JP3824932B2 - Installation work for air conditioning equipment in underground space - Google Patents

Installation work for air conditioning equipment in underground space Download PDF

Info

Publication number
JP3824932B2
JP3824932B2 JP2001394703A JP2001394703A JP3824932B2 JP 3824932 B2 JP3824932 B2 JP 3824932B2 JP 2001394703 A JP2001394703 A JP 2001394703A JP 2001394703 A JP2001394703 A JP 2001394703A JP 3824932 B2 JP3824932 B2 JP 3824932B2
Authority
JP
Japan
Prior art keywords
temporary
packer
conditioning equipment
concrete
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001394703A
Other languages
Japanese (ja)
Other versions
JP2003193491A (en
Inventor
清之 大和田
Original Assignee
松下環境空調エンジニアリング株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 松下環境空調エンジニアリング株式会社 filed Critical 松下環境空調エンジニアリング株式会社
Priority to JP2001394703A priority Critical patent/JP3824932B2/en
Publication of JP2003193491A publication Critical patent/JP2003193491A/en
Application granted granted Critical
Publication of JP3824932B2 publication Critical patent/JP3824932B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、とくに、地下鉄等の地下空間における空調設備機器等の据付け工事方法に関するものである。
【0002】
【従来の技術】
一般に、この種の地下鉄等の地下空間における空調設備機器の据付け工事にあっては、該空調設備機器等の据付けすべき部位に対し、アンカーボルトが立設される複数個のアンカーボルト設定孔を設けた基礎コンクリートを打設し、この作業が終了後、該基礎コンクリートブ上においてアンカーボルトの両側に配置される仮パッカーを、一体型の型枠内にコンクリートを充填してこれを突き固めながら形成し、この仮パッカー上に据付けすべき空調機器等の機台ベースを上載し、その後、前記前記アンカーボルト設定孔にアンカーボルト固設用に打設されるアンカーボルト固設用のコンクリート上において該コンクリート上面と前記空調機器等の機台ベースとの間に本パッカーを打設して空調設備機器の据付けを行なうようにしていた。
【0003】
【発明が解決しようとする課題】
しかしながら、上記した従来の方法にあっては、複数個のアンカーボルト設定孔を形成する場合、木製の有底箱形状の型枠を使用するため、コンクリートの打設前における方形に枠組みされた鉄筋と該木製箱形状型枠との結束が困難となり、また、基礎コンクリートの打設後における型枠の底板部の除去が不可能な状態となって後で該木製箱形状型枠内に打設充填されるアンカーボルト固設用のコンクリートとの密着性が阻害されて、結果的にはその作業効率並びに空調機器等の設置精度を悪化させる要因となっていた。また、基礎コンクリートを打設後の仮パッカーの形成にあって、作業者が一体型の型枠内にコンクリートを充填してこれを突き固めながら形成し、その上面の水平度の調整を熟練した作業者に求めているため、その作業には多大な労力と時間を必要とし、空調設備機器の据付けに伴う全体の工期を大幅に長くする要因となっていた。
【0004】
そこで、本発明は上記の問題点に鑑みてなされたもので、その目的とするところは、作業効率並びに空調機器等の設置精度の良化向上を図るとともに、空調設備機器の据付けに伴う各作業に必要な労力と時間を極力省き、作業全体の工期を可及的に短縮し得る地下空間における空調設備機器等の据付け工事方法を提供するものである。
【0005】
【課題を解決するための手段】
この課題を解決するために、請求項1に記載の発明は、地下空間における空調設備機器等の据付け工事において、
該空調設備機器等の据付けすべき部位に対し、ほぼ中心部にアンカーボルトが立設される所定の深さの複数個のアンカーボルト設定孔を設けた基礎コンクリートを打設する基礎形成工程と、
該基礎コンクリート上において配置される仮パッカーを形成する仮パッカー形成工程と、
該仮パッカー上に錠台及び高さ調整部材を介して据付けすべき空調機器等の機台ベースを上載するとともに、該機台ベースの高さ及び水平度を調整する機台ベース設置調整工程と、
前記アンカーボルト設定孔にアンカーボルト固設用に打設されるアンカーボルト固設用のコンクリート上において該コンクリート上面と前記空調機器等の機台ベースとの間に本パッカーを打設する本パッカー打設工程よりなり、
前記基礎形成工程は、金属製の造形装置を前記基礎コンクリート用の基礎鉄筋枠ととも枠組みしかつ該造形装置内のほぼ中心部にアンカーボルトを立設して前記基礎コンクリートに埋込みすること、
前記仮パッカー形成工程は、仮枠内に無収縮性セメントを充填してこれを突き固め、上部に錠台及び高さ調整部材を載置して該錠台の高さレベル並びに水平度を設定して仮パッカーを形成すること、を要旨とする。
【0006】
上記した構成によれば、基礎形成工程において、アンカーボルトは方形に枠組みされた鉄筋とともに、例えば引掛けて定置することとし、金属製の造形装置は、そのまま基礎コンクリートに埋設されるため、方形に枠組みされた鉄筋及びアンカーボルト等の結束を容易にし、コンクリートの打設後における金属製の造形装置の底板部の除去を不要とした。
また、仮パッカー上に錠台及び高さ調整部材を介して据付けすべき空調機器等の機台ベースの高さレベル及び水平度を調整することによって、その作業効率並びに空調機器等の設置精度の良化向上を図るとともに、空調設備機器の据付けに伴う各作業に必要な労力と時間を極力省き、作業全体の工期を可及的に短縮し得る。
【0007】
請求項2記載の発明は、請求項1に記載の地下空間における空調設備機器等の据付け工事方法であって、前記仮パッカー形成工程における仮枠を分割とし、該仮枠内に無収縮性セメントを数回に分けて充填するとともに、該充填された無収縮性セメントに振動を付与しながら固めることを要旨とする。
【0008】
上記の構成によれば、仮パッカーの形成を、熟練した作業者を必要とすることなく、簡易になし得るので、その作業に伴う労力と時間を極力省き、作業全体の工期を可及的に短縮し得る。
【0009】
【発明の実施の形態】
以下、地下空間における空調設備機器等の据付け工事方法における本発明の実施形態について図1〜図9を参照して説明する。
以下記載する本実施の形態にあっては、地下空間に据付けられる空調設備機器等において、該空調設備機器等を構成する送風機の据付けの場合について説明する。
【0010】
まず、送風機1の据付け状態にあっては、図1及び図2に示すように、地下空間Sにおいて、据付けすべき送風機1の形態に対応して所定の形状にコンクリート打設された基礎コンクリート2に対し、送風機1の据付けすべき部位にアンカーボルト3を納める金属製の造形装置を構成する金属製有底型枠4〜4が該基礎コンクリート2と一体でコンクリート打設され、該基礎コンクリート部2上に仮パッカー5〜5を介在して送風機1の機台ベース6を載置するとともに、金属製有底型枠4〜4内に打設充填されたアンカーボルト3固設用のコンクリート9上面と機台ベース6下面との間に本パッカー7を形成し、そのアンカーボルト3を介してナット等の締着手段により前記機台ベース6を固定することにより、空調設備機器等を構成する送風機1を地下空間における基礎コンクリート2上に据付けられるものである。
【0011】
以下、その据付け工事方法を具体的に説明する。
まず、基礎コンクリート2は、送風機1の据付けすべき部位に対応して設定された送風機基礎の配筋用アンカーボルトを床面スラブに打設し、基礎鉄筋を配筋して配筋枠組8を形成する。この配筋枠組8の中に後述する金属製有底型枠(アンカースリーブともいう。)4を組み込み、円周の鉄筋に接続固定する。この後送風機基礎全体の型枠(木製)を形成し、基礎コンクリート2を打設する。(基礎形成工程という。)。すなわち、基礎コンクリート2用の方形状等に枠組みされた配筋枠組8とともに、後述するアンカーボルト固設のためのコンクリート9用の金属製有底型枠4を配設した後、送風機基礎全体の型枠(図示しない)を施工し基礎コンクリート2の打設を行う。
【0012】
なお、前記金属製有底型枠4の内径部位がアンカーボルト設定孔とされるものであり、このアンカーボルト設定孔のほぼ中央部には下端をU字状に曲折されたアンカーボルト3を立設するものである。
【0013】
この場合、図5に示すように、金属製有底型枠4は、例えば、亜鉛鉄板等の金属製の有底円筒形状に形成されており、これにより、基礎コンクリート2用の配筋枠組8をそのまま金属製有底型枠4内に挿通しかつ該配筋枠組8における円周の鉄筋て該金属製有底型枠4を配置することができ、また、アンカーボルト3を該金属製有底型枠4に挿通された配筋枠組8における鉄筋に対して引掛け金具(図示しない)を介して引掛けて立設することができ、それぞれの結束作業の作業性を良くするものである。さらに、金属製有底型枠4と基礎コンクリート2の打設コンクリートとの密着性を良化して基礎コンクリート2の打設精度を高めるものである。
【0014】
ついで、上記基礎コンクリート2における型枠解体後、該基礎コンクリート2上にスミ出しを行い、その基礎コンクリート2上において、仮パッカー5〜5を据付けすべき送風機1に対応する所定の複数個所(図3では3箇所を示す。)打設形成して配置する。(仮パッカー形成工程という。)
【0015】
すなわち、図6に示すように、各仮パッカー5は、鋼製の横方向に2分割した方形状の所定の高さの型枠10(仮枠ともいう)を組み、該型枠10内に無収縮性モルタル(パッドタイプ)を目分量により数回(約5回が好ましい。)に分けて投入してバイブレータ手段により振動を付与しながら打ち固めることにより打設形成される。この場合、無収縮性モルタル(パッドタイプ)を目分量により数回(約5回が好ましい。)に分けて投入することにより、無収縮性モルタル(パッドタイプ)を型枠10の上部まで早く固めることができるものである。
【0016】
そして、上記無収縮性モルタル(パッドタイプ)からなる仮パッカー5上に錠台(平行ライナー)11をバイブレータ手段により振動を付与しながら該仮パッカー5内に1/3程度まで突きながら埋め込む(図6参照)。この場合、錠台(平行ライナー)11の上面の平行度を調整しながら行ない、高い部分はゴム製のハンマー等により微調整を行なうものである。
【0017】
ついで、上記仮パッカー5上の錠台(平行ライナー)11に対して、相対向する摺動テーパー面を備えた一対の高さ調整部材12(テーパーライナー)を載置し、この高さ調整部材12(テーパーライナー)を介して据付けすべき空調機器等である送風機1の機台ベース6を上載するとともに、該機台ベース6の高さレベル及び水平度を別設される後述の螺旋回転動作機構付きの面高低微調整器具13の操作で調整し設定する(機台ベース設置仮芯調整工程という)。
【0018】
そして、この螺旋回転動作機構付きの面高低微調整器具13は、図9に示すように、例えば、レベリングブロックのような互いに対向して摺接する摺動テーパー面14、15を有する一対の固定側及び可動側の調整台16、17と、該固定側の調整台16に対し可動側の調整台17をその上面が平行状態で上下動するように両者をねじ連繋したねじ手段18とから構成され、このねじ手段18の螺進及び螺退回転することにより可動側の調整台17をその摺動テーパー面を利用して上下動してその高さの高低を調整する。なお、固定側と可動側の調整台16、17のねじ連繋(ねじ手段18)における螺合組付け状態の遊びは、1/1000〜5/1000の精度に設定したものが使用されるものである。
【0019】
上記機台ベース設置仮芯調整工程において、機台ベース6の高さ及び水平度の調整設定にあっては、基礎コンクリート2上面と前記送風機1の機台ベース6との間における所定部位(後述する本パッカー7の形成部位の近傍)の複数箇所に対して前記螺旋回転動作機構付きの面高低微調整器具13を設置し、該螺旋回転動作機構付きの面高低微調整器具13により機台ベース6の水平度並びに予め決められた高さレベルを微調整して設定する。
【0020】
この各螺旋回転動作機構付きの面高低微調整器具13の個々の操作によって、機台ベース6の水平度並びに高さレベルの調整作業を簡単かつ素早く行なうことができるものである。
【0021】
この状態において、螺旋回転動作機構付きの面高低微調整器具13にて設定した高さレベルに合せて前記仮パッカー5上における高さ調整部材12(テーパーライナー)を調整し、該高さ調整部材12(テーパーライナー)の上面を機台ベース6の下面に当接する。
【0022】
なお、上記のように機台ベース6を水平度並びに予め決められた高さレベルに調整設定した後においては、前記螺旋回転動作機構付きの面高低微調整器具13を外して仮芯検査を受け、その検査合格後、金属製有底型枠4内、すなわち、アンカーボルト設定孔にアンカーボルト固設用としてのコンクリート9を充填、打設して、該充填、打設されたコンクリート9によりアンカーボルト3を垂直状態に固定する。
【0023】
そして、前記アンカーボルト固設用としての各コンクリート9上においてアンカーボルト3を挟んだ位置における該コンクリート9上面と前記送風機1の機台ベース6との間に本パッカー7を、無収縮セメントを金属製分割型枠に流し込むようにして打設しかつ該無収縮セメント上に前述の仮パッカー5と同様に錠台11aを載置することにより形成する(本パッカー打設工程という)。
【0024】
本パッカー7の錠台レベルの調整は,既に仮パッカー5上に載置され仮芯出しが完了している機台ベース6の下面と錠台11aとの間に一対の高さ調整部材12a(テーパーライナー)を入れてこの高さ調整部材12a(テーパーライナー)を摺動させることで該錠台11aを本パッカー7内に押し込む方法によって行なうものである。
【0025】
すなわち、上記錠台(平行ライナー)11a上に対し、前記仮パッカー5に使用された高さ調整部材12と同様に構成した対向する摺動テーパー面を備えた高さ調整部材12a(テーパーライナー)を載置し、該高さ調整部材12a(テーパーライナー)を摺動させることによって、錠台11aを本パッカー7内に押し込みながら、この高さ調整部材12a(テーパーライナー)の上面を機台ベース6の下面に当接する(図6及び図7参照)。
【0026】
この場合、本パッカー7が硬化するまでの間は、錠台(平行ライナー)11aの上面レベルが据付ける送風機1の機台ベース6の下面と平行でかつ高さ調整部材12aに「がた」が生じないように点検するものである。このとき、アンカーボルト3の垂直度についても該垂直となるように設定する。
【0027】
ついで、前記本パッカー7が硬化した後、本パッカー7の錠台上の高さ調整部材12により本芯出し調整を行うとともに、アンカーボルト3に螺合するナット等により締着する。すなわち、この本芯出し調整は、前述のように、アンカーボルトに螺合するナット等をトルクレンチで締めながら高さ調整部材12を摺動させる精密調整作業として行なわれるものである。
【0028】
そして、これ等の調整作業が終了し、最終検査を合格した後に、本パッカー7の金属製分割型枠を解体抜出するとともに、前記各仮パッカー5における錠台11及び高さ調整部材12とを全数溶接固定する。
【0029】
その後、基礎コンクリート2に対し据付けした機台ベース6上面までシンダーコンクリート19を打設しコテ仕上げを行い、ここに、地下空間において、空調設備機器等を構成する送風機1を基礎コンクリート2上に据付けるものである。
【0030】
なお、上記した実施の形態において、機台ベース6の据付けにあたっての仮パッカー5及び本パッカー7の設置位置並びにその個数は、図示のものに限定するものではなく、また、螺旋回転動作機構付きの面高低微調整器具13にあっても図示のものに限定するものではない。
【0031】
【発明の効果】
請求項1の発明によれば、基礎形成工程において、アンカーボルトは方形に枠組みされた鉄筋とともに、例えば引掛けて定置することとし、金属製の造形装置は、そのまま基礎コンクリートに埋設されるため、方形に枠組みされた鉄筋及びアンカーボルト等の結束を容易にし、コンクリートの打設後における金属製の造形装置の底板部の除去を不要とすることができ、したがって、金属製の造形装置における強度及びその位置精度並びに該金属製の造形装置内に打設される、アンカーボルト固設用のコンクリートの打設精度を良化向上することができる。
【0032】
また、仮パッカー上に錠台及び高さ調整部材を介して据付けすべき空調機器等の機台ベースの高さレベル及び水平度を調整することにより、その作業効率並びに空調機器等の設置精度の良化向上を図るとともに、空調設備機器の据付けに伴う各作業に必要な労力と時間を極力省き、作業全体の工期を可及的に短縮し得る。
【0033】
請求項2の発明によれば、仮パッカーの形成を、熟練した作業者を必要とすることなく、簡易になし得るので、その作業に伴う労力と時間を極力省き、作業全体の工期を可及的に短縮できる。
【図面の簡単な説明】
【図1】本実施の形態に係る送風機1の据付け状態を示す説明図である。
【図2】同じく、本実施の形態に係る送風機1の据付け状態を示す説明図である。
【図3】本実施の形態に係る送風機1の据付け工事方法のパッカー配置を略示する平面説明図である。
【図4】本実施の形態に係る送風機1の据付け工事方法を略示する側面説明図である。
【図5】アンカーボルト用の金属製有底型枠の説明図である。
【図6】仮パッカー形成工程の説明図である。
【図7】同じく、仮パッカー形成工程の説明図である。
【図8】機台ベース設置調整工程及び本パッカー打設工程の説明図である。
【図9】本実施の形態に係る螺旋回転動作機構付きの面高低微調整器の一例を示す斜視図である。
【符号の説明】
1 送風機
2 基礎コンクリート
3 アンカーボルト
4 金属製有底型枠
5 仮パッカー
6 機台ベース
7 本パッカー
8 配筋枠組
9 アンカーボルト固設用のコンクリート
11 錠台
12 高さ調整部材
[0001]
BACKGROUND OF THE INVENTION
In particular, the present invention relates to a method for installing air conditioning equipment in an underground space such as a subway.
[0002]
[Prior art]
In general, in the installation work of air conditioning equipment in underground spaces of this kind such as subways, a plurality of anchor bolt setting holes in which anchor bolts are erected are provided for the parts to be installed such as air conditioning equipment. After placing the foundation concrete provided and completing this work, temporary packers placed on both sides of the anchor bolts on the foundation concrete block are formed by filling the concrete in the integrated mold and solidifying it. Then, a machine base such as an air conditioner to be installed on the temporary packer is mounted on the concrete, and then the anchor bolt fixing concrete to be installed in the anchor bolt setting hole for fixing the anchor bolt. This packer was placed between the concrete upper surface and the machine base of the air conditioner or the like to install the air conditioner equipment.
[0003]
[Problems to be solved by the invention]
However, in the above-described conventional method, when a plurality of anchor bolt setting holes are formed, a wooden bottomed box-shaped formwork is used. And the wooden box-shaped formwork are difficult to bind, and after the foundation concrete is placed, it becomes impossible to remove the bottom plate portion of the formwork and is then placed in the wooden box-shaped formwork. Adhesion with the concrete for fixing anchor bolts to be filled is hindered, and as a result, the working efficiency and the installation accuracy of air conditioning equipment and the like are deteriorated. In addition, in forming a temporary packer after placing the concrete foundation, the worker filled the concrete into an integral mold and formed it while tamping it, and was skilled in adjusting the level of the upper surface. Since the work is required by the workers, the work requires a great deal of labor and time, which greatly increases the overall construction period associated with the installation of the air conditioning equipment.
[0004]
Therefore, the present invention has been made in view of the above-described problems, and the object of the present invention is to improve work efficiency and installation accuracy of air conditioning equipment, etc., and to perform each work associated with installation of air conditioning equipment. It is intended to provide a method for installing air-conditioning equipment and the like in an underground space that can reduce the labor and time required for the work as much as possible and shorten the work period of the entire work as much as possible.
[0005]
[Means for Solving the Problems]
In order to solve this problem, the invention according to claim 1 is the installation work of the air conditioning equipment in the underground space,
A foundation forming step of placing a foundation concrete provided with a plurality of anchor bolt setting holes of a predetermined depth in which anchor bolts are erected substantially at the center with respect to a site to be installed such as the air conditioning equipment,
A temporary packer forming step for forming a temporary packer disposed on the foundation concrete;
A machine base installation adjustment step for mounting a machine base such as an air conditioner to be installed on the temporary packer via a lock table and a height adjustment member, and adjusting the height and level of the machine base; ,
This packer striking which places this packer between the concrete upper surface and the machine base of the air conditioner or the like on the anchor bolt fixing concrete to be installed in the anchor bolt setting hole. It consists of an installation process,
In the foundation forming step, the metal modeling apparatus is framed with the foundation rebar frame for the foundation concrete, and an anchor bolt is erected substantially in the center of the modeling apparatus and embedded in the foundation concrete.
In the temporary packer forming step, a temporary frame is filled with a non-shrinkable cement and is solidified, and a lock base and a height adjusting member are placed on the upper part to set the height level and levelness of the lock base. And forming a temporary packer.
[0006]
According to the configuration described above, in the foundation forming process, the anchor bolt is to be placed with, for example, a square framed reinforcing bar, and the metal modeling apparatus is embedded in the foundation concrete as it is, so that it is square. This makes it easy to bind framed reinforcing bars and anchor bolts, and eliminates the need to remove the bottom plate portion of the metal molding apparatus after placing concrete.
In addition, by adjusting the height level and level of the base of the air conditioner to be installed on the temporary packer via the lock table and the height adjusting member, the work efficiency and the installation accuracy of the air conditioner can be improved. In addition to improving the quality, the labor and time required for each work associated with the installation of air conditioning equipment can be saved as much as possible, and the work period of the entire work can be shortened as much as possible.
[0007]
A second aspect of the present invention is an installation method for air conditioning equipment or the like in an underground space according to the first aspect, wherein the temporary frame in the temporary packer forming step is divided, and the non-shrinkable cement is provided in the temporary frame. The gist is to fill the non-shrinkable cement filled in several times and harden it while applying vibration to the filled non-shrinkable cement.
[0008]
According to the above configuration, the temporary packer can be easily formed without requiring a skilled worker. Therefore, labor and time associated with the work can be saved as much as possible, and the work period of the entire work can be minimized. It can be shortened.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention in an installation method for air conditioning equipment in an underground space will be described with reference to FIGS.
In the present embodiment described below, a description will be given of the case of installing an air blower constituting the air conditioning equipment in the air conditioning equipment installed in the underground space.
[0010]
First, in the installed state of the blower 1, as shown in FIG.1 and FIG.2, in the underground space S, the concrete foundation 2 in which concrete was cast in a predetermined shape corresponding to the form of the blower 1 to be installed. On the other hand, the bottomed metal frames 4 to 4 constituting the metal forming apparatus for housing the anchor bolt 3 in the portion to be installed in the blower 1 are concretely cast integrally with the foundation concrete 2, and the foundation concrete portion Concrete base 9 for fixing anchor bolts 3 placed on metal bottomed molds 4 to 4 while placing machine base 6 of blower 1 with temporary packers 5 to 5 interposed on 2 The main packer 7 is formed between the upper surface and the lower surface of the machine base 6, and the machine base 6 is fixed by fastening means such as nuts via the anchor bolts 3, thereby configuring air conditioning equipment and the like. The wind machine 1 is intended to be installed on the concrete foundation 2 in the underground space.
[0011]
Hereinafter, the installation method will be specifically described.
First, the foundation concrete 2 is constructed by placing anchor reinforcement bolts for the blower foundation set on the floor slab corresponding to the part to be installed on the blower 1, and arranging the reinforcing bar 8 by placing the foundation rebar. Form. A metal bottomed formwork (also referred to as an anchor sleeve) 4 to be described later is incorporated in the reinforcing bar frame 8 and connected and fixed to a circumferential reinforcing bar. After this, the formwork (wooden) of the entire blower foundation is formed, and the foundation concrete 2 is placed. (Referred to as the basic formation process). That is, after arranging the bottomed metal frame 4 for the concrete 9 for anchor bolt fixing, which will be described later, together with the reinforcing bar frame 8 framed in a square shape or the like for the foundation concrete 2, A formwork (not shown) is constructed and the foundation concrete 2 is placed.
[0012]
In addition, an inner diameter portion of the metal bottomed mold 4 is an anchor bolt setting hole, and an anchor bolt 3 whose lower end is bent in a U-shape is set up substantially at the center of the anchor bolt setting hole. It is to be established.
[0013]
In this case, as shown in FIG. 5, the metal bottomed mold 4 is formed in a metal bottomed cylindrical shape such as a galvanized iron plate, for example, so that the reinforcing bar frame 8 for the foundation concrete 2 is formed. Can be inserted into the metal bottomed mold 4 as it is, and the metal bottomed mold 4 can be arranged as a circumferential reinforcing bar in the reinforcing bar frame assembly 8, and the anchor bolt 3 can be The reinforcing bars in the reinforcing bar frame 8 inserted through the bottom mold 4 can be hooked up via hooks (not shown) to improve the workability of each bundling operation. . Furthermore, the adhesiveness between the metal bottomed formwork 4 and the foundation concrete 2 is improved to improve the placement accuracy of the foundation concrete 2.
[0014]
Next, after dismantling the formwork in the foundation concrete 2, smearing is performed on the foundation concrete 2, and a plurality of predetermined locations corresponding to the blower 1 on which the temporary packers 5 to 5 are to be installed (see FIG. 3 shows three places.) It is formed and placed. (This is called a temporary packer forming step.)
[0015]
That is, as shown in FIG. 6, each temporary packer 5 assembles a square-shaped mold frame 10 (also referred to as a temporary frame) having a predetermined height divided into two in the horizontal direction. A non-shrinkable mortar (pad type) is thrown in several times (preferably about 5 times) according to the target amount, and is placed and formed by squeezing it while applying vibration by means of a vibrator. In this case, the non-shrinkable mortar (pad type) is quickly solidified to the upper part of the mold 10 by adding the non-shrinkable mortar (pad type) several times (preferably about 5 times) according to the amount of the division. It is something that can be done.
[0016]
Then, a lock base (parallel liner) 11 is embedded on the temporary packer 5 made of the non-shrinkable mortar (pad type) while applying vibration to the temporary packer 5 to about 1/3 while applying vibration by means of a vibrator (see FIG. 6). In this case, the adjustment is performed while adjusting the parallelism of the upper surface of the lock table (parallel liner) 11, and the high portion is finely adjusted with a rubber hammer or the like.
[0017]
Next, a pair of height adjusting members 12 (taper liners) having sliding taper surfaces facing each other are placed on the lock table (parallel liner) 11 on the temporary packer 5, and this height adjusting member is placed. 12 (the taper liner) is mounted on the machine base 6 of the blower 1 that is an air conditioner to be installed, and the height and level of the machine base 6 are separately provided. It adjusts and sets by operation of the surface height fine adjustment tool 13 with a mechanism (it is called a machine base installation temporary core adjustment process).
[0018]
Then, as shown in FIG. 9, the surface height fine adjustment device 13 with the spiral rotation operation mechanism includes a pair of fixed sides having sliding taper surfaces 14 and 15 that are in sliding contact with each other such as a leveling block. And the movable adjustment bases 16 and 17, and the screw means 18 in which the movable adjustment base 17 is connected to the fixed adjustment base 16 so that the upper surface thereof moves up and down in a parallel state. The screw means 18 is screwed up and screwed down so that the movable adjustment base 17 is moved up and down using the sliding taper surface to adjust the height. The play in the threaded assembly state in the screw connection (screw means 18) of the adjustment bases 16 and 17 on the fixed side and the movable side is set to an accuracy of 1/1000 to 5/1000. is there.
[0019]
In the machine base installation temporary core adjustment process, in the adjustment setting of the height and horizontality of the machine base 6, a predetermined portion (described later) between the upper surface of the foundation concrete 2 and the machine base 6 of the blower 1. The surface height fine adjustment device 13 with the helical rotation operation mechanism is installed at a plurality of locations (in the vicinity of the formation site of the present packer 7), and the base height is adjusted by the surface height fine adjustment device 13 with the helical rotation operation mechanism. The level of 6 and the predetermined height level are finely adjusted and set.
[0020]
By the individual operation of the surface height fine adjustment tool 13 with each spiral rotation operation mechanism, the adjustment work of the level and height level of the machine base 6 can be easily and quickly performed.
[0021]
In this state, the height adjustment member 12 (taper liner) on the temporary packer 5 is adjusted according to the height level set by the surface height fine adjustment device 13 with the spiral rotation operation mechanism, and the height adjustment member The upper surface of 12 (taper liner) is brought into contact with the lower surface of the machine base 6.
[0022]
In addition, after the machine base 6 is adjusted and set to a level and a predetermined height as described above, the surface height fine adjustment device 13 with the spiral rotation operation mechanism is removed and a temporary core inspection is performed. After passing the inspection, the concrete 9 for fixing the anchor bolt is filled in the metal bottomed mold 4, that is, in the anchor bolt setting hole, and the anchor 9 is anchored by the filled and cast concrete 9. The bolt 3 is fixed in a vertical state.
[0023]
Then, the packer 7 is placed between the top surface of the concrete 9 and the machine base 6 of the blower 1 at a position where the anchor bolt 3 is sandwiched on the concrete 9 for fixing the anchor bolt. It is formed by pouring into a divided mold form and placing the lock table 11a on the non-shrinkable cement in the same manner as the temporary packer 5 described above (referred to as the present packer placing step).
[0024]
The lock table level of the packer 7 is adjusted by a pair of height adjustment members 12a (between the lower surface of the machine base 6 already placed on the temporary packer 5 and the temporary centering completed and the lock table 11a. A taper liner) is inserted and the height adjusting member 12a (taper liner) is slid to push the lock 11a into the main packer 7.
[0025]
That is, a height adjusting member 12a (taper liner) having an opposing sliding taper surface configured in the same manner as the height adjusting member 12 used for the temporary packer 5 on the lock table (parallel liner) 11a. , And slide the height adjusting member 12a (taper liner) to push the lock table 11a into the packer 7, while the upper surface of the height adjusting member 12a (taper liner) is 6 (see FIGS. 6 and 7).
[0026]
In this case, until the present packer 7 is cured, the upper surface level of the lock table (parallel liner) 11a is parallel to the lower surface of the machine base 6 of the blower 1 to be installed, and the height adjustment member 12a is “back”. It is inspected so as not to occur. At this time, the perpendicularity of the anchor bolt 3 is also set to be perpendicular.
[0027]
Next, after the main packer 7 is hardened, the main centering adjustment is performed by the height adjusting member 12 on the lock base of the main packer 7, and the main packer 7 is fastened by a nut or the like screwed onto the anchor bolt 3. That is, this centering adjustment is performed as a precision adjustment operation in which the height adjusting member 12 is slid while tightening a nut or the like screwed to the anchor bolt with a torque wrench as described above.
[0028]
And after these adjustment work is complete | finished and the final inspection is passed, while disassembling and extracting the metal division | segmentation formwork of this packer 7, the lock base 11 in each said temporary packer 5, and the height adjustment member 12 and All are fixed by welding.
[0029]
After that, cinder concrete 19 is placed to the upper surface of the machine base 6 installed on the foundation concrete 2 and troweled, and the blower 1 constituting the air conditioning equipment is installed on the foundation concrete 2 in the underground space. It is what you attach.
[0030]
In the above-described embodiment, the installation positions and the number of temporary packers 5 and main packers 7 for installing the machine base 6 are not limited to those shown in the drawings, and a spiral rotation operation mechanism is provided. Even if it exists in the surface height fine adjustment tool 13, it does not limit to the thing of illustration.
[0031]
【The invention's effect】
According to the invention of claim 1, in the foundation forming step, the anchor bolt is to be placed with a square framed reinforcing bar, for example, hooked, and the metal modeling apparatus is embedded in the foundation concrete as it is, Facilitates the binding of reinforcing bars and anchor bolts that are squarely framed, and eliminates the need to remove the bottom plate portion of the metal modeling device after placing the concrete. It is possible to improve and improve the positioning accuracy and the casting accuracy of the anchor bolt fixing concrete that is placed in the metal molding apparatus.
[0032]
In addition, by adjusting the height level and level of the machine base such as air conditioning equipment to be installed on the temporary packer via the lock table and the height adjusting member, the work efficiency and the installation accuracy of the air conditioning equipment etc. can be improved. In addition to improving the quality, the labor and time required for each work associated with the installation of air conditioning equipment can be saved as much as possible, and the work period of the entire work can be shortened as much as possible.
[0033]
According to the second aspect of the present invention, the temporary packer can be easily formed without requiring a skilled worker. Therefore, labor and time associated with the work can be saved as much as possible, and the work period of the whole work can be reduced. Can be shortened.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram showing an installed state of a blower 1 according to the present embodiment.
FIG. 2 is also an explanatory diagram showing an installation state of the blower 1 according to the present embodiment.
FIG. 3 is an explanatory plan view schematically showing a packer arrangement in the method of installing the blower 1 according to the present embodiment.
FIG. 4 is an explanatory side view schematically showing a method for installing the blower 1 according to the present embodiment.
FIG. 5 is an explanatory diagram of a metal bottomed mold for an anchor bolt.
FIG. 6 is an explanatory diagram of a temporary packer forming process.
FIG. 7 is also an explanatory diagram of a temporary packer forming step.
FIG. 8 is an explanatory diagram of a machine base installation adjustment process and a main packer placement process.
FIG. 9 is a perspective view showing an example of a surface height fine adjuster with a helical rotation operation mechanism according to the present embodiment.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Blower 2 Foundation concrete 3 Anchor bolt 4 Metal bottom formwork 5 Temporary packer 6 Machine base 7 This packer 8 Reinforcement frame structure 9 Anchor bolt fixed concrete 11 Lock base 12 Height adjustment member

Claims (2)

地下空間における空調設備機器等の据付け工事において、
該空調設備機器等の据付けすべき部位に対し、ほぼ中心部にアンカーボルトが立設される所定の深さの複数個のアンカーボルト設定孔を設けた基礎コンクリートを打設する基礎形成工程と、
該基礎コンクリート上において配置される仮パッカーを形成する仮パッカー形成工程と、
該仮パッカー上に錠台及び高さ調整部材を介して据付けすべき空調機器等の機台ベースを上載するとともに、該機台ベースの高さ及び水平度を調整する機台ベース設置調整工程と、
前記アンカーボルト設定孔にアンカーボルト固設用に打設されるアンカーボルト固設用のコンクリート上において該コンクリート上面と前記空調機器等の機台ベースとの間に本パッカーを打設する本パッカー打設工程よりなり、
前記基礎形成工程は、金属製の造形装置を前記基礎コンクリート用の基礎鉄筋枠ととも枠組みしかつ該造形装置内のほぼ中心部にアンカーボルトを立設して前記基礎コンクリートに埋込みすること、
前記仮パッカー形成工程は、仮枠内に無収縮性セメントを充填してこれを突き固め、上部に錠台及び高さ調整部材を載置して該錠台の高さレベル並びに水平度を設定して仮パッカーを形成すること、
を特徴とする地下空間における空調設備機器等の据付け工事方法。
In the installation work of air conditioning equipment etc. in the underground space,
A foundation forming step of placing a foundation concrete provided with a plurality of anchor bolt setting holes of a predetermined depth in which anchor bolts are erected substantially at the center with respect to a site to be installed such as the air conditioning equipment,
A temporary packer forming step for forming a temporary packer disposed on the foundation concrete;
A machine base installation adjustment step for mounting a machine base such as an air conditioner to be installed on the temporary packer via a lock table and a height adjustment member, and adjusting the height and level of the machine base; ,
This packer striking which places this packer between the concrete upper surface and the machine base of the air conditioner or the like on the anchor bolt fixing concrete to be installed in the anchor bolt setting hole. It consists of an installation process,
In the foundation forming step, the metal modeling apparatus is framed with the foundation rebar frame for the foundation concrete, and an anchor bolt is erected substantially in the center of the modeling apparatus and embedded in the foundation concrete.
In the temporary packer forming step, a temporary frame is filled with a non-shrinkable cement and is solidified, and a lock base and a height adjusting member are placed on the upper part to set the height level and levelness of the lock base. To form a temporary packer,
Installation work method for air conditioning equipment etc. in underground space characterized by
請求項1に記載の地下空間における空調設備機器等の据付け工事方法であって、前記仮パッカー形成工程における仮枠を分割とし、該仮枠内に無収縮性セメントを数回に分けて充填するとともに、該充填された無収縮性セメントに振動を付与しながら固めることを特徴とする地下空間における空調設備機器等の据付け工事方法。It is an installation work method of the air-conditioning equipment etc. in the underground space of Claim 1, Comprising: The temporary frame in the said temporary packer formation process is made into a division | segmentation, and it fills in the temporary frame in several times in this temporary frame. And an installation method for air-conditioning equipment and the like in the underground space, wherein the filled non-shrinkable cement is hardened while applying vibration.
JP2001394703A 2001-12-26 2001-12-26 Installation work for air conditioning equipment in underground space Expired - Fee Related JP3824932B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001394703A JP3824932B2 (en) 2001-12-26 2001-12-26 Installation work for air conditioning equipment in underground space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001394703A JP3824932B2 (en) 2001-12-26 2001-12-26 Installation work for air conditioning equipment in underground space

Publications (2)

Publication Number Publication Date
JP2003193491A JP2003193491A (en) 2003-07-09
JP3824932B2 true JP3824932B2 (en) 2006-09-20

Family

ID=27601354

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001394703A Expired - Fee Related JP3824932B2 (en) 2001-12-26 2001-12-26 Installation work for air conditioning equipment in underground space

Country Status (1)

Country Link
JP (1) JP3824932B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493481A (en) * 2011-12-15 2012-06-13 中国一冶集团有限公司 Construction method of large equipment foundation reserved foundation bolt hole
CN103726507A (en) * 2013-12-26 2014-04-16 河南万达铝业有限公司 Ground anchor fixing structure for cold rolling mill

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101098386B1 (en) * 2011-06-14 2011-12-23 김민호 Unified ground structures for diecastings and mounting method thereof
CN102538443B (en) * 2012-02-10 2014-04-09 马鞍山十七冶工程科技有限责任公司 Inverse-suspension mounting method for backing plates for rail rest of arc furnace with screwed-off furnace cover
CN106128284A (en) * 2016-08-26 2016-11-16 江苏建筑职业技术学院 Column foundation model and manufacture method with foundation bolt
CN106157794A (en) * 2016-08-26 2016-11-23 江苏建筑职业技术学院 Column foundation model and preparation method with anchor bolt box

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493481A (en) * 2011-12-15 2012-06-13 中国一冶集团有限公司 Construction method of large equipment foundation reserved foundation bolt hole
CN103726507A (en) * 2013-12-26 2014-04-16 河南万达铝业有限公司 Ground anchor fixing structure for cold rolling mill
CN103726507B (en) * 2013-12-26 2016-08-17 河南万达铝业有限公司 A kind of earth anchorage structure for cold-rolling mill

Also Published As

Publication number Publication date
JP2003193491A (en) 2003-07-09

Similar Documents

Publication Publication Date Title
US8720160B1 (en) Process for forming concrete walls and other vertically positioned shapes
CZ285120B6 (en) Process for producing gravel-free superstructure for at least one track
KR20110128396A (en) Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof
JP3824932B2 (en) Installation work for air conditioning equipment in underground space
JP3763575B2 (en) Underground beam construction frame and underground beam construction method using the same
JPH0813608A (en) Construction method of thin-walled precast concrete post and guide form
JP3824931B2 (en) Installation work for air conditioning equipment in underground space
JP2004017645A (en) Form device for pre-cast concrete foundation block, pre-cast concrete foundation block, and foundation technique using pre-cast concrete foundation block
JP3429459B2 (en) Construction method of bridge deck haunch
JP7112635B1 (en) U-shaped throwaway formwork for rising foundations of buildings
JP2009150067A (en) Method of and structure for renewing existing bearing apparatus
JP7396763B1 (en) 3-point anchor integrated liner, long anchor integrated liner, equipment installation method
JP3713192B2 (en) Foundation structure with anchor bolt and its construction method
JPH06316939A (en) Positioning jig for construction work, and construction of building therewith
JP7288390B2 (en) Foundation construction method and foundation
JP3148138B2 (en) Mounting method of PC formwork in driving formwork method
JP3878945B2 (en) Method of installing a plate on the top end of concrete columns or column base concrete
JPH08338030A (en) Supporting base
JP3368360B2 (en) How to install a packer plate for equipment installation
CN111002462A (en) Processing method of reinforcing through-length steel bar at bottom of prefabricated overlapped wallboard
JPH07233581A (en) Precast reinforced concrete board and concrete compond slab method
JP2927783B1 (en) Top level adjustment method of reinforced concrete cloth foundation and precast reinforced concrete cloth foundation member
JPH0813512A (en) Foundation constructing method
JP4555724B2 (en) Construction method of structures using precast concrete members
JPH06315920A (en) Manufacture of concrete block

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041021

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060403

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060530

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060628

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090707

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090707

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120707

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120707

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130707

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees