JP4014483B2 - Diagonal shaft propulsion construction equipment - Google Patents
Diagonal shaft propulsion construction equipment Download PDFInfo
- Publication number
- JP4014483B2 JP4014483B2 JP2002302782A JP2002302782A JP4014483B2 JP 4014483 B2 JP4014483 B2 JP 4014483B2 JP 2002302782 A JP2002302782 A JP 2002302782A JP 2002302782 A JP2002302782 A JP 2002302782A JP 4014483 B2 JP4014483 B2 JP 4014483B2
- Authority
- JP
- Japan
- Prior art keywords
- propulsion
- tube
- shaft
- guide rail
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Earth Drilling (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、傾斜縦坑(斜坑)を推進工法で構築する装置に関するもので、推進する坑内での点検作業などを併せて行える作業者の坑内昇降移動手段を備えた斜坑推進構築装置に関するものである。
【0002】
【従来の技術】
従来、地中に構築されているトンネル内と地上とを接続する斜坑を構築する場合、一般的にその地中トンネル側から地上に向けて掘進させて斜坑を掘削構築する工法が採用されている。このような斜坑の掘削には主にシールド掘進機が用いられている(例えば、特許文献1参照)。また、斜坑内に作業者が入って坑道内での作業を実施するために、移動台車によって資材や作業者を送り込むとともにその移動台車上で点検等の作業を実施する作業ステージを備えたものが知られている(特許文献2参照)。このほかに、斜坑内に作業者が入って坑道内での点検や補修作業を行なうために用いられる作業者の移動手段については、本出願人らの先願になる特願2001−138763号がある。
【0003】
【特許文献1】
特開平8−189285号公報
【特許文献2】
特開2001−88691号公報
【0004】
【発明が解決しようとする課題】
前記従来の技術では、特許文献1に示されるように、水平坑内に斜坑掘削機の発進用装置(受け構台)を搬入して設置する必要があり、掘削機を搬入後にその受け構台上に所要の傾斜角度で配置して、推進反力を受け止めさせるようにされるので、当該発進位置の周囲を過剰に掘削して広げることや掘削機とその受け構台の搬入設置などの準備をせねばならず、多くの手数を必要として多大な工費がかかり、しかも作業性がよくないという問題がある。
【0005】
また、下部からの掘削機による掘削では、掘進に併せて掘削された坑道内を覆工する作業を必要とし、その覆工材を搬入して覆工するには多大な労力と工費を必要とするので工期も長引き、しかも掘削中は掘削土砂を水平坑内に送り出すので、その坑内からの搬出にも多くの費用がかかることになる。
【0006】
一方、傾斜した坑道内に作業者が入って点検や補修作業を行なうには、前記特許文献2によって開示されるように、発進側に設置されるウインチからトンネル掘削機の後端部に設けられるシーブを巡らせたワイヤロープによって移動台車を昇降させ、その移動台車に乗って作業者が発進側から坑道内に進入して作業を行うことになり、上部から水平坑側に掘削土を排出されているので非常に危険であって、その自由度が制限される。しかも傾斜する坑道内に作業者が入るには掘削機側にロープを支持させて作業員搭乗室を備える移動台車を引き上げるために掘削距離の延長に応じてレールを敷設しなければならず、その作業にはおのずと多くの制約が加わり、坑道が長くなるとさらに作業性が悪くなるので掘削機の運転停止時間が長引き、工期が長引くことを避けることができないという問題がある。
【0007】
本発明では、目的水平坑に向かって地上部から推進工法によって所要口径の管体を掘削推進させるとともに、その推進管の進捗に応じて順次接続される管体内部に仮設される昇降路を延長させ、坑道構築の管内部での点検補修作業に対応できる作業者の坑道内出入り機能を、掘削推進作業に支障を来すことなく具備させて、斜坑の構築作業を能率よく施工できるようにされた斜坑推進構築装置を提供することを目的とする。
【0008】
【課題を解決するための手段および作用・効果】
このような目的を達成するために、第1発明による斜坑推進構築装置は、
地中の水平坑に向かって地上部から掘削推進工法により斜坑を構築する斜坑推進構築装置であって、
地上部に設置されて推進管を推進させる推進架台と、その推進架台の推進方向背後上方に設けられる推進管の反力桁と、複数の推進ジャッキが一体に固定配置されるジャッキ架台と、前記反力桁の下面に取付けられて前記ジャッキ架台を反力桁に沿って推進位置と退避位置との間を移動可能に案内するガイドレールと、前記ジャッキ架台を移動させる駆動手段とを有する管体推進装置を含み、
前記推進架台の内部に、推進管を受入れた際、推進管の軸心が推進軸心線に合致するように支持する受け部材と、この受け部材と対向して推進管押さえ手段を備えていることを特徴とするものである。
【0009】
本発明においては、斜坑を推進掘削する地上の発進位置に推進架台とその背後に推進管の反力桁および推進用のジャッキを備えるジャッキ架台を、推進管によって構築する斜坑の傾斜角に対応させて設置する。推進管を所定位置に持ち込むときには、ジャッキ架台を推進位置から退避位置に駆動手段によってガイドに沿って移動させて推進管を掘進角度に合わせて所定位置に別途揚重機によって搬入し、掘削推進中の推進管後部に新たな推進管を接続し、その後に退避していたジャッキ架台を元の位置に戻して推進ジャッキにより推進管に推進力を付勢して推進させ掘進構築する。この推進時における反力は、推進架台に取付く反力桁によって受け止められ、推進架台でもって負荷を保持させる。
【0010】
本発明によれば、地上部から目的地中の水平坑に向かって推進管を推進掘削工法によって掘進して、斜坑を構築することができるので、設備・機材などの設置搬入が容易になり、作業能率の向上を図り、地中からの掘進構築に比べて工期の短縮を可能にすることができるという効果が得られる。
【0011】
本発明において、前記管体推進装置の設置位置より下側には、前記推進ジャッキの後退時の推進管の浮き上がりを防止する推進管クランプ機構が設けられ、この推進管クランプ機構が、中央部に推進管が貫通できる空間を有する推進管反力構台と、この推進管反力構台の中央部を貫通する推進管の側面を抱えて縮小・拡大する複数片にてなるクランプ保持部片と、このクランプ保持部片を操作する操作シリンダとを備えているのが好ましい(第2発明)。こうすることにより、推進ジャッキによる1ストローク推進操作後後退させる直前に推進管クランプ機構を作動させて推進されている推進管の中間を両側から把持させることにより、推進ジャッキによる推進力が除かれる際の反動で、その推進管が浮き上がる(戻される)のを阻止して推進力を有効にすることができる。
【0012】
次に、第3発明による斜坑推進構築装置は、
地中の水平坑に向かって地上部から掘削推進工法により斜坑を構築する斜坑推進構築装置であって、
地上部に設置されて推進管を推進させる推進架台と、その推進架台の推進方向背後上方に設けられる推進管の反力桁と、複数の推進ジャッキが一体に固定配置されるジャッキ架台と、前記反力桁の下面に取付けられて前記ジャッキ架台を反力桁に沿って推進位置と退避位置との間を移動可能に案内するガイドレールと、前記ジャッキ架台を移動させる駆動手段とを有する管体推進装置と、この管体推進装置に併設されて、前記推進管内に付設されて継足し可能なガイドレールと、そのガイドレールに案内されて斜坑構築推進管の開口上部から坑内にロープによって昇降可能に吊下げられる搬器と、その搬器を前記推進管の推進位置開口部から上方に引き上げて推進管挿入位置から退避できる搬器支持構造体と、この搬器支持構造体に備えられて前記搬器を支持して昇降させる搬器昇降装置を有することを特徴とするものである。
【0013】
本発明においては、予め内面にガイドレールを取付けられた推進管を推進ジャッキによって推進させて、順次継足して斜坑を構築するに際して、その坑内での点検作業などを行うのに、搬器支持構造体を前進させて搬器を、搬器昇降装置の運転で坑内(推進管内)に配設されているガイドレールに案内させて斜坑内に進入させ、順次継足されて斜坑を構築する推進管内面に沿った内部作業を、搬器に搭乗して坑内を移動する作業者がその搬器から身を乗り出して行うことができる。なお、搬器に搭乗する作業者は、坑口から斜坑内の所要個所まで移動する間は搬器のケージ内に収まって移動できるので、安全を確保できる。そして、作業を行う場所に移動して後に、ケージ外で作業可能にされるステージ(作業床)に乗って目的作業を行うことができる。
【0014】
本発明によれば、斜坑内に進入して作業目的個所まで移動する(下降する)のに、斜坑を構築する推進管に付設されたガイドレールに案内されて前記搬器支持構造体から吊下げられるロープによって搬器が昇降できるので、迅速に目的位置まで移動でき、かつ安全性の確保が図れるという利点がある。また、斜坑構築の推進管の継足し操作を行う際には、搬器を坑外に引上げて搬器支持構造体を後退移動させるとその継足し作業位置から系外に退避できるので、次の使用時まで休止させることができて、斜坑の掘進構築作業に対して無理なく対応できる。
【0015】
前記第3発明において、前記搬器は、そのケージの上部に作業床が設けられ、かつケージ下部に作業足場が付設され、ケージ内からその作業足場および作業床に移動可能な出入り口が設けられている構成であるのがよい(第4発明)。このようにすると、斜坑内の目的作業位置に移動しての作業時には、ケージ内から上部の作業床あるいは下部の作業足場に作業者が移動して、坑内壁に沿った作業を行うことができる。
【0016】
また、前記搬器のケージ下側には支持部材を取付けて、この支持部材に吊上げ機を付設して揚重物を搬器とともに搬送できる構成とするのがよい(第5発明)。こうすると、斜坑内作業が完了して昇降用のガイドレールなどの撤去時に、揚重機によりそのガイドレールなどの物体を吊上げて、下方から順次坑道内の架設物を別途扛重機を用いることなく坑外に搬出することができる。
【0017】
また、前記第3発明において、前記搬器支持構造体は、斜坑軸線と交差する前後方向に移動可能に架台上で支持され、前面に前記搬器のガイドレールを付設するとともに、巻上げ機を搭載して前記搬器を巻上げロープで昇降駆動できるようにされ、搬器を斜坑内に昇降移動させる時には前記ガイドレールが斜坑内敷設のものと接続されて搬器の出入りが可能で、推進管の推進作業時には搬器とともに退避位置まで駆動手段によって移動される構成であることを特徴とする(第6発明)。
【0018】
こうすることによって、斜坑構築用の推進管の推進作業時には搬器支持構造体を搬器とともに退避位置に後退させ、推進作業を行うのに支障を来すことがなく、作業者が坑内に進入して作業を行うときには搬器支持構造体を前進させてその前面に設けられているガイドレールをスライドさせて、坑内に敷設されているガイドレールと合致するようにして搬器を坑内に進入させ、あるいは坑内から引き上げることができる。したがって、斜坑構築のための斜坑推進装置と別個に作動して斜坑構築の推進管の推進接続作業に支障を来さないで、坑内作業のときにのみガイドレールを接続して搬器を坑内に進入できるようにするとともに、斜坑上部位置と退避位置との間で搬器支持構造体を進退可能に設けることで、斜坑内作業時以外は搬器を前面に保持して退避させるようにして推進構築作業を優先させ、かつ坑内作業の安全を期すことができる。また、作業用搬器の斜坑に対する出入り操作を別な機材を用いることなく行えるので、作業工程を効率よく運用できるという利点がある。
【0019】
また、前記斜坑内に設けられる搬器のガイドレールは、二本のレール部材を所要間隔で平行するように複数の横部材で接合して形成され、その一端に左右対称で内向き傾斜面が形成され、他端には前記内向き傾斜面に合致するようにして左右対称で外向き傾斜面が形成されており、前記内向き傾斜面と外向き傾斜面とを合致させてレールの接続を行えるように構成されるのが好ましい(第7発明)。このようにすることで、構築用の推進管に予めガイドレールの向きを一定にして付設しておき、管接続時に前記ガイドレール端の内向き傾斜面部と他方のガイドレール外向き傾斜面部とを合致させるようにして推進管を接続すれば、ガイドレールの敷設を容易にすることができるという効果が得られる。
【0020】
【発明の実施の形態】
次に、本発明による斜坑推進構築装置の実施の形態につき、図面を参照しつつ説明する。
【0021】
図1には本発明が適用される斜坑推進構築装置の一実施形態の全体図が示されている。図2には斜坑構築部における管体推進装置の側面図が、図3には図2のA−A視図(a)と図2のB−B視平面図とが、図4には管体推進装置要部を表わす図が、図5には図4のC−C視図が、図6には搬器支持構造体の正面図が、図7には図6の左側面図が、図8には推進管に付設されるガイドレール一実施形態の一部を省略した正面図が、図9には図8におけるD−D視断面図で推進管体との取付部を併記した図が、それぞれ示されている。
【0022】
本実施の形態の斜坑推進構築装置1は、地中に掘削構築された図示されない隧道と地上とを繋ぐ斜坑2を構築するのに使用されるものである。その斜坑2は、地上部から目標位置まで小口径推進掘削工法によって構築され、その推進掘削には所要口径の推進管3が用いられる。
【0023】
前記斜坑推進構築装置1は、構築される斜坑2の殻体となる推進管3を掘削推進させる管体推進装置10と、これに併設されて斜坑2内での作業が必要な場合に搬器50を推進管3の推進位置開口部から斜坑2内に進入させて坑内での作業ができるようにされる搬器50とその搬器支持構造体40とで構成されている。
【0024】
前記管体推進装置10は、推進管3を推進させる推進架台11と、その推進架台11の推進管推進方向背後に設けられる推進管3の反力桁12と、複数の推進ジャッキ13を固定配置されるジャッキ架台14と、前記反力桁12に取付けられて前記ジャッキ架台14を反力桁12に沿い推進位置と退避位置との間を移動可能に案内するガイドおよびそのジャッキ架台14を移動させる駆動手段(後述)と、推進管3を所定の位置に受入れて推進操作を行なえるようにする推進管押え手段20とを備えて構成される。
【0025】
前記推進架台11は、地上部の斜坑構築発進位置で、その斜坑構築用の推進管3の推進傾斜角αに合わせ支持軸心(推進軸心線C)を傾斜させて内側に推進管3を受入れられる空間部を形成されるように、幅方向に広くとってその両面の前後に所要の高さで支柱11a,11bを平行させて幅方向の両側にそれぞれ配され、それら支柱11a,11bを繋ぎ部材11c、11dなどによって連結された枠組構造にされている。この推進架台11の頂部には推進管3の反力桁12が前記推進軸心線Cに直交するようにして取付けられている。なお、前記推進架台11は、設置地盤に対して推進管3を推進させる際の反力で浮き上がるのを阻止できるようにベース桁11fから地盤に対してアンカー15を打設して保持される。
【0026】
前記反力桁12の下面には、推進軸心線Cを跨いで所要の間隔にて二本のガイドレール16(I型断面の部材)が平行して傾斜前方に向かって(図1における紙面上左側)突出延長して配設され、このガイドレール16に案内されて推進位置と退避位置との間で移動可能に前記ジャッキ架台14が設けられている。そのジャッキ架台14には、下面に複数本(この実施形態では4本)の推進ジャッキ13が推進軸心線Cに平行して配設され、それらのロッド先端に推進管3の管端に接して推力を伝達する推進リング13′が取付けられている。なお、このジャッキ架台14を推進位置と退避位置との間で移動させる駆動手段としては、前記ガイドレール16,16の前端部を相互に連結する横部材16aにブラケットで支持される油圧シリンダ17が用いられ、その油圧シリンダ17のロッド17a端をジャッキ架台14の前端に接続して進退させるようにされている。また、前記ジャッキ架台14にはガイドレール16,16のI型断面両側のフランジ部上をガイドにして案内支持されるガイドローラ14a,14aが左右両側にそれぞれ複数付設され移動が容易なようにされている。
【0027】
さらに、前記推進架台11の内部には、後面側に推進管3を受入れた際推進軸心線Cにその管体が合致するように縁部で支持する二本の受け部材18,18が所定の間隔で縦通配設されている。この両受け部材18に対して3点受けできるように前側に推進管押え手段20が設けられている。この推進管押え手段20は、推進架台11の横部材11c,11dにて固定支持される固定縦通部材21に、基端をピン23で枢支される平行リンク22,22の可動端と取付ブラケット24aでピン24bにてそれぞれ連結されて前後方向に可動支持される押え縦通部材24とでなる。この押え縦通部材24は、さらに操作シリンダ25,25により前後動させることで、既設管端に継足す推進管3を押えることができる。なお、操作シリンダ25,25は、その両端部が、前記固定縦通部材21の背面側で前記ピン23,23位置よりも下方に設けられたブラケット21a,21aと、前記平行リンク22,22の可動端側にそれぞれ連結されている。
【0028】
このように構成される管体推進装置10とは別に、その設置位置より下側には前記推進管3の中間部を把持して前記推進ジャッキ13が所定のストローク推進して、その後退時の管浮き上がりを防止する推進管クランプ機構30がその軸芯を推進軸心線Cに合致させて管体推進装置10の設置位置より下側に配置されている。この推進管クランプ機構30は、中央部を推進管3が貫通できる空間を形成された構台31と、この構台31の中央部を貫通する推進管3の側面を抱えるように構台内部で縮小・拡大する円弧状の内側面を有する複数片(例えば4部片に分割されている)にてなるクランプ保持部片32と、そのクランプ保持部片32を操作する複数の油圧シリンダ33(操作シリンダ33)とで構成されている。なお、この推進管クランプ機構30は、構台31をその四隅に位置する支持脚31aの基部で地盤にアンカーボルトによって固定され、浮き上がるのを固定できるようにされている。図中符号34は構台31の上面に形成された点検用踊り場の手摺である。また、符号Fで示されるのは鋼矢板である。
【0029】
さらに、前記管体推進装置10の上方位置には掘削推進されて構築される斜坑2内に作業員が入って作業を行えるようにする搬器50を支持して昇降させる搬器昇降装置42を備えた搬器支持構造体40が設置されている。
【0030】
この搬器支持構造体40は、前面41aを前記推進管(斜坑2)の傾斜した推進軸心線Cと平行するように傾斜させた所要高さで枠組構造の支持フレーム41と、この支持フレーム41に付設される搬器昇降装置42と、前記支持フレーム41を前記管体推進装置10による推進管3の開口部より搬器50を進入させる位置から管推進操作時に退避させる位置まで進退可能に支持する支持架台60とで構成されている。
【0031】
前記搬器昇降装置42は、前記支持フレーム41の前面41aの上下方向にスライド可能に付設されるガイドレール43と、前記支持フレーム41の頂部に設けたガイドシーブ45,45を巡らせたワイヤロープ46,46で吊下げられる搬器50を昇降操作する巻上機44とで構成されている。
【0032】
前記ガイドレール43は、所要の間隔で溝型鋼にてなるレール部材43aを一対その溝部が外向きになるようにして平行に配され、それらレール部材43aを所要の間隔で複数本の横部材43bによって相互に接続されて一体に形成された構造のものである。このガイドレール43は、支持フレーム41の前面で支持部材によって上下方向にスライド可能に支持されて、支持フレーム41の枠組内下部の前方位置に設置されるウインチ47からその支持フレーム41の頂部に配設されるガイドシーブ48,48を巡らせたワイヤロープ47aで吊り上げられて支持され、前記搬器50の昇降操作時以外では引き上げられた状態に保たれている。
【0033】
前記搬器50は、前記ガイドレール43のレール部材43a,43aにより案内されるガイドローラを幅方向の両側に少なくとも上下一対設けた作業者を乗せるためのケージ52と、作業足場53を装着する昇降フレーム51と、ケージ52の上部に取付けられた作業床54とで構成されている。
【0034】
また、搬器50は、その昇降フレーム51の上頂部に設けられる図示省略された公知の安全機構を介して、前記支持フレーム41頂部に設置されているガイドシーブ45,45を巡らせて巻上機44により操作されるワイヤロープ46(本発明のロープに相当)により吊下げられている。そして、ケージ52の上部にはその内部から昇降できるようにして作業床54が設けてあり、この作業床54上で通常の坑内作業が行なえるようにされている。
【0035】
また、ケージ52の床下には支持梁55(本発明の支持部材に相当)が昇降フレーム51から前方へケージ52よりやや突出するようにして付設され、その支持梁55の先端部下に小型の揚重機56(例えば小型電動ホイストなど、以下電動ホイスト56という)が吊設されている。下側に設けられる作業足場53は、主として前記電動ホイスト56を使用して斜坑構築作業の終了に伴い付設されているガイドレール(後述)や坑内作業に要した部材などを撤去する際に使用できるようにされ、例えば撤去したガイドレールをその作業足場53内に回収して地上部まで搬出するのに使用できるスペースに形成されている。
【0036】
また、前記支持フレーム41は、地上部に立設された支持架台60上で、前記搬器50を、推進構築される斜坑2(推進管)の開口部から内部に進入できるようにする位置から推進管3の推進操作時に後方に退避できる位置まで前後移動できるように、ガイドレール61上で支持されている。したがって、その支持架台60の上面は、前記推進架台11上の反力桁12の上面と接触しない位置に設けられ、前記ガイドレール61の前端部は反力桁12上に突出している(図1参照)。
【0037】
このように支持フレーム41は、前記支持架台60の上面部に配置されて基端側をその支持架台60に取付け、ロッド端部を支持フレーム41下部の適所に接続される進退操作シリンダ63によって、所定のストローク移動させるようになされており、支持フレーム41の下部には支持架台60付設のガイドレール61に案内支持されて移動可能に支持する車輪41cが複数設けてある。なお、この支持フレーム41の前面上部には搬器50への給電・制御用のケーブルを巻き取るケーブルリール64が搭載され、また、搬器50が引き上げられた状態で作業者が搬器のケージ52に乗降するための踊り場(図示省略)が側面部に設けられている。
【0038】
一方、掘削推進して斜坑2を構築する推進管3は、所要口径の金属管体で構成され、順次嵌め合いにより連結してその連結部の外周で多数本のボルトによって接続される構造になっている。そして、この推進管3の内面には、その軸心線に沿って搬器50の進入時案内するガイドレール65が取外し可能に付設されている。また、そのガイドレール65の側方位置に図示省略するがケーブルなどを案内するローラが適宜間隔で配設され、これらも取外し可能に設けられている。
【0039】
前記推進管内に付設されるガイドレール65は、図8で示されるように、前記支持フレーム41の前面に付設されるガイドレール43と同一のガイド部材65a,65aを複数本の横部材65bで相互に接続されて一体構造にされており、その推進管3の接続全長に対応する長さで、撤去時に前述の搬器50に付属する作業足場53内に収容できる長さ寸法で例えば三分割65A,65B,65Cと形成されて、端部においてボルト68にて連結されている。また、このガイドレール65の例えば分割レール65Aの一端は中央線に向かって両側から下がり勾配の傾斜面66が対称に付され、分割レール65Cの他端では前記分割レール65Aの一端の傾斜面66と合致する突勾配の傾斜面67に形成されている。したがって、推進管3の接続時には下がり勾配の傾斜面66端と突勾配の傾斜面67端とを合わせることによりガイド部材65aの位置を合致させて突き合わせ接続することができるように構成されている。また、下面の複数箇所には図9に示すように、推進管3の管内壁に設けられる取付座3Aに対してボルト70により締結して固着される座板69が付設されている。
【0040】
このように構成される斜坑推進構築装置10は、まず、掘削推進される斜坑2の殻体となる推進管3を図示されない先導掘削機に続いて推進部に装着する準備作業を行う。この際には、図1または図4に二点鎖線で示されるように、推進架台11上部の反力桁12下面に位置するジャッキ架台14をその移動駆動手段である油圧シリンダ17を作動させて推進位置P前方の退避位置Qまで移動させ、推進管3を受入れ容易なように推進架台11の内部空間の上部を開放させる。なお、この時点で推進管3の中間部を把持する推進管クランプ機構30は、保持部片32によるチャッキング位置から後退して緩め、推進管3の挿入が容易なようにする。また、搬器支持構造体40は、退避位置に移動待機させて推進管3の吊り込み作業に支障がないようにしておく(図1参照)。
【0041】
推進管3は、図示されない別途揚重機によって推進位置Pに吊り込んで先進している管の後端に接続する。この際、推進管3を受入れ位置に吊り込むと、推進架台11内の受け部材18,18にもたれるようにして支持させる。こうすることで所定の傾斜で先導管の軸心と合致させることができる。この際に、吊り込まれた推進管3の軸心が推進軸心線Cに合致していない場合、図4に示されるように、推進管押え手段20の操作シリンダ25を作動させて平行リンク22,22との協働操作で押え縦通部材24を押出して受け部材18,18側に推進管3を移動させ、軸心線が先の推進管と合致するように操作させる。なお、推進管3を推進位置Pに吊り込む際には、先に地上部で取付けてあるガイドレール65の取付け向きを、先の推進管3におけるガイドレール65の取付位置と合致するように位置合わせされる。
【0042】
吊り込まれた推進管3が既設の推進管先端部にボルト締結されると、油圧シリンダ17を前進作動させてジャッキ架台14を推進位置Pに戻す。その後に複数の推進ジャッキ13のロッドを一斉に前進操作すると、それらのロッドに取付く推進リング13′が推進管3の上端部に押し付けられる。そこで、全推進ジャッキ13を前進作動させると、その推力で推進管3が徐々に地中に押し込まれ、先導管端に付される掘削機による掘削と相俟って推進される。なお、掘削土は掘削機に付設の排土手段によって構築されつつある斜坑2内から図示されない排泥管によって地上部に排出される(排泥管については、前記ガイドレール65と同様に予め推進管の内部に取付けておき、接続時にその管も接続される)。
【0043】
やがて、推進ジャッキ13が最大ストロークに到達すると、推進管クランプ機構30の操作シリンダ33を作動させて保持部片32を管軸心方向に収縮させて推進管3の中間部をチャッキングさせる。こうすることによって、推進管3は押し込み状態のままで保持される。そこで、推進ジャッキ13を一斉に後退させるとともに、油圧シリンダ17を後退方向に作動させてジャッキ架台14を退避位置Qに後退させる。こうして推進ジャッキ13の1ストローク分の空間が生じた推進中の推進管3の上側にスペーサ管(図示せず)を吊り込んで仮接続し、再びジャッキ架台14を油圧シリンダ17によって推進位置Pまで戻すようにする。
【0044】
ジャッキ架台14が推進位置Pに戻されると再び推進ジャッキ13を作動させて推進リング13′をスペーサ管の端部に押し付けて推進力を付勢する。前記推進ジャッキ13によってスペーサ管を介して推進管3を所要位置まで推進させると、次の新たな推進管3を継足す作業に移行する。この新たな推進管3の接続作業は、まず推進管クランプ機構30の操作シリンダ33を作動させて保持部片32によって、押し込まれている推進管3の外周部をチャッキングさせて推進力が除かれたときに推進中の管体が浮き上がるのを阻止させる。続いて推進ジャッキ13のロッドを後退させて推進リング13′を引き上げるとともに、ジャッキ架台14を前述の要領で退避位置Qまで後退させる。スペーサ管を取除いて先の推進管上部位置を開放状態にしてから、図10に示されるように、新たな推進管3を吊り込んで接続作業を行い、再びジャッキ架台14を戻してから推進管クランプ機構30によるチャッキングを解除し、推進ジャッキ13を前進作動させて推進力を付勢して推進作業を行う。なお、前記接続作業を行う際には先導管に取付く掘削機は一旦停止し、推進動作に移行する時点で運転して掘進させる。以後この操作を繰り返して斜坑2の構築作業を行うのである。
【0045】
一方、斜坑2の構築作業が進捗して斜坑内での作業が必要となるときには、次の推進管3を継足す作業を中断して、前述の推進ジャッキ13による動作を一旦停止し、ジャッキ架台14を退避位置Qに後退させる。もちろんこのときには、推進管クランプ機構30によるチャッキング操作によって推進管3を固定しておく。こうしてから、斜坑2内に搬器を送り込む。
【0046】
搬器50を斜坑2内に送り込むには、図10に示されるように、まず、待機位置にあった地上部の搬器支持構造体40の支持フレーム41をその進退操作シリンダ63によって、前面41aに保持されている搬器50を案内するガイドレール43が斜坑2の坑口(推進操作されている推進管3の上端部)上部に位置するように前進させる。この際、搬器のガイドレール43はその下端が斜坑2内のガイドレール65上端と合致するように位置調整を行わせる。
【0047】
前記支持フレーム41側に支持されているガイドレール43は、ウインチ47によって操作されるワイヤロープ47aによって引上げられた状態にあるので、そのウインチ47を作動させて前記ガイドレール43を推進管3の内部に付設されているガイドレール65の端部と当接する状態になるまでスライド下降させる。なお、推進管側のガイドレール65位置と支持フレーム41側のガイドレール43とは予め接続可能なように両者の軸線が合致するように設定されている。
【0048】
こうして支持フレーム側のガイドレール43と推進管側のガイドレール65とが接続されると、搬器50に作業者が搭乗し、巻上機44をロープ繰出し側に運転操作するとワイヤロープ(ロープ)46,46が繰出されてガイドレール65に沿い斜坑2内へ降下できる。したがって、作業者は目的位置まで降下すると巻上機44の運転を停止させ、その後に搬器50のケージ52内から天井部に設けられる作業床54上に登って斜坑2内の内壁に沿って行えばよい。なお、搬器50が斜坑内に降下進入して作業を行うに際しては、作業者が搭乗しているケージ52に設けられている運転制御手段によって地上部の巻上機44の駆動を操作するようにされ、そのための電源並びに制御用のケーブルは支持フレーム41上に搭載されるケーブルリール64に巻き取られているケーブル(図示省略)を搬器50の昇降に応じて繰出し・巻き取られて地上側の制御機器を介して運転操作が行えるようにされている。
【0049】
前記搬器50は、斜坑の推進軸心線Cの傾斜角に合わせて傾斜した構造にされているが、構内での作業時には前述のようにケージ52内から天井部に設けられている作業床54に上って作業することになり、開放状態であるから斜坑内壁前周面にわたって作業することができる。また、昇降時にはケージ52の内部に作業者が収まって移動することにより安全を確保できる。もちろん、非常時には搬器50を吊下げている個所に公知の安全装置が設けられているので、その安全装置の作動によって保護されるようになされている。
【0050】
坑内での作業が終了すれば、作業者はケージ52内に戻り、昇降に支障のない状態で坑口まで上昇し、搬器支持構造体40の支持フレーム側ガイドレール43上まで搬器50を上昇させて斜坑2から離脱させ、その後にウインチ47を作動させてガイドレール43を所定の位置まで引上げる。こうすることによって、支持フレーム41側のガイドレール43は、斜坑2側のガイドレール65と引き離されて推進作業に支障を来さないように搬器支持構造体40を待機位置に移動退避させることができる。したがって、進退操作シリンダ63を後退作動させることによって、支持フレーム41を退避位置に戻し、次の推進管3の継足し作業(推進作業)が開始できることになる。
【0051】
なお、搬器50は、前述のように斜坑2内に敷設されるガイドレール65に沿って巻上機44の駆動により昇降できるので、例えば斜坑掘削部先端の掘削機に支障が生じたり、あるいは点検の必要があるときには、作業者を切羽位置まで降下させてケージ52の下部に付設されている作業足場53から身を乗り出して、あるいは外に出て直接掘削機の点検修理を行うことができる。この場合は、いわば斜坑2の底部に位置するので、別途な機材を使用しないで作業を行うことができる。
【0052】
斜坑2の掘削構築が終れば、図11に示すように、搬器50を前述のようにして斜坑2内に降下させ、ケージ52下側の作業足場53内に作業者が降りて、斜坑2(推進管体)に付設されているガイドレール65の最下端のものから順次上方へ敷設取付部の締結ボルトを解き、かつ接続部で所定長さにそのガイドレール65のセグメント(65A,65B,65C)を分解し、ケージ52下に設けられた支持梁55に吊設の電動ホイスト56によってその分解したガイドレール65のセグメントを作業足場53内に取り込み、搬器50を運転して地上に運び上げる。なお、前記作業足場53は、作業者が載ってガイドレール65の解体作業を行なうに適したスペースを有するもので、作業面以外の周面にはガードが付されて安全性が保てるように形成されている。また、このガイドレール65の解体撤去に際して、坑内壁に付設されているその他の部品などの解体撤去も併せて行うことができる。
【0053】
このようにして本実施形態の斜坑推進構築装置1は、推進管推進装置10に搬器支持構造体40を併設して、地上部から小口径掘削推進工法によって斜坑2の推進構築を行うとともに、構築時にガイドレール65を斜坑の殻体(推進管3)とともに順次敷設して、このガイドレール65に沿って搬器50を地上側から斜坑内に昇降自在なように構成されるので、必要時にその都度搬器50を斜坑2内に送り込んで、その内部での作業を安全に行えるので、斜坑構築の作業を容易化して短工期で構築することが可能になるのである。また、斜坑2の構築後にはガイドレール65を分解して搬器50内部に積み込んで、他の機材を使用することなく解体撤去することができるので、付帯工事に要する費用も軽減できることになる。
【図面の簡単な説明】
【図1】図1は、本発明が適用される斜坑推進構築装置の一実施形態の全体図である。
【図2】図2は、斜坑構築部における管体推進装置の側面図である。
【図3】図3は、図2のA−A視図(a)と図2のB−B視平面図(b)である。
【図4】図4は、管体推進装置要部を表わす図である。
【図5】図5は、図4のC−C視図である。
【図6】図6は、搬器支持構造体の正面図である。
【図7】図7は、図6の左側面図である。
【図8】図8は、推進管に付設されるガイドレール一実施形態の一部を省略した正面図である。
【図9】図9は、図8におけるD−D視断面図で推進管体との取付部を併記したものである。
【図10】図10は、推進管の受け入れと搬器を斜坑内に進入させる状態を表わす図である。
【図11】図11は、斜坑内でガイドレールなどの撤去作業を行うときの態様を表わす図である。
【符号の説明】
1 斜坑推進構築装置
2 斜坑
3 推進管
10 管体推進装置
11 推進架台
12 反力桁
13 推進ジャッキ
13′ 推進リング
14 ジャッキ架台
16 ジャッキ架台のガイドレール
17 ジャッキ架台を移動させる油圧シリンダ
18 推進管の受け部材
20 推進管押え手段
24 押え縦通部材
25,33 操作シリンダ
30 推進管クランプ機構
31 構台
32 クランプ保持部片
40 搬器支持構造体
41 支持フレーム
43 ガイドレール
44 巻上機
46 搬器昇降用のワイヤロープ(ロープ)
47 ウインチ
47a ガイドレールスライド用のワイヤロープ
50 搬器
52 ケージ
53 作業足場
54 作業床
55 支持梁
56 電動ホイスト
60 支持フレームの支持架台
61 ガイドレール
63 進退操作シリンダ
65 推進管に付設されるガイドレール
66 ガイドレール端の下がり勾配の傾斜面
67 ガイドレール端の突勾配の傾斜面
C 推進軸心線[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a device for constructing an inclined vertical shaft (shaft shaft) by a propulsion method, and relates to a shaft shaft propulsion construction device equipped with an up-and-down moving means for an operator who can also perform inspection work in the propelled shaft. is there.
[0002]
[Prior art]
Conventionally, when constructing a tilt pit that connects the inside of a tunnel built in the ground and the ground, a construction method is generally adopted in which the shaft is excavated and constructed from the underground tunnel side toward the ground. . A shield machine is mainly used for the excavation of such an inclined shaft (for example, refer patent document 1). In addition, in order to carry out the work in the tunnel with the worker entering the inclined shaft, there are those equipped with a work stage for sending materials and workers by a moving carriage and performing work such as inspection on the moving carriage. It is known (see Patent Document 2). In addition to this, Japanese Patent Application No. 2001-138863, which is a prior application of the present applicants, discloses a moving means for workers used to perform inspections and repairs in the tunnels when workers enter the inclined shaft. is there.
[0003]
[Patent Document 1]
JP-A-8-189285
[Patent Document 2]
JP 2001-88691 A
[0004]
[Problems to be solved by the invention]
In the prior art, as shown in
[0005]
In addition, excavation with an excavator from the bottom requires lining work inside the excavated tunnel along with the excavation, and enormous labor and cost are required to carry in and cover the lining material. As a result, the construction period is prolonged, and during the excavation, the excavated earth and sand are sent into the horizontal mine, so that it takes a lot of cost to carry out the mine.
[0006]
On the other hand, in order to perform inspection and repair work by entering an inclined tunnel, an operator is provided at the rear end of a tunnel excavator from a winch installed on the start side, as disclosed in
[0007]
In the present invention, the pipe body of the required diameter is excavated and propelled from the ground part toward the target horizontal pit by the propulsion method, and the hoistway temporarily installed inside the pipe body that is sequentially connected according to the progress of the propulsion pipe is extended. It is possible to efficiently construct the inclined shaft by providing the operator with a function to enter and exit the tunnel, which can handle inspection and repair work inside the pipe of the tunnel construction. It aims to provide a tilt shaft propulsion construction device.
[0008]
[Means for solving the problems and actions / effects]
In order to achieve such an object, the first inventionbyThe inclined shaft propulsion construction equipment
A tilt shaft propulsion construction device for constructing a tilt shaft by excavation propulsion method from the ground part toward the underground horizontal shaft,
Installed on the groundPropulsion stand that propels the propulsion pipe and the direction behind the propulsion standUpwardPropulsion pipe reaction force girder and multiple jacksButJack stand that is fixed and integrated with the reaction force girderUnderside ofA guide that is attached to the jack and movably guides the jack frame along the reaction beam between the propulsion position and the retreat position.Rail and saidDriving means for moving the jack mount;Including a tubular propulsion device having,
The propulsion frame includes a receiving member that supports the propelling pipe so that the axis of the propelling pipe coincides with the propelling axis when the propelling pipe is received, and a propelling pipe pressing unit facing the receiving member.It is characterized by this.
[0009]
In the present invention, a jack gantry provided with a propulsion frame, a reaction beam girder of a propulsion pipe and a jack for propulsion at the starting position on the ground for propulsion excavation of the inclined shaft is made to correspond to the inclination angle of the inclined shaft constructed by the propulsion pipe. Install. When the propulsion pipe is brought into a predetermined position, the jack mount is moved from the propulsion position to the retracted position along the guide by the driving means, and the propulsion pipe is separately carried into the predetermined position according to the excavation angle by a hoisting machine. A new propulsion pipe is connected to the rear part of the propulsion pipe, and then the jack base that has been retreated is returned to its original position, and the propulsion force is urged and propelled by the propulsion jack to construct the excavation. The reaction force at the time of propulsion is received by a reaction force girder attached to the propulsion frame, and the load is held by the propulsion frame.
[0010]
According to the present invention, the propulsion pipe can be excavated by the propulsion excavation method from the above-ground part toward the horizontal pit in the destination, and the inclined pit can be constructed. The work efficiency can be improved, and the construction period can be shortened compared with the construction of excavation from the ground.
[0011]
In the present invention, a propulsion pipe clamp mechanism for preventing the propulsion pipe from being lifted when the propulsion jack is retracted is provided below the installation position of the tube propulsion device. A propulsion tube reaction force gantry having a space through which the propulsion tube can penetrate, a clamp holding piece consisting of a plurality of pieces that contract and expand while holding the side surface of the propulsion tube penetrating the center of the propulsion tube reaction force gantry, It is preferable to include an operation cylinder for operating the clamp holding piece.(Second invention). In this way, when the propulsion force by the propulsion jack is removed by operating the propulsion tube clamp mechanism and gripping the middle of the propulsion tube being propelled from both sides immediately before retreating after the one-stroke propulsion operation by the propulsion jack. In this reaction, the propulsion force can be made effective by preventing the propulsion pipe from being lifted (returned).
[0012]
Next, the third inventionbyThe inclined shaft propulsion construction equipment
A tilt shaft propulsion construction device for constructing a tilt shaft by excavation propulsion method from the ground part toward the underground horizontal shaft,
Installed on the groundPropulsion stand that propels the propulsion pipe and the direction behind the propulsion standUpwardPropulsion pipe reaction force girder and multiple jacksButJack stand that is fixed and integrated with the reaction force girderUnderside ofA guide that is attached to the jack and movably guides the jack frame along the reaction beam between the propulsion position and the retreat position.Rail and saidDriving means for moving the jack mount;HaveTube propulsion deviceAnd this tube propulsion deviceA guide rail that is attached to the propulsion pipe and can be extended, and a carrier that is guided by the guide rail and that is suspended from the upper opening of the inclined shaft construction propulsion pipe by a rope so as to be able to be lifted and lowered by the rope. ThePropulsion position of the propulsion pipeCarriage support structure that can be lifted upward from the opening and retracted from the propelling tube insertion positionAnd thisEquipped in the transporter support structureA lifting device for supporting and lifting the carrierIt is characterized by having.
[0013]
In the present invention, a propelling pipe having a guide rail attached to the inner surface in advance is propelled by a propulsion jack, and when a tilt shaft is constructed by successive addition, a carrier support structure is used to perform inspection work and the like in the shaft. To move forward,Carriage lifting deviceGuided by the guide rails installed in the mine (in the propulsion pipe)SetAn operator who gets on the inside of the propulsion pipe and moves inside the mine on the inside of the propulsion pipe, which is successively added to build the inclined pit, gets out of the carrier.Dobe able to. In addition, since the worker boarding a carrier can move in the cage of the carrier while moving from the wellhead to the required part in the inclined shaft, safety can be ensured. Then, after moving to the place where the work is performed, the target work can be performed on a stage (work floor) that can be worked outside the cage.
[0014]
According to the present invention, when entering the inclined shaft and moving (lowering) to the work destination, it is guided by the guide rail attached to the propulsion pipe constructing the inclined shaft and suspended from the transporter support structure. Since the carrier can be moved up and down by the rope, there is an advantage that it can be quickly moved to the target position and safety can be ensured. In addition, when the propulsion pipe for the construction of a tilt shaft is operated, if the carrier is lifted out of the pit and the carrier support structure is moved backward, it can be retracted from the system from the work position, so that the next use And can respond to the construction work of the inclined shaft without difficulty.
[0015]
In the third aspect of the present invention, the carrier is provided with a work floor at the top of the cage, a work scaffold is attached at the bottom of the cage, and a doorway that is movable from the inside of the cage to the work scaffold and the work floor is provided. It is good to have a configuration (fourth invention). If it does in this way, at the time of the work after moving to the target work position in the inclined shaft, the worker can move from the cage to the upper work floor or the lower work scaffold, and work along the inner wall of the mine can be performed. .
[0016]
Moreover, it is good to set it as the structure which attaches a support member to the cage lower side of the said carrying device, attaches a lifting machine to this supporting member, and can convey a lift with a carrying device (5th invention). In this way, when the work in the inclined shaft is completed and the guide rail for lifting is removed, the object such as the guide rail is lifted by a lifting machine, and the construction in the tunnel is sequentially removed from below without using a separate heavy machine. Can be carried outside.
[0017]
In the third aspect of the invention, the transporter support structure is supported on a gantry so as to be movable in the front-rear direction intersecting the inclined shaft axis, and is provided with a guide rail for the transporter on the front surface and mounted with a hoisting machine. The transporter can be driven up and down with a hoisting rope. When the transporter is moved up and down in the inclined shaft, the guide rail is connected to the one installed in the inclined shaft so that the transporter can enter and exit. The present invention is characterized in that the driving means moves to the retreat position (sixth invention).
[0018]
By doing so, the propelling support structure is retracted to the retracted position together with the transporter during the propulsion work of the propulsion pipe for the construction of the inclined shaft, and there is no hindrance to the propulsion work. When carrying out the work, the carrier support structure is advanced and the guide rail provided on the front surface is slid so that the carrier enters the mine so that it matches the guide rail laid in the mine, or from the mine. Can be raised. Therefore, it operates separately from the shaft propulsion device for the construction of the shaft, and does not interfere with the propulsion connection work of the shaft for the construction of the shaft. The guide rail is connected only when working in the shaft, and the transporter enters the shaft. Propulsion construction work can be carried out by holding the carrier on the front and retracting it except when working inside the shaft by providing the carrier support structure so that it can advance and retract between the upper position of the shaft and the retreat position. It is possible to give priority and ensure the safety of underground work. Moreover, since the operation of entering and exiting the inclined shaft of the work carrier can be performed without using another equipment, there is an advantage that the work process can be efficiently operated.
[0019]
In addition, the guide rail of the carrier provided in the inclined shaft is formed by joining two rail members with a plurality of horizontal members so as to be parallel at a required interval, and an inwardly inclined surface is formed symmetrically at one end thereof. The other end is symmetrically formed with an outwardly inclined surface so as to match the inwardly inclined surface, and the rail can be connected by matching the inwardly inclined surface and the outwardly inclined surface. It is preferable to be configured as described above (seventh invention). In this way, the construction guide pipe is attached in advance with the direction of the guide rail being fixed, and when the pipe is connected, the inward inclined surface portion of the guide rail end and the other guide rail outward inclined surface portion are provided. If the propulsion pipes are connected so as to match, the effect of facilitating the laying of the guide rail can be obtained.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
Next, an embodiment of a tilt shaft propulsion construction apparatus according to the present invention will be described with reference to the drawings.
[0021]
FIG. 1 is an overall view of an embodiment of a tilt shaft propulsion construction apparatus to which the present invention is applied. 2 is a side view of the tubular body propulsion device in the inclined shaft construction section, FIG. 3 is a view taken along line AA in FIG. 2 and a plan view taken along line BB in FIG. 2, and FIG. FIG. 5 is a view taken along the line CC of FIG. 4, FIG. 6 is a front view of the carrier support structure, FIG. 7 is a left side view of FIG. 8 is a front view in which a part of an embodiment of the guide rail attached to the propulsion pipe is omitted, and FIG. 9 is a sectional view taken along line DD in FIG. , Respectively.
[0022]
A tilt shaft
[0023]
The tilt shaft
[0024]
The tubular
[0025]
The
[0026]
Two guide rails 16 (I-shaped cross-section members) are parallel to the lower surface of the
[0027]
Furthermore, inside the
[0028]
Separately from the
[0029]
Further, a portable device lifting / lowering
[0030]
The
[0031]
The transport
[0032]
The guide rails 43 are arranged in parallel so that a pair of rail members 43a made of groove steel at a predetermined interval so that the groove portions face outward, and the rail members 43a are arranged at a plurality of horizontal members 43b at a predetermined interval. And are integrally connected to each other. The
[0033]
The carrying
[0034]
In addition, the
[0035]
A support beam 55 (corresponding to a support member of the present invention) is attached below the floor of the
[0036]
Further, the
[0037]
In this way, the
[0038]
On the other hand, the
[0039]
As shown in FIG. 8, the
[0040]
The inclined shaft
[0041]
The
[0042]
When the suspended
[0043]
Eventually, when the
[0044]
When the
[0045]
On the other hand, when the construction work of the
[0046]
In order to feed the
[0047]
Since the
[0048]
Thus, when the
[0049]
The
[0050]
When the work in the mine is completed, the operator returns to the
[0051]
Since the
[0052]
When the excavation construction of the
[0053]
In this way, the inclined shaft
[Brief description of the drawings]
FIG. 1 is an overall view of an embodiment of a tilt shaft propulsion construction apparatus to which the present invention is applied.
FIG. 2 is a side view of the tubular body propulsion device in the inclined shaft construction section.
3 is an AA view (a) in FIG. 2 and a BB plan view (b) in FIG. 2; FIG.
FIG. 4 is a diagram illustrating a main part of a tubular body propulsion device.
FIG. 5 is a CC view of FIG. 4;
FIG. 6 is a front view of the transporter support structure.
FIG. 7 is a left side view of FIG. 6;
FIG. 8 is a front view in which a part of an embodiment of a guide rail attached to a propulsion pipe is omitted.
FIG. 9 is a sectional view taken along line DD in FIG. 8 along with a mounting portion with a propelling tube.
FIG. 10 is a view showing a state where the propelling pipe is received and the carrier is made to enter the inclined shaft.
FIG. 11 is a diagram illustrating an aspect when a guide rail or the like is removed in the inclined shaft.
[Explanation of symbols]
1 inclined shaft propulsion construction equipment
2 inclined shaft
3 Promotion pipe
10 Tube propulsion device
11 Propulsion stand
12 Reaction Girder
13 Propulsion jack
13 'propulsion ring
14 Jack stand
16 Jack rail guide rail
17 Hydraulic cylinder to move the jack mount
18 Receiving member of propulsion pipe
20 Propulsion tube presser
24 Presser longitudinal member
25, 33 Operation cylinder
30 Propulsion tube clamp mechanism
31 gantry
32 Clamp holding piece
40 Transporter support structure
41 Support frame
43 Guide rail
44 hoisting machine
46 Wire rope (rope) for lifting and lowering the carrier
47 Winch
47a Wire rope for guide rail slide
50 Carryer
52 cage
53 Working scaffold
54 Work floor
55 Support beam
56 Electric hoist
60 Support frame for support frame
61 Guide rail
63 Forward / backward operation cylinder
65 Guide rail attached to the propulsion pipe
66 Inclined surface at the end of the guide rail
67 Inclined surface at the end of guide rail
C propeller axis
Claims (7)
地上部に設置されて推進管を推進させる推進架台と、その推進架台の推進方向背後上方に設けられる推進管の反力桁と、複数の推進ジャッキが一体に固定配置されるジャッキ架台と、前記反力桁の下面に取付けられて前記ジャッキ架台を反力桁に沿って推進位置と退避位置との間を移動可能に案内するガイドレールと、前記ジャッキ架台を移動させる駆動手段とを有する管体推進装置を含み、
前記推進架台の内部に、推進管を受入れた際、推進管の軸心が推進軸心線に合致するように支持する受け部材と、この受け部材と対向して推進管押さえ手段を備えていることを特徴とする斜坑推進構築装置。 A tilt shaft propulsion construction device for constructing a tilt shaft by excavation propulsion method from the ground part toward the underground horizontal shaft,
A propulsion gantry for propelling the propulsion tube is installed on the ground portion, and the reaction force digit propulsion tube provided to the propulsion direction behind above the propulsion pedestal, a jack frame having a plurality of propulsion jacks are fixedly arranged together, the A tube having a guide rail attached to the lower surface of the reaction force girder so as to guide the jack mount so as to be movable between a propulsion position and a retreat position along the reaction force girder, and drive means for moving the jack mount. Including propulsion devices,
The propulsion frame includes a receiving member that supports the propelling pipe so that the axis of the propelling pipe coincides with the propelling axis when the propelling pipe is received, and a propelling pipe pressing unit facing the receiving member. A tilt shaft propulsion construction device characterized by that.
地上部に設置されて推進管を推進させる推進架台と、その推進架台の推進方向背後上方に設けられる推進管の反力桁と、複数の推進ジャッキが一体に固定配置されるジャッキ架台と、前記反力桁の下面に取付けられて前記ジャッキ架台を反力桁に沿って推進位置と退避位置との間を移動可能に案内するガイドレールと、前記ジャッキ架台を移動させる駆動手段とを有する管体推進装置と、この管体推進装置に併設されて、前記推進管内に付設されて継足し可能なガイドレールと、そのガイドレールに案内されて斜坑構築推進管の開口上部から坑内にロープによって昇降可能に吊下げられる搬器と、その搬器を前記推進管の推進位置開口部から上方に引き上げて推進管挿入位置から退避できる搬器支持構造体と、この搬器支持構造体に備えられて前記搬器を支持して昇降させる搬器昇降装置を有することを特徴とする斜坑推進構築装置。 A tilt shaft propulsion construction device for constructing a tilt shaft by excavation propulsion method from the ground part toward the underground horizontal shaft,
A propulsion gantry for propelling the propulsion tube is installed on the ground portion, and the reaction force digit propulsion tube provided to the propulsion direction behind above the propulsion pedestal, a jack frame having a plurality of propulsion jacks are fixedly arranged together, the A tube having a guide rail attached to the lower surface of the reaction force girder so as to guide the jack mount so as to be movable between a propulsion position and a retreat position along the reaction force girder, and drive means for moving the jack mount. A propulsion device , a guide rail attached to the propulsion device and attached to the propulsion tube, which can be extended, and guided by the guide rail, can be moved up and down by a rope from the upper opening of the inclined shaft construction propulsion tube and hanging are carriage in a carriage support structure which can be retracted from the propulsion tube insertion position by pulling the carriage upwardly from propulsion position the opening of the propulsion tube, provided on the carriage support structure of this Inclined shaft propulsion builder, characterized in that it comprises a carriage lifting device for lifting and supporting the carriage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002302782A JP4014483B2 (en) | 2002-10-17 | 2002-10-17 | Diagonal shaft propulsion construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002302782A JP4014483B2 (en) | 2002-10-17 | 2002-10-17 | Diagonal shaft propulsion construction equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004137742A JP2004137742A (en) | 2004-05-13 |
JP4014483B2 true JP4014483B2 (en) | 2007-11-28 |
Family
ID=32450750
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002302782A Expired - Fee Related JP4014483B2 (en) | 2002-10-17 | 2002-10-17 | Diagonal shaft propulsion construction equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4014483B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110056314A (en) * | 2019-03-27 | 2019-07-26 | 中建三局集团有限公司 | It is a kind of for the supplementary base of raked pile construction equipment angular adjustment to be perfused |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2020153175A (en) * | 2019-03-22 | 2020-09-24 | 株式会社奥村組 | Tunnel construction method |
CN113294166B (en) * | 2021-05-20 | 2023-11-14 | 北京建工土木工程有限公司 | Oblique starting method for large-section rectangular jacking pipe |
-
2002
- 2002-10-17 JP JP2002302782A patent/JP4014483B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110056314A (en) * | 2019-03-27 | 2019-07-26 | 中建三局集团有限公司 | It is a kind of for the supplementary base of raked pile construction equipment angular adjustment to be perfused |
Also Published As
Publication number | Publication date |
---|---|
JP2004137742A (en) | 2004-05-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3458396A (en) | Demolition machine | |
US20110193398A1 (en) | Heading or extraction machine | |
CN110778320A (en) | Synchronous excavation supporting construction method for three-step inverted arch of weak surrounding rock tunnel | |
JP2020084447A (en) | Installation method of land slide prevention pile for high place work platform | |
JP6125882B2 (en) | Elector device and segment assembly device using the same | |
JP4014483B2 (en) | Diagonal shaft propulsion construction equipment | |
CN113605905B (en) | Construction method for nondestructive disassembly of shield machine in tunnel | |
JP4557931B2 (en) | Excavator body recovery device in tunnel excavator | |
JPH08158800A (en) | Conveyance device of segment etc. | |
JPH07269270A (en) | Shaft excavation device, and shaft construction method | |
JP4612283B2 (en) | Segment assembling apparatus and segment assembling method | |
JP3692120B2 (en) | Pile removal device | |
JP2618798B2 (en) | Multi-function excavator | |
JP7373773B2 (en) | Formwork installation device and formwork installation method using the same | |
JPH03129099A (en) | Lining construction for tunnel in shield method and equipment thereof | |
CN216841788U (en) | Escape pipeline positioning and detachable moving device | |
CN110984170B (en) | Semi-automatic foundation pit steel support installation method and steel support installation auxiliary device | |
JP3825516B2 (en) | Vertical shaft segment assembly equipment | |
SU1213210A1 (en) | Articlulated lining-laying machine for tunneling | |
JP2741846B2 (en) | Continuous pile driving system and continuous pile driving method | |
JPH10205261A (en) | Raising/lowering device of excavator | |
JP6053409B2 (en) | Cutting and dismantling method and cutting and dismantling equipment for large cylindrical structures made of reinforced concrete | |
JP4603434B2 (en) | Propulsion pipe propulsion method and apparatus | |
JP4215907B2 (en) | Inclined trolley | |
JP2002332181A (en) | Work device for inclined shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050419 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070425 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070508 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070705 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070904 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070911 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100921 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4014483 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100921 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110921 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120921 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130921 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130921 Year of fee payment: 6 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130921 Year of fee payment: 6 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |