of pile and foundation concrete slab - Google Patents
Joint structure of pile and foundation concrete slab Download PDFInfo
- Publication number
- JP4107452B2 JP4107452B2 JP31787998A JP31787998A JP4107452B2 JP 4107452 B2 JP4107452 B2 JP 4107452B2 JP 31787998 A JP31787998 A JP 31787998A JP 31787998 A JP31787998 A JP 31787998A JP 4107452 B2 JP4107452 B2 JP 4107452B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- concrete slab
- foundation concrete
- fixing
- main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は構造物における杭と基礎コンクリートスラブとの接合構造に関する。
【0002】
【従来の技術】
図21乃至図24を参照して従来一般的に行われている杭と基礎コンクリートスラブの接合構造を説明する。
図21(A)は場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
図21(A)に示す場所打ちコンクリート杭1201では、まず孔14が掘削され、この孔14の外周部に周方向に間隔をおきそれらの上部が孔の上方に突出する複数の杭主筋16が配筋された後、コンクリートCが打設される。これにより、複数の杭主筋16が杭頭部1201Aよりも上方に突出する場所打ちコンクリート杭1201が得られる。
次に、場所打ちコンクリート杭1201上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の杭主筋16の上部が埋設され、かつ、その下面が杭頭部1201Aの上面よりも下位に位置するように形成される。
そして、このように場所打ちコンクリート杭1201の杭主筋16を基礎コンクリートスラブ18に直接定着させることで、杭頭部1201Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1201Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0003】
また、図21(B)に示す場所打ち鋼管コンクリート杭1202では、14が掘削され、孔14に鋼管1222が打ち込まれ、この鋼管1222の内部に定着筋19が配筋される。定着筋19は鋼管1222の内部で外周寄り部分に周方向に間隔をおいて上下に延在する複数の主筋1902と、これら複数の主筋1902を連結する補強筋1904を備えている。そして、鋼管1222の内部にコンクリートCが打設されることで、複数の主筋1902が杭頭部1202Aよりも上方に突出する場所打ち鋼管コンクリート杭1202が得られる。
次に、場所打ち鋼管コンクリート杭1202上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1202Aの上面よりも下位に位置するように形成される。
そして、このように場所打ち鋼管コンクリート杭1202の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1202Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1202Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0004】
また、図22(A)に示す鋼管杭1203では、地盤に鋼管杭1203が打ち込まれる。鋼管杭1203の杭頭部1203Aには、鋼管1222の内部に中詰めコンクリート20が充填されており、中詰めコンクリート20に定着筋19が取着されている。定着筋19は鋼管1222の内部で外周寄り部分に周方向に間隔をおいて上下に延在し杭頭部1203Aの上方に突出する複数の主筋1902と、これら複数の主筋1902を連結する補強筋1904を備えている。
そして、鋼管杭1203上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1203Aの上面よりも下位に位置するように形成される。
そして、このように場所打ち鋼管コンクリート杭1203の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1203Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1203Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0005】
また、図22(B)に示す既製コンクリート杭1204では、地盤に既製コンクリート杭(鋼管巻き既製コンクリート杭などを含む)1204が打ち込まれる。既製コンクリート杭1204の杭頭部1204Aには、コンクリート管(または鋼管)1222の内部に中詰めコンクリート20が充填されており、中詰めコンクリート20に定着筋19が取着されている。定着筋19はコンクリート管1222の内部で外周寄り部分に周方向に間隔をおいて上下に延在し杭頭部1204Aの上方に突出する複数の主筋1902と、これら複数の主筋1902を連結する補強筋1904を備えている。
そして、既製コンクリート杭1204上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1204Aの上面よりも下位に位置するように形成される。
そして、このように既製コンクリート杭1204の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1204Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1204Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0006】
また、図23(A)に示す場所打ち鋼管コンクリート杭1205では、鋼管1222の上端部外周に定着筋19が溶接などにより取着されている。定着筋19は鋼管1222の周方向に間隔をおいて上下に延在する複数の主筋1902を備えている。そして、鋼管1222の内部にコンクリートCが打設されることで、複数の主筋1902が杭頭部1205Aよりも上方に突出する場所打ち鋼管コンクリート杭1205が得られる。
次に、場所打ち鋼管コンクリート杭1205上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1205Aの上面よりも下位に位置するように形成される。
そして、このように場所打ち鋼管コンクリート杭1205の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1205Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1205Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0007】
また、図23(B)に示す鋼管杭(SC杭などを含む)1206では、鋼管1222の上端部外周に定着筋19が溶接などにより取着されている。定着筋19は鋼管1222の周方向に間隔をおいて上下に延在する複数の主筋1902を備えている。
そして、鋼管杭1206が地盤に打ち込まれた後、鋼管杭1206上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1206Aの上面よりも下位に位置するように形成される。
そして、このように場所打ち鋼管コンクリート杭1206の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1206Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1206Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0008】
また、図24(A)に示す既製コンクリート杭1207では、杭頭部1207Aに補強バンド1232が取着され、補強バンド1232の外周に定着筋19が溶接により取着されている。定着筋19は周方向に間隔をおいて上下に延在し杭頭部1207Aの上方に突出する複数の主筋1902を備えている。
そして、既製コンクリート杭1207が地盤に打ち込まれた後、既製コンクリート杭1207上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1204Aの上面よりも下位に位置するように形成される。
そして、このように既製コンクリート杭1207の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1207Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1207Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0009】
また、図24(B)に示す既製コンクリート杭1208では、杭頭部1207Aに端板1234が取着され、この端板1234に定着筋19がスタッド溶接またはねじ式結合により取着されている。定着筋19は周方向に間隔をおいて上下に延在し杭頭部1208Aの上方に突出する複数の主筋1902を備えている。そして、既製コンクリート杭1208が地盤に打ち込まれた後、既製コンクリート杭1208上に鉄筋が配筋された後、コンクリートが打設され、基礎コンクリートスラブ18が形成される。基礎コンクリートスラブ18は、複数の主筋1902の上部が埋設され、かつ、その下面が杭頭部1208Aの上面よりも下位に位置するように形成される。
そして、このように既製コンクリート杭1208の主筋1902を基礎コンクリートスラブ18に直接定着させることで、杭頭部1208Aと基礎コンクリートスラブ18を構造的に接続し、地震時に作用する水平力によって杭頭部1208Aに生じるせん断力、曲げモーメント、引き抜き力に抵抗している。
【0010】
【発明が解決しようとする課題】
しかしながら、上述のように杭1201乃至1208の杭主筋16や定着筋19を基礎コンクリートスラブ18に直接定着させると、杭頭部1201A乃至1208Aに水平力が生じた時の杭主筋16あるいは定着筋19の伸びが小さく、また、基礎コンクリートスラブ18からの抜け出し量も小さいため、杭頭部1201A乃至1208Aの拘束条件は固定に近い。
そのため、水平力が大きい場合には、大きな曲げモーメントが杭頭部1201A乃至1208Aに作用することになり、杭頭部1201A乃至1208Aがその大きな曲げモーメントに耐えられるように杭頭部1201A乃至1208Aの配筋量を増大させる必要がある。
さらに、その大きな曲げモーメントは、基礎梁にも伝達され、それに対して基礎梁もそれに耐えられるような配筋量とする必要がある。したがって、杭頭部と基礎梁の双方の配筋量が増大する。
その結果、基礎コンクリートスラブ周辺は、杭主筋あるいは定着筋と基礎梁主筋の込み合った配筋となり、配筋作業が煩雑化し、施工性および経済性の点で不利があった。
本発明は前記事情に鑑み案出されたものであって、本発明の目的は、杭頭部や基礎梁の配筋を簡素化して施工性および経済性を向上できる杭と基礎コンクリートスラブとの接合構造を提供することにある。
【0011】
【課題を解決するための手段】
前記目的を達成するため本発明は、上下に延在する鉄筋が取着された杭の杭頭部を基礎コンクリートスラブに接合する構造であって、前記鉄筋は杭頭部から上方に突出しており、前記杭頭部から上方に突出する鉄筋部分は基礎コンクリートスラブに埋設され、前記基礎コンクリートスラブに埋設された鉄筋部分に、基礎コンクリートスラブのコンクリートと非定着状態を保ちつつ鉄筋の長手方向に沿って延在する非定着部が設けられ、前記非定着部の端部に、鉄筋が基礎コンクリートスラブに定着された定着部が設けられ、前記杭頭部に水平力が作用した場合、前記非定着部において前記鉄筋が伸び、前記杭頭部に働く曲げモーメントが減じられることを特徴とする。
また、本発明は、前記非定着部の下端が杭頭部の上端面上に位置していることを特徴とする。
また、本発明は、前記定着部が前記基礎コンクリートスラブの上面上に位置していることを特徴とする。
また、本発明は、前記定着部が前記基礎コンクリートスラブ中に位置していることを特徴とする。
また、本発明は、前記杭頭部がコンクリートを有し、前記鉄筋は前記コンクリートに埋設され、前記鉄筋が前記コンクリートに埋設された部分で杭頭部の上端面近傍に位置する箇所に、前記コンクリートと非定着状態を保ちつつ鉄筋の長手方向に沿って延在する非定着部が設けられ、この非定着部と、前記基礎コンクリートスラブ側に設けられた非定着部は連続していることを特徴とする。
また、本発明は、前記非定着部が、コンクリート中に筒体が埋設され、この筒体の内部に前記鉄筋が挿通されることで形成されていることを特徴とする。また、本発明は、前記定着部が、前記鉄筋に定着部材が取着されることで形成されていることを特徴とする。
また、本発明は、前記定着部が基礎コンクリートスラブ中でコンクリートとの定着状態を保ちつつ延在するに前記鉄筋の部分により形成されていることを特徴とする。
また、本発明は、前記杭が杭主筋を有する場所打ちコンクリート杭であり、前記鉄筋は前記杭主筋であることを特徴とする。
また、本発明は、前記杭が定着筋を有する場所打ち鋼管コンクリート杭であり、前記定着筋は上下に延在する主筋を有し、前記鉄筋は前記主筋であることを特徴とする。
また、本発明は、前記杭が定着筋を有する鋼管杭であり、前記定着筋は上下に延在する主筋を有し、前記鉄筋は前記主筋であることを特徴とする。
また、本発明は、前記杭が定着筋を有する既製コンクリート杭であり、前記定着筋は上下に延在する主筋を有し、前記鉄筋は前記主筋であることを特徴とする。
【0012】
本発明によれば、杭頭部に水平力が作用した場合、非定着部において鉄筋が伸び、この非定着部における鉄筋の伸びは杭頭部の拘束を緩めることになる。
すなわち、非定着部を設けることで杭頭部の固定度が低下し、杭頭部に働く曲げモーメントが減じられる。
したがって、杭頭部や基礎梁の配筋量を減らし、基礎コンクリートスラブ周辺の配筋を簡素化できる。
【0013】
【発明の実施の形態】
以下、本発明の実施の形態を図面を参照して説明する。
まず、第1の実施の形態から説明すると、図1は第1の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
鉄筋コンクリート造りの構造物は、場所打ちコンクリート杭1201の上に設けられた基礎コンクリートスラブ18を備えている。
場所打ちコンクリート杭1201の杭頭部1201Aは基礎コンクリートスラブ18の底部に埋設され、場所打ちコンクリート杭1201の杭頭部1201Aの上端面1201Bは基礎コンクリートスラブ18の下面よりも上方に位置している。
場所打ちコンクリート杭1201は、円柱状のコンクリートCの外周部に周方向に間隔をおいて上下に延在する複数の杭主筋16を有しており、これら杭主筋16は杭頭部1201Aよりも上方に突出し、それらの上端は基礎コンクリートスラブ18の上面上に位置している。
【0014】
前記複数の杭主筋16が基礎コンクリートスラブ18中を延在する部分には筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201Aの上端面1201Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面に一致している。前記筒体30は、その内部において杭主筋16が長手方向に移動できるものであればよく、例えば、シース管などを用いることができる。
したがって、杭主筋16は基礎コンクリートスラブ18中では筒体30の内部を挿通し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態(杭主筋16とコンクリートとが付着していない状態)を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。本実施の形態では、非定着部32は、杭頭部1201Aの上端面1201Bから基礎コンクリートスラブ18の上面にわたって設けられ、言い換えると、杭主筋16が基礎コンクリートスラブ18中を延在する部分全てに非定着部32が設けられている。
【0015】
また、基礎コンクリートスラブ18の上面上に位置する複数の杭主筋16の上端には定着金物34が取着され、定着金物34により杭主筋16の上端が基礎コンクリートスラブ18の上面に定着された定着部36が設けられ、本実施の形態では、定着部36は基礎コンクリートスラブ18の上面上に位置している。前記定着金物34は杭主筋16の上端を基礎コンクリートスラブ18の上面に定着できるものであればよく、例えば、ナットなどを用いることができる。
なお、杭主筋16の上端が基礎コンクリートスラブ18の上面に定着された状態とは、杭主筋16の上端が基礎コンクリートスラブ18の上面と一体的に連結される状態や、あるいは、杭主筋16の上端が基礎コンクリートスラブ18の上面よりも下方に変位することが阻止された状態をいう。
【0016】
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ちコンクリート杭1201を施工した後、杭頭部1201Aの上端面1201Bから突出する杭主筋16に筒体30を被せ、その後、杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する杭主筋16の上端に定着金物34を取着することで行われる。
【0017】
本実施の形態によれば、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸びる。
そして、この杭主筋16の伸び量はコンクリートとの付着がある場合に比べて大きい。非定着部32における杭主筋16の伸びは杭頭部1201Aに回転を生じさせるため、非定着部32を設けて杭主筋16の伸び量を増加させることは、杭頭部1201Aの拘束を緩めることになる。
すなわち、非定着部32を設けることで杭頭部1201Aの固定度が低下し、同じ水平力に対し、従来工法に比べ杭頭部1201Aに働く曲げモーメントが減じられる。
したがって、杭頭部1201Aや基礎梁の配筋量を減らし、基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0018】
次に、第2の実施の形態について説明する。
図2は第2の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第2の実施の形態では、非定着部32と定着部36の構成が前記第1の実施の形態と異なっている。
すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が基礎コンクリートスラブ18中を延在する部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201Aの上端面1201Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0019】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の杭主筋16の上端には定着金物34が取着され、定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ちコンクリート杭1201を施工した後、杭頭部1201Aの上端面1201Bから突出する杭主筋16に筒体30を被せ、筒体30から突出する杭主筋16の上端に定着金物34を取着し、その後、杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第2の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0020】
次に、第3の実施の形態について説明する。
図3は第3の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第3の実施の形態では、定着部36の構成が前記第2の実施の形態と異なっている。
すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ下半部に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201Aの上端面1201Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0021】
また、杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ上半部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ上半部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ちコンクリート杭1201を施工した後、杭頭部1201Aの上端面1201Bから突出する杭主筋16のほぼ下半部に筒体30を被せ、杭頭部1201Aの上端面1201Bから突出する杭主筋16のほぼ上半部を筒体30の上端から露出させた状態で、杭頭部1201A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第2の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0022】
次に、第4の実施の形態について説明する。
図4は第4の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第4の実施の形態では、定着部36の構成が前記第3の実施の形態と異なっている。
すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201Aの上端面1201Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0023】
また、杭主筋16が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する杭主筋16の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する杭主筋16部分と定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ちコンクリート杭1201を施工した後、杭頭部1201Aの上端面1201Bから突出する杭主筋16に筒体30を被せ、さらに、筒体30から杭主筋16の上部から露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1201A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第4の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0024】
次に、第5の実施の形態について説明する。
図5は第5の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第5の実施の形態は非定着部32の構成が第1の実施の形態と異なっている。すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が杭頭部1201A中を延在する部分から基礎コンクリートスラブ18中を延在する部分にわたって筒体30が被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面上に位置している。
したがって、杭主筋16は杭頭部1201Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0025】
また、基礎コンクリートスラブ18の上面上に位置する杭主筋16の上端に定着金物34が取着され、定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ちコンクリート杭1201の施工時に、杭主筋16に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1201を得、その後、杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する杭主筋16の上端に定着金物34を取着することで行われる。
第5の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0026】
次に、第6の実施の形態について説明する。
図6は第6の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第6の実施の形態は非定着部32の構成が第2の実施の形態と異なっている。すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が杭頭部1201A中を延在する部分から基礎コンクリートスラブ18中を延在する部分にわたって筒体30が被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。したがって、杭主筋16は杭頭部1201Aおよび基礎コンクリートスラブ18中で筒体30の内部に挿通され、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0027】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の杭主筋16の上端には定着金物34が取着され、定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ちコンクリート杭1201の施工時に、杭主筋16に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1201を得、その後、筒体30から突出する杭主筋16の上端に定着金物34を取着し、次に、杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第6の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0028】
次に、第7の実施の形態について説明する。
図7は第7の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第7の実施の形態は非定着部32の構成が第3の実施の形態と異なっている。すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が杭頭部1201A中を延在する部分から杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ下半部にわたり筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は杭頭部1201Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0029】
また、杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ上半部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、杭主筋16が基礎コンクリートスラブ18中を延在する部分のほぼ上半部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ちコンクリート杭1201の施工時に、杭主筋16に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1201を得、その後、筒体30から杭主筋16の上部を露出させた状態で杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第7の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0030】
次に、第8の実施の形態について説明する。
図8は第8の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第8の実施の形態は非定着部32の構成が第4の実施の形態と異なっている。すなわち、杭頭部1201Aの上端面1201Bから複数の杭主筋16が突出しており、これら杭主筋16が杭頭部1201A中を延在する部分から基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、杭主筋16は杭頭部1201Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより杭主筋16に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ杭主筋16の長手方向に沿って延在する非定着部32が設けられている。
【0031】
また、杭主筋16が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する杭主筋16の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する杭主筋16部分と定着金物34により杭主筋16の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ちコンクリート杭1201の施工時に、杭主筋16に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1201を得、その後、筒体30から杭主筋16の上部から露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1201A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第8の実施の形態によっても、地震時に杭頭部1201Aに水平力が作用した場合、非定着部32において杭主筋16にほぼ一様な引っ張り応力が生じ、非定着部32において杭主筋16が伸び、杭頭部1201Aの拘束が緩められる。これにより、杭頭部1201Aに働く曲げモーメントを減じ、杭頭部1201Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0032】
次に、第9の実施の形態について説明する。
図9は第9の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第9の実施の形態では杭が場所打ち鋼管コンクリート杭1202であり、定着筋19と基礎コンクリートスラブ18との接合に本発明が適用されている点が前記第1乃至第8実施の形態と異なっている。
場所打ち鋼管コンクリート杭1202の杭頭部1202Aは基礎コンクリートスラブ18の底部に埋設され、場所打ち鋼管コンクリート杭1202の杭頭部1202Aの上端面1202Bは基礎コンクリートスラブ18の下面よりも上方に位置している。
そして、場所打ち鋼管コンクリート杭1202では、鋼管1222の内部にその下部を埋設固定して定着筋19が配筋されている。定着筋19は鋼管1222の内部で外周寄り部分に周方向に間隔をおいて上下に延在する複数の主筋1902と、これら複数の主筋1902を連結する補強筋1904を備えている。複数の主筋1902の上部は杭頭部1202Aよりも上方に突出し、その上端は基礎コンクリートスラブ18の上面上に位置している。
【0033】
前記複数の主筋1902が基礎コンクリートスラブ18中を延在する部分には筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202Aの上端面1202Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面に一致している。前記筒体30は、その内部において主筋1902が長手方向に移動できるものであればよく、第1乃至第8の実施の形態と同様にシース管などを用いることができる。
したがって、主筋1902は基礎コンクリートスラブ18中では筒体30の内部を挿通し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。本実施の形態では、非定着部32は、杭頭部1202Aの上端面1202Bから基礎コンクリートスラブ18の上面にわたって設けられ、言い換えると、主筋1902が基礎コンクリートスラブ18中を延在する部分全てに非定着部32が設けられている。
また、基礎コンクリートスラブ18の上面上に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18の上面に定着された定着部36が設けられ、本実施の形態では、定着部36は基礎コンクリートスラブ18の上面上に位置している。前記定着金物34は主筋1902の上端を基礎コンクリートスラブ18の上面に定着できるものであればよく、第1乃至第8の実施の形態と同様にナットなどを用いることができる。
【0034】
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ち鋼管コンクリート杭1202を施工した後、杭頭部1202Aの上端面1202Bから突出する主筋1902に筒体30を被せ、その後、杭頭部1202A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する主筋1902の上端に定着金物34を取着することで行われる。
本実施の形態によれば、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸びる。
そして、この主筋1902の伸び量はコンクリートとの付着がある場合に比べて大きい。非定着部32における主筋1902の伸びは杭頭部1202Aに回転を生じさせるため、非定着部32を設けて主筋1902の伸び量を増加させることは、杭頭部1202Aの拘束を緩めることになる。
すなわち、非定着部32を設けることで杭頭部1202Aの固定度が低下し、同じ水平力に対し、従来工法に比べ杭頭部1202Aに働く曲げモーメントが減じられる。
したがって、杭頭部1202Aや基礎梁の配筋量を減らし、基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0035】
次に、第10の実施の形態について説明する。
図10は第10の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第10の実施の形態では、非定着部32と定着部36の構成が前記第10の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202Aの上端面1202Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0036】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ち鋼管コンクリート杭1202を施工した後、杭頭部1202Aの上端面1202Bから突出する主筋1902に筒体30を被せ、筒体30から突出する主筋1902の上端に定着金物34を取着し、その後、杭頭部1202A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第10の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0037】
次に、第11の実施の形態について説明する。
図11は第11の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第11の実施の形態では、定着部36の構成が前記第10の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ下半部に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202Aの上端面1202Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0038】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ上半部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ上半部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ち鋼管コンクリート杭1202を施工した後、杭頭部1202Aの上端面1202Bから突出する主筋1902のほぼ下半部に筒体30を被せ、杭頭部1202Aの上端面1202Bから突出する主筋1902のほぼ上半部を筒体30の上端から露出させた状態で、杭頭部1202A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第11の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0039】
次に、第12の実施の形態について説明する。
図12は第12の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第12の実施の形態では、定着部36の構成が前記第11の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202Aの上端面1202Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0040】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する主筋1902の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する主筋1902部分と定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に場所打ち鋼管コンクリート杭1202を施工した後、杭頭部1202Aの上端面1202Bから突出する主筋1902に筒体30を被せ、さらに、筒体30から主筋1902の上部から露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1202A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第12の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋19026が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0041】
次に、第13の実施の形態について説明する。
図13は第13の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第13の実施の形態は非定着部32の構成が第9の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202から定着筋19の複数の主筋1902が突出しており、これら主筋1902が杭頭部1202A中を延在する部分から基礎コンクリートスラブ18中を延在する部分にわたって筒体30が被せられている。各筒体30の下端は杭頭部1202A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面上に位置している。
したがって、主筋1902は杭頭部1202Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0042】
また、基礎コンクリートスラブ18の上面上に位置する主筋1902の上端に定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ち鋼管コンクリート杭1202の施工時に、定着筋19の主筋1902に筒体30を被せた後コンクリートを打設して場所打ち鋼管コンクリート杭1202を得、その後、杭頭部1202A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する主筋1902の上端に定着金物34を取着することで行われる。
第13の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0043】
次に、第14の実施の形態について説明する。
図14は第14の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第14の実施の形態は非定着部32の構成が第10の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が杭頭部1202A中を延在する部分から基礎コンクリートスラブ18中を延在する部分にわたって筒体30が被せられている。各筒体30の下端は杭頭部1202A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は杭頭部1202Aおよび基礎コンクリートスラブ18中で筒体30の内部に挿通され、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0044】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ち鋼管コンクリート杭1202の施工時に、主筋1902に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1202を得、その後、筒体30から突出する主筋1902の上端に定着金物34を取着し、次に、杭頭部1202A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第14の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0045】
次に、第15の実施の形態について説明する。
図15は第15の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第15の実施の形態は非定着部32の構成が第11の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が杭頭部1202A中を延在する部分から主筋1902が基礎コンクリートスラブ18中を延在する部分の下部にわたり筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1202A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は杭頭部1202Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0046】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ち鋼管コンクリート杭1202の施工時に、主筋1902に筒体30を被せた後コンクリートを打設して場所打ちコンクリート杭1202を得、その後、筒体30から主筋1902の上部を露出させた状態で杭頭部1201A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第15の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0047】
次に、第16の実施の形態について説明する。
図16は第16の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第16の実施の形態は非定着部32の構成が第12の実施の形態と異なっている。
すなわち、杭頭部1202Aの上端面1202Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が杭頭部1202A中を延在する部分から基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1201A内に位置し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は杭頭部1202Aおよび基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0048】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する主筋1902の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する主筋1902部分と定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、場所打ち鋼管コンクリート杭1202の施工時に、主筋1902に筒体30を被せた後コンクリートを打設して場所打ち鋼管コンクリート杭1202を得、その後、筒体30から主筋1902の上部を露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1202A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第16の実施の形態によっても、地震時に杭頭部1202Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1202Aの拘束が緩められる。これにより、杭頭部1202Aに働く曲げモーメントを減じ、杭頭部1202Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0049】
次に、第17の実施の形態について説明する。
図17は第17の実施の形態に係る鋼管杭(鋼管巻き既製コンクリート杭などを含む)と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第17の実施の形態では杭が鋼管杭1206であり、定着筋19と基礎コンクリートスラブ18との接合に本発明が適用されている点が前記第1乃至第16実施の形態と異なっている。
鋼管杭1206の杭頭部1206Aは基礎コンクリートスラブ18の底部に埋設され、鋼管杭1206の杭頭部1206Aの上端面1206Bは基礎コンクリートスラブ18の下面よりも上方に位置している。
そして、鋼管杭1206では、鋼管1222の上端部外周に定着筋19が溶接などにより取着されている。定着筋19は鋼管1222の周方向に間隔をおいて上下に延在する複数の主筋1902を備えており、これら複数の主筋1902は杭頭部1206Aよりも上方に突出し、その上端は基礎コンクリートスラブ18の上面上に位置している。
【0050】
前記複数の主筋1902が基礎コンクリートスラブ18中を延在する部分には筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1206Aの上端面1206Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面に一致している。前記筒体30は、その内部において主筋1902が長手方向に移動できるものであればよく、筒体30としてシース管などを用いることができる。
したがって、主筋1902は基礎コンクリートスラブ18中では筒体30の内部を挿通し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
本実施の形態では、非定着部32は、杭頭部1206Aの上端面1206Bから基礎コンクリートスラブ18の上面にわたって設けられ、言い換えると、主筋1902が基礎コンクリートスラブ18中を延在する部分全てに非定着部32が設けられている。
また、基礎コンクリートスラブ18の上面上に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18の上面に定着された定着部36が設けられ、本実施の形態では、定着部36は基礎コンクリートスラブ18の上面上に位置している。前記定着金物34は主筋1902の上端を基礎コンクリートスラブ18の上面に定着できるものであればよく、第1乃至第8の実施の形態と同様にナットなどを用いることができる。
【0051】
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に鋼管杭1206を施工した後、杭頭部1206Aの上端面1206Bから突出する主筋1902に筒体30を被せ、その後、杭頭部1206A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工し、コンクリートが硬化した後、基礎コンクリートスラブ18の上面上に突出する主筋1902の上端に定着金物34を取着することで行われる。
本実施の形態によれば、地震時に杭頭部1206Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸びる。
そして、この主筋1902の伸び量はコンクリートとの付着がある場合に比べて大きい。
非定着部32における主筋1902の伸びは杭頭部1206Aに回転を生じさせるため、非定着部32を設けて主筋1902の伸び量を増加させることは、杭頭部1206Aの拘束を緩めることになる。
すなわち、非定着部32を設けることで杭頭部1206Aの固定度が低下し、同じ水平力に対し、従来工法に比べ杭頭部1206Aに働く曲げモーメントが減じられる。
したがって、杭頭部1206Aや基礎梁の配筋量を減らし、基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0052】
次に、第18の実施の形態について説明する。
図18は第18の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第18の実施の形態では、非定着部32と定着部36の構成が前記第17の実施の形態と異なっている。
すなわち、杭頭部1206Aの上端面1206Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1206Aの上端面1206Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の上面寄りで基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0053】
また、基礎コンクリートスラブ18の上面寄りの基礎コンクリートスラブ18中に位置する複数の主筋1902の上端には定着金物34が取着され、定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に鋼管杭1206を施工した後、杭頭部1206Aの上端面1206Bから突出する主筋1902に筒体30を被せ、筒体30から突出する主筋1902の上端に定着金物34を取着し、その後、杭頭部1206A上に鉄筋を配筋しコンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第18の実施の形態によっても、地震時に杭頭部1206Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1206Aの拘束が緩められる。これにより、杭頭部1206Aに働く曲げモーメントを減じ、杭頭部1206Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0054】
次に、第19の実施の形態について説明する。
図19は第19の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第19の実施の形態では、定着部36の構成が前記第18の実施の形態と異なっている。
すなわち、杭頭部1206Aの上端面1206Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ下半部に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1206Aの上端面1206Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0055】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ上半部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在しており、基礎コンクリートスラブ18のコンクリートと付着し、基礎コンクリートスラブ18に定着している。すなわち、主筋1902が基礎コンクリートスラブ18中を延在する部分のほぼ上半部により、基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に鋼管杭1206を施工した後、杭頭部1206Aの上端面1206Bから突出する主筋1902のほぼ下半部に筒体30を被せ、杭頭部1206Aの上端面1206Bから突出する主筋1902のほぼ上半部を筒体30の上端から露出させた状態で、杭頭部1206A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第19の実施の形態によっても、地震時に杭頭部1206Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1206Aの拘束が緩められる。これにより、杭頭部1206Aに働く曲げモーメントを減じ、杭頭部1206Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0056】
次に、第20の実施の形態について説明する。
図20は第20の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図を示す。
第20の実施の形態では、定着部36の構成が前記第18の実施の形態と異なっている。
すなわち、杭頭部1206Aの上端面1206Bから定着筋19の複数の主筋1902が突出しており、これら主筋1902が基礎コンクリートスラブ18中を延在する部分の上部を除いた部分に筒体30がそれぞれ被せられている。各筒体30の下端は杭頭部1206Aの上端面1206Bに当接し、各筒体30の上端は基礎コンクリートスラブ18の厚さ方向の中間部における基礎コンクリートスラブ18中に位置している。
したがって、主筋1902は基礎コンクリートスラブ18中で筒体30の内部を挿通する部分を有し、これにより主筋1902に、基礎コンクリートスラブ18のコンクリートと非定着状態を保ちつつ主筋1902の長手方向に沿って延在する非定着部32が設けられている。
【0057】
また、主筋1902が基礎コンクリートスラブ18中を延在する部分の上部は、筒体30の上端から露出して基礎コンクリートスラブ18中を延在し、その上端に定着金物34が取着されている。すなわち、筒体30の上端から露出する主筋1902の上部は基礎コンクリートスラブ18のコンクリートと付着し、また、定着金物34は基礎コンクリートスラブ18のコンクリート中に埋設されて定着されており、筒体30の上端から露出する主筋1902部分と定着金物34により主筋1902の上端が基礎コンクリートスラブ18中に定着された定着部36が設けられている。
上記のような杭と基礎コンクリートスラブとの接合は、従来と同様に鋼管杭1206を施工した後、杭頭部1206Aの上端面1206Bから突出する主筋1902に筒体30を被せ、さらに、筒体30から主筋1902の上部から露出させた状態でその上端に定着金物34を取着し、その後、杭頭部1206A上に鉄筋を配筋し、コンクリートを打設して基礎コンクリートスラブ18を施工することでなされる。
第20の実施の形態によっても、地震時に杭頭部1206Aに水平力が作用した場合、非定着部32において主筋1902にほぼ一様な引っ張り応力が生じ、非定着部32において主筋1902が伸び、杭頭部1206Aの拘束が緩められる。これにより、杭頭部1206Aに働く曲げモーメントを減じ、杭頭部1206Aや基礎梁の配筋量を減らして基礎コンクリートスラブ18周辺の配筋を簡素化できる。
【0058】
なお、上述した実施の形態では、杭が場所打ちコンクリート杭である場合にその杭主筋と基礎コンクリートスラブとの接合構造と、杭が場所打ち鋼管コンクリート杭である場合にその定着筋の主筋と基礎コンクリートスラブとの接合構造と、杭が鋼管杭である場合にその定着筋の主筋と基礎コンクリートスラブとの接合構造について説明したが、本発明は従来の技術で述べたように杭がその他の既製コンクリート杭(鋼管巻き既製コンクリート杭を含む)などである場合にも、それらの定着筋と基礎コンクリートスラブとの接合部分に広く適用されるものである。
【0059】
【発明の効果】
以上の説明で明らかなように本発明は、上下に延在する鉄筋が取着された杭の杭頭部を基礎コンクリートスラブに接合する構造であって、前記鉄筋は杭頭部から上方に突出しており、前記杭頭部から上方に突出する鉄筋部分は基礎コンクリートスラブに埋設され、前記基礎コンクリートスラブに埋設された鉄筋部分に、基礎コンクリートスラブのコンクリートと非定着状態を保ちつつ鉄筋の長手方向に沿って延在する非定着部が設けられ、前記非定着部の端部に、鉄筋が基礎コンクリートスラブに定着された定着部が設けられ、前記杭頭部に水平力が作用した場合、前記非定着部において前記鉄筋が伸び、前記杭頭部に働く曲げモーメントが減じられる構成とした。そのため、地震時に杭頭部に水平力が作用した場合、非定着部において鉄筋に引っ張り応力が生じ、非定着部において鉄筋が伸びる。この鉄筋の伸び量はコンクリートとの付着がある場合に比べて大きく、非定着部における鉄筋の伸びは杭頭部に回転を生じさせ、杭頭部の拘束を緩める。すなわち、非定着部を設けることで杭頭部の固定度が低下し、従来工法に比べ杭頭部に働く曲げモーメントが減じられる。これにより、杭頭部や基礎梁の配筋量を減らし、杭頭部や基礎梁の配筋を簡素化して施工性および経済性を向上できる。また、鋼管杭や鋼管巻き既製コンクリート杭の場合には、鉄筋の取付部近傍にひずみが集中することがなくなるので、大変形時において、鉄筋の破断とそれに伴う耐力の低下を防止することができ、安定した復元力特性が得られる。
【図面の簡単な説明】
【図1】第1の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図2】第2の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図3】第3の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図4】第4の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図5】第5の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図6】第6の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図7】第7の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図8】第8の実施の形態に係る場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図9】第9の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図10】第10の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図11】第11の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図12】第12の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図13】第13の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図14】第14の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図15】第15の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図16】第16の実施の形態に係る場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図17】第17の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図18】第18の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図19】第19の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図20】第20の実施の形態に係る鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図21】(A)は従来の場所打ちコンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は従来の場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図22】(A)は従来の鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は従来の既製コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図23】(A)は従来の場所打ち鋼管コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は従来の鋼管杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【図24】(A)は従来の既製コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図、(B)は従来の既製コンクリート杭と基礎コンクリートスラブとの接合部分の断面正面図である。
【符号の説明】
1201 場所打ちコンクリート杭
1202 場所打ち鋼管コンクリート杭
1206 鋼管杭
1201A、1202A、1206A 杭頭部
16 杭主筋
18 基礎コンクリートスラブ
19 定着筋
1902 主筋
30 筒体
32 非定着部
34 定着金物
36 定着部[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a joint structure between a pile and a foundation concrete slab in a structure.
[0002]
[Prior art]
With reference to FIG. 21 to FIG. 24, description will be given of a joint structure of a pile and a foundation concrete slab which is generally performed conventionally.
FIG. 21 (A) is a sectional front view of the joint portion between the cast-in-place concrete pile and the foundation concrete slab, and FIG. 21 (B) is a sectional front view of the joint portion between the cast-in-place steel pipe concrete pile and the foundation concrete slab.
In the cast-in-
Next, after reinforcing bars are placed on the cast-in-
Then, by fixing the pile
[0003]
Further, in the cast-in-place steel
Next, after reinforcing bars are placed on the cast-in-place steel
And by fixing the
[0004]
Moreover, in the
And after a reinforcing bar is arranged on the
And by fixing the
[0005]
In addition, in the ready-made
And after reinforcing bars are arranged on the ready-made
And by fixing the
[0006]
Further, in the cast-in-place steel
Next, after reinforcing bars are placed on the cast-in-place steel
Then, by fixing the
[0007]
Further, in the steel pipe pile (including SC pile) 1206 shown in FIG. 23B, the
After the
Then, by fixing the
[0008]
In addition, in the ready-made
Then, after the ready-made
And by fixing the
[0009]
Further, in the ready-made
Then, by fixing the
[0010]
[Problems to be solved by the invention]
However, as described above, when the pile
Therefore, when the horizontal force is large, a large bending moment acts on the pile heads 1201A to 1208A, and the pile heads 1201A to 1208A can withstand the large bending moment. It is necessary to increase the amount of bar arrangement.
Furthermore, the large bending moment is transmitted to the foundation beam, and it is necessary to set the bar arrangement amount so that the foundation beam can withstand it. Therefore, the bar arrangement amount of both the pile head and the foundation beam increases.
As a result, the surrounding area of the foundation concrete slab became a bar arrangement with pile main reinforcement or anchoring reinforcement and the foundation beam main reinforcement, making the arrangement work complicated and disadvantageous in terms of workability and economy.
The present invention has been devised in view of the above circumstances, and the object of the present invention is to provide a pile and a foundation concrete slab that can improve the workability and economy by simplifying the reinforcement of the pile head and foundation beams. It is to provide a joint structure.
[0011]
[Means for Solving the Problems]
In order to achieve the above object, the present invention is a structure in which a pile head of a pile to which reinforcing bars extending vertically are attached to a foundation concrete slab, wherein the reinforcing bars protrude upward from the pile head. The rebar part protruding upward from the pile head is embedded in the foundation concrete slab, and the rebar part embedded in the foundation concrete slab is along the longitudinal direction of the rebar while maintaining the non-fixed state with the concrete of the foundation concrete slab. A non-fixing part extending in the direction is provided, and a fixing part in which a reinforcing bar is fixed to the foundation concrete slab is provided at the end of the non-fixing part. When a horizontal force acts on the pile head, the reinforcing bars extend in the non-fixed portion, and the bending moment acting on the pile head is reduced. It is characterized by that.
Further, the present invention is characterized in that the lower end of the non-fixing portion is located on the upper end surface of the pile head.
Moreover, the present invention is characterized in that the fixing portion is located on the upper surface of the foundation concrete slab.
Further, the present invention is characterized in that the fixing portion is located in the foundation concrete slab.
In the present invention, the pile head includes concrete, the reinforcing bar is embedded in the concrete, and the portion where the reinforcing bar is embedded in the concrete is positioned near the upper end surface of the pile head, A non-fixing part extending along the longitudinal direction of the reinforcing bar is provided while maintaining a non-fixed state with the concrete, and the non-fixing part and the non-fixing part provided on the foundation concrete slab side are continuous. Features.
Further, the present invention is characterized in that the non-fixed portion is formed by embedding a cylindrical body in concrete and inserting the reinforcing bar into the cylindrical body. Further, the present invention is characterized in that the fixing portion is formed by attaching a fixing member to the reinforcing bar.
Further, the present invention is characterized in that the fixing portion is formed by the portion of the reinforcing bar so as to extend while maintaining a fixing state with the concrete in the basic concrete slab.
Moreover, this invention is a cast-in-place concrete pile in which the said pile has a pile main reinforcement, and the said reinforcing bar is the said pile main reinforcement.
Moreover, this invention is a cast-in-place steel pipe concrete pile in which the said pile has a fixing reinforcement, the said fixing reinforcement has the main reinforcement extended up and down, and the said reinforcing bar is the said main reinforcement.
Further, the present invention is characterized in that the pile is a steel pipe pile having a fixing bar, the fixing bar has a main bar extending vertically, and the reinforcing bar is the main bar.
Moreover, this invention is a ready-made concrete pile in which the said pile has a fixed reinforcement, the said fixed reinforcement has the main reinforcement extended up and down, and the said reinforcing bar is the said main reinforcement.
[0012]
According to the present invention, when a horizontal force acts on the pile head, the reinforcing bar extends in the non-fixed portion, and the extension of the reinforcing bar in the non-fixed portion loosens the restraint of the pile head.
That is, by providing the non-fixed portion, the fixing degree of the pile head is lowered, and the bending moment acting on the pile head is reduced.
Therefore, it is possible to reduce the amount of reinforcement of the pile head and the foundation beam and simplify the arrangement of the reinforcement around the foundation concrete slab.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
First, from the first embodiment, FIG. 1 shows a cross-sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to the first embodiment.
The reinforced concrete structure includes a foundation
The
The cast-in-
[0014]
Accordingly, the pile
[0015]
Further, a fixing
The state in which the upper end of the pile
[0016]
For the joining of the pile and the foundation concrete slab as described above, the cast-in-
[0017]
According to the present embodiment, when a horizontal force acts on the
And the extension amount of this pile
That is, by providing the
Therefore, the amount of reinforcement of the
[0018]
Next, a second embodiment will be described.
FIG. 2: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 2nd Embodiment.
In the second embodiment, the configurations of the
That is, a plurality of pile
Therefore, the pile
[0019]
In addition, a fixing
For the joining of the pile and the foundation concrete slab, the cast-in-
Also according to the second embodiment, when a horizontal force is applied to the
[0020]
Next, a third embodiment will be described.
FIG. 3: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 3rd Embodiment.
In the third embodiment, the configuration of the fixing
That is, a plurality of pile
Therefore, the pile
[0021]
The upper half of the portion where the pile
The above-mentioned pile and the foundation concrete slab are joined to the cylindrical body in the lower half of the pile
Also according to the second embodiment, when a horizontal force is applied to the
[0022]
Next, a fourth embodiment will be described.
FIG. 4: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 4th Embodiment.
In the fourth embodiment, the configuration of the fixing
That is, a plurality of pile
Therefore, the pile
[0023]
Moreover, the upper part of the part where the pile
For the joining of the pile and the foundation concrete slab as described above, after the cast-in-
Also according to the fourth embodiment, when a horizontal force acts on the
[0024]
Next, a fifth embodiment will be described.
FIG. 5: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 5th Embodiment.
In the fifth embodiment, the configuration of the
Therefore, the pile
[0025]
In addition, a fixing
The above-mentioned pile and the foundation concrete slab are joined at the time of construction of the cast-in-
Also according to the fifth embodiment, when a horizontal force acts on the
[0026]
Next, a sixth embodiment will be described.
FIG. 6: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab based on 6th Embodiment.
The sixth embodiment is different from the second embodiment in the configuration of the
[0027]
In addition, a fixing
The above-mentioned pile and the foundation concrete slab are joined at the time of construction of the cast-in-
Also according to the sixth embodiment, when a horizontal force acts on the
[0028]
Next, a seventh embodiment will be described.
FIG. 7: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 7th Embodiment.
In the seventh embodiment, the configuration of the
Therefore, the pile
[0029]
The upper half of the portion where the pile
The above-mentioned pile and the foundation concrete slab are joined at the time of construction of the cast-in-
Also according to the seventh embodiment, when a horizontal force acts on the
[0030]
Next, an eighth embodiment will be described.
FIG. 8: shows the cross-sectional front view of the junction part of the cast-in-place concrete pile and foundation concrete slab which concern on 8th Embodiment.
The eighth embodiment is different from the fourth embodiment in the configuration of the
Therefore, the pile
[0031]
Moreover, the upper part of the part where the pile
The above-mentioned pile and the foundation concrete slab are joined at the time of construction of the cast-in-
Also according to the eighth embodiment, when a horizontal force acts on the
[0032]
Next, a ninth embodiment will be described.
FIG. 9: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 9th Embodiment.
The ninth embodiment is different from the first to eighth embodiments in that the pile is a cast-in-place steel pipe
The
And in the cast-in-place steel pipe
[0033]
The
Therefore, the main reinforcing
Further, a fixing
[0034]
For the joining of the pile and the foundation concrete slab as described above, after the cast-in-place steel pipe
According to the present embodiment, when a horizontal force acts on the
And the extension amount of this
That is, by providing the
Therefore, the amount of reinforcement of the
[0035]
Next, a tenth embodiment will be described.
FIG. 10: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 10th Embodiment.
In the tenth embodiment, the configurations of the
That is, a plurality of
Accordingly, the main reinforcing
[0036]
In addition, a fixing
For the joining of the pile and the foundation concrete slab as described above, after the cast-in-place steel pipe
Also according to the tenth embodiment, when a horizontal force acts on the
[0037]
Next, an eleventh embodiment will be described.
FIG. 11: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 11th Embodiment.
In the eleventh embodiment, the configuration of the fixing
That is, a plurality of
Accordingly, the main reinforcing
[0038]
The upper half of the portion where the
The above-mentioned pile and the foundation concrete slab are joined to the cylindrical body in the lower half of the
Also according to the eleventh embodiment, when a horizontal force acts on the
[0039]
Next, a twelfth embodiment will be described.
FIG. 12: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 12th Embodiment.
In the twelfth embodiment, the configuration of the fixing
That is, a plurality of
Accordingly, the main reinforcing
[0040]
Further, the upper part of the portion where the main reinforcing
For the joining of the pile and the foundation concrete slab as described above, after the cast-in-place steel pipe
Also according to the twelfth embodiment, when a horizontal force acts on the
[0041]
Next, a thirteenth embodiment will be described.
FIG. 13: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 13th Embodiment.
In the thirteenth embodiment, the configuration of the
That is, a plurality of
Therefore, the
[0042]
Further, a fixing
When the cast-in-place steel pipe
Also according to the thirteenth embodiment, when a horizontal force acts on the
[0043]
Next, a fourteenth embodiment will be described.
FIG. 14: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 14th Embodiment.
The fourteenth embodiment is different from the tenth embodiment in the configuration of the
That is, a plurality of
Therefore, the
[0044]
In addition, a fixing
Joining the pile and the foundation concrete slab as described above is performed by placing the
Also according to the fourteenth embodiment, when a horizontal force acts on the
[0045]
Next, a fifteenth embodiment is described.
FIG. 15: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab which concern on 15th Embodiment.
The fifteenth embodiment differs from the eleventh embodiment in the configuration of the
That is, a plurality of
Therefore, the
[0046]
Further, the upper part of the portion where the
Joining the pile and the foundation concrete slab as described above is performed by placing the
Also according to the fifteenth embodiment, when a horizontal force acts on the
[0047]
Next, a sixteenth embodiment will be described.
FIG. 16: shows the cross-sectional front view of the junction part of the cast-in-place steel pipe concrete pile and foundation concrete slab based on 16th Embodiment.
The sixteenth embodiment differs from the twelfth embodiment in the configuration of the
That is, a plurality of
Therefore, the
[0048]
Further, the upper part of the portion where the main reinforcing
In the construction of the cast-in-place steel pipe
Also according to the sixteenth embodiment, when a horizontal force acts on the
[0049]
Next, a seventeenth embodiment will be described.
FIG. 17: shows the cross-sectional front view of the junction part of the steel pipe pile (including steel pipe winding ready-made concrete pile etc.) and the foundation concrete slab which concern on 17th Embodiment.
The seventeenth embodiment differs from the first to sixteenth embodiments in that the pile is a
The
In the
[0050]
The
Therefore, the main reinforcing
In the present embodiment, the
Further, a fixing
[0051]
For the joining of the pile and the foundation concrete slab as described above, the
According to the present embodiment, when a horizontal force acts on the
And the extension amount of this
Since the extension of the main reinforcing
That is, by providing the
Therefore, the amount of reinforcement of the
[0052]
Next, an eighteenth embodiment will be described.
FIG. 18: shows the cross-sectional front view of the junction part of the steel pipe pile and foundation concrete slab based on 18th Embodiment.
In the eighteenth embodiment, the configurations of the
That is, a plurality of
Accordingly, the main reinforcing
[0053]
In addition, a fixing
For the joining of the pile and the foundation concrete slab as described above, the
Also according to the eighteenth embodiment, when a horizontal force acts on the
[0054]
Next, a nineteenth embodiment will be described.
FIG. 19: shows the cross-sectional front view of the junction part of the steel pipe pile and foundation concrete slab based on 19th Embodiment.
In the nineteenth embodiment, the configuration of the fixing
That is, a plurality of
Accordingly, the main reinforcing
[0055]
The upper half of the portion where the
For the joining of the pile and the foundation concrete slab as described above, the
Also according to the nineteenth embodiment, when a horizontal force acts on the
[0056]
Next, a twentieth embodiment will be described.
FIG. 20: shows the cross-sectional front view of the junction part of the steel pipe pile and foundation concrete slab which concerns on 20th Embodiment.
In the twentieth embodiment, the configuration of the fixing
That is, a plurality of
Accordingly, the main reinforcing
[0057]
Further, the upper part of the portion where the main reinforcing
In the joining of the pile and the foundation concrete slab as described above, the
Also according to the twentieth embodiment, when a horizontal force acts on the
[0058]
In the above-described embodiment, when the pile is a cast-in-place concrete pile, the joint structure between the pile main bar and the foundation concrete slab, and when the pile is a cast-in-place steel pipe concrete pile, the main bar and the foundation of the anchor bar Although the joint structure with the concrete slab and the joint structure between the main reinforcement of the anchoring bar and the foundation concrete slab when the pile is a steel pipe pile have been described, the present invention is not limited to other ready-made piles as described in the prior art. Even in the case of concrete piles (including steel pipe-wrapped ready-made concrete piles) and the like, it is widely applied to the joint portion between these anchoring bars and the foundation concrete slab.
[0059]
【The invention's effect】
As apparent from the above description, the present invention has a structure in which a pile head of a pile to which a reinforcing bar extending vertically is attached to a foundation concrete slab, and the reinforcing bar protrudes upward from the pile head. The rebar part protruding upward from the pile head is embedded in the foundation concrete slab, and the reinforcing bar part embedded in the foundation concrete slab is in the longitudinal direction of the reinforcing bar while maintaining a non-fixed state with the concrete of the foundation concrete slab. A non-fixing part extending along the non-fixing part is provided, and a fixing part in which a reinforcing bar is fixed to the foundation concrete slab is provided at the end of the non-fixing part. When a horizontal force acts on the pile head, the reinforcing bars extend in the non-fixed portion, and the bending moment acting on the pile head is reduced. The configuration. Therefore, when a horizontal force acts on the pile head during an earthquake, tensile stress is generated in the reinforcing bar in the non-fixed part, and the reinforcing bar extends in the non-fixed part. The amount of extension of the reinforcing bar is larger than that when there is adhesion with concrete, and the extension of the reinforcing bar in the non-fixed part causes the pile head to rotate and loosens the pile head. That is, the fixing degree of the pile head is lowered by providing the non-fixing portion, and the bending moment acting on the pile head is reduced as compared with the conventional method. Thereby, the amount of reinforcement of a pile head and a foundation beam can be reduced, the arrangement of a pile head and a foundation beam can be simplified, and workability and economical efficiency can be improved. In addition, in the case of steel pipe piles and pre-cast concrete piles wound with steel pipes, strain does not concentrate near the rebar attachment part, so it is possible to prevent breakage of the rebar and the accompanying decrease in yield strength during large deformations. A stable restoring force characteristic can be obtained.
[Brief description of the drawings]
FIG. 1 is a cross-sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a first embodiment.
FIG. 2 is a cross-sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a second embodiment.
FIG. 3 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a third embodiment.
FIG. 4 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a fourth embodiment.
FIG. 5 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a fifth embodiment.
FIG. 6 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a sixth embodiment.
FIG. 7 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to a seventh embodiment.
FIG. 8 is a sectional front view of a joint portion between a cast-in-place concrete pile and a foundation concrete slab according to an eighth embodiment.
FIG. 9 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a ninth embodiment.
FIG. 10 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a tenth embodiment.
FIG. 11 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to an eleventh embodiment.
FIG. 12 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a twelfth embodiment.
FIG. 13 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a thirteenth embodiment.
FIG. 14 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a fourteenth embodiment.
FIG. 15 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a fifteenth embodiment.
FIG. 16 is a sectional front view of a joint portion between a cast-in-place steel pipe concrete pile and a foundation concrete slab according to a sixteenth embodiment.
FIG. 17 is a sectional front view of a joint portion between a steel pipe pile and a foundation concrete slab according to a seventeenth embodiment.
FIG. 18 is a sectional front view of a joint portion between a steel pipe pile and a foundation concrete slab according to an eighteenth embodiment.
FIG. 19 is a sectional front view of a joint portion between a steel pipe pile and a foundation concrete slab according to a nineteenth embodiment.
FIG. 20 is a cross-sectional front view of a joint portion between a steel pipe pile and a foundation concrete slab according to a twentieth embodiment.
21A is a cross-sectional front view of a joint portion between a conventional cast-in-place concrete pile and a foundation concrete slab, and FIG. 21B is a cross-sectional front view of a joint portion between a conventional cast-in-place concrete pipe and a foundation concrete slab. It is.
FIG. 22A is a sectional front view of a joint portion between a conventional steel pipe pile and a foundation concrete slab, and FIG. 22B is a sectional front view of a joint portion between a conventional ready-made concrete pile and a foundation concrete slab.
FIG. 23A is a sectional front view of a joint portion between a conventional cast-in-place steel pipe concrete pile and a foundation concrete slab, and FIG. 23B is a sectional front view of a joint portion between a conventional steel pipe pile and a foundation concrete slab. .
24A is a cross-sectional front view of a joint portion between a conventional ready-made concrete pile and a foundation concrete slab, and FIG. 24B is a cross-sectional front view of a joint portion between a conventional ready-made concrete pile and a foundation concrete slab.
[Explanation of symbols]
1201 Cast-in-place concrete pile
1202 Cast-in-place steel pipe concrete pile
1206 Steel pipe pile
1201A, 1202A, 1206A Pile head
16 Pile main bar
18 Foundation concrete slab
19 Anchorage
1902 main muscle
30 cylinder
32 Non-fixing part
34 Fixing hardware
36 Fixing part
Claims (12)
前記鉄筋は杭頭部から上方に突出しており、
前記杭頭部から上方に突出する鉄筋部分は基礎コンクリートスラブに埋設され、
前記基礎コンクリートスラブに埋設された鉄筋部分に、基礎コンクリートスラブのコンクリートと非定着状態を保ちつつ鉄筋の長手方向に沿って延在する非定着部が設けられ、
前記非定着部の端部に、鉄筋が基礎コンクリートスラブに定着された定着部が設けられ、
前記杭頭部に水平力が作用した場合、前記非定着部において前記鉄筋が伸び、前記杭頭部に働く曲げモーメントが減じられる、
ことを特徴とする杭と基礎コンクリートスラブとの接合構造。It is a structure that joins the pile head of the pile to which the reinforcing bars extending vertically are attached to the foundation concrete slab,
The rebar protrudes upward from the pile head,
The rebar part protruding upward from the pile head is embedded in the foundation concrete slab,
A non-fixed portion extending along the longitudinal direction of the reinforcing bar is provided in the reinforcing bar portion embedded in the basic concrete slab while maintaining a non-fixed state with the concrete of the basic concrete slab,
At the end of the non-fixing part, a fixing part in which a reinforcing bar is fixed to the foundation concrete slab is provided ,
When a horizontal force acts on the pile head, the rebar extends in the non-fixed portion, and the bending moment acting on the pile head is reduced.
The joint structure of the pile and the foundation concrete slab characterized by this.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31787998A JP4107452B2 (en) | 1998-11-09 | 1998-11-09 | Joint structure of pile and foundation concrete slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31787998A JP4107452B2 (en) | 1998-11-09 | 1998-11-09 | Joint structure of pile and foundation concrete slab |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000144763A JP2000144763A (en) | 2000-05-26 |
JP4107452B2 true JP4107452B2 (en) | 2008-06-25 |
Family
ID=18093085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP31787998A Expired - Lifetime JP4107452B2 (en) | 1998-11-09 | 1998-11-09 | Joint structure of pile and foundation concrete slab |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4107452B2 (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4508854B2 (en) * | 2004-12-15 | 2010-07-21 | 株式会社フジタ | Pile and footing joint structure |
JP4890069B2 (en) * | 2006-03-29 | 2012-03-07 | 株式会社フジタ | Pile head joint design method |
JP5052396B2 (en) * | 2008-04-23 | 2012-10-17 | 岡部株式会社 | Pile head joint structure and temporary tool for pile head joint used in its construction |
JP5574840B2 (en) * | 2010-06-17 | 2014-08-20 | 大和小田急建設株式会社 | PC joint structure between pile and foundation in structure |
JP5661514B2 (en) * | 2011-03-04 | 2015-01-28 | 東日本旅客鉄道株式会社 | Seismic construction method using seismic isolation mechanism |
JP5633525B2 (en) * | 2012-01-27 | 2014-12-03 | 新日鐵住金株式会社 | Pile head joint structure |
JP2020037787A (en) * | 2018-09-03 | 2020-03-12 | 東京電力ホールディングス株式会社 | Joint structure between cast-in-place pile and floor plate |
KR102430502B1 (en) * | 2020-12-11 | 2022-08-08 | 목포대학교 산학협력단 | Reinforcing structure for pile head |
-
1998
- 1998-11-09 JP JP31787998A patent/JP4107452B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2000144763A (en) | 2000-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101136926B1 (en) | Composite beam by prestressed concrete filled tube | |
JP4844928B2 (en) | Pile head joint structure and construction method | |
WO2005066419A1 (en) | Method of applying prestress and connecting means used therein and prestressed concrete beam therefrom | |
JP4107452B2 (en) | Joint structure of pile and foundation concrete slab | |
JP2008231799A (en) | Base isolation structure | |
KR102034760B1 (en) | Construction method of Sing column drilled pier foundation introduced the tension system and Pile structure-GNS Pile Method | |
KR20110027022A (en) | Connecting structure between footing and hybrid concrete pile having various cross-section | |
JP6703816B2 (en) | Footing foundation structure | |
JP4430496B2 (en) | Pile head joint structure and construction method | |
JP3300162B2 (en) | Joint structure between steel wall and reinforced concrete floor slab | |
JP5008683B2 (en) | Pile head reinforcement member and pile head reinforcement structure using it | |
JP5574840B2 (en) | PC joint structure between pile and foundation in structure | |
JP4572038B2 (en) | Truss structure | |
JP2004027727A (en) | Foundation pile and construction method for foundation pile | |
JP3681367B2 (en) | Joint structure of steel column and foundation concrete | |
JP3096660B2 (en) | Pile head structure of cast-in-place steel pipe concrete pile and its construction method | |
JP7409834B2 (en) | Pile cap joint structure and pile cap joint method | |
KR100694763B1 (en) | Construction methods of underground structure adopting concrete-composite crossbeam | |
JP7419627B2 (en) | Welded reinforcing bar joint structure | |
KR102483445B1 (en) | Composite pile connectiing device, structure and construction method using the same | |
JP7427507B2 (en) | Bonding structure and bonding method | |
KR100662774B1 (en) | Steel beam joint attachment | |
JP2001107373A (en) | Joint structure of steel column base with foundation concrete | |
JP6905817B2 (en) | Pile head structure | |
KR100541162B1 (en) | Composite Beam Stiffened with Prestressed Concrete Panel Having Embedded Lower Flange and Constructing Method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051101 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070823 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071025 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071220 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080327 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080327 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110411 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120411 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130411 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130411 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130411 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130411 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140411 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |