JP3981496B2 - Precast pillar unit - Google Patents

Precast pillar unit Download PDF

Info

Publication number
JP3981496B2
JP3981496B2 JP11357399A JP11357399A JP3981496B2 JP 3981496 B2 JP3981496 B2 JP 3981496B2 JP 11357399 A JP11357399 A JP 11357399A JP 11357399 A JP11357399 A JP 11357399A JP 3981496 B2 JP3981496 B2 JP 3981496B2
Authority
JP
Japan
Prior art keywords
column
floor
main
reinforcement
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP11357399A
Other languages
Japanese (ja)
Other versions
JP2000303622A (en
Inventor
和久 末岡
琢雄 小竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP11357399A priority Critical patent/JP3981496B2/en
Publication of JP2000303622A publication Critical patent/JP2000303622A/en
Application granted granted Critical
Publication of JP3981496B2 publication Critical patent/JP3981496B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、柱主筋とこの柱主筋の下端部に配筋された柱剪断補強筋とがコンクリート製の柱部材に埋設されて成るプレキャスト柱ユニット(以下、PC柱ユニットと略称する)に関する。
【0002】
【従来の技術】
従来、コンクリート製の柱および梁の構築方法として図4に示すような方法がある。この柱および梁の構築方法においては、先ず、図4(a)に示すように、N階の柱設置位置に、1階分の階高長さを有する柱主筋1を立設する。この柱主筋1の立設は、例えばN階の床面から突出している(N−1)階の柱主筋の上端に、N階の柱主筋1の下端を接続することによって行う。次に、上記立設された柱主筋1の周囲に、N階床面まで柱剪断補強筋2を巻き付ける。そして、図4(b)に示すように、柱剪断補強筋2が巻き付けられた柱主筋1の周囲に柱型枠3を組み立てて、コンクリートを打設する。
【0003】
こうして、図4(c)に示すように、1階分の階高長さを有するコンクリート柱4が完成した後に、隣接するコンクリート柱4,4間の施工階床面上に1階分階高の足場(図示せず)を設け、例えばハーフプレキャストコンクリート(以下、ハーフPCと略称する)梁5を吊り込んで、ハーフPC梁5の両端から突出している梁主筋6,6をコンクリート柱4,4の上端から突出している柱主筋1,1の間に垂直方向に挿入して、ハーフPC梁5の両端部をコンクリート柱4,4の上端に載置する。このようにして、2本のコンクリート柱4,4の間にハーフPC梁5を架設する。最後に、コンクリート柱4,4とハーフPC梁5との接合部であるパネルゾーン7,7に型枠を組み、床型枠および床鉄筋を組み立てて、コンクリートを打設する。
【0004】
【発明が解決しようとする課題】
しかしながら、上記従来の柱及び梁の構築方法には以下のような問題がある。
(a)地上から各施工階まで柱主筋1や柱剪断補強筋2等の鉄筋とハーフPC梁5を揚重しなければならず、高層建築物に適用する場合には、施工高さ(揚重高さ)が高くなるために揚重に要する時間が長くなり、施工効率が悪くなってしまう。
【0005】
(b)上記柱主筋1の長さは1階分の階高長さである。したがって、総ての階で柱主筋1と柱主筋1との接続を行わなければならず、柱構築に時間と労力を要する。尚、予め柱主筋1に柱剪断補強筋2を配筋した先組鉄筋籠を使用しても同様である。また、1階分階高長さの柱主筋を有するPC柱ユニットを使用しても同様である。
【0006】
(c)(a)における揚重回数や(b)における柱主筋と柱主筋との接続回数を少なくする方法として、図4(a)に示す柱主筋の長さを一様に2階分階高長さまたはそれ以上にすることが考えられる。ところが、ハーフPC梁5の両端から突出している梁主筋6,6を、コンクリート柱4,4の上端から突出している柱主筋の間に垂直に挿入する作業が高所作業になるので、施工性が悪いという問題がある。さらに、柱主筋の長さを一様に2階分階高長さあるいはそれ以上にすると、従来よりも高所まで足場を設けなければならず、そのため施工コストが上がるという問題もある。
【0007】
そこで、この発明の目的は、各施工階毎の揚重回数が少なく、柱主筋と柱主筋との接続回数が少なく、施工効率の高いPC柱ユニットを提供することにある。
【0008】
【課題を解決するための手段】
上記目的を達成するため、請求項1に係る発明のPC柱ユニットは、
1階分階高長さのコンクリート製柱部材と、
2階分階高長さを有すると共に、下端部が上記コンクリート製柱部材に埋設される一方、上端部が上記コンクリート製柱部材から突出している複数本の柱主筋と、
上記柱主筋における上記コンクリート製柱部材に埋設された個所の外周に、所定間隔で巻き回された複数の柱剪断補強筋と、
上記コンクリート製柱部材の上端に載置されると共に、複数の梁主筋に外接して所定の間隔で梁剪断補強筋が巻き回されて成る梁主筋先組鉄筋籠と
を備え
上記柱主筋および上記柱剪断補強筋を含む上記コンクリート製柱部材と、上記梁主筋先組鉄筋籠とは、一体になって吊り上げ可能になっている
ことを特徴としている。
【0009】
上記構成によれば、施工階に立設される柱主筋の長さは2階分階高長さを有するために、当該PC柱ユニットの揚重回数が従来のPC柱ユニットの1/2となる。さらに、柱主筋と柱主筋との接続個所が従来の柱施工の1/2となる。こうして、上記揚重時間や接続時間が短縮されて柱の施工効率が向上されると共に、柱構築の労力とコストとが削減される。
【0010】
さらに、予め ( N+1 ) 階分の梁主筋先組鉄筋籠が上記コンクリート製柱部材の上端に載置され、上記コンクリート製柱部材と一体になって吊り上げ可能になっている。そのために、上記柱主筋が2階分階高長さであるにも拘わらず、高所作業によらずに梁形成が行われ、施工性の低下および施工コストの高騰が防止される。
【0011】
また、請求項2に係る発明は、請求項1にかかる発明のPC柱ユニットにおいて、上記コンクリート製柱部材の下端面における上記柱主筋の位置に埋設されて形成されると共に、上記柱主筋と他の柱主筋とを接続する継手部材を備えたことを特徴としている。
【0012】
上記構成によれば、上記コンクリート製柱部材の下端面に継手部材が埋設されて形成されているため、当該PC柱ユニットの柱主筋を下層階からの柱主筋の上端に接続する際の接続作業が容易に行われる。こうして、柱の施工効率が更に向上される
【0013】
【発明の実施の形態】
以下、この発明を図示の実施の形態により詳細に説明する。
<第1実施の形態>
図1は、本実施の形態のPC柱ユニットを示す図である。尚、図1(a)は縦断面図であり、図1(b)は図1(a)におけるA−A矢視断面図であり、図1(c)は図1(a)におけるB−B矢視断面図である。尚、上記図1(a)は、図1(b)および図1(a)におけるC−C矢視断面図に相当する。
【0014】
本実施の形態においては、上記PC柱ユニットとして、2階分の階高の長さを有する複数本の柱主筋12が埋設されたPC柱ユニット11を用いることによって、各施工階毎の柱部材(PC柱ユニット11)の揚重回数を少なくし、柱部材の柱主筋と柱部材の柱主筋との接続回数を少なくするのである。
【0015】
本実施の形態におけるPC柱ユニット11は、次のような構成を有している。すなわち、図1(a)に示すように、2階分階高の長さを有する柱主筋12が四角筒状に配列され、その下部が1階分階高長さのコンクリート製柱部材(以下、フルPC柱と言う)13に埋設されている。また、柱主筋12におけるフルPC柱13に埋設された個所の外周には、長手方向に所定間隔で巻付け配筋された柱剪断補強筋14が埋設されている。尚、柱主筋12は必ずしも四角筒状に配列される必要はなく、円筒状等の他の筒状に配列しても差し支えない。
【0016】
また、上記フルPC柱13の下端面には、上記各柱主筋12の位置に、柱主筋12の下端部を外部に連通する孔が形成されて、スリーブ継手15を構成している。尚、上記孔は、柱主筋12の直径よりやや大きな内径を有すると共に、柱主筋12と同心で所定深さに形成されている。
【0017】
上記構成を有するPC柱ユニット11(以下、第1PC柱ユニット11と言う)は、図2に示すような手順によって立設される。図2(a)に示すように、柱立設作業を行うN階の床面からは、(N−2)階に立設された第2PC柱ユニット21(第1PC柱ユニット11と同じ構造を有する)における2階分の階高の長さを有するの第2柱主筋22の先端22aが突出している。また、(N−1)階に立設された第3PC柱ユニット23(第1PC柱ユニット11と同じ構造を有する)における2階分の階高の長さを有する第3柱主筋24のN階部分24aが突出している。そして、第2PC柱ユニット21と第3PC柱ユニット23とは交互に配列されている。
【0018】
先ず、上記第1PC柱ユニット11がクレーン16によって吊り上げられる。そして、フルPC柱13の下端におけるスリーブ継手15の上記孔にN階の床面から突出している第2柱主筋22の先端22aが挿入されて、第1PC柱ユニット11と第2PC柱ユニット21とが接続される。こうして、フルPC柱13をN階の床面上に設置することによってN階のコンクリート柱が形成される。
【0019】
次に、上記(N−1)階からの第3柱主筋24におけるN階部分24aには、(1階分の階高の長さ−梁高さ)分の柱剪断補強筋25が配筋される。次に、図2(b)に示すように、第3柱主筋24aの柱剪断補強筋25の箇所にN階の柱型枠26が組み立てられる。
【0020】
次に、ハーフPC梁17を第3柱主筋24aの先端近傍までクレーン16で吊り上げ、一端から突出している上側梁主筋18を柱主筋(第1柱主筋)12に挿入した後、ハーフPC梁17を吊り降ろす。さらに、ハーフPC梁17を、その他端から突出している上側梁主筋19を柱型枠26から突出している第3柱主筋24aに挿入しながら更に吊り降ろし、両端から突出しているハーフPC梁17の端部の夫々をフルPC柱13あるいは柱型枠26上に載置する。こうして、フルPC柱13と柱型枠26との間にハーフPC梁17を架設する。
【0021】
次に、上記上側梁主筋18,19をフルPC柱13上のパネルゾーン外に(図中右側に)ずらし、上記パネルゾーンに柱剪断補強筋(図示せず)を配筋する。さらに、上側梁主筋18,19を柱型枠26外に(図中左側に)ずらし、第3柱主筋24aに柱剪断補強筋(図示せず)を配筋する。そうした後、上側梁主筋18,19を元の位置に戻す。
【0022】
次に、上記フルPC柱13と柱型枠26との間に架設されたハーフPC梁17の中央部を支持材(図示せず)で支持し、第1柱主筋12とハーフPC梁17との接合部であるパネルゾーンに第1型枠(図示せず)を形成する一方、第3柱主筋24aとハーフPC梁17とのパネルゾーンに第2型枠(図示せず)を形成する。さらに、床型枠および床鉄筋を組み立てる。そうした後、上記第1型枠,第2型枠,柱型枠26の各型枠内および上記床型枠内にコンクリートを打設して、図2(c)に示すように、N階の柱と(N+1)階の床とが形成される。さらに、第1柱主筋12の(N+1)階部分に柱剪断補強筋27が配筋される。
【0023】
以後、(N+1)階の床28から突出している第1柱主筋12の(N+1)階分の柱剪断補強筋27が配筋された部分を図2(a)の第3柱主筋24aと見なし、床28から突出している第3柱主筋24aを図2(a)における第2柱主筋22の先端22aと見なして、図1(a)から図1(c)までの手順を繰り返すことによって、(N+1)階に柱が立設されるのである。
【0024】
上述のように、本実施の形態においては、2階分階高の長さを有する柱主筋12の下部に柱剪断補強筋14を配筋して1階分階高長さのフルPC柱13に埋設し、フルPC柱13の下端部にスリーブ継手15を設けてPC柱ユニット11を構成している。そして、PC柱ユニット11を立設する場合には、施工階であるN階の床から突出している(N−2)階からの第2柱主筋22の先端22aに、PC柱ユニット11における柱主筋12の下端をスリーブ継手15によって接続して立設するようにしている。
【0025】
したがって、上記PC柱ユニット11のN階への揚重回数を、図4に示す従来の構築方法における柱主筋の揚重回数の半分にすることができ、施工効率を上げることができるのである。さらに、柱主筋12の長さは2階分階高長さを有している。したがって、(N+1)階では、柱主筋12に対する次の柱主筋との接続を省略でき、柱主筋と柱主筋の接続回数を従来の半分にできる。すなわち、上記接続に要する時間と労力とコストを略半減できるのである。
【0026】
また、上記PC柱ユニット11を立設する際に、図2に示すように、同一梁が架設される2本のPC柱ユニット11のうちの一方をN階に立設し、他方を(N−1)階に立設すれば、第1柱主筋12におけるN階床面からの高さは2階分の階高であるのに対して、第3柱主筋24におけるN階部分24aの上記高さは1階分の階高となる。したがって、第1柱主筋12と第3柱主筋24aの間にハーフPC梁17を架設する場合に、吊り上げたハーフPC梁17を低い方の第3柱主筋24aの近傍まで降下させてから夫々の梁主筋18,19を柱主筋12,24aに挿入できる。そのため2階分高さの特別な足場を必要とはせず、第3柱主筋24aの上方の空間を利用することができ、ハーフPC梁17の架設を作業性良く行うことができる。さらに、ハーフPC梁17の梁主筋19を第3柱主筋24aに挿入する際に、先に梁主筋18が挿入された第1柱主筋12がガイドになって容易に挿入できる。尚、この効果は、第1柱主筋12と第3柱主筋24aの間に梁主筋先組鉄筋籠を架設する場合も同様に奏することができる。
【0027】
尚、上記実施の形態においては、上記PC柱ユニット11の立設手順を、図2に示すように、立設作業を行うN階の床面から、(N−2)階に立設された第2PC柱ユニット21の第2柱主筋22の先端22aと、(N−1)階に立設された第3PC柱ユニット23の第3柱主筋24のN階部分24aとが、交互に突出している場合を例に説明している。しかしながら、柱立設作業を行うN階の床面から(N−2)階に立設された第2PC柱ユニット21の第2柱主筋22の先端22aのみが突出している場合(つまり、全PC柱ユニット11の立設作業が同一階で行われる場合)でも、PC柱ユニット11のN階への揚重回数および柱主筋と柱主筋の接続回数を、図4に示す従来の構築方法場合の半分にできることは言うまでもない。但し、このように、全部のPC柱ユニット11の立設作業を同一施工階で行う場合には、全PC柱ユニット11の立設を行う階と全く行わない階とが交互に存在することになる。
【0028】
また、上記実施の形態においては、上記PC柱ユニット11における上階部分に対する柱形成時には柱型枠26を組み立てる場合を例に、PC柱ユニット11の立設手順を説明している。しかしながら、柱型枠26を組み立てずに、内部に矩形の柱剪断補強筋が長手方向に所定の間隔で埋設された鉄筋コンクリート構造の四角筒体でなる中空PC柱型枠を柱主筋24a,12に挿通させても差し支えない。
【0029】
<第2実施の形態>
図3は、本実施の形態におけるPC柱ユニットの外観図である。本実施の形態におけるPC柱ユニット31は、2階分階高の長さを有する柱主筋32が四角筒状に配列され、その下部が1階分階高長さのフルPC柱33に埋設されている。また、柱主筋32におけるフルPC柱33に埋設された個所の外周には長手方向に所定間隔で巻付け配筋された柱剪断補強筋(図示せず)が埋設されており、フルPC柱33の下端部にはスリーブ継手(図示せず)が設けられている。尚、柱主筋32は必ずしも四角筒状に配列される必要はなく、円筒状等の他の筒状に配列しても差し支えない。
【0030】
上記フルPC柱33上には、梁主筋先組鉄筋籠34が水平方向に載置されている。その場合、梁主筋先組鉄筋籠34における柱との接合部であるパネルゾーン部35には、柱主筋32が挿通されている。ここで、梁主筋先組鉄筋籠34は、水平方向に配設された複数の梁主筋36と、この梁主筋36の長手方向に所定の間隔で梁主筋36に外接して矩形状に巻き付け固定された梁剪断補強筋37で構成される。尚、梁主筋先組鉄筋籠34におけるパネルゾーン部35には梁剪断補強筋37は設けられてはおらず、柱主筋32に外接して矩形の柱剪断補強筋38が所定の間隔で配筋されている。また、39は、PC柱ユニット31を施工階床面40上に支持する支保工である。
【0031】
尚、上記構成を有する本実施の形態のPC柱ユニット31の立設作業は、第1実施の形態の場合に順じて行われる。但し、PC柱ユニット31は、梁主筋先組鉄筋籠34が搭載されている関係上、全PC柱ユニット31の立設を同一階で行う方が作業効率はよい。その場合、PC柱ユニット31には(N+2)階分の梁主筋先組鉄筋籠梁は設けられていないので、梁主筋先組鉄筋籠34と同じ構成を有する(N+2)階分の梁主筋先組鉄筋籠の上記パネルゾーンを柱主筋32に挿通させるか、あるいは、(N+2)階分の梁を現場で組み立てる必要がある。但し、その場合、既に(N+1)階の床は形成されているので、高い足場を必要とはせず、従来の梁形成作業と同様にして行うことができる。
【0032】
上述のように、本実施の形態においては、柱立設作業階であるN階分のフルPC柱33と、下部が柱剪断補強筋と共にフルPC柱33内に埋設された2階分の階高長さを有する柱主筋32と、パネルゾーン部35が柱主筋32に挿通されてフルPC柱33上に水平方向に載置された(N+1)階分の梁主筋先組鉄筋籠34で、PC柱ユニット31を構成している。
【0033】
したがって、本実施の形態によれば、上記PC柱ユニット31の揚重回数を、図4に示す従来の構築方法における柱主筋の揚重回数の半分に短縮して施工効率を上げることができる。さらに、PC柱ユニット31の柱主筋32と床から突出している柱主筋との接続回数を従来の半分にして時間と労力とを略半減できる。また、予め(N+1)階分の梁主筋先組鉄筋籠34をフルPC柱33上に載置しているので、柱主筋32を2階分階高の長さにした場合における梁形成の高所作業を無くすことができ、施工性の低下を防止できる。
【0034】
【発明の効果】
以上より明らかなように、請求項1に係る発明のPC柱ユニットは、2階分階高長さを有する柱主筋の下端部に所定間隔で複数の柱剪断補強筋を配筋し、この柱主筋における上記柱剪断補強筋が配筋された下端部を1階分階高長さのコンクリート製柱部材に埋設して構成したので、当該PC柱ユニットの揚重回数を従来のPC柱ユニットの1/2にできる。さらに、柱主筋と柱主筋との接続個所を従来の柱施工の1/2にできる。したがって、上記揚重時間や接続時間を短縮して柱の施工効率を向上でき、柱構築の労力とコストとを削減できる
【0035】
さらに、上記コンクリート製柱部材の上端に梁主筋先組鉄筋籠を載置して、上記コンクリート製柱部材と一体になって吊り上げ可能にしているので、上記柱主筋が2階分階高長さであるにも拘わらず、高所作業によらずに梁形成を行うことができる。したがって、上記柱主筋が2階分階高長さであるがための施工性の低下および施工コストの高騰を防止できる。
【0036】
また、請求項2に係る発明のPC柱ユニットは、上記コンクリート製柱部材の下端面に埋設されて、上記柱主筋と他の柱主筋とを接続する継手部材を設けたので、当該PC柱ユニットの柱主筋と下層階からの柱主筋の上端との接続作業を容易にできる。したがって、柱の施工効率を更に向上できる
【図面の簡単な説明】
【図1】 この発明のPC柱ユニットの構成を示す図である。
【図2】 図1に示すPC柱ユニットの立設手順を示す図である。
【図3】 図1とは異なるPC柱ユニットの構成を示す図である。
【図4】 従来の柱および梁の構築方法における作業手順の説明図である。
【符号の説明】
11,21,23,31…PC柱ユニット、
12,22,24,32…柱主筋、 13,33…フルPC柱、
14,25,27,38…柱剪断補強筋、
15…スリーブ継手、 26…柱型枠、
34…梁主筋先組鉄筋籠、 35…パネルゾーン部、
36…梁主筋、 37…梁剪断補強筋。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a precast column unit (hereinafter abbreviated as a PC column unit) in which a column main reinforcement and a column shear reinforcing bar arranged at the lower end of the column main reinforcement are embedded in a concrete column member.
[0002]
[Prior art]
Conventionally, as a method for constructing concrete columns and beams, there is a method as shown in FIG. In this column and beam construction method, first, as shown in FIG. 4 (a), a column main reinforcement 1 having a floor height of one floor is erected at a column installation position on the Nth floor. The column main reinforcement 1 is erected, for example, by connecting the lower end of the N-th column main reinforcement 1 to the upper end of the (N-1) -th column main reinforcement protruding from the floor surface of the N-th floor. Next, the column shear reinforcement 2 is wound around the upright column main reinforcement 1 up to the N-th floor. And as shown in FIG.4 (b), the column form frame 3 is assembled around the column main reinforcement 1 around which the column shear reinforcement 2 was wound, and concrete is laid.
[0003]
Thus, as shown in FIG. 4 (c), after the concrete pillar 4 having the height of one floor is completed, the height of the first floor is set on the construction floor between the adjacent concrete pillars 4 and 4. For example, a half precast concrete (hereinafter abbreviated as half PC) beam 5 is suspended, and the beam main bars 6, 6 protruding from both ends of the half PC beam 5 are connected to the concrete column 4, Inserted in the vertical direction between the column main bars 1, 1 protruding from the upper end of 4, both ends of the half PC beam 5 are placed on the upper ends of the concrete columns 4, 4. In this way, the half PC beam 5 is installed between the two concrete columns 4 and 4. Finally, the formwork is assembled in the panel zones 7 and 7 which are the joint portions of the concrete columns 4 and 4 and the half PC beam 5, the floor formwork and the floor rebar are assembled, and concrete is placed.
[0004]
[Problems to be solved by the invention]
However, the conventional methods for constructing columns and beams have the following problems.
(a) Reinforcing bars such as column main reinforcement 1 and column shear reinforcement 2 and half PC beams 5 must be lifted from the ground to each construction floor. When applied to high-rise buildings, the construction height (lifting As the height is increased, the time required for lifting becomes longer and the construction efficiency becomes worse.
[0005]
(b) The length of the column main reinforcement 1 is the floor height of one floor. Therefore, it is necessary to connect the column main reinforcement 1 to the column main reinforcement 1 on all floors, and time and labor are required for the column construction. The same applies even if a pre-assembled reinforcing bar rod in which the column shear reinforcing bar 2 is arranged in advance on the column main reinforcing bar 1 is used. The same applies to the case where a PC column unit having a column main reinforcement with a height of one floor is used.
[0006]
(c) As a method of reducing the number of lifting in (a) and the number of connections between the column main reinforcement and column main reinforcement in (b), the length of the column main reinforcement shown in FIG. It is conceivable to make it high or longer. However, the work of inserting the beam main bars 6 and 6 protruding from both ends of the half PC beam 5 vertically between the column main bars protruding from the upper ends of the concrete columns 4 and 4 is a work at a high place. There is a problem that is bad. Furthermore, if the length of the column main reinforcement is uniformly set to the height of the second floor or more, it is necessary to provide a scaffold to a higher place than before, which causes a problem that the construction cost increases.
[0007]
Accordingly, an object of the present invention is to provide a PC column unit having a high construction efficiency with a small number of lifting operations for each construction floor, a small number of connection between the column main reinforcement and the column main reinforcement.
[0008]
[Means for Solving the Problems]
In order to achieve the above object, the PC pillar unit of the invention according to claim 1 is:
A concrete pillar member with a height on the first floor,
A plurality of column main bars having a second floor height and having a lower end embedded in the concrete column member and an upper end protruding from the concrete column member,
A plurality of column shear reinforcement bars wound at predetermined intervals on the outer periphery of the portion embedded in the concrete column member in the column main reinforcement ,
A beam main bar tip assembly reinforcing bar 載 which is placed on the upper end of the concrete column member and which is circumscribed by a plurality of beam main bars and wound with beam shear reinforcing bars at a predetermined interval ;
The concrete column member including the column main reinforcing bar and the column shear reinforcing bar and the beam main bar pre-assembled reinforcing bar rod can be integrally lifted .
[0009]
According to the above configuration, since the length of the column main reinforcement erected on the construction floor has the height of the second floor, the number of lifting of the PC column unit is 1/2 of that of the conventional PC column unit. Become. Furthermore, the connection part between the column main reinforcement and the column main reinforcement becomes 1/2 of the conventional column construction. Thus, the lifting time and connection time are shortened to improve the column construction efficiency, and the labor and cost of column construction are reduced.
[0010]
Further, a beam main reinforcing bar rebar bar for ( N + 1 ) floors is placed in advance on the upper end of the concrete column member, and can be lifted together with the concrete column member. Therefore, in spite of the fact that the column main reinforcement is 2 stories high, beam formation is performed regardless of the work at a high place, and the workability and the construction cost are prevented from being lowered.
[0011]
The invention according to claim 2 is the PC column unit of the invention according to claim 1, wherein the PC column unit is embedded in the position of the column main reinforcement on the lower end surface of the concrete column member, and the column main reinforcement and the like. It is characterized by comprising a joint member for connecting the column main bars.
[0012]
According to the said structure, since the joint member is embed | buried and formed in the lower end surface of the said concrete column member, the connection operation | work at the time of connecting the column main reinforcement of the said PC column unit to the upper end of the column main reinforcement from a lower floor Is easily done. Thus, the construction efficiency of the pillar is further improved .
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in detail with reference to the illustrated embodiments.
<First embodiment>
FIG. 1 is a diagram showing a PC pillar unit of the present embodiment. 1 (a) is a longitudinal sectional view, FIG. 1 (b) is a sectional view taken along line AA in FIG. 1 (a), and FIG. 1 (c) is a sectional view taken along line B- in FIG. 1 (a). It is B arrow sectional drawing. 1A corresponds to a cross-sectional view taken along the line CC in FIGS. 1B and 1A.
[0014]
In the present embodiment, by using the PC column unit 11 in which a plurality of column main reinforcing bars 12 having a height of two floors is embedded as the PC column unit, a column member for each construction floor is used. The number of lifting of the (PC column unit 11) is reduced, and the number of connections between the column main reinforcement of the column member and the column main reinforcement of the column member is reduced.
[0015]
The PC pillar unit 11 in the present embodiment has the following configuration. That is, as shown in FIG. 1 (a), column main bars 12 having a length of the second floor are arranged in a square cylinder shape, and a lower portion thereof is a concrete column member (hereinafter referred to as a first floor height). This is buried in 13). Further, column shear reinforcing bars 14 wound and arranged at predetermined intervals in the longitudinal direction are embedded in the outer periphery of the portion embedded in the full PC column 13 in the column main reinforcement 12. The columnar reinforcing bars 12 do not necessarily have to be arranged in a square cylinder shape, and may be arranged in another cylinder shape such as a cylindrical shape.
[0016]
Further, a hole for communicating the lower end portion of the column main bar 12 to the outside is formed at the position of each column main bar 12 on the lower end surface of the full PC column 13 to constitute a sleeve joint 15. The hole has an inner diameter slightly larger than the diameter of the columnar main bar 12 and is formed concentrically with the columnar main bar 12 to a predetermined depth.
[0017]
The PC column unit 11 having the above configuration (hereinafter referred to as the first PC column unit 11) is erected in accordance with the procedure shown in FIG. As shown in FIG. 2 (a), from the floor surface of the N floor where the column erecting work is performed, the second PC column unit 21 (the same structure as the first PC column unit 11) erected on the (N-2) floor is used. The tip 22a of the second column main reinforcing bar 22 has a length of the height of the second floor. Further, in the third PC pillar unit 23 (having the same structure as the first PC pillar unit 11) erected on the (N-1) floor, the N floor of the third pillar main bar 24 having the height of the second floor. The portion 24a protrudes. And the 2nd PC pillar unit 21 and the 3rd PC pillar unit 23 are arranged by turns.
[0018]
First, the first PC column unit 11 is lifted by the crane 16. And the front end 22a of the 2nd column main reinforcement 22 which protrudes from the floor surface of the N-th floor is inserted in the hole of the sleeve joint 15 in the lower end of the full PC column 13, and the first PC column unit 11 and the second PC column unit 21 Is connected. In this way, the concrete floor of the N floor is formed by installing the full PC pillar 13 on the floor of the N floor.
[0019]
Next, column shear reinforcement bars 25 corresponding to (the height of the first floor-the height of the beam minus the beam height) are arranged in the N-floor portion 24a of the third column main reinforcement 24 from the (N-1) floor. Is done. Next, as shown in FIG. 2B, the N-th column formwork 26 is assembled at the location of the column shear reinforcement bar 25 of the third column main bar 24a.
[0020]
Next, the half PC beam 17 is lifted by the crane 16 to the vicinity of the tip of the third column main bar 24a, and the upper beam main bar 18 protruding from one end is inserted into the column main bar (first column main bar) 12, and then the half PC beam 17 Suspend. Further, the half PC beam 17 is further suspended while the upper beam main bar 19 protruding from the other end is inserted into the third column main bar 24a protruding from the column frame 26, and the half PC beam 17 protruding from both ends Each of the end portions is placed on the full PC column 13 or the column mold 26. Thus, the half PC beam 17 is installed between the full PC column 13 and the column mold 26.
[0021]
Next, the upper beam main bars 18 and 19 are shifted out of the panel zone on the full PC column 13 (to the right in the drawing), and column shear reinforcement bars (not shown) are arranged in the panel zone. Further, the upper beam main bars 18 and 19 are shifted to the outside of the column mold 26 (to the left in the drawing), and a column shear reinforcing bar (not shown) is arranged in the third column main bar 24a. After that, the upper beam main bars 18 and 19 are returned to their original positions.
[0022]
Next, the central part of the half PC beam 17 installed between the full PC column 13 and the column mold 26 is supported by a support material (not shown), and the first column main reinforcement 12, the half PC beam 17, A first mold (not shown) is formed in a panel zone that is a joint portion of the third column, and a second mold (not shown) is formed in the panel zone of the third column main reinforcement 24a and the half PC beam 17. In addition, the floor formwork and floor rebar are assembled. After that, concrete is placed in each of the first formwork, the second formwork, and the column formwork 26 and in the floor formwork, and as shown in FIG. Pillars and (N + 1) floors are formed. Further, column shear reinforcement bars 27 are arranged at the (N + 1) floor portion of the first column main reinforcement 12.
[0023]
Hereinafter, the portion where the column shear reinforcement 27 for the (N + 1) floor of the first column main reinforcement 12 protruding from the floor 28 of the (N + 1) floor is regarded as the third column main reinforcement 24a in FIG. 2 (a). By considering the third column main reinforcement 24a protruding from the floor 28 as the tip 22a of the second column main reinforcement 22 in FIG. 2 (a), by repeating the procedure from FIG. 1 (a) to FIG. 1 (c), A pillar is erected on the (N + 1) floor.
[0024]
As described above, in the present embodiment, the full PC column 13 having the first floor height is obtained by arranging the column shear reinforcement bar 14 below the column main reinforcement 12 having the length of the second floor height. The PC column unit 11 is configured by providing a sleeve joint 15 at the lower end of the full PC column 13. When the PC column unit 11 is erected, the column in the PC column unit 11 is placed on the tip 22a of the second column main reinforcement 22 from the (N-2) floor projecting from the floor of the N floor which is the construction floor. The lower ends of the main bars 12 are connected by a sleeve joint 15 and are erected.
[0025]
Therefore, the number of lifting of the PC pillar unit 11 to the N floor can be reduced to half of the number of lifting of the column main reinforcement in the conventional construction method shown in FIG. 4, and the construction efficiency can be increased. Further, the length of the column main reinforcement 12 has a second floor height. Therefore, on the (N + 1) floor, the connection between the column main reinforcement 12 and the next column main reinforcement can be omitted, and the number of connection between the column main reinforcement and the column main reinforcement can be reduced to half of the conventional number. That is, the time, labor, and cost required for the connection can be substantially halved.
[0026]
When the PC column unit 11 is erected, as shown in FIG. 2, one of the two PC column units 11 on which the same beam is erected is erected on the N floor, and the other (N -1) If the first column main reinforcement 12 is erected on the floor, the height from the floor of the N floor of the first pillar main bar 12 is the height of the second floor, whereas the above-mentioned of the N floor portion 24a in the third column main reinforcement 24 The height is the height of one floor. Therefore, when the half PC beam 17 is installed between the first column main reinforcing bar 12 and the third column main reinforcing bar 24a, each half PC beam 17 is lowered to the vicinity of the lower third column main reinforcing bar 24a. The beam main bars 18, 19 can be inserted into the column main bars 12, 24a. Therefore, a special scaffold with a height of two floors is not required, the space above the third column main reinforcement 24a can be used, and the half PC beam 17 can be constructed with good workability. Furthermore, when the beam main bar 19 of the half PC beam 17 is inserted into the third column main bar 24a, the first column main bar 12 into which the beam main bar 18 has been previously inserted can be easily inserted as a guide. In addition, this effect can be produced similarly when a beam main bar tip rebar bar is installed between the first column main bar 12 and the third column main bar 24a.
[0027]
In the above embodiment, the standing procedure of the PC pillar unit 11 is erected on the (N-2) floor from the floor of the N floor where the standing work is performed as shown in FIG. The tip 22a of the second column main reinforcement 22 of the second PC column unit 21 and the N floor portion 24a of the third column main reinforcement 24 of the third PC column unit 23 erected on the (N-1) floor alternately protrude. The case is described as an example. However, when only the tip 22a of the second column main bar 22 of the second PC column unit 21 standing on the (N-2) floor protrudes from the floor of the N floor where the column standing work is performed (that is, all PCs Even when the column unit 11 is erected on the same floor), the number of lifts of the PC column unit 11 to the N floor and the number of connection between the column main bars and the column main bars in the conventional construction method shown in FIG. Needless to say, it can be halved. However, when the standing work of all the PC pillar units 11 is performed on the same construction floor as described above, the floor where all the PC pillar units 11 are standing and the floor where no PC pillar unit 11 is placed are alternately present. Become.
[0028]
Moreover, in the said embodiment, the standing procedure of the PC column unit 11 is demonstrated to the case where the column form frame 26 is assembled at the time of column formation with respect to the upper floor part in the said PC column unit 11 as an example. However, without assembling the column formwork 26, a hollow PC column formwork made of a reinforced concrete square tube body in which rectangular column shear reinforcement bars are embedded at predetermined intervals in the longitudinal direction is used as the column main bars 24a and 12. It can be inserted.
[0029]
<Second Embodiment>
FIG. 3 is an external view of the PC pillar unit in the present embodiment. In the PC pillar unit 31 in the present embodiment, pillar main bars 32 having a length of the second floor are arranged in a rectangular tube shape, and the lower part is embedded in a full PC pillar 33 having a height of the first floor. ing. Further, column shear reinforcement bars (not shown) wound and arranged at predetermined intervals in the longitudinal direction are embedded in the outer periphery of the portion embedded in the full PC column 33 in the column main bar 32, and the full PC column 33. A sleeve joint (not shown) is provided at the lower end of the sleeve. Note that the columnar reinforcing bars 32 are not necessarily arranged in a square cylinder shape, and may be arranged in other cylindrical shapes such as a cylindrical shape.
[0030]
On the full PC column 33, a beam main bar tip rebar bar 34 is placed in the horizontal direction. In that case, the column main bar 32 is inserted in the panel zone part 35 which is a junction part with the column in the beam main bar front reinforcing bar rod 34. Here, the beam bar reinforcing bar bar 34 is a plurality of beam bars 36 arranged in the horizontal direction, and circumscribes the beam bar 36 at a predetermined interval in the longitudinal direction of the beam bar 36 and is wound around and fixed in a rectangular shape. It is comprised by the beam shear reinforcement bar 37 made. It should be noted that the beam zone reinforcing reinforcement 37 is not provided in the panel zone portion 35 of the beam main reinforcing bar bar 34, and rectangular column shear reinforcing bars 38 that are circumscribed by the column main reinforcing bars 32 are arranged at predetermined intervals. ing. Reference numeral 39 denotes a support for supporting the PC column unit 31 on the construction floor surface 40.
[0031]
The standing work of the PC column unit 31 of the present embodiment having the above configuration is performed in the same manner as in the case of the first embodiment. However, the work efficiency of the PC column unit 31 is better when all the PC column units 31 are erected on the same floor because the beam main bar tip assembled reinforcing bar 34 is mounted. In that case, since the (P + N) floor beam reinforcement bar rebars are not provided in the PC column unit 31, the (N + 2) floor beam reinforcement point has the same configuration as the beam reinforcement bar assembly 34. It is necessary to insert the panel zone of the braided bar into the column main bar 32 or to assemble the (N + 2) floor beams on site. However, in that case, since the floor of the (N + 1) floor has already been formed, a high scaffold is not required, and it can be performed in the same manner as a conventional beam forming operation.
[0032]
As described above, in the present embodiment, the full PC pillar 33 for N floors, which is a column standing work floor, and the floors for two floors, in which the lower part is embedded in the full PC pillar 33 together with the column shear reinforcement. A column main bar 32 having a high length, and a (N + 1) -level beam main bar tip rebar bar 34 in which the panel zone 35 is inserted in the column main bar 32 and horizontally placed on the full PC column 33, The PC pillar unit 31 is configured.
[0033]
Therefore, according to the present embodiment, the lifting efficiency of the PC column unit 31 can be shortened to half the lifting frequency of the column main reinforcement in the conventional construction method shown in FIG. Furthermore, the number of connections between the column main bars 32 of the PC column unit 31 and the column main bars protruding from the floor can be halved compared to the conventional method, so that time and labor can be reduced by half. In addition, since the beam reinforcement bars 34 for (N + 1) floors are placed on the full PC column 33 in advance, the beam formation height when the column reinforcement 32 is set to the length of the second floor height. Work can be eliminated, and workability can be prevented from deteriorating.
[0034]
【The invention's effect】
As is clear from the above, the PC column unit of the invention according to claim 1 has a plurality of column shear reinforcement bars arranged at predetermined intervals at the lower end portion of the column main bar having the second floor height, and this column. Since the lower end of the main bar where the above-mentioned column shear reinforcement bars are laid is embedded in a concrete column member having a height of one floor, the number of lifts of the PC column unit is the same as that of the conventional PC column unit. Can be halved. Furthermore, the connection part between the column main reinforcement and the column main reinforcement can be made 1/2 of the conventional column construction. Therefore, the lifting time and connection time can be shortened to improve the construction efficiency of the pillar, and the labor and cost for constructing the pillar can be reduced .
[0035]
Furthermore, since the beam main bar pre-assembled reinforcing bar is placed on the upper end of the concrete column member so that it can be lifted integrally with the concrete column member, the column main bar has a height of two stories. Despite this, it is possible to perform beam formation without depending on the work at a high place. Accordingly, it is possible to prevent deterioration in workability and increase in construction cost due to the fact that the above-mentioned pillar main bars are two stories high.
[0036]
Moreover, since the PC column unit of the invention according to claim 2 is provided with a joint member that is embedded in the lower end surface of the concrete column member and connects the column main bar and the other column main bar, the PC column unit It is possible to facilitate the connection work between the column main reinforcement and the upper end of the column main reinforcement from the lower floor. Therefore, the construction efficiency of the pillar can be further improved .
[Brief description of the drawings]
FIG. 1 is a diagram showing a configuration of a PC pillar unit according to the present invention.
FIG. 2 is a diagram showing a procedure for erecting a PC pillar unit shown in FIG. 1;
FIG. 3 is a diagram showing a configuration of a PC pillar unit different from FIG.
FIG. 4 is an explanatory diagram of a work procedure in a conventional column and beam construction method.
[Explanation of symbols]
11, 21, 23, 31 ... PC pillar unit,
12, 22, 24, 32 ... Column main bar, 13, 33 ... Full PC column,
14, 25, 27, 38 ... column shear reinforcement,
15 ... Sleeve joint, 26 ... Column formwork,
34: Reinforcement bar main bar rebar bar 35: Panel zone
36: Beam main reinforcement, 37: Beam shear reinforcement.

Claims (2)

1階分階高長さのコンクリート製柱部材と、
2階分階高長さを有すると共に、下端部が上記コンクリート製柱部材に埋設される一方、上端部が上記コンクリート製柱部材から突出している複数本の柱主筋と、
上記柱主筋における上記コンクリート製柱部材に埋設された個所の外周に、所定間隔で巻き回された複数の柱剪断補強筋と、
上記コンクリート製柱部材の上端に載置されると共に、複数の梁主筋に外接して所定の間隔で梁剪断補強筋が巻き回されて成る梁主筋先組鉄筋籠と
を備え
上記柱主筋および上記柱剪断補強筋を含む上記コンクリート製柱部材と、上記梁主筋先組鉄筋籠とは、一体になって吊り上げ可能になっている
ことを特徴とするプレキャスト柱ユニット。
A concrete pillar member with a height on the first floor,
A plurality of column main bars having a second floor height and having a lower end embedded in the concrete column member and an upper end protruding from the concrete column member,
A plurality of column shear reinforcement bars wound at predetermined intervals on the outer periphery of the portion embedded in the concrete column member in the column main reinforcement ,
A beam main bar tip assembly reinforcing bar 載 which is placed on the upper end of the concrete column member and which is circumscribed by a plurality of beam main bars and wound with beam shear reinforcing bars at a predetermined interval ;
The precast column unit, wherein the concrete column member including the column main reinforcing bar and the column shear reinforcing bar and the beam main bar pre-assembled reinforcing bar rod can be lifted together. .
請求項1に記載のプレキャスト柱ユニットにおいて、
上記コンクリート製柱部材の下端面における上記柱主筋の位置に埋設されて形成されると共に、上記柱主筋と他の柱主筋とを接続する継手部材を備えたことを特徴とするプレキャスト柱ユニット。
In the precast pillar unit according to claim 1,
A precast column unit comprising a joint member that is embedded in a position of the column main reinforcement on the lower end surface of the concrete column member and connects the column main reinforcement to another column main reinforcement.
JP11357399A 1999-04-21 1999-04-21 Precast pillar unit Expired - Fee Related JP3981496B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11357399A JP3981496B2 (en) 1999-04-21 1999-04-21 Precast pillar unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11357399A JP3981496B2 (en) 1999-04-21 1999-04-21 Precast pillar unit

Publications (2)

Publication Number Publication Date
JP2000303622A JP2000303622A (en) 2000-10-31
JP3981496B2 true JP3981496B2 (en) 2007-09-26

Family

ID=14615675

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11357399A Expired - Fee Related JP3981496B2 (en) 1999-04-21 1999-04-21 Precast pillar unit

Country Status (1)

Country Link
JP (1) JP3981496B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302255A (en) * 2020-10-28 2021-02-02 中建三局第二建设工程有限责任公司 Frame column inverted insertion combined system and construction method

Also Published As

Publication number Publication date
JP2000303622A (en) 2000-10-31

Similar Documents

Publication Publication Date Title
KR101903628B1 (en) Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof
KR200414349Y1 (en) Connection structure of precast concrete structure
JP5993203B2 (en) Reinforced concrete structure construction method and RC structure structure
KR101798138B1 (en) Multi precast wall structure and its construction method
JP2006063718A (en) Method of constructing overhung bridge using corrugated steel plate web
JP3981496B2 (en) Precast pillar unit
KR101908943B1 (en) RC WALL STRUCTURE FOR TOP-DOWN AND METHOD FOR CONSTRUCTING THE STRUCTUREa
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
JP3426492B2 (en) Hollow precast concrete precast concrete column unit with column and beam reinforcement and column construction method using this column unit
JP2020084686A (en) Independent footing foundation structure and its construction method
JP4005259B2 (en) How to build columns and beams
JP2002332691A (en) Joint construction between column and beam
JP3364426B2 (en) How to build pillars
JP2984626B2 (en) PC pillar construction method and its PC pillar
KR102634082B1 (en) Bracket reinforcement structure of hollow-core column and its construction method
JPH05156654A (en) Top-down construction method
JPH0598653A (en) Steel pipe concrete pillar in underground inverter construction method
JPH108725A (en) Constructing method for building frame
JP3187618B2 (en) How to assemble beam reinforcement
KR20060028889A (en) Structure for plastic slab deck system and downward construction method using the same
JPH038954A (en) Concrete panel for wall, and constructing method for wall using concrete panel
JP2023022563A (en) Concrete wall construction method
KR200369485Y1 (en) a deck supportframe
KR20020089636A (en) Structure means and it&#39;s structure operation method of a building
JP3364185B2 (en) Temporary scaffold for assembling wooden ramen and method of assembling wooden ramen using the temporary scaffold

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050622

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070306

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070320

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070516

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070619

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070702

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100706

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100706

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130706

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees