JP3999556B2 - Three-dimensional intersection construction method and three-dimensional intersection - Google Patents
Three-dimensional intersection construction method and three-dimensional intersection Download PDFInfo
- Publication number
- JP3999556B2 JP3999556B2 JP2002123447A JP2002123447A JP3999556B2 JP 3999556 B2 JP3999556 B2 JP 3999556B2 JP 2002123447 A JP2002123447 A JP 2002123447A JP 2002123447 A JP2002123447 A JP 2002123447A JP 3999556 B2 JP3999556 B2 JP 3999556B2
- Authority
- JP
- Japan
- Prior art keywords
- segment
- girder
- road
- dimensional intersection
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、立体交差施工方法および立体交差に関するものである。
【0002】
【従来の技術】
都市部における道路の平面交差は、交通渋滞の大きな原因となっている。交差部の通過交通と右折左折交通を立体化することにより、通過交通を減速あるいは停止させることなく通過させることが可能となる。都市部の幹線においては、これら立体交差をアンダーパスあるいはオーバーパスのどちらかの方法で施工している。
【0003】
従来、オーバーパスの方法で立体交差を施工するには、交通を遮断して施工ヤードとし、その場所で杭あるいはケーソンなどの基礎を構築した後、橋脚・桁を構築する方法がある。
【0004】
【発明が解決しようとする課題】
しかしながら、従来の方法では、施工開始から完成までに、数年の期間を要する。数年の施工期間中、車線規制によって交通を阻害するため、さらなる交通渋滞が発生する。
【0005】
本発明は、このような問題に鑑みてなされたもので、その目的とするところは、基礎および橋脚工事と桁製作を同時に行うことで工期を短縮できる立体交差施工方法および立体交差を提供することにある。
【0006】
【課題を解決するための手段】
前述した目的を達成するための第1の発明は、架設ガーダ脚部と道路上ガーダを設置する工程と、基準セグメントの下方に前記架設ガーダ脚部を挟み込むような形状の仮支持ピースを設置して、前記架設ガーダ脚部を貫通するように前記基準セグメントを設置する工程と、前記道路上ガーダを用いて、前記基準セグメントを基準として複数のセグメントを配置する工程と、を具備することを特徴とする立体交差施工方法である。
【0007】
架設ガーダ脚部は、橋脚設置予定位置に、計画道路の幅員内に収まるように設置される。道路上ガーダは、隣接する2ヶ所の架設ガーダ脚部の間に架け渡され、計画道路高さの上方に設置される。計画道路の構成部材である基準セグメントは、ガーダ脚部の計画道路高さに設置される。計画道路の構成部材である複数のセグメントは、基準セグメントを基準として配置される。このとき、複数のセグメントは、例えば、道路上ガーダに取り付けられた吊り治具で吊下げて並べられる。吊り治具は、例えば、セグメントを所定の位置に吊下げるセグメント吊りロッド、道路上ガーダに沿ってセグメントを移動させるセグメント吊装置等で構成される。
【0008】
第1の発明では、まず、架設ガーダ脚部と道路上ガーダを設置し、架設ガーダ脚部に基準セグメントを設置する。そして、道路上ガーダを用いて、基準セグメントを基準として複数のセグメントを並べる。
【0009】
第2の発明は、第1の発明の立体交差施工方法で施工されたことを特徴とする立体交差である。
【0010】
【発明の実施の形態】
以下、図面に基づいて、本発明の実施例を詳細に説明する。図1は、立体交差道路2の立面図を示す。図1に示すように、立体交差道路2は、桁35a、桁35b、桁35c、橋脚23等で構成される。
【0011】
図2は、架設ガーダ脚部5と道路上ガーダ7を構築する工程を示す図である。立体交差道路2を構築するには、まず、図2に示すように、橋脚23の計画予定位置に、路面1と垂直に架設ガーダ脚部5を設置する。架設ガーダ脚部5は、交通障害とならないよう、立体交差道路2の計画幅員内に収まるように立設される。架設ガーダ脚部5は、後述する道路上ガーダ7と、道路上ガーダ7に固定されるセグメント仮受け桁9、セグメント仮受け桁9に吊下げられるセグメント等の重量を支持できる材質、構造を有する。
【0012】
さらに、隣接する2ヶ所の架設ガーダ脚部5の間に、道路上ガーダ7を架け渡す。道路上ガーダ7は、桁35a、桁35b、桁35cの計画位置の上方に配置される。道路上ガーダ7は、例えば、複数の水平部材8と、水平部材8を連結するトラス部材10で構成される。
【0013】
図3は、セグメント仮受け桁9等を設置する工程を示す図である。道路上ガーダ7の上側の水平部材8上に、水平部材8と直交するように、複数のセグメント仮受け桁9を設置する。セグメント仮受け桁9は、例えば、長方形板状の部材である。セグメント仮受け桁9の両端部には、ナット12を用いて棒状のセグメント仮吊用ゲビンデ11が固定される。セグメント仮吊用ゲビンデ11は、セグメントの仮吊りに用いられる。
【0014】
セグメント仮受け桁9の両端部には、さらに落下防止材吊ロープ13が設けられる。落下防止材吊ロープ13は、セグメント仮吊用ゲビンデ11の外側に吊下げられる。落下防止材吊ロープ13の下端部には、板状の落下防止材15が固定される。
【0015】
落下防止材15は、セグメント吊下げ予定位置の下方に配置され、施工中の工具あるいはボルト、ナット等の材料の地上への落下を防止する。落下防止材吊ロープ13、落下防止材15は、工具等の落下時の衝撃に耐えられる強度を有する部材で構成される。
【0016】
道路上ガーダ7には、さらに、セグメント吊り装置17が設けられる。セグメント吊り装置17は、道路上ガーダ7に沿って水平方向に移動可能である。また、クラブトロリ25(図5)を用いて、上下方向に昇降可能である。
【0017】
図4は、セグメント21cを設置する工程を示す図である。図5は、セグメント21cの通過中の架設ガーダ脚部5の断面立面図である。図5は、図4のA−Aによる断面の立面図である。
【0018】
図4に示すように、架設ガーダ脚部5を貫通するように、基準セグメント19a、基準セグメント19b、基準セグメント19cを設置する。基準セグメント19a、基準セグメント19b、基準セグメント19cは、桁35a、桁35b、桁35cの設置予定位置の高さに配置される。
【0019】
図5に示すように、架設ガーダ脚部5は、基準セグメント19b(19a、19c)に設けられた穴(図示せず)を貫通する。基準セグメント19b(19a、19c)の下方には、架設ガーダ脚部5を挟み込むような形状の仮支持ピース30が設置され、基準セグメント19b(19a、19c)を仮支持する。
【0020】
基準セグメント19a、基準セグメント19b、基準セグメント19cを設置した後、基準セグメント19aに隣接するセグメント21aをセグメント仮吊用ゲビンデ11で吊下げて設置する。さらに、セグメント21b、セグメント21c…を、順次セグメント仮吊用ゲビンデ11で吊下げて設置していく。
【0021】
セグメント21cを仮吊用ゲビンデ11で吊下げて設置するには、図4に示すように、設置時の状態から90度回転させた状態で、セグメント21cをセグメント吊り装置17に吊下げる。そして、セグメント吊り装置17を用いて、セグメント21cの位置を移動させる。
【0022】
セグメント吊り装置17は、クラブトロリ25、セグメント旋回機構27、セグメント吊りフレーム29等で構成される。クラブトロリ25は、セグメント旋回機構27やセグメント吊りフレーム29等の上下方向の吊上げ・吊下げを行い、道路上ガーダ7を走行路としてセグメント吊り装置17を移動させる。セグメント吊りフレーム29は、カプラ33、セグメント吊りロッド31等を用いてセグメント21cを保持する。セグメント旋回機構27は、セグメント吊りフレーム29や、セグメント吊りフレーム29に保持されたセグメント21cを旋回させる。
【0023】
図4に示す状態から、クラブトロリ25を用いて、セグメント吊りフレーム29に保持されたセグメント21cを、基準セグメント19bより高い位置まで吊上げる。そして、図5に示すように、架設ガーダ脚部5の間を通過させる。
【0024】
図6は、セグメント21cを設置予定位置付近まで移動させる工程を示す図、図7は、図6のB−Bによる断面の立面図である。図8は、セグメント21cを旋回させた状態を示す図である。
【0025】
図4に示す位置から、クラブトロリ25を用いて、セグメント21cを図6に示す位置、すなわち設置位置の手前まで移動させる。そして、図5に示すセグメント旋回機構27を用いてセグメント吊りフレーム29とセグメント21cとを90度旋回させる。旋回は、セグメント21cの方向転回に支障のない位置および高さで行う。
【0026】
次に、セグメント21cとセグメント21bの上端部が滑らかに連続するように、クラブトロリ25を用いてセグメント21cの位置と高さを調整する。そして、図8に示すように、セグメント仮吊り用ゲビンデ11をカプラ33に挿入してセグメント仮吊り用ゲビンデ11とセグメント吊りロッド31を接続し、セグメント21cの荷重をクラブトロリ25からセグメント仮吊り用ゲビンデ11に受け替える。セグメント21cは、図6に示すセグメント21a、21bと同様に、セグメント仮吊り用ゲビンデ11とセグメント吊りロッド31を用いて、セグメント仮受け桁9に吊下げられる。
【0027】
図4から図8に示す工程を繰り返して、桁35a、桁35b、桁35cを構成する複数のセグメントをセグメント仮受け桁9に吊下げる。そして、道路上ガーダ7に吊下げて並べられたセグメント21a、セグメント21b、セグメント21c…や架設ガーダ脚部5に保持された基準セグメント19a、基準セグメント19b、基準セグメント19cの接合面に接着剤を塗布し、適切な位置に緊張材を配置した後、間詰め部コンクリートの打設と緊張材の緊張を行う。桁35a、桁35b、桁35cは、プレストレスを与えることにより、一体化される。
【0028】
桁35a、桁35b、桁35cの形成と並行して、図1から図3に示すように、路面1の下方の地盤4を掘削し、適切な位置に基礎3を形成する。基礎3は、例えば、橋脚23の計画位置の下方等に形成される。さらに、図4から図6に示すように、架設ガーダ脚部5の位置に橋脚23を構築する。橋脚23は、図5に示すように、基準セグメント19b等の基準セグメントの下方に設けられ、桁35a、桁35b、桁35cを支持する。
【0029】
図9は、セグメント仮受け桁9等を撤去した状態を示す図である。プレストレスを与えて連続する複数のセグメントを一体化し、桁35a、桁35b、桁35cを形成した後、図9に示すように、セグメント仮受け桁9、セグメント仮吊用ゲビンデ11、セグメント吊り装置17等を撤去する。
【0030】
図10は、架設ガーダ脚部5等を撤去した状態を示す図である。図9に示す様態から、さらに架設ガーダ脚部5、道路上ガーダ7を撤去する。なお、図2から図10では、桁35bと桁35cの一方と桁35aのみを図示したが、残りの桁35b、桁35cも同様の方法で形成する。形成は、例えば、図2から図10に示した桁35bと桁35cの一方と桁35aの形成と並行して行う。最後に、橋面工や仕上げ工を施し、立体交差道路1を完成する。
【0031】
このように、本実施の形態では、基礎3および橋脚23を構築しつつ、架設ガーダ脚部5や道路上ガーダ7を用いて桁35a、桁35b、桁35cを形成する。基礎や橋脚の施工と桁製作を同時に行うことで、工期を短縮できる。架設ガーダ脚部5を立体交差道路2の計画幅員内に配置するため、交通の障害にならない。
なお、立体交差道路1を構成する桁や橋脚等の部材数は、図1に示す限りではない。
【0032】
【発明の効果】
以上、詳細に説明したように、本発明によれば、基礎および橋脚工事と桁製作を同時に行うことで工期を短縮できる立体交差施工方法および立体交差を提供できる。
【図面の簡単な説明】
【図1】立体交差道路2の立面図
【図2】架設ガーダ脚部5と道路上ガーダ7を構築する工程を示す図
【図3】セグメント仮受け桁9等を設置する工程を示す図
【図4】セグメント21cを設置する工程を示す図
【図5】セグメント21cの通過中の架設ガーダ脚部5の断面立面図
【図6】セグメント21cを設置予定位置付近まで移動させる工程を示す図
【図7】図6のB−Bによる断面の立面図
【図8】セグメント21cを旋回させた状態を示す図
【図9】セグメント仮受け桁9等を撤去した状態を示す図
【図10】架設ガーダ脚部5等を撤去した状態を示す図
【符号の説明】
1………路面
2………立体交差道路
5………架設ガーダ脚部
7………道路上ガーダ
9………セグメント仮受け桁
11………セグメント仮吊用ゲビンデ
17………セグメント吊り装置
19a、19b、19c………基準セグメント
21a、21b、21c………セグメント
25………クラブトロリ
27………セグメント旋回機構
29………セグメント吊りフレーム
31………セグメント吊りロッド[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a three-dimensional intersection construction method and a three-dimensional intersection.
[0002]
[Prior art]
Road crossings in urban areas are a major cause of traffic congestion. By making the passing traffic at the intersection and the right turn and left turn traffic three-dimensional, it is possible to pass the passing traffic without decelerating or stopping. On urban trunk lines, these three-dimensional intersections are constructed by either underpass or overpass methods.
[0003]
Conventionally, in order to construct a three-dimensional intersection by the overpass method, there is a method in which a traffic yard is cut off to form a construction yard and a foundation such as a pile or a caisson is constructed at that location, and then a pier / girder is constructed.
[0004]
[Problems to be solved by the invention]
However, in the conventional method, a period of several years is required from the start of construction to completion. During the construction period of several years, traffic congestion will occur due to lane restrictions, resulting in further traffic congestion.
[0005]
The present invention has been made in view of such problems, and an object of the present invention is to provide a three-dimensional intersection construction method and a three-dimensional intersection that can shorten the work period by simultaneously performing foundation and pier construction and girder production. It is in.
[0006]
[Means for Solving the Problems]
According to a first aspect of the present invention for achieving the above object, there is provided a step of installing a construction girder leg and a road girder, and a temporary support piece having a shape sandwiching the construction girder leg under a reference segment. Te, characterized by comprising the steps of placing the reference segment to pass through the bridging girder legs, with the road on girder, and disposing a plurality of segments based on the reference segment It is a three-dimensional intersection construction method.
[0007]
The erection girder leg is installed at the planned pier installation position so as to be within the width of the planned road. The on-road girder is bridged between two adjacent girder legs and installed above the planned road height. The reference segment, which is a component of the planned road, is installed at the planned road height of the girder leg. A plurality of segments that are constituent members of the planned road are arranged with reference to the reference segment. At this time, the plurality of segments are arranged by being suspended by, for example, a suspension jig attached to a girder on the road. The hanging jig includes, for example, a segment suspension rod that suspends the segment to a predetermined position, a segment suspension device that moves the segment along the girder on the road, and the like.
[0008]
In the first invention, first, an installation girder leg and a road girder are installed, and a reference segment is installed on the installation girder leg. Then, a plurality of segments are arranged with reference to the reference segment using the girder on the road.
[0009]
The second invention is a three-dimensional intersection characterized by being constructed by the three-dimensional intersection construction method of the first invention.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 shows an elevation view of the multilevel intersection road 2. As shown in FIG. 1, the three-dimensional intersection road 2 is composed of a
[0011]
FIG. 2 is a diagram illustrating a process of constructing the
[0012]
Further, the
[0013]
FIG. 3 is a diagram showing a process of installing the segment
[0014]
Fall prevention
[0015]
The
[0016]
A
[0017]
FIG. 4 is a diagram illustrating a process of installing the
[0018]
As shown in FIG. 4, the
[0019]
As shown in FIG. 5, the
[0020]
After the
[0021]
In order to suspend and install the
[0022]
The
[0023]
From the state shown in FIG. 4, using the
[0024]
6 is a diagram showing a process of moving the
[0025]
Using the
[0026]
Next, the position and height of the
[0027]
The steps shown in FIGS. 4 to 8 are repeated to suspend the plurality of segments constituting the
[0028]
In parallel with the formation of the
[0029]
FIG. 9 is a diagram showing a state in which the segment
[0030]
FIG. 10 is a diagram illustrating a state in which the erected
[0031]
As described above, in the present embodiment, the
In addition, the number of members, such as a girder and a bridge pier which comprise the three-
[0032]
【The invention's effect】
As described above in detail, according to the present invention, it is possible to provide a three-dimensional intersection construction method and a three-dimensional intersection that can shorten the construction period by simultaneously performing foundation and pier construction and girder production.
[Brief description of the drawings]
FIG. 1 is an elevation view of a three-dimensional crossing road. FIG. 2 is a diagram showing a process of constructing a
1 ......... Road surface 2 ... ...
Claims (6)
基準セグメントの下方に前記架設ガーダ脚部を挟み込むような形状の仮支持ピースを設置して、前記架設ガーダ脚部を貫通するように前記基準セグメントを設置する工程と、
前記道路上ガーダを用いて、前記基準セグメントを基準として複数のセグメントを配置する工程と、
を具備することを特徴とする立体交差施工方法。Installing a girder leg and a girder on the road;
Installing a temporary support piece shaped to sandwich the installation girder leg below the reference segment, and installing the reference segment so as to penetrate the installation girder leg;
Using the girder on the road, placing a plurality of segments based on the reference segment;
A three-dimensional intersection construction method characterized by comprising:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002123447A JP3999556B2 (en) | 2002-04-25 | 2002-04-25 | Three-dimensional intersection construction method and three-dimensional intersection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002123447A JP3999556B2 (en) | 2002-04-25 | 2002-04-25 | Three-dimensional intersection construction method and three-dimensional intersection |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003313825A JP2003313825A (en) | 2003-11-06 |
JP3999556B2 true JP3999556B2 (en) | 2007-10-31 |
Family
ID=29538735
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002123447A Expired - Fee Related JP3999556B2 (en) | 2002-04-25 | 2002-04-25 | Three-dimensional intersection construction method and three-dimensional intersection |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3999556B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4872940B2 (en) * | 2008-02-12 | 2012-02-08 | Jfeエンジニアリング株式会社 | Bridge erection device, floor slab erection method, and bridge erection method |
CN104727211A (en) * | 2015-02-04 | 2015-06-24 | 河南工程学院 | Two-way independent type city overhead bridge structure |
CN104929049B (en) * | 2015-06-15 | 2018-03-02 | 许昌学院 | Road and bridge combined type construction method |
-
2002
- 2002-04-25 JP JP2002123447A patent/JP3999556B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2003313825A (en) | 2003-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3885584B2 (en) | Construction method of composite truss bridge | |
CN102121234B (en) | Quick construction method of two-tower five-span steel truss girder cable-stayed bridge | |
KR102321338B1 (en) | Segmental precast concrete ventilating slabs of structure and construction way in tunnel for rapid installation | |
CN113638304B (en) | Concrete beam type bridge hidden cover beam structure system and construction method thereof | |
JP3579897B1 (en) | Construction method of split bridge type traffic route and split bridge type traffic route | |
JP2003253623A (en) | Rebuilding construction method for bridge beam | |
CN114214920B (en) | Large-span double-layer built-up steel truss arch bridge and construction method thereof | |
CN109371820A (en) | A kind of rotator construction frame-type bridge pier and its construction method | |
JP3999556B2 (en) | Three-dimensional intersection construction method and three-dimensional intersection | |
JP2000045231A (en) | Erection method for arch bridge | |
CN112878171A (en) | Large-span steel structure arch bridge and construction method | |
JP4685341B2 (en) | Viaduct construction method | |
JP7409952B2 (en) | Viaduct construction method and viaduct construction equipment | |
JP3954905B2 (en) | Three-dimensional crossing method of plane intersection and viaduct | |
CN114892813A (en) | Large-span building main body supporting steel structure and construction method | |
JP2004324340A (en) | Steel shell for footing foundation, structure of bridge, construction method of bridge, and construction method of grade separation viaduct | |
JP3852686B2 (en) | Three-dimensional intersection construction method and three-dimensional intersection | |
JP2005090108A (en) | Erection method of bridge | |
CN109930497B (en) | Workpiece for line crossing construction of formwork suspension casting combined system and construction process | |
JP3682247B2 (en) | Construction method of elevated traffic route | |
JP3779978B2 (en) | Elevated traffic route | |
CN218540353U (en) | Steel bridge | |
JPH0711620A (en) | Construction method of artificial ground | |
CN108914717B (en) | Method for in-situ overhead installation of auxiliary support by using reinforcing steel bars of integral ballast bed | |
CN211421937U (en) | Column bearing type viewing platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050111 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070201 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070417 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070615 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070807 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070809 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100817 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100817 Year of fee payment: 3 |
|
R154 | Certificate of patent or utility model (reissue) |
Free format text: JAPANESE INTERMEDIATE CODE: R154 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130817 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |