JP3790951B2 - Construction method for underwater structures - Google Patents
Construction method for underwater structures Download PDFInfo
- Publication number
- JP3790951B2 JP3790951B2 JP13139299A JP13139299A JP3790951B2 JP 3790951 B2 JP3790951 B2 JP 3790951B2 JP 13139299 A JP13139299 A JP 13139299A JP 13139299 A JP13139299 A JP 13139299A JP 3790951 B2 JP3790951 B2 JP 3790951B2
- Authority
- JP
- Japan
- Prior art keywords
- cloth bag
- underwater
- construction method
- float
- cylindrical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Revetment (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、流動性を有する水中硬化材料を水中投入して水中構造物を構築する工法に関する。
【0002】
【従来の技術】
従来、突堤、防波堤、埋立地内の中仕切り堤等を構築するには、岩ずりや礫などの築堤材料を水中に直接投棄して堆積させる工法が多く採用されていた。
【0003】
【発明が解決しようとする課題】
しかし、上記した築堤工法によれば、築堤材料を水中に直接投棄するため、堆積部分が断面台形状に拡がって堤体が大断面化し、比較的高価な岩ずりや礫が大量に必要となって、コスト負担が大きくなるという問題があった。
【0004】
なお、築堤材料として土砂を用いることにより、上記したコスト負担を軽減することができるが、この場合は、上記した堤体の大断面化が顕著となり、大水深で規模が大きくなる堤体への適用は、実質不可能となる。
また、鋼矢板やコンクリート矢板を打設してなる矢板壁、あるいは杭に支持させた鋼製型枠により計画築堤領域を囲んで、この中にモルタルやコンクリートあるいは改良土などの水中硬化材料を投入、硬化させて、堤体の小断面化を図ることも一部で行われているが、この場合は、矢板壁や型枠の構築に多大の工数と費用とを要し、根本的な解決には至らない。
【0005】
本発明は、上記した従来の問題点を解決することを課題としてなされたもので、その目的とするところは、岩ずりや礫などの比較的高価な材料を用いることなく、かつ特別の矢板壁や型枠を用いることなく小断面の水中構造物を構築することを可能にし、もって工期短縮やコスト低減に寄与する水中構造物の構築工法を提供することにある。
【0006】
【課題を解決するための手段】
上記目的を達成するため、本発明に係る水中構造物の構築工法は、大型の布袋を水底に降ろして、その底部を環状のアンカーにより水底に固定した後、前記布袋の開口端部側を環状のフロートで吊上げて該布袋を円筒形状に展開させ、次に、該布袋の周りを拘束バンドで囲み、該拘束バンドを、前記布袋の底部側から所定のピッチで上昇させて、各上昇位置で、該拘束バンドで囲まれた布袋内領域に流動性を有する水中硬化材料を供給し、順次硬化させて硬化層を積層していくことを特徴とする。
【0008】
上記のように構成した発明においては、フロートから布袋に張力が加えられているので、布袋が、その内部に供給された水中硬化材料の土圧に抵抗し、したがって、水中硬化材料の供給量すなわち堆積厚さを適当に設定することで、布袋は所定の円筒形状を維持し、この水中硬化材料の供給とその硬化待ちとを繰り返すことで、円板状の硬化層が順次積層されて、円柱状水中構造物が完成する。
しかして、本発明においては、布袋の周りを囲む拘束バンドが布袋を外側から補強するので、布袋は土圧に十分に耐え、結果として水中硬化材料の供給量を増やして、各硬化層の厚さを可及的に増大させることができる。
【0009】
上記した本発明において用いる布袋は、透水性を有する構造とするのが望ましく、これにより水中硬化材料の圧密化が進み、構築される水中構造物の強度が向上する。
また、この布袋は、予めその外周面に縦横に縫着したベルトにより補強されている構造とするのが望ましく、これにより布袋に大きな張力を加えることが可能になる。
また、上記アンカーは、陸上で布袋の内底部に配置固定されるようにしてよく、この場合は、水中作業を大幅に省略することができて、布袋の据付作業が著しく向上する。
上記本発明においてはさらに、フロートを水没させ、布袋の開口に臨む領域にトレミー台船を乗入れて、トレミー管を通じて水中硬化材料を供給するようにしてもよく、この場合は、効率よく水中硬化材料を供給することができる。
【0010】
上記した本発明で用いる水中硬化材料の種類は任意であり、モルタルやコンクリートを単独で用いることができることはもちろん、土砂中にセメントや石灰などの硬化材を混入した改良土を用いることができる。改良土を用いる場合は、その主材料としての土砂は浚渫土砂であっても、あるいはシールド工法で発生した土砂であってもよく、コスト的に有利となる。この場合、前記した土砂に硬化材を混入する方法としては、土砂を空気圧送する輸送管中に固化材を供給して混合する管中混合方式、あるいは土砂の輸送元で固化材を混合した後、空気圧送する事前混合方式を採用することができる。また、この改良土には、所望により石炭灰、軽量材等を副材料として混入してもよい。
【0012】
【発明の実施の形態】
以下、本発明の実施の形態を添付図面に基づいて説明する。
図1乃至図9は、本発明に係る水中構造物の構築工法の第1の実施の形態を示したものである。本第1の実施の形態は、海底1上に海面に突出する円柱状の水中構造物2(図9)を構築しようとするもので、その構築に際しては、図2に示すように展開することにより有底円筒形状となる大型の布袋3を用意し、先ず、この布袋3を海底1に降ろして、その底部を内側から環状のアンカー4により海底1に固定し(図3)、次に、図1に示すようにこの布袋3の開口端部側を環状のフロート5で吊上げて該布袋3を前記した所定の円筒形状に展開させる。その後、同じく図1に示すように前記布袋3の周りを、流体を封入した可撓性の拘束バンド6で囲み、該拘束バンド6を、布袋3の底部側から所定のピッチで上昇させて、各上昇位置で、拘束バンド6で囲まれた布袋3内の領域に、トレミー台船7からトレミー管8を通じて流動性を有する水中硬化材料9を供給し、これを順次硬化させて、図9に示すように各硬化層10を積層した円柱状の水中構造物2を完成させる。
【0013】
上記布袋3は、ここでは、図2に示すようにその開口端側が裁頭円錐状に絞られており、したがって、正確には有底筒状をなす本体部11と裁頭円錐状をなす絞り部12とを連接した構造となっている。この布袋3は、透水性を有しかつ十分なる引張強さを有する材料、例えばポリエステル繊維シートからなっており、その外周面に逢着した複数の縦ベルト13と横ベルト14とにより補強されている。布袋3の大きさは、一例として、その本体部11の外径D1 が15〜20m、口径D2 が10〜12mとなっており、また、その全高Hは最高潮位に対応する水深L(図1)よりもわずか大きくなるように設定されている。
【0014】
本実施の形態においては、上記のごとく用意した布袋3の内底部に、陸上において前記アンカー4を配置し、予め布袋3とアンカー4とを連結一体化してサブアセンブリ体15(図3)とし、これを、図4に示すように適宜の吊具16を利用して起重機船17で吊って陸上から海上の施工現場まで搬送し、海底1の所定箇所に据付ける。アンカー4は、ここではポリエチレン製のスパイラル管18内にコンクリート19を打設してなるもので(図3)、フロート5の浮力に抗して布袋3の底部を海底1に定着させるに足る十分なる重量を有している。
【0015】
上記サブアセンブリ体15を製作するには、例えば図5に示すように、陸上の平坦地に、布袋3の本体部11の外径D1 と同じ直径を有するピッチ円に外接するように複数の外側土嚢20を所定のピッチで並べた後、これら外側土嚢20の内側に底部3aが拡がるように布袋3をセットする。次に、この布袋3の底部3aの上に前記外側土壌20に内接するように前記スパイラル管18を配置し、さらにこのスパイラル管18の内側に複数の内側土嚢21を所定のピッチで並べて、両土嚢20と21とにより挟むようにしてスパイラル管18を位置固定する。その後、スパイラル管18に予め設けられた複数の注入口18aを通じて管内にコンクリートを流し込み、そのまま養生硬化させ、これにてアンカー4は完成する。そして、このアンカー4が完成した後は、内側土嚢21を取除いて、アンカー4と布袋3とを適宜の締結具を用いて結合して前記サブアセンブリ体15を完成させ、布袋3の本体部11と絞り部12とは折り畳んだ状態として(図3)、前出図4に示した態様で施工現場へ搬送する。なお、前記サブアセンブリ体15の製作に際して、予め布袋3の底部3aの下面から放射方向へ複数の吊りロープ22(図1、4)を引出しておくことで、この吊りロープ22を、前記吊具16によるサブアセンブリ体15の吊上げに用いることができる。
【0016】
上記サブアセンブリ体15の海底1への据付けを終えたら、前出図4に示したように作業船23から潜水士24を海底1に降ろし、布袋3に前記フロート5を取付ける。フロート5は、ゴム引き布シートを素材とする袋状物からなっており、その内部に空気を供給することで扁平状態から断面だ円形乃至円形に膨張するようになっている。このフロート5には、図6に示すようにその円周方向に等配して複数のフック(カラビナ)25が設けられ、一方、布袋3の外面の補強用縦ベルト13には、布袋3の本体部11と絞り部12との境界付近に位置して前記フック25に係合可能な複数のシャックル26が設けられている。フロート5の取付けに際しては、これを扁平状態として海底1に沈め、潜水士24がフック25をシャックル26に順次引掛けて、フロート5を布袋3に保持させる。その後、このフロート5内に空気を圧送すると、フロート5が膨張して浮上し、これに引張られて布袋3が円筒形状に展開する。本実施の形態においては、布袋3の本体部11と絞り部12との境界付近にフロート5を取付けているので、図1に示すように、フロート5は海中に所定深さだけ沈んだ状態となり、したがって、布袋3の開口に臨む領域にトレミー台船7を乗入れできるようになる。
【0017】
上記フロート5による布袋3の展開を終えたら、この布袋3の本体部11の周りを前記可撓性の拘束バンド6で囲む。この拘束バンド6もまた、フロート5と同様にゴム引き布シートを素材とする袋状物からなっており、その内部に流体(ここでは海水)を供給することで扁平状態から断面だ円形乃至円形に膨張する。この拘束バンド6には、図7に示すようにその円周方向に等配して複数対のフック(カラビナ)27が設けられ、一方、布袋3の外面の補強用縦ベルト13には、その円周方向と高さ方向とに等配して前記フック27に係合可能な複数のシャックル28が設けられている。拘束バンド6を布袋3に取付けるには、フロート5の場合と同様、これを扁平状態として海底1に沈め、潜水士24がフック27をシャックル28に順次引掛けて、拘束バンド6を布袋3に保持させる。そして、この状態で拘束バンド6に海水を供給すると、拘束バンド6が膨張して布袋3を外側から局部的に押え、布袋3は、前記拘束バンド6による押えの利いた部分が剛体的に円筒形状を維持するようになる。
【0018】
本第1の実施の形態においては、最初に、上記拘束バンド6を、前出図1に示したように布袋3の底部のアンカー4に近接する部位に位置決めし、その位置で内部に海水を供給して膨張させる。この準備完了後、トレミー台船7を布袋3の開口に臨む領域に乗入れ、図1に示すように、トレミー台船7からトレミー管8を布袋3の内底部付近まで延ばし、先ずアンカー4の高さまで水中硬化材料9を供給し、そのまま養生させて下地となる円板状の硬化層10Aを形成する。この硬化層10Aの打設により布袋3の底部は強固に海底1に定着し、したがって、その後、フロート5に供給する空気量を増やして浮力を増しても、布袋3の支持は安定する。なお、緊急時に対処するため、前記吊りロープ22を布袋3のシャックル27、25を通して上方へ延ばして、その端部をトレミー台船7に係止させておく。
【0019】
次に、同じく図1に示すように、トレミー管8を通じて上記下地の硬化層10A上に水中硬化材料9を供給し、拘束バンド6の頂部とほぼ同じ高さレベルまで水中硬化材料9を堆積させてその供給を停止する。この水中硬化材料9の供給により布袋3の周壁には土圧が作用するが、拘束バンド6が布袋3を外側から補強しているので、布袋3は所定の円筒形状を維持する。したがって、水中硬化材量9を供給した後、所定時間(1〜2日)養生させると、下地の硬化層10A上には第2層目の円板状の硬化層10Bが形成される(図8)。本第1の実施の形態においては、前記養生の途中で拘束バンド6内の海水を半分程度抜く。すると、拘束バンド6は断面収縮し、残存する土圧により布袋3がわずかに拡張(拡径)し、結果として硬化層10Bの外面形状が整えられる。
【0020】
上記硬化層10Bを形成するための養生が最終段階に達したら、フック27をシャックル28から外して拘束バンド6を布袋3から離脱させ、該拘束バンド6をほぼその幅(高さ)分だけ上昇させて、布袋3に付け直す。その後、拘束バンド6内に海水を供給して再びこれを膨張させ、さらに、前記した手順で水中硬化材料9の供給とその養生(硬化待ち)とを繰返して、第3層目の硬化層を積層形成し、以降、前記した作業工程を繰り返して、硬化層を順次積層していく。
【0021】
このようにして、ほぼフロート4を取付けた部位まで硬化層が積層されたら、トレミー台船7を布袋3の上方域から退去させ、図8に示すように最上層の硬化層10Gの中央に支柱29を建込む。そして、この支柱29の上端に前記吊りロープ22を引張り込んで、布袋3の絞り部12を所定の裁頭円錐形状に展開させる。その後、例えば起重機船17から吊下げた注入管30を利用して、前記布袋3の絞り部12内に水中硬化材料9を供給し、そのまま養生固化させてさらに硬化層をかさ上げしていく。この際、海面付近の作業となるため、波浪の影響で水中硬化材料9が外部へ流出しようとするが、布袋3の絞り部12によって開口部が絞られているので、その流出が抑制され、この結果、海面付近の硬化層を安定して形成できる。このようにして、図9に示すように上部が海上に露出する1つの円柱状の水中構造物2が完成し、これからフロート5を撤去して工事は終了する。
【0022】
なお、上記第1の実施の形態の実施に際しては、図10に示すように、2つの拘束バンド6,6を連結して、これらを一体的に布袋3に取付けるようにしてもよく、この場合は、2つの拘束バンド6で囲まれた布袋3の領域内に一度に水中硬化材料9を供給して、一回の打設でより厚肉の硬化層10′を形成することができ、円柱状の水中構造物2をより短期間で構築できるようになる。
【0023】
図11は、上記第1の実施の形態の工法を利用した築堤工法を示したものである。本築堤工法においては、上記第1の実施の形態の工法を所定のピッチで実施し、この際、相隣接する円柱状水中構造物2A,2B,2C…の周面を相互に接触させるようにする。各水中構造物2A,2B,2C…を相互に接触させるには、上記第1の実施の形態の実施に際し、拘束バンド6による布袋3の拘束を、水中硬化材料9の養生の初期段階で解放するようにすればよく、これにより、土圧を受けて布袋3が拡張し、結果として各硬化層が側方へ膨出して相互に接触するようになる。なお、この築堤工法は、各水中構造物2A,2B,2C…を1つずつ完成させるように実施しても、あるいは、複数並列して同時に完成させるように実施してもよいものである。
【0024】
図12および図13は、本発明に係る水中構造物の構築工法の第2の実施の形態を示したものである。本第2の実施の形態においては、上記第1の実施の形態で用いた布袋3から絞り部12(図2)を省略した単純な有底円筒形状の大型の布袋31を用意する。そして、上記第1の実施の形態と同様に、この布袋31を、その内底部に予め配置したアンカー32と共に海底1に降ろして、その底部を海底1に定着させ、続いて、この布袋31の開口端部側を環状のフロート33で吊上げて該布袋31を前記した所定の円筒形状に展開させ、その後、この布袋31の開口端部内の相対向する壁間を複数の緊張ロープ34で連結する。なお、布袋31を縦バンド35および横バンド36で補強する点は第1の実施形態と同様である。また、アンカー32の製作方法、フロート33の構造、布袋31に対するフロート33の結合構造等は前記第1の実施の形態における場合とほぼ同様であるので、ここでは、それらの説明を省略する。
【0025】
上記準備完了後、例えば作業船(図示略)から布袋31内に供給管37を延ばし、先ずアンカー32の高さまで水中硬化材料9を供給し、そのまま養生させて下地となる円板状の硬化層10Aを形成し、次に、この硬化層10A上に所定厚さに水中硬化材料9を供給して、その養生硬化を待つ。本第2の実施の形態においては、布袋31の開口部の相対向する壁間を連結する複数の緊張ロープ34が布袋31に加える張力を増大させて、その形状維持に寄与するので、水中硬化材料9から土圧がかかっても布袋31はわずか拡張するだけとなる。すなわち、水中硬化材料9の養生硬化により下地の硬化層10A上にはこれよりわずか大径の第2層目の円板状の硬化層10Bが形成され、以降、水中硬化材料9の供給とその養生とを所定のピッチで繰り返すことで、最終的に、円柱形状の水中構造物が完成する。
【0026】
本第2の実施の形態によれば、第1の実施の形態で必要とした拘束バンド6が不要になるので、施工はより簡単となり、第1の実施の形態よりも工期は短縮する。なお、上記緊張ロープ34は、予め布袋31に取付けておいてもよい。また、この緊張ロープ34は、布袋31の開口部付近だけでなく、その内部側にも配設してもよいものである。ここで用いる布袋31には、前記第1の実施の形態における絞り部12(図2)を設けてもよいことはもちろんで、この場合は、第1の実施の形態と同様の手順で(図8)、最終の硬化層を積層する。
【0027】
図14および図15は、上記第2の実施の形態の工法を発展させた築堤工法を示したものである。本築堤工法においては、計画築堤領域の輪郭とほぼ同じ長尺矩形の底面形状を有する布袋41を用意し、この布袋41を、その内底部に予め配置した同じ長尺矩形のアンカー42と共に海底1に降ろして、その底部を海底1に定着させた後、この布袋41の開口端部側をアンカー42より一回り小さい長尺矩形のフロート43で吊上げて該布袋41を山形に展開させ、その後、この布袋41の開口端部内の相対向する内縁間を複数の緊張ロープ44で連結する。
【0028】
上記準備完了後、例えば作業船(図示略)から布袋41内に供給管45を延ばし、先ずアンカー42の高さまで水中硬化材料9を供給し、そのまま養生させて下地となる矩形の硬化層50Aを形成し、次に、この硬化層50A上に所定厚さに水中硬化材料9と供給して、その養生硬化を待つ。本築堤工法においては、布袋41の開口部の相対向する内縁間を連結する複数の緊張ロープ44が布袋41に加える張力を増大させて、その形状維持に寄与するので、水中硬化材料9から土圧がかかってもわずか拡張するだけとなる。すなわち、水中硬化材料9をそのまま養生硬化させることで、下地の硬化層50A上には第2層目の矩形状の硬化層50Bが形成される。したがって、この水中硬化材料9の供給とその養生とを所定のピッチで繰返すことで、硬化層が順次積層して、最終的に断面台形状をなす堤体が完成する。本築堤工法によれば、一回の工事で必要とする堤体が完成するので、上記した円柱状水中構造物2を連接する築堤工法(図11)に比べて工期が短縮する。
【0029】
【発明の効果】
以上、詳細に説明したように、本発明に係る水中構造物の構築工法によれば、アンカーとフロートとを用いて水中に展開させた布袋内に水中硬化材料を供給し、これを層状に硬化させて積層していくことで、岩ずりや礫などの比較的高価な材料に頼ることなく、小断面化した円柱状水中構造物または堤体を高能率に構築することができ、工期の短縮はもとより工費の低減に大きく寄与する効果を奏する。
【図面の簡単な説明】
【図1】本発明に係る水中構造物の構築工法の第1の実施の形態を模式的に示す断面図である。
【図2】第1の実施の形態で用いる布袋の構造を示す斜視図である。
【図3】第1の実施の形態で用いる布袋とアンカーとの海底への据付け状態を示す断面図である。
【図4】布袋とアンカーとを組合せたサブアセンブリ体の海底への据付け状況を示す模式図である。
【図5】布袋とアンカーとの組合せてサブアセンブリ体とする組立手順を示す模式図である。
【図6】第1の実施の形態で用いる布袋とフロートとの結合構造を示す断面図である。
【図7】第1の実施の形態で用いる布袋と拘束バンドとの結合構造を示す断面図である。
【図8】第1の実施の形態の最終段階を模式的に示す断面図である。
【図9】第1の実施の形態で完成した円柱状水中構造物の構造を示す断面図である。
【図10】第1の実施の形態の変形例を模式的に示す断面図である。
【図11】第1の実施の形態を利用した築堤工法により完成させた堤体の構造を模式的に示す平面図である。
【図12】本発明に係る水中構造物の構築工法の第2の実施の形態を模式的に示す断面図である。
【図13】第2の実施の形態で用いる布袋の展開状態を示す斜視図である。
【図14】第2の実施の形態を発展させた構築工法を模式的に示す断面図である。
【図15】第2の実施の形態を発展させた構築工法を模式的に示す斜視図である。
【符号の説明】
1 海底(水底)
2、2A〜2C 円柱状水中構造物
3、31、41 布袋
4、32、42 アンカー
5、33、43 フロート
6 拘束バンド
7 トレミー台船
8 トレミー管
9 水中硬化材料
10、10A、10B、10G、10′、50A、50B 硬化層
13、14、35、36 補強用ベルト
34、44 緊張ロープ[0001]
BACKGROUND OF THE INVENTION
The present invention is related to method for constructing underwater structures underwater curable material having fluidity was put into water.
[0002]
[Prior art]
Conventionally, in order to construct a jetty, a breakwater, a partition wall in a landfill, etc., many methods have been employed in which embankment materials such as rock debris and gravel are directly dumped and deposited in water.
[0003]
[Problems to be solved by the invention]
However, according to the above-mentioned embankment method, the embankment material is dumped directly into the water, so that the accumulated part spreads into a trapezoidal cross section and the dam body has a large cross section, and a large amount of relatively expensive rock debris and gravel are required. Therefore, there is a problem that the cost burden increases.
[0004]
In addition, although the above-mentioned cost burden can be reduced by using earth and sand as the embankment material, in this case, the large cross-section of the above-mentioned embankment becomes remarkable, and the scale to the embankment whose scale is large at a large water depth. Application becomes virtually impossible.
In addition, the sheet embankment area is surrounded by a sheet pile wall made by placing steel sheet piles and concrete sheet piles, or a steel formwork supported by piles, and underwater hardening materials such as mortar, concrete or improved soil are put into this area. However, in some cases, it is hardened to reduce the cross section of the dam body, but in this case, it takes a lot of man-hours and costs to construct the sheet pile wall and formwork, and it is a fundamental solution. It does not lead to.
[0005]
The present invention has been made to solve the above-described conventional problems, and the object of the present invention is to use a special sheet pile wall without using relatively expensive materials such as rocks and gravel. An object of the present invention is to provide a construction method for an underwater structure that makes it possible to construct an underwater structure having a small cross section without using a mold or a formwork, thereby contributing to shortening the construction period and cost.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the construction method of the underwater structure according to the present invention includes lowering a large cloth bag to the bottom of the water, fixing the bottom to the bottom with an annular anchor, and then annularly opening the end of the cloth bag. The cloth bag is expanded into a cylindrical shape by being lifted by a float, and then the surroundings of the cloth bag are surrounded by a restraining band, and the restraining band is lifted at a predetermined pitch from the bottom side of the cloth bag at each raised position. The underwater curing material having fluidity is supplied to the region in the cloth bag surrounded by the restraining band, and the cured layer is laminated by sequentially curing the material.
[0008]
In the invention configured as described above, since the tension is applied to the cloth bag from the float, the cloth bag resists the earth pressure of the underwater hardening material supplied to the inside of the cloth bag. By appropriately setting the deposition thickness, the cloth bag maintains a predetermined cylindrical shape, and by repeating the supply of the underwater curing material and waiting for its curing, a disk-shaped cured layer is sequentially laminated, A columnar underwater structure is completed.
In the present invention , since the restraining band surrounding the cloth bag reinforces the cloth bag from the outside, the cloth bag sufficiently withstands the earth pressure, and as a result, the supply amount of the underwater curing material is increased, and the thickness of each cured layer is increased. The thickness can be increased as much as possible .
[0009]
It is desirable that the cloth bag used in the present invention has a water-permeable structure, whereby the consolidation of the underwater curing material proceeds and the strength of the constructed underwater structure is improved.
In addition, it is desirable that the cloth bag is reinforced by a belt that has been sewn vertically and horizontally on the outer peripheral surface in advance, so that a large tension can be applied to the cloth bag.
Further, the anchor may be arranged and fixed on the inner bottom portion of the cloth bag on land. In this case, the underwater work can be largely omitted, and the work of installing the cloth bag is remarkably improved.
In the present invention , the float may be further submerged, a tremmy ship may be placed in a region facing the opening of the cloth bag, and the underwater curing material may be supplied through the tremy tube. Can be supplied.
[0010]
The kind of the underwater curing material used in the present invention described above is arbitrary, and mortar and concrete can be used alone, as well as improved soil in which a hardener such as cement or lime is mixed in the earth and sand. When the improved soil is used, the earth and sand as the main material may be dredged sand or earth and sand generated by the shield method, which is advantageous in terms of cost. In this case, as a method of mixing the hardened material into the above-mentioned earth and sand, after mixing the solidified material at the transportation source of the earth and sand, or after mixing the solidified material at the source of the earth and sand The pre-mixing method of pneumatic feeding can be adopted. Moreover, you may mix coal ash, a lightweight material, etc. in this improved soil as a subsidiary material if desired.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.
FIG. 1 thru | or FIG. 9 shows 1st Embodiment of the construction method of the underwater structure which concerns on this invention. In the first embodiment, a columnar underwater structure 2 (FIG. 9) is projected on the
[0013]
Here, as shown in FIG. 2, the opening end side of the
[0014]
In the present embodiment, the
[0015]
In order to manufacture the
[0016]
When the installation of the
[0017]
When the deployment of the
[0018]
In the first embodiment, first, the restraining
[0019]
Next, as shown in FIG. 1, the
[0020]
When the curing for forming the
[0021]
In this way, when the hardened layer is laminated almost to the portion where the
[0022]
In the implementation of the first embodiment, as shown in FIG. 10, two restraining
[0023]
FIG. 11 shows the embankment method using the method of the first embodiment. In this embankment construction method, the construction method of the first embodiment is carried out at a predetermined pitch, and at this time, the circumferential surfaces of adjacent cylindrical
[0024]
12 and 13 show a second embodiment of the construction method for an underwater structure according to the present invention. In the second embodiment, a simple large-
[0025]
After completion of the above preparation, for example, the
[0026]
According to the second embodiment, since the
[0027]
FIG. 14 and FIG. 15 show the embankment method developed from the construction method of the second embodiment. In the present embankment method, a
[0028]
After completion of the above preparation, for example, the
[0029]
【The invention's effect】
As described above in detail, according to the construction method of an underwater structure according to the present invention, an underwater curing material is supplied into a cloth bag developed in water using an anchor and a float, and this is cured in layers. By laminating them, it is possible to construct a cylindrical underwater structure or a dam body with a small cross section without relying on relatively expensive materials such as rocks and gravel, and shorten the construction period. Besides, it has the effect of greatly contributing to the reduction of construction costs.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view schematically showing a first embodiment of a construction method for an underwater structure according to the present invention.
FIG. 2 is a perspective view showing a structure of a cloth bag used in the first embodiment.
FIG. 3 is a cross-sectional view showing a state in which the cloth bag and the anchor used in the first embodiment are installed on the seabed.
FIG. 4 is a schematic view showing a state in which a sub-assembly body in which a cloth bag and an anchor are combined is installed on the seabed.
FIG. 5 is a schematic view showing an assembling procedure in which a cloth bag and an anchor are combined to form a sub-assembly body.
FIG. 6 is a cross-sectional view showing a coupling structure between a cloth bag and a float used in the first embodiment.
FIG. 7 is a cross-sectional view showing a coupling structure between a cloth bag and a restraining band used in the first embodiment.
FIG. 8 is a cross-sectional view schematically showing a final stage of the first embodiment.
FIG. 9 is a cross-sectional view showing the structure of a cylindrical underwater structure completed in the first embodiment.
FIG. 10 is a cross-sectional view schematically showing a modification of the first embodiment.
FIG. 11 is a plan view schematically showing the structure of a bank body completed by a bank embankment method using the first embodiment.
FIG. 12 is a cross-sectional view schematically showing a second embodiment of the construction method for an underwater structure according to the present invention.
FIG. 13 is a perspective view showing an unfolded state of the cloth bag used in the second embodiment.
FIG. 14 is a cross-sectional view schematically showing a construction method developed from the second embodiment.
FIG. 15 is a perspective view schematically showing a construction method developed from the second embodiment.
[Explanation of symbols]
1 Sea floor (water bottom)
2, 2A-2C Cylindrical
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13139299A JP3790951B2 (en) | 1999-05-12 | 1999-05-12 | Construction method for underwater structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13139299A JP3790951B2 (en) | 1999-05-12 | 1999-05-12 | Construction method for underwater structures |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000319845A JP2000319845A (en) | 2000-11-21 |
JP3790951B2 true JP3790951B2 (en) | 2006-06-28 |
Family
ID=15056905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP13139299A Expired - Fee Related JP3790951B2 (en) | 1999-05-12 | 1999-05-12 | Construction method for underwater structures |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3790951B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017071897A (en) * | 2015-10-05 | 2017-04-13 | 株式会社モチヅキ | Joining method and joining material for sheath pipe and pile |
-
1999
- 1999-05-12 JP JP13139299A patent/JP3790951B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2000319845A (en) | 2000-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2005038146A1 (en) | Marine foundations | |
KR101211811B1 (en) | Cast in concrete pile With precast type Caisson | |
GB2029876A (en) | Method of forming a concrete wall | |
JP3790951B2 (en) | Construction method for underwater structures | |
JP3688546B2 (en) | Cast-in-place concrete pile construction method and cast-in-place concrete pile bottom ground preloading device | |
US5024557A (en) | Method and apparatus for constructing an offshore hollow column | |
KR101806851B1 (en) | Temporary levee structure using guideframe and the construction method therefor | |
KR20020024136A (en) | Erosion control structures of coastal area and the construction methodology of erosion control structure and embankment by this structure | |
JP4551985B2 (en) | Quay structure and method for forming the same | |
WO2014202948A1 (en) | Gravity base for a marine structure | |
US4468156A (en) | Underwater structure and method for its construction | |
JP2004092221A (en) | Construction method for underwater tunnel, and device for joining caissons together | |
JP2005139667A (en) | Bag body for forming civil engineering structure, and civil engineering structure using it | |
US20230340745A1 (en) | Submersible foundation and systems and methods for manufacturing and using the same | |
US20240067307A1 (en) | Anchoring Floating Structures to an Underwater Floor | |
CN207519430U (en) | The environment-friendly type gravity type foundation of the controllable postposition ballast of dive | |
JP3310452B2 (en) | Method of constructing continuous wall in water area and guide device for construction | |
CN116084421B (en) | Construction method of permeable anti-collision pier | |
JP4701412B2 (en) | Artificial tidal flat and its construction method | |
JP3030571B2 (en) | Outer shell of offshore structure and construction method of offshore structure | |
EP0391736A2 (en) | Underwater wall construction | |
JPH11209940A (en) | Floating form and under water reclamation execution method | |
JPS598835A (en) | Footing type steel plate cell caisson work | |
CN117513437A (en) | Underwater pile foundation local siltation promotion anti-impact protection device and assembly protection method thereof | |
JP2000319847A (en) | Covering method for face of slope of rubble mound |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20051116 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20051130 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060127 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060315 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060323 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 3790951 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090414 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100414 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100414 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110414 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130414 Year of fee payment: 7 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140414 Year of fee payment: 8 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |