JP4022383B2 - Integrated heat source system - Google Patents

Integrated heat source system Download PDF

Info

Publication number
JP4022383B2
JP4022383B2 JP2001314450A JP2001314450A JP4022383B2 JP 4022383 B2 JP4022383 B2 JP 4022383B2 JP 2001314450 A JP2001314450 A JP 2001314450A JP 2001314450 A JP2001314450 A JP 2001314450A JP 4022383 B2 JP4022383 B2 JP 4022383B2
Authority
JP
Japan
Prior art keywords
water
cold
heat
cooling
circulation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001314450A
Other languages
Japanese (ja)
Other versions
JP2003121024A (en
Inventor
信雄 平田
真武 入部
浩美 杉山
康浩 桑原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takasago Thermal Engineering Co Ltd
Sony Corp
Original Assignee
Takasago Thermal Engineering Co Ltd
Sony Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takasago Thermal Engineering Co Ltd, Sony Corp filed Critical Takasago Thermal Engineering Co Ltd
Priority to JP2001314450A priority Critical patent/JP4022383B2/en
Publication of JP2003121024A publication Critical patent/JP2003121024A/en
Application granted granted Critical
Publication of JP4022383B2 publication Critical patent/JP4022383B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier

Landscapes

  • Air Conditioning Control Device (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は統合型熱源システムに関し、より詳しくは、種々の冷熱源構成要素を積極的に統合して全体的に省エネルギーを図る統合型熱源システムに関する。
【0002】
【従来の技術】
近年、社会が地球環境との調和のとれた設備とその運転を要求する趨勢にあり、例えば工場のようにエネルギーを大量に消費する施設では、省エネルギーと環境負荷低減について、所轄官庁から指導されあるいは自ら取り組んでいる。
【0003】
空調設備、特に熱源システムにおいて省エネルギーを図る技術については種々のものがある。例えば特開平6−249471号公報に示される「フリークーリング」と称される方法がある。これは冬期などに冷凍機を稼動せず、冷却塔の運転による冷熱を空調に利用しようというものである。
【0004】
また、電力料金の割安な夜間に冷凍機その他の熱源機器を運転して温熱や冷熱を生成し、これを蓄熱槽に蓄えて昼に消費する技術、さらに氷や潜熱蓄熱剤を蓄熱媒体として潜熱を利用して熱源システムの運転効率を上げようとする技術も周知である。それらの運転方法としては特許第2510888号を挙げることができ、空調機等による熱負荷に対し氷蓄熱槽からの冷熱だけでは賄えない場合に冷凍機を運転する、いわゆる追い掛け運転の発停制御法が開示されている。
【0005】
【発明が解決しようとする課題】
このように熱源システムを高効率に運用しようという技術については種々の技術が知られているが、いずれも個々の要素技術の開発にとどまっている観があり、熱源システムの構成要素を積極的に統合して全体的に省エネルギーを図ろうという提案は知られていない。これは、熱源システム全体を分散させることなく一つのシステムとして構成することについて、熱利用側で刻々と変化する負荷の変動への追従性、熱バランスの安定、省運転費の維持などの面から検討が十分にしきれないことが要因として挙げられる。
【0006】
本発明は前記事項に鑑みなされたものであり、種々の冷熱源構成要素を積極的に統合して全体的に省エネルギー運転を実現する熱源システムを提供することを課題とする。
【0007】
【課題を解決するための手段】
本発明は、フリークーリング、冷熱蓄熱、蓄積された冷熱の放出、及び追い掛け運転を実施する各構成要素を採用し、冷却手段や冷熱源機器を統合して制御し、熱負荷の冷熱需要の変動に応じて冷水用冷凍機の冷凍能力を調整し、次いで冷水用冷凍機から熱負荷への冷水流量を調整することにより、前記各構成要素による冷熱生成を冷水用冷凍機の冷凍能力のベースアップと見なし、種々の冷熱源機器を有しながら一台の冷凍機を制御するかのように制御することが可能な統合型熱源システムを提供する。
【0008】
すなわち本発明の統合型熱源システムは、冷却水の冷熱を生成する冷却手段と、熱負荷の冷熱需要を賄う冷熱源機器と、冷却手段及び前記冷熱源機器の間で冷却水を往還させる冷却水循環系と、冷却水循環系の還水を冷却水循環系の往水に混合する冷却水混合手段と、を有する熱源システムであって、冷熱源機器は、熱負荷に供給される冷熱を生成する冷水用冷凍機と、蓄積用の冷熱を生成する蓄熱用冷凍機とを含み、熱負荷と冷水用冷凍機との間で冷水を往還させる第一の冷水循環系と、冷却水循環系の往水と第一の冷水循環系の還水との間で熱交換を行うフリークール熱交換器と、冷熱を蓄える冷熱蓄熱槽と、蓄熱用冷凍機と冷熱蓄熱槽との間で冷水又はブラインを往還させる第二の冷水循環系と、蓄熱用冷凍機が生成した冷熱を第一の冷水循環系の往水に供給する第一の冷熱供給手段と、冷熱蓄熱槽が蓄えた冷熱を第一の冷水循環系の往水に供給する第二の冷熱供給手段と、少なくとも第一の冷水循環系における冷水の温度を検出する温度検出手段と、第一の冷水循環系における冷水の温度及び流量の設定値を有し、冷水の温度が所望の範囲内に収まるように、冷水用冷凍機の冷凍能力を調整し、さらに冷水用冷凍機から熱負荷への単位時間当たりの冷水の流量を調整すべく各機器の運転を制御する運転制御手段と、を有する。
【0009】
前記構成によれば、冷却手段及び冷熱源機器で生成した冷熱を有効に活用することが可能であり、刻々と変化する熱負荷の冷熱需要に対応した冷熱の供給が可能であり、また各機器が熱負荷に供給する冷熱をバランス良く、かつ安定して供給することが可能となる。
【0010】
前記冷却手段は、冷却水の冷熱を生成するものであれば特に限定されず、単数でも良いし複数でも良く、一般に冷却塔等の空冷式冷却手段が好ましい。前記冷却手段には、井戸や河川等のように、温度が比較的安定している水を供給できるものを利用することもでき、このような場合では冷却塔と併用することが好ましい。また井戸水や河川水を冷却水として用いることも可能であるが、井戸水や河川水と冷却水との間で熱交換器による熱交換を行うことが、冷却水循環系における水質を保全する上で好ましい。
【0011】
前記冷熱源機器は、熱負荷の冷熱需要を賄う冷熱を生成する機器をいう。このような冷熱源機器としては冷凍機を用いることができる。
【0012】
前記冷却水循環系は、冷却手段及び冷熱源機器の間で冷却水を往還させるものであり、そのための適当な手段、すなわち送水手段や自動制御の二方弁等の弁などを含む。なおこのような循環系中の送水手段は、後述する運転制御手段によって適宜制御される。
【0013】
前記冷却水混合手段は、冷却水循環系の還水を冷却水循環系の往水に混合する手段であり、主に冷却水循環系の往水の温度を制御するための手段である。冷却水混合手段は、冷却水循環系中の任意の位置に単数又は複数が設けられるが、個々の冷熱源機器の直前直後の冷却水循環系を接続し還水を往水に混合する手段であることが好ましく、冷却水循環系に接続されている各機器に対応して設けられていることがより好ましい。冷却水混合手段には、還水を往水に混合するための適当な手段、すなわち、冷却水循環系還水管と冷却水循環系往水管とを接続する混合用通水路、送水手段、自動制御の二方弁や逆止弁等の弁などの手段を含み、これらの手段は後述する運転制御手段によって適宜制御される。
【0014】
前記冷水用冷凍機は、熱負荷に供給される冷熱を生成する冷凍機であり、第一の冷水循環系によって熱負荷と接続される。冷水用冷凍機の設置数は単数でも複数でも良く、冷水用冷凍機には、冷凍能力や用途等に応じて公知の冷凍機の中から適当な冷凍機を用いることができる。
【0015】
前記蓄熱用冷凍機は、蓄熱用の冷熱を生成する冷凍機であり、第二の冷水循環系によって冷熱蓄熱槽と接続される。蓄熱用冷凍機の設置数は単数でも複数でも良く、また蓄熱用冷凍機には、冷水用冷凍機と同様に公知の冷凍機の中から適当な冷凍機を用いることができる。また冷熱蓄熱槽は、冷熱を蓄熱するものであればその種類や設置数は特に限定されないが、本発明では公知の氷蓄熱槽を用いることができる。
【0016】
前記フリークール熱交換器は、冷却水循環系の往水と第一の冷水循環系の還水との間で熱交換を行うものであり、冷水用冷凍機の負荷を低減させ、あるいは冷水用冷凍機の運転を安定させる。
【0017】
本発明では冷却水循環系は、少なくとも冷水用冷凍機、蓄熱用冷凍機及びフリークール熱交換器を接続するが、この接続形態は冷却手段に対して直列でも良いし、並列でも良いが、冷却手段から各機器へ供給される冷却水の温度をほぼ均等にし、冷却手段の運転制御を統合する上で好ましい。
【0018】
これらの機器を直列に接続する場合では、各機器に対しそれらの還水温度が低い順に冷却水循環系の往水を供給するように各機器を接続することが、冷熱源機器間の熱バランスを調整し、かつ冷却水の冷熱を有効に活用する上で好ましい。また冷却手段として冷却塔と前述した井戸等の冷却手段とを併用する場合では、直列及び並列のいずれの場合でも、併用する冷却手段を前記各機器間の任意の位置に接続することができる。
【0019】
前記第一の冷熱供給手段は、蓄熱用冷凍機が生成した冷熱を第一の冷水循環系の往水に供給する手段であり、蓄熱用冷凍機による追い掛け運転を実現するための手段である。また前記第二の冷熱供給手段は、冷熱蓄熱槽が蓄えた冷熱を第一の冷水循環系の往水に供給する手段であり、蓄熱された冷熱を熱負荷に供給するための手段である。
【0020】
これらの冷熱供給手段は、例えば第一の冷水循環系の往水に第二の冷水循環系の冷水を直接供給するものであっても良いが、第一の冷水循環系の往水と第二の冷水循環系の冷水又はブラインとの間で熱交換を行う熱交換器であることが熱源システム及び前記両冷凍機の安定運転を実現する上で好ましい。なおここでいう第一の冷水循環系の往水とは、第一の冷水循環系において熱負荷への往水となるものであれば良く、例えば第一の冷水循環系の還水を第一の冷水循環系の往水に混合する通水路を設け、この通水路中の冷水に前記冷熱供給手段から冷熱が供給される構成を例示することができ、このような構成によれば、冷水用冷凍機の負荷を軽減し、かつ蓄熱用冷凍機で生成した冷熱を熱負荷に効率良く供給する上で好ましい。
【0021】
前記温度検出手段は、少なくとも第一の冷水循環系の冷水の温度を検出する手段であれば良く、温度センサを用いることができる。温度検出手段は、第一の冷水循環系に限定されず、第二の冷水循環系や冷却水循環系等の適所に設けることが、熱源システムの運転において各機器を統合して制御する上で好ましい。
【0022】
前記運転制御手段は、第一の冷水循環系における冷水について予め設定されている設定値に基づき、冷水の温度が所望の範囲内に収まるように、冷水用冷凍機の運転を調整し、さらに冷水用冷凍機から熱負荷への単位時間当たりの冷水の流量を調整すべく前記各機器を制御する手段である。このような運転制御手段としては、例えば設定値と検出値との比較や設定値の補正のための演算等を行う処理機構と、設定値や補正式を記憶する内部記憶装置とを有する処理装置(CPU)を例示することができる。
【0023】
前記運転制御手段は、統合型熱源システムを構成する各機器を制御するが、統合型熱源システムの構成によって種々の制御を行うことが可能である。
【0024】
例えば、本発明の統合型熱源システムが複数の冷水用冷凍機を有する場合では、運転制御手段は、冷水の温度で表される設定値と冷水の検出温度とを比較し、冷水の検出温度が前記設定値を上回る又は下回る場合では、稼動する冷水用冷凍機の台数を増加又は減少させ、さらに冷水用冷凍機から熱負荷への単位時間当たりの冷水の流量を増加又は減少させる制御を行う。このような制御によれば、熱負荷の急激な増減にも対応でき、刻々と変化する熱負荷への追従性を高める上で好ましい。
【0025】
また、本発明の統合型熱源システムが複数の冷水用冷凍機を有する場合では、運転制御手段は、各冷水用冷凍機について予め設定されている熱負荷への冷水の流量の設定値に基づいて、冷水の流量が設定値から逸脱した場合に冷水用冷凍機の稼動台数を変更する制御を行う。このような制御によれば、冷水の流量から冷水用冷凍機の稼動台数が制御され、適正なシステム運転を行う上でより好ましい。
【0026】
また、温度検出手段が第一の冷水循環系における還水の温度を検出するものであり、本発明の統合型熱源システムが複数の冷水用冷凍機を有し、冷凍機の稼動台数によって冷水の往水と還水との混合比率が変化する場合では、運転制御手段は、稼動する冷水用冷凍機の台数を変更させた場合には、変更後の冷水用冷凍機の台数と、第一の冷水循環系における還水の検出温度とに応じて、冷水用冷凍機の停止基準となる設定値を補正する制御を行う。このような制御によれば、システム運転の省力化を実現する上でより好ましい。
【0027】
また、本発明の統合型熱源システムが複数の冷水用冷凍機を有する場合では、例えばタイマーを利用し、運転制御手段は、稼動する冷水用冷凍機の台数を変更した後の一定時間内ではさらなる台数の変更を行わない制御を行う。このような制御によれば、冷凍機の台数変更後の効果を確かめることができ、熱負荷への追従性を高めつつも冷熱源機器間における熱バランスを安定させる上で好ましい。またタイマーを用いるこのような制御は他の場合に適用しても良く、このような場合としては、例えば冷凍機等の運転条件の変更後における効果待ちや、冷凍機等の運転条件の変更前における保留等が挙げられる。
【0028】
また、フリークール熱交換器によるフリークーリングについては、運転制御手段は、フリークール熱交換器を通過した冷水の温度に基づいて、例えば前述した冷却水循環系や冷却水混合手段を制御することにより、フリークール熱交換器を通る冷却水の流量を比例制御する。このような制御によれば、システム運転の省力化及び冷熱源機器間における熱バランスの安定化を実現する上で好ましい。
【0029】
また、本発明の統合型熱源システムが冷却手段として複数の冷却塔からなる場合では、運転制御手段は、予め設定されている、単位時間当たりの冷却水の流量の設定値に基づいて、冷却水の流量が設定値から逸脱した場合に冷却塔の稼動台数を変更する制御を行う。このような制御によれば、システム運転の省力化及び冷熱源機器間における熱バランスの安定化を実現する上でより好ましい。
【0030】
また、前述した場合では、冷水用冷凍機を複数有する場合と同様に、運転制御手段は、例えばタイマーを用いることにより、稼動する冷却塔の台数を変更した後の一定時間ではさらなる台数の変更を行わない制御を行う。このような制御によれば、システム運転の省力化及び冷熱源機器間における熱バランスの安定化を実現する上でより一層好ましい。
【0031】
また、本発明の統合型熱源システムは蓄熱用冷凍機、第一及び第二の冷熱供給手段を有することから、冷熱の蓄熱、冷熱蓄熱槽からの冷熱の放出、及び蓄熱用冷凍機の追い掛け運転が可能である。冷熱の蓄熱については、従来より知られているように、夜間に行う等電力料金事情に応じて行うことが好ましく、この他にも平日前休日では通常の冷熱蓄熱運転に比べてより冷熱を蓄える過蓄熱運転を行うことが好ましい。
【0032】
温度検出手段が第一の冷水循環系における還水の温度を検出するものである場合、追い掛け運転については、運転制御手段は、第一の冷水循環系における還水の検出温度に応じて蓄熱用冷凍機を稼動して、第一の冷熱供給手段に冷水を供給する制御を行う。このような制御によれば、熱負荷の冷熱需要が急激に増大した場合などにおいて追い掛け運転が可能であり、熱負荷への追従性を高める上で好ましい。
【0033】
また、本発明の統合型熱源システムが冷熱源機器として第二の冷水循環系によって冷熱蓄熱槽に接続される二台の蓄熱用冷凍機を含む場合では、運転制御手段は、蓄熱用冷凍機を稼動させ、第一の冷熱供給手段から熱負荷への冷熱の供給、第二の冷熱供給手段から熱負荷への冷熱の供給、及び冷熱蓄熱槽への冷熱の蓄積、の中から選ばれる一つ以上の運転を制御する。このような制御によれば、追い掛け運転、冷熱蓄熱槽からの冷熱の放出、及び冷熱の蓄熱、のいずれか一つ乃至全部を行うことができ、多様な運転モードを実現し、熱負荷への追従性を高めたり、またシステム運転の省力化を実現する上でより一層好ましい。
【0034】
前述した制御を可能とする統合型熱源システムの構成としては、個々の蓄熱用冷凍機と第一の冷熱供給手段又は冷熱蓄熱槽との間で冷水の循環系が形成されていれば良く、例えば、第二の冷水循環系によって冷熱蓄熱槽に接続される二台の蓄熱用冷凍機を含み、一方の蓄熱用冷凍機には少なくとも第一の冷熱供給手段が接続されており、他方の蓄熱用冷凍機には少なくとも第二の冷熱供給手段が接続されている構成が挙げられる。
【0035】
このような構成では、二台の蓄熱用冷凍機のそれぞれが独立して第二の冷水循環系及び冷熱蓄熱槽と接続されている構成であっても良いし、二台の蓄熱用冷凍機が第二の冷水循環系と冷熱蓄熱槽とを共有する構成であっても良い。また、二台の蓄熱用冷凍機が第二の冷水循環系と冷熱蓄熱槽とを共有する場合では、第二の冷水循環系に切り替え弁等を適宜設けることによって前述した循環系を形成することが可能である。
【0036】
なお、本発明の統合型熱源システムでは、熱負荷の冷熱需要を賄うにあたり、冷水用冷凍機による冷熱の供給を主とし、蓄熱用冷凍機から第一及び第二の冷熱供給手段を介する冷熱の供給を副として熱負荷に冷熱を供給することが可能であり、また、冷水用冷凍機を停止し、蓄熱用冷凍機の運転及び冷熱蓄熱槽からの冷熱の放出によって熱負荷に冷熱を供給することも可能である。このような冷熱の供給形態は、季節や熱負荷における冷熱需要の変動によって選択することが可能である。
【0037】
また、本発明の統合型熱源システムでは、本システムで生成する冷熱を、冷熱源機器によって冷熱が賄われる熱負荷以外の他の熱負荷に利用することも可能であり、このような構成としては、例えば、冷却水循環系の往水と、工場の生産機器との間で熱交換を行う他の熱交換器を冷却水循環系に設ける構成が挙げられる。
【0038】
本発明の統合型熱源システムは、冷却手段側においては冷却水混合手段を有することから、混合手段によって各機器へ適温の冷却水を供給すれば良く、複数種類の機器が冷却手段を共有していても、そのいずれか一つ(例えば要求冷却水温度が最も低い機器)に温度を合わせた冷却水を冷却手段が供給すれば良く、あたかも一台の機器(例えば冷凍機)の冷却手段のように制御することが可能である。
【0039】
また本発明の統合型熱源システムは、熱負荷側においては冷水用冷凍機による冷熱生成、蓄熱用冷凍機による追い掛け運転、冷熱蓄熱槽からの冷熱放出運転、及びフリークーリングが可能であることから、これらのうちのいずれか一つの運転をメインとし、その他の運転をメインの運転のベースアップ(例えばメインの運転機器における台数増加や冷水流量の増加)と捉えて運転を制御することが可能であり、あたかも一つの機器(例えば冷水用冷凍機)の運転を制御するように、システム全体の運転制御を行うことが可能である。
【0040】
これらのことから、本発明の統合型熱源システムは、熱負荷への冷熱生成、フリークーリング、冷熱蓄熱、及び冷熱放出の運転を実現する種々の機器を有しながらも、システム全体のバランスのとれた制御が可能であり、またシステム運転の省力化が可能であり、かつ熱負荷への追従性に優れていると言える。
【0041】
【発明の実施の形態】
本発明の統合型熱源システムについて、具体的な実施の形態を以下に示す。
【0042】
<第一の実施の形態>
本実施の形態における統合型熱源システムの装置構成図を図1に示す。本実施の形態における統合型熱源システムは、冷却塔1と、冷却水循環系2と、冷却水循環系2から往水が供給される熱交換器3、4と、ブラインスクリュー冷凍機5と、ターボ冷凍機6と、図示しない運転制御手段とを有する。熱交換器3、4、ブラインスクリュー冷凍機5、及びターボ冷凍機6は、この順に冷却水の往水が供給されるように、冷却水循環系2に並列に接続されている。ターボ冷凍機6は、第一の冷水循環系7によって空調冷熱負荷(エアハンドリングユニット、ファンコイルユニット、あるいはこれらと冷凍機との間に介装される熱交換器等)と接続されている。
【0043】
熱交換器3は、冷却水循環系2の往水管と還水管とを接続する通水路に設けられ、この通水路には冷却水循環系2の往水を熱交換器3に導入するためのポンプp1が設けられている。一方で熱交換器3は、生産機器を冷却するための生産冷却水を往還させる通水路に接続されており、この通水路中の高温冷水と冷却水循環系2の往水との間で熱交換を行う。
【0044】
熱交換器4は、冷却水循環系2の往水管と還水管とを接続する通水路に設けられ、この通水路には冷却水循環系2の往水を熱交換器4に導入するためのポンプp2が設けられている。一方で熱交換器4は、第一の冷水循環系7の還水管に接続され第一の冷水循環系7から還水を導入するためのポンプp3が設けられた通水路に接続されており、この通水路中の第一の冷水循環系7からの還水と冷却水循環系2の往水との間で熱交換を行う。
【0045】
ブラインスクリュー冷凍機5は、冷却水循環系2の往水管と冷凍機の凝縮器とを接続し冷却水循環系2から往水を導入するためのポンプp4が設けられた通水路、及び冷凍機の凝縮器と冷却水循環系2の還水管とを接続する通水路によって冷却水循環系2に接続されている。またこれらの通水路は、自動弁v1を有する通水路によってポンプp4よりも冷却塔1側で接続されている。
【0046】
ターボ冷凍機6は、冷却水循環系2の往水管と冷凍機の凝縮器とを接続し往水を導入するためのポンプp5が設けられた通水路、及び冷凍機の凝縮器と冷却水循環系2の還水管とを接続する通水路によって冷却水循環系2に接続されている。またこれらの通水路は、自動弁v2を有する通水路によってポンプp5よりも冷却塔1側で接続されている。
【0047】
ブラインスクリュー冷凍機5には、第二の冷水循環系8を介して氷蓄熱槽9が接続されている。第二の冷水循環系8の往液管には自動弁v3が設けられており、第二の冷水循環系8の還液管には自動弁v4及びポンプp6が設けられている。ポンプp6は自動弁v4よりもブラインスクリュー冷凍機5寄りにあり、自動弁v3、v4よりもブラインスクリュー冷凍機5寄りの第二の冷水循環系8には、追い掛け運転用の熱交換器10が接続されており、自動弁v3、v4よりも氷蓄熱槽9寄りの第二の冷水循環系8には、氷蓄熱槽9で蓄えた冷熱を放出するための熱交換器11が接続されている。
【0048】
熱交換器10は、第二の冷水循環系8の往液管と還液管とを接続する通水路に設けられている。第二の冷水循環系8の往液管と熱交換器10との間の通水路には自動弁v5が設けられている。また前記往液管及び熱交換器を接続する通水路と熱交換器及び前記還液管を接続する通水路とは、自動弁v6が設けられている通水路によって自動弁v5よりも熱交換器側で接続されている。一方で熱交換器10は、第一の冷水循環系7の還水管と第一の冷水循環系7の往水管とを接続する通水路に接続されており、この通水路には第一の冷水循環系7の還水を第一の冷水循環系7の往水管に供給するポンプp7が設けられている。
【0049】
熱交換器11は、第二の冷水循環系8の往液管と還液管とを接続する通水路に設けられている。第二の冷水循環系8の往液管と熱交換器11との間の通水路中には自動弁v7及びポンプp8が設けられている。また前記往液管及び熱交換器を接続する通水路と熱交換器及び前記還液管を接続する通水路とは、自動弁v8が設けられている通水路によって、自動弁v7とポンプp8との間で接続されている。一方で熱交換器11は、第一の冷水循環系7の還水管と第一の冷水循環系7の往水管とを接続する通水路に接続されており、この通水路には第一の冷水循環系7の還水を第一の冷水循環系7の往水管に供給するポンプp9が設けられている。
【0050】
また冷却水循環系2の還水管には、各冷却塔1への還水量を調整するための自動弁v9〜v11が設けられている。また図示しないが、冷却水循環系2、第一の冷水循環系7、及び第二の冷水循環系8には適所に温度センサが配置されており、検出結果を前記運転制御手段に送信するように構成されている。また図示しないが、第一の冷水循環系7の往水管及び還水管には、ターボ冷凍機6からの又は冷凍機への冷水を集合又は分配する冷水ヘッダが設けられており、保守が容易な構造とされている。
【0051】
以下、本実施の形態における統合型熱源システムについて、前述した各構成要素ごとにさらに詳しく説明する。
【0052】
<冷却手段>
本実施の形態では、大規模なシステムが必要とする冷熱を賄うため複数基((1)12セル×2、(2)21セル×1、(3)3セル×1、の48基)の冷却塔を設置している。なお(2)と(3)は連設されている。冷却塔軸流ファンの動力は、三基分を一系統としている。また冷却水の温度は、冷却水循環系2の往水管に設けた温度センサによって、各系統ごとにそれぞれ計測する。
【0053】
制御は、冷却水流量に応じた台数制御とし、前記ファン系統に合わせ、前記(1)は四段、(2)は三段、(3)は一段とし、予め制御盤に登録したマスターテーブルにしたがって起動順位を決め、それぞれの冷却塔を稼動させるものとする。なお冷却塔の稼動については、スケジュールを決め、これにしたがう交互運転としても良い。冷却水の流量は、後述するが冷凍機やフリークール用の熱交換器3、4の要求によって決定する。
【0054】
また外気条件によっては同じ運転をしても往水の温度は異なるが、水温によるファン制御は、前記の段の中で、フリークーリングを行うか否かにより設定値を決め(例えば実施するときは2℃、実施しないときは13℃)、それにあわせて運転するファンの台数を制御する。もちろん休止している冷却塔(冷却水が流れていない)ではファンを停止する。なお、流量、温度による台数制御は、その計測値に基づき一基ずつを増減させる。
【0055】
<蓄熱用冷凍機>
本実施の形態では蓄熱用冷凍機としてスクリューチラーを二基採用している。この冷凍機はターボ冷凍機よりも冷凍機成績係数(C.O.P.)が高く、通常時では−5℃のブラインを氷蓄熱槽9内の蓄熱カプセルや伝熱コイルに送り、−2℃の還液を受ける。一方で凝縮器には13度以上の冷却水が供給され、18℃の還水を冷却塔に戻す。夜間に運転(例えば10時間)し、平日前休日には過蓄熱運転(例えば冷水の供給温度を−8℃とし、例えば12時間)を行う。昼間は原則として休止するが、後述する氷蓄熱槽において氷の融解度合いが高いときや、時期により第一の冷水循環系の往水温度が高いときには稼動する。
【0056】
<冷熱蓄熱槽>
本実施の形態では、夜間の冷熱蓄熱及び昼間の冷熱放出のため、氷蓄熱の一方式である、蓄熱槽内を冷ブラインが流れ槽内の潜熱カプセルを冷却しその球体内に氷を形成する潜熱蓄熱方式を採用している。例えば朝の8時になると夜間に蓄えた冷熱の空調負荷への放出を開始する。なお放熱は、熱交換器11の入口温度が設定値(例えば4℃)より1℃上昇し例えば5分間経過したときに完了させる。休日前平日には、上記値を超えてもブラインスクリュー冷凍機5の運転を抑制して氷蓄熱槽9からの冷熱の供給を優先する。
【0057】
<冷水循環系間の配管>
ブラインスクリュー冷凍機5と氷蓄熱槽9、及び空調冷熱負荷は、それぞれ熱交換器を介してそれぞれ別系統の配管で接続されている。両系統における空調冷熱負荷側の配管は、空調冷熱負荷への入り(すなわち第一の冷水循環系7における往水管)で合流している。なお第二の冷水循環系8から第一の冷水循環系7へ冷水を直接導入する開放系配管システムとしても良く、この場合では熱交換器10、11は必要とされない。
【0058】
<冷水用冷凍機>
本実施の形態では、冷水用冷凍機としてターボ冷凍機を八基設置し、変動する負荷に対し、空調負荷の求める温度から第一の冷水循環系7における冷水の流量に基づき供給すべき冷水の温度を演算し、冷凍機のオンオフを制御する台数制御を行う。ターボ冷凍機は例えば7℃の冷水を空調冷熱負荷に送り、15℃の還水を受ける。ターボ冷凍機の凝縮器では20〜32℃の冷却水が導かれ、冷水が7℃で送り出される。凝縮器へ導かれる冷却水の温度を適正に維持するため、冷却水の還水管から冷却水還水を一部取り出して、自動弁v2を介して凝縮器入口側の冷却水往水に混合している。なお上記設定値7℃は、季節別に、例えば冬期9℃、中間期8℃のように変更される。台数制御は中央監視盤又は操作パネル等の外部入力手段からの群発停指令で開始され、また停止される。
【0059】
<空調冷熱負荷に対するフリークーリング用熱交換器>
本実施の形態における熱交換器4は、冷却水の冷熱を第一の冷水循環系における還水に伝えてターボ冷凍機6の負荷を低下させあるいは運転を安定させる。熱交換器4によるフリークーリングは二台のポンプp2及びp3の稼動により行われ、例えば冷却水温度が11℃でポンプを稼動させ、13℃でポンプを停止することで行うことができる。第一の冷水循環系7における還水は、冷水還水の一部又は全部が枝管によって熱交換器に導入され、その後還水管に戻される。
【0060】
<生産冷却水槽(図7参照)>
本実施の形態では、空調冷熱負荷以外の熱負荷として、例えば工場で使用される種々の生産装置の装置発熱部を冷却するために、冷却水の冷熱が利用されている。前記生産装置の冷却に関する運転は、例えば冷却塔からの冷却水が21℃でオンし23℃でオフとなる態様を示すことができる。この場合、生産装置への高温冷水の往水温度は約25℃になる。前記の運転は高温冷水の往水又は還水の温度によって発停を制御するものであっても良い。なお冷却塔からの冷却水温度が低すぎる場合では、前述したような通水路及び自動弁を設けることにより冷却水往水に冷却水還水を混合し、冷却水の往水温度を所定値に制御することができる。なお前述した装置発熱部としては、例えば半導体製造装置その他生産装置の発熱部のほか、冷蔵ショーケースの凝縮器やCVCS等の電気設備等が挙げられる。
【0061】
以下に本実施の形態における統合型熱源システムの運転について説明する。
一般に、冷凍機を安定して運転するためには、冷凍機の凝縮器に導入される冷却水の温度を一定にすることが好ましい。本実施の形態では、自動弁v1、v2の開度を運転制御手段によって制御し、各冷凍機へ導入される冷却水往水に還水を混合して、冷凍機に導入される冷却水の温度を一定に制御する。この際、冷却水循環系2に接続されている各機器については、適切な冷却水温度が必ずしも一様ではなく、導入される冷却水の温度をそれぞれの機器に応じて制御することが好ましい。そこで冷却塔1では、最も低温の熱を使用する機器(図1に示す場合では一般にはブラインスクリュー冷凍機であるが、負荷変動によっては熱交換器4)に合わせた冷熱を生成し、後は前述した還水の混合で冷却水往水温度を適宜調整する。なお冷却塔1の運転制御については後に詳述する。
【0062】
本実施の形態では複数のターボ冷凍機6が用いられており、これらは前記運転制御手段によって制御される。運転制御手段によるターボ冷凍機6の制御フローを図2及び図3に示す。
【0063】
運転制御手段は、例えば設定値と検出値との比較や設定値の補正のための演算等を行う処理機構と、設定値や補正式を記憶する内部記憶装置とを有する。また運転制御手段は、タイマーと接続されており、所定のステップに到達した時間を測定可能に構成されている。前記内部記憶装置には種々の設定値が記憶されており、ターボ冷凍機6の運転制御における設定値として、強制増台回数カウント値、強制減台回数カウント値(本統合型熱源システムは所定条件のときに、運転する冷凍機の台数を一台ずつ増減するが、前記二つのカウント値はその操作を行うための信号のカウント値である)、第一の冷水循環系における往水温度、往水温度の比例帯(例えば2℃)、冷凍機停止基準温度(TID)、減台乗率(DF、例えば10%)、段階的に設定された空調冷熱負荷への送水率(例えば100%、50%、0%)、冷凍機の稼動台数を変更した際の効果待ち時間(例えば5分間)、冷水の流量を変更した際の効果待ち時間(例えば30分間)、及び冷凍機の稼動台数及び冷水の流量を変動する前の保留時間、が記憶されている。なお往水の設定値は、ターボ冷凍機6の運転順序により、各ターボ冷凍機6の個々の流量設定値の総和として求められる。
【0064】
この他にもハンチング防止の隙間温度(例えば0.5℃)が設定されており、このような設定では前述した設定値よりもさらに0.5℃変動した後に次のステップに移動するが、以下の説明ではこの隙間温度設定による制御の説明を省略する。
【0065】
運転制御手段は、複数のターボ冷凍機6の台数制御をシーケンス制御にて制御する。まず運転制御手段は、中央監視装置や操作パネル等の外部入力手段から群発停の指令を受ける(ステップ201)。運転制御手段は、群発停オンの指示であれば群起動時の運転制御を開始(ステップ202)する。このとき運転制御手段は、所定の負荷流量を達成する台数までターボ冷凍機を順次起動させる。この冷凍機の起動については、予め決められた優先順位にしたがい起動する。また運転モードが予め設定されている場合では、各モードにおける最大運転台数を上限として冷凍機を起動させる。
【0066】
運転制御手段は、ターボ冷凍機を起動したら強制増台回数カウント値及び強制減台回数カウント値を設定値にリセット(ステップ203)し、タイマーによって群起動運転制御時間を測定(ステップ204)する。ここで制御時間は、群起動した冷凍機の運転を安定させるための時間であり、例えば台数変更効果待ち時間などでも良い。運転制御手段は、所定の群起動運転制御時間が経過したら群起動運転制御を停止(ステップ205)する。
【0067】
運転制御手段は、ステップ201にて停止の指令を受けた場合では、ターボ冷凍機の運転を前述した優先順位にしたがい優先順位の低い順に順次停止(ステップ206)させ、自動運転中のターボ冷凍機の台数をカウント(ステップ207)し、全台の停止によりターボ冷凍機の運転制御を終了(ステップ208)する。なおターボ冷凍機6は、第一の冷水循環系7の往水管への往水流量を制御する電動バタフライ弁を個々に備えており、電動バタフライ弁の開度を50%とする状態で起動する。
【0068】
ターボ冷凍機を起動させたら、運転制御手段は、図3に示すように第一の冷水循環系7における往水温度の検出結果と設定値とを比較(ステップ301)し、往水温度が上限値(往水温度+比例帯)を超えていなければ第一の冷水循環系7における還水温度の検出結果と設定値とを比較(ステップ302)し、還水温度が下限値(TID)以下でなければ(例えばTID+DF超)空調冷熱負荷への単位時間当たりの往水流量(段階的に設定された空調冷熱負荷への送水率)を比較(ステップ303)する。温度制御手段は、ステップ303において往水流量の増又は減をすべき流量ではない場合ではステップ301に戻る。
【0069】
ステップ301において往水温度が上限値を上回る場合では、運転制御手段は、ターボ冷凍機6の稼動台数を強制的に一台増やし、タイマーによってその効果待ち時間を測定(ステップ304)し、効果待ち時間の設定値以上の時間が経過したらステップ305に進む。運転制御手段は、ステップ305において、それまでの強制増台回数をカウントし、カウントした強制増台回数が強制増台回数カウント値(設定値)を上回る場合では設定値に1を足して補正(ステップ306)し、ステップ307に進む。運転制御手段は、ステップ305において、カウントした強制増台回数が設定値を下回る場合ではステップ307に進む。
【0070】
運転制御手段は、ステップ307においてターボ冷凍機6の電動バタフライ弁の開度が50%である冷凍機があるか否かを検出し、50%である冷凍機がある場合では電動バタフライ弁の100%とし(ステップ308)、空調冷熱負荷への往水流量を増量した効果の待ち時間をタイマーによって測定(ステップ309)し、効果待ち時間が設定値を超えた場合にはステップ301に戻る。
【0071】
運転制御手段は、ステップ307において開度が50%である冷凍機がない場合では第一の冷水循環系における往水の温度を検出し、往水温度が所定値を超えているか否かを判断(ステップ310)する。ここで前記所定値は、往水の設定値にある値を足したものであるが、このある値とは前記比例帯よりも小さな数値(例えば1℃)とされている。
【0072】
運転制御手段は、検出された往水温度が所定値を下回る場合では往水の検出温度と所定値との比較を繰り返す。運転制御手段は、検出された往水温度が所定値を上回る場合ではタイマーによって増台前の保留時間を測定(ステップ311)し、増台前の保留時間が経過した後にターボ冷凍機を一台増台(ステップ312)する。このとき増台するターボ冷凍機6は前記電動バタフライ弁の開度を50%として起動する。ステップ312において冷凍機を一台増台したら、運転制御手段は、タイマーによって時間を測定(ステップ313)し、増台の効果待ち時間を経過したらステップ301に戻る。
【0073】
ステップ302において、還水温度が設定値を下回る場合では、運転制御手段は、ターボ冷凍機6の稼動台数を強制的に一台減らし、タイマーによってその効果待ち時間を測定(ステップ314)し、効果待ち時間の設定値以上の時間が経過したらステップ315に進む。運転制御手段は、ステップ315において、それまでの強制減台回数をカウントし、カウントした強制減台回数が強制減台回数カウント値(設定値)を上回る場合では設定値に1を足して補正(ステップ316)し、ステップ317に進む。運転制御手段は、ステップ315において、カウントした強制減台回数が設定値を下回る場合ではステップ317に進む。
【0074】
運転制御手段は、ステップ317において稼動しているターボ冷凍機6の中に前記50%冷凍機があるか否かを検出し、50%冷凍機がある場合ではターボ冷凍機を一台減台(ステップ318)し、タイマーによって減台効果待ち時間を測定(ステップ319)し、減台の効果待ち時間を経過したらステップ301に戻る。
【0075】
運転制御手段は、ステップ317において50%冷凍機がない場合では電動バタフライ弁の開度を100%から50%とし(ステップ320)、タイマーによって空調冷熱負荷への往水流量を変更した効果の待ち時間を測定(ステップ321)し、効果待ち時間が設定値を超えた場合にはステップ301に戻る。
【0076】
ステップ303において、冷凍機において段階的に設定されている流量のいずれか一つを超えた場合では、運転制御手段は、ステップ322において増台又は流量の増量を行う前の保留時間をタイマーによって測定する。ここで台数の変動が条件とされているのは、前述した設定値(例えば100%、50%、0%)において実際の往水流量が設定値である100%以上となる場合があるためである。一定の保留時間が経過したら、運転制御手段はステップ307に進む。
【0077】
ステップ303において、冷凍機において段階的に設定されている流量のいずれか一つを下回った場合では、運転制御手段は、ステップ323において減台又は流量の減量を行う前の保留時間をタイマーによって測定する。台数の減台と流量の減量との両方の条件を設けた理由については前述の増台、増量の場合と同様である。一定の保留時間が経過したら、運転制御手段はステップ317に進む。
【0078】
なお、冷水用冷凍機に、機器自身でベーン開度を調整し、若干の容量制御をする機能を有する冷凍機を用いる場合では、冷凍機による自己調整を考慮し、比例帯を小さくし(例えば2℃→1℃)、設定値を調整(例えば7℃→8℃)すれば良い。また季節等の環境に応じて設定値を変更しても良い。
【0079】
本実施の形態では、第一の冷水循環系7における空調冷熱負荷からの還水を熱交換器4によるフリークーリングで冷却可能な構成とされている。このフリークーリングは、熱交換器4に供給する冷却水の水温が急激に変動しないように、冷却塔1で散水される水量を二方弁の比例制御により行われる。本実施の形態では、3グループの冷却塔1群が形成されており、優先順位をつけてある冷却塔群(セット)についてフル運転(全流量運転)をし、他の2セットについては流量を絞るかあるいは運転を停止(弁は全閉、散水量はゼロ)する。
【0080】
また、フリークーリングが有効か無効かは外気温の変動等によって影響されるが、これを判断するために、冷却塔1の運転では有効温度を予め設定しておく。そして冷却塔1の運転制御に際しては、設定された温度及び隙間温度(例えば2℃)をとり、前述したターボ冷凍機の運転制御のごとく、効果待ち時間を計測する制御を行う。例えばフリークーリングをやめた後冷却水温度が下がり、冷却水の温度が前記設定温度に達してもすぐにはフリークーリングを再開せず、前記設定温度から2℃降下したときにフリークーリングを再開するように制御する。このような制御は運転制御手段によって行われ、温度の検出は冷却水循環系2に適宜配置された温度センサによって行われる。
【0081】
冷却塔1の運転制御では、温度調整手段は、例えば図4に示す台数制御フローにしたがい冷却塔1の運転を制御する。冷却塔1の台数制御では、冷却塔1での冷却能力は冷却水の流量で判断することができ、個々の冷却塔セットにおける、増台又は減台すべき冷却水の流量(例えば増台乗率100%や減台乗率10%)が設定値として設定される。なお冷却水流量の設定値は、冷却塔の運転順序により個々の冷却塔セットにおける冷却水流量の総和として求められる。
【0082】
冷却塔の台数制御において、運転制御手段は、冷却水循環系2における冷却水流量と設定値とを比較(ステップ401)し、冷却水循環系2における冷却水流量が増台流量以上である場合ではタイマーによって比較後の時間を測定(ステップ402)し、増台保留時間を経過したら冷却塔を一台(又は1セット)増台(ステップ403)し、タイマーによって増台後の時間を測定(ステップ404)し、増台効果待ち時間を経過した後にステップ401に戻る。
【0083】
また運転制御手段は、ステップ401において循環系2の冷却水流量が減台流量以下である場合ではタイマーによって比較後の時間を測定(ステップ405)し、減台保留時間を経過したら冷却塔を一台(又は1セット)減台(ステップ406)し、タイマーによって減台後の時間を測定(ステップ407)し、減台効果待ち時間を経過した後にステップ401に戻る。
【0084】
なおステップ401において循環系2の冷却水流量が前記いずれの条件に当てはまらない場合では、運転制御手段はステップ401にて冷却水流量の比較を繰り返す。
【0085】
本実施の形態では、ブラインスクリュー冷凍機5による冷熱蓄熱運転、追い掛け運転、及び氷蓄熱槽からの冷熱放出が行われる。冷熱蓄熱運転では通常の冷熱蓄熱運転と過蓄熱運転とを行うことができる。
【0086】
冷熱蓄熱運転では、運転制御手段は、自動弁v3、v4を開き、自動弁v5、v6、v7、v8を閉じ、ポンプp6を稼動させる。これによりブラインスクリュー冷凍機5と氷蓄熱槽9との間にブラインの循環系が形成され、冷熱蓄熱が行われる。
【0087】
運転制御手段は、通常は日単位及び週単位の条件によって冷熱蓄熱運転を開始する。ここで前記条件とは、夜間、平日前休日等の条件である。運転制御手段は、ブラインスクリュー冷凍機5への還液の温度が一定温度以下が一定時間以上継続した場合に蓄熱完了と判断し冷熱蓄熱運転を終了する。通常の冷熱蓄熱運転であれば、例えば、第二の冷水循環系8において、ブラインスクリュー冷凍機5の出口温度(すなわち往液温度)が−3.5℃を達成するブラインスクリュー冷凍機5の入口温度を基準設定値とし、隙間温度を1℃、待機時間を5分間とする条件が挙げられる。過蓄熱運転であれば、例えば冷凍機出口温度が−8.0℃を達成するブラインスクリュー冷凍機5の入口温度を基準設定値とし、後は通常蓄熱時と同様とする条件が挙げられる。
【0088】
追い掛け運転では、運転制御手段は、自動弁v3、v4を閉じ、自動弁v5、v6を開きポンプp6を稼動させる。これによりブラインスクリュー冷凍機5と熱交換器10との間にブラインの循環系が形成され、空調冷熱負荷に供給される冷水が冷却される。なお追い掛け運転に際しては、運転制御手段は、第一の冷水循環系7に設けられたポンプp7を稼動させ、熱交換器10を介して第一の冷水循環系7の還水を第一の冷水循環系7の往水管に導入させる。
【0089】
追い掛け運転は、ターボ冷凍機6への還水を冷却して往水に合流させることから、ターボ冷凍機6による冷熱生成を助け、あたかもターボ冷凍機が増台したかのように制御することができる。追い掛け運転は、運転制御手段が所定の設定に応じて行うことができ、またシステムオペレータによる外部入力指令によって実行させることもできる。
【0090】
氷蓄熱槽9からの冷熱放出では、運転制御手段は、自動弁v3、v4を閉じ、自動弁v7、v8を開きポンプp6を稼動させる。これによりブラインスクリュー冷凍機5と熱交換器11との間にブラインの循環系が形成され、空調冷熱負荷に供給される冷水が冷却される。なお冷熱放出に際しては、運転制御手段は、第一の冷水循環系7に設けられたポンプp9を稼動させ、熱交換器11を介して第一の冷水循環系7の還水を第一の冷水循環系7の往水管に導入させる。
【0091】
冷熱放出は、追い掛け運転と同様に、運転制御手段による判断又はシステムオペレータからの指令によって実行される。冷熱放出も、ターボ冷凍機6への還水を冷却して往水に合流させることから、ターボ冷凍機6による冷熱生成を助け、あたかもターボ冷凍機が増台したかのように制御することができる。
【0092】
なお冷熱放出は、日単位や週単位の条件を加味して行われても良く、例えば休日前平日である場合などでは氷蓄熱槽9に蓄えた冷熱の全てを使用すべく冷熱放出運転を優先して行うことができる。また冷熱放出と追い掛け運転は同時に行うことができ、季節にもよるが、例えば午後2時などのピーク時間帯などでは冷熱放出と追い掛け運転とを同時に行うと良い。
【0093】
本実施の形態における統合型熱源システムは、ターボ冷凍機6、ブラインスクリュー冷凍機5、熱交換器10、11、及び、熱交換器10及び11を介して第二の冷水循環系8から第一の冷水循環系7に冷熱を供給できる構成を有することから、追い掛け運転と冷熱放出運転が可能となり、またこれらの運転は、ターボ冷凍機6の冷熱生成容量のベースアップとして制御することが可能であるので、これらの運転を統合して制御することができ、種々の冷熱源を有しつつも空調冷熱負荷の変動に対する追従性、熱バランスの安定及びシステム運転のさらなる省力化を実現することができる。
【0094】
また本実施の形態における統合型熱源システムは、冷却塔1、冷却水循環系2、及び各冷凍機からの還水を各冷凍機への往水に自在に混合できる構成を有することから、一系統の冷却手段から各冷熱源機器に適した温度の冷却水を各冷熱源機器に供給することが可能であり、種々の冷熱源を有しつつも空調冷熱負荷の変動に対する追従性、熱バランスの安定及びシステム運転のさらなる省力化を実現することができる。
【0095】
また本実施の形態における統合型熱源システムは、熱交換器4を有することから、空調冷熱負荷からの還水を冷却することができ、ターボ冷凍機6の負担を軽減し、さらには冷却塔1で生成した冷熱を有効に活用することができ、空調冷熱負荷の変動に対する追従性、熱バランスの安定及びシステム運転のさらなる省力化を実現することができる。
【0096】
また本実施の形態における統合型熱源システムは、熱交換器3を有することから、工場における生産機器等、他の熱負荷に対して冷却塔1で生成した冷熱を利用することができ、冷却塔1において生成した冷熱をさらに有効に活用することができる。
【0097】
また本実施の形態における統合型熱源システムは、台数制御において、稼動台数又は冷水流量又は冷却水流量を変更した場合に、効果待ち時間をおいて次の制御工程に進むことから、熱バランスの安定性を確保しつつ種々の機器を好適に制御することができる。
【0098】
<第二の実施の形態>
本実施の形態における統合型熱源システムは、図5に示すように、ブラインスクリュー冷凍機を二機有している。そして各々を別の運転モードで独立運転することを可能にしている。より詳しくは、本実施の形態における統合型熱源システムは、自動弁v3及びv4よりも氷蓄熱槽9寄りで、かつ熱交換器11への通水管と第二の冷水循環系8との接続部よりもブラインスクリュー冷凍機5寄りの第二の冷水循環系8にブラインスクリュー冷凍機15をさらに接続し、自動弁v3、v4に対応する自動弁v12、v13を設け、ブラインスクリュー冷凍機5と冷却水循環系2を共有する通水管及びポンプp11を設けた以外は第一の実施の形態と同様の構成とされている。
【0099】
本実施の形態における統合型熱源システムは、自動弁v3、v4を閉じることによって、ブラインスクリュー冷凍機5による追い掛け運転と、ブラインスクリュー冷凍機15の冷熱蓄熱運転とを同時に行うことが可能であり、また冬期などの低負荷時ではターボ冷凍機6を使用せずにブラインスクリュー冷凍機5及び15によって空調冷熱負荷の冷熱需要を賄うことが可能となり、さらに自動弁v3、v4、v12、v13を開くことにより、二機のブラインスクリュー冷凍機による追い掛け運転や冷熱蓄熱運転を行うことが可能である。また二機のブラインスクリュー冷凍機5を自動弁の切替によって、冷熱蓄熱、追い掛け運転に同時に共働させることもできる。このように本実施の形態における統合型熱源システムは、よりバリエーションの多いシステム運転を可能としている。
【0100】
なお本実施の形態では二機のブラインスクリュー冷凍機を用いているが、空調冷熱負荷の冷熱需要を賄うのに十分な容量の冷凍機を用い、この冷凍機に、氷蓄熱槽9と接続される冷水循環系、及び熱交換器10と接続される冷水循環系をそれぞれ接続し、ヘッダによって蓄熱系統と追い掛け運転系統とに冷水を分配する構成とすることにより、本実施の形態における統合型熱源システムと同様の効果を奏する統合型熱源システムを構築することが可能である。
【0101】
<第三の実施の形態>
本実施の形態における統合型熱源システムは、図6に示すように、冷却水循環系2に接続される各機器を冷却水の流れ方向に沿って冷却塔1側から、熱交換器4、ブラインスクリュー冷凍機5、熱交換器3、ターボ冷凍機6の順に配置し、かつこれらの機器を冷却水循環系2の往水管で直列に接続した以外は第一の実施の形態と同様の構成とされている。
【0102】
本実施の形態における統合型熱源システムは、冷却塔1側から順に冷却水の冷熱が利用される。また前述した実施の形態では、冷却水の還水を往水に混合することで各機器に適した水温の冷却水を供給することが可能であったが、本実施の形態ではこのような冷却水の水温調整も可能であり、かつ上流側の機器における冷熱利用によって下流側の機器における冷却水温度の調整が可能であることから、本実施の形態における統合型熱源システムは、冷却塔1で生成した冷熱を有効に利用する上で効果的な一形態であると言える。
【0103】
<第四の実施の形態>
本実施の形態における統合型熱源システムは、図7に示すように、冷却水循環系2における冷却水の流れ方向に沿って冷却塔1側からブラインスクリュー冷凍機5、熱交換器3、熱交換器4、ターボ冷凍機6を接続し、さらに冷却水循環系2からブラインスクリュー冷凍機5に冷却水を導入する通水路に井戸水を混合できるように構成され、かつブラインスクリュー冷凍機5に対応する冷却水混合手段が設けられていない以外は、第一の実施の形態と同様に構成されている。
【0104】
より詳しくは、本実施の形態における統合型熱源システムでは、ブラインスクリュー冷凍機と冷却水循環系2の往水管とを接続する通水路に自動弁v14、ポンプp4を設け、ポンプp4とブラインスクリュー冷凍機5との間の前記通水路に井戸水を供給する通水路が接続されている。またブラインスクリュー冷凍機5と冷却水循環系2の還水管とを接続する通水路には井戸20への冷却水戻り通水路が接続されている。井戸からの通水路にはポンプp13と自動弁v15とが設けられており、井戸への戻り通水路には自動弁v16が設けられている。
【0105】
本実施の形態における統合型熱源システムは、冷却水として井戸水が単独で、又は冷却塔1の冷却水と併用して利用できることから、例えば冷却塔1の冷却能力が低下する夏季にも、各機器に冷熱を安定して供給することが可能となる。なお本実施の形態では、冷却水循環系2に井戸水を直接導入する構成としているが、井戸水の冷熱と冷却水循環系2の冷却水とを、熱交換器を介して熱交換させる構成としても良い。また本実施の形態では、冷却塔1以外の冷却手段で冷却水の冷熱が生成される構成として井戸を利用しているが、井戸水に代えて河川水を用いても良い。
【0106】
【発明の効果】
本発明の統合型熱源システムは、冷却水の冷熱を生成する冷却手段と、熱負荷の冷熱需要を賄う冷熱源機器と、冷却手段及び冷熱源機器の間で冷却水を往還させる冷却水循環系と、冷却水循環系の還水を冷却水循環系の往水に混合する冷却水混合手段と、を有する熱源システムであって、冷熱源機器は、熱負荷に供給される冷熱を生成する冷水用冷凍機と、蓄積用の冷熱を生成する蓄熱用冷凍機とを含み、熱負荷と冷水用冷凍機との間で冷水を往還させる第一の冷水循環系と、冷却水循環系の往水と第一の冷水循環系の還水との間で熱交換を行うフリークール熱交換器と、冷熱を蓄える冷熱蓄熱槽と、蓄熱用冷凍機と冷熱蓄熱槽との間で冷水又はブラインを往還させる第二の冷水循環系と、蓄熱用冷凍機が生成した冷熱を第一の冷水循環系の往水に供給する第一の冷熱供給手段と、冷熱蓄熱槽が蓄えた冷熱を第一の冷水循環系の往水に供給する第二の冷熱供給手段と、少なくとも第一の冷水循環系における冷水の温度を検出する温度検出手段と、第一の冷水循環系における冷水の温度及び流量の設定値を有し、冷水の温度が所望の範囲内に収まるように、冷水用冷凍機の冷凍能力を調整し、さらに冷水用冷凍機から熱負荷への単位時間当たりの冷水の流量を調整すべく各機器の運転を制御する運転制御手段と、を有することから、冷水用冷凍機の冷凍能力容量を各冷熱源機器が補う形で各機器を制御することができ、かつ任意の機器に条件を合わせて冷却手段を制御しても各機器に好適な水温の冷却水を供給することができ、種々の冷熱源構成要素を積極的に統合して全体的に省エネルギー運転を実現することができる。
【0107】
また本発明の統合型熱源システムでは、冷熱源機器は複数の冷水用冷凍機を含み、運転制御手段は、冷水の温度で表される設定値と冷水の検出温度とを比較し、冷水の検出温度が設定値を上回る場合又は下回る場合では、稼動する冷水用冷凍機の台数を増加又は減少させ、さらに冷水用冷凍機から熱負荷への単位時間当たりの冷水の流量を増加又は減少させる構成であると、熱負荷の急激な増減にも対応し、刻々と変化する熱負荷への追従性を高める上でより一層効果的である。
【0108】
また本発明の統合型熱源システムでは、運転制御手段は、各冷水用冷凍機について予め設定されている熱負荷への冷水の流量の設定値に基づいて、冷水の流量が設定値から逸脱した場合に冷水用冷凍機の稼働台数を変更する構成であると、冷水の流量から冷水用冷凍機の稼動台数が制御され、適正なシステム運転を行う上でより一層効果的である。
【0109】
また本発明の統合型熱源システムでは、温度検出手段は第一の冷水循環系における還水の温度を検出するものであり、運転制御手段は、稼動する冷水用冷凍機の台数を変更させた場合には、変更後の冷水用冷凍機の台数と、第一の冷水循環系における還水の検出温度とに応じて、冷水用冷凍機の停止基準となる設定値を補正する構成であると、システム運転の省力化及び適正なシステム運転を実現する上でより一層効果的である。
【0110】
また本発明の統合型熱源システムでは、運転制御手段は、稼動する冷水用冷凍機の台数を変更した後の一定時間内ではさらなる台数の変更を行わない構成とすると、熱負荷への追従性を高めつつも冷熱源機器間における熱バランスを安定させる上でより一層効果的である。
【0111】
また本発明の統合型熱源システムでは、運転制御手段は、フリークール熱交換器を通過した冷水の温度に基づいて、フリークール熱交換器を通る冷却水の流量を比例制御する構成であると、システム運転の省力化及び冷熱源機器間における熱バランスの安定化を実現する上でより一層効果的である。
【0112】
また本発明の統合型熱源システムでは、冷却手段は複数の冷却塔からなり、運転制御手段は、予め設定されている、単位時間当たりの冷却水の流量の設定値に基づいて、冷却水の流量が設定値から逸脱した場合に冷却塔の稼動台数を変更する構成であると、システム運転の省力化及び冷熱源機器間における熱バランスの安定化を実現する上でより一層効果的である。
【0113】
また本発明の統合型熱源システムでは、運転制御手段は、稼動する冷却塔の台数を変更した後の一定時間内ではさらなる台数の変更を行わない構成であると、システム運転の省力化及び冷熱源機器間における熱バランスの安定化を実現する上でより一層効果的である。
【0114】
また本発明の統合型熱源システムでは、温度検出手段は第一の冷水循環系における還水の温度を検出するものであり、運転制御手段は、第一の冷水循環系における還水の検出温度に応じて蓄熱用冷凍機を稼動して、第一の冷熱供給手段に冷水を供給する構成であると、熱負荷の冷熱需要が急激に増大した場合などにおいて追い掛け運転が可能であり、熱負荷への追従性を高める上でより一層効果的である。
【0115】
また本発明の統合型熱源システムでは、冷熱源機器は、第二の冷水循環系によって冷熱蓄熱槽に接続される二台の蓄熱用冷凍機を含み、一方の蓄熱用冷凍機には少なくとも第一の冷熱供給手段が接続されており、他方の蓄熱用冷凍機には少なくとも第二の冷熱供給手段が接続されている構成であり、運転制御手段は、蓄熱用冷凍機を稼動させ、第一の冷熱供給手段から熱負荷への冷熱の供給、第二の冷熱供給手段から熱負荷への冷熱の供給、及び冷熱蓄熱槽への冷熱の蓄積、の中から選ばれる一つ以上の運転を制御する構成であると、多様な運転モードを実現し、熱負荷への追従性を高めたり、またシステム運転の省力化を実現する上でより一層効果的である。
【0116】
また本発明の統合型熱源システムでは、第一の冷水循環系の還水を第一の冷水循環系の往水に混合する通水路を有し、第一の冷熱供給手段は通水路の冷水と第二の冷水循環系の往液との間で熱交換を行う熱交換器であり、第二の冷熱供給手段は通水路の冷水と第二の冷水循環系の還液との間で熱交換を行う熱交換器であると、熱源システム及び前記両冷凍機の安定運転を実現する上でより一層効果的である。
【0117】
また本発明の統合型熱源システムでは、冷却水循環系は、各機器に対しそれらの還水温度の低い順に冷却水循環系の往水を供給するように各機器を直列に接続する構成であると、生成した冷熱の有効活用を実現する上でより一層効果的である。
【0118】
また本発明の統合型熱源システムでは、冷却手段は井戸を含む構成であると、熱バランスの安定化を実現する上でより一層効果的である。
【図面の簡単な説明】
【図1】本発明の統合型熱源システムにおける第一の実施の形態を示す全体構成図である。
【図2】本発明に用いられる運転制御手段の台数制御における群発停起動の一例を示す制御フローである。
【図3】本発明に用いられる運転制御手段によるターボ冷凍機の台数制御の一例を示す制御フローである。
【図4】本発明に用いられる運転制御手段による冷却塔の台数制御の一例を示す制御フローである。
【図5】本発明の統合型熱源システムにおける第二の実施の形態を示す全体構成図である。
【図6】本発明の統合型熱源システムにおける第三の実施の形態を示す全体構成図である。
【図7】本発明の統合型熱源システムにおける第四の実施の形態を示す全体構成図である。
【符号の説明】
1 冷却塔
2 冷却水循環系
3、4、10、11 熱交換器
5、15 ブラインスクリュー冷凍機
6 ターボ冷凍機
7 第一の冷水循環系
8 第二の冷水循環系
9 氷蓄熱槽
20 井戸
p1〜p13 ポンプ
v1〜v17 自動弁
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an integrated heat source system, and more particularly to an integrated heat source system that actively integrates various cold heat source components to save energy overall.
[0002]
[Prior art]
In recent years, society is in a trend to demand equipment and its operation that are in harmony with the global environment. For example, in facilities that consume large amounts of energy, such as factories, etc. I am working on my own.
[0003]
There are various technologies for energy saving in air conditioning equipment, particularly heat source systems. For example, there is a method called “free cooling” disclosed in Japanese Patent Laid-Open No. 6-249471. This is to avoid using the refrigerator in the winter and to use the cold energy from the operation of the cooling tower for air conditioning.
[0004]
In addition, we operate refrigerators and other heat source equipment at night when electricity rates are cheap to generate heat and cold, store them in a heat storage tank and consume them in the daytime, and latent heat using ice and latent heat storage agent as a heat storage medium A technique for improving the operation efficiency of a heat source system using the above is also well known. Patent No. 2510888 can be cited as an operation method thereof, and so-called chasing operation start / stop control in which a refrigerator is operated when the heat load from an air conditioner or the like cannot be covered only by cold heat from an ice heat storage tank. The law is disclosed.
[0005]
[Problems to be solved by the invention]
As described above, various technologies are known for operating the heat source system with high efficiency. However, there is a view that all of them are limited to the development of individual elemental technologies, and the components of the heat source system are actively used. There is no known proposal to consolidate and save energy overall. This is because the entire heat source system is configured as a single system without being dispersed, from the viewpoints of followability to load fluctuations that change every moment on the heat utilization side, stability of heat balance, maintenance of operating costs, etc. The reason is that the study is not fully conducted.
[0006]
This invention is made | formed in view of the said matter, and makes it a subject to provide the heat-source system which implement | achieves an energy saving driving | operation as a whole by actively integrating various cold-heat-source components.
[0007]
[Means for Solving the Problems]
The present invention adopts each component that implements free cooling, cold heat storage, discharge of accumulated cold heat, and chasing operation, and integrates and controls the cooling means and the cold source equipment to change the cold demand of the heat load. By adjusting the refrigeration capacity of the chilled water refrigerator according to the temperature, and then adjusting the flow rate of the chilled water from the chilled water refrigerator to the heat load, the base of the refrigeration capacity of the chilled water refrigerator is generated by the cold water generation by the above components. Therefore, the present invention provides an integrated heat source system that can be controlled as if it controls a single refrigerator while having various cold heat source devices.
[0008]
That is, the integrated heat source system of the present invention includes a cooling unit that generates cooling water of cooling water, a cooling source device that covers the cooling demand of the heat load, and a cooling water circulation that returns cooling water between the cooling unit and the cooling source device. And a cooling water mixing means that mixes the return water of the cooling water circulation system with the outgoing water of the cooling water circulation system, and the cold heat source device is for cold water that generates cold heat supplied to the heat load. A first chilled water circulation system that includes a refrigeration machine and a heat storage chiller that generates cold energy for storage, and that transfers chilled water between the heat load and the chilled water refrigerator; A free cool heat exchanger that exchanges heat with the return water of one chilled water circulation system, a cold heat storage tank that stores cold heat, a chilled water or brine that goes back and forth between the heat storage refrigerator and the cold heat storage tank The cold heat generated by the second cold water circulation system and the heat storage refrigerator A first cold supply means for supplying water to the water circulation system; a second cold supply means for supplying cold energy stored in the cold heat storage tank to the first cold water circulation system; and at least a first cold water circulation. The temperature detection means for detecting the temperature of the chilled water in the system, and the set value of the temperature and flow rate of the chilled water in the first chilled water circulation system, so that the temperature of the chilled water falls within a desired range. Operation control means for adjusting the refrigerating capacity and controlling the operation of each device to adjust the flow rate of the cold water per unit time from the cold water refrigerator to the heat load.
[0009]
According to the above configuration, it is possible to effectively use the cold generated by the cooling means and the cold heat source equipment, and it is possible to supply cold heat corresponding to the cold demand of the heat load that changes every moment. It is possible to supply the cold heat supplied to the heat load in a balanced and stable manner.
[0010]
The cooling means is not particularly limited as long as it generates cooling water of cooling water, and may be single or plural, and air cooling type cooling means such as a cooling tower is generally preferable. As the cooling means, one that can supply water having a relatively stable temperature, such as a well or a river, can be used. In such a case, it is preferable to use it together with a cooling tower. It is also possible to use well water or river water as cooling water, but it is preferable to perform heat exchange between the well water, river water and cooling water using a heat exchanger in order to maintain water quality in the cooling water circulation system. .
[0011]
The cold heat source device refers to a device that generates cold heat to meet the cold load demand of the heat load. A refrigerator can be used as such a cold heat source device.
[0012]
The cooling water circulation system is for returning the cooling water between the cooling means and the cold heat source equipment, and includes appropriate means for that purpose, that is, a valve such as a water supply means and an automatic control two-way valve. The water supply means in such a circulation system is appropriately controlled by an operation control means described later.
[0013]
The cooling water mixing means is means for mixing the return water of the cooling water circulation system with the outgoing water of the cooling water circulation system, and is a means for mainly controlling the temperature of the outgoing water of the cooling water circulation system. One or more cooling water mixing means are provided at any position in the cooling water circulation system, but the cooling water circulation system immediately before and after each cold heat source device is connected to mix the return water with the outgoing water. It is preferable that it is provided corresponding to each device connected to the cooling water circulation system. The cooling water mixing means includes an appropriate means for mixing the return water with the outgoing water, that is, a mixing water passage for connecting the cooling water circulation system return water pipe and the cooling water circulation system outgoing pipe, water supply means, and automatic control. It includes means such as a valve such as a direction valve and a check valve, and these means are appropriately controlled by operation control means described later.
[0014]
The cold water refrigerator is a refrigerator that generates cold heat supplied to a heat load, and is connected to the heat load by a first cold water circulation system. The number of installed cold water refrigerators may be one or more. As the cold water refrigerator, an appropriate refrigerator can be used from among known refrigerators according to the refrigeration capacity and application.
[0015]
The regenerator for heat storage is a refrigerating machine that generates cold heat for heat storage, and is connected to a cold heat storage tank by a second cold water circulation system. The number of installed heat storage refrigerators may be one or more, and a suitable refrigerator from among known refrigerators can be used as the heat storage refrigerator as well as the cold water refrigerator. Further, the type and number of installations of the cold heat storage tank are not particularly limited as long as the cold heat storage tank stores heat, but a known ice heat storage tank can be used in the present invention.
[0016]
The free cool heat exchanger performs heat exchange between the outgoing water of the cooling water circulation system and the return water of the first cold water circulation system, and reduces the load of the cold water refrigerator or the cold water freezing Stabilize machine operation.
[0017]
In the present invention, the cooling water circulation system connects at least a cold water refrigerator, a heat storage refrigerator, and a free cool heat exchanger, and this connection form may be in series or in parallel with the cooling means. It is preferable to make the temperature of the cooling water supplied to each device substantially uniform and to integrate the operation control of the cooling means.
[0018]
When these devices are connected in series, connecting each device so that the cooling water circulation system water is supplied to each device in the order of their return water temperature is the heat balance between the heat source devices. It is preferable for adjusting and effectively utilizing the cooling heat of cooling water. Further, in the case where the cooling tower and the cooling means such as the well described above are used together as the cooling means, the cooling means used in combination can be connected to any position between the devices in both cases of series and parallel.
[0019]
The first cold heat supply means is means for supplying cold heat generated by the heat storage refrigerator to the outgoing water of the first cold water circulation system, and is means for realizing a chasing operation by the heat storage refrigerator. The second cold supply means is a means for supplying the cold heat stored in the cold heat storage tank to the outgoing water of the first cold water circulation system, and is a means for supplying the stored cold heat to the heat load.
[0020]
These cold heat supply means may, for example, supply the cold water of the second cold water circulation system directly to the outgoing water of the first cold water circulation system. A heat exchanger that exchanges heat with cold water or brine in the cold water circulation system is preferable in order to realize stable operation of the heat source system and the two refrigerators. Note that the first cold water circulation system referred to here may be any water that can be used for the heat load in the first cold water circulation system. For example, the return water of the first cold water circulation system may be the first. A configuration is provided in which a water passage that is mixed with the outgoing water of the cold water circulation system is provided, and cold water is supplied to the cold water in the water passage from the cold heat supply means. It is preferable for reducing the load on the refrigerator and efficiently supplying the cold heat generated by the heat storage refrigerator to the heat load.
[0021]
The temperature detecting means may be any means that detects at least the temperature of the cold water in the first cold water circulation system, and a temperature sensor can be used. The temperature detection means is not limited to the first cold water circulation system, and is preferably provided at an appropriate place such as the second cold water circulation system or the cooling water circulation system in order to integrate and control each device in the operation of the heat source system. .
[0022]
The operation control means adjusts the operation of the chilled water refrigerator based on a preset value for the chilled water in the first chilled water circulation system so that the temperature of the chilled water falls within a desired range, and further It is a means to control each said apparatus in order to adjust the flow volume of the cold water per unit time from the refrigerator to a heat load. As such an operation control means, for example, a processing device having a processing mechanism for performing a comparison between a set value and a detected value, a calculation for correcting the set value, and the like, and an internal storage device for storing the set value and the correction formula (CPU) can be exemplified.
[0023]
The operation control means controls each device constituting the integrated heat source system, and various controls can be performed depending on the configuration of the integrated heat source system.
[0024]
For example, in the case where the integrated heat source system of the present invention has a plurality of cold water refrigerators, the operation control means compares the set value represented by the temperature of the cold water with the detected temperature of the cold water, and the detected temperature of the cold water is When exceeding or below the set value, control is performed to increase or decrease the number of operating cold water refrigerators, and further increase or decrease the flow rate of cold water per unit time from the cold water refrigerator to the heat load. Such control can cope with a sudden increase or decrease of the thermal load, and is preferable for improving the followability to the changing thermal load.
[0025]
Further, in the case where the integrated heat source system of the present invention has a plurality of chilled water refrigerators, the operation control means is based on the set value of the flow rate of the chilled water to the heat load preset for each chilled water refrigerator. When the flow rate of cold water deviates from the set value, control is performed to change the number of operating cold water refrigerators. According to such control, the number of operating cold water refrigerators is controlled from the flow rate of cold water, which is more preferable in performing proper system operation.
[0026]
Further, the temperature detection means detects the temperature of the return water in the first chilled water circulation system, and the integrated heat source system of the present invention has a plurality of chilled water refrigerators, and the chilled water depends on the number of operating chillers. In the case where the mixing ratio of the outgoing water and the return water changes, the operation control means, when changing the number of operating cold water refrigerators, Control for correcting a set value serving as a reference for stopping the cold water refrigerator is performed in accordance with the detected temperature of the return water in the cold water circulation system. Such control is more preferable in realizing the labor saving of the system operation.
[0027]
Further, in the case where the integrated heat source system of the present invention has a plurality of cold water refrigerators, for example, a timer is used, and the operation control means further increases within a certain time after changing the number of cold water refrigerators to be operated. Control without changing the number of units. According to such control, the effect after changing the number of refrigerators can be confirmed, and it is preferable for stabilizing the heat balance between the cold heat source devices while improving the followability to the heat load. In addition, such control using a timer may be applied to other cases, such as waiting for an effect after changing operating conditions such as a refrigerator or before changing operating conditions such as a refrigerator. The suspension etc. are mentioned.
[0028]
For free cooling by the free cool heat exchanger, the operation control means controls the cooling water circulation system and the cooling water mixing means described above based on the temperature of the cold water that has passed through the free cool heat exchanger, for example, Proportionally controls the flow rate of cooling water through the free cool heat exchanger. Such control is preferable in realizing labor saving of the system operation and stabilization of the heat balance between the cold heat source devices.
[0029]
In the case where the integrated heat source system of the present invention includes a plurality of cooling towers as the cooling means, the operation control means is configured to set the cooling water flow rate based on a preset value of the cooling water flow rate per unit time. When the flow rate of deviates from the set value, control is performed to change the number of operating cooling towers. Such control is more preferable in realizing labor saving of system operation and stabilization of heat balance between the cold source devices.
[0030]
In the case described above, as in the case of having a plurality of chilled water refrigerators, the operation control means uses a timer, for example, to change the number of cooling towers for a certain period of time after changing the number of operating cooling towers. Do not perform control. Such control is more preferable in realizing the labor saving of system operation and the stabilization of the heat balance between the cold heat source devices.
[0031]
Moreover, since the integrated heat source system of the present invention has the regenerator for heat storage, the first and second cold energy supply means, the cold energy is stored, the cold heat is discharged from the cold heat storage tank, and the chasing operation of the heat storage refrigerator is performed. Is possible. As is known in the art, it is preferable to carry out cold heat storage according to the situation of electricity charges such as nighttime, and in addition to this, it stores colder than usual cold heat storage operation on holidays before weekdays. It is preferable to perform an excessive heat storage operation.
[0032]
When the temperature detection means is for detecting the temperature of the return water in the first cold water circulation system, for the chasing operation, the operation control means is for heat storage according to the detection temperature of the return water in the first cold water circulation system. The refrigerator is operated to perform control for supplying cold water to the first cold heat supply means. According to such control, it is possible to perform the chasing operation when the cold demand of the heat load increases rapidly, and it is preferable for improving the followability to the heat load.
[0033]
Further, in the case where the integrated heat source system of the present invention includes two heat storage refrigerators connected to the cold heat storage tank by the second cold water circulation system as the cold heat source equipment, the operation control means includes the heat storage refrigerator. One selected from the following: cold supply from the first cold supply means to the heat load, supply of cold heat from the second cold supply means to the heat load, and accumulation of cold heat in the cold storage tank The above operation is controlled. According to such control, it is possible to perform any one or all of the chasing operation, the cold heat discharge from the cold heat storage tank, and the cold heat storage, realizing various operation modes, It is even more preferable for improving the followability and realizing the labor saving of the system operation.
[0034]
As the configuration of the integrated heat source system that enables the above-described control, it is sufficient that a chilled water circulation system is formed between the individual heat storage refrigerators and the first cold heat supply means or the cold heat storage tank. , Including two heat storage refrigerators connected to the cold heat storage tank by the second cold water circulation system, at least the first cold supply means is connected to one of the heat storage refrigerators, the other for the heat storage The structure to which the 2nd cold heat supply means is connected to the refrigerator is mentioned.
[0035]
In such a configuration, each of the two heat storage refrigerators may be independently connected to the second cold water circulation system and the cold heat storage tank, or the two heat storage refrigerators may be The structure which shares a 2nd cold-water circulation system and a cold heat storage tank may be sufficient. When the two heat storage refrigerators share the second cold water circulation system and the cold heat storage tank, the circulation system described above is formed by appropriately providing a switching valve or the like in the second cold water circulation system. Is possible.
[0036]
In the integrated heat source system of the present invention, the supply of chilled water by a chilled water refrigerator is mainly used to cover the refrigeration demand of the heat load, and the cold energy is supplied from the heat storage refrigerator through the first and second chilled heat supply means. It is possible to supply cold heat to the heat load as a secondary supply, and also to supply the cold load to the heat load by stopping the cold water refrigerator and operating the heat storage refrigerator and releasing the cold heat from the cold heat storage tank It is also possible. Such a supply form of cold energy can be selected according to the fluctuation of the cold energy demand in the season or heat load.
[0037]
Further, in the integrated heat source system of the present invention, the cold heat generated by this system can be used for other heat loads other than the heat load covered by the cold heat source device. For example, the cooling water circulation system may include another heat exchanger that exchanges heat between the cooling water circulation water and the factory production equipment.
[0038]
Since the integrated heat source system of the present invention has the cooling water mixing means on the cooling means side, it is only necessary to supply cooling water of an appropriate temperature to each device by the mixing means, and a plurality of types of equipment share the cooling means. However, the cooling means only needs to supply the cooling water whose temperature is adjusted to any one of them (for example, the equipment having the lowest required cooling water temperature), as if it is a cooling means for one equipment (for example, a refrigerator). It is possible to control.
[0039]
Further, the integrated heat source system of the present invention is capable of cold generation by a cold water refrigerator, chasing operation by a heat storage refrigerator, cold discharge operation from a cold heat storage tank, and free cooling on the heat load side, It is possible to control the operation with any one of these operations as the main and the other operations as a base up of the main operation (for example, increase in the number of main operating devices or increase in chilled water flow rate). The operation control of the entire system can be performed as if the operation of one device (for example, a cold water refrigerator) is controlled.
[0040]
For these reasons, the integrated heat source system of the present invention has various devices that realize the operation of generating cold heat to the heat load, free cooling, cold heat storage, and cooling heat discharge, but is able to balance the entire system. It can be said that the system can be controlled, the system operation can be saved, and the followability to the heat load is excellent.
[0041]
DETAILED DESCRIPTION OF THE INVENTION
Specific embodiments of the integrated heat source system of the present invention are shown below.
[0042]
<First embodiment>
The apparatus block diagram of the integrated heat source system in this Embodiment is shown in FIG. The integrated heat source system in the present embodiment includes a cooling tower 1, a cooling water circulation system 2, heat exchangers 3 and 4 to which outgoing water is supplied from the cooling water circulation system 2, a brine screw refrigerator 5, and a turbo refrigeration. Machine 6 and operation control means (not shown). The heat exchangers 3 and 4, the brine screw refrigerator 5, and the turbo refrigerator 6 are connected in parallel to the cooling water circulation system 2 so that the cooling water is supplied in this order. The turbo chiller 6 is connected to an air-conditioning / cooling load (an air handling unit, a fan coil unit, or a heat exchanger interposed between these and the refrigerator) by a first chilled water circulation system 7.
[0043]
The heat exchanger 3 is provided in a water passage connecting the outgoing water pipe and the return water pipe of the cooling water circulation system 2, and a pump p1 for introducing the outgoing water of the cooling water circulation system 2 into the heat exchanger 3 in this water passage. Is provided. On the other hand, the heat exchanger 3 is connected to a water passage for returning production cooling water for cooling the production equipment, and heat exchange is performed between the high-temperature cold water in the water passage and the outgoing water of the cooling water circulation system 2. I do.
[0044]
The heat exchanger 4 is provided in a water passage connecting the outgoing water pipe and the return water pipe of the cooling water circulation system 2, and a pump p2 for introducing the outgoing water of the cooling water circulation system 2 into the heat exchanger 4 in this water passage. Is provided. On the other hand, the heat exchanger 4 is connected to the water return path connected to the return water pipe of the first cold water circulation system 7 and provided with a pump p3 for introducing the return water from the first cold water circulation system 7. Heat exchange is performed between the return water from the first cold water circulation system 7 and the outgoing water of the cooling water circulation system 2 in the water passage.
[0045]
The brine screw refrigerator 5 is connected to the outlet pipe of the cooling water circulation system 2 and the condenser of the refrigerator, and has a water passage provided with a pump p4 for introducing the outgoing water from the cooling water circulation system 2, and the condensation of the refrigerator. It is connected to the cooling water circulation system 2 by a water passage connecting the vessel and the return water pipe of the cooling water circulation system 2. These water passages are connected to the cooling tower 1 side of the pump p4 by a water passage having an automatic valve v1.
[0046]
The turbo chiller 6 is connected to the outlet pipe of the cooling water circulation system 2 and the condenser of the refrigerator and is provided with a water passage provided with a pump p5 for introducing the outgoing water, and the condenser and the cooling water circulation system 2 of the refrigerator. It is connected to the cooling water circulation system 2 by a water passage connecting the return water pipe. These water passages are connected to the cooling tower 1 side of the pump p5 by a water passage having an automatic valve v2.
[0047]
An ice heat storage tank 9 is connected to the brine screw refrigerator 5 via a second cold water circulation system 8. An automatic valve v3 is provided in the outgoing pipe of the second cold water circulation system 8, and an automatic valve v4 and a pump p6 are provided in the return liquid pipe of the second cold water circulation system 8. The pump p6 is closer to the brine screw refrigerator 5 than the automatic valve v4, and the second cold water circulation system 8 closer to the brine screw refrigerator 5 than the automatic valves v3 and v4 is provided with a heat exchanger 10 for chasing operation. A heat exchanger 11 for discharging the cold heat stored in the ice heat storage tank 9 is connected to the second cold water circulation system 8 that is connected and closer to the ice heat storage tank 9 than the automatic valves v3 and v4. .
[0048]
The heat exchanger 10 is provided in a water passage that connects the outgoing liquid pipe and the return liquid pipe of the second cold water circulation system 8. An automatic valve v <b> 5 is provided in the water passage between the outgoing pipe of the second cold water circulation system 8 and the heat exchanger 10. Further, the water passage connecting the outgoing liquid pipe and the heat exchanger and the water passage connecting the heat exchanger and the return liquid pipe are more heat exchangers than the automatic valve v5 by the water passage provided with the automatic valve v6. Connected on the side. On the other hand, the heat exchanger 10 is connected to a water passage connecting the return water pipe of the first cold water circulation system 7 and the outgoing water pipe of the first cold water circulation system 7, and the first cold water is connected to the water passage. A pump p7 for supplying the return water of the circulation system 7 to the outgoing pipe of the first cold water circulation system 7 is provided.
[0049]
The heat exchanger 11 is provided in a water passage that connects the outgoing liquid pipe and the return liquid pipe of the second cold water circulation system 8. An automatic valve v7 and a pump p8 are provided in a water passage between the outgoing pipe of the second cold water circulation system 8 and the heat exchanger 11. Further, the water passage connecting the outgoing liquid pipe and the heat exchanger and the water passage connecting the heat exchanger and the return liquid pipe are the automatic valve v7, the pump p8, and the water passage provided with the automatic valve v8. Connected between. On the other hand, the heat exchanger 11 is connected to a water passage connecting the return water pipe of the first cold water circulation system 7 and the outgoing water pipe of the first cold water circulation system 7, and the first cold water is connected to the water passage. A pump p9 for supplying the return water of the circulation system 7 to the outgoing pipe of the first cold water circulation system 7 is provided.
[0050]
The return water pipe of the cooling water circulation system 2 is provided with automatic valves v9 to v11 for adjusting the amount of return water to each cooling tower 1. Although not shown, temperature sensors are arranged at appropriate positions in the cooling water circulation system 2, the first cold water circulation system 7, and the second cold water circulation system 8, and the detection results are transmitted to the operation control means. It is configured. Although not shown, the outgoing water pipe and the return water pipe of the first cold water circulation system 7 are provided with a cold water header for collecting or distributing the cold water from the turbo refrigerator 6 or to the refrigerator, so that maintenance is easy. It is structured.
[0051]
Hereinafter, the integrated heat source system according to the present embodiment will be described in more detail for each of the components described above.
[0052]
<Cooling means>
In the present embodiment, a plurality of units (48 units of (1) 12 cells × 2, (2) 21 cells × 1, (3) 3 cells × 1) are provided to cover the cooling heat required by a large-scale system. A cooling tower is installed. Note that (2) and (3) are connected in series. The power of the cooling tower axial fan is composed of three units. The temperature of the cooling water is measured for each system by a temperature sensor provided in the outgoing water pipe of the cooling water circulation system 2.
[0053]
Control is based on the number of units according to the cooling water flow rate. According to the fan system, (1) has four stages, (2) has three stages, and (3) has one stage. Accordingly, the starting order is determined and each cooling tower is operated. Regarding the operation of the cooling tower, a schedule may be determined and alternate operation may be performed in accordance with the schedule. Although mentioned later, the flow volume of a cooling water is determined by the request | requirement of the heat exchangers 3 and 4 for freezers and free cool.
[0054]
Even if the same operation is performed depending on the outside air temperature, the temperature of the outgoing water is different, but the fan control based on the water temperature determines a set value depending on whether or not free cooling is performed in the above-mentioned stage (for example, when performing it) 2 ° C, 13 ° C when not implemented), and the number of fans to be operated is controlled accordingly. Of course, the fan is stopped in the cooling tower that is not in operation (cooling water is not flowing). In addition, the number control by the flow rate and the temperature is increased or decreased one by one based on the measured values.
[0055]
<Heat storage refrigerator>
In the present embodiment, two screw chillers are employed as the heat storage refrigerator. This refrigerator has a higher coefficient of performance (COP) than the turbo refrigerator, and normally −5 ° C. brine is sent to the heat storage capsule or heat transfer coil in the ice heat storage tank 9, and −2 Receive a return solution at ℃. On the other hand, cooling water of 13 degrees or more is supplied to the condenser, and 18 ° C. return water is returned to the cooling tower. Operation is performed at night (for example, 10 hours), and overheated operation (for example, the supply temperature of cold water is set to −8 ° C., for example, 12 hours) is performed on a holiday before weekdays. In principle, it is stopped during the day, but it operates when the degree of ice melting is high in an ice storage tank, which will be described later, or when the temperature of the first cold water circulation system is high depending on the season.
[0056]
<Cool storage tank>
In the present embodiment, cold brine flows in the heat storage tank, which cools the latent heat capsule in the heat storage tank, and forms ice in the sphere, which is one type of ice heat storage for nighttime cold heat storage and daytime cold heat release. The latent heat storage method is adopted. For example, at 8 o'clock in the morning, the cold energy stored at night starts to be released to the air conditioning load. The heat dissipation is completed when the inlet temperature of the heat exchanger 11 rises by 1 ° C. from a set value (eg 4 ° C.) and e.g. 5 minutes elapses. On weekdays before holidays, even if the above value is exceeded, the operation of the brine screw refrigerator 5 is suppressed and priority is given to the supply of cold heat from the ice heat storage tank 9.
[0057]
<Piping between cold water circulation systems>
The brine screw refrigerator 5, the ice heat storage tank 9, and the air conditioning cooling / heating load are connected to each other by piping of different systems via a heat exchanger. The piping on the air-conditioning / cooling load side in both systems is joined at the entrance to the air-conditioning / cooling load (that is, the outgoing water pipe in the first cold water circulation system 7). In addition, it is good also as an open system piping system which introduce | transduces cold water directly from the 2nd cold water circulation system 8 to the 1st cold water circulation system 7, and the heat exchangers 10 and 11 are not required in this case.
[0058]
<Chilled water refrigerator>
In the present embodiment, eight turbo chillers are installed as chilled water refrigerators, and the chilled water to be supplied based on the flow rate of the chilled water in the first chilled water circulation system 7 from the temperature required for the air conditioning load to the fluctuating load. Unit control is performed to calculate the temperature and control on / off of the refrigerator. The turbo refrigerator, for example, sends cold water at 7 ° C. to the air-conditioning cold load and receives 15 ° C. return water. In the condenser of the turbo chiller, cooling water of 20 to 32 ° C. is guided and cold water is sent out at 7 ° C. In order to properly maintain the temperature of the cooling water led to the condenser, a part of the cooling water return water is taken out from the cooling water return pipe and mixed with the cooling water supply water at the condenser inlet side via the automatic valve v2. ing. The set value 7 ° C. is changed according to the season, for example, 9 ° C. in winter and 8 ° C. in the middle. The unit control is started and stopped by a group start / stop command from an external input means such as a central monitoring panel or an operation panel.
[0059]
<Heat exchanger for free cooling for air conditioning cooling load>
The heat exchanger 4 in the present embodiment transmits the cold heat of the cooling water to the return water in the first cold water circulation system to reduce the load on the turbo chiller 6 or stabilize the operation. Free cooling by the heat exchanger 4 is performed by operating two pumps p2 and p3. For example, the pump can be operated at a cooling water temperature of 11 ° C. and stopped at 13 ° C. As for the return water in the 1st cold water circulation system 7, a part or all of cold water return water is introduced into a heat exchanger by a branch pipe, and is returned to a return water pipe after that.
[0060]
<Production cooling water tank (see FIG. 7)>
In the present embodiment, as the heat load other than the air-conditioning cooling / heating load, for example, the cooling heat of the cooling water is used to cool the apparatus heat generating portion of various production apparatuses used in a factory. The operation related to the cooling of the production apparatus can show an aspect in which, for example, the cooling water from the cooling tower is turned on at 21 ° C. and turned off at 23 ° C. In this case, the outgoing temperature of the high-temperature cold water to the production apparatus is about 25 ° C. The operation may be controlled by the temperature of outgoing or return water of high-temperature cold water. If the cooling water temperature from the cooling tower is too low, the cooling water return water is mixed with the cooling water going water by providing a water passage and an automatic valve as described above, and the cooling water going temperature is set to a predetermined value. Can be controlled. Examples of the apparatus heat generating unit described above include, for example, a heat generating unit of a semiconductor manufacturing apparatus or other production apparatus, and electric equipment such as a condenser of a refrigerated showcase or CVCS.
[0061]
The operation of the integrated heat source system in the present embodiment will be described below.
Generally, in order to operate the refrigerator stably, it is preferable to keep the temperature of the cooling water introduced into the condenser of the refrigerator constant. In the present embodiment, the opening degree of the automatic valves v1, v2 is controlled by the operation control means, the return water is mixed with the cooling water going water introduced into each refrigerator, and the cooling water introduced into the refrigerator Control the temperature constant. Under the present circumstances, about each apparatus connected to the cooling water circulation system 2, suitable cooling water temperature is not necessarily uniform, and it is preferable to control the temperature of the introduced cooling water according to each apparatus. Therefore, the cooling tower 1 generates cold heat that matches the equipment that uses the lowest temperature heat (generally a brine screw refrigerator in the case shown in FIG. 1, but depending on the load fluctuation, the heat exchanger 4). Adjust the coolant water temperature appropriately by mixing the return water as described above. The operation control of the cooling tower 1 will be described in detail later.
[0062]
In the present embodiment, a plurality of turbo refrigerators 6 are used, and these are controlled by the operation control means. The control flow of the turbo refrigerator 6 by the operation control means is shown in FIGS.
[0063]
The operation control means includes, for example, a processing mechanism that performs a comparison between a set value and a detected value, correction for the set value, and the like, and an internal storage device that stores the set value and the correction formula. The operation control means is connected to a timer and is configured to be able to measure the time when it reaches a predetermined step. Various set values are stored in the internal storage device, and as the set values in the operation control of the turbo chiller 6, the forced increase number of times count value, the forced decrease number of times count value (this integrated heat source system has predetermined conditions) At this time, the number of refrigerators to be operated is increased or decreased one by one, but the two count values are the count values of signals for performing the operation), the temperature of the outgoing water in the first chilled water circulation system, Proportional band of water temperature (for example, 2 ° C.), refrigerator stop reference temperature (TID), reduction factor (DF, for example, 10%), water supply rate to air conditioning cooling load set in stages (for example, 100%, 50%, 0%), effect waiting time when changing the number of operating refrigerators (for example, 5 minutes), effect waiting time when changing the flow rate of cold water (for example, 30 minutes), and the number of operating refrigerators When holding before changing the flow rate of cold water , It is stored. The set value of the going water is obtained as the sum of the individual flow rate setting values of each turbo refrigerator 6 according to the operation order of the turbo refrigerator 6.
[0064]
In addition to this, a gap temperature for preventing hunting (for example, 0.5 ° C.) is set, and in such a setting, after moving further by 0.5 ° C. from the set value described above, the process moves to the next step. In the explanation of, the explanation of the control by the gap temperature setting is omitted.
[0065]
The operation control means controls the number of turbo chillers 6 by sequence control. First, the operation control means receives a group start / stop command from an external input means such as a central monitoring device or an operation panel (step 201). If the operation control means is an instruction to turn on and off the group, the operation control means starts operation control at the time of group activation (step 202). At this time, the operation control means sequentially starts up the centrifugal chillers up to the number that achieves a predetermined load flow rate. The refrigerator is started according to a predetermined priority order. When the operation mode is set in advance, the refrigerator is started with the maximum number of operating units in each mode as the upper limit.
[0066]
When the turbo chiller is started, the operation control means resets the forced addition number count value and the forced decrease number count value to the set values (step 203), and measures the group activation operation control time with a timer (step 204). Here, the control time is a time for stabilizing the operation of the group-started refrigerator, and may be, for example, a waiting time for changing the number of units. The operation control means stops the group activation operation control when a predetermined group activation operation control time has elapsed (step 205).
[0067]
When receiving a stop command in step 201, the operation control means sequentially stops the operation of the turbo chiller according to the above-mentioned priority order (step 206) in the order of lower priority, and the turbo chiller currently in automatic operation. Is counted (step 207), and the operation control of the centrifugal chiller is terminated by stopping all the units (step 208). The turbo chiller 6 is individually provided with an electric butterfly valve that controls the flow rate of the outgoing water to the outgoing water pipe of the first cold water circulation system 7 and starts up with the opening degree of the electric butterfly valve being 50%. .
[0068]
When the turbo chiller is activated, the operation control means compares the detection result of the water temperature in the first cold water circulation system 7 with the set value as shown in FIG. If the value (outgoing water temperature + proportional band) is not exceeded, the detection result of the return water temperature in the first cold water circulation system 7 is compared with the set value (step 302), and the return water temperature is equal to or lower than the lower limit (TID). Otherwise (for example, more than TID + DF), the flow rate of water flow per unit time to the air conditioning cooling / heating load (the water supply rate to the air conditioning cooling / heating load set in stages) is compared (step 303). In step 303, the temperature control means returns to step 301 if it is not the flow rate at which the increase or decrease in the outgoing water flow rate should be performed.
[0069]
When the going water temperature exceeds the upper limit value in step 301, the operation control means forcibly increases the number of operating turbo chillers 6 by one, measures the effect waiting time by a timer (step 304), and waits for the effect. If a time longer than the set time has elapsed, the process proceeds to step 305. In step 305, the operation control means counts the number of forced additions up to that point, and if the counted number of forced additions exceeds the forced addition number count value (setting value), the setting value is incremented by 1 and corrected ( Step 306) and then proceed to Step 307. In step 305, the operation control means proceeds to step 307 if the counted number of forced additions falls below the set value.
[0070]
In step 307, the operation control means detects whether or not there is a refrigerator whose opening degree of the electric butterfly valve of the turbo chiller 6 is 50%. If there is a refrigerator which is 50%, the operation control means 100 of the electric butterfly valve. % (Step 308), the waiting time of the effect of increasing the amount of water flow to the air conditioning cooling load is measured by a timer (step 309), and if the effect waiting time exceeds the set value, the process returns to step 301.
[0071]
When there is no refrigerator having an opening degree of 50% in step 307, the operation control means detects the temperature of the incoming water in the first cold water circulation system, and determines whether the outgoing water temperature exceeds a predetermined value. (Step 310). Here, the predetermined value is obtained by adding a certain value to the set value of the going water, and this certain value is a numerical value (for example, 1 ° C.) smaller than the proportional band.
[0072]
The operation control means repeats the comparison between the detected temperature of the going water and the predetermined value when the detected going water temperature is lower than the predetermined value. When the detected water temperature exceeds a predetermined value, the operation control means measures the holding time before the addition by a timer (step 311), and after the holding time before the addition has elapsed, sets one turbo refrigerator. The number is increased (step 312). At this time, the increased number of turbo chillers 6 is started with the opening degree of the electric butterfly valve set to 50%. When the number of refrigerators is increased by one in step 312, the operation control means measures the time by using a timer (step 313), and returns to step 301 when the effect waiting time for the additional number of units has elapsed.
[0073]
In step 302, when the return water temperature is lower than the set value, the operation control means forcibly reduces the number of operating turbo chillers 6 by one, measures the effect waiting time by a timer (step 314), When a time longer than the set value of the waiting time has elapsed, the process proceeds to step 315. In step 315, the operation control means counts the number of forced vehicle reductions up to that point, and if the counted number of forced vehicle reductions exceeds the forced vehicle reduction number count value (set value), it is corrected by adding 1 to the set value ( Step 316) and then proceed to Step 317. In step 315, the operation control means proceeds to step 317 if the counted number of forced reductions falls below the set value.
[0074]
The operation control means detects whether or not the 50% refrigerator is present in the turbo refrigerator 6 operating in step 317, and if there is a 50% refrigerator, the number of turbo refrigerators is reduced by one ( Step 318), and the reduction effect waiting time is measured by a timer (Step 319), and when the reduction effect waiting time elapses, the process returns to Step 301.
[0075]
When there is no 50% refrigerator in step 317, the operation control means sets the opening degree of the electric butterfly valve from 100% to 50% (step 320), and waits for the effect of changing the flow rate of the outgoing water to the air conditioning cooling load by the timer. Time is measured (step 321), and if the effect waiting time exceeds the set value, the process returns to step 301.
[0076]
In step 303, when any one of the flow rates set stepwise in the refrigerator is exceeded, the operation control means measures the holding time before performing the increase or increase of the flow rate in step 322 by a timer. To do. The reason for the change in the number of units is that the actual water flow rate may be 100% or more, which is the set value, in the above-described set values (for example, 100%, 50%, 0%). is there. When the fixed holding time has elapsed, the operation control means proceeds to step 307.
[0077]
In step 303, if any one of the flow rates set stepwise in the refrigerator is below, the operation control means measures the holding time before performing the reduction or flow reduction in step 323 using a timer. To do. The reason why both the number of units are reduced and the flow rate is reduced is the same as in the case of increasing the number of units and increasing the amount. When the fixed holding time has elapsed, the operation control means proceeds to step 317.
[0078]
In addition, in the case of using a refrigerator having a function of adjusting the vane opening by the device itself and performing a slight capacity control in the refrigerator for cold water, the proportional band is reduced in consideration of self-adjustment by the refrigerator (for example, (2 ° C. → 1 ° C.) and the set value may be adjusted (for example, 7 ° C. → 8 ° C.). The set value may be changed according to the environment such as the season.
[0079]
In this Embodiment, it is set as the structure which can cool the return water from the air-conditioning cooling / heating load in the 1st cold-water circulation system 7 by the free cooling by the heat exchanger 4. FIG. This free cooling is performed by proportional control of the two-way valve so that the temperature of the cooling water supplied to the heat exchanger 4 does not fluctuate rapidly. In the present embodiment, three groups of cooling towers 1 are formed, and a full operation (full flow operation) is performed for the cooling tower groups (sets) with priorities, and the flow rates are set for the other two sets. Throttle or stop operation (valve fully closed, watering is zero).
[0080]
Whether the free cooling is valid or invalid is influenced by fluctuations in the outside air temperature or the like. In order to determine this, an effective temperature is set in advance in the operation of the cooling tower 1. In the operation control of the cooling tower 1, the set temperature and the gap temperature (for example, 2 ° C.) are taken, and the effect waiting time is measured as in the operation control of the turbo chiller described above. For example, after the free cooling is stopped, the cooling water temperature drops, and even if the cooling water temperature reaches the set temperature, the free cooling is not resumed immediately, and the free cooling is resumed when the temperature falls by 2 ° C. from the set temperature. To control. Such control is performed by the operation control means, and the temperature is detected by a temperature sensor appropriately disposed in the cooling water circulation system 2.
[0081]
In the operation control of the cooling tower 1, the temperature adjusting means controls the operation of the cooling tower 1 in accordance with, for example, the number control flow shown in FIG. In the control of the number of cooling towers 1, the cooling capacity in the cooling tower 1 can be determined by the flow rate of the cooling water, and the flow rate of cooling water to be increased or decreased in each cooling tower set (for example, an increase in the number of additional cooling towers). Rate 100% and reduced platform factor 10%) are set as set values. The set value of the cooling water flow rate is obtained as the sum of the cooling water flow rates in the individual cooling tower sets according to the operation order of the cooling towers.
[0082]
In controlling the number of cooling towers, the operation control means compares the cooling water flow rate in the cooling water circulation system 2 with the set value (step 401), and if the cooling water flow rate in the cooling water circulation system 2 is equal to or greater than the additional flow rate, the timer The time after the comparison is measured (step 402), and when the additional storage hold time has elapsed, the number of cooling towers is increased by one (or one set) (step 403), and the time after the increase is measured by a timer (step 404). ), And returns to step 401 after the stand-up effect waiting time has elapsed.
[0083]
Further, when the cooling water flow rate in the circulation system 2 is equal to or less than the reduced flow rate in step 401, the operation control means measures the time after the comparison by a timer (step 405), and when the reduced stand suspension time has elapsed, Decrease the number of units (or one set) (step 406), measure the time after the decrease by a timer (step 407), and return to step 401 after the decrease effect waiting time has elapsed.
[0084]
If the cooling water flow rate of the circulation system 2 does not meet any of the above conditions in step 401, the operation control means repeats the comparison of the cooling water flow rate in step 401.
[0085]
In the present embodiment, the cold heat storage operation, the chasing operation, and the cold heat release from the ice heat storage tank by the brine screw refrigerator 5 are performed. In the cold heat storage operation, a normal cold heat storage operation and an excessive heat storage operation can be performed.
[0086]
In the cold heat storage operation, the operation control means opens the automatic valves v3, v4, closes the automatic valves v5, v6, v7, v8, and operates the pump p6. As a result, a brine circulation system is formed between the brine screw refrigerator 5 and the ice heat storage tank 9, and cold heat storage is performed.
[0087]
The operation control means usually starts the cold energy storage operation according to the conditions of the daily unit and the week unit. Here, the conditions are conditions such as nighttime and holidays before weekdays. The operation control means determines that the heat storage is completed when the temperature of the return liquid to the brine screw refrigerator 5 continues below a certain temperature for a certain time or more, and ends the cold heat storage operation. In the case of normal cold heat storage operation, for example, in the second cold water circulation system 8, the inlet temperature of the brine screw refrigerator 5 at which the outlet temperature of the brine screw refrigerator 5 (that is, the outgoing temperature) reaches −3.5 ° C. Examples include conditions where the temperature is set as a reference set value, the gap temperature is 1 ° C., and the waiting time is 5 minutes. In the case of the excessive heat storage operation, for example, the inlet temperature of the brine screw refrigerator 5 at which the outlet temperature of the refrigerator achieves −8.0 ° C. is set as a reference set value, and thereafter, the same conditions as during normal heat storage are included.
[0088]
In the chasing operation, the operation control means closes the automatic valves v3 and v4, opens the automatic valves v5 and v6, and operates the pump p6. As a result, a brine circulation system is formed between the brine screw refrigerator 5 and the heat exchanger 10, and the cold water supplied to the air conditioning cooling load is cooled. During the chasing operation, the operation control means operates the pump p7 provided in the first chilled water circulation system 7 and uses the heat exchanger 10 to return the return water from the first chilled water circulation system 7 to the first chilled water. It is introduced into the outgoing pipe of the circulation system 7.
[0089]
In the chasing operation, the return water to the turbo chiller 6 is cooled and merged with the outgoing water, so that it is possible to control the heat generation by the turbo chiller 6 as if the number of turbo chillers is increased. it can. The chasing operation can be performed by the operation control means in accordance with a predetermined setting, and can also be executed by an external input command from the system operator.
[0090]
In the cold heat release from the ice heat storage tank 9, the operation control means closes the automatic valves v3 and v4, opens the automatic valves v7 and v8, and operates the pump p6. As a result, a brine circulation system is formed between the brine screw refrigerator 5 and the heat exchanger 11, and the cold water supplied to the air conditioning cooling load is cooled. When the cold heat is released, the operation control means operates the pump p9 provided in the first cold water circulation system 7 and uses the heat exchanger 11 to return the return water from the first cold water circulation system 7 to the first cold water. It is introduced into the outgoing pipe of the circulation system 7.
[0091]
Similarly to the chasing operation, the cold heat release is executed by a determination by the operation control means or a command from the system operator. The cooling heat release also cools the return water to the turbo chiller 6 and merges it with the outgoing water, so it can help control the cold heat generation by the turbo chiller 6 and be controlled as if the number of turbo chillers is increased. it can.
[0092]
The cold heat release may be performed taking into account the conditions of the daily unit or the weekly unit. For example, when it is a weekday before a holiday, priority is given to the cold heat release operation to use all the cold heat stored in the ice heat storage tank 9. Can be done. Further, the cool heat release and the chasing operation can be performed at the same time. Depending on the season, for example, the cool heat discharge and the chasing operation may be performed simultaneously in a peak time zone such as 2 pm.
[0093]
The integrated heat source system in the present embodiment includes a turbo chiller 6, a brine screw refrigerator 5, heat exchangers 10 and 11, and heat exchangers 10 and 11 through the second cold water circulation system 8 to the first. Therefore, the chasing operation and the cooling heat release operation are possible, and these operations can be controlled as a base up of the cooling heat generation capacity of the turbo chiller 6. Therefore, it is possible to control these operations in an integrated manner, and it is possible to achieve various follow-ups to the air-conditioning cooling load, stability of heat balance, and further labor saving of system operation while having various cooling sources. it can.
[0094]
In addition, the integrated heat source system in the present embodiment has a configuration in which the cooling tower 1, the cooling water circulation system 2, and the return water from each refrigerator can be freely mixed in the outgoing water to each refrigerator. Cooling water at a temperature suitable for each cooling source device can be supplied from each cooling means to each cooling source device. More stable labor and system operation can be realized.
[0095]
Moreover, since the integrated heat source system in this Embodiment has the heat exchanger 4, it can cool the return water from an air-conditioning cooling-and-heating load, reduce the burden of the turbo refrigerator 6, and also the cooling tower 1 Thus, it is possible to effectively use the cold generated in the above, and to realize followability to fluctuations in the air conditioning cooling load, stability of heat balance, and further labor saving of system operation.
[0096]
Moreover, since the integrated heat source system in this Embodiment has the heat exchanger 3, it can utilize the cold produced | generated with the cooling tower 1 with respect to other heat loads, such as production equipment in a factory, 1 can be used more effectively.
[0097]
In the integrated heat source system according to the present embodiment, when the number of operating units, the chilled water flow rate or the cooling water flow rate is changed in the unit control, the process proceeds to the next control step with an effect waiting time, so that the heat balance is stabilized. Various devices can be suitably controlled while ensuring the performance.
[0098]
<Second Embodiment>
The integrated heat source system in the present embodiment has two brine screw refrigerators as shown in FIG. Each of them can be operated independently in different operation modes. More specifically, the integrated heat source system in the present embodiment is closer to the ice heat storage tank 9 than the automatic valves v3 and v4, and the connection portion between the water pipe to the heat exchanger 11 and the second cold water circulation system 8 A brine screw refrigerator 15 is further connected to the second chilled water circulation system 8 closer to the brine screw refrigerator 5, and automatic valves v12 and v13 corresponding to the automatic valves v3 and v4 are provided. The configuration is the same as that of the first embodiment except that a water pipe sharing the water circulation system 2 and a pump p11 are provided.
[0099]
The integrated heat source system in the present embodiment can simultaneously perform the chasing operation by the brine screw refrigerator 5 and the cold heat storage operation of the brine screw refrigerator 15 by closing the automatic valves v3 and v4. Further, at the time of low load such as winter season, it becomes possible to cover the cooling demand of the air conditioning cooling load by the brine screw refrigerators 5 and 15 without using the turbo refrigerator 6, and further open the automatic valves v3, v4, v12, v13. Accordingly, it is possible to perform a chasing operation or a cold heat storage operation by two brine screw refrigerators. Further, the two brine screw refrigerators 5 can be simultaneously operated for cold energy storage and chasing operation by switching automatic valves. Thus, the integrated heat source system in the present embodiment enables system operation with more variations.
[0100]
In this embodiment, two brine screw refrigerators are used. However, a refrigerator having a capacity sufficient to cover the cooling demand of the air conditioning cooling load is used, and the ice storage tank 9 is connected to this refrigerator. The chilled water circulation system and the chilled water circulation system connected to the heat exchanger 10 are connected to each other, and the chilled water is distributed to the heat storage system and the chasing operation system by the header, whereby the integrated heat source in the present embodiment It is possible to construct an integrated heat source system that exhibits the same effects as the system.
[0101]
<Third embodiment>
As shown in FIG. 6, the integrated heat source system in the present embodiment is configured so that each device connected to the cooling water circulation system 2 is moved from the cooling tower 1 side along the cooling water flow direction to the heat exchanger 4 and the brine screw. The configuration is the same as that of the first embodiment except that the refrigerator 5, the heat exchanger 3, and the turbo refrigerator 6 are arranged in this order, and these devices are connected in series by the outgoing water pipe of the cooling water circulation system 2. Yes.
[0102]
In the integrated heat source system in the present embodiment, the cooling water is used in order from the cooling tower 1 side. In the above-described embodiment, it is possible to supply cooling water having a water temperature suitable for each device by mixing the return water of the cooling water with the outgoing water. In this embodiment, such cooling is performed. Since the water temperature can be adjusted and the cooling water temperature in the downstream equipment can be adjusted by using the cold energy in the upstream equipment, the integrated heat source system in the present embodiment is the cooling tower 1. It can be said that this is an effective form for effectively using the generated cold energy.
[0103]
<Fourth embodiment>
As shown in FIG. 7, the integrated heat source system according to the present embodiment includes a brine screw refrigerator 5, a heat exchanger 3, and a heat exchanger from the cooling tower 1 side along the flow direction of the cooling water in the cooling water circulation system 2. 4. Cooling water connected to the centrifugal chiller 6 and configured to be able to mix well water into a water passage for introducing cooling water from the cooling water circulation system 2 to the brine screw chiller 5 and corresponding to the brine screw chiller 5 The configuration is the same as in the first embodiment except that no mixing means is provided.
[0104]
More specifically, in the integrated heat source system in the present embodiment, an automatic valve v14 and a pump p4 are provided in a water passage connecting the brine screw refrigerator and the outgoing water pipe of the cooling water circulation system 2, and the pump p4 and the brine screw refrigerator are provided. A water passage for supplying well water is connected to the water passage between 5 and 5. A cooling water return channel to the well 20 is connected to a water channel connecting the brine screw refrigerator 5 and the return water pipe of the cooling water circulation system 2. A pump p13 and an automatic valve v15 are provided in the water passage from the well, and an automatic valve v16 is provided in the return water passage to the well.
[0105]
Since the integrated heat source system in the present embodiment can use well water alone as cooling water or in combination with the cooling water of the cooling tower 1, for example, in the summer season when the cooling capacity of the cooling tower 1 decreases, each device It becomes possible to supply cold heat stably. In the present embodiment, the well water is directly introduced into the cooling water circulation system 2, but the cooling water of the well water and the cooling water of the cooling water circulation system 2 may be configured to exchange heat via a heat exchanger. Moreover, in this Embodiment, although the well is utilized as a structure by which the cooling water of cooling water is produced | generated by cooling means other than the cooling tower 1, river water may be used instead of well water.
[0106]
【The invention's effect】
An integrated heat source system of the present invention includes a cooling unit that generates cooling water of cooling water, a cooling source device that covers the cooling demand of the heat load, and a cooling water circulation system that returns cooling water between the cooling unit and the cooling source device. A cooling water mixing means for mixing the return water of the cooling water circulation system with the outgoing water of the cooling water circulation system, wherein the cold heat source device generates the cold heat supplied to the heat load. And a heat storage refrigerator that generates cold energy for storage, a first cold water circulation system for returning cold water between the heat load and the cold water refrigerator, and a first cooling water circulation system and a first cooling water circulation system A free cool heat exchanger that exchanges heat with the return water of the chilled water circulation system, a cold heat storage tank that stores cold heat, and a second unit that returns cold water or brine between the heat storage refrigerator and the cold heat storage tank The cold water generated by the cold water circulation system and the heat storage refrigerator First cold supply means for supplying water, second cold supply means for supplying cold water stored in the cold heat storage tank to the outgoing water of the first cold water circulation system, and cold water in at least the first cold water circulation system Adjusting the refrigeration capacity of the chilled water freezer so that the temperature of the chilled water is within the desired range, with temperature detection means that detects the temperature, and the chilled water temperature and flow rate settings in the first chilled water circulation system And an operation control means for controlling the operation of each device in order to adjust the flow rate of the chilled water per unit time from the chilled water refrigerator to the heat load. Each device can be controlled in a form supplemented by the cold heat source device, and even if the cooling means is controlled by adjusting the conditions to an arbitrary device, cooling water having a suitable water temperature can be supplied to each device. Actively integrate components of the cold heat source to save energy overall It is possible to realize the Energy operation.
[0107]
In the integrated heat source system of the present invention, the cold heat source device includes a plurality of cold water refrigerators, and the operation control means compares the set value represented by the cold water temperature with the cold water detection temperature to detect cold water. When the temperature is above or below the set value, increase or decrease the number of chilled water refrigerators in operation, and increase or decrease the flow rate of chilled water per unit time from the chilled water refrigerator to the heat load. If it exists, it responds to rapid increase and decrease of the thermal load, and is more effective in improving the followability to the changing thermal load.
[0108]
Further, in the integrated heat source system of the present invention, the operation control means is configured such that the flow rate of the chilled water deviates from the set value based on the set value of the flow rate of the chilled water to the heat load preset for each chilled water refrigerator. If the configuration is such that the number of operating cold water refrigerators is changed, the number of operating cold water refrigerators is controlled from the flow rate of cold water, which is more effective for proper system operation.
[0109]
In the integrated heat source system of the present invention, the temperature detection means detects the temperature of the return water in the first chilled water circulation system, and the operation control means changes the number of cold water refrigerators to be operated. Is a configuration that corrects a set value serving as a reference for stopping the cold water refrigerator according to the number of the cold water refrigerators after the change and the detected temperature of the return water in the first cold water circulation system, This is even more effective in saving system operation and realizing proper system operation.
[0110]
In the integrated heat source system of the present invention, if the operation control means is configured not to further change the number of the chilled water refrigerators to be operated within a certain time after changing the number of chilled water refrigerators, It is more effective in stabilizing the heat balance between the cold heat source devices while increasing the temperature.
[0111]
In the integrated heat source system of the present invention, the operation control means is configured to proportionally control the flow rate of the cooling water passing through the free cool heat exchanger based on the temperature of the cold water that has passed through the free cool heat exchanger. This is even more effective in realizing the labor saving of system operation and the stabilization of the heat balance between the cold source equipment.
[0112]
In the integrated heat source system of the present invention, the cooling means is composed of a plurality of cooling towers, and the operation control means is configured to set the flow rate of the cooling water based on a preset value of the flow rate of the cooling water per unit time. When the configuration deviates from the set value, the configuration in which the number of cooling towers to be operated is changed is more effective in realizing the labor saving of system operation and the stabilization of the heat balance between the heat source devices.
[0113]
Further, in the integrated heat source system of the present invention, the operation control means has a configuration in which the number of cooling towers to be operated is not changed within a certain time after the number of cooling towers to be operated is reduced. This is even more effective in stabilizing the heat balance between the devices.
[0114]
In the integrated heat source system of the present invention, the temperature detection means detects the temperature of the return water in the first chilled water circulation system, and the operation control means sets the detected temperature of the return water in the first chilled water circulation system. Accordingly, if the storage heat storage refrigerator is operated to supply cold water to the first cold supply means, the chasing operation can be performed when the cold load of the heat load increases rapidly. This is even more effective in improving the following ability.
[0115]
In the integrated heat source system of the present invention, the cold heat source device includes two heat storage refrigerators connected to the cold heat storage tank by the second cold water circulation system, and one of the heat storage refrigerators includes at least the first heat storage refrigerator. The other heat storage refrigerator is connected to at least the second cold energy supply means, and the operation control means operates the heat storage refrigerator, Controls one or more operations selected from the supply of cold heat from the cold supply means to the heat load, the supply of cold heat from the second cold supply means to the heat load, and the accumulation of cold heat in the cold heat storage tank. The configuration is more effective in realizing various operation modes, improving the followability to the heat load, and realizing the labor saving of the system operation.
[0116]
The integrated heat source system of the present invention has a water passage that mixes the return water of the first cold water circulation system with the outgoing water of the first cold water circulation system, and the first cold heat supply means includes cold water in the water passage and It is a heat exchanger that exchanges heat with the outgoing liquid of the second cold water circulation system, and the second cold heat supply means exchanges heat between the cold water in the water passage and the return liquid of the second cold water circulation system. The heat exchanger that performs is more effective in realizing stable operation of the heat source system and the two refrigerators.
[0117]
Moreover, in the integrated heat source system of the present invention, the cooling water circulation system is configured to connect each device in series so as to supply the outgoing water of the cooling water circulation system to each device in ascending order of their return water temperature. This is even more effective in realizing effective use of the generated cold energy.
[0118]
In the integrated heat source system according to the present invention, the cooling means having a well structure is more effective in achieving stabilization of the heat balance.
[Brief description of the drawings]
FIG. 1 is an overall configuration diagram showing a first embodiment in an integrated heat source system of the present invention.
FIG. 2 is a control flow showing an example of group start / stop activation in the number control of operation control means used in the present invention.
FIG. 3 is a control flow showing an example of controlling the number of turbo chillers by the operation control means used in the present invention.
FIG. 4 is a control flow showing an example of the control of the number of cooling towers by the operation control means used in the present invention.
FIG. 5 is an overall configuration diagram showing a second embodiment in the integrated heat source system of the present invention.
FIG. 6 is an overall configuration diagram showing a third embodiment in the integrated heat source system of the present invention.
FIG. 7 is an overall configuration diagram showing a fourth embodiment in the integrated heat source system of the present invention.
[Explanation of symbols]
1 Cooling tower
2 Cooling water circulation system
3, 4, 10, 11 heat exchanger
5, 15 Brine screw refrigerator
6 Turbo refrigerator
7 First cold water circulation system
8 Second cold water circulation system
9 Ice storage tank
20 wells
p1-p13 pump
v1-v17 automatic valve

Claims (14)

冷却水の冷熱を生成する冷却手段と、熱負荷の冷熱需要を賄う冷熱源機器と、前記冷却手段及び前記冷熱源機器の間で冷却水を往還させる冷却水循環系と、前記冷却水循環系の還水を前記冷却水循環系の往水に混合する冷却水混合手段と、を有する熱源システムであって、
前記冷熱源機器は、熱負荷に供給される冷熱を生成する冷水用冷凍機と、蓄積用の冷熱を生成する蓄熱用冷凍機とを含み、
前記熱負荷と前記冷水用冷凍機との間で冷水を往還させる第一の冷水循環系と、
前記冷却水循環系の往水と前記第一の冷水循環系の還水との間で熱交換を行うフリークール熱交換器と、
冷熱を蓄える冷熱蓄熱槽と、
前記蓄熱用冷凍機と前記冷熱蓄熱槽との間で冷水又はブラインを往還させる第二の冷水循環系と、
前記蓄熱用冷凍機が生成した冷熱を前記第一の冷水循環系の往水に供給する第一の冷熱供給手段と、
前記冷熱蓄熱槽が蓄えた冷熱を前記第一の冷水循環系の往水に供給する第二の冷熱供給手段と、
少なくとも前記第一の冷水循環系における冷水の温度を検出する温度検出手段と、
前記第一の冷水循環系における冷水の温度及び流量の設定値を有し、冷水の温度が所望の範囲内に収まるように、前記冷水用冷凍機の冷凍能力を調整し、さらに冷水用冷凍機から熱負荷への単位時間当たりの冷水の流量を調整すべく前記各機器の運転を制御する運転制御手段と、を有する統合型熱源システム。
A cooling means for generating cooling water of cooling water, a cooling heat source device that covers the cooling demand of the heat load, a cooling water circulation system for returning cooling water between the cooling means and the cooling heat source equipment, and a return of the cooling water circulation system A cooling water mixing means for mixing water with the outgoing water of the cooling water circulation system,
The cold heat source device includes a cold water refrigerator that generates cold supplied to a heat load, and a heat storage refrigerator that generates cold for storage,
A first cold water circulation system for returning cold water between the heat load and the cold water refrigerator;
A free-cool heat exchanger that exchanges heat between the outgoing water of the cooling water circulation system and the return water of the first cold water circulation system;
A cold heat storage tank for storing cold heat;
A second cold water circulation system for transferring cold water or brine back and forth between the heat storage refrigerator and the cold heat storage tank;
First cold supply means for supplying cold generated by the regenerator for heat storage to the outgoing water of the first cold water circulation system;
Second cold energy supply means for supplying cold energy stored in the cold energy storage tank to the outgoing water of the first cold water circulation system;
Temperature detection means for detecting the temperature of cold water in at least the first cold water circulation system;
The chilled water refrigerator has a set value for the temperature and flow rate of the chilled water in the first chilled water circulation system, and adjusts the refrigeration capacity of the chilled water refrigerator so that the temperature of the chilled water falls within a desired range. And an operation control means for controlling the operation of each device so as to adjust the flow rate of cold water per unit time from the heat load to the heat load.
前記冷熱源機器は複数の前記冷水用冷凍機を含み、前記運転制御手段は、前記冷水の温度で表される設定値と冷水の検出温度とを比較し、冷水の検出温度が前記設定値を上回る場合又は下回る場合では、稼動する冷水用冷凍機の台数を増加又は減少させ、さらに冷水用冷凍機から熱負荷への単位時間当たりの冷水の流量を増加又は減少させることを特徴とする請求項1記載の統合型熱源システム。The cold heat source device includes a plurality of the cold water refrigerators, and the operation control unit compares a set value represented by the temperature of the cold water with a detected temperature of the cold water, and the detected temperature of the cold water satisfies the set value. In the case of exceeding or decreasing, the number of operating cold water refrigerators is increased or decreased, and the flow rate of cold water per unit time from the cold water refrigerator to the heat load is increased or decreased. The integrated heat source system according to 1. 前記運転制御手段は、前記各冷水用冷凍機について予め設定されている熱負荷への冷水の流量の設定値に基づいて、前記冷水の流量が前記設定値から逸脱した場合に冷水用冷凍機の稼働台数を変更することを特徴とする請求項2記載の統合型熱源システム。When the flow rate of the cold water deviates from the set value based on a preset value of the flow rate of the cold water to the heat load set in advance for each of the cold water refrigerators, The integrated heat source system according to claim 2, wherein the number of operating units is changed. 前記温度検出手段は、前記第一の冷水循環系における還水の温度を検出するものであり、前記運転制御手段は、稼動する前記冷水用冷凍機の台数を変更させた場合には、変更後の冷水用冷凍機の台数と、前記還水の温度とに応じて、冷水用冷凍機の停止基準となる設定値を補正することを特徴とする請求項2又は3に記載の統合型熱源システム。The temperature detection means detects the temperature of the return water in the first cold water circulation system, and the operation control means changes the number of the cold water refrigerators to be operated after the change. 4. The integrated heat source system according to claim 2, wherein a set value serving as a reference for stopping the cold water refrigerator is corrected according to the number of the cold water refrigerators and the temperature of the return water. 5. . 前記運転制御手段は、稼動する前記冷水用冷凍機の台数を変更した後の一定時間内ではさらなる台数の変更を行わないことを特徴とする請求項2〜4のいずれか一項に記載の統合型熱源システム。The integration according to any one of claims 2 to 4, wherein the operation control means does not change the number of the chilled water refrigerators to be operated within a predetermined time after the number of the chilled water refrigerators to be operated is changed. Mold heat source system. 前記運転制御手段は、前記フリークール熱交換器を通過した冷水の温度に基づいて、フリークール熱交換器を通る前記冷却水の流量を比例制御することを特徴とする請求項1記載の統合型熱源システム。2. The integrated type according to claim 1, wherein the operation control means proportionally controls a flow rate of the cooling water passing through the free cool heat exchanger based on a temperature of the cold water passing through the free cool heat exchanger. Heat source system. 前記冷却手段は複数の冷却塔からなり、前記運転制御手段は、予め設定されている、単位時間当たりの冷却水の流量の設定値に基づいて、前記冷却水の流量が前記設定値から逸脱した場合に冷却塔の稼動台数を変更することを特徴とする請求項1記載の統合型熱源システム。The cooling means comprises a plurality of cooling towers, and the operation control means has a flow rate of the cooling water that deviates from the set value based on a preset set value of the flow rate of cooling water per unit time. 2. The integrated heat source system according to claim 1, wherein the number of operating cooling towers is changed. 前記運転制御手段は、稼動する冷却塔の台数を変更した後の一定時間内ではさらなる台数の変更を行わないことを特徴とする請求項7記載の統合型熱源システム。8. The integrated heat source system according to claim 7, wherein the operation control means does not change the number of cooling towers within a predetermined time after changing the number of cooling towers to be operated. 前記温度検出手段は、前記第一の冷水循環系における還水の温度を検出するものであり、前記運転制御手段は、前記第一の冷水循環系における還水の検出温度に応じて前記蓄熱用冷凍機を稼動して、前記第一の冷熱供給手段に冷水を供給することを特徴とする請求項1記載の統合型熱源システム。The temperature detecting means detects the temperature of the return water in the first cold water circulation system, and the operation control means is for the heat storage according to the detected temperature of the return water in the first cold water circulation system. The integrated heat source system according to claim 1, wherein a refrigerator is operated to supply cold water to the first cold heat supply means. 前記冷熱源機器は、前記第二の冷水循環系によって前記冷熱蓄熱槽に接続される二台の蓄熱用冷凍機を含み、一方の蓄熱用冷凍機には少なくとも前記第一の冷熱供給手段が接続されており、他方の蓄熱用冷凍機には少なくとも前記第二の冷熱供給手段が接続されていることを特徴とする請求項1記載の統合型熱源システム。The cold heat source device includes two heat storage refrigerators connected to the cold heat storage tank by the second cold water circulation system, and at least the first cold heat supply means is connected to one heat storage refrigerator 2. The integrated heat source system according to claim 1, wherein at least the second cold energy supply means is connected to the other heat storage refrigerator. 前記運転制御手段は、前記蓄熱用冷凍機を稼動させ、第一の冷熱供給手段から前記熱負荷への冷熱の供給、第二の冷熱供給手段から前記熱負荷への冷熱の供給、及び前記冷熱蓄熱槽への冷熱の蓄積、の中から選ばれる一つ以上の運転を制御することを特徴とする請求項10記載の統合型熱源システム。The operation control means operates the heat storage refrigerator, supplies cold heat from the first cold supply means to the heat load, supplies cold heat from the second cold supply means to the heat load, and the cold heat 11. The integrated heat source system according to claim 10, wherein one or more operations selected from the accumulation of cold heat in the heat storage tank are controlled. 前記第一の冷水循環系の還水を第一の冷水循環系の往水に混合する通水路を有し、前記第一の冷熱供給手段は前記通水路の冷水と前記第二の冷水循環系の往液との間で熱交換を行う熱交換器であり、前記第二の冷熱供給手段は前記通水路の冷水と前記第二の冷水循環系の還液との間で熱交換を行う熱交換器であることを特徴とする請求項1記載の統合型熱源システム。A water passage that mixes the return water of the first cold water circulation system with the outgoing water of the first cold water circulation system, and the first cold heat supply means includes the cold water of the water passage and the second cold water circulation system. The second cold heat supply means is a heat exchanger that exchanges heat between the cold water in the water passage and the return liquid of the second cold water circulation system. The integrated heat source system according to claim 1, wherein the integrated heat source system is an exchanger. 前記冷却水循環系は、各機器に対しそれらの還水温度の低い順に冷却水循環系の往水を供給するように各機器を直列に接続することを特徴とする請求項1記載の統合型熱源システム。2. The integrated heat source system according to claim 1, wherein the cooling water circulation system connects the devices in series so as to supply the cooling water circulation water to the devices in ascending order of their return water temperatures. . 前記冷却手段は井戸を含むことを特徴とする請求項1記載の統合型熱源システム。2. The integrated heat source system according to claim 1, wherein the cooling means includes a well.
JP2001314450A 2001-10-11 2001-10-11 Integrated heat source system Expired - Fee Related JP4022383B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001314450A JP4022383B2 (en) 2001-10-11 2001-10-11 Integrated heat source system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001314450A JP4022383B2 (en) 2001-10-11 2001-10-11 Integrated heat source system

Publications (2)

Publication Number Publication Date
JP2003121024A JP2003121024A (en) 2003-04-23
JP4022383B2 true JP4022383B2 (en) 2007-12-19

Family

ID=19132765

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001314450A Expired - Fee Related JP4022383B2 (en) 2001-10-11 2001-10-11 Integrated heat source system

Country Status (1)

Country Link
JP (1) JP4022383B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104791925A (en) * 2015-03-27 2015-07-22 仪征祥源动力供应有限公司 Energy-saving type open cold supply system for cooling tower
CN104896796A (en) * 2015-06-18 2015-09-09 河南中烟工业有限责任公司 Energy-saving type cooling and heating integrated system
CN104896795A (en) * 2015-06-01 2015-09-09 北京京能未来燃气热电有限公司 Centralized heating and cooling system realizing cold-hot pipe network integration
WO2020196940A1 (en) * 2019-03-25 2020-10-01 한국지역난방공사 Low-temperature district heating system for improving heating efficiency

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1297785C (en) * 2004-07-20 2007-01-31 贵州华城楼宇科技有限公司 Distribution type high efficient energy device of central air conditioner
JP4652371B2 (en) * 2007-05-08 2011-03-16 株式会社Nttファシリティーズ Air conditioning system and operation method thereof
JP5096803B2 (en) * 2007-06-12 2012-12-12 高砂熱学工業株式会社 Air conditioning system
US8553416B1 (en) * 2007-12-21 2013-10-08 Exaflop Llc Electronic device cooling system with storage
JP5495499B2 (en) * 2008-02-27 2014-05-21 三菱重工業株式会社 Turbo refrigerator, refrigeration system, and control method thereof
JP5363212B2 (en) * 2008-09-30 2013-12-11 株式会社日立製作所 Air conditioning system
JP2011149665A (en) * 2010-01-25 2011-08-04 Misawa Kankyo Gijutsu Kk Cooling water supply facility using underground cold
CN102494437B (en) * 2011-11-25 2014-01-15 洋浦清江环保有限公司 Cross-season energy-storage cold and heat supplying system
JP5787792B2 (en) 2012-02-29 2015-09-30 三菱重工業株式会社 Apparatus and method for controlling number of heat source systems and heat source system
JP6086236B2 (en) * 2013-06-24 2017-03-01 三菱重工冷熱株式会社 Capacity control method and capacity control device for compressor of refrigeration equipment
JP6572005B2 (en) * 2015-06-18 2019-09-04 株式会社日立製作所 Refrigerator control device, refrigerator system and program

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60142133A (en) * 1983-12-29 1985-07-27 Tokyo Gas Co Ltd Operation of air-conditioning equipment
JPS6162774A (en) * 1984-09-05 1986-03-31 株式会社日立製作所 Heat accumulation type refrigerator
JPS61128042A (en) * 1984-11-28 1986-06-16 Shinryo Air Conditioning Co Ltd Air conditioner having cold water producing circuit
JPS61138971U (en) * 1985-09-25 1986-08-28
JPH0443239A (en) * 1990-06-11 1992-02-13 Takasago Thermal Eng Co Ltd Operating method for heat storage type water heat source air conditioning system
JP2824353B2 (en) * 1991-12-20 1998-11-11 三菱重工業株式会社 Subcooled ice making system
JP3260894B2 (en) * 1993-02-24 2002-02-25 高砂熱学工業株式会社 Cold water production system
JPH06341683A (en) * 1993-05-28 1994-12-13 Mitsubishi Heavy Ind Ltd Air conditioner system of water heat source heat pump type
JP3256940B2 (en) * 1993-09-28 2002-02-18 川崎重工業株式会社 Water level control method and water level control device for cooling tower water tank
JPH094881A (en) * 1995-06-20 1997-01-10 Toyo Eng Works Ltd Cooling device
JPH10232059A (en) * 1997-02-20 1998-09-02 Sanyo Electric Co Ltd Method for feeding heat
JPH10300163A (en) * 1997-04-28 1998-11-13 Mitsubishi Electric Corp Method for operating air conditioner and air conditioner

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104791925A (en) * 2015-03-27 2015-07-22 仪征祥源动力供应有限公司 Energy-saving type open cold supply system for cooling tower
CN104896795A (en) * 2015-06-01 2015-09-09 北京京能未来燃气热电有限公司 Centralized heating and cooling system realizing cold-hot pipe network integration
CN104896796A (en) * 2015-06-18 2015-09-09 河南中烟工业有限责任公司 Energy-saving type cooling and heating integrated system
CN104896796B (en) * 2015-06-18 2017-04-26 河南中烟工业有限责任公司 Energy-saving type cooling and heating integrated system
WO2020196940A1 (en) * 2019-03-25 2020-10-01 한국지역난방공사 Low-temperature district heating system for improving heating efficiency

Also Published As

Publication number Publication date
JP2003121024A (en) 2003-04-23

Similar Documents

Publication Publication Date Title
JP4022383B2 (en) Integrated heat source system
JP5501179B2 (en) Medium temperature source system with free cooling
EP2232230B1 (en) Refrigeration system comprising a test chamber with temperature and humidity control
US20030037919A1 (en) Connected chilling-heating system
JP2001091087A (en) Method for controlling refrigerator of absorption heater chiller
JP2010127559A (en) Heat source control system for air conditioning facility
US4815527A (en) Multi-zone off-peak storage on-peak energy saving air conditioning
EP2751499B1 (en) Refrigeration system and refrigeration method providing heat recovery
JP2007298235A (en) Heat source system and its control method
JP2009216321A (en) Freezing prevention control system and freezing prevention control method
EP3961127A1 (en) Air conditioning system and method for its control
JP2014070753A (en) Air conditioning equipment
CN100445668C (en) Energy-saving refrigerator set
US11353234B2 (en) Air conditioning system
EP2751500B1 (en) Refrigeration circuit and refrigeration method providing heat recovery
JP4610688B2 (en) Air-conditioning and hot-water supply system and control method thereof
JP4917468B2 (en) Refrigerator system
KR100258235B1 (en) Surging-proof device of turbo refrigerator
JP3854586B2 (en) Heat source system, control method of heat source system, heat source, and control method of heat source
US11333366B2 (en) Temperature adjustment apparatus, intermediary apparatus, load apparatus, and refrigeration cycle apparatus
JP2004144411A (en) Air conditioning equipment
JPH06272987A (en) Chilled water system controlling method for air conditioning facility
JP3359495B2 (en) Thermal storage air conditioning system
CN109373553A (en) A kind of integral air conditioner and the water system device of end
JP7322219B1 (en) heat source system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040825

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061108

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070801

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070925

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071001

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101005

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4022383

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101005

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111005

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111005

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121005

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121005

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131005

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141005

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees