JP3845839B2 - Pedestal deck installation structure - Google Patents

Pedestal deck installation structure Download PDF

Info

Publication number
JP3845839B2
JP3845839B2 JP2002129980A JP2002129980A JP3845839B2 JP 3845839 B2 JP3845839 B2 JP 3845839B2 JP 2002129980 A JP2002129980 A JP 2002129980A JP 2002129980 A JP2002129980 A JP 2002129980A JP 3845839 B2 JP3845839 B2 JP 3845839B2
Authority
JP
Japan
Prior art keywords
joist
pedestal deck
flooring
floor
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002129980A
Other languages
Japanese (ja)
Other versions
JP2003321925A (en
Inventor
英雄 内本
佳裕 辰巳
信夫 裏橋
和彦 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2002129980A priority Critical patent/JP3845839B2/en
Publication of JP2003321925A publication Critical patent/JP2003321925A/en
Application granted granted Critical
Publication of JP3845839B2 publication Critical patent/JP3845839B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、根太との着脱が容易で、かつ根太との接合時における剛性が高いペデスタルデッキの設置構造に関する。
【0002】
【従来の技術】
従来より、図4(a)に示すように、半導体工場や液晶工場等のクリーンルームの一般的な床構造は、構造物を構成する小梁2の上面に、所定の間隔をもって複数の根太3が離間配置され、該根太3の上面に、通気性を持たせたグレーチング床6が配置される構成を有している。このようなクリーンルーム内に、生産機器7等を設置するような場合には、生産機器7の据付用の架台であるペデスタルデッキ5を設置する必要があるが、振動の発生を抑制するため、図4(b)に示すように、ペデスタルデッキ5として前記根太の上部にRCスラブ18を打設していた。しかし、生産ラインの変更が生じた場合には、新たな位置にRCスラブ18を打設するだけでなく、空調機能を維持するために既存のRCスラブ18を撤去する必要があるため、産業廃棄物が発生するとともに、作業が繁雑で、コスト高となりやすい。
【0003】
このような中、RCスラブ18に代わり、図5に示すように、モジュール化された床材20aを同一平面上に複数組み合わせ、PC鋼棒にて互いに連結しユニット化するペデスタルデッキユニット20が検討されている。これらは、連結方法が簡便なため、ペデスタルデッキユニット20に係る移動、組み立て及び解体が容易であるといった効果を有している。
【0004】
【発明が解決しようとする課題】
しかし、このようなペデスタルデッキユニット20は、根太とペデスタルデッキユニット20を構成する床材20aとの間の剛性が不安定で、振動が発生しやすいとともに、振動を増幅しやすいといった課題を有している。このため、床材20aをユニット化するペデスタルデッキ5の特徴を損なうことなく、振動を防止できるペデスタルデッキ5の接合構造が求められている。
【0005】
上記事情に鑑み、本発明は、着脱が容易で、かつ根太との接合時における剛性が高いペデスタルデッキの設置構造を提供することを目的としている。
【0006】
【課題を解決するための手段】
請求項1に記載のペデスタルデッキの設置構造は、建物の床を支持すべく平行に離間配置された複数の根太の上に生産機器据付用のペデスタルデッキを取り付けるためのペデスタルデッキの設置構造であって、前記根太の下面には、側方に突出するようにして水平面を形成する固定具が、所定の間隔をもって複数配置されて、該固定具の上面にアンカーボルトが固着手段により固着されるとともに、前記ペデスタルデッキには、少なくとも一方の向かい合う辺が、隣り合う前記根太の軸線間の離間距離と同一もしくは倍数の長さを有する四角形にモジュール化された床材を、同一平面を形成するように複数連接してユニット化することにより構成され、該床材の裏面には、前記アンカーボルトと嵌合する長ナットが所定の間隔をもって複数埋設されており、前記根太の上面に、前記床材の他方の向かい合う辺が載置されるとともに、前記根太の両側面各々に、一方の面が前記根太より側方に突出して水平面を形成して前記床材の裏面と面どうしで接するとともに、他方の面が前記根太の側面に平行な垂直面を形成して根太の側面に面どうしで接するL形鋼が配置されて、前記アンカーボルトが、前記L形鋼の一方の面を貫通し、前記床材に埋設された長ナットに締結されて、前記ペデスタルデッキが根太に固着されることを特徴としている。
【0007】
請求項2に記載のペデスタルデッキの設置構造は、前記根太の上面には、前記床材の他方の向かい合う辺を支持する床支持部材が、所定の間隔をもって根太の長さ方向に複数配置されており、該床支持部材がレベル調整を自在とされることを特徴としている。
【0008】
【発明の実施の形態】
以下、本発明のペデスタルデッキの設置構造を図1から図3に示す。本発明は、クリーンルーム内の生産機器用架台となるペデスタルデッキをプレキャストコンクリート造の床材より構成されるユニットとし、根太に対して着脱可能であり、かつ接合時には根太との剛性を高める構成とするものである。
【0009】
図1(a)(b)に示すように、クリーンルームの床構造1は、建築物を構成する複数の小梁2と、該小梁2の上面でこれと直交する方向に、平行に離間配置された複数の根太3と、該根太3の上部に配置される床4とにより構成される。該床4には、クリーンルーム内の空調機能に対して影響の少ない、鋼材を格子状に組み合わせることにより形成されるグレーチング床6が一般に用いられており、ほぼ全面に敷設されているが、生産機器7を設置したい位置には、これに代わりペデスタルデッキ5が敷設されている。
【0010】
図1(b)に示すように、該ペデスタルデッキ5は、生産機器7の据付用架台として設置されるもので、正方形の床材8を前記根太3に平行なx方向、及びこれと直交するy方向に複数連接して、ユニット化することにより形成されている。該床材8は、その平面形状が隣り合う前記根太3の軸線間から見た配置距離t1と等しい1辺を有する正方形のプレキャストコンクリート造よりなるものである。なお、床材8は、正方形に限るものではなく、少なくともy方向に配置される一方の向かい合う辺が隣り合う前記根太3の軸線間から見た配置距離t1と同一、もしくはこれの倍数となる長さを有していれば、長方形に成形されても良い。
【0011】
図2にクリーンルームの床構造1のy方向の側面図を示す。前記床材8の裏面8cには、x方向に平行な他方の向かい合う辺に、前記根太3と比較して略半分程度の幅を有する脚部8aが設けられている。該脚部8aの底部には、平板状の鋼材よりなる設置プレート8bが埋設されている。これは、前記根太3の上面に配置される際に、後に述べる床支持部材13上に載置されるが、該床支持部材13との接地面を、床材8のコンクリートの仕上がり面に影響されない平滑面に形成することを目的とするものである。また、図3に示すように、床材8の裏面8cで、脚部8aの内方には、所定の間隔に位置決めされた4箇所に長ナット12aが埋設されている。該長ナット12aは、後に詳述する前記根太3に設けられるアンカーボルト12に締結されることとなる。
【0012】
図3に示す前記床材8の平面図を見ると、該床材8の内方には、中心点を通過するとともに各辺に直交する2方向にシース管9が埋設されている。隣り合う床材8どうしは、x方向、及びy方向に各々のシース管9が連続されており、これに緊張材11としてPC鋼棒が貫通されるとともに、該緊張材11が緊張された状態で両端部を固定手段により固定されることによりユニット化されて、前記ペデスタルデッキ5が構成されることとなる。なお、緊張材11は、PC鋼棒に限ることなく、隣り合う床材8どうしを緊結でき、かつユニット化した床材8を容易に分解できる部材であれば、PC鋼線等何れを用いてもよい。
【0013】
このように前記ペデスタルデッキ5は、その大きさが隣り合う前記根太3の軸線間から見た配置距離t1と等しい1辺を有する正方形にモジュール化された床材8を、x方向、及びy方向の何れの方向にも自在に連接してユニット化することにより形成されるため、ペデスタルデッキ5の大きさを自在に変更できるものである。また、ユニット化されたペデスタルデッキ5は、前記緊張材11の緊結を弛めることで床材8に分解することも容易に行うことのできる構成となっている。なお、床材8を一方の向かい合う辺が隣り合う前記根太3の軸線間から見た配置距離t1の倍数となる長さを有する長方形に成形した場合には、一方の向かい合う辺がつねにy方向に位置するように連接すればよい。
【0014】
ところで、上述する構成のペデスタルデッキ5が載置される前記根太3は、図2に示すように、複数の鋼板を組み合わせて形成された根太型枠15と、該根太型枠15の内方に充填されたコンクリート16とによる鋼板型枠コンクリート造により構成されている。該根太型枠15は、底部鋼板15aと対をなす側部鋼板15bにより構成されており、前記底部鋼板15aは、根太型枠15の底部に配置されて、断面がコの字型の溝状の外形を有している。
【0015】
一方、対をなす前記側部鋼板15bも、断面がコの字型の溝状の外形を有しており、前記底部鋼板15aの内方で、互いに開口を向かい合わせるように配置されている。これらは、対をなす側部鋼板15bの外周面と底部鋼板15aの内周面が接するようにして組み合わせることにより、上部に開口部を有する直方体の前記根太型枠15が形成される。
【0016】
前記根太3は、上述する根太型枠15の内方に前記コンクリート16が充填されることにより形成されるが、該コンクリート16が前記根太型枠15に拘束されるため、優れた剛性を有する構成となる。なお、該根太3は、前記根太型枠15がせん断補強筋の機能を有するため、内方への配筋が不要である。
【0017】
このような構成の該根太3の上面には、前記ペデスタルデッキ5を構成する床材8の脚部8aを支持する床支持部材13が固着されている。該床支持部材13は、前記根太3の開口部を覆うように固着された鋼材よりなる平板15cに、底部を溶接等の固着手段により固着されたナット14aと、これに嵌合する天端が平らなレベルボルト14により形成されている。これは、ペデスタルデッキ5を構成する床材8における脚部8aの水平レベルが、個々の床材8で微小に異なる場合にも、前記ペデスタルデッキ5を構成する全ての床材8の脚部8aが、浮き上がることなく床支持部材13に支持されることを目的に、該レベルボルト14を回転させて床支持部材13の高さを自在に調整するものである。
【0018】
該床支持部材13は、図3に示すように、隣り合う前記根太3の上面でy方向軸と平行となる位置に対をなして設けられた床支持部材13aどうしが、前記床材8の対をなす脚部8aにおける両者の一方の側部を支持するとともに、前記根太3の長さ方向にも隣り合う前記根太3の上面でy方向軸と平行となるように対をなして床支持部材13bが設けられており、該床支持部材13bどうしが、前記床材8の脚部8a両者の他方の側部を支持する構成となっている。つまり、前記ペデスタルデッキ5が配置される位置の前記根太3の上面には、前記ペデスタルデッキ5を構成する複数の床材8各々に対して、脚部8aの両端部近傍と鉛直方向と同軸となる位置に、床支持部材13a、13bの4個が1組となって配置されており、前記床材8を支持することとなる。
【0019】
また、図2に示すように、前記根太3の下端部には、直交する側方に突出して水平面を形成するように、溝型鋼よりなる固定具3aが開口を下方に向けて固着手段を介して固着されている。該固定具3aには、前記床材8の裏面8cに埋設された長ナット12aと鉛直方向で同軸の位置にアンカーボルト12が固着手段を介して固着されている。該アンカーボルト12が、前記床材8の長ナット12aに嵌合されてペデスタルデッキ5を構成する床材8と根太3とは剛に結合されることとなる。
【0020】
上述する前記ペデスタルデッキ5、および根太3を用いたペデスタルデッキ5の設置構造を以下に示す。
図1(b)に示すように、x方向及びy方向に複数配置された前記床材8は、x方向及びy方向に各々連続する前記シース管9の内方に、前記緊張材11が各々貫通された状態で緊結されて、所望の面積を有する前記ペデスタルデッキ5が形成されている。このとき、前記床材8の脚部8aは、全てx方向に平行となるように配置されている。
【0021】
図2に示すように、該ペデスタルデッキ5は、前記根太3の上部において、前記ペデスタルデッキ5を構成する床材8の脚部8aの設置プレート8bが、前記根太3の上面に設けられた前記床支持部材13上に位置するように載置されるが、床材8の裏面8cに設けられた長ナット12aが、前記根太3に設けられたアンカーボルト12と鉛直軸方向で同軸に位置するように位置決めされる。このようにして、前記根太3の上部に配置されたペデスタルデッキ5は、前記固定具3aに設けられた前記アンカーボルト12が、前記床材8の長ナット12aに締結されて前記根太3に結合される。
【0022】
このとき、図2に示すように、前記床材8の裏面8cには、L形鋼17が取り付けられている。該L形鋼17は、断面がL字型の形鋼よりなり、他方の板17bが根太3の側面に平行な垂直面を形成し、根太3の側面と面どうしで接するように配置されるとともに、一方の板17aが、前記根太3より上方で、かつ根太3から側方に突出して水平面を形成し、前記床材8の裏面8cと面どうしで接するように配置されている。このようなL形鋼17は、該一方の板17aに、前記アンカーボルト12が貫通する孔17cが設けられており、アンカーボルト12を介して前記床材8の裏面8cに固定される。
【0023】
該L形鋼17は、隣り合う前記根太3の向かい合う側面に対をなして配置されており、両者の一方の板17aが、同じく隣り合う根太3に支持される床材8の裏面8cに、各々アンカーボルト12を介して固定されているため、地震等により前記ペデスタルデッキ5に大きな水平力が作用した際にも、L形鋼17の他方の板17bが根太3の側面に拘束されて、個々の床材8は水平方向に移動することなく、所定位置に固定されるものである。
【0024】
なお、前記ペデスタルデッキ5と根太3との水平方向の接合剛性を高めることを目的に、図2に示すように、床支持部材13を埋設するようにして、対をなすL形鋼17の内方に、モルタル等の充填材10を充填してもよい。
【0025】
また、前記根太3に接合されたペデスタルデッキ5は、図3に示すように、隣り合う床材8との間に形成される目地、前記L形鋼17と床材8の裏面8cとの間等、部材同士の接合部全般に対して、一般に行われる目地シール19がなされている。
【0026】
上述する構成によれば、前記ペデスタルデッキ5は、ペデスタルデッキを構成する複数の床材8各々が、前記アンカーボルト12を介して根太3に固着されるとともに、L形鋼17を介して前記根太3に水平方向の移動を拘束されることから、ペデスタルデッキ5に、鉛直方向だけでなく水平方向の力が作用した際にも、床材8自身が根太3にゆるみなく剛に連結されるため、ペデスタルデッキ5の着脱が容易で施工性が良いといった特徴を損なうことなく、クリーンルームの床構造に対して安定したペデスタルデッキ5を構成することが可能となる。
【0027】
前記床支持部材13が高さ調整可能に形成されていることから、前記ペデスタルデッキ5を構成する複数の床材8が、緊張材11により連結された際に、個々で微小な水平レベルの差異が生じた際にも、全ての床材8を確実に床支持部材13に支持させることが可能となるため、前記ペデスタルデッキ5と根太3との間に浮きやゆるみが生じることなく、振動を生じさせることがないとともに、振動の増幅も抑えることが可能となる。
【0028】
【発明の効果】
請求項1に記載のペデスタルデッキの設置構造によれば、建物の床を支持すべく平行に離間配置された複数の根太の上に生産機器据付用のペデスタルデッキを取り付けるためのペデスタルデッキの設置構造であって、前記根太の下面には、側方に突出するようにして水平面を形成する固定具が、所定の間隔をもって複数配置されて、該固定具の上面にアンカーボルトが固着手段により固着されるとともに、前記ペデスタルデッキには、少なくとも一方の向かい合う辺が、隣り合う前記根太の軸線間の離間距離と同一もしくは倍数の長さを有する四角形にモジュール化された床材を、同一平面を形成するように複数連接してユニット化することにより構成され、該床材の裏面には、前記アンカーボルトと嵌合する長ナットが所定の間隔をもって複数埋設されており、前記根太の上面に、前記床材の他方の向かい合う辺が載置されるとともに、前記根太の両側面各々に、一方の面が前記根太より側方に突出して水平面を形成して前記床材の裏面と面どうしで接するとともに、他方の面が前記根太の側面に平行な垂直面を形成して根太の側面に面どうしで接するL形鋼が配置されて、前記アンカーボルトが、前記L形鋼の一方の面を貫通し、前記床材に埋設された長ナットに締結されて、前記ペデスタルデッキが根太に固着されることから、ペデスタルデッキに、鉛直方向だけでなく水平方向の力が作用した際にも、床材自身が根太にゆるみなく剛に連結されるため、ペデスタルデッキの着脱が容易で施工性が良いといった特徴を損なうことなく、クリーンルームの床構造に対して安定したペデスタルデッキを構成することが可能となる。
【0029】
請求項2に記載のペデスタルデッキの設置構造によれば、前記根太の上面には、前記床材の他方の向かい合う辺を支持する床支持部材が、所定の間隔をもって根太の長さ方向に複数配置されており、該床支持部材がレベル調整を自在とされることから、前記ペデスタルデッキを構成する複数の床材が、緊張材により連結された際に、個々で微小な水平レベルの差異が生じた際にも、全ての床材を確実に床支持部材に支持させることが可能となるため、前記ペデスタルデッキと根太との間に浮きやゆるみが生じることなく、振動を生じさせることがないとともに、振動の増幅も抑えることが可能となる。
【図面の簡単な説明】
【図1】 本発明に係るクリーンルームのペデスタルデッキの概略を示す図である。
【図2】 本発明に係る床材のy方向の側面を示す図である。
【図3】 本発明に係る床材の平面を示す図である。
【図4】 従来のクリーンルームのペデスタルデッキの概略を示す図である。
【図5】 従来のクリーンルームのペデスタルデッキの概略を示す図である。
【符号の説明】
1 床構造
2 小梁
3 根太
3a 固定具
4 床
5 ペデスタルデッキ
6 グレーチング床
7 生産機器
8 床材
8a 脚部
8b 設置プレート
8c 裏面
9 シーズ管
10 充填材
11 緊張材
12 アンカー
12a 長ナット
13 床支持部材
13a 床支持部材
13b 床支持部材
14 レベルボルト
14a ナット
15 根太型枠
15a 底部鋼板
15b 側部鋼板
16 コンクリート
17 L形鋼
17a 一方の板
17b 他方の板
17c 孔
18 RCスラブ
19 目地シール
20 ペデスタルデッキユニット
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an installation structure of a pedestal deck that can be easily attached to and detached from a joist and has high rigidity at the time of joining to the joist.
[0002]
[Prior art]
Conventionally, as shown in FIG. 4A, a general floor structure of a clean room such as a semiconductor factory or a liquid crystal factory has a plurality of joists 3 at predetermined intervals on the upper surface of a small beam 2 constituting the structure. The grating floor 6 that is spaced apart and has air permeability is disposed on the upper surface of the joist 3. In the case where the production equipment 7 or the like is installed in such a clean room, it is necessary to install the pedestal deck 5 which is a mounting base for the production equipment 7, but in order to suppress the occurrence of vibration, FIG. As shown in FIG. 4B, an RC slab 18 was placed on the joist as the pedestal deck 5. However, when the production line is changed, it is necessary not only to place the RC slab 18 at a new position but also to remove the existing RC slab 18 in order to maintain the air conditioning function. Things are generated, the work is complicated, and the cost tends to be high.
[0003]
Under such circumstances, instead of the RC slab 18, as shown in FIG. 5, a pedestal deck unit 20 is considered in which a plurality of modular floor materials 20a are combined on the same plane and connected to each other with a PC steel bar. Has been. These have the effect that the movement, assembly, and disassembly concerning the pedestal deck unit 20 are easy because the connection method is simple.
[0004]
[Problems to be solved by the invention]
However, such a pedestal deck unit 20 has a problem that rigidity between the joist and the floor material 20a constituting the pedestal deck unit 20 is unstable, and vibrations are easily generated and vibrations are easily amplified. ing. For this reason, there is a need for a joint structure of the pedestal deck 5 that can prevent vibration without impairing the characteristics of the pedestal deck 5 that unitizes the flooring 20a.
[0005]
In view of the above circumstances, an object of the present invention is to provide an installation structure of a pedestal deck that is easy to attach and detach and has high rigidity at the time of joining with joists.
[0006]
[Means for Solving the Problems]
The pedestal deck installation structure according to claim 1 is a pedestal deck installation structure for mounting a pedestal deck for installing production equipment on a plurality of joists spaced apart in parallel to support a floor of a building. A plurality of fixtures forming a horizontal plane so as to protrude laterally are disposed on the lower surface of the joist, and anchor bolts are fixed to the upper surface of the fixture by fixing means. In the pedestal deck, a floor material modularized into a quadrangle in which at least one opposite side has a length equal to or a multiple of the separation distance between adjacent joists' axes is formed to form the same plane. A plurality of long nuts to be fitted to the anchor bolts are embedded at predetermined intervals on the back surface of the flooring. And the other facing side of the flooring is placed on the upper surface of the joist, and one surface protrudes laterally from the joists to form both sides of the joist to form a horizontal plane. An L-shaped steel that is in contact with the back surface of the flooring between the surfaces, the other surface forms a vertical surface parallel to the side surface of the joist and is in contact with the side surface of the joist is disposed, and the anchor bolt is The pedestal deck is fixed to the joist by passing through one surface of the L-shaped steel and fastened to a long nut embedded in the flooring material.
[0007]
The installation structure of the pedestal deck according to claim 2, wherein a plurality of floor support members that support the other facing side of the flooring material are arranged on the upper surface of the joist along the joist's length direction at a predetermined interval. The floor support member is characterized in that the level can be adjusted freely.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the installation structure of the pedestal deck of the present invention is shown in FIGS. The present invention is a unit composed of a precast concrete floor material as a pedestal deck serving as a production equipment stand in a clean room, and is configured to be detachable from the joists and to increase the rigidity with the joists when joined. Is.
[0009]
As shown in FIGS. 1 (a) and 1 (b), a floor structure 1 of a clean room has a plurality of small beams 2 constituting a building, and is spaced apart in parallel in a direction perpendicular to the upper surface of the small beams 2 The plurality of joists 3 and the floor 4 disposed on the joists 3 are configured. The floor 4 is generally a grating floor 6 formed by combining steel materials in a lattice shape, which has little influence on the air-conditioning function in the clean room. Instead of this, a pedestal deck 5 is laid at a position where 7 is to be installed.
[0010]
As shown in FIG. 1 (b), the pedestal deck 5 is installed as a mounting base for production equipment 7, and a square flooring 8 is parallel to the joist 3 in the x direction and orthogonal thereto. A plurality of units are connected in the y direction to form a unit. The flooring 8 is made of a square precast concrete structure having one side whose plane shape is equal to the arrangement distance t 1 viewed from between the axes of the adjacent joists 3 adjacent to each other. The flooring 8 is not limited to a square, and at least one opposite side arranged in the y direction is the same as or a multiple of the arrangement distance t 1 seen from between the axes of the adjacent joists 3. As long as it has a length, it may be formed into a rectangle.
[0011]
FIG. 2 shows a side view of the floor structure 1 of the clean room in the y direction. The back surface 8c of the flooring 8 is provided with a leg portion 8a having a width approximately half that of the joist 3 on the other opposite side parallel to the x direction. An installation plate 8b made of a flat steel material is embedded in the bottom of the leg 8a. This is placed on the floor support member 13 which will be described later when it is arranged on the upper surface of the joist 3, but the ground contact surface with the floor support member 13 has an effect on the finished surface of the concrete of the flooring 8. It is intended to form on a smooth surface that is not. As shown in FIG. 3, long nuts 12a are embedded at four positions positioned at predetermined intervals on the inner surface of the leg 8a on the back surface 8c of the flooring 8. The long nut 12a is fastened to an anchor bolt 12 provided on the joist 3 described in detail later.
[0012]
Referring to the plan view of the flooring 8 shown in FIG. 3, a sheath tube 9 is embedded in the flooring 8 in two directions that pass through the center point and are orthogonal to each side. Adjacent flooring materials 8 have respective sheath tubes 9 continuous in the x-direction and y-direction, and a PC steel rod is penetrated as a tensioning material 11, and the tensioning material 11 is in tension. Thus, the pedestal deck 5 is constructed by unitizing the two ends by fixing them with fixing means. The tension member 11 is not limited to a PC steel bar, and any member such as a PC steel wire can be used as long as adjacent floor members 8 can be tightly connected and a unitized floor member 8 can be easily disassembled. Also good.
[0013]
In this way, the pedestal deck 5 has a floor material 8 modularized in a square shape having one side equal to the arrangement distance t 1 as seen from between the axes of the adjacent joists 3, and in the x direction and y The size of the pedestal deck 5 can be freely changed because it is formed by uniting freely in any direction. Further, the unitized pedestal deck 5 has a configuration that can be easily disassembled into the floor material 8 by loosening the tightness of the tension material 11. In addition, when the flooring 8 is formed into a rectangle having a length that is a multiple of the arrangement distance t 1 as viewed from between the axes of the adjacent joists 3, one facing side is always in the y direction. What is necessary is just to connect so that it may be located in.
[0014]
By the way, the joist 3 on which the pedestal deck 5 having the above-described configuration is placed is, as shown in FIG. 2, a joist mold 15 formed by combining a plurality of steel plates, and an inward of the joist mold 15. It is comprised by the steel-plate formwork concrete structure with the concrete 16 with which it filled. The joist frame 15 is composed of a side steel plate 15b that forms a pair with the bottom steel plate 15a, and the bottom steel plate 15a is disposed at the bottom of the joist mold frame 15 and has a U-shaped cross section. It has the outer shape.
[0015]
On the other hand, the paired side steel plates 15b also have a groove-shaped outer shape with a U-shaped cross section, and are arranged so that the openings face each other inside the bottom steel plate 15a. These are combined so that the outer peripheral surface of the paired side steel plates 15b and the inner peripheral surface of the bottom steel plate 15a are in contact with each other, whereby the joist frame 15 having a rectangular parallelepiped shape having an opening at the top is formed.
[0016]
The joist 3 is formed by filling the concrete 16 inside the joist mold 15 described above. Since the concrete 16 is constrained by the joist mold 15, the structure has excellent rigidity. It becomes. The joist 3 need not be inwardly arranged because the joist mold 15 has the function of a shear reinforcement.
[0017]
A floor support member 13 that supports the leg portion 8a of the floor material 8 constituting the pedestal deck 5 is fixed to the upper surface of the joist 3 having such a configuration. The floor support member 13 has a nut 14a whose bottom is fixed to a flat plate 15c made of steel fixed so as to cover the opening of the joist 3 by a fixing means such as welding, and a top end fitted to the nut 14a. It is formed by a flat level bolt 14. This is because the leg portions 8a of all the flooring materials 8 constituting the pedestal deck 5 even when the horizontal level of the leg portions 8a in the flooring material 8 constituting the pedestal deck 5 is slightly different among the individual flooring materials 8. However, for the purpose of being supported by the floor support member 13 without lifting, the level bolt 14 is rotated to freely adjust the height of the floor support member 13.
[0018]
As shown in FIG. 3, the floor support members 13 are arranged such that the floor support members 13 a provided in pairs at positions parallel to the y-direction axis on the upper surfaces of the adjacent joists 3 Supports one side of both of the leg portions 8a making a pair, and supports the floor in a pair so as to be parallel to the y-direction axis on the upper surface of the joist 3 adjacent also in the longitudinal direction of the joist 3. A member 13b is provided, and the floor support members 13b are configured to support the other side of both the leg portions 8a of the flooring 8. That is, the upper surface of the joist 3 at the position where the pedestal deck 5 is arranged is coaxial with the vicinity of both ends of the leg portion 8a and the vertical direction with respect to each of the plurality of flooring materials 8 constituting the pedestal deck 5. The four floor support members 13a and 13b are arranged as a set at the position where the floor material 8 is supported.
[0019]
In addition, as shown in FIG. 2, a fixing tool 3a made of channel steel is provided at the lower end portion of the joist 3 through a fixing means with the opening facing downward so as to form a horizontal surface projecting in the direction orthogonal to the side. It is fixed. Anchor bolts 12 are fixed to the fixture 3a via fixing means at a position coaxial with the long nut 12a embedded in the back surface 8c of the flooring 8 in the vertical direction. The anchor bolt 12 is fitted to the long nut 12a of the floor material 8 so that the floor material 8 and the joist 3 constituting the pedestal deck 5 are rigidly coupled.
[0020]
The installation structure of the pedestal deck 5 using the pedestal deck 5 and the joists 3 described above is shown below.
As shown in FIG. 1 (b), the flooring material 8 arranged in the x direction and the y direction has the tension material 11 inside the sheath tube 9 continuous in the x direction and the y direction, respectively. The pedestal deck 5 having a desired area is formed by being tightly coupled in a penetrating manner. At this time, all the leg portions 8a of the flooring 8 are arranged so as to be parallel to the x direction.
[0021]
As shown in FIG. 2, in the pedestal deck 5, the installation plate 8 b of the leg portion 8 a of the flooring 8 constituting the pedestal deck 5 is provided on the upper surface of the joist 3. The long nut 12a provided on the back surface 8c of the flooring 8 is positioned coaxially with the anchor bolt 12 provided on the joist 3 in the vertical axis direction. Are positioned as follows. In this way, the pedestal deck 5 arranged on the top of the joist 3 is connected to the joist 3 by fastening the anchor bolt 12 provided on the fixture 3a to the long nut 12a of the flooring 8. Is done.
[0022]
At this time, as shown in FIG. 2, an L-shaped steel 17 is attached to the back surface 8 c of the flooring 8. The L-shaped steel 17 is made of a steel having an L-shaped cross section, and the other plate 17b forms a vertical surface parallel to the side surface of the joist 3 and is disposed so as to be in contact with the side surface of the joist 3 by the surface. At the same time, one plate 17a is disposed above the joist 3 so as to protrude laterally from the joist 3 to form a horizontal plane and to come into contact with the back surface 8c of the flooring 8 between the faces. Such an L-shaped steel 17 is provided with a hole 17c through which the anchor bolt 12 passes in the one plate 17a, and is fixed to the back surface 8c of the flooring 8 via the anchor bolt 12.
[0023]
The L-shaped steel 17 is arranged in a pair on the opposite side surfaces of the adjacent joists 3, and one of the two plates 17 a is also attached to the back surface 8 c of the floor material 8 supported by the adjacent joists 3. Since each is fixed via the anchor bolt 12, even when a large horizontal force acts on the pedestal deck 5 due to an earthquake or the like, the other plate 17b of the L-shaped steel 17 is constrained to the side surface of the joist 3, Each floor material 8 is fixed at a predetermined position without moving in the horizontal direction.
[0024]
For the purpose of increasing the horizontal joint rigidity between the pedestal deck 5 and the joists 3, as shown in FIG. 2, a floor support member 13 is embedded, and a pair of L-shaped steels 17 is formed. Alternatively, a filler 10 such as mortar may be filled.
[0025]
Further, the pedestal deck 5 joined to the joist 3 has a joint formed between adjacent floor materials 8, as shown in FIG. 3, between the L-shaped steel 17 and the back surface 8c of the floor material 8. In general, a joint seal 19 that is generally performed is applied to the entire joint portion between the members.
[0026]
According to the configuration described above, the pedestal deck 5 includes a plurality of floor materials 8 constituting the pedestal deck that are fixed to the joists 3 through the anchor bolts 12 and the joists through the L-shaped steel 17. 3 is restrained from moving in the horizontal direction, so that the floor material 8 itself is rigidly connected to the joists 3 without slack when the force is applied not only in the vertical direction but also in the horizontal direction to the pedestal deck 5. The pedestal deck 5 can be configured stably with respect to the floor structure of the clean room without impairing the characteristics that the pedestal deck 5 is easy to attach and detach and has good workability.
[0027]
Since the floor support member 13 is formed so that the height can be adjusted, when the plurality of floor materials 8 constituting the pedestal deck 5 are connected by the tension material 11, individual differences in horizontal level are small. In this case, since all the flooring material 8 can be reliably supported by the floor support member 13, vibrations can be generated without causing any floating or loosening between the pedestal deck 5 and the joists 3. It is possible to suppress the amplification of vibrations.
[0028]
【The invention's effect】
According to the installation structure of the pedestal deck according to claim 1, the installation structure of the pedestal deck for attaching the pedestal deck for installing the production equipment on the plurality of joists spaced apart in parallel to support the floor of the building In the lower surface of the joist, a plurality of fixtures forming a horizontal plane so as to protrude laterally are arranged at a predetermined interval, and anchor bolts are fixed to the upper surface of the fixture by fixing means. In addition, the pedestal deck has a flat surface formed by modularizing a floor material in which at least one opposite side has a length equal to or a multiple of the distance between the adjacent joist axes. A long nut fitted with the anchor bolt is provided at a predetermined interval on the back surface of the flooring. The other facing side of the flooring is placed on the top surface of the joist and one side protrudes laterally from the joist to form a horizontal plane. An L-shaped steel which is in contact with the back surface of the flooring material and is in contact with the side surface of the joist with the other surface forming a vertical plane parallel to the side surface of the joist, and the anchor bolt However, since it penetrates one surface of the L-shaped steel and is fastened to a long nut embedded in the floor material, the pedestal deck is fixed to the joist, so that the pedestal deck not only in the vertical direction but also horizontally Even when a direction force is applied, the flooring itself is firmly connected to the joists without loosening, so the pedestal deck is easy to attach and detach, and without sacrificing features such as good workability. Stable It is possible to configure the pedestal deck.
[0029]
According to the installation structure of the pedestal deck according to claim 2, a plurality of floor support members that support the other opposite side of the flooring material are arranged on the upper surface of the joist along the joist length direction at a predetermined interval. Since the level of the floor support member can be freely adjusted, when a plurality of floor materials constituting the pedestal deck are connected by a tension material, individual differences in horizontal level occur. In this case, since all floor materials can be reliably supported by the floor support member, there is no floating or loosening between the pedestal deck and the joists, and no vibration is generated. In addition, vibration amplification can be suppressed.
[Brief description of the drawings]
FIG. 1 is a diagram showing an outline of a pedestal deck of a clean room according to the present invention.
FIG. 2 is a view showing a side surface in the y direction of a flooring according to the present invention.
FIG. 3 is a plan view of a flooring according to the present invention.
FIG. 4 is a view showing an outline of a conventional clean room pedestal deck.
FIG. 5 is a view showing an outline of a conventional clean room pedestal deck.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Floor structure 2 Beam 3 joist 3a Fixture 4 Floor 5 Pedestal deck 6 Grating floor 7 Production equipment 8 Floor material 8a Leg part 8b Installation plate 8c Back surface 9 Seeds tube 10 Filling material 11 Tension material 12 Anchor 12a Long nut 13 Floor support Member 13a floor support member 13b floor support member 14 level bolt 14a nut 15 joist frame 15a bottom steel plate 15b side steel plate 16 concrete 17 L-shaped steel 17a one plate 17b other plate 17c hole 18 RC slab 19 joint seal 20 pedestal deck unit

Claims (2)

建物の床を支持すべく平行に離間配置された複数の根太の上に生産機器据付用のペデスタルデッキを取り付けるためのペデスタルデッキの設置構造であって、
前記根太の下面には、側方に突出するようにして水平面を形成する固定具が、所定の間隔をもって複数配置されて、該固定具の上面にアンカーボルトが固着手段により固着されるとともに、
前記ペデスタルデッキには、少なくとも一方の向かい合う辺が、隣り合う前記根太の軸線間の離間距離と同一もしくは倍数の長さを有する四角形にモジュール化された床材を、同一平面を形成するように複数連接してユニット化することにより構成され、該床材の裏面には、前記アンカーボルトと嵌合する長ナットが所定の間隔をもって複数埋設されており、
前記根太の上面に、前記床材の他方の向かい合う辺が載置されるとともに、
前記根太の両側面各々に、一方の面が前記根太より側方に突出して水平面を形成して前記床材の裏面と面どうしで接するとともに、他方の面が前記根太の側面に平行な垂直面を形成して根太の側面に面どうしで接するL形鋼が配置されて、
前記アンカーボルトが、前記L形鋼の一方の面を貫通し、前記床材に埋設された長ナットに締結されて、前記ペデスタルデッキが根太に固着されることを特徴とするペデスタルデッキの設置構造。
A pedestal deck installation structure for mounting a pedestal deck for installing production equipment on a plurality of joists spaced apart in parallel to support the floor of a building,
On the lower surface of the joist, a plurality of fixtures forming a horizontal plane so as to protrude sideways are arranged at a predetermined interval, and anchor bolts are fixed to the upper surface of the fixture by fixing means,
In the pedestal deck, a plurality of floor materials modularized into a quadrangle having at least one opposite side having a length equal to or a multiple of the separation distance between adjacent joist axes are formed so as to form the same plane. It is configured by connecting and uniting, and on the back surface of the flooring material, a plurality of long nuts fitted with the anchor bolts are embedded at a predetermined interval,
On the upper surface of the joist, the other facing side of the flooring is placed,
A vertical surface in which one surface protrudes laterally from the joist and forms a horizontal plane on each side surface of the joist to contact the back surface of the flooring and the other surface is parallel to the side surface of the joist L-shaped steel that is in contact with each other on the side face of the joist is arranged,
The pedestal deck installation structure, wherein the anchor bolt penetrates one surface of the L-shaped steel and is fastened to a long nut embedded in the flooring, so that the pedestal deck is fixed to a joist. .
請求項1に記載のペデスタルデッキの設置構造であって、
前記根太の上面には、前記床材の他方の向かい合う辺を支持する床支持部材が、所定の間隔をもって根太の長さ方向に複数配置されており、
該床支持部材がレベル調整を自在とされることを特徴とするペデスタルデッキの設置構造。
The pedestal deck installation structure according to claim 1,
On the upper surface of the joist, a plurality of floor support members that support the other facing side of the flooring material are arranged in the length direction of the joists at a predetermined interval,
An installation structure of a pedestal deck, wherein the level of the floor support member is freely adjustable.
JP2002129980A 2002-05-01 2002-05-01 Pedestal deck installation structure Expired - Fee Related JP3845839B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002129980A JP3845839B2 (en) 2002-05-01 2002-05-01 Pedestal deck installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002129980A JP3845839B2 (en) 2002-05-01 2002-05-01 Pedestal deck installation structure

Publications (2)

Publication Number Publication Date
JP2003321925A JP2003321925A (en) 2003-11-14
JP3845839B2 true JP3845839B2 (en) 2006-11-15

Family

ID=29543221

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002129980A Expired - Fee Related JP3845839B2 (en) 2002-05-01 2002-05-01 Pedestal deck installation structure

Country Status (1)

Country Link
JP (1) JP3845839B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5918965B2 (en) * 2011-10-25 2016-05-18 キヤノン株式会社 Processing machine system and processing machine arrangement method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6241861A (en) * 1985-08-15 1987-02-23 株式会社フジタ Floor structure of factory
JP3191569B2 (en) * 1993-07-28 2001-07-23 住友金属工業株式会社 Composite slab, method of construction, and joint of composite slab
JPH0713961U (en) * 1993-08-06 1995-03-10 積水化学工業株式会社 Floor material fixed structure
JP3054672U (en) * 1998-06-04 1998-12-08 隆義 湯山 Tension fittings for floorboards
JP3616916B2 (en) * 2000-07-18 2005-02-02 清水建設株式会社 Pedestal deck installation structure

Also Published As

Publication number Publication date
JP2003321925A (en) 2003-11-14

Similar Documents

Publication Publication Date Title
KR101711614B1 (en) Connection structure of steel column and steel beam
JP2008025125A (en) Column unit and construction method for building using it
JP3845839B2 (en) Pedestal deck installation structure
KR20210078120A (en) A Yoke Support For Slab­Mold
KR200268195Y1 (en) A clamping unit for a floor panel supporting frame of clean room
JP4964528B2 (en) Floor structure of steel structure building and construction method of floor structure
JP2015063852A (en) Underground pit structure
KR102115733B1 (en) Water tank and construction method thereof
JP7032051B2 (en) Floor structure construction method and floor structure reuse method
JP6861406B1 (en) Architectural support
JP7303712B2 (en) unit building
JP7208028B2 (en) Construction method of earthquake-resistant ceiling structure
JP7117190B2 (en) Nut mounting structure and building
JP5467935B2 (en) Mixed structure unit type building and construction method of mixed structure unit type building
JP2018145746A (en) Floor unit with small beam and floor structure
JP2012202051A (en) Mixed structure building and method for constructing the same
KR100442909B1 (en) Access floor assembly for vibartion isolation
JP6875120B2 (en) Floor panels, floor structures, floor construction methods and building skeleton reuse methods
JP2021188273A (en) Column-beam frame
JP2022182435A (en) Top floor slab construction method
JP2023170048A (en) Timbering
JP2024008392A (en) Building unit and unit building
KR200295149Y1 (en) Access floor assembly for vibartion isolation
JP4502529B2 (en) Floor configuration method for micro vibration countermeasures
KR100276865B1 (en) Wall formwork support bar and formwork installation method using the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040618

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060313

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060718

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060811

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120901

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120901

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130901

Year of fee payment: 7

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140901

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees