JP3987091B1 - Asbestos removal vehicle - Google Patents

Asbestos removal vehicle Download PDF

Info

Publication number
JP3987091B1
JP3987091B1 JP2006132524A JP2006132524A JP3987091B1 JP 3987091 B1 JP3987091 B1 JP 3987091B1 JP 2006132524 A JP2006132524 A JP 2006132524A JP 2006132524 A JP2006132524 A JP 2006132524A JP 3987091 B1 JP3987091 B1 JP 3987091B1
Authority
JP
Japan
Prior art keywords
work
work box
asbestos
dust
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006132524A
Other languages
Japanese (ja)
Other versions
JP2007303153A (en
Inventor
賢一 田中
正人 寺田
中村  文彦
純一 萩原
達也 近藤
宗行 相田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2006132524A priority Critical patent/JP3987091B1/en
Application granted granted Critical
Publication of JP3987091B1 publication Critical patent/JP3987091B1/en
Publication of JP2007303153A publication Critical patent/JP2007303153A/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

【課題】延長の長いトンネル又はそれに接続される換気用立坑などにおいて安全かつ効率的にアスベストを除去することが可能なアスベスト除去作業用車両を提供する。
【解決手段】トンネル1の壁1b面に形成されたアスベストが混入する被覆層1aを除去するための作業列車6である。
そしてこの作業列車6は、被覆層に連通させるための開口部61a1,62a1に開閉自在なシャッタ8が設けられた作業函体61a,62aと、その作業函体内の作業エリアを負圧に保つとともに粉塵を吸引除去する負圧除塵機61d,62dと、その作業函体に連通して作業函体内からの粉塵の漏出を阻止するためのエアシャワー室63bを備えたセキュリティゾーン台車63とを有している。
【選択図】図1
An asbestos removal work vehicle capable of removing asbestos safely and efficiently in a long extension tunnel or a ventilation shaft connected to the tunnel is provided.
A work train 6 for removing a coating layer 1a mixed with asbestos formed on a wall 1b surface of a tunnel 1 is provided.
The work train 6 keeps the work boxes 61a and 62a provided with shutters 8 that can be freely opened and closed at the openings 61a1 and 62a1 for communicating with the coating layer, and the work area in the work box at a negative pressure. A negative pressure dust remover 61d, 62d for sucking and removing dust, and a security zone carriage 63 provided with an air shower chamber 63b communicating with the work box to prevent leakage of dust from the work box. ing.
[Selection] Figure 1

Description

本発明は、トンネルなどの長大構造物やそれに接続される換気用立坑などの壁面に、吹き付けなどによって形成されたアスベストが混入する被覆層を除去するためのアスベスト除去作業用車両に関するものである。   The present invention relates to a vehicle for asbestos removal work for removing a covering layer in which asbestos formed by spraying or the like is mixed on a wall such as a long structure such as a tunnel or a ventilation shaft connected thereto.

従来、古いビルなどの建築物においては、防音や防火のために壁面や天井にアスベストが混入する材料を吹き付けて被覆層を形成する場合があった(特許文献1,2など参照)。   Conventionally, in a building such as an old building, there is a case where a coating layer is formed by spraying a material in which asbestos is mixed into a wall surface or a ceiling for soundproofing or fireproofing (see Patent Documents 1 and 2).

このようなアスベストは、被覆層が劣化したり損傷したりすると飛散するおそれがあるため、飛散防止対策を充分に施したうえで被覆層の除去がおこなわれる。   Since such asbestos may be scattered when the coating layer is deteriorated or damaged, the coating layer is removed after sufficient anti-scattering measures are taken.

このような被覆層の除去作業では、まずビニールシートなどからなる養生シートによって作業エリアを覆い、その作業エリア内を換気装置によって負圧状態(外気圧より低い状態)として、水などを浸透させた被覆層をケレン棒などによって削り落とす。   In such an operation of removing the covering layer, the work area is first covered with a curing sheet made of a vinyl sheet or the like, and the work area is made into a negative pressure state (a state lower than the external air pressure) by a ventilator, and water is infiltrated. The covering layer is scraped off with a keren rod or the like.

そして、削り落とした後の壁面に残留しているアスベストをブラシなどでこすり落とし、さらにその壁面に飛散防止剤を塗布して残留したアスベストを壁面に封じ込める。   Then, the asbestos remaining on the wall surface after scraping is rubbed off with a brush or the like, and a scattering inhibitor is applied to the wall surface to contain the remaining asbestos in the wall surface.

また、特許文献1,2には、キャスターなどの移動手段で作業架台を移動させながらアスベストを除去するための方法及び装置が開示されている。
特開平9−72111号公報 特開平11−193642号公報
Patent Documents 1 and 2 disclose a method and an apparatus for removing asbestos while moving a work platform by a moving means such as a caster.
JP-A-9-72111 JP-A-11-193642

しかしながら、前記した従来の方法は、使用していない状態にしたビルの室内など、比較的狭い範囲で移動しながらアスベストの除去作業をおこなうのに適したものである。   However, the above-described conventional method is suitable for removing asbestos while moving in a relatively narrow range, such as in a building room that is not in use.

一方、鉄道用トンネルや道路トンネルなど供用を完全に停止できないトンネル内からアスベストを除去するには、短時間の間に効率的に作業をおこなわなければならないうえに、作業中及び供用中の安全性を低下させることがないようにしなければならない。   On the other hand, in order to remove asbestos from tunnels such as railway tunnels and road tunnels where operation cannot be completely stopped, work must be carried out efficiently in a short period of time, and safety during work and in service Must not be reduced.

そこで、本発明は、延長の長い長大構造物又はそれに接続される構造物において安全かつ効率的にアスベストを除去することが可能なアスベスト除去作業用車両を提供することを目的としている。   Accordingly, an object of the present invention is to provide an asbestos removal work vehicle capable of removing asbestos safely and efficiently in a long and long structure with a long extension or a structure connected thereto.

前記目的を達成するために、本発明のアスベスト除去作業用車両は、長大構造物又はそれに接続される構造物の壁面に形成されたアスベストが混入する被覆層を除去するためのアスベスト除去作業用車両であって、前記被覆層に連通させるための開口部に開閉自在な遮蔽手段が設けられた作業函体と、その作業函体内又はその作業函体に連通される作業エリアを負圧に保つとともに粉塵を吸引除去する除塵機と、その作業函体に連通して作業函体内からの粉塵の漏出を阻止するためのエアシャワーを備えたバッファルームとを有することを特徴とする。   In order to achieve the above object, an asbestos removing work vehicle according to the present invention is an asbestos removing work vehicle for removing a covering layer mixed with asbestos formed on the wall surface of a long structure or a structure connected thereto. A work box having an openable and closable shielding means at an opening for communicating with the coating layer, and the work box or a work area communicating with the work box is maintained at a negative pressure. It has a dust remover that sucks and removes dust, and a buffer room provided with an air shower that communicates with the work box to prevent leakage of dust from the work box.

ここで、前記作業函体は、前記車両上で前記長大構造物の壁面方向へ移動するための横移動手段を備えるとともに、前記車両には前記作業函体とは反対側にカウンターウェイトが配設されている構成とする。また、前記作業函体は、前記車両上で上下方向へ移動するための昇降手段を備えていてもよい。
Here, the working box body is Rutotomoni comprises a horizontal moving means for moving the wall surface direction of the long structure on said vehicle, said counterweight on the opposite side of the vehicle and the working box making body distribution It shall be the configuration that is set. Moreover, the said work box may be equipped with the raising / lowering means for moving to the up-down direction on the said vehicle.

さらに、前記作業函体の内面にはレール部が配設されており、そのレール部に沿って移動可能な吊り具を介して取り付けられる養生シートを備えた構成とすることもできる。   Furthermore, a rail part is arrange | positioned in the inner surface of the said work box, and it can also be set as the structure provided with the curing sheet attached via the lifting tool which can move along the rail part.

また、前記開口部は前記作業函体の上面に形成されており、その開口部から外部に向けて延伸可能な接続路と、前記作業函体の内部で前記開口部に向けて上昇可能な昇降装置と、その昇降装置を水平に設置するための調整台とを備えた構成とすることもできる。 Further, the opening is formed on the upper surface of the work box, a connection path that can be extended from the opening to the outside, and a lift that can be raised toward the opening inside the work box. It can also be set as the structure provided with the apparatus and the adjustment stand for installing the raising / lowering apparatus horizontally .

このように構成された本発明のアスベスト除去作業用車両は、開口部に開閉自在の遮蔽手段が設けられた作業函体と除塵機とエアシャワーを備えたバッファルームとを備えており、長大構造物のいずれの場所へも短時間で行くことができる。   The asbestos removal work vehicle of the present invention configured as described above includes a work box provided with an openable / closable shielding means at the opening, a buffer room equipped with a dust remover, and an air shower, and has a long structure. You can go to any place in a short time.

また、作業函体又はそれに連通される作業エリアの粉塵を除塵機によって吸引除去することができるとともに、作業員の防護服や袋詰めされた廃棄物に粉塵が付着していてもバッファルームで浄化されるため、外部に粉塵が漏れだすことがなく安全である。   In addition, dust in the work box or work area connected to it can be removed by suction with a dust remover, and even if dust adheres to the protective clothing of workers or bagged waste, it is purified in the buffer room. Therefore, dust is not leaked outside and it is safe.

また、作業函体に横移動手段を設けることで、走行中は車両上に収容して安定性を向上させることができるとともに、作業函体を被覆層に可能な限り近づけて安全かつ効率的な作業をおこなうことができる。   In addition, by providing a lateral movement means on the work box, it can be housed on the vehicle while driving to improve stability, and the work box is as close as possible to the covering layer for safety and efficiency. You can do the work.

さらに、作業函体に昇降手段を設けることで、被覆層が高所に形成されている場合も容易に除去作業をおこなうことができる。   Furthermore, by providing the working box with lifting means, the removal work can be easily performed even when the coating layer is formed at a high place.

そして、作業函体の内部にレール部に沿って移動可能な吊り具を介して養生シートを取り付けることで、作業函体の内面の汚染を防ぐために養生シートを展開したり、粉塵で汚染された養生シートを畳んで片付けたりする作業を迅速におこなうことができる。   And by attaching a curing sheet to the inside of the work box via a lifting tool that can move along the rail, the curing sheet was developed to prevent contamination of the inner surface of the work box or was contaminated with dust. It is possible to quickly fold up and clear the curing sheet.

また、上面の開口部に移動するための昇降装置が作業函体の内部に配備されるとともに、その開口部に設けられた接続路が外部に向けて延伸可能に構成されているため、長大構造物に接続される換気用立坑などに対しても安全かつ効率的にアスベストの除去作業をおこなうことができる。   In addition, an elevating device for moving to the opening on the upper surface is disposed inside the work box, and the connection path provided in the opening is configured to be extendable to the outside, so that the long structure Asbestos removal work can be performed safely and efficiently on a ventilation shaft connected to an object.

以下、本発明の最良の実施の形態について図面を参照して説明する。   The best mode for carrying out the present invention will be described below with reference to the drawings.

図1は、長大構造物としてのトンネル1内に敷設されたレール1f上を走行する、アスベスト除去作業用車両としての作業列車6の構成を説明する平面図(図1(a))及び縦断面図(図1(b))である。   FIG. 1 is a plan view (FIG. 1 (a)) and a longitudinal sectional view illustrating a configuration of a work train 6 as an asbestos removal work vehicle that travels on a rail 1 f laid in a tunnel 1 as a long structure. It is a figure (FIG.1 (b)).

この作業列車6は、列車全体を牽引するクレーンを装備した駆動車64に、上部作業台車62、下部作業台車61、バッファルームとしてのセキュリティゾーン台車63、遠隔操作台車65、貨物台車66が連結されて編成された車両である。   In this work train 6, an upper work carriage 62, a lower work carriage 61, a security zone carriage 63 as a buffer room, a remote operation carriage 65, and a cargo carriage 66 are connected to a drive vehicle 64 equipped with a crane that pulls the entire train. It is a vehicle that is organized.

この下部作業台車61上には、図2に示すように一面に開口部が設けられた箱型の作業函体61aと、通路61bと、作業函体61aと通路61bを繋ぐ伸縮可能な連絡路61cと、除塵機としての負圧除塵機61dとが主に搭載されている(図1(a),(b)参照)。   On the lower work carriage 61, as shown in FIG. 2, a box-shaped work box 61a having an opening on one side, a passage 61b, and an extendable communication path connecting the work box 61a and the passage 61b. 61c and a negative pressure dust remover 61d as a dust remover are mainly mounted (see FIGS. 1A and 1B).

この作業函体61aには、図2(a)に示すように開口部61a1に開閉自在な遮蔽手段としてのシャッタ8が設けられている。このシャッタ8は、図2(b)に示すように作業函体61aの床面及び天井に平面視略U字型に敷設された床レール81と天井レール82に沿ってスライドする扉である。   As shown in FIG. 2A, the work box 61a is provided with a shutter 8 as a shielding means that can be opened and closed at an opening 61a1. As shown in FIG. 2B, the shutter 8 is a door that slides along a floor rail 81 and a ceiling rail 82 that are laid in a substantially U shape in plan view on the floor and ceiling of the work box 61a.

このシャッタ8は、作業列車6が走行中は開口部61a1を閉塞し、作業時は床レール81及び天井レール82に沿って連絡路61cに通じる連絡口61a2側に移動して開口部61a1を開口させる。   The shutter 8 closes the opening 61a1 while the work train 6 is traveling, and moves to the connection port 61a2 side that leads to the connection path 61c along the floor rail 81 and the ceiling rail 82 during the work to open the opening 61a1. Let

また、作業函体61aの内部には、表面が特殊ポリマー加工されたポリエステルシートなどの養生シート7が、図3(a)に示すようにテント状に張設される。   Further, inside the work box 61a, a curing sheet 7 such as a polyester sheet whose surface is processed with a special polymer is stretched in a tent shape as shown in FIG.

この養生シート7は、被覆層1aに対面する一面が開口されて残りの五面が囲まれた外部と遮断された作業エリアを形成するための可撓性部材であり、開口からおこなった被覆層1aの除去によって発生したアスベストなどの粉塵を、吸引口7aに接続された吸引ホース61fを介して負圧除塵機61dに吸引させて養生シート7の外部に飛散しないようにすることができる。   This curing sheet 7 is a flexible member for forming a work area that is cut off from the outside of which one surface facing the coating layer 1a is opened and the remaining five surfaces are surrounded, and the coating layer formed from the opening. The dust such as asbestos generated by the removal of 1a can be sucked into the negative pressure dust remover 61d through the suction hose 61f connected to the suction port 7a so as not to be scattered outside the curing sheet 7.

この養生シート7内は、負圧除塵機61dの吸引によって負圧状態になっているので、エア供給口7b,7bからは空気が流れ込むだけで内気が排出されることはない。   Since the inside of the curing sheet 7 is in a negative pressure state due to suction by the negative pressure dust remover 61d, only the air flows from the air supply ports 7b and 7b, and the inside air is not discharged.

さらにこの養生シート7は、作業函体61aに所々で吊りバンド73,・・・によって連結されているので、内部が負圧状態になって養生シート7が内側に撓んでも作業エリアを充分に確保することができる。   Furthermore, since the curing sheet 7 is connected to the work box 61a by the hanging bands 73,..., The work area is sufficiently large even if the inside is in a negative pressure state and the curing sheet 7 is bent inward. Can be secured.

この吊りバンド73は、カッタなどで容易に切断可能なベルト状部材で、図3(b)に示すように吊り具72の吊り輪72bに係留させたリング72cに通して結束させる。   The suspension band 73 is a belt-like member that can be easily cut by a cutter or the like, and is bound through a ring 72c moored to a suspension ring 72b of a suspension tool 72 as shown in FIG.

この吊り具72は、例えば車輪72aと吊り輪72bとリング72cとによって主に構成される。また、この車輪72aを走行させるために、作業函体61aの天井61a3と床61a4には断面視略コ字型のレール部74,74が敷設されている。   The hanger 72 is mainly composed of, for example, a wheel 72a, a hanger 72b, and a ring 72c. Moreover, in order to drive this wheel 72a, rail portions 74 and 74 having a substantially U-shaped cross-sectional view are laid on the ceiling 61a3 and the floor 61a4 of the work box 61a.

この養生シート7は、畳まれた状態で吊りバンド73,・・・を吊り具72,・・・に連結し、レール部74,74に沿って移動させることで作業函体61aの内部で短時間に展開することができる。   The curing sheet 7 is short in the work box 61a by connecting the suspension bands 73,... To the suspension tools 72,. Can be deployed in time.

また、レール部74,74に沿って移動させて縮めて、吊りバンド73,・・・をカッタで切断して吊り具72,・・・から解除することで、内面に付着した粉塵を飛散させることなく折り畳むことができる。   Moreover, it moves along the rail parts 74 and 74, is shrunk, the suspension band 73 and ... are cut | disconnected with a cutter, and the dust adhering to the inner surface is scattered by releasing from the suspension tools 72 and ... Can be folded without

また、養生シート7の開口側の上下縁は図4に示すようにテープ71やシール材などで遮蔽パネル2の裏面に密着固定され、側縁は図9に示すように仕切り板4,4にテープ71,71等で密着固定される。   Further, the upper and lower edges on the opening side of the curing sheet 7 are closely fixed to the back surface of the shielding panel 2 with tape 71 or a sealing material as shown in FIG. 4, and the side edges are attached to the partition plates 4 and 4 as shown in FIG. It is fixed in close contact with tape 71, 71 or the like.

また、この作業函体61aは、走行中は台車上に収容されており、所定の位置に到達すると、壁面1b方向へ移動するための横移動手段としてのジャッキ61eが図4に示すようにトンネル1軸直交方向に伸長して遮蔽パネル2方向(被覆層1a方向)に作業函体61aが押し出され、その開口縁部が遮蔽パネル2の表面側に当接される。   Further, the work box 61a is housed on the carriage during traveling, and when it reaches a predetermined position, a jack 61e as a lateral movement means for moving in the direction of the wall surface 1b is tunneled as shown in FIG. The work box 61a extends in the direction perpendicular to the one axis and is pushed in the direction of the shielding panel 2 (in the direction of the covering layer 1a), and the opening edge thereof is brought into contact with the surface side of the shielding panel 2.

一方、上部作業台車62は、上述した下部作業台車61とほぼ同じ構成の作業函体62a、通路62b、連絡路62c、負圧除塵機62dを搭載している。   On the other hand, the upper work carriage 62 is equipped with a work box 62a, a passage 62b, a communication path 62c, and a negative pressure dust remover 62d having substantially the same configuration as the lower work carriage 61 described above.

また、この上部作業台車62の作業函体62aは、図5に示すように壁1b面方向へ移動するための横移動手段としてのジャッキ62eと、上下方向へ移動するための昇降手段としての昇降機62fとを備えている。すなわち、この上部作業台車62は、壁1b面の上部の被覆層1aを除去するための台車であるため、遮蔽パネル2方向(トンネル1軸直交方向)に移動するためのジャッキ62eに加えて、高所作業をおこなうためのパンタグラフ型の昇降機62fを備えている。   Further, as shown in FIG. 5, the work box 62a of the upper work carriage 62 includes a jack 62e as a lateral movement means for moving in the direction of the wall 1b and an elevator as a lifting means for moving up and down. 62f. That is, since the upper work carriage 62 is a carriage for removing the coating layer 1a on the upper surface of the wall 1b, in addition to the jack 62e for moving in the shielding panel 2 direction (tunnel 1 axis orthogonal direction), A pantograph type elevator 62f is provided for working at high places.

さらに、作業函体62aを台車から飛び出させたときに台車が傾かないように図5に示すように作業函体62aとは反対側にカウンターウェイト62gを配設しておく。なお、このカウンターウェイトの説明は下部作業台車61の説明では省略したが同様のものが備えられている。   Further, a counterweight 62g is disposed on the opposite side of the work box 62a as shown in FIG. 5 so that the work box 62a is not tilted when the work box 62a is ejected from the carriage. Although the description of the counterweight is omitted in the description of the lower work carriage 61, a similar one is provided.

また、これらの下部作業台車61や上部作業台車62に作業員Mが行き来するための通路61b,62bは、図1(a)に示すようにセキュリティゾーン台車63に接続されており、このセキュリティゾーン台車63を経由しなければ各作業台車61,62に辿りつくことができず、各作業台車61,62で作業した作業員Mはセキュリティゾーン台車63を通らなければ外部にでることができないようになっている。なお、これらの通路61b,62bも負圧状態となっている。   The passages 61b and 62b for the worker M to and from the lower work carriage 61 and the upper work carriage 62 are connected to the security zone carriage 63 as shown in FIG. The work trucks 61 and 62 cannot reach the work carts 61 and 62 unless they pass through the cart 63, and the worker M who works on the work carts 61 and 62 can not go outside without passing through the security zone cart 63. It has become. These passages 61b and 62b are also in a negative pressure state.

そして、このセキュリティゾーン台車63には、通路61bに近いほうから掃除機63cを備えた部屋とエアシャワーを備えたエアシャワー室63bと更衣室63aとの3区画が搭載されており、粉塵を防護服に付着させた作業員Mは、掃除機63cで粉塵を吸い取った後にエアシャワー室63bで粉塵を吹き飛ばし、更衣室63aで着替えをおこなうことになる。   The security zone carriage 63 is equipped with three compartments: a room with a vacuum cleaner 63c, an air shower room 63b with an air shower, and a changing room 63a from the side closer to the passage 61b to protect dust. The worker M attached to the clothes sucks up the dust with the cleaner 63c, blows off the dust with the air shower chamber 63b, and changes clothes in the changing chamber 63a.

さらにこのセキュリティゾーン台車63の後方には、作業函体61a,62a内の負圧状態などを遠隔で操作する遠隔操作台車65、被覆層1aの除去によって発生した廃棄物66a,・・・などを運搬するための貨物台車66などが連結されている。   Further, behind the security zone carriage 63, there are a remote operation carriage 65 for remotely operating a negative pressure state in the work boxes 61a, 62a, waste 66a,... Generated by removing the covering layer 1a, and the like. A freight cart 66 for transportation is connected.

次に、作業列車6を走行させるトンネル1のアスベスト除去用の構造の構成について説明する。   Next, the structure of the asbestos removal structure of the tunnel 1 that travels the work train 6 will be described.

このトンネル1は、図7に示すように、断面視矩形のカルバート型トンネルで、壁1b、梁1d、中柱1e、床版、天井1gなどが鉄筋コンクリートによって形成され、路面にレール1fが敷設された鉄道用トンネルである。   As shown in FIG. 7, the tunnel 1 is a culvert-type tunnel having a rectangular cross-sectional view, and walls 1b, beams 1d, middle columns 1e, floor slabs, ceiling 1g, etc. are formed of reinforced concrete, and rails 1f are laid on the road surface. It is a railway tunnel.

なお、この作業列車6を走行させることができるトンネル1はこの形状に限定されるものではない。   In addition, the tunnel 1 which can drive this work train 6 is not limited to this shape.

また、この壁1bの内側面には、アスベストが混入する被覆層1aが30mm程度の厚さで吹き付けられている。   A coating layer 1a mixed with asbestos is sprayed on the inner side surface of the wall 1b with a thickness of about 30 mm.

この被覆層1aを除去するために、図6に示すように複数の遮蔽パネル2,・・・と、それを取り付ける支柱3,・・・と、支柱3と被覆層1aとの間を閉塞する仕切り板4,・・・とを有するアスベスト除去用のトンネル1の構造を構築する。   In order to remove the covering layer 1a, as shown in FIG. 6, a plurality of shielding panels 2,..., The supporting pillars 3,. A structure of a tunnel 1 for removing asbestos having partition plates 4,.

この支柱3は、図6(a)に示すように被覆層1aから所定の距離だけ内部側に離間させてトンネル1の延伸方向に間隔を置いて立設される支持材である。さらに詳述すると、図7に示すようにトンネル1の底面にコンクリートで構築された下部台座51上に支柱3としてH型鋼を立設してアンカーボルト51aで固定し、その支柱3の上端は上部固定部52を介してトンネル1の上面ハンチ部に固定する。   As shown in FIG. 6A, the support column 3 is a support member that is erected at a predetermined distance from the coating layer 1 a with a predetermined distance and spaced in the extending direction of the tunnel 1. More specifically, as shown in FIG. 7, an H-shaped steel is erected as a support 3 on a lower pedestal 51 constructed of concrete on the bottom of the tunnel 1 and fixed with an anchor bolt 51a. It fixes to the upper surface haunch part of the tunnel 1 via the fixing part 52.

また、仕切り板4は、図6(a)に示すように、アルミ板などの軽量板材などから形成される板部4aと、その板部4aの壁1b側の側縁に沿って取り付けられる緩衝材としてのウレタンフォーム4bとから主に構成される。   Further, as shown in FIG. 6A, the partition plate 4 includes a plate portion 4a formed from a lightweight plate material such as an aluminum plate, and a buffer attached along the side edge of the plate portion 4a on the wall 1b side. It is mainly composed of urethane foam 4b as a material.

この仕切り板4は、支柱3にボルトとナットで取り付けられたL型金具(図示せず)を介して固定されるものである。すなわち、この仕切り板4の板部4aに形成された横穴とL型金具の板部4aとの当接部に形成された縦穴とを挿通させたボルトに、ナットを螺着して仕切り板4を支柱3に取り付ける。   The partition plate 4 is fixed to the support column 3 via an L-shaped bracket (not shown) attached with bolts and nuts. That is, a nut is screwed into a bolt inserted through a horizontal hole formed in the plate portion 4a of the partition plate 4 and a vertical hole formed in a contact portion between the plate portion 4a of the L-shaped metal fitting and the partition plate 4 is screwed. Is attached to the column 3.

この横穴と縦穴は位置調整手段として設けられるもので、ボルトの固定位置を横穴内で変化させることで仕切り板4の壁1b面方向への移動が可能になり、ボルトの固定位置を縦穴内で変化させることで仕切り板4の上下方向への移動が可能になる。   The horizontal hole and the vertical hole are provided as position adjusting means. By changing the fixing position of the bolt in the horizontal hole, the partition plate 4 can be moved in the direction of the wall 1b, and the fixing position of the bolt is set in the vertical hole. By changing it, the partition plate 4 can be moved in the vertical direction.

また、遮蔽パネル2は、図8に示すように厚さ1〜2mm程度の矩形鋼板などによって形成される板部2aと、その周縁に配置される断面視L型の枠部2b,・・・とから主に構成される。   As shown in FIG. 8, the shielding panel 2 includes a plate portion 2a formed of a rectangular steel plate having a thickness of about 1 to 2 mm, and an L-shaped frame portion 2b in a cross-sectional view disposed on the periphery thereof. And mainly consists of

この板部2aのトンネル1内側面側に向ける表面には、滑面加工としてのラミネートシート2cが貼り付けられている。   A laminate sheet 2c as a smooth surface is attached to the surface of the plate portion 2a facing the inner surface of the tunnel 1.

また、枠部2bは、この板部2a表面にL型の一面を固定して形成されるもので、遮蔽パネル2の上下縁に配設される枠部2bの外側には軟質ポリウレタンフォームなどによって形成される四角柱状の目地材2eが遮蔽パネル2の幅と同じ長さで貼り付けられている。   The frame portion 2b is formed by fixing one surface of the L shape on the surface of the plate portion 2a. The outer side of the frame portion 2b disposed on the upper and lower edges of the shielding panel 2 is made of a flexible polyurethane foam or the like. The formed quadrangular columnar joint material 2 e is pasted with the same length as the width of the shielding panel 2.

さらにこの遮蔽パネル2には、図8(a)に示すように上下縁の枠部2b,2bの間隔に合わせて切込み2f1,2f1が形成された四角柱状のクッション材2fを取り付けることができる。   Further, as shown in FIG. 8A, a rectangular columnar cushion material 2f in which cuts 2f1 and 2f1 are formed in accordance with the distance between the upper and lower frame portions 2b and 2b can be attached to the shielding panel 2.

また、この遮蔽パネル2の両側縁に配設される枠部2b,2bには、蝶ねじ(図示せず)のボルト部を挿通させる長穴2d,・・・が形成されている。   Further, the frame portions 2b, 2b disposed on both side edges of the shielding panel 2 are formed with long holes 2d,... For inserting bolt portions of thumbscrews (not shown).

この長穴2dの周囲には、脱落防止手段として側面視コ字型の脱落防止カバー(図示せず)が溶接によって固定され、その脱落防止カバーと枠部2bの間にはバネ座金付ナットとワッシャが収容されてそれらの孔に蝶ねじのボルト部が挿通される。また、このバネ座金付ナットは点付によって蝶ねじのボルト部に所定の位置で固定されている。   Around this elongated hole 2d, a side-view U-shaped drop-off prevention cover (not shown) is fixed by welding as a drop-off prevention means, and a nut with a spring washer is provided between the drop-off prevention cover and the frame 2b. Washers are accommodated and the bolts of the thumbscrews are inserted through the holes. The nut with a spring washer is fixed at a predetermined position to the bolt portion of the thumbscrew by doting.

この蝶ねじのボルト部は、支柱3の被覆層1a側に点付で固定されたナット(図示せず)に螺合させる。この際、蝶ねじを回してもバネ座金付ナットが移動することがないので、ナットに所定の量だけ螺入されると回すことができなくなり、蝶ねじとナットが所定の長さで螺合されたことが確認できる。   The bolt portion of this thumbscrew is screwed into a nut (not shown) fixed with a dot on the covering layer 1a side of the column 3. At this time, since the nut with spring washer does not move even if the thumbscrew is turned, it cannot be turned when the nut is screwed in a predetermined amount, and the thumbscrew and the nut are screwed together at a predetermined length. It can be confirmed.

また、このようにバネ座金付ナットがストッパになるので、遮蔽パネル2を支柱3から取り外しても蝶ねじが外れて脱落することがない。   Further, since the nut with the spring washer becomes a stopper in this way, even if the shielding panel 2 is removed from the support column 3, the thumbscrew will not come off and fall off.

図6(b)は、蝶ねじによって支柱3,・・・に複数の遮蔽パネル2,・・・を取り付けた際のトンネル1の内側面側から見た正面図を示したものである。   FIG. 6B shows a front view as seen from the inner side surface of the tunnel 1 when a plurality of shielding panels 2,.

また、この遮蔽パネル2,・・・によって形成される壁面は、図7に2点鎖線で示すようにトンネル1の建築限界1cより外側に形成しなければならない。   Further, the wall surface formed by the shielding panels 2,... Must be formed outside the building limit 1c of the tunnel 1 as shown by a two-dot chain line in FIG.

次に、本実施の形態の作業列車6によってトンネル1内のアスベストを除去する方法について説明する。   Next, a method for removing asbestos in the tunnel 1 by the work train 6 of the present embodiment will be described.

まず、図6,7に示すように、トンネル1の壁1b内側面に形成された被覆層1aの下縁に沿って、アンカーボルト51a,・・・を立設した下部台座51を構築する。   First, as shown in FIGS. 6 and 7, a lower pedestal 51 in which anchor bolts 51 a,... Are erected is constructed along the lower edge of the coating layer 1 a formed on the inner surface of the wall 1 b of the tunnel 1.

そして、トンネル1延伸方向に間隔を置いて複数の支柱3,・・・を立設して下端をアンカーボルト51a,・・・に固定し、上端を上部固定部52,・・・を介して天井面に固定する。   Then, a plurality of columns 3,... Are erected at intervals in the tunnel 1 extending direction, the lower ends are fixed to the anchor bolts 51a,..., And the upper ends are connected via the upper fixing portions 52,. Secure to the ceiling.

さらに作業函体61a,62aの幅程度の間隔を置いていくつかの支柱3,・・・には、仕切り板4,・・・を取り付けて支柱3と被覆層1aとの間を閉塞し、トンネル延伸方向に仕切り板4,・・・によって仕切られた複数の区画を形成する。   Furthermore, a partition plate 4,... Is attached to some of the columns 3,... At intervals of about the width of the work boxes 61a, 62a to close the space between the column 3 and the covering layer 1a. A plurality of sections partitioned by the partition plates 4,... Are formed in the tunnel extending direction.

この仕切り板4は、壁1b面方向及び上下方向に移動可能となるように位置調整手段を介して支柱3に取り付けられているので、仕切り板4の下端をトンネル1底面に当接させつつ側縁のウレタンフォーム4bを被覆層1aに密着させた位置で固定することができる。   Since the partition plate 4 is attached to the support column 3 through the position adjusting means so as to be movable in the wall 1b surface direction and the vertical direction, the partition plate 4 is placed on the side while the lower end of the partition plate 4 is in contact with the bottom surface of the tunnel 1. The edge urethane foam 4b can be fixed at a position in close contact with the coating layer 1a.

また、この仕切り板4の側縁にはウレタンフォーム4bが取り付けられているので、被覆層1aの表面に凹凸があっても密着させて作業中のアスベストの飛散範囲を仕切り板4,4で区切られた区画内に抑えることができるうえに、作業エリアを形成する前に被覆層1aを傷つけてしまうこともない。   Since the urethane foam 4b is attached to the side edge of the partition plate 4, even if the surface of the coating layer 1a is uneven, it adheres closely and the asbestos scattering range during operation is partitioned by the partition plates 4 and 4. In addition to being able to be constrained within the defined compartment, the coating layer 1a is not damaged before the work area is formed.

さらに、このように被覆層1aからトンネル1内部側に離間した位置に立設された支柱3,・・・間には、複数の遮蔽パネル2,・・・を架け渡して蝶ねじで支柱3,・・・に固定する。   In addition, a plurality of shielding panels 2,... Are bridged between the columns 3,. , ... to fix.

この遮蔽パネル2,・・・は、上下方向に目地材2e,・・・によって閉塞できる程度の隙間を開けて配置するようにすれば、着脱を容易におこなうことができる。また、トンネル1の底面及び上面と遮蔽パネル2,・・・の境界には、図6(b)に示すようにコーキング材などでシール部53,53を設けておく。   The shielding panels 2,... Can be easily attached and detached if they are arranged with a gap that can be closed by the joint materials 2e,. Further, seal portions 53, 53 are provided with a caulking material or the like as shown in FIG. 6B at the boundary between the bottom and top surfaces of the tunnel 1 and the shielding panels 2,.

このようにして被覆層1aを遮蔽パネル2,・・・によって覆った後に、レール1fに沿って作業列車6を走行させ、下部作業台車61を図6(b)の下部作業領域610前で停車させる。なお、走行中は作業函体61aの遮蔽パネル2側の開口部61a1がシャッタ8で閉塞されている。   Thus, after covering the covering layer 1a with the shielding panels 2,..., The work train 6 is run along the rail 1f, and the lower work carriage 61 is stopped in front of the lower work area 610 in FIG. Let During traveling, the opening 61a1 on the shielding panel 2 side of the work box 61a is closed by the shutter 8.

そして、停車後にシャッタ8を開けるとともに下部作業台車61のジャッキ61eを伸長することによって作業函体61aを遮蔽パネル2方向(トンネル軸直交方向)に移動させ、遮蔽パネル2に取り付けたクッション材2f(図8(a)参照)に作業函体61aの端面のクッション材61a4を図9に示すように当接させて、作業函体61aと遮蔽パネル2,・・・で囲まれた空間を形成する。   After the vehicle stops, the shutter 8 is opened and the jack 61e of the lower work carriage 61 is extended to move the work box 61a in the direction of the shielding panel 2 (in the direction perpendicular to the tunnel axis), and the cushion material 2f attached to the shielding panel 2 ( The cushion material 61a4 on the end face of the work box 61a is brought into contact with the work box 61a as shown in FIG. 9 to form a space surrounded by the work box 61a and the shielding panels 2,. .

この作業函体61aへは、セキュリティゾーン台車63の更衣室63aで防護服に着替えて防塵マスクを着用した作業員Mが通路61b及び連絡路61cを通って入室する。   The worker M who changes to the protective clothing and wears a dust mask in the changing room 63a of the security zone carriage 63 enters the work box 61a through the passage 61b and the communication path 61c.

そして作業函体61aに入室した作業員Mは、養生シート7の吊りバンド73,・・・を吊り具72,・・・に連結し、レール部74,74に沿って吊り具72,・・・を移動させることで養生シート7を展開して作業エリアを形成する。   Then, the worker M who has entered the work box 61a connects the suspension bands 73,... Of the curing sheet 7 to the suspension tools 72,. -Move the curing sheet 7 to form a work area.

この下部作業台車61は、図6(b)に示す下部作業領域610で囲まれた領域内の遮蔽パネル2,・・・を外して被覆層1aの除去をおこなうための台車であり、作業函体61aの内部から下部作業領域610に四隅が収まっている遮蔽パネル2,・・・の蝶ねじを手で回して取り外す。   The lower work carriage 61 is a carriage for removing the covering layer 1a by removing the shielding panels 2,... In the area surrounded by the lower work area 610 shown in FIG. From the inside of the body 61a, remove the thumbscrews of the shielding panels 2,... Having the four corners in the lower work area 610 by hand.

なお、外した遮蔽パネル2,・・・は、作業終了後に再び設置するため、アスベストが付着しないように袋にいれた状態で養生シート7内に仮置きする。   Since the removed shielding panels 2,... Are installed again after the work is completed, they are temporarily placed in the curing sheet 7 in a state where they are put in a bag so that asbestos does not adhere.

また、養生シート7の開口部の縁部は、図4,9に示すようにテープ71やシール材によって遮蔽パネル2,・・・や仕切り板4,4に固定し、被覆層1aと仕切り板4,4と遮蔽パネル2,・・・と養生シート7とによって囲まれた作業エリアを形成する。   Moreover, the edge part of the opening part of the curing sheet 7 is fixed to the shielding panels 2,... And the partition plates 4 and 4 with a tape 71 or a sealing material as shown in FIGS. A work area surrounded by 4, 4 and the shielding panels 2, ... and the curing sheet 7 is formed.

さらに、負圧除塵機61dを稼働させて作業エリア内を外部より低い圧力(例えば−0.02〜−0.03kPa程度)にして、作業エリア内に滞留した空気はすべて負圧除塵機61dに吸引されるようにしておく。   Further, the negative pressure dust remover 61d is operated so that the pressure in the work area is lower than the outside (for example, about −0.02 to −0.03 kPa), and all the air accumulated in the work area is sucked into the negative pressure dust remover 61d. Keep it like that.

この作業エリア内で作業員Mは、除去作業中の吸入性石綿繊維の飛散を低減させるために被覆層1aの表面に飛散抑制剤を散布してアスベストを湿潤化させる。   In this work area, the worker M wets asbestos by spraying a scattering inhibitor on the surface of the coating layer 1a in order to reduce the scattering of the respirable asbestos fibers during the removal work.

その後、ヘラ、ケレン棒、スクレーパなどによって被覆層1aを掻き落とし、さらにワイヤブラシや研磨用具によって壁1b面に付着しているアスベストを擦り落とす。この作業中は、作業エリア内の粉塵濃度が最も高くなるので、粉塵飛散防止剤を随時空中に散布する。   Thereafter, the covering layer 1a is scraped off with a spatula, a kerren rod, a scraper, and the asbestos adhering to the wall 1b surface is scraped off with a wire brush or a polishing tool. During this work, the dust concentration in the work area is the highest, so a dust scattering inhibitor is sprayed into the air as needed.

なお、被覆層1aの除去によって仕切り板4の側縁と壁1bとの間に隙間が生じた場合は、ボルトを緩めて仕切り板4を壁1b側に移動させてウレタンフォーム4bを壁1b面に当接させる。   If a gap is generated between the side edge of the partition plate 4 and the wall 1b due to the removal of the covering layer 1a, the bolts are loosened to move the partition plate 4 to the wall 1b side so that the urethane foam 4b faces the wall 1b. Abut.

また、アスベスト除去後は真空掃除機で作業エリア内の清掃をおこない、被覆層1aを除去した壁1bの表面、養生シート7の内面、空気中などに粉塵飛散防止剤(シール剤)を散布して、残存しているかもしれない微量のアスベストの飛散を防止しておく。   After removing asbestos, clean the inside of the work area with a vacuum cleaner and spray dust scattering agent (sealant) on the surface of the wall 1b from which the coating layer 1a has been removed, the inner surface of the curing sheet 7, and in the air. To prevent the scattering of trace amounts of asbestos that may remain.

そして、撤去した遮蔽パネル2,・・・を元の位置に戻して蝶ねじを締めることによって支柱3,・・・に再び固定する。この際、設置した遮蔽パネル2,・・・が建築限界1cを越えていないことを確認する。   Then, the removed shielding panels 2,... Are returned to their original positions and fastened to the columns 3,. At this time, it is confirmed that the installed shielding panels 2, ... do not exceed the building limit 1c.

その後、養生シート7の開口縁部のテープ71を剥がし、吊り具72,・・・に吊るした状態で作業函体61aの一方に押し寄せ、吊りバンド73,・・・をカッタで切断して吊り具72,・・・から切り離して作業エリア側が内側に封じ込められるように畳む。   Thereafter, the tape 71 at the opening edge of the curing sheet 7 is peeled off, and is pushed to one side of the work box 61a while being hung on the hanger 72,... And the hanger band 73,. Separated from the tools 72,... Folds so that the work area side is contained inside.

そして、シャッタ8を閉じて開口部61a1を閉塞するとともに、ジャッキ61eを縮めて作業函体61aを台車上の元の位置に戻す。   Then, the shutter 8 is closed to close the opening 61a1, and the jack 61e is contracted to return the work box 61a to the original position on the carriage.

また、除去したアスベスト及び畳んだ養生シート7は、廃棄専用プラスチック袋に詰めてセキュリティゾーン台車63まで運び、真空掃除機などの掃除機63cで外側に付着したアスベストを吸い取り、エアシャワー室63bで新しい袋に入れて二重袋にして接着テープなどで密閉して廃棄物66aとして貨物台車66に積載する。   Also, the removed asbestos and the folded curing sheet 7 are packed in a plastic bag for disposal and carried to the security zone carriage 63, and the asbestos adhering to the outside is sucked up by a vacuum cleaner 63c such as a vacuum cleaner, and new in the air shower chamber 63b. The bag is put into a double bag, sealed with an adhesive tape or the like, and loaded on the cargo cart 66 as waste 66a.

このセキュリティゾーン台車63では、作業員Mも上記と同様に掃除機63cで防護服に付着したアスベストを吸い取り、防護服を脱いで袋に詰めてエアシャワー室63bを通って更衣室63aで着替えをおこなう。   In this security zone carriage 63, the worker M also sucks asbestos adhering to the protective clothing with the vacuum cleaner 63c in the same manner as above, removes the protective clothing, packs it in a bag, changes clothes in the changing room 63a through the air shower chamber 63b. Do it.

また、負圧除塵機61dに溜まったアスベストは、ダスト回収専用の集塵機であるダスト回収用集塵機64aによって負圧状態のエリア内で外部に粉塵が飛散しないようにして回収する。   Further, the asbestos accumulated in the negative pressure dust remover 61d is collected by the dust collecting dust collector 64a, which is a dust collecting dust collector, so that the dust is not scattered outside in the negative pressure area.

このような下部作業台車61でおこなった被覆層1aの撤去作業は、並行して上部作業台車62においても同様の手法で行なわれる。   The removal work of the coating layer 1a performed by the lower work carriage 61 is performed by the same method also in the upper work carriage 62 in parallel.

このように構成された本実施の形態の作業列車6は、開口部61a1,62a1に開閉自在のシャッタ8が設けられた作業函体61a,62aと、負圧除塵機61d,62dと、エアシャワー室63bを備えたセキュリティゾーン台車63とを備えており、トンネル1のいずれの場所へもレール1fを走行して短時間で行くことができる。   The work train 6 of the present embodiment configured as described above includes work boxes 61a and 62a provided with opening / closing shutters 8 at the openings 61a1 and 62a1, negative pressure dust removers 61d and 62d, and an air shower. A security zone carriage 63 provided with a chamber 63b is provided, and the rail 1f can be traveled to any place of the tunnel 1 in a short time.

また、作業函体61a,62aの作業エリアの粉塵を負圧除塵機61d,62dによって吸引除去することができるとともに、作業員Mの防護服や袋詰めされた廃棄物66aに粉塵が付着していてもセキュリティゾーン台車63で浄化されるため、外部に粉塵が漏れだすことがなく安全である。   In addition, the dust in the work area of the work boxes 61a and 62a can be sucked and removed by the negative pressure dust removers 61d and 62d, and the dust adheres to the protective clothing of the worker M and the bagged waste 66a. However, since it is purified by the security zone carriage 63, dust is not leaked to the outside and is safe.

さらに、負圧除塵機61d,62d内のアスベストも負圧状態のエリア内で回収されるため、外部に粉塵を飛散させることがない。   Furthermore, since the asbestos in the negative pressure dust removers 61d and 62d is also collected in the negative pressure area, dust is not scattered outside.

また、作業函体61a,62aに水平移動用のジャッキ61e,62eを設けることで、走行中は台車上に収容して安定性を向上させることができるとともに、作業函体61a,62aを被覆層1aに可能な限り近づけて安全かつ効率的な作業をおこなうことができる。   Further, by providing the horizontal movement jacks 61e and 62e on the work boxes 61a and 62a, the work boxes 61a and 62a can be accommodated on the carriage during running to improve stability, and the work boxes 61a and 62a are covered with the covering layer. Safe and efficient work can be performed as close as possible to 1a.

さらに、作業函体62aに昇降機62fを設けることで、被覆層1aが高所に形成されている場合も容易に除去作業をおこなうことができる。   Furthermore, by providing the elevator 62f on the work box 62a, the removal work can be easily performed even when the coating layer 1a is formed at a high place.

そして、作業函体61a,62aの内部にレール部74,74に沿って移動可能な吊り具72,・・・を介して養生シート7を取り付けることで、作業函体61a,62aの内面の汚染を防ぐために養生シート7を展開したり、アスベストで汚染された養生シート7を畳んで片付けたりする作業を迅速におこなうことができる。   And by attaching the curing sheet 7 to the inside of the work boxes 61a, 62a through the lifting tools 72,... Movable along the rail parts 74, 74, the contamination of the inner surfaces of the work boxes 61a, 62a is obtained. In order to prevent this, the curing sheet 7 can be expanded, or the curing sheet 7 contaminated with asbestos can be quickly folded and cleaned.

また、このような作業列車6を使用することで、作業函体61a,62aの内部に簡単に作業エリアが形成できるので、終電が終わって始発電車が発車するまでの短い時間しか作業時間が確保できない場合であっても効率的に作業をおこなうことができる。   Further, by using such a work train 6, a work area can be easily formed inside the work boxes 61a and 62a, so that the work time is ensured only for a short time from the end of the last train to the start of the first generator. Even if it is not possible, work can be performed efficiently.

以下、前記した実施の形態の実施例1について説明する。なお、前記実施の形態で説明した内容と同一乃至均等な部分の説明については同一符号を付して説明する。   Hereinafter, Example 1 of the above-described embodiment will be described. The description of the same or equivalent parts as those described in the above embodiment will be given the same reference numerals.

この実施例1では、長大構造物であるトンネル1に接続される構造物としての換気用立坑11において、その壁面に形成されたアスベストが混入する被覆層1aを除去するために使用するアスベスト除去作業用車両としての作業列車60について説明する。   In the first embodiment, asbestos removal work used for removing the coating layer 1a mixed with asbestos formed on the wall surface in the ventilation shaft 11 as a structure connected to the tunnel 1 which is a long structure. The work train 60 as a work vehicle will be described.

この作業列車60は、図10に示すように駆動車64に、換気口用作業台車67、セキュリティゾーン台車63、遠隔操作台車65、貨物台車66が連結されて編成された車両である。   As shown in FIG. 10, the work train 60 is a vehicle formed by connecting a drive car 64 to a work car 67 for a ventilation opening, a security zone car 63, a remote operation car 65, and a freight car 66.

この換気口用作業台車67上には、図10に示すように作業函体67aと、除塵機としての負圧除塵機67bに溜まったアスベストを回収するためのダスト回収用集塵機64aと、高所作業用の昇降装置67dとが主に搭載されている。   As shown in FIG. 10, a work box 67a, a dust collecting dust collector 64a for collecting asbestos collected in a negative pressure dust remover 67b as a dust remover, and a high place A lifting device 67d for work is mainly mounted.

この作業函体67aは、図10,11に示すように上面から側面にかけて開口部67a1が形成された箱型の外殻であって、開口部67a1には開閉自在な遮蔽手段としてのシャッタ9が設けられている。   As shown in FIGS. 10 and 11, the work box 67a is a box-shaped outer shell having an opening 67a1 formed from the upper surface to the side surface. The opening 67a1 is provided with a shutter 9 as an openable / closable shielding means. Is provided.

また、作業函体67aの内部に配備される昇降装置67dは、開口部67a1に向けて上昇可能な装置であってタイヤ67d1によって作業函体67aの内部を移動することができる。   The lifting device 67d provided inside the work box 67a is a device that can be raised toward the opening 67a1 and can move inside the work box 67a by the tire 67d1.

さらに、開口部67a1には、外部に向けて延伸可能な幌状の接続路91が設けられており、作業函体67aから換気用立坑11に連通する外部から遮断された通路を形成することができる。   Further, the opening 67a1 is provided with a hood-like connection path 91 that can be extended to the outside, so that a passage blocked from the outside that communicates from the work box 67a to the ventilation shaft 11 can be formed. it can.

この接続路91は、図12(a)に示すように作業列車60が走行中は作業函体67aの内部に収容されている。すなわち、接続路91を縮めてシャッタ9の両脇に端部を固定したゴムバンド92,92で支持させる。   As shown in FIG. 12A, the connection path 91 is accommodated in the work box 67a while the work train 60 is traveling. That is, the connection path 91 is contracted and supported by rubber bands 92 and 92 having ends fixed to both sides of the shutter 9.

またこの接続路91には、鍔状に周縁部91aが形成されており、その周縁部91aを開口部67a1の作業函体67a内側面側周縁に両面テープ93及びテープ94で固定しておく。   Further, a peripheral edge portion 91a is formed in the connection path 91 in a bowl shape, and the peripheral edge portion 91a is fixed to the inner peripheral surface side peripheral edge of the opening 67a1 with a double-sided tape 93 and a tape 94.

図12(b)は、シャッタ9を開けて接続路91を外部に向けて延伸させた状態を示した図である。このようにシャッタ9を開けても、接続路91の周縁部91aが作業函体67aの内側面に密着して固定されているので、接続路91の内部と作業函体67aの内部を連通させて外部とは遮断された状態にすることができる。   FIG. 12B is a diagram illustrating a state in which the shutter 9 is opened and the connection path 91 is extended outward. Even when the shutter 9 is opened in this way, the peripheral edge 91a of the connection path 91 is fixed in close contact with the inner surface of the work box 67a, so that the inside of the connection path 91 and the inside of the work box 67a are communicated. Can be cut off from the outside.

次に、実施例1の作業列車60によってトンネル1に接続される換気用立坑11内のアスベストを除去する方法について説明する。   Next, a method for removing asbestos in the ventilation shaft 11 connected to the tunnel 1 by the work train 60 of the first embodiment will be described.

まず、図11に示すように換気用立坑11の上部を上蓋部23で閉塞し、アスベストが地上に放出されないようにしておく。また、換気用立坑11のトンネル1側の開口部はドア22を備えた閉塞部21で閉塞しておく。   First, as shown in FIG. 11, the upper part of the ventilation shaft 11 is closed with the upper lid part 23 so that asbestos is not released to the ground. Further, the opening of the ventilation shaft 11 on the tunnel 1 side is closed with a closing portion 21 having a door 22.

そして、終電が終わった後に作業列車60を走行させ、換気口用作業台車67を換気用立坑11の換気口前で停車させる。なお、走行中は作業函体67aの開口部67a1がシャッタ9で閉塞されている。   Then, after the last train is finished, the work train 60 is run, and the work carriage 67 for the ventilation opening is stopped in front of the ventilation opening of the vertical shaft 11 for ventilation. During traveling, the opening 67a1 of the work box 67a is closed by the shutter 9.

この作業函体67aへは、セキュリティゾーン台車63の更衣室63aで防護服に着替えて防塵マスクを着用した作業員Mが入室する。   A worker M who changes into protective clothing and wears a dust mask enters the work box 67a in the changing room 63a of the security zone carriage 63.

作業函体67aに入室した作業員Mは、換気口の閉塞部21と対面する位置のシャッタ9を開け、昇降装置67dに乗って畳んだ接続路91を支持していたゴムバンド92,92を外し、接続路91を閉塞部21に向けて延伸させる。   The worker M who has entered the work box 67a opens the shutter 9 at a position facing the closed portion 21 of the ventilation opening, and uses the rubber bands 92 and 92 that support the connection path 91 folded on the lifting device 67d. The connection path 91 is extended toward the closing portion 21.

この接続路91の端部は、閉塞部21のトンネル1側の面に両面テープなどで固定して密閉させる。   The end portion of the connection path 91 is fixed and sealed with a double-faced tape or the like on the surface of the blocking portion 21 on the tunnel 1 side.

そして、閉塞部21のドア22を開けて換気用立坑11の内部に入り、ドア22の脇に設けた穴を通した吸引ホース67eと送気ホース67fを換気用立坑11内部の所定の位置まで延伸させる。   Then, the door 22 of the blocking portion 21 is opened to enter the inside of the ventilation shaft 11, and the suction hose 67 e and the air supply hose 67 f through the hole provided on the side of the door 22 are moved to a predetermined position inside the ventilation shaft 11. Stretch.

この吸引ホース67eの端部は、図10に示すように駆動車64に搭載した負圧除塵機67bに接続し、送気ホース67fの端部は送風機67gに接続する。なお、この送風機67gには、冷気を作業エリアに送るためのクーラー67hが接続されている。また、作業函体67a内を負圧状態にするための負圧除塵機67bも駆動車64に搭載されている。   The end of the suction hose 67e is connected to a negative pressure dust remover 67b mounted on the drive wheel 64 as shown in FIG. 10, and the end of the air supply hose 67f is connected to the blower 67g. Note that a cooler 67h for sending cool air to the work area is connected to the blower 67g. Further, a negative pressure dust remover 67 b for bringing the inside of the work box 67 a into a negative pressure state is also mounted on the drive wheel 64.

このように除去作業に取り掛かる準備をした後、ドア22を締めて負圧除塵機67bを稼働させると、換気用立坑11内に形成された上蓋部23と閉塞部21で閉塞された作業エリアは、外部より低い圧力(例えば−0.02〜−0.03kPa程度)になって内部に滞留した空気はすべて負圧除塵機67bに吸引されるようになる。   After preparing for the removal work in this way, when the door 22 is tightened and the negative pressure dust remover 67b is operated, the work area closed by the upper lid portion 23 and the closing portion 21 formed in the ventilation shaft 11 is All the air staying inside at a lower pressure than the outside (for example, about -0.02 to -0.03 kPa) is sucked into the negative pressure dust remover 67b.

このように作業エリアを負圧状態にした後に、換気用立坑11の壁面に形成されたアスベストが混入する被覆層1aを除去する。この除去作業中は、閉塞部21のドア22を開けて作業員Mが出入りしたとしても、作業エリアで発生した粉塵は同じく負圧状態の接続路91や作業函体67aに流れるだけで外部に漏れだすことはない。   Thus, after making a work area into a negative pressure state, the coating layer 1a in which the asbestos formed in the wall surface of the ventilation shaft 11 mixes is removed. During this removal operation, even if the worker M opens and closes by opening the door 22 of the closing portion 21, the dust generated in the work area similarly flows to the outside only by flowing into the connection path 91 and the work box 67a in the negative pressure state. There is no leakage.

また、アスベスト除去後は真空掃除機で作業エリア内の清掃をおこない、被覆層1aを除去した壁面、閉塞部21、接続路91の内面、空気中などに粉塵飛散防止剤(シール剤)を散布して、残存しているかもしれない微量のアスベストの飛散を防止しておく。   After removing asbestos, clean the inside of the work area with a vacuum cleaner, and spray dust scattering agent (sealant) on the wall surface from which the coating layer 1a has been removed, the blocking portion 21, the inner surface of the connection path 91, and the air. Then, a small amount of asbestos that may remain is prevented from scattering.

また、負圧除塵機67bに溜まったアスベストは、作業函体67内のダスト回収用集塵機64aによって回収する。   The asbestos collected in the negative pressure dust remover 67 b is collected by the dust collecting dust collector 64 a in the work box 67.

そして、接続路91を縮めてゴムバンド92,92で支持させるとともにシャッタ9を閉じて作業函体67aを密閉し、作業函体67a内の清掃をおこなう。   Then, the connection path 91 is contracted and supported by the rubber bands 92, 92, and the shutter 9 is closed to seal the work box 67a, and the work box 67a is cleaned.

その後、除去したアスベストを詰めた廃棄専用プラスチック袋をセキュリティゾーン台車63まで運び、真空掃除機などの掃除機63cで袋や作業員Mの防護服の外側に付着したアスベストを吸い取り、エアシャワー室63bで廃棄物66aや防護服を新しい袋に入れて二重袋にして接着テープなどで密閉し、遠隔操作台車65後方の貨物台車66に積載する。   Thereafter, the discarded plastic bag filled with the removed asbestos is carried to the security zone carriage 63, and the asbestos adhering to the outside of the bag and the protective clothing of the worker M is sucked by the vacuum cleaner 63c such as a vacuum cleaner, and the air shower chamber 63b. Then, the waste 66a and protective clothing are put in a new bag, made into a double bag, sealed with adhesive tape or the like, and loaded on the cargo cart 66 behind the remote control cart 65.

このように構成された本実施の形態の作業列車60は、開口部67a1に開閉自在のシャッタ9が設けられた作業函体67aと、負圧除塵機67bと、エアシャワー室63bを備えたセキュリティゾーン台車63とを備えており、トンネル1の途中に接続された換気用立坑11へもレール1fを走行して短時間で行くことができる。   The work train 60 of the present embodiment configured as described above has a work box 67a provided with an openable / closable shutter 9 at an opening 67a1, a negative pressure dust remover 67b, and an air shower chamber 63b. A zone carriage 63 is provided, and the rail 1f can be traveled to the ventilation shaft 11 connected in the middle of the tunnel 1 in a short time.

また、上方の開口部67a1に移動するための昇降装置67dを内部に備えるとともに、その開口部67a1に設けられた接続路91は外部に向けて延伸可能に構成されているため、トンネル1に接続される換気用立坑11の作業エリアで効率的にアスベストの除去作業をおこなうことができるうえに、トンネル1内にアスベストを飛散させることがないので安全である。   In addition, an elevating device 67d for moving to the upper opening 67a1 is provided inside, and the connection path 91 provided in the opening 67a1 is configured to be able to extend toward the outside. Asbestos removal work can be efficiently performed in the work area of the ventilation shaft 11 to be used, and it is safe because the asbestos is not scattered in the tunnel 1.

なお、他の構成及び作用効果については、前記実施の形態と略同様であるので説明を省略する。   Other configurations and functions and effects are substantially the same as those in the above-described embodiment, and thus description thereof is omitted.

以下、前記した実施の形態の実施例2について説明する。なお、前記実施の形態又は実施例1で説明した内容と同一乃至均等な部分の説明については同一符号を付して説明する。   Hereinafter, Example 2 of the above-described embodiment will be described. The description of the same or equivalent parts as those described in the above embodiment or Example 1 will be given with the same reference numerals.

この実施例2では、実施例1と同様にトンネル1に接続される換気用立坑11の壁面の被覆層1aを除去するために使用する、アスベスト除去作業用車両に連結される換気口用作業台車68について説明する。   In this second embodiment, as in the first embodiment, the work carriage for the vent opening connected to the asbestos removal work vehicle used for removing the coating layer 1a on the wall surface of the ventilation shaft 11 connected to the tunnel 1. 68 will be described.

この換気口用作業台車68は、図13に示すように換気用立坑11の換気口がトンネル1の天井1gに設けられている場合に使用する。   The work carriage 68 for the ventilation opening is used when the ventilation opening of the ventilation shaft 11 is provided on the ceiling 1g of the tunnel 1 as shown in FIG.

この作業函体68aは、図13に示すように上面に開口部68a1が形成された箱型の外殻であって、開口部68a1には開閉自在な遮蔽手段としてのシャッタ(図示せず)が設けられている。   As shown in FIG. 13, the work box 68a is a box-shaped outer shell having an opening 68a1 formed on the upper surface, and the opening 68a1 has a shutter (not shown) as an openable / closable shielding means. Is provided.

また、作業函体68aの内部には、クローラ68d1によって移動可能であるとともに開口部68a1に向けて上昇可能な昇降装置68dが配備されている。なお、この昇降装置68dに代えて実施例1の昇降装置67dを使用することもできる。   In addition, an elevating device 68d that can be moved by the crawler 68d1 and can be raised toward the opening 68a1 is disposed inside the work box 68a. In addition, it can replace with this raising / lowering apparatus 68d, and can also use the raising / lowering apparatus 67d of Example 1. FIG.

また、この実施例2では、図13に示すようにトンネル1のカント部に換気用立坑11の換気口が設けられている場合について説明するため、傾いた作業函体68aの床面に水平に昇降装置68dを設置するために楔状の調整台68cを配設している。   Further, in this second embodiment, as shown in FIG. 13, in order to explain the case where the vent of the ventilation shaft 11 is provided in the cant portion of the tunnel 1, it is horizontally disposed on the floor surface of the inclined work box 68 a. In order to install the lifting device 68d, a wedge-shaped adjustment table 68c is provided.

さらに、開口部68a1には、外部に向けて延伸可能な幌状の接続路91が設けられており、作業函体68aから換気用立坑11に連通する外部から遮断された通路を形成することができる。   Further, the opening 68a1 is provided with a hood-like connection path 91 that can be extended to the outside, and can form a passage blocked from the outside that communicates from the work box 68a to the ventilation shaft 11. it can.

次に、実施例2の換気口用作業台車68を連結した作業列車によって、トンネル1に接続される換気用立坑11内のアスベストを除去する方法について説明する。   Next, a method for removing asbestos in the ventilation shaft 11 connected to the tunnel 1 by a work train connected to the work carriage 68 for the ventilation opening of the second embodiment will be described.

まず、図13に示すように換気用立坑11の上部を上蓋部23で閉塞し、アスベストが地上に放出されないようにしておく。また、換気用立坑11のトンネル1側の開口部はドア22を備えた閉塞部21で閉塞しておく。   First, as shown in FIG. 13, the upper part of the ventilation shaft 11 is closed with the upper lid part 23 so that asbestos is not released to the ground. Further, the opening of the ventilation shaft 11 on the tunnel 1 side is closed with a closing portion 21 having a door 22.

そして、終電が終わった後に作業列車を走行させ、換気口用作業台車68を換気用立坑11の換気口の下で停車させる。なお、走行中は作業函体68aの開口部68a1がシャッタで閉塞されている。   Then, after the last train is finished, the work train is run, and the work carriage 68 for the ventilation opening is stopped under the ventilation opening of the vertical shaft 11 for ventilation. During traveling, the opening 68a1 of the work box 68a is closed by a shutter.

続いてシャッタを開けて接続路91を閉塞部21に向けて延伸させ、接続路91の上端を閉塞部21の下面に両面テープなどで密着固定させる。また、換気用立坑11の内部には足場11aを設置し、負圧除塵機68bに一端が接続される吸引ホース68eを配管する。   Subsequently, the shutter is opened and the connection path 91 is extended toward the blocking portion 21, and the upper end of the connection path 91 is closely fixed to the lower surface of the blocking portion 21 with double-sided tape or the like. Further, a scaffold 11a is installed inside the ventilation shaft 11, and a suction hose 68e having one end connected to the negative pressure dust remover 68b is piped.

このようにトンネル1の天井1gに換気口が設けられた換気用立坑11の壁面の被覆層1aであっても、上面の開口部68a1に移動するための昇降装置68dを内部に備えるとともに、その開口部68a1に設けられた接続路91が外部に向けて延伸可能に構成された換気口用作業台車68を使用することで、換気用立坑11の作業エリアで効率的にアスベストの除去作業をおこなうことができるうえに、トンネル1内にアスベストを飛散させることがないので安全である。   In this way, even the covering layer 1a on the wall surface of the vertical shaft 11 with the ventilation opening provided in the ceiling 1g of the tunnel 1 is provided with an elevating device 68d for moving to the opening 68a1 on the upper surface, Asbestos removal work can be efficiently performed in the work area of the ventilation shaft 11 by using the ventilating work carriage 68 in which the connection path 91 provided in the opening 68a1 is configured to be extended outward. In addition, it is safe because no asbestos is scattered in the tunnel 1.

なお、他の構成及び作用効果については、前記実施の形態又は実施例1と略同様であるので説明を省略する。   Other configurations and functions and effects are substantially the same as those of the above-described embodiment or Example 1, and thus description thereof is omitted.

以上、図面を参照して、本発明の最良の実施の形態を詳述してきたが、具体的な構成は、この実施の形態又は実施例に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。   Although the best embodiment of the present invention has been described in detail with reference to the drawings, the specific configuration is not limited to this embodiment or example, and the design does not depart from the gist of the present invention. Such modifications are included in the present invention.

例えば、前記した実施の形態及び実施例では、長大構造物として鉄道用トンネルについて説明したが、これに限定されるものではなく、自動車用トンネル、大規模オートメーション工場、飛行機の格納庫など延長が長い長大構造物であればいずれにも本発明を適用することができる。   For example, in the above-described embodiments and examples, the railway tunnel has been described as a long and large structure. However, the present invention is not limited to this, and is not limited to this. The present invention can be applied to any structure.

また、前記実施の形態及び実施例では複数の台車が連結された作業列車6,60について説明したが、これに限定されるものではなく、1台の台車上に作業函体、除塵機、バッファルームなど複数の設備が設けられたものであってもよい。   In the above-described embodiments and examples, the work trains 6 and 60 in which a plurality of carriages are connected have been described. However, the present invention is not limited to this, and a work box, a dust remover, and a buffer are provided on one carriage. A plurality of facilities such as a room may be provided.

さらに、前記実施の形態及び実施例では線路が敷設されたトンネル1内を走行する作業列車6,60について説明したが、自動車用トンネルなど線路のない長大構造物においては無軌条で走行可能なタイヤなどの移動手段を備えた車両を使用することができる。   Furthermore, in the above-described embodiments and examples, the work trains 6 and 60 that travel in the tunnel 1 in which the track is laid have been described. However, in a long structure without a track such as an automobile tunnel, a tire that can run without a rail A vehicle equipped with a moving means such as can be used.

また、前記実施例1,2の作業函体67a,68aの内部には養生シート7を設置しなかったが、これに限定されるものではなく、前記実施の形態と同様に展開及び撤去が容易な養生シート7を設置することができる。   Moreover, although the curing sheet 7 was not installed inside the working boxes 67a, 68a of the first and second embodiments, the present invention is not limited to this, and it is easy to deploy and remove as in the previous embodiment. A special curing sheet 7 can be installed.

本発明の最良の実施の形態の作業列車の編成を説明する図であって、(a)は平面図、(b)は縦断面図である。It is a figure explaining organization of the work train of the best embodiment of the present invention, (a) is a top view and (b) is a longitudinal section. (a)は作業函体の概略構成を説明する斜視図、(b)は作業函体に配設された天井レールの構成を説明する平面図である。(A) is a perspective view explaining the schematic structure of a work box, (b) is a top view explaining the structure of the ceiling rail arrange | positioned at the work box. (a)は養生シートの概略構成を説明する斜視図、(b)は作業函体内部のレール部に養生シートを吊り下げた構成を説明する詳細断面図である。(A) is a perspective view explaining schematic structure of a curing sheet, (b) is detailed sectional drawing explaining the structure which suspended the curing sheet on the rail part inside a work box. 下部作業台車の構成を説明する断面図である。It is sectional drawing explaining the structure of a lower work trolley | bogie. 上部作業台車の構成を説明する断面図である。It is sectional drawing explaining the structure of an upper work trolley | bogie. アスベスト除去用のトンネルの構造を説明する図であって、(a)は(b)のB−B方向平面図、(b)は(a)A−A方向正面図である。It is a figure explaining the structure of the tunnel for asbestos removal, Comprising: (a) is a BB direction top view of (b), (b) is a (A) AA direction front view. 図6(b)のC−C方向から見たアスベスト除去用のトンネルの構造の断面図である。It is sectional drawing of the structure of the tunnel for asbestos removal seen from CC direction of FIG.6 (b). (a)は遮蔽パネルの概略構成を説明する斜視図、(b)は遮蔽パネルの概略構成を説明する正面図である。(A) is a perspective view explaining the schematic structure of a shielding panel, (b) is a front view explaining the schematic structure of a shielding panel. 下部作業台車の作業函体に形成される作業エリアの構成を説明する説明図である。It is explanatory drawing explaining the structure of the work area formed in the work box of a lower work trolley | bogie. 実施例1の作業列車の編成を説明する図であって、(a)は縦断面図、(b)は平面図である。It is a figure explaining formation of the work train of Example 1, Comprising: (a) is a longitudinal cross-sectional view, (b) is a top view. 換気口用作業台車が換気用立坑に接続している状態を説明する一部切断斜視図である。It is a partially cutaway perspective view explaining the state where the work carriage for ventilator is connected to the vertical shaft for ventilation. (a)は作業函体に接続路が収容された状態を説明する断面図、(b)は作業函体から外部に向けて接続路を延伸させた状態を説明する断面図である。(A) is sectional drawing explaining the state by which the connection path was accommodated in the work box, (b) is sectional drawing explaining the state which extended the connection path toward the exterior from the work box. 実施例2の換気口用作業台車が換気用立坑に接続している状態を説明する断面図である。It is sectional drawing explaining the state which the work trolley for ventilation openings of Example 2 has connected to the vertical shaft for ventilation.

符号の説明Explanation of symbols

1 トンネル(長大構造物)
11 換気用立坑(構造物)
1a 被覆層
6,60 作業列車(アスベスト除去作業用車両)
61 下部作業台車
62 上部作業台車
61a,62a 作業函体
61a1,62a1 開口部
61d,62d 負圧除塵機(除塵機)
61e,62e ジャッキ(横移動手段)
62f 昇降機(昇降手段)
63 セキュリティゾーン台車(バッファルーム)
63b エアシャワー室
67,68 換気口用作業台車
67a,68a 作業函体
67a1,68a1 開口部
67b,68b 負圧除塵機(除塵機)
67d,68d 昇降装置
7 養生シート
72 吊り具
74 レール部
8,9 シャッタ(遮蔽手段)
91 接続路
1 Tunnel (long structure)
11 Ventilation shaft (structure)
1a Covering layer 6, 60 Work train (vehicle for asbestos removal work)
61 Lower work cart 62 Upper work cart 61a, 62a Work box 61a1, 62a1 Opening 61d, 62d Negative pressure dust remover (dust remover)
61e, 62e Jack (lateral movement means)
62f Elevator (elevating means)
63 Security zone cart (buffer room)
63b Air shower chamber 67, 68 Ventilation work cart 67a, 68a Work box 67a1, 68a1 Opening 67b, 68b Negative pressure dust remover (dust remover)
67d, 68d Lifting device 7 Curing sheet 72 Suspension tool 74 Rail portion 8, 9 Shutter (shielding means)
91 connection

Claims (4)

長大構造物又はそれに接続される構造物の壁面に形成されたアスベストが混入する被覆層を除去するためのアスベスト除去作業用車両であって、
前記被覆層に連通させるための開口部に開閉自在な遮蔽手段が設けられた作業函体と、その作業函体内又はその作業函体に連通される作業エリアを負圧に保つとともに粉塵を吸引除去する除塵機と、その作業函体に連通して作業函体内からの粉塵の漏出を阻止するためのエアシャワーを備えたバッファルームとを有し、
前記作業函体は、前記車両上で前記長大構造物の壁面方向へ移動するための横移動手段を備えるとともに、前記車両には前記作業函体とは反対側にカウンターウェイトが配設されていることを特徴とするアスベスト除去作業用車両。
An asbestos removal work vehicle for removing a coating layer mixed with asbestos formed on a wall surface of a long structure or a structure connected thereto,
A work box having an openable and closable shielding means at the opening for communicating with the coating layer, and the work box or the work area communicating with the work box is kept at a negative pressure and dust is removed by suction. a dust remover for, and a buffer room with air shower for preventing leakage of dust from the work box-body communicates with the work box making bodies possess,
The work box body is Rutotomoni comprises a horizontal moving means for moving the wall surface direction of the long structure on said vehicle, said the vehicle and working a box body counterweight is disposed on the opposite side asbestos removal work vehicle, characterized in that there.
前記作業函体は、前記車両上で上下方向へ移動するための昇降手段を備えていることを特徴とする請求項1に記載のアスベスト除去作業用車両。 The asbestos-removing work vehicle according to claim 1, wherein the work box includes an elevating means for moving up and down on the vehicle. 前記作業函体の内面にはレール部が配設されており、そのレール部に沿って移動可能な吊り具を介して取り付けられる養生シートを備えていることを特徴とする請求項1又は2に記載のアスベスト除去作業用車両。 The working on the inner surface of a box body and the rail portion is provided, in claim 1 or 2, characterized in that it comprises a curing sheet attached via a movable hanger along the rail section The vehicle for asbestos removal work as described. 長大構造物又はそれに接続される構造物の壁面に形成されたアスベストが混入する被覆層を除去するためのアスベスト除去作業用車両であって、
前記被覆層に連通させるための開口部に開閉自在な遮蔽手段が設けられた作業函体と、その作業函体内又はその作業函体に連通される作業エリアを負圧に保つとともに粉塵を吸引除去する除塵機と、その作業函体に連通して作業函体内からの粉塵の漏出を阻止するためのエアシャワーを備えたバッファルームとを有し、
前記開口部は前記作業函体の上面に形成されており、その開口部から外部に向けて延伸可能な接続路と、前記作業函体の内部で前記開口部に向けて上昇可能な昇降装置と、その昇降装置を水平に設置するための調整台とが備えられていることを特徴とするアスベスト除去作業用車両。
An asbestos removal work vehicle for removing a coating layer mixed with asbestos formed on a wall surface of a long structure or a structure connected thereto,
A work box having an openable and closable shielding means at the opening for communicating with the coating layer, and the work box or the work area communicating with the work box is kept at a negative pressure and dust is removed by suction. a dust remover for, and a buffer room with air shower for preventing leakage of dust from the work box-body communicates with the work box making bodies possess,
The opening is formed on the upper surface of the work box, a connection path that can be extended outward from the opening, and a lifting device that can be raised toward the opening inside the work box. , features and to luer asbestos removal work vehicle that the adjustment base for mounting the lifting device horizontally is provided.
JP2006132524A 2006-05-11 2006-05-11 Asbestos removal vehicle Expired - Fee Related JP3987091B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006132524A JP3987091B1 (en) 2006-05-11 2006-05-11 Asbestos removal vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006132524A JP3987091B1 (en) 2006-05-11 2006-05-11 Asbestos removal vehicle

Publications (2)

Publication Number Publication Date
JP3987091B1 true JP3987091B1 (en) 2007-10-03
JP2007303153A JP2007303153A (en) 2007-11-22

Family

ID=38640047

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006132524A Expired - Fee Related JP3987091B1 (en) 2006-05-11 2006-05-11 Asbestos removal vehicle

Country Status (1)

Country Link
JP (1) JP3987091B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008308914A (en) * 2007-06-15 2008-12-25 Shimizu Corp Work unit
JP2021177119A (en) * 2017-03-06 2021-11-11 テックプロジェクトサービス株式会社 Suction removal method for suctioning and removing powder adhering to clothing of human

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5431653B2 (en) * 2007-04-27 2014-03-05 株式会社大気社 Processing equipment
JP5365844B2 (en) * 2009-02-27 2013-12-11 清水建設株式会社 Building renovation / demolition equipment and building renovation / demolition method
JP5365843B2 (en) * 2009-02-27 2013-12-11 清水建設株式会社 Building renovation / demolition equipment and building renovation / demolition method
JP5146772B2 (en) * 2009-02-27 2013-02-20 清水建設株式会社 Building renovation / demolition equipment and building renovation / demolition method
JP5967482B2 (en) * 2012-11-06 2016-08-10 株式会社とわに Railway vehicle asbestos removal method and railway vehicle asbestos isolation device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008308914A (en) * 2007-06-15 2008-12-25 Shimizu Corp Work unit
JP2021177119A (en) * 2017-03-06 2021-11-11 テックプロジェクトサービス株式会社 Suction removal method for suctioning and removing powder adhering to clothing of human
JP7258085B2 (en) 2017-03-06 2023-04-14 テックプロジェクトサービス株式会社 Suction removal method for suction removal of powder adhering to human clothing

Also Published As

Publication number Publication date
JP2007303153A (en) 2007-11-22

Similar Documents

Publication Publication Date Title
JP3987091B1 (en) Asbestos removal vehicle
JP3987090B1 (en) Method for removing asbestos from long structures and structure of long structures for removing asbestos
JPH07259324A (en) Work scaffold structure safe on environmental sanitation
JP2007289822A (en) Coating booth
KR102109969B1 (en) A work bogie for tunnel work
JP7112361B2 (en) Tunnel Ceiling Surface Cleaning Method and Tunnel Ceiling Surface Cleaning and Cleaning Device
JP5146772B2 (en) Building renovation / demolition equipment and building renovation / demolition method
US5367841A (en) Containing structure for abrasive blast head rigging and tank side cleaning apparatus
KR20110029606A (en) Vacuum cleaner for rail road
JP7009287B2 (en) Anti-scattering device and anti-scattering method
JP4114276B2 (en) Curing fence and dismantling method using this curing fence
JP3913648B2 (en) Work scaffolding device for bridge railing
JP6811987B2 (en) Cutting method and cutting equipment used for this method
JP5365843B2 (en) Building renovation / demolition equipment and building renovation / demolition method
JP4971006B2 (en) Clean room renovation method and temporary facilities for renovation
JP2007016402A (en) Construction method for preventing exfoliation at structure surface
JP2007107359A (en) Asbestos removal method and asbestos removal device
JP2002276300A (en) Dust discharging device and sound insulating method and dust discharging method using the same
JP7228753B2 (en) Ventilation equipment used for renovation work on the lining of existing road tunnels
JP2002221592A (en) Decontamination facility
KR20050117504A (en) Nozzle device
JPH07292964A (en) Device for construction work of building wall surface
JP5927835B2 (en) How to remove deposits
JP3527383B2 (en) painting booth
JP5866755B2 (en) Partition wall, partition wall installation method, and deposit disposal method

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070710

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070711

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100720

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110720

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110720

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120720

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130720

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130720

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140720

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees