JP3896032B2 - Construction method of precast column head and pier column head - Google Patents
Construction method of precast column head and pier column head Download PDFInfo
- Publication number
- JP3896032B2 JP3896032B2 JP2002140043A JP2002140043A JP3896032B2 JP 3896032 B2 JP3896032 B2 JP 3896032B2 JP 2002140043 A JP2002140043 A JP 2002140043A JP 2002140043 A JP2002140043 A JP 2002140043A JP 3896032 B2 JP3896032 B2 JP 3896032B2
- Authority
- JP
- Japan
- Prior art keywords
- pier
- column head
- head
- precast
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 26
- 230000003014 reinforcing effect Effects 0.000 claims description 49
- 239000004567 concrete Substances 0.000 claims description 12
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 238000009415 formwork Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000008602 contraction Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、プレキャスト柱頭部及び橋脚柱頭部の施工方法に関し、特に橋脚と柱頭部を剛結構造としたラーメン橋のプレキャスト柱頭部及び橋脚柱頭部の施工方法に関する。
【0002】
【従来の技術】
ラーメン橋の橋脚柱頭部aを施工する場合、橋脚bの躯体施工後に、橋脚bに架設ブラケットcを固定し、その上に支保工dを設置するか(図10(A)参照)、橋脚bに沿って地上から支保工eを設置し(図10(B)参照)、柱頭部aの鉄筋及び型枠fを建て込み、橋脚bから柱頭部aに伸びる鉄筋gを巻き込むようにコンクリートを打設し、橋脚bと柱頭部aとを剛結構造とするのが一般的である。
【0003】
【発明が解決しようとする課題】
ところが、上記従来の施工方法では、大掛かりなブラケットcや支保工d、e、型枠fを必要とし、柱頭部aの施工に長期間(約3ヶ月)を要する。
また、径間数の多い長大海上橋などでは工事費が極めて増大する。
一方、工期短縮のために柱頭部aをプレキャスト化する方法もあるが、橋脚bと柱頭部aを一体化するために、図11に示すようにPCケーブルやPC綱棒hで固定することが考えられる。しかしながら、プレキャストブロックによる柱頭部aをPCケーブルやPC綱棒hのみで橋脚bと接合し、剛結する場合は、沓(支承)をよけた配置となるため、十分な配置スペースを確保できず、剛性の高い一体化が困難である場合が多い。
【0004】
【発明の目的】
本発明は上記したような従来の問題点に鑑みて考えられたもので、工期を大幅に短縮することができるプレキャスト柱頭部及び橋脚柱頭部の施工方法を提供することを目的とする。
また、本発明は、橋脚と柱頭部との一体性を高めたプレキャスト柱頭部及び橋脚柱頭部の施工方法を提供することを目的とする。
さらに本発明は、径間数の多い長大海上橋などでも経済的な工事費で施工できるプレキャスト柱頭部及び橋脚柱頭部の施工方法を提供することを目的とする。
本発明は、これらの目的の少なくとも一つを達成するものである。
【0005】
【課題を解決するための手段】
上記のような目的を達成するために、本発明のプレキャスト柱頭部は、橋脚の頭部に剛結するプレキャスト柱頭部であって、上床版と、下床版と、ウェブとで構成し、前記下床版に、橋脚の頭部から突出した主鉄筋が貫通する開口部を設け、前記下床版の開口部側面及びウェブに鉄筋継手具を埋設してなるものである。
【0006】
また、本発明の橋脚柱頭部の施工方法は、橋脚とプレキャスト柱頭部とを一体化する施工方法であって、前記したプレキャスト柱頭部を、その開口部に橋脚の頭部から突出した主鉄筋を貫入しながら橋脚上に設置し、前記鉄筋継手具に鉄筋を接続して、柱頭部横桁の横方向鉄筋と下床版の主鉄筋を組み立て、コンクリートを打設して橋脚とプレキャスト柱頭部を一体化して行うものである。
【0007】
ここで、プレキャスト柱頭部を橋脚上に仮設置し、橋脚及びプレキャスト柱頭部に設けたブラケットに位置調整用ジャッキをセットし、該位置調整用ジャッキを使用してプレキャスト柱頭部の高さ及び方向を調整することができる。
さらに、ウェブの外側に橋脚の頭部から外側鉄筋を突出して配置し、プレキャスト柱頭部と外側鉄筋をコンクリートで一体化することもできる。
【0008】
【発明の実施の形態1】
以下、図面を参照しながら、本発明に係る一実施の形態について説明する。
【0009】
<イ>プレキャスト柱頭部10の構造(図3)
橋脚20の頭部(天端21)に剛結する柱頭部は、予め工場やヤードで製作したプレキャストコンクリートからなるプレキャスト柱頭部10である。
プレキャスト柱頭部10は、上床版11と下床版12とをウェブ13で結合した形状である。
プレキャスト柱頭部10を橋脚20の天端21上に設置し、桁部分を構成する(図1、図2参照)。
【0010】
<ロ>下床版12
下床版12に開口部14を設ける。
開口部14は、橋脚20の天端21から上方へ突出する多数の橋脚用主鉄筋22(以下、主鉄筋22という)をプレキャスト柱頭部10内に貫入するためのもので、これら主鉄筋22を貫入することのできる大きさである。
開口部14の側面に鉄筋継手具15を複数埋設する。鉄筋継手具15は、例えばネジ式鉄筋継手を使用することができる。このネジ式鉄筋継手15に下床版用主鉄筋18(以下、主鉄筋18という)を接続し、開口部14によって間隔が隔てられた下床版12に主鉄筋18を配筋し、下床版12を後打ちする。
【0011】
<ハ>ウェブ13
ウェブ13は、下床版12と上床版11との間であって、荷重の作用方向に略平行に配置される。
ウェブ13の垂直方向に、鉄筋継手具16を前後2列に複数埋設する(図1参照)。鉄筋継手具16は、前記と同様に例えばネジ式鉄筋継手を使用することができる。このネジ式鉄筋継手16は、後述する横桁30を構築するための横方向鉄筋31を接続するものである。
【0012】
<ニ>橋脚用主鉄筋22
橋脚20の天端21から主鉄筋22が上方へ突出する。
このため、プレキャスト柱頭部10を橋脚20上に設置すると、主鉄筋22はプレキャスト柱頭部10内に貫入する。主鉄筋22は、上床版11の内側近くまで突出しており、横方向鉄筋31と直交し、横桁30のRC構造部材となる。
【0013】
<ホ>位置調整用ジャッキ40
橋脚20の上部(天端21付近)にブラケット23を取り付け、位置調整用ジャッキ40を設置する。
位置調整用ジャッキ40は、例えば、油圧駆動式のものであって、ジャッキ本体と、伸縮プランジャ41とを有していて、伸縮プランジャ41が垂直上方を指向するように、ジャッキ本体の下端をブラケット23上に固定設置する。
プレキャスト柱頭部10のウェブ13にブラケット17を下向きに取り付ける。ブラケット17は伸縮プランジャ41に当接し、位置調整用ジャッキ40の駆動によってプレキャスト柱頭部10を支持することができ、プレキャスト柱頭部10の高さや方向を調整することができる。
【0014】
次に、橋脚柱頭部の施工方法について説明する。
【0015】
<イ>プレキャスト柱頭部10の製作
工場やヤードでプレキャスト柱頭部10を製作する。プレキャスト柱頭部10の下床版12に開口部14を設け、下床版12とウェブ13に予め鉄筋継手具15、16を埋設しておく。
ウェブ13にブラケット17を下向きに取り付けておく(図4(A))。また、橋脚20の天端21付近に、位置調整用ジャッキ40を設置するためのブラケット23を取り付けておく(図4(A))。
【0016】
<ロ>プレキャスト柱頭部10の仮設置(図4(B))
プレキャスト柱頭部10を現場に運搬し、図示しないが、クレーンなどでプレキャスト柱頭部10を吊り、橋脚20の天端21へ仮設置する。
プレキャスト柱頭部10をクレーンで下げていくとき、上方に突出している主鉄筋22を、開口部14からプレキャスト柱頭部10内へ貫入する。
長大海上橋などの場合は、クレーン船を用いた海上作業となる。
【0017】
<ハ>位置調整用ジャッキ40による調整(図5(A)、図5(B))
伸縮プランジャ41が垂直上方を指向するように、ブラケット17、23に位置調整用ジャッキ40をセットする。
位置調整用ジャッキ40を駆動し、伸縮プランジャ41がブラケット17を介してプレキャスト柱頭部10を支持しながら、プレキャスト柱頭部10の高さや方向を調整する。
【0018】
<ニ>主鉄筋18、横方向鉄筋31の組立(図6(A)、図6(B))
予め下床版12の開口部14側面に埋め込んである鉄筋継手具15に主鉄筋18を接続し、開口部14によって間隔が隔てられた下床版12に主鉄筋18を配筋する。
また、予めウェブ13に埋め込んである鉄筋継手具16に横方向鉄筋31を接続する。横方向鉄筋31は主鉄筋22と交差し、横桁30を構築するための鉄筋が組み立てられる。横方向鉄筋31と主鉄筋22とを交差して配置することで、荷重による応力を広く分布することができる。
【0019】
<ホ>コンクリート50の打設(図7(A)、図7(B))
主鉄筋18と横方向鉄筋31を組み立てた下床版12及び横桁30にコンクリート50を打設する。下床版12の開口部14に打設されたコンクリート50が橋脚20の天端21と一体になり、プレキャスト柱頭部10と橋脚20とが一体化する。
このようにしてプレキャスト柱頭部10と橋脚20が一体化すれば、このプレキャスト柱頭部10に、例えば型枠と支保工が一体となった移動作業台車を据え付け、移動作業台車をプレキャスト柱頭部10から張り出しながPC片持架設橋等を施工することができる。
【0020】
本発明のプレキャスト柱頭部10は、予め工場で製作するため、場所打ちコンクリート工法に比べて現場で型枠を必要とせず、品質の優れたものとすることができる。
また、プレキャスト柱頭部10としたことにより、橋脚20の施工とプレキャスト柱頭部10の製作を平行作業で行え、工期を三分の一以下に大幅に短縮することができる。
さらに、本発明の橋脚柱頭部の施工方法によれば、プレキャスト柱頭部10の荷重のみを支えれば足りる位置調整用ジャッキ40を設置するだけなので、仮設構造が比較的小規模で済むメリットがある。
【0021】
【発明の実施の形態2】
橋軸直角方向(橋軸と直交する横方向)に大きな力を受ける場合は、ウェブ13の外側に橋脚20から突出する外側鉄筋24を配置することができる。
即ち、図8に示すように橋脚20の両側に円弧部25を突設し、円弧部25の天端21から外側鉄筋24を上方へ突出する(図では一方の円弧部25及び外側鉄筋24はブロック10Aに隠れて見えない)。
プレキャスト柱頭部10を二つのブロック10A、10Bに分割し、ウェブ13の外側に外側鉄筋24が位置するように橋脚20上に設置する。なお、プレキャスト柱頭部10は二つのブロックに分割することなく、一体のままでもよい。
外側鉄筋24とウェブ13にコンクリート50を打設して一体化する(図9参照)。
なお、実施の形態1と同様に、下床版12の主鉄筋18、横桁30の横方向鉄筋31を組み立ててコンクリート50を打設してプレキャスト柱頭部10と橋脚10とを一体化する。
本例は、プレキャスト柱頭部10にRC構造の円弧部26を突出して形成するため、一体性がより高まり、橋軸直角方向の大きな力に抵抗できる。
なお、突出する形状は、円弧部25、26に限らず、例えば角形に形成してもよい。
【0022】
【本発明の効果】
本発明は、以上説明したようになるから次のような効果を得ることができる。
<イ>プレキャスト柱頭部としたため、予め工場やヤードで製作することにより橋脚の施工とプレキャスト柱頭部の製作を平行作業で行え、工期を三分の一以下に大幅に短縮することができる。
<ロ>橋脚の頭部から突出する主鉄筋、横桁の横方向鉄筋及び下床版の主鉄筋が連結したRC構造となるので、プレキャスト柱頭部と橋脚との一体性を高めたプレキャスト柱頭部及び橋脚柱頭部の施工方法を提供することができる。
<ハ>通常、ラーメン橋の柱頭部を施工するには、大掛かりなブラケットや支保工を必要とするが、本発明の施工方法によれば調整用のジャッキを載せるだけでよいため、仮設構造が小規模で済む。
<ニ>径間数の多い長大海上橋などに適用した場合は、工事費が極めて経済的となる。
【図面の簡単な説明】
【図1】橋脚上に設置したプレキャスト柱頭部の一部を断面して示す斜視図。
【図2】橋脚とプレキャスト柱頭部を一体化した状態を示す斜視図。
【図3】プレキャスト柱頭部の斜視図。
【図4】(A)は仮設置前のプレキャスト柱頭部と橋脚を示す説明図で、(B)は仮設置後のプレキャスト柱頭部と橋脚を示す説明図。
【図5】位置調整ジャッキによる位置調整を示す説明図で、(A)は一部を断面した側面図で、(B)は断面した正面図。
【図6】鉄筋を組み立てた状態を示す説明図で、(A)は側面図で、(B)は一部を断面した正面図。
【図7】コンクリートを打設した状態を示す説明図で、(A)は側面図で、(B)は断面した正面図。
【図8】他の実施例で、プレキャスト柱頭部と橋脚を示す斜視図。
【図9】他の実施例で、橋脚とプレキャスト柱頭部を一体化した状態を示す斜視図。
【図10】従来の説明図で、(A)はブラケット方式を示す図で、(B)は固定支保工方式を示す図。
【図11】従来のプレキャスト柱頭部の施工例を示す説明図。
【符号の説明】
10・・・プレキャスト柱頭部
12・・・下床版
13・・・ウェブ
14・・・開口部
15、16・・・鉄筋継手具
18・・・主鉄筋
20・・・橋脚
22・・・主鉄筋(橋脚用主鉄筋)
24・・・外側鉄筋
25、26・・・円弧部
31・・・横方向鉄筋
40・・・位置調整用ジャッキ
41・・・伸縮プランジャ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for constructing a precast column head and a pier column head, and more particularly, to a method for constructing a precast column head and a pier column head of a rigid frame bridge having a rigid structure between the pier and the column head.
[0002]
[Prior art]
When the pier head a of the ramen bridge is constructed, after the pier b is constructed, the construction bracket c is fixed to the pier b and the support d is installed thereon (see FIG. 10 (A)), or the pier b A support e is installed from above the ground (see Fig. 10 (B)), the rebar and formwork f of the column head a are built, and concrete is driven so that the rebar g extending from the pier b to the column head a is involved. In general, the bridge pier b and the column head a have a rigid connection structure.
[0003]
[Problems to be solved by the invention]
However, the conventional construction method requires a large bracket c, supporting works d and e, and a formwork f, and construction of the column head a requires a long time (about 3 months).
In addition, construction costs will increase significantly for long ocean bridges with many spans.
On the other hand, there is a method of precasting the column head a for shortening the construction period, but in order to integrate the bridge pier b and the column head a, it may be fixed with a PC cable or a PC rope h as shown in FIG. Conceivable. However, when the column head a by the precast block is joined to the bridge pier b only with the PC cable or the PC rope h and rigidly connected, it is arranged to avoid the anchor (support), so it is not possible to secure a sufficient arrangement space. In many cases, it is difficult to integrate with high rigidity.
[0004]
OBJECT OF THE INVENTION
The present invention has been conceived in view of the above-described conventional problems, and an object thereof is to provide a method for constructing a precast column head and an abutment column head that can significantly shorten the construction period.
Moreover, an object of this invention is to provide the construction method of the precast column head and the pier column head which improved the integrity of a bridge pier and a column head.
Furthermore, an object of the present invention is to provide a method for constructing a precast column head and a pier column head that can be constructed at an economical construction cost even on a long ocean bridge with a large number of spans.
The present invention achieves at least one of these objects.
[0005]
[Means for Solving the Problems]
In order to achieve the above object, the precast column head of the present invention is a precast column head rigidly connected to the head of the pier, and is composed of an upper floor slab, a lower floor slab, and a web, The lower floor slab is provided with an opening through which the main rebar protruding from the head of the pier passes, and a reinforcing bar joint is embedded in the side of the opening of the lower floor slab and the web.
[0006]
Moreover, the construction method of the pier head of the present invention is a construction method of integrating the pier and the precast column head, and the main rebar protruding from the head of the pier is formed in the opening of the precast column head. Installed on the pier while penetrating, connect the reinforcing bar to the reinforcing bar joint, assemble the horizontal reinforcing bar of the column head girder and the main reinforcing bar of the lower floor slab, cast concrete, and connect the pier and precast column head Integrated.
[0007]
Here, the precast column head is temporarily installed on the pier, the position adjustment jack is set on the bracket provided on the pier and the precast column head, and the height and direction of the precast column head are adjusted using the position adjustment jack. Can be adjusted.
Furthermore, an outer reinforcing bar protrudes from the head of the pier outside the web, and the precast column head and the outer reinforcing bar can be integrated with concrete.
[0008]
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0009]
<A> Structure of precast column head 10 (FIG. 3)
The column head rigidly connected to the head (top end 21) of the
The
The
[0010]
<Ro>
An
The opening 14 is for penetrating a large number of pier main rebars 22 (hereinafter referred to as main rebars 22) projecting upward from the
A plurality of reinforcing bar joints 15 are embedded in the side surface of the
[0011]
<C>
The
In the vertical direction of the
[0012]
<D>
The
For this reason, when the
[0013]
<E>
The
The
A
[0014]
Next, the construction method of the pier column head will be described.
[0015]
<A> Production of
A
[0016]
<B> Temporary installation of precast column head 10 (FIG. 4B)
The
When the
In the case of a long ocean bridge, the work is carried out using a crane ship.
[0017]
<C> Adjustment using position adjusting jack 40 (FIGS. 5A and 5B)
The
The
[0018]
<D> Assembly of main reinforcing
The main reinforcing
Further, the transverse reinforcing
[0019]
<E> Placing concrete 50 (FIGS. 7A and 7B)
Concrete 50 is placed on the
If the
[0020]
Since the
Moreover, by setting it as the
Furthermore, according to the construction method of the pier column head according to the present invention, since only the
[0021]
Second Embodiment of the Invention
When receiving a large force in the direction perpendicular to the bridge axis (lateral direction perpendicular to the bridge axis), the outer reinforcing bar 24 protruding from the
That is, as shown in FIG. 8, arc portions 25 are provided on both sides of the
The
Concrete 50 is cast on the outer reinforcing bar 24 and the
As in the first embodiment, the
In this example, since the arc portion 26 of the RC structure protrudes from the
The protruding shape is not limited to the arc portions 25 and 26, and may be formed in, for example, a square shape.
[0022]
[Effect of the present invention]
Since the present invention has been described above, the following effects can be obtained.
<I> Since it is a precast column head, it can be constructed in advance in a factory or a yard, so that the construction of the pier and the production of the precast column head can be performed in parallel work, and the construction period can be greatly reduced to one-third or less.
<B> Precast column head with improved integration between precast column head and pier, because it has an RC structure in which the main rebar protruding from the head of the pier, the transverse rebar of the cross beam and the main rebar of the lower floor slab are connected And the construction method of the pier head can be provided.
<C> Normally, in order to construct the column head of a ramen bridge, a large bracket or support work is required. However, according to the construction method of the present invention, it is only necessary to place a jack for adjustment, so that the temporary structure is Small scale is enough.
<D> When applied to a long ocean bridge with a large number of spans, the construction cost is extremely economical.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a cross-section of a part of a precast column head installed on a pier.
FIG. 2 is a perspective view showing a state where a bridge pier and a precast column head are integrated.
FIG. 3 is a perspective view of a precast column head.
4A is an explanatory diagram showing a precast column head and a pier before temporary installation, and FIG. 4B is an explanatory diagram showing a precast column head and a pier after temporary installation.
FIGS. 5A and 5B are explanatory views showing position adjustment by a position adjustment jack, wherein FIG. 5A is a side view in which a part is cut, and FIG.
6A and 6B are explanatory views showing a state where the reinforcing bars are assembled, in which FIG. 6A is a side view, and FIG.
7A and 7B are explanatory views showing a state in which concrete is placed, in which FIG. 7A is a side view and FIG. 7B is a cross-sectional front view.
FIG. 8 is a perspective view showing a precast column head and an abutment in another embodiment.
FIG. 9 is a perspective view showing a state where the pier and the precast column head are integrated in another embodiment.
FIGS. 10A and 10B are explanatory diagrams of the prior art, FIG. 10A is a diagram showing a bracket method, and FIG. 10B is a diagram showing a fixed support method.
FIG. 11 is an explanatory view showing a construction example of a conventional precast column head.
[Explanation of symbols]
DESCRIPTION OF
24 ... Outer rebar 25, 26 ...
Claims (4)
上床版と、下床版と、ウェブとで構成し、
前記下床版に、橋脚の頭部から突出した主鉄筋が貫通する開口部を設け、
前記下床版の開口部側面及びウェブに鉄筋継手具を埋設してなる、
プレキャスト柱頭部。A precast pillar head that is rigidly attached to the head of the pier,
It consists of an upper floor slab, a lower floor slab, and a web.
The lower floor slab is provided with an opening through which the main rebar protruding from the head of the pier passes.
Reinforcing bar joints are embedded in the opening side and web of the lower floor slab,
Precast pillar head.
請求項1に記載するプレキャスト柱頭部を、その開口部に橋脚の頭部から突出した主鉄筋を貫入しながら橋脚上に設置し、
前記鉄筋継手具に鉄筋を接続して、柱頭部横桁の横方向鉄筋と下床版の主鉄筋を組み立て、
コンクリートを打設して橋脚とプレキャスト柱頭部を一体化して行う、
橋脚柱頭部の施工方法。A construction method of the pier column head that integrates the pier and the precast column head,
The precast column head described in claim 1 is installed on the pier while penetrating the main rebar protruding from the head of the pier into the opening,
Connect the reinforcing bars to the above-mentioned reinforcing bar joint, and assemble the horizontal reinforcing bars of the column head girder and the main reinforcing bars of the lower floor slab,
Concrete is placed and the pier and precast column head are integrated.
Construction method of the pier head.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002140043A JP3896032B2 (en) | 2002-05-15 | 2002-05-15 | Construction method of precast column head and pier column head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002140043A JP3896032B2 (en) | 2002-05-15 | 2002-05-15 | Construction method of precast column head and pier column head |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003328320A JP2003328320A (en) | 2003-11-19 |
JP3896032B2 true JP3896032B2 (en) | 2007-03-22 |
Family
ID=29701018
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002140043A Expired - Fee Related JP3896032B2 (en) | 2002-05-15 | 2002-05-15 | Construction method of precast column head and pier column head |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3896032B2 (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006265976A (en) * | 2005-03-25 | 2006-10-05 | Oriental Construction Co Ltd | Corrugated steel-plate web u component bridge and its construction method |
JP4607785B2 (en) * | 2006-02-13 | 2011-01-05 | 三井住友建設株式会社 | Continuous viaduct |
JP5157433B2 (en) * | 2007-12-28 | 2013-03-06 | 鹿島建設株式会社 | Composite hollow structure of bridge column head or girder end |
KR101526889B1 (en) * | 2013-07-05 | 2015-06-09 | 지에스건설 주식회사 | Permanent form and construction method for coping |
JP6089096B2 (en) * | 2015-12-24 | 2017-03-01 | 三井住友建設株式会社 | Method for suppressing twist of precast girder and method for joining precast girder |
CN111809523B (en) * | 2020-07-07 | 2021-09-14 | 中交二航局第四工程有限公司 | Measurement and check method based on section box girder short line matching prefabricated pedestal foundation |
JP7483594B2 (en) | 2020-11-13 | 2024-05-15 | 三井住友建設株式会社 | How to build a box girder bridge |
CN114837069B (en) * | 2022-04-26 | 2024-01-30 | 中机中联工程有限公司 | Pier beam consolidation structure of steel box girder bridge and construction method thereof |
CN115369748B (en) * | 2022-09-19 | 2024-06-04 | 中交一公局第七工程有限公司 | Construction method of formwork system for integrally pouring bridge pier and tie beam |
-
2002
- 2002-05-15 JP JP2002140043A patent/JP3896032B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2003328320A (en) | 2003-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102187993B1 (en) | Prefabricated Bridge Structure and Construction Method | |
KR100889273B1 (en) | Construction method for rhamen bridge | |
JP5045214B2 (en) | Column head construction method | |
KR101937680B1 (en) | Prefabricated Precast Structure and Construction Method Thereof | |
JP2007077630A (en) | Continuous girder using precast main-girder segment, and its erection method | |
KR102072685B1 (en) | Bridge using connecting member and method of construction | |
KR100543969B1 (en) | Composite rigid-frame bridge installing prestressed compound beam to the contral point of the slab of rigid-frame bridge and connecting the beam to the steel member installed in the upper of pole, and construction method thereof | |
JP5405337B2 (en) | Construction method of railway RC ramen structure viaduct | |
KR101263370B1 (en) | Precast end-block with girder connection member and bridge construction method using ths same | |
JP3896032B2 (en) | Construction method of precast column head and pier column head | |
JP2008266910A (en) | Projection structure of anchorage or deviator of tendon, and construction method therefor | |
JP6543077B2 (en) | Construction method of structure | |
KR102254227B1 (en) | High-strength concrete pile structure with pc pile cap and construction method | |
JP5342312B2 (en) | Precast member installation method | |
KR100653283B1 (en) | Method for connecting reinforced concrete structures | |
KR20090027052A (en) | Precast concrete panel, construction method and structure of precast concrete panel using steel plate | |
JP2006063718A (en) | Method of constructing overhung bridge using corrugated steel plate web | |
KR101107729B1 (en) | Rahmen structure construction method | |
KR101906322B1 (en) | Rahmen bridge allowing longitudinal displacement and construction method therefor | |
KR20090075484A (en) | Preflex composite girder bridge coupled width composite girder and method thereof | |
KR100860592B1 (en) | Temporary system for vertical structure using precast concreat block | |
JP6817589B1 (en) | How to build pile support structure | |
KR200343468Y1 (en) | Composite rigid-frame bridge installing prestressed compound beam to the contral point of the slab of rigid-frame bridge and connecting the beam to the steel member installed in the upper of pole | |
KR102257540B1 (en) | Truss composite precast deck plate and construction method using it | |
JP2001040675A (en) | Foundation structure for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050415 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20061206 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20061212 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061215 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 3896032 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101222 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111222 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111222 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121222 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121222 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131222 Year of fee payment: 7 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |