JP4099639B2 - Chain elongation adjustment device for slat conveyor - Google Patents

Chain elongation adjustment device for slat conveyor Download PDF

Info

Publication number
JP4099639B2
JP4099639B2 JP2002020540A JP2002020540A JP4099639B2 JP 4099639 B2 JP4099639 B2 JP 4099639B2 JP 2002020540 A JP2002020540 A JP 2002020540A JP 2002020540 A JP2002020540 A JP 2002020540A JP 4099639 B2 JP4099639 B2 JP 4099639B2
Authority
JP
Japan
Prior art keywords
link
links
connecting pin
pin
chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002020540A
Other languages
Japanese (ja)
Other versions
JP2003221108A (en
Inventor
信也 菱沼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanki Engineering Co Ltd
Original Assignee
Sanki Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanki Engineering Co Ltd filed Critical Sanki Engineering Co Ltd
Priority to JP2002020540A priority Critical patent/JP4099639B2/en
Publication of JP2003221108A publication Critical patent/JP2003221108A/en
Application granted granted Critical
Publication of JP4099639B2 publication Critical patent/JP4099639B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Chain Conveyers (AREA)

Description

【0001】
本発明は、曲走又は直線搬送路の形成が可能なスラットコンベヤチェーンの任意位置のチェーンピッチを変更することによりチェーンの伸びを調整する装置に関する。
【0002】
【従来の技術】
曲走又は直線搬送可能なスラットコンベヤは、通常チェーンリンクの前側に形成した下段部をリンク後側に形成した上段部を重合し、重合部にそれぞれ連結ピンを貫挿して多数のリンクを連結すると共に、各連結ピンの下端にガイドローラを取付け、リンクの上部に荷物を載せるスラットを取付けたもので、平面上カーブした経路を走行する。
このようなコンベヤとして知られている実用新案登録第2574039号には、連結ピンの上部に偏心頭部を一体に形成し、チェーンリンクのピン孔に前記偏心頭部を嵌合できる偏心孔付から各種方面においてスラットコンベヤが利用されている。スラットコンベヤの一例を示すと、例えば物品を所定位置に搬送するため、床面上に例えばフレームをアンカボルトにて固定して適宜曲がりくねった経路の搬送路が構成されることが多い。この搬送路の中央部分にエンドレスのチェーンを走行させる。このチェーンの上部に多数のスラット支持部材を取付け、このスラット支持部材上に矩形状の合成ゴムで形成されたスラットを取付けていた。
【0003】
上記コンベヤのチェーンは、左右側にリンクを配設した組と、上下側にリンクを配設した組とを交互に組み合わせ、リンク相互の接続位置には十字状のシャフトを設けて回動自在に且つエンドレスに形成されている。十字状のシャフトの上下方向に廷伸された軸上には、それぞれローラが回転自在に設けてあり、フレームの略々中央部爪のチェーン架設位置に設けられたガイドに沿って転動する。また、シャフトの左右方向に廷伸された軸上にもローラが回転自在に設けてあって、このローラはフレームに設けられたガイドに沿って転動し、駆動装置によりチェーンは搬送路に沿って移動されるようになっている。
スラット支持部材は締着部材を介して各リンクに取付けられており、これらのスラット支持部材に取付けられるスラットは、スラット支持部材の進行方向に向ってスラットの後端部に、後続するスラットの前輪上面が下側に重ね合わされ、スラット上に載置される物品を搬送路上に落とすことなくスムーズに搬送できるようになっている。
【0004】
【発明が解決しようとする課題】
しかしながら、上記のようなスラットコンベヤにおいては、長期間の使用により接続用シャフトの摩耗等により、チェーンに伸びを生じてリンクにガタ等を発生し、搬送部のカーブ部分での走行に円滑性を欠き、振動や騒音をおこす。このため、従来では、チェーンの伸びに合わせてフレーム及び走行レール等の軌道系を移動することによりチェーンの伸びを吸収することで対応していた。この軌道系の移動方法は、例えば、コンベヤフレームのカーブ部分と直進部分との接続部のところを調整するようにしていたが、フレームは通常アンカーボルトによって床面に固定されており、前記カーブ部分を移動させたり、移動によって生じた隙間に新しい部材を充填せしめて調整することは、大掛りな工事を必要とするばかりか多くの手間と時間を必要とし、また、摩耗したシャフトを交換するにはチェーンやリンクプレートを分解し再組立を行なわなければならなかった。
本発明は、ピン孔を偏心状にあけた軸受け筒を回動させてピン孔の偏心位置を変えることにより任意の位置のチェーンピッチを調節するようにしたもので、従来形のようにフレームを移動することなく、またスラット支持部材の間隔を大きく変化させることなくチェーンの張りを容易に調整することができるスラットコンベヤを提供することを目的とする。
【0005】
【課題を解決するための手段】
上記目的を達成するため、本発明の請求項1は、各リンクの長手方向前側にリンクのほぼ下半厚みに相当する前側下段部を形成する一方、同長手方向後側にリンクのほぼ上半部厚みに相当する後側上段部を形成して前後に配置された各リンクの上下段部を重合したうえ各重合部にそれぞれ連結ピンを貫挿して多数のリンクをエンドレス状に連結し、各連結ピンの下端にガイドローラを設ける一方、リンクの上部に荷物を載せるスラットを取付けたスラットコンベヤにおいて;前記各リンクの後側上段部の連結ピン貫挿位置にピン孔より大径の軸受け孔を設け、前記各リンクのうち少なくとも一つおき又は数個おきのリンクの後側上段部に前記連結ピンの上半部を挿合しうる偏心状のピン孔を有する軸受け筒を嵌合し、前記各リンクの残りの後側上段部に前記連結ピンの上半部を挿合しうる同心状のピン孔を有する軸受け筒を嵌合し;前記各リンク上段部の長手方向と、連結ピン及び軸受け筒の頂部直径方向にそれぞれ同一深さ、幅の溝を設け;前記連結ピン及び軸受け筒の頂部に形成させた溝とリンク上位段部の溝とを連通状態にしてロック部材をはめ込み、該ロック部材の両端をリンク上段部にビス止めする、ことを特徴とするスラットコンベヤのチェーン伸び調整装置である。
請求項2は、多数のリンクをエンドレス状に連結したリンクチェーンの長さ調整をする際に、前記連結ピンの上半部を挿合しうる偏心状ピン孔を有する軸受け筒を嵌合した前記各リンクのうち少なくとも一部のリンクまたは1つおき乃至数個おきのリンクにおいて、前記ロック部材を取り外した上、前記偏心状ピン孔を有する軸受け筒を回転させてピン孔の偏心位置を変更し、前記連結ピン及び軸受け筒の溝とリンク上段部に溝とを連通状態にしロック部材を嵌め込むことで前記リンクチェーンの長さ調整を可能とすることを特徴とする請求項1に記載のスラットコンベヤのチェーン伸び調整装置である。
【0006】
【発明の実施の形態】
以下本発明の実施の形態を図面に基づいて説明する。
図1は本発明の一実施例に係るスラットコンベヤの斜視図を示す。
スラットコンベヤ1は、リンクチェーン11を構成する各チェーン12の上面にボルト9、9を用いて固着したブラケット8の上部にスラット5を取付けており、下流側スラットの後部に上流側スラットの前部分が順次重なって搬送面が形成され、矢印30の方向に走行される。
フレーム2の長手方向中央にはガイドレール3を設けて各連結ピン10の下端細径部16に取付けたガイドレール15をガイドし、またスラット両翼下面に設けた脚7、7に走行ローラ6、6を取付けてフレーム2の左右の支持レール4、4に当接させている。なお、各リンク12は、例えば、走行方向前部側に形成した下段部13に、前段リンクの後部側に形成した上段部14を順次重合すると共に、前記リンク上段部14に軸受け筒18、19(図2、3)を配置したうえそれぞれ連結ピン10、10を貫挿している。
【0007】
図2は図1におけるリンクチェーンの拡大縦断面図、図3は図2の平面図、図4は図3のA−A線における縦断面図である。
リンク12は、図示のように、比較的厚みのあるブロック状をなしており、前側の下段部13は、リンクのほぼ下半に相当する厚みを有し、後側の上段部14はリンクの上半に相当する厚みを有している。リンク15の前側下段部13と後側部上段部14との重合位置に連結ピン10を貫挿するに当たり、前側下段部13のほぼ中央にピン孔17をあけておくのに対し、後側上段部14にはピン孔より大径の軸受け孔20を設けてピン上半部を挿合するためのピン孔をもつ軸受け筒(ピン上半部支持用受筒)18または19を嵌合する。第1の軸受け筒18は同心状のピン孔17aを有し、第2の軸受け筒19は偏心状のピン孔17bを有している。
一連のリンクチェーンにおける第1、第2の軸受け筒18、19の組み込み位置及び数は任意であって、図示のように、前後に同心状ピン孔をもつ第1の軸受け筒18を連結したり、あるいは1つおき、または、数個おきのリンク12の前側に同心状ピン孔をもつ第1の軸受け筒18、後側に偏心位置にピン孔17bを有する第2の軸受け筒19を連結ししたりしてもよい。なお、図4中、符号22は、リンク端の下段部13のピン孔17に嵌装したスリ−ブ、23はリンク端の上段部14の軸受け孔20に嵌装したスリ−ブであって、図3では、これらスリーブの図示を省略している。
【0008】
上記のように、この装置は、比較的厚みのあるブロック状リンク12の前部側下段部13に、前段リンクの後部側上段部14を順次重合し、各重合部に連結ピン10を貫挿して多数のリンクをエンドレス状に連結するものであるが、さらに、各リンク上段部14の上面長手方向に溝24aを削成する、一方連結ピン10及び同心状ピン孔17aをもつ軸受け筒18の頂部直径方向に溝24aと同一深さ、幅の溝24b、24cをそれぞれ設けている。
偏心状ピン孔17bを有する軸受け筒19は、ピン孔の偏心方向に沿う軸受け筒19の頂部にリンク上段部及び連結ピンと連通する、すなわち、原点位置または所定角度回動位置で連通する溝24cを設けている。
なお、多数連結した大部分のリンク12は、後側上段部14の軸受け孔20にピンの上半部支持用の同心状ピン孔17aをもつ軸受け筒18が嵌合されるが、数個又は複数個おきのリンク12の後側上段部14には偏心状ピン孔17bをもつ偏心軸受け筒19を嵌合する。
【0009】
チェーンの連結組立て時には、図2〜4に示すように、リンク上段部14の溝24aの方向と、連結ピン10頂部の溝24bと軸受け筒18、19頂部の溝24cの方向とを合わせて各溝を連通状態にし、これに共通するロック部材25を嵌め込んで回り止めしたのち、ロック部材25の両端近くにビス26、26を用いてリンク上段部14にそれぞれ固定することにより、一定のピッチPで連結されたリンクチェーンが完成される。なお、各連結ピン10は、ロック部材25の上縁と下段部13の下部にそれぞれ止め輪27をはめて抜け止めされている(図2)。
【0010】
図5はピッチを調節したときのリンクチェーンの拡大縦断面図、図6はその平面図である。
スラットコンベヤの搬送運転によりチェーンに伸びを生じたときには、偏心軸受け筒19の偏心位置を変更してピンを貫装することでピッチ調整することができる。
すなわち、偏心軸受け筒19側のロック部材25を取り外したうえ、偏心軸受け筒19を回動(図示例では180°)させてピン孔17bの偏心位置を変え、溝24a、24b、24cを連通状態にしたのち、再びロック部材25を嵌め込む。このようにすることにより任意の位置のチェーンピッチPをピッチP1に調節できる。例えば、基本のチェーンピッチPを200mm±0.2とした場合に205mmに変更する。したがって、チェーン長さを15mm短くするときには、任意位置における3個のリンクの偏心状軸受け筒を180°回動させて組み直すことによりチェーン伸びを調整することができる。
このように、偏心軸受け筒19による連結ピン10の偏心部分だけ長く設定した状態で、スラットコンベヤを走行させておき、長期の使用によってチェーンピッチが、連結用シャフトの摩耗等によって伸びた時に、偏心位置を変更することによりピッチを容易に調整することができる。
【0011】
【発明の効果】
以上のように本発明は、偏心位置にピン孔をもつ軸受け筒を所定の角度回動させて連結ピンを貫装することで任意の位置のチェーンピッチを調節することができる。また、各リンク上段部の長手方向と、連結ピン及び軸受け筒の頂部直径方向にそれぞれ同一深さ、幅の溝を設け、これらの溝を連通状態にしたロック部材を嵌め込み、ロック部材の両端をリンク上段部にビス止めしているので連結ピンの軸受け筒に対する回り止めを確保することができる。
【図面の簡単な説明】
【図1】本発明のチェーン伸び調整装置を備えたスラットコンベヤの斜視図である。
【図2】図1におけるリンクチェーンの拡大縦断面図である。
【図3】図2の平面図である。
【図4】図3のA−A線における縦断面図である。
【図5】ピッチを調整したときのリンクチェーンの拡大縦断面図である。
【図6】図5の平面図である。
【符号の説明】
1 スラットコンベヤ 2 フレーム
3 ガイドレール 4 支持レール
5 スラット 6 走行ローラ
7 脚 8 ブラケット
9 ボルト 10 連結ピン
11 リンクチェーン 12 リンク
13 下段部 14 上段部
15 ガイドローラ 16 ピン細径部
17、17a、17b ピン孔 18 軸受け筒
19 偏心軸受け筒 20 軸受け孔
24a、24b、24c 溝 25 ロック部材
26 ビス 27 止め輪
30 走行方向
[0001]
The present invention relates to an apparatus for adjusting chain elongation by changing a chain pitch at an arbitrary position of a slat conveyor chain capable of bending or forming a straight conveyance path.
[0002]
[Prior art]
A slat conveyor that can be bent or linearly transported usually combines a lower step formed on the front side of the chain link with an upper step formed on the rear side of the link, and connects a number of links by inserting connecting pins into the overlapped portions. At the same time, a guide roller is attached to the lower end of each connecting pin, and a slat for placing a load on the upper part of the link is attached, and travels on a curved path on a plane.
In the utility model registration No. 2574039 known as such a conveyor, an eccentric head is integrally formed on the upper part of the connecting pin, and the eccentric head can be fitted to the pin hole of the chain link. Slat conveyors are used in various directions. As an example of a slat conveyor, for example, in order to convey an article to a predetermined position, for example, a frame is often formed on a floor surface by, for example, fixing a frame with an anchor bolt and winding it appropriately. An endless chain is run in the central part of the transport path. A large number of slat support members are attached to the upper portion of the chain, and slats made of a rectangular synthetic rubber are attached to the slat support members.
[0003]
The chain of the above conveyor is a combination of a group with links on the left and right sides and a group with links on the top and bottom sides. And it is formed endlessly. Each of the rollers is rotatably provided on the shaft extending in the vertical direction of the cross-shaped shaft, and rolls along a guide provided at a chain erection position of a substantially central claw of the frame. A roller is also rotatably provided on the shaft extending in the left-right direction of the shaft, and this roller rolls along a guide provided on the frame, and the chain is moved along the conveyance path by the driving device. To be moved.
The slat support members are attached to the respective links via fastening members, and the slats attached to these slat support members are arranged at the rear end portion of the slats in the traveling direction of the slat support members, and the front wheels of the following slats. The upper surface is superposed on the lower side, so that articles placed on the slats can be smoothly conveyed without dropping onto the conveyance path.
[0004]
[Problems to be solved by the invention]
However, in the slat conveyor as described above, the chain is stretched due to wear of the connecting shaft, etc. due to long-term use, and the link is loosened, etc. Notch, cause vibration and noise. For this reason, conventionally, this has been dealt with by absorbing the elongation of the chain by moving the track system such as the frame and the traveling rail in accordance with the elongation of the chain. In this moving method of the track system, for example, the connection portion between the curved portion and the straight portion of the conveyor frame is adjusted, but the frame is usually fixed to the floor surface by anchor bolts, and the curved portion It is necessary not only to require extensive work but also to add a lot of work and time, and to replace a worn shaft. Had to disassemble and reassemble chains and link plates.
The present invention adjusts the chain pitch at an arbitrary position by rotating a bearing cylinder having an eccentric pin hole and changing the eccentric position of the pin hole. It is an object of the present invention to provide a slat conveyor that can easily adjust the tension of the chain without moving and without greatly changing the interval between the slat support members.
[0005]
[Means for Solving the Problems]
In order to achieve the above object, according to the first aspect of the present invention, a front lower step portion corresponding to a substantially lower half thickness of the link is formed on the front side in the longitudinal direction of each link, while a substantially upper half of the link is formed on the rear side in the longitudinal direction. a number of links each connecting pin lower portion to the overlapping portion after having polymerized on each link arranged back and forth to form a side upper portion inserted through after corresponding to the part thickness connected to endless, each In a slat conveyor provided with a guide roller at the lower end of the connecting pin, and attached with a slat for placing a load on the upper part of the link; a bearing hole larger in diameter than the pin hole is provided at the connecting pin insertion position of the rear upper step of each link. Provided, fitting a bearing cylinder having an eccentric pin hole into which the upper half of the connecting pin can be inserted into the rear upper step part of every other link or every few links among the links, After the rest of each link Fitted bushing having a concentric pin hole capable of挿合the upper half of the connection pin in the upper portion; wherein the longitudinal direction of each link upper portion, the connecting pin and the respective top diameter direction of the bush same depth, a groove width; the fitted locking member is in communication with the grooves of the groove and the link upper stepped portion is formed on the top of each connecting pin and bushing, across the link upper of the lock member It is a chain elongation adjusting device of a slat conveyor characterized by being screwed to a part.
In the second aspect of the present invention, when adjusting the length of a link chain in which a large number of links are connected in an endless manner, the bearing cylinder having an eccentric pin hole into which the upper half of the connecting pin can be inserted is fitted. In at least some of the links or every other or several links, after removing the lock member, the eccentric cylinder pin position is changed by rotating the bearing cylinder having the eccentric pin hole. 2. The slat according to claim 1 , wherein the length of the link chain can be adjusted by connecting the groove of the connecting pin and the bearing tube and the groove in the upper step portion of the link so as to fit the lock member. It is a chain elongation adjusting device for a conveyor.
[0006]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a perspective view of a slat conveyor according to an embodiment of the present invention.
The slat conveyor 1 has a slat 5 attached to an upper portion of a bracket 8 fixed with bolts 9 and 9 on the upper surface of each chain 12 constituting the link chain 11, and a front portion of the upstream slat at the rear portion of the downstream slat. Are sequentially overlapped to form a conveyance surface and travel in the direction of arrow 30.
A guide rail 3 is provided at the center in the longitudinal direction of the frame 2 to guide the guide rail 15 attached to the lower end narrow diameter portion 16 of each connecting pin 10, and the traveling rollers 6 are attached to the legs 7, 7 provided on the lower surfaces of the slats. 6 is attached to the left and right support rails 4 and 4 of the frame 2. Each link 12 is, for example, in the lower portion 13 formed in the traveling direction of the front side, while sequentially polymerizing the upper portion 14 formed on the rear side of the front link, bushings on the link upper portion 14 18,19 (FIGS. 2 and 3) are arranged and the connecting pins 10 and 10 are respectively inserted.
[0007]
2 is an enlarged longitudinal sectional view of the link chain in FIG. 1, FIG. 3 is a plan view of FIG. 2, and FIG. 4 is a longitudinal sectional view taken along line AA of FIG.
As shown in the figure, the link 12 has a relatively thick block shape, the front lower step portion 13 has a thickness substantially corresponding to the lower half of the link, and the rear upper step portion 14 is the link. It has a thickness corresponding to the upper half. When the connecting pin 10 is inserted into the overlapping position of the front lower step 13 and the rear upper step 14 of the link 15, a pin hole 17 is formed in the approximate center of the front lower step 13, whereas the rear upper step The part 14 is provided with a bearing hole 20 having a diameter larger than that of the pin hole, and is fitted with a bearing cylinder (pin upper half support cylinder) 18 or 19 having a pin hole for inserting the upper half of the pin. The first bearing cylinder 18 has a concentric pin hole 17a, and the second bearing cylinder 19 has an eccentric pin hole 17b.
Assembling positions and number of the first and second bearing cylinders 18 and 19 in the series of link chains are arbitrary, and as shown in the drawing, the first bearing cylinder 18 having concentric pin holes at the front and rear is connected. or every, or connecting the second bush 19 having a first bush 18 pin hole 17b, an eccentric position on the rear side with a concentric pin holes in front of the number every other link 12 You may do it . In FIG. 4, reference numeral 22 denotes a sleeve fitted into the pin hole 17 of the lower step portion 13 of the link end, and 23 denotes a sleeve fitted to the bearing hole 20 of the upper step portion 14 of the link end. In FIG. 3, illustration of these sleeves is omitted.
[0008]
As described above, this apparatus sequentially superimposes the rear upper part 14 of the front link on the front lower part 13 of the relatively thick block-shaped link 12, and inserts the connecting pin 10 into each superposition part. A plurality of links are connected in an endless manner. Further, a groove 24a is cut in the longitudinal direction of the upper surface of each link upper step portion 14, and a bearing cylinder 18 having a connecting pin 10 and a concentric pin hole 17a. In the top diameter direction, grooves 24b and 24c having the same depth and width as the groove 24a are provided.
The bearing cylinder 19 having the eccentric pin hole 17b has a groove 24c that communicates with the top of the link cylinder 19 and the connecting pin at the top of the bearing cylinder 19 along the eccentric direction of the pin hole, that is, communicates at the origin position or a predetermined angle rotation position. Provided.
Most of the links 12 connected in large numbers are fitted with bearing cylinders 18 having concentric pin holes 17a for supporting the upper half of the pins in the bearing holes 20 of the rear upper step part 14, but several or An eccentric bearing tube 19 having an eccentric pin hole 17b is fitted to the rear upper step portion 14 of the plurality of links 12.
[0009]
2-4, when connecting and assembling the chain, the direction of the groove 24a of the link upper step 14 and the direction of the groove 24b at the top of the connection pin 10 and the direction of the groove 24c at the top of the bearing cylinders 18 and 19 are combined. The groove is in a communicating state, and a locking member 25 common to the groove is fitted and prevented from rotating, and then fixed to the link upper step portion 14 using screws 26 and 26 near both ends of the locking member 25 to obtain a constant pitch. The link chain connected by P is completed. Each connecting pin 10 is prevented from coming off by attaching a retaining ring 27 to the upper edge of the lock member 25 and the lower part of the lower step part 13 (FIG. 2).
[0010]
FIG. 5 is an enlarged longitudinal sectional view of the link chain when the pitch is adjusted, and FIG. 6 is a plan view thereof.
When the chain is stretched by the transport operation of the slat conveyor, the pitch can be adjusted by changing the eccentric position of the eccentric bearing tube 19 and penetrating the pin.
That is, after removing the lock member 25 on the eccentric bearing tube 19 side, the eccentric bearing tube 19 is rotated (180 ° in the illustrated example) to change the eccentric position of the pin hole 17b, and the grooves 24a, 24b, and 24c are in communication. After that, the lock member 25 is fitted again. In this way, the chain pitch P at any position can be adjusted to the pitch P1. For example, when the basic chain pitch P is 200 mm ± 0.2, it is changed to 205 mm. Therefore, when the chain length is shortened by 15 mm, the chain elongation can be adjusted by rotating and reassembling the eccentric bearing cylinders of the three links at arbitrary positions by 180 °.
In this way, when only the eccentric portion of the connecting pin 10 by the eccentric bearing cylinder 19 is set long, the slat conveyor is run, and when the chain pitch is extended due to wear or the like of the connecting shaft by long-term use, The pitch can be easily adjusted by changing the position.
[0011]
【The invention's effect】
As described above, according to the present invention, the chain pitch at an arbitrary position can be adjusted by rotating a bearing cylinder having a pin hole at an eccentric position by a predetermined angle and penetrating the connecting pin. Also, grooves of the same depth and width are provided in the longitudinal direction of each link upper step part and the top pin diameter direction of the connecting pin and the bearing tube, and a lock member in which these grooves are in communication is fitted, and both ends of the lock member are fitted. Since the screw is fixed to the upper stage portion of the link, it is possible to secure the rotation prevention of the connecting pin with respect to the bearing tube.
[Brief description of the drawings]
FIG. 1 is a perspective view of a slat conveyor provided with a chain elongation adjusting device of the present invention.
FIG. 2 is an enlarged vertical sectional view of the link chain in FIG.
FIG. 3 is a plan view of FIG. 2;
4 is a longitudinal sectional view taken along line AA in FIG. 3;
FIG. 5 is an enlarged longitudinal sectional view of the link chain when the pitch is adjusted.
6 is a plan view of FIG. 5. FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Slat conveyor 2 Frame 3 Guide rail 4 Support rail 5 Slat 6 Traveling roller 7 Leg 8 Bracket 9 Bolt 10 Connection pin 11 Link chain 12 Link 13 Lower step 14 Upper step 15 Guide roller 16 Pin Small diameter part 17, 17a, 17b Pin Hole 18 Bearing cylinder 19 Eccentric bearing cylinder 20 Bearing holes 24a, 24b, 24c Groove 25 Lock member 26 Screw 27 Retaining ring 30 Traveling direction

Claims (2)

各リンクの長手方向前側にリンクのほぼ下半厚みに相当する前側下段部を形成する一方、同長手方向後側にリンクのほぼ上半部厚みに相当する後側上段部を形成して前後に配置された各リンクの上下段部を重合したうえ各重合部にそれぞれ連結ピンを貫挿して多数のリンクをエンドレス状に連結し、各連結ピンの下端にガイドローラを設ける一方、リンクの上部に荷物を載せるスラットを取付けたスラットコンベヤにおいて、
前記各リンクの後側上段部の連結ピン貫挿位置にピン孔より大径の軸受け孔を設け、前記各リンクのうち少なくとも一つおき又は数個おきのリンクの後側上段部に前記連結ピンの上半部を挿合しうる偏心状のピン孔を有する軸受け筒を嵌合し、前記各リンクの残りの後側上段部に前記連結ピンの上半部を挿合しうる同心状のピン孔を有する軸受け筒を嵌合し、
前記各リンク上段部の長手方向と、連結ピン及び軸受け筒の頂部直径方向にそれぞれ同一深さ、幅の溝を設け、
前記連結ピン及び軸受け筒の頂部に形成させた溝とリンク上位段部の溝とを連通状態にしてロック部材をはめ込み、該ロック部材の両端をリンク上段部にビス止めする、
ことを特徴とするスラットコンベヤのチェーン伸び調整装置。
A front lower step corresponding to substantially the lower half thickness of the link is formed on the front side in the longitudinal direction of each link, while a rear upper step corresponding to the thickness of the upper half of the link is formed on the rear side in the longitudinal direction. and inserted through a respective connecting pin lower portion to the overlapping portion after having polymerized on the arranged respective links connecting the plurality of links in an endless shape, while providing a guide roller to the lower end of each connecting pin, the upper link In slat conveyors with slats to load loads,
A bearing hole having a diameter larger than that of the pin hole is provided at the connecting pin insertion position of the rear upper step portion of each link, and the connecting pin is provided at the rear upper step portion of at least every other or several links among the links. A concentric pin that fits a bearing cylinder having an eccentric pin hole into which the upper half of the link can be inserted, and can insert the upper half of the connecting pin into the remaining rear upper step of each link Fit the bearing cylinder with the hole,
A groove having the same depth and width is provided in the longitudinal direction of each link upper step part and in the top diameter direction of the connecting pin and the bearing tube,
Fit the locking member and the said grooves of the groove and the link upper stepped portion is formed on the top of each connecting pin and bushing in communication with, screwed at both ends of the lock member in the link upper portion,
A device for adjusting chain elongation of a slat conveyor.
多数のリンクをエンドレス状に連結したリンクチェーンの長さ調整をする際に、前記連結ピンの上半部を挿合しうる偏心状ピン孔を有する軸受け筒を嵌合した前記各リンクのうち少なくとも一部のリンクまたは1つおき乃至数個おきのリンクにおいて、前記ロック部材を取り外した上、前記偏心状ピン孔を有する軸受け筒を回転させてピン孔の偏心位置を変更し、前記連結ピン及び軸受け筒の溝とリンク上段部に溝とを連通状態にしロック部材を嵌め込むことで前記リンクチェーンの長さ調整を可能とすることを特徴とする請求項1に記載のスラットコンベヤのチェーン伸び調整装置。 When adjusting the length of a link chain in which a large number of links are connected in an endless manner, at least one of the links fitted with a bearing tube having an eccentric pin hole into which the upper half of the connecting pin can be inserted. In some links or every other or several links, the lock member is removed, and the bearing cylinder having the eccentric pin hole is rotated to change the eccentric position of the pin hole. 2. The chain extension adjustment of the slat conveyor according to claim 1 , wherein the length of the link chain can be adjusted by making the groove communicate with the groove of the bearing tube and the link upper step portion to fit the lock member. apparatus.
JP2002020540A 2002-01-29 2002-01-29 Chain elongation adjustment device for slat conveyor Expired - Lifetime JP4099639B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002020540A JP4099639B2 (en) 2002-01-29 2002-01-29 Chain elongation adjustment device for slat conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002020540A JP4099639B2 (en) 2002-01-29 2002-01-29 Chain elongation adjustment device for slat conveyor

Publications (2)

Publication Number Publication Date
JP2003221108A JP2003221108A (en) 2003-08-05
JP4099639B2 true JP4099639B2 (en) 2008-06-11

Family

ID=27744009

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002020540A Expired - Lifetime JP4099639B2 (en) 2002-01-29 2002-01-29 Chain elongation adjustment device for slat conveyor

Country Status (1)

Country Link
JP (1) JP4099639B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2833089A1 (en) * 2010-04-13 2011-10-20 George Terah Gough Conveyor
CN103129916A (en) * 2011-12-03 2013-06-05 苏州豪特景精密机械有限公司 Conveying device for wood floor
CN107694162A (en) * 2017-11-27 2018-02-16 山东赛恩环保设备有限公司 A kind of split type carrier bar for chain mud scraper

Also Published As

Publication number Publication date
JP2003221108A (en) 2003-08-05

Similar Documents

Publication Publication Date Title
JP2574039Y2 (en) Slat conveyor
US7540368B2 (en) Transverse-roller belts and modules
JP3717979B2 (en) Tensile transfer plate for small pitch chain conveyors
AU2012225677B2 (en) Transverse driven-roller belt and conveyor
EP1174370A1 (en) Conveyor belt impact cradle with adjustable wing members
ES2219543T3 (en) CARRIER FRONT BAR.
US5829849A (en) Undercarriage assembly for attack-type machine
CN110040615B (en) Moving sidewalk
AU2001271818A1 (en) Conveyor nose bar
JP4099639B2 (en) Chain elongation adjustment device for slat conveyor
US7588140B2 (en) Product conveyor with load-carrying platforms
US6481567B2 (en) Conveyor system with intermediate drive and related method
US8167116B2 (en) Reducing drag on the web of a positive displacement sorter
US6050196A (en) Storage conveyor system for carrier car
WO2000035784A8 (en) Conveyor apparatus having adjustable rollers
US6009994A (en) Modular conveyor system
JP4350402B2 (en) Chain elongation adjustment device for slat conveyor
US4821871A (en) Idler pulley surfacing
DE60307613D1 (en) DRIVING FALL CHAIN DRIVE
JP2952119B2 (en) Transfer device
JPH065282Y2 (en) Turning device
JP4211625B2 (en) Conveyor equipment
JP4622361B2 (en) Transport device
JP2590377Y2 (en) Pipe conveyor
JP4211626B2 (en) Conveyor equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050113

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071031

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071228

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080304

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110328

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4099639

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120328

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120328

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130328

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130328

Year of fee payment: 5

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130328

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140328

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term