JP3798420B1 - Steel frame / reinforcement type dry block masonry method - Google Patents

Steel frame / reinforcement type dry block masonry method Download PDF

Info

Publication number
JP3798420B1
JP3798420B1 JP2005299426A JP2005299426A JP3798420B1 JP 3798420 B1 JP3798420 B1 JP 3798420B1 JP 2005299426 A JP2005299426 A JP 2005299426A JP 2005299426 A JP2005299426 A JP 2005299426A JP 3798420 B1 JP3798420 B1 JP 3798420B1
Authority
JP
Japan
Prior art keywords
tie beam
steel
block
horizontal tie
bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005299426A
Other languages
Japanese (ja)
Other versions
JP2007107282A (en
Inventor
吉松 張替
Original Assignee
株式会社張替工務店
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社張替工務店 filed Critical 株式会社張替工務店
Priority to JP2005299426A priority Critical patent/JP3798420B1/en
Application granted granted Critical
Publication of JP3798420B1 publication Critical patent/JP3798420B1/en
Publication of JP2007107282A publication Critical patent/JP2007107282A/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

【課題】本発明は、ブロックの積重ね壁を構築する際にセメントモルタルを用いることない乾式ブロック組積工法において、剛性が高く、耐震、耐風上の安全性の高いブロック組積工法を提供することを目的とする。
【解決手段】本発明の鉄骨・鉄筋補強型乾式ブロック組積工法は、基礎部より垂直方向に鉄骨支柱を一定間隔の柱間をもって立設するとともに、該鉄骨支柱間に基礎部より垂直方向にネジ付き垂直補強筋を立設し、鉄骨支柱とネジ付き垂直補強筋との間及びネジ付き垂直補強筋間に組積られるブロックの一定段目ごとにネジ付き垂直補強筋を通して水平タイビーム筋を設置し、水平タイビーム筋をネジ付き垂直補強筋に設けた締め付け部材により下部方向に押し下げることにより組積られるブロックを圧着することを特徴としている。
【選択図】 図1
[PROBLEMS] To provide a block masonry method having high rigidity and high safety in terms of earthquake resistance and wind resistance in a dry block masonry method without using cement mortar when building a stacking wall of blocks. With the goal.
According to the present invention, a steel block / reinforced dry block masonry method is used in which a steel column is erected in a vertical direction from a foundation part with a fixed interval between columns, and between the steel columns in a direction perpendicular to the foundation part. Vertical threaded reinforcing bars are erected, and horizontal tie beam bars are installed through the threaded vertical reinforcing bars at every fixed stage of the block built between the steel column and the threaded vertical reinforcing bars and between the threaded vertical reinforcing bars. Then, the blocks to be stacked are pressure-bonded by pressing the horizontal tie beam bars downward by a fastening member provided on the vertical reinforcing bars with screws.
[Selection] Figure 1

Description

本発明は、ブロックの積重ね壁を構築するための組積工法に関し、施工の際にセメントモルタルを用いることなく、鉄骨及び鉄筋で補強するようにした乾式ブロック組積工法に関するものである。   The present invention relates to a masonry method for constructing a stacked wall of blocks, and relates to a dry-type block masonry method that is reinforced with steel frames and reinforcing bars without using cement mortar during construction.

従来から、ブロックの積重ね壁を構築する際、セメントモルタルを用いることのない乾式のブロック組積工法として、特開昭63−122848号公報に記載のものが知られている(以下、「従来工法1」という。)。この従来工法1は、プラスチック材質の内部に垂直に貫通した孔を設け、上面と底面が相互に嵌合する略凹凸組合せの溝を一方の面に略凹溝を他方の面に略凸溝を設け、両側面に係合棒を介して連接係合可能な略凹溝を設けたブロックと、基礎コンクリート上面とブロック下面との間に設けられる下板と、オールアンカーと、オールアンカーに係止可能な係止部と上端に止め部を有する立棒と、ブロック側面の凹溝に嵌挿してブロックを連接係合するプラスチック材質の係合棒と、ブロック上面に嵌合する天板とを、それぞれ用意し、基礎コンクリート上面の下板にブロックを適宜積み重ね、その後、ブロック相互の接面する各側面に設けた略凹溝に係合棒を挿入し、次に、立棒を最上段のブロックの貫通した孔から挿入し立棒の下端とオールアンカーとを係止し、立棒の上端を最上段のブロックにに固定し、最後に、天板を最上段のブロックに嵌合させるものである。   Conventionally, as a dry block masonry method that does not use cement mortar when building a stacked wall of blocks, the one described in JP-A-63-122848 is known (hereinafter referred to as “conventional method”). 1 ”). In this conventional construction method 1, a hole vertically penetrating inside a plastic material is provided, and a substantially concave / convex combination groove in which the top surface and the bottom surface are fitted to each other has a substantially concave groove on one surface and a substantially convex groove on the other surface. Blocks provided with substantially concave grooves that can be connected and engaged via engaging rods on both side surfaces, a lower plate provided between the upper surface of the basic concrete and the lower surface of the block, all anchors, and all anchors A vertical bar having a locking part and a stopper part at the upper end, an engaging bar made of plastic material that is inserted into a concave groove on the side surface of the block and connected to the block, and a top plate that fits on the upper surface of the block. Prepare each and stack the blocks appropriately on the bottom plate of the upper surface of the foundation concrete, and then insert the engaging rods into the roughly recessed grooves provided on the side surfaces where the blocks contact each other. Insert from the through hole of the Locking the anchor, the upper end of Tatsubo fixed to the top of the block, finally, it is intended to fit the top plate at the top of the block.

また、セメントモルタルを用いることのない乾式のブロック組積工法として、特開平2−47442号公報に記載のものも知られている(以下、「従来工法2」という。)。この従来工法2は、表裏両面が方形をなした略直方体形のコンクリートブロックの上下面に相互に嵌合する凸面及び凹部を設け、上下両面を貫通して下端部が拡大開口したボルト挿通孔を設け、このブロックを上下間において凸部と凹部を嵌合し、ボルト挿通孔を連通して積重ね、先端に雄ネジ部、後端に雌ネジ孔が開口した膨大部があり、ブロックの長さより僅かに長い長ボルトを上段ブロックのボルト挿通孔に差込み、先端の雄ネジ部を下段ブロックのボルト挿通孔に差込んだ長ボルト後端膨大部の雌ネジ孔に、上段ブロックのボルト挿通孔下端の拡大開口部内において螺合連結し、長ボルト後端の膨大部をブロック上面のボルト挿通孔開口縁部に圧接し下段ブロック上に上段ブロックを締付け固定するものである。
特開昭63−122848号公報 特開平2−47442号公報
As a dry block masonry method without using cement mortar, one disclosed in Japanese Patent Laid-Open No. 2-47442 is also known (hereinafter referred to as “conventional method 2”). This conventional construction method 2 is provided with a convex surface and a concave portion that are fitted to the upper and lower surfaces of a substantially rectangular parallelepiped concrete block whose front and back surfaces are rectangular, and has a bolt insertion hole with a lower end expanded through the upper and lower surfaces. This block is fitted with a convex part and a concave part between the upper and lower sides, the bolt insertion holes are connected and stacked, and there is a huge part with a male screw part at the tip and a female screw hole at the rear part. Insert a slightly longer long bolt into the bolt insertion hole of the upper block, and insert the male screw at the tip into the female screw hole at the rear end of the long bolt and the lower end of the bolt insertion hole in the upper block. And the enormous portion at the rear end of the long bolt is pressed against the bolt insertion hole opening edge on the upper surface of the block to fasten and fix the upper block on the lower block.
JP 63-122848 A Japanese Patent Laid-Open No. 2-47442

上記した従来工法1においては、ブロックを基礎に固定する役割は最上段のブロックの貫通した孔から挿入しオールアンカーと係止する立棒上端のナット部材の締め付け力のみによるもであるため、壁全体に厚み方向(内外方向)の荷重が作用した場合、立棒の伸びにより壁が内側あるいは外側に傾ことを抑えることができないという問題を有していた。
また、従来工法2においても、ブロック1段分の長さを有する長ボルトの螺合連結により上段ブロック及び下段ブロックを締付け固定するのみであるため、長ボルト及びブロックの両方あるいは片方に寸法誤差があったりすると締付けることができないばかりか、壁の厚み方向(内外方向)の荷重に対向する力が弱く、また、基礎部分との固定については何ら開示されていないため、壁全体に厚み方向(内外方向)の荷重が作用した場合、壁全体の傾きを抑えることができないという問題を有していた。
In the above-mentioned conventional construction method 1, the role of fixing the block to the foundation is only due to the tightening force of the nut member at the upper end of the vertical bar inserted through the hole in the uppermost block and locked to the all anchor. When a load in the thickness direction (internal / external direction) acts on the whole, there is a problem that it is impossible to prevent the wall from being inclined inward or outward due to the extension of the vertical bar.
Also in the conventional method 2, since the upper block and the lower block are only fastened and fixed by screwing the long bolt having a length corresponding to one block, there is a dimensional error in both or one of the long bolt and the block. In addition to being unable to tighten, the force facing the load in the thickness direction (inside and outside) of the wall is weak, and there is no disclosure of fixing with the foundation part, so the entire wall (inside and outside) When the load of (direction) is applied, the inclination of the entire wall cannot be suppressed.

本発明は、ブロックの積重ね壁を構築する際にセメントモルタルを用いることない乾式ブロック組積工法において、剛性が高く、耐震、耐風上の安全性の高いブロック組積工法を提供することを目的とする。   It is an object of the present invention to provide a block masonry method that has high rigidity and is highly safe in terms of earthquake resistance and wind resistance, in a dry block masonry method that does not use cement mortar when building a stacked wall of blocks. To do.

上記目的を達成するため本発明の鉄骨・鉄筋補強型乾式ブロック組積工法は、基礎部より垂直方向に鉄骨支柱を一定間隔の柱間をもって立設するとともに、該鉄骨支柱間に基礎部より垂直方向にネジ付き垂直補強筋を立設し、組積られるブロックの一定段目ごとにネジ付き垂直補強筋を通して水平タイビーム筋を設置し、水平タイビーム筋をネジ付き垂直補強筋に螺合する締め付け部材により下方に押し下げることにより、組積られるブロックを圧着するようにしたことを特徴としている。
また、本発明の鉄骨・鉄筋補強型乾式ブロック組積工法は、水平タイビーム筋端部の係合部を鉄骨支柱の水平タイビーム筋取付孔の下部に設けられた楔に噛合させることにより固定するようにしたことを特徴としている。
また、本発明の鉄骨・鉄筋補強型乾式ブロック組積工法は、水平タイビーム筋の端部を鉄骨支柱に固着された水平タイビーム筋固定棒にターンバックルを介して取付けることにより固定するようにしたことを特徴としている。
また、本発明の鉄骨・鉄筋補強型乾式ブロック組積工法は、ネジ付き垂直補強筋の一部に一定間隔をもってナット挿入用の表面切欠部を設け、ネジ付き垂直補強筋に螺合させるナットには挿入用開口部を設けることを特徴としている。
In order to achieve the above object, the steel frame / reinforcement-reinforced dry block masonry method of the present invention is such that a steel column is erected in a vertical direction from the foundation with a space between columns, and the steel column is perpendicular to the foundation from the foundation. Tightening member that vertically installs a vertical reinforcing bar with a thread in the direction, installs a horizontal tie beam bar through the vertical reinforcing bar with a thread at every fixed stage of the blocks to be stacked, and screwes the horizontal tie beam bar into the vertical reinforcing bar with a thread It is characterized in that the blocks to be stacked are pressure-bonded by being pushed down by the above.
Further, the steel frame / reinforcement-reinforced dry block masonry method of the present invention is fixed by engaging the engaging portion of the end of the horizontal tie beam bar with the wedge provided at the lower part of the horizontal tie beam bar mounting hole of the steel column. It is characterized by that.
The steel frame / reinforcement-type dry block masonry method of the present invention is fixed by attaching the end of the horizontal tie beam bar to the horizontal tie beam bar fixing rod fixed to the steel column via a turnbuckle. It is characterized by.
Further, the steel frame / reinforcement-reinforced dry block masonry method of the present invention provides a nut notched portion for inserting a nut at a certain interval in a part of a threaded vertical reinforcement bar, and screwed into the threaded vertical reinforcement bar. Is characterized by providing an insertion opening.

本発明は、以下のような優れた効果を奏する。
(1)セメントモルタルを用いることのない乾式のブロック組積工法であるため、セメントなどの接着材の固定時間を必要とせず、工期を大幅に短縮できる。
(2)鉄骨支柱、ネジ付き垂直補強筋及び水平タイビーム筋を用いるため、剛性が高く、耐震、耐風上の安定性が増大する。また、ネジ付き垂直補強筋及び水平タイビーム筋の使用により、組積時にブロックのズレを防止して壁面の安定性を確保できる。
(3)水平タイビーム筋を組積けられるブロックの一定段目ごとに設けてネジ付き垂直補強筋の締め付け部材によりブロックを締め付けることにより、ブロック組積けを下部段から順次緊密に行うことができ、基礎と一体となったブロック壁を構築することができる。
(4)鉄骨支柱、ネジ付き垂直補強筋及び水平タイビーム筋がブロック組積けのガイド役を果たすので、高度な技術を必要とすることなく組積工事を施工できる。
(5)乾式工法であるため、工事現場を清潔に保つことができる。
The present invention has the following excellent effects.
(1) Since it is a dry block masonry method that does not use cement mortar, it does not require fixing time for adhesives such as cement, and the construction period can be greatly shortened.
(2) Since steel columns, threaded vertical reinforcement bars and horizontal tie beam bars are used, the rigidity is high and the stability in earthquake resistance and wind resistance increases. Further, the use of threaded vertical reinforcement bars and horizontal tie beam bars can prevent block displacement during assembling and ensure the stability of the wall surface.
(3) By installing the horizontal tie beam bar at every fixed stage of the block to be assembled, and tightening the block with the fastening member of the vertical reinforcing bar with screws, the block assembly can be performed tightly sequentially from the lower stage. It is possible to build a block wall that is integrated with the foundation.
(4) Since the steel struts, threaded vertical reinforcement bars and horizontal tie beam bars serve as a guide for building blocks, masonry work can be performed without the need for advanced techniques.
(5) Since it is a dry method, the construction site can be kept clean.

本発明に係る鉄骨・鉄筋補強型乾式ブロック組積工法を実施するための最良の形態を実施例に基づいて図面を参照して以下に説明する。   The best mode for carrying out the steel block / reinforcement-reinforced dry block masonry method according to the present invention will be described below with reference to the drawings based on the embodiments.

図1及び2は、それぞれ本発明の実施の形態に係る鉄骨・鉄筋補強型乾式ブロック組積工法により組積けられたブロック壁の正面図及び平面図を示したものであり、図3は図1のA−A矢視断面図を示したものである。   1 and 2 show a front view and a plan view of a block wall built by a steel frame / reinforcement reinforced dry block masonry method according to an embodiment of the present invention, respectively. 1 is a cross-sectional view taken along the line AA.

図1及び図3において、GLは地面を示しており、地面を掘削し、掘削された部分に基礎コンクリート1を打接する。その際、基礎コンクリート1の部分から垂直上方に向けて、鉄骨支柱2及びネジ付き垂直補強筋3を立設させ、基礎コンクリート1の部分においてこれらをコンクリートで埋設・固定する。鉄骨支柱2は、図1に示すようにブロック数枚を間に挟む間隔で配置されるものであり、また、ネジ付き垂直補強筋3は、ブロック1枚ごとにブロックのほぼ中央に配置される。ブロック壁の両側の端部は、図1に示すようにブロック6を配置した状態で終わりとしても良いが、鉄骨支柱2を両側の端部に配置して鉄骨支柱2で終わりとしても良い。   In FIG.1 and FIG.3, GL has shown the ground, excavating the ground, and hitting the foundation concrete 1 to the excavated part. At that time, the steel column 2 and the vertical reinforcing bar 3 with screws are erected vertically upward from the portion of the foundation concrete 1, and these are embedded and fixed with concrete in the portion of the foundation concrete 1. As shown in FIG. 1, the steel struts 2 are arranged at intervals with several blocks in between, and the threaded vertical reinforcing bars 3 are arranged almost at the center of each block. . Ends on both sides of the block wall may be finished in a state where the block 6 is arranged as shown in FIG. 1, but the steel struts 2 may be arranged at both ends and may be finished with the steel struts 2.

図4は、鉄骨支柱2及びネジ付き垂直補強筋3の上部を省略して基礎部分を示す斜視図であり、鉄骨支柱2のリブ板4が底部において直角方向に所定の長さ張り出した形状になっており、地盤に安定して埋設・固定されるようになっている。また、ネジ付き垂直補強筋3も、その底部において鉄骨支柱2のリブ板4の張り出し方向に直角に曲げられた部分を有している。鉄骨支柱2とネジ付き垂直補強筋3とは基礎コンクリート1内に埋設される部分において、複数本の水平補強筋25により一体に連結・固定されているため、ブロック壁に水平荷重がかかっても、鉄骨支柱2、ネジ付き垂直補強筋3、水平補強筋25及び基礎コンクリート1により、より強固に安定してブロック壁を支持することができる。   FIG. 4 is a perspective view showing the base portion with the upper portions of the steel struts 2 and the threaded vertical reinforcing bars 3 omitted, and the rib plates 4 of the steel struts 2 have a shape that protrudes a predetermined length in the perpendicular direction at the bottom. It is designed to be buried and fixed stably on the ground. Further, the threaded vertical reinforcing bar 3 also has a portion bent at a right angle to the protruding direction of the rib plate 4 of the steel column 2 at the bottom. The steel strut 2 and the threaded vertical reinforcing bar 3 are connected and fixed integrally by a plurality of horizontal reinforcing bars 25 in the portion embedded in the foundation concrete 1, so that even if a horizontal load is applied to the block wall The block wall can be supported more firmly and stably by the steel strut 2, the threaded vertical reinforcing bar 3, the horizontal reinforcing bar 25 and the foundation concrete 1.

鉄骨支柱2は、例えば鉄等の金属材料からなり、その断面形状は、例えば、図6に示すようなリブ板4の両側にチャンネル状部材5を溶接した中空形状をしており、軽量で、かつ組積られたブロック壁の地震、風圧等による水平荷重に耐えられる断面係数を有している。ネジ付き垂直補強筋3は、鉄等の金属材料から形成され、断面円形をしており、基礎コンクリート1より上方部分の表面にはネジが穿設されている。このネジ付き垂直補強筋3は、1本の長い棒状部材で形成してもよいが、適宜繋ぎあわせて形成してもよい。   The steel column 2 is made of a metal material such as iron, and the cross-sectional shape thereof is, for example, a hollow shape in which channel-like members 5 are welded to both sides of the rib plate 4 as shown in FIG. In addition, it has a section modulus that can withstand horizontal loads due to earthquakes, wind pressure, etc. of the built-up block walls. The threaded vertical reinforcing bar 3 is made of a metal material such as iron and has a circular cross section, and a screw is formed on the surface of the upper part of the foundation concrete 1. This threaded vertical reinforcing bar 3 may be formed by one long rod-like member, or may be formed by appropriately connecting.

基礎コンクリート1の打設とともに鉄骨支柱2及びネジ付き垂直補強筋3が立設された後に、基礎コンクリート1の上方にはブロック6が順次組積られる。
図5は、図1のB−B矢視断面図、図6は、図1のC−C矢視断面図である。
ブロック6は、図6に示すように上下方向に貫通した孔7が形成された中空形状とすることにより軽量化が図られている。また、左右両側面は図6の左側のブロックのように一方が凸形状、他方が凹形状に、さらに、上下面も図5に示すように一方が凸形状、他方が凹形状に形成され、上下左右において噛合するようになっている。
ブロック6としては、公知のコンクリートブロック、軽量コンクリートブロックあるいはプラスチック製ブロック等が用いられる。
After the foundation concrete 1 is placed and the steel column 2 and the vertical reinforcing bar 3 with screws are erected, the blocks 6 are sequentially stacked above the foundation concrete 1.
5 is a cross-sectional view taken along the line B-B in FIG. 1, and FIG. 6 is a cross-sectional view taken along the line C-C in FIG. 1.
As shown in FIG. 6, the block 6 has a hollow shape in which a hole 7 penetrating in the vertical direction is formed, thereby reducing the weight. Further, the left and right side surfaces are formed in a convex shape, the other is a concave shape, as shown in the left block of FIG. It meshes vertically and horizontally.
As the block 6, a known concrete block, a lightweight concrete block, a plastic block, or the like is used.

図6に示すように、鉄骨支柱2の部分の一側に用いられるブロック6、例えば、図6の右側のブロック6は、その左側面が鉄骨支柱2に嵌合するよう凹形状に形成され、その右側面も他のブロックの凸形状に噛合するよう凹形状に形成される。また、ブロック6の中央部にはネジ付き垂直補強筋3が上下方向に貫通する竪孔8を有している。鉄骨支柱2とブロック6、及び、ネジ付き垂直補強筋3とブロック6、との間はできるだけ緊密であることが望ましいが、施工の容易さを考慮して適宜の隙間が設けられている。   As shown in FIG. 6, the block 6 used on one side of the portion of the steel column 2, for example, the block 6 on the right side of FIG. 6 is formed in a concave shape so that its left side surface is fitted to the steel column 2, The right side surface is also formed in a concave shape so as to mesh with the convex shape of another block. Further, a central portion of the block 6 has a hole 8 through which the threaded vertical reinforcing bar 3 penetrates in the vertical direction. It is desirable that the steel column 2 and the block 6 and the threaded vertical reinforcing bar 3 and the block 6 be as close as possible, but an appropriate gap is provided in consideration of ease of construction.

図7は、施工中のブロック組積みの一部を示す斜視図である。
図5及び図7に示すように、ブロック6の一定段目ごとにネジ付き垂直補強筋3を通して水平タイビーム筋9が設置される。図5及び図7では、ブロック6の2段目ごとに水平タイビーム筋9が設置されている様子を示しているが、設置されるブロック壁の状況に応じてブロック6の1段目ごと、あるいは3段目ごとに設置するなど柔軟に設置されるものである。水平タイビーム筋9は、金属材料からなり、板状をしており、その幅はブロック6上面の凸部10とほぼ同じ幅を有し、その長さは鉄骨支柱2間に設置されるも場合はその設置間隔とほぼ同じ長さに形成され、後述する2通りの手段でもってその両端が鉄骨支柱2に固定される。なお、図1の両端に設置される水平タイビーム筋9のように鉄骨支柱2の一側に設置される場合は、その長さも短いため、鉄骨支柱2の側においてのみ鉄骨支柱2に固定され、その他、ネジ付き垂直補強筋3により締め付け固定されるが端部は自由端となってもよい。
FIG. 7 is a perspective view showing a part of the block assembly under construction.
As shown in FIGS. 5 and 7, horizontal tie beam bars 9 are installed through the threaded vertical reinforcing bars 3 at every fixed stage of the block 6. 5 and 7 show a state in which the horizontal tie beam streaks 9 are installed at every second stage of the block 6, but every first stage of the block 6 depending on the situation of the installed block wall, or It is installed flexibly, for example, every third stage. The horizontal tie beam 9 is made of a metal material and has a plate shape. The width of the horizontal tie beam 9 is substantially the same as that of the convex portion 10 on the upper surface of the block 6. Is formed to have substantially the same length as the installation interval, and both ends thereof are fixed to the steel column 2 by two means described later. In addition, when it is installed on one side of the steel column 2 like the horizontal tie beam muscles 9 installed at both ends of FIG. 1, the length is also short, so it is fixed to the steel column 2 only on the steel column 2 side, In addition, it is fastened and fixed by the vertical reinforcing bar 3 with a screw, but the end may be a free end.

ブロック6上面の凸部10に載置された水平タイビーム筋9には項7が設けられており、ネジ付き垂直補強筋3に通された後、ネジ付き垂直補強筋3に螺合する締め付け部材であるナット11により下部方向に押し下げられ、組積られるブロック6を圧着する。このため、組積られた全てのブロック6同士のズレが修正され、その上下凹凸嵌合面でもって緊密に嵌合するとともに、基礎コンクリート1から立設するネジ付き垂直補強筋3によりブロックが基礎コンクリート1と一体的に堅固に構築されることになる。なお、ブロック6の下面には、水平タイビーム筋9及びナット11を収容できる凹部が形成され、下段のブロック上面との嵌合に支障を来さないようになっている。   A term 7 is provided in the horizontal tie beam reinforcement 9 placed on the convex portion 10 on the upper surface of the block 6, and a fastening member that is threaded into the threaded vertical reinforcement 3 after passing through the threaded vertical reinforcement 3. The blocks 6 to be stacked are pressure-bonded by being pushed downward by the nut 11. For this reason, the misalignment between all the stacked blocks 6 is corrected, and the blocks are foundationally fitted by the vertical reinforcing bars 3 with the screws standing up from the foundation concrete 1 while closely fitting with the upper and lower uneven fitting surfaces. It will be firmly constructed integrally with the concrete 1. A recess that can accommodate the horizontal tie beam 9 and the nut 11 is formed on the lower surface of the block 6 so that the fitting with the upper surface of the lower block is not hindered.

図7において、ネジ付き垂直補強筋3の一部には一定間隔をもってナット挿入用の表面切欠部12が設けられている。この表面切欠部12はネジ付き垂直補強筋3のネジが形成されている表面の対向する両側を切り欠き形成しているものであり、切り欠かれていない表面部分にはネジ部が残されている。この表面切欠部12は、ネジ付き垂直補強筋3のネジ部に螺合するナット11をネジ付き垂直補強筋3の長手方向の途中から入れ込み、水平タイビーム筋9を締め付けるものであるから、水平タイビーム筋9が設置される位置の上方近傍に形成される。一方、ネジ付き垂直補強筋3の表面切欠部12から入れ込まれるナットにも表面切欠部12の径より若干大きい開口部13が形成されている。   In FIG. 7, a part of the threaded vertical reinforcing bar 3 is provided with a surface notch 12 for inserting a nut at a constant interval. This surface notch 12 is formed by notching the opposite sides of the surface on which the thread of the threaded vertical reinforcing bar 3 is formed, and the threaded portion is left on the uncut surface portion. Yes. Since the surface notch 12 is for inserting a nut 11 screwed into the threaded portion of the threaded vertical reinforcing bar 3 in the longitudinal direction of the threaded vertical reinforcing bar 3 and tightening the horizontal tie beam bar 9, the horizontal tie beam It is formed in the upper vicinity of the position where the streak 9 is installed. On the other hand, an opening 13 slightly larger than the diameter of the surface notch 12 is also formed in the nut inserted from the surface notch 12 of the threaded vertical reinforcing bar 3.

図8及び図9は、それぞれ水平タイビーム筋9端部の固定手段を示すものである。
まず、図8に示すものでは、水平タイビーム筋9の端部を下方にコ字状に折り曲げ形成して係合部14を水平タイビーム筋9の端部に形成しておき、他方、鉄骨支柱2には、両側のチャンネル部材5に水平タイビーム筋取付孔15を開口し、水平タイビーム筋9の係合部14が鉄骨支柱2のチャンネル部材5に入り込めるようになっている。また、水平タイビーム筋取付孔15の下方には係合部14が噛合できる大きさの楔16が固着されている。水平タイビーム筋9の係合部14を鉄骨支柱2のチャンネル部材5に入れ込んだ状態で、図に示すように水平タイビーム筋9の係合部14を楔16の斜面に沿って下方に押し下げ、係合部14と楔16とを歯合させることにより、水平タイビーム筋9は鉄骨支柱2に固定される。図7に示すものの場合、水平タイビーム筋9は鉄骨支柱2の中に若干入り込む関係から、鉄骨支柱2、2間に設置される場合は鉄骨支柱2、2間の内面間隔より少し長くなり、水平タイビーム筋9の設置の際には水平タイビーム筋9を山状に曲げて鉄骨支柱2の取付孔15にその係合部14を挿入する必要がある。 そのため、水平タイビーム筋9に設けられるネジ付き垂直補強筋3を通す孔17は、両側方向に長い楕円形状に形成されている。
8 and 9 show fixing means for the end portion of the horizontal tie beam line 9, respectively.
First, in the structure shown in FIG. 8, the end of the horizontal tie beam bar 9 is bent downwardly in a U-shape to form the engaging part 14 at the end of the horizontal tie beam bar 9, while the steel column 2 The horizontal tie beam reinforcement mounting holes 15 are opened in the channel members 5 on both sides so that the engaging portions 14 of the horizontal tie beam reinforcement 9 can enter the channel members 5 of the steel column 2. Further, a wedge 16 having a size capable of engaging with the engaging portion 14 is fixed below the horizontal tie beam streak mounting hole 15. With the engaging portion 14 of the horizontal tie beam reinforcement 9 inserted into the channel member 5 of the steel column 2, the engaging portion 14 of the horizontal tie beam reinforcement 9 is pushed down along the slope of the wedge 16, as shown in the figure. By engaging the engaging portion 14 and the wedge 16, the horizontal tie beam reinforcement 9 is fixed to the steel column 2. In the case shown in FIG. 7, the horizontal tie beam 9 slightly enters the steel column 2, and therefore, when installed between the steel columns 2 and 2, the horizontal tie beam 9 is slightly longer than the inner surface interval between the steel columns 2 and 2. When the tie beam reinforcement 9 is installed, it is necessary to bend the horizontal tie beam reinforcement 9 into a mountain shape and insert the engaging portion 14 into the attachment hole 15 of the steel column 2. Therefore, the hole 17 through which the threaded vertical reinforcing bar 3 provided in the horizontal tie beam bar 9 passes is formed in an elliptical shape that is long in both sides.

図9は、図8に示すものとは異なる水平タイビーム筋9端部の固定手段を示すものであって、鉄骨支柱2には、両側のチャンネル部材5に水平タイビーム筋取付孔15を開口するとともに、リブ板4に水平タイビーム筋固定棒18を嵌合・固定する孔19を設け、水平タイビーム筋固定棒18を孔19に嵌入した状態で溶接等で固着する。水平タイビーム筋固定棒18の両側には右ネジ20及び左ネジ21が設けられている。
一方、水平タイビーム筋9の端部には、端部ネジ棒22を溶接等で固定する。端部ネジ棒22には、水平タイビーム筋固定棒18の右ネジ20と反対の左ネジ23が設けられる。水平タイビーム筋固定棒18と端部ネジ棒22とを接続固定するため、ターンバックル24が用いられる。ターンバックル24を回転することにより、水平タイビーム筋固定棒18と端部ネジ棒22とは接近したり離れたりするものであるが、水平タイビーム筋9の設置の際には、水平タイビーム筋固定棒18と端部ネジ棒22とを接近するようにターンバックル24を回転させて水平タイビーム筋9を引っ張るようにして水平タイビーム筋固定棒18を介して鉄骨支柱2に固定するものである。
FIG. 9 shows a fixing means for the end portion of the horizontal tie beam bar 9 different from that shown in FIG. 8. In the steel column 2, horizontal tie beam bar mounting holes 15 are opened in the channel members 5 on both sides. The rib plate 4 is provided with a hole 19 for fitting and fixing the horizontal tie beam rebar fixing rod 18, and the horizontal tie beam rebar fixing rod 18 is fixed to the hole 19 by welding or the like. A right screw 20 and a left screw 21 are provided on both sides of the horizontal tie beam bar fixing rod 18.
On the other hand, the end screw rod 22 is fixed to the end portion of the horizontal tie beam reinforcement 9 by welding or the like. The end screw rod 22 is provided with a left screw 23 opposite to the right screw 20 of the horizontal tie beam rebar fixing rod 18. A turnbuckle 24 is used to connect and fix the horizontal tie beam bar 18 and the end screw bar 22. By rotating the turnbuckle 24, the horizontal tie beam rebar fixing rod 18 and the end screw rod 22 are moved closer to or away from each other. The turnbuckle 24 is rotated so as to bring the end 18 and the end screw rod 22 close to each other, and the horizontal tie beam rebar 9 is pulled and fixed to the steel column 2 via the horizontal tie beam rebar fixing rod 18.

本発明の実施の形態に係る鉄骨・鉄筋補強型乾式ブロック組積工法の作業手順について説明すると以下のようである。
(1)ブロック壁の基礎となる部分に、鉄骨支柱2及びネジ付き垂直補強筋3を必要数立設し、型枠内にコンクリートを打設して基礎コンクリート1を形成し、鉄骨支柱2及びネジ付き垂直補強筋3を基礎コンクリート1で堅固に固定する。この際、必要に応じて鉄骨支柱2及びネジ付き垂直補強筋3の基礎部分を複数本の水平補強筋25により連結固定する。
(2)基礎コンクリート1の上面にブロック6の1段目及び2段目を、ブロック6の竪孔8にネジ付き垂直補強筋3が貫通するようにして載置する。その際、ブロック6の上下面及び両側面の凹凸を嵌合させる。また、鉄骨支柱2と接する部分のブロック6においては、その凹部に鉄骨支柱2嵌合するようにして組積する。
(3)2段目のブロックが組積られたら、水平タイビーム筋9を2段目のブロックの上面に位置するようにしてその両端部を鉄骨支柱2に楔を介して、あるいは、ターンバックル24を介して固定する。
(4)ネジ付き垂直補強筋3の表面切欠部12からナット11を入れ込み、ネジ付き垂直補強筋3のネジ部に螺合させ、ナット11を工具等で締め付け方向に回転させて水平タイビーム筋9を下方に締め付ける。
(5)3段目及び4段目のブロックを、上記(2)の要領で組積する。
(6)水平タイビーム筋9を4段目のブロック上面に上記(3)(4)の要領で締め付け固定する。
(7)最上段のブロックを組積したら、その上面に水平タイビーム筋9を上記(3)(4)の要領で締め付け固定する。
The work procedure of the steel block / reinforcement-reinforced dry block masonry method according to the embodiment of the present invention will be described as follows.
(1) The required number of steel struts 2 and threaded vertical reinforcement bars 3 are erected on the base part of the block wall, and concrete is cast in the formwork to form the foundation concrete 1, and the steel struts 2 and The threaded vertical reinforcement 3 is firmly fixed with the foundation concrete 1. At this time, the steel struts 2 and the foundation portions of the threaded vertical reinforcing bars 3 are connected and fixed by a plurality of horizontal reinforcing bars 25 as necessary.
(2) The first and second steps of the block 6 are placed on the upper surface of the foundation concrete 1 so that the threaded vertical reinforcing bars 3 pass through the holes 8 of the block 6. At that time, the unevenness of the upper and lower surfaces and both side surfaces of the block 6 is fitted. Moreover, in the block 6 of the part which contact | connects the steel-frame support | pillar 2, it piles up so that the steel-frame support | pillar 2 may be fitted in the recessed part.
(3) When the second stage block is assembled, the horizontal tie beam 9 is positioned on the upper surface of the second stage block, and both ends thereof are connected to the steel column 2 via wedges or the turnbuckle 24 Secure through.
(4) A nut 11 is inserted from the surface notch 12 of the vertical reinforcing bar 3 with a screw, screwed into the threaded part of the vertical reinforcing bar 3 with a screw, and the nut 11 is rotated in the tightening direction with a tool or the like to obtain a horizontal tie beam bar 9 Tighten down.
(5) Stack the third and fourth blocks in the manner described in (2) above.
(6) The horizontal tie beam 9 is fastened and fixed to the upper surface of the fourth block block as described in (3) and (4) above.
(7) When the uppermost block is assembled, the horizontal tie beam streak 9 is fastened and fixed to the upper surface thereof as described in (3) and (4) above.

本発明の実施の形態に係る鉄骨・鉄筋補強型乾式ブロック組積工法により組積けられたブロック壁の正面を示す正面図である。It is a front view which shows the front of the block wall laminated | stacked by the steel frame and the reinforcing bar reinforcement type dry block masonry method concerning embodiment of this invention. 本発明の実施の形態に係る鉄骨・鉄筋補強型乾式ブロック組積工法により組積けられたブロック壁の上面を示す平面図である。It is a top view which shows the upper surface of the block wall laminated by the steel frame and the reinforcing bar reinforcement type dry block masonry method concerning an embodiment of the invention. 図1のA−A矢視断面図である。It is AA arrow sectional drawing of FIG. 鉄骨支柱及びネジ付き垂直補強筋の上部を省略した基礎部分を示す斜視図である。It is a perspective view which shows the foundation part which abbreviate | omitted the upper part of the steel pillar and the vertical reinforcement with a screw. 図1のB−B矢視断面図である。It is BB arrow sectional drawing of FIG. 図1のC−C矢視断面図である。It is CC sectional view taken on the line of FIG. 施工中のブロック組積みの一部を示す斜視図である。It is a perspective view which shows a part of block assembling under construction. 水平タイビーム筋の両端の固定手段の1例を示す説明図である。It is explanatory drawing which shows an example of the fixing means of the both ends of a horizontal tie beam line. 水平タイビーム筋の両端の固定手段の他の例を示す説明図である。It is explanatory drawing which shows the other example of the fixing means of the both ends of a horizontal tie beam line.

符号の説明Explanation of symbols

1 基礎コンクリート
2 鉄骨支柱
3 ネジ付き垂直補強筋
4 鉄骨支柱のリブ板
5 鉄骨支柱のチャンネル状部材
6 ブロック
7 ブロックの孔
8 ブロックの竪孔
9 水平タイビーム筋
10 ブロック上面の凸部
11 ナット
12 ネジ付き垂直補強筋の表面切欠部
13 ナットの開口部
14 水平タイビーム筋端部の係合部
15 水平タイビーム筋取付孔
16 楔
17 ネジ付き垂直補強筋を通す水平タイビーム筋に設けられる孔
18 水平タイビーム筋固定棒
19 水平タイビーム筋固定棒を嵌合・固定する孔
20 水平タイビーム筋固定棒の右ネジ
21 水平タイビーム筋固定棒の左ネジ
22 端部ネジ棒22
23 端部ネジ棒の左ネジ
24 ターンバックル
25 水平補強筋
























DESCRIPTION OF SYMBOLS 1 Basic concrete 2 Steel strut 3 Threaded vertical reinforcing bar 4 Steel strut rib plate 5 Steel strut channel-like member 6 Block 7 Block hole 8 Block hole 9 Horizontal tie beam 10 Projection on top of block 11 Nut 12 Screw Surface notch 13 of vertical reinforcing bar with attachment 13 Nut opening 14 Horizontal tie beam bar end 15 Horizontal tie beam bar mounting hole 16 Wedge 17 Hole provided in horizontal tie beam bar through threaded vertical bar 18 Horizontal tie beam bar Fixing bar 19 Hole for fitting and fixing the horizontal tie beam bar fixing rod 20 Right screw of the horizontal tie beam bar fixing bar 21 Left screw of the horizontal tie beam bar fixing bar 22 End screw bar 22
23 Left-hand thread on the end screw rod 24 Turnbuckle 25 Horizontal reinforcement
























Claims (3)

基礎部より垂直方向に鉄骨支柱を一定間隔の柱間をもって立設するとともに、該鉄骨支柱間に基礎部より垂直方向にネジ付き垂直補強筋を立設し、組積られるブロックの一定段目ごとにネジ付き垂直補強筋を通して水平タイビーム筋を設置し、水平タイビーム筋をネジ付き垂直補強筋に螺合する締め付け部材により下方に押し下げることにより、組積られるブロックを圧着するようにした鉄骨・鉄筋補強型乾式ブロック組積工法において、水平タイビーム筋端部の係合部を鉄骨支柱の水平タイビーム筋取付孔の下部に設けられた楔に噛合させることにより固定するようにしたことを特徴とする鉄骨・鉄筋補強型乾式ブロック組積工法。   The steel pillars are erected vertically between the foundations in the vertical direction from the foundation part, and the vertical reinforcing bars with screws are erected between the steel pillars in the perpendicular direction from the foundation part. Steel tie / rebar reinforcement that installs horizontal tie beam bars through threaded vertical reinforcement bars and presses down the horizontal tie beam bars downward with a fastening member that is screwed into the threaded vertical reinforcement bars. In the die-type dry block masonry method, the steel tie, which is fixed by engaging the engaging portion of the horizontal tie beam bar end with the wedge provided at the lower part of the horizontal tie beam bar mounting hole of the steel column Reinforced reinforcing dry block masonry method. 基礎部より垂直方向に鉄骨支柱を一定間隔の柱間をもって立設するとともに、該鉄骨支柱間に基礎部より垂直方向にネジ付き垂直補強筋を立設し、組積られるブロックの一定段目ごとにネジ付き垂直補強筋を通して水平タイビーム筋を設置し、水平タイビーム筋をネジ付き垂直補強筋に螺合する締め付け部材により下方に押し下げることにより、組積られるブロックを圧着するようにした鉄骨・鉄筋補強型乾式ブロック組積工法において、水平タイビーム筋の端部を鉄骨支柱に固着された水平タイビーム筋固定棒にターンバックルを介して取付けることにより固定するようにしたことを特徴とする鉄骨・鉄筋補強型乾式ブロック組積工法。   The steel pillars are erected vertically between the foundations in the vertical direction from the foundation part, and the vertical reinforcing bars with screws are erected between the steel pillars in the perpendicular direction from the foundation part. Steel tie / rebar reinforcement that installs horizontal tie beam bars through threaded vertical reinforcement bars and presses down the horizontal tie beam bars downward with a fastening member that is screwed into the threaded vertical reinforcement bars. In the type dry block masonry method, the end of the horizontal tie beam is fixed by attaching it to the horizontal tie beam fixing rod fixed to the steel column via a turnbuckle. Dry block masonry method. ネジ付き垂直補強筋の一部に一定間隔をもってナット挿入用の表面切欠部を設け、ネジ付き垂直補強筋に螺合させるナットには挿入用開口部を設けることを特徴とする請求項1又は請求項2記載の鉄骨・鉄筋補強型乾式ブロック組積工法。   The surface of the vertical reinforcing bar with a thread is provided with a notch for inserting a nut at regular intervals, and an opening for insertion is provided in a nut to be screwed into the vertical reinforcing bar with a screw. Item 2. A steel block / reinforced dry block masonry method.
JP2005299426A 2005-10-13 2005-10-13 Steel frame / reinforcement type dry block masonry method Expired - Fee Related JP3798420B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005299426A JP3798420B1 (en) 2005-10-13 2005-10-13 Steel frame / reinforcement type dry block masonry method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005299426A JP3798420B1 (en) 2005-10-13 2005-10-13 Steel frame / reinforcement type dry block masonry method

Publications (2)

Publication Number Publication Date
JP3798420B1 true JP3798420B1 (en) 2006-07-19
JP2007107282A JP2007107282A (en) 2007-04-26

Family

ID=36803402

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005299426A Expired - Fee Related JP3798420B1 (en) 2005-10-13 2005-10-13 Steel frame / reinforcement type dry block masonry method

Country Status (1)

Country Link
JP (1) JP3798420B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948514A (en) * 2017-04-06 2017-07-14 中建局集团第三建筑有限公司 A kind of superelevation masonry wall anti-seismic construction and its construction method
CN107816127A (en) * 2017-10-31 2018-03-20 广西旭腾实业集团有限公司 Aluminium alloy structure novel fabricated building system and its assembly method
CN111155677A (en) * 2020-02-05 2020-05-15 西安建筑科技大学 Raw soil brick masonry structure with core column and construction method thereof
CN111734023A (en) * 2020-08-03 2020-10-02 南京东亦南工程科技有限公司 Steel flat beam-vertical cable curtain wall supporting structure system
CN114233015A (en) * 2022-01-17 2022-03-25 中国十七冶集团有限公司 Method for connecting steel structure and masonry filler wall

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168460A (en) * 2011-03-18 2011-08-31 北京工业大学 Aerated concrete block masonry composite wall reinforced with embedded reinforcements and borehole core columns
KR102058423B1 (en) * 2016-07-22 2019-12-23 주식회사 대도벽돌시스템 Direct vision type brick wall and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948514A (en) * 2017-04-06 2017-07-14 中建局集团第三建筑有限公司 A kind of superelevation masonry wall anti-seismic construction and its construction method
CN107816127A (en) * 2017-10-31 2018-03-20 广西旭腾实业集团有限公司 Aluminium alloy structure novel fabricated building system and its assembly method
CN107816127B (en) * 2017-10-31 2018-12-11 广西旭腾实业集团有限公司 Aluminium alloy structure assembled architecture system and its assembly method
CN111155677A (en) * 2020-02-05 2020-05-15 西安建筑科技大学 Raw soil brick masonry structure with core column and construction method thereof
CN111155677B (en) * 2020-02-05 2021-08-03 西安建筑科技大学 Raw soil brick masonry structure with core column and construction method thereof
CN111734023A (en) * 2020-08-03 2020-10-02 南京东亦南工程科技有限公司 Steel flat beam-vertical cable curtain wall supporting structure system
CN114233015A (en) * 2022-01-17 2022-03-25 中国十七冶集团有限公司 Method for connecting steel structure and masonry filler wall

Also Published As

Publication number Publication date
JP2007107282A (en) 2007-04-26

Similar Documents

Publication Publication Date Title
JP3798420B1 (en) Steel frame / reinforcement type dry block masonry method
US8281541B2 (en) Hold down connector
KR101302458B1 (en) Cast-in anchor channel with sub-anchor
KR102093071B1 (en) A seismic portal structures attached out-plane square framed type strengthened by level-gap plates and sleeve-cap anchors
KR102312319B1 (en) Magnetic assembly type mold panel
JP2004176482A (en) Construction method for non-buried column leg and structure of non-buried column leg
KR200409942Y1 (en) Strut supporting member for temporary soil sheathing
JP2010159543A (en) Aseismatic reinforcing structure
KR101671894B1 (en) Stud-Anchor Connection Method for Seismic Resistant with Precast Wall Panels in an Old Reinforced Concrete Beam Column Building
JP4672459B2 (en) Building reinforcement method
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JP3522255B2 (en) Seismic retrofitting structure and construction method that also renovates existing veranda
KR102398605B1 (en) Construction method of seismic retrofit system using pc panel
JP6026794B2 (en) Column base structure of steel column
KR100609500B1 (en) Apparatus for fixing temporary-mold, using iron-bar
JP7339865B2 (en) How to install wall panels
KR102238294B1 (en) the high performance Hybrid beam structure for seismic reinforcing and construction method thereof
KR102093070B1 (en) A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors
KR102071825B1 (en) Precast concrete staircase frame construction method of core type
JP2004011203A (en) Precast src-column joining section structure
KR101193074B1 (en) Method of strengthening foundation where above main structure is reinforced with external load bearing precast concrete wall panel
JP6829631B2 (en) Construction method of column base, reinforcement method of existing column base
JP5358203B2 (en) Building unit fixed structure and unit building
KR101685632B1 (en) Shear connector to increase strength and ductility
KR101980550B1 (en) Method of aseismic reinforcement for reinforcing columns of building

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060418

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060419

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120428

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees