JP3986810B2 - Power switching control device - Google Patents

Power switching control device Download PDF

Info

Publication number
JP3986810B2
JP3986810B2 JP2001368446A JP2001368446A JP3986810B2 JP 3986810 B2 JP3986810 B2 JP 3986810B2 JP 2001368446 A JP2001368446 A JP 2001368446A JP 2001368446 A JP2001368446 A JP 2001368446A JP 3986810 B2 JP3986810 B2 JP 3986810B2
Authority
JP
Japan
Prior art keywords
time
voltage
circuit breaker
closing
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001368446A
Other languages
Japanese (ja)
Other versions
JP2003168335A (en
Inventor
広幸 蔦田
隆史 平位
弘基 伊藤
治彦 香山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2001368446A priority Critical patent/JP3986810B2/en
Publication of JP2003168335A publication Critical patent/JP2003168335A/en
Application granted granted Critical
Publication of JP3986810B2 publication Critical patent/JP3986810B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H1/00Contacts

Landscapes

  • Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)
  • Keying Circuit Devices (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、遮断器等の電力開閉装置の開閉タイミングを制御する電力開閉制御装置に関するもので、特に、送電線投入時に発生する過電圧を抑制する電力開閉制御装置に関するものである。
【0002】
【従来の技術】
従来の電力開閉制御装置は、電源側電圧の零点を基準として遮断器を閉極させるタイミングを制御することで、遮断器投入時の過電圧を抑制している。このような電力開閉制御装置は、例えば特許公報第2892717号に示されている。
【0003】
例えば、送電線の事故遮断では、健全相に電荷が残留することが知られている。この場合、遮断器の電源側だけでなく、遮断器の負荷側にも送電線条件に応じて様々な電圧が発生する。例えば、分路リアクトル補償送電線の負荷側電圧には、一定周波数の正弦波電圧が発生し、分路リアクトル非補償送電線では、直流電圧が発生する。このような状況下で、遮断器投入時の過電圧を抑制するためには、電源側電圧と負荷側電圧の差が最小となるタイミングに投入されるように遮断器を閉極させればよい。
【0004】
しかし、このような電力開閉制御装置にあっては、電源側電圧の零点のみを基準としているので、負荷側電圧の状態によっては遮断器投入時の過電圧を抑制できないという欠点があった。
【0005】
文献「Controlled Closing on Shunt Reactor Compensated Transmission Lines」によれば、電源側電圧と負荷側電圧をそれぞれ計測し、その差である極間電圧の波形パターンを用いて遮断器の投入タイミングを制御する方法について示されている。これによれば、パターンマッチングを用いて電圧波形パターンの零点周期を調べ、最適投入タイミングを予測すると示されている。
【0006】
この文献では、電源側電圧と負荷側電圧をそれぞれ計測し、その差である極間電圧の波形パターンを調べて遮断器の投入タイミングを制御するという概念、及び電圧波形パターンの零点周期を求める方法については記述されているが、最適な閉極タイミングを決定するための具体的実現方法が示されていない。
【0007】
また、遮断器のプレアーク特性、及び遮断器の機械的動作バラツキ特性を考慮していないので、遮断器の特性によっては、投入時の過電圧を抑制できないという欠点があった。
【0008】
【発明が解決しようとする課題】
上述したような従来の電力開閉制御装置では、電源側電圧の零点のみを基準としているので、負荷側電圧の状態によっては遮断器投入時の過電圧を抑制できないという問題点があった。
【0009】
また、上述したような別の従来の電力開閉制御装置では、遮断器のプレアーク特性、及び遮断器の機械的動作バラツキ特性を考慮していないので、遮断器の特性によっては、投入時の過電圧を抑制できないという問題点があった。
【0010】
この発明は、前述した問題点を解決するためになされたもので、最適タイミングで遮断器投入を行うことができ、ひいては送電線投入時に発生する過電圧を抑制することができる電力開閉制御装置を得ることを目的とする。
【0011】
【課題を解決するための手段】
この発明に係る電力開閉制御装置は、計測した遮断器の電源側電圧信号及び負荷側電圧信号が正弦波信号の場合には前記電圧信号の零点時刻間隔の平均値の逆数をとって2倍した値を周波数として算出し、前記電圧信号の複数の零点時刻の中から、負から正に変化する零点で最も新しい時刻の値を位相0度の時刻として算出し、かつ、前記電圧信号を周期積分して求めた実効値の√2倍を振幅として算出し、以上の算出値を用いて、位相0度の時刻t=0として電圧値=振幅×sin(2π×周波数×t)と前記電圧信号を関数近似し、この近似関数に基づいて現在時刻以降の電圧信号を外挿して現在時刻から一定時間後までの推定した電源側電圧信号及び負荷側電圧信号を得て、前記推定した電源側電圧信号及び負荷側電圧信号の差の絶対値を取った信号である極間電圧の絶対値を推定し、この推定した現在時刻から一定時間後までの極間電圧の絶対値について、あらかじめ設定しておいた閾値以下となる時間領域を現在時刻から一定時間後まで順に探し出し、探し出した時間領域の中であらかじめ設定しておいた長さ以上の時間領域を選び出し、前記長さ以上の時間領域の中間点を目標閉極時刻として決定する目標点検出手段と、前記遮断器の閉極を行わせる制御信号の出力時刻と、前記遮断器と連動した補助スイッチの動作時刻の差に基づいて、前記遮断器の閉極時間を計測する閉極時間計測手段と、前記閉極時間計測手段により計測された前回の閉極時間と、現在の環境温度、制御電圧、及び操作圧力に基づいて、次回の閉極時間の予測値である予測閉極時間を予測する閉極時間予測手段と、閉極指令が入力されると、前記遮断器を前記目標閉極時刻において閉極させるように、前記目標閉極時刻から前記予測閉極時間だけ前の時点で前記制御信号を前記遮断器へ出力する閉極制御手段とを備えたものである。
【0012】
また、この発明に係る電力開閉制御装置は、前記目標点検出手段が、前記極間電圧を合成した波形に対して、前記遮断器のプレアーク特性に基づいた信号変換、及び前記遮断器の機械的動作バラツキに基づいた信号変換を行った上で前記目標閉極時刻を決定するものである。
【0014】
【発明の実施の形態】
実施の形態1.
この発明の実施の形態1に係る電力開閉制御装置について図面を参照しながら説明する。図1は、この発明の実施の形態1に係る電力開閉制御装置の構成を示す図である。なお、各図中、同一符号は同一又は相当部分を示す。
【0015】
図1において、1は主回路、2は遮断器、3は送電線、4は電源側電圧計測手段、5は負荷側電圧計測手段、6は補助スイッチ、7は電源側電圧、8は負荷側電圧である。なお、電源側電圧計測手段4としては、高電圧回路において一般的な交流電圧測定用センサを使用する。また、負荷側電圧計測手段5としては、高電圧回路において交流電圧及び直流電圧成分が直接測定可能なセンサを使用する。
【0016】
また、同図において、10は目標点検出手段、11は閉極時間予測手段、12は閉極制御手段、13は環境温度計測手段、14は制御電圧計測手段、15は操作圧力計測手段、16は閉極時間計測手段、17は目標閉極時刻、18は予測閉極時間、19は閉極指令、20は制御信号である。
【0017】
また、同図において、目標点検出手段10は、電源側電圧計測手段4により計測された電源側電圧7と、負荷側電圧計測手段5により計測された負荷側電圧8から、目標閉極時刻17を出力する。
【0018】
閉極時間計測手段16は、遮断器2の閉極を行わせる制御信号20と、遮断器2の可動接触子と連動した補助スイッチ6から、遮断器2の閉極時間を計測する。
【0019】
閉極時間予測手段11は、閉極時間計測手段16により算出された前回閉極時の閉極時間と、環境温度計測手段13により計測された環境温度と、制御電圧計測手段14により計測された制御電圧と、操作圧力計測手段15により計測された操作圧力から、次回閉極時における遮断器2の閉極時間の予測値である予測閉極時間18を出力する。
【0020】
閉極制御手段12は、閉極指令19が入力されると、遮断器2を目標閉極時刻17において閉極させるように、目標閉極時刻17から予測閉極時間18だけ前の時点で制御信号20を出力する。
【0021】
つぎに、この実施の形態1に係る電力開閉制御装置の動作について図面を参照しながら説明する。
【0022】
図2は、この発明の実施の形態1に係る電力開閉制御装置の目標点検出手段の動作を示すフローチャートである。
【0023】
ステップ101において、電源側電圧7及び負荷側電圧8のアナログ信号は、A/D変換器により所定のサンプリング間隔で離散化し、一定時間分の電圧信号を記憶する。
【0024】
次に、ステップ102において、得られた電圧信号について符号が負から正、または正から負に変化した点である複数の零点時刻を検出し、記憶する。
【0025】
次に、ステップ103において、電圧信号が正弦波信号であるか直流信号であるかを判別する。例えば、記憶された複数の零点時刻間の時間間隔をすべて算出する。全ての時間間隔が一定範囲内にあれば、ゼロを中心として一定周波数で振動しているとして正弦波信号であるとみなす。それ以外の場合は直流信号であるとみなす。電圧信号を高速フーリエ変換(FFT)して、各周波数に対するパワー密度を算出し、ある周波数範囲内のパワーが一定値以上であれば正弦波信号、そうでなければ直流信号であるとみなしてもよい。
【0026】
次に、ステップ104において、正弦波信号であった場合は、信号の周波数・位相・振幅をそれぞれ算出する。例えば、ステップ102で記憶した複数の零点時刻から零点時刻間隔の平均値を求める。正弦波信号では半周期毎に零点が得られるので、零点時刻間隔の平均値の逆数をとって2倍した値を周波数とすればよい。位相については、ステップ102で記憶した複数の零点時刻の中から、負から正に変化する零点で最も新しい時刻の値を位相0度の時刻として記憶しておく。振幅については、電圧信号を周期積分して実効値を求め、√2倍を振幅とすればよい。以上の算出値を用いると位相0度の時刻t=0として電圧信号は、電圧値=振幅×sin(2π×周波数×t)と近似できる。
【0027】
一方、ステップ105において、直流信号であった場合は、例えば電圧信号の時間平均値を直流振幅として算出する。
【0028】
次に、ステップ106において、現在時刻から一定時間後までの極間電圧信号を推定する。図3に時間波形グラフの一例を示している。図3では負荷側電圧が正弦波信号であるとした。図3において、206が現在時刻、計測した電源側電圧が201、計測した負荷側電圧が202である。ステップ104において201及び202の正弦波信号が関数近似されているので、近似関数を用いて現在時刻以降の電圧信号を外挿し、推定した電源側電圧203、推定した負荷側電圧204を得る。そして、電源側電圧信号203と負荷側電圧信号204の差の絶対値を取った信号である極間電圧の絶対値205を算出する。
【0029】
次に、ステップ107において、現在時刻から一定時間後までの目標閉極時刻を推定する。図4にその一例を示している。図4において、信号304は各時間における極間電圧の絶対値を表しており、この値が小さくなる時刻が最適な閉極タイミングとなる。そこで、極間電圧の絶対値信号304に対して、あらかじめ設定しておいた閾値A(301)以下となる時間領域を前から順に探していく。閾値A以下となる時間領域は領域A〜領域Gである。これらの中であらかじめ設定しておいた長さ以上の時間領域を選び出す。ここでは、領域Eのみが選ばれたとする。最後に、この領域Eの中間点である303を目標閉極時刻17として選ぶ。閾値Aであらかじめ設定しておいた長さ以上の時間領域が無かった場合は、閾値Aよりも高い閾値B(302)に変更して同様の処理を行う。また、図4では、図示している時間範囲が短いため目標閉極時刻17は303の1つしか選ばれていないが、実際においては現在時刻から一定時間内に複数の目標閉極時刻17が選ばれる。そこで、これら全てを目標閉極時刻17であるとして記憶しておく。
【0030】
次に、ステップ108において、目標閉極時刻17の更新を行う。目標点検出処理は一定時間毎に繰り返し行われるため、処理を行うたびに前回の目標点検出処理で算出された目標閉極時刻17を更新する必要がある。最新の結果が正しいとみなし、前回の目標点検出処理で算出された目標閉極時刻を全て消去し、今回の処理で算出された目標閉極時刻17で全て書きかえる処理を行う。
【0031】
つづいて、図1に示す閉極時間計測手段16の動作について説明する。
【0032】
遮断器2の可動接触子と連動して動作する補助スイッチ6の動作時刻と制御信号20が出力された時刻の差をとることにより閉極時間を算出する。なお、閉極時間計測手段16として補助スイッチ6を用いるものとしたが、遮断器2の可動接触子駆動部回転軸にロータリーエンコーダ等による回転角計測手段を設け、これから得られる可動接触子の位置信号によって閉極時間を算出するようにしてもよい。回転角計測手段を設けることによって、遮断器機構部の動作が容易にモニターできるという効果が得られる。
【0033】
次に、図1に示す閉極時間予測手段11の動作について説明する。
【0034】
遮断器2の閉極時間変動は、環境温度、制御電圧、及び操作圧力といった環境条件に依存し、同型遮断器に対して共通の変動時間補正が可能である部分と、接点摩耗、経時変化、及び微小な個体差等の遮断器個々の状態変化によって変動し、個別に補正を必要とする部分に分離することができる。そこで、次回閉極時における遮断器2の閉極時間の予測値である予測閉極時間について、環境温度、制御電圧、及び操作圧力の環境条件に基づいた補正時間ΔT1と、過去の動作履歴に基づいた補正時間ΔT2により補正を行う。
【0035】
具体的には、あらかじめ一定の環境温度、制御電圧、及び操作圧力条件において閉極時間の平均値である基準閉極時間T0を計測しておく。また、あらかじめ環境温度、制御電圧、及び操作圧力条件を変化させて閉極させ、その時の閉極時間の平均値について、基準閉極時間T0に対する差分値としてテーブルに記憶させておく。
【0036】
運用時には、環境温度計測手段13により計測された環境温度と、制御電圧計測手段14により計測された制御電圧と、操作圧力計測手段15により計測された操作圧力に基づき、テーブルの最も近い値から内挿して、環境条件に基づいた補正時間ΔT1を算出する。
【0037】
さらに、閉極時間計測手段16によって得られた実際の閉極時間と、その動作時における予測閉極時間について、過去n回(例えば、過去10回)についての誤差を求め、誤差に重み付けをして過去の動作履歴に基づいた補正時間ΔT2を算出する。すなわち、過去i回目の動作における誤差に重み係数w(i)を乗じて過去n回分にわたり加算し、補正時間ΔT2を算出する。
ΔT2=Σ{w(i)×(実際の閉極時間(i)−予測閉極時間(i))}
(i=1〜n)
重み係数w(i)は総和が1となるようにする。重み係数については、閉極時間の変動に対する応答性をよくするために直近のデータに対する係数を大きくするのが望ましい。
【0038】
以上の値を用いて予測閉極時間18を算出する。
【0039】
予測閉極時間=T0+ΔT1+ΔT2
【0040】
次に、図1に示す閉極制御手段12の動作について説明する。
【0041】
閉極指令19が入力されると、遮断器2を目標点検出手段10により得られた目標閉極時刻17において閉極させるように制御信号20を出力する。閉極時間予測手段11により得られた予測閉極時間18は、制御信号20が出力されてから遮断器2が閉極するまでの時間の予測値であるので、目標閉極時刻17において閉極させるには、目標閉極時刻17から予測閉極時間18だけ前の時点で制御信号20を出力すればよい。
【0042】
目標閉極時刻17は複数点記憶されているので、それぞれの値を読み出して予測閉極時間18との差を取り、制御信号出力時刻の候補を算出する。制御信号出力時刻の候補の中で、現在時刻よりも後にあり、かつ最も現在時刻に近い時刻を一つえらびだし、制御信号出力時刻とする。そして、制御信号出力時刻において制御信号20を出力する。
【0043】
なお、この動作においては閉極指令19が入力されてから、制御信号20が出力されるまでの制御遅れ時間についての制限がない。例えば、高速再閉路のような責務においては、制御遅れ時間の最大値を規定することがある。負荷側電圧8が正弦波信号であり、その周波数が電源側電圧7の周波数に近い場合は目標閉極時刻17の出現時間間隔が大きくなるので、場合によっては制御遅れ時間の最大値以内に制御信号出力時刻の候補が存在しないことも想定される。
【0044】
よって、制御遅れ時間について最大値をあらかじめ設定しておき、この最大値以内に制御信号出力時刻の候補が存在しない場合は、強制的に制御信号20を出力するように動作してもよい。あるいは、現在時刻から予測閉極時間18以降に存在し、かつ最も直近の電源側電圧7の零点を目標閉極時刻17として制御信号20を出力するように動作してもよい。この場合は最適目標とはならないが、投入電圧は最悪でも負荷側電圧8のピーク値となるので、想定される過電圧の最悪条件を回避することが可能となる。
【0045】
すなわち、この実施の形態1に係る電力開閉制御装置は、遮断器2の電源側電圧と負荷側電圧の測定波形を関数近似し、この近似関数を用いて現在時刻以降の極間電圧を合成した波形から目標閉極時刻17を決定する目標点検出手段10と、前記遮断器2の閉極を行わせる制御信号20の出力時刻と、前記遮断器2と連動した補助スイッチ6の動作時刻の差に基づいて、前記遮断器2の閉極時間を計測する閉極時間計測手段16と、前記閉極時間計測手段16により計測された前回の閉極時間と、現在の環境温度、制御電圧、及び操作圧力に基づいて、次回の閉極時間の予測値である予測閉極時間18を予測する閉極時間予測手段11と、閉極指令19が入力されると、前記遮断器2を前記目標閉極時刻17において閉極させるように、前記目標閉極時刻17から前記予測閉極時間18だけ前の時点で前記制御信号20を前記遮断器2へ出力する閉極制御手段12等で構成したものである。
【0046】
この構成によれば、正確に極間電圧を予測した上で目標閉極時刻17が決定できるので、最適タイミングで遮断器投入を行えるという効果がある。よって、送電線投入時に発生する過電圧を抑制することができ、系統や機器にとって有害な現象の発生を防止する装置が提供できる。
【0047】
なお、上記の実施の形態1は遮断器2が単相であることを前提としたが、三相個別動作の遮断器についても、上記構成を各相毎に備えることで適用可能であることは言うまでもない。
【0048】
実施の形態2.
この発明の実施の形態2に係る電力開閉制御装置について図面を参照しながら説明する。図5は、この発明の実施の形態2に係る電力開閉制御装置の目標点検出手段の動作を示すフローチャートである。なお、構成は、上記実施の形態1と同様である。
【0049】
図5に示すように、図2と比較して、プレアーク補正(ステップ401)と、動作バラツキ補正(ステップ402)を新たに追加し、ステップ107の目標閉極時刻推定を一部改変して目標閉極時刻推定(ステップ403)としたものである。
【0050】
目標点検出手段10の動作を説明する。ステップ101〜106、及び108の処理は、前記実施の形態1と同様である。
【0051】
図6を用いて、遮断器2の特性について説明する。遮断器2を投入する際には、接触子の機械的な接触(閉極)前に先行放電によって主回路電流が流れ始めることが知られている。この先行放電を『プレアーク』と呼び、主回路電流が流れ始める瞬間を投入と読んでいる。投入時刻は遮断器2の接触子間に印加される電圧である極間電圧の絶対値に依存しており、同型遮断器についてはその特性は同一である。
【0052】
図6に示した耐電圧直線501は、目標閉極時刻A(502)に閉極させた遮断器における、ある時刻での接触子間の耐電圧値を示している。ある時刻において耐電圧値よりも極間電圧の絶対値が低い場合は、接触子間の耐電圧が上回っているため投入されないが、耐電圧直線と極間電圧の交点である図中の503では、接触子間の耐電圧が極間電圧に等しくなるのでプレアークが発生して、投入が行われる。最適投入タイミングは、投入電圧が最も低くなる瞬間であるため、このようなプレアーク特性を考慮した上で目標閉極時刻17を決定する必要がある。
【0053】
また、遮断器2には機械的な動作バラツキがあることが知られており、環境温度、制御電圧、操作圧力が一定条件においても、閉極時間は一定の広がりを持った正規分布状となる。例えば、目標閉極時刻B(504)に閉極させると、実際の閉極時刻が505に示した最小値から506に示した最大値となる可能性がある。例えば、505に示した閉極時刻であった場合は、投入時刻Bは507となり、高い投入電圧となってしまう。最適投入タイミングは、投入電圧が最も低くなる瞬間であるため、このような動作バラツキ特性を考慮した上で目標閉極時刻17を決定する必要がある。
【0054】
以上のような特性を考慮し、ステップ401のプレアーク補正の処理では、遮断器2のプレアーク特性を考慮して極間電圧の絶対値信号を補正した信号を求める。具体的な補正方法としては、耐電圧直線の方向に射影した信号への変換を行う。
【0055】
図7を用いて変換の一例を説明する。図7において、耐電圧直線606の傾きをkとする。電圧値ゼロの点601から開始して、耐電圧直線606上で1サンプリングずつ前の位置に移動していき、極間電圧の絶対値信号の値を超えた点602と、1点後ろの603との値を内挿することで交点604の値が得られる。この交点604の電圧値は、時刻601におけるプレアーク補正の結果であるので、交点604の電圧値と等しく、時刻601にあたる点605がプレアーク補正信号となる。これを全てのサンプリング点で繰り返し、図8中の極間電圧の絶対値701に対するプレアーク補正信号702を得る。
【0056】
次に、ステップ402の動作バラツキ補正の処理では、プレアーク補正処理で得られたプレアーク補正信号702に対して、さらに遮断器2の動作バラツキによる補正を行った信号を求める。予め適用する遮断器機種毎に最大動作バラツキ時間±Emsecを計測しておくものとする。
【0057】
図8に一例を示している。最大動作バラツキ時間が±Emsecである場合、プレアーク補正信号702に対して幅2Emsecの最大値フィルタを適用すればよい。最大値フィルタとは、フィルタ幅内の信号の最大値を出力するフィルタのことである。本処理を行った動作バラツキ補正信号を703に示す。この信号703は、E=1msecとした時の結果である。動作バラツキ補正信号703は、ある目標閉極時刻を狙って閉極させたときに、遮断器2の動作バラツキによって発生する可能性のある最大電圧値を示している。
【0058】
次に、ステップ403の目標閉極時刻推定の処理について説明する。図8に一例を示している。動作バラツキ補正信号703は、極間電圧の絶対値にプレアーク特性及び動作バラツキ特性を考慮した信号であり、この値が小さくなる時刻が最適な閉極タイミングとなる。そこで、動作バラツキ補正信号703に対して、あらかじめ設定しておいた閾値705以下となる時間領域を前から順に探していく。この閾値705以下となる時間領域は、図8中では領域A〜領域Cとなる。それぞれの領域において中間点を目標閉極時刻として選ぶ。例えば、領域Bにおける目標閉極時刻は706である。
【0059】
また、図8では、図示している時間範囲が短いため目標閉極時刻は706の1つしか選ばれていないが、実際においては現在時刻から一定時間内に複数の目標閉極時刻が選ばれる。そこで、これら全てを目標閉極時刻であるとして記憶しておく。
【0060】
このような構成によれば、遮断器特性を考慮して目標閉極時刻17を決定するようにしたので、最適タイミングで遮断器投入を行えるという効果がある。よって、送電線投入時に発生する過電圧を抑制することができ、系統や機器にとって有害な現象の発生を防止する装置が提供できる。
【0061】
実施の形態3.
この発明の実施の形態3に係る電力開閉制御装置について図面を参照しながら説明する。図9は、この発明の実施の形態3に係る電力開閉制御装置の構成を示す図である。
【0062】
上記実施の形態1に係る電力開閉制御装置においては、負荷側PT5として直流成分が直接測定可能なものを使用していたが、この実施の形態3では、例えばコンデンサ分圧型計器用変圧器のような電荷放電がなく、かつ直流成分が測定できない負荷側電圧計測手段801を使用しても、上記実施の形態1と同様の効果が得られるように構成したものである。
【0063】
図9において、図1の実施の形態1と比較して、電荷放電がなく、かつ直流成分が測定できない負荷側電圧計測手段801と、変流器802により測定される主回路電流803を用いて、直流電圧を推定する直流電圧推定手段805を追加したものである。
【0064】
図10に動作の一例を示す。負荷側電圧計測手段801により測定された信号が負荷側電圧901、変流器802により測定された信号803が主回路電流902である。送電線3は分路リアクトル補償されておらず、遮断後の負荷側に電荷が残留し、負荷側電圧の真値が直流電圧となる例を示している。負荷側電圧計測手段801は直流電圧が測定できないので、負荷側電圧901は遮断直後に一定の時定数をもった減衰信号として観測されることになる。
【0065】
負荷側電圧901および主回路電流902については、常に現在時刻から一定時間前までのデータを記憶しておく。そして、補助スイッチ6が閉から開へ変化するのを検知すると、一定時間経過した時点でデータの記憶を停止する。これにより、図10に示したような遮断時刻903前後の信号を記憶することができる。以下の処理ではこの記憶データを使用する。
【0066】
まず、主回路電流902において電流ゼロとなる点である遮断時刻903を見つける。次に、負荷側電圧901について、遮断時刻903から一定時間の電圧値の複数サンプリング点を用いて関数近似する。直流成分があった場合は、遮断直後に一定の時定数で電圧値が減衰する様子が観測されるので、例えば、電圧値=K×exp(−α×時間)について前記複数サンプリング点を最小自乗近似してK、αを求め、近似関数905を作成する。得られた近似関数905より、遮断時刻903における電圧値を求め、直流電圧推定値904とする。
【0067】
そして、目標点検出手段10は、図2中の負荷側電圧側のステップ105において直流振幅を算出していた処理に代わり、この直流電圧推定値904を用いるようにすればよい。
【0068】
いままでの説明では、送電線3が分路リアクトル非補償であり、負荷側電圧が直流電圧となる例を示したが、送電線3が分路リアクトル補償されている場合においては、負荷側電圧は直流電圧ゼロであり正弦波信号となる。この場合、近似関数905は、K=0、すなわち電圧値=0と推定されるので、同様の処理で扱うことができる。
【0069】
なお、電源側電圧計測手段4については、遮断器2を開閉する状況下において直流成分は通常ゼロ値であるので、電圧計測手段の種類に関らず、上記処理を行う必要はない。
【0070】
このような構成によれば、電荷放電がなく、かつ直流成分が測定できない電圧計測手段を使用しても、遮断後に残留している負荷側電圧の直流成分値がわかるようになるので、最適タイミングで遮断器投入を行う装置を容易に構成できるという効果がある。
【0071】
【発明の効果】
この発明に係る電力開閉制御装置は、以上説明したとおり、計測した遮断器の電源側電圧信号及び負荷側電圧信号が正弦波信号の場合には前記電圧信号の零点時刻間隔の平均値の逆数をとって2倍した値を周波数として算出し、前記電圧信号の複数の零点時刻の中から、負から正に変化する零点で最も新しい時刻の値を位相0度の時刻として算出し、かつ、前記電圧信号を周期積分して求めた実効値の√2倍を振幅として算出し、以上の算出値を用いて、位相0度の時刻t=0として電圧値=振幅×sin(2π×周波数×t)と前記電圧信号を関数近似し、この近似関数に基づいて現在時刻以降の電圧信号を外挿して現在時刻から一定時間後までの推定した電源側電圧信号及び負荷側電圧信号を得て、前記推定した電源側電圧信号及び負荷側電圧信号の差の絶対値を取った信号である極間電圧の絶対値を推定し、この推定した現在時刻から一定時間後までの極間電圧の絶対値について、あらかじめ設定しておいた閾値以下となる時間領域を現在時刻から一定時間後まで順に探し出し、探し出した時間領域の中であらかじめ設定しておいた長さ以上の時間領域を選び出し、前記長さ以上の時間領域の中間点を目標閉極時刻として決定する目標点検出手段と、前記遮断器の閉極を行わせる制御信号の出力時刻と、前記遮断器と連動した補助スイッチの動作時刻の差に基づいて、前記遮断器の閉極時間を計測する閉極時間計測手段と、前記閉極時間計測手段により計測された前回の閉極時間と、現在の環境温度、制御電圧、及び操作圧力に基づいて、次回の閉極時間の予測値である予測閉極時間を予測する閉極時間予測手段と、閉極指令が入力されると、前記遮断器を前記目標閉極時刻において閉極させるように、前記目標閉極時刻から前記予測閉極時間だけ前の時点で前記制御信号を前記遮断器へ出力する閉極制御手段とを備えたので、最適タイミングで遮断器投入を行うことができ、送電線投入時に発生する過電圧を抑制することができ、系統や機器にとって有害な現象の発生を防止することができるという効果を奏する。
【0072】
また、この発明に係る電力開閉制御装置は、以上説明したとおり、前記目標点検出手段が、前記極間電圧を合成した波形に対して、前記遮断器のプレアーク特性に基づいた信号変換、及び前記遮断器の機械的動作バラツキに基づいた信号変換を行った上で前記目標閉極時刻を決定するので、最適タイミングで遮断器投入を行うことができ、送電線投入時に発生する過電圧を抑制することができ、系統や機器にとって有害な現象の発生を防止することができるという効果を奏する。
【図面の簡単な説明】
【図1】 この発明の実施の形態1に係る電力開閉制御装置の構成を示す図である。
【図2】 この発明の実施の形態1に係る電力開閉制御装置の目標点検出手段の動作を示すフローチャートである。
【図3】 この発明の実施の形態1に係る電力開閉制御装置の動作を示すタイミングチャートである。
【図4】 この発明の実施の形態1に係る電力開閉制御装置の動作を示すタイミングチャートである。
【図5】 この発明の実施の形態2に係る電力開閉制御装置の目標点検出手段の動作を示すフローチャートである。
【図6】 この発明の実施の形態2に係る電力開閉制御装置の動作を示すタイミングチャートである。
【図7】 この発明の実施の形態2に係る電力開閉制御装置の動作を示すタイミングチャートである。
【図8】 この発明の実施の形態2に係る電力開閉制御装置の動作を示すタイミングチャートである。
【図9】 この発明の実施の形態3に係る電力開閉制御装置の構成を示す図である。
【図10】 この発明の実施の形態3に係る電力開閉制御装置の動作を示すタイミングチャートである。
【符号の説明】
1 主回路、2 遮断器、3 送電線、4 電源側電圧計測手段、5 負荷側電圧計測手段、6 補助スイッチ、10 目標点検出手段、11 閉極時間予測手段、12 閉極、13 環境温度計測手段、14 制御電圧計測手段、15 操作圧力計測手段、16 閉極時間計測手段、805 直流電圧推定手段。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a power switching control device that controls the switching timing of a power switching device such as a circuit breaker, and more particularly to a power switching control device that suppresses an overvoltage generated when a transmission line is turned on.
[0002]
[Prior art]
The conventional power switching control device suppresses overvoltage when the circuit breaker is turned on by controlling the timing for closing the circuit breaker with reference to the zero point of the power supply side voltage. Such a power switching control device is shown, for example, in Japanese Patent No. 2892717.
[0003]
For example, it is known that electric charges remain in a healthy phase when an accident is interrupted in a transmission line. In this case, various voltages are generated not only on the power source side of the circuit breaker but also on the load side of the circuit breaker according to the transmission line conditions. For example, a sine wave voltage having a constant frequency is generated in the load side voltage of the shunt reactor compensated transmission line, and a DC voltage is generated in the shunt reactor non-compensated transmission line. Under such circumstances, in order to suppress the overvoltage when the circuit breaker is turned on, the circuit breaker may be closed so that the difference between the power supply side voltage and the load side voltage is turned on.
[0004]
However, in such a power switching control device, since only the zero point of the power supply side voltage is used as a reference, there is a drawback in that the overvoltage when the circuit breaker is turned on cannot be suppressed depending on the state of the load side voltage.
[0005]
According to the document “Controlled Closing on Shunt Reactor Compensated Transmission Lines”, a method of measuring a power supply side voltage and a load side voltage, respectively, and controlling a closing timing of a circuit breaker using a waveform pattern of an interelectrode voltage that is a difference between them. It is shown. According to this, it is shown that the zero point cycle of the voltage waveform pattern is examined by using pattern matching and the optimum input timing is predicted.
[0006]
In this document, the concept of measuring the power supply side voltage and the load side voltage, examining the waveform pattern of the interelectrode voltage, which is the difference between them, and controlling the circuit breaker closing timing, and the method for obtaining the zero cycle of the voltage waveform pattern Is described, but a specific implementation method for determining the optimal closing timing is not shown.
[0007]
Further, since the pre-arc characteristic of the circuit breaker and the mechanical operation variation characteristic of the circuit breaker are not taken into account, there is a drawback that overvoltage at the time of application cannot be suppressed depending on the characteristics of the circuit breaker.
[0008]
[Problems to be solved by the invention]
In the conventional power switching control device as described above, since only the zero point of the power supply side voltage is used as a reference, there is a problem that overvoltage at the time of turning on the circuit breaker cannot be suppressed depending on the state of the load side voltage.
[0009]
In addition, in another conventional power switching control device as described above, the pre-arc characteristic of the circuit breaker and the mechanical operation variation characteristic of the circuit breaker are not considered. There was a problem that it could not be suppressed.
[0010]
The present invention has been made to solve the above-described problems, and obtains a power switching control device capable of turning on a circuit breaker at an optimum timing and, in turn, suppressing an overvoltage generated when a transmission line is turned on. For the purpose.
[0011]
[Means for Solving the Problems]
The power switching control device according to the present invention is: When the measured power supply side voltage signal and load side voltage signal of the circuit breaker are sine wave signals, the value obtained by taking the inverse of the average value of the zero point time interval of the voltage signal and doubling the value is calculated as the frequency signal. The most recent time value at the zero point that changes from negative to positive is calculated as the time of phase 0 degree, and the effective value obtained by periodically integrating the voltage signal is √2 times Is calculated as an amplitude, and the voltage value = amplitude × sin (2π × frequency × t) and the voltage signal are approximated by function using the above calculated value and a time t = 0 of phase 0 degree, and based on this approximate function Extrapolating the voltage signal after the current time to obtain the estimated power-side voltage signal and load-side voltage signal from the current time until a certain time later, and the absolute difference between the estimated power-side voltage signal and load-side voltage signal The absolute value of the interelectrode voltage, which is a signal that takes a value The absolute value of the interelectrode voltage from the estimated current time to a certain time later is sequentially searched for a time region that is less than or equal to a preset threshold value from the current time until a certain time later, and Select a time region that is longer than the preset length, and set the middle point of the time region longer than the length as the target closing time. The closing time of the circuit breaker is measured based on the difference between the target point detection means to be determined, the output time of the control signal for closing the circuit breaker, and the operation time of the auxiliary switch linked to the circuit breaker. A predicted closing time based on the previous closing time measured by the closing time measuring means, the current closing temperature, the control voltage, and the operating pressure. Closing time prediction means for predicting a predicted closing time, and when a closing command is input, the predicted closing time from the target closing time so as to close the circuit breaker at the target closing time. And a closing control means for outputting the control signal to the circuit breaker at a point just before.
[0012]
Further, in the power switching control device according to the present invention, the target point detection means performs signal conversion based on a pre-arc characteristic of the circuit breaker with respect to a waveform obtained by synthesizing the voltage between the electrodes, and mechanical of the circuit breaker. The target closing time is determined after performing signal conversion based on operation variation.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Embodiment 1 FIG.
A power switching control apparatus according to Embodiment 1 of the present invention will be described with reference to the drawings. 1 is a diagram showing a configuration of a power switching control apparatus according to Embodiment 1 of the present invention. In addition, in each figure, the same code | symbol shows the same or equivalent part.
[0015]
In FIG. 1, 1 is a main circuit, 2 is a circuit breaker, 3 is a power transmission line, 4 is power supply side voltage measurement means, 5 is load side voltage measurement means, 6 is an auxiliary switch, 7 is power supply side voltage, and 8 is load side. Voltage. As the power supply side voltage measuring means 4, a common AC voltage measuring sensor is used in a high voltage circuit. As the load side voltage measuring means 5, a sensor capable of directly measuring an AC voltage and a DC voltage component in a high voltage circuit is used.
[0016]
In the figure, 10 is a target point detecting means, 11 is a closing time predicting means, 12 is a closing control means, 13 is an environmental temperature measuring means, 14 is a control voltage measuring means, 15 is an operating pressure measuring means, 16 Is a closing time measuring means, 17 is a target closing time, 18 is a predicted closing time, 19 is a closing command, and 20 is a control signal.
[0017]
Further, in the figure, the target point detection means 10 includes a target closing time 17 based on the power supply side voltage 7 measured by the power supply side voltage measurement means 4 and the load side voltage 8 measured by the load side voltage measurement means 5. Is output.
[0018]
The closing time measuring means 16 measures the closing time of the circuit breaker 2 from the control signal 20 for closing the circuit breaker 2 and the auxiliary switch 6 interlocked with the movable contact of the circuit breaker 2.
[0019]
The closing time prediction means 11 is measured by the control voltage measuring means 14, the closing time at the previous closing time calculated by the closing time measuring means 16, the environmental temperature measured by the environmental temperature measuring means 13, and the control voltage measuring means 14. Based on the control voltage and the operating pressure measured by the operating pressure measuring means 15, a predicted closing time 18 that is a predicted value of the closing time of the circuit breaker 2 at the next closing time is output.
[0020]
When the closing command 19 is input, the closing control unit 12 controls the circuit breaker 2 at the time before the predicted closing time 18 from the target closing time 17 so that the circuit breaker 2 is closed at the target closing time 17. The signal 20 is output.
[0021]
Next, the operation of the power switching control device according to the first embodiment will be described with reference to the drawings.
[0022]
FIG. 2 is a flowchart showing the operation of the target point detecting means of the power switching control apparatus according to Embodiment 1 of the present invention.
[0023]
In step 101, the analog signals of the power supply side voltage 7 and the load side voltage 8 are discretized at a predetermined sampling interval by an A / D converter, and a voltage signal for a predetermined time is stored.
[0024]
Next, in step 102, a plurality of zero time points that are points where the sign of the obtained voltage signal has changed from negative to positive or from positive to negative are detected and stored.
[0025]
Next, in step 103, it is determined whether the voltage signal is a sine wave signal or a DC signal. For example, all time intervals between a plurality of stored zero time points are calculated. If all the time intervals are within a certain range, it is regarded as a sine wave signal because it is oscillating at a constant frequency centering on zero. Otherwise, it is considered as a DC signal. The power density for each frequency is calculated by performing a fast Fourier transform (FFT) on the voltage signal. If the power within a certain frequency range is greater than a certain value, it can be regarded as a sine wave signal, otherwise it can be regarded as a DC signal. Good.
[0026]
Next, in step 104, if it is a sine wave signal, the frequency, phase and amplitude of the signal are calculated. For example, the average value of the zero point time intervals is obtained from the plurality of zero point times stored in step 102. Since a zero point is obtained for each half cycle in a sine wave signal, a value obtained by taking the reciprocal of the average value of the zero point time interval and doubling it can be used as the frequency. As for the phase, the value of the newest time at the zero that changes from negative to positive among the plurality of zero times stored in step 102 is stored as the time of phase 0 degree. As for the amplitude, the effective value may be obtained by periodically integrating the voltage signal, and √2 times the amplitude. When the above calculated values are used, the voltage signal can be approximated as voltage value = amplitude × sin (2π × frequency × t) with time t = 0 of phase 0 degree.
[0027]
On the other hand, if it is a DC signal in step 105, for example, the time average value of the voltage signal is calculated as the DC amplitude.
[0028]
Next, in step 106, an inter-electrode voltage signal from the current time to a certain time later is estimated. FIG. 3 shows an example of a time waveform graph. In FIG. 3, the load side voltage is assumed to be a sine wave signal. In FIG. 3, 206 is the current time, 201 is the measured power supply side voltage, and 202 is the measured load side voltage. Since the sinusoidal signals 201 and 202 are approximated by function in step 104, the voltage signal after the current time is extrapolated using the approximate function to obtain the estimated power supply side voltage 203 and the estimated load side voltage 204. Then, the absolute value 205 of the interelectrode voltage, which is a signal obtained by taking the absolute value of the difference between the power supply side voltage signal 203 and the load side voltage signal 204, is calculated.
[0029]
Next, in step 107, the target closing time from the current time to a certain time later is estimated. An example is shown in FIG. In FIG. 4, a signal 304 represents the absolute value of the interelectrode voltage at each time, and the time when this value decreases becomes the optimal closing timing. Therefore, a time region in which the absolute value signal 304 of the interelectrode voltage is equal to or less than a preset threshold A (301) is searched in order from the front. Time regions that are equal to or less than the threshold value A are regions A to G. Among these, a time region longer than a preset length is selected. Here, it is assumed that only the region E is selected. Finally, the intermediate point 303 of the region E is selected as the target closing time 17. If there is no time region longer than the length set in advance by the threshold A, the threshold B (302) higher than the threshold A is changed to perform the same processing. Further, in FIG. 4, since the illustrated time range is short, only one target closing time 17 is selected as 303, but actually, a plurality of target closing times 17 are within a certain time from the current time. To be elected. Therefore, all these are stored as the target closing time 17.
[0030]
Next, in step 108, the target closing time 17 is updated. Since the target point detection process is repeatedly performed at regular intervals, it is necessary to update the target closing time 17 calculated in the previous target point detection process every time the process is performed. Assuming that the latest result is correct, all the target closing times calculated in the previous target point detection process are erased, and a process of rewriting all at the target closing time 17 calculated in the current process is performed.
[0031]
Next, the operation of the closing time measuring means 16 shown in FIG. 1 will be described.
[0032]
The closing time is calculated by taking the difference between the operation time of the auxiliary switch 6 that operates in conjunction with the movable contact of the circuit breaker 2 and the time when the control signal 20 is output. Although the auxiliary switch 6 is used as the closing time measuring means 16, the rotation angle measuring means such as a rotary encoder is provided on the rotating shaft of the movable contactor driving unit of the circuit breaker 2, and the position of the movable contact obtained from this is measured. The closing time may be calculated from the signal. By providing the rotation angle measuring means, it is possible to easily monitor the operation of the circuit breaker mechanism.
[0033]
Next, the operation of the closing time prediction means 11 shown in FIG. 1 will be described.
[0034]
The closing time fluctuation of the circuit breaker 2 depends on environmental conditions such as environmental temperature, control voltage, and operating pressure, and a common fluctuation time correction can be performed for the same type of circuit breaker, contact wear, change over time, Further, the circuit breaker can be separated into portions that need to be corrected individually, depending on the state change of each circuit breaker such as a minute individual difference. Therefore, for the predicted closing time, which is the predicted value of the closing time of the circuit breaker 2 at the next closing time, the correction time ΔT1 based on the environmental conditions of the environmental temperature, the control voltage, and the operating pressure, and the past operation history Correction is performed based on the correction time ΔT2 based on it.
[0035]
Specifically, a reference closing time T0, which is an average value of closing times, is measured in advance at a constant environmental temperature, control voltage, and operating pressure conditions. Further, the ambient temperature, the control voltage, and the operating pressure conditions are changed in advance to close the pole, and the average value of the closing time at that time is stored in the table as a difference value with respect to the reference closing time T0.
[0036]
During operation, based on the environmental temperature measured by the environmental temperature measuring means 13, the control voltage measured by the control voltage measuring means 14, and the operating pressure measured by the operating pressure measuring means 15, The correction time ΔT1 based on the environmental conditions is calculated.
[0037]
Further, with respect to the actual closing time obtained by the closing time measuring means 16 and the predicted closing time at the time of the operation, an error for the past n times (for example, the past 10 times) is obtained, and the error is weighted. Then, the correction time ΔT2 based on the past operation history is calculated. That is, the correction time ΔT2 is calculated by multiplying the error in the past i-th operation by the weighting coefficient w (i) and adding it over the past n times.
ΔT2 = Σ {w (i) × (actual closing time (i) −predicted closing time (i))}
(I = 1 to n)
The sum of weighting factors w (i) is set to 1. As for the weighting coefficient, it is desirable to increase the coefficient for the most recent data in order to improve the response to fluctuations in the closing time.
[0038]
The predicted closing time 18 is calculated using the above values.
[0039]
Estimated closing time = T0 + ΔT1 + ΔT2
[0040]
Next, the operation of the closing control means 12 shown in FIG. 1 will be described.
[0041]
When the closing command 19 is input, the control signal 20 is output so that the circuit breaker 2 is closed at the target closing time 17 obtained by the target point detection means 10. The predicted closing time 18 obtained by the closing time prediction means 11 is a predicted value of the time from when the control signal 20 is output until the circuit breaker 2 is closed. In order to do this, the control signal 20 may be output at a point in time before the predicted closing time 18 from the target closing time 17.
[0042]
Since a plurality of target closing times 17 are stored, each value is read out, and the difference from the predicted closing time 18 is calculated to calculate a control signal output time candidate. Among the control signal output time candidates, one time that is later than the current time and closest to the current time is selected and set as the control signal output time. Then, the control signal 20 is output at the control signal output time.
[0043]
In this operation, there is no restriction on the control delay time from when the closing command 19 is input until the control signal 20 is output. For example, in duties such as high-speed reclosing, the maximum value of the control delay time may be specified. When the load side voltage 8 is a sine wave signal and its frequency is close to the frequency of the power source side voltage 7, the appearance time interval of the target closing time 17 becomes large. It is also assumed that there is no signal output time candidate.
[0044]
Therefore, a maximum value may be set in advance for the control delay time, and if there is no control signal output time candidate within this maximum value, the control signal 20 may be forcibly output. Alternatively, the control signal 20 may be output so that the zero point of the latest power supply side voltage 7 that exists after the predicted closing time 18 from the current time is the target closing time 17. In this case, the target is not an optimum target, but the input voltage has the peak value of the load side voltage 8 at worst, so that the worst condition of the assumed overvoltage can be avoided.
[0045]
That is, the power switching control device according to the first embodiment approximates the measured waveforms of the power supply side voltage and the load side voltage of the circuit breaker 2 as a function, and synthesizes the interpolar voltage after the current time using this approximate function The difference between the target point detection means 10 for determining the target closing time 17 from the waveform, the output time of the control signal 20 for closing the circuit breaker 2, and the operation time of the auxiliary switch 6 linked to the circuit breaker 2 The closing time measuring means 16 for measuring the closing time of the circuit breaker 2, the previous closing time measured by the closing time measuring means 16, the current environmental temperature, the control voltage, and When a closing time prediction means 11 for predicting a predicted closing time 18 that is a predicted value of the next closing time based on the operating pressure and a closing command 19 are input, the circuit breaker 2 is closed to the target closing time. In order to close at the extreme time 17, It is obtained by constituting the control signal 20 at such closing control unit 12 to be output to the circuit breaker 2 at a time prior only the predicted closing time 18 from target closing time 17.
[0046]
According to this configuration, since the target closing time 17 can be determined after accurately predicting the inter-electrode voltage, the circuit breaker can be turned on at the optimum timing. Therefore, an overvoltage generated when the transmission line is turned on can be suppressed, and an apparatus that prevents the occurrence of a phenomenon harmful to the system or equipment can be provided.
[0047]
In addition, although said Embodiment 1 presupposed that the circuit breaker 2 is a single phase, it is applicable also about the circuit breaker of a three-phase individual operation | movement by providing the said structure for every phase. Needless to say.
[0048]
Embodiment 2. FIG.
A power switching control apparatus according to Embodiment 2 of the present invention will be described with reference to the drawings. FIG. 5 is a flowchart showing the operation of the target point detection means of the power switching control apparatus according to Embodiment 2 of the present invention. The configuration is the same as that of the first embodiment.
[0049]
As shown in FIG. 5, compared with FIG. 2, pre-arc correction (step 401) and operation variation correction (step 402) are newly added, and the target closing time estimation in step 107 is partially modified to achieve the target The closing time is estimated (step 403).
[0050]
The operation of the target point detection means 10 will be described. The processing in steps 101 to 106 and 108 is the same as that in the first embodiment.
[0051]
The characteristic of the circuit breaker 2 is demonstrated using FIG. When the circuit breaker 2 is turned on, it is known that the main circuit current starts to flow due to the preceding discharge before the contact (mechanical closing) of the contact. This pre-discharge is called “pre-arc” and the moment when the main circuit current begins to flow is read as “on”. The closing time depends on the absolute value of the interelectrode voltage, which is a voltage applied between the contacts of the circuit breaker 2, and the characteristics of the same type of circuit breaker are the same.
[0052]
The withstand voltage straight line 501 shown in FIG. 6 shows the withstand voltage value between the contacts at a certain time in the circuit breaker closed at the target closing time A (502). When the absolute value of the interelectrode voltage is lower than the withstand voltage value at a certain time, it is not inserted because the withstand voltage between the contacts is higher, but at 503 in the figure which is the intersection of the withstand voltage straight line and the interelectrode voltage Since the withstand voltage between the contacts becomes equal to the inter-electrode voltage, a pre-arc is generated and charging is performed. Since the optimum closing timing is the moment when the closing voltage becomes the lowest, it is necessary to determine the target closing time 17 in consideration of such pre-arc characteristics.
[0053]
In addition, it is known that the circuit breaker 2 has mechanical operation variations, and the closing time has a normal distribution with a certain spread even when the environmental temperature, the control voltage, and the operation pressure are constant. . For example, when closing at the target closing time B (504), the actual closing time may be changed from the minimum value indicated at 505 to the maximum value indicated at 506. For example, in the case of the closing time shown in 505, the closing time B is 507, which is a high closing voltage. Since the optimal closing timing is the moment when the closing voltage is lowest, it is necessary to determine the target closing time 17 in consideration of such operation variation characteristics.
[0054]
In consideration of the above characteristics, in the pre-arc correction process in step 401, a signal obtained by correcting the absolute value signal of the interelectrode voltage in consideration of the pre-arc characteristics of the circuit breaker 2 is obtained. As a specific correction method, conversion to a signal projected in the direction of the withstand voltage straight line is performed.
[0055]
An example of conversion will be described with reference to FIG. In FIG. 7, the slope of the withstand voltage line 606 is k. Starting from a point 601 having a voltage value of zero, the voltage moves to the previous position by one sampling on the withstand voltage straight line 606, and a point 602 that exceeds the absolute value signal value of the interelectrode voltage and 603 that is one point behind The value of the intersection point 604 is obtained by interpolating the values of. Since the voltage value at the intersection 604 is the result of the pre-arc correction at time 601, it is equal to the voltage value at the intersection 604, and the point 605 corresponding to the time 601 is a pre-arc correction signal. This is repeated at all sampling points to obtain a pre-arc correction signal 702 for the absolute value 701 of the interelectrode voltage in FIG.
[0056]
Next, in the operation variation correction processing in step 402, a signal obtained by further correcting the pre-arc correction signal 702 obtained by the pre-arc correction processing by the operation variation of the circuit breaker 2 is obtained. The maximum operation variation time ± Emsec is measured for each circuit breaker model to be applied in advance.
[0057]
An example is shown in FIG. When the maximum operation variation time is ± Emsec, a maximum value filter having a width of 2 Emsec may be applied to the pre-arc correction signal 702. The maximum value filter is a filter that outputs the maximum value of the signal within the filter width. An operation variation correction signal subjected to this processing is indicated by 703. This signal 703 is the result when E = 1 msec. The operation variation correction signal 703 indicates the maximum voltage value that may be generated due to operation variation of the circuit breaker 2 when the target circuit is closed with a target closing time.
[0058]
Next, the target closing time estimation process in step 403 will be described. An example is shown in FIG. The operation variation correction signal 703 is a signal that takes into account the pre-arc characteristic and the operation variation characteristic with respect to the absolute value of the inter-electrode voltage, and the time when the value becomes smaller is the optimum closing timing. Therefore, a time region in which the operation variation correction signal 703 is equal to or less than a preset threshold value 705 is searched in order from the front. The time regions in which the threshold value 705 is equal to or less than these are regions A to C in FIG. In each region, the intermediate point is selected as the target closing time. For example, the target closing time in the region B is 706.
[0059]
Further, in FIG. 8, since the illustrated time range is short, only one target closing time 706 is selected, but actually, a plurality of target closing times are selected within a certain time from the current time. . Therefore, all these are stored as the target closing time.
[0060]
According to such a configuration, since the target closing time 17 is determined in consideration of the circuit breaker characteristics, there is an effect that the circuit breaker can be turned on at the optimum timing. Therefore, an overvoltage generated when the transmission line is turned on can be suppressed, and an apparatus that prevents the occurrence of a phenomenon harmful to the system or equipment can be provided.
[0061]
Embodiment 3 FIG.
A power switching control apparatus according to Embodiment 3 of the present invention will be described with reference to the drawings. FIG. 9 is a diagram showing the configuration of the power switching control apparatus according to Embodiment 3 of the present invention.
[0062]
In the power switching control device according to the first embodiment, a load-side PT5 that can directly measure a DC component is used. However, in the third embodiment, for example, a capacitor voltage dividing instrument transformer is used. Even when the load-side voltage measuring means 801 that does not cause a significant charge discharge and cannot measure a direct current component is used, the same effects as those of the first embodiment can be obtained.
[0063]
9, compared with the first embodiment of FIG. 1, the load-side voltage measuring unit 801 that does not discharge charges and cannot measure the DC component, and the main circuit current 803 measured by the current transformer 802 are used. , DC voltage estimating means 805 for estimating the DC voltage is added.
[0064]
FIG. 10 shows an example of the operation. The signal measured by the load side voltage measuring means 801 is the load side voltage 901, and the signal 803 measured by the current transformer 802 is the main circuit current 902. In the example, the transmission line 3 is not compensated for the shunt reactor, the electric charge remains on the load side after the interruption, and the true value of the load side voltage becomes a DC voltage. Since the load-side voltage measuring unit 801 cannot measure a DC voltage, the load-side voltage 901 is observed as an attenuation signal having a certain time constant immediately after being cut off.
[0065]
As for the load side voltage 901 and the main circuit current 902, data from the current time to a certain time before is always stored. When it is detected that the auxiliary switch 6 changes from closed to open, the storage of data is stopped when a certain time has elapsed. As a result, a signal around the cutoff time 903 as shown in FIG. 10 can be stored. This stored data is used in the following processing.
[0066]
First, a cutoff time 903, which is a point where the current becomes zero in the main circuit current 902, is found. Next, the load side voltage 901 is approximated by a function using a plurality of sampling points having a voltage value for a predetermined time from the cutoff time 903. When there is a direct current component, it is observed that the voltage value is attenuated with a constant time constant immediately after the interruption, so that, for example, the plurality of sampling points are set to the least squares for voltage value = K × exp (−α × time). Approximate K and α are obtained, and an approximate function 905 is created. From the obtained approximate function 905, a voltage value at the cutoff time 903 is obtained and set as a DC voltage estimated value 904.
[0067]
Then, the target point detection means 10 may use this DC voltage estimated value 904 instead of the process of calculating the DC amplitude in step 105 on the load side voltage side in FIG.
[0068]
In the description so far, the example in which the transmission line 3 is uncompensated for the shunt reactor and the load side voltage is a DC voltage is shown. However, when the transmission line 3 is compensated for the shunt reactor, Is a DC voltage zero and becomes a sine wave signal. In this case, since the approximate function 905 is estimated as K = 0, that is, the voltage value = 0, it can be handled by the same processing.
[0069]
Note that the power source side voltage measuring means 4 does not need to perform the above process regardless of the type of the voltage measuring means because the direct current component is normally zero when the circuit breaker 2 is opened and closed.
[0070]
According to such a configuration, the DC component value of the load-side voltage remaining after the shut-off can be known even when using voltage measuring means that does not discharge charges and cannot measure the DC component. Thus, it is possible to easily configure a device for closing the circuit breaker.
[0071]
【The invention's effect】
As described above, the power switching control device according to the present invention is as follows. When the measured power supply side voltage signal and load side voltage signal of the circuit breaker are sine wave signals, the value obtained by taking the inverse of the average value of the zero point time interval of the voltage signal and doubling the value is calculated as the frequency signal. The most recent time value at the zero point that changes from negative to positive is calculated as the time of phase 0 degree, and the effective value obtained by periodically integrating the voltage signal is √2 times Is calculated as an amplitude, and the voltage value = amplitude × sin (2π × frequency × t) and the voltage signal are approximated by function using the above calculated value and a time t = 0 of phase 0 degree, and based on this approximate function Extrapolating the voltage signal after the current time to obtain the estimated power-side voltage signal and load-side voltage signal from the current time until a certain time later, and the absolute difference between the estimated power-side voltage signal and load-side voltage signal The absolute value of the interelectrode voltage, which is a signal that takes a value The absolute value of the interelectrode voltage from the estimated current time to a certain time later is sequentially searched for a time region that is less than or equal to a preset threshold value from the current time until a certain time later, and Select a time region that is longer than the preset length, and set the middle point of the time region longer than the length as the target closing time. The closing time of the circuit breaker is measured based on the difference between the target point detection means to be determined, the output time of the control signal for closing the circuit breaker, and the operation time of the auxiliary switch linked to the circuit breaker. A predicted closing time based on the previous closing time measured by the closing time measuring means, the current closing temperature, the control voltage, and the operating pressure. Closing time prediction means for predicting a predicted closing time, and when a closing command is input, the predicted closing time from the target closing time so as to close the circuit breaker at the target closing time. Since it is equipped with a closing control means for outputting the control signal to the circuit breaker at a point just before, the circuit breaker can be turned on at the optimum timing, and the overvoltage generated when the power transmission line is turned on can be suppressed. Harmful to systems and equipment An effect that it is possible to prevent the occurrence.
[0072]
In addition, as described above, the power switching control device according to the present invention is configured such that the target point detection unit performs signal conversion based on the pre-arc characteristic of the circuit breaker with respect to the waveform obtained by synthesizing the inter-electrode voltage, and the Since the target closing time is determined after performing signal conversion based on the mechanical operation variation of the circuit breaker, the circuit breaker can be turned on at the optimum timing, and the overvoltage generated when the power line is turned on can be suppressed. It is possible to prevent the occurrence of a phenomenon that is harmful to the system and equipment.
[Brief description of the drawings]
FIG. 1 is a diagram showing a configuration of a power switching control apparatus according to Embodiment 1 of the present invention.
FIG. 2 is a flowchart showing the operation of target point detection means of the power switching control apparatus according to Embodiment 1 of the present invention.
FIG. 3 is a timing chart showing an operation of the power switching control device according to the first embodiment of the present invention.
FIG. 4 is a timing chart showing an operation of the power switching control apparatus according to the first embodiment of the present invention.
FIG. 5 is a flowchart showing the operation of target point detection means of the power switching control apparatus according to Embodiment 2 of the present invention.
FIG. 6 is a timing chart showing an operation of the power switching control apparatus according to the second embodiment of the present invention.
FIG. 7 is a timing chart showing an operation of the power switching control apparatus according to the second embodiment of the present invention.
FIG. 8 is a timing chart showing an operation of the power switching control apparatus according to the second embodiment of the present invention.
FIG. 9 is a diagram showing a configuration of a power switching control apparatus according to Embodiment 3 of the present invention.
FIG. 10 is a timing chart showing an operation of the power switching control apparatus according to the third embodiment of the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Main circuit, 2 Circuit breaker, 3 Transmission line, 4 Power supply side voltage measurement means, 5 Load side voltage measurement means, 6 Auxiliary switch, 10 Target point detection means, 11 Closure time prediction means, 12 Closure, 13 Environment temperature Measuring means, 14 Control voltage measuring means, 15 Operating pressure measuring means, 16 Closing time measuring means, 805 DC voltage estimating means.

Claims (2)

計測した遮断器の電源側電圧信号及び負荷側電圧信号が正弦波信号の場合には前記電圧信号の零点時刻間隔の平均値の逆数をとって2倍した値を周波数として算出し、前記電圧信号の複数の零点時刻の中から、負から正に変化する零点で最も新しい時刻の値を位相0度の時刻として算出し、かつ、前記電圧信号を周期積分して求めた実効値の√2倍を振幅として算出し、以上の算出値を用いて、位相0度の時刻t=0として電圧値=振幅×sin(2π×周波数×t)と前記電圧信号を関数近似し、この近似関数に基づいて現在時刻以降の電圧信号を外挿して現在時刻から一定時間後までの推定した電源側電圧信号及び負荷側電圧信号を得て、前記推定した電源側電圧信号及び負荷側電圧信号の差の絶対値を取った信号である極間電圧の絶対値を推定し、この推定した現在時刻から一定時間後までの極間電圧の絶対値について、あらかじめ設定しておいた閾値以下となる時間領域を現在時刻から一定時間後まで順に探し出し、探し出した時間領域の中であらかじめ設定しておいた長さ以上の時間領域を選び出し、前記長さ以上の時間領域の中間点を目標閉極時刻として決定する目標点検出手段と、
前記遮断器の閉極を行わせる制御信号の出力時刻と、前記遮断器と連動した補助スイッチの動作時刻の差に基づいて、前記遮断器の閉極時間を計測する閉極時間計測手段と、
前記閉極時間計測手段により計測された前回の閉極時間と、現在の環境温度、制御電圧、及び操作圧力に基づいて、次回の閉極時間の予測値である予測閉極時間を予測する閉極時間予測手段と、
閉極指令が入力されると、前記遮断器を前記目標閉極時刻において閉極させるように、前記目標閉極時刻から前記予測閉極時間だけ前の時点で前記制御信号を前記遮断器へ出力する閉極制御手段と
を備えたことを特徴とする電力開閉制御装置。
When the measured power supply side voltage signal and load side voltage signal of the circuit breaker are sine wave signals, the value obtained by taking the inverse of the average value of the zero point time interval of the voltage signal and doubling the value is calculated as the frequency signal. The most recent time value at the zero point that changes from negative to positive is calculated as the time of phase 0 degree, and the effective value obtained by periodically integrating the voltage signal is √2 times Is calculated as an amplitude, and the voltage value = amplitude × sin (2π × frequency × t) and the voltage signal are approximated by function using the above calculated value and a time t = 0 of phase 0 degree, and based on this approximate function Extrapolating the voltage signal after the current time to obtain the estimated power-side voltage signal and load-side voltage signal from the current time until a certain time later, and the absolute difference between the estimated power-side voltage signal and load-side voltage signal The absolute value of the interelectrode voltage, which is a signal that takes a value The absolute value of the interelectrode voltage from the estimated current time to a certain time later is sequentially searched for a time region that is less than or equal to a preset threshold value from the current time until a certain time later, and A target point detecting means for selecting a time region having a length longer than that set in advance and determining an intermediate point of the time region longer than the length as a target closing time;
A closing time measuring means for measuring a closing time of the circuit breaker based on a difference between an output time of a control signal for closing the circuit breaker and an operation time of an auxiliary switch linked to the circuit breaker;
Based on the previous closing time measured by the closing time measuring means, the current environmental temperature, the control voltage, and the operating pressure, the predicted closing time that is the predicted value of the next closing time is predicted. Extreme time prediction means;
When a closing command is input, the control signal is output to the circuit breaker at a time just before the predicted closing time from the target closing time so that the circuit breaker is closed at the target closing time. An electric power switching control device comprising:
前記目標点検出手段は、前記極間電圧を合成した波形に対して、前記遮断器のプレアーク特性に基づいた信号変換、及び前記遮断器の機械的動作バラツキに基づいた信号変換を行った上で前記目標閉極時刻を決定する
ことを特徴とする請求項1記載の電力開閉制御装置。
The target point detection unit performs signal conversion based on the pre-arc characteristic of the circuit breaker and signal conversion based on mechanical operation variation of the circuit breaker on the waveform obtained by synthesizing the inter-electrode voltage. The power switching control device according to claim 1, wherein the target closing time is determined.
JP2001368446A 2001-12-03 2001-12-03 Power switching control device Expired - Fee Related JP3986810B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001368446A JP3986810B2 (en) 2001-12-03 2001-12-03 Power switching control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001368446A JP3986810B2 (en) 2001-12-03 2001-12-03 Power switching control device

Publications (2)

Publication Number Publication Date
JP2003168335A JP2003168335A (en) 2003-06-13
JP3986810B2 true JP3986810B2 (en) 2007-10-03

Family

ID=19178037

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001368446A Expired - Fee Related JP3986810B2 (en) 2001-12-03 2001-12-03 Power switching control device

Country Status (1)

Country Link
JP (1) JP3986810B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4818488B1 (en) * 2011-01-11 2011-11-16 三菱電機株式会社 Power switching control device and its closing control method
WO2012104910A1 (en) * 2011-02-02 2012-08-09 三菱電機株式会社 Power switch device operation time prediction equipment and method

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4507092B2 (en) * 2004-12-22 2010-07-21 三菱電機株式会社 Switching pole phase controller
DE102005005228A1 (en) * 2005-01-31 2006-08-31 Siemens Ag Method and device for determining a switching time of an electrical switching device
JP4495030B2 (en) * 2005-05-19 2010-06-30 三菱電機株式会社 Closed phase control device for switchgear
JP4452653B2 (en) * 2005-06-07 2010-04-21 三菱電機株式会社 Input phase detector for electromagnetic induction equipment
JP4765762B2 (en) * 2006-05-12 2011-09-07 三菱電機株式会社 Phase control switchgear
JP4825648B2 (en) * 2006-11-28 2011-11-30 三菱電機株式会社 Switch control device
JP4908171B2 (en) * 2006-12-04 2012-04-04 株式会社東芝 Circuit breaker closing control method and apparatus
US7936093B2 (en) 2007-02-15 2011-05-03 Mitsubishi Electric Corporation Phase control switching device
JP4936974B2 (en) 2007-04-27 2012-05-23 三菱電機株式会社 Power switching control device
JP5084645B2 (en) * 2008-07-09 2012-11-28 三菱電機株式会社 Phase control switchgear
BRPI0804330B1 (en) * 2008-10-13 2019-03-12 Universidade Estadual De Campinas - Unicamp METHOD FOR FAST TRIPOLAR RELIGION IN DRIVING REACTIVE COMPENSATION LINES
JP5472912B2 (en) * 2010-02-19 2014-04-16 株式会社東芝 Overvoltage suppression device
US9263213B2 (en) 2011-01-12 2016-02-16 Mitsubishi Electric Corporation Power switching control device and closing control method thereof
FR2996693B1 (en) * 2012-10-05 2014-11-21 Schneider Electric Ind Sas REACTIVE ENERGY COMPENSATOR
CA2889935C (en) * 2012-12-14 2018-01-02 Mitsubishi Electric Corporation Power switching control apparatus
US11300616B2 (en) * 2017-07-12 2022-04-12 Mayo Foundation For Medical Education And Research Systems and methods for non-invasive current estimation
RU2658673C1 (en) * 2017-09-26 2018-06-22 Александр Леонидович Куликов Method of automatic reclosure of overhead transmission line
CN111929572B (en) * 2019-12-20 2023-05-12 南京南瑞继保电气有限公司 Circuit breaker opening and closing time estimation device and method
CN113376515A (en) * 2020-03-09 2021-09-10 西门子股份公司 Method and device for determining closing time of circuit breaker and computer readable medium

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4818488B1 (en) * 2011-01-11 2011-11-16 三菱電機株式会社 Power switching control device and its closing control method
WO2012095942A1 (en) 2011-01-11 2012-07-19 三菱電機株式会社 Power switching control device and closing control method thereof
WO2012104910A1 (en) * 2011-02-02 2012-08-09 三菱電機株式会社 Power switch device operation time prediction equipment and method
JP5615385B2 (en) * 2011-02-02 2014-10-29 三菱電機株式会社 Operating time prediction device for power switchgear
US9966753B2 (en) 2011-02-02 2018-05-08 Mitsubishi Electric Corporation Power switching device operating time prediction equipment and method

Also Published As

Publication number Publication date
JP2003168335A (en) 2003-06-13

Similar Documents

Publication Publication Date Title
JP3986810B2 (en) Power switching control device
JP3716691B2 (en) Power switchgear
JP5159075B2 (en) Circuit breaker switching control device
JP4825648B2 (en) Switch control device
US7010436B2 (en) Method and device for prediction of a zero-crossing alternating current
CA2451438C (en) Delta filter with an adaptive time window for protective relays
JP4936974B2 (en) Power switching control device
JP4700110B2 (en) Phase control switchgear
JP5844015B1 (en) Power switching control device
US20160225548A1 (en) Power switching control apparatus and closing control method
US9779892B2 (en) Power switching control apparatus for switching timings of breaker to suppress transit voltage and current upon turning on the breaker
JP4818488B1 (en) Power switching control device and its closing control method
Petruzziello et al. Some implementation aspects of line current reconstruction in three phase PWM inverters
JP4666367B2 (en) Power switching control device
US20230420933A1 (en) Reducing transformer inrush current
JP2019207798A (en) Excitation rush current suppression device and power switchgear
US20230420932A1 (en) Reducing transformer inrush current
RU2117309C1 (en) Method for testing of electric commutator
EP4297214A1 (en) Reducing transformer inrush current
WO2022207502A1 (en) Determination of changeover time for circuit breaker
UA64218A (en) Method for determining parameters of thyristor electric drive and the device for the realization of the method
JPH0745683A (en) Semiconductor testing device
JPH07260844A (en) Frequency detecting method for sinusoidal wave ac signal

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060907

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060926

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061113

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070522

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070619

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070710

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070711

R150 Certificate of patent or registration of utility model

Ref document number: 3986810

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100720

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100720

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110720

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110720

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120720

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120720

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130720

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees