JP3981496B2 - Precast pillar unit - Google Patents
Precast pillar unit Download PDFInfo
- Publication number
- JP3981496B2 JP3981496B2 JP11357399A JP11357399A JP3981496B2 JP 3981496 B2 JP3981496 B2 JP 3981496B2 JP 11357399 A JP11357399 A JP 11357399A JP 11357399 A JP11357399 A JP 11357399A JP 3981496 B2 JP3981496 B2 JP 3981496B2
- Authority
- JP
- Japan
- Prior art keywords
- column
- floor
- main
- reinforcement
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、柱主筋とこの柱主筋の下端部に配筋された柱剪断補強筋とがコンクリート製の柱部材に埋設されて成るプレキャスト柱ユニット(以下、PC柱ユニットと略称する)に関する。
【0002】
【従来の技術】
従来、コンクリート製の柱および梁の構築方法として図4に示すような方法がある。この柱および梁の構築方法においては、先ず、図4(a)に示すように、N階の柱設置位置に、1階分の階高長さを有する柱主筋1を立設する。この柱主筋1の立設は、例えばN階の床面から突出している(N−1)階の柱主筋の上端に、N階の柱主筋1の下端を接続することによって行う。次に、上記立設された柱主筋1の周囲に、N階床面まで柱剪断補強筋2を巻き付ける。そして、図4(b)に示すように、柱剪断補強筋2が巻き付けられた柱主筋1の周囲に柱型枠3を組み立てて、コンクリートを打設する。
【0003】
こうして、図4(c)に示すように、1階分の階高長さを有するコンクリート柱4が完成した後に、隣接するコンクリート柱4,4間の施工階床面上に1階分階高の足場(図示せず)を設け、例えばハーフプレキャストコンクリート(以下、ハーフPCと略称する)梁5を吊り込んで、ハーフPC梁5の両端から突出している梁主筋6,6をコンクリート柱4,4の上端から突出している柱主筋1,1の間に垂直方向に挿入して、ハーフPC梁5の両端部をコンクリート柱4,4の上端に載置する。このようにして、2本のコンクリート柱4,4の間にハーフPC梁5を架設する。最後に、コンクリート柱4,4とハーフPC梁5との接合部であるパネルゾーン7,7に型枠を組み、床型枠および床鉄筋を組み立てて、コンクリートを打設する。
【0004】
【発明が解決しようとする課題】
しかしながら、上記従来の柱及び梁の構築方法には以下のような問題がある。
(a)地上から各施工階まで柱主筋1や柱剪断補強筋2等の鉄筋とハーフPC梁5を揚重しなければならず、高層建築物に適用する場合には、施工高さ(揚重高さ)が高くなるために揚重に要する時間が長くなり、施工効率が悪くなってしまう。
【0005】
(b)上記柱主筋1の長さは1階分の階高長さである。したがって、総ての階で柱主筋1と柱主筋1との接続を行わなければならず、柱構築に時間と労力を要する。尚、予め柱主筋1に柱剪断補強筋2を配筋した先組鉄筋籠を使用しても同様である。また、1階分階高長さの柱主筋を有するPC柱ユニットを使用しても同様である。
【0006】
(c)(a)における揚重回数や(b)における柱主筋と柱主筋との接続回数を少なくする方法として、図4(a)に示す柱主筋の長さを一様に2階分階高長さまたはそれ以上にすることが考えられる。ところが、ハーフPC梁5の両端から突出している梁主筋6,6を、コンクリート柱4,4の上端から突出している柱主筋の間に垂直に挿入する作業が高所作業になるので、施工性が悪いという問題がある。さらに、柱主筋の長さを一様に2階分階高長さあるいはそれ以上にすると、従来よりも高所まで足場を設けなければならず、そのため施工コストが上がるという問題もある。
【0007】
そこで、この発明の目的は、各施工階毎の揚重回数が少なく、柱主筋と柱主筋との接続回数が少なく、施工効率の高いPC柱ユニットを提供することにある。
【0008】
【課題を解決するための手段】
上記目的を達成するため、請求項1に係る発明のPC柱ユニットは、
1階分階高長さのコンクリート製柱部材と、
2階分階高長さを有すると共に、下端部が上記コンクリート製柱部材に埋設される一方、上端部が上記コンクリート製柱部材から突出している複数本の柱主筋と、
上記柱主筋における上記コンクリート製柱部材に埋設された個所の外周に、所定間隔で巻き回された複数の柱剪断補強筋と、
上記コンクリート製柱部材の上端に載置されると共に、複数の梁主筋に外接して所定の間隔で梁剪断補強筋が巻き回されて成る梁主筋先組鉄筋籠と
を備え、
上記柱主筋および上記柱剪断補強筋を含む上記コンクリート製柱部材と、上記梁主筋先組鉄筋籠とは、一体になって吊り上げ可能になっている
ことを特徴としている。
【0009】
上記構成によれば、施工階に立設される柱主筋の長さは2階分階高長さを有するために、当該PC柱ユニットの揚重回数が従来のPC柱ユニットの1/2となる。さらに、柱主筋と柱主筋との接続個所が従来の柱施工の1/2となる。こうして、上記揚重時間や接続時間が短縮されて柱の施工効率が向上されると共に、柱構築の労力とコストとが削減される。
【0010】
さらに、予め ( N+1 ) 階分の梁主筋先組鉄筋籠が上記コンクリート製柱部材の上端に載置され、上記コンクリート製柱部材と一体になって吊り上げ可能になっている。そのために、上記柱主筋が2階分階高長さであるにも拘わらず、高所作業によらずに梁形成が行われ、施工性の低下および施工コストの高騰が防止される。
【0011】
また、請求項2に係る発明は、請求項1にかかる発明のPC柱ユニットにおいて、上記コンクリート製柱部材の下端面における上記柱主筋の位置に埋設されて形成されると共に、上記柱主筋と他の柱主筋とを接続する継手部材を備えたことを特徴としている。
【0012】
上記構成によれば、上記コンクリート製柱部材の下端面に継手部材が埋設されて形成されているため、当該PC柱ユニットの柱主筋を下層階からの柱主筋の上端に接続する際の接続作業が容易に行われる。こうして、柱の施工効率が更に向上される。
【0013】
【発明の実施の形態】
以下、この発明を図示の実施の形態により詳細に説明する。
<第1実施の形態>
図1は、本実施の形態のPC柱ユニットを示す図である。尚、図1(a)は縦断面図であり、図1(b)は図1(a)におけるA−A矢視断面図であり、図1(c)は図1(a)におけるB−B矢視断面図である。尚、上記図1(a)は、図1(b)および図1(a)におけるC−C矢視断面図に相当する。
【0014】
本実施の形態においては、上記PC柱ユニットとして、2階分の階高の長さを有する複数本の柱主筋12が埋設されたPC柱ユニット11を用いることによって、各施工階毎の柱部材(PC柱ユニット11)の揚重回数を少なくし、柱部材の柱主筋と柱部材の柱主筋との接続回数を少なくするのである。
【0015】
本実施の形態におけるPC柱ユニット11は、次のような構成を有している。すなわち、図1(a)に示すように、2階分階高の長さを有する柱主筋12が四角筒状に配列され、その下部が1階分階高長さのコンクリート製柱部材(以下、フルPC柱と言う)13に埋設されている。また、柱主筋12におけるフルPC柱13に埋設された個所の外周には、長手方向に所定間隔で巻付け配筋された柱剪断補強筋14が埋設されている。尚、柱主筋12は必ずしも四角筒状に配列される必要はなく、円筒状等の他の筒状に配列しても差し支えない。
【0016】
また、上記フルPC柱13の下端面には、上記各柱主筋12の位置に、柱主筋12の下端部を外部に連通する孔が形成されて、スリーブ継手15を構成している。尚、上記孔は、柱主筋12の直径よりやや大きな内径を有すると共に、柱主筋12と同心で所定深さに形成されている。
【0017】
上記構成を有するPC柱ユニット11(以下、第1PC柱ユニット11と言う)は、図2に示すような手順によって立設される。図2(a)に示すように、柱立設作業を行うN階の床面からは、(N−2)階に立設された第2PC柱ユニット21(第1PC柱ユニット11と同じ構造を有する)における2階分の階高の長さを有するの第2柱主筋22の先端22aが突出している。また、(N−1)階に立設された第3PC柱ユニット23(第1PC柱ユニット11と同じ構造を有する)における2階分の階高の長さを有する第3柱主筋24のN階部分24aが突出している。そして、第2PC柱ユニット21と第3PC柱ユニット23とは交互に配列されている。
【0018】
先ず、上記第1PC柱ユニット11がクレーン16によって吊り上げられる。そして、フルPC柱13の下端におけるスリーブ継手15の上記孔にN階の床面から突出している第2柱主筋22の先端22aが挿入されて、第1PC柱ユニット11と第2PC柱ユニット21とが接続される。こうして、フルPC柱13をN階の床面上に設置することによってN階のコンクリート柱が形成される。
【0019】
次に、上記(N−1)階からの第3柱主筋24におけるN階部分24aには、(1階分の階高の長さ−梁高さ)分の柱剪断補強筋25が配筋される。次に、図2(b)に示すように、第3柱主筋24aの柱剪断補強筋25の箇所にN階の柱型枠26が組み立てられる。
【0020】
次に、ハーフPC梁17を第3柱主筋24aの先端近傍までクレーン16で吊り上げ、一端から突出している上側梁主筋18を柱主筋(第1柱主筋)12に挿入した後、ハーフPC梁17を吊り降ろす。さらに、ハーフPC梁17を、その他端から突出している上側梁主筋19を柱型枠26から突出している第3柱主筋24aに挿入しながら更に吊り降ろし、両端から突出しているハーフPC梁17の端部の夫々をフルPC柱13あるいは柱型枠26上に載置する。こうして、フルPC柱13と柱型枠26との間にハーフPC梁17を架設する。
【0021】
次に、上記上側梁主筋18,19をフルPC柱13上のパネルゾーン外に(図中右側に)ずらし、上記パネルゾーンに柱剪断補強筋(図示せず)を配筋する。さらに、上側梁主筋18,19を柱型枠26外に(図中左側に)ずらし、第3柱主筋24aに柱剪断補強筋(図示せず)を配筋する。そうした後、上側梁主筋18,19を元の位置に戻す。
【0022】
次に、上記フルPC柱13と柱型枠26との間に架設されたハーフPC梁17の中央部を支持材(図示せず)で支持し、第1柱主筋12とハーフPC梁17との接合部であるパネルゾーンに第1型枠(図示せず)を形成する一方、第3柱主筋24aとハーフPC梁17とのパネルゾーンに第2型枠(図示せず)を形成する。さらに、床型枠および床鉄筋を組み立てる。そうした後、上記第1型枠,第2型枠,柱型枠26の各型枠内および上記床型枠内にコンクリートを打設して、図2(c)に示すように、N階の柱と(N+1)階の床とが形成される。さらに、第1柱主筋12の(N+1)階部分に柱剪断補強筋27が配筋される。
【0023】
以後、(N+1)階の床28から突出している第1柱主筋12の(N+1)階分の柱剪断補強筋27が配筋された部分を図2(a)の第3柱主筋24aと見なし、床28から突出している第3柱主筋24aを図2(a)における第2柱主筋22の先端22aと見なして、図1(a)から図1(c)までの手順を繰り返すことによって、(N+1)階に柱が立設されるのである。
【0024】
上述のように、本実施の形態においては、2階分階高の長さを有する柱主筋12の下部に柱剪断補強筋14を配筋して1階分階高長さのフルPC柱13に埋設し、フルPC柱13の下端部にスリーブ継手15を設けてPC柱ユニット11を構成している。そして、PC柱ユニット11を立設する場合には、施工階であるN階の床から突出している(N−2)階からの第2柱主筋22の先端22aに、PC柱ユニット11における柱主筋12の下端をスリーブ継手15によって接続して立設するようにしている。
【0025】
したがって、上記PC柱ユニット11のN階への揚重回数を、図4に示す従来の構築方法における柱主筋の揚重回数の半分にすることができ、施工効率を上げることができるのである。さらに、柱主筋12の長さは2階分階高長さを有している。したがって、(N+1)階では、柱主筋12に対する次の柱主筋との接続を省略でき、柱主筋と柱主筋の接続回数を従来の半分にできる。すなわち、上記接続に要する時間と労力とコストを略半減できるのである。
【0026】
また、上記PC柱ユニット11を立設する際に、図2に示すように、同一梁が架設される2本のPC柱ユニット11のうちの一方をN階に立設し、他方を(N−1)階に立設すれば、第1柱主筋12におけるN階床面からの高さは2階分の階高であるのに対して、第3柱主筋24におけるN階部分24aの上記高さは1階分の階高となる。したがって、第1柱主筋12と第3柱主筋24aの間にハーフPC梁17を架設する場合に、吊り上げたハーフPC梁17を低い方の第3柱主筋24aの近傍まで降下させてから夫々の梁主筋18,19を柱主筋12,24aに挿入できる。そのため2階分高さの特別な足場を必要とはせず、第3柱主筋24aの上方の空間を利用することができ、ハーフPC梁17の架設を作業性良く行うことができる。さらに、ハーフPC梁17の梁主筋19を第3柱主筋24aに挿入する際に、先に梁主筋18が挿入された第1柱主筋12がガイドになって容易に挿入できる。尚、この効果は、第1柱主筋12と第3柱主筋24aの間に梁主筋先組鉄筋籠を架設する場合も同様に奏することができる。
【0027】
尚、上記実施の形態においては、上記PC柱ユニット11の立設手順を、図2に示すように、立設作業を行うN階の床面から、(N−2)階に立設された第2PC柱ユニット21の第2柱主筋22の先端22aと、(N−1)階に立設された第3PC柱ユニット23の第3柱主筋24のN階部分24aとが、交互に突出している場合を例に説明している。しかしながら、柱立設作業を行うN階の床面から(N−2)階に立設された第2PC柱ユニット21の第2柱主筋22の先端22aのみが突出している場合(つまり、全PC柱ユニット11の立設作業が同一階で行われる場合)でも、PC柱ユニット11のN階への揚重回数および柱主筋と柱主筋の接続回数を、図4に示す従来の構築方法場合の半分にできることは言うまでもない。但し、このように、全部のPC柱ユニット11の立設作業を同一施工階で行う場合には、全PC柱ユニット11の立設を行う階と全く行わない階とが交互に存在することになる。
【0028】
また、上記実施の形態においては、上記PC柱ユニット11における上階部分に対する柱形成時には柱型枠26を組み立てる場合を例に、PC柱ユニット11の立設手順を説明している。しかしながら、柱型枠26を組み立てずに、内部に矩形の柱剪断補強筋が長手方向に所定の間隔で埋設された鉄筋コンクリート構造の四角筒体でなる中空PC柱型枠を柱主筋24a,12に挿通させても差し支えない。
【0029】
<第2実施の形態>
図3は、本実施の形態におけるPC柱ユニットの外観図である。本実施の形態におけるPC柱ユニット31は、2階分階高の長さを有する柱主筋32が四角筒状に配列され、その下部が1階分階高長さのフルPC柱33に埋設されている。また、柱主筋32におけるフルPC柱33に埋設された個所の外周には長手方向に所定間隔で巻付け配筋された柱剪断補強筋(図示せず)が埋設されており、フルPC柱33の下端部にはスリーブ継手(図示せず)が設けられている。尚、柱主筋32は必ずしも四角筒状に配列される必要はなく、円筒状等の他の筒状に配列しても差し支えない。
【0030】
上記フルPC柱33上には、梁主筋先組鉄筋籠34が水平方向に載置されている。その場合、梁主筋先組鉄筋籠34における柱との接合部であるパネルゾーン部35には、柱主筋32が挿通されている。ここで、梁主筋先組鉄筋籠34は、水平方向に配設された複数の梁主筋36と、この梁主筋36の長手方向に所定の間隔で梁主筋36に外接して矩形状に巻き付け固定された梁剪断補強筋37で構成される。尚、梁主筋先組鉄筋籠34におけるパネルゾーン部35には梁剪断補強筋37は設けられてはおらず、柱主筋32に外接して矩形の柱剪断補強筋38が所定の間隔で配筋されている。また、39は、PC柱ユニット31を施工階床面40上に支持する支保工である。
【0031】
尚、上記構成を有する本実施の形態のPC柱ユニット31の立設作業は、第1実施の形態の場合に順じて行われる。但し、PC柱ユニット31は、梁主筋先組鉄筋籠34が搭載されている関係上、全PC柱ユニット31の立設を同一階で行う方が作業効率はよい。その場合、PC柱ユニット31には(N+2)階分の梁主筋先組鉄筋籠梁は設けられていないので、梁主筋先組鉄筋籠34と同じ構成を有する(N+2)階分の梁主筋先組鉄筋籠の上記パネルゾーンを柱主筋32に挿通させるか、あるいは、(N+2)階分の梁を現場で組み立てる必要がある。但し、その場合、既に(N+1)階の床は形成されているので、高い足場を必要とはせず、従来の梁形成作業と同様にして行うことができる。
【0032】
上述のように、本実施の形態においては、柱立設作業階であるN階分のフルPC柱33と、下部が柱剪断補強筋と共にフルPC柱33内に埋設された2階分の階高長さを有する柱主筋32と、パネルゾーン部35が柱主筋32に挿通されてフルPC柱33上に水平方向に載置された(N+1)階分の梁主筋先組鉄筋籠34で、PC柱ユニット31を構成している。
【0033】
したがって、本実施の形態によれば、上記PC柱ユニット31の揚重回数を、図4に示す従来の構築方法における柱主筋の揚重回数の半分に短縮して施工効率を上げることができる。さらに、PC柱ユニット31の柱主筋32と床から突出している柱主筋との接続回数を従来の半分にして時間と労力とを略半減できる。また、予め(N+1)階分の梁主筋先組鉄筋籠34をフルPC柱33上に載置しているので、柱主筋32を2階分階高の長さにした場合における梁形成の高所作業を無くすことができ、施工性の低下を防止できる。
【0034】
【発明の効果】
以上より明らかなように、請求項1に係る発明のPC柱ユニットは、2階分階高長さを有する柱主筋の下端部に所定間隔で複数の柱剪断補強筋を配筋し、この柱主筋における上記柱剪断補強筋が配筋された下端部を1階分階高長さのコンクリート製柱部材に埋設して構成したので、当該PC柱ユニットの揚重回数を従来のPC柱ユニットの1/2にできる。さらに、柱主筋と柱主筋との接続個所を従来の柱施工の1/2にできる。したがって、上記揚重時間や接続時間を短縮して柱の施工効率を向上でき、柱構築の労力とコストとを削減できる。
【0035】
さらに、上記コンクリート製柱部材の上端に梁主筋先組鉄筋籠を載置して、上記コンクリート製柱部材と一体になって吊り上げ可能にしているので、上記柱主筋が2階分階高長さであるにも拘わらず、高所作業によらずに梁形成を行うことができる。したがって、上記柱主筋が2階分階高長さであるがための施工性の低下および施工コストの高騰を防止できる。
【0036】
また、請求項2に係る発明のPC柱ユニットは、上記コンクリート製柱部材の下端面に埋設されて、上記柱主筋と他の柱主筋とを接続する継手部材を設けたので、当該PC柱ユニットの柱主筋と下層階からの柱主筋の上端との接続作業を容易にできる。したがって、柱の施工効率を更に向上できる。
【図面の簡単な説明】
【図1】 この発明のPC柱ユニットの構成を示す図である。
【図2】 図1に示すPC柱ユニットの立設手順を示す図である。
【図3】 図1とは異なるPC柱ユニットの構成を示す図である。
【図4】 従来の柱および梁の構築方法における作業手順の説明図である。
【符号の説明】
11,21,23,31…PC柱ユニット、
12,22,24,32…柱主筋、 13,33…フルPC柱、
14,25,27,38…柱剪断補強筋、
15…スリーブ継手、 26…柱型枠、
34…梁主筋先組鉄筋籠、 35…パネルゾーン部、
36…梁主筋、 37…梁剪断補強筋。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a precast column unit (hereinafter abbreviated as a PC column unit) in which a column main reinforcement and a column shear reinforcing bar arranged at the lower end of the column main reinforcement are embedded in a concrete column member.
[0002]
[Prior art]
Conventionally, as a method for constructing concrete columns and beams, there is a method as shown in FIG. In this column and beam construction method, first, as shown in FIG. 4 (a), a column
[0003]
Thus, as shown in FIG. 4 (c), after the concrete pillar 4 having the height of one floor is completed, the height of the first floor is set on the construction floor between the adjacent concrete pillars 4 and 4. For example, a half precast concrete (hereinafter abbreviated as half PC) beam 5 is suspended, and the beam main bars 6, 6 protruding from both ends of the half PC beam 5 are connected to the concrete column 4, Inserted in the vertical direction between the column
[0004]
[Problems to be solved by the invention]
However, the conventional methods for constructing columns and beams have the following problems.
(a) Reinforcing bars such as column
[0005]
(b) The length of the column
[0006]
(c) As a method of reducing the number of lifting in (a) and the number of connections between the column main reinforcement and column main reinforcement in (b), the length of the column main reinforcement shown in FIG. It is conceivable to make it high or longer. However, the work of inserting the beam main bars 6 and 6 protruding from both ends of the half PC beam 5 vertically between the column main bars protruding from the upper ends of the concrete columns 4 and 4 is a work at a high place. There is a problem that is bad. Furthermore, if the length of the column main reinforcement is uniformly set to the height of the second floor or more, it is necessary to provide a scaffold to a higher place than before, which causes a problem that the construction cost increases.
[0007]
Accordingly, an object of the present invention is to provide a PC column unit having a high construction efficiency with a small number of lifting operations for each construction floor, a small number of connection between the column main reinforcement and the column main reinforcement.
[0008]
[Means for Solving the Problems]
In order to achieve the above object, the PC pillar unit of the invention according to
A concrete pillar member with a height on the first floor,
A plurality of column main bars having a second floor height and having a lower end embedded in the concrete column member and an upper end protruding from the concrete column member,
A plurality of column shear reinforcement bars wound at predetermined intervals on the outer periphery of the portion embedded in the concrete column member in the column main reinforcement ,
A beam main bar tip assembly reinforcing bar 載 which is placed on the upper end of the concrete column member and which is circumscribed by a plurality of beam main bars and wound with beam shear reinforcing bars at a predetermined interval ;
The concrete column member including the column main reinforcing bar and the column shear reinforcing bar and the beam main bar pre-assembled reinforcing bar rod can be integrally lifted .
[0009]
According to the above configuration, since the length of the column main reinforcement erected on the construction floor has the height of the second floor, the number of lifting of the PC column unit is 1/2 of that of the conventional PC column unit. Become. Furthermore, the connection part between the column main reinforcement and the column main reinforcement becomes 1/2 of the conventional column construction. Thus, the lifting time and connection time are shortened to improve the column construction efficiency, and the labor and cost of column construction are reduced.
[0010]
Further, a beam main reinforcing bar rebar bar for ( N + 1 ) floors is placed in advance on the upper end of the concrete column member, and can be lifted together with the concrete column member. Therefore, in spite of the fact that the column main reinforcement is 2 stories high, beam formation is performed regardless of the work at a high place, and the workability and the construction cost are prevented from being lowered.
[0011]
The invention according to
[0012]
According to the said structure, since the joint member is embed | buried and formed in the lower end surface of the said concrete column member, the connection operation | work at the time of connecting the column main reinforcement of the said PC column unit to the upper end of the column main reinforcement from a lower floor Is easily done. Thus, the construction efficiency of the pillar is further improved .
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in detail with reference to the illustrated embodiments.
<First embodiment>
FIG. 1 is a diagram showing a PC pillar unit of the present embodiment. 1 (a) is a longitudinal sectional view, FIG. 1 (b) is a sectional view taken along line AA in FIG. 1 (a), and FIG. 1 (c) is a sectional view taken along line B- in FIG. 1 (a). It is B arrow sectional drawing. 1A corresponds to a cross-sectional view taken along the line CC in FIGS. 1B and 1A.
[0014]
In the present embodiment, by using the
[0015]
The
[0016]
Further, a hole for communicating the lower end portion of the column
[0017]
The
[0018]
First, the first
[0019]
Next, column shear reinforcement bars 25 corresponding to (the height of the first floor-the height of the beam minus the beam height) are arranged in the N-
[0020]
Next, the
[0021]
Next, the upper beam
[0022]
Next, the central part of the
[0023]
Hereinafter, the portion where the
[0024]
As described above, in the present embodiment, the
[0025]
Therefore, the number of lifting of the
[0026]
When the
[0027]
In the above embodiment, the standing procedure of the
[0028]
Moreover, in the said embodiment, the standing procedure of the
[0029]
<Second Embodiment>
FIG. 3 is an external view of the PC pillar unit in the present embodiment. In the
[0030]
On the
[0031]
The standing work of the
[0032]
As described above, in the present embodiment, the
[0033]
Therefore, according to the present embodiment, the lifting efficiency of the
[0034]
【The invention's effect】
As is clear from the above, the PC column unit of the invention according to
[0035]
Furthermore, since the beam main bar pre-assembled reinforcing bar is placed on the upper end of the concrete column member so that it can be lifted integrally with the concrete column member, the column main bar has a height of two stories. Despite this, it is possible to perform beam formation without depending on the work at a high place. Accordingly, it is possible to prevent deterioration in workability and increase in construction cost due to the fact that the above-mentioned pillar main bars are two stories high.
[0036]
Moreover, since the PC column unit of the invention according to
[Brief description of the drawings]
FIG. 1 is a diagram showing a configuration of a PC pillar unit according to the present invention.
FIG. 2 is a diagram showing a procedure for erecting a PC pillar unit shown in FIG. 1;
FIG. 3 is a diagram showing a configuration of a PC pillar unit different from FIG.
FIG. 4 is an explanatory diagram of a work procedure in a conventional column and beam construction method.
[Explanation of symbols]
11, 21, 23, 31 ... PC pillar unit,
12, 22, 24, 32 ... Column main bar, 13, 33 ... Full PC column,
14, 25, 27, 38 ... column shear reinforcement,
15 ... Sleeve joint, 26 ... Column formwork,
34: Reinforcement bar main bar rebar bar 35: Panel zone
36: Beam main reinforcement, 37: Beam shear reinforcement.
Claims (2)
2階分階高長さを有すると共に、下端部が上記コンクリート製柱部材に埋設される一方、上端部が上記コンクリート製柱部材から突出している複数本の柱主筋と、
上記柱主筋における上記コンクリート製柱部材に埋設された個所の外周に、所定間隔で巻き回された複数の柱剪断補強筋と、
上記コンクリート製柱部材の上端に載置されると共に、複数の梁主筋に外接して所定の間隔で梁剪断補強筋が巻き回されて成る梁主筋先組鉄筋籠と
を備え、
上記柱主筋および上記柱剪断補強筋を含む上記コンクリート製柱部材と、上記梁主筋先組鉄筋籠とは、一体になって吊り上げ可能になっている
ことを特徴とするプレキャスト柱ユニット。A concrete pillar member with a height on the first floor,
A plurality of column main bars having a second floor height and having a lower end embedded in the concrete column member and an upper end protruding from the concrete column member,
A plurality of column shear reinforcement bars wound at predetermined intervals on the outer periphery of the portion embedded in the concrete column member in the column main reinforcement ,
A beam main bar tip assembly reinforcing bar 載 which is placed on the upper end of the concrete column member and which is circumscribed by a plurality of beam main bars and wound with beam shear reinforcing bars at a predetermined interval ;
The precast column unit, wherein the concrete column member including the column main reinforcing bar and the column shear reinforcing bar and the beam main bar pre-assembled reinforcing bar rod can be lifted together. .
上記コンクリート製柱部材の下端面における上記柱主筋の位置に埋設されて形成されると共に、上記柱主筋と他の柱主筋とを接続する継手部材を備えたことを特徴とするプレキャスト柱ユニット。In the precast pillar unit according to claim 1,
A precast column unit comprising a joint member that is embedded in a position of the column main reinforcement on the lower end surface of the concrete column member and connects the column main reinforcement to another column main reinforcement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11357399A JP3981496B2 (en) | 1999-04-21 | 1999-04-21 | Precast pillar unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11357399A JP3981496B2 (en) | 1999-04-21 | 1999-04-21 | Precast pillar unit |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000303622A JP2000303622A (en) | 2000-10-31 |
JP3981496B2 true JP3981496B2 (en) | 2007-09-26 |
Family
ID=14615675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11357399A Expired - Fee Related JP3981496B2 (en) | 1999-04-21 | 1999-04-21 | Precast pillar unit |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3981496B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112302255A (en) * | 2020-10-28 | 2021-02-02 | 中建三局第二建设工程有限责任公司 | Frame column inverted insertion combined system and construction method |
-
1999
- 1999-04-21 JP JP11357399A patent/JP3981496B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2000303622A (en) | 2000-10-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101903628B1 (en) | Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof | |
KR200414349Y1 (en) | Connection structure of precast concrete structure | |
JP5993203B2 (en) | Reinforced concrete structure construction method and RC structure structure | |
KR101798138B1 (en) | Multi precast wall structure and its construction method | |
JP2006063718A (en) | Method of constructing overhung bridge using corrugated steel plate web | |
JP3981496B2 (en) | Precast pillar unit | |
KR101908943B1 (en) | RC WALL STRUCTURE FOR TOP-DOWN AND METHOD FOR CONSTRUCTING THE STRUCTUREa | |
JP6849491B2 (en) | Exposed column base structure of steel columns and its construction method | |
JP3426492B2 (en) | Hollow precast concrete precast concrete column unit with column and beam reinforcement and column construction method using this column unit | |
JP2020084686A (en) | Independent footing foundation structure and its construction method | |
JP4005259B2 (en) | How to build columns and beams | |
JP2002332691A (en) | Joint construction between column and beam | |
JP3364426B2 (en) | How to build pillars | |
JP2984626B2 (en) | PC pillar construction method and its PC pillar | |
KR102634082B1 (en) | Bracket reinforcement structure of hollow-core column and its construction method | |
JPH05156654A (en) | Top-down construction method | |
JPH0598653A (en) | Steel pipe concrete pillar in underground inverter construction method | |
JPH108725A (en) | Constructing method for building frame | |
JP3187618B2 (en) | How to assemble beam reinforcement | |
KR20060028889A (en) | Structure for plastic slab deck system and downward construction method using the same | |
JPH038954A (en) | Concrete panel for wall, and constructing method for wall using concrete panel | |
JP2023022563A (en) | Concrete wall construction method | |
KR200369485Y1 (en) | a deck supportframe | |
KR20020089636A (en) | Structure means and it's structure operation method of a building | |
JP3364185B2 (en) | Temporary scaffold for assembling wooden ramen and method of assembling wooden ramen using the temporary scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050622 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070306 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070320 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070516 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070619 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070702 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100706 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100706 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130706 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees |